3GPP TDocs (written contributions) at meeting
Meeting: R1-86b - 2016-10-10 to 2016-10-14, Lisbon
meeting id: R1-86b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑1608561 | Draft Agenda of RAN1#86bis meeting | RAN1 Chair | imported from 3GU |
R1‑1608562 | Final Report of 3GPP TSG RAN1 #86 v1.0.0 | ETSI | imported from 3GU |
R1‑1608563 | Selected highlights from RAN#73 of relevance to RAN1 | RAN1 Chair | imported from 3GU |
R1‑1608564 | LS Response on QoS requirements for V2X | RAN2, Intel | imported from 3GU |
R1‑1608565 | LS on Support of CAT 9/10 and CAT 13 | RAN2, | imported from 3GU |
R1‑1608566 | LS on Exceptional Pool Handling for V2X | RAN2, | imported from 3GU |
R1‑1608567 | LS on Timing reference for LAA SCell | RAN2, | imported from 3GU |
R1‑1608568 | LS on further mobility enhancements | RAN2, | imported from 3GU |
R1‑1608569 | LS on RAN2 agreements on FeMBMS | RAN2, | imported from 3GU |
R1‑1608570 | Reply LS on ECID positioning for TDD | RAN2, | imported from 3GU |
R1‑1608571 | LS on introduction of new UL categories in Rel-13 | RAN2, | imported from 3GU |
R1‑1608572 | LS on CSI measurement ambiguity in LAA | RAN4, | imported from 3GU |
R1‑1608573 | [DRAFT] Response LS on Modelling and simulation of IMT networks for use in sharing and compatibility studies | RAN4, | imported from 3GU |
R1‑1608574 | [DRAFT] LS on Characteristics of terrestrial IMT systems for frequency sharing/interference analysis in the frequency range between 24.25 GHz and 86 GHz | RAN4, | imported from 3GU |
R1‑1608575 | Reply LS on blind detection evaluations | RAN4, | imported from 3GU |
R1‑1608576 | Reply LS on the feasibility of mobility enhancement solutions | RAN4, | imported from 3GU |
R1‑1608577 | Reply LS on SRS carrier switching interruption time | RAN4, | imported from 3GU |
R1‑1608578 | LS on Measurement gap enhancement | RAN4, | imported from 3GU |
R1‑1608579 | LS for definition of SSTD measurement | RAN4, | imported from 3GU |
R1‑1608580 | LS on on UCG parameters for eMTC | RAN4, | imported from 3GU |
R1‑1608581 | LS on LTE Rel-13 UE feature list | RAN4, | imported from 3GU |
R1‑1608582 | Reply LS on QoS requirements for V2X | SA2, | imported from 3GU |
R1‑1608583 | Reply LS on NR requirements | RAN, | imported from 3GU |
R1‑1608584 | Complementary turbo and LDPC codes for NR, motivated by a survey of over 100 ASICs | AccelerComm Ltd | imported from 3GU |
R1‑1608585 | Details on SRS switching-from CC and switching-to CC | Huawei, HiSilicon | imported from 3GU |
R1‑1608586 | Other considerations on SRS switching | Huawei, HiSilicon | imported from 3GU |
R1‑1608587 | Power headroom report for SRS switching | Huawei, HiSilicon | imported from 3GU |
R1‑1608588 | DCI design for SRS switching | Huawei, HiSilicon | imported from 3GU |
R1‑1608589 | Details on collision handling for SRS switching | Huawei, HiSilicon | imported from 3GU |
R1‑1608590 | Details on SRS switching for UEs with multiple antennas | Huawei, HiSilicon | imported from 3GU |
R1‑1608591 | Resource allocation in partial coverage | Huawei, HiSilicon | imported from 3GU |
R1‑1608592 | Congestion control for V2V | Huawei, HiSilicon | imported from 3GU |
R1‑1608593 | Coexistence of cellular and V2V services | Huawei, HiSilicon | imported from 3GU |
R1‑1608594 | Coexistence of 802.11p and V2V services | Huawei, HiSilicon | imported from 3GU |
R1‑1608595 | SPS enhancement for V2V mode 1 | Huawei, HiSilicon | imported from 3GU |
R1‑1608596 | SPS enhancement for V2X on Uu interface | Huawei, HiSilicon | imported from 3GU |
R1‑1608597 | Overview of advanced CSI feedback for LTE | Huawei, HiSilicon | imported from 3GU |
R1‑1608598 | Interference measurement enhancement in LTE Rel-14 | Huawei, HiSilicon | imported from 3GU |
R1‑1608599 | Uplink channel design for quantized/un-quantized channel representation | Huawei, HiSilicon | imported from 3GU |
R1‑1608600 | Discussion on non-precoded CSI-RS up to 32 CSI-RS ports | Huawei, HiSilicon | imported from 3GU |
R1‑1608601 | Enhancement on rate matching for different transmission modes | Huawei, HiSilicon | imported from 3GU |
R1‑1608602 | On IFDMA based DMRS design | Huawei, HiSilicon | imported from 3GU |
R1‑1608603 | Downlink control signaling design to support IFDMA based DMRS | Huawei, HiSilicon | imported from 3GU |
R1‑1608604 | Discussion on power ratios for MUST Case 1&2 | Huawei, HiSilicon | imported from 3GU |
R1‑1608605 | DCI design for MUST Case 1&2 | Huawei, HiSilicon | imported from 3GU |
R1‑1608606 | Discussion on VoLTE coverage enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑1608607 | Further Discussion on Scheduling and HARQ Timing for PUSCH on UpPTS | Huawei, HiSilicon | imported from 3GU |
R1‑1608608 | Transmission of PUSCH on UpPTS | Huawei, HiSilicon | imported from 3GU |
R1‑1608609 | TP for 36.741 on definition and classification of non-coherent JT | Huawei, HiSilicon | imported from 3GU |
R1‑1608610 | Potential enhancements and specification impact analysis of non-coherent JT | Huawei, HiSilicon | imported from 3GU |
R1‑1608611 | Potential enhancements and specification impacts for CS/CB with FD-MIMO | Huawei, HiSilicon | imported from 3GU |
R1‑1608612 | Discussion on configuration of SC-MTCH in NB-IoT | Huawei | imported from 3GU |
R1‑1608613 | Discussion on SC-MTCH transmission in NB-IoT | Huawei | imported from 3GU |
R1‑1608614 | Discussion on NPDCCH search space for multicast in NB-IoT | Huawei | imported from 3GU |
R1‑1608615 | Discussion on collision handling for multicast in NB-IoT | Huawei | imported from 3GU |
R1‑1608616 | Discussion on acknowledgement of SC-MTCH transmission in NB-IoT | Huawei | imported from 3GU |
R1‑1608617 | On reusing existing downlink signals for NB-IoT downlink positioning | Huawei, HiSilicon | imported from 3GU |
R1‑1608618 | Design of new downlink positioning reference signal for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1608619 | Configuration of downlink positioning reference signal for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1608620 | Evaluation of downlink positioning accuracy for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1608621 | Analysis of power consumption and complexity for NB-IoT downlink positioning | Huawei, HiSilicon | imported from 3GU |
R1‑1608622 | On enabling and disabling of wider bandwidth in FeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1608623 | Considerations on the control channel of supporting wider bandwidth in FeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1608624 | DCI design on supporting wider bandwidth in FeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1608625 | On supporting larger channel bandwidth for Rel-14 non-BL UEs in CE mode A | Huawei, HiSilicon | imported from 3GU |
R1‑1608626 | On supporting larger TBS for UEs with maximum 1.4 MHz bandwidth in TDD/HD-FDD | Huawei, HiSilicon | imported from 3GU |
R1‑1608627 | On supporting larger TBS for UEs with larger bandwidth | Huawei, HiSilicon | imported from 3GU |
R1‑1608628 | Consideration on SC-PTM transmission for FeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1608629 | Analysis on increasing DL HARQ processes in CE mode A for FD-FDD | Huawei, HiSilicon | imported from 3GU |
R1‑1608630 | HARQ-ACK bundling in HD-FDD | Huawei, HiSilicon | imported from 3GU |
R1‑1608631 | Discussion on sTTI structure | Huawei, HiSilicon | imported from 3GU |
R1‑1608632 | Discussion on CRS based sPDCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1608633 | Discussion on DMRS-based sPDCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1608634 | Details of two-level DCI schemes for short TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1608635 | Discussion on DCI design for short TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1608636 | Discussion on sPDSCH design | Huawei, HiSilicon | imported from 3GU |
R1‑1608637 | Discussion on sPUCCH design | Huawei, HiSilicon | imported from 3GU |
R1‑1608638 | Discussion on sPUSCH design | Huawei, HiSilicon | imported from 3GU |
R1‑1608639 | UCI on sPUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑1608640 | Handling collision between sTTI and 1ms TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1608641 | Discussion on UL RS for short TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1608642 | Discussion on CSI feedback for short TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1608643 | Processing time reduction and related procedures for short TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1608644 | Some issues on shortened processing time for 1ms TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1608645 | Performance evaluation of short TTI vs. 1ms TTI with processing time reduction | Huawei, HiSilicon | imported from 3GU |
R1‑1608646 | TDD-specific design for short TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1608647 | On reusing existing uplink signals for NB-IoT uplink positioning | Huawei, HiSilicon | imported from 3GU |
R1‑1608648 | On further power consumption and latency reduction for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1608649 | Discussion on the P-UE resource selection | Huawei, HiSilicon | imported from 3GU |
R1‑1608650 | DCI design for sidelink SPS scheduling | Huawei, HiSilicon | imported from 3GU |
R1‑1608651 | Discussion on sync priority and SLSS ID set definition | Huawei, HiSilicon | imported from 3GU |
R1‑1608652 | Discussion on PSBCH contents and SLSS transmission procedure | Huawei, HiSilicon | imported from 3GU |
R1‑1608653 | Discussion on CA issues for shortened TTI operation | Huawei, HiSilicon | imported from 3GU |
R1‑1608654 | Processing time reduction and related HARQ timings for 1ms TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1608655 | Discussion on the HARQ issues for TTI length reconfiguration | Huawei, HiSilicon | imported from 3GU |
R1‑1608656 | Discussion on sPUCCH resource for shortened TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1608657 | Sidelink synchronization enhancement for V2X communication | Huawei, HiSilicon | imported from 3GU |
R1‑1608658 | Discussion on the necessity of differentiating P-UE and V-UE | Huawei, HiSilicon | imported from 3GU |
R1‑1608659 | Discussion on UL CWS adjustment for eLAA | Huawei, HiSilicon | imported from 3GU |
R1‑1608660 | Unified MIMO framework for NR above and below 6GHz | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608661 | Summary of [86-20] email discussion on MIMO calibration for NR | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608662 | Phase 1 calibration results for NR MIMO | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608663 | Phase 2 & 3 calibration and evaluation assumptions for NR MIMO | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608664 | Beam management for NR MIMO | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608665 | Discussion on transparency of beam management | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608666 | Discussion on beamforming procedure considering high frequency channel characteristics | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608667 | Discussion on methods of determining Tx and Rx beams for NR MIMO | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608668 | Discussion on interference issues in NR | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608669 | Discussion on UL MIMO transmission for NR | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608670 | Discussion on DL MIMO transmission for NR | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608671 | Beam selection and CSI acquisition for NR MIMO | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608672 | Advanced CSI measurement and reporting framework for NR MIMO | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608673 | Discussion on demodulation reference signal for NR MIMO | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608674 | Discussion on measurement related reference signal for NR-MIMO | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608675 | Discussion on QCL issues in NR | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608676 | Discussion on Control Channel Design for NR | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608677 | Discussion on Common Control Channel for NR | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608678 | MUST system performances with different power ratio choices | ZTE | imported from 3GU |
R1‑1608679 | Specification for Gray mapped composite constellation for MUST | ZTE | imported from 3GU |
R1‑1608680 | Signaling design for MUST | ZTE | imported from 3GU |
R1‑1608681 | Discussion and evaluation for MUST Case 3 | ZTE | imported from 3GU |
R1‑1608682 | Discussion on design of linear combination codebook | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608683 | Discussion on interference measurement for MU-CSI | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608684 | Feedback mechanism for linear combination based CSI | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608685 | Port layout and Class A codebook design for 20-32 ports | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608686 | Enhancements for DMRS-based Semi-Open-Loop Transmission | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608687 | Discussion on UL DMRS enhancement for eFD-MIMO | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608688 | Further discussion on non-precoded CSI-RS design for eFD-MIMO | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608689 | Aperiodic CSI-RS for non-precoded CSI-RS | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608690 | Remaining issues on aperiodic CSI-RS | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608691 | Remaining issues on Hybrid CSI | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608692 | Potential Enhancement on the Non-coherent JT | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608693 | QCL Issues of Joint Transmission | ZTE, ASTRI | imported from 3GU |
R1‑1608694 | Initial evaluation results of non-coherent JT | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608695 | Initial evaluation results for CS/CB | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608696 | Potential enhancements for CS/CB with FD-MIMO | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1608697 | OTDOA design for NB-IoT | Ericsson | imported from 3GU |
R1‑1608698 | OTDOA performance for NB-IoT | Ericsson | imported from 3GU |
R1‑1608699 | OTDOA system simulator description for NB-IoT | Ericsson | imported from 3GU |
R1‑1608700 | On modelling of NPRACH based UTDOA performance | Ericsson | imported from 3GU |
R1‑1608701 | On NPRACH based UTDOA impact on NB-IOT performance | Ericsson | imported from 3GU |
R1‑1608702 | On NPRACH based UTDOA capacity | Ericsson | imported from 3GU |
R1‑1608703 | L1 configuration for multicast support for NB-IoT | Ericsson | imported from 3GU |
R1‑1608704 | NB-IoT Paging on non-anchor PRBs | Ericsson | imported from 3GU |
R1‑1608705 | NB-IoT Paging Capacity | Ericsson | imported from 3GU |
R1‑1608706 | Draft CR on 36.211 NB-IoT PDSCH symobl mapping | Ericsson | imported from 3GU |
R1‑1608707 | Draft CR on 36.213 NB-IoT Type1 and Type 2 search space definition | Ericsson | imported from 3GU |
R1‑1608708 | Optimized PAPR/CM SC-CPS Waveform and Further Results | Idaho National Laboratory | imported from 3GU |
R1‑1608709 | Optimized PAPR/CM SC-CPS Waveform and Further Results | Idaho National Laboratory | imported from 3GU |
R1‑1608710 | Frame Structure for Ultra-Low Latency Scheduled-based UL Access | Idaho National Laboratory | imported from 3GU |
R1‑1608711 | Common signal/information allocation for initial access and mobility | Mitsubishi Electric Corp | imported from 3GU |
R1‑1608712 | RACH preamble transmission | Mitsubishi Electric Corp | imported from 3GU |
R1‑1608713 | Correction to DMRS for MPDCCH associated with P-RNTI | Virtuosys Limited | imported from 3GU |
R1‑1608714 | PSSCH/PSBCH decoding issue | CATT | imported from 3GU |
R1‑1608715 | Discussion on randomization on DMRS | CATT | imported from 3GU |
R1‑1608716 | Discussion on details of resource reselection | CATT | imported from 3GU |
R1‑1608717 | Correction on SSTD definition | CATT | imported from 3GU |
R1‑1608718 | DCI design to support multiple SPS configurations | CATT | imported from 3GU |
R1‑1608719 | Discussion on P-UE resource selection | CATT | imported from 3GU |
R1‑1608720 | Measurement metric for the congestion level in V2X | CATT | imported from 3GU |
R1‑1608721 | Synchronization enhancements in PC5-based V2V | CATT | imported from 3GU |
R1‑1608722 | Multiplexing V2V with other signals/channels | CATT | imported from 3GU |
R1‑1608723 | On Prioritization of SL TX for V2X under eNB management | CATT | imported from 3GU |
R1‑1608724 | Considerations on advanced CSI reporting | CATT | imported from 3GU |
R1‑1608725 | Aperiodic CSI-IM for interference measurement enhancement | CATT | imported from 3GU |
R1‑1608726 | Codebook design for advanced CSI reporting | CATT | imported from 3GU |
R1‑1608727 | Non-precoded CSI-RS codebook for 20-32 ports | CATT | imported from 3GU |
R1‑1608728 | CSI feedback and PDSCH transmission for open-loop MIMO | CATT | imported from 3GU |
R1‑1608729 | Consideration on UL DMRS enhancements | CATT | imported from 3GU |
R1‑1608730 | Enhanced non-precoded CSI-RS with CDM-8 | CATT | imported from 3GU |
R1‑1608731 | Enhanced non-precoded CSI-RS with CDM-2/4 | CATT | imported from 3GU |
R1‑1608732 | Density reduction for class A CSI-RS with 20-32 ports | CATT | imported from 3GU |
R1‑1608733 | Remaining issues on aperiodic CSI-RS | CATT | imported from 3GU |
R1‑1608734 | PDSCH rate-matching for aperiodic CSI-RS | CATT | imported from 3GU |
R1‑1608735 | Density reduction for beamformed CSI-RS | CATT | imported from 3GU |
R1‑1608736 | On QCL for aperiodic CSI-RS | CATT | imported from 3GU |
R1‑1608737 | On remaining issues on hybrid CSI-RS | CATT | imported from 3GU |
R1‑1608738 | Support of downlink superposition transmission | CATT | imported from 3GU |
R1‑1608739 | On SRS carrier switching with antenna switching | CATT | imported from 3GU |
R1‑1608740 | Remaining issues for PUSCH support in UpPTS | CATT | imported from 3GU |
R1‑1608741 | HARQ and scheduling timing design for LTE processing timing reduction with 1ms TTI | CATT | imported from 3GU |
R1‑1608742 | On sDCI design | CATT | imported from 3GU |
R1‑1608743 | Design of sPDCCH structure | CATT | imported from 3GU |
R1‑1608744 | Other issues for sPDCCH design | CATT | imported from 3GU |
R1‑1608745 | DL/UL sTTI partition | CATT | imported from 3GU |
R1‑1608746 | DMRS design for sPUSCH | CATT | imported from 3GU |
R1‑1608747 | DMRS design for DL sTTI | CATT | imported from 3GU |
R1‑1608748 | On efficient multiplexing of normal TTI and sTTI | CATT | imported from 3GU |
R1‑1608749 | Discussion on UL sTTI operation | CATT | imported from 3GU |
R1‑1608750 | sPUCCH design for sTTI | CATT | imported from 3GU |
R1‑1608751 | Discussion on the simultaneous transmissions of (s)PUCCH and (s)PUSCH | CATT | imported from 3GU |
R1‑1608752 | UCI transmission for LTE sTTI | CATT | imported from 3GU |
R1‑1608753 | Implicit HARQ and scheduling timing design for LTE sTTI | CATT | imported from 3GU |
R1‑1608754 | Explicit HARQ and scheduling timing design for LTE shorten TTI | CATT | imported from 3GU |
R1‑1608755 | LLS results of PDMA with realistic channel estimation | CATT | imported from 3GU |
R1‑1608756 | SLS results of PDMA | CATT | imported from 3GU |
R1‑1608757 | Consideration on grant-free transmission | CATT | imported from 3GU |
R1‑1608758 | Discussion on MA for URLLC | CATT | imported from 3GU |
R1‑1608759 | NR numerology | CATT | imported from 3GU |
R1‑1608760 | NR CP length for different numerologies | CATT | imported from 3GU |
R1‑1608761 | NR symbol alignment and operation in unlicensed spectrum | CATT | imported from 3GU |
R1‑1608762 | Way Forward on UE-specific slot configuration | CATT | imported from 3GU |
R1‑1608763 | NR Time domain structure: subframe, slot and mini-slot and time interval | CATT | imported from 3GU |
R1‑1608764 | NR frame structure for multiplexing of URLLC and eMBB traffic | CATT | imported from 3GU |
R1‑1608765 | NR frequency domain structure: PRB | CATT | imported from 3GU |
R1‑1608766 | Configurable DL control channel monitoring in NR system design | CATT | imported from 3GU |
R1‑1608767 | On-demand access for UE power saving in NR system design | CATT | imported from 3GU |
R1‑1608768 | Performance of Turbo codes with high speed decoding algorithm for NR | CATT | imported from 3GU |
R1‑1608769 | Discussion on implementation of high speed Turbo decoder for NR | CATT | imported from 3GU |
R1‑1608770 | Flexibility evaluation of channel coding schemes for NR | CATT | imported from 3GU |
R1‑1608771 | Evaluation of channel coding schemes for NR control channels | CATT | imported from 3GU |
R1‑1608772 | LDPC codes design for eMBB | CATT | imported from 3GU |
R1‑1608773 | On beam management procedures | CATT | imported from 3GU |
R1‑1608774 | Design of beam training | CATT | imported from 3GU |
R1‑1608775 | MIMO transmission schemes for NR | CATT | imported from 3GU |
R1‑1608776 | Discussion on UL MIMO for NR | CATT | imported from 3GU |
R1‑1608777 | High-level views on CSI acquisition for NR | CATT | imported from 3GU |
R1‑1608778 | DMRS design for NR | CATT | imported from 3GU |
R1‑1608779 | Consideration on SRS transmission for NR | CATT | imported from 3GU |
R1‑1608780 | Consideration on CSI-RS transmission for NR | CATT | imported from 3GU |
R1‑1608781 | Discussion on phase noise compensation RS for NR | CATT | imported from 3GU |
R1‑1608782 | Phase1 calibration for NR MIMO | CATT | imported from 3GU |
R1‑1608783 | NR Numerology Agnostic Synchronization Channel Design | CATT | imported from 3GU |
R1‑1608784 | NR System Bandwidth Agnostic Synchronization Channel Design | CATT | imported from 3GU |
R1‑1608785 | NR Multi-stage Synchronization Channel Design | CATT | imported from 3GU |
R1‑1608786 | QCL assumption of NR Synchronization Signals and DM RS of Broadcast Channel | CATT | imported from 3GU |
R1‑1608787 | NR RACH Procedure | CATT | imported from 3GU |
R1‑1608788 | NR RACH Preamble Design Consideration | CATT | imported from 3GU |
R1‑1608789 | NR RRM measurements and mobility management | CATT | imported from 3GU |
R1‑1608790 | Interference management for dynamic TDD and flexible duplex | CATT | imported from 3GU |
R1‑1608791 | NR DL control channel design considerations | CATT | imported from 3GU |
R1‑1608792 | NR UL control channel design considerations | CATT | imported from 3GU |
R1‑1608793 | Principle of DL DCI formats design | CATT | imported from 3GU |
R1‑1608794 | Principle of UL DCI formats design | CATT | imported from 3GU |
R1‑1608795 | NR Scheduling procedure | CATT | imported from 3GU |
R1‑1608796 | NR HARQ operation | CATT | imported from 3GU |
R1‑1608797 | design of HARQ-ACK bundling for HD-FDD | Sequans Communications | imported from 3GU |
R1‑1608798 | on supporting 10 DL HARQ processes | Sequans Communications | imported from 3GU |
R1‑1608799 | VoLTE coverage enhancements | Sequans Communications | imported from 3GU |
R1‑1608800 | Discussion on real domain OFDM for mMTC | Fujitsu | imported from 3GU |
R1‑1608801 | Further LLS results for UL non-orthogonal multiple access | Fujitsu | imported from 3GU |
R1‑1608802 | DM-RS considerations for UL non-orthogonal multiple access | Fujitsu | imported from 3GU |
R1‑1608803 | Discussion on grant-free transmission for UL multiple access | Fujitsu | imported from 3GU |
R1‑1608804 | NR Frame structure considerations for low latency TDD operation | Fujitsu | imported from 3GU |
R1‑1608805 | Discussion on flexible/dynamic TDD | Fujitsu | imported from 3GU |
R1‑1608806 | Guard period setting in TDD based NR frame structure | Fujitsu | imported from 3GU |
R1‑1608807 | TDD frame structure with mixed numerology | Fujitsu | imported from 3GU |
R1‑1608808 | Discussion on subframe design with symbol level alignment | Fujitsu | imported from 3GU |
R1‑1608809 | Over the air calibration for channel reciprocity in NR MIMO | Fujitsu | imported from 3GU |
R1‑1608810 | Discussion on Paging in NR | Fujitsu | imported from 3GU |
R1‑1608811 | Discussion on CSI Acquisition for Massive MIMO in NR | Fujitsu | imported from 3GU |
R1‑1608812 | Discussion on initial access in NR | Fujitsu | imported from 3GU |
R1‑1608813 | Discussion on PRACH configuration in NR | Fujitsu | imported from 3GU |
R1‑1608814 | DL control channel related to multiplexing eMBB and URLLC | Fujitsu | imported from 3GU |
R1‑1608815 | Scheduling and CQI feedback for URLLC | Fujitsu | imported from 3GU |
R1‑1608816 | Principles for DL Reference Signal Design and QCL Assumptions | Huawei, HiSilicon | imported from 3GU |
R1‑1608817 | DL RS design for NR CSI acquisition and beam management | Huawei, HiSilicon | imported from 3GU |
R1‑1608818 | Reference signal design for demodulation in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1608819 | Discussion on DL MIMO transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1608820 | Discussion on UL MIMO transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1608821 | UL power control for NR MIMO | Huawei, HiSilicon | imported from 3GU |
R1‑1608822 | Reference signal design for phase noise compensation in HF | Huawei, HiSilicon | imported from 3GU |
R1‑1608823 | Unified single/multiple beam-based initial access procedure in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1608824 | RACH preamble and procedures for unified single/multiple beam based access | Huawei, HiSilicon | imported from 3GU |
R1‑1608825 | Low-complexity filter implementation for f-OFDM | Huawei, HiSilicon | imported from 3GU |
R1‑1608826 | Delay analysis for f-OFDM | Huawei, HiSilicon | imported from 3GU |
R1‑1608827 | Analysis of guard band for FDM of different numerologies in a NR carrier | Huawei, HiSilicon | imported from 3GU |
R1‑1608828 | Overview of PAPR reduction techniques | Huawei, HiSilicon | imported from 3GU |
R1‑1608829 | Uplink coverage performance of OFDM with PAPR reduction for below 6 GHz | Huawei, HiSilicon | imported from 3GU |
R1‑1608830 | Discussion on TRP-to-TRP interference mitigation schemes | Huawei, HiSilicon | imported from 3GU |
R1‑1608831 | Discussion on UE-to-UE interference mitigation schemes | Huawei, HiSilicon | imported from 3GU |
R1‑1608832 | On Support of Aggregation of Carrier on Different Levels | Huawei, HiSilicon | imported from 3GU |
R1‑1608833 | Discussion on time alignment with different CP overhead | Huawei, HiSilicon | imported from 3GU |
R1‑1608834 | Discussion on time alignment with the same CP overhead | Huawei, HiSilicon | imported from 3GU |
R1‑1608835 | Evaluation on CP types for 60kHz subcarrier | Huawei, HiSilicon | imported from 3GU |
R1‑1608836 | Discussion on time domain structures | Huawei, HiSilicon | imported from 3GU |
R1‑1608837 | Discussion on slot and mini-slot | Huawei, HiSilicon | imported from 3GU |
R1‑1608838 | Discussion on TDD operation on an unpaired spectrum | Huawei, HiSilicon | imported from 3GU |
R1‑1608839 | Discussion on timing relations for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1608840 | Discussion on uplink control channel design in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1608841 | Support of flexible bandwidth | Huawei, HiSilicon | imported from 3GU |
R1‑1608842 | Discussion on blank resources | Huawei, HiSilicon | imported from 3GU |
R1‑1608843 | Overview of URLLC support for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1608844 | Support of URLLC in DL | Huawei, HiSilicon | imported from 3GU |
R1‑1608845 | Support of URLLC in UL | Huawei, HiSilicon | imported from 3GU |
R1‑1608846 | Synchronization signal design in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1608847 | Channel raster and synchronization signal locations | Huawei, HiSilicon | imported from 3GU |
R1‑1608848 | UL based RRM measurement and mobility | Huawei, HiSilicon | imported from 3GU |
R1‑1608849 | DL based measurement and mobility | Huawei, HiSilicon | imported from 3GU |
R1‑1608850 | Views on access procedures for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1608851 | Antenna Structure Impacts on MIMO transmission and codebook design | Huawei, HiSilicon | imported from 3GU |
R1‑1608852 | Categorization and analysis of MA schemes | Huawei, HiSilicon | imported from 3GU |
R1‑1608853 | Further UL LLS Results | Huawei, HiSilicon | imported from 3GU |
R1‑1608854 | Further UL SLS Results | Huawei, HiSilicon | imported from 3GU |
R1‑1608855 | Advanced multi-user detectors for grant-free transmissions | Huawei, HiSilicon | imported from 3GU |
R1‑1608856 | Further discussion on URLLC evaluation | Huawei, HiSilicon | imported from 3GU |
R1‑1608857 | Remaining issues on panel modeling | Huawei, HiSilicon | imported from 3GU |
R1‑1608858 | Discussion on grant-free versus grant-based transmissions for infrequent small packets | Huawei, HiSilicon | imported from 3GU |
R1‑1608859 | The retransmission and HARQ schemes for grant-free | Huawei, HiSilicon | imported from 3GU |
R1‑1608860 | Solutions for collisions of MA signatures | Huawei, HiSilicon | imported from 3GU |
R1‑1608861 | Resource allocation and management for grant-free UL | Huawei, HiSilicon | imported from 3GU |
R1‑1608862 | Polar Code Construction for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1608863 | Evaluation of channel coding schemes for control channel | Huawei, HiSilicon | imported from 3GU |
R1‑1608864 | Performance Evaluation for NR Channel Coding | Huawei, HiSilicon | imported from 3GU |
R1‑1608865 | Design aspects of Polar Code/LDPC for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1608866 | Evaluation of LDPC performance | Huawei, HiSilicon | imported from 3GU |
R1‑1608867 | Considerations on performance and spectrum efficiency | Huawei, HiSilicon | imported from 3GU |
R1‑1608868 | Analysis of spectral utilization in a NR carrier | Huawei, HiSilicon | imported from 3GU |
R1‑1608869 | Grant-free Non-orthogonal MA for uplink URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1608870 | Advanced modulation for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1608871 | On TBCC Generator Polynomials | Ericsson | imported from 3GU |
R1‑1608872 | Study of LDPC Codes for Control Channel of NR | Ericsson | imported from 3GU |
R1‑1608873 | Study of Polar Codes for Control Channel of NR | Ericsson | imported from 3GU |
R1‑1608874 | Performance Comparison of Channel Coding Candidates for Short Block Lengths | Ericsson | imported from 3GU |
R1‑1608875 | LDPC Code Design for NR | Ericsson | imported from 3GU |
R1‑1608876 | LDPC Code Performance with Rate Matching | Ericsson | imported from 3GU |
R1‑1608877 | On Achieving Low Code Rate with LDPC Codes | Ericsson | imported from 3GU |
R1‑1608878 | Updated Survey of Channel Coding Implementations | Ericsson | imported from 3GU |
R1‑1608879 | Implementation Consideration of Channel Coding Options for NR | Ericsson | imported from 3GU |
R1‑1608880 | UTDOA positioning in NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608881 | Existing Downlink Signals for OTDOA Positioning in NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608882 | NPRS Design for OTDOA Positioning in NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608883 | SC-PTM seach space design for NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608884 | SC-MCCH transmission for NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608885 | SC-MTCH transmission for NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608886 | Random access on non-anchor PRB for NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608887 | Paging on non-anchor PRB for NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608888 | Supporting 2 HARQ processes for NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608889 | Larger maximum TBS for NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608890 | Maximum TBS for FeMTC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608891 | Consideration on supporting larger channel bandwidth for FeMTC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608892 | ACK/NACK Bundling in FeMTC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608893 | Increasing the number of HARQ processes in FeMTC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608894 | SPS Design Considerations | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608895 | SC-PTM Search Space Considerations | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608896 | OTDOA enhancements for FeMTC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608897 | VoLTE performance for Cat-M1 UE | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608898 | VoLTE enhancements for FeMTC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608899 | Details of partial sensing by pedestrian UEs | Sequans Communications | imported from 3GU |
R1‑1608900 | Subcarrier spacing design for data and reference signal | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R1‑1608901 | Discussion of the UE support of multiple numerologies | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R1‑1608902 | Discussion on subframe structure for NR | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R1‑1608903 | Discussion of the UE processing time on the support of multiple numerologies and frame structures | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R1‑1608904 | Effects of channel reciprocity-based MIMO on frame structure design | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R1‑1608905 | Discussion on Multi-antenna Scheme | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R1‑1608906 | Discussion on multi-beam based synchronization signal and DL broadcast channel for NR | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R1‑1608907 | DL PHY procedure issues for multi-beam based approaches | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R1‑1608908 | On DL HARQ for NR | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R1‑1608909 | UE measurement based congestion control | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R1‑1608910 | Discussion on the GNSS based synchronization | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R1‑1608911 | Discussion on resource sensing and selection for pedestrian UEs | Spreadtrum Communications | imported from 3GU |
R1‑1608912 | Considerations for shortened processing time | Spreadtrum Communications | imported from 3GU |
R1‑1608913 | Discussion on sPDCCH design for sTTI | Spreadtrum Communications | imported from 3GU |
R1‑1608914 | Discussion on sPUSCH design for sTTI | Spreadtrum Communications | imported from 3GU |
R1‑1608915 | Discussion on DL RS design for sTTI | Spreadtrum Communications | imported from 3GU |
R1‑1608916 | Further considerations on waveform configuration | Spreadtrum Communications | imported from 3GU |
R1‑1608917 | Considerations on random resource selection | Spreadtrum Communications | imported from 3GU |
R1‑1608918 | Multiple access schemes with considering different UE requirements | Spreadtrum Communications | imported from 3GU |
R1‑1608919 | Considerations on pre-configured resource for grant-free based UL non-orthogonal MA | Spreadtrum Communications | imported from 3GU |
R1‑1608920 | Discussion on numerology of NR | Spreadtrum Communications | imported from 3GU |
R1‑1608921 | Code segmentation and CRC issues for LDPC codes | Spreadtrum Communications | imported from 3GU |
R1‑1608922 | Performance analysis of channel coding schemes for NR | Spreadtrum Communications | imported from 3GU |
R1‑1608923 | Discussion on UL sounding RS design | Spreadtrum Communications | imported from 3GU |
R1‑1608924 | Discussion on Synchronization signal design | Spreadtrum Communications | imported from 3GU |
R1‑1608925 | Discussion on duplexing modes in NR | Fujitsu | imported from 3GU |
R1‑1608926 | Codebook Design for Class A CSI Reporting up to 32 Ports | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608927 | DMRS-based Semi-open Loop Schemes for Rank 1 Transmission | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608928 | Remailing details of UL DMRS Base Sequences with IFDMA | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608929 | Control Signaling Design for UL DMRS with IFDMA | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608930 | Considerations of Non-precoded CSI-RS for Class A | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608931 | Remaining Details of aperiodic CSI-RS and overhead Reduction | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608932 | Remaining Details of Hybrid CSI Reporting | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608933 | Discussion and Preliminary Simulation Results of NCJT Case 1 of FeCoMP | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1608934 | Views on beam management for NR | Sony | imported from 3GU |
R1‑1608935 | Evaluation of NU-QAM for NR | Sony | imported from 3GU |
R1‑1608936 | Signal Space Diversity Use in NR | Sony | imported from 3GU |
R1‑1608937 | Resource Allocation in wide bandwidth feMTC | Sony | imported from 3GU |
R1‑1608938 | Considerations on HARQ-ACK Bundling in HD-FDD | Sony | imported from 3GU |
R1‑1608939 | Considerations on HARQ Processes in FD-FDD | Sony | imported from 3GU |
R1‑1608940 | Multicast Support for feMTC | Sony | imported from 3GU |
R1‑1608941 | Multicast Support for eNB-IoT | Sony | imported from 3GU |
R1‑1608942 | Multiplexing eMBB and URLLC Transmissions | Sony | imported from 3GU |
R1‑1608943 | Interleaver based non-orthogonal multiple access | Sony | imported from 3GU |
R1‑1608944 | Consideration on NR synchronization signal design | Sony | imported from 3GU |
R1‑1608945 | Discussion on longer CP lengths | Sony | imported from 3GU |
R1‑1608946 | Discussion on sPDCCH for shortened TTI | Sony | imported from 3GU |
R1‑1608947 | Discussion on details of partial sensing for pedestrian UEs | Sony | imported from 3GU |
R1‑1608948 | Discussion on details of congestion control | Sony | imported from 3GU |
R1‑1608949 | CSI feedback for channel reciprocity operation | Sony | imported from 3GU |
R1‑1608950 | OTDoA enhancements for feMTC | Sony | imported from 3GU |
R1‑1608951 | Sub-carrier spacing considerations for NR DL Synchronization | Sony | imported from 3GU |
R1‑1608952 | System level performance evaluation for MUSA | ZTE | imported from 3GU |
R1‑1608953 | Link level performance evaluation for MUSA | ZTE | imported from 3GU |
R1‑1608954 | Physical layer abstraction method for MMSE-SIC type receiver | ZTE | imported from 3GU |
R1‑1608955 | Considerations on the Preamble design for grant-free non-orthogonal MA | ZTE | imported from 3GU |
R1‑1608956 | Summary of [86-18] email discussion on categorization for NR MA schemes | ZTE | imported from 3GU |
R1‑1608957 | Multiplexing of eMBB and URLLC | ZTE | imported from 3GU |
R1‑1608958 | On indicating HARQ timing and PUCCH | ZTE | imported from 3GU |
R1‑1608959 | Fast scheduling and transmission for NR | ZTE | imported from 3GU |
R1‑1608960 | Remaning issue on system level evaluation assumptions for URLLC | ZTE | imported from 3GU |
R1‑1608961 | Reference numerology for NR | ZTE | imported from 3GU |
R1‑1608962 | About the support of multiple CP families for NR | ZTE | imported from 3GU |
R1‑1608963 | About RB grid definition and handling inter-numerology interference in NR | ZTE | imported from 3GU |
R1‑1608964 | About slot structure and scheduling units for NR | ZTE | imported from 3GU |
R1‑1608965 | Initial Link Level Simulation Results for URLLC | ZTE | imported from 3GU |
R1‑1608966 | Considerations on sweeping time interval in NR | ZTE | imported from 3GU |
R1‑1608967 | Frequency and Channel Raster Issue in NR | ZTE | imported from 3GU |
R1‑1608968 | Unified Random Access in NR | ZTE | imported from 3GU |
R1‑1608969 | On 2-step Random Access Procedure | ZTE | imported from 3GU |
R1‑1608970 | Idle and connected mode mobility in NR | ZTE | imported from 3GU |
R1‑1608971 | Consideration on the flexibility of LDPC codes for NR | ZTE | imported from 3GU |
R1‑1608972 | Consideration on channel coding candidates for NR eMBB | ZTE | imported from 3GU |
R1‑1608973 | Evaluation on channel coding candidates for eMBB control channel | ZTE | imported from 3GU |
R1‑1608974 | Consideration on LDPC design for NR | ZTE | imported from 3GU |
R1‑1608975 | Consideration on polar codes for NR | ZTE | imported from 3GU |
R1‑1608976 | Consideration on outer codes for NR | ZTE | imported from 3GU |
R1‑1608977 | On the maturity of polar decoders, based on a survey of over 150 hardware implementations | AccelerComm Ltd | imported from 3GU |
R1‑1608978 | Periodic CSI reporting for eLAA | Samsung | imported from 3GU |
R1‑1608979 | Draft CR on Periodic CSI report | Samsung | imported from 3GU |
R1‑1608980 | Draft CR on start timing of PUSCH | Samsung | imported from 3GU |
R1‑1608981 | PHR reporting for two-step scheduling | Samsung | imported from 3GU |
R1‑1608982 | CCA slot and tx-rx/rx-tx switching time | Samsung | imported from 3GU |
R1‑1608983 | Further randomization on DMRS and scrambling code | Samsung | imported from 3GU |
R1‑1608984 | On resource (re)selection in 36.213 | Samsung | imported from 3GU |
R1‑1608985 | Remaining issues on resource exclusion in Step 2 | Samsung | imported from 3GU |
R1‑1608986 | Remaining issues on resource reservation | Samsung | imported from 3GU |
R1‑1608987 | Support of multiple UL SPS configurations | Samsung | imported from 3GU |
R1‑1608988 | Remaining details on DCI design for Mode 3 | Samsung | imported from 3GU |
R1‑1608989 | Partial sensing for pedestrian UE | Samsung | imported from 3GU |
R1‑1608990 | Discussion on congestion control | Samsung | imported from 3GU |
R1‑1608991 | Discussion on SLSS based Sidelink synchronization | Samsung | imported from 3GU |
R1‑1608992 | Remaining details on resource pool configuration | Samsung | imported from 3GU |
R1‑1608993 | Coexistence of PC5-based V2V operation and legacy Uu operation | Samsung | imported from 3GU |
R1‑1608994 | Overall operations for processing time reduction with 1ms TTI | Samsung | imported from 3GU |
R1‑1608995 | DCI for processing time reduction with 1ms TTI | Samsung | imported from 3GU |
R1‑1608996 | Fall-back mode operation for processing time reduction with 1ms TTI | Samsung | imported from 3GU |
R1‑1608997 | Discussion on processing time reduction with 1ms TTI | Samsung | imported from 3GU |
R1‑1608998 | CSI measurement and reporting for processing time reduction with 1ms TTI | Samsung | imported from 3GU |
R1‑1608999 | TDD DL HARQ-ACK feedback procedure for processing time reduction with 1ms TTI | Samsung | imported from 3GU |
R1‑1609000 | Overview of sTTI operations | Samsung | imported from 3GU |
R1‑1609001 | sDCI for sTTI operation | Samsung | imported from 3GU |
R1‑1609002 | sPDCCH for 2-symbol sTTI | Samsung | imported from 3GU |
R1‑1609003 | sPDCCH for 1-slot sTTI | Samsung | imported from 3GU |
R1‑1609004 | sPDSCH for 2-symbol/1-slot sTTI | Samsung | imported from 3GU |
R1‑1609005 | sPUCCH for 2-symbol, 4-symbol, 1-slot sTTI | Samsung | imported from 3GU |
R1‑1609006 | sPUSCH for 2-symbol, 4-symbol, 1-slot sTTI | Samsung | imported from 3GU |
R1‑1609007 | TDD-specific issues on sTTI operation | Samsung | imported from 3GU |
R1‑1609008 | Coexistence between 1ms TTI and sTTI operations for DL/UL | Samsung | imported from 3GU |
R1‑1609009 | Processing time reduction for sTTI operation | Samsung | imported from 3GU |
R1‑1609010 | Initial evaluation results and enhancements for non-coherent JT | Samsung | imported from 3GU |
R1‑1609011 | Initial evaluation results and enhancements for CS/CB with FDMIMO | Samsung | imported from 3GU |
R1‑1609012 | Linear combination W1 codebook | Samsung | imported from 3GU |
R1‑1609013 | Linear combination W2 codebook | Samsung | imported from 3GU |
R1‑1609014 | Rank 2 linear combination codebook | Samsung | imported from 3GU |
R1‑1609015 | Discussions on enhanced interference measurement based on NZP CSI-RS | Samsung | imported from 3GU |
R1‑1609016 | Discussion on enhanced MU interference measurement based on DMRS | Samsung | imported from 3GU |
R1‑1609017 | Discussions on enhanced interference measurement based on aperiodic IMR | Samsung | imported from 3GU |
R1‑1609018 | Discussions on periodic CSI reporting for class A in eFD-MIMO | Samsung | imported from 3GU |
R1‑1609019 | Class A codebook extension and enhancement | Samsung | imported from 3GU |
R1‑1609020 | Discussions on semi-open-loop transmission in eFD-MIMO | Samsung | imported from 3GU |
R1‑1609021 | Simulation results for precoder cycling based on semi-open-loop transmission | Samsung | imported from 3GU |
R1‑1609022 | Further discussion on UL DMRS enhancement for eFDMIMO | Samsung | imported from 3GU |
R1‑1609023 | Discussions on non-precoded CSI-RS port numbering | Samsung | imported from 3GU |
R1‑1609024 | Discussions on CDM-4/-8 for non-precoded CSI-RS | Samsung | imported from 3GU |
R1‑1609025 | Discussions on remaining details of rate matching and QCL for aperiodic and multi-shot CSI-RS | Samsung | imported from 3GU |
R1‑1609026 | Completing aperiodic and “multi-shot” CSI-RS for Rel.14 | Samsung | imported from 3GU |
R1‑1609027 | Partial port hybrid CSI reporting | Samsung | imported from 3GU |
R1‑1609028 | Completing mechanism 1 of hybrid CSI for Rel.14 | Samsung | imported from 3GU |
R1‑1609029 | Configurations for SRS/RACH switching | Samsung | imported from 3GU |
R1‑1609030 | DCI for SRS Triggering and Power Control | Samsung | imported from 3GU |
R1‑1609031 | SRS Collisions due to Carrier Switching | Samsung | imported from 3GU |
R1‑1609032 | SRS Switching for UE with Multiple Antennas | Samsung | imported from 3GU |
R1‑1609033 | Discussion on Low PAPR waveform for UL | Samsung | imported from 3GU |
R1‑1609034 | Evaluation results of Low PAPR waveform | Samsung | imported from 3GU |
R1‑1609035 | Evaluation results of guard-band supporting methods | Samsung | imported from 3GU |
R1‑1609036 | Discussion on low PAPR non-orthogonal multiple access | Samsung | imported from 3GU |
R1‑1609037 | Discussion on grant-free based multiple access | Samsung | imported from 3GU |
R1‑1609038 | Collision analysis of grant-free based multiple access | Samsung | imported from 3GU |
R1‑1609039 | Support of HARQ in grant-free based multiple access | Samsung | imported from 3GU |
R1‑1609040 | Basic channel structure for grant-free based multiple access | Samsung | imported from 3GU |
R1‑1609041 | Link level evaluation results for IGMA | Samsung | imported from 3GU |
R1‑1609042 | System level evaluation results for IGMA | Samsung | imported from 3GU |
R1‑1609043 | Discussion on IGMA under multi-cell environments | Samsung | imported from 3GU |
R1‑1609044 | Discussion on guard-band supporting methods | Samsung | imported from 3GU |
R1‑1609045 | RB grid for mixed numerology | Samsung | imported from 3GU |
R1‑1609046 | Number of subcarriers per PRB | Samsung | imported from 3GU |
R1‑1609047 | Support of Different Numerologies for Same Vertical | Samsung | imported from 3GU |
R1‑1609048 | Time Alignment Among Different Numerologies for Same CP Overhead | Samsung | imported from 3GU |
R1‑1609049 | Time Alignment Among Different Numerologies for Different CP Overhead | Samsung | imported from 3GU |
R1‑1609050 | Numerology for URLLC | Samsung | imported from 3GU |
R1‑1609051 | Consideration on UE capability to process multiple numerologies | Samsung | imported from 3GU |
R1‑1609052 | Numerology for URLLC | Samsung | imported from 3GU |
R1‑1609053 | Time domain structure design | Samsung | imported from 3GU |
R1‑1609054 | FDM for eMBB and URLLC | Samsung | imported from 3GU |
R1‑1609055 | Forward compatibility considerations for joint operation of wireless backhaul and access | Samsung | imported from 3GU |
R1‑1609056 | Multiplexing UL URLLC and eMBB | Samsung | imported from 3GU |
R1‑1609057 | Evaluation results of eMBB with HARQ retransmission in case of multiplexing eMBB and URLLC | Samsung | imported from 3GU |
R1‑1609058 | Evaluation results of superposition scheme in case of multiplexing eMBB and URLLC | Samsung | imported from 3GU |
R1‑1609059 | Multiplexing URLLC and eMBB in DL | Samsung | imported from 3GU |
R1‑1609060 | Impact on eMBB PDSCH BLER by eMBB puncturing to support URLLC | Samsung | imported from 3GU |
R1‑1609061 | User plane latency evaluation results for URLLC in FDD NR | Samsung | imported from 3GU |
R1‑1609062 | User plane latency evaluation results for URLLC in TDD NR | Samsung | imported from 3GU |
R1‑1609063 | Summary of Channel Coding for NR | Samsung | imported from 3GU |
R1‑1609064 | IR-HARQ Performance of Rate-Compatible Quasi-Cyclic LDPC Codes | Samsung | imported from 3GU |
R1‑1609065 | Length-Compatible Quasi-Cyclic LDPC Codes | Samsung | imported from 3GU |
R1‑1609066 | Decoder Architecture for Length-Compatible Quasi-Cyclic LDPC Codes | Samsung | imported from 3GU |
R1‑1609067 | Evaluation of HW Complexity for Flexible Quasi-Cyclic LDPC Codes | Samsung | imported from 3GU |
R1‑1609068 | Discussion on Maximum Code Block Size | Samsung | imported from 3GU |
R1‑1609069 | Design of Short-Length LDPC Codes | Samsung | imported from 3GU |
R1‑1609070 | Analysis on Trade-off between Performance and Complexity | Samsung | imported from 3GU |
R1‑1609071 | Cross check results of LDPC code proposal | Samsung | imported from 3GU |
R1‑1609072 | Performance of Short-Length Polar Codes | Samsung | imported from 3GU |
R1‑1609073 | Discussion on latency of channel codes for NR | Samsung | imported from 3GU |
R1‑1609074 | Evaluation Assumptions for NR Modulation Schemes | Samsung | imported from 3GU |
R1‑1609075 | Discussion on modulation for MIMO | Samsung | imported from 3GU |
R1‑1609076 | Modulation scheme for interference management in NR | Samsung | imported from 3GU |
R1‑1609077 | Performance evaluation of MLC with natural mapping for MIMO | Samsung | imported from 3GU |
R1‑1609078 | Low PAPR modulation and waveform | Samsung | imported from 3GU |
R1‑1609079 | Discussion on beam management RS | Samsung | imported from 3GU |
R1‑1609080 | Overview on beam management | Samsung | imported from 3GU |
R1‑1609081 | Discussion on beam recovery | Samsung | imported from 3GU |
R1‑1609082 | Impact of beam/channel reciprocity for NR | Samsung | imported from 3GU |
R1‑1609083 | Discussion on beam switching | Samsung | imported from 3GU |
R1‑1609084 | DMRS-based spatial multiplexing for DL NR MIMO | Samsung | imported from 3GU |
R1‑1609085 | DMRS-based spatial multiplexing for UL NR MIMO | Samsung | imported from 3GU |
R1‑1609086 | Discussion on transmission schemes, transmission modes and control signaling | Samsung | imported from 3GU |
R1‑1609087 | CSI acquisition for DL NR MIMO | Samsung | imported from 3GU |
R1‑1609088 | CSI acquisition for UL NR MIMO | Samsung | imported from 3GU |
R1‑1609089 | Advanced CSI feedback for NR | Samsung | imported from 3GU |
R1‑1609090 | Simulation results for explicit CSI reporting for NR MIMO | Samsung | imported from 3GU |
R1‑1609091 | Discussions on periodic CSI reporting for NR | Samsung | imported from 3GU |
R1‑1609092 | Discussions on aperiodic CSI reporting for NR | Samsung | imported from 3GU |
R1‑1609093 | Discussions on channel and interference measurements for NR | Samsung | imported from 3GU |
R1‑1609094 | DMRS Design Aspects for NR | Samsung | imported from 3GU |
R1‑1609095 | DMRS Design Dependence on numerology | Samsung | imported from 3GU |
R1‑1609096 | UL CSI-RS (SRS) design for NR | Samsung | imported from 3GU |
R1‑1609097 | Further discussions on QCL in NR | Samsung | imported from 3GU |
R1‑1609098 | Discussions on CSI-RS design for NR MIMO | Samsung | imported from 3GU |
R1‑1609099 | MIMO LLS calibration results for NR on 4GHz frequency band | Samsung | imported from 3GU |
R1‑1609100 | On the support of compensation of phase rotation in NR | Samsung | imported from 3GU |
R1‑1609101 | Discussions on NR network coordination | Samsung | imported from 3GU |
R1‑1609102 | Evaluation assumptions for NR network coordination | Samsung | imported from 3GU |
R1‑1609103 | Coordinated interference cancellation for NR | Samsung | imported from 3GU |
R1‑1609104 | Evaluation assumptions for NR coordinated interference cancellation based on advanced receivers | Samsung | imported from 3GU |
R1‑1609105 | Overview on system information delivery and beam alignment/association | Samsung | imported from 3GU |
R1‑1609106 | Discussion on minimum bandwidth for NR | Samsung | imported from 3GU |
R1‑1609107 | Discussion on beam sweeping for initial access signals | Samsung | imported from 3GU |
R1‑1609108 | Time domain mapping of initial access signals for the multi-beam case | Samsung | imported from 3GU |
R1‑1609109 | Discussion on SI delivery for multi-beam before RACH | Samsung | imported from 3GU |
R1‑1609110 | Initial access design consideration for unified framework | Samsung | imported from 3GU |
R1‑1609111 | Multiplexing of synchronization signals and system information delivery channels for below 6 GHz and above 6 GHz | Samsung | imported from 3GU |
R1‑1609112 | Numerology for synchronization signal | Samsung | imported from 3GU |
R1‑1609113 | Overview on issues on NR downlink synchronization | Samsung | imported from 3GU |
R1‑1609114 | Carrier raster and synchronization signal transmission | Samsung | imported from 3GU |
R1‑1609115 | Discussion on NR paging design | Samsung | imported from 3GU |
R1‑1609116 | RACH procedure considering flexible UE bandwidth | Samsung | imported from 3GU |
R1‑1609117 | Discussion on RA procedure | Samsung | imported from 3GU |
R1‑1609118 | RACH design with and without beam reciprocity | Samsung | imported from 3GU |
R1‑1609119 | RACH preamble design for NR | Samsung | imported from 3GU |
R1‑1609120 | NR mobility in idle mode | Samsung | imported from 3GU |
R1‑1609121 | NR mobility in connected-active mode | Samsung | imported from 3GU |
R1‑1609122 | Discussion on RS for supporting mobility | Samsung | imported from 3GU |
R1‑1609123 | Discussion on hierarchical beam sweeping | Samsung | imported from 3GU |
R1‑1609124 | Discussion on RS resource mapping for beam measurement | Samsung | imported from 3GU |
R1‑1609125 | Inter-cell Interference Management for Uncoordinated TDD | Samsung | imported from 3GU |
R1‑1609126 | Dynamic TDD for latency reduction | Samsung | imported from 3GU |
R1‑1609127 | Signaling of Slot Structure | Samsung | imported from 3GU |
R1‑1609128 | DL Control Channel Design | Samsung | imported from 3GU |
R1‑1609129 | UL Control Channel Design | Samsung | imported from 3GU |
R1‑1609130 | Common Control Signaling | Samsung | imported from 3GU |
R1‑1609131 | DCI Formats and Contents for NR | Samsung | imported from 3GU |
R1‑1609132 | UCI Contents for NR | Samsung | imported from 3GU |
R1‑1609133 | Support of Flexible Scheduling Timing | Samsung | imported from 3GU |
R1‑1609134 | Number of HARQ Processes | Samsung | imported from 3GU |
R1‑1609135 | Discussion on UE power consumption reduction | Samsung | imported from 3GU |
R1‑1609136 | Signaling of Resources for forward compatibility | Samsung | imported from 3GU |
R1‑1609137 | NR-LTE Coexistence | Samsung | imported from 3GU |
R1‑1609138 | Carrier Aggregation for NR | Samsung | imported from 3GU |
R1‑1609139 | Overview of NR Unlicensed Spectrum | Samsung | imported from 3GU |
R1‑1609140 | Remaining evaluation assumption for dense urban macro with 30GHz frequency | Samsung | imported from 3GU |
R1‑1609141 | Discussion on congestion control in distributed scheduling mode | NEC | imported from 3GU |
R1‑1609142 | Discussion on congestion control in eNB scheduling mode | NEC | imported from 3GU |
R1‑1609143 | Discussion on determining timing of sidelink synchronization signals for V2X | NEC | imported from 3GU |
R1‑1609144 | New DCI design consideration for MUST | NEC | imported from 3GU |
R1‑1609145 | Discussion on numerology multiplexing for supporting different service requirements | NEC | imported from 3GU |
R1‑1609146 | Discussion on numerology of synchronisation signals | NEC | imported from 3GU |
R1‑1609147 | Discussion on NR synchronization signal and essential system information mapping | NEC | imported from 3GU |
R1‑1609148 | Discussion on backward compatibility for IFDMA based scheme | NEC | imported from 3GU |
R1‑1609149 | Proposals for CSI-RS with CDM4 | NEC | imported from 3GU |
R1‑1609150 | Proposals for CSI-RS with CDM8 | NEC | imported from 3GU |
R1‑1609151 | Proposals for frame structure | NEC | imported from 3GU |
R1‑1609152 | Proposals for beamformed synchronization signals | NEC | imported from 3GU |
R1‑1609153 | Discussion on PSS/SSS/PBCH in numerology multiplexing | NEC | imported from 3GU |
R1‑1609154 | Larger maximum PDSCH/PUSCH channel bandwidth in CE mode A | NEC | imported from 3GU |
R1‑1609155 | Different Options for HARQ-ACK bundling in CE mode A for HD-FDD | NEC | imported from 3GU |
R1‑1609156 | Retuning Symbols for FeMTC in Rel-14 | NEC | imported from 3GU |
R1‑1609157 | sPDSCH/sPDCCH with 2-symbol sTTI and 1-slot sTTI | NEC | imported from 3GU |
R1‑1609158 | Principles of L1/L2 Control Channel Design for NR | NEC | imported from 3GU |
R1‑1609159 | On Number of subcarriers per PRB for NR | NEC | imported from 3GU |
R1‑1609160 | Latency Reduction for FS2 with 1-ms TTI | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609161 | Considerations on Asymmetric DL&UL sTTI Length Operations | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609162 | Simultaneous Transmissions of UL Signals for Shortened TTI Operation | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609163 | On signaling details for flexible DMRS in UL shorter TTI | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609164 | sPUCCH Design for shortened TTI | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609165 | Considerations of slot-level sTTI for FS2 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609166 | MIMO SLS calibration results for NR on 30GHz frequency band | Samsung Electronics Co., Ltd | imported from 3GU |
R1‑1609167 | Evaluation scenarios and assumptions for DL mobility at above 6GHz | Samsung Electronics Co., Ltd | imported from 3GU |
R1‑1609168 | Discussion on RAN4 LS on CSI measurement ambiguity in LAA | LG Electronics | imported from 3GU |
R1‑1609169 | Correction on CSI reference resource definition in LAA | LG Electronics | imported from 3GU |
R1‑1609170 | Correction on CSI measurement in LAA | LG Electronics | imported from 3GU |
R1‑1609171 | Correction on NZP CSI-RS aggregation for Class A | LG Electronics | imported from 3GU |
R1‑1609172 | Discussion on (E)PDCCH candidate configuration | LG Electronics | imported from 3GU |
R1‑1609173 | Discussion on periodic CSI transmission | LG Electronics | imported from 3GU |
R1‑1609174 | Correction on UL grant reception in ending partial subframe | LG Electronics | imported from 3GU |
R1‑1609175 | Correction on UL burst scheduling | LG Electronics | imported from 3GU |
R1‑1609176 | Discussion on minimum portion of remaining resources for PSSCH | LG Electronics | imported from 3GU |
R1‑1609177 | Discussion on power offset for PSCCH | LG Electronics | imported from 3GU |
R1‑1609178 | Corrections on excluding resources within selection window | LG Electronics | imported from 3GU |
R1‑1609179 | Corrections on randomizing PSSCH DM-RS | LG Electronics | imported from 3GU |
R1‑1609180 | Corrections on the set of reserved subframes in SL TM 4 | LG Electronics | imported from 3GU |
R1‑1609181 | Remaining details of UE procedure for sidelink and uplink SPS | LG Electronics | imported from 3GU |
R1‑1609182 | Remaining details of (E)PDCCH design of sidelink and uplink SPS | LG Electronics | imported from 3GU |
R1‑1609183 | Details of random resource selection for P-UE | LG Electronics | imported from 3GU |
R1‑1609184 | Discussion on partial sensing for P-UEs | LG Electronics | imported from 3GU |
R1‑1609185 | Considerations on the co-channel coexistence of multiple RATs for V2X | LG Electronics | imported from 3GU |
R1‑1609186 | Discussion on support of inter-PLMN for Uu and PC5 | LG Electronics | imported from 3GU |
R1‑1609187 | Discussion on congestion control for PC5-based V2X | LG Electronics | imported from 3GU |
R1‑1609188 | Discussion on power cotrol for simultaneous SL TX and WAN TX in different carriers | LG Electronics | imported from 3GU |
R1‑1609189 | Remaining issues on synchronization enhancements for V2X | LG Electronics | imported from 3GU |
R1‑1609190 | Time domain multiplexing of V2V subframes and other signals/channels | LG Electronics | imported from 3GU |
R1‑1609191 | Discussion on support of small periodicity resource reservation | LG Electronics | imported from 3GU |
R1‑1609192 | Discussion on prioritizing SL TX over WAN TX | LG Electronics | imported from 3GU |
R1‑1609193 | Performance evaluation on linear combination based CSI | LG Electronics | imported from 3GU |
R1‑1609194 | Discussion on feedback mechanism enhancement for advanced CSI | LG Electronics | imported from 3GU |
R1‑1609195 | Discussion on Class A codebook for eFD-MIMO | LG Electronics | imported from 3GU |
R1‑1609196 | Discussion on OL and Semi-OL MIMO | LG Electronics | imported from 3GU |
R1‑1609197 | Remaining details on UL DMRS enhancement | LG Electronics | imported from 3GU |
R1‑1609198 | Remaining details on Non-precoded CSI-RS | LG Electronics | imported from 3GU |
R1‑1609199 | Remaining details on beamformed CSI-RS enhancement | LG Electronics | imported from 3GU |
R1‑1609200 | Remaining details on Hybrid CSI-RS | LG Electronics | imported from 3GU |
R1‑1609201 | Discussion on power ratio and modulation order | LG Electronics | imported from 3GU |
R1‑1609202 | Discussion on Gray mapping for superposed constellation | LG Electronics | imported from 3GU |
R1‑1609203 | Discussion on Signaling Assistance Information and remaining issues | LG Electronics | imported from 3GU |
R1‑1609204 | Fallback operation for FeMTC | LG Electronics | imported from 3GU |
R1‑1609205 | Larger channel bandwidth for FeMTC | LG Electronics | imported from 3GU |
R1‑1609206 | Multicast support for FeMTC | LG Electronics | imported from 3GU |
R1‑1609207 | OTDOA design for eNB-IoT | LG Electronics | imported from 3GU |
R1‑1609208 | Multicast support for eNB-IoT | LG Electronics | imported from 3GU |
R1‑1609209 | Non-anchor PRB enhancements for eNB-IoT | LG Electronics | imported from 3GU |
R1‑1609210 | Low power UE support for eNB-IoT | LG Electronics | imported from 3GU |
R1‑1609211 | Remaining issues on shortened processing time for 1ms TTI | LG Electronics | imported from 3GU |
R1‑1609212 | Discussion on shortened processing time for FS2 | LG Electronics | imported from 3GU |
R1‑1609213 | Discussion on CSI feedback for 1ms TTI with shortened processing time | LG Electronics | imported from 3GU |
R1‑1609214 | Discussions on sPDCCH for latency reduction | LG Electronics | imported from 3GU |
R1‑1609215 | Discussions on sPDSCH for latency reduction | LG Electronics | imported from 3GU |
R1‑1609216 | sPUCCH for HARQ-ACK in shortened TTI | LG Electronics | imported from 3GU |
R1‑1609217 | sPUCCH for CSI in shortened TTI | LG Electronics | imported from 3GU |
R1‑1609218 | Discussion on CA operations for latency reduction | LG Electronics | imported from 3GU |
R1‑1609219 | Discussion on sTTI designs for UL | LG Electronics | imported from 3GU |
R1‑1609220 | Shortened processing time for shortened TTI length | LG Electronics | imported from 3GU |
R1‑1609221 | HARQ timing in shortened TTI | LG Electronics | imported from 3GU |
R1‑1609222 | Discussion on DFT-s-OFDM and CP-OFDM for Uplink | LG Electronics | imported from 3GU |
R1‑1609223 | Further evaluation results of NCMA in UL LLS | LG Electronics | imported from 3GU |
R1‑1609224 | SLS evaluation results for the NR MA | LG Electronics | imported from 3GU |
R1‑1609225 | Discussion on the MA evaluations and further considerations | LG Electronics | imported from 3GU |
R1‑1609226 | Discussion on feedback signaling for grant-free MA | LG Electronics | imported from 3GU |
R1‑1609227 | On MA resource and MA signature configurations | LG Electronics | imported from 3GU |
R1‑1609228 | General procedures on grant-free/grant-based MA | LG Electronics | imported from 3GU |
R1‑1609229 | NoMA scheme based on NCMA | LG Electronics | imported from 3GU |
R1‑1609230 | Discussion on Non-orthogonal Spreading Sequence and codebooks for NoMA | LG Electronics | imported from 3GU |
R1‑1609231 | Discussion on 60kHz CP options | LG Electronics | imported from 3GU |
R1‑1609232 | Details on symbol-level alignment | LG Electronics | imported from 3GU |
R1‑1609233 | Discussion on time-alignment between different CP families | LG Electronics | imported from 3GU |
R1‑1609234 | Discussion on frequency-alignment and resource block structure for different numerologies | LG Electronics | imported from 3GU |
R1‑1609235 | Discussion on subframe/slot/mini-slot | LG Electronics | imported from 3GU |
R1‑1609236 | On multiplexing between eMBB and URLLC | LG Electronics | imported from 3GU |
R1‑1609237 | Discussion on control and data transmssion of URLLC | LG Electronics | imported from 3GU |
R1‑1609238 | Discussion on multi-carrier operation between LTE and NR | LG Electronics | imported from 3GU |
R1‑1609239 | HARQ of LDPC code for NR | LG Electronics | imported from 3GU |
R1‑1609240 | Comparison of complexity for turbo and LDPC codes | LG Electronics | imported from 3GU |
R1‑1609241 | Consideration on implementation of flexible channel decoder | LG Electronics | imported from 3GU |
R1‑1609242 | Length flexibility of QC-LDPC | LG Electronics | imported from 3GU |
R1‑1609243 | Channel coding selection of eMBB scenario | LG Electronics | imported from 3GU |
R1‑1609244 | Control channel coding scheme evaluation | LG Electronics | imported from 3GU |
R1‑1609245 | Multiple CRC for TBCC list decoding | LG Electronics | imported from 3GU |
R1‑1609246 | Turbo code enhancement | LG Electronics | imported from 3GU |
R1‑1609247 | Views on NR beam management | LG Electronics | imported from 3GU |
R1‑1609248 | On the impact of UE rotation | LG Electronics | imported from 3GU |
R1‑1609249 | Views on NR DL MIMO | LG Electronics | imported from 3GU |
R1‑1609250 | Views on NR UL MIMO | LG Electronics | imported from 3GU |
R1‑1609251 | Discussion on semi-OL MIMO for NR | LG Electronics | imported from 3GU |
R1‑1609252 | Discussion on interference management for NR | LG Electronics | imported from 3GU |
R1‑1609253 | Views on CSI acquisition for NR | LG Electronics | imported from 3GU |
R1‑1609254 | Discussion on interference measurement for NR | LG Electronics | imported from 3GU |
R1‑1609255 | Discussion on channel reciprocity for NR MIMO | LG Electronics | imported from 3GU |
R1‑1609256 | Discussion on beam coordination and QCL for NR | LG Electronics | imported from 3GU |
R1‑1609257 | Design considerations on NR CSI-RS | LG Electronics | imported from 3GU |
R1‑1609258 | Discussion on UL sounding signal design for NR | LG Electronics | imported from 3GU |
R1‑1609259 | Issues on NR DMRS Design | LG Electronics | imported from 3GU |
R1‑1609260 | Discussion on NR DMRS Pattern | LG Electronics | imported from 3GU |
R1‑1609261 | Discussion on Common Phase Error Compensation for Above 6GHz | LG Electronics | imported from 3GU |
R1‑1609262 | Phase 1 system level calibration results for NR MIMO | LG Electronics | imported from 3GU |
R1‑1609263 | Phase 1 link level calibration results for NR MIMO | LG Electronics | imported from 3GU |
R1‑1609264 | Issues on NR Initial Access | LG Electronics | imported from 3GU |
R1‑1609265 | Numerology for NR Synchronization Signal | LG Electronics | imported from 3GU |
R1‑1609266 | Discussion on PRACH Preamble Design for NR | LG Electronics | imported from 3GU |
R1‑1609267 | Consideration on RACH Procedure in NR | LG Electronics | imported from 3GU |
R1‑1609268 | Measurement for Mobility and Beam Procedure in NR | LG Electronics | imported from 3GU |
R1‑1609269 | Discussion on flexible duplex operations in NR design | LG Electronics | imported from 3GU |
R1‑1609270 | Semi-static DL/UL configuration for inter-cell interference coordination/handling | LG Electronics | imported from 3GU |
R1‑1609271 | Interference coordination for flexible duplex operation | LG Electronics | imported from 3GU |
R1‑1609272 | Remaining issues on evaluation assumptions for flexible duplex | LG Electronics | imported from 3GU |
R1‑1609273 | Overall structure of DL control transmission for NR | LG Electronics | imported from 3GU |
R1‑1609274 | Discussion on DL control channel design for NR | LG Electronics | imported from 3GU |
R1‑1609275 | Discussion on common control signaling for NR | LG Electronics | imported from 3GU |
R1‑1609276 | Structure of control and data multiplexing for NR | LG Electronics | imported from 3GU |
R1‑1609277 | Discussion on UL control channel design for NR | LG Electronics | imported from 3GU |
R1‑1609278 | Discussion on support of CA operation in NR | LG Electronics | imported from 3GU |
R1‑1609279 | Discussion on UL power control procedure for NR | LG Electronics | imported from 3GU |
R1‑1609280 | Discussion on HARQ timing and resource for NR | LG Electronics | imported from 3GU |
R1‑1609281 | Discussion on scheduling in time domain for NR | LG Electronics | imported from 3GU |
R1‑1609282 | Discussion on HARQ latency reduction for NR | LG Electronics | imported from 3GU |
R1‑1609283 | Discussion on potential HARQ operation in NR | LG Electronics | imported from 3GU |
R1‑1609284 | Discussion on minimum HARQ-ACK and retransmission timing | LG Electronics | imported from 3GU |
R1‑1609285 | Forward compatibility issues considering NR operation in unlicensed spectrum | LG Electronics | imported from 3GU |
R1‑1609286 | On coexistence of NR and LTE | LG Electronics | imported from 3GU |
R1‑1609287 | Forward compatibility issues on mMTC | LG Electronics | imported from 3GU |
R1‑1609288 | MIMO LLS calibration results for NR on 30GHz frequency band | Samsung Electronics Co., Ltd | imported from 3GU |
R1‑1609289 | Considerations on multiple anchor PRBs for NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609290 | Discussion on SL-SPS DCI and cross carrier scheduling | CMCC | imported from 3GU |
R1‑1609291 | Enhancing interference measurement for MU transmissions | CMCC | imported from 3GU |
R1‑1609292 | Views on MUST power ratio signaling | CMCC | imported from 3GU |
R1‑1609293 | On signaling design for MUST case 3 | CMCC | imported from 3GU |
R1‑1609294 | Discussion on DMRS design for PUSCH in UpPTS | CMCC | imported from 3GU |
R1‑1609295 | Discussion on TBS scaling design for PUSCH in UpPTS | CMCC | imported from 3GU |
R1‑1609296 | Discussion on TTI bundling for PUSCH in UpPTS | CMCC | imported from 3GU |
R1‑1609297 | Discussion on HARQ timing design for PUSCH in UpPTS | CMCC | imported from 3GU |
R1‑1609298 | Discussion on HARQ timing for shortened TTI in TDD | CMCC | imported from 3GU |
R1‑1609299 | Discussion and evaluation of UL Waveforms | CMCC | imported from 3GU |
R1‑1609300 | Discussion on multiple access schemes for URLLC | CMCC | imported from 3GU |
R1‑1609301 | Discussion on phase noise modeling | CMCC | imported from 3GU |
R1‑1609302 | Discussion on High Mobility Numerology and RS design | CMCC | imported from 3GU |
R1‑1609303 | Discussion and evaluation of CP design for NR | CMCC | imported from 3GU |
R1‑1609304 | Discussion on guard period in NR frame structure | CMCC | imported from 3GU |
R1‑1609305 | Updated System Level Evaluation for NR MIMO | CMCC | imported from 3GU |
R1‑1609306 | General Requirements on NR MIMO | CMCC | imported from 3GU |
R1‑1609307 | Considerations on DL CSI acquisition framework of massive MIMO for new radio | CMCC | imported from 3GU |
R1‑1609308 | Beam Sweeping using Multi-width Beams | CMCC | imported from 3GU |
R1‑1609309 | RACH in Gradual UE-Specific (GUS) initial access | CMCC | imported from 3GU |
R1‑1609310 | On multi-beam-based mobility management | CMCC | imported from 3GU |
R1‑1609311 | Discussion on uplink control channel design for NR | CMCC | imported from 3GU |
R1‑1609312 | Remaining evaluation details of High Speed Train Scenario | CMCC | imported from 3GU |
R1‑1609313 | Numerologies for different carrier frequencies | KT Corp. | imported from 3GU |
R1‑1609314 | Initial timing and beam acquisition for multi-beam based approach | KT Corp. | imported from 3GU |
R1‑1609315 | On maximum TA and EPDCCH support for n+3 timing | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609316 | On support of n+2 timing for 1ms TTI | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609317 | Dynamic fall-back and required scheduling restrictions for 1ms TTI with different processing times | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609318 | On DCI details for 1ms TTI UL asynchronous HARQ | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609319 | Interaction between synchronous and asynchronous UL HARQ for 1ms TTI | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609320 | On processing time reduction between PDSCH transmission and DL HARQ feedback | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609321 | On processing time reduction between UL grant and UL data transmission | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609322 | On DL control channel design for shorter TTI operation | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609323 | On two-level DL control channel design and subframe structure for shorter TTI operation | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609324 | On design of search space for short PDCCH | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609325 | On details of flexible DMRS design for DL shorter TTI | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609326 | Unified Framework for Beam Management and RRM for NR | MediaTek Inc. | imported from 3GU |
R1‑1609327 | CSI framework for multi-beam operation | MediaTek Inc. | imported from 3GU |
R1‑1609328 | Definition of a Downlink Basic Beacon Unit in the Unified Framework for NR Initial Access | MediaTek Inc. | imported from 3GU |
R1‑1609329 | Synchronization Signal Design in CP-OFDM Based on Time-Frequency Hopping Patterns | MediaTek Inc. | imported from 3GU |
R1‑1609330 | Link level simulation results for NR initial synchronization and cell search | MediaTek Inc. | imported from 3GU |
R1‑1609331 | System level simulation results for NR initial synchronization and cell search | MediaTek Inc. | imported from 3GU |
R1‑1609332 | LLS results for GOCA schemes | MediaTek Inc. | imported from 3GU |
R1‑1609333 | LLS results for RDMA schemes | MediaTek Inc. | imported from 3GU |
R1‑1609334 | System level evaluation result on RDMA | MediaTek Inc. | imported from 3GU |
R1‑1609335 | System level evaluation result on GOCA | MediaTek Inc. | imported from 3GU |
R1‑1609336 | UE considerations on coding combination for NR data channels | MediaTek Inc. | imported from 3GU |
R1‑1609337 | Implementation considerations on flexible and efficient LDPC decoders | MediaTek Inc. | imported from 3GU |
R1‑1609338 | Resolving Polar code memory complexity issue | MediaTek Inc. | imported from 3GU |
R1‑1609339 | Some issues in 1ms TTI with shortened processing time | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609340 | HARQ with shortened processing time for 1ms TTI | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609341 | Discussion on sPDCCH for sTTI | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609342 | Discussion on PUCCH design for sTTI | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609343 | Study on PDSCH transmission in sTTI | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609344 | Details on timing advance for SRS on TDD CCs without PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑1609345 | MUST UE multiplexing and resource allocation | Huawei, HiSilicon | imported from 3GU |
R1‑1609346 | Inter-PLMN operation on PC5 | Huawei, HiSilicon | imported from 3GU |
R1‑1609347 | Timing alignment for cross-carrier operation | Huawei, HiSilicon | imported from 3GU |
R1‑1609348 | Considerations on increased number of MBSFN subframes | Huawei, HiSilicon | imported from 3GU |
R1‑1609349 | Restricted sets of cyclic shifts for PRACH in high speed scenario | Huawei | imported from 3GU |
R1‑1609350 | On the support for legacy UEs in high speed cells | Huawei | imported from 3GU |
R1‑1609351 | Further discussion on the same PCI case for E-CID enhancements | Huawei, HiSilicon | imported from 3GU |
R1‑1609352 | Further discussion on the UE Rx-Tx measurement over multiple serving cells | Huawei, HiSilicon | imported from 3GU |
R1‑1609353 | Discussion on Gray conversion for MUST Case 1&2 | Huawei, HiSilicon | imported from 3GU |
R1‑1609354 | Discussion on UCI in PUSCH on UpPTS | Huawei, HiSilicon | imported from 3GU |
R1‑1609355 | Simulation results of non-coherent JT | Huawei, HiSilicon | imported from 3GU |
R1‑1609356 | Simulation results of CS/CB with FD-MIMO | Huawei, HiSilicon | imported from 3GU |
R1‑1609357 | On non-anchor carrier paging | Huawei, HiSilicon | imported from 3GU |
R1‑1609358 | Control channel design on supporting SC-PTM in FeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1609359 | Discussion on the OTDOA enhancements for FeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1609360 | Discussion on sensing procedure for PC5 based V2V | Huawei, HiSilicon | imported from 3GU |
R1‑1609361 | Discussion on UE capability in decoding PSSCH and PSCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1609362 | Discussion on sensing window range for PC5 based V2V | Huawei, HiSilicon | imported from 3GU |
R1‑1609363 | Discussion on resource pool for PC5 based V2V | Huawei, HiSilicon | imported from 3GU |
R1‑1609364 | Coexistence of cellular and V2V services in partial network coverage | Huawei, HiSilicon | imported from 3GU |
R1‑1609365 | Details for supporting traffic with smaller periodicity on PC5 based V2V | Huawei, HiSilicon | imported from 3GU |
R1‑1609366 | Draft CR on UL CWS adjustment for eLAA in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1609367 | Draft CR on PHICH operation for eLAA in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1609368 | Draft CR on energy detection threshold for DL multi-carrier operation for LAA in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1609369 | On half duplex enhancements for VoLTE | Huawei, HiSilicon | imported from 3GU |
R1‑1609370 | Evaluations of feMTC OTDOA | Huawei, HiSilicon | imported from 3GU |
R1‑1609371 | On larger TBS for enhancement of NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1609372 | DCI formats for enhancement of NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1609373 | Discussion on the remaining issues for sidelink power control | Huawei, HiSilicon | imported from 3GU |
R1‑1609374 | Study on PUSCH transmission in sTTI | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609375 | Simultaneous transmission and reception in sTTI | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609376 | Processing time reduction and related procedures | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609377 | RSTD measurement and reporting in NB-IoT | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609378 | A New DFTS-OFDM Compatible Low PAPR Technique for NR Uplink Waveforms | MediaTek Inc. | imported from 3GU |
R1‑1609379 | Discussion on Beam Training Procedure of NR MIMO | Sony | imported from 3GU |
R1‑1609380 | Massive MIMO: Channel State Information (CSI) Acquisition in Angular Domain | Sony | imported from 3GU |
R1‑1609381 | Discussion on DCI options for providing MUST-near UE co-schedule information | Sony | imported from 3GU |
R1‑1609382 | Evaluation on channel coding candidates for uRLLC and mMTC | ZTE | imported from 3GU |
R1‑1609383 | Summary of Link level analysis of candidate waveforms for NR | AT&T GNS Belgium SPRL | imported from 3GU |
R1‑1609384 | Network Assisted Waveform Selection for NR | AT&T GNS Belgium SPRL | imported from 3GU |
R1‑1609385 | Link level analysis for channel coding schemes for control channel | AT&T GNS Belgium SPRL | imported from 3GU |
R1‑1609386 | NR Frame Structure Design Requirements | AT&T GNS Belgium SPRL | imported from 3GU |
R1‑1609387 | Initial Access and Mobility Requirements for NR | AT&T GNS Belgium SPRL | imported from 3GU |
R1‑1609388 | Generalized CSI feedback framework for NR MIMO | AT&T GNS Belgium SPRL | imported from 3GU |
R1‑1609389 | On the channel coding scheme for NR | NEC | imported from 3GU |
R1‑1609390 | Low PAPR Waveform Design for NR | IITH | imported from 3GU |
R1‑1609391 | Frequency domain NR frame structure | ETRI | imported from 3GU |
R1‑1609392 | Multiplexing of eMBB and URLLC transmissions | ETRI | imported from 3GU |
R1‑1609393 | Discussion on the slot structure in time domain | ETRI | imported from 3GU |
R1‑1609394 | Design of synchronization signal for supporting different numerologies in NR | ETRI | imported from 3GU |
R1‑1609395 | Discussion of DL hybrid beamforming procedure | Lenovo | imported from 3GU |
R1‑1609396 | Discussion RACH procedure in beamformed scenarios | Lenovo | imported from 3GU |
R1‑1609397 | Discussion on Higher Data Rate for Further eMTC | Lenovo | imported from 3GU |
R1‑1609398 | Uplink Grant-free Access for 5G mMTC | Lenovo | imported from 3GU |
R1‑1609399 | Discussion on grant-free based UL transmission | Lenovo | imported from 3GU |
R1‑1609400 | Discussion on retransmission design for grant-free based UL transmission | Lenovo | imported from 3GU |
R1‑1609401 | Discussion on DCI design to support multiple SPS configurations | Lenovo | imported from 3GU |
R1‑1609402 | Discussion on random selection by pedestrian UEs | Lenovo | imported from 3GU |
R1‑1609403 | Correction on the determination of NPDCCH candidates | ITRI | imported from 3GU |
R1‑1609404 | Correction on the determination of NPDCCH candidates | ITRI | imported from 3GU |
R1‑1609405 | On the carrier aggregation system supporting shortened TTI operation | ITRI | imported from 3GU |
R1‑1609406 | Discussion on the power headroom reporting for shortened TTI operation | ITRI | imported from 3GU |
R1‑1609407 | Discussion on frequency domain reduced overhead CSI-RS | ITRI | imported from 3GU |
R1‑1609408 | Discussion on beam management procedure | ITRI | imported from 3GU |
R1‑1609409 | Coordinated and uncoordinated operation in inter-PLMN for V2X scenario | ITRI | imported from 3GU |
R1‑1609410 | Discussion prioritization of multiple synchronization sources on sidelink synchronization protocol for V2V communication | ITRI | imported from 3GU |
R1‑1609411 | Enhancement to sidelink synchronization among multiple synchronization sources for V2X communications | ITRI | imported from 3GU |
R1‑1609412 | Discussion measurement metric and report for zone based resource management in V2V service | ITRI | imported from 3GU |
R1‑1609413 | Reference Signal design for UL based measurement, CSI acquisition, and beam management | Huawei, HiSilicon | imported from 3GU |
R1‑1609414 | Discussion on beam management aspects for DL MIMO | Huawei, HiSilicon | imported from 3GU |
R1‑1609415 | Discussion on beam management aspects for UL MIMO | Huawei, HiSilicon | imported from 3GU |
R1‑1609416 | Discussion on CSI measurement and reporting | Huawei, HiSilicon | imported from 3GU |
R1‑1609417 | Overview of coordination schemes and interference management techniques in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1609418 | DL RS design for downlink-based RRM measurement and TRP/beam discovery | Huawei, HiSilicon | imported from 3GU |
R1‑1609419 | In-band Tx requirements for FDM of different numerologies in a NR carrier | Huawei, HiSilicon | imported from 3GU |
R1‑1609420 | In-band Rx requirements for FDM of different numerologies in a NR carrier | Huawei, HiSilicon | imported from 3GU |
R1‑1609421 | General discussion on flexible duplex | Huawei, HiSilicon | imported from 3GU |
R1‑1609422 | Evaluation of flexible duplex in indoor hotspot scenario | Huawei, HiSilicon | imported from 3GU |
R1‑1609423 | Evaluation of flexible duplex in dense urban scenario | Huawei, HiSilicon | imported from 3GU |
R1‑1609424 | Evaluation of flexible duplex in urban macro scenario | Huawei, HiSilicon | imported from 3GU |
R1‑1609425 | Discussion on UE behavior on mixed numerology carrier | Huawei, HiSilicon | imported from 3GU |
R1‑1609426 | Evaluation on subcarrier spacing and CP types for UL transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1609427 | Evaluation and discussion on CP types for above 6GHz | Huawei, HiSilicon | imported from 3GU |
R1‑1609428 | Numerology for 70 GHz and above | Huawei, HiSilicon | imported from 3GU |
R1‑1609429 | Discussion on resource block for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1609430 | On multiple carrier operation | Huawei, HiSilicon | imported from 3GU |
R1‑1609431 | Discussion on short processing delay | Huawei, HiSilicon | imported from 3GU |
R1‑1609432 | Discussion on downlink control channel design | Huawei, HiSilicon | imported from 3GU |
R1‑1609433 | Discussion on DC handling for downlink and uplink | Huawei, HiSilicon | imported from 3GU |
R1‑1609434 | Discussion on UE power consumption reduction in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1609435 | Control channel design for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1609436 | Support of multiple numerologies in synchronization signal design | Huawei, HiSilicon | imported from 3GU |
R1‑1609437 | Scenarios and initial evaluation for UL-based RRM measurement and mobility | Huawei, HiSilicon | imported from 3GU |
R1‑1609438 | Initial evaluation results for initial access | Huawei, HiSilicon | imported from 3GU |
R1‑1609439 | Further results on channel coding schemes for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1609440 | Analysis on orthogonal/non-orthogonal basis for advanced CSI feedback | Huawei, HiSilicon | imported from 3GU |
R1‑1609441 | Text Proposal of PHY abstraction method for NR MA | Huawei, HiSilicon | imported from 3GU |
R1‑1609442 | Summary of email discussion thread 86-15 and 86-17 on SLS calibration for NR MA | Huawei, HiSilicon | imported from 3GU |
R1‑1609443 | Summary of preliminary LLS results | Huawei, HiSilicon | imported from 3GU |
R1‑1609444 | Summary of preliminary SLS results | Huawei, HiSilicon | imported from 3GU |
R1‑1609445 | Discussion on MIMO calibration | Huawei, HiSilicon | imported from 3GU |
R1‑1609446 | Reference signal design for UL grant-free transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1609447 | WF on Modeling Line-of-Sight Blockage for V2V | Huawei, HiSilicon, Volkswagen, Ericsson, General Motors, Vodafone | imported from 3GU |
R1‑1609448 | Low frequency assisted high frequency operation on initial access | Huawei, HiSilicon | imported from 3GU |
R1‑1609449 | Correction on periodic CSI reporting mode 2-1 for Class B FD-MIMO | Intel Corporation, ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609450 | Correction on periodic CSI reporting mode 1-1 for Class B FD-MIMO | Intel Corporation, ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609451 | Correction of PRACH starting subframes for eMTC | Intel Corporation | imported from 3GU |
R1‑1609452 | Correction of NPRACH frequency hopping | Intel Corporation | imported from 3GU |
R1‑1609453 | Proposal to align DMRS cyclic shift for PSCCH and PSSCH (Correction to V2V CR - 36.211) | Intel Corporation | imported from 3GU |
R1‑1609454 | Clarification on Resource Selection Procedure (Correction to V2V CR - 36.213) | Intel Corporation | imported from 3GU |
R1‑1609455 | Clarification on CRC value for initialization of PSSCH sidelink scrambling and DMRS sequence generation (Correction to V2V CR - 36.212) | Intel Corporation | imported from 3GU |
R1‑1609456 | Random resource selection by pedestrian UEs for V2V communication | Intel Corporation | imported from 3GU |
R1‑1609457 | Partial sensing for P2V communication | Intel Corporation | imported from 3GU |
R1‑1609458 | Design considerations on LTE-V2V coexistence with DSRC technology | Intel Corporation | imported from 3GU |
R1‑1609459 | Sidelink congestion control for V2X services | Intel Corporation | imported from 3GU |
R1‑1609460 | Discussion on V2V synchronization procedure | Intel Corporation | imported from 3GU |
R1‑1609461 | On PSBCH physical layer design for V2V communication | Intel Corporation | imported from 3GU |
R1‑1609462 | Sidelink enhancements to support V2V traffic with smaller periodicity | Intel Corporation | imported from 3GU |
R1‑1609463 | On beam combining codebook for Class B FD-MIMO | Intel Corporation | imported from 3GU |
R1‑1609464 | Discussion on advanced CSI feedback | Intel Corporation | imported from 3GU |
R1‑1609465 | Beam broadening for more than 16 antenna ports | Intel Corporation | imported from 3GU |
R1‑1609466 | Discussion on open loop and semi-open loop | Intel Corporation | imported from 3GU |
R1‑1609467 | Discussion on UL DM-RS with IFDMA structure | Intel Corporation | imported from 3GU |
R1‑1609468 | Remaining details on NZP CSI-RS for Class A FD-MIMO | Intel Corporation | imported from 3GU |
R1‑1609469 | Remaining details on overhead reduction for Class B CSI-RS | Intel Corporation | imported from 3GU |
R1‑1609470 | Potential CRS reductions for further enhanced MBMS carriers | Intel Corporation | imported from 3GU |
R1‑1609471 | PBCH coverage enhancements for further enhanced MBMS carriers | Intel Corporation | imported from 3GU |
R1‑1609472 | On SRS transmission without PUSCH | Intel Corporation | imported from 3GU |
R1‑1609473 | Remaing details of SRS triggering with CC switching | Intel Corporation | imported from 3GU |
R1‑1609474 | Collision handling for SRS CC-based switching | Intel Corporation | imported from 3GU |
R1‑1609475 | CRS Usage together with PRS | Intel Corporation | imported from 3GU |
R1‑1609476 | Overall DCI design options for higher data rates for FeMTC | Intel Corporation | imported from 3GU |
R1‑1609477 | Support of larger max TBS for DL and UL | Intel Corporation | imported from 3GU |
R1‑1609478 | Support of larger max channel bandwidth for PDSCH/PUSCH | Intel Corporation | imported from 3GU |
R1‑1609479 | SC-PTM for FeMTC | Intel Corporation | imported from 3GU |
R1‑1609480 | VoLTE enhancements for HD-FDD and TDD UEs | Intel Corporation | imported from 3GU |
R1‑1609481 | Multicast support for NB-IoT | Intel Corporation | imported from 3GU |
R1‑1609482 | Enhancements to paging on non-anchor PRBs | Intel Corporation | imported from 3GU |
R1‑1609483 | Support of two DL and UL processes and larger max TBS values | Intel Corporation | imported from 3GU |
R1‑1609484 | On reducing processing time for 1ms TTI | Intel Corporation | imported from 3GU |
R1‑1609485 | DCI formats for shorten TTI | Intel Corporation | imported from 3GU |
R1‑1609486 | On sPDCCH design for shoten TTI | Intel Corporation | imported from 3GU |
R1‑1609487 | UL design aspects of TTI shortening | Intel Corporation | imported from 3GU |
R1‑1609488 | On the processing time reduction for latency reduction | Intel Corporation | imported from 3GU |
R1‑1609489 | CSI feedback enhancements for non coherent JT | Intel Corporation | imported from 3GU |
R1‑1609490 | Control signalling enhancements for non coherent JT | Intel Corporation | imported from 3GU |
R1‑1609491 | System level evaluation results for non coherent JT | Intel Corporation | imported from 3GU |
R1‑1609492 | Enhancements and system level evaluation of CS/CB CoMP for FD-MIMO | Intel Corporation | imported from 3GU |
R1‑1609493 | Single carrier based waveform for high frequency bands above 40 GHz | Intel Corporation | imported from 3GU |
R1‑1609494 | Further discussion on GI-DFT-s-OFDM for high frequency bands above 40 GHz | Intel Corporation | imported from 3GU |
R1‑1609495 | Views on multiple NR waveform proposals for high bands | Intel Corporation | imported from 3GU |
R1‑1609496 | Considerations on NR waveform with improved spectral containment | Intel Corporation | imported from 3GU |
R1‑1609497 | Link-level analysis of UL NOMA schemes | Intel Corporation | imported from 3GU |
R1‑1609498 | System-level analysis of UL NOMA schemes | Intel Corporation | imported from 3GU |
R1‑1609499 | Grant-free UL transmissions in NR | Intel Corporation | imported from 3GU |
R1‑1609500 | On spreading-based NOMA schemes | Intel Corporation | imported from 3GU |
R1‑1609501 | DM-RS design and channel estimation for UL NOMA | Intel Corporation | imported from 3GU |
R1‑1609502 | Retransmissions and repetitions for UL grant-free NOMA schemes | Intel Corporation | imported from 3GU |
R1‑1609503 | Reference numerology and time alignment | Intel Corporation | imported from 3GU |
R1‑1609504 | Slot and mini-slot numerology and alignment | Intel Corporation | imported from 3GU |
R1‑1609505 | Capability to support multiple numerologies | Intel Corporation | imported from 3GU |
R1‑1609506 | NR physical resource block definition | Intel Corporation | imported from 3GU |
R1‑1609507 | Further details on NR slots | Intel Corporation | imported from 3GU |
R1‑1609508 | Frame Structure for NR unlicensed operation | Intel Corporation | imported from 3GU |
R1‑1609509 | NR frame structure for forward compatibility | Intel Corporation | imported from 3GU |
R1‑1609510 | Discussion on mini-slot structure for URLLC | Intel Corporation | imported from 3GU |
R1‑1609511 | Discussion on Data channel coding for NR | Intel Corporation | imported from 3GU |
R1‑1609512 | Discussion on Control channel coding for NR | Intel Corporation | imported from 3GU |
R1‑1609513 | Modulation schemes for New RAT | Intel Corporation | imported from 3GU |
R1‑1609514 | Reference Signal and Procedure for UE Beam Refinement (BM P-3) | Intel Corporation | imported from 3GU |
R1‑1609515 | On network beam switching and refinement (BM P-2) | Intel Corporation | imported from 3GU |
R1‑1609516 | Beam management for initial and candidate beam discovery (BM P-1) | Intel Corporation | imported from 3GU |
R1‑1609517 | UL beam management | Intel Corporation | imported from 3GU |
R1‑1609518 | Discussion on NR MIMO Transmission Schemes and Transmission Modes | Intel Corporation | imported from 3GU |
R1‑1609519 | Discussion on Beamforming for NR PDCCH | Intel Corporation | imported from 3GU |
R1‑1609520 | UL subband precoding for NR | Intel Corporation | imported from 3GU |
R1‑1609521 | Discussion on NR CSI framework | Intel Corporation | imported from 3GU |
R1‑1609522 | Discussion on NR CSI configuration | Intel Corporation | imported from 3GU |
R1‑1609523 | Discussion on NR CSI contents | Intel Corporation | imported from 3GU |
R1‑1609524 | Study on QCL of DM-RS antenna ports | Intel Corporation | imported from 3GU |
R1‑1609525 | On QCL to support UE beam management | Intel Corporation | imported from 3GU |
R1‑1609526 | On the need of QCL for NR | Intel Corporation | imported from 3GU |
R1‑1609527 | Discussion on DM-RS design for NR | Intel Corporation | imported from 3GU |
R1‑1609528 | Discussion on CSI-RS design for NR | Intel Corporation | imported from 3GU |
R1‑1609529 | Study of phase noise tracking | Intel Corporation | imported from 3GU |
R1‑1609530 | Evaluation results of NR below 6GHz | Intel Corporation | imported from 3GU |
R1‑1609531 | Discussion on UL Power Control | Intel Corporation | imported from 3GU |
R1‑1609532 | Evaluation results of NR above 6GHz | Intel Corporation | imported from 3GU |
R1‑1609533 | Time Advance derivation for non-reciprocal UE | Intel Corporation | imported from 3GU |
R1‑1609534 | UL control channel mapping in time | Intel Corporation | imported from 3GU |
R1‑1609535 | UCI embedding onto UL shared channel | Intel Corporation | imported from 3GU |
R1‑1609536 | UCI contents and UL control channel formats | Intel Corporation | imported from 3GU |
R1‑1609537 | UL control coverage enhancement | Intel Corporation | imported from 3GU |
R1‑1609538 | Resource allocation for NR uplink control channel | Intel Corporation | imported from 3GU |
R1‑1609539 | On the NR physical control channel | Intel Corporation | imported from 3GU |
R1‑1609540 | Reference signal design for NR control channel | Intel Corporation | imported from 3GU |
R1‑1609541 | On the transmission schemes of NR physical control channel | Intel Corporation | imported from 3GU |
R1‑1609542 | NR HARQ and scheduling timing | Intel Corporation | imported from 3GU |
R1‑1609543 | On HARQ support for URLLC | Intel Corporation | imported from 3GU |
R1‑1609544 | LTE/NR coexistence | Intel Corporation | imported from 3GU |
R1‑1609545 | Remaining details of URLLC system level evaluation assumptions | Intel Corporation | imported from 3GU |
R1‑1609546 | On eMBB and URLLC multiplexing | Intel Corporation | imported from 3GU |
R1‑1609547 | Interference measurement and reporting for MU transmission in FD-MIMO | ASTRI, TCL | imported from 3GU |
R1‑1609548 | DMRS design for non-orthogonal UL multiple access user channel estimation | ETRI | imported from 3GU |
R1‑1609549 | Comparison of OFDMA vs LSSA system level UL performance | ETRI | imported from 3GU |
R1‑1609550 | On the PRB definition: subcarrier number analysis | MediaTek Inc. | imported from 3GU |
R1‑1609551 | Reference signal design consideration | MediaTek Inc. | imported from 3GU |
R1‑1609552 | Introduction of RACHless handover for Further mobility enhancement in LTE | ZTE Corporation | imported from 3GU |
R1‑1609553 | Discussion on non-orthogonal MA for eMBB | CATT | imported from 3GU |
R1‑1609554 | Views on remaining issues for NR frame structure | MediaTek Inc. | imported from 3GU |
R1‑1609555 | Discussion on slot strucutre and channel format | MediaTek Inc. | imported from 3GU |
R1‑1609556 | Cross slot scheduling in NR | MediaTek Inc. | imported from 3GU |
R1‑1609557 | On techniques for enhanced UE power efficiency | MediaTek Inc. | imported from 3GU |
R1‑1609558 | Consideration on NR-PDCCH design | MediaTek Inc. | imported from 3GU |
R1‑1609559 | Discussion on UL control channel design | MediaTek Inc. | imported from 3GU |
R1‑1609560 | Preconfigured decoding or transmission candidates in NR | MediaTek Inc. | imported from 3GU |
R1‑1609561 | Consideration on HARQ mechanism in NR | MediaTek Inc. | imported from 3GU |
R1‑1609562 | Consideration on narrowband anchor based access | MediaTek Inc. | imported from 3GU |
R1‑1609563 | DL Based RRM Measurement for NR | MediaTek Inc. | imported from 3GU |
R1‑1609564 | Implementation-specific UF-OFDM for New Radio | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609565 | Specification impact of VoLTE/ViLTE coverage enhancements | China Telecommunications | imported from 3GU |
R1‑1609566 | DCI design for MUST Case 1 and Case 2 | China Telecommunications | imported from 3GU |
R1‑1609567 | On UL Waveforms below 40 GHz | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609568 | Out of band emissions, in-band emissions and EVM requirement considerations for NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609569 | [Draft 36.212 CR] Corrections to RV in eLAA DCI definitions | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609570 | Signalling design on supporting SPS for slidelink transmission mode 3 | Panasonic | imported from 3GU |
R1‑1609571 | Discussion on channel busy ratio measurement in V2X | Panasonic | imported from 3GU |
R1‑1609572 | Discussion on reference signal design for shortened TTI | Panasonic | imported from 3GU |
R1‑1609573 | Discussion on multiplexing between sTTI and TTI in the same subframe | Panasonic | imported from 3GU |
R1‑1609574 | UL simultaneous transmission between sTTI and TTI | Panasonic | imported from 3GU |
R1‑1609575 | Discussion on single level DCI and two-level DCI | Panasonic | imported from 3GU |
R1‑1609576 | Draft CR on DCI formats related with LAA in TS 36.212 | ETRI | imported from 3GU |
R1‑1609577 | Draft CR on timing offset field in TS 36.213 | ETRI | imported from 3GU |
R1‑1609578 | Some simulation results for eMBB | CATR | imported from 3GU |
R1‑1609579 | Simulation results for control channel | CATR | imported from 3GU |
R1‑1609580 | Discussion on non-orthogonal multiple access for URLLC usage scenario | CATR | imported from 3GU |
R1‑1609581 | Initial system level simulation results of new multiple access scheme | CATR | imported from 3GU |
R1‑1609582 | Selection of eMBB coding scheme | Nokia, Alcatel-Lucent Shanghai Bell, Verizon Wireless | imported from 3GU |
R1‑1609583 | Update on eMBB coding performance | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609584 | LDPC link design for eMBB | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609585 | IR HARQ schemes for LDPC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609586 | Discussion on the IR-HARQ support of polar codes | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609587 | Design and performance of polar codes for eMBB | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609588 | False alarm rate of LDPC decoding and CRC requirement | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609589 | Performance of coding candidates for control channels | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609590 | Polar codes for control channels | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609591 | Reed-Muller and BCH codes for control channels | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609592 | LDPC codes for control channels | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609593 | Evaluation criteria for URLLC/mMTC coding scheme | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609594 | Performance of mMTC and URLLC channel coding candidates | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609595 | Digital Modulation for 5G New Radio | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609596 | Waveform Simulation Results for Above 40 GHz | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609597 | Waveform proposal for carrier frequencies beyond 40 GHz | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609598 | Potential for system level gains for low-PAPR waveforms | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609599 | Way forward waveform for carrier frequencies beyond 40 GHz | Nokia, Alcatel-Lucent Shanghai Bell, Mitsubishi Electric, InterDigital Communications | imported from 3GU |
R1‑1609600 | Gray mapped composite constellation of MUST | MediaTek Inc. | imported from 3GU |
R1‑1609601 | Power allocation for CRS based transmission schemes in MUST | MediaTek Inc. | imported from 3GU |
R1‑1609602 | On scheduling restrictions of MUST | MediaTek Inc. | imported from 3GU |
R1‑1609603 | Fallback transmission mode of MUST | MediaTek Inc. | imported from 3GU |
R1‑1609604 | System-level evaluation and design requirements for MUST Case 3 | MediaTek Inc. | imported from 3GU |
R1‑1609605 | Correction to DMRS for MPDCCH associated with P-RNTI | Virtuosys Limited, Qualcomm Incorporated, Intel Corporation | imported from 3GU |
R1‑1609606 | on supporting multicast with large TBS | Sequans Communications | imported from 3GU |
R1‑1609607 | Numerology design and link-level simulation results for high speed scenario | ETRI | imported from 3GU |
R1‑1609608 | Discussion on the subcarrier spacing selection for NR | ETRI | imported from 3GU |
R1‑1609609 | Discussion on time domain frame structure for high speed train scenario with relay for NR | ETRI | imported from 3GU |
R1‑1609610 | Discussion on the additional RS for NR | ETRI | imported from 3GU |
R1‑1609611 | Discussion on RACH procedure for high speed train scenario with relay for NR | ETRI | imported from 3GU |
R1‑1609612 | Discussion on usage scenarios for non-orthogonal multiple access | MediaTek Inc. | imported from 3GU |
R1‑1609613 | Benchmark with NB-IoT with non- orthogonal multiple access | MediaTek Inc. | imported from 3GU |
R1‑1609614 | NR DL Control Channel Coding Selection from UE Perspectives | MediaTek Inc. | imported from 3GU |
R1‑1609615 | On the set of power ratios for MUST Case 1 and 2 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609616 | On standardization of the composite constellations for MUST Case 1 and 2 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609617 | On signaling for MUST CASE1/2/3 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609618 | On slots and mini-slots | Ericsson | imported from 3GU |
R1‑1609619 | On downlink control channels | Ericsson | imported from 3GU |
R1‑1609620 | On scrambling | Ericsson | imported from 3GU |
R1‑1609621 | On carrier bandwidth | Ericsson | imported from 3GU |
R1‑1609622 | On DL HARQ feedback transmission in UL | Ericsson | imported from 3GU |
R1‑1609623 | On fast DL HARQ feedback transmission in UL | Ericsson | imported from 3GU |
R1‑1609624 | On scheduled DL HARQ feedback transmission in UL | Ericsson | imported from 3GU |
R1‑1609625 | On RB structure for mixed numerologies | Ericsson | imported from 3GU |
R1‑1609626 | On RB size | Ericsson | imported from 3GU |
R1‑1609627 | On supported numerologies | Ericsson | imported from 3GU |
R1‑1609628 | On dynamic TDD | Ericsson | imported from 3GU |
R1‑1609629 | On subframes | Ericsson | imported from 3GU |
R1‑1609630 | On UE-specific DC subcarrier in NR | Ericsson | imported from 3GU |
R1‑1609631 | On timing of downlink control signaling | Ericsson | imported from 3GU |
R1‑1609632 | On modulation schemes for NR | Ericsson | imported from 3GU |
R1‑1609633 | On URLLC characteristics | Ericsson | imported from 3GU |
R1‑1609634 | On URLLC design principles | Ericsson | imported from 3GU |
R1‑1609635 | On symbol alignment | Ericsson | imported from 3GU |
R1‑1609636 | On NR Operation in the 60 GHz Unlicensed Band | Ericsson | imported from 3GU |
R1‑1609637 | On channel access mechanisms for NR in unlicensed spectrum | Ericsson | imported from 3GU |
R1‑1609638 | Technology components for unlicensed operation | Ericsson | imported from 3GU |
R1‑1609639 | On autonomous UL transmissions for NR in unlicensed spectrum | Ericsson | imported from 3GU |
R1‑1609640 | Discussion of multi-antenna and highly directional beam-forming for unlicensed operation | Ericsson | imported from 3GU |
R1‑1609641 | On Physical Layer Design Policies for Unlicensed Operation of NR | Ericsson | imported from 3GU |
R1‑1609642 | On extended CP | Ericsson | imported from 3GU |
R1‑1609643 | On UL waveform - discussion | Ericsson | imported from 3GU |
R1‑1609644 | On UL waveform - evaluation | Ericsson | imported from 3GU |
R1‑1609645 | On half-subcarrier shift in NR UL | Ericsson | imported from 3GU |
R1‑1609646 | Summarizing the MA findings in the TR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609647 | On MA resources for grant-free transmission | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609648 | Collision handling for grant-free | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609649 | Grant-free retransmission with diversity and combining for NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609650 | Receiver considerations on UL MA | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609651 | Non-orthogonal coded access (NOCA) | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609652 | Calibration results for UL grant-free transmission | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609653 | Preamble transmission procedures for the mMTC uplink | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609654 | Link adaptation for grant-free transmissions | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609655 | Relationship between grant-free and grant-based transmission | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609656 | On the symbol level alignment across different subcarrier spacings | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609657 | On the number of subcarriers per PRB | Nokia, Alcatel-Lucent Shanghai Bell, Verizon Wireless | imported from 3GU |
R1‑1609658 | Supported numerologies for NR Phase I | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609659 | Guard band arrangement supporting mixed numerology | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609660 | Intra-carrier sub-band for mixed numerology | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609661 | Comparison of ECP and NCP link performance with 60 kHz subcarrier spacing | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609662 | On the subframe and slot strcutures in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609663 | On the mini-slot structures in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609664 | Comparison of slot and mini-slot based approaches for URLLC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609665 | On bandwidth extension solutions in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609666 | On the indication of forward compatibility resources | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609667 | On the unlicensed band operation in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609668 | NR Synchronization signals for idle and connected mode mobility | Ericsson | imported from 3GU |
R1‑1609669 | Overview of synchronization signal design for NR initial access | Ericsson | imported from 3GU |
R1‑1609670 | NR random access procedure | Ericsson | imported from 3GU |
R1‑1609671 | NR PRACH preamble design | Ericsson | imported from 3GU |
R1‑1609672 | NR PRACH preamble evaluations | Ericsson | imported from 3GU |
R1‑1609673 | NR random-access response design | Ericsson | imported from 3GU |
R1‑1609674 | NR random-access response signal format | Ericsson | imported from 3GU |
R1‑1609675 | NR DL mobility measurement signal design | Ericsson | imported from 3GU |
R1‑1609676 | MBSFN reference signal design | Ericsson | imported from 3GU |
R1‑1609677 | Synchronization and acquisition of system information for FeMBMS carrier | Ericsson | imported from 3GU |
R1‑1609678 | CRS reductions in FeMBMS carrier with less than 100% MBSFN subframes | Ericsson | imported from 3GU |
R1‑1609679 | Clarifications about NPRACH configuration parameters | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609680 | Clarifications about NPRACH configuration parameters | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609681 | Discussion on partial sensing of pedestrian UEs | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑1609682 | Considerations on SC-PTM in NBIoT | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑1609683 | Parameters for transmission of SRS in carrier based switching | Ericsson | imported from 3GU |
R1‑1609684 | UE reporting of interruption time for SRS in carrier based switching | Ericsson | imported from 3GU |
R1‑1609685 | Power control for SRS carrier based switching | Ericsson | imported from 3GU |
R1‑1609686 | General principles for handling interruptions with SRS carrier based switching | Ericsson | imported from 3GU |
R1‑1609687 | PUCCH in SRS carrier switching | Ericsson | imported from 3GU |
R1‑1609688 | PUSCH in SRS carrier switching | Ericsson | imported from 3GU |
R1‑1609689 | SRS switching within the Special subframe | Ericsson | imported from 3GU |
R1‑1609690 | Views on Framework of NR MIMO and Beam Management | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑1609691 | Beam Management Views and Designs | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑1609692 | Initial Simulation Results of Beam Search | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑1609693 | Views on NR MIMO Transmission Schemes | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑1609694 | Views on NR CSI Acquisition and Report | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑1609695 | Views on NR Reference Signal for Beam and CSI measurement | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑1609696 | Initial NR MIMO Calibration Results | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑1609697 | Discussion of NR Initial Access | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑1609698 | Remaining numerology related aspects | Panasonic Corporation | imported from 3GU |
R1‑1609699 | Outstanding Physical Layer Structure Details and Receiver Behavior for Sidelink V2V | Ericsson | imported from 3GU |
R1‑1609700 | Remaining frame structure discussion | Panasonic Corporation | imported from 3GU |
R1‑1609701 | NR synchronization signal and DL broadcast signal | Panasonic Corporation | imported from 3GU |
R1‑1609702 | Discussion on the NR mobility | Panasonic Corporation | imported from 3GU |
R1‑1609703 | Antenna pattern at UE/RSU in NR eV2X | Ericsson | imported from 3GU |
R1‑1609704 | Discussion on NR duplexing | Panasonic Corporation | imported from 3GU |
R1‑1609705 | Overview on DL control channel design | Panasonic Corporation | imported from 3GU |
R1‑1609706 | Timing relation dependency to slots transmission direction indication method | Panasonic Corporation | imported from 3GU |
R1‑1609707 | Autonomous Resource allocation for multiple retransmissions | Ericsson | imported from 3GU |
R1‑1609708 | Discussion of QC-LDPC code design with regular degree-3 for NR | National Taiwan University | imported from 3GU |
R1‑1609709 | Radio measurements for congestion control for V2X | Ericsson | imported from 3GU |
R1‑1609710 | Discussion on Coexistence Between Different Technologies for ITS Services | Ericsson | imported from 3GU |
R1‑1609711 | Detection Sequence in LTE-ITS Sidelink for Coexistence with Other Access Technologies | Ericsson | imported from 3GU |
R1‑1609712 | Congestion Control Framework for V2V | Ericsson | imported from 3GU |
R1‑1609713 | Discussions on simulation scenarios of NR eV2X at 63GHz | Ericsson | imported from 3GU |
R1‑1609714 | Discussions on traffic model for NR eV2X | Ericsson | imported from 3GU |
R1‑1609715 | QCL Issues of Joint Transmission | ZTE, ASTRI | imported from 3GU |
R1‑1609716 | On Resource Assignment and Interference Handling for Flexible TDD | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609717 | Distributed Synchronization Procedure for V2X over PC5 | Ericsson | imported from 3GU |
R1‑1609718 | On the Need for V2V Gaps | Ericsson | imported from 3GU |
R1‑1609719 | Mechanisms for releasing V2X SPS | Ericsson | imported from 3GU |
R1‑1609720 | Receiver Timing Assumptions for V2V SL Operation | Ericsson | imported from 3GU |
R1‑1609721 | Outstanding details of PSBCH for V2V over PC5 | Ericsson | imported from 3GU |
R1‑1609722 | New Radio MIMO Access Procedures | National Instruments Corp. | imported from 3GU |
R1‑1609723 | VoLTE coverage enhancement | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609724 | Partial sensing for V2P | Ericsson | imported from 3GU |
R1‑1609725 | Over The Air Calibration For Reciprocity Based MIMO | National Instruments Corp. | imported from 3GU |
R1‑1609726 | Pool design for V2V | Ericsson | imported from 3GU |
R1‑1609727 | Pools for V2X | Ericsson LM | imported from 3GU |
R1‑1609728 | Study of PN Models for above 6 GHz with experimental data | National Instruments Corp. | imported from 3GU |
R1‑1609729 | Outstanding issues for mode-4 resource allocation | Ericsson | imported from 3GU |
R1‑1609730 | Resource allocation for exceptional pools | Ericsson | imported from 3GU |
R1‑1609731 | V2V Signals Transmission Dropping for SLSS Reception | Ericsson | imported from 3GU |
R1‑1609732 | SL-SPS and DCI design for V2X | Ericsson | imported from 3GU |
R1‑1609733 | SLSS/PSBCH and Transmitter Behavior under Congestion Control Restrictions | Ericsson | imported from 3GU |
R1‑1609734 | Support for smaller resource reservation periods in V2X | Ericsson | imported from 3GU |
R1‑1609735 | Zero-Header Zero-Tail Random Access Preambles for New Radio | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609736 | Cyclic delay-Doppler shifted M-Sequences for New Radio PRACH | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609737 | Random Access Principles for New Radio | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609738 | RACH resource configuration for single-beam and multi-beam operation | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609739 | On the DL control channel structure for NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609740 | On the UL control channel structure for NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609741 | Input to control channel design from a scheduler perspective | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609742 | On HARQ/scheduling timing and self-contained operation | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609743 | Enhanced redundancy matching for HARQ transmission | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609744 | HARQ operation for large transport block sizes | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609745 | Early Hybrid ARQ Feedback for the 5G New Radio | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609746 | HARQ Pooling for Carrier Aggregation in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609747 | Punctured Scheduling for Low Latency Transmissions | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609748 | Semi-persistent scheduling for 5G new radio URLLC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609749 | Pause-Resume Scheduling for Low Latency Transmissions | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609750 | Support for TDM mode | Ericsson | imported from 3GU |
R1‑1609751 | Discussion on UE decoding capabilities | Ericsson | imported from 3GU |
R1‑1609752 | UL-SPS and DCI design for V2X | Ericsson | imported from 3GU |
R1‑1609753 | Update to channel models for eV2X evaluation | Ericsson | imported from 3GU |
R1‑1609754 | Beam management principles | Ericsson | imported from 3GU |
R1‑1609755 | On codewords and layer mapping | Ericsson | imported from 3GU |
R1‑1609756 | On NR MIMO below 6 GHz | Ericsson | imported from 3GU |
R1‑1609757 | UL MIMO in NR | Ericsson | imported from 3GU |
R1‑1609758 | Overview of CSI framework for NR | Ericsson | imported from 3GU |
R1‑1609759 | On CSI reporting methods in NR | Ericsson | imported from 3GU |
R1‑1609760 | Decoupled CSI framework for NR | Ericsson | imported from 3GU |
R1‑1609761 | Details on the unified CSI framework for NR | Ericsson | imported from 3GU |
R1‑1609762 | Port combining codebook for NR | Ericsson | imported from 3GU |
R1‑1609763 | Aperiodic CSI and CSI-RS resource pooling | Ericsson | imported from 3GU |
R1‑1609764 | On UL RS for CSI measurements | Ericsson | imported from 3GU |
R1‑1609765 | CSI-RS Design | Ericsson | imported from 3GU |
R1‑1609766 | Discussion on QCL | Ericsson | imported from 3GU |
R1‑1609767 | Demodulation reference signal design principles | Ericsson | imported from 3GU |
R1‑1609768 | Frame structure and DMRS positions | Ericsson | imported from 3GU |
R1‑1609769 | DMRS density configurations in the time domain | Ericsson | imported from 3GU |
R1‑1609770 | DMRS placement configurations | Ericsson | imported from 3GU |
R1‑1609771 | On PRB bundling for NR | Ericsson | imported from 3GU |
R1‑1609772 | Concatenated block RS design | Ericsson | imported from 3GU |
R1‑1609773 | IC friendliness vs configurable DMRS | Ericsson | imported from 3GU |
R1‑1609774 | Channel model for evaluation of Rural scenario | Ericsson | imported from 3GU |
R1‑1609775 | Path loss model for evaluation of mMTC | Ericsson | imported from 3GU |
R1‑1609776 | Correction for O-I modeling for RMa | Ericsson | imported from 3GU |
R1‑1609777 | Draft CR on eLAA UL Multicarrier channel access | BROADCOM LIMITED | imported from 3GU |
R1‑1609778 | Further discussions on FB-OFDM | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609779 | Further evaluations on FB-OFDM | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609780 | Text Proposal on TR38.802 for NR waveform | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609781 | Satellite Aspects- Forward Compatibility Consideration | Dish Network | imported from 3GU |
R1‑1609782 | Introduction of HS-SCCH Order for HS-SCCH DRx feature in enhanced Cell Fach | Qualcomm Europe Inc.(France) | imported from 3GU |
R1‑1609783 | Transmission Options for the mMTC Grant-Free Uplink | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609784 | UE Procedures for HS-SCCH DRx feature in enhanced Cell Fach | Qualcomm Europe Inc.(France) | imported from 3GU |
R1‑1609785 | e-mail discussion summary [86-28] on additional feature calibration | Samsung | imported from 3GU |
R1‑1609786 | Comments on Pool Configuration with Random Resource Selection | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609787 | On resource selection for V2P communication | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609788 | On congestion control for PC5-based V2X | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609789 | Enhancements to sidelink synchronization | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609790 | On Prioritization of V2V Sidelink TX over WAN UL TX | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609791 | Proposals for frame format supporting different CP families | Mitsubishi Electric | imported from 3GU |
R1‑1609792 | mmWave UW DFTsOFDM link level evaluation | Mitsubishi Electric | imported from 3GU |
R1‑1609793 | TR25.996_CR_Equation_Numbering | Fraunhofer HHI | imported from 3GU |
R1‑1609794 | TR36.814_CR_Equation_Numbering | Fraunhofer HHI | imported from 3GU |
R1‑1609795 | TR36.873_CR_Equation_Numbering | Fraunhofer HHI | imported from 3GU |
R1‑1609796 | TR38.900_CR_Section_7.5 | Fraunhofer HHI | imported from 3GU |
R1‑1609797 | TR38.900_CR_Section_7.6.2.2 | Fraunhofer HHI | imported from 3GU |
R1‑1609798 | TR38.900_CR_Section_7.7.1 | Fraunhofer HHI | imported from 3GU |
R1‑1609799 | TR38.900_CR_Section_8.4 | Fraunhofer HHI | imported from 3GU |
R1‑1609800 | On unified NR frame structure for different spectrum types | ZTE | imported from 3GU |
R1‑1609801 | Discussion on grant-free transmission based on sensing | ZTE | imported from 3GU |
R1‑1609802 | Operation on high frequency band of unlicensed spectrum in NR | ZTE | imported from 3GU |
R1‑1609803 | Discussion on NR operation in unlicensed spectrum | ZTE | imported from 3GU |
R1‑1609804 | Scheduling of V2X SPS resources | ZTE | imported from 3GU |
R1‑1609805 | Details of random selection by pedestrian UEs | ZTE | imported from 3GU |
R1‑1609806 | Details of resource selection using partial sensing by P-UEs | ZTE | imported from 3GU |
R1‑1609807 | Co-channel coexistence between DSRC and LTE V2V on same channel | ZTE | imported from 3GU |
R1‑1609808 | Discussion on congestion control of PC5 carrier | ZTE | imported from 3GU |
R1‑1609809 | Remaining enhancement to sidelink synchronization | ZTE | imported from 3GU |
R1‑1609810 | Discussion on smaller periodicity | ZTE | imported from 3GU |
R1‑1609811 | TP on PSBCH | ZTE | imported from 3GU |
R1‑1609812 | Discussion on PSD offset with PSCCH and PSSCH | ZTE | imported from 3GU |
R1‑1609813 | Uplink waveform evaluations and proposals for NR Phase 1 | Panasonic Corporation | imported from 3GU |
R1‑1609814 | Multiple access schemes for NR phase 1 | Panasonic Corporation | imported from 3GU |
R1‑1609815 | Discussion on frequency domain frame structure for NR | Panasonic Corporation | imported from 3GU |
R1‑1609816 | Discussion on uplink control channel for NR | Panasonic Corporation | imported from 3GU |
R1‑1609817 | TP on random selection of PSCCH cyclic shift | ZTE | imported from 3GU |
R1‑1609818 | NR PSS Design for Wideband and Narrowband UEs | Sierra Wireless, S.A. | imported from 3GU |
R1‑1609819 | Ack Bundling Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R1‑1609820 | Considerations on short TTI design | Mediatek Inc. | imported from 3GU |
R1‑1609821 | Considerations on processing time reduction for legacy TTIs | Mediatek Inc. | imported from 3GU |
R1‑1609822 | UL RS design for short TTI | Mediatek Inc. | imported from 3GU |
R1‑1609823 | DL DMRS and DCI design for short TTI | Mediatek Inc. | imported from 3GU |
R1‑1609824 | Correction on SSTD definition | CATT | imported from 3GU |
R1‑1609825 | OTFS Performance in High Doppler with Varying Subcarrier Spacing | Cohere Technologies | imported from 3GU |
R1‑1609826 | Clarification of number of repetitions of PUCCH | ZTE | imported from 3GU |
R1‑1609827 | Clarification on nrs-Power related description | ZTE | imported from 3GU |
R1‑1609828 | Discussion on support of larger PDSCH/PUSCH bandwidth for MTC | ZTE | imported from 3GU |
R1‑1609829 | Resource allocation for larger PDSCH/PUSCH bandwidth for MTC | ZTE | imported from 3GU |
R1‑1609830 | Support of HARQ-ACK bundling for MTC | ZTE | imported from 3GU |
R1‑1609831 | Discussion on Number of DL processes in FD-FDD for MTC | ZTE | imported from 3GU |
R1‑1609832 | Discussion on multicast support for MTC | ZTE | imported from 3GU |
R1‑1609833 | Considerations on multicast support for NB-IoT | ZTE | imported from 3GU |
R1‑1609834 | Considerations on power consumption and latency reduction | ZTE | imported from 3GU |
R1‑1609835 | OTDOA positioning for NB-IoT | ZTE | imported from 3GU |
R1‑1609836 | UTDOA positioning for NB-IoT | ZTE | imported from 3GU |
R1‑1609837 | Discussion for aspects of supporting Low Power class UE for NB-IoT | ZTE | imported from 3GU |
R1‑1609838 | Remaining issues on multiple PRB support for NB-IoT | ZTE | imported from 3GU |
R1‑1609839 | Discussion on OTDOA support for eMTC | ZTE | imported from 3GU |
R1‑1609840 | Frequency domain measurement restriction for reduced overhead NZP CSI-RS | Ericsson | imported from 3GU |
R1‑1609841 | On Supported CSI-RS Density Values for Class A in eFD-MIMO | Ericsson | imported from 3GU |
R1‑1609842 | Remaining details on aggregation of CSI-RS configurations | Ericsson | imported from 3GU |
R1‑1609843 | CDM-8 for NZP CSI-RS | Ericsson | imported from 3GU |
R1‑1609844 | Mechanism for Class B overhead reduction | Ericsson | imported from 3GU |
R1‑1609845 | Remaining details of Aperiodic and Multi-shot CSI-RS | Ericsson | imported from 3GU |
R1‑1609846 | On Rate Matching for Beamformed CSI-RS | Ericsson | imported from 3GU |
R1‑1609847 | QCL for Multi-Shot or Aperiodic CSI-RS | Ericsson | imported from 3GU |
R1‑1609848 | On Cyclic Shifts for UL DMRS with IFDMA | Ericsson | imported from 3GU |
R1‑1609849 | On RPF, Control Signalling, and Power Boosting for UL DMRS | Ericsson | imported from 3GU |
R1‑1609850 | On new UL DMRS sequences of lengths 6, 18 and 30 | Ericsson | imported from 3GU |
R1‑1609851 | Email summary: [86-14] FD-MIMO Port Layouts and Oversampling Factors | Ericsson | imported from 3GU |
R1‑1609852 | Performance comparison of different antenna port layouts | Ericsson | imported from 3GU |
R1‑1609853 | Generalized Hybrid CSI Reporting | Ericsson | imported from 3GU |
R1‑1609854 | Orthogonal vs. non-orthogonal basis for advanced CSI reporting | Ericsson | imported from 3GU |
R1‑1609855 | Phase and amplitude vs. phase only beam combining for advanced CSI reporting | Ericsson | imported from 3GU |
R1‑1609856 | Performance of Advanced CSI with 4 & 8 Tx Antennas | Ericsson | imported from 3GU |
R1‑1609857 | Support of advanced CSI for CLASS B | Ericsson | imported from 3GU |
R1‑1609858 | Feedback Mechanisms for Advanced CSI | Ericsson | imported from 3GU |
R1‑1609859 | Draft LS on Support for Advanced CSI Reporting in Higher Layer Signaling | Ericsson | imported from 3GU |
R1‑1609860 | On need of interference measurement enhancement in Rel-14 | Ericsson | imported from 3GU |
R1‑1609861 | Details of Semi-Open Loop Transmission | Ericsson | imported from 3GU |
R1‑1609862 | Semi-Open Loop Transmission Scheme | Ericsson | imported from 3GU |
R1‑1609863 | Non-Coherent JT Enhancements | Ericsson | imported from 3GU |
R1‑1609864 | Further results on CS/CB in indoor scenario | Ericsson | imported from 3GU |
R1‑1609865 | Random Resource Selection for Pedestrian UEs | Sharp | imported from 3GU |
R1‑1609866 | Further Discussions on Power Efficient Sensing for P-UEs | Sharp | imported from 3GU |
R1‑1609867 | Further discussion on the change notification of SC-PTM for FeMTC | Sharp | imported from 3GU |
R1‑1609868 | Further discussion on change notification of SC-PTM for NB-IoT | Sharp | imported from 3GU |
R1‑1609869 | Shortened processing time operation for 1ms TTI | Sharp | imported from 3GU |
R1‑1609870 | HARQ-ACK feedback for 1ms TTI with reduced processing time | Sharp | imported from 3GU |
R1‑1609871 | Association timing for sTTI with different UL and DL lengths | Sharp | imported from 3GU |
R1‑1609872 | Processing time reduction for TDD with 1-slot sTTI | Sharp | imported from 3GU |
R1‑1609873 | Supporting URLLC in NR: Views and Recommendations | Sharp | imported from 3GU |
R1‑1609874 | Supporting URLLC in NR: Views and Recommendations | Sharp | imported from 3GU |
R1‑1609875 | Numerology for DL synchronization in NR | Sharp | imported from 3GU |
R1‑1609876 | Numerology for PRACH preamble in NR | Sharp | imported from 3GU |
R1‑1609877 | DL HARQ and UL scheduling timing in NR | Sharp | imported from 3GU |
R1‑1609878 | Beam Management for Control Channel | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1609879 | Discussion on the design for synchronization signal | Shenzhen Coolpad Technologies | imported from 3GU |
R1‑1609880 | Discussion on the DL control channel design | Shenzhen Coolpad Technologies | imported from 3GU |
R1‑1609881 | Discussion on the DL control channel design | Shenzhen Coolpad Technologies | imported from 3GU |
R1‑1609882 | Joint group DCI for SRS switching | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609883 | HARQ timing for PUSCH transmission in special subframe | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609884 | HARQ timing for TTI bundling for PUSCH transmission in special subframe | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1609885 | Non-precoded CSI-RS design for eFD-MIMO | Potevio | imported from 3GU |
R1‑1609886 | Discussion on flexible slot structure with different numerologies | Potevio | imported from 3GU |
R1‑1609887 | Coexistence of CP OFDM and CP DFT-s-OFDM for NR UL | InterDigital Communications | imported from 3GU |
R1‑1609888 | Details of multiple SPS configurations for V2X over Uu | Potevio | imported from 3GU |
R1‑1609889 | Waveform design considerations for carrier frequencies above 40 GHz | InterDigital Communications | imported from 3GU |
R1‑1609890 | Requirements on Future Railway Mobile Communcation | ZTE, China Academy of Railway Sciences (CARS), CATR | imported from 3GU |
R1‑1609891 | Interleaved-based MA in Fading and Asynchronous environments | InterDigital Communications | imported from 3GU |
R1‑1609892 | On the Performance of Interleaved-based Multiple Access Schemes | InterDigital Communications | imported from 3GU |
R1‑1609893 | Considerations on UL grant-free transmissions for mMTC | InterDigital Communications | imported from 3GU |
R1‑1609894 | System level evaluations for multiple CP lengths | InterDigital Communications | imported from 3GU |
R1‑1609895 | Summary of Channel Coding Simulation Data Sharing | InterDigital Communications | imported from 3GU |
R1‑1609896 | Performance Evaluation of Channel Codes for eMBB Control Channel | InterDigital Communications | imported from 3GU |
R1‑1609897 | Updated LDPC Simulation Data Sharing | InterDigital Communications | imported from 3GU |
R1‑1609898 | Performance Evaluation of Puncturing Schemes for Polar Codes | InterDigital Communications | imported from 3GU |
R1‑1609899 | Interleaver for Polar Codes | InterDigital Communications | imported from 3GU |
R1‑1609900 | Performance Evaluation of Dual Carrier Modulation for New Radio | InterDigital Communications | imported from 3GU |
R1‑1609901 | Evaluation of Spatial Modulation with Spatial Correlation and Imperfect Channel Estimation | InterDigital Communications | imported from 3GU |
R1‑1609902 | On Fractional N-ary Modulation for NR | InterDigital Communications | imported from 3GU |
R1‑1609903 | Partial reciprocity based UL MIMO schemes | InterDigital Communications | imported from 3GU |
R1‑1609904 | Impact of UE Calibration in a Reciprocity-based UL MIMO Transmission | InterDigital Communications | imported from 3GU |
R1‑1609905 | MIMO transmission schemes for NR | InterDigital Communications | imported from 3GU |
R1‑1609906 | CSI acquisition for NR MIMO | InterDigital Communications | imported from 3GU |
R1‑1609907 | Consideration of Short Block-length for CQI Feedback for NR | InterDigital Communications | imported from 3GU |
R1‑1609908 | Considerations on DCI design for shortened TTI | Beijing Xiaomi Mobile Software | imported from 3GU |
R1‑1609909 | Considerations on demodulation RS design for NR | InterDigital Communications | imported from 3GU |
R1‑1609910 | Considerations on measurement RS design for NR | InterDigital Communications | imported from 3GU |
R1‑1609911 | On the need of phase noise correction reference signal | InterDigital Communications | imported from 3GU |
R1‑1609912 | Unified Control Channel Design for NR | InterDigital Communications | imported from 3GU |
R1‑1609913 | On Non-orthogonal Control Channel Design for NR | InterDigital Communications | imported from 3GU |
R1‑1609914 | Shortened TTI design | Motorola Mobility | imported from 3GU |
R1‑1609915 | Multiplexing of Regular TTI and shortened TTI | Motorola Mobility | imported from 3GU |
R1‑1609916 | CSI aspects of shortened TTI operation | Motorola Mobility | imported from 3GU |
R1‑1609917 | Synchronisation signal in NR | Motorola Mobility | imported from 3GU |
R1‑1609918 | Random access in NR | Motorola Mobility | imported from 3GU |
R1‑1609919 | Flexible frame structure and control signalling for NR | Motorola Mobility | imported from 3GU |
R1‑1609920 | Considerations for Initial Synchronization in NR | InterDigital Communications | imported from 3GU |
R1‑1609921 | Design and performance evaluation for advanced CSI feedback | Huawei, HiSilicon | imported from 3GU |
R1‑1609922 | Advanced CSI feedback for Class B | Huawei, HiSilicon | imported from 3GU |
R1‑1609923 | Support of multi-shot CSI-RS | Huawei, HiSilicon | imported from 3GU |
R1‑1609924 | Support of aperiodic CSI-RS | Huawei, HiSilicon | imported from 3GU |
R1‑1609925 | Discussion on DMRS sequence design | Huawei, HiSilicon | imported from 3GU |
R1‑1609926 | Codebook design for up to 32 CSI-RS ports | Huawei, HiSilicon | imported from 3GU |
R1‑1609927 | Discussion on Hybrid CSI reporting | Huawei, HiSilicon | imported from 3GU |
R1‑1609928 | DMRS based semi-open loop transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1609929 | Introduction of PRACH enhancement for high speed scenario | Huawei | imported from 3GU |
R1‑1609930 | Discussion on power allocation issue for MUST Case 1&2 | Huawei, HiSilicon | imported from 3GU |
R1‑1609931 | Simulation results for MUST Case 3 | Huawei, HiSilicon | imported from 3GU |
R1‑1609932 | SC-PTM Enhancements for V2X | MediaTek Inc. | imported from 3GU |
R1‑1609933 | On suitability of Uu transport and PC5 transport for V2X Solutions | MediaTek Inc. | imported from 3GU |
R1‑1609934 | Draft LS response to 802.11 regarding LAA | Qualcomm Incorporated | imported from 3GU |
R1‑1609935 | Draft LS response to WFA regarding LAA | Qualcomm Incorporated | imported from 3GU |
R1‑1609936 | On RAN2 LS on further mobility enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1609937 | Discussion on periodic and aperiodic CSI reporting in LAA | Qualcomm Incorporated | imported from 3GU |
R1‑1609938 | Draft CR on aperiodic CSI reporting in LAA | Qualcomm Incorporated | imported from 3GU |
R1‑1609939 | Draft CR clarification on spectral efficiency | Qualcomm Incorporated | imported from 3GU |
R1‑1609940 | Draft CR clarification on PUSCH repetition levels | Qualcomm Incorporated | imported from 3GU |
R1‑1609941 | CR for clarification on i_0 value | Qualcomm Incorporated | imported from 3GU |
R1‑1609942 | CR for clarification on A-CSI without hopping | Qualcomm Incorporated, Samsung | imported from 3GU |
R1‑1609943 | CR for clarification on NPRACH and NPUSCH collision | Qualcomm Incorporated | imported from 3GU |
R1‑1609944 | Discussion on UL resource allocation for 10MHz eLAA | Qualcomm Incorporated | imported from 3GU |
R1‑1609945 | Draft 212 CR on UL resource allocation for 10MHz eLAA | Qualcomm Incorporated | imported from 3GU |
R1‑1609946 | Draft 213 CR on UL resource allocation for 10MHz eLAA | Qualcomm Incorporated | imported from 3GU |
R1‑1609947 | Discussion on trigger monitoring timeline for two stage triggered grants in eLAA | Qualcomm Incorporated | imported from 3GU |
R1‑1609948 | Draft CR on trigger monitoring timeline for two stage triggered grants in eLAA | Qualcomm Incorporated | imported from 3GU |
R1‑1609949 | Dicussion on simultanoeus transmission on the non-LAA and LAA Scells | Qualcomm Incorporated | imported from 3GU |
R1‑1609950 | Draft CR on SRS dropping rules for eLAA | Qualcomm Incorporated | imported from 3GU |
R1‑1609951 | Discussion on RI transmission on PUSCH for LAA Scells | Qualcomm Incorporated | imported from 3GU |
R1‑1609952 | Draft CR for RI transmission on PUSCH for LAA Scells | Qualcomm Incorporated | imported from 3GU |
R1‑1609953 | Frame structure and maximum timing advance for eLAA | Qualcomm Incorporated | imported from 3GU |
R1‑1609954 | On UE assumptions for UL LBT and start of UL transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1609955 | Remaining issues for V2V | Qualcomm Incorporated | imported from 3GU |
R1‑1609956 | Uplink SPS enhancements for V2X | Qualcomm Incorporated | imported from 3GU |
R1‑1609957 | Sensing based resource selection for V2P | Qualcomm Incorporated | imported from 3GU |
R1‑1609958 | Co-channel coexistence for DSRC and LTE-V2V | Qualcomm Incorporated | imported from 3GU |
R1‑1609959 | Inter-PLMN support for PC5 and Uu | Qualcomm Incorporated | imported from 3GU |
R1‑1609960 | Congestion control for V2V | Qualcomm Incorporated | imported from 3GU |
R1‑1609961 | Synchronization Procedure for V2V | Qualcomm Incorporated | imported from 3GU |
R1‑1609962 | Low latency support for V2V | Qualcomm Incorporated | imported from 3GU |
R1‑1609963 | Sidelink gap for V2V transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1609964 | Discussion on advanced CSI reporting for eFD-MIMO | Qualcomm Incorporated | imported from 3GU |
R1‑1609965 | Discussion on interference measurement enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1609966 | Discussion on analog CSI feedback | Qualcomm Incorporated | imported from 3GU |
R1‑1609967 | Non-precoded CSI-RS Codebooks for 20-32 ports | Qualcomm Incorporated | imported from 3GU |
R1‑1609968 | DMRS based semi-OL Transmission schemes and CSI reporting | Qualcomm Incorporated | imported from 3GU |
R1‑1609969 | Remaining details on uplink DMRS enhancements for FD-MIMO | Qualcomm Incorporated | imported from 3GU |
R1‑1609970 | Non-precoded CSI-RS design for up to 32 ports | Qualcomm Incorporated | imported from 3GU |
R1‑1609971 | Discussion on activation and release mechanism for beamformed CSI-RS | Qualcomm Incorporated | imported from 3GU |
R1‑1609972 | Remaining details on aperiodic CSI-RS | Qualcomm Incorporated | imported from 3GU |
R1‑1609973 | Remaining details on CSI reporting for hybrid CSI-RS | Qualcomm Incorporated | imported from 3GU |
R1‑1609974 | Superposition transmissions | Qualcomm Incorporated | imported from 3GU |
R1‑1609975 | Power ratio set considerations for MUST | Qualcomm Incorporated | imported from 3GU |
R1‑1609976 | Mechanisms for efficient operation | Qualcomm Incorporated | imported from 3GU |
R1‑1609977 | MUST UE pairing with existing CQI feedback | Qualcomm Incorporated | imported from 3GU |
R1‑1609978 | Design options for longer cyclic prefix and link level simulation results | Qualcomm Incorporated | imported from 3GU |
R1‑1609979 | RS pattern for longer CP | Qualcomm Incorporated | imported from 3GU |
R1‑1609980 | Initial acquisition and system information for eMBMS | Qualcomm Incorporated | imported from 3GU |
R1‑1609981 | MBSFN subframes without a unicast control region and cell-specific reference signals | Qualcomm Incorporated | imported from 3GU |
R1‑1609982 | Considerations on further CRS reduction | Qualcomm Incorporated | imported from 3GU |
R1‑1609983 | Details for SRS and PRACH switching and transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1609984 | DCI design | Qualcomm Incorporated | imported from 3GU |
R1‑1609985 | Collision Handling | Qualcomm Incorporated | imported from 3GU |
R1‑1609986 | Support of multiple antennas for SRS switching | Qualcomm Incorporated | imported from 3GU |
R1‑1609987 | Introduction of UE inter-frequency RSTD calibration accuracy reporting | Qualcomm Incorporated | imported from 3GU |
R1‑1609988 | Draft CR 36.211: Additional PRS configuration indices for PRS-based Terrestrial Beacon Systems | Qualcomm Incorporated | imported from 3GU |
R1‑1609989 | Draft CR 36.213: Introduction of PRS-only transmission points for PRS-based Terrestrial Beacon Systems | Qualcomm Incorporated | imported from 3GU |
R1‑1609990 | PRS CP length in MBSFN subframes | Qualcomm Incorporated | imported from 3GU |
R1‑1609991 | PUSCH in UpPTS | Qualcomm Incorporated | imported from 3GU |
R1‑1609992 | Support of higher data rates | Qualcomm Incorporated | imported from 3GU |
R1‑1609993 | Support of larger data channel bandwidth | Qualcomm Incorporated | imported from 3GU |
R1‑1609994 | Support of HARQ-ACK bundling in HD-FDD | Qualcomm Incorporated | imported from 3GU |
R1‑1609995 | Support of multicast | Qualcomm Incorporated | imported from 3GU |
R1‑1609996 | OTDOA enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1609997 | VoLTE enhancements for eMTC | Qualcomm Incorporated | imported from 3GU |
R1‑1609998 | Paging channel enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1609999 | Power consumption reduction techniques for eMTC | Qualcomm Incorporated | imported from 3GU |
R1‑1610000 | Downlink-based narrowband positioning | Qualcomm Incorporated | imported from 3GU |
R1‑1610001 | Uplink-based narrowband positioning | Qualcomm Incorporated | imported from 3GU |
R1‑1610002 | Support of multicast | Qualcomm Incorporated | imported from 3GU |
R1‑1610003 | Non-anchor PRB enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1610004 | Support of larger TBS and 2 HARQ processes | Qualcomm Incorporated | imported from 3GU |
R1‑1610005 | Shortened processing time for 1ms TTI for DL | Qualcomm Incorporated | imported from 3GU |
R1‑1610006 | Shortened processing time for 1ms TTI for UL | Qualcomm Incorporated | imported from 3GU |
R1‑1610007 | Dl design for shortened TTI | Qualcomm Incorporated | imported from 3GU |
R1‑1610008 | UL design for shortened TTI | Qualcomm Incorporated | imported from 3GU |
R1‑1610009 | Processing time reduction and related procedures for DL | Qualcomm Incorporated | imported from 3GU |
R1‑1610010 | Processing time reduction and related procedures for UL | Qualcomm Incorporated | imported from 3GU |
R1‑1610011 | TDD-specific design for shortened TTI | Qualcomm Incorporated | imported from 3GU |
R1‑1610012 | Link evaluation of DL data transmission under symbol-dependent impact | Qualcomm Incorporated | imported from 3GU |
R1‑1610013 | PRACH enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1610014 | Coverage emhancement techniques | Qualcomm Incorporated | imported from 3GU |
R1‑1610015 | Specification impact of DFTs-OFDM vs OFDM | Qualcomm Incorporated | imported from 3GU |
R1‑1610016 | Enhancements for non-coherent JT | Qualcomm Incorporated | imported from 3GU |
R1‑1610017 | Enhancements for coordinated scheduling/beamforming with FD-MIMO | Qualcomm Incorporated | imported from 3GU |
R1‑1610018 | Clarification on power ramping for NPRACH | MediaTek Inc. | imported from 3GU |
R1‑1610019 | Discussion on SC-PTM for NB-IoT | MediaTek Inc. | imported from 3GU |
R1‑1610020 | Discussion on two HARQ process | MediaTek Inc. | imported from 3GU |
R1‑1610021 | Support of larger Max TBS | MediaTek Inc. | imported from 3GU |
R1‑1610022 | UE support for multiple numerologies for NR | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑1610023 | Frame structure for NR | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑1610024 | On the number of subcarriers per PRB for NR | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑1610025 | HARQ bundling design for HD-FDD^^ in Rel-14 MTC | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610026 | Indication of up to 10 HARQ process number for FD-FDD in Rel-14 MTC | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610027 | Discussion on multicast support for Rel-14 NB-IoT | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610028 | Correction on equation for MPDCCH search space and starting subframe position | NTT DOCOMO, INC., Panasonic | imported from 3GU |
R1‑1610029 | MU interference measurement and MU-CQI enhancement | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610030 | On feedback enhancements to support advanced CSI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610031 | Semi-open-loop MIMO with beamformed CSI-RS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610032 | Low-density CSI-RS and port sharing | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610033 | Discussion on Resource Sharing of Beamformed CSI-RS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610034 | CSI Reporting for Hybrid CSI-RS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610035 | Discussion on details of pedestrian UE partial sensing | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610036 | Discussion on eNB management of prioritizing V2x SL Tx over WAN Tx | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610037 | Multiple SPS support for sidelink and uplink V2X | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610038 | SLSS Enhancements for GNSS based Synchronization | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610039 | Discussion on background sensing | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610040 | Discussion on power ratios for MUST scheme | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610041 | Discussion on remaining issues and signaling design for DL MUST | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610042 | Views on shortened processing time for 1ms TTI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610043 | HARQ/Scheduling for shortened processing time for 1ms TTI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610044 | Views on CSI feedback for 1ms TTI with shortened processing time | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610045 | s(E)PDCCH for shortened TTI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610046 | sPDSCH for shortened TTI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610047 | sPUCCH for shortened TTI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610048 | sPUSCH for shortened TTI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610049 | Views on processing time reduction and related procedures | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610050 | Views on CSI feedback for shortened TTI with reduced processing time | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610051 | On PRB alignment for different NR numerologies | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑1610052 | Workplan for Study on NR Access Technology | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610053 | Draft TR 38.802 Study on New Radio (NR) Access Technology - Physical Layer Aspects | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610054 | Views on UL waveform for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610055 | Wider BW operation for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610056 | Design for RACH preamble for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610057 | Design for RACH procedure for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610058 | Initial views on DL control channel design | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610059 | Evaluation of LDPC codes for eMBB | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610060 | Evaluation of polar codes for eMBB | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610061 | Frequency-domain aspects of frame structure | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610062 | General Views on Beam Management for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610063 | Discussion on beam management for reciprocity based operation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610064 | Hybrid Beamforming for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610065 | High order MU-MIMO with TDD channel reciprocity | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610066 | Discussion on frequency selective precoding for Uplink MIMO transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610067 | CSI Acquisition Schemes for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610068 | Codebook design requirement for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610069 | Discussion on CSI acquisition scheme for Uplink MIMO transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610070 | CSI-RS design for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610071 | Initial investigation of the impact of UE movement | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610072 | Phase-1 MIMO calibration results | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610073 | Discussion on initial access design for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610074 | Performance evaluation results on NR synchronization signals | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610075 | Discussion on mobility measurement design for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610076 | Discussion on multiple access for uplink eMBB | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610077 | SLS evaluation on uplink multiple access | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610078 | LLS evaluation on uplink multiple access | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610079 | Views on RS for demodulation and tracking | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610080 | Remaining numerology aspects | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610081 | Time-domain aspects of frame structure | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610082 | Multiplexing mechanism for eMBB and URLLC | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610083 | Initial views on UL control channel design | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610084 | HARQ and scheduling operation for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610085 | Mechanisms for dynamic TDD | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610086 | Dynamic TDD in dense urban scenario | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610087 | Initial evaluation results of dynamic TDD | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610088 | On time alignment between numerologies of different CP overhead | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑1610089 | DL control channel framework for NR | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑1610090 | Scheduling and support of service multiplexing | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑1610091 | In-band full duplexing in NR | HTC Corporation | imported from 3GU |
R1‑1610092 | Reduced HARQ timing for NR | HTC Corporation | imported from 3GU |
R1‑1610093 | sPDCCH design for short TTI | HTC Corporation | imported from 3GU |
R1‑1610094 | Clarification on a few PUCCH format 4 and 5 related issues in eCA | Qualcomm Incorporated | imported from 3GU |
R1‑1610095 | Discussion on DL multi-antenna transmission schemes | CHTTL | imported from 3GU |
R1‑1610096 | On sPDCCH Design | InterDigital Communications | imported from 3GU |
R1‑1610097 | On sPDSCH Design | InterDigital Communications | imported from 3GU |
R1‑1610098 | On sPUCCH Design | InterDigital Communications | imported from 3GU |
R1‑1610099 | On sPUSCH Design | InterDigital Communications | imported from 3GU |
R1‑1610100 | Processing Time Reduction for sTTI | InterDigital Communications | imported from 3GU |
R1‑1610101 | Performance evaluation of explicit CSI feedback | InterDigital Communications | imported from 3GU |
R1‑1610102 | CSI-RS overhead reduction | InterDigital Communications | imported from 3GU |
R1‑1610103 | Initial NR MIMO Calibration Results | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑1610104 | A-CSI-RS Impacts on EPDCCH | InterDigital Communications | imported from 3GU |
R1‑1610105 | PDSCH rate-matching for A-CSI-RS | InterDigital Communications | imported from 3GU |
R1‑1610106 | Discussion on power allocation for SC-PTM | TD Tech, Huawei | imported from 3GU |
R1‑1610107 | Precoder flexibility and forward compatibility of CPS-OFDM waveform | National Taiwan University | imported from 3GU |
R1‑1610108 | Evaluation results of CPS-OFDM waveform | National Taiwan University | imported from 3GU |
R1‑1610109 | NR and LTE coexistence assisted by embedded-GFDM | National Taiwan University | imported from 3GU |
R1‑1610110 | Correction on downlink power allocation for SC-PTM | TD Tech, Huawei | imported from 3GU |
R1‑1610111 | Phase I Waveform proposal: CP-OFDM plus DFT-s-OFDM | Qualcomm Incorporated | imported from 3GU |
R1‑1610112 | On the impact of beamforming to link budget comparison of DFTs-OFDM and OFDM | Qualcomm Incorporated | imported from 3GU |
R1‑1610113 | Coverage analysis of DFT-s-OFDM and OFDM with low PAPR techniques | Qualcomm Incorporated | imported from 3GU |
R1‑1610114 | User Multiplexing of DFTs-OFDM and OFDM in uplink | Qualcomm Incorporated | imported from 3GU |
R1‑1610115 | UL reference signal design for eMBB with CP-OFDM and DFT-s-OFDM | Qualcomm Incorporated | imported from 3GU |
R1‑1610116 | UL waveform considerations for mmW | Qualcomm Incorporated | imported from 3GU |
R1‑1610117 | Common PAPR reduction techniques for OFDM / DFT-s-OFDM | Qualcomm Incorporated | imported from 3GU |
R1‑1610118 | Link level simulation results for RSMA vs OMA | Qualcomm Incorporated | imported from 3GU |
R1‑1610119 | System level simulation results for calibration | Qualcomm Incorporated | imported from 3GU |
R1‑1610120 | System level simulation results for proposed multiple access scheme | Qualcomm Incorporated | imported from 3GU |
R1‑1610121 | Battery life analysis for grant-free transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1610122 | Mixed grant-free and grant based multiple access | Qualcomm Incorporated | imported from 3GU |
R1‑1610123 | URLLC numerology and frame structure design | Qualcomm Incorporated | imported from 3GU |
R1‑1610124 | 60kHz vs. 120kHz vs. 240kHz performance; impact to PN | Qualcomm Incorporated | imported from 3GU |
R1‑1610125 | NR RB Size Design: 12 vs 16 | Qualcomm Incorporated | imported from 3GU |
R1‑1610126 | Scaled CP vs ECP: delay spread, Doppler and SNR tradeoff study | Qualcomm Incorporated | imported from 3GU |
R1‑1610127 | Numerology tradeoff case study | Qualcomm Incorporated | imported from 3GU |
R1‑1610128 | Slot structure, control intervals and scheduling intervals | Qualcomm Incorporated | imported from 3GU |
R1‑1610129 | Summary of [86-19] Discussion on Slot Structure Use Cases | Qualcomm Incorporated | imported from 3GU |
R1‑1610130 | Scalable Numerology Control Design for NR | Qualcomm Incorporated | imported from 3GU |
R1‑1610131 | NR numerology scaling and alignment | Qualcomm Incorporated | imported from 3GU |
R1‑1610132 | Advanced frame structure | Qualcomm Incorporated | imported from 3GU |
R1‑1610133 | Multi-TTI and size of slot/minislot and impact to mmW | Qualcomm Incorporated | imported from 3GU |
R1‑1610134 | Methodology for UE DOU analysis | Qualcomm Incorporated | imported from 3GU |
R1‑1610135 | Evaluation of frame structure design for UE power consumption | Qualcomm Incorporated | imported from 3GU |
R1‑1610136 | LDPC for EMBB and URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1610137 | LDPC rate compatible design overview | Qualcomm Incorporated | imported from 3GU |
R1‑1610138 | Performance of EMBB channel codes with fading | Qualcomm Incorporated | imported from 3GU |
R1‑1610139 | Efficient channel coding implementations for EMBB | Qualcomm Incorporated | imported from 3GU |
R1‑1610140 | LDPC decoding with adjusted min-sum | Qualcomm Incorporated | imported from 3GU |
R1‑1610141 | Short blocklength design | Qualcomm Incorporated | imported from 3GU |
R1‑1610142 | URLLC channel coding | Qualcomm Incorporated | imported from 3GU |
R1‑1610143 | Erasure coding and HARQ design | Qualcomm Incorporated | imported from 3GU |
R1‑1610144 | Evaluation assumptions for NR modulation schemes | Qualcomm Incorporated | imported from 3GU |
R1‑1610145 | Beam management for NR | Qualcomm Incorporated | imported from 3GU |
R1‑1610146 | Continuous beamforming and initial evluation results | Qualcomm Incorporated | imported from 3GU |
R1‑1610147 | DL open-loop MIMO transmission schemes | Qualcomm Incorporated | imported from 3GU |
R1‑1610148 | Uplink MIMO transmission schemes | Qualcomm Incorporated | imported from 3GU |
R1‑1610149 | Discussion on CSI acquisition | Qualcomm Incorporated | imported from 3GU |
R1‑1610150 | Beam reciprocity aspects | Qualcomm Incorporated | imported from 3GU |
R1‑1610151 | Views on RS for CSI acquisition | Qualcomm Incorporated | imported from 3GU |
R1‑1610152 | Views on DL DMRS | Qualcomm Incorporated | imported from 3GU |
R1‑1610153 | Views on RS for control and tracking | Qualcomm Incorporated | imported from 3GU |
R1‑1610154 | Phase 1 calibration results for sub6GHz and Phase 2 calibration assumptions | Qualcomm Incorporated | imported from 3GU |
R1‑1610155 | Phase 1 calibration results for above 6GHz and Phase 2 calibration assumptions | Qualcomm Incorporated | imported from 3GU |
R1‑1610156 | Single beam SYNC design | Qualcomm Incorporated | imported from 3GU |
R1‑1610157 | Single beam PBCH design | Qualcomm Incorporated | imported from 3GU |
R1‑1610158 | Revised simulation assumptions and metrics for SYNC evaluatoin | Qualcomm Incorporated | imported from 3GU |
R1‑1610159 | Multi-beam SYNC design | Qualcomm Incorporated | imported from 3GU |
R1‑1610160 | Multi-beam PBCH design | Qualcomm Incorporated | imported from 3GU |
R1‑1610161 | Multi-beam SYNC evaluation | Qualcomm Incorporated | imported from 3GU |
R1‑1610162 | System Information transmission considering different UE BWs | Qualcomm Incorporated | imported from 3GU |
R1‑1610163 | Single beam RACH design | Qualcomm Incorporated | imported from 3GU |
R1‑1610164 | Multi-beam RACH design and evaluation | Qualcomm Incorporated | imported from 3GU |
R1‑1610165 | Multi-beam RACH procedure aspects | Qualcomm Incorporated | imported from 3GU |
R1‑1610166 | Updated evaluation results for high speed rural | Qualcomm Incorporated | imported from 3GU |
R1‑1610167 | Comparative Power Analysis between UL and DL-based Mobility | Qualcomm Incorporated | imported from 3GU |
R1‑1610168 | DL based mobility DL channels | Qualcomm Incorporated | imported from 3GU |
R1‑1610169 | DL based mobility UL channels | Qualcomm Incorporated | imported from 3GU |
R1‑1610170 | UL based mobility DL channels | Qualcomm Incorporated | imported from 3GU |
R1‑1610171 | UL based mobility UL channels | Qualcomm Incorporated | imported from 3GU |
R1‑1610172 | DL mobility in above 6 GHz bands | Qualcomm Incorporated | imported from 3GU |
R1‑1610173 | NR DL/UL mobility for active and inactive states | Qualcomm Incorporated | imported from 3GU |
R1‑1610174 | Dynamic TDD control interference considerations | Qualcomm Incorporated | imported from 3GU |
R1‑1610175 | Dynamic TDD data interference considerations | Qualcomm Incorporated | imported from 3GU |
R1‑1610176 | Signaling requirements for dynamic TDD | Qualcomm Incorporated | imported from 3GU |
R1‑1610177 | DL control channels overview | Qualcomm Incorporated | imported from 3GU |
R1‑1610178 | UL control channels overview | Qualcomm Incorporated | imported from 3GU |
R1‑1610179 | UCI content | Qualcomm Incorporated | imported from 3GU |
R1‑1610180 | Number of HARQ processes | Qualcomm Incorporated | imported from 3GU |
R1‑1610181 | DL processing time consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1610182 | UL processing time consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1610183 | Updated mMTC battery life evaluation assumptions | Qualcomm Incorporated | imported from 3GU |
R1‑1610184 | Summary of email discussion on mMTC evaluation path loss calibration | Qualcomm Incorporated | imported from 3GU |
R1‑1610185 | Remaining issue for mMTC evaluation assumption | Qualcomm Incorporated | imported from 3GU |
R1‑1610186 | Updated URLLC SLS evaluation assumptions | Qualcomm Incorporated | imported from 3GU |
R1‑1610187 | EMBB DL bursty data | Qualcomm Incorporated | imported from 3GU |
R1‑1610188 | URLLC system capacity and URLLC/eMBB multiplexing efficiency analysis | Qualcomm Incorporated | imported from 3GU |
R1‑1610189 | Summary of KP evaluation results for MMW scenarios | Qualcomm Incorporated | imported from 3GU |
R1‑1610190 | Impact of initial access design for access/backhaul relay | Qualcomm Incorporated | imported from 3GU |
R1‑1610191 | Scheduling request design for NR | Intel Corporation | imported from 3GU |
R1‑1610192 | Resource assignment and interference handling in TDD NR RAN | Intel Corporation | imported from 3GU |
R1‑1610193 | Considerations on power scaling rules for 2ms+10ms configurations | Huawei, HiSilicon | imported from 3GU |
R1‑1610194 | HS-SCCH order design for TTI switching | Huawei, HiSilicon | imported from 3GU |
R1‑1610195 | Response to RAN2 LS on MC enhancements | Huawei, HiSilicon | imported from 3GU |
R1‑1610196 | Configuration of physical layer parameters for MC enhancements | Huawei, HiSilicon | imported from 3GU |
R1‑1610197 | Correction on CWp adjustment on Type B1 multi-carrier access procedure for Rel-13 LAA | WILUS Inc. | imported from 3GU |
R1‑1610198 | Correction on PUSCH RE mapping in case of multiple subframe scheduling | WILUS Inc. | imported from 3GU |
R1‑1610199 | Correction on handling UL LBT procedure under UE power limited case | WILUS Inc. | imported from 3GU |
R1‑1610200 | Clarification on channel access priority class according to UL LBT type indication in eLLA DCI | WILUS Inc. | imported from 3GU |
R1‑1610201 | Discussion on UL Multi-carrier Transmission for eLAA | WILUS Inc. | imported from 3GU |
R1‑1610202 | Discussion on Handling UL Multicarrier Transmission under UE power limited case | WILUS Inc. | imported from 3GU |
R1‑1610203 | Synchronization in NR considering beam sweeping | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1610204 | Impact of multiplexing multiple numerologies on initial access | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1610205 | Discussion on resource assignment and interference handling in TDD NR RAN | Intel Corporation | imported from 3GU |
R1‑1610206 | Paging Transmission on Non-Anchor PRB | III | imported from 3GU |
R1‑1610207 | Discussion on System Information Delivery in NR | III | imported from 3GU |
R1‑1610208 | Draft CR for correction on MPDCCH hopping | Qualcomm Incorporated | imported from 3GU |
R1‑1610209 | On simultaneous transmission of periodic and aperiodic CSI in eLAA | Qualcomm Incorporated | imported from 3GU |
R1‑1610210 | Draft CR on simultaneous transmission of periodic and aperiodic CSI in eLAA | Qualcomm Incorporated | imported from 3GU |
R1‑1610211 | Way Forward on modulation for NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610212 | On random resource selection for V2P | Ericsson | imported from 3GU |
R1‑1610213 | On Low Latency UL Multiple Access in NR | Ericsson | imported from 3GU |
R1‑1610214 | On Synchronization Requirements for Grant-free MA | Ericsson | imported from 3GU |
R1‑1610215 | RSTD Reporting Enhancement in OTDOA | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610216 | Discussion of PRS-Based Beacon for Indoor Positioning | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610217 | Resource assignment for mixed numerologies | Panasonic | imported from 3GU |
R1‑1610218 | Some Considerations on HARQ Feedback Mechanism | ZTE | imported from 3GU |
R1‑1610219 | On Flexible Duplexing and Associated Interference Management Techniques | Ericsson | imported from 3GU |
R1‑1610220 | Considerations on handling wrap-around issue in subframe pool configuration for V2V | Innovative Technology Lab Co. | imported from 3GU |
R1‑1610221 | Support of OTDOA in NB-IoT | Innovative Technology Lab Co. | imported from 3GU |
R1‑1610222 | On support of SC-PTM in NB-IoT | Innovative Technology Lab Co., KT Corp. | imported from 3GU |
R1‑1610223 | PRACH for very high speed scenario | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610224 | Coexistence of DFTsOFDM and OFDM in UL below 40GHz | Mitsubishi Electric RCE | imported from 3GU |
R1‑1610225 | TR38.900_CR_Section_7.7.5.1 | Mitsubishi Electric Co., Fraunhofer HHI | imported from 3GU |
R1‑1610226 | CSI acquisition frameworks for NR MU-MIMO | Mitsubishi Electric Co. | imported from 3GU |
R1‑1610227 | Nonlinear precoding schemes for NR MU-MIMO and their specification impact | Mitsubishi Electric Co. | imported from 3GU |
R1‑1610228 | Discussion on time domain structure for CP length | KDDI Corporation | imported from 3GU |
R1‑1610229 | Performance comparison of nonlinear precoding schemes for NR MU-MIMO | Mitsubishi Electric Co. | imported from 3GU |
R1‑1610230 | Discussion on HARQ Process for Slot-based TTI | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1610231 | Initial results for Phase 1 link level MIMO calibration for NR | Mitsubishi Electric Co. | imported from 3GU |
R1‑1610232 | UL power control in multi-beam based approaches | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1610233 | On introducing the HS-SCCH orders for enabling TTI Switching in Multicarrier Enhancements in UMTS | Ericsson | imported from 3GU |
R1‑1610234 | On Power Scaling and Multicarrier Enhancements for UMTS | Ericsson | imported from 3GU |
R1‑1610235 | On the “Response LS” related to the configuration of DTX along with the Rel-14 Multicarrier Enhancements for UMTS | Ericsson | imported from 3GU |
R1‑1610236 | Primary Carrier Switching for Multicarrier Enhancements in UMTS | Ericsson | imported from 3GU |
R1‑1610237 | An assessment on the potential gains in cell throughput derived from fully applying DTX on the stand alone UL DPCCH transmissions in CELL_FACH | Ericsson | imported from 3GU |
R1‑1610238 | FC-OFDM discussion based on RAN1#86 agreement | ORANGE | imported from 3GU |
R1‑1610239 | On beam management in NR - procedures | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610240 | Beam managemenet - DCI monitoring | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610241 | Beam management - reciprocity issues | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610242 | Frame structure support for DL and UL sweeping subframes | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610243 | On procedures for beam selection and feedback signalling | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610244 | On beam training based on periodic DL signals | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610245 | Beam training based on aperiodic DL signals | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610246 | Increasing beam management robustness at both BS and UE | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610247 | Multi-Beam Common Control Plane Design | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610248 | DRX and Beam Management | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610249 | Initial results on beam management | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610250 | Scalability of MIMO operation across NR carrier frequencies | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610251 | On simultaneous reception of single-beam and multi-beam uplink | Nokia, Alcatel-Lucent Shanghai Bell, Verizon Wireless | imported from 3GU |
R1‑1610252 | Unified MIMO transmission mode for NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610253 | Decoupled Control and Data for NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610254 | High-level principles for beam coordination and Link Adaptation in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610255 | Non-coherent Multi-node Transmission for URLLC in the 5G New Radio | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610256 | On the support of transmit diversity in NR for data and control channels | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610257 | UL MIMO transmission in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610258 | On the support for frequency selectiove precoding in UL MIMO | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610259 | SU-MIMO Performance Characteristics in UMa 30GHz | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610260 | MU-MIMO Performance Characteristics in UMa 30GHz | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610261 | Uplink SU-MIMO Performance Characteristics in 5G-UMa 4GHz | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610262 | Coverage Enhancement Opportunities at High Carrier Frequencies | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610263 | Network Coordination to support advanced receivers | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610264 | CSI feedback types in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610265 | Explicit feedback options in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610266 | On the CSI reporting in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610267 | On the CSI timing relationhips | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610268 | On the channel and interference estimation in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610269 | Reference symbols supporting CSI acquisition framework | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610270 | Flexible CSI-RS configuration for CSI measurement | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610271 | On the DMRS structure for NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610272 | On the number of antenna ports to be supported in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610273 | UL SRS design considerations in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610274 | On QCL Configurations in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610275 | Extended framework for QCL assumptions | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610276 | On PCRS Design for NR | Nokia, Alcatel-Lucent Shanghai Bell, Verizon Wireless | imported from 3GU |
R1‑1610277 | On the evaluation of PN model | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610278 | On-demand power boost and cell muting for URLLC in the 5G New Radio | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610279 | Latency assumptions for network-based coordination studies | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610280 | Interference Aware Inter Cell Rank Coordination | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610281 | UL Interference Coordination and Power Control | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610282 | Dynamic TDD DL-to-UL Interference Cancellation using Packet Exchange in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610283 | Power control for MIMO | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610284 | MIMO link level calibration results | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610285 | MIMO system level calibration results | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610286 | Numerology for NR Synchronization Signals | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610287 | On the synchronization signal design principle in NR | Nokia, Alcatel-Lucent Shanghai Bell, Verizon Wireless | imported from 3GU |
R1‑1610288 | Beam management in initial access | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610289 | Downlink Discovery Signal for NR | Nokia, Alcatel-Lucent Shanghai Bell, Verizon Wireless | imported from 3GU |
R1‑1610290 | Initial Synch Signal Performance Results | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610291 | Physical Layer Cell Identity in Initial Access | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610292 | DL Signals for Mobility Measurements in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610293 | Cell Identification in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610294 | On scalable and band agnostic single-beam and multi-beam initial access | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610295 | High speed mobility in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610296 | On RRM for NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610297 | Evaluation of UW DFT-s-OFDM as a CPless waveform for high speed train scenario | Mitsubishi Electric Co. | imported from 3GU |
R1‑1610298 | System design considerations for UL NoMA | MediaTek Inc. | imported from 3GU |
R1‑1610299 | TP on TR 36.741 Study on FeCoMP | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1610300 | CP length for NR | VODAFONE Group Plc | imported from 3GU |
R1‑1610301 | Discussion on inter-PLMN V2X over Uu and PC5 | Ericsson | imported from 3GU |
R1‑1610302 | Discussion on the issue of transmission during the sensing window | Panasonic | imported from 3GU |
R1‑1610303 | Evaluations on DMRS based open and semi-open loop MIMO schemes | CEWiT | imported from 3GU |
R1‑1610304 | Super-constellation based power ratios and gray mapping for MUST | KT Corp. | imported from 3GU |
R1‑1610305 | Design aspects of short PUSCH | KT Corp. | imported from 3GU |
R1‑1610306 | Forward compatible reference signal design requirement for interference mitigation | CEWiT | imported from 3GU |
R1‑1610307 | Views on time domain structure for NR | KT Corp. | imported from 3GU |
R1‑1610308 | DraftCR: 36.213 Clarification on the reference subframe k in ECCE determination in a MPDCCH search space | Sony | imported from 3GU |
R1‑1610309 | flexi-OFDMA, a new waveform for NR | CEWiT, IIT-H, IIT-M, Reliance Jio, Tejas Networks | imported from 3GU |
R1‑1610310 | eMBMS RS Design Considerations | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610311 | eMBMS PSS/SSS/PBCH and SIB1 transmission | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610312 | Considerations on PBCH coverage enhancement | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610313 | Correction for correlation modelling for multi-frequency simulations | Ericsson | imported from 3GU |
R1‑1610314 | FEC performance comparison for short frame sizes for NR | IMT, ORANGE | imported from 3GU |
R1‑1610315 | On battery models for mMTC | Ericsson | imported from 3GU |
R1‑1610316 | On the evolution of mMTC | Ericsson | imported from 3GU |
R1‑1610317 | On the DM-RS structure | Ericsson | imported from 3GU |
R1‑1610318 | Open Items in Synchronization Signal Design | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610319 | Beam-based design framework for New Radio | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑1610320 | Random access aspects for beam-based NR initial access | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑1610321 | DL DMRS design for TTI shortening | Ericsson | imported from 3GU |
R1‑1610322 | sPDCCH search space design | Ericsson | imported from 3GU |
R1‑1610323 | Design aspects of sPDCCH | Ericsson | imported from 3GU |
R1‑1610324 | DL control for short TTI | Ericsson | imported from 3GU |
R1‑1610325 | Design aspects of sPDSCH | Ericsson | imported from 3GU |
R1‑1610326 | Design aspects of sPUSCH | Ericsson | imported from 3GU |
R1‑1610327 | sPUSCH sTTI operation | Ericsson | imported from 3GU |
R1‑1610328 | UCI on sPUSCH with short TTI | Ericsson | imported from 3GU |
R1‑1610329 | Design aspects of sPUCCH | Ericsson | imported from 3GU |
R1‑1610330 | On reduced processing time for short TTI | Ericsson | imported from 3GU |
R1‑1610331 | On the operation with different TTI lengths | Ericsson | imported from 3GU |
R1‑1610332 | TDD aspects of short TTI | Ericsson | imported from 3GU |
R1‑1610333 | sTTI lengths combination in case of CA | Ericsson | imported from 3GU |
R1‑1610334 | Asynchronous HARQ for UL retransmissions with short TTI | Ericsson | imported from 3GU |
R1‑1610335 | Handling overlapping allocations with short and 1 ms TTI | Ericsson | imported from 3GU |
R1‑1610336 | Puncturing sTTI in legacy TTI | Ericsson | imported from 3GU |
R1‑1610337 | UL power-related aspects for sTTI | Ericsson | imported from 3GU |
R1‑1610338 | Draft LS on UL power control related aspects | Ericsson | imported from 3GU |
R1‑1610339 | Reduced processing for 1ms TTI | Ericsson | imported from 3GU |
R1‑1610340 | Fast CSI for 1ms TTI | Ericsson | imported from 3GU |
R1‑1610341 | HARQ and UL scheduling timings for 1ms TTI and reduced processing time | Ericsson | imported from 3GU |
R1‑1610342 | PUCCH collisions with reduced processing time for 1ms TTI | Ericsson | imported from 3GU |
R1‑1610343 | Asynchronous HARQ for PUSCH | Ericsson | imported from 3GU |
R1‑1610344 | TBS scaling for short TTI | Ericsson | imported from 3GU |
R1‑1610345 | Robust and Efficient Beam Management for NR | InterDigital Communications | imported from 3GU |
R1‑1610346 | On the use of exising NB-IoT signals for OTDOA | Ericsson | imported from 3GU |
R1‑1610347 | NB-IoT Collision handling in Multicast | Ericsson | imported from 3GU |
R1‑1610348 | Power consumption and latency reduction by increasing the maximum NPDSCH transport block sizes and using two HARQ | Ericsson | imported from 3GU |
R1‑1610349 | Power consumption and latency reduction by increasing the maximum NPUSCH transport block size and using two HARQ | Ericsson | imported from 3GU |
R1‑1610350 | Latency consideration of channel coding candidates for URLLC | National Taiwan University | imported from 3GU |
R1‑1610351 | A framework for initial access for NR | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑1610352 | Random access and support for multiple numerologies for NR | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑1610353 | Long Network DTX in NR | Ericsson | imported from 3GU |
R1‑1610354 | System information acquisition principle for NR | Ericsson | imported from 3GU |
R1‑1610355 | NR IDLE mode operation | Ericsson | imported from 3GU |
R1‑1610356 | Considerations for DL Broadcast Channel | InterDigital Communications | imported from 3GU |
R1‑1610357 | Unicast control region for FeMBMS carrier | Ericsson | imported from 3GU |
R1‑1610358 | System Information modification indication for FeMBMS carrier | Ericsson | imported from 3GU |
R1‑1610359 | On the utilization of Advanced Receivers in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610360 | On the cross-link interference mitigation | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610361 | On network energy efficiency requirement and evaluation for the 5G new radio | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610362 | Uplink power control for 5G New Radio | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610363 | Discussion on subframe bitmap for V2V communication | Intel Corporation | imported from 3GU |
R1‑1610364 | Discussion on CSI reporting for hybrid CSI | Intel Corporation | imported from 3GU |
R1‑1610365 | Discussion multi-shot CSI-RS | Intel Corporation | imported from 3GU |
R1‑1610366 | Discussion on URLLC design aspects | Intel Corporation | imported from 3GU |
R1‑1610367 | Considerations on eV2X NR design | Intel Corporation | imported from 3GU |
R1‑1610368 | Preliminary eV2X evaluation analysis | Intel Corporation | imported from 3GU |
R1‑1610369 | Correction on MPDCCH monitoring in special subframes | Huawei, HiSilicon | imported from 3GU |
R1‑1610370 | Correction on MPDCCH transmission without repetition | Huawei, HiSilicon | imported from 3GU |
R1‑1610371 | Discussion on Sync Signal Design for NR | Convida Wireless LLC | imported from 3GU |
R1‑1610372 | Synchronization on Beamforming Initial Access Operations | Convida Wireless LLC | imported from 3GU |
R1‑1610373 | On VoLTE coverage enhancements based on CE mode A mechanisms | Intel Corporation | imported from 3GU |
R1‑1610374 | Support of link adaptation for UL grant-free NOMA schemes | Intel Corporation | imported from 3GU |
R1‑1610375 | Coverage performance for UL NOMA schemes | Intel Corporation | imported from 3GU |
R1‑1610376 | Summary of current studies on NR Multiple Access | Intel Corporation | imported from 3GU |
R1‑1610377 | Channel Coding scheme for EMBB | Intel Corporation | imported from 3GU |
R1‑1610378 | Preliminary performance evaluation of different beamforming options for NR synchronization signals | Intel Corporation | imported from 3GU |
R1‑1610379 | On Downlink Control Channel Design for New Radio | Convida Wireless LLC | imported from 3GU |
R1‑1610380 | Discussion on Dynamic Switching of Transmission Modes | Convida Wireless LLC | imported from 3GU |
R1‑1610381 | On OTDOA Positioning for NB-IOT | Fraunhofer IIS | imported from 3GU |
R1‑1610382 | Clarification of PUCCH and SRS not belonging to any narrowband for BL/CE UE | Ericsson | imported from 3GU |
R1‑1610383 | Multipath RSTD reporting per cell for enhanced indoor positioning | Ericsson, Nokia | imported from 3GU |
R1‑1610384 | On combining of CRS and PRS for enhanced indoor positioning | Ericsson | imported from 3GU |
R1‑1610385 | PRS patterns for PRS-based TBS for enhanced indoor positioning | Ericsson | imported from 3GU |
R1‑1610386 | On CSI-RSRP reporting support to E-SMLC for enhanced indoor positioning | Ericsson | imported from 3GU |
R1‑1610387 | Defining indoor/outdoor classification for enhanced indoor positioning | Ericsson | imported from 3GU |
R1‑1610388 | Larger max TBS for MTC | Ericsson | imported from 3GU |
R1‑1610389 | Larger max channel bandwidth for MTC | Ericsson | imported from 3GU |
R1‑1610390 | HARQ-ACK bundling for MTC | Ericsson | imported from 3GU |
R1‑1610391 | Number of DL HARQ processes for MTC | Ericsson | imported from 3GU |
R1‑1610392 | Collision handling for multicast support for MTC | Ericsson | imported from 3GU |
R1‑1610393 | L1 configuration for multicast support for MTC | Ericsson | imported from 3GU |
R1‑1610394 | OTDOA enhancements for MTC | Ericsson | imported from 3GU |
R1‑1610395 | VoLTE enhancements for CE mode A | Ericsson | imported from 3GU |
R1‑1610396 | PUSCH coverage enhancement for VoLTE | Ericsson | imported from 3GU |
R1‑1610397 | OTFS PAPR Analysis | Cohere Technologies | imported from 3GU |
R1‑1610398 | Power consumption and latency reduction by increasing the maximum NPDSCH transport block sizes | Ericsson | imported from 3GU |
R1‑1610399 | Power consumption and latency reduction by increasing the maximum NPUSCH transport block size | Ericsson | imported from 3GU |
R1‑1610400 | On NR DL synchronization | Intel Corporation | imported from 3GU |
R1‑1610401 | On NR RACH procedure | Intel Corporation | imported from 3GU |
R1‑1610402 | On NR initial access and mobility | Intel Corporation | imported from 3GU |
R1‑1610403 | Waveform Simulation Results for Above 40 GH | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610404 | FC-OFDM discussion based on RAN1#86 waveform agreements | ORANGE | imported from 3GU |
R1‑1610405 | DRX and Beam Management | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610406 | Design for larger max PDSCH/PUSCH channel bandwidth | Kyocera Corporation | imported from 3GU |
R1‑1610407 | Design for larger maximum TBS | Kyocera Corporation | imported from 3GU |
R1‑1610408 | DraftCR: 36.213 Clarification on the reference subframe k in ECCE determination in a MPDCCH search space | Sony Europe Limited | imported from 3GU |
R1‑1610409 | CR on 36.211 NB-IoT PDSCH symbol mapping | Ericsson | imported from 3GU |
R1‑1610410 | CR on 36.213 NB-IoT Type1 and Type 2 search space definition | Ericsson | imported from 3GU |
R1‑1610411 | URLLC channel coding | Qualcomm Incorporated | imported from 3GU |
R1‑1610412 | Clarifications about NPRACH configuration parameters | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610413 | Introduction of new Transport Block Size for DL 256QAM | Qualcomm | imported from 3GU |
R1‑1610414 | Comparative Power Analysis between UL and DL-based Mobility | Qualcomm Incorporated | imported from 3GU |
R1‑1610415 | Discussion on flexible duplex operations in NR design | LG Electronics | imported from 3GU |
R1‑1610416 | High speed mobility in NR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610417 | Data Sharing on NR Channel Coding Simulation Results | MediaTek | imported from 3GU |
R1‑1610418 | Co-channel coexistence for DSRC and LTE-V2V | Qualcomm Incorporated | imported from 3GU |
R1‑1610419 | UE considerations on coding combination for NR data channels | MediaTek Inc. | imported from 3GU |
R1‑1610420 | Resolving Polar code memory complexity issue | MediaTek Inc. | imported from 3GU |
R1‑1610421 | Removal of LAA DRS channel access from UL Type 2 Channel Access description | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610422 | New Radio MIMO Access Procedures | National Instruments Corp. | imported from 3GU |
R1‑1610423 | Summary of Channel Coding Simulation Data Sharing | InterDigital Communications | imported from 3GU |
R1‑1610424 | Completing mechanism 1 of hybrid CSI for Rel.14 | Samsung | imported from 3GU |
R1‑1610425 | Rapporteur Work Plan on eFD-MIMO | ETSI | imported from 3GU |
R1‑1610426 | Numerology design and link-level simulation results for high speed scenario | ETRI | imported from 3GU |
R1‑1610427 | Discussion of PRS-Based Beacon for Indoor Positioning | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610428 | Correction on periodic CSI reporting mode 2-1 for Class B FD-MIMO | Intel Corporation, ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1610429 | Discussion on DM-RS design for NR | Intel Corporation | imported from 3GU |
R1‑1610430 | Power consumption and latency reduction by increasing the maximum NPDSCH transport block sizes and using two HARQ | Ericsson | imported from 3GU |
R1‑1610431 | Power consumption and latency reduction by increasing the maximum NPUSCH transport block size and using two HARQ | Ericsson | imported from 3GU |
R1‑1610432 | Power consumption and latency reduction by increasing the maximum NPDSCH transport block sizes | Ericsson | imported from 3GU |
R1‑1610433 | Power consumption and latency reduction by increasing the maximum NPUSCH transport block size | Ericsson | imported from 3GU |
R1‑1610434 | A new system simulator for NB-IoT positioning | Ericsson | imported from 3GU |
R1‑1610435 | Link level simulation results for NR initial synchronization and cell search | MediaTek Inc. | imported from 3GU |
R1‑1610436 | Path loss model for evaluation of mMTC | Ericsson | imported from 3GU |
R1‑1610437 | Beam grouping for beam management | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1610438 | Coverage emhancement techniques | Qualcomm Incorporated | imported from 3GU |
R1‑1610439 | Correction of typos due to wrong implementation of CR0283 “Clarification of valid subframe in eMTC” | ETSI | imported from 3GU |
R1‑1610440 | Draft Agenda of RAN1#86bis meeting | RAN1 Chair | imported from 3GU |
R1‑1610441 | On UL waveform - evaluation | Ericsson | imported from 3GU |
R1‑1610442 | Multi-beam RACH design and evaluation | Qualcomm Incorporated | imported from 3GU |
R1‑1610443 | MIMO LLS calibration results for NR on 30GHz frequency band | Samsung Electronics Co., Ltd | imported from 3GU |
R1‑1610444 | Explicit HARQ and scheduling timing design for LTE shorten TTI | CATT | imported from 3GU |
R1‑1610445 | MIMO calibration for NR – system level | InterDigital Communications | imported from 3GU |
R1‑1610446 | OTFS PAPR Analysis | Cohere Technologies | imported from 3GU |
R1‑1610447 | Correction of PRACH starting subframes for eMTC | Intel Corporation | imported from 3GU |
R1‑1610448 | System-level analysis of UL NOMA schemes | Intel Corporation | imported from 3GU |
R1‑1610449 | void | ETSI | imported from 3GU |
R1‑1610450 | Correction on CWp adjustment on Type B1 multi-carrier access procedure for Rel-13 LAA | WILUS Inc. | imported from 3GU |
R1‑1610451 | Correction on NZP CSI-RS aggregation for Class A | LG Electronics, Samsung | imported from 3GU |
R1‑1610452 | Correction to PUCCH reporting mode 2-1 | Intel Corporation, ZTE Corporation, ZTE Microelectronics | imported from 3GU |
R1‑1610453 | Correction to PUCCH reporting mode 1-1 | Intel Corporation, ZTE Corporation, ZTE Microelectronics | imported from 3GU |
R1‑1610454 | Correction to PUCCH reporting mode 2-1 | Intel Corporation, ZTE Corporation, ZTE Microelectronics | imported from 3GU |
R1‑1610455 | Correction to PUCCH reporting mode 1-1 | Intel Corporation, ZTE Corporation, ZTE Microelectronics | imported from 3GU |
R1‑1610456 | Correction on UL grant reception in ending partial subframe | LG Electronics | imported from 3GU |
R1‑1610457 | Correction on UL burst scheduling | LG Electronics | imported from 3GU |
R1‑1610458 | CR on PHICH operation for eLAA in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1610459 | Corrections to RV in eLAA DCI definitions | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610460 | Correction on handling UL LBT procedure under UE power limited case | WILUS Inc. | imported from 3GU |
R1‑1610461 | PSSCH/PSBCH decoding issue | CATT | imported from 3GU |
R1‑1610462 | Draft CR on energy detection threshold for DL multi-carrier operation for LAA in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1610463 | Draft CR on DCI formats related with LAA in TS 36.212 | ETRI | imported from 3GU |
R1‑1610464 | Draft CR on UL duration and offset field in TS 36.213 | ETRI | imported from 3GU |
R1‑1610465 | Way Forward on DMRS randomization | Samsung | imported from 3GU |
R1‑1610466 | Way Forward on resource reselection | Samsung, CATT | imported from 3GU |
R1‑1610467 | Correction on equation for MPDCCH search space and starting subframe position | NTT DOCOMO, INC., Panasonic | imported from 3GU |
R1‑1610468 | Way Forward on collision issue on SC-PTM for eNB-IoT | LG Electronics | imported from 3GU |
R1‑1610469 | Way Forward on SC-PTM configuration for eNB-IoT | LG Electronics | imported from 3GU |
R1‑1610470 | Way Forward on paging PRB configuration for eNB-IoT | LG Electronics | imported from 3GU |
R1‑1610471 | CR for clarification on NPRACH and NPUSCH collision | Qualcomm Incorporated | imported from 3GU |
R1‑1610472 | Evaluation of Adjusted-Min-Sum LDPC Decoder and Complexity Aspects of Permutation Networks | Huawei, HiSilicon | imported from 3GU |
R1‑1610473 | UCI on sPUSCH with short TTI | Ericsson | imported from 3GU |
R1‑1610474 | Correction on equation for MPDCCH search space and starting subframe position | NTT DOCOMO, INC., Panasonic | imported from 3GU |
R1‑1610475 | CR on start timing of PUSCH | Samsung | imported from 3GU |
R1‑1610476 | CR on DCI formats related with LAA in TS 36.212 | ETRI | imported from 3GU |
R1‑1610477 | Way Forward on UE background sensing | NTT DOCOMO, Panasonic | imported from 3GU |
R1‑1610478 | Further LLS results for UL non-orthogonal multiple access | Fujitsu | imported from 3GU |
R1‑1610479 | TR38.900_CR_Section_7.6.2.2 | Fraunhofer HHI, Samsung, Ericsson, Intel, Nokia, InterDigital | imported from 3GU |
R1‑1610480 | Dynamic TDD in dense urban scenario | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610481 | void | ETSI | imported from 3GU |
R1‑1610482 | WF on NR frame structure | NTT DOCOMO | imported from 3GU |
R1‑1610483 | Way Forward on RB grid definition for mixed numerologies - FDM | ZTE, ZTE Microelectronics, Ericsson, Qualcomm, Nokia, Alcatel-Lucent Shanghai Bell, Panasonic, Convida Wireless | imported from 3GU |
R1‑1610484 | WF on coordinated transmission schemes in NR | LG Electronics, Intel Corporation, Samsung | imported from 3GU |
R1‑1610485 | Way Forward on Waveform for NR Uplink | Qualcomm | imported from 3GU |
R1‑1610486 | WF on Spatial Multiplexing Schemes for MU-MIMO | Mitsubishi Electric, InterDigital | imported from 3GU |
R1‑1610487 | WF on beam management | Ericsson, Intel, CATT, InterDigital Communications | imported from 3GU |
R1‑1610488 | WF on wider BW operation for NR | NTT DOCOMO, AT&T | imported from 3GU |
R1‑1610489 | WF on RACH procedure for multi-beam operation | NTT DOCOMO, ETRI, Qualcomm, Nokia, Alcatel-Lucent Shanghai-Bell, ZTE | imported from 3GU |
R1‑1610490 | WF on NR CSI-RS | Huawei, HiSilicon | imported from 3GU |
R1‑1610491 | WF on NR DMRS | Huawei, HiSilicon | imported from 3GU |
R1‑1610492 | WF on the CSI-RS configuration for NR | Intel Corporation, Samsung, Ericsson | imported from 3GU |
R1‑1610493 | CR clarification on spectral efficiency | Qualcomm Incorporated | imported from 3GU |
R1‑1610494 | CR for clarification on A-CSI without hopping | Qualcomm Incorporated, Samsung | imported from 3GU |
R1‑1610495 | CR clarification on spectral efficiency | Qualcomm Incorporated | imported from 3GU |
R1‑1610496 | CR for clarification on A-CSI without hopping | Qualcomm Incorporated, Samsung | imported from 3GU |
R1‑1610497 | Correction on equation for MPDCCH search space and starting subframe position | NTT DOCOMO, INC., Panasonic | imported from 3GU |
R1‑1610498 | WF on NR initial access sgnals/channels | NTT DOCOMO, Intel Corporation, Ericsson, Qualcomm, InterDigital | imported from 3GU |
R1‑1610499 | Performance evaluation results on NR synchronization signals | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610500 | WF on numerology for forward compatibility | InterDigital, Mitsubishi, Nokia, Alcatel-Lucent Shanghai Bell, Intel | imported from 3GU |
R1‑1610501 | Correction on equation for MPDCCH search space and starting subframe position | NTT DOCOMO, INC., Panasonic | imported from 3GU |
R1‑1610502 | WF on symbol level alignments | LG Electronics | imported from 3GU |
R1‑1610503 | WF on Alignments among different numerologies in frequency domain | LG Electronics | imported from 3GU |
R1‑1610504 | Correction to DMRS for MPDCCH associated with P-RNTI | Virtuosys Limited, Qualcomm Incorporated, Intel Corporation | imported from 3GU |
R1‑1610505 | Clarification on NPRACH and NPUSCH collision | Qualcomm Incorporated | imported from 3GU |
R1‑1610506 | Clarification on NPRACH and NPUSCH collision | Qualcomm Incorporated | imported from 3GU |
R1‑1610507 | Way Forward on Resource Reservation | Samsung | imported from 3GU |
R1‑1610508 | [Draft] LS on wider bandwidth operation for NR | NTT DOCOMO | imported from 3GU |
R1‑1610509 | WF on CSI-RS and CSI reporting in NR | LG Electronics, Ericsson, Intel | imported from 3GU |
R1‑1610510 | WF on Beam reporting for NR | LG Electronics | imported from 3GU |
R1‑1610511 | WF on Beam management for DL control channel | ZTE | imported from 3GU |
R1‑1610512 | WF on Group-based beam management | ZTE | imported from 3GU |
R1‑1610513 | WF on QCL for NR | ZTE Corporation, ZTE Microelectronics | imported from 3GU |
R1‑1610514 | WF on reference signal for demodulation | ZTE Corporation, ZTE Microelectronics | imported from 3GU |
R1‑1610515 | WF on CSI reporting for NR | Samsung, Intel, Ericsson, Xinwei | imported from 3GU |
R1‑1610516 | WF on Beam management RS | Samsung, Intel, Verizon Wireless | imported from 3GU |
R1‑1610517 | WF on CSI measurement and reporting | Huawei, HiSilicon, Ericsson, Qualcomm | imported from 3GU |
R1‑1610518 | WF on DL MIMO transmission | Huawei | imported from 3GU |
R1‑1610519 | WF on MIMO transmission based on multiple antenna panels | Huawei | imported from 3GU |
R1‑1610520 | WF on the QCL for NR | Intel Corporation, LGE | imported from 3GU |
R1‑1610521 | WF on subframe duration | ZTE, ZTE Microelectronics,Ericsson, NTT Docomo, Nokia Qualcomm, Panasonic, CATT, Mediatek, Convida Wireless | imported from 3GU |
R1‑1610522 | WF on unified structure of DL sync signal | Intel Corporation, NTT DOCOMO, ZTE, ZTE Microelectronics, ETRI, InterDigital | imported from 3GU |
R1‑1610523 | WF on coordination schemes in NR | Huawei | imported from 3GU |
R1‑1610524 | WF on RS definition | Huawei, HiSilicon | imported from 3GU |
R1‑1610525 | WF on UL MIMO | CATT | imported from 3GU |
R1‑1610526 | WF on UL link adaptation procedures in NR | LG Electronics | imported from 3GU |
R1‑1610527 | Way forward on CRS usage together with PRS | Intel Corporation | imported from 3GU |
R1‑1610528 | Way Forward on support of UL non-orthogonal multiple access | Huawei, HiSilicon, Convida Wireless, Interdigital | imported from 3GU |
R1‑1610529 | Way Forward on support of UL grant-free | Huawei, HiSilicon, CATT, Convida Wireless, Interdigital | imported from 3GU |
R1‑1610530 | Summary of preliminary LLS results | Huawei, HiSilicon | imported from 3GU |
R1‑1610531 | Summary of preliminary SLS results | Huawei, HiSilicon | imported from 3GU |
R1‑1610532 | WF on compensation of phase rotation and frequency offset | Huawei | imported from 3GU |
R1‑1610533 | WF on CSI framework for NR | Samsung | imported from 3GU |
R1‑1610534 | WF on PMI reporting for NR | Samsung | imported from 3GU |
R1‑1610535 | WF on CSI feedback framework for hybrid beamforming in NR | CMCC | imported from 3GU |
R1‑1610536 | Evaluation Assumptions for NR Network Coordination | Samsung, Intel | imported from 3GU |
R1‑1610537 | WF on Network Coordination Framework | Samsung | imported from 3GU |
R1‑1610538 | Way forward on SYNC periodicity | Qualcomm Incorporated | imported from 3GU |
R1‑1610539 | WF on Beam management | CATT | imported from 3GU |
R1‑1610540 | WF on slot | NTT DOCOMO, INC., Ericsson, Panasonic, Nokia, Alcatel-Lucent Shanghai Bell, Qualcomm, Huawei, HiSilicon | imported from 3GU |
R1‑1610541 | Performance Evaluation for NR Channel Coding | Huawei, HiSilicon | imported from 3GU |
R1‑1610542 | Way Forward on maximum TA restriction for 1ms TTI processing time reduction | Qualcomm Incorporated | imported from 3GU |
R1‑1610543 | Way Forward on not supporting N+2 in 1ms TTI processing time reduction | Qualcomm Incorporated | imported from 3GU |
R1‑1610544 | Observations on channel codes for NR eMBB data | AccelerComm | imported from 3GU |
R1‑1610545 | Way Forward on channel codes for NR eMBB data | AccelerComm | imported from 3GU |
R1‑1610546 | WF on bandwidth adapatation in NR | MediaTek | imported from 3GU |
R1‑1610547 | WF on timing relationship for NR | MediaTek | imported from 3GU |
R1‑1610548 | Way Forward on sTTI scheduling options | Ericsson | imported from 3GU |
R1‑1610549 | Way Forward on handling of overlapping PDSCH/sPDSCH and PUSCH/sPUSCH | Ericsson | imported from 3GU |
R1‑1610550 | WF on multiplexing of Sync and Broadcast signals | Qualcomm Incorporated, CATT | imported from 3GU |
R1‑1610551 | Way Forward on NB IoT SC-PTM scheduling | Ericsson | imported from 3GU |
R1‑1610552 | Way Forward on NB IoT SC-MTCH transmission | Ericsson | imported from 3GU |
R1‑1610553 | Way Forward on NB IoT multicast collision handling | Ericsson | imported from 3GU |
R1‑1610554 | Way Forward on the Presence of NRS on Non-anchor PRBs | Ericsson | imported from 3GU |
R1‑1610555 | Way Forward on Paging in non-anchor PRBs | Ericsson | imported from 3GU |
R1‑1610556 | DCI design to support multiple SPS configurations | CATT | imported from 3GU |
R1‑1610557 | Way Forward on supporting n+2 minimum timing for shortened processing time in 1ms TTI | Nokia, Alcatel-Lucent Shanghai Bell, Ericsson, NTT DoCoMo, Sharp | imported from 3GU |
R1‑1610558 | WF on Synchronization signal for NR initial access | Huawei, HiSilicon | imported from 3GU |
R1‑1610559 | WF on NR RACH design | Huawei, HiSilicon | imported from 3GU |
R1‑1610560 | Way Forward on Antenna Port Layouts and Oversampling Factors | Ericsson, Sprint, Verizon, DOCOMO | imported from 3GU |
R1‑1610561 | Way Forward on fallback mechanisms for shortened processing time in 1ms TTI | LG Electronics, Ericsson, Intel, Qualcomm, Huawei, HiSilicon | imported from 3GU |
R1‑1610562 | Way Forward on UL scheduling timing for FS2 with shortened processing time in 1ms TTI | LG Electronics, NTT DOCOMO, Ericsson, ZTE Corp, ZTE Microelectronics, Intel | imported from 3GU |
R1‑1610563 | Way Forward on short TTI structure | LG Electronics, Huawei, HiSilicon | imported from 3GU |
R1‑1610564 | Way Forward on sPUCCH design | LG Electronics, ZTE Corp, ZTE Microelectronics | imported from 3GU |
R1‑1610565 | LS on Multi-carrier enhancements for UMTS | RAN2, Ericsson | imported from 3GU |
R1‑1610566 | WF on NR UL control channel | Samsung, Qualcomm, Intel, Panasonic, InterDigital, Sony, Ericsson, NTT DOCOMO, Fujitsu | imported from 3GU |
R1‑1610567 | WF on multiplexing of sync signal | Samsung | imported from 3GU |
R1‑1610568 | Way Forward on DL HARQ-ACK timing for FS2 | Samsung | imported from 3GU |
R1‑1610569 | Way Forward on sTTI length | Samsung | imported from 3GU |
R1‑1610570 | Way forward on IFDMA based DMRS | Intel, Qualcomm | imported from 3GU |
R1‑1610571 | LS reply on Multi-carrier enhancements for UMTS | RAN1, Ericsson | imported from 3GU |
R1‑1610572 | LS to RAN2/3 on RAN1 progress on MC enhancements | RAN1, Huawei | imported from 3GU |
R1‑1610573 | Report of the UMTS sessions | UMTS Session Chairman’s Notes (Huawei) | imported from 3GU |
R1‑1610574 | void | ETSI | imported from 3GU |
R1‑1610575 | void | ETSI | imported from 3GU |
R1‑1610576 | void | ETSI | imported from 3GU |
R1‑1610577 | void | ETSI | imported from 3GU |
R1‑1610578 | void | ETSI | imported from 3GU |
R1‑1610579 | void | ETSI | imported from 3GU |
R1‑1610580 | Performance Evaluation for NR Channel Coding | Huawei, HiSilicon | imported from 3GU |
R1‑1610581 | Way Forward on handling of PUSCH and sPUSCH grants for the same subframe and carrier | Ericsson, Huawei, HiSilicon | imported from 3GU |
R1‑1610582 | Way Forward on sTTI scheduling options | Ericsson, Panasonic, Samsung, Nokia, ASB, ZTE, ZTE Microelectronics, LG Electronics | imported from 3GU |
R1‑1610583 | Way Forward on sTTI scheduling options | Ericsson, Huawei, HiSilicon | imported from 3GU |
R1‑1610584 | [DRAFT] LS On Shortened TTI and processing time for LTE | Ericsson | imported from 3GU |
R1‑1610585 | [DRAFT] LS on implication of sTTI operation on UL ON/OFF time mask | Ericsson | imported from 3GU |
R1‑1610586 | Session Notes | Ericsson | imported from 3GU |
R1‑1610587 | void | ETSI | imported from 3GU |
R1‑1610588 | void | ETSI | imported from 3GU |
R1‑1610589 | void | ETSI | imported from 3GU |
R1‑1610590 | Way Forward on Evaluation scenarios and assumptions for DL mobility at above-6GHz | Samsung | imported from 3GU |
R1‑1610591 | Matthew session | ETSI | imported from 3GU |
R1‑1610592 | Matthew session | ETSI | imported from 3GU |
R1‑1610593 | Matthew session | ETSI | imported from 3GU |
R1‑1610594 | Way Forward on Signalling Details for CSI-RS Overhead Reduction | Samsung, InterDigital, ZTE, Ericsson, DoCoMo | imported from 3GU |
R1‑1610595 | Way Forward on Nk and Mk for {20, 28}-port CSI-RS | Samsung, LGE, CATT, Nokia, ASB | imported from 3GU |
R1‑1610596 | Way Forward on CSI-RS design for CDM-4 and CDM-8 | LGE | imported from 3GU |
R1‑1610597 | Matthew session | ETSI | imported from 3GU |
R1‑1610598 | Matthew session | ETSI | imported from 3GU |
R1‑1610599 | void | ETSI | imported from 3GU |
R1‑1610600 | Matthew session | ETSI | imported from 3GU |
R1‑1610601 | Matthew session | ETSI | imported from 3GU |
R1‑1610602 | Matthew session | ETSI | imported from 3GU |
R1‑1610603 | Matthew session | ETSI | imported from 3GU |
R1‑1610604 | Matthew session | ETSI | imported from 3GU |
R1‑1610605 | [DRAFT] LS regarding agreements for FeMBMS | Qualcomm | imported from 3GU |
R1‑1610606 | Draft LS for Voice and Video enhancement for LTE | Huawei | imported from 3GU |
R1‑1610607 | Matthew session | ETSI | imported from 3GU |
R1‑1610608 | void | ETSI | imported from 3GU |
R1‑1610609 | Matthew session | ETSI | imported from 3GU |
R1‑1610610 | Matthew session | ETSI | imported from 3GU |
R1‑1610611 | Way Forward on RPF-4 support in uplink DMRS | Huawei, HiSilicon | imported from 3GU |
R1‑1610612 | Way Forward on sequence collision handling in uplink DMRS | Huawei, HiSilicon | imported from 3GU |
R1‑1610613 | Way Forward on CSI feedback for DMRS based open loop transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1610614 | Way Forward on downlink control signaling for PDSCH rate matching | Huawei, HiSilicon | imported from 3GU |
R1‑1610615 | Way Forward on supporting aperiodic CSI-RS with one resource | Huawei, HiSilicon | imported from 3GU |
R1‑1610616 | Way Forward on DL DMRS for sTTI | Huawei, HiSilicon | imported from 3GU |
R1‑1610617 | Way Forward on UL DMRS indication for sTTI | Huawei, HiSilicon | imported from 3GU |
R1‑1610618 | Way Forward on sDCI | Huawei, HiSilicon | imported from 3GU |
R1‑1610619 | Way Forward on sPUCCH formats | Huawei, HiSilicon | imported from 3GU |
R1‑1610620 | Way Forward on sPUCCH patterns | Huawei, HiSilicon | imported from 3GU |
R1‑1610621 | Way Forward on PRS Frequency Hopping for OTDOA | Sony, ZTE | imported from 3GU |
R1‑1610622 | WF on DC subcarrier | Ericsson | imported from 3GU |
R1‑1610623 | Way Forward on CSI-RS Density Values for Class A | Ericsson, LG Electronics | imported from 3GU |
R1‑1610624 | Way Forward on CSI-RS Overhead Reduction for Class A | Ericsson, Samsung | imported from 3GU |
R1‑1610625 | Way Forward on TP Structure for NR Multiple Access in TR 38.802 | ZTE | imported from 3GU |
R1‑1610626 | Way Forward on Physical layer abstraction method for MMSE-SIC/PIC receiver | ZTE | imported from 3GU |
R1‑1610627 | Way Forward on technique(s) to handle cross-link interference in flexible duplex | LGE | imported from 3GU |
R1‑1610628 | Long Network DTX in NR | Ericsson | imported from 3GU |
R1‑1610629 | Way Forward on aggregation for NP CSI-RS | ZTE, ZTE Microelectronics, Qualcomm | imported from 3GU |
R1‑1610630 | Way Forward on RRC reconfiguration for FeMTC features | Qualcomm | imported from 3GU |
R1‑1610631 | Way forward on NR HARQ | Intel Corporation | imported from 3GU |
R1‑1610632 | Way Forward on PDSCH rate matching for supporting aperiodic CSIRS | LGE | imported from 3GU |
R1‑1610633 | WF on phase continuity of DL precodong | Qualcomm | imported from 3GU |
R1‑1610634 | Evaluation of flexible duplex in dense urban scenario | Huawei, HiSilicon | imported from 3GU |
R1‑1610635 | Way Forward on Aperiodic CSI-RS for eFD-MIMO | Samsung | imported from 3GU |
R1‑1610636 | Way Forward on Advanced CSI Codebook for eFD-MIMO | Samsung | imported from 3GU |
R1‑1610637 | WF on CSI Framework for NR | Samsung | imported from 3GU |
R1‑1610638 | WF on PMI Reporting for NR | Samsung | imported from 3GU |
R1‑1610639 | Way Forward on configurations of time resources for NPRS | Huawei, HiSilicon | imported from 3GU |
R1‑1610640 | Way Forward on configuration of NPRS transmission on multiple NB-IoT carriers | Huawei, HiSilicon | imported from 3GU |
R1‑1610641 | Way Forward on configuration of NPRS power for NB-IoT downlink positioning | Huawei, HiSilicon | imported from 3GU |
R1‑1610642 | Way Forward on SC-MTCH transmission for NB-IoT SC-PTM | Huawei, HiSilicon | imported from 3GU |
R1‑1610643 | Way Forward on SC-MCCH transmission for NB-IoT SC-PTM | Huawei, HiSilicon | imported from 3GU |
R1‑1610644 | Way Forward on search space design for SC-PTM in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1610645 | Way Forward on timing relationships of 2 HARQ processes for NB-IoT enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑1610646 | WF on subcarrier spacing selection and switching | ETRI | imported from 3GU |
R1‑1610647 | Way Forward on SRS Carrier-based Switching | Huawei, HiSilicon | imported from 3GU |
R1‑1610648 | Clarification of number of repetitions of PUCCH | ZTE, Rohde & Schwarz | imported from 3GU |
R1‑1610649 | Clarification on nrs-Power related description | ZTE | imported from 3GU |
R1‑1610650 | Way Forward on larger PDSCH/PUSCH channel bandwidth for MTC | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1610651 | Way Forward on HARQ bundling in HD-FDD for MTC | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1610652 | WF on symbol level alignments | LG Electronics, NTT DOCOMO, Ericsson, Panasonic, Qualcomm, ZTE | imported from 3GU |
R1‑1610653 | Correction on channel access priority class according to UL LBT type indication in eLAA | WILUS Inc. | imported from 3GU |
R1‑1610654 | Way Forward on OTDOA for eMTC | ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1610655 | LS on wider bandwidth operation for NR | RAN1, NTT DOCOMO | imported from 3GU |
R1‑1610656 | Clarification of number of repetitions of PUCCH | ZTE, Rohde & Schwarz | imported from 3GU |
R1‑1610657 | Clarification on nrs-Power related description | ZTE | imported from 3GU |
R1‑1610658 | WF on beam management | Ericsson, Samsung, Intel | imported from 3GU |
R1‑1610659 | Evaluation on channel coding candidates for eMBB control channel_Figures | ZTE | imported from 3GU |
R1‑1610660 | Evaluation on channel coding candidates for uRLLC and mMTC | ZTE | imported from 3GU |
R1‑1610661 | Way Forward on DCI for higher data rates in FeMTC | Ericsson, Qualcomm, Sony, NTT DoCoMo, Intel | imported from 3GU |
R1‑1610662 | Way Forward on retuning symbols in FeMTC | Ericsson, NEC | imported from 3GU |
R1‑1610663 | Way Forward on TBS for FeMTC | Ericsson | imported from 3GU |
R1‑1610664 | Way Forward on FeMTC SC-PTM scheduling | Ericsson | imported from 3GU |
R1‑1610665 | Way Forward on FeMTC multicast collision handling | Ericsson | imported from 3GU |
R1‑1610666 | Way Forward on FeMTC SC-MTCH transmission | Ericsson | imported from 3GU |
R1‑1610667 | Channel Coding Observations | Huawei, HiSilicon | imported from 3GU |
R1‑1610668 | Way Forward on Channel Coding | Huawei, HiSilicon | imported from 3GU |
R1‑1610669 | Way Forward on flexible duplex | Huawei, HiSilicon | imported from 3GU |
R1‑1610670 | Way Forward on supporting 10 HARQ processes | Sequans | imported from 3GU |
R1‑1610671 | WF on NR DL Control | ZTE | imported from 3GU |
R1‑1610672 | Way Forward on the SLSS Transmission | Huawei, HiSilicon, Qualcomm , LG Electronics, Ericsson, Samsung, CATT, ITRI, NTT DOCOMO, OPPO, Nokia, ASB | imported from 3GU |
R1‑1610673 | Way Forward on Sync Priority for OOC | Huawei, HiSilicon, LG Electronics, Qualcomm, ZTE, ITRI, DCM, Xinwei, Samsung, NEC, CATT, Ericsson, Nokia, ASB | imported from 3GU |
R1‑1610674 | WF on UL beam management | Huawei, HiSilicon | imported from 3GU |
R1‑1610675 | WF on UL MIMO transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1610676 | WF on UCI transmission for NR | LGE | imported from 3GU |
R1‑1610677 | WF on common control channel for NR | LGE | imported from 3GU |
R1‑1610678 | Efficient Channel Coding Implementations for EMBB | Qualcomm Incorporated | imported from 3GU |
R1‑1610679 | CR to capture additional feature calibration results | Samsung | imported from 3GU |
R1‑1610680 | LS on TTI switching for MC enhancements | RAN2, Huawei | imported from 3GU |
R1‑1610681 | Way Forward on coexistence between NR and LTE | LGE | imported from 3GU |
R1‑1610682 | Channel Coding scheme for EMBB | Intel Corporation | imported from 3GU |
R1‑1610683 | Discussion points on DL control signaling | Ericsson | imported from 3GU |
R1‑1610684 | Way Forward on supporting larger channel bandwidth for Rel-14 non-BL UEs | Huawei, HiSilicon | imported from 3GU |
R1‑1610685 | WF on UL MIMO | CATT | imported from 3GU |
R1‑1610686 | Way Forward on TR structure for NR multiple access | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610687 | Clarification on IF-HARQ for PC-Polar | Huawei, HiSilicon | imported from 3GU |
R1‑1610688 | Full calibration results for channel model above 6GHz | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1610689 | Way forward on eMBB data channel coding | Samsung | imported from 3GU |
R1‑1610690 | Way forward on observations for eMBB data channel coding | Samsung | imported from 3GU |
R1‑1610691 | Way Forward on Channel Coding Design for NR | Ericsson | imported from 3GU |
R1‑1610692 | Way Forward on Further Evaluation Assumptions of Control Channel | Ericsson | imported from 3GU |
R1‑1610693 | Way Forward on Basics of LDPC Design | Ericsson, Intel, Qualcomm | imported from 3GU |
R1‑1610694 | WF on NR UL MIMO precoding | Intel Corporation, NTT DoCoMo | imported from 3GU |
R1‑1610695 | Way Forward on HARQ timing for PUSCH UpPTS | CMCC | imported from 3GU |
R1‑1610696 | Way Forward on DMRSfor PUSCH UpPTS | CMCC | imported from 3GU |
R1‑1610697 | Way Forward on timing design for TTI bundling | CMCC | imported from 3GU |
R1‑1610698 | Way Forward on TBS scalling design for PUSCH UpPTS | CMCC | imported from 3GU |
R1‑1610699 | TR38.900_CR_Azimuthal_Angle_Notation | Fraunhofer HHI | imported from 3GU |
R1‑1610700 | TR38.900_CR_Harmonizing_Terminology | Fraunhofer HHI | imported from 3GU |
R1‑1610701 | TR36.873_CR_Section_7.3 | Fraunhofer HHI | imported from 3GU |
R1‑1610702 | TR36.873_CR_LOS_Probability | Fraunhofer HHI | imported from 3GU |
R1‑1610703 | TR36.814_CR_Section_B.1.2.2.1 | Fraunhofer HHI | imported from 3GU |
R1‑1610704 | TR36.814_CR_LOS_Probability | Fraunhofer HHI | imported from 3GU |
R1‑1610705 | WF on CSI-RS pooling | Ericsson | imported from 3GU |
R1‑1610706 | Way Forward on DCI format for SC-PTM | Huawei, HiSilicon | imported from 3GU |
R1‑1610707 | Way Forward on SC-PTM configuration and scheduling | Huawei, HiSilicon | imported from 3GU |
R1‑1610708 | Way Forward on handling multiplexing V2V with other signals/channels | LG Electronics | imported from 3GU |
R1‑1610709 | Way Forward on prioritization of SL TX over UL TX | LG Electronics | imported from 3GU |
R1‑1610710 | Discussion on DL control channels | Ericsson | imported from 3GU |
R1‑1610711 | Way Forward on the pre-defined SLSS IDs for the GNSS timing | Huawei, HiSilicon, ZTE, Samsung, ITRI, CATT, LG Electronics, NTT DOCOMO, Qualcomm, Nokia, ASB | imported from 3GU |
R1‑1610712 | WF on dynamic resource sharing between eMBB and URLLC in DL | Huawei, HiSilicon | imported from 3GU |
R1‑1610713 | Way Forward on supporting traffic with small periodicity for LTE-V2X | Huawei, HiSilicon, LG Electronics, Qualcomm, Ericsson | imported from 3GU |
R1‑1610714 | Way Forward on Principle of Generating Power Ratio | ZTE, LGE | imported from 3GU |
R1‑1610715 | Way Forward on the Gray conversion | LG Electronics, ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1610716 | WF on CSI-RS and CSI reporting in NR | LG Electronics, Ericsson, Intel, Samsung | imported from 3GU |
R1‑1610717 | Way Forward on additional offset in path-loss model for flexible duplex | LG Electronics | imported from 3GU |
R1‑1610718 | Way Forward on the overhead reduction for Class B CSI-RS | Intel Corporation | imported from 3GU |
R1‑1610719 | WF on evaluation assumptions for compensation of phase rotation and frequency offset | LG Electronics, InterDigital, KT, Huawei | imported from 3GU |
R1‑1610720 | Way Forward on URLLC System Level Evaluation Methodology | Intel | imported from 3GU |
R1‑1610721 | WF on UL link adaptation procedures in NR | LG Electronics | imported from 3GU |
R1‑1610722 | Way forward on SYNC periodicity | Qualcomm Incorporated | imported from 3GU |
R1‑1610723 | Way Forward on Gray Mapped Composite Constellation in MUST | MediaTek | imported from 3GU |
R1‑1610724 | Way Forward on Power Ratio in MUST Cases 1 and 2 | MediaTek | imported from 3GU |
R1‑1610725 | Way Forward on DMRS based Transmission Scheme of MUST Case 3 | MediaTek | imported from 3GU |
R1‑1610726 | Way Forward on PDSCH Starting Symbol in MUST | MediaTek | imported from 3GU |
R1‑1610727 | WF on CSI feedback framework for hybrid beamforming in NR | CMCC | imported from 3GU |
R1‑1610728 | Way Forward on ITS Coexistence Mechanisms | Ericsson | imported from 3GU |
R1‑1610729 | Way Forward on PDSCH starting symbol | LG Electronics, Qualcomm | imported from 3GU |
R1‑1610730 | Way Forward on new DCI design | LG Electronics, LG Uplus, MediaTek, ZTE, ZTE Microelectronics, Huawei, HiSilicon | imported from 3GU |
R1‑1610731 | Way Forward on PUSCH CSI reporting for hybrid CSIRS mechanism | LG Electronics, Samsung | imported from 3GU |
R1‑1610732 | Way Forward on QCL issue for aperiodic CSIRS | LG Electronics, Samsung | imported from 3GU |
R1‑1610733 | CR on 36.213 NB-IoT Type1 and Type 2 search space definition | Ericsson | imported from 3GU |
R1‑1610734 | CR on 36.213 NB-IoT Type1 and Type 2 search space definition | Ericsson | imported from 3GU |
R1‑1610735 | WF on Network Coordination for Advanced Receivers | Samsung | imported from 3GU |
R1‑1610736 | Summary of offline discussion on downlink control channels | Ericsson | imported from 3GU |
R1‑1610737 | Support of URLLC in UL | Huawei, HiSilicon | imported from 3GU |
R1‑1610738 | WF on compensation of phase rotation and frequency offset for CP-OFDM | Huawei | imported from 3GU |
R1‑1610739 | Way Forward on P-UE sensing timeline in partial sensing | Huawei | imported from 3GU |
R1‑1610740 | Way Forward on V2V PC5 SLSS transmission | Huawei | imported from 3GU |
R1‑1610741 | Way Forward on CSI-RS design for CDM-4 and CDM-8 | LG Electronics | imported from 3GU |
R1‑1610742 | Clarification on i_0 value | Qualcomm Incorporated | imported from 3GU |
R1‑1610743 | Way Forward on UL grant-free workplan Huawei, HiSilicon, CMCC | Huawei | imported from 3GU |
R1‑1610744 | Way Forward on non-orthogonal MA workplan Huawei, HiSilicon, CMCC | Huawei | imported from 3GU |
R1‑1610745 | Way Forward on summary of UL non-orthogonal MA progress Huawei, HiSilicon, | Huawei | imported from 3GU |
R1‑1610746 | Way Forward on summary of grant-free progress Huawei, HiSilicon, | Huawei, HiSilicon | imported from 3GU |
R1‑1610747 | WF on RS for Phase Tracking for CP-OFDM | Huawei, HiSilicon, LG Electronics, Samsung, NTT DOCOMO, INC., Intel | imported from 3GU |
R1‑1610748 | Draft LS on power allocation for SC-PTM | Huawei | imported from 3GU |
R1‑1610749 | Way Forward on PUCCH and SRS not belonging to any narrowband for BL/CE UE | Ericsson, Intel, Qualcomm, Sequans, Sony, ZTE | imported from 3GU |
R1‑1610750 | WF on HARQ feedback for eMBB | MediaTek | imported from 3GU |
R1‑1610751 | WF on Symbol Index indication in NR-SS | Samsung | imported from 3GU |
R1‑1610752 | Way forward on NR DCI monitoring | Intel, CATT, Ericsson, Panasonic, ETRI | imported from 3GU |
R1‑1610753 | Way Forward on congestion control | Huawei, HiSilicon, Ericsson, OPPO, Nokia | imported from 3GU |
R1‑1610754 | Way Forward on Definition of Gray Mapped Composite Constellation | ZTE, LGE | imported from 3GU |
R1‑1610755 | Correction of PRACH starting subframes for eMTC | Intel Corporation | imported from 3GU |
R1‑1610756 | Correction of NPRACH frequency hopping | Intel Corporation | imported from 3GU |
R1‑1610757 | Observations on hardware implementations of flexible channel decoders | AccelerComm | imported from 3GU |
R1‑1610758 | Overhead Comparison Between Class-A-Based and Unrestricted Orthogonal Designs | Samsung | imported from 3GU |
R1‑1610759 | Way Forward on Remaining Issues on Hybrid CSI | Samsung | imported from 3GU |
R1‑1610760 | Clarification on NR HARQ UL/DL timing relationships | Qualcomm | imported from 3GU |
R1‑1610761 | Way Forward on number of ports supported in advanced CSI | Huawei | imported from 3GU |
R1‑1610762 | Way Forward on further details in Advanced CSI | Huawei | imported from 3GU |
R1‑1610763 | Way Forward on NZP CSI-RS based interference measurement | Huawei | imported from 3GU |
R1‑1610764 | Way Forward on extra scheme supported in hybrid CSI | Huawei | imported from 3GU |
R1‑1610765 | LS on RAN2 agreements on FeMBMS | RAN2, Ericsson | imported from 3GU |
R1‑1610766 | LS to RAN1 on V2V agreements | RAN2, LGE | imported from 3GU |
R1‑1610767 | Way forward on eMBB data channel coding | Samsung | imported from 3GU |
R1‑1610768 | Way Forward on dynamic TDD opreration for NR | ZTE | imported from 3GU |
R1‑1610769 | Way Forward on resource reselection | Samsung, CATT, Huawei, HiSilicon, ZTE | imported from 3GU |
R1‑1610770 | Way Forward on Clarification of NPRACH for single/multi-tone MSG 3 | MediaTek | imported from 3GU |
R1‑1610771 | Way Forward on interference measurement enhancement | CATT, Samsung, CATR, ITRI, InterDigital, KT, KDDI, LG Electronics, ZTE, Xinwei | imported from 3GU |
R1‑1610772 | Way Forward for Quantized Advanced CSI Feedback Structure | Ericsson, Huawei | imported from 3GU |
R1‑1610773 | Correction on CSI measurement in LAA | LG Electronics | imported from 3GU |
R1‑1610774 | Correction on periodic CSI transmission | LG Electronics | imported from 3GU |
R1‑1610775 | Correction on UL burst scheduling | LG Electronics | imported from 3GU |
R1‑1610776 | Way Forward on reliable sidelink SPS | NTT DOCOMO | imported from 3GU |
R1‑1610777 | Way Forward on NR modulation high spectral efficency | Samsung | imported from 3GU |
R1‑1610778 | Correction on MPDCCH transmission without repetition | Huawei, HiSilicon | imported from 3GU |
R1‑1610779 | Discussion on DL control channels | Ericsson | imported from 3GU |
R1‑1610780 | LS on power allocation for SC-PTM | RAN1, Huawei | imported from 3GU |
R1‑1610781 | Performance of Advanced CSI with 4 and 8 TX antennas | Ericsson | imported from 3GU |
R1‑1610782 | Way Forward on enhancement of CS/CB with FD-MIMO | Huawei, HiSilicon, Intel | imported from 3GU |
R1‑1610783 | Way Forward on RACH Procedure for Multi-beam without gNB reciprocity | ZTE, ZTE Microelectronics, Nokia, NTT DOCOMO | imported from 3GU |
R1‑1610784 | Way Forward on DL control channel design | Huawei, HiSilicon, Qualcomm, ZTE, InterDigital, Convida Wireless | imported from 3GU |
R1‑1610785 | Way Forward on rate matching for aperiodic CSI-RS | ZTE, ZTE Microelectronics, Ericsson | imported from 3GU |
R1‑1610786 | Way Forward on hybrid CSI mechanism | ZTE, ZTE Microelectronics, NTT DOCOMO, Ericsson | imported from 3GU |
R1‑1610787 | Way Forward on transmission modes for sTTI | Huawei, HiSilicon | imported from 3GU |
R1‑1610788 | Way Forward on supporting multiplxing sDCI with different AL in one sPDCCH | Qualcomm | imported from 3GU |
R1‑1610789 | Way Forward on Using Scaled Numerology for DL Control | Qualcomm, ZTE | imported from 3GU |
R1‑1610790 | Way Forward on Multiplexing eMBB and URLLC in DL | Samsung | imported from 3GU |
R1‑1610791 | Way Forward on Fractional RB usage | Samsung | imported from 3GU |
R1‑1610792 | Way Forward on coexistence between NR and LTE | LGE | imported from 3GU |
R1‑1610793 | Way Forward on SLS observations of non-orthogonal MA | Huawei, HiSilicon, ZTE | imported from 3GU |
R1‑1610794 | Way Forward on UL grant-free technical aspects | Huawei, HiSilicon | imported from 3GU |
R1‑1610795 | Way Forward on non-orthogonal multiple access for non-mMTC scenarios | Huawei, HiSilicon, CATT, Convida Wireless, Interdigital | imported from 3GU |
R1‑1610796 | Correction on equation for MPDCCH search space and starting subframe position | NTT DOCOMO, INC., Panasonic | imported from 3GU |
R1‑1610797 | Correction on equation for MPDCCH search space and starting subframe position | NTT DOCOMO, INC., Panasonic | imported from 3GU |
R1‑1610798 | LS on DFN offset | RAN2, Huawei | imported from 3GU |
R1‑1610799 | Way Forward on Modulation for NR | InterDigital | imported from 3GU |
R1‑1610800 | Way Forward on coexistence between NR and LTE | LGE | imported from 3GU |
R1‑1610801 | Way Forward on Categorization of MA Signature | ZTE | imported from 3GU |
R1‑1610802 | Discussion on power ratios for MUST Case 1&2 | Huawei, HiSilicon | imported from 3GU |
R1‑1610803 | Way Forward on downlink power allocation for MUST Case 1&2 | Huawei, HiSilicon | imported from 3GU |
R1‑1610804 | Way Forward on power ratios for MUST Case 1&2 | Huawei, HiSilicon | imported from 3GU |
R1‑1610805 | Way Forward on Gray Conversion for MUST Case 1&2 | Huawei, HiSilicon | imported from 3GU |
R1‑1610806 | Way Forward on CRS-based MUST Case 3 | Huawei, HiSilicon | imported from 3GU |
R1‑1610807 | Clarification on IF-HARQ for PC-Polar | Huawei, HiSilicon | imported from 3GU |
R1‑1610808 | Way Forward on NR UL control channel | Samsung, Qualcomm, Intel, Panasonic, InterDigital, Sony, Ericsson, NTT DOCOMO, Fujitsu, OPPO, CATT, CMCC ^^Samsung, Qualcomm, Intel, Panasonic, InterDigital, Sony, Ericsson, NTT DOCOMO, Fujitsu, OPPO, CATT, CMCC | imported from 3GU |
R1‑1610809 | Way Forward on MUST UE multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1610810 | Way Forward on CP | Huawei, HiSilicon | imported from 3GU |
R1‑1610811 | Way Forward on NR DL Control Channel Structure | Samsung | imported from 3GU |
R1‑1610812 | Way Forward on DCI design for V2X UL SPS | LG Electronics | imported from 3GU |
R1‑1610813 | Way Forward on DCI design for SL SPS | LG Electronics | imported from 3GU |
R1‑1610814 | DMRS-based sPDCCH | ZTE | imported from 3GU |
R1‑1610815 | Way Forward on aperiodic CSI-RS selection | Ericsson, NTT DoCoMo | imported from 3GU |
R1‑1610816 | On PHICH collision analysis | Ericsson | imported from 3GU |
R1‑1610817 | Way Forward on TBS indication for 1.4MHz feMTC UEs | Huawei, HiSilicon | imported from 3GU |
R1‑1610818 | Way Forward on PHY abstraction method for MA SLS | ZTE | imported from 3GU |
R1‑1610819 | Way Forward on potential enhancements for Non Coherent Joint Transmission | ZTE | imported from 3GU |
R1‑1610820 | Way Forward on FeMTC multicast scheduling | Ericsson | imported from 3GU |
R1‑1610821 | Observations on hardware implementations of flexible LDPC decoders | AccelerComm | imported from 3GU |
R1‑1610822 | Observations on hardware implementations of flexible polar decoders | AccelerComm | imported from 3GU |
R1‑1610823 | Way Forward on Network Assistance for NR Uplink Waveform | AT&T, Huawei | imported from 3GU |
R1‑1610824 | Way Forward on bundle size and bundle number in HD-FDD for MTC | ZTE, ZTE Microelectronics, Sierra Wireless, Ericsson, Lenovo, Sony | imported from 3GU |
R1‑1610825 | Way Forward on Beam management | CATT, CATR, CMCC, Xinwei | imported from 3GU |
R1‑1610826 | Way Forward on summary of grant-free progress | Huawei, HiSilicon | imported from 3GU |
R1‑1610827 | Way Forward on DL sTTI pattern | Huawei, HiSilicon, NTT DOCOMO, Intel, Qualcomm, Ericsson, LGE, Sharp | imported from 3GU |
R1‑1610828 | Way Forward on DL measurement for L3 mobility | LG Electronics, Samsung, NTT DOCOMO | imported from 3GU |
R1‑1610829 | Way Forward on evaluation assumptions for tracking of phase rotation and/or frequency offset | LG Electronics | imported from 3GU |
R1‑1610830 | Way Forward on MUST control operation | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610831 | Way Forward on Spatial Multiplexing Schemes for MU-MIMO | Mitsubishi Electric, InterDigital, Samsung, NTT DOCOMO, IITH, IITM, Tejas Networks, CEWIT, KDDI | imported from 3GU |
R1‑1610832 | Way Forward on asynchronous UL HARQ in 1ms TTI | LG Electronics, NTT DOCOMO | imported from 3GU |
R1‑1610833 | Way Forward on UL short TTI structure | LG Electronics, Huawei, HiSilicon, Ericsson, Nokia, Alcatel-Lucent Shanghai Bell, Samsung, NTT DOCOMO, Sharp, Intel, Qualcomm, CATT | imported from 3GU |
R1‑1610834 | Way Forward on UL short TTI structure for 4-symbol sTTI | LG Electronics, Samsung, Ericsson, CATT, NTT DOCOMO, ZTE, ZTE Microelectronics, Huawei, HiSilicon, Panasonic, Sharp | imported from 3GU |
R1‑1610835 | Way Forward on sTTI scheduling options | Ericsson, Panasonic, Samsung, Nokia, ASB, ZTE, ZTE Microelectronics, CATT, LG Electronics | imported from 3GU |
R1‑1610836 | Way Forward on handling of PDSCH/sPDSCH assignments for the same subframe and carrier | Ericsson, Huawei, HiSilicon, Qualcomm, NTT DOCOMO, LG Electronics | imported from 3GU |
R1‑1610837 | CR for clarification on A-CSI without hopping | Qualcomm Incorporated, Samsung | imported from 3GU |
R1‑1610838 | CR for clarification on A-CSI without hopping | Qualcomm Incorporated, Samsung | imported from 3GU |
R1‑1610839 | Way Forward on Updated Link Level Evaluation Assumptions for Initial Access in NR | Qualcomm | imported from 3GU |
R1‑1610840 | Way Forward on Multiplexing of SYNC and Broadcast Signals | Qualcomm | imported from 3GU |
R1‑1610841 | [Draft] Reply LS on CSI measurement ambiguity in LAA | LG Electronics | imported from 3GU |
R1‑1610842 | Implementation considerations on flexible and efficient LDPC decoders | MediaTek Inc. | imported from 3GU |
R1‑1610843 | Draft TR 38.802 Study on New Radio (NR) Access Technology - Physical Layer Aspects | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610844 | Offline discussion summary of initial access for NR | NTT DOCOMO | imported from 3GU |
R1‑1610845 | Way Forward on NR UL-based RRM measurement | Huawei, HiSilicon, Qualcomm | imported from 3GU |
R1‑1610846 | Way Forward on NR RACH procedure | Huawei, HiSilicon, Qualcomm, ETRI | imported from 3GU |
R1‑1610847 | [Draft] LS response on DFN offset | Ericsson | imported from 3GU |
R1‑1610848 | Draft TR 38.802 Study on New Radio (NR) Access Technology - Physical Layer Aspects | NTT DOCOMO, INC. | imported from 3GU |
R1‑1610849 | Way Forward on the definition of beam reciporcity | Samsung | imported from 3GU |
R1‑1610850 | Way Forward on Channel Coding | Huawei, HiSilicon | imported from 3GU |
R1‑1610851 | Reply LS on CSI measurement ambiguity in LAA | RAN1, LGE | imported from 3GU |
R1‑1610852 | Correction on PDCCH candidate configuration | LG Electronics | imported from 3GU |
R1‑1610853 | Correction on PDCCH candidate configuration | LG Electronics | imported from 3GU |
R1‑1610854 | Way Forward on NR RACH procedure | Huawei, HiSilicon, Qualcomm, ETRI | imported from 3GU |
R1‑1610855 | Way Forward on the combination of sTTI length for DL and UL | Samsung, Qualcomm | imported from 3GU |
R1‑1610856 | Way Forward on sTTI length for DL | Samsung Ericsson Sharp NTT DOCOMO ;Huawei HiSilicon Intel CATT ;ZTE ZTE Microelectronics LG Electronics | imported from 3GU |
R1‑1610857 | Observations on Performance and Implementation Issues of AdjMS decoders | Huawei, HiSilicon | imported from 3GU |
R1‑1610858 | Draft CR on using 25us LBT for UEs on carriers without eNB Cat 4 LBT foe eLAA | Qualcomm | imported from 3GU |
R1‑1610859 | Draft CR on clarification of PUSCH start position for eLAA | Panasonic, Qualcomm Incorporated | imported from 3GU |
R1‑1610860 | Way Forward on Basics of LDPC Design | Ericsson, Intel, Qualcomm, MediaTek | imported from 3GU |
R1‑1610861 | Way Forward on TBS indication for 1.4MHz feMTC UEs | Huawei, HiSilicon | imported from 3GU |
R1‑1610862 | void | ETSI | imported from 3GU |
R1‑1610863 | void | ETSI | imported from 3GU |
R1‑1610864 | Chairman's notes of AI 7.2.1 on LTE-based V2X Services | Ad-Hoc chair (Nokia, LGE) | imported from 3GU |
R1‑1610865 | Chairman's notes of AI 7.2.2 on Enhancements on Full-Dimension (FD) MIMO for LTE | Ad-Hoc chair (Nokia) | imported from 3GU |
R1‑1610866 | Chairman's notes of AI 7.2.3 on Downlink Multiuser Superposition Transmission for LTE | Ad-Hoc chair (Qualcomm, MediaTek) | imported from 3GU |
R1‑1610867 | Chairman's notes of AI 7.2.4 on eMBMS enhancements for LTE | Ad-Hoc chair (Ericsson) | imported from 3GU |
R1‑1610868 | Chairman's notes of AI 7.2.5 on SRS Carrier Based Switching for LTE | Ad-Hoc chair (Huawei) | imported from 3GU |
R1‑1610869 | Chairman's notes of AI 7.2.6 on Further Indoor Positioning enhancements for UTRA and LTE | Ad-Hoc chair (Qualcomm) | imported from 3GU |
R1‑1610870 | Chairman's notes of AI 7.2.7 on Uplink Capacity Enhancements for LTE | Ad-Hoc chair (Ericsson) | imported from 3GU |
R1‑1610871 | Chairman's notes of AI 7.2.8 on Further Enhanced MTC for LTE | Ad-Hoc chair (Nokia, Ericsson) | imported from 3GU |
R1‑1610872 | Chairman's notes of AI 7.2.9 on Enhancements of NB-IoT | Ad-Hoc chair (Huawei) | imported from 3GU |
R1‑1610873 | Chairman's notes of AI 7.2.10 on Shortened TTI and processing time for LTE | Ad-Hoc chair (Ericsson) | imported from 3GU |
R1‑1610874 | Chairman's notes of AI 7.2.11 on Performance enhancements for high speed scenario | Ad-Hoc chair (Qualcomm) | imported from 3GU |
R1‑1610875 | Chairman's notes of AI 7.2.12 on Study on Enhancement of VoLTE | Ad-Hoc chair (Qualcomm) | imported from 3GU |
R1‑1610876 | Chairman's notes of AI 7.2.13 on Study on Further enhancements to Coordinated Multi-Point Operation | Ad-Hoc chair (Intel) | imported from 3GU |
R1‑1610877 | Chairman's notes of AI 8.1.1 on waveform and multiple access schemes for NR | Ad-Hoc chair (Qualcomm) | imported from 3GU |
R1‑1610878 | Chairman's notes of AI 8.1.3 on channel coding and modulation for NR | Ad-Hoc chair (Nokia) | imported from 3GU |
R1‑1610879 | Chairman's notes of AI 8.1.6 on duplexing for NR | Ad-Hoc chair (Qualcomm) | imported from 3GU |
R1‑1610880 | Chairman's notes of AI 8.1.8 | Ad-Hoc chair (Qualcomm) | imported from 3GU |
R1‑1610881 | Chairman's notes of AI 8.2 | Ad-Hoc chair (Nokia) | imported from 3GU |
R1‑1610882 | Chairman's notes of AI 7.1 on CRs | Ad-Hoc chair (Qualcomm) | imported from 3GU |
R1‑1610883 | Way Forward on Using Scaled Numerology for Control Transmission | Qualcomm, ZTE, Ericsson | imported from 3GU |
R1‑1610884 | Removal of LAA DRS channel access from UL Type 2 Channel Access description | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610885 | Observations on Area | Qualcomm | imported from 3GU |
R1‑1610886 | Clarification of PUSCH start position for eLAA | Panasonic, Qualcomm Incorporated | imported from 3GU |
R1‑1610887 | Notes from offline discussion on ulplink control channels | Ericsson | imported from 3GU |
R1‑1610888 | Way Forward on NR MIMO calibration | ZTE, ZTE Microelectronics, Nokia, ASB, CATT, MediaTek, Xinwei, Huawei, Hisilicon, Intel, Ericsson, Mitsubishi Electric, Samsung | imported from 3GU |
R1‑1610889 | Way Forward on Phase 1 link-level calibration for NR-MIMO with simplified antenna configuration | ZTE | imported from 3GU |
R1‑1610890 | Clarification on assumptions for Phase 1 link-level calibration for NR-MIMO | ZTE | imported from 3GU |
R1‑1610891 | Way Forward on group-based beam management | ZTE, ZTE Microelectronics, ASTRI, Nokia, ASB, CATT | imported from 3GU |
R1‑1610892 | Way Forward on reference signal for demodulation | ZTE | imported from 3GU |
R1‑1610893 | Way Forward on MIMO transmission based on multiple antenna panels | Huawei | imported from 3GU |
R1‑1610894 | Way Forward on UL beam management | Samsung | imported from 3GU |
R1‑1610895 | Way Forward on DL MIMO transmission | Huawei | imported from 3GU |
R1‑1610896 | CR on UL duration and offset field in TS 36.213 | ETRI | imported from 3GU |
R1‑1610897 | Observations on Area | Qualcomm | imported from 3GU |
R1‑1610898 | Way Forward on coordinated transmission in NR | LG Electronics, Huawei, HiSilicon, Samsung | imported from 3GU |
R1‑1610899 | Way Forward on CSI feedback framework for hybrid beamforming in NR | CMCC, CATT, Xinwei, Samsung, Ericsson, Huawei, HiSilicon, Qualcomm | imported from 3GU |
R1‑1610900 | Correction on channel access priority class according to UL LBT type indication in eLAA | WILUS Inc. | imported from 3GU |
R1‑1610901 | Correction on downlink power allocation for SC-PTM | TD Tech, Huawei | imported from 3GU |
R1‑1610902 | Way Forward on Multiplexing eMBB and URLLC in DL | Samsung | imported from 3GU |
R1‑1610903 | Way Forward on Performance enhancements for high speed scenario | Huawei | imported from 3GU |
R1‑1610904 | Way Forward on Low PAPR Modulation in NR | Samsung | imported from 3GU |
R1‑1610905 | Way Forward on UTDOA for NB-IoT | ZTE | imported from 3GU |
R1‑1610906 | Way Forward on channel and interference measurements for NR | Samsung | imported from 3GU |
R1‑1610907 | Way Forward on CSI-RS resource pooling | Ericsson, Samsung, LG, Nokia | imported from 3GU |
R1‑1610908 | Correction on periodic CSI transmission | LG Electronics | imported from 3GU |
R1‑1610909 | Way Forward on Multipath RSTD | Ericsson | imported from 3GU |
R1‑1610910 | Draft LS on Multipath RSTD report | Ericsson | imported from 3GU |
R1‑1610911 | Clarification on i_0 value | Qualcomm Incorporated | imported from 3GU |
R1‑1610912 | Clarification on i_0 value | Qualcomm Incorporated | imported from 3GU |
R1‑1610913 | Way Forward on enhancement in step 2 for supporting shorter periodicity | LG Electronics | imported from 3GU |
R1‑1610914 | Correction of PRACH starting subframes for eMTC | Intel Corporation | imported from 3GU |
R1‑1610915 | Correction of PRACH starting subframes for eMTC | Intel Corporation | imported from 3GU |
R1‑1610916 | Correction of NPRACH frequency hopping | Intel Corporation | imported from 3GU |
R1‑1610917 | Correction of NPRACH frequency hopping | Intel Corporation | imported from 3GU |
R1‑1610918 | Link-level evaluation results of UL NOMA schemes | Intel Corporation | imported from 3GU |
R1‑1610919 | Way Forward on PUCCH and SRS not belonging to any narrowband for BL/CE UE | Ericsson, Alcatel-Lucent Shanghai Bell, Intel, Nokia, NTT DoCoMo, Qualcomm, Sequans, Sony, Sierra Wireless, Virtuosys, ZTE, ZTE Microelectronics | imported from 3GU |
R1‑1610920 | [Draft] LS response on Exceptional Pool Handling for V2X | Ericsson | imported from 3GU |
R1‑1610921 | Way Forward on VoLTE and ViLTE enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑1610922 | Way Forward on FeMTC eVoLTE | Huawei, HiSilicon | imported from 3GU |
R1‑1610923 | Way Forward on Beam reporting for NR | LG Electronics | imported from 3GU |
R1‑1610924 | Way Forward on remaining details on PDSCH rate matching | LG Electronics | imported from 3GU |
R1‑1610925 | Way Forward on dynamic resource sharing between eMBB and URLLC in DL | Huawei, HiSilicon | imported from 3GU |
R1‑1610926 | Correction on MPDCCH transmission without repetition | Huawei, HiSilicon | imported from 3GU |
R1‑1610927 | Way Forward on eMBMS enhancements | Ericsson, Qualcomm, Intel, Nokia, ASB, BBC, IRT, EBU | imported from 3GU |
R1‑1610928 | Way Forward on PRS-Based RSRP/RSRQ Measurement and Reporting for PRS-Based Beacon | Nokia | imported from 3GU |
R1‑1610929 | LS response on DFN offset | RAN1, Ericsson | imported from 3GU |
R1‑1610930 | LS response on Exceptional Pool Handling for V2X | RAN1, Ericsson | imported from 3GU |
R1‑1610931 | Way Forward on channel codes for NR eMBB data | AccelerComm | imported from 3GU |
R1‑1610932 | Way Forward on supporting 50 ms periodicity | CATT | imported from 3GU |
R1‑1610933 | Way Forward on longer CP | Qualcomm | imported from 3GU |
R1‑1610934 | Way Forward on OTDOA for eMTC | ZTE, ZTE Microelectronics, Ericsson, Qualcomm | imported from 3GU |
R1‑1610935 | Outcome offline discussion on V2V maintenance | LG Electronics | imported from 3GU |
R1‑1610936 | Outcome offline discussion on V2X | LG Electronics | imported from 3GU |
R1‑1610937 | Way Forward on CSI parameters for NR | Samsung | imported from 3GU |
R1‑1610938 | Outcome of Friday Offline Session on eFD-MIMO | Samsung | imported from 3GU |
R1‑1610939 | Phase 1 link level calibration results for NR MIMO | LG Electronics | imported from 3GU |
R1‑1610940 | Codebook design for up to 32 CSI-RS ports | Huawei, HiSilicon | imported from 3GU |
R1‑1610941 | Way Forward on MAC CE based activation/release mechanism | Qualcomm | imported from 3GU |
R1‑1610942 | Way Forward on Class A codebook enhancements | Qualcomm, LGE | imported from 3GU |
R1‑1610943 | Offline outcome of Wednesday evening on 8.1.7.1 | NTT DOCOMO | imported from 3GU |
R1‑1610944 | CR for clarification on A-CSI without hopping | Qualcomm Incorporated, Samsung | imported from 3GU |
R1‑1610945 | CR for clarification on A-CSI without hopping | Qualcomm Incorporated, Samsung | imported from 3GU |
R1‑1610946 | Way Forward on URLLC HARQ | Intel | imported from 3GU |
R1‑1610947 | Way Forward on MUST control operation | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑1610948 | Way Forward on power ratios for Case 1 and 2 | Huawei, HiSilicon | imported from 3GU |
R1‑1610949 | Way Forward on forward compatibility for NR | Samsung | imported from 3GU |
R1‑1610950 | Way Forward on MU CSI acquisition | Qualcomm | imported from 3GU |
R1‑1610951 | Way Forward on LLS evaluation assumption for control channel evaluation in URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1610952 | Way Forward on Semi-static resource sharing between URLLC and eMBB | LG Electronics | imported from 3GU |
R1‑1610953 | Way Forward on carrier aggregation | Huawei, HiSilicon | imported from 3GU |
R1‑1610954 | WF on synchronization and carrier rasters | Huawei, Ericsson, NTT Docomo | imported from 3GU |
R1‑1610955 | WF on channel model for Rural macro scenario | Ericsson, AT&T, Deutsche Telekom, Samsung, Intel | imported from 3GU |
R1‑1610956 | WF on Common Features and General Framework of MA Schemes | Huawei, HiSilicon, CATR, CATT, CMCC, Samsung, ETRI, MediaTek | imported from 3GU |
R1‑1610957 | WF on Further Summary of LLS Results | Huawei, HiSilicon | imported from 3GU |
R1‑1610958 | WF on Grant-free URRLC Performance Evaluations | Huawei, HiSilicon | imported from 3GU |
R1‑1610959 | WF on Updated Link Level Evaluation Assumptions for Initial Access in NR | Qualcomm | imported from 3GU |
R1‑1610960 | Way Forward on RACH preamble | NTT DOCOMO | imported from 3GU |
R1‑1610961 | Way Forward on O2I model for rural scenario | Huawei, HiSilicon | imported from 3GU |
R1‑1610962 | Way Forward on Unified RACH Procedure | ZTE | imported from 3GU |
R1‑1610963 | Way Forward on Group-based beam management | ZTE | imported from 3GU |
R1‑1610964 | WF on Beam Recovery | Samsung | imported from 3GU |
R1‑1610965 | WF on SLS/LLS results summary | LG Electronics | imported from 3GU |
R1‑1610966 | Draft LS on V2X UE transmission chain | Huawei | imported from 3GU |
R1‑1610967 | WF on MIMO transmisison techniques in NR | LG Electronics | imported from 3GU |
R1‑1610968 | Way Forward on search space of NB-IoT SC-PTM | Huawei, HiSilicon | imported from 3GU |
R1‑1610969 | Draft LS on SC-MCCH transmission in NB-IoT | HiSilicon | imported from 3GU |
R1‑1610970 | Draft LS on collisions between SC-PTM and Paging in NB-IoT | HiSilicon | imported from 3GU |
R1‑1610971 | Way Forward on the definition of beam reciporcity | Samsung | imported from 3GU |
R1‑1610972 | [DRAFT] LS on Multipath RSTD reporting and CRS usage together with PRS | Ericsson, Intel | imported from 3GU |
R1‑1610973 | WF on prioritizing V2X SL TX over WAN TX | NTT DOCOMO | imported from 3GU |
R1‑1610974 | Outcomes of Thursday offline session on NR MIMO | Samsung | imported from 3GU |
R1‑1610975 | WF on DL measurement for L3 mobility | Samsung | imported from 3GU |
R1‑1610976 | WF on Updated Link Level Evaluation Assumptions for RACH Preamble | Qualcomm | imported from 3GU |
R1‑1610977 | WF on V2V support for TDD | Intel, CATT | imported from 3GU |
R1‑1610978 | Way Forward on NR RACH procedure | Huawei, HiSilicon, Qualcomm, ETRI | imported from 3GU |
R1‑1610979 | [DRAFT] LS on NR RACH procedure | Huawei | imported from 3GU |
R1‑1610980 | Way Forward on Beam management | CATT | imported from 3GU |
R1‑1610981 | Way forward on observations of eMBB data channel coding for short block length | InterDigital | imported from 3GU |
R1‑1610982 | WF on NR channel coding selection | CMCC | imported from 3GU |
R1‑1610983 | WF on SRS-based UL link adaptation | LG Electronics | imported from 3GU |
R1‑1610984 | Way Forward on Basics of LDPC Design | Ericsson, Intel, Qualcomm, NTU, Nokia, ASB, LG, Samsung | imported from 3GU |
R1‑1610985 | [DRAFT] Reply LS on A New PRACH Cyclic Shift Restriction Set | Huawei | imported from 3GU |
R1‑1610986 | WF on Updated Link Level Evaluation Assumptions for RACH Preamble | Qualcomm | imported from 3GU |
R1‑1610987 | WF on Updated Link Level Evaluation Assumptions for Initial Access in NR | Qualcomm, NTT DOCOMO, Samsung, Intel | imported from 3GU |
R1‑1610988 | [Draft] LS on supported modulations for Sidelink V2X | Ericsson | imported from 3GU |
R1‑1610989 | LS on supported modulations for Sidelink V2X | RAN1, Ericsson | imported from 3GU |
R1‑1610990 | [Draft] LS on NR RACH Procedure | Huawei | imported from 3GU |
R1‑1610991 | WF on Updated Link Level Evaluation Assumptions for RACH Preamble | Qualcomm | imported from 3GU |
R1‑1610992 | LS on NR RACH Procedure | RAN1, Huawei | imported from 3GU |
R1‑1610993 | Way forward on observations of eMBB data channel coding for large block length | InterDigital | imported from 3GU |
R1‑1610994 | Way Forward on timing relationships of 2 HARQ processes for NB-IoT enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑1610995 | Way Forward on dynamic resource sharing between eMBB and URLLC in DL | Huawei, HiSilicon, CATR,Potevio,Samsung | imported from 3GU |
R1‑1610996 | Draft CR on UL CWS adjustment for eLAA in 36.213 | Huawei, HiSilicon, Qualcomm, Broadcom, LGE, Ericsson, Intel | imported from 3GU |
R1‑1610997 | WF on Channel Coding Design for NR | Ericsson, LG | imported from 3GU |
R1‑1610998 | CR for RI transmission on PUSCH for LAA Scells | Qualcomm | imported from 3GU |
R1‑1610999 | WF on UL Power Control | Huawei, HiSilicon | imported from 3GU |
R1‑1611000 | LS on V2X UE transmission chain | RAN1, Huawei | imported from 3GU |
R1‑1611001 | void | ETSI | imported from 3GU |
R1‑1611002 | void | ETSI | imported from 3GU |
R1‑1611003 | void | ETSI | imported from 3GU |
R1‑1611004 | void | ETSI | imported from 3GU |
R1‑1611005 | Way Forward on UCI transmission for NR | LG Electronics | imported from 3GU |
R1‑1611006 | Draft LS on configuration of NPRS power for NB-IoT downlink positioning | Huawei | imported from 3GU |
R1‑1611007 | Correction on periodic CSI transmission | LG Electronics | imported from 3GU |
R1‑1611008 | System-level analysis of UL NOMA schemes | Intel Corporation | imported from 3GU |
R1‑1611009 | Draft LS for SRS Carrier-Based Switching Agreements | Huawei | imported from 3GU |
R1‑1611010 | Evaluation Assumptions for NR Network Coordination | Samsung, Intel, ZTE, ZTE Microelectronics, Huawei | imported from 3GU |
R1‑1611011 | WF on RACH preamble evaluation assumptions | Nokia, Alcatel-Lucent Shanghai Bell, NTT DOCOMO | imported from 3GU |
R1‑1611012 | Way Forward on evaluation assumptions for tracking of phase rotation and/or frequency offset | LG Electronics | imported from 3GU |
R1‑1611013 | Way Forward on Remaining Issues on Hybrid CSI | Samsung | imported from 3GU |
R1‑1611014 | Way Forward on Beam management | CATT | imported from 3GU |
R1‑1611015 | WF on Assumptions for Comparing Different SYNC Multiplexing Techniques | Qualcomm | imported from 3GU |
R1‑1611016 | Way Forward on P-UE sensing timeline in partial sensing | Huawei | imported from 3GU |
R1‑1611017 | [DRAFT]LS on FeMTC VoLTE enhancements | Huawei | imported from 3GU |
R1‑1611018 | Way Forward for Quantized Advanced CSI Feedback Structure | Ericsson, Huawei, HiSilicon, ZTE, ZTE Microelectronics, CATT, Qualcomm | imported from 3GU |
R1‑1611019 | WF on timing relationship for 2 HARQ processes for Rel-14 NB-IoT | MediaTek, Qualcomm, DoCoMo, AT&T, Softbank, ITRI, Sharp, MTI, APT, Xinwei, ZTE, ZTE Microelectronics, KDDI | imported from 3GU |
R1‑1611020 | Correction of typos due to wrong implementation of CR0283 “Clarification of valid subframe in eMTC” | MCC, Qualcomm | imported from 3GU |
R1‑1611021 | Draft CR on trigger monitoring timeline for triggered grants in eLAA | Qualcomm Incorporated | imported from 3GU |
R1‑1611022 | Draft CR on UL CWS adjustment for eLAA in 36.213 | Huawei, HiSilicon, Qualcomm, Broadcom, LGE, Ericsson, Intel | imported from 3GU |
R1‑1611023 | Comparison of OFDMA vs LSSA system level UL performance | ETRI | imported from 3GU |
R1‑1611024 | Offline Thursday discussion summary of initial access for NR | NTT DOCOMO | imported from 3GU |
R1‑1611025 | CR on trigger monitoring timeline for triggered grants in eLAA | Qualcomm Incorporated | imported from 3GU |
R1‑1611026 | Reply LS on CSI measurement ambiguity in LAA | LG Electronics | imported from 3GU |
R1‑1611027 | Correction on CSI reference resource definition in LAA | LG Electronics | imported from 3GU |
R1‑1611028 | Correction on CSI reference resource definition in LAA | LG Electronics | imported from 3GU |
R1‑1611029 | Correction on CSI measurement in LAA | LG Electronics | imported from 3GU |
R1‑1611030 | Correction on CSI measurement in LAA | LG Electronics | imported from 3GU |
R1‑1611031 | Response LS to IEEE 802.11 regarding LAA | RAN1, Qualcomm | imported from 3GU |
R1‑1611032 | LS on configuration of NPRS power for NB-IoT downlink positioning | RAN1, Huawei | imported from 3GU |
R1‑1611033 | LS on SC-MCCH transmission in NB-IoT | RAN1, HiSilicon | imported from 3GU |
R1‑1611034 | LS on collisions between SC-PTM and Paging in NB-IoT | RAN1, HiSilicon | imported from 3GU |
R1‑1611035 | WF on synchronization and carrier rasters | Huawei, Ericsson, NTT Docomo | imported from 3GU |
R1‑1611036 | WF on DL control channel design | Huawei, HiSilicon, Qualcomm, ZTE | imported from 3GU |
R1‑1611037 | Way Forward on phase continuity of DL precodong | Qualcomm | imported from 3GU |
R1‑1611038 | WF on Updated Link Level Evaluation Assumptions for RACH Preamble | Qualcomm | imported from 3GU |
R1‑1611039 | Offline outcome of Thursday afternoon on 8.1.7 | NTT DOCOMO | imported from 3GU |
R1‑1611040 | Offline outcome of Thursday afternoon on 8.1.2 | NTT DOCOMO | imported from 3GU |
R1‑1611041 | Way Forward on bandwidth adapatation in NR | MediaTek | imported from 3GU |
R1‑1611042 | Draft LS on L1 parameters for Carrier-Based Switching | Huawei | imported from 3GU |
R1‑1611043 | Discussion about Mini-slots | ZTE | imported from 3GU |
R1‑1611044 | Way Forward on DL MIMO Transmission | Huawei | imported from 3GU |
R1‑1611045 | Correction on downlink power allocation for SC-PTM | TD Tech, Huawei | imported from 3GU |
R1‑1611046 | Way Forward on SRS transmission | CATT | imported from 3GU |
R1‑1611047 | Way Forward on Network Coordination for Advanced Receivers | Samsung, Intel, MediaTek, Orange, Vodafone, IITH, Tejas Networks, IITM, KDDI, CeWiT, Reliance Jio | imported from 3GU |
R1‑1611048 | Summary of RAN1 agreements for Rel-14 FeMTC | Ericsson | imported from 3GU |
R1‑1611049 | LS for SRS Carrier-Based Switching Agreements | RAN1, Huawei | imported from 3GU |
R1‑1611050 | LS on L1 parameters for Carrier-Based Switching | RAN1, Huawei | imported from 3GU |
R1‑1611051 | LS regarding agreements for FeMBMS | RAN1, Qualcomm | imported from 3GU |
R1‑1611052 | LS on Multipath RSTD reporting and CRS usage together with PRS | RAN1, Ericsson, Intel | imported from 3GU |
R1‑1611053 | LS on FeMTC VoLTE enhancements | RAN1, Huawei | imported from 3GU |
R1‑1611054 | LS on implication of sTTI operation on UL ON/OFF time mask | RAN1, Ericsson | imported from 3GU |
R1‑1611055 | LS On Shortened TTI and processing time for LTE | RAN1, Ericsson | imported from 3GU |
R1‑1611056 | Reply LS on A New PRACH Cyclic Shift Restriction Set | RAN1, Huawei | imported from 3GU |
R1‑1611057 | LS for Voice and Video enhancement for LTE | RAN1, Huawei | imported from 3GU |
R1‑1611058 | WF on further MA results summary | LG Electronics, Huawei, HiSilicon, ZTE, Samsung | imported from 3GU |
R1‑1611059 | Way Forward on Data Sharing | Qualcomm | imported from 3GU |
R1‑1611060 | Offline outcome of Friday morning | NTT DOCOMO | imported from 3GU |
R1‑1611061 | [Draft] LS on RAN1 agreements potentially related to RAN2/4 in LTE-based V2X services | LGE | imported from 3GU |
R1‑1611062 | Summary of preliminary LLS results | Huawei, HiSilicon | imported from 3GU |
R1‑1611063 | Summary of preliminary SLS results | Huawei, HiSilicon | imported from 3GU |
R1‑1611064 | Way Forward on Network Coordination for Advanced Receivers | Samsung, Intel, MediaTek, AT&T, Orange, Vodafone, IITH, Tejas Networks, IITM, KDDI, CeWiT, Reliance Jio | imported from 3GU |
R1‑1611065 | To capture LLS and SLS simulation results for NR MA Huawei, HiSilicon | Huawei, HiSilicon | imported from 3GU |
R1‑1611066 | LS on RAN1 agreements potentially related to RAN2/4 in LTE-based V2X services | RAN1, LGE | imported from 3GU |
R1‑1611067 | List of agreements for “SRS Carrier-Based Switching” | Huawei | imported from 3GU |
R1‑1611068 | Summary of RAN1 agreements for Rel-14 work item on ‘Performance enhancements for high speed scenario’ | Huawei, HiSilicon, NTT DOCOMO | imported from 3GU |
R1‑1611069 | Summary of RAN1 agreements for Rel-14 Further Indoor Positioning | Huawei, HiSilicon, NextNav | imported from 3GU |
R1‑1611070 | Summary of RAN1 Agreements for Rel-14 DL MUST | MediaTek | imported from 3GU |
R1‑1611071 | NR channel coding BLER database | InterDigital | imported from 3GU |
R1‑1611072 | Correction on PDCCH candidate configuration | LG Electronics | imported from 3GU |
R1‑1611073 | New Transport Block Size (TBS) tables for Rel-14 NB-IoT | Ericsson | imported from 3GU |
R1‑1611074 | Correction on PDCCH candidate configuration | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
page generated from database: 2024-12-12 15:02:31