3GPP TDocs (written contributions) at meeting
Meeting: R1-93 - 2018-05-21 to 2018-05-25, Busan
meeting id: R1-93 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑180580 | - | - | - |
R1‑1805800 | Draft Agenda of RAN1#93 meeting | RAN1 Chair | imported from 3GU |
R1‑1805801 | Report of RAN1#92bis meeting | ETSI | imported from 3GU |
R1‑1805802 | Reply LS on beam failure recovery | RAN2, Ericsson | imported from 3GU |
R1‑1805803 | LS on the design of PRACH table | RAN2, Huawei | imported from 3GU |
R1‑1805804 | LS on further RAN2 agreements for euCA | RAN2, vivo | imported from 3GU |
R1‑1805805 | LS on DL channel quality reporting in MSG3 | RAN2, Ericsson | imported from 3GU |
R1‑1805806 | LS on feLAA agreements | RAN2, Nokia | imported from 3GU |
R1‑1805807 | LS on SSB-based Beam Management, Beam Failure Detection, RLM | RAN2, ZTE | imported from 3GU |
R1‑1805808 | LS on Removal of csi-RS-for-tracking from TCI-State | RAN2, ZTE | imported from 3GU |
R1‑1805809 | LS on Defining reserved resources in NR-SIB1 | RAN2, Ericsson | imported from 3GU |
R1‑180581 | - | - | - |
R1‑1805810 | Reply LS on Simultaneous PDSCH Reception with Paging | RAN2, Qualcomm | imported from 3GU |
R1‑1805811 | LS to RAN1 on Removing RLM-RS Restriction in TS 38.331 ASN.1 | RAN2, Samsung | imported from 3GU |
R1‑1805812 | LS on subcarrier spacing for BWPs and TDD configurations | RAN2, Nokia | imported from 3GU |
R1‑1805813 | LS on Type 3 UE capabilities | RAN2, NTT DOCOMO | imported from 3GU |
R1‑1805814 | Reply LS on MSG3 size for NR | RAN2, Huawei | imported from 3GU |
R1‑1805815 | LS response on serving cell measurement relaxation for NB-IOT | RAN4, Ericsson | imported from 3GU |
R1‑1805816 | LS on RLM Qin/Qout Targets for URLLC | RAN4, Ericsson | imported from 3GU |
R1‑1805817 | Reply LS on SRS switching | RAN4, Huawei | imported from 3GU |
R1‑1805818 | LS on UE Rx/Tx Transition Times | RAN4, Qualcomm | imported from 3GU |
R1‑1805819 | Reply LS on narrowband measurement | RAN4, Huawei | imported from 3GU |
R1‑180582 | - | - | - |
R1‑1805820 | Reply LS on CRS muting in eFeMTC | RAN4, Huawei | imported from 3GU |
R1‑1805821 | LS reply to RAN1 on P_0 ranges on UL power control | RAN4, ZTE | imported from 3GU |
R1‑1805822 | LS on network-based CRS interference mitigation | RAN4, Ericsson | imported from 3GU |
R1‑1805823 | Reply LS on PC5 transmission mechanism selection | SA2, LG Electronics | imported from 3GU |
R1‑1805824 | Underlay SR: a complementary solution to overcome the limitations of periodic PUCCH-SR | Idaho National Laboratory | imported from 3GU |
R1‑1805825 | Remaining issues on non-codebook based UL transmission | ZTE | imported from 3GU |
R1‑1805826 | Remaining issues on CSI measurement | ZTE | imported from 3GU |
R1‑1805827 | Remaining issues on CSI reporting | ZTE | imported from 3GU |
R1‑1805828 | Remaining issues on beam management | ZTE | imported from 3GU |
R1‑1805829 | Remaining issues on beam recovery | ZTE | imported from 3GU |
R1‑180583 | - | - | - |
R1‑1805830 | Simultaneous transmission and reception of channels/signals | ZTE | imported from 3GU |
R1‑1805831 | Remaining issues on CSI-RS | ZTE | imported from 3GU |
R1‑1805832 | Remaining issues on DMRS | ZTE | imported from 3GU |
R1‑1805833 | Remaining issues on PT-RS | ZTE | imported from 3GU |
R1‑1805834 | Remaining issues on SRS | ZTE | imported from 3GU |
R1‑1805835 | Remaining issues on TRS | ZTE | imported from 3GU |
R1‑1805836 | Remaining issues on QCL | ZTE | imported from 3GU |
R1‑1805837 | Remaining issues on NR power control in non-CA aspects | ZTE | imported from 3GU |
R1‑1805838 | [Draft] Reply LS on removal of CSI-RS-for-tracking from TCI-State | ZTE | imported from 3GU |
R1‑1805839 | Text proposal to capture agreements made in RAN1#92bis to TR 38.812 (NOMA) | ZTE | imported from 3GU |
R1‑180584 | - | - | - |
R1‑1805840 | Key processing modules at transmitter side for NOMA | ZTE | imported from 3GU |
R1‑1805841 | Multi-user receivers for NOMA | ZTE | imported from 3GU |
R1‑1805842 | Procedures related to NOMA | ZTE | imported from 3GU |
R1‑1805843 | Remaining evaluation methodology and assumptions for NOMA | ZTE | imported from 3GU |
R1‑1805844 | Channel estimation error modeling for NOMA receiver | ZTE | imported from 3GU |
R1‑1805845 | Link-level simulation results for NOMA | ZTE | imported from 3GU |
R1‑1805846 | Calibration results of reference OMA single user cases | ZTE | imported from 3GU |
R1‑1805847 | Impact of Doppler Shift on Time Density of DMRS for NR Supporting NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805848 | Discussion of HARQ Issue for NR supporting NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805849 | Resynchronization signal for MTC | Ericsson | imported from 3GU |
R1‑180585 | - | - | - |
R1‑1805850 | Early data transmission for MTC | Ericsson | imported from 3GU |
R1‑1805851 | Wake-up signal for MTC | Ericsson | imported from 3GU |
R1‑1805852 | PUSCH sub-PRB allocation for MTC | Ericsson | imported from 3GU |
R1‑1805853 | Flexible PDSCH/PUSCH starting PRB for MTC | Ericsson | imported from 3GU |
R1‑1805854 | Wake-up signal functions for NB-IoT | Ericsson | imported from 3GU |
R1‑1805855 | Wake-up signal configurations and procedures for NB-IoT | Ericsson | imported from 3GU |
R1‑1805856 | Detailed design of wake-up signal for NB-IoT | Ericsson | imported from 3GU |
R1‑1805857 | Data transmission during random access procedure for NB-IoT | Ericsson | imported from 3GU |
R1‑1805858 | Physical layer scheduling request for NB-IoT | Ericsson | imported from 3GU |
R1‑1805859 | Semi-persistent scheduling for NB-IoT | Ericsson | imported from 3GU |
R1‑180586 | - | - | - |
R1‑1805860 | NPRACH false alarm reduction for NB-IoT | Ericsson | imported from 3GU |
R1‑1805861 | NPRACH range enhancements for NB-IoT | Ericsson | imported from 3GU |
R1‑1805862 | DL aspects of TDD for NB-IoT | Ericsson | imported from 3GU |
R1‑1805863 | UL aspects of TDD for NB-IoT | Ericsson | imported from 3GU |
R1‑1805864 | DL/UL common aspects of TDD for NB-IoT | Ericsson | imported from 3GU |
R1‑1805865 | Correction for multiple starting and ending positions | Huawei, HiSilicon | imported from 3GU |
R1‑1805866 | Corrections for AUL control channels | Huawei, HiSilicon | imported from 3GU |
R1‑1805867 | Blind/HARQ-less Repetition for Scheduled DL-SCH Operation | Huawei, HiSilicon | imported from 3GU |
R1‑1805868 | Repetition Enhancements for UL SPS Operation | Huawei, HiSilicon | imported from 3GU |
R1‑1805869 | Draft LS reply on Coexistence of NR-NR and NR-LTE networks with synchronised, unsynchronised and semi-synchronised operation in 3400-3800 MHz | Huawei, HiSilicon | imported from 3GU |
R1‑180587 | - | - | - |
R1‑1805870 | Discussion on Coexistence of NR-NR and NR-LTE networks with synchronized, unsynchronized and semi-synchronized operation | Huawei, HiSilicon | imported from 3GU |
R1‑1805871 | Remaining details on synchronization signal | Huawei, HiSilicon | imported from 3GU |
R1‑1805872 | Remaining details of NR PBCH design | Huawei, HiSilicon | imported from 3GU |
R1‑1805873 | Remaining details on RMSI configurations | Huawei, HiSilicon | imported from 3GU |
R1‑1805874 | Remaining details on paging | Huawei, HiSilicon | imported from 3GU |
R1‑1805875 | Remaining details of RACH Preambles | Huawei, HiSilicon | imported from 3GU |
R1‑1805876 | Remaining details of RACH Procedures | Huawei, HiSilicon | imported from 3GU |
R1‑1805877 | Remaining details on NR RRM | Huawei, HiSilicon | imported from 3GU |
R1‑1805878 | Remaining details on NR RLM | Huawei, HiSilicon | imported from 3GU |
R1‑1805879 | Remaining issues on TA aspects | Huawei, HiSilicon | imported from 3GU |
R1‑180588 | - | - | - |
R1‑1805880 | Remaining issues on PDCCH structure | Huawei, HiSilicon | imported from 3GU |
R1‑1805881 | Remaining issues on search space | Huawei, HiSilicon | imported from 3GU |
R1‑1805882 | Remaining issues on DCI contents and format | Huawei, HiSilicon | imported from 3GU |
R1‑1805883 | Remaining issues on group-common PDCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1805884 | Remaining issues on PUCCH structure in short-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1805885 | Remaining issues on PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1805886 | Remaining issues on resource allocation for PUCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1805887 | Remaining issues on UCI multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1805888 | Remaining issues on scheduling and HARQ | Huawei, HiSilicon | imported from 3GU |
R1‑1805889 | Remaining issues on soft buffer management | Huawei, HiSilicon | imported from 3GU |
R1‑180589 | - | - | - |
R1‑1805890 | On RMSI PRB grid | Huawei, HiSilicon | imported from 3GU |
R1‑1805891 | On k0 for OFDM signal generation | Huawei, HiSilicon | imported from 3GU |
R1‑1805892 | Remaining issues on bandwidth part and wideband operation | Huawei, HiSilicon | imported from 3GU |
R1‑1805893 | Remaining issues on resource allocation and TBS | Huawei, HiSilicon | imported from 3GU |
R1‑1805894 | Remaining issues on reserved resources and rate-matching | Huawei, HiSilicon | imported from 3GU |
R1‑1805895 | Remaining issues on NR CA | Huawei, HiSilicon | imported from 3GU |
R1‑1805896 | Discussion on remaining issues for SUL and EN-DC | Huawei, HiSilicon | imported from 3GU |
R1‑1805897 | Remaining issues of NR UE features | Huawei, HiSilicon | imported from 3GU |
R1‑1805898 | MCS and CQI design for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1805899 | Intra-UE UL multiplexing between eMBB and URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑180590 | - | - | - |
R1‑1805900 | PDSCH design for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1805901 | Summary of remaining issues on PDCCH monitoring with TP | Huawei, HiSilicon | imported from 3GU |
R1‑1805902 | DCI design for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1805903 | Text Proposal for TR38.811 | Huawei, HiSilicon | imported from 3GU |
R1‑1805904 | HAPS channel modeling | Huawei, HiSilicon | imported from 3GU |
R1‑1805905 | LEO/GEO channel modelling | Huawei, HiSilicon | imported from 3GU |
R1‑1805906 | Updated Ray Tracing simulation result for NTN | Huawei, HiSilicon | imported from 3GU |
R1‑1805907 | Discussion on the design of SCMA | Huawei, HiSilicon | imported from 3GU |
R1‑1805908 | Discussion on the design of NoMA receiver | Huawei, HiSilicon | imported from 3GU |
R1‑1805909 | Discussion on NoMA related procedures | Huawei, HiSilicon | imported from 3GU |
R1‑180591 | - | - | - |
R1‑1805910 | Further discussion on SLS and LLS evaluations | Huawei, HiSilicon | imported from 3GU |
R1‑1805911 | LLS evaluation results for mMTC scenario | Huawei, HiSilicon | imported from 3GU |
R1‑1805912 | LLS evaluation results for URLLC scenario | Huawei, HiSilicon | imported from 3GU |
R1‑1805913 | LLS evaluation results for eMBB scenario | Huawei, HiSilicon | imported from 3GU |
R1‑1805914 | V2X sidelink channel model | Huawei, HiSilicon, | imported from 3GU |
R1‑1805915 | On eV2X Evaluation Methodology | Huawei, HiSilicon | imported from 3GU |
R1‑1805916 | DL channel and signals in NR unlicensed band | Huawei, HiSilicon | imported from 3GU |
R1‑1805917 | NR frame structure on unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R1‑1805918 | HARQ enhencement in NR unlicensed | Huawei, HiSilicon | imported from 3GU |
R1‑1805919 | Coexistence and channel access for NR unlicensed band operations | Huawei, HiSilicon | imported from 3GU |
R1‑180592 | - | - | - |
R1‑1805920 | Initial access in NR unlicensed | Huawei, HiSilicon | imported from 3GU |
R1‑1805921 | UL PHY channels for NR unlicensed | Huawei, HiSilicon | imported from 3GU |
R1‑1805922 | Transmission with configured grant in NR unlicensed band | Huawei, HiSilicon | imported from 3GU |
R1‑1805923 | BWP operation in NR unlicesned band | Huawei, HiSilicon | imported from 3GU |
R1‑1805924 | IAB system evaluation methodology and preliminary results | Huawei, HiSilicon | imported from 3GU |
R1‑1805925 | Physical layer enhancement consideration on IAB | Huawei, HiSilicon | imported from 3GU |
R1‑1805926 | Consideration on evaluation features and parameters for IMT-2020 self evaluation | Huawei, HiSilicon | imported from 3GU |
R1‑1805927 | Considerations and evaluation results for IMT-2020 for eMBB spectral efficiency | Huawei, HiSilicon | imported from 3GU |
R1‑1805928 | IMT-2020 initial evaluation results for user experienced data rate | Huawei, HiSilicon | imported from 3GU |
R1‑1805929 | Considerations and evaluation results for IMT-2020 for area traffic capacity | Huawei, HiSilicon | imported from 3GU |
R1‑180593 | - | - | - |
R1‑1805930 | Considerations and evaluation results for IMT-2020 for high mobility | Huawei, HiSilicon | imported from 3GU |
R1‑1805931 | Considerations and evaluation results for IMT-2020 for peak spectral efficiency and peak data rate | Huawei, HiSilicon | imported from 3GU |
R1‑1805932 | Considerations and evaluation results for IMT-2020 for network energy efficiency | Huawei, HiSilicon | imported from 3GU |
R1‑1805933 | Considerations and evaluation results for IMT-2020 for UE energy efficiency | Huawei, HiSilicon | imported from 3GU |
R1‑1805934 | Considerations and evaluation results for IMT-2020 for mMTC connection density | Huawei, HiSilicon | imported from 3GU |
R1‑1805935 | Considerations and evaluation results for IMT-2020 for reliability | Huawei, HiSilicon | imported from 3GU |
R1‑1805936 | Considerations and evaluation results for IMT-2020 for control plane latency | Huawei, HiSilicon | imported from 3GU |
R1‑1805937 | Considerations and evaluation results for IMT-2020 for user plane latency | Huawei, HiSilicon | imported from 3GU |
R1‑1805938 | Consideration on self evaluation of IMT-2020 for link budget | Huawei, HiSilicon | imported from 3GU |
R1‑1805939 | Discussion on LTE peak data rate for EN-DC | Huawei, HiSilicon | imported from 3GU |
R1‑180594 | - | - | - |
R1‑1805940 | Draft reply LS on LTE peak data rate for EN-DC | Huawei, HiSilicon | imported from 3GU |
R1‑1805941 | Remaining details of Synchronization Signal Design | ZTE | imported from 3GU |
R1‑1805942 | Remaining details of NR-PBCH Design | ZTE | imported from 3GU |
R1‑1805943 | Remaining details of RMSI | ZTE | imported from 3GU |
R1‑1805944 | Remaining details of PRACH Format | ZTE | imported from 3GU |
R1‑1805945 | Remaining details of RACH procedure | ZTE | imported from 3GU |
R1‑1805946 | Remaining details of RRM measurements | ZTE | imported from 3GU |
R1‑1805947 | Remaining details of RLM | ZTE | imported from 3GU |
R1‑1805948 | Remaining issues for UL non-codebook based transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1805949 | Remaining issues on CSI measurement | Huawei, HiSilicon | imported from 3GU |
R1‑180595 | - | - | - |
R1‑1805950 | Summary of remaining issues on CSI reporting | Huawei, HiSilicon | imported from 3GU |
R1‑1805951 | Remaining issues on CQI and MCS | Huawei, HiSilicon | imported from 3GU |
R1‑1805952 | Remaining issues on beam management | Huawei, HiSilicon | imported from 3GU |
R1‑1805953 | Remaining issues on beam failure recovery | Huawei, HiSilicon | imported from 3GU |
R1‑1805954 | Antenna selection for PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑1805955 | Remaining issues on simultaneous reception and transmission over CCs and BWPs | Huawei, HiSilicon | imported from 3GU |
R1‑1805956 | Remaining issues on RS multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1805957 | Remaining details on CSI-RS design in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1805958 | Remaining issues on DMRS design | Huawei, HiSilicon | imported from 3GU |
R1‑1805959 | Remaining details of SRS design | Huawei, HiSilicon | imported from 3GU |
R1‑180596 | - | - | - |
R1‑1805960 | Remaining issues on PT-RS | Huawei, HiSilicon | imported from 3GU |
R1‑1805961 | Remaining issues and TP for QCL assumptions | Huawei, HiSilicon | imported from 3GU |
R1‑1805962 | Further discussion on introducing aperiodic TRS | Huawei, HiSilicon | imported from 3GU |
R1‑1805963 | Remaining details of UL power control design | Huawei, HiSilicon | imported from 3GU |
R1‑1805964 | On configurations and procedures of power saving signal | Huawei, HiSilicon | imported from 3GU |
R1‑1805965 | On detailed design and evaluations of power saving signal | Huawei, HiSilicon | imported from 3GU |
R1‑1805966 | Design for physical layer scheduling request | Huawei, HiSilicon | imported from 3GU |
R1‑1805967 | On support of semi-persistent scheduling | Huawei, HiSilicon | imported from 3GU |
R1‑1805968 | Early data transmission in RACH for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1805969 | Common aspects for TDD NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑180597 | - | - | - |
R1‑1805970 | On downlink TDD NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1805971 | On uplink TDD NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1805972 | Remaining details of NB-IoT measurements improvement | Huawei, HiSilicon | imported from 3GU |
R1‑1805973 | On the support of NB-IoT small cell | Huawei, HiSilicon | imported from 3GU |
R1‑1805974 | NPRACH enhancement for cell radius extension | Huawei, HiSilicon | imported from 3GU |
R1‑1805975 | On NPRACH false alarm reduction due to inter-cell interference | Huawei, HiSilicon | imported from 3GU |
R1‑1805976 | On NPRS for OTDOA | Huawei, HiSilicon | imported from 3GU |
R1‑1805977 | Cell search and system information acquisition improvements in eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1805978 | Early data transmission for eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1805979 | On wake-up signal for eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑180598 | - | - | - |
R1‑1805980 | Remaining details of HARQ-ACK feedback for PUSCH in eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1805981 | On Sub-RB resource allocation for MTC PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑1805982 | On more flexible starting PRB for PDSCH/PUSCH resource allocation | Huawei, HiSilicon | imported from 3GU |
R1‑1805983 | On functions of power saving signal | Huawei, HiSilicon | imported from 3GU |
R1‑1805984 | Phase noise correction for non-terrestrial networks | Mitsubishi Electric RCE | imported from 3GU |
R1‑1805985 | Solutions for Rel-14 and Rel-15 UE Pool sharing | Huawei, HiSilicon | imported from 3GU |
R1‑1805986 | Remaining details for latency reduction for eV2X | Huawei, HiSilicon | imported from 3GU |
R1‑1805987 | Remaining details for supporting 64-QAM | Huawei, HiSilicon | imported from 3GU |
R1‑1805988 | Remaining details for supporting carrier aggregation with mode-4 | Huawei, HiSilicon | imported from 3GU |
R1‑1805989 | Waveform considerations for NR-U in the 60GHz band | Mitsubishi Electric RCE | imported from 3GU |
R1‑180599 | - | - | - |
R1‑1805990 | Remaining issues on PTRS | Mitsubishi Electric RCE | imported from 3GU |
R1‑1805991 | Addition of V2X Phase 2 based on LTE in 36.213, s14 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1805992 | Modulation Enhancements | MediaTek Inc. | imported from 3GU |
R1‑1805993 | Blind/Harq-less repetitions for scheduled DL-SCH in LTE HRLLC | MediaTek Inc. | imported from 3GU |
R1‑1805994 | UL SPS in LTE HRLLC | MediaTek Inc. | imported from 3GU |
R1‑1805995 | Wake Up Signal Functionsfor NB-IoT | MediaTek Inc. | imported from 3GU |
R1‑1805996 | Wake Up Signal Configuration for NB-IoT | MediaTek Inc. | imported from 3GU |
R1‑1805997 | Wake Up Signal Design for NB-IoT | MediaTek Inc. | imported from 3GU |
R1‑1805998 | UL SPS for Scheduling Request and BSR | MediaTek Inc. | imported from 3GU |
R1‑1805999 | Fallback in Early Data Transmission | MediaTek Inc. | imported from 3GU |
R1‑180600 | - | - | - |
R1‑1806000 | Remaining Issues for PUSCH Sub-PRB Allocation | Sierra Wireless, S.A. | imported from 3GU |
R1‑1806001 | WUS Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R1‑1806002 | Re-Sync Signal Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R1‑1806003 | TDD and FDD for NTN Applications | HUGHES Network Systems Ltd | imported from 3GU |
R1‑1806004 | CQI and MCS Tables for URLLC | Ericsson | imported from 3GU |
R1‑1806005 | Intra-UE Pre-emption in Uplink | Ericsson | imported from 3GU |
R1‑1806006 | Channel Coding Techniques for URLLC | Ericsson | imported from 3GU |
R1‑1806007 | On PUCCH for Ultra-Reliable Transmission | Ericsson | imported from 3GU |
R1‑1806008 | On Performance of PUCCH Format 0 for URLLC Use Cases | Ericsson | imported from 3GU |
R1‑1806009 | On Performance of PUCCH Format 2 for URLLC Use Cases | Ericsson | imported from 3GU |
R1‑180601 | - | - | - |
R1‑1806010 | On Frequency Hopping for Ultra-reliable Transmission | Ericsson | imported from 3GU |
R1‑1806011 | On Transmit Diversity for Ultra-high Reliability Use Cases | Ericsson | imported from 3GU |
R1‑1806012 | URLLC Downlink System Level Simulation Results | Ericsson | imported from 3GU |
R1‑1806013 | On Supporting Reliable HARQ Feedback for UL Transmission with Configured Grant | Ericsson | imported from 3GU |
R1‑1806014 | UCI Transmission for URLLC | Ericsson | imported from 3GU |
R1‑1806015 | Evaluation of Reliability in NR | Ericsson | imported from 3GU |
R1‑1806016 | Evaluation of UP latency in NR | Ericsson | imported from 3GU |
R1‑1806017 | Indication of URLLC Configuration | Ericsson | imported from 3GU |
R1‑1806018 | Precoder Update for SPS UL | Ericsson | imported from 3GU |
R1‑1806019 | Search Space Design for URLLC | Ericsson | imported from 3GU |
R1‑180602 | - | - | - |
R1‑1806020 | DCI Contents and Formats for URLLC | Ericsson | imported from 3GU |
R1‑1806021 | Scheduling and HARQ for URLLC | Ericsson | imported from 3GU |
R1‑1806022 | Coexistence of NR-NR and NR-LTE networks with synchronised, unsynchronised and semi-synchronised operation in 3400-3800 MHz | CEPT ECC PT1 | imported from 3GU |
R1‑1806023 | Discussion of PTRS for NR Supporting NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806024 | Overview of physical layer enhancements for IAB | ZTE | imported from 3GU |
R1‑1806025 | IAB scenarios and evaluations | ZTE | imported from 3GU |
R1‑1806026 | Discussion on IAB node initial access process | ZTE | imported from 3GU |
R1‑1806027 | NR eV2X Evaluation Methodology | ZTE Wistron Telecom AB, Sanechips | imported from 3GU |
R1‑1806028 | Further discussion on eV2X Channel Modeling | ZTE Wistron Telecom AB, Sanechips | imported from 3GU |
R1‑1806029 | NR eV2X Link Level Simulation Assumptions | ZTE Wistron Telecom AB, Sanechips | imported from 3GU |
R1‑180603 | - | - | - |
R1‑1806030 | Remaining issues for UL data transmission procedure | ZTE | imported from 3GU |
R1‑1806031 | Remaining aspects on wake-up signals for efeMTC | vivo | imported from 3GU |
R1‑1806032 | Remaining aspects on configurations and procedures of wake-up signals for feNB-IoT | vivo | imported from 3GU |
R1‑1806033 | Remaining issues on synchronization signal | vivo | imported from 3GU |
R1‑1806034 | Remaining issues on Paging | vivo | imported from 3GU |
R1‑1806035 | Remaining issues on RACH procedure | vivo | imported from 3GU |
R1‑1806036 | Remaining issues on RRM | vivo | imported from 3GU |
R1‑1806037 | Remaining issues on RLM | vivo | imported from 3GU |
R1‑1806038 | Remaining issues on layer mapping | vivo | imported from 3GU |
R1‑1806039 | Remaining issues on codebook based UL transmission | vivo | imported from 3GU |
R1‑180604 | - | - | - |
R1‑1806040 | Remaining issues on non-codebook based UL transmission | vivo | imported from 3GU |
R1‑1806041 | Remaining issues on PRB bundling | vivo | imported from 3GU |
R1‑1806042 | Remaining issues on CSI measurement | vivo | imported from 3GU |
R1‑1806043 | Remaining issues on CSI reporting | vivo | imported from 3GU |
R1‑1806044 | Remaining issues on beam measurement and reporting | vivo | imported from 3GU |
R1‑1806045 | Remaining issues on mechanism to recover from beam failure | vivo | imported from 3GU |
R1‑1806046 | Remaining issues for CQI and MCS | vivo | imported from 3GU |
R1‑1806047 | Remaining issues on simultaneous reception of DL/UL physical channels and reference signals | vivo | imported from 3GU |
R1‑1806048 | Remaining issues on multiplexing of different types of RSs | vivo | imported from 3GU |
R1‑1806049 | Remaining issues on CSI-RS | vivo | imported from 3GU |
R1‑180605 | - | - | - |
R1‑1806050 | Remaining issues on DMRS | vivo | imported from 3GU |
R1‑1806051 | Remaining issues on PT-RS | vivo | imported from 3GU |
R1‑1806052 | Remaining issues on SRS | vivo | imported from 3GU |
R1‑1806053 | Remaining issues on TRS | vivo | imported from 3GU |
R1‑1806054 | Remaining issues on QCL | vivo | imported from 3GU |
R1‑1806055 | Remaining issues on PDCCH CORESET | vivo | imported from 3GU |
R1‑1806056 | Remaining issues on Search Space | vivo | imported from 3GU |
R1‑1806057 | Remaining issues on SFI | vivo | imported from 3GU |
R1‑1806058 | Remaining issues on eMBB DCI format | vivo | imported from 3GU |
R1‑1806059 | Discussion on DCI format for URLLC | vivo | imported from 3GU |
R1‑180606 | - | - | - |
R1‑1806060 | Remaining issues on short PUCCH for eMBB | vivo | imported from 3GU |
R1‑1806061 | Discussion on short PUCCH for URLLC | vivo | imported from 3GU |
R1‑1806062 | Remaining issues on long PUCCH for eMBB | vivo | imported from 3GU |
R1‑1806063 | Remaining issues on UCI multiplexing for eMBB | vivo | imported from 3GU |
R1‑1806064 | Discussion on eMBB and URLLC UCI multiplexing | vivo | imported from 3GU |
R1‑1806065 | Remaining issues on PUCCH resource allocation for eMBB | vivo | imported from 3GU |
R1‑1806066 | Discussion on PUCCH resource allocation for URLLC | vivo | imported from 3GU |
R1‑1806067 | Resource block bundle for RMSI | vivo | imported from 3GU |
R1‑1806068 | Remaining issues on HARQ management for eMBB | vivo | imported from 3GU |
R1‑1806069 | Discussion on DL scheduling for URLLC | vivo | imported from 3GU |
R1‑180607 | - | - | - |
R1‑1806070 | Discussion on URLLC UL transmission procedure | vivo | imported from 3GU |
R1‑1806071 | Remaining issues on Multiplexing data with different transmission durations | vivo | imported from 3GU |
R1‑1806072 | Remaining issues on bandwidth part switching | vivo | imported from 3GU |
R1‑1806073 | Remaining issues on NR CA | vivo | imported from 3GU |
R1‑1806074 | Remaining aspects for rate matching | vivo | imported from 3GU |
R1‑1806075 | Remaining issues on non-CA UL power control | vivo | imported from 3GU |
R1‑1806076 | Discussion on Rel-15 NR UE features | vivo | imported from 3GU |
R1‑1806077 | Discussion on CSI report for URLLC | vivo | imported from 3GU |
R1‑1806078 | Other aspects for URLLC | vivo | imported from 3GU |
R1‑1806079 | Discussion on NOMA transmitters | vivo | imported from 3GU |
R1‑180608 | - | - | - |
R1‑1806080 | Receiver design considerations for NOMA | vivo | imported from 3GU |
R1‑1806081 | Discussion on NOMA procedures | vivo | imported from 3GU |
R1‑1806082 | Evaluations for NOMA | vivo | imported from 3GU |
R1‑1806083 | Frame structure for NR-U operation | vivo | imported from 3GU |
R1‑1806084 | Discussion on physical DL channel design in unlicensed spectrum | vivo | imported from 3GU |
R1‑1806085 | Discussion on physical UL channel design in unlicensed spectrum | vivo | imported from 3GU |
R1‑1806086 | Discussion on the channel access procedures | vivo | imported from 3GU |
R1‑1806087 | Discussion on RACH procedure for NR-U | vivo | imported from 3GU |
R1‑1806088 | Discussion on HARQ operation for NR-U | vivo | imported from 3GU |
R1‑1806089 | Enhancements to support NR backhaul link | vivo | imported from 3GU |
R1‑180609 | - | - | - |
R1‑1806090 | Measurement results and analysis on UE power consumption | vivo | imported from 3GU |
R1‑1806091 | NR UE power saving | vivo | imported from 3GU |
R1‑1806092 | Link-Level Simulation results for ACMA | HUGHES Network Systems Ltd | imported from 3GU |
R1‑1806093 | Overloading Comparison of Synchronous and Asynchronous NOMA | HUGHES Network Systems Ltd | imported from 3GU |
R1‑1806094 | Impact of long propagation to control loops | HUGHES Network Systems Ltd | imported from 3GU |
R1‑1806095 | Satellite Payload Characteristics and its performance impact on NTN signals | HUGHES Network Systems Ltd | imported from 3GU |
R1‑1806096 | Further discussion on resource pool sharing between mode 3 and mode 4 UEs | ZTE Wistron Telecom AB, Sanechips, Fraunhofer HHI | imported from 3GU |
R1‑1806097 | Further discussion on maximum time reduction between packet arrival at layer 1 and resource selection for transmission | ZTE Wistron Telecom AB, Sanechips | imported from 3GU |
R1‑1806098 | Remaining issues on resource selection in mode 4 CA | ZTE | imported from 3GU |
R1‑1806099 | Discussion on support of 64QAM | ZTE | imported from 3GU |
R1‑180610 | - | - | - |
R1‑1806100 | Resource pool sharing between mode 3 and mode 4 | ZTE | imported from 3GU |
R1‑1806101 | Consideration on maximum time reduction between packet arrival and resource selection | ZTE | imported from 3GU |
R1‑1806102 | On NR eV2X evaluation methodology | ZTE | imported from 3GU |
R1‑1806103 | Remaining issues on eV2X channel modeling | ZTE | imported from 3GU |
R1‑1806104 | Simulation Methodology and Assumptions for NR-U Evaluations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806105 | Frame Structure for NR-U Operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806106 | On DL Signals and Channels for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806107 | On Uplink Signal and Channel Structures for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806108 | Channel access and co-existence for NR-U operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806109 | On Initial Access and Mobility for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180611 | - | - | - |
R1‑1806110 | HARQ Enhancements for NR-Unlicensed | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806111 | On Support of UL Transmission with Configured Grants in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806112 | On Wideband Operation for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806113 | Updated UMi calibration results for user experience data rate in the multi-layer network deployment | ZTE | imported from 3GU |
R1‑1806114 | Updated DL spectral efficiency in the eMBB usage scenario for IMT-2020 self evaluation | ZTE | imported from 3GU |
R1‑1806115 | Link curve performance of LDPC coding in IMT-2020 self evaluation | ZTE | imported from 3GU |
R1‑1806116 | Considerations on the evaluated details and parameters for IMT-2020 self evaluation | ZTE | imported from 3GU |
R1‑1806117 | Updated UL spectral efficiency in the eMBB usage scenario for IMT-2020 self evaluation | ZTE | imported from 3GU |
R1‑1806118 | Consideration on Evaluation methodology of IMT-2020 self-evaluation | ZTE | imported from 3GU |
R1‑1806119 | Consideration on Evaluation of mobility and reliability of IMT-2020 self-evaluation | ZTE | imported from 3GU |
R1‑180612 | - | - | - |
R1‑1806120 | Ambiguities about PUCCH beam indication | Fujitsu | imported from 3GU |
R1‑1806121 | UCI piggyback on PUSCH with URLLC data | Fujitsu | imported from 3GU |
R1‑1806122 | Considerations on procedures related to NOMA | Fujitsu | imported from 3GU |
R1‑1806123 | Discussion on flextible starting positions and related PDCCH monitoring for NR-U | Fujitsu | imported from 3GU |
R1‑1806124 | Enhancements on Type II CSI Reporting scheme | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑1806125 | Remaining detail on support for 64-QAM | ZTE Wistron Telecom AB, Sanechips | imported from 3GU |
R1‑1806126 | Discuss the remaining issues for resource selection in mode 4 CA | ZTE Wistron Telecom AB, Sanechips | imported from 3GU |
R1‑1806127 | PDCCH structure remaining issues | ZTE | imported from 3GU |
R1‑1806128 | Remaining issues on search space | ZTE | imported from 3GU |
R1‑1806129 | Remaining issues for slot format | ZTE | imported from 3GU |
R1‑180613 | - | - | - |
R1‑1806130 | Remaining issues on DCI content | ZTE | imported from 3GU |
R1‑1806131 | Remaining issues on short PUCCH | ZTE | imported from 3GU |
R1‑1806132 | Issues related to Long PUCCH | ZTE | imported from 3GU |
R1‑1806133 | Further considerations on remaining UCI multiplexing issues | ZTE | imported from 3GU |
R1‑1806134 | Remaining issues for data resource allocation | ZTE | imported from 3GU |
R1‑1806135 | Remaining issues for BWP | ZTE | imported from 3GU |
R1‑1806136 | Remaining aspects for rate matching | ZTE | imported from 3GU |
R1‑1806137 | Considerations on CQI /MCS table(s) for URLLC | ZTE | imported from 3GU |
R1‑1806138 | Discussion on URLLC control | ZTE | imported from 3GU |
R1‑1806139 | Intra UE UL multiplexing of transmissions with different reliability requirements | ZTE | imported from 3GU |
R1‑180614 | - | - | - |
R1‑1806140 | On details of CQI and MCS tables for NR URLLC | Panasonic | imported from 3GU |
R1‑1806141 | Remaining details on PDCCH structure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806142 | Remaining details on search space | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806143 | On remaining details of BWPs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806144 | Remaining aspects of NR CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806145 | Remaining details on rate-matching in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806146 | On Synchronization Aspects for PC5 CA | Ericsson | imported from 3GU |
R1‑1806147 | On mode-4 support for PC5 CA | Ericsson | imported from 3GU |
R1‑1806148 | Remaining aspects of 64QAM | Ericsson | imported from 3GU |
R1‑1806149 | Resource pool sharing between mode 3 and mode 4 UEs | Ericsson | imported from 3GU |
R1‑180615 | - | - | - |
R1‑1806150 | Reducing time-to-transmit for V2X | Ericsson | imported from 3GU |
R1‑1806151 | Simulation scenarios and performance metrics for V2X | Ericsson | imported from 3GU |
R1‑1806152 | Remaining issues on channel models and antenna models for V2X | Ericsson | imported from 3GU |
R1‑1806153 | Discussion on eV2X use cases | Ericsson | imported from 3GU |
R1‑1806154 | Remaining issues on PT-RS | Panasonic Corporation | imported from 3GU |
R1‑1806155 | Discussion on the channel model for sub-urban | ZTE,CATR | imported from 3GU |
R1‑1806156 | TP for TR38.811 on random access for NTN | ZTE | imported from 3GU |
R1‑1806157 | TP for TR38.811 on additional modelling components | ZTE,CATR | imported from 3GU |
R1‑1806158 | Functions of wake-up signal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806159 | Wake-up signal configurations and procedures | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180616 | - | - | - |
R1‑1806160 | Considerations for design of wake-up signal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806161 | Data transmission during random access procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806162 | Design of physical layer scheduling request | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806163 | Support for semi-persistent scheduling in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806164 | NPRACH reliability enhancement in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806165 | NPRACH cell range enhancement in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806166 | Downlink aspects of TDD support in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806167 | Uplink aspects of TDD support in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806168 | Common Aspects of NB-IoT TDD Operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806169 | PHR Enhancement for NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180617 | - | - | - |
R1‑1806170 | Measurement accuracy improvement in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806171 | Small cell support in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806172 | Resynchronization signal for efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806173 | Data transmission during random access procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806174 | Wake-up signal for efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806175 | Design of PUSCH Sub-PRB Allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806176 | Support for flexible PDSCH/PUSCH starting PRB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806177 | Remaining details of HARQ-ACK feedback for efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806178 | Draft TR 37.885 v0.2.0 Study on evaluation methodology of new Vehicle-to-Everything V2X use cases for LTE and NR | LG Electronics Inc. | imported from 3GU |
R1‑1806179 | Discussion on uplink power control for NR URLLC | Panasonic Corporation | imported from 3GU |
R1‑180618 | - | - | - |
R1‑1806180 | Discussion on PUCCH overlap issues | Panasonic Corporation | imported from 3GU |
R1‑1806181 | Discussion on UCI multiplexing | Panasonic Corporation | imported from 3GU |
R1‑1806182 | Discussion on URLLC UL multiplexing | Panasonic Corporation | imported from 3GU |
R1‑1806183 | Discussion on remaining issues on PUCCH resource allocation | Panasonic Corporation | imported from 3GU |
R1‑1806184 | Discussion on multi-slot PUCCH and PUSCH supporting | Panasonic Corporation | imported from 3GU |
R1‑1806185 | Remaining details on resynchronization signal for MTC | ZTE | imported from 3GU |
R1‑1806186 | Remaining issues on early data transmission for MTC | ZTE | imported from 3GU |
R1‑1806187 | Discussion on wake-up signal for MTC | ZTE | imported from 3GU |
R1‑1806188 | Remaining issues on PUSCH sub-PRB allocation for MTC | ZTE | imported from 3GU |
R1‑1806189 | Flexible starting PRB of PUSCH/PDSCH for MTC | ZTE | imported from 3GU |
R1‑180619 | - | - | - |
R1‑1806190 | Remaining issues on UL HARQ-ACK feedback for MTC | ZTE | imported from 3GU |
R1‑1806191 | Discussion on wake up signal function for NB-IoT | ZTE | imported from 3GU |
R1‑1806192 | Remaining issues on wake up signal configuration for NB-IoT | ZTE | imported from 3GU |
R1‑1806193 | Details design of wake up signal for NB-IoT | ZTE | imported from 3GU |
R1‑1806194 | Remaining issues on early data transmission for NB-IoT | ZTE | imported from 3GU |
R1‑1806195 | Remaining issues on physical layer SR for NB-IoT | ZTE | imported from 3GU |
R1‑1806196 | Discussion on physical layer aspects on SPS in NB-IoT | ZTE | imported from 3GU |
R1‑1806197 | NPRACH reliability enhancement for NB-IoT | ZTE | imported from 3GU |
R1‑1806198 | Remaining issues on NPRACH range enhancement | ZTE | imported from 3GU |
R1‑1806199 | Remaining issues on downlink aspects to support TDD NB-IoT | ZTE | imported from 3GU |
R1‑180620 | - | - | - |
R1‑1806200 | Remaining issues on uplink aspects to support TDD NB-IoT | ZTE | imported from 3GU |
R1‑1806201 | Remaining issues on common aspects to support TDD NB-IoT | ZTE | imported from 3GU |
R1‑1806202 | Considerations on extended Power Headroom report for NB-IoT | ZTE | imported from 3GU |
R1‑1806203 | UL power control enhancement for NB-IoT small cell | ZTE | imported from 3GU |
R1‑1806204 | Vehicle UE Antenna Radiation Patterns | OnStar Europe | imported from 3GU |
R1‑1806205 | On the Motivation for Periodic Data Traffic Model | OnStar Europe | imported from 3GU |
R1‑1806206 | PRI Metric Calculation | OnStar Europe | imported from 3GU |
R1‑1806207 | Draft LS reply to RAN2 on removal of CSI-RS-for-tracking from TCI-State | Ericsson | imported from 3GU |
R1‑1806208 | Draft LS reply on beam failure recovery | Ericsson | imported from 3GU |
R1‑1806209 | Corrections for UL Antenna Port Identification | Ericsson | imported from 3GU |
R1‑180621 | - | - | - |
R1‑1806210 | Remaining issues on codeword mapping and data scrambling | Ericsson | imported from 3GU |
R1‑1806211 | Corrections for Codebook Based UL MIMO | Ericsson | imported from 3GU |
R1‑1806212 | Corrections for Non-codebook Based UL MIMO | Ericsson | imported from 3GU |
R1‑1806213 | Remaining issue on PRB bundling | Ericsson | imported from 3GU |
R1‑1806214 | Remaining issues on CQI and MCS | Ericsson | imported from 3GU |
R1‑1806215 | Corrections and clarifications for CSI measurement | Ericsson | imported from 3GU |
R1‑1806216 | Corrections and clarifications for CSI reporting | Ericsson | imported from 3GU |
R1‑1806217 | Remaining issues for beam measurement and reporting | Ericsson | imported from 3GU |
R1‑1806218 | Remaining issues for beam recovery | Ericsson | imported from 3GU |
R1‑1806219 | On simultaneous reception of physical and reference signals across CCs | Ericsson | imported from 3GU |
R1‑180622 | - | - | - |
R1‑1806220 | On signalling reduction for beam management | Ericsson | imported from 3GU |
R1‑1806221 | Multi-cell beam recovery | Ericsson | imported from 3GU |
R1‑1806222 | On DMRS groups in Rel-15 | Ericsson | imported from 3GU |
R1‑1806223 | On multiplexing of different types of RSs | Ericsson | imported from 3GU |
R1‑1806224 | Remaining details on CSI-RS | Ericsson | imported from 3GU |
R1‑1806225 | Remaining issues on DMRS | Ericsson | imported from 3GU |
R1‑1806226 | Remaining issues on PT-RS | Ericsson | imported from 3GU |
R1‑1806227 | Remaining issues on SRS | Ericsson | imported from 3GU |
R1‑1806228 | Remaining issues on TRS | Ericsson | imported from 3GU |
R1‑1806229 | Remaining issues on QCL | Ericsson | imported from 3GU |
R1‑180623 | - | - | - |
R1‑1806230 | Further analysis of the PAPR issue of DMRS in Rel-15 | Ericsson | imported from 3GU |
R1‑1806231 | Benefits of resource specific DMRS mapping | Ericsson | imported from 3GU |
R1‑1806232 | On correlation of DMRS Gold sequences | Ericsson | imported from 3GU |
R1‑1806233 | On high PAPR in rank 2 transmissions with FDM of DMRS ports | Ericsson | imported from 3GU |
R1‑1806234 | Type 1 mapping of pi/2-BPSK DFTS DM-RS | Ericsson | imported from 3GU |
R1‑1806235 | Analysis of periodic vs aperiodic TRS | Ericsson | imported from 3GU |
R1‑1806236 | On the benefits of a resource element specific sequence mapping for CSI-RS | Ericsson | imported from 3GU |
R1‑1806237 | Evaluations of TRS periodicity | Ericsson | imported from 3GU |
R1‑1806238 | NR UE feature list for MIMO and RS | Ericsson | imported from 3GU |
R1‑1806239 | Discussion on UE capability list | Ericsson | imported from 3GU |
R1‑180624 | - | - | - |
R1‑1806240 | UE Feature Band Combination Signalling Granularity | Ericsson | imported from 3GU |
R1‑1806241 | Signature design for NoMA | Ericsson | imported from 3GU |
R1‑1806242 | Receiver design for NOMA | Ericsson | imported from 3GU |
R1‑1806243 | Procedures related to NoMA | Ericsson | imported from 3GU |
R1‑1806244 | Evaluation methodology and metrics for NoMA | Ericsson | imported from 3GU |
R1‑1806245 | Observations on NOMA traffic models | Ericsson | imported from 3GU |
R1‑1806246 | Impairments model for link and system evaluations | Ericsson | imported from 3GU |
R1‑1806247 | Link level evaluations for MU-MIMO | Ericsson | imported from 3GU |
R1‑1806248 | MU-MIMO operation in NR with configured grants | Ericsson | imported from 3GU |
R1‑1806249 | NR-U evaluation methodology | Ericsson | imported from 3GU |
R1‑180625 | - | - | - |
R1‑1806250 | Frame structure for NR-U | Ericsson | imported from 3GU |
R1‑1806251 | On DL Signals and channels | Ericsson | imported from 3GU |
R1‑1806252 | On UL Signals and channels | Ericsson | imported from 3GU |
R1‑1806253 | Channel access mechanisms | Ericsson | imported from 3GU |
R1‑1806254 | On initial access, RRM, mobility and RLM | Ericsson | imported from 3GU |
R1‑1806255 | HARQ enhancements for NR-U | Ericsson | imported from 3GU |
R1‑1806256 | Configured UL grant for NR-U | Ericsson | imported from 3GU |
R1‑1806257 | On NR operation in 60GHz unlicensed band | Ericsson | imported from 3GU |
R1‑1806258 | On PRACH for NR in Unlicensed Spectrum | Ericsson | imported from 3GU |
R1‑1806259 | On interlace design for NR-U uplinks | Ericsson | imported from 3GU |
R1‑180626 | - | - | - |
R1‑1806260 | On SRS design for NR unlicensed operation | Ericsson | imported from 3GU |
R1‑1806261 | NR-U PUCCH Design | Ericsson | imported from 3GU |
R1‑1806262 | Remaining details on carrier aggregation for mode 4 in V2X phase 2 | CATT | imported from 3GU |
R1‑1806263 | Remaining details on synchronization for carrier aggregation in V2X Phase 2 | CATT | imported from 3GU |
R1‑1806264 | Remaining details on 64QAM support in V2X phase 2 | CATT | imported from 3GU |
R1‑1806265 | Discussion on latency reduction between packet arrival and resource selection | CATT | imported from 3GU |
R1‑1806266 | Further Discussion on Control Plane Latency Reduction in LTE | CATT | imported from 3GU |
R1‑1806267 | Introduction of further reduced control plane latency | CATT | imported from 3GU |
R1‑1806268 | Remaining Issues on Synchronization Signal | CATT | imported from 3GU |
R1‑1806269 | Remaining Issues on RMSI | CATT | imported from 3GU |
R1‑180627 | - | - | - |
R1‑1806270 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1806271 | Further details on NR RACH format | CATT | imported from 3GU |
R1‑1806272 | Further details on NR 4-step RA Procedure | CATT | imported from 3GU |
R1‑1806273 | Remaining Issues on NR Mobility Management | CATT | imported from 3GU |
R1‑1806274 | Remaining Issues on NR Radio Link Monitoring | CATT | imported from 3GU |
R1‑1806275 | Remaining issues on codeword mapping | CATT | imported from 3GU |
R1‑1806276 | Remaining issues on codebook based UL transmission | CATT | imported from 3GU |
R1‑1806277 | Remaining issues on non-codebook based UL transmission | CATT | imported from 3GU |
R1‑1806278 | Remaining issues on CSI measurement | CATT | imported from 3GU |
R1‑1806279 | Remaining issues on CSI reporting | CATT | imported from 3GU |
R1‑180628 | - | - | - |
R1‑1806280 | Remaining issues on beam management | CATT | imported from 3GU |
R1‑1806281 | Remaining issues on beam failure recovery | CATT | imported from 3GU |
R1‑1806282 | Simultaneous Tx/Rx of channels and reference signals | CATT | imported from 3GU |
R1‑1806283 | Remaining issues on CSI-RS | CATT | imported from 3GU |
R1‑1806284 | Remaining issues on DMRS | CATT | imported from 3GU |
R1‑1806285 | Remaining issues on PT-RS | CATT | imported from 3GU |
R1‑1806286 | Remaining issues on SRS | CATT | imported from 3GU |
R1‑1806287 | Remaining issues on QCL | CATT | imported from 3GU |
R1‑1806288 | On PDCCH structure | CATT | imported from 3GU |
R1‑1806289 | Remaining details of NR PDCCH search space | CATT | imported from 3GU |
R1‑180629 | - | - | - |
R1‑1806290 | On UE procedures for SFI reception | CATT | imported from 3GU |
R1‑1806291 | Remaining issues on DCI contents | CATT | imported from 3GU |
R1‑1806292 | On support of URLLC scheduling | CATT | imported from 3GU |
R1‑1806293 | On UCI multiplexing on PUCCH | CATT | imported from 3GU |
R1‑1806294 | PUCCH enhancement for URLLC | CATT | imported from 3GU |
R1‑1806295 | Remaining issues for long PUCCH | CATT | imported from 3GU |
R1‑1806296 | On UCI multiplexing on PUSCH | CATT | imported from 3GU |
R1‑1806297 | Considerations on UCI multiplexing for NR URLLC | CATT | imported from 3GU |
R1‑1806298 | On PUCCH resource allocation | CATT | imported from 3GU |
R1‑1806299 | Remaining issues on time domain resource allocation | CATT | imported from 3GU |
R1‑180630 | - | - | - |
R1‑1806300 | On BWP operation | CATT | imported from 3GU |
R1‑1806301 | Remaining issues on HARQ-ACK codebook | CATT | imported from 3GU |
R1‑1806302 | Dynamic Power Sharing for NE-DC | CATT | imported from 3GU |
R1‑1806303 | Remaining issues of Non-CA based power control | CATT | imported from 3GU |
R1‑1806304 | CQI and MCS design for NR URLLC | CATT | imported from 3GU |
R1‑1806305 | NOMA transmitter side signal processing | CATT | imported from 3GU |
R1‑1806306 | Discussion on NOMA receivers | CATT | imported from 3GU |
R1‑1806307 | Discussion on NOMA procedures | CATT | imported from 3GU |
R1‑1806308 | Further link level evaluation results of NOMA | CATT | imported from 3GU |
R1‑1806309 | Link level evaluation results of OMA | CATT | imported from 3GU |
R1‑180631 | - | - | - |
R1‑1806310 | Remaining evaluation assumptions | CATT | imported from 3GU |
R1‑1806311 | Remaining details on evaluation scenarios of new V2X use cases | CATT | imported from 3GU |
R1‑1806312 | Remaining details on channel models of new V2X use cases | CATT | imported from 3GU |
R1‑1806313 | Remaining Issues of Simulation Methodology for NR Unlicensed operations | CATT | imported from 3GU |
R1‑1806314 | Frame Structure for NR Unlicensed Operations | CATT | imported from 3GU |
R1‑1806315 | DL Physical Channel and Signal Design for NR-U Operations | CATT | imported from 3GU |
R1‑1806316 | UL Physical Channel and Signal Design for NR-U Operations | CATT | imported from 3GU |
R1‑1806317 | Channel Access Procedures for NR Unlicensed Operations | CATT | imported from 3GU |
R1‑1806318 | Initial Access and Mobiity for NR Unlicensed Operations | CATT | imported from 3GU |
R1‑1806319 | HARQ Operations in NR-U | CATT | imported from 3GU |
R1‑180632 | - | - | - |
R1‑1806320 | DL control design for NR-U | CATT | imported from 3GU |
R1‑1806321 | NR Physical Layer design for IAB backhual link | CATT | imported from 3GU |
R1‑1806322 | Discussions on evaluation methodology for self-evaluation | CATT | imported from 3GU |
R1‑1806323 | Discussions on detailed link budget evaluation methodology | CATT | imported from 3GU |
R1‑1806324 | Discussions on calculation of shadow fading margin for link budget | CATT | imported from 3GU |
R1‑1806325 | Discussions on penetration margin and SD for link budget | CATT | imported from 3GU |
R1‑1806326 | Discussions on system level simulation configurations and technical features for self evaluation | CATT | imported from 3GU |
R1‑1806327 | Initial self evaluation on peak data rate and peak spectrum efficiency | CATT | imported from 3GU |
R1‑1806328 | Initial self evaluation for Indoor Hotspot-eMBB | CATT | imported from 3GU |
R1‑1806329 | Initial self evaluation for Dense Urban-eMBB | CATT | imported from 3GU |
R1‑180633 | - | - | - |
R1‑1806330 | Initial self evaluation for Rural-eMBB | CATT | imported from 3GU |
R1‑1806331 | Initial self evaluation on control plane latency | CATT | imported from 3GU |
R1‑1806332 | Initial self evaluation on user plane latency | CATT | imported from 3GU |
R1‑1806333 | Discussions and initial self evaluation on energy efficiency | CATT | imported from 3GU |
R1‑1806334 | Initial self evaluation on mobility | CATT | imported from 3GU |
R1‑1806335 | On the Urban Scenario Evaluation Scenario | OnStar Europe | imported from 3GU |
R1‑1806336 | Remaining issues on UCI multiplexing on PUCCH | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806337 | Remaining issues on UCI multiplexing on PUSCH | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806338 | Remaining issues on codebook based UL transmission | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806339 | Remaining issues on non-Codebook based UL transmission | Lenovo, Motorola Mobility | imported from 3GU |
R1‑180634 | - | - | - |
R1‑1806340 | Remining issues on CSI reporting | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806341 | Remaining issues on CSI-RS | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806342 | Remaining issues on QCL | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806343 | Remaining issues for HARQ-ACK feedback timing indication | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806344 | Remaining issues for CA with different numerologies | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806345 | Frame structure for NR-U operation | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806346 | HARQ-ACK transmission on unlicensed carriers | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806347 | Correction on QCL of SS blocks | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806348 | Views on TDD downlink aspect | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806349 | Views on TDD common aspect | Lenovo, Motorola Mobility | imported from 3GU |
R1‑180635 | - | - | - |
R1‑1806350 | Discussion on Mode 4 support for V2X carrier aggregation | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806351 | Discussion on Pool sharing for V2X Phase 2 | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806352 | Discussion on Latency Reduction for V2X Phase 2 | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806353 | Discussion of remaining details of beam reporting | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806354 | Discussion of remaining details of beam failure recovery | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806355 | Discussion of UE behavior related to QCL assumption in CA | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1806356 | Correction on HARQ timing issues for TDD specific sTTI | CMCC | imported from 3GU |
R1‑1806357 | Discussion on remaining issues for PRACH formats | CMCC | imported from 3GU |
R1‑1806358 | Discussion on remaining issues for paging | CMCC | imported from 3GU |
R1‑1806359 | Discussion on remaining issues on beam failure recovery | CMCC | imported from 3GU |
R1‑180636 | - | - | - |
R1‑1806360 | Discussion on remaining issues on SRS | CMCC | imported from 3GU |
R1‑1806361 | Discussion on remaining issues for unicast PDCCH in CORESET#0 | CMCC | imported from 3GU |
R1‑1806362 | Discussion on PDCCH repetition for URLLC | CMCC | imported from 3GU |
R1‑1806363 | Discussion on remaining issues for group-common PDCCH | CMCC | imported from 3GU |
R1‑1806364 | Discussion on remaining issues for DCI | CMCC | imported from 3GU |
R1‑1806365 | Discussion on support of compact DCI for URLLC | CMCC | imported from 3GU |
R1‑1806366 | Discussion on PUCCH repetition | CMCC | imported from 3GU |
R1‑1806367 | Discussion on remaining issues for time domain resource allocation | CMCC | imported from 3GU |
R1‑1806368 | Discussion on scheduling and HARQ management | CMCC | imported from 3GU |
R1‑1806369 | Discussion on handling collision issues of UL URLLC and eMBB | CMCC | imported from 3GU |
R1‑180637 | - | - | - |
R1‑1806370 | Discussion on power control signalling | CMCC | imported from 3GU |
R1‑1806371 | Discussion on CQI and MCS design for URLLC | CMCC | imported from 3GU |
R1‑1806372 | Considerations on Rel-15 NoMA Transmitter Design | CMCC | imported from 3GU |
R1‑1806373 | Considerations on NoMA related procedures | CMCC | imported from 3GU |
R1‑1806374 | Discussion on enhancements for IAB | CMCC | imported from 3GU |
R1‑1806375 | Discussion on evaluation methodology for IAB | CMCC | imported from 3GU |
R1‑1806376 | Initial self evaluation results for eMBB spectrum efficiency | CMCC | imported from 3GU |
R1‑1806377 | Initial self evaluation results for mobility in eMBB scenario | CMCC | imported from 3GU |
R1‑1806378 | Initial self evaluation results for connection density in mMTC scenario | CMCC | imported from 3GU |
R1‑1806379 | Initial self evaluation results for reliability in URLLC scenario | CMCC | imported from 3GU |
R1‑180638 | - | - | - |
R1‑1806380 | Initial link-level self evaluation results for mobility in eMBB scenario | CMCC | imported from 3GU |
R1‑1806381 | Introduce definitions of the terms BL/CE and non-BL/CE in 36.211 | Ericsson | imported from 3GU |
R1‑1806382 | Introduce definitions of the terms BL/CE and non-BL/CE in 36.213 | Ericsson | imported from 3GU |
R1‑1806383 | Remaining details of CRS muting for MTC | Ericsson | imported from 3GU |
R1‑1806384 | [DRAFT] Reply LS on LTE peak data-rate calculation for EN-DC | Ericsson | imported from 3GU |
R1‑1806385 | On remaining details of blind/HARQ-less PDSCH repetition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806386 | On remaining details of CFI configuration operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806387 | On TEI-15 LTE Modulation Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806388 | On LTE HRLLC RLM Qin/Qout Targets | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806389 | [Draft] Reply LS on RLM Qin/Qout Targets for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180639 | - | - | - |
R1‑1806390 | QCL related issues during BWP switching | PANASONIC | imported from 3GU |
R1‑1806391 | Remaining issues on non-codebook based UL | Spreadtrum Communications | imported from 3GU |
R1‑1806392 | Remaining issues on CSI measurement | Spreadtrum Communications | imported from 3GU |
R1‑1806393 | Remaining issues on CSI reporting | Spreadtrum Communications | imported from 3GU |
R1‑1806394 | Remaining issues on beam management | Spreadtrum Communications | imported from 3GU |
R1‑1806395 | Remaining issues on beam failure recovery | Spreadtrum Communications | imported from 3GU |
R1‑1806396 | Reimaining issues on DMRS | Spreadtrum Communications | imported from 3GU |
R1‑1806397 | Remaining issues on PT-RS | Spreadtrum Communications | imported from 3GU |
R1‑1806398 | Remaining issues on TRS | Spreadtrum Communications | imported from 3GU |
R1‑1806399 | Remaining issues on DCI contents and formats | Spreadtrum Communications | imported from 3GU |
R1‑180640 | - | - | - |
R1‑1806400 | Remaining issues on PUCCH structure in short-duration | Spreadtrum Communications | imported from 3GU |
R1‑1806401 | Remaining issues on UCI multiplexing | Spreadtrum Communications | imported from 3GU |
R1‑1806402 | Remaining issues on resource allocation for PUCCH | Spreadtrum Communications | imported from 3GU |
R1‑1806403 | Remaining issues on resource allocation of multi-slot transmission | Spreadtrum Communications | imported from 3GU |
R1‑1806404 | Remaining issues on UE procedure for determining slot format | Spreadtrum Communications | imported from 3GU |
R1‑1806405 | Considerations on NOMA procedures | Spreadtrum Communications | imported from 3GU |
R1‑1806406 | Remaining issues for synchronization signals | Spreadtrum Communications | imported from 3GU |
R1‑1806407 | Remaining issues for CSI-RS based mobility management | Spreadtrum Communications | imported from 3GU |
R1‑1806408 | Remaining issues on PDCCH structure | Spreadtrum Communications | imported from 3GU |
R1‑1806409 | Consideration on CQI and MCS tables for NR URLLC | Spreadtrum Communications | imported from 3GU |
R1‑180641 | - | - | - |
R1‑1806410 | Discussion on SS/PBCH block design in NR-U operation | Spreadtrum Communications | imported from 3GU |
R1‑1806411 | Remaining issues on BWP | Spreadtrum Communications | imported from 3GU |
R1‑1806412 | Considerations on the channel access procedures for NR-U | Spreadtrum Communications | imported from 3GU |
R1‑1806413 | Consideration on autonomous UL transmission in NR-U operation | Spreadtrum Communications | imported from 3GU |
R1‑1806414 | Draft Reply LS on messagePowerOffsetGroupB RAN2 | Ericsson | imported from 3GU |
R1‑1806415 | Draft Reply LS on the design of PRACH table | Ericsson | imported from 3GU |
R1‑1806416 | Draft Reply LS on Simultaneous PDSCH Reception with Paging | Ericsson | imported from 3GU |
R1‑1806417 | Draft Reply LS on Defining reserved resources in NR-SIB1 | Ericsson | imported from 3GU |
R1‑1806418 | Draft Reply LS on MSG3 size for NR | Ericsson | imported from 3GU |
R1‑1806419 | Remaining details on Synchronization signal | Ericsson | imported from 3GU |
R1‑180642 | - | - | - |
R1‑1806420 | Remaining details of PBCH | Ericsson | imported from 3GU |
R1‑1806421 | Remaining minimum system information | Ericsson | imported from 3GU |
R1‑1806422 | On other system information delivery | Ericsson | imported from 3GU |
R1‑1806423 | Remaining details on paging design | Ericsson | imported from 3GU |
R1‑1806424 | Remaining details of RACH configurations | Ericsson | imported from 3GU |
R1‑1806425 | Remaining details of RACH procedure | Ericsson | imported from 3GU |
R1‑1806426 | Remaining details for mobility measurements | Ericsson | imported from 3GU |
R1‑1806427 | Remaining details for radio link monitoring | Ericsson | imported from 3GU |
R1‑1806428 | On multiple preamble transmissions for contention free random access | Ericsson | imported from 3GU |
R1‑1806429 | L1-RSRP reporting on non-serving cells | Ericsson | imported from 3GU |
R1‑180643 | - | - | - |
R1‑1806430 | On IMT-2020 Evaluation methodology | Ericsson | imported from 3GU |
R1‑1806431 | An overview of the IMT-2020 Evaluations | Ericsson | imported from 3GU |
R1‑1806432 | IMT-2020 Self-Evaluation: NR Link Budgets | Ericsson | imported from 3GU |
R1‑1806433 | IMT 2020 Evaluations: On eMBB spectral efficiency with NR | Ericsson | imported from 3GU |
R1‑1806434 | IMT 2020 Evaluations: On eMBB user experienced data rate with NR | Ericsson | imported from 3GU |
R1‑1806435 | IMT 2020 Evaluations: On eMBB area traffic capacity with NR | Ericsson | imported from 3GU |
R1‑1806436 | IMT-2020 self-evaluation: mMTC non-full-buffer connection density | Ericsson | imported from 3GU |
R1‑1806437 | IMT-2020 self-evaluation: mMTC full buffer connection density | Ericsson | imported from 3GU |
R1‑1806438 | IMT-2020 self-evaluation: Mobility evaluations for NR | Ericsson | imported from 3GU |
R1‑1806439 | IMT-2020 self-evaluation: Peak data rate and peak spectrum efficiency evaluations for NR | Ericsson | imported from 3GU |
R1‑180644 | - | - | - |
R1‑1806440 | IMT-2020 self evaluation: Radio Network Energy Performance | Ericsson | imported from 3GU |
R1‑1806441 | IMT 2020 Evaluations - CP latency in NR | Ericsson | imported from 3GU |
R1‑1806442 | IMT 2020 Evaluations - UP latency in NR | Ericsson | imported from 3GU |
R1‑1806443 | IMT 2020 Evaluations - Reliability in NR | Ericsson | imported from 3GU |
R1‑1806444 | On Maximum TX Power for UL Interlace Structures | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806445 | Corrections for channel access mechanism | Huawei, HiSilicon | imported from 3GU |
R1‑1806446 | Remaining issues on SPS | Huawei, HiSilicon | imported from 3GU |
R1‑1806447 | On support of PUSCH antenna selection for 1T4R and 2T4R antenna configurations | Huawei, HiSilicon | imported from 3GU |
R1‑1806448 | Correction on QCL Type C for feCoMP in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1806449 | Aspects related to UL data channel | Huawei, HiSilicon | imported from 3GU |
R1‑180645 | - | - | - |
R1‑1806450 | Aspects related to FS2 | Huawei, HiSilicon | imported from 3GU |
R1‑1806451 | UE capability on PDSCH/PUSCH repetition | Huawei, HiSilicon | imported from 3GU |
R1‑1806452 | CFI configuration for LTE URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1806453 | Discussion on PRG size for TM9 and TM10 | Huawei, HiSilicon | imported from 3GU |
R1‑1806454 | Correction on RV determination for eVoLTE | Huawei, HiSilicon, CMCC | imported from 3GU |
R1‑1806455 | Introduction of configured PRG size for TM9 and TM10 in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1806456 | LS on minimum number of RX antennae for NR vehicular UEs | 5GAA WG2, LG Electronics | imported from 3GU |
R1‑1806457 | On UL SPS enhancements for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806458 | Simulation Methodology for NR-U Operation | ZTE Corporation | imported from 3GU |
R1‑1806459 | Discussion on frame structure for NR-U | ZTE Corporation | imported from 3GU |
R1‑180646 | - | - | - |
R1‑1806460 | Consideration on DL reference signals and channels design for NR-U | ZTE Corporation | imported from 3GU |
R1‑1806461 | Consideration on UL reference signals and channels design for NR-U | ZTE Corporation | imported from 3GU |
R1‑1806462 | Discussion on Channel access mechanism for NR-U | ZTE Corporation | imported from 3GU |
R1‑1806463 | Discussion on initial access and mobility for NR-U | ZTE Corporation | imported from 3GU |
R1‑1806464 | Discussion on scheduling and HARQ for NR-U | ZTE Corporation | imported from 3GU |
R1‑1806465 | Discussion on configured grant for NR-U | ZTE Corporation | imported from 3GU |
R1‑1806466 | Miscellaneous Corrections to TS38.213 | Editor (Samsung) | imported from 3GU |
R1‑1806467 | TP for Section 6 of TR38.811 – “Rain + Scintillations” | ESA, THALES | imported from 3GU |
R1‑1806468 | Remaining issues of PUCCH RA prior to RRC configuration | NEC | imported from 3GU |
R1‑1806469 | Discussion on NoMA Schemes for NR | NEC | imported from 3GU |
R1‑180647 | - | - | - |
R1‑1806470 | Considerations on NOMA related procedures | NEC | imported from 3GU |
R1‑1806471 | Proposed recommendations | THALES | imported from 3GU |
R1‑1806472 | NR-NTN: Impact of Doppler variation rate on DM-RS time distribution | THALES, Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806473 | NR-NTN: Proposed recommendations | THALES | imported from 3GU |
R1‑1806474 | Discussion on HARQ Procedure | TCL Communication Ltd. | imported from 3GU |
R1‑1806475 | NR-NTN: Impact of channel frequency selectivity on DM-RS distribution in frequency | THALES | imported from 3GU |
R1‑1806476 | NR-NTN: Impact on Initial TA during random access procedure | THALES | imported from 3GU |
R1‑1806477 | [DRAFT] Reply LS on formula or table for L1 data rate | Intel Corporation | imported from 3GU |
R1‑1806478 | Draft Response to LS on Beam Failure Recovery | Intel Corporation | imported from 3GU |
R1‑1806479 | Correction on 256QAM for DL sTTI operation | Intel Corporation | imported from 3GU |
R1‑180648 | - | - | - |
R1‑1806480 | Remaining issues of 1024QAM support in LTE | Intel Corporation | imported from 3GU |
R1‑1806481 | Remaining physical layer aspects of sidelink carrier aggregation for mode-4 LTE V2V communication | Intel Corporation | imported from 3GU |
R1‑1806482 | Remaining sidelink synchronization details for LTE V2V carrier aggregation | Intel Corporation | imported from 3GU |
R1‑1806483 | Remaining details of demodulation enhancements for LTE V2V sidelink communication | Intel Corporation | imported from 3GU |
R1‑1806484 | On sidelink resource pool sharing for eNB-controlled and UE-autonomous V2V transmission modes | Intel Corporation | imported from 3GU |
R1‑1806485 | Remaining details of reduced resource selection time for LTE V2V sidelink communication | Intel Corporation | imported from 3GU |
R1‑1806486 | UE Capabilities for LTE Rel.15 V2X Communication | Intel Corporation | imported from 3GU |
R1‑1806487 | Resynchronization signal for efeMTC | Intel Corporation | imported from 3GU |
R1‑1806488 | Early data transmission for efeMTC | Intel Corporation | imported from 3GU |
R1‑1806489 | Power saving signal for efeMTC | Intel Corporation | imported from 3GU |
R1‑180649 | - | - | - |
R1‑1806490 | Design of sub-PRB PUSCH for efeMTC | Intel Corporation | imported from 3GU |
R1‑1806491 | The function scope of wake-up signal for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1806492 | Configurations of wake-up signal for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1806493 | Early data transmission for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1806494 | Remaining details of PDSCH repetitions | Intel Corporation | imported from 3GU |
R1‑1806495 | On MCS selection for LTE | Intel Corporation | imported from 3GU |
R1‑1806496 | Removal of SRS-RSRP and RSSI measurements from TS 38.215 | Intel Corporation | imported from 3GU |
R1‑1806497 | Remaining issues in SSB | Intel Corporation | imported from 3GU |
R1‑1806498 | Remaining issues in RMSI | Intel Corporation | imported from 3GU |
R1‑1806499 | Remaining issues in Paging | Intel Corporation | imported from 3GU |
R1‑180650 | - | - | - |
R1‑1806500 | Remaining issues in PRACH formats | Intel Corporation | imported from 3GU |
R1‑1806501 | Remaining issues in RACH procedure | Intel Corporation | imported from 3GU |
R1‑1806502 | Remaining issues in RRM measurements | Intel Corporation | imported from 3GU |
R1‑1806503 | Remaining issues in RLM | Intel Corporation | imported from 3GU |
R1‑1806504 | Remaining Issues on Codebook based UL Transmission | Intel Corporation | imported from 3GU |
R1‑1806505 | Remaining Issues on Non-Codebook based UL Transmission | Intel Corporation | imported from 3GU |
R1‑1806506 | Remaining issues on CSI reporting | Intel Corporation | imported from 3GU |
R1‑1806507 | Remaining Issues on Beam Management | Intel Corporation | imported from 3GU |
R1‑1806508 | Remaining Issues on Beam Failure Recovery | Intel Corporation | imported from 3GU |
R1‑1806509 | Simultaneous Tx and Rx of physical channels and RS | Intel Corporation | imported from 3GU |
R1‑180651 | - | - | - |
R1‑1806510 | On UE capability signalling for Type II CSI | Intel Corporation | imported from 3GU |
R1‑1806511 | Remaining issues on CSI-RS | Intel Corporation | imported from 3GU |
R1‑1806512 | Remaining Issues on PT-RS | Intel Corporation | imported from 3GU |
R1‑1806513 | Remaining issues on SRS | Intel Corporation | imported from 3GU |
R1‑1806514 | Remaining Issues on TRS | Intel Corporation | imported from 3GU |
R1‑1806515 | On the remaining issues of QCL | Intel Corporation | imported from 3GU |
R1‑1806516 | Remaining details on GC PDCCH and dynamic SFI | Intel Corporation | imported from 3GU |
R1‑1806517 | Further considerations on DCI formats | Intel Corporation | imported from 3GU |
R1‑1806518 | On DCI format for NR URLLC | Intel Corporation | imported from 3GU |
R1‑1806519 | Multiple UCI types in a PUCCH | Intel Corporation | imported from 3GU |
R1‑180652 | - | - | - |
R1‑1806520 | PUSCH-PUCCH and PUCCH-PUCCH collision handling | Intel Corporation | imported from 3GU |
R1‑1806521 | UCI on PUSCH | Intel Corporation | imported from 3GU |
R1‑1806522 | Remaining details on scheduling and HARQ | Intel Corporation | imported from 3GU |
R1‑1806523 | On slot aggregation for URLLC | Intel Corporation | imported from 3GU |
R1‑1806524 | Remaining details of BWP adaptation | Intel Corporation | imported from 3GU |
R1‑1806525 | Remaining aspects for carrier aggregation | Intel Corporation | imported from 3GU |
R1‑1806526 | Remaining Issues on Power Control Framework | Intel Corporation | imported from 3GU |
R1‑1806527 | Further discussion on power sharing for EN-DC | Intel Corporation | imported from 3GU |
R1‑1806528 | On Rel-15 UE feature list | Intel Corporation | imported from 3GU |
R1‑1806529 | CQI/MCS enhancements for URLLC | Intel Corporation | imported from 3GU |
R1‑180653 | - | - | - |
R1‑1806530 | On UE features for URLLC | Intel Corporation | imported from 3GU |
R1‑1806531 | NOMA transmission scheme: LCRS | Intel Corporation | imported from 3GU |
R1‑1806532 | Receiver structure for NOMA | Intel Corporation | imported from 3GU |
R1‑1806533 | NOMA related procedure | Intel Corporation | imported from 3GU |
R1‑1806534 | Evaluation methodology for NOMA study | Intel Corporation | imported from 3GU |
R1‑1806535 | Initial link level evaluations for NOMA – mMTC | Intel Corporation | imported from 3GU |
R1‑1806536 | Initial link level evaluations for NOMA – eMBB | Intel Corporation | imported from 3GU |
R1‑1806537 | Initial link level evaluations for NOMA - URLLC | Intel Corporation | imported from 3GU |
R1‑1806538 | Scenarios, traffic models and performance metrics for eV2X evaluations | Intel Corporation | imported from 3GU |
R1‑1806539 | Channel models for eV2X evaluation methodology | Intel Corporation | imported from 3GU |
R1‑180654 | - | - | - |
R1‑1806540 | Simulation methodology and assumptions for NR unlicensed | Intel Corporation | imported from 3GU |
R1‑1806541 | On the NR frame structure to support unlicensed operation | Intel Corporation | imported from 3GU |
R1‑1806542 | Potential enhancements to NR DL signals and channels for unlicensed operation | Intel Corporation | imported from 3GU |
R1‑1806543 | Potential enhancements to NR UL signals and channels for unlicensed operation | Intel Corporation | imported from 3GU |
R1‑1806544 | Potential designs for NR unlicensed channel access mechanism | Intel Corporation | imported from 3GU |
R1‑1806545 | Potential enhancements to NR initial access and mobility to support unlicensed operation | Intel Corporation | imported from 3GU |
R1‑1806546 | Potential enhancements to NR scheduling and HARQ to support unlicensed operation | Intel Corporation | imported from 3GU |
R1‑1806547 | Potential enhancements to NR configured grants to support unlicensed operation | Intel Corporation | imported from 3GU |
R1‑1806548 | Potential designs to support spatial reuse for NR-unlicensed. | Intel Corporation | imported from 3GU |
R1‑1806549 | Initial thoughts on technology neutral design for greenfield | Intel Corporation | imported from 3GU |
R1‑180655 | - | - | - |
R1‑1806550 | Remaining details on CORESET and search space | Intel Corporation | imported from 3GU |
R1‑1806551 | PHY layer enhancements for NR IAB | Intel Corporation | imported from 3GU |
R1‑1806552 | Evaluation methodology for NR IAB | Intel Corporation | imported from 3GU |
R1‑1806553 | On the IMT-2020 self-evaluation ^^performance metrics and evaluation methods | Intel Corporation | imported from 3GU |
R1‑1806554 | Initial Results for IMT-2020 self-evaluation | Intel Corporation | imported from 3GU |
R1‑1806555 | Missing agreement on system level assumptions for LTE URLLC | Ericsson | imported from 3GU |
R1‑1806556 | Summary of the email discussion [92b-LTE-13] on UE capability for LTE_HRLLC | Ericsson | imported from 3GU |
R1‑1806557 | [Draft] Reply LS on PC5 transmission mechanism selection | Huawei | imported from 3GU |
R1‑1806558 | Remaining issues in RSS | Sony | imported from 3GU |
R1‑1806559 | Transmission of EDT on Message 3 | Sony | imported from 3GU |
R1‑180656 | - | - | - |
R1‑1806560 | Remaining issues in WUS for efeMTC | Sony | imported from 3GU |
R1‑1806561 | Remaining issues in Sub-PRB PUSCH transmission in efeMTC | Sony | imported from 3GU |
R1‑1806562 | On flexible PDSCH/PUSCH PRB allocation in efeMTC | Sony | imported from 3GU |
R1‑1806563 | Remaining issues on beam management | Sony | imported from 3GU |
R1‑1806564 | Remaining issues on SRS | Sony | imported from 3GU |
R1‑1806565 | Consideration on the transmitter side signal processing for NOMA | Sony | imported from 3GU |
R1‑1806566 | Discussion on remaining issues of eV2X evaluation methodology | Sony | imported from 3GU |
R1‑1806567 | Considerations on frame structure for NR unlicensed operations | Sony | imported from 3GU |
R1‑1806568 | Considerations on DL signals and channels for NR unlicensed operations | Sony | imported from 3GU |
R1‑1806569 | Considerations on channel access for NR unlicensed operations | Sony | imported from 3GU |
R1‑180657 | - | - | - |
R1‑1806570 | Considerations on initial access procedures for NR unlicensed operations | Sony | imported from 3GU |
R1‑1806571 | Considerations on Configured Grant for NR-U | Sony | imported from 3GU |
R1‑1806572 | Discussion on NR enhancements to support IAB | Sony | imported from 3GU |
R1‑1806573 | Miscellaneous Corrections to TS38.213 | Editor (Samsung) | imported from 3GU |
R1‑1806574 | Resource pool sharing between mode-3 and mode-4 users | NEC | imported from 3GU |
R1‑1806575 | Corrections related to interaction between different TTI lengths | LG Electronics | imported from 3GU |
R1‑1806576 | Corrections related to DL control channel for sTTI | LG Electronics | imported from 3GU |
R1‑1806577 | Corrections related to DL data channel for sTTI | LG Electronics | imported from 3GU |
R1‑1806578 | Corrections related to UL data channel for sTTI | LG Electronics | imported from 3GU |
R1‑1806579 | Corrections related to SPS for sTTI | LG Electronics | imported from 3GU |
R1‑180658 | - | - | - |
R1‑1806580 | Discussion on remaining issues for AUL | LG Electronics | imported from 3GU |
R1‑1806581 | Discussion on carrier aggregation in sidelink mode 4 operation | LG Electronics | imported from 3GU |
R1‑1806582 | Remaining issues on synchronization for sidelink CA | LG Electronics | imported from 3GU |
R1‑1806583 | Discussion on 64QAM support | LG Electronics | imported from 3GU |
R1‑1806584 | Discussion on resource pool sharing between UEs using mode 3 and 4 | LG Electronics | imported from 3GU |
R1‑1806585 | Discussion on maximum time reduction between packet arrival and selected transmission resource | LG Electronics | imported from 3GU |
R1‑1806586 | Data transmission during random access procedure in MTC | LG Electronics | imported from 3GU |
R1‑1806587 | Discussion on wake up signal in MTC | LG Electronics | imported from 3GU |
R1‑1806588 | Discussion on early termination of uplink repetitions for MTC | LG Electronics | imported from 3GU |
R1‑1806589 | Discussion on wake up signal configurations and procedures in NB-IoT | LG Electronics | imported from 3GU |
R1‑180659 | - | - | - |
R1‑1806590 | Wake up signal design in NB-IoT | LG Electronics | imported from 3GU |
R1‑1806591 | Data transmission during random access procedure in NB-IoT | LG Electronics | imported from 3GU |
R1‑1806592 | Discussion on Scheduling request in NB-IoT | LG Electronics | imported from 3GU |
R1‑1806593 | Remaining issues on reliability enhancements for NPRACH | LG Electronics | imported from 3GU |
R1‑1806594 | Remaining issues on NPRACH range enhancement | LG Electronics | imported from 3GU |
R1‑1806595 | Discussion on DL aspects in TDD NB-IoT | LG Electronics | imported from 3GU |
R1‑1806596 | Discussion on UL aspects in TDD NB-IoT | LG Electronics | imported from 3GU |
R1‑1806597 | Discussion on common aspects in TDD NB-IoT | LG Electronics | imported from 3GU |
R1‑1806598 | Discussion on blind/HARQ-less PDSCH repetition for URLLC | LG Electronics | imported from 3GU |
R1‑1806599 | Repetition Enhancements for UL SPS Operation | LG Electronics | imported from 3GU |
R1‑180660 | - | - | - |
R1‑1806600 | Remaining Details on Synchronization signal | LG Electronics | imported from 3GU |
R1‑1806601 | Remaining Details on PBCH design and contents | LG Electronics | imported from 3GU |
R1‑1806602 | RMSI delivery and CORESET configuration | LG Electronics | imported from 3GU |
R1‑1806603 | Other system information delivery | LG Electronics | imported from 3GU |
R1‑1806604 | Paging design in NR | LG Electronics | imported from 3GU |
R1‑1806605 | Discussion on PRACH preamble format details | LG Electronics | imported from 3GU |
R1‑1806606 | RACH Procedure | LG Electronics | imported from 3GU |
R1‑1806607 | Remaining Details on L3 measurement and mobility management | LG Electronics | imported from 3GU |
R1‑1806608 | Discussion on Radio Link Monitoring in NR | LG Electronics | imported from 3GU |
R1‑1806609 | Remaining issues on CSI reporting | LG Electronics | imported from 3GU |
R1‑180661 | - | - | - |
R1‑1806610 | Remaining issues on beam management | LG Electronics | imported from 3GU |
R1‑1806611 | Remaining issues on beam failure recovery | LG Electronics | imported from 3GU |
R1‑1806612 | Text proposals on PT-RS | LG Electronics | imported from 3GU |
R1‑1806613 | Remaining issues on SRS | LG Electronics | imported from 3GU |
R1‑1806614 | Text proposals on TRS | LG Electronics | imported from 3GU |
R1‑1806615 | Remaining issues on PDCCH structure | LG Electronics | imported from 3GU |
R1‑1806616 | Remaining issues on search space | LG Electronics | imported from 3GU |
R1‑1806617 | Remaining issues on group common PDCCH | LG Electronics | imported from 3GU |
R1‑1806618 | Remaining issues on DCI contents and formats | LG Electronics | imported from 3GU |
R1‑1806619 | DCI contents and foramts for URLLC | LG Electronics | imported from 3GU |
R1‑180662 | - | - | - |
R1‑1806620 | Remaining issues on short-duration PUCCH | LG Electronics | imported from 3GU |
R1‑1806621 | Remaining issues on long-duration PUCCH | LG Electronics | imported from 3GU |
R1‑1806622 | Discussion on multiplexing UL transmission with different requirements | LG Electronics | imported from 3GU |
R1‑1806623 | Remaining issues on UCI multiplexing | LG Electronics | imported from 3GU |
R1‑1806624 | Remaining issues on PUCCH resource allocation | LG Electronics | imported from 3GU |
R1‑1806625 | Remaining issues on Time-domain Resource allocation | LG Electronics | imported from 3GU |
R1‑1806626 | URLLC aspects on DL/UL scheduling and HARQ management | LG Electronics | imported from 3GU |
R1‑1806627 | Remaining issues on DL/UL scheduling and HARQ | LG Electronics | imported from 3GU |
R1‑1806628 | Remaining issues on UL data transmission procedure | LG Electronics | imported from 3GU |
R1‑1806629 | Remaining issues on bandwidth part operation | LG Electronics | imported from 3GU |
R1‑180663 | - | - | - |
R1‑1806630 | Remaining issues on CA and HARQ-ACK codebook | LG Electronics | imported from 3GU |
R1‑1806631 | Remaining issues for NR LTE coexistence | LG Electronics | imported from 3GU |
R1‑1806632 | Remaining issues on non-CA aspect of UL power control | LG Electronics | imported from 3GU |
R1‑1806633 | Remaining issues on CA aspect of UL power control | LG Electronics | imported from 3GU |
R1‑1806634 | Discussion on CQI and MCS table design for URLLC | LG Electronics | imported from 3GU |
R1‑1806635 | Transmitter side signal processing schemes for NCMA | LG Electronics | imported from 3GU |
R1‑1806636 | Considerations on the receiver types and NoMA schemes | LG Electronics | imported from 3GU |
R1‑1806637 | Discussion on procedures related to NOMA | LG Electronics | imported from 3GU |
R1‑1806638 | LLS evaluation for NCMA | LG Electronics | imported from 3GU |
R1‑1806639 | Discussion on evaluation scenarios for new V2X use cases | LG Electronics | imported from 3GU |
R1‑180664 | - | - | - |
R1‑1806640 | Discussion on channel model for new V2X use cases | LG Electronics | imported from 3GU |
R1‑1806641 | Simulation methodology for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1806642 | Frame structure for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1806643 | Physical layer design of DL signals and channels for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1806644 | Physical layer design of UL signals and channels for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1806645 | Channel access procedure for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1806646 | Initial access and mobility for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1806647 | HARQ operation for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1806648 | Discussion on configured grant for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1806649 | Discussions on NR IAB support | LG Electronics | imported from 3GU |
R1‑180665 | - | - | - |
R1‑1806650 | Discussions on evaluation methodology on NR IAB | LG Electronics | imported from 3GU |
R1‑1806651 | Initial evaluation results of IMT-2020 self-evaluation for high mobility | LG Electronics | imported from 3GU |
R1‑1806652 | Initial evaluation results of Rural-eMBB for IMT-2020 self-evaluation | LG Electronics | imported from 3GU |
R1‑1806653 | Initial evaluation results of Indoor Hotspot-eMBB for IMT-2020 self-evaluation | LG Electronics | imported from 3GU |
R1‑1806654 | Initial evaluation results of Dense Urban-eMBB for IMT-2020 self-evaluation | LG Electronics | imported from 3GU |
R1‑1806655 | On the PDCCH limits on the number of CCEs for channel estimation and BDs for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806656 | Proposed corrections for slot configuration in 38.213 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806657 | On the remaining issues for DCI format sizes and contents | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806658 | Remaining details of CQI and MCS for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806659 | On Intra-UE UL multiplexing between eMBB and URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180666 | - | - | - |
R1‑1806660 | NR support for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806661 | Evaluation Methodology for NR IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806662 | Dynamic resource allocation between backhaul and access link | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806663 | Measurements for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806664 | IAB Synchronization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806665 | On Cross-link Interference Management in IA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806666 | Clarification on UE procedure for receiving OSI | ETRI | imported from 3GU |
R1‑1806667 | Remaining issues for PUCCH structure in long-duration | ETRI | imported from 3GU |
R1‑1806668 | Remaining issues on DL data multiplexing with different reliability requirements | ETRI | imported from 3GU |
R1‑1806669 | Comparison of full-length spreading domains for NOMA transmitter design | ETRI | imported from 3GU |
R1‑180667 | - | - | - |
R1‑1806670 | Discussion on subband based channel access procedures for NR-U | NEC | imported from 3GU |
R1‑1806671 | Discussion on HARQ enhancements for NR-U | NEC | imported from 3GU |
R1‑1806672 | Remaining issues on non-codebook based UL transmission | NEC | imported from 3GU |
R1‑1806673 | Remaining details of synchronization signal and signal generation | NEC Corporation | imported from 3GU |
R1‑1806674 | Discussion on the transmission of video over PC5 interface | Samsung | imported from 3GU |
R1‑1806675 | Corrections in Physical Resource Block numbering to RA Type0 for FeMTC UEs | Samsung | imported from 3GU |
R1‑1806676 | Discussion on UCI transmission without UL-SCH for PUSCH mode 1 | Samsung | imported from 3GU |
R1‑1806677 | mode-4 support in V2X CA | Samsung | imported from 3GU |
R1‑1806678 | Synchronization in V2X CA | Samsung | imported from 3GU |
R1‑1806679 | High order modulation in V2X | Samsung | imported from 3GU |
R1‑180668 | - | - | - |
R1‑1806680 | Resource pool sharing between mode 3 and mode 4 Ues | Samsung | imported from 3GU |
R1‑1806681 | Support of shorter latency in V2X | Samsung | imported from 3GU |
R1‑1806682 | Discussion on enhanced synchronization signals and resynchronization signals | Samsung | imported from 3GU |
R1‑1806683 | Early data transmission for eMTC | Samsung | imported from 3GU |
R1‑1806684 | DL power consumption reduction for eMTC | Samsung | imported from 3GU |
R1‑1806685 | Discussion on sub-PRB allocation for eFeMTC | Samsung | imported from 3GU |
R1‑1806686 | Discussion on Flexible PDSCH/PUSCH starting PRB | Samsung | imported from 3GU |
R1‑1806687 | Discussion on Wake up signal configuraion | Samsung | imported from 3GU |
R1‑1806688 | Wake up signal Design | Samsung | imported from 3GU |
R1‑1806689 | Early data transmission for NB-IOT | Samsung | imported from 3GU |
R1‑180669 | - | - | - |
R1‑1806690 | Discussion on scheduling request for NB IoT | Samsung | imported from 3GU |
R1‑1806691 | New SPS mechanism for power saving | Samsung | imported from 3GU |
R1‑1806692 | Reliability enhancements for NPRACH | Samsung | imported from 3GU |
R1‑1806693 | Range enhancements for NPRACH | Samsung | imported from 3GU |
R1‑1806694 | Discussion on DL common channel/signal for TDD NB-IoT | Samsung | imported from 3GU |
R1‑1806695 | Discussion on UL channel for TDD NB-IoT | Samsung | imported from 3GU |
R1‑1806696 | Discussion on 2 HARQ processes and cross carrier scheduling | Samsung | imported from 3GU |
R1‑1806697 | Discussion on PDSCH repetition | Samsung | imported from 3GU |
R1‑1806698 | Discussion on Repetition for UL SPS | Samsung | imported from 3GU |
R1‑1806699 | Corrections on Synchronization Signaling | Samsung | imported from 3GU |
R1‑180670 | - | - | - |
R1‑1806700 | Corrections on NR-PBCH | Samsung | imported from 3GU |
R1‑1806701 | Corrections on Remaining Minimum System Information | Samsung | imported from 3GU |
R1‑1806702 | Corrections on Other System Information Delivery | Samsung | imported from 3GU |
R1‑1806703 | Corrections on Paging Design | Samsung | imported from 3GU |
R1‑1806704 | Corrections on PRACH Formats | Samsung | imported from 3GU |
R1‑1806705 | Corrections on RACH Procedure | Samsung | imported from 3GU |
R1‑1806706 | Corrections on Measurements for Mobility Management | Samsung | imported from 3GU |
R1‑1806707 | Corrections on Radio Link Monitoring | Samsung | imported from 3GU |
R1‑1806708 | Summary of open issues on codeword mapping | Samsung | imported from 3GU |
R1‑1806709 | Issues on codebook based UL transmission | Samsung | imported from 3GU |
R1‑180671 | - | - | - |
R1‑1806710 | On non-codebook based UL transmission | Samsung | imported from 3GU |
R1‑1806711 | Remaining issues on DL PRB bundling | Samsung | imported from 3GU |
R1‑1806712 | Remaining issues on CSI measurement | Samsung | imported from 3GU |
R1‑1806713 | On CSI processing and reporting latency | Samsung | imported from 3GU |
R1‑1806714 | Issues on CSI reporting | Samsung | imported from 3GU |
R1‑1806715 | Corrections on beam reporting and indication | Samsung | imported from 3GU |
R1‑1806716 | Corrections on beam failure recovery | Samsung | imported from 3GU |
R1‑1806717 | Remaining issues on CQI and MCS | Samsung | imported from 3GU |
R1‑1806718 | Aperiodic beam reporting | Samsung | imported from 3GU |
R1‑1806719 | Corrections on UL beam management | Samsung | imported from 3GU |
R1‑180672 | - | - | - |
R1‑1806720 | Simultaneous transmission and reception of physical channels and reference signals | Samsung | imported from 3GU |
R1‑1806721 | Remaining issues on RS multiplexing | Samsung | imported from 3GU |
R1‑1806722 | Remaining issues on CSI-RS | Samsung | imported from 3GU |
R1‑1806723 | Remaining issues on DMRS | Samsung | imported from 3GU |
R1‑1806724 | Issues on PT-RS design | Samsung | imported from 3GU |
R1‑1806725 | Remaining issues on SRS | Samsung | imported from 3GU |
R1‑1806726 | Remaining issues on TRS | Samsung | imported from 3GU |
R1‑1806727 | Remaining issues on QCL | Samsung | imported from 3GU |
R1‑1806728 | Corrections on PDCCH structure | Samsung | imported from 3GU |
R1‑1806729 | Corrections on Search Space Design | Samsung | imported from 3GU |
R1‑180673 | - | - | - |
R1‑1806730 | Corrections on UE-Group Common PDCCH | Samsung | imported from 3GU |
R1‑1806731 | DCI Contents and Formats | Samsung | imported from 3GU |
R1‑1806732 | On Need for Additional DCI Format for URLLC | Samsung | imported from 3GU |
R1‑1806733 | Corrections on PUCCH for up to 2 Symbols | Samsung | imported from 3GU |
R1‑1806734 | Corrections on PUCCH for more than 2 Symbols | Samsung | imported from 3GU |
R1‑1806735 | Corrections on UCI Multiplexing in PUSCH | Samsung | imported from 3GU |
R1‑1806736 | Corrections on Resource Allocation for PUCCH | Samsung | imported from 3GU |
R1‑1806737 | Corrections on DL/UL Resource Allocation | Samsung | imported from 3GU |
R1‑1806738 | Corrections on HARQ Management and Feedback | Samsung | imported from 3GU |
R1‑1806739 | Corrections on Bandwidth Part Operation | Samsung | imported from 3GU |
R1‑180674 | - | - | - |
R1‑1806740 | Corrections on CA Operation | Samsung | imported from 3GU |
R1‑1806741 | Remaining Issues on Channel Coding | Samsung | imported from 3GU |
R1‑1806742 | Corrections on LTE-NR Coexistence | Samsung | imported from 3GU |
R1‑1806743 | Corrections on UL Power Control | Samsung | imported from 3GU |
R1‑1806744 | Corrections on UL Power Control for EN-DC | Samsung | imported from 3GU |
R1‑1806745 | Corrections on PHR calculation for CA | Samsung | imported from 3GU |
R1‑1806746 | UE Features | Samsung | imported from 3GU |
R1‑1806747 | CQI and MCS Tables for URLLC | Samsung | imported from 3GU |
R1‑1806748 | Remaining issues on NTN Channel Modeling | Samsung | imported from 3GU |
R1‑1806749 | PT-RS consideration for NTN | Samsung | imported from 3GU |
R1‑180675 | - | - | - |
R1‑1806750 | Considerations on random access for NTN | Samsung | imported from 3GU |
R1‑1806751 | Transmitter side signal processing schemes for NOMA | Samsung | imported from 3GU |
R1‑1806752 | Considerations on receiver types for NoMA schemes | Samsung | imported from 3GU |
R1‑1806753 | Discussion on NoMA related procedure | Samsung | imported from 3GU |
R1‑1806754 | Evaluation discussion for NoMA study | Samsung | imported from 3GU |
R1‑1806755 | Evaluation scenarios for NR V2X | Samsung | imported from 3GU |
R1‑1806756 | Channel model for NR V2X | Samsung | imported from 3GU |
R1‑1806757 | Remaining simulation methodology for NR-U | Samsung | imported from 3GU |
R1‑1806758 | Frame structure for NR-U | Samsung | imported from 3GU |
R1‑1806759 | Downlink signal and channel design for NR-U | Samsung | imported from 3GU |
R1‑180676 | - | - | - |
R1‑1806760 | Uplink signal and channel design for NR-U | Samsung | imported from 3GU |
R1‑1806761 | Channel access procedure for NR-U | Samsung | imported from 3GU |
R1‑1806762 | Initial access and mobility procedure for NR-U | Samsung | imported from 3GU |
R1‑1806763 | HARQ enhancements for NR-U | Samsung | imported from 3GU |
R1‑1806764 | Enhancements on configured grant for NR-U | Samsung | imported from 3GU |
R1‑1806765 | Necessary Enhancements for NR IAB | Samsung | imported from 3GU |
R1‑1806766 | Evaluation Methodology for NR IAB | Samsung | imported from 3GU |
R1‑1806767 | Evaluation methodology for IMT-2020 submission | Samsung | imported from 3GU |
R1‑1806768 | Considerations on Timing Advance and Random Access for NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806769 | Remaining issues on PDSCH repetition for LTE URLLC | ZTE | imported from 3GU |
R1‑180677 | - | - | - |
R1‑1806770 | On UL SPS repetition for LTE URLLC | ZTE | imported from 3GU |
R1‑1806771 | On remaining issues of RACH procedure | MediaTek Inc. | imported from 3GU |
R1‑1806772 | Remaining issues on RRM | MediaTek Inc. | imported from 3GU |
R1‑1806773 | Remaining issues on RLM | MediaTek Inc. | imported from 3GU |
R1‑1806774 | Remaining TA related issues | MediaTek Inc. | imported from 3GU |
R1‑1806775 | Remaining Details on Bandwidth Part Operation in NR | MediaTek Inc. | imported from 3GU |
R1‑1806776 | Remaining issues in carrier aggregation | MediaTek Inc. | imported from 3GU |
R1‑1806777 | LS reply on subcarrier spacing for BWPs and TDD configurations | MediaTek Inc. | imported from 3GU |
R1‑1806778 | Reamining issues on PDCCH structure | MediaTek Inc. | imported from 3GU |
R1‑1806779 | Reamining issues on PDCCH search space | MediaTek Inc. | imported from 3GU |
R1‑180678 | - | - | - |
R1‑1806780 | Reamining issues on group-common PDCCH | MediaTek Inc. | imported from 3GU |
R1‑1806781 | Reamining issues on DCI formats and contents | MediaTek Inc. | imported from 3GU |
R1‑1806782 | Power offset between PDCCH DMRS and QCL'ed SSS | MediaTek Inc. | imported from 3GU |
R1‑1806783 | Remaining issues for RMSI | MediaTek Inc. | imported from 3GU |
R1‑1806784 | Remaining issues for OSI | MediaTek Inc. | imported from 3GU |
R1‑1806785 | Remaining issues for Paging | MediaTek Inc. | imported from 3GU |
R1‑1806786 | Remaining issues in CSI measurement | MediaTek Inc. | imported from 3GU |
R1‑1806787 | Remaining issues in CSI reporting | MediaTek Inc. | imported from 3GU |
R1‑1806788 | Remaining issues on beam management | MediaTek Inc. | imported from 3GU |
R1‑1806789 | Remaining issues on beam failure recovery | MediaTek Inc. | imported from 3GU |
R1‑180679 | - | - | - |
R1‑1806790 | Views on multi-CC QCL assumptions | MediaTek Inc. | imported from 3GU |
R1‑1806791 | Remaining issues in SRS | MediaTek Inc. | imported from 3GU |
R1‑1806792 | Discussion on NR UE Feature List | MediaTek Inc. | imported from 3GU |
R1‑1806793 | On simulation methodology for NR-U operation | MediaTek Inc. | imported from 3GU |
R1‑1806794 | On frame structure design for NR-U operation | MediaTek Inc. | imported from 3GU |
R1‑1806795 | On downlink transmission detection for NR-U operation | MediaTek Inc. | imported from 3GU |
R1‑1806796 | On UL signals and channels design for NR-U operation | MediaTek Inc. | imported from 3GU |
R1‑1806797 | Channel access to NR-based unlicensed spectrum | MediaTek Inc. | imported from 3GU |
R1‑1806798 | Considerations on initial access and mobility for NR-U | MediaTek Inc. | imported from 3GU |
R1‑1806799 | Remaining issues of short-PUCCH | MediaTek Inc. | imported from 3GU |
R1‑180680 | - | - | - |
R1‑1806800 | Remaining issues of long-PUCCH | MediaTek Inc. | imported from 3GU |
R1‑1806801 | Remaining issues of DLUL scheduling and HARQ management | MediaTek Inc. | imported from 3GU |
R1‑1806802 | Remaining issues of UL power control | MediaTek Inc. | imported from 3GU |
R1‑1806803 | On UE power saving for NR | MediaTek Inc. | imported from 3GU |
R1‑1806804 | On CQI and MCS design for URLLC | MediaTek Inc. | imported from 3GU |
R1‑1806805 | Remaining issues on PTRS | MediaTek Inc. | imported from 3GU |
R1‑1806806 | Remaining issues on TRS | MediaTek Inc. | imported from 3GU |
R1‑1806807 | Remaining issues on multiplexing | MediaTek Inc. | imported from 3GU |
R1‑1806808 | Remaining issues on CSI-RS | MediaTek Inc. | imported from 3GU |
R1‑1806809 | Discussion on new DCI format for URLLC | MediaTek Inc. | imported from 3GU |
R1‑180681 | - | - | - |
R1‑1806810 | PUSCH repetition in configured-grant for URLLC | MediaTek Inc. | imported from 3GU |
R1‑1806811 | Remaining issues for UL data transmission procedure | MediaTek Inc. | imported from 3GU |
R1‑1806812 | ACK/NACK feedback design and reliability for URLLC | MediaTek Inc. | imported from 3GU |
R1‑1806813 | On UL Multiplexing for URLLC | MediaTek Inc. | imported from 3GU |
R1‑1806814 | PUCCH HARQ reporting framework for URLLC | MediaTek Inc. | imported from 3GU |
R1‑1806815 | Remaining Issues on DL/UL Resource Allocation | MediaTek Inc. | imported from 3GU |
R1‑1806816 | Remaining Issues on V2X Sidelink CA Scheduling issues in Mode 4 | ITRI | imported from 3GU |
R1‑1806817 | Remaining Issues on Synchronization for Sidelink Carrier Aggregation in V2X Phase 2 | ITRI | imported from 3GU |
R1‑1806818 | Remaining issues on Resource Pool Sharing for Mode 3 and Mode 4 V2X | ITRI | imported from 3GU |
R1‑1806819 | Remaining issues on Latency Reduction for V2X | ITRI | imported from 3GU |
R1‑180682 | - | - | - |
R1‑1806820 | Remaining issues on evaluation scenarios for new V2X use cases | China Telecommunications | imported from 3GU |
R1‑1806821 | On enhancements for IAB | China Telecommunications | imported from 3GU |
R1‑1806822 | Initial self-evaluation for Indoor Hotspot-eMBB | China Telecommunications | imported from 3GU |
R1‑1806823 | Link level performance for LDPC coding with BP decoder | China Telecommunications | imported from 3GU |
R1‑1806824 | Remaining issues on codebook based UL transmission | OPPO | imported from 3GU |
R1‑1806825 | Remaining issues on non-codebook based UL transmission | OPPO | imported from 3GU |
R1‑1806826 | Text proposal on CSI-RS design | OPPO | imported from 3GU |
R1‑1806827 | Text proposal on DMRS design | OPPO | imported from 3GU |
R1‑1806828 | Remaining issues on SRS design | OPPO | imported from 3GU |
R1‑1806829 | Remaining issues on uplink power control for non-CA | OPPO | imported from 3GU |
R1‑180683 | - | - | - |
R1‑1806830 | Power offset between SS/PBCH block and PDCCH | OPPO | imported from 3GU |
R1‑1806831 | Further considerations on evaluation scenarios for NR-V2X | OPPO | imported from 3GU |
R1‑1806832 | On vehicle blocking in channel modelling | OPPO | imported from 3GU |
R1‑1806833 | Utilising sidelink in IAB | OPPO | imported from 3GU |
R1‑1806834 | Remaining issues on UCI multiplexing | OPPO | imported from 3GU |
R1‑1806835 | Remaining issues on CSI reporting using PUCCH | OPPO | imported from 3GU |
R1‑1806836 | Discussion on PUCCH partial overlap | OPPO | imported from 3GU |
R1‑1806837 | Discussion on overlapped UL transmissions with URLLC | OPPO | imported from 3GU |
R1‑1806838 | Remaining details on HARQ-ACK transmission | OPPO | imported from 3GU |
R1‑1806839 | Text Proposal for DL PRB Bundling | OPPO | imported from 3GU |
R1‑180684 | - | - | - |
R1‑1806840 | Remaining Issues and Text Proposals for Beam Management | OPPO | imported from 3GU |
R1‑1806841 | Remaining issues and Text Proposal for Beam Failure Recovery | OPPO | imported from 3GU |
R1‑1806842 | Discussion on simultaneous receptions/transmissions of multiple signals/channels | OPPO | imported from 3GU |
R1‑1806843 | Remaining Issues and Text Proposal for TRS | OPPO | imported from 3GU |
R1‑1806844 | Text Proposal for QCL | OPPO | imported from 3GU |
R1‑1806845 | Parallel DL reception | OPPO | imported from 3GU |
R1‑1806846 | Remaining issues for low latency uplink transmission | OPPO | imported from 3GU |
R1‑1806847 | Study on URLLC scenario and UE | OPPO | imported from 3GU |
R1‑1806848 | Remaining issues on CSI reporting | OPPO | imported from 3GU |
R1‑1806849 | Frame structure for NR-U | OPPO | imported from 3GU |
R1‑180685 | - | - | - |
R1‑1806850 | DL design for NR-U | OPPO | imported from 3GU |
R1‑1806851 | UL design for NR-U | OPPO | imported from 3GU |
R1‑1806852 | Channel access mechanisms on NR-U | OPPO | imported from 3GU |
R1‑1806853 | Initial access procedure on NR-U | OPPO | imported from 3GU |
R1‑1806854 | HARQ procedure on NR-U | OPPO | imported from 3GU |
R1‑1806855 | Paging transmission on NR-U | OPPO | imported from 3GU |
R1‑1806856 | SS/PBCH block transmission on NR-U | OPPO | imported from 3GU |
R1‑1806857 | Aspects related to collision handling for subslot-PUSCH | OPPO | imported from 3GU |
R1‑1806858 | Remaining issues on GC-PDCCH | OPPO | imported from 3GU |
R1‑1806859 | Discussion of backhaul link enhancement for IAB | OPPO | imported from 3GU |
R1‑180686 | - | - | - |
R1‑1806860 | Remaining issues in eV2X carrier aggregation | OPPO | imported from 3GU |
R1‑1806861 | Support of 64 QAM | OPPO | imported from 3GU |
R1‑1806862 | Discussion of resource pool sharing between mode 3 and mode 4 | OPPO | imported from 3GU |
R1‑1806863 | Latency reduction for eV2X | OPPO | imported from 3GU |
R1‑1806864 | Remaining issues on CSI measurement | OPPO | imported from 3GU |
R1‑1806865 | Consideration on mobility evaluation method | OPPO | imported from 3GU |
R1‑1806866 | Remaining issues on resource allocation for HARQ-ACK before RRC connection setup | OPPO | imported from 3GU |
R1‑1806867 | Remaining issues on multi-slot resource allocation | OPPO | imported from 3GU |
R1‑1806868 | Other aspects on bandwidth parts | OPPO | imported from 3GU |
R1‑1806869 | Remaining details on NR RRM | OPPO | imported from 3GU |
R1‑180687 | - | - | - |
R1‑1806870 | Remaining details on NR RLM | OPPO | imported from 3GU |
R1‑1806871 | On wake-up precedure for efeMTC | OPPO | imported from 3GU |
R1‑1806872 | On wake-up procedure for feNBIoT | OPPO | imported from 3GU |
R1‑1806873 | Remaining issues on NR-PBCH | OPPO | imported from 3GU |
R1‑1806874 | Remaining issues on RMSI configuration | OPPO | imported from 3GU |
R1‑1806875 | Remaining issues on paging | OPPO | imported from 3GU |
R1‑1806876 | TX side processing for UL NOMA | NICT | imported from 3GU |
R1‑1806877 | UL DMRS pattern for subslot #5 | ZTE | imported from 3GU |
R1‑1806878 | UL index based scheduling flexibility for TDD UL/DL configuration #6 with slot-TTI | ZTE | imported from 3GU |
R1‑1806879 | Channel estimation complexity and search space | Panasonic Corporation | imported from 3GU |
R1‑180688 | - | - | - |
R1‑1806880 | Cell search time reduction for NB-IoT | Ericsson | imported from 3GU |
R1‑1806881 | System information acquisition time reduction for NB-IoT | Ericsson | imported from 3GU |
R1‑1806882 | Discussion of partial overlap between PUCCH and PUCCH/PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑1806883 | TP on HARQ-ACK reporting with different numerology | Huawei, HiSilicon | imported from 3GU |
R1‑1806884 | DCI size and interpretation for different BWP | Huawei, HiSilicon | imported from 3GU |
R1‑1806885 | Draft reply LS on subcarrier spacing for BWPs and TDD configurations | Huawei, HiSilicon | imported from 3GU |
R1‑1806886 | Draft reply LS on defining reserved resources in NR-SIB1 | Huawei, HiSilicon | imported from 3GU |
R1‑1806887 | Consideration on power saving for NR CA | Huawei, HiSilicon | imported from 3GU |
R1‑1806888 | On coexistence between LTE and NR | Huawei, HiSilicon | imported from 3GU |
R1‑1806889 | Discussion on PHR for SUL | Huawei, HiSilicon | imported from 3GU |
R1‑180689 | - | - | - |
R1‑1806890 | Correction on scheduling and HARQ procedure for case 1 HARQ timing of EN-DC in TS36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1806891 | TP on UCI multiplexing between UL and SUL | Huawei, HiSilicon | imported from 3GU |
R1‑1806892 | CSI feedback enhancements for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1806893 | UL multiplexing for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1806894 | PUCCH design for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1806895 | Discussion on partially overlapped PUCCH and PUSCH for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1806896 | On evaluation assumptions for URLLC and the need of enhanced schemes | Huawei, HiSilicon | imported from 3GU |
R1‑1806897 | Summary of remaining issues on pre-emption indication | Huawei, HiSilicon | imported from 3GU |
R1‑1806898 | Support of 60 kHz subcarrier spacing | Huawei, HiSilicon | imported from 3GU |
R1‑1806899 | PUCCH resource allocation for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑180690 | - | - | - |
R1‑1806900 | Considerations on DMRS to support URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1806901 | Summary of remaining issues on UL data transmission procedure | Huawei, HiSilicon | imported from 3GU |
R1‑1806902 | PUSCH reliability for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1806903 | Handling of parallel DL receptions with URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1806904 | [Draft] Reply LS on the transmission of video over PC5 interface | Huawei, HiSilicon | imported from 3GU |
R1‑1806905 | Simulation assumptions and preliminary results for NR unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R1‑1806906 | Zero-Autocorrelation zone of frequency-interlaced PRACH | Huawei, HiSilicon | imported from 3GU |
R1‑1806907 | On the performance of IAB solutions | Huawei, HiSilicon | imported from 3GU |
R1‑1806908 | Draft reply LS on the design of PRACH table | Huawei, HiSilicon | imported from 3GU |
R1‑1806909 | On NPRS performance | Ericsson | imported from 3GU |
R1‑180691 | - | - | - |
R1‑1806910 | draft CR on 2 NPUSCH timing in NB-IoT HARQ processes | Ericsson | imported from 3GU |
R1‑1806911 | Narrowband measurement accuracy improvements for NB-IoT | Ericsson | imported from 3GU |
R1‑1806912 | Small-cell support for NB-IoT | Ericsson | imported from 3GU |
R1‑1806913 | Remaining issues for SFI | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1806914 | What is "initial access" in RAN1? | Panasonic | imported from 3GU |
R1‑1806915 | Collision between SSB and PDCCH | Panasonic | imported from 3GU |
R1‑1806916 | Remaining issues on DCI contents and formats | Panasonic | imported from 3GU |
R1‑1806917 | Remaining issues on DL/UL scheduling and HARQ management | Panasonic | imported from 3GU |
R1‑1806918 | Inconsistent PDCCH detection | Panasonic | imported from 3GU |
R1‑1806919 | Reliability and latency problems with existing grant free transmission | Sequans Communications | imported from 3GU |
R1‑180692 | - | - | - |
R1‑1806920 | Introduction of NB-IoT Rel-15 physical layer enhancements to TS 36.300 | Huawei, HiSilicon | imported from 3GU |
R1‑1806921 | Considerations for PUCCH reliability | Sequans Communications | imported from 3GU |
R1‑1806922 | Remaining details on PRACH formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806923 | Remaining details on RACH procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806924 | PUCCH Groups and Timing Advance Groups | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806925 | On short PUCCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806926 | Remaining open items on long PUCCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806927 | On UCI multiplexing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806928 | URLLC aspects for overlapped UL transmissions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806929 | Remaining open items on PUCCH resource allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180693 | - | - | - |
R1‑1806930 | Considerations on NOMA transmitter | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806931 | Receiver considerations for UL NOMA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806932 | Procedures to be considered for NOMA operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806933 | Further considerations on NOMA evaluation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806934 | Initial link level simulation results for NOCA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806935 | Initial system level simulation results for NOCA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806936 | Corrections on sPT for FDD-TDD CA with FDD PCell | Sharp, Ericsson | imported from 3GU |
R1‑1806937 | Remaining issues of PUSCH sub-PRB allocation | Sharp | imported from 3GU |
R1‑1806938 | On more flexible PDSCH/PUSCH resource allocation | Sharp | imported from 3GU |
R1‑1806939 | Remaining issues of early data transmission for NB-IoT | Sharp | imported from 3GU |
R1‑180694 | - | - | - |
R1‑1806940 | Remaining issues of uplink aspects of TDD NB-IoT | Sharp | imported from 3GU |
R1‑1806941 | Remaining issues on RACH procedure | Sharp | imported from 3GU |
R1‑1806942 | Open issue on codeword mapping | Sharp | imported from 3GU |
R1‑1806943 | Clarification on aperiodic CSI reporting in CA case | Sharp | imported from 3GU |
R1‑1806944 | Remaining issues on beam management | Sharp | imported from 3GU |
R1‑1806945 | Remaining issues on SRS | Sharp | imported from 3GU |
R1‑1806946 | Remaining issues on slot format for NR | Sharp | imported from 3GU |
R1‑1806947 | Remaining issues on PUCCH in long duration | Sharp | imported from 3GU |
R1‑1806948 | Remaining issues on UCI multiplexing | Sharp | imported from 3GU |
R1‑1806949 | Clarification on aperiodic CSI reporting for CA | Sharp | imported from 3GU |
R1‑180695 | - | - | - |
R1‑1806950 | Introducing sTTI to V2X mode 3 | Panasonic | imported from 3GU |
R1‑1806951 | Discussion on resource pool sharing between UEs in mode 3 and UEs in mode 4 | Panasonic | imported from 3GU |
R1‑1806952 | Miscellaneous corrections and clarifications on CSI acquisition | Ericsson | imported from 3GU |
R1‑1806953 | On OFDM symbol level PDSCH power boosting | Ericsson | imported from 3GU |
R1‑1806954 | Remaining details on SP CSI activation/deactivatin on PUSCH | Ericsson | imported from 3GU |
R1‑1806955 | Draft LS on introduction of advanced CSI CBSR and associated UE capability | Ericsson | imported from 3GU |
R1‑1806956 | Introduction of advanced CSI CBSR in TS 36.213 | Ericsson | imported from 3GU |
R1‑1806957 | On enhancements for eMBB/URLLC multiplexing in DL | Sequans Communications | imported from 3GU |
R1‑1806958 | On PDCCH repetition for NR URLLC | Sequans Communications | imported from 3GU |
R1‑1806959 | On UL multiplexing between grant-based URLLC and eMBB | Sequans Communications | imported from 3GU |
R1‑180696 | - | - | - |
R1‑1806960 | Discussion on Procedures Related to NOMA | National Taiwan University | imported from 3GU |
R1‑1806961 | Indication of Transmission Format for Rel 15 Features | InterDigital, Inc. | imported from 3GU |
R1‑1806962 | Reducing resource collision between mode 3 and mode 4 in pool sharing | InterDigital, Inc. | imported from 3GU |
R1‑1806963 | URLLC UCI prioritization | InterDigital, Inc. | imported from 3GU |
R1‑1806964 | Remaining issues on dynamic BWP switching | InterDigital, Inc. | imported from 3GU |
R1‑1806965 | Power Control for NE-DC (Option 4/4a) | InterDigital, Inc. | imported from 3GU |
R1‑1806966 | Timing and Asynchronous Transmissions with Power Control for NR DC | InterDigital, Inc. | imported from 3GU |
R1‑1806967 | Power Control for NR DC | InterDigital, Inc. | imported from 3GU |
R1‑1806968 | BWP operation in unlicensed spectrum | InterDigital, Inc. | imported from 3GU |
R1‑1806969 | A Fast Fading Model for S-Band Satellites in GOOD Link State | Dish Network | imported from 3GU |
R1‑180697 | - | - | - |
R1‑1806970 | Details of physical layer enhancements for IAB | AT&T | imported from 3GU |
R1‑1806971 | Remaining details of IAB evaluation methodology | AT&T | imported from 3GU |
R1‑1806972 | System level simulation results of IAB | AT&T | imported from 3GU |
R1‑1806973 | Further details on NR UE Feature List | AT&T | imported from 3GU |
R1‑1806974 | Remaining Issues of DMRS for NR | AT&T | imported from 3GU |
R1‑1806975 | Remaining Issues of Codeword Mapping | AT&T | imported from 3GU |
R1‑1806976 | Remaining Issues in CQI/MCS | AT&T | imported from 3GU |
R1‑1806977 | CQI/MCS Reporting for NR URLLC | AT&T | imported from 3GU |
R1‑1806978 | On the repetition of NR PDCCH for URLLC | AT&T | imported from 3GU |
R1‑1806979 | On Transmitter Side signal Processing for NOMA | AT&T | imported from 3GU |
R1‑180698 | - | - | - |
R1‑1806980 | Receiver techniques for NOMA | AT&T | imported from 3GU |
R1‑1806981 | On NOMA Procedures | AT&T | imported from 3GU |
R1‑1806982 | Link system performance for NOMA | AT&T | imported from 3GU |
R1‑1806983 | Remaining details of beam reporting | AT&T | imported from 3GU |
R1‑1806984 | Evaluation scenario and simulation assumptions | AT&T | imported from 3GU |
R1‑1806985 | Channel model for V2X | AT&T | imported from 3GU |
R1‑1806986 | Autonomous topology management for sidelink operation | AT&T | imported from 3GU |
R1‑1806987 | Frame structure for NR-U operation | AT&T | imported from 3GU |
R1‑1806988 | Physical layer channel design for NR-U | AT&T | imported from 3GU |
R1‑1806989 | Channel access enhancements for NR-U | AT&T | imported from 3GU |
R1‑180699 | - | - | - |
R1‑1806990 | Beam measurement for NR-U | AT&T | imported from 3GU |
R1‑1806991 | Discussion of SR collision with MPDCCH for CE Mode B | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806992 | SR collision with MPDCCH for CE Mode B | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806993 | Text proposal for LOS probability, path loss and shadow fading in TR38.811 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806994 | Remaining Details for Mode 4 support for V2X carrier aggregation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806995 | Remaining details of SL CA synchronization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806996 | Remaining Details for Support of 64QAM for LTE V2X sidelink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806997 | Resource pool sharing between mode-3 and mode-4 - remaining details | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806998 | Discussion on latency reduction for eV2X | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1806999 | eV2X UE capabilities | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180700 | - | - | - |
R1‑1807000 | Introduction of 10 ms sidelink SPS period | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807001 | Evaluation scenarios of new V2X use cases | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807002 | NR Unlicensed physical channel design considerations | Apple Inc. | imported from 3GU |
R1‑1807003 | NR Unlicensed channel access procedure considerations | Apple Inc. | imported from 3GU |
R1‑1807004 | Single Tx switched UL support for EN-DC in LTE TDD band | Apple Inc. | imported from 3GU |
R1‑1807005 | Enhancements for NR UE power saving | Apple Inc. | imported from 3GU |
R1‑1807006 | Clarification on Xp value determination for sTTI | InterDigital, Inc. | imported from 3GU |
R1‑1807007 | TBS determination for partial UL subframes | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1807008 | On Remaining Details of NR Synchronization Signal | InterDigital, Inc. | imported from 3GU |
R1‑1807009 | On Remaining Details of NR Physical Broadcast Signal and Channel | InterDigital, Inc. | imported from 3GU |
R1‑180701 | - | - | - |
R1‑1807010 | On Remaining Details of NR Paging Channel | InterDigital, Inc. | imported from 3GU |
R1‑1807011 | On Remaining Details of NR Physical Random Access Channel | InterDigital, Inc. | imported from 3GU |
R1‑1807012 | Remaining Details on Non-CB UL Transmission | InterDigital, Inc. | imported from 3GU |
R1‑1807013 | Remaining details on CSI reporting | InterDigital, Inc. | imported from 3GU |
R1‑1807014 | Remaining issues on beam management | InterDigital, Inc. | imported from 3GU |
R1‑1807015 | Remaining details on beam failure recovery | InterDigital, Inc. | imported from 3GU |
R1‑1807016 | On remaining aspects of search space | InterDigital, Inc. | imported from 3GU |
R1‑1807017 | Discussion on Pathloss Update during Beam Switch | InterDigital, Inc. | imported from 3GU |
R1‑1807018 | CQI and MCS Tables for NR URLLC | InterDigital, Inc. | imported from 3GU |
R1‑1807019 | Rain and Cloud Attenuation in NTN Channel Model | InterDigital, Inc. | imported from 3GU |
R1‑180702 | - | - | - |
R1‑1807020 | Simulation Results for PTRS Performance in NTN | InterDigital, Inc. | imported from 3GU |
R1‑1807021 | Implementation Aspects of Low Code Rate NOMA Schemes | InterDigital, Inc. | imported from 3GU |
R1‑1807022 | IDMA Receiver Performance Evaluation | InterDigital, Inc. | imported from 3GU |
R1‑1807023 | On Procedures for Non-orthogonal Multiple Access | InterDigital, Inc. | imported from 3GU |
R1‑1807024 | Link Level Evaluation of IDMA | InterDigital, Inc. | imported from 3GU |
R1‑1807025 | DMRS CHEST Error Model for NOMA Evaluation | InterDigital, Inc. | imported from 3GU |
R1‑1807026 | Remaining issues on system level simulations for NOMA | InterDigital, Inc. | imported from 3GU |
R1‑1807027 | Link Level mMTC Performance Comparison | InterDigital, Inc. | imported from 3GU |
R1‑1807028 | On Operations of Non-orthogonal Multiple Access | InterDigital, Inc. | imported from 3GU |
R1‑1807029 | On Collision Mitigation and Handling for Non-orthogonal Multiple Access | InterDigital, Inc. | imported from 3GU |
R1‑180703 | - | - | - |
R1‑1807030 | On Demodulation Reference Signal for Non-orthogonal Multiple Access | InterDigital, Inc. | imported from 3GU |
R1‑1807031 | Discussion on Remaining Issues of V2X Evaluation Scenarios | InterDigital, Inc. | imported from 3GU |
R1‑1807032 | On the Remaining Details of V2X Channel Model | InterDigital, Inc. | imported from 3GU |
R1‑1807033 | Simulation Calibration and Model Selection for NR-Unlicensed | InterDigital, Inc. | imported from 3GU |
R1‑1807034 | On NR-Unlicensed Frame Structure | InterDigital, Inc. | imported from 3GU |
R1‑1807035 | On UL Signals and Channels in NR-Unlicensed | InterDigital, Inc. | imported from 3GU |
R1‑1807036 | On NR-Unlicensed channel access procedures | InterDigital, Inc. | imported from 3GU |
R1‑1807037 | On Initial Access in NR-Unlicensed Spectrum | InterDigital, Inc. | imported from 3GU |
R1‑1807038 | Discussion on HARQ Procedure in NR-Unlicensed | InterDigital, Inc. | imported from 3GU |
R1‑1807039 | Discussion on Configured Grants in NR-Unlicensed | InterDigital, Inc. | imported from 3GU |
R1‑180704 | - | - | - |
R1‑1807040 | Discussion on Potential Waveform Solutions for NR Unlicensed | InterDigital, Inc. | imported from 3GU |
R1‑1807041 | UE Capabilities for Supporting URLLC | Ericsson Inc. | imported from 3GU |
R1‑1807042 | Assumptions on the number of CRC bits for UCI rate matching with segmentation | Huawei Technologies Co. Ltd. | imported from 3GU |
R1‑1807043 | Views on PUSCH sub-PRB allocation for MTC | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807044 | Views on UL HARQ-ACK feedback design for MTC | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807045 | On carrier aggregation using mode 4 resource selection | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807046 | Resource pool sharing between Mode-3 UE and Mode-4 UE | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807047 | Reducing the maximum time between packet arrival and selected resource for data transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807048 | Draft LS reply on simultaneous configuration of EN-DC and NR PUCCH Scell | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807049 | Remaining issues on Synchronization signal | NTT DOCOMO, INC. | imported from 3GU |
R1‑180705 | - | - | - |
R1‑1807050 | Remaining issues on NR-PBCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807051 | Remaining issues on RMSI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807052 | Remaining issues on Paging design | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807053 | Remaining issues on PRACH formats | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807054 | Remaining issues on RACH procedure | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807055 | Remaining issues on Measurement for mobility management | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807056 | Remaining issues on RLM for mobility management | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807057 | Remaining issues on TA related aspects | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807058 | Search space | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807059 | Search space for June drop URLLC | NTT DOCOMO, INC. | imported from 3GU |
R1‑180706 | - | - | - |
R1‑1807060 | Remaining issues on group-common PDCCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807061 | PUCCH structure in short-duration | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807062 | PUCCH structure in long-duration | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807063 | Maintenance of UCI multiplexing on PUSCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807064 | UCI multiplexing for June drop URLLC | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807065 | Resource allocation for PUCCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807066 | On PUSCH time-domain resource allocation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807067 | On HARQ-ACK feedback | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807068 | UL data transmission procedure | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807069 | UL data transmission procedure for June drop URLLC | NTT DOCOMO, INC. | imported from 3GU |
R1‑180707 | - | - | - |
R1‑1807070 | Other aspects on bandwidth Parts | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807071 | Remaining issues on CA and type1 HARQ-ACK codebook | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807072 | Further views on NR UE features | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807073 | Transmitter design of UGMA | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807074 | Receiver candidates for uplink NOMA transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807075 | Considerations on NOMA related procedures | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807076 | Discussion on comparison methodology and evaluations assumption for NOMA | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807077 | LLS calibration results for OMA | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807078 | Evaluation assumption for V2X phase 3 | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807079 | Channel model for V2X phase 3 | NTT DOCOMO, INC. | imported from 3GU |
R1‑180708 | - | - | - |
R1‑1807080 | Discussion on eV2X operation scenario | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807081 | DL Signals and Channels for NR-U operation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807082 | UL Signals and Channels for NR-U operation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807083 | Channel access procedures for NR-U operation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807084 | Evaluation results of Indoor Hotspot-eMBB for IMT-2020 self-evaluation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807085 | Evaluation results of dense urban-eMBB for IMT-2020 self-evaluation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807086 | Evaluation results of rural-eMBB for IMT-2020 self-evaluation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807087 | Preliminary evaluation results of mobility for IMT-2020 self-evaluation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807088 | Clarification on beta offset for more than 22 HARQ-Ack bits | Qualcomm Incorporated | imported from 3GU |
R1‑1807089 | Clarification on simultaneousAckNackAndCQI for format 4-5 and format 3 | Qualcomm Incorporated | imported from 3GU |
R1‑180709 | - | - | - |
R1‑1807090 | Clarification on PUCCH formats | Qualcomm Incorporated | imported from 3GU |
R1‑1807091 | Clarification on CSI-RS resource aggregation | Qualcomm Incorporated | imported from 3GU |
R1‑1807092 | On support of advanced CSI | Qualcomm Incorporated | imported from 3GU |
R1‑1807093 | Correction to timing advance | Qualcomm Incorporated | imported from 3GU |
R1‑1807094 | NPRS enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1807095 | Aspects related to interaction between different TTI lengths | Qualcomm Incorporated | imported from 3GU |
R1‑1807096 | Aspects related to DL control channel | Qualcomm Incorporated | imported from 3GU |
R1‑1807097 | Aspects related to UL control channel | Qualcomm Incorporated | imported from 3GU |
R1‑1807098 | Aspects related to DL data channel | Qualcomm Incorporated | imported from 3GU |
R1‑1807099 | Aspects related to UL data channel | Qualcomm Incorporated | imported from 3GU |
R1‑180710 | - | - | - |
R1‑1807100 | UE Categories for 1024QAM | Qualcomm Incorporated | imported from 3GU |
R1‑1807101 | Corrections for 1024QAM | Qualcomm Incorporated | imported from 3GU |
R1‑1807102 | Reduced system acquisition time | Qualcomm Incorporated | imported from 3GU |
R1‑1807103 | Physical layer aspects of early data transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1807104 | Remaining issues on wake-up signals for MTC | Qualcomm Incorporated | imported from 3GU |
R1‑1807105 | Remaining issues for sub-PRB allocation | Qualcomm Incorporated | imported from 3GU |
R1‑1807106 | Flexible allocation for PDSCH and PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑1807107 | Further discusion of Wake-up signal functions | Qualcomm Incorporated | imported from 3GU |
R1‑1807108 | Remaining issues on Wake-up signal configurations and procedures | Qualcomm Incorporated | imported from 3GU |
R1‑1807109 | Detailed design of Wake-up signal sequence | Qualcomm Incorporated | imported from 3GU |
R1‑180711 | - | - | - |
R1‑1807110 | Physical layer aspects of data transmission during random access procedure | Qualcomm Incorporated | imported from 3GU |
R1‑1807111 | Physical layer scheduling request | Qualcomm Incorporated | imported from 3GU |
R1‑1807112 | Support of SPS | Qualcomm Incorporated | imported from 3GU |
R1‑1807113 | NPRACH support for large cell access | Qualcomm Incorporated | imported from 3GU |
R1‑1807114 | NPRACH Reliability Enhancement | Qualcomm Incorporated | imported from 3GU |
R1‑1807115 | Remaining issues on downlink aspects of TDD NB-IoT | Qualcomm Incorporated | imported from 3GU |
R1‑1807116 | Remaining issues on uplink aspects of TDD NB-IoT | Qualcomm Incorporated | imported from 3GU |
R1‑1807117 | Remaining issues on common aspects of TDD NB-IoT | Qualcomm Incorporated | imported from 3GU |
R1‑1807118 | Coexistence with NR | Qualcomm Incorporated | imported from 3GU |
R1‑1807119 | Enhancements to cell search and system information acquisition | Qualcomm Incorporated | imported from 3GU |
R1‑180712 | - | - | - |
R1‑1807120 | Improvement of PHY measurements | Qualcomm Incorporated | imported from 3GU |
R1‑1807121 | Blind and HARQ-less Repetition for Scheduled DL-SCH Operation | Qualcomm Incorporated | imported from 3GU |
R1‑1807122 | Repetition Enhancements for UL SPS Operation | Qualcomm Incorporated | imported from 3GU |
R1‑1807123 | Capability for SRS antenna switching | Qualcomm Incorporated | imported from 3GU |
R1‑1807124 | Discussion on modulation enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1807125 | Support of CRS muting | Qualcomm Incorporated | imported from 3GU |
R1‑1807126 | Discussion on remaining issues of beam management | CHTTL | imported from 3GU |
R1‑1807127 | Remaining issues for codebook based transmission for UL MIMO | Huawei, HiSilicon | imported from 3GU |
R1‑1807128 | Further enhancements on CSI reporting and codebook design | Huawei, HiSilicon | imported from 3GU |
R1‑1807129 | [Draft] Reply LS on beam failure recovery | Huawei, HiSilicon | imported from 3GU |
R1‑180713 | - | - | - |
R1‑1807130 | Discussion on multi-TRP/panel transmission in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1807131 | Discussion on diversity based multi-TRP transmission in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1807132 | [Draft] Reply LS on Removing RLM-RS Restriction | Huawei, HiSilicon | imported from 3GU |
R1‑1807133 | [Draft] Reply LS on Removal of csi-RS-for-tracking from TCI-State | Huawei, HiSilicon | imported from 3GU |
R1‑1807134 | Remaining issues for SRS switching among CCs | Huawei, HiSilicon | imported from 3GU |
R1‑1807135 | Independent Power control for SRS | Huawei, HiSilicon | imported from 3GU |
R1‑1807136 | Remaining details of UL power control design for CA | Huawei, HiSilicon | imported from 3GU |
R1‑1807137 | Discussion on remaining issues of EDT for NB-IoT | Xiaomi Communications | imported from 3GU |
R1‑1807138 | Discussion on semi-static HARQ-ACK codebook when slot aggregation for UCI reliability | Huawei, HiSilicon | imported from 3GU |
R1‑1807139 | On minimum number of RX antennae for NR vehicular UEs | Huawei, HiSilicon | imported from 3GU |
R1‑180714 | - | - | - |
R1‑1807140 | Intra-UE UL multiplexing with different reliability requirements | III | imported from 3GU |
R1‑1807141 | Frame structure and numerology for NR-U | ITL | imported from 3GU |
R1‑1807142 | Initial access and mobility for NR-U | ITL | imported from 3GU |
R1‑1807143 | [DRAFT] LS reply on beam failure recovery | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807144 | Remaining issues on CSI reporting | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807145 | Remaining issues on beam management | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807146 | Remaining issues on beam recovery | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807147 | On Type II codebook enhancement | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807148 | Simultaneous reception of DL/UL physical channels and reference signals | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807149 | Remaining details on DM-RS | NTT DOCOMO, INC. | imported from 3GU |
R1‑180715 | - | - | - |
R1‑1807150 | Remaining details on PTRS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807151 | Remaining issues on group common TPC command | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807152 | Design of DL aspects for TDD support in feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1807153 | Design of common aspects for TDD support in feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1807154 | On UL power control enhancements for LTE Aerials | Ericsson | imported from 3GU |
R1‑1807155 | On specification for PC5 CA | Ericsson | imported from 3GU |
R1‑1807156 | Outdoor Sub-7 GHz RSSI Evaluation | Charter Communications | imported from 3GU |
R1‑1807157 | On PUCCH for NR-U | Charter Communications | imported from 3GU |
R1‑1807158 | HARQ Feedback Principles | Charter Communications | imported from 3GU |
R1‑1807159 | Remaining issues on beam recovery | ITRI | imported from 3GU |
R1‑180716 | - | - | - |
R1‑1807160 | Remaining issues on CORESET#0 | ITRI | imported from 3GU |
R1‑1807161 | Discussion on NR unlicensed band operation | ITRI | imported from 3GU |
R1‑1807162 | On the out-of-order HARQ-ACK support for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807163 | Virtual PHR derivation in some situations | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1807164 | NR-NTN Channel Modeling - Flat fading criteria | THALES | imported from 3GU |
R1‑1807165 | NR-NTN Channel Modeling - TP for methodology, atmospheric absorption, fast fading model and calibration | THALES | imported from 3GU |
R1‑1807166 | PUSCH repetitions enhancements for UL SPS | Intel Corporation | imported from 3GU |
R1‑1807167 | Discussion on NOMA schemes | Google Inc. | imported from 3GU |
R1‑1807168 | On Remaining issue of UCI multiplexing | Xiaomi Communications | imported from 3GU |
R1‑1807169 | Coding schemes for NOMA in mMTC | Google Inc. | imported from 3GU |
R1‑180717 | - | - | - |
R1‑1807170 | Open issues related to Synchronisation Signal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807171 | Remaining details related to SS/PBCH block | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807172 | Remaining issues on RMSI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807173 | On remaining details on Other System Information Delivery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807174 | On open issues on paging message delivery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807175 | Remaining issues on mobility measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807176 | Remaining Details on Radio Link Monitoring | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807177 | Initial active BWP definition for RMSI multiplexing pattern 2 and 3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807178 | Consideration on UE feature for DL MIMO layers | China Unicom | imported from 3GU |
R1‑1807179 | Remaining issues on CSI reporting | China Unicom | imported from 3GU |
R1‑180718 | - | - | - |
R1‑1807180 | Draft LS Response to RAN2 on beam failure recovery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807181 | Remaining issues on UL codebook based transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807182 | Remaining issues on non-codebook based UL-MIMO transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807183 | Remaining issues on CSI reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807184 | Remaining issues on beam management | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807185 | Remaining Details on Beam Recovery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807186 | Remaining Details on the CSI Framework | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807187 | Remaining Issue on Type II CSI Omission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807188 | On channels multiplexing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807189 | Decoupling DL and UL beam selection | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180719 | - | - | - |
R1‑1807190 | Discussion on DL and UL beam tracking | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807191 | Discussion on PUCCH Beam management | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807192 | Discussion on PUSCH Beam Indication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807193 | Joint L1-RSRP Beam Reporting for SSB and CSI-RS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807194 | On Spatial Relation between UL and DL Beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807195 | Common parameters on CSI-RS resource set configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807196 | Further comments on DM-RS for NR physical data channels | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807197 | Further comments on PT-RS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807198 | SRS resource configuration for antenna switching | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807199 | Remaining details of TRS design | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180720 | - | - | - |
R1‑1807200 | Discussion on eV2X evaluation scenarios | vivo | imported from 3GU |
R1‑1807201 | On the Motivation for Periodic Data Traffic Model | OnStar Europe | imported from 3GU |
R1‑1807202 | Remaining issues on UCI multiplexing on PUSCH | CATR | imported from 3GU |
R1‑1807203 | Further link level simulation results of non-orthogonal multiple-access schemes | CATR | imported from 3GU |
R1‑1807204 | Frame structure design in NR-U | CATR | imported from 3GU |
R1‑1807205 | Considerations on LBT in NR-U | CATR | imported from 3GU |
R1‑1807206 | Discussions on HARQ enhancement for NR-U | CATR | imported from 3GU |
R1‑1807207 | Considerations on Link Rate Adaptation for NOMA | TCL Communication Ltd. | imported from 3GU |
R1‑1807208 | SS/PBCH blocks transmission for NR unlicensed | Xiaomi Technology | imported from 3GU |
R1‑1807209 | Discussion on NOMA procedure | Google, Inc. | imported from 3GU |
R1‑180721 | - | - | - |
R1‑1807210 | Remaining issues on beam management | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1807211 | Remaining issues on beam failure recovery procedure | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1807212 | Correction of number of UL HARQ processes for shorter TTI and shortened processing time (36.213) - TP#1 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R1‑1807213 | Enabling transmit diversity fallback for DL TM 6 for shorter TTI (36.212, 36.213) - TP#2 | Nokia, Nokia Shanghai Bell, Ericsson, LG Electronics, Qualcomm, Intel | imported from 3GU |
R1‑1807214 | Enabling transmit diversity fallback for DL TM 8 for shorter TTI (36.212, 36.213) - TP#3 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R1‑1807215 | Enabling transmit diversity fallback for DL TM 9 and 10 for shorter TTI (36.211, 36.212, 36.213) - TP#4 | Nokia, Nokia Shanghai Bell, Ericsson, Qualcomm, LG Electronics | imported from 3GU |
R1‑1807216 | Changes to FS2 SRS triggering for shorter TTI (36.212, 36.213) - TP#5 | Nokia, Nokia Shanghai Bell, Ericsson, Huawei, HiSilicon, LG Electronics, Qualcomm | imported from 3GU |
R1‑1807217 | Corrections on DM-RS for slot PDSCH (36.211) - TP#6 | Nokia, Nokia Shanghai Bell, Ericsson, Huawei, HiSilicon, Qualcomm | imported from 3GU |
R1‑1807218 | Correction in 36.213 to TDD UL index based slot PUSCH scheduling - TP#8 | Nokia, Nokia Shanghai Bell, Ericsson, LG Electronics | imported from 3GU |
R1‑1807219 | On UL TPC initialization after UL shorter TTI configuration - TP#9 | Nokia, Nokia Shanghai Bell, LG Electronics | imported from 3GU |
R1‑180722 | - | - | - |
R1‑1807220 | Resource Pool Sharing between V2X Mode 3 and Mode 4 UEs | Fraunhofer HHI | imported from 3GU |
R1‑1807221 | Physical-layer aspects related to IAB | Ericsson | imported from 3GU |
R1‑1807222 | Discussion on procedures related to NOMA | KDDI Corporation | imported from 3GU |
R1‑1807223 | Design Considerations for NOMA Transmitter | Convida Wireless LLC | imported from 3GU |
R1‑1807224 | Duplexing options for IAB | Ericsson | imported from 3GU |
R1‑1807225 | Design Considerations for SSB in NR-U | Convida Wireless LLC | imported from 3GU |
R1‑1807226 | Node failure in AB half duplexing | Nanjing Ericsson Panda Com Ltd | imported from 3GU |
R1‑1807227 | Interference overview of IAB architecture | Ericsson | imported from 3GU |
R1‑1807228 | Discussion on UL pre-emption for URLLC reliability | Potevio | imported from 3GU |
R1‑1807229 | Discussion on SSB design for NR-U | Potevio | imported from 3GU |
R1‑180723 | - | - | - |
R1‑1807230 | Discussion on Procedures for LBT in NR-U | Convida Wireless LLC | imported from 3GU |
R1‑1807231 | Design Considerations for Network Assisted Channel Access | Convida Wireless LLC | imported from 3GU |
R1‑1807232 | Discussion on channel access for UL transmission with Mode-1 under UE’s power limitation | WILUS Inc. | imported from 3GU |
R1‑1807233 | Remaining issues on DCI contents and formats | WILUS Inc. | imported from 3GU |
R1‑1807234 | Remaining issues on long PUCCH over multiple slots | WILUS Inc. | imported from 3GU |
R1‑1807235 | Intra-UE UL multiplexing considering URLLC data in PUSCH | WILUS Inc. | imported from 3GU |
R1‑1807236 | Remaining issues on HARQ-ACK codebook construction | WILUS Inc. | imported from 3GU |
R1‑1807237 | Discussion on NR-U in Wider Band | Convida Wireless LLC | imported from 3GU |
R1‑1807238 | Remaining details on search space | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1807239 | Remaining details on DCI interpretation | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑180724 | - | - | - |
R1‑1807240 | Discussion on Channel Access Indication in NR-U | Convida Wireless LLC | imported from 3GU |
R1‑1807241 | Discussion about semi-static codebook | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1807242 | CR to 38.214: maintenance according to agreed Rel 15 features | Nokia | imported from 3GU |
R1‑1807243 | Discussions on handover in NTN | Sony | imported from 3GU |
R1‑1807244 | Initial link level simulation result of NOMA | Sony | imported from 3GU |
R1‑1807245 | Remaining issues in explicit uplink HARQ-ACK feedback | Sony | imported from 3GU |
R1‑1807246 | Remaining issues of PDCCH | Ericsson | imported from 3GU |
R1‑1807247 | Remaining issues of search space | Ericsson | imported from 3GU |
R1‑1807248 | Remaining issues of GC-PDCCH | Ericsson | imported from 3GU |
R1‑1807249 | Remaining issues of DCI | Ericsson | imported from 3GU |
R1‑180725 | - | - | - |
R1‑1807250 | On Improvements to the Search Space Design | Ericsson | imported from 3GU |
R1‑1807251 | On UCI Multiplexing on PUCCH | Ericsson | imported from 3GU |
R1‑1807252 | On PUCCH Remaining Issues | Ericsson | imported from 3GU |
R1‑1807253 | On UCI Multiplexing on PUSCH | Ericsson | imported from 3GU |
R1‑1807254 | On PUCCH Resource Allocation | Ericsson | imported from 3GU |
R1‑1807255 | Remaining issues for DL UL resource allocation | Ericsson | imported from 3GU |
R1‑1807256 | Remaining issues of DL Scheduling and Processing times | Ericsson | imported from 3GU |
R1‑1807257 | Remaining issues for CBG based HARQ | Ericsson | imported from 3GU |
R1‑1807258 | Remaining issues of UL data transmission procedure | Ericsson | imported from 3GU |
R1‑1807259 | Remaining issues of Soft buffer management | Ericsson | imported from 3GU |
R1‑180726 | - | - | - |
R1‑1807260 | Remaining issues of multiplexing data with different transmission durations | Ericsson | imported from 3GU |
R1‑1807261 | TP on remaining issues for DL UL resource allocation | Ericsson | imported from 3GU |
R1‑1807262 | Other aspects on carrier aggregation | Ericsson | imported from 3GU |
R1‑1807263 | Remaining issues for BWP operation | Ericsson | imported from 3GU |
R1‑1807264 | On remaining issues of NR-LTE co-existence | Ericsson | imported from 3GU |
R1‑1807265 | Remaining issues for NR power control | Ericsson | imported from 3GU |
R1‑1807266 | Remaining issues for LTE-NR power sharing | Ericsson | imported from 3GU |
R1‑1807267 | PUSCH power scaling in UL power control | Ericsson | imported from 3GU |
R1‑1807268 | SRS power scaling in UL power control | Ericsson | imported from 3GU |
R1‑1807269 | Remaining issues on closed loop power control | Ericsson | imported from 3GU |
R1‑180727 | - | - | - |
R1‑1807270 | Corrections to BWP Operation | III | imported from 3GU |
R1‑1807271 | Scheduling Aspects of TDD NB-IoT | III | imported from 3GU |
R1‑1807272 | Remaining details on synchronization for CA in V2X Phase 2 | ITL | imported from 3GU |
R1‑1807273 | PDSCH aspects of LTE-URLLC | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1807274 | Discussion on valid RACH occasions | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1807275 | Remaining details for Msg/2/3/4 transmission and reception | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1807276 | Remaining details for radio link monitoring | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1807277 | Remaining details for BWP operation | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1807278 | Remaining Details on non-CA NR UL power control | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1807279 | Remaining Details on CA-related NR UL power control | Motorola Mobility, Lenovo | imported from 3GU |
R1‑180728 | - | - | - |
R1‑1807280 | Remaining issues on resource allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807281 | On single Tx transmission timing in TDD LTE-NR D | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807282 | On UE features 3-1, 5-1, 5-1a, 6-1, 6-2 and capability to FDM slot and mini-slot | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807283 | On Evaluation of the Mobility Parameter for IMT-2020 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807284 | Spectral Efficiency Results for the IMT-2020 Self-Evaluation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807285 | IMT-2020 Reliability Evaluation Results (URLLC) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807286 | IMT-2020 Connection Density Evaluation Results (mMTC) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807287 | IMT-2020 self evaluation: Control plane latency | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807288 | IMT-2020 self evaluation: User plane latency | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807289 | IMT-2020 self evaluation: Network energy efficiency | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180729 | - | - | - |
R1‑1807290 | On the NOMA schemes | KT Corp. | imported from 3GU |
R1‑1807291 | Short CQI Reporting for EuCA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807292 | Discussions on DL DMRS | Mitsubishi Electric Co. | imported from 3GU |
R1‑1807293 | Discussions on multiplexing of different types of RSs | Mitsubishi Electric Co. | imported from 3GU |
R1‑1807294 | Discussions on intra-UE multiplexing between URLLC and eMBB | Mitsubishi Electric Co. | imported from 3GU |
R1‑1807295 | Remaining issues on DL DMRS | KT Corp. | imported from 3GU |
R1‑1807296 | Correction on PUCCH configuration with CEModeA or CEModeB | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
R1‑1807297 | Miscellaneous corrections to SPUCCH (36.213) | Ericsson, LG Electronics, Qualcomm | imported from 3GU |
R1‑1807298 | Correction to the derivation of the number of bits for Rank Indication | Ericsson | imported from 3GU |
R1‑1807299 | Text proposal on TPC timing with DCI format 3/3A and short TTI operation | Ericsson, Nokia, Nokia Shanghai Bell, Qualcomm | imported from 3GU |
R1‑180730 | - | - | - |
R1‑1807300 | RLM for URLLC | Ericsson | imported from 3GU |
R1‑1807301 | Analysis of Uplink SPS solutions for URLLC | Ericsson | imported from 3GU |
R1‑1807302 | Remaining details on URLLC techniques for PDSCH | Ericsson | imported from 3GU |
R1‑1807303 | Reply LS on RLM Qin/Qout Targets for URLLC | Ericsson | imported from 3GU |
R1‑1807304 | Considerations on HARQ operation for NR-U | KT Corp. | imported from 3GU |
R1‑1807305 | Consideration on PDCCH monitoring occasion and number of monitored DCIs | Huawei, HiSilicon | imported from 3GU |
R1‑1807306 | Design considerations for UE power saving | Huawei, HiSilicon | imported from 3GU |
R1‑1807307 | On CGS ordering for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1807308 | Draft reply LS on MSG3 size for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1807309 | Introduction of further enhancements of NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑180731 | - | - | - |
R1‑1807310 | Introduction of even further enhancements of eMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1807311 | Correction on RV determination for eVoLTE | Huawei, HiSilicon, CMCC | imported from 3GU |
R1‑1807312 | Corrections on timing from sPDSCH to HARQ-ACK for SSC3,4,8 | Huawei, HiSilicon,Ericsson,Nokia, Nokia Shanghai Bell, LG Electronics | imported from 3GU |
R1‑1807313 | Corrections on HARQ-ACK reporting procedure for FS2 with sTTI | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, LG Electronics | imported from 3GU |
R1‑1807314 | Text proposal on TBS determination for uplink DMRS position pattern DDD | Huawei, HiSilicon, Qualcomm | imported from 3GU |
R1‑1807315 | Text proposal on TBS determination for downlink pattern DDD | Huawei, HiSilicon | imported from 3GU |
R1‑1807316 | Corrections on TBS determination for more than 1 layer | Huawei, HiSilicon, Ericsson | imported from 3GU |
R1‑1807317 | Corrections on DAI in 36.212 | Huawei, HiSilicon | imported from 3GU |
R1‑1807318 | Additional DMRS position pattern for subslot #5 | Huawei, HiSilicon, Qualcomm | imported from 3GU |
R1‑1807319 | Text proposal on UL resource allocation | Huawei, HiSilicon, Qualcomm | imported from 3GU |
R1‑180732 | - | - | - |
R1‑1807320 | Correction on DL subslot pattern determination | Huawei, HiSilicon, Ericsson, Nokia, Nokia Shanghai Bell, LG Electronics | imported from 3GU |
R1‑1807321 | On modulation for sTTI operation | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, LG Electronics | imported from 3GU |
R1‑1807322 | Correction on SPUCCH coverage | Huawei, HiSilicon, Qualcomm | imported from 3GU |
R1‑1807323 | Corrections on HARQ-ACK reporting procedure for FS2 with sTTI | Huawei, HiSilicon | imported from 3GU |
R1‑1807324 | Discussion on the Reliability Enhancement for Grant-free Transmission | China Telecommunications | imported from 3GU |
R1‑1807325 | Discussion on the Reliability Enhancement for Grant-free Transmission | China Telecommunications | imported from 3GU |
R1‑1807326 | Discussion on the Reliability Enhancement for Grant-free Transmission | China Telecommunications | imported from 3GU |
R1‑1807327 | Discussion on outdoor network topology for sub-7GHz coexistence evaluations between NR-U and Wi-Fi | BROADCOM | imported from 3GU |
R1‑1807328 | Remaining details on synchronization signal design | Qualcomm Incorporated | imported from 3GU |
R1‑1807329 | Remaining details on NR-PBCH | Qualcomm Incorporated | imported from 3GU |
R1‑180733 | - | - | - |
R1‑1807330 | Remaining system information delivery consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1807331 | Paging design consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1807332 | Remaining details on PRACH formats | Qualcomm Incorporated | imported from 3GU |
R1‑1807333 | Remaining details on RACH procedure | Qualcomm Incorporated | imported from 3GU |
R1‑1807334 | Remaining details on measurement for mobility management | Qualcomm Incorporated | imported from 3GU |
R1‑1807335 | Radio link monitoring consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1807336 | Remaining details on Timing advance granularity and adjustment consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1807337 | Maintenance for codebook based UL transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1807338 | Maintenance for non-codebook based UL transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1807339 | Maintenance for CSI measurement | Qualcomm Incorporated | imported from 3GU |
R1‑180734 | - | - | - |
R1‑1807340 | Maintenance for CSI reporting | Qualcomm Incorporated | imported from 3GU |
R1‑1807341 | Beam management for NR | Qualcomm Incorporated | imported from 3GU |
R1‑1807342 | Beam recovery procedures | Qualcomm Incorporated | imported from 3GU |
R1‑1807343 | Remaining Issues in MCS | Qualcomm Incorporated | imported from 3GU |
R1‑1807344 | Details on simultaneous reception of PHY channels and RS in FR2 | Qualcomm Incorporated | imported from 3GU |
R1‑1807345 | Maintenance for Multiplexing of RS | Qualcomm Incorporated | imported from 3GU |
R1‑1807346 | Maintenance for on CSI-RS | Qualcomm Incorporated | imported from 3GU |
R1‑1807347 | Maintenance for DMRS | Qualcomm Incorporated | imported from 3GU |
R1‑1807348 | PTRS considerations | Qualcomm Incorporated | imported from 3GU |
R1‑1807349 | Maintenance for SRS | Qualcomm Incorporated | imported from 3GU |
R1‑180735 | - | - | - |
R1‑1807350 | Remaining issues on TRS | Qualcomm Incorporated | imported from 3GU |
R1‑1807351 | Remaining details on QCL | Qualcomm Incorporated | imported from 3GU |
R1‑1807352 | Remaining issues on PDCCH structure | Qualcomm Incorporated | imported from 3GU |
R1‑1807353 | Remaining issues on control resource set and search space | Qualcomm Incorporated | imported from 3GU |
R1‑1807354 | Remaining issues for slot format indication | Qualcomm Incorporated | imported from 3GU |
R1‑1807355 | Discussion on DCI related issues | Qualcomm Incorporated | imported from 3GU |
R1‑1807356 | Considerations on a new DCI format for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1807357 | Remaining issues for short PUCCH | Qualcomm Incorporated | imported from 3GU |
R1‑1807358 | Remaining issues for long PUCCH | Qualcomm Incorporated | imported from 3GU |
R1‑1807359 | Remaining issues for overlapping UL transmissions | Qualcomm Incorporated | imported from 3GU |
R1‑180736 | - | - | - |
R1‑1807360 | Handling UCI on PUSCH for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1807361 | Remaining issues for resource allocation for PUCCH | Qualcomm Incorporated | imported from 3GU |
R1‑1807362 | Considerations for URLLC resource allocation for PUCCH | Qualcomm Incorporated | imported from 3GU |
R1‑1807363 | Remaining Issues on DL/UL resource allocation | Qualcomm Incorporated | imported from 3GU |
R1‑1807364 | Remaining Issues on DL/UL Scheduling, Processing Time and HARQ management | Qualcomm Incorporated | imported from 3GU |
R1‑1807365 | On UE Capability #2 Processing Time | Qualcomm Incorporated | imported from 3GU |
R1‑1807366 | Considerations on short periodicities of DL SPS for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1807367 | Considerations on differentiating eMBB and URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1807368 | Remaining issues on BWP | Qualcomm Incorporated | imported from 3GU |
R1‑1807369 | Remaining issues on CA | Qualcomm Incorporated | imported from 3GU |
R1‑180737 | - | - | - |
R1‑1807370 | Remaining issues on PDSCH rate matching in CORESET | Qualcomm Incorporated | imported from 3GU |
R1‑1807371 | Remaining issues on coexistence | Qualcomm Incorporated | imported from 3GU |
R1‑1807372 | Remaining issues on power control for NR | Qualcomm Incorporated | imported from 3GU |
R1‑1807373 | Remaining Issues on power control for NR CA | Qualcomm Incorporated | imported from 3GU |
R1‑1807374 | NR Features and Capabilities | Qualcomm Incorporated | imported from 3GU |
R1‑1807375 | Signaling aspects for UE capabilities | Qualcomm Incorporated | imported from 3GU |
R1‑1807376 | Considerations for CQI and MCS for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1807377 | Transmitter side signaling processing schemes for NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑1807378 | Receivers for NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑1807379 | Procedures related to NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑180738 | - | - | - |
R1‑1807380 | System level evaluation for NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑1807381 | Link level evaluation for NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑1807382 | Traffic models for NR V2X evaluation scenarios | Qualcomm Incorporated | imported from 3GU |
R1‑1807383 | TR38.889 v0.0.2 | Qualcomm Incorporated | imported from 3GU |
R1‑1807384 | Email discussion summary for sub7 indoor evalution calibration | Qualcomm Incorporated | imported from 3GU |
R1‑1807385 | Simulation methodology for NR unlicensed | Qualcomm Incorporated | imported from 3GU |
R1‑1807386 | Frame structure for NR-U operation | Qualcomm Incorporated | imported from 3GU |
R1‑1807387 | DL signals and channels for NR-U | Qualcomm Incorporated | imported from 3GU |
R1‑1807388 | UL signals and channels for NR-U | Qualcomm Incorporated | imported from 3GU |
R1‑1807389 | Channel access procedure for NR-U | Qualcomm Incorporated | imported from 3GU |
R1‑180739 | - | - | - |
R1‑1807390 | Initial access and mobility for NR-U | Qualcomm Incorporated | imported from 3GU |
R1‑1807391 | Potential HARQ enhancements for NR-U | Qualcomm Incorporated | imported from 3GU |
R1‑1807392 | Potential enhancements to configured grants for NR-U | Qualcomm Incorporated | imported from 3GU |
R1‑1807393 | Enhancements to support NR backhaul links | Qualcomm Incorporated | imported from 3GU |
R1‑1807394 | Evaluation methodology for NR IAB | Qualcomm Incorporated | imported from 3GU |
R1‑1807395 | Inter-IAB-node discovery | Qualcomm Incorporated | imported from 3GU |
R1‑1807396 | Network synchronization for multi-hop IAB | Qualcomm Incorporated | imported from 3GU |
R1‑1807397 | Draft Response LS on Coexistence of NR-NR and NR-LTE networks | Qualcomm Incorporated | imported from 3GU |
R1‑1807398 | Remaining details on QCL | Qualcomm Incorporated | imported from 3GU |
R1‑1807399 | Remaining issues on CA | Qualcomm Incorporated | imported from 3GU |
R1‑180740 | - | - | - |
R1‑1807400 | Rel-15 LTE modulation enhancements | Ericsson | imported from 3GU |
R1‑1807401 | Introduction of V2X Phase 2 based on LTE | Huawei | imported from 3GU |
R1‑1807402 | UE capability on number of antenna ports for advanced CSI | Ericsson Inc. | imported from 3GU |
R1‑1807403 | Introduction Rel-15 Further NB-IoT enhancements | Ericsson | imported from 3GU |
R1‑1807404 | Remaining details on NR PUSCH power control | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807405 | Remaining Issue of Channel Coding | Ericsson Inc. | imported from 3GU |
R1‑1807406 | Discussion on Multiplexing UL Transmissions with Different Reliabilities | TCL Communication Ltd. | imported from 3GU |
R1‑1807407 | Latency reduction for eV2X | OPPO | imported from 3GU |
R1‑1807408 | Introduction of eV2X | ETSI | imported from 3GU |
R1‑1807409 | Introduction of Even Further Enhanced MTC for LTE | ETSI | imported from 3GU |
R1‑180741 | - | - | - |
R1‑1807410 | Introduction Rel-15 Further NB-IoT enhancements | ETSI | imported from 3GU |
R1‑1807411 | Addition of V2X Phase 2 based on LTE in 36.213, s14 | Motorola Mobility, LG Electronics | imported from 3GU |
R1‑1807412 | Remaining issues for DL UL resource allocation | Ericsson | imported from 3GU |
R1‑1807413 | Remaining issues on PDCCH structure | Qualcomm Incorporated | imported from 3GU |
R1‑1807414 | Introduction of V2X Phase 2 enhancements into 36.201 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807415 | Remaining issues on CA and type1 HARQ-ACK codebook | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807416 | Summary of views on CSI reporting v1 | Ericsson | imported from 3GU |
R1‑1807417 | On remaining issues of RACH procedure | MediaTek Inc. | imported from 3GU |
R1‑1807418 | Support of CRS muting | Qualcomm Incorporated, MediaTek | imported from 3GU |
R1‑1807419 | Remaining Issues on RMSI | CATT | imported from 3GU |
R1‑180742 | - | - | - |
R1‑1807420 | void | ETSI | imported from 3GU |
R1‑1807421 | void | ETSI | imported from 3GU |
R1‑1807422 | void | ETSI | imported from 3GU |
R1‑1807423 | void | ETSI | imported from 3GU |
R1‑1807424 | void | ETSI | imported from 3GU |
R1‑1807425 | void | ETSI | imported from 3GU |
R1‑1807426 | void | ETSI | imported from 3GU |
R1‑1807427 | void | ETSI | imported from 3GU |
R1‑1807428 | void | ETSI | imported from 3GU |
R1‑1807429 | void | ETSI | imported from 3GU |
R1‑180743 | - | - | - |
R1‑1807430 | void | ETSI | imported from 3GU |
R1‑1807431 | void | ETSI | imported from 3GU |
R1‑1807432 | void | ETSI | imported from 3GU |
R1‑1807433 | void | ETSI | imported from 3GU |
R1‑1807434 | void | ETSI | imported from 3GU |
R1‑1807435 | void | ETSI | imported from 3GU |
R1‑1807436 | void | ETSI | imported from 3GU |
R1‑1807437 | void | ETSI | imported from 3GU |
R1‑1807438 | void | ETSI | imported from 3GU |
R1‑1807439 | void | ETSI | imported from 3GU |
R1‑180744 | - | - | - |
R1‑1807440 | void | ETSI | imported from 3GU |
R1‑1807441 | void | ETSI | imported from 3GU |
R1‑1807442 | void | ETSI | imported from 3GU |
R1‑1807443 | void | ETSI | imported from 3GU |
R1‑1807444 | void | ETSI | imported from 3GU |
R1‑1807445 | void | ETSI | imported from 3GU |
R1‑1807446 | void | ETSI | imported from 3GU |
R1‑1807447 | void | ETSI | imported from 3GU |
R1‑1807448 | void | ETSI | imported from 3GU |
R1‑1807449 | void | ETSI | imported from 3GU |
R1‑180745 | - | - | - |
R1‑1807450 | void | ETSI | imported from 3GU |
R1‑1807451 | void | ETSI | imported from 3GU |
R1‑1807452 | void | ETSI | imported from 3GU |
R1‑1807453 | void | ETSI | imported from 3GU |
R1‑1807454 | void | ETSI | imported from 3GU |
R1‑1807455 | void | ETSI | imported from 3GU |
R1‑1807456 | void | ETSI | imported from 3GU |
R1‑1807457 | void | ETSI | imported from 3GU |
R1‑1807458 | void | ETSI | imported from 3GU |
R1‑1807459 | void | ETSI | imported from 3GU |
R1‑180746 | - | - | - |
R1‑1807460 | void | ETSI | imported from 3GU |
R1‑1807461 | void | ETSI | imported from 3GU |
R1‑1807462 | void | ETSI | imported from 3GU |
R1‑1807463 | void | ETSI | imported from 3GU |
R1‑1807464 | void | ETSI | imported from 3GU |
R1‑1807465 | void | ETSI | imported from 3GU |
R1‑1807466 | void | ETSI | imported from 3GU |
R1‑1807467 | void | ETSI | imported from 3GU |
R1‑1807468 | void | ETSI | imported from 3GU |
R1‑1807469 | void | ETSI | imported from 3GU |
R1‑180747 | - | - | - |
R1‑1807470 | void | ETSI | imported from 3GU |
R1‑1807471 | void | ETSI | imported from 3GU |
R1‑1807472 | void | ETSI | imported from 3GU |
R1‑1807473 | void | ETSI | imported from 3GU |
R1‑1807474 | void | ETSI | imported from 3GU |
R1‑1807475 | void | ETSI | imported from 3GU |
R1‑1807476 | void | ETSI | imported from 3GU |
R1‑1807477 | void | ETSI | imported from 3GU |
R1‑1807478 | void | ETSI | imported from 3GU |
R1‑1807479 | void | ETSI | imported from 3GU |
R1‑180748 | - | - | - |
R1‑1807480 | void | ETSI | imported from 3GU |
R1‑1807481 | void | ETSI | imported from 3GU |
R1‑1807482 | void | ETSI | imported from 3GU |
R1‑1807483 | void | ETSI | imported from 3GU |
R1‑1807484 | void | ETSI | imported from 3GU |
R1‑1807485 | void | ETSI | imported from 3GU |
R1‑1807486 | void | ETSI | imported from 3GU |
R1‑1807487 | void | ETSI | imported from 3GU |
R1‑1807488 | void | ETSI | imported from 3GU |
R1‑1807489 | void | ETSI | imported from 3GU |
R1‑180749 | - | - | - |
R1‑1807490 | void | ETSI | imported from 3GU |
R1‑1807491 | void | ETSI | imported from 3GU |
R1‑1807492 | void | ETSI | imported from 3GU |
R1‑1807493 | void | ETSI | imported from 3GU |
R1‑1807494 | void | ETSI | imported from 3GU |
R1‑1807495 | void | ETSI | imported from 3GU |
R1‑1807496 | void | ETSI | imported from 3GU |
R1‑1807497 | void | ETSI | imported from 3GU |
R1‑1807498 | void | ETSI | imported from 3GU |
R1‑1807499 | void | ETSI | imported from 3GU |
R1‑180750 | - | - | - |
R1‑1807500 | void | ETSI | imported from 3GU |
R1‑1807501 | void | ETSI | imported from 3GU |
R1‑1807502 | void | ETSI | imported from 3GU |
R1‑1807503 | void | ETSI | imported from 3GU |
R1‑1807504 | void | ETSI | imported from 3GU |
R1‑1807505 | void | ETSI | imported from 3GU |
R1‑1807506 | void | ETSI | imported from 3GU |
R1‑1807507 | void | ETSI | imported from 3GU |
R1‑1807508 | void | ETSI | imported from 3GU |
R1‑1807509 | void | ETSI | imported from 3GU |
R1‑180751 | - | - | - |
R1‑1807510 | void | ETSI | imported from 3GU |
R1‑1807511 | void | ETSI | imported from 3GU |
R1‑1807512 | void | ETSI | imported from 3GU |
R1‑1807513 | void | ETSI | imported from 3GU |
R1‑1807514 | void | ETSI | imported from 3GU |
R1‑1807515 | void | ETSI | imported from 3GU |
R1‑1807516 | void | ETSI | imported from 3GU |
R1‑1807517 | void | ETSI | imported from 3GU |
R1‑1807518 | void | ETSI | imported from 3GU |
R1‑1807519 | void | ETSI | imported from 3GU |
R1‑180752 | - | - | - |
R1‑1807520 | void | ETSI | imported from 3GU |
R1‑1807521 | void | ETSI | imported from 3GU |
R1‑1807522 | void | ETSI | imported from 3GU |
R1‑1807523 | void | ETSI | imported from 3GU |
R1‑1807524 | void | ETSI | imported from 3GU |
R1‑1807525 | void | ETSI | imported from 3GU |
R1‑1807526 | void | ETSI | imported from 3GU |
R1‑1807527 | void | ETSI | imported from 3GU |
R1‑1807528 | void | ETSI | imported from 3GU |
R1‑1807529 | void | ETSI | imported from 3GU |
R1‑180753 | - | - | - |
R1‑1807530 | void | ETSI | imported from 3GU |
R1‑1807531 | void | ETSI | imported from 3GU |
R1‑1807532 | void | ETSI | imported from 3GU |
R1‑1807533 | void | ETSI | imported from 3GU |
R1‑1807534 | void | ETSI | imported from 3GU |
R1‑1807535 | void | ETSI | imported from 3GU |
R1‑1807536 | void | ETSI | imported from 3GU |
R1‑1807537 | void | ETSI | imported from 3GU |
R1‑1807538 | void | ETSI | imported from 3GU |
R1‑1807539 | void | ETSI | imported from 3GU |
R1‑180754 | - | - | - |
R1‑1807540 | void | ETSI | imported from 3GU |
R1‑1807541 | void | ETSI | imported from 3GU |
R1‑1807542 | void | ETSI | imported from 3GU |
R1‑1807543 | void | ETSI | imported from 3GU |
R1‑1807544 | void | ETSI | imported from 3GU |
R1‑1807545 | void | ETSI | imported from 3GU |
R1‑1807546 | void | ETSI | imported from 3GU |
R1‑1807547 | void | ETSI | imported from 3GU |
R1‑1807548 | void | ETSI | imported from 3GU |
R1‑1807549 | void | ETSI | imported from 3GU |
R1‑180755 | - | - | - |
R1‑1807550 | void | ETSI | imported from 3GU |
R1‑1807551 | void | ETSI | imported from 3GU |
R1‑1807552 | void | ETSI | imported from 3GU |
R1‑1807553 | void | ETSI | imported from 3GU |
R1‑1807554 | void | ETSI | imported from 3GU |
R1‑1807555 | void | ETSI | imported from 3GU |
R1‑1807556 | void | ETSI | imported from 3GU |
R1‑1807557 | void | ETSI | imported from 3GU |
R1‑1807558 | void | ETSI | imported from 3GU |
R1‑1807559 | void | ETSI | imported from 3GU |
R1‑180756 | - | - | - |
R1‑1807560 | void | ETSI | imported from 3GU |
R1‑1807561 | void | ETSI | imported from 3GU |
R1‑1807562 | void | ETSI | imported from 3GU |
R1‑1807563 | void | ETSI | imported from 3GU |
R1‑1807564 | void | ETSI | imported from 3GU |
R1‑1807565 | void | ETSI | imported from 3GU |
R1‑1807566 | void | ETSI | imported from 3GU |
R1‑1807567 | void | ETSI | imported from 3GU |
R1‑1807568 | void | ETSI | imported from 3GU |
R1‑1807569 | void | ETSI | imported from 3GU |
R1‑180757 | - | - | - |
R1‑1807570 | void | ETSI | imported from 3GU |
R1‑1807571 | void | ETSI | imported from 3GU |
R1‑1807572 | void | ETSI | imported from 3GU |
R1‑1807573 | void | ETSI | imported from 3GU |
R1‑1807574 | void | ETSI | imported from 3GU |
R1‑1807575 | void | ETSI | imported from 3GU |
R1‑1807576 | void | ETSI | imported from 3GU |
R1‑1807577 | void | ETSI | imported from 3GU |
R1‑1807578 | void | ETSI | imported from 3GU |
R1‑1807579 | void | ETSI | imported from 3GU |
R1‑180758 | - | - | - |
R1‑1807580 | void | ETSI | imported from 3GU |
R1‑1807581 | void | ETSI | imported from 3GU |
R1‑1807582 | void | ETSI | imported from 3GU |
R1‑1807583 | void | ETSI | imported from 3GU |
R1‑1807584 | void | ETSI | imported from 3GU |
R1‑1807585 | void | ETSI | imported from 3GU |
R1‑1807586 | void | ETSI | imported from 3GU |
R1‑1807587 | void | ETSI | imported from 3GU |
R1‑1807588 | void | ETSI | imported from 3GU |
R1‑1807589 | void | ETSI | imported from 3GU |
R1‑180759 | - | - | - |
R1‑1807590 | void | ETSI | imported from 3GU |
R1‑1807591 | void | ETSI | imported from 3GU |
R1‑1807592 | void | ETSI | imported from 3GU |
R1‑1807593 | void | ETSI | imported from 3GU |
R1‑1807594 | void | ETSI | imported from 3GU |
R1‑1807595 | void | ETSI | imported from 3GU |
R1‑1807596 | void | ETSI | imported from 3GU |
R1‑1807597 | void | ETSI | imported from 3GU |
R1‑1807598 | void | ETSI | imported from 3GU |
R1‑1807599 | void | ETSI | imported from 3GU |
R1‑180760 | - | - | - |
R1‑1807600 | Summary of RAN1#93 Tdocs on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1807601 | Discussion on NOMA schemes | Google Inc. | imported from 3GU |
R1‑1807602 | Summary of SRS | Sony | imported from 3GU |
R1‑1807603 | Remaining issues on RACH procedure | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807604 | Remaining issues on UCI multiplexing on PUSCH | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1807605 | PTRS considerations | Qualcomm Incorporated | imported from 3GU |
R1‑1807606 | LLS calibration results for OMA | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807607 | Summary of 7.1.1.1 Synchronization signal | Ericsson | imported from 3GU |
R1‑1807608 | Summary of 7.1.1.2.1 NR-PBCH | Ericsson | imported from 3GU |
R1‑1807609 | IMT 2020 Evaluations: On eMBB spectral efficiency with NR | Ericsson | imported from 3GU |
R1‑180761 | - | - | - |
R1‑1807610 | Remaining issues on beam management | LG Electronics | imported from 3GU |
R1‑1807611 | Remaining issues on CSI reporting | China Unicom | imported from 3GU |
R1‑1807612 | Discussion on antenna radiation pattern for vehicle UE | LG Electronics, OnStar | imported from 3GU |
R1‑1807613 | Vehicle UE Antenna Radiation Patterns | OnStar Europe | imported from 3GU |
R1‑1807614 | LS on Removal of LTE specific terminology from Group Communication System Enablers TS 22.468 | SA1, Nokia | imported from 3GU |
R1‑1807615 | On selected MIMO UE features | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807616 | NR Features and Capabilities | Qualcomm Incorporated | imported from 3GU |
R1‑1807617 | Summary on CA aspects | Samsung | imported from 3GU |
R1‑1807618 | On selected MIMO UE features | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807619 | Summary of 7.1.1.2.3 Other system information delivery | Samsung | imported from 3GU |
R1‑180762 | - | - | - |
R1‑1807620 | Consideration on CQI and MCS tables for NR URLLC | Spreadtrum Communications | imported from 3GU |
R1‑1807621 | Remaining issues on beam recovery | NTT DOCOMO, INC. | imported from 3GU |
R1‑1807622 | Summary of 7.1.3.3.1 (resource allocation) | Ericsson | imported from 3GU |
R1‑1807623 | Summary of 7.1.3.1.4 (DCI content) | Ericsson | imported from 3GU |
R1‑1807624 | Remaining details on GC PDCCH and dynamic SFI | Intel Corporation | imported from 3GU |
R1‑1807625 | Feature lead summary for beam measurement and reporting | Ericsson | imported from 3GU |
R1‑1807626 | Remaining issues of UL power control | MediaTek Inc. | imported from 3GU |
R1‑1807627 | LS on L2 measurement specification for NR in R15 | SA5, Ericsson | imported from 3GU |
R1‑1807628 | Summary of Discussion for NR RRM measurements | Intel Corporation | imported from 3GU |
R1‑1807629 | Summary of Discussion for NR Radio Link Monitoring | Intel Corporation | imported from 3GU |
R1‑180763 | - | - | - |
R1‑1807630 | Review Summary for Al 7.1.3.2.2 PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1807631 | Outcome offline discussion on PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1807632 | Summary of Remaining details on PRACH formats | Convida Wireless | imported from 3GU |
R1‑1807633 | Summary of Remaining Details on RACH Procedure | Qualcomm Incorporated | imported from 3GU |
R1‑1807634 | Maintenance for CSI reporting | Qualcomm Incorporated | imported from 3GU |
R1‑1807635 | Summary of open issues related to rate-matching in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807636 | Offline summary for AI 7.1.3.1.1 PDCCH structure | NTT DOCOMO | imported from 3GU |
R1‑1807637 | Offline summary for AI 7.1.3.1.1 PDCCH structure for URLLC | NTT DOCOMO | imported from 3GU |
R1‑1807638 | Offline summary for AI 7.1.3.1.2 Search space | NTT DOCOMO | imported from 3GU |
R1‑1807639 | Offline summary for AI 7.1.3.1.2 Search space for URLLC | NTT DOCOMO | imported from 3GU |
R1‑180764 | - | - | - |
R1‑1807640 | Offline summary for UL data transmission procedure | NTT DOCOMO | imported from 3GU |
R1‑1807641 | Offline summary for UL data transmission procedure for June drop URLLC | NTT DOCOMO | imported from 3GU |
R1‑1807642 | Evaluation Methodology for NR IAB | Samsung | imported from 3GU |
R1‑1807643 | Offline summary for Al 7.1.1.3 on Paging | Huawei | imported from 3GU |
R1‑1807644 | Summary of TA related aspects | Panasonic | imported from 3GU |
R1‑1807645 | Summary on proposals for offline discussion on GC-PDCCH for SFI | Qualcomm | imported from 3GU |
R1‑1807646 | Summary of 7.1.3.3.6 – URLLC related aspects | vivo | imported from 3GU |
R1‑1807647 | Summary of PRB bundling for DL | vivo | imported from 3GU |
R1‑1807648 | Summary of views on CSI reporting v2 | Ericsson | imported from 3GU |
R1‑1807649 | Summary for CQI and MCS | AT&T | imported from 3GU |
R1‑180765 | - | - | - |
R1‑1807650 | Reply LS on messagePowerOffsetGroupB | RAN1, Ericsson | imported from 3GU |
R1‑1807651 | Reply LS on formula or table for L1 data rate | RAN1, Intel Corporation | imported from 3GU |
R1‑1807652 | Remaining Issues on DL/UL resource allocation | Qualcomm Incorporated | imported from 3GU |
R1‑1807653 | Summary for AI 7.1.6.1 NR UL power control in non-CA aspects | ZTE | imported from 3GU |
R1‑1807654 | Summary of remaining issues on CSI measurement | ZTE | imported from 3GU |
R1‑1807655 | Draft LS reply on Coexistence of NR-NR and NR-LTE networks with synchronised, unsynchronised and semi-synchronised operation in 3400-3800 MHz | Huawei | imported from 3GU |
R1‑1807656 | Feature lead summary of CSI-RS #0 | Huawei, HiSilicon | imported from 3GU |
R1‑1807657 | Feature lead summary of remaining issues for RS multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1807658 | Feature lead summary 1 of PT-RS | Ericsson | imported from 3GU |
R1‑1807659 | Feature lead summary 2 of PT-RS | Ericsson | imported from 3GU |
R1‑180766 | - | - | - |
R1‑1807660 | Summary of NR UL Power Control - CA/DC aspects | Samsung | imported from 3GU |
R1‑1807661 | Summary 1 on Remaining issues on Beam Failure Recovery | MediaTek Inc. | imported from 3GU |
R1‑1807662 | Summary of overlapped PUCCH resources | Ericsonn | imported from 3GU |
R1‑1807663 | Summary of URLLC contributions | Ericsson | imported from 3GU |
R1‑1807664 | Feature lead summary on QCL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807665 | Consideration on HARQ Impact for NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807666 | WF on evaluation methodology for use case ‘tethering via vehicle’ | NTT DOCOMO, AT&T | imported from 3GU |
R1‑1807667 | Summary of bandwidth part remaining issues | MediaTek | imported from 3GU |
R1‑1807668 | Summary #1 for TRS | MediaTek | imported from 3GU |
R1‑1807669 | Summary on Codebook Based UL Transmission | Intel Corporation | imported from 3GU |
R1‑180767 | - | - | - |
R1‑1807670 | Summary of Maintenance for DL/UL Scheduling | Qualcomm | imported from 3GU |
R1‑1807671 | Summary of issues on UL non-codebook based transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807672 | V2X sidelink channel model | Huawei, HiSilicon, InterDigital, General Motors, Sony | imported from 3GU |
R1‑1807673 | Updated Ray Tracing simulation result for NTN | Huawei, HiSilicon | imported from 3GU |
R1‑1807674 | [Draft] Reply LS on subcarrier spacing for BWPs and TDD configurations | MediaTek Inc. | imported from 3GU |
R1‑1807675 | Outcome from offline discussion on 7.1.3.3.1 (resource allocation) | Ericsson | imported from 3GU |
R1‑1807676 | LS reply on subcarrier spacing for BWPs and TDD configurations | RAN1, MediaTek Inc. | imported from 3GU |
R1‑1807677 | Summary of remaining issues for overlapping UL transmissions | Qualcomm | imported from 3GU |
R1‑1807678 | WF on UL beam management | LG Electronics | imported from 3GU |
R1‑1807679 | Feature lead summary 2 for beam measurement and reporting | Ericsson | imported from 3GU |
R1‑180768 | - | - | - |
R1‑1807680 | Initial evaluation results of the Dense Urban-eMBB scenario for IMT-2020 evaluation | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1807681 | Summary of Maintenance for DL/UL Scheduling | Qualcomm | imported from 3GU |
R1‑1807682 | Summary for 7.1.3.3.5 | Ericsson | imported from 3GU |
R1‑1807683 | LS on updates for TS 36.300 | RAN2, Huawei | imported from 3GU |
R1‑1807684 | Offline summary of link and system level evaluations for NOMA | ZTE | imported from 3GU |
R1‑1807685 | Channel access enhancements for NR-U | AT&T | imported from 3GU |
R1‑1807686 | Summary of Remaining details on PRACH formats | Convida Wireless | imported from 3GU |
R1‑1807687 | Summary of discussion on NR V2X evaluation scenarios | LG Electronics | imported from 3GU |
R1‑1807688 | Summary of discussion for NR V2X channel model | LG Electronics | imported from 3GU |
R1‑1807689 | Summary of Offline Discussion for NR RRM measurements | Intel Corporation | imported from 3GU |
R1‑180769 | - | - | - |
R1‑1807690 | Summary of Offline Discussion for NR Radio Link Monitoring | Intel Corporation | imported from 3GU |
R1‑1807691 | Finalizing PDSCH/PUSCH’s DM-RS for NR Rel-15 | Qualcomm | imported from 3GU |
R1‑1807692 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1807693 | Proposals on LTE-NR coexistence | Qualcomm | imported from 3GU |
R1‑1807694 | CSI reporting offline session notes Tuesday morning | Ericsson | imported from 3GU |
R1‑1807695 | Summary of offline discussion on CSI measurement | ZTE | imported from 3GU |
R1‑1807696 | WF on Clarification of report quantity set to "none" | LG Electronics, MediaTek | imported from 3GU |
R1‑1807697 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1807698 | Summary for 7.1.3.3.5 | Ericsson | imported from 3GU |
R1‑1807699 | Summary on CA aspects | Samsung | imported from 3GU |
R1‑180770 | - | - | - |
R1‑1807700 | Summary of TA related aspects | Panasonic | imported from 3GU |
R1‑1807701 | TR38.889 v0.0.2 Study on NR-based Access to Unlicensed Spectrum | Qualcomm Incorporated | imported from 3GU |
R1‑1807702 | Outcome of offline discussion on 7.1.3.1.4 (DCI content) - part I | Ericsson | imported from 3GU |
R1‑1807703 | Summary of 7.7.1 Enhancements to support NR backhaul links | AT&T | imported from 3GU |
R1‑1807704 | Summary of 7.7.2 Evaluation Methodology for NR IAB | AT&T | imported from 3GU |
R1‑1807705 | Summary of open issues related to rate-matching in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807706 | Summary of Remaining Details on RACH Procedure | Qualcomm | imported from 3GU |
R1‑1807707 | LS on numberOfRA-PreamblesGroupA | Qualcomm | imported from 3GU |
R1‑1807708 | Summary of simultaneous transmission and reception of channels/signals | Intel Corporation | imported from 3GU |
R1‑1807709 | Offline summary for AI 7.1.3.1.2 Search space | NTT DOCOMO | imported from 3GU |
R1‑180771 | - | - | - |
R1‑1807710 | Summary for AI 7.1.6.1 NR UL power control in non-CA aspects | ZTE | imported from 3GU |
R1‑1807711 | Summary of Maintenance for DL/UL Scheduling | Qualcomm | imported from 3GU |
R1‑1807712 | Outcome of offline discussion on 7.1.3.3.1 (resource allocation) – part II | Ericsson | imported from 3GU |
R1‑1807713 | WF on single Tx in EN-DC with TDD Pcell | Apple | imported from 3GU |
R1‑1807714 | NR-NTN Channel Modeling - Summary of offline discussions | Thales | imported from 3GU |
R1‑1807715 | NR-NTN Channel Modeling - TP for remaining sections of the 6th clause of TR38.811 | Thales | imported from 3GU |
R1‑1807716 | Summary of SRS | Sony | imported from 3GU |
R1‑1807717 | Feature lead summary of CSI-RS #1 | Huawei, HiSilicon | imported from 3GU |
R1‑1807718 | Reply LS on PC5 transmission mechanism selection | RAN1, LG Electronics | imported from 3GU |
R1‑1807719 | LS to RAN about TR38.811 chap 6 text proposal completion | RAN1, Thales | imported from 3GU |
R1‑180772 | - | - | - |
R1‑1807720 | Signalling Aspects Related to Pi/2 BPSK | RAN1, Qualcomm | imported from 3GU |
R1‑1807721 | [DRAFT] LS on DMRS positions of PUSCH | vivo | imported from 3GU |
R1‑1807722 | LS on adjacent TDM combinations of SRS for antenna switching and other UL physical channels | RAN1, Qualcomm | imported from 3GU |
R1‑1807723 | Reply LS on removal of CSI-RS-for-tracking from TCI-State | RAN1, ZTE | imported from 3GU |
R1‑1807724 | void | Samsung | imported from 3GU |
R1‑1807725 | Reply LS on beam failure recovery | RAN1, Ericsson | imported from 3GU |
R1‑1807726 | [DRAFT] LS on DMRS positions of PUSCH | RAN1, vivo | imported from 3GU |
R1‑1807727 | LS on configuration of non-PMI port index | RAN1, ZTE | imported from 3GU |
R1‑1807728 | Summary of offline discussion on NR-U | Qualcomm | imported from 3GU |
R1‑1807729 | Summary of bandwidth part remaining issues | MediaTek | imported from 3GU |
R1‑180773 | - | - | - |
R1‑1807730 | Offline Discussion on Support of Separate CQI and MCS table(s) for URLLC | Ericsson | imported from 3GU |
R1‑1807731 | LS on Bandwidth configuration for initial BWP | RAN2, NTT DOCOMO | imported from 3GU |
R1‑1807732 | Reply LS on PDCCH common search space configurations | RAN2, NTT DOCOMO | imported from 3GU |
R1‑1807733 | Summary of Remaining details on PRACH formats | Convida Wireless | imported from 3GU |
R1‑1807734 | Remaining Issue on RMSI CORESET Configuration | Samsung | imported from 3GU |
R1‑1807735 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1807736 | On the Size of Transmit Buffer | Huawei, HiSilicon | imported from 3GU |
R1‑1807737 | Reply LS on signalling | RAN3 | imported from 3GU |
R1‑1807738 | Outcome of offline discussion on 7.1.3.1.4 (DCI content) - part II | Ericsson | imported from 3GU |
R1‑1807739 | Summary of Offline Discussion for NR RRM measurements | Intel Corporation | imported from 3GU |
R1‑180774 | - | - | - |
R1‑1807740 | Summary of Offline Discussion for NR Radio Link Monitoring | Intel Corporation | imported from 3GU |
R1‑1807741 | [Draft] LS on useServingCellTimingForSync definition | Intel Corporation | imported from 3GU |
R1‑1807742 | Summary of offline discussion on eMBB and URLLC data differentiation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807743 | [Draft] LS on RRC Parameters for NR URLLC | Ericsson | imported from 3GU |
R1‑1807744 | [Draft] LS on LTE-NR switching time for Single UL operation | Ericsson | imported from 3GU |
R1‑1807745 | Finalizing PDSCH/PUSCH’s DM-RS for NR Rel-15 | Qualcomm | imported from 3GU |
R1‑1807746 | [draft] reply LS on the design of PRACH table | Qualcomm | imported from 3GU |
R1‑1807747 | Summary of Remaining Details on RACH Procedure | Qualcomm | imported from 3GU |
R1‑1807748 | Offline Discussion on Support of Separate CQI and MCS table(s) for URLLC | Ericsson | imported from 3GU |
R1‑1807749 | Offline summary for Al 7.1.1.3 on Paging | Huawei | imported from 3GU |
R1‑180775 | - | - | - |
R1‑1807750 | [Draft] LS on simultaneous PDSCH reception with Paging | Huawei | imported from 3GU |
R1‑1807751 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1807752 | Summary of Maintenance for DL/UL Scheduling | Qualcomm | imported from 3GU |
R1‑1807753 | [DRAFT] LS on maximum number of SRS resources per set | Qualcomm | imported from 3GU |
R1‑1807754 | [DRAFT] LS on adjacent TDM combinations of SRS for antenna switching and other UL physical channels | Qualcomm | imported from 3GU |
R1‑1807755 | Summary of discussion for NR V2X channel model | LG Electronics | imported from 3GU |
R1‑1807756 | Summary of offline discussion on NR V2X evaluation scenarios | LG Electronics | imported from 3GU |
R1‑1807757 | LS on DMRS positions of PUSCH | RAN1, vivo | imported from 3GU |
R1‑1807758 | Summary on offline discussion on eMBB evaluation method and parameters for IMT-2020 self-evaluation | Huawei | imported from 3GU |
R1‑1807759 | Summary on offline discussion on mMTC evaluation method and parameters for IMT-2020 self-evaluation | Huawei | imported from 3GU |
R1‑180776 | - | - | - |
R1‑1807760 | Summary on offline discussion on URLLC evaluation method and parameters for IMT-2020 self-evaluation | Huawei | imported from 3GU |
R1‑1807761 | Remaining issues for MIMO feature list | Qualcomm | imported from 3GU |
R1‑1807762 | Draft LS reply on Coexistence of NR-NR and NR-LTE networks with synchronised, unsynchronised and semi-synchronised operation in 3400-3800 MHz | Huawei | imported from 3GU |
R1‑1807763 | LS on simultaneous PDSCH reception with Paging | RAN1, Huawei | imported from 3GU |
R1‑1807764 | LS on numberOfRA-PreamblesGroupA | RAN1, Qualcomm | imported from 3GU |
R1‑1807765 | Text proposals on channel coding | Intel | imported from 3GU |
R1‑1807766 | Draft Reply LS on MSG3 size for NR | Ericsson | imported from 3GU |
R1‑1807767 | LS on useServingCellTimingForSync definition | RAN1, Intel Corporation | imported from 3GU |
R1‑1807768 | Way Forward on PUSCH Power Scaling in UL Power Control | Ericsson, Samsung, NTT DOCOMO, CATT | imported from 3GU |
R1‑1807769 | Summary of 7.7.1 Enhancements to support NR backhaul links | AT&T | imported from 3GU |
R1‑180777 | - | - | - |
R1‑1807770 | Summary of 7.7.2 Evaluation Methodology for NR IAB | AT&T | imported from 3GU |
R1‑1807771 | Summary on CA aspects | Samsung | imported from 3GU |
R1‑1807772 | Offline summary for AI 7.1.3.1.2 Search space | NTT DOCOMO | imported from 3GU |
R1‑1807773 | Summary of remaining issues for overlapping UL transmissions | Qualcomm | imported from 3GU |
R1‑1807774 | Wed offline on Overlapped PUCCH Resources | Ericsson | imported from 3GU |
R1‑1807775 | Summary of 7.1.1.1 Synchronization signal | Ericsson | imported from 3GU |
R1‑1807776 | Summary of 7.1.1.2.1 NR-PBCH | Ericsson | imported from 3GU |
R1‑1807777 | Summary of offline discussion on NR-U | Qualcomm | imported from 3GU |
R1‑1807778 | Offline summary of transmitter processing for NOMA | ZTE | imported from 3GU |
R1‑1807779 | Offline summary of receiver for NOMA | ZTE | imported from 3GU |
R1‑180778 | - | - | - |
R1‑1807780 | Offline summary of procedures for NOMA | ZTE | imported from 3GU |
R1‑1807781 | Offline summary of link and system level evaluations for NOMA | ZTE | imported from 3GU |
R1‑1807782 | Feature lead summary 3 for beam measurement and reporting | Ericsson | imported from 3GU |
R1‑1807783 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1807784 | Draft LS reply on Coexistence of NR-NR and NR-LTE networks with synchronised, unsynchronised and semi-synchronised operation in 3400-3800 MHz | Huawei | imported from 3GU |
R1‑1807785 | Chairman's notes of AI 7.1.2 MIMO | Ad-hoc chair (Samsung) | imported from 3GU |
R1‑1807786 | Chairman's notes of AI 7.1.4 Channel coding | Ad-hoc chair (Ericsson) | imported from 3GU |
R1‑1807787 | Chairman's notes of AI 7.1.5 NR-LTE co-existence | Ad-hoc chair (Ericsson) | imported from 3GU |
R1‑1807788 | Chairman's notes of AI 7.1.6 UL power control | Ad-hoc chair (Samsung) | imported from 3GU |
R1‑1807789 | Chairman's notes of AI 7.1.7 UE features | Ad-hoc chair (NTT DOCOMO, AT&T) | imported from 3GU |
R1‑180779 | - | - | - |
R1‑1807790 | Chairman's notes of AI 7.3 Study on enhanced NR to support Non-Terrestrial Networks | Ad-hoc chair (Samsung) | imported from 3GU |
R1‑1807791 | Chairman's notes of AI 7.6 Study on NR-based Access to Unlicensed Spectrum | Ad-hoc chair (Ericsson) | imported from 3GU |
R1‑1807792 | Text proposal for TR 38.811 chap 6 NTN channel modelling | Thales | imported from 3GU |
R1‑1807793 | [Draft] Liaison Statement to RAN about TP for TR38.811 chapter 6 | Thales | imported from 3GU |
R1‑1807794 | Text proposal for TR 38.811 chap 7.3 | Thales | imported from 3GU |
R1‑1807795 | Text proposal for TR 38.811 chap 8 | Thales | imported from 3GU |
R1‑1807796 | Summary 2 on Remaing issues on Beam Failure Recovery | nnMediaTek Inc. | imported from 3GU |
R1‑1807797 | [Draft] LS on configuration of non-PMI port index | ZTE | imported from 3GU |
R1‑1807798 | Summary #2 for TRS | MediaTek | imported from 3GU |
R1‑1807799 | [Draft] Reply LS on the transmission of video over PC5 interface | Huawei, HiSilicon | imported from 3GU |
R1‑180780 | - | - | - |
R1‑1807800 | Summary 3 for AI 7.1.6.1 NR UL power control in non-CA aspects | ZTE | imported from 3GU |
R1‑1807801 | Summary of bandwidth part remaining issues | MediaTek | imported from 3GU |
R1‑1807802 | Summary of Remaining details on PRACH formats | Convida Wireless | imported from 3GU |
R1‑1807803 | Text proposal for TR 38.811 chap 6 NTN channel modelling | Thales, HNS, Huawei, Hisilicon, Nokia, ZTE, ESA, Dish | imported from 3GU |
R1‑1807804 | LS on the feasibility of 1 symbol GP for 60KHz in FR1 and 120KHz in FR2 | RAN4, MediaTek | imported from 3GU |
R1‑1807805 | LS on RAN4 agreement on intraband EN-DC A-MPR | RAN4, Nokia | imported from 3GU |
R1‑1807806 | LS on RMSI CORESET configuration for a band with 15kHz SSB SCS and 10MHz minimum channel bandwidth | RAN4, CATT, Samsung | imported from 3GU |
R1‑1807807 | Summary of Remaining Details on RACH Procedure | Qualcomm | imported from 3GU |
R1‑1807808 | Signalling Aspects Related to Pi/2 BPSK | Qualcomm | imported from 3GU |
R1‑1807809 | Assumptions on the number of CRC bits for PUCCH resource determination | Huawei, HiSilicon, Sharp | imported from 3GU |
R1‑180781 | - | - | - |
R1‑1807810 | CSI reporting offline session notes Thursday | nnEricsson | imported from 3GU |
R1‑1807811 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1807812 | Summary of offline discussion on SFI | Qualcomm | imported from 3GU |
R1‑1807813 | TP for 38.213 for SFI | Qualcomm | imported from 3GU |
R1‑1807814 | Proposals on EN-DC and NR PUCCH Scell | NTT DOCOMO | imported from 3GU |
R1‑1807815 | Summary of offline discussion on NR-U | Qualcomm | imported from 3GU |
R1‑1807816 | [Draft] LS on LTE-NR switching time for Single UL operation | Ericsson | imported from 3GU |
R1‑1807817 | Outcome of offline discussion on 7.1.3.1.4 (DCI content) - part III | Ericsson | imported from 3GU |
R1‑1807818 | Summary of offline on simultaneous transmission and reception of channels/signals | Intel Corporation | imported from 3GU |
R1‑1807819 | [Draft] Reply LS on RMSI CORESET configuration for a band with 15kHz SSB SCS and 10MHz minimum channel bandwidth | CATT | imported from 3GU |
R1‑180782 | - | - | - |
R1‑1807820 | Summary of remaining issues for overlapping UL transmissions | Qualcomm | imported from 3GU |
R1‑1807821 | Proposals on remaining issues on overlapping PUCCHs | Ericsson | imported from 3GU |
R1‑1807822 | [Draft] LS on RRC Parameters for NR URLLC | Ericsson | imported from 3GU |
R1‑1807823 | Offline Discussion on Support of Separate CQI and MCS table(s) for URLLC | Ericsson | imported from 3GU |
R1‑1807824 | Summary of offline discussion on UL non-codebook based transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807825 | Summary of Maintenance for DL/UL Scheduling | Qualcomm | imported from 3GU |
R1‑1807826 | [Draft] Reply LS on the transmission of video over PC5 interface | Huawei, HiSilicon | imported from 3GU |
R1‑1807827 | [Draft] LS on aperiodic SRS | ZTE | imported from 3GU |
R1‑1807828 | Text Proposal for Polar Code Rate Matching | Ericsson | imported from 3GU |
R1‑1807829 | Offline summary for Al 7.1.1.3 on Paging | Huawei | imported from 3GU |
R1‑180783 | - | - | - |
R1‑1807830 | Summary of Remaining details on PRACH formats | Convida Wireless | imported from 3GU |
R1‑1807831 | Reply LS on RMSI CORESET configuration for a band with 15kHz SSB SCS and 10MHz minimum channel bandwidth | RAN1, CATT | imported from 3GU |
R1‑1807832 | Summary of Remaining Details on RACH Procedure | Qualcomm | imported from 3GU |
R1‑1807833 | LS on power offset of CSI-RS resource RE to SS RE for CSI-RS based Msg1 | Qualcomm | imported from 3GU |
R1‑1807834 | DRAFT Reply LS on beam failure recovery | Ericsson | imported from 3GU |
R1‑1807835 | Draft reply LS on simultaneous configuration of EN-DC and NR PUCCH Scell | NTT DOCOMO | imported from 3GU |
R1‑1807836 | Offline discussions on working assumptions in channel model | LG Electronics | imported from 3GU |
R1‑1807837 | Draft TR 37.885 v0.3.0 Study on evaluation methodology of new Vehicle-to-Everything V2X use cases for LTE and NR | LG Electronics | imported from 3GU |
R1‑1807838 | Offline summary on Thursday | NTT DOCOMO | imported from 3GU |
R1‑1807839 | TCI state for PDCCH | NTT DOCOMO | imported from 3GU |
R1‑180784 | - | - | - |
R1‑1807840 | [Draft] Reply LS on bandwidth configuration for initial BWP | MediaTek | imported from 3GU |
R1‑1807841 | [Draft] LS on the size of DCI format 2-1 | Ericsson | imported from 3GU |
R1‑1807842 | Reply LS on MSG3 size for NR | RAN1, Ericsson | imported from 3GU |
R1‑1807843 | [Draft] LS on NR CSI-RS | Huawei, HiSilicon | imported from 3GU |
R1‑1807844 | Draft LS reply on Coexistence of NR-NR and NR-LTE networks with synchronised, unsynchronised and semi-synchronised operation in 3400-3800 MHz | Huawei | imported from 3GU |
R1‑1807845 | Draft LS on updated NR UE features | NTT DOCOMO, AT&T | imported from 3GU |
R1‑1807846 | Updated NR UE features | NTT DOCOMO, AT&T | imported from 3GU |
R1‑1807847 | Draft reply LS on Type 3 UE capabilities | NTT DOCOMO, AT&T | imported from 3GU |
R1‑1807848 | Proposals on remaining issues on overlapping PUCCHs | Ericsson | imported from 3GU |
R1‑1807849 | Outcome of offline discussion on 7.1.3.3.1 (resource allocation) – part III | Ericsson | imported from 3GU |
R1‑180785 | - | - | - |
R1‑1807850 | TP for 38.874 capturing RAN1 agreements on IAB | AT&T | imported from 3GU |
R1‑1807851 | Summary of offline discussion on 7.1.3.3.5 | Ericsson | imported from 3GU |
R1‑1807852 | Summary of Offline Discussion for NR RRM measurements | Intel Corporation | imported from 3GU |
R1‑1807853 | Summary of Offline Discussion for NR Radio Link Monitoring | Intel Corporation | imported from 3GU |
R1‑1807854 | Outcome offline discussion on PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1807855 | Summary of Remaining details on PRACH formats | Convida Wireless | imported from 3GU |
R1‑1807856 | void | ETSI | imported from 3GU |
R1‑1807857 | Proposals on remaining issues on overlapping PUCCHs | Ericsson | imported from 3GU |
R1‑1807858 | Reply LS on physical layer aspects of Rel-15 NB-IoT and eMTC for TS 36.300 | RAN1, Huawei | imported from 3GU |
R1‑1807859 | void | ETSI | imported from 3GU |
R1‑180786 | - | - | - |
R1‑1807860 | Introduction of Rel-15 NB-IoT physical layer aspects | Huawei | imported from 3GU |
R1‑1807861 | List of RRC parameters for L1 configuration of Rel-15 LTE-MTC | Ericsson | imported from 3GU |
R1‑1807862 | Summary of 7.1.1.1 Synchronization signal | Ericsson | imported from 3GU |
R1‑1807863 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1807864 | NR-NTN: solution principles for NR to support Non-Terrestrial networks | Thales | imported from 3GU |
R1‑1807865 | Proposals on LTE-NR coexistence | Qualcomm | imported from 3GU |
R1‑1807866 | RRC parameter list for NR URLLC | Ericsson | imported from 3GU |
R1‑1807867 | Summary of TA related aspects | Panasonic | imported from 3GU |
R1‑1807868 | LS reply on Coexistence of NR-NR and NR-LTE networks with synchronised, unsynchronised and semi-synchronised operation in 3400-3800 MHz | RAN1, Huawei | imported from 3GU |
R1‑1807869 | TR 37.885 v1.0.0 Study on evaluation methodology of new Vehicle-to-Everything V2X use cases for LTE and NR | LG Electronics | imported from 3GU |
R1‑180787 | - | - | - |
R1‑1807870 | Reply LS on the transmission of video over PC5 interface | RAN1, Huawei | imported from 3GU |
R1‑1807871 | Reply LS on simultaneous configuration of EN-DC and NR PUCCH Scell | RAN1, NTT DOCOMO | imported from 3GU |
R1‑1807872 | Offline summary for Al 7.1.1.3 on Paging | Huawei | imported from 3GU |
R1‑1807873 | Reply LS on bandwidth configuration for initial BWP | RAN1, MediaTek | imported from 3GU |
R1‑1807874 | [Draft] LS on RRC Parameters for NR URLLC | Ericsson | imported from 3GU |
R1‑1807875 | WF on PUSCH time-domain resource allocation | NTT DOCOMO, Samsung, Panasonic, KDDI, OPPO, Ericsson, CATT, AT&T, vivo | imported from 3GU |
R1‑1807876 | [draft] Reply LS on Initial Active BWP for Pattern 2 and Pattern 3 | Huawei | imported from 3GU |
R1‑1807877 | [Draft] LS on BFR search space configuration | MediaTek | imported from 3GU |
R1‑1807878 | Third Offline Summary on CA Aspects | Samsung | imported from 3GU |
R1‑1807879 | TP to include total DAI in TS38.213 for determining missed TBs/CBGs | Samsung | imported from 3GU |
R1‑180788 | - | - | - |
R1‑1807880 | k0 for OFDM signal generation | Huawei | imported from 3GU |
R1‑1807881 | [draft] LS on BFR search space configuration | MediaTek | imported from 3GU |
R1‑1807882 | LS on aperiodic SRS | RAN1, ZTE | imported from 3GU |
R1‑1807883 | LS on BFR search space configuration | RAN1, MediaTek | imported from 3GU |
R1‑1807884 | Draft reply LS on LTE peak data rate for EN-DC | Huawei | imported from 3GU |
R1‑1807885 | Summary of offline discussion on capturing URLLC related agreements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1807886 | WF on PUSCH time-domain resource allocation | NTT DOCOMO, Samsung, Panasonic, KDDI, OPPO, Ericsson, CATT, AT&T, vivo, Nokia, NSB, NTT, Sharp, ZTE | imported from 3GU |
R1‑1807887 | LS on NR CSI-RS | RAN1, Huawei | imported from 3GU |
R1‑1807888 | [draft] Reply LS on Initial Active BWP for Pattern 2 and Pattern 3 | Huawei | imported from 3GU |
R1‑1807889 | [draft] reply LS on the design of PRACH table | Qualcomm | imported from 3GU |
R1‑180789 | - | - | - |
R1‑1807890 | Draft LS on updated NR UE features | NTT DOCOMO, AT&T | imported from 3GU |
R1‑1807891 | Updated NR UE features | NTT DOCOMO, AT&T | imported from 3GU |
R1‑1807892 | Reply LS on the design of PRACH table | RAN1, Qualcomm | imported from 3GU |
R1‑1807893 | LS on Initial Active BWP for Pattern 2 and Pattern 3 | RAN1, Huawei | imported from 3GU |
R1‑1807894 | Summary of Remaining Details on RACH Procedure | Qualcomm | imported from 3GU |
R1‑1807895 | Draft reply LS on LTE peak data rate for EN-DC | Huawei | imported from 3GU |
R1‑1807896 | LS on updated NR UE features | RAN1, NTT DOCOMO, AT&T | imported from 3GU |
R1‑1807897 | Summary of Remaining Details on RACH Procedure | Qualcomm | imported from 3GU |
R1‑1807898 | LS on Lead Time for Beam Switching | RAN4, Qualcomm | imported from 3GU |
R1‑1807899 | WF for OCC configuration of PF1 | NTT DOCOMO, Qualcomm, OPPO, Panasonic, Nokia, NSB, Samsung, KDDI, Intel, MediaTek, vivo, InterDigital, Huawei, HiSilicon | imported from 3GU |
R1‑180790 | - | - | - |
R1‑1807900 | [DRAFT] Reply to LS on Defining reserved resources in NR-SIB1 | Nokia | imported from 3GU |
R1‑1807901 | TP on TS38.213 Section 10.1 | NTT DOCOMO | imported from 3GU |
R1‑1807902 | Summary of Maintenance for DL/UL Scheduling | Qualcomm | imported from 3GU |
R1‑1807903 | LS on the size of DCI format 2-1 | RAN1, Ericsson | imported from 3GU |
R1‑1807904 | Proposals on remaining issues on overlapping PUCCHs | Ericsson | imported from 3GU |
R1‑1807905 | [Draft] LS on signalling of transmitter-side DC location | MediaTek | imported from 3GU |
R1‑1807906 | [DRAFT] LS on CSI-RS for L3 mobility | Intel | imported from 3GU |
R1‑1807907 | Reply to LS on Defining reserved resources in NR-SIB1 | RAN1, Nokia | imported from 3GU |
R1‑1807908 | Reply LS on LTE peak data rate for EN-DC | RAN1, Huawei | imported from 3GU |
R1‑1807909 | LS on CSI-RS for L3 mobility | RAN1, Intel | imported from 3GU |
R1‑180791 | - | - | - |
R1‑1807910 | LS on signalling of transmitter-side DC location | RAN1, MediaTek | imported from 3GU |
R1‑1807911 | TS 37.213 v0.2.1 Physical layer procedures for shared spectrum channel access | Ericsson | imported from 3GU |
R1‑1807912 | LS on RRC parameter k0 | RAN1, Ericsson | imported from 3GU |
R1‑1807913 | Corrections on shortened processing time and shortened TTI in 36 212 | Huawei | imported from 3GU |
R1‑1807914 | Introduction of FeLAA into 36.212 | Huawei | imported from 3GU |
R1‑1807915 | Introduction of high capacity stationary wireless link and 1024QAM into 36.212 | Huawei | imported from 3GU |
R1‑1807916 | Introduction of even further enhancements of eMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1807917 | Introduction of further enhancements of NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1807918 | Introduction of V2X Phase 2 based on LTE | Huawei | imported from 3GU |
R1‑1807919 | Introduction of HRLLC into 36.212 | Huawei | imported from 3GU |
R1‑180792 | - | - | - |
R1‑1807920 | RRC parameter list for NR URLLC | Ericsson | imported from 3GU |
R1‑1807921 | LS on RRC Parameters for NR URLLC | RAN1, Ericsson | imported from 3GU |
R1‑1807922 | Introduction of modulation enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1807923 | Introduction of modulation enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1807924 | LS on introduction of modulation enhancements for LTE | RAN1, Qualcomm | imported from 3GU |
R1‑1807925 | Corrections to sTTI and SPT implementation | Ericsson | imported from 3GU |
R1‑1807926 | Corrections for shortened processing time and shortened TTI in 36.213, s00-s05 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1807927 | Corrections for shortened processing time and shortened TTI in 36.213, s06-s07 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1807928 | Corrections for shortened processing time and shortened TTI in 36.213, s10-s13 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1807929 | Corrections for shortened processing time and shortened TTI in 36.213, s08-s09 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑180793 | - | - | - |
R1‑1807930 | Introduction of enhancements to operation in unlicensed spectrum | Ericsson | imported from 3GU |
R1‑1807931 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s06-s09 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1807932 | TS 37.213 v1.0.0 Physical layer procedures for shared spectrum channel access | Ericsson | imported from 3GU |
R1‑1807933 | Corrections to feCoMP in 36.213, s06-s07 | Motorola Mobility | imported from 3GU |
R1‑1807934 | Draft CR on NPRS enhancement | Ericsson | imported from 3GU |
R1‑1807935 | Introduction of Even Further Enhanced MTC for LTE | Ericsson | imported from 3GU |
R1‑1807936 | Introduction of even further enhanced MTC for LTE in 36.213, s00-s05 | Motorola Mobility | imported from 3GU |
R1‑1807937 | Introduction of even further enhanced MTC for LTE in 36.213, s06-s07 | Motorola Mobility | imported from 3GU |
R1‑1807938 | Introduction of even further enhanced MTC for LTE in 36.213, s08-s09 | Motorola Mobility | imported from 3GU |
R1‑1807939 | Introduction Rel-15 Further NB-IoT enhancements | Ericsson | imported from 3GU |
R1‑180794 | - | - | - |
R1‑1807940 | Introduction of Rel-15 Further NB-IoT enhancements in 36.213, s14 | Motorola Mobility | imported from 3GU |
R1‑1807941 | Introduction Rel-15 Further NB-IoT enhancements | Ericsson | imported from 3GU |
R1‑1807942 | Introduction of enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE to 36.213 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1807943 | Correction on layer-to-port mapping for feCoMP | Ericsson | imported from 3GU |
R1‑1807944 | Addition of V2X Phase 2 based on LTE in 36.213, s14 | Motorola Mobility, LG Electronics | imported from 3GU |
R1‑1807945 | Introduction of HRLLC into 36.211 | Ericsson | imported from 3GU |
R1‑1807946 | Introduction of HRLLC for LTE in 36.213, s07-1 | Motorola Mobility | imported from 3GU |
R1‑1807947 | Introduction of HRLLC for LTE in 36.213, s07-3 | Motorola Mobility | imported from 3GU |
R1‑1807948 | Introduction of HRLLC for LTE in 36.213, s08 | Motorola Mobility | imported from 3GU |
R1‑1807949 | Introduction of HRLLC for LTE in 36.213, s09 | Motorola Mobility | imported from 3GU |
R1‑180795 | - | - | - |
R1‑1807950 | Introduction of HRLLC for LTE in 36.213, s10 | Motorola Mobility | imported from 3GU |
R1‑1807951 | Introduction of Aerial for LTE in 36.213, s00-s05 | Motorola Mobility | imported from 3GU |
R1‑1807952 | Correction for EN-DC Coexistence into TS36.213 s06-s07 | Motorola Mobility | imported from 3GU |
R1‑1807953 | Correction for EN-DC Coexistence into TS36.213 s08-s09 | Motorola Mobility | imported from 3GU |
R1‑1807954 | CR to 38.202 capturing the RAN1#92bis and RAN1#93 meeting agreements | Qualcomm | imported from 3GU |
R1‑1807955 | CR to 38.211 capturing the RAN1#92bis and RAN1#93 meeting agreements | Ericsson | imported from 3GU |
R1‑1807956 | CR to 38.212 capturing the RAN1#92bis and RAN1#93 meeting agreements | Huawei | imported from 3GU |
R1‑1807957 | CR to 38.213 capturing the RAN1#92bis and RAN1#93 meeting agreements | Samsung | imported from 3GU |
R1‑1807958 | CR to 38.214 capturing the RAN1#92bis and RAN1#93 meeting agreements | Nokia | imported from 3GU |
R1‑1807959 | CR to 38.215 capturing the RAN1#92bis and RAN1#93 meeting agreements | Intel | imported from 3GU |
R1‑180796 | - | - | - |
R1‑1807960 | Reply LS on Type 3 UE capabilities | NTT DOCOMO, AT&T | imported from 3GU |
R1‑1807961 | CR to 38.202 capturing the RAN1#92bis and RAN1#93 meeting agreements related to URLLC | Qualcomm | imported from 3GU |
R1‑1807962 | CR to 38.212 capturing the RAN1#92bis and RAN1#93 meeting agreements related to URLLC | Huawei | imported from 3GU |
R1‑1807963 | CR to 38.214 capturing the RAN1#92bis and RAN1#93 meeting agreements related to URLLC | Nokia | imported from 3GU |
R1‑1807964 | Correction for EN-DC Coexistence into TS36.213 s00-s05 | Motorola Mobility | imported from 3GU |
R1‑1807965 | Correction for EN-DC Coexistence into TS36.213 s10-s13 | Motorola Mobility | imported from 3GU |
R1‑1807966 | Support of early contention resolution | Qualcomm | imported from 3GU |
R1‑1807967 | Support of early contention resolution | Qualcomm | imported from 3GU |
R1‑1807968 | CR to 38.214: maintenance according to agreed Rel 15 features | Nokia | imported from 3GU |
R1‑1807969 | LS on removing RRC parameters related to multi-TRP | RAN1, Nokia | imported from 3GU |
R1‑180797 | - | - | - |
R1‑1807970 | LS on CSI measurement and reporting in DRX active time | RAN1, Nokia | imported from 3GU |
R1‑1807971 | Agreement summary for Rel-15 Even further enhanced MTC for LTE | WI rapporteur (Ericsson) | imported from 3GU |
R1‑1807972 | LS on LTE V2X UE Categories and Reception Capabilities | RAN1, Intel | imported from 3GU |
R1‑1807973 | Summary of email discussion [93-NR-01] LS on intra-band EN-DC MPR, A-MPR | Qualcomm | imported from 3GU |
R1‑1807974 | Reply LS on RAN4 agreement on intraband EN-DC A-MPR | RAN1, Qualcomm | imported from 3GU |
page generated from database: 2024-10-07 07:52:06