3GPP TDocs (written contributions) at meeting
Meeting: R4-62 - 2012-02-06 to 2012-02-10, Dresden
meeting id: R4-62 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑120001 | Proposed agenda | WG Chairman | imported from 3GU |
R4‑120002 | RSTD signalling modifications | Spirent Communications | imported from 3GU |
R4‑120003 | RSTD signalling modifications | Spirent Communications | imported from 3GU |
R4‑120004 | Introduction of non-contiguous operation for 4C-HSDPA | Nokia Siemens Networks | imported from 3GU |
R4‑120005 | Introduction of intra-band non-contiguous operation for E-UTRA | Nokia Siemens Networks | imported from 3GU |
R4‑120006 | TX IM applicability correction | Nokia Siemens Networks | imported from 3GU |
R4‑120007 | TX IM applicability correction | Nokia Siemens Networks | imported from 3GU |
R4‑120008 | ------------ | ------------ | imported from 3GU |
R4‑120009 | Thresholds and margins for UTRA TDD to E-UTRA handover test A.5.3a and A.5.3b for R8 | CATT | imported from 3GU |
R4‑120010 | Thresholds and margins for UTRA TDD to E-UTRA handover test A.5.3a and A.5.3b for R9 | CATT | imported from 3GU |
R4‑120011 | Thresholds and margins for UTRA TDD to E-UTRA handover test A.5.3a and A.5.3b for R10 | CATT | imported from 3GU |
R4‑120012 | Thresholds and margins for E-UTRA cell search test A.8.5.1 and A.8.5.2 for R8 | CATT | imported from 3GU |
R4‑120013 | Thresholds and margins for E-UTRA cell search test A.8.5.1 and A.8.5.2 for R9 | CATT | imported from 3GU |
R4‑120014 | Thresholds and margins for E-UTRA cell search test A.8.5.1 and A.8.5.2 for R10 | CATT | imported from 3GU |
R4‑120015 | Thresholds and margins for E-UTRA cell search test A.8.5.3 and A.8.5.4 for R8 | CATT | imported from 3GU |
R4‑120016 | Thresholds and margins for E-UTRA cell search test A.8.5.3 and A.8.5.4 for R9 | CATT | imported from 3GU |
R4‑120017 | Thresholds and margins for E-UTRA cell search test A.8.5.3 and A.8.5.4 for R10 | CATT | imported from 3GU |
R4‑120018 | Test case for E-UTRA TDD RRC connection release redirection to UTRA TDD without SI provided for R9 | CATT, Huawei, ZTE | imported from 3GU |
R4‑120019 | Test case for E-UTRA TDD RRC connection release redirection to UTRA TDD without SI provided for R10 | CATT, Huawei, ZTE | imported from 3GU |
R4‑120020 | Test case for E-UTRA FDD RRC connection release redirection to UTRA TDD without SI provided for R9 | CATT, Huawei, ZTE | imported from 3GU |
R4‑120021 | Test case for E-UTRA FDD RRC connection release redirection to UTRA TDD without SI provided for R10 | CATT, Huawei, ZTE | imported from 3GU |
R4‑120022 | Technical Report 36.cde V0.0.3 for LTE_CA_B7 | China Unicom | imported from 3GU |
R4‑120023 | Thresholds and margins for E-UTRAN to C2K RRM reselection test cases (Rel-8) | Rohde & Schwarz | imported from 3GU |
R4‑120024 | Thresholds and margins for E-UTRAN to C2K RRM reselection test cases (Rel-9) | Rohde & Schwarz | imported from 3GU |
R4‑120025 | Thresholds and margins for E-UTRAN to C2K RRM reselection test cases (Rel-10) | Rohde & Schwarz | imported from 3GU |
R4‑120026 | Discussion on cell identification requirements with DRX for eICIC | ZTE | imported from 3GU |
R4‑120027 | CR to TS36.133: cell identification requirements with DRX for eICIC | ZTE | imported from 3GU |
R4‑120028 | Simulation results for radio link monitoring test cases in eICIC | ZTE | imported from 3GU |
R4‑120029 | Initial simulation results for TDD PMI test | ZTE | imported from 3GU |
R4‑120030 | Simulation results for wideband CQI test in fading channel | ZTE | imported from 3GU |
R4‑120031 | CR to 36.101: Correction on the CQI fading test | ZTE | imported from 3GU |
R4‑120032 | Simulation results for subband CQI test in fading channel | ZTE | imported from 3GU |
R4‑120033 | Simulation results for eDL-MIMO RI test | ZTE | imported from 3GU |
R4‑120034 | TP of relay power class in TR 36.826 | ZTE | imported from 3GU |
R4‑120035 | TP of access link receiver spurious emissions in TR 36.826 | ZTE | imported from 3GU |
R4‑120036 | TP of access link receiver intermodulation in TR 36.826 | ZTE | imported from 3GU |
R4‑120037 | TP of access link blocking characteristics in TR 36.826 | ZTE | imported from 3GU |
R4‑120038 | TP of backhaul link Transmitter Spurious Emission in TR 36.826 | ZTE | imported from 3GU |
R4‑120039 | TP of backhaul link Transmitter Intermodulation in TR 36.826 | ZTE | imported from 3GU |
R4‑120040 | TP of backhaul link EVM in TR 36.826 | ZTE | imported from 3GU |
R4‑120041 | CR to 36.104: Minimum Requirement of TAE for NC CA | ZTE | imported from 3GU |
R4‑120042 | CR to 36.141: Test Requirement of TAE for NC CA | ZTE | imported from 3GU |
R4‑120043 | Simulation results for E-UTRA medium range BS reference sensitivity | ZTE | imported from 3GU |
R4‑120044 | TP of medium range BS reference sensitivity | ZTE | imported from 3GU |
R4‑120045 | Simulation results on blocking characteristics for Medium Range BS class | ZTE | imported from 3GU |
R4‑120046 | TP of medium range BS in-band blocking | ZTE | imported from 3GU |
R4‑120047 | The co-existence between IMT and the TV with specific broadcasting architecture | ZTE | imported from 3GU |
R4‑120048 | TS36.104 change for B41 CA | Nokia Siemens Networks | imported from 3GU |
R4‑120049 | TS36.141 change for B41 CA | Nokia Siemens Networks | imported from 3GU |
R4‑120050 | Harmonized AAS Nomenclature | Nokia Siemens Networks | imported from 3GU |
R4‑120051 | Survey of AAS test options | Nokia Siemens Networks | imported from 3GU |
R4‑120052 | Preliminary Medium-Range BS coexistence simulation results | Nokia Siemens Networks | imported from 3GU |
R4‑120053 | Considerations on TDD PMI tests for e-DL MIMIO | Samsung | imported from 3GU |
R4‑120054 | Simulation results for evaluation of eICIC CQI test | ZTE | imported from 3GU |
R4‑120055 | Correction for TS 37.141 | ZTE | imported from 3GU |
R4‑120056 | Simulation results for RI test of TDD mode | Samsung | imported from 3GU |
R4‑120057 | Correction for TS 37.141 | ZTE | imported from 3GU |
R4‑120058 | Simulation results for frequency non-selective CQI tests | Samsung | imported from 3GU |
R4‑120059 | Simulation results for frequency selective CQI tests | Samsung | imported from 3GU |
R4‑120060 | Simulation results of weighted DIP profile for advanced receiver | Samsung | imported from 3GU |
R4‑120061 | Initial simulation results for AAS blocking | ZTE | imported from 3GU |
R4‑120062 | Some antenna terminologies about AAS | ZTE | imported from 3GU |
R4‑120063 | Text proposal for simulation assumptions for AAS | ZTE | imported from 3GU |
R4‑120064 | Discussion on feasibility and necessity of OTA far field testing for AAS | ZTE | imported from 3GU |
R4‑120065 | New Figures of Merit for Basic MIMO OTA compliance testing using throughput statistical performance analyses – Reverberation chamber method | CTTC, EMITE, UPCT | imported from 3GU |
R4‑120066 | New Figures of Merit for Basic MIMO OTA compliance testing using throughput statistical performance analyses – Anechoic Chamber method | CTTC, EMITE, UPCT | imported from 3GU |
R4‑120067 | New Figures of Merit for Basic MIMO OTA compliance testing using throughput statistical performance analyses – 2-Stage method | CTTC, EMITE, UPCT | imported from 3GU |
R4‑120068 | RF: Updates and corrections to the RMC-s related annexes (Rel-8) | Rohde & Schwarz | imported from 3GU |
R4‑120069 | RF: Updates and corrections to the RMC-s related annexes (Rel-9) | Rohde & Schwarz | imported from 3GU |
R4‑120070 | RF: Updates and corrections to the RMC-s related annexes (Rel-10) | Rohde & Schwarz | imported from 3GU |
R4‑120071 | Way forward on Simulation assumptions of measurement bandwidth impacts on RSRQ | Huawei, HiSilicon | imported from 3GU |
R4‑120072 | Remaining issues on requirements for inter-frequency measurements without gaps | Huawei, HiSilicon | imported from 3GU |
R4‑120073 | Addition of E-UTRAN TDD-HRPD Cell Reselection: HRPD is of Lower Priority test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120074 | Addition of E-UTRAN TDD-HRPD Cell Reselection: HRPD is of Lower Priority test case R10 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120075 | Addition of E-UTRAN TDD-cdma2000 1X Cell Reselection: cdma2000 1X is of Lower Priority test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120076 | Addition of E-UTRAN TDD-cdma2000 1X Cell Reselection: cdma2000 1X is of Lower Priority test case R10 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120077 | Addition of E-UTRAN TDD-HRPD Handover test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120078 | Addition of E-UTRAN TDD-HRPD Handover test case R10 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120079 | Addition of E-UTRAN TDD-cdma2000 1X Handover test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120080 | Addition of E-UTRAN TDD-cdma2000 1X Handover test case R10 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120081 | Addition of E-UTRAN FDD-TDD Inter-frequency RRC Re-establishment test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120082 | Addition of E-UTRAN FDD-TDD Inter-frequency RRC Re-establishment test case R10 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120083 | Addition of E-UTRAN TDD-FDD Inter-frequency RRC Re-establishment test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120084 | Addition of E-UTRAN TDD-FDD Inter-frequency RRC Re-establishment test case R10 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120085 | Addition of E-UTRAN FDD-TDD inter frequency RSRQ measurement accuracy test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120086 | Addition of E-UTRAN FDD-TDD inter frequency RSRQ measurement accuracy test case R10 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120087 | Addition of E-UTRAN FDD-TDD Inter frequency cell reselection test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120088 | Addition of E-UTRAN TDD-FDD Inter frequency cell reselection test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120089 | Addition of E-UTRAN FDD-TDD Inter frequency handover test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120090 | Addition of E-UTRAN TDD-FDD Inter frequency handover test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120091 | Addition of E-UTRAN TDD-FDD Inter-frequency event triggered reporting under fading propagation conditions in asynchronous cells test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120092 | Addition of E-UTRAN FDD-TDD Inter-frequency event triggered reporting under fading propagation conditions in asynchronous cells test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120093 | Addition of E-UTRAN FDD-TDD inter frequency measurement accuracy test case R9 | Huawei, HiSilicon, Clearwire, CMCC | imported from 3GU |
R4‑120094 | FDD Event-Triggered Reporting on Deactivated SCell with PCell Interruption | Huawei, HiSilicon | imported from 3GU |
R4‑120095 | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation | Huawei, HiSilicon | imported from 3GU |
R4‑120096 | Addition of E-UTRAN TDD RSTD measurement accuracy test case in carrier aggregation | Huawei, HiSilicon | imported from 3GU |
R4‑120097 | FDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS | Huawei, HiSilicon | imported from 3GU |
R4‑120098 | TDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS | Huawei, HiSilicon | imported from 3GU |
R4‑120099 | SNR methodology deriving for RLM tests in eICIC | Huawei, HiSilicon | imported from 3GU |
R4‑120100 | RLM test cases with SNRs for OOS and INS for E-UTRAN TDD in eICIC | Huawei, HiSilicon | imported from 3GU |
R4‑120101 | Preliminary simulation results for RFPM | Huawei, HiSilicon | imported from 3GU |
R4‑120102 | Simulation results for RLM when autonomous gap is configured in eICIC | Huawei, HiSilicon | imported from 3GU |
R4‑120103 | Core requirement for cell identification in DRX for eICIC | Huawei, HiSilicon | imported from 3GU |
R4‑120104 | E-UTRA TDD RRC connection release redirection to UTRAN FDD without SI provided | Huawei, HiSilicon | imported from 3GU |
R4‑120105 | Discussion on CSG proximity indicator testing | Huawei, HiSilicon | imported from 3GU |
R4‑120106 | Discussion on the interruption of activation - deactivation transitions | CATT | imported from 3GU |
R4‑120107 | Feasibility of CA power imbalance test | Huawei, HiSilicon | imported from 3GU |
R4‑120108 | Discussion on the CA soft buffer limitation tests and SDR tests | Huawei, HiSilicon | imported from 3GU |
R4‑120109 | Simulation assumptions and results for ABS pattern evaluation | Huawei, HiSilicon | imported from 3GU |
R4‑120110 | On eICIC ABS pattern | Huawei, HiSilicon | imported from 3GU |
R4‑120111 | Further discussion on eICIC CSI test | Huawei, HiSilicon | imported from 3GU |
R4‑120112 | On eICIC interference models | Huawei, HiSilicon | imported from 3GU |
R4‑120113 | FRC consideration and simulation results on demodulation tests | Huawei, HiSilicon | imported from 3GU |
R4‑120114 | Discussion on simulation assumptions for R-PDCCH with cross-interleaving | Huawei | imported from 3GU |
R4‑120115 | 36.826 TP: on R-PDCCH performance requirements | Huawei | imported from 3GU |
R4‑120116 | Discussion on Enabling operation of 4 Tx support in LTE networks | Huawei, HiSilicon | imported from 3GU |
R4‑120117 | TS36.104 CR: Add the Tx antenna number for CA PUCCH requirements | Huawei | imported from 3GU |
R4‑120118 | TS36.101 CR: on eDL-MIMO channel model using cross-polarized antennas | Huawei, HiSilicon | imported from 3GU |
R4‑120119 | Introduction of 8Tx ULA correlation matrix into 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑120120 | TS36.101 CR: Correction to MBMS Performance Test Parameters | Huawei, HiSilicon | imported from 3GU |
R4‑120121 | TS36.101 CR: Correction to MBMS Performance Test Parameters | Huawei, HiSilicon | imported from 3GU |
R4‑120122 | Consideration on the rank adaptation test with power imbalance | Huawei, HiSilicon | imported from 3GU |
R4‑120123 | TP for TR ab.cde (inter-band CA): 1UL/2DL 2UL/2DL IMD study for B3 + B7 CA | TeliaSonera AB | imported from 3GU |
R4‑120124 | TP for TR ab.cde (inter-band CA): Handling of inter-band CA with 2ULs | TeliaSonera AB | imported from 3GU |
R4‑120125 | Io difference band-independent in Inter-frequency RSRP TDD TC A.9.1.4 | Anritsu | imported from 3GU |
R4‑120126 | Inter-RAT E-UTRA RSRP, RSRQ band dependency | Anritsu | imported from 3GU |
R4‑120127 | Inter-RAT E-UTRA RSRP, RSRQ band dependency | Anritsu | imported from 3GU |
R4‑120128 | Inter-RAT E-UTRA RSRP, RSRQ band dependency | Anritsu | imported from 3GU |
R4‑120129 | Inter-RAT E-UTRA RSRP, RSRQ Test cases band dependency | Anritsu | imported from 3GU |
R4‑120130 | Thresholds and margins in RRM test case A.8.11.4 | Anritsu | imported from 3GU |
R4‑120131 | Thresholds and margins in RRM test case A.8.11.4 | Anritsu | imported from 3GU |
R4‑120132 | Thresholds and margins in RRM test case A.8.11.4 | Anritsu | imported from 3GU |
R4‑120133 | TDD PRACH Test cases value of PRACH Configuration Index and first preamble power | Anritsu | imported from 3GU |
R4‑120134 | TDD PRACH Test cases value of PRACH Configuration Index and first preamble power | Anritsu | imported from 3GU |
R4‑120135 | TDD PRACH Test cases value of PRACH Configuration Index and first preamble power | Anritsu | imported from 3GU |
R4‑120136 | Harmonic exceptions in LTE UE to UE co-ex tests | Anritsu | imported from 3GU |
R4‑120137 | RF: PDCCH wrong detection in receiver spurious emissions test (Rel-8) | Rohde & Schwarz | imported from 3GU |
R4‑120138 | Considerations on Band7 & Band38 UE coexistence | ZTE | imported from 3GU |
R4‑120139 | RSRQ Measurement wider Bandwidth | ZTE | imported from 3GU |
R4‑120140 | TP for UE Reference sensitivity for LTE_CA_B7 | ZTE, China Unicom, China Telecom, Nokia Corporation | imported from 3GU |
R4‑120141 | Text proposal on UE receiver characteristics for CA in Band 38 | ZTE | imported from 3GU |
R4‑120142 | Summary of the deterministic Analysis on TDD eTIMA phase1 | ZTE | imported from 3GU |
R4‑120143 | System Simulation Results on TDD eTIMA phase1 | ZTE | imported from 3GU |
R4‑120144 | LS on possibility of TDD dynamic configuration in different scenarios phase1 | ZTE | imported from 3GU |
R4‑120145 | Remaining issues for CQI/PMI performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑120146 | Unified titles for Rel-10 CSI tests | Huawei, HiSilicon | imported from 3GU |
R4‑120147 | Power settings for Rel-10 static CQI test | Huawei, HiSilicon | imported from 3GU |
R4‑120148 | Remaining issues for RI requirement | Huawei, HiSilicon | imported from 3GU |
R4‑120149 | Correction on CSI-RS based CQI and PMI tests for Rel-10 | Huawei, HiSilicon | imported from 3GU |
R4‑120150 | RI requirements for Rel-10 | Huawei, HiSilicon | imported from 3GU |
R4‑120151 | E-UTRA MR BS absolute ACLR requirement | Huawei | imported from 3GU |
R4‑120152 | E-UTRA MR BS Output power requirement | Huawei | imported from 3GU |
R4‑120153 | TP on Tx operating band unwanted emissions for MR BS | Huawei | imported from 3GU |
R4‑120154 | Simulation results for in-band blocking | Huawei | imported from 3GU |
R4‑120155 | TP on in-band blocking for MR BS | Huawei | imported from 3GU |
R4‑120156 | Additional simulation assumptions for MR BS (UTRA/E-UTRA) | Huawei | imported from 3GU |
R4‑120157 | UL Power control for MR BS | Huawei | imported from 3GU |
R4‑120158 | TP on Tx spurious emission requirement for MR BS | Huawei | imported from 3GU |
R4‑120159 | TP on Rx spurious emissions for MR BS | Huawei | imported from 3GU |
R4‑120160 | TP on out of band blocking requirement for MR BS | Huawei | imported from 3GU |
R4‑120161 | Initial simulation result for E-UTRA MR BS REFSENS | Huawei | imported from 3GU |
R4‑120162 | Discussion on MSR Pico RF requirements | Huawei | imported from 3GU |
R4‑120163 | TP on output power for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120164 | TP on frequency error for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120165 | TP on UEM for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120166 | TP on ACLR for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120167 | TP on Tx intermodulation for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120168 | TP on Reference sensitivity for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120169 | TP on Rx dynamic range for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120170 | TP on spurious emissions (additional) for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120171 | TP on in-band blocking for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120172 | Discussion on spurious emission requirement for co-located LA BS in TS 25.104 | Huawei | imported from 3GU |
R4‑120173 | Spurious emission requirement for coexistence with co-located and co-sited LA BS in TS 25.104-Rel10 | Huawei | imported from 3GU |
R4‑120174 | Spurious emission requirement for coexistence with co-located and co-sited LA BS in TS 25.104-Rel11 | Huawei | imported from 3GU |
R4‑120175 | TP on narrowband blocking for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120176 | TP on ACS for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120177 | TP on out of band blocking for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120178 | TP on Rx spurious emissions for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120179 | TP on Rx intermodulation for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120180 | TP on in channel selectivity for MSR Local Area BS | Huawei | imported from 3GU |
R4‑120181 | Time Alignment Error for NC CA | Huawei | imported from 3GU |
R4‑120182 | Co-existence with Band 27 | Huawei | imported from 3GU |
R4‑120183 | Discussion on open issues for ULTD | Huawei, Hisilicon, | imported from 3GU |
R4‑120184 | Remaining core requirements | Huawei, Hisilicon | imported from 3GU |
R4‑120185 | TP subclause 3.1 and 3.2 Definitions and Abbr | Huawei | imported from 3GU |
R4‑120186 | Required change to TS25.101 on general part for ULTD | Huawei, Hisilicon | imported from 3GU |
R4‑120187 | TP subclause 4.1 SI Objective and methodologies | Huawei | imported from 3GU |
R4‑120188 | Required change to TS25.101 due to introduction of CLTD | Huawei, Hisilicon | imported from 3GU |
R4‑120189 | TP subclause 4.2 reference structure | Huawei | imported from 3GU |
R4‑120190 | Required change to 25.101 due to introduction of OLTD | Huawei, Hisilicon | imported from 3GU |
R4‑120191 | On the impacts to UPH definition by UE architecture | Huawei, Hisilicon | imported from 3GU |
R4‑120192 | ------------ | ------------ | imported from 3GU |
R4‑120193 | ------------ | ------------ | imported from 3GU |
R4‑120194 | TP subclause 5.1 Applications | Huawei | imported from 3GU |
R4‑120195 | TP subclause 5.2 Deployment scenarios | Huawei | imported from 3GU |
R4‑120196 | TP subclause 5.3 Classifications | Huawei | imported from 3GU |
R4‑120197 | ------------ | ------------ | imported from 3GU |
R4‑120198 | Discussion on additional carrier types for carrier aggregation enhancement | Huawei, Hisilicon | imported from 3GU |
R4‑120199 | TP subclause 6.1 General review of the transmitter characteristic | Huawei | imported from 3GU |
R4‑120200 | TP subclause 6.2 The transmitter spatial characteristics | Huawei | imported from 3GU |
R4‑120201 | Reply LS on additional carrier types for carrier aggregation enhancement | Huawei, Hisilicon | imported from 3GU |
R4‑120202 | ------------ | ------------ | imported from 3GU |
R4‑120203 | TP subclause 7.1: General review of receiver characteristics | Huawei | imported from 3GU |
R4‑120204 | On relative phase discontinuity | Huawei, Hisilicon | imported from 3GU |
R4‑120205 | TP subclause 7.2: The receiver spatial characteristics | Huawei | imported from 3GU |
R4‑120206 | Receiver structure of intra-band non-contiguous CA | Huawei, Hisilicon | imported from 3GU |
R4‑120207 | TP subclause 8.1: Comparison of different test methods | Huawei | imported from 3GU |
R4‑120208 | UE to UE coexistence requirements in CA | Huawei, Hisilicon | imported from 3GU |
R4‑120209 | TP subclause 8.2: AAS test methodologies | Huawei | imported from 3GU |
R4‑120210 | TP subclause Annex A: The SI progress and work plan | Huawei | imported from 3GU |
R4‑120211 | Non-CA UE coexistence for Band 38 and Band 7 | Huawei, Hisilicon | imported from 3GU |
R4‑120212 | Technical Report for AAS SI, ver 0.1.0 | Huawei | imported from 3GU |
R4‑120213 | Non-CA Band 7 and Band 38 coexistence | Huawei, Hisilicon | imported from 3GU |
R4‑120214 | Non-CA Band 7 and Band 38 coexistence | Huawei, Hisilicon | imported from 3GU |
R4‑120215 | Further considerations of AAS study item | Huawei | imported from 3GU |
R4‑120216 | Non-CA Band 7 and Band 38 coexistence | Huawei, Hisilicon | imported from 3GU |
R4‑120217 | Coexistence simulation results in non-CA case | Huawei, Hisilicon | imported from 3GU |
R4‑120218 | Technial Report for CA in Band 38 ver 0.3.0 | Huawei, Hisilicon | imported from 3GU |
R4‑120219 | Text proposal: Required changes to TS36.101 | Huawei, Hisilicon | imported from 3GU |
R4‑120220 | Text proposal: Required changes to TS36.307 | Huawei, Hisilicon | imported from 3GU |
R4‑120221 | Text proposal: E-UTRA RRM requirements for UE | Huawei, Hisilicon | imported from 3GU |
R4‑120222 | TP Coexistence simulation results in CA | Huawei, Hisilicon | imported from 3GU |
R4‑120223 | Text proposal: Additional spurious emission requirements for CA in Band 38 | Huawei, Hisilicon | imported from 3GU |
R4‑120224 | Demodulation performance requirements for CA in Band 38 | Huawei, Hisilicon | imported from 3GU |
R4‑120225 | Text proposal: UE Receiver RF requirements for CA in Band 38 | Huawei, Hisilicon | imported from 3GU |
R4‑120226 | Clarification of unwanted emissions requirements for TS 25.104 Rel-10 | Huawei | imported from 3GU |
R4‑120227 | Clarification of unwanted emissions requirements for TS 36.104 Rel-10 | Huawei | imported from 3GU |
R4‑120228 | Clarification of unwanted emissions requirements for TS 37.104 Rel-10 | Huawei | imported from 3GU |
R4‑120229 | CA_B5-B12: Core requirements text proposal | US Cellular | imported from 3GU |
R4‑120230 | Impact of transmit power distribution on RPD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120231 | Comments on the RPD requirements for Rel-10 UEs | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120232 | Open issues for UE receiver requirements for non-contiguous intra-band CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120233 | Overview of UE transmitter requirements for non-contiguous intra-band CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120234 | Way Forward for Band 26 on coexistence with other adjacent services | WG Chairman | imported from 3GU |
R4‑120235 | RAN4 #B26AH Meeting Report | WG Chairman | imported from 3GU |
R4‑120236 | [DRAFT] LS on Channelization scenarios for public protection and disaster relief operations in some parts of the UHF band in accordance with Resolution 646 (WRC-03) | WG Chairman | imported from 3GU |
R4‑120237 | MIMO OTA tests and reality | Rohde & Schwarz | imported from 3GU |
R4‑120238 | RF: PDCCH wrong detection in receiver spurious emissions test (Rel-9) | Rohde & Schwarz | imported from 3GU |
R4‑120239 | RF: PDCCH wrong detection in receiver spurious emissions test (Rel-10) | Rohde & Schwarz | imported from 3GU |
R4‑120240 | MIMO 2x2 Reference Antennas, latest results | TB Officer | imported from 3GU |
R4‑120241 | CTIA Hand Phantom Experience in OTA Testing ( Source: , To: , Cc: ) | CTIA ERP Chair & vice Chair | imported from 3GU |
R4‑120242 | Adding TRP/TRS values for LEE devices to empty tables in TS 25.144 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120243 | Adding TRP minimum performance requirement values for LEE (Laptop Embedded Equipment) devices for roaming bands | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120244 | Adding TRS minimum performance requirement values for LEE (Laptop Embedded Equipment) devices for roaming bands | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120245 | Adding recommended TRP and TRS requirement values for LEE (Laptop Embedded Equipment) devices in annex B | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120246 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (1 + 7) | Alcatel-Lucent | imported from 3GU |
R4‑120247 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (3 + 5) | Alcatel-Lucent | imported from 3GU |
R4‑120248 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (3 + 20) | Alcatel-Lucent | imported from 3GU |
R4‑120249 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 13) | Alcatel-Lucent | imported from 3GU |
R4‑120250 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (8 + 20) | Alcatel-Lucent | imported from 3GU |
R4‑120251 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS34.124 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120252 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS37.104 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120253 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS37.113 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120254 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS37.141 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120255 | E-UTRA FDD RSTD Measurement Accuracy Test in Carrier Aggregation | ZTE | imported from 3GU |
R4‑120256 | E-UTRAN FDD Event-Triggered Reporting on Deactivated SCell with PCell Interruption Test in Carrier Aggregation | ZTE | imported from 3GU |
R4‑120257 | Consideration on R-PDCCH performance with cross-interleaving | Ericsson, ST Ericsson | imported from 3GU |
R4‑120258 | Introduction of reference channel for eICIC demodulation | Ericsson, ST Ericsson | imported from 3GU |
R4‑120259 | Consideration on the open issues for eICIC demodulation | Ericsson, ST Ericsson | imported from 3GU |
R4‑120260 | Simulation results for CQI test in eICIC | Ericsson, ST Ericsson | imported from 3GU |
R4‑120261 | SINR threshold setting for eICIC RLM | Ericsson, ST Ericsson | imported from 3GU |
R4‑120262 | Clarification on test procedure for BS In-channel selectivity test | Alcatel-Lucent | imported from 3GU |
R4‑120263 | Clarification on test procedure for BS In-channel selectivity test | Alcatel-Lucent | imported from 3GU |
R4‑120264 | Clarification on test procedure for BS In-channel selectivity test | Alcatel-Lucent | imported from 3GU |
R4‑120265 | Correction on BS Spurious emissions limits for co-existence with Band 25 uplink | Alcatel-Lucent | imported from 3GU |
R4‑120266 | BS to BS coexistence between APAC 700 FDD and possible re-arrangements of Lower E850 | Alcatel-Lucent | imported from 3GU |
R4‑120267 | Proposal on absolute ACLR limit for E-UTRA Medium Range BS | Alcatel-Lucent | imported from 3GU |
R4‑120268 | Proposal on operating band unwanted emissions for E-UTRA Medium Range BS | Alcatel-Lucent | imported from 3GU |
R4‑120269 | Recommendations on BS requirement for time alignment between transmitter branches for non-contiguous intra-band carrier aggregation | Alcatel-Lucent | imported from 3GU |
R4‑120270 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS25.307 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120271 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS25.307 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120272 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS25.307 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120273 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS25.307 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120274 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS25.307 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120275 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS25.307 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120276 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS25.307 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120277 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS25.307 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120278 | Addition of new band XXVI (Extending 850 MHz Upper Band (814 - 849 MHz) | Alcatel-Lucent, Samsung, Sprint | imported from 3GU |
R4‑120279 | Correction for Pcmax | ITRI | imported from 3GU |
R4‑120280 | RF front-end architecture consideration for inter-band applications | ITRI | imported from 3GU |
R4‑120281 | RF front-end architecture consideration for intra-band applications | ITRI | imported from 3GU |
R4‑120282 | Inter-band Carrier Aggregation TR v0.1.0 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120283 | Addition of QPSK UL RMCs with 54 RBs partial allocation | Anritsu | imported from 3GU |
R4‑120284 | Addition of QPSK UL RMCs with 54 RBs partial allocation | Anritsu | imported from 3GU |
R4‑120285 | Addition of QPSK UL RMCs with 54 RBs partial allocation | Anritsu | imported from 3GU |
R4‑120286 | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | Anritsu | imported from 3GU |
R4‑120287 | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | Anritsu | imported from 3GU |
R4‑120288 | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | Anritsu | imported from 3GU |
R4‑120289 | 8C-HSDPA: Introduction of BS Core Requirements in TS 25.104 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120290 | 8C-HSDPA: Introduction of BS Core Requirements in TS 25.141 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120291 | 8C-HSDPA: Introduction of new configuration in TS 25.104 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120292 | 8C-HSDPA: Introduction of new configuration in TS 25.141 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120293 | MC DB HSDPA: Introduction of configurations I-2-VIII-2 and II-1-V-2 in TS 25.104 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120294 | MC DB HSDPA: Introduction of configurations I-2-VIII-2 and II-1-V-2 in TS 25.141 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120295 | Discussion on RSTD Measurement Reporting Test Cases for Carrier Aggregation | Alcatel-Lucent | imported from 3GU |
R4‑120296 | Discussion on RSTD Measurement Accuracy Test Cases for Carrier Aggregation | Alcatel-Lucent | imported from 3GU |
R4‑120297 | FDD RSTD Measurement Reporting Delay Test Case for Carrier Aggregation | Alcatel-Lucent | imported from 3GU |
R4‑120298 | TDD RSTD Measurement Reporting Delay Test Case for Carrier Aggregation | Alcatel-Lucent | imported from 3GU |
R4‑120299 | FDD RSTD Measurement Accuracy Test Case for Carrier Aggregation | Alcatel-Lucent | imported from 3GU |
R4‑120300 | TDD RSTD Measurement Accuracy Test Case for Carrier Aggregation | Alcatel-Lucent | imported from 3GU |
R4‑120301 | Add Missing Case for RSTD CA Measurement Accuracy Requirements | Alcatel-Lucent | imported from 3GU |
R4‑120302 | RSTD Measurement Accuracy with Small PRS bandwidth | Alcatel-Lucent | imported from 3GU |
R4‑120303 | Clarification of difference between conformance LTE OTA and performance MIMO OTA | CATR, NTT DOCOMO, CMCC, China Telecom, China Unicom, SAMSUNG, NOKIA, ZTE, ETS-Lindgren | imported from 3GU |
R4‑120304 | New study item proposal: Measurements of radio performances for LTE terminals- conformance testing methodology | CATR, NTT DOCOMO, CMCC, China Telecom, China Unicom, SAMSUNG, NOKIA, ZTE, ETS-Lindgren | imported from 3GU |
R4‑120305 | Antenna Model for Active Antenna Array Systems | Kathrein | imported from 3GU |
R4‑120306 | Add upper 850MHz band in 25.113 | Sprint | imported from 3GU |
R4‑120307 | ------------ | ------------ | imported from 3GU |
R4‑120308 | Impairment Results for TDD CA UE Demodulation requirements | CATT | imported from 3GU |
R4‑120309 | Correction of Actual code rate for CSI RMCs | CATT, Ericsson, ST-Ericsson | imported from 3GU |
R4‑120310 | Simulation Assumptions on DTX detection of PUCCH CQI | Nokia Siemens Networks | imported from 3GU |
R4‑120311 | On DIP distribution for Advanced Receivers Studies | Nokia, Nokia Siemens Networks | imported from 3GU |
R4‑120312 | Correction of Actual code rate for CSI RMCs | CATT, Ericsson, ST-Ericsson | imported from 3GU |
R4‑120313 | Link level performance in Scenario 1 (TM6) of enhanced UE receiver | Nokia Siemens Networks, Nokia | imported from 3GU |
R4‑120314 | System simulation results on impact of reduced carrier spacing | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120315 | Link level performance in Scenario 2 (TM9) of enhanced UE receiver | Nokia, Nokia Siemens Networks | imported from 3GU |
R4‑120316 | Correction of Actual code rate for CSI RMCs | CATT, Ericsson, ST-Ericsson | imported from 3GU |
R4‑120317 | Discussion on inter frequency measurement requirment without gap | Research In Motion UK Limited | imported from 3GU |
R4‑120318 | Simulation results for CQI reporting (frequency selective) for TDD | CATT | imported from 3GU |
R4‑120319 | Simulation results for CQI reporting (frequency non-selective) for TDD | CATT | imported from 3GU |
R4‑120320 | Proposed Transmit Intermodulation and Transmit Pulse Shape Filter Requirements for OLTD Beam-forming | Magnolia Broadband | imported from 3GU |
R4‑120321 | Proposed Phase Discontinuity Requirements for OLTD Beam-forming | Magnolia Broadband | imported from 3GU |
R4‑120322 | CA_B4-B12: Core requirements text proposal | Cox Communications | imported from 3GU |
R4‑120323 | TDD impairment results for CA UE performance | ST-Ericsson, Ericsson | imported from 3GU |
R4‑120324 | Impairment results for SDR FDD and TDD test scenario on CA | ST-Ericsson, Ericsson | imported from 3GU |
R4‑120325 | Performance test for soft buffer implementation in CA scenarios | ST-Ericsson, Ericsson | imported from 3GU |
R4‑120326 | Test scenario for power imbalance under CA deployment | ST-Ericsson, Ericsson | imported from 3GU |
R4‑120327 | CSI requirements under CA deployment in Rel-10 | ST-Ericsson, Ericsson | imported from 3GU |
R4‑120328 | Radio Reference Architecture for BS with AAS | Alcatel-Lucent | imported from 3GU |
R4‑120329 | BS AAS Requirements and Tests | Alcatel-Lucent | imported from 3GU |
R4‑120330 | BS AAS Definition and Reference Points | Alcatel-Lucent | imported from 3GU |
R4‑120331 | Inter-freq RRM Requirements for feICIC | Alcatel-Lucent | imported from 3GU |
R4‑120332 | Finalizing the Requirements for Home BS output power for E-UTRA protection | Alcatel-Lucent | imported from 3GU |
R4‑120333 | Update to improve readability of tables in section 4.5 of 37.104 | Alcatel Lucent | imported from 3GU |
R4‑120334 | Some considerations for enhanced cell FACH | Alcatel-Lucent | imported from 3GU |
R4‑120335 | BS-BS Interference: Coexistence results | Alcatel-Lucent | imported from 3GU |
R4‑120336 | Proposal on absolute ACLR limit for MSR medium range / local area BS class | Alcatel-Lucent | imported from 3GU |
R4‑120337 | Time alignment between transmitter branches for non-contiguous 4C HSDPA | Alcatel-Lucent | imported from 3GU |
R4‑120338 | Proposal on operating band unwanted emissions for MSR medium range / local area BS | Alcatel-Lucent | imported from 3GU |
R4‑120339 | Absolute limit for CACLR: Removal of brackets | Ericsson | imported from 3GU |
R4‑120340 | Absolute limit for CACLR: Removal of brackets | Ericsson | imported from 3GU |
R4‑120341 | E-UTRA channel BW restrictions per band for BS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120342 | E-UTRA channel BW restrictions per band for BS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120343 | E-UTRA channel BW restrictions per band for BS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120344 | E-UTRA channel BW restrictions per band for BS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120345 | Definition of synchronized operation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120346 | Definition of synchronized operation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120347 | Definition of synchronized operation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120348 | Definition of synchronized operation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120349 | Definition of synchronized operation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120350 | TP for Overview of international regulation related to AAS | Ericsson, Huawei, NTT DOCOMO | imported from 3GU |
R4‑120351 | TP for Medium Range BS class simulation assumptions and scenarios | Ericsson | imported from 3GU |
R4‑120352 | TP for MR E-UTRA BS Operating band unwanted emissions | Ericsson, Nokia Siemens Networks | imported from 3GU |
R4‑120353 | TP for MR E-UTRA BS Spurious emissions | Ericsson | imported from 3GU |
R4‑120354 | TP for MR E-UTRA BS ACLR absolute limit | Ericsson | imported from 3GU |
R4‑120355 | TP for MR E-UTRA BS Reference Sensitivity | Ericsson | imported from 3GU |
R4‑120356 | TP for MR E-UTRA BS Receiver dynamic range | Ericsson | imported from 3GU |
R4‑120357 | TP for MR E-UTRA BS Blocking requirements | Ericsson | imported from 3GU |
R4‑120358 | TP for MR E-UTRA BS ACS and narrowband blocking | Ericsson | imported from 3GU |
R4‑120359 | TP for MR E-UTRA BS Receiver spurious emissions | Ericsson | imported from 3GU |
R4‑120360 | TP for MR E-UTRA BS Receiver intermodulation | Ericsson | imported from 3GU |
R4‑120361 | TP for MR E-UTRA BS In-channels selectivity | Ericsson | imported from 3GU |
R4‑120362 | TP for MR MSR BS Unwanted Emissions Mask (UEM) | Ericsson, Nokia Siemens Networks | imported from 3GU |
R4‑120363 | TP for MR MSR BS In-band blocking | Ericsson | imported from 3GU |
R4‑120364 | TP for MR MSR BS Narrowband blocking | Ericsson | imported from 3GU |
R4‑120365 | TP for MR MSR BS Receiver intermodulation | Ericsson | imported from 3GU |
R4‑120366 | MSR LA requirement overview | Ericsson | imported from 3GU |
R4‑120367 | Consideration on PCell interruption requirement during SCell activation/deactivation | Research In Motion UK Limited; Mediatek Inc | imported from 3GU |
R4‑120368 | On the Conditions to Activate/Deactivate P-MPR | SOFTBANK MOBILE | imported from 3GU |
R4‑120369 | TP for 36.809: Simulation Methodology and Parameters | Polaris Wireless | imported from 3GU |
R4‑120370 | TP for 36.809: Simulation Methodology and Parameters | Polaris Wireless | imported from 3GU |
R4‑120371 | Initial RFPM Simulation Results | Polaris Wireless | imported from 3GU |
R4‑120372 | eICIC HeNB Autonomous Power setting finalization | picoChip | imported from 3GU |
R4‑120373 | TP for Correction on APAC700 WI TR regarding Digital Trunked Radio System band in Korea | KT | imported from 3GU |
R4‑120374 | Throughput simulation results for enhanced LTE UE receiver | Huawei, HiSilicon | imported from 3GU |
R4‑120375 | Discussion on advanced receiver modelling for system level performance evaluation | Huawei, HiSilicon | imported from 3GU |
R4‑120376 | TP for TR 37.804 Technical conditions for E-UTRA in Korea | KT | imported from 3GU |
R4‑120377 | TP for TR 37.804 Harmonization in the 900MHz ranges Japan and Korea | KT | imported from 3GU |
R4‑120378 | Discussion on new 2.1GHz Spectrum Allocation | ETRI, KT, LGE, LG Uplus, Samsung, SKT, TTA | imported from 3GU |
R4‑120379 | Correction of PRS BW definition for RSTD measurements | LG Electronics, Renesas Mobile Europe, Qualcomm Incorporated, Samsung | imported from 3GU |
R4‑120380 | Correction of PRS BW definition for RSTD measurements | LG Electronics, Renesas Mobile Europe, Qualcomm Incorporated, Samsung | imported from 3GU |
R4‑120381 | Study of UE emission level for the coexistence of Band 7 and Band 38 | Samsung | imported from 3GU |
R4‑120382 | CQI test results for non-selective fading channel | LG Electronics | imported from 3GU |
R4‑120383 | Rank Indicator test results for eDL-MIMO | LG Electronics | imported from 3GU |
R4‑120384 | Simulation results for UE Cat 6 sustained data rate test | NEC | imported from 3GU |
R4‑120385 | Enhancement of additional emission requirement handling^^ | Samsung | imported from 3GU |
R4‑120386 | Simulation results for UE Cat 4 soft buffering test | NEC | imported from 3GU |
R4‑120387 | Simulation results for eDL-MIMO CQI TDD tests | NEC | imported from 3GU |
R4‑120388 | MPR mask for multi-clustered simultaneous transmission of single CC | LG Electronics | imported from 3GU |
R4‑120389 | Simulation results for eDL-MIMO PMI TDD tests | NEC | imported from 3GU |
R4‑120390 | Link level simulation results for the enhanced performance requirement for LTE UE SI | NEC | imported from 3GU |
R4‑120391 | RF simulation results for multi-clustered simultaneous transmission for single CC | LG Electronics | imported from 3GU |
R4‑120392 | Simulation results for UE soft buffer implementation issues in CA | LG Electronics | imported from 3GU |
R4‑120393 | TP for TR ab.cde (inter-band CA): Harmonic interference on UE and BS in CA_1_19 | NTT DOCOMO | imported from 3GU |
R4‑120394 | TP for TR ab.cde (inter-band CA): Harmonic interference on UE and BS in CA_1_21 | NTT DOCOMO | imported from 3GU |
R4‑120395 | Simulation results for evaluation of eICIC PDSCH demodulation performance | LG Electronics | imported from 3GU |
R4‑120396 | Simulation results for evaluation of eICIC PDCCH demodulation performance | LG Electronics | imported from 3GU |
R4‑120397 | Simulation results for evaluation of eICIC PHICH demodulation performance | LG Electronics | imported from 3GU |
R4‑120398 | Pmin in HeNB Power Setting for Co-Channel E-UTRA Protection | Nokia Siemens Networks, Nokia | imported from 3GU |
R4‑120399 | Finalizing Home BS Output Power parameter for co-channel E-UTRA protection in 36.104 | Nokia Siemens Networks, Nokia, Picochip, NEC, III | imported from 3GU |
R4‑120400 | Simulation results for evaluation of eICIC CQI report test | LG Electronics | imported from 3GU |
R4‑120401 | Finalizing Home BS Output Power parameters for co-channel E-UTRA protection in 36.141 | Nokia Siemens Networks, Nokia, Picochip, NEC, III | imported from 3GU |
R4‑120402 | Considerations on Reduced Transmission Power ABS Concept | Nokia Siemens Networks, Nokia | imported from 3GU |
R4‑120403 | CR on RSRQ test cases for eICIC | LG Electronics | imported from 3GU |
R4‑120404 | Preliminary view on coexistence for LTE TDD networks with flexible UL/DL configuration | Nokia, Nokia Siemens Networks | imported from 3GU |
R4‑120405 | Disccusion on RSRQ of inter frequency in Further eICIC | LG Electronics | imported from 3GU |
R4‑120406 | Revised System level simulation results of DIP for Advanced Receiver | LG Electronics | imported from 3GU |
R4‑120407 | Link level simulation results for advanced receiver | LG Electronics | imported from 3GU |
R4‑120408 | Information of KCC plan on new 2.1GHz Spectrum Re-allocation in Korea | TTA | imported from 3GU |
R4‑120409 | Information to 3GPP RAN4 on 900MHz LTE UE to UE coexistence requirement in Korea | TTA | imported from 3GU |
R4‑120410 | CA_41C A-MPR for contiguous allocation | Nokia Corporation | imported from 3GU |
R4‑120411 | Work Item Proposal: LTE Advanced Carrier Aggregation of Band 3 and Band 8 | KT | imported from 3GU |
R4‑120412 | Carrier Aggregation Opportunity for Band 26 | KT | imported from 3GU |
R4‑120413 | Impact of a laptop ground plane phantom on TRS of a USB dongle^^ | Nokia Corporation | imported from 3GU |
R4‑120414 | Impact of a laptop ground plane phantom on TRS of a USB dongle^^ | Nokia Corporation | imported from 3GU |
R4‑120415 | Addition of UE Spurious Emissions Requirement for Band V and Public Safety Band in TS36.101 | LG U+ | imported from 3GU |
R4‑120416 | Simulation results for static eICIC CQI tests | Qualcomm Incorporated | imported from 3GU |
R4‑120417 | Correction of frequency range for spurious emission requirements | Rohde & Schwarz | imported from 3GU |
R4‑120418 | Enhanced ICIC cell identification requirements with DRX | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R4‑120419 | Correction of frequency range for spurious emission requirements | Rohde & Schwarz | imported from 3GU |
R4‑120420 | Correction of frequency range for spurious emission requirements | Rohde & Schwarz | imported from 3GU |
R4‑120421 | Simulation results for eICIC demodulation test cases | Qualcomm Incorporated | imported from 3GU |
R4‑120422 | Further considerations on CSI accuracy reporting test cases for eICIC | Qualcomm Incorporated | imported from 3GU |
R4‑120423 | Coexistence requirement for Band 5 and Public Safety Band in Korea. | TTA | imported from 3GU |
R4‑120424 | Interference conditions for TM3 in eICIC | Qualcomm Incorporated | imported from 3GU |
R4‑120425 | Discussion on EVM and global in channel test for CA | Rohde & Schwarz | imported from 3GU |
R4‑120426 | Inter cell/frequency measurement requirements with CELL_FACH longer DRX | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120427 | UE spurious emissions for Band 7 and Band 38 coexistence | Nokia Corporation | imported from 3GU |
R4‑120428 | Conditional DIP distribution for synchronous network operation | Qualcomm Incorporated | imported from 3GU |
R4‑120429 | CR for EVM and global in channel test for Intra-Band CA | Rohde & Schwarz | imported from 3GU |
R4‑120430 | FDD-TDD co-ex 54 RB restriction frequency range | Nokia Corporation | imported from 3GU |
R4‑120431 | On MMSE receiver performance under synchronous and asynchronous inter cell interference | Qualcomm Incorporated | imported from 3GU |
R4‑120432 | UE spurious emissions for Band 7 and Band 38 coexistence | Nokia Corporation | imported from 3GU |
R4‑120433 | Assumptions and deployment scenarios for additional new carrier types | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R4‑120434 | Additions and Corrections of eICIC demod tests | Qualcomm Incorporated | imported from 3GU |
R4‑120435 | Lab Comparison for MIMO OTA Multiprobe Method | Nokia Corporation | imported from 3GU |
R4‑120436 | UE spurious emissions for Band 7 and Band 38 coexistence | Nokia Corporation | imported from 3GU |
R4‑120437 | Co-existence with APAC700 band | KDDI | imported from 3GU |
R4‑120438 | Introduction of hand phantom to TR25.914 | Nokia Corporation | imported from 3GU |
R4‑120439 | Intra band contiguos CA Ue to Ue Co-ex | Nokia Corporation | imported from 3GU |
R4‑120440 | CA_1C coexistence with PHS and Band 34 | Nokia Corporation | imported from 3GU |
R4‑120441 | Considerations for completing MIMO OTA Study Item | Nokia Corporation | imported from 3GU |
R4‑120442 | Way forward for inter-band CA Class A2 | Nokia Corporation | imported from 3GU |
R4‑120443 | Impact of 8C-HSDPA introduction on BS performance requirements | Nokia Siemens Networks | imported from 3GU |
R4‑120444 | Reply LS on status of the OTA Antenna Study Item for Head & Hand Measurements | Nokia Corporation | imported from 3GU |
R4‑120445 | Harmonics and/or Inter-Modulation distortions analysis on Inter-band CA for Band 1+18 | KDDI | imported from 3GU |
R4‑120446 | Assumptions for simulation of UL CLTD time misalignment impact on BS performance | Nokia Siemens Networks, Qualcomm Incorporated | imported from 3GU |
R4‑120447 | Harmonics and/or Inter-Modulation analysis on Inter-band CA for Band 11+18 | KDDI | imported from 3GU |
R4‑120448 | Diplexer performance data regarding Band 11 (1.5 GHz band in Japan) | KDDI | imported from 3GU |
R4‑120449 | Simulation results of UL CLTD time misalignment impact on BS performance | Nokia Siemens Networks | imported from 3GU |
R4‑120450 | Correction on the definition of Repeater Pass Band and on the table of Regional requirements | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120451 | Correction on the definition of Repeaters Pass Band and on the table of Regional requirements | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120452 | Introduction of operating frequency band XXII | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120453 | Introduction of operating frequency band XXII | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120454 | Proposed EPRE vs. Total Downlink Power Test Methodology | AT&T | imported from 3GU |
R4‑120455 | Introduction of operating frequency band XXV and protection limits towards E-UTRA Band 23 | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120456 | Introduction of operating frequency band XXV and protection limits towards E-UTRA Band 23 | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120457 | Introduction of protection limits towards E-UTRA Band 24, 33, 34, 38, 39, 40, 41, 42 and 43 | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120458 | Introduction of protection limits towards E-UTRA Band 24, 33, 34, 38, 39, 40, 41, 42 and 43 | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120459 | Correction on the definition of Repeater Pass Band, on the table of Regional requirements, and on tables of Unwanted Emission and Input Intermodulation | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120460 | Correction on the definition of Repeater Pass Band, on the table of Regional requirements, and on tables of Unwanted Emission and Input Intermodulation | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120461 | Introduction of operating frequency bands 23 and 25 | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120462 | Introduction of operating frequency bands 23 and 25 | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑120463 | Wideband RRM Measurements | Qualcomm Incorporated | imported from 3GU |
R4‑120464 | SNR Levels for eICIC Radio Link Monitoring Tests | Qualcomm Incorporated | imported from 3GU |
R4‑120465 | Interruptions at SCell Activation and Deactivation | Qualcomm Incorporated | imported from 3GU |
R4‑120466 | Draft RSRP Accuracy test for eICIC | Qualcomm Incorporated | imported from 3GU |
R4‑120467 | Draft Reply LS on UE Tx Timing Tests | Qualcomm Incorporated | imported from 3GU |
R4‑120468 | NC-intra-band CA reference receiver architecture | Nokia Corporation | imported from 3GU |
R4‑120469 | Add Extending 850 MHz Upper Band (814 – 849 MHz) to TS25.423 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120470 | Add Extending 850 MHz Upper Band (814 – 849 MHz) to TS25.461 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120471 | Add Extending 850 MHz Upper Band (814 – 849 MHz) to TS25.466 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑120472 | REL-10 CA specification editorial consistency | Nokia Corporation | imported from 3GU |
R4‑120473 | TP of UE RRM requirements for LTE_CA_B7 | Rapporteur | imported from 3GU |
R4‑120474 | Operator requirements for the MIMO OTA testing methodology | NTT DOCOMO | imported from 3GU |
R4‑120475 | Japanese DTV protection in APAC700 (FDD) | NTT DOCOMO | imported from 3GU |
R4‑120476 | Self-band protection for APAC700 (FDD) | NTT DOCOMO | imported from 3GU |
R4‑120477 | TRP and TRS requirements for UMTS band XIX | NTT DOCOMO | imported from 3GU |
R4‑120478 | ------------ | ------------ | imported from 3GU |
R4‑120479 | Further consideration on Japanese DTV protection for APAC700(FDD) | NTT DOCOMO | imported from 3GU |
R4‑120480 | REFSENS for APAC700(FDD) | NTT DOCOMO | imported from 3GU |
R4‑120481 | Conventional A-MPR tables for Band 26 UL | Nokia Corporation | imported from 3GU |
R4‑120482 | PUCCH over-provisioning based A-MPR solution for Band 26 UL | Nokia Corporation | imported from 3GU |
R4‑120483 | On APAC700 protection from Band 26 | NTT DOCOMO | imported from 3GU |
R4‑120484 | Protection of B27 using the same NS value as for PS protection. | Nokia Corporation | imported from 3GU |
R4‑120485 | Further analysis on B3_B7 diplexer data | NTT DOCOMO | imported from 3GU |
R4‑120486 | CA Band 1 and 19 specific requirements in TS 36.101 | NTT DOCOMO | imported from 3GU |
R4‑120487 | On spatial distribution aspects of receiver performance requirements | Ericsson | imported from 3GU |
R4‑120488 | Work plan for CA of Band 1 and Band 19 | NTT DOCOMO | imported from 3GU |
R4‑120489 | HeNB Autonomous Power Setting for Macro-eNB Scenario: correction to option A | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120490 | CA Band 1 and 21 specific requirements in TS 36.101 | NTT DOCOMO | imported from 3GU |
R4‑120491 | HeNB Autonomous Power Setting for Macro-eNB Scenario: correction to option A | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120492 | Work plan for CA of Band 1 and Band 21 | NTT DOCOMO | imported from 3GU |
R4‑120493 | Introduction of Equivalent frequency band indicator and required specification modification | NTT DOCOMO | imported from 3GU |
R4‑120494 | HeNB Autonomous Power Setting for Macro-eNB Scenario test case - 36.141 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120495 | Simulation results for soft buffer limitation on CA demodulation performance | NTT DOCOMO | imported from 3GU |
R4‑120496 | Framework for the CSI reporting accuracy performance requirements on eDL MIMO (Revision 4) | NTT DOCOMO | imported from 3GU |
R4‑120497 | Power control setting parameters for E-UTRA MR co-existence simulations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120498 | Clarification of colliding CRS in MBSFN ABS | NTT DOCOMO | imported from 3GU |
R4‑120499 | REFSENS simulation results for E-UTRA MR | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120500 | Test case for redirection from E-UTRAN FDD to UTRAN FDD without System Information | NTT DOCOMO | imported from 3GU |
R4‑120501 | Blocking simulation results for E-UTRA MR | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120502 | CQI reporting accuracy test on eDL MIMO | NTT DOCOMO | imported from 3GU |
R4‑120503 | Editorial corrections on the test cases of RRC connection release with redirection to UTRAN FDD | NTT DOCOMO | imported from 3GU |
R4‑120504 | PMI reporting accuracy test on eDL MIMO | NTT DOCOMO | imported from 3GU |
R4‑120505 | Test case for deactivated SCell measurements under AWGN with interruption checking | NTT DOCOMO | imported from 3GU |
R4‑120506 | Discussion for MBSFN ABS test scenarios on Rel.10 eICIC | NTT DOCOMO | imported from 3GU |
R4‑120507 | Corrections to Configured Transmitted Power | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120508 | TP for Enhanced performance requirements for LTE UE SI | NTT DOCOMO | imported from 3GU |
R4‑120509 | Performance Evaluation Results of MMSE-IRC Receiver based on Conditional Median DIP | NTT DOCOMO | imported from 3GU |
R4‑120510 | Further discussion on UE behaviours during SCell activation/ deactivation transitions | NTT DOCOMO | imported from 3GU |
R4‑120511 | Investigation on Typical DIP Scenario based on Average Throughput Gain of MMSE-IRC Receiver | NTT DOCOMO | imported from 3GU |
R4‑120512 | Clarification of the UE behaviours during SCell activation and deactivation transitions | NTT DOCOMO | imported from 3GU |
R4‑120513 | Applicability of Δ TIB and Δ RIB in low-high band combinations in sing-band mode | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120514 | On necessary margins for Rel-10 eICIC RLM requirements | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120515 | Preliminary simulation results for RSRQ measurement bandwidth | NTT DOCOMO | imported from 3GU |
R4‑120516 | dTIB and dRIB for CA_3-7 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120517 | Discussion on UE measurement requirements without gaps | NTT DOCOMO | imported from 3GU |
R4‑120518 | Alignment results for Rel-10 eICIC demodulation test cases | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120519 | NC-4C-HSDPA way forward | Renesas Mobile Europe | imported from 3GU |
R4‑120520 | NC-4C-HSDPA way forward | Renesas Mobile Europe | imported from 3GU |
R4‑120521 | NC-4C-HSDPA way forward | Renesas Mobile Europe | imported from 3GU |
R4‑120522 | Beamforming model for TM9 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120523 | 4 TX PMI simulation results | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120524 | 8 TX PMI simulation results | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120525 | On DIP profiles conditioned to -3dB geometry | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120526 | Summary of individual company contributions and averaged DIP profiles for weighted average throughput gain study | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120527 | Link level performance evaluation of MMSE-IRC receiver | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120528 | System level performance evaluation of MMSE-IRC receiver | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120529 | Verification of Channel Model Implementations | Elektrobit | imported from 3GU |
R4‑120530 | System Simulation assumptions for RSRQ BW | Renesas Mobile Europe Ltd., NTT Docomo | imported from 3GU |
R4‑120531 | Preliminary Results from RSRQ BW studies | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑120532 | System simulation results for demodulation requirement with power imbalance | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑120533 | Incomplete requirements for Transport Format Combination Selection for 4C-HSDPA | InterDigital | imported from 3GU |
R4‑120534 | Requirements for transport format combination selection in 3/4C-HSDPA | InterDigital | imported from 3GU |
R4‑120535 | Requirements introduction for Transport Format Combination Selection for 8C-HSDPA | InterDigital | imported from 3GU |
R4‑120536 | Requirements for transport format combination selection in 8-carrier HSDPA | InterDigital | imported from 3GU |
R4‑120537 | Requirement for CA demodulation with power imbalance | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120538 | consideration on TAE for intra-band non-congituous CA BS | CATT | imported from 3GU |
R4‑120539 | TP for 3GPP TR ab.cde V0.1.0 (2012-02) in Band 20+3 | Vodafone | imported from 3GU |
R4‑120540 | Clarification of eICIC RRM requirements | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120541 | The Upper Limit of Pcmax and P-MPR | InterDigital, Qualcomm Inc. | imported from 3GU |
R4‑120542 | Improved Minimum Performance Requirements for E-UTRA: Interference Rejection | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120543 | The impact of P-MPR on HSPA | InterDigital | imported from 3GU |
R4‑120544 | Proposal on TAE for intra-band non-congituous CA BS | CATT | imported from 3GU |
R4‑120545 | Considerations on testing CSG proximity function | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120546 | Band 7 and Band 38 UE to UE coexistence requirements | CMCC | imported from 3GU |
R4‑120547 | Requirements for UE that support measurements without gaps | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑120548 | Discussion on E-UTRA BS unwanted emission requirement | CATT | imported from 3GU |
R4‑120549 | Text proposal on E-UTRA medium range BS UEM | CATT | imported from 3GU |
R4‑120550 | ------------ | ------------ | imported from 3GU |
R4‑120551 | Text proposal on reference sensitivity for high power class RN access link | CMCC | imported from 3GU |
R4‑120552 | Text proposal on blocking characteristic for Relay access link | CMCC | imported from 3GU |
R4‑120553 | Text proposal on UE minimum output power for CA_38 | CMCC | imported from 3GU |
R4‑120554 | Text proposal on UE transmit off power for CA_38 | CMCC | imported from 3GU |
R4‑120555 | Evaluation results for R-PDCCH performance requirements | CMCC | imported from 3GU |
R4‑120556 | TP for 3GPP TR ab.cde V0.1.0 (2012-02) in Band 20+8 1UL UE side | Vodafone | imported from 3GU |
R4‑120557 | E-UTRA Medium range BS reference sensitivity simulations | CATT | imported from 3GU |
R4‑120558 | Simulation results on E-UTRA medium range BS blocking level | CATT | imported from 3GU |
R4‑120559 | Text proposal on E-UTRA medium range BS blocking requirement | CATT | imported from 3GU |
R4‑120560 | Inter-band CA for Band 20 and Band 8 categorization based on #UL carriers | Vodafone | imported from 3GU |
R4‑120561 | Corrections on test case of Event triggered reporting on deactivated Scell in non-DRX | CATT | imported from 3GU |
R4‑120562 | Band 7/38 UE-UE co-existence | CATT | imported from 3GU |
R4‑120563 | TP for TDD event triggered reporting on deactivating Scells and interruption probability (0.5%) without DRX | CATT | imported from 3GU |
R4‑120564 | TP for Relay classification | CATT | imported from 3GU |
R4‑120565 | TP for ON/OFF time mask of backhaul link | CATT | imported from 3GU |
R4‑120566 | Analysis on introduction of APAC700 band for TDD | CATT | imported from 3GU |
R4‑120567 | Inter-band CA 20-8 issues | Vodafone | imported from 3GU |
R4‑120568 | Email discussion summary on the feasibility study for LTE TDD eIMTA | CATT | imported from 3GU |
R4‑120569 | TP for TR APAC700: Carrier arrangement limitation for 20MHz CBW, and raster size | Vodafone | imported from 3GU |
R4‑120570 | LS on the feasibility of applying different UL-DL configurations in multi-cell scenarios | CATT | imported from 3GU |
R4‑120571 | Summary of the Bluetest Results and Learning Outcomes from the MIMO LTE Round Robin Measurement Campaign | Bluetest AB | imported from 3GU |
R4‑120572 | TR skeleton of Rel-11 FS_LTE_TDD_eIMTA | CATT | imported from 3GU |
R4‑120573 | RRC Connection Release with Redirection from E-UTRAN FDD to GERAN without System Information | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120574 | RRC Connection Release with Redirection from E-UTRAN TDD to GERAN without System Information | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120575 | TP to TR 37.976 for Adding Conclusions from the LTE MIMO Round Robin Measurement Campaign | Bluetest AB | imported from 3GU |
R4‑120576 | Core requirements for E-UTRAN TDD inter-RAT UTRAN FDD SI acquisition using autonomous gaps | Ericsson, ST-Ericsson, Huawei, HiSilicon | imported from 3GU |
R4‑120577 | Phase II CA RRM test case scenario 1 (FDD): Event-Triggered Reporting on SCell with PCell interruption | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120578 | Phase II CA RRM test case scenario 1 (TDD): Event-Triggered Reporting on SCell with PCell interruption | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120579 | Analysis of Inter-frequency Requirements for Measurements without Measurement Gaps | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120580 | Inter-frequency Requirements for Measurements without Measurement Gaps | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120581 | MIMO OTA meeting minutes | Vodafone | imported from 3GU |
R4‑120582 | Radio conditions for MIB and SIB1 reading using autonomous gaps^^^^^^^^^^ | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120583 | Non Contiguous CA | Ericsson,ST-Ericsson | imported from 3GU |
R4‑120584 | Test Configuration for eICIC RRM Test Cases with MBSFN ABS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120585 | List of RRM Test Cases for eICIC with MBSFN ABS | Ericsson, ST-Ericsson, ZTE | imported from 3GU |
R4‑120586 | TR 36.820 v0.4.0 APAC700 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120587 | Overview of RAN4 Work under Further Enhanced Non CA-based ICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120588 | Regulatory aspects of APAC700 | Ericsson, ST-Ericsson, Huawei | imported from 3GU |
R4‑120589 | ------------ | ------------ | imported from 3GU |
R4‑120590 | Analysis of Inter-frequency Requirements for eICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120591 | BS requirements for TDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120592 | Protection of DTV in 694-698 MHz | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120593 | Discussion and TP alternative for MR/LA output power | Ericsson | imported from 3GU |
R4‑120594 | BS Time Alignment error NC CA | Ericsson,ST-Ericsson | imported from 3GU |
R4‑120595 | Analysis of conditions for system information acquisition for CSG cell | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120596 | TR 36.826 v 0.13.0 Relay | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120597 | Reference sensitivity for the backhaul link | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120598 | Conditions for system information acquisition for CSG cell | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120599 | Conditions for system information acquisition for CSG cell | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120600 | Introduction of NC operation for TDD in 37.104 | Ericsson, Nokia Siemens Networks | imported from 3GU |
R4‑120601 | Conditions for system information acquisition for CSG cell | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120602 | Introduction of NC operation for TDD in 37.141 | Ericsson, Nokia Siemens Networks | imported from 3GU |
R4‑120603 | Conditions for system information acquisition for CSG cell | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120604 | Correction to SCH_RP levels for Inter-RAT E-UTRA TDD SI Reading | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120605 | Spatial domain impact on AAS specification work | Ericsson | imported from 3GU |
R4‑120606 | BS Time Alignment error NC CA | Ericsson,ST-Ericsson | imported from 3GU |
R4‑120607 | Updating Band 23 duplex specifications | DBSD, TerreStar Networks and Dish Network | imported from 3GU |
R4‑120608 | Application scenarios for AAS | Ericsson | imported from 3GU |
R4‑120609 | Overview and Work Plan for new HSDPA Dual-band Multi-carrier Configurations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120610 | On spatial domain properties of the transmitter in AAS | Ericsson | imported from 3GU |
R4‑120611 | Updating Band 23 duplex specifications | DBSD, TerreStar Networks and Dish Network | imported from 3GU |
R4‑120612 | ------------ | ------------ | imported from 3GU |
R4‑120613 | ------------ | ------------ | imported from 3GU |
R4‑120614 | On AAS specification base-line | Ericsson | imported from 3GU |
R4‑120615 | Updating Band 23 duplex specifications | DBSD, TerreStar Networks and Dish Network | imported from 3GU |
R4‑120616 | Correcting UE Coexistence Requirements for Band 23 | DBSD, TerreStar Networks and Dish Network | imported from 3GU |
R4‑120617 | Introduction of Requirements for Multiple Timing Advance for Carrier Aggregation | Ericsson,ST-Ericsson | imported from 3GU |
R4‑120618 | Addition of Band 23 HeNB specifications in 36.104 | DBSD, TerreStar Networks and Dish Network | imported from 3GU |
R4‑120619 | TP for 3GPP TR 37.976 V1.6.0 | Vodafone | imported from 3GU |
R4‑120620 | Addition of Band 23 HeNB specifications in 36.141 | DBSD, TerreStar Networks and Dish Network | imported from 3GU |
R4‑120621 | Addition of Band 23 HeNB specifications in 36.141 | DBSD, TerreStar Networks and Dish Network | imported from 3GU |
R4‑120622 | Addition of Band 23 HeNB specifications in 25.104 | DBSD, TerreStar Networks and Dish Network | imported from 3GU |
R4‑120623 | Addition of Band 23 HeNB specifications in 25.141 | DBSD, TerreStar Networks and Dish Network | imported from 3GU |
R4‑120624 | Considerations on new carrier types | Ericsson,ST-Ericsson | imported from 3GU |
R4‑120625 | Maximum timing advance for LTE TDD | MStar Semiconductor, Renesas | imported from 3GU |
R4‑120626 | MIMO OTA Way forward drafted at RAN4#61 | Vodafone | imported from 3GU |
R4‑120627 | MIMO OTA WI proposal | Vodafone | imported from 3GU |
R4‑120628 | CA demodulation performance requirements for LTE TDD | ST-Ericsson, Ericsson | imported from 3GU |
R4‑120629 | Supported bandwidth combinations for intra-band and inter-band carrier aggregation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120630 | Requirement for CA SDR FDD test scenario | ST-Ericsson, Ericsson | imported from 3GU |
R4‑120631 | Exceptions for out-of-band blocking requirements for inter-band carrier aggregation with one active uplink | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120632 | Transmit modulation requirements and test cases for intra-band CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120633 | Editorial corrections | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120634 | Extension of supported bandwidth combinations for carrier aggregation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120635 | TS36.101 RF editorial corrections Rel 9 | Motorola Solutions | imported from 3GU |
R4‑120636 | Reporting criteria requirements for carrier aggregation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120637 | LO leakage and IQ image requirements and relation to A-MPR | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120638 | Side condition clarification for eICIC with MBSFN | Ericsson, ST-Ericsson, Samsung, NTT DOCOMO, CMCC | imported from 3GU |
R4‑120639 | TS36.101 RF editorial corrections Rel 10 | Motorola Solutions | imported from 3GU |
R4‑120640 | TS36.101 RF editorial corrections Rel 10 | Motorola Solutions | imported from 3GU |
R4‑120641 | Test configuration for receiver RF requirements for Category B combinations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120642 | ------------ | ------------ | imported from 3GU |
R4‑120643 | Clarification on reported cells with eICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120644 | Correction of RSTD accuracy test cases for TDD | Ericsson, ST-Ericsson, Spirent Communications | imported from 3GU |
R4‑120645 | Band 26: A-MPR for protection of adjacent services | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120646 | Correction of RSTD accuracy test cases for TDD | Ericsson, ST-Ericsson, Spirent Communications | imported from 3GU |
R4‑120647 | WI : B14 PSBB High Power UE (HPUE) | Motorola Solutions | imported from 3GU |
R4‑120648 | TP to TR 36.820: UE maximum output power requirements (FDD) | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120649 | Measurement BW in RSTD accuracy requirements | Ericsson, ST-Ericsson, Alcatel-Lucent | imported from 3GU |
R4‑120650 | TP to TR 36.820: UE reference sensitivity for APAC700 and blocking requirements for adjacent bands (FDD) | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120651 | Measurement BW in RSTD accuracy requirements | Ericsson, ST-Ericsson, Alcatel-Lucent | imported from 3GU |
R4‑120652 | Impact of SI reading on RLM requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120653 | RLM requirements with autonomous gaps | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120654 | Phase II tests: absolute and relative RSRP accuracies with non-MBSFN ABS in FDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120655 | CA UE capability signalling for intra-band non-contiguous CA | Motorola Mobility | imported from 3GU |
R4‑120656 | Phase II tests: absolute and relative RSRP accuracies with non-MBSFN ABS in TDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120657 | Link-level simulation results for enhanced performance requirements for LTE UE | Motorola Mobility | imported from 3GU |
R4‑120658 | On E-CID requirements with eICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120659 | Response to RAN1 LS on UL RTOA definition | Ericsson | imported from 3GU |
R4‑120660 | Performance requirements for rank indicator reporting accuracy | Motorola Mobility | imported from 3GU |
R4‑120661 | On LMU deployment aspects | Ericsson | imported from 3GU |
R4‑120662 | System DIP results for LTE UE enhanced performance requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120663 | Impairment results for TDD CA UE demodulation performance requirements | Motorola Mobility | imported from 3GU |
R4‑120664 | ------------ | ------------ | imported from 3GU |
R4‑120665 | Phase II CA: RSTD measurement reporting in carrier aggregation, Scenario # 3 FDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120666 | Phase II CA: RSTD measurement reporting in carrier aggregation, Scenario # 4 TDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120667 | Carrier Aggregation Bandwidth Combination | Qualcomm Incorporated | imported from 3GU |
R4‑120668 | SNR levels in out-of-sync RLM test cases for eICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120669 | SNR levels in in-sync RLM test cases for eICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120670 | Editorial corrections in BS output power requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120671 | Proposal of using frequency-linear-average filter rejections in specifying A-MPR | Apple (UK) Limited | imported from 3GU |
R4‑120672 | On received energy and power-related terminology | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120673 | Test configuration for eICIC requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120674 | AAS spatial aspects | Nokia Siemens Networks | imported from 3GU |
R4‑120675 | Anechoic Chamber based MIMO OTA: Channel Emulators, and Channel Models Implementation Comparison^^ | SATIMO Industries, Elektrobit, SPIRENT Communications | imported from 3GU |
R4‑120676 | Correction of DC-HSUPA transmitter test coverage | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120677 | UE supporting multi-band HSDPA and operating in LTE mode | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120678 | Coverage of UE requirements for 4CRS BS antenna ports | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120679 | Geographically separated antenna and impact on CSI estimation | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120680 | Updated TR v0.4.0 for LTE Advanced Carrier Aggregation in Band 41 (LTE_CA_B41) WI | Rapporteur | imported from 3GU |
R4‑120681 | Reply on LS on enhanced performance requirements | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120682 | Further feedback on TR 37.901 | Qualcomm Incorporated, , Orange, KT, NTT DoCoMo, SK Telecom, SOFTBANK MOBILE | imported from 3GU |
R4‑120683 | On impact due to LO leakage | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120684 | Feedback on UE application layer data throughput SI | Qualcomm Incorporated | imported from 3GU |
R4‑120685 | Updated TR v0.3.0 for LTE Advanced Carrier Aggregation in Band 41 (LTE_CA_B41) WI | Clearwire | imported from 3GU |
R4‑120686 | Definition of the requirements for non contiguous carrier aggregation in HSDPA | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120687 | Definition of the requirements for non contiguous carrier aggregation in HSDPA | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120688 | Correction to H-Set 8 | Qualcomm Incorporated | imported from 3GU |
R4‑120689 | Correction to H-Set 8 | Qualcomm Incorporated | imported from 3GU |
R4‑120690 | Activation states and reference receivers | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120691 | Correction to H-Set 8 | Qualcomm Incorporated | imported from 3GU |
R4‑120692 | Correction to H-Set 8 | Qualcomm Incorporated | imported from 3GU |
R4‑120693 | Remaining UE RF requirements for ULTD | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120694 | Remaining UE RF requirements for ULTD | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120695 | Requirements for DC-HSUPA in band XXII | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120696 | Additional reference measurement channels for DC-HSUPA Tx core requirements | Qualcomm Incorporated | imported from 3GU |
R4‑120697 | Initial analysis for new band combinations I-VIII and II-V. | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120698 | Inter frequency search requirements for configured frequenc(ies) without compressed mode | Qualcomm Incorporated | imported from 3GU |
R4‑120699 | Inter frequency search requirements for configured frequenc(ies) without compressed mode | Qualcomm Incorporated | imported from 3GU |
R4‑120700 | Way forward on 8C-HSDPA | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120701 | A-MPR requirements for CA_41C contiguous allocation | Clearwire, Nokia | imported from 3GU |
R4‑120702 | Core requirements for 8C in band I assuming dual receiver | ST-Ericcson/Ericsson | imported from 3GU |
R4‑120703 | On the need of turning on/off CLTD feature based on UE implementation | Qualcomm Incorporated | imported from 3GU |
R4‑120704 | eDLMIMO CQI results and parameters | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120705 | Relative phase discontinuity model for CLTD | Qualcomm Incorporated | imported from 3GU |
R4‑120706 | eDLMIMO PMI 4x2 proposal | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120707 | eDLMIMO PMI 8x2 results | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120708 | eDLMIMO RI results | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120709 | NodeB performance requirements for CLTD | Qualcomm Incorporated | imported from 3GU |
R4‑120710 | Link level simulation results for advanced receiver | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120711 | UE co-existence spurious emissions between TDD systems | Ericsson, ST-Ericsson, IntelCorporation | imported from 3GU |
R4‑120712 | Introduction of TM9 demodulation performance requirements | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120713 | UE co-existence spurious emissions between TDD systems | Ericsson, ST-Ericsson, IntelCorporation | imported from 3GU |
R4‑120714 | On a generic approach for IL handling for HSPA and LTE | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120715 | UE reference architecture for derivation of CLTD UE Tx core requirements | Qualcomm Incorporated | imported from 3GU |
R4‑120716 | UE reference architecture for derivation of non-contiguous 4C-HSDPA UE core requirements | Qualcomm Incorporated | imported from 3GU |
R4‑120717 | UE co-existence spurious emissions between TDD systems | Ericsson, ST-Ericsson, IntelCorporation | imported from 3GU |
R4‑120718 | Revisiting NS_07 Assumptions | Fujitsu | imported from 3GU |
R4‑120719 | Guard band analysis for band XXVI coexistence requirements | Qualcomm Incorporated | imported from 3GU |
R4‑120720 | Introduction of Band 26/XXVI to TS 36.101 | Ericsson, ST-Ericsson, Sprint | imported from 3GU |
R4‑120721 | ------------ | ------------ | imported from 3GU |
R4‑120722 | ------------ | ------------ | imported from 3GU |
R4‑120723 | Background TP for TR on operating bands and bandwidths for CA in Band 41 | Clearwire | imported from 3GU |
R4‑120724 | Introduction of FE-FACH absolute priority cell reselection in 25.133 | Qualcomm Incorporated | imported from 3GU |
R4‑120725 | Revision of NS_07 assumptions | Fujitsu | imported from 3GU |
R4‑120726 | Introduction of Band 26/XXVI to TS 25.101 | Ericsson, ST-Ericsson, Sprint | imported from 3GU |
R4‑120727 | AMPR Requirements for APC700 Protection from Band 26 | Fujitsu | imported from 3GU |
R4‑120728 | Evaluation of eICIC CQI testing framework | Intel Corporation | imported from 3GU |
R4‑120729 | ------------ | ------------ | imported from 3GU |
R4‑120730 | Introduction of Band 26/XXVI to TS 36.307 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120731 | Clarification on applicability of the enhanced performance requirements type 2 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120732 | Alignment simulation results for eICIC PDSCH, PDCCH, and PHICH tests | Intel Corporation | imported from 3GU |
R4‑120733 | Introduction of Band 26/XXVI to TS 36.307 | Ericsson, ST-Ericsson, Sprint | imported from 3GU |
R4‑120734 | Introduction of a CA demodulation test for UE soft buffer management testing | Intel Corporation | imported from 3GU |
R4‑120735 | TP for TR 36.820: Protection Limits toward the Lower E850 band UL | NII Holdings | imported from 3GU |
R4‑120736 | ------------ | ------------ | imported from 3GU |
R4‑120737 | Introduction of Band 26/XXVI to TS 36.307 | Ericsson, ST-Ericsson, Sprint | imported from 3GU |
R4‑120738 | Introduction of Band 26/XXVI to TS 36.307 | Ericsson, ST-Ericsson, Sprint | imported from 3GU |
R4‑120739 | MIMO OTA Channel Model Alignment | Spirent Communications, Elektrobit, Satimo | imported from 3GU |
R4‑120740 | AMPR Tables for Protection of Public Safety DL from B26 | Fujitsu | imported from 3GU |
R4‑120741 | ------------ | ------------ | imported from 3GU |
R4‑120742 | Introduction of Band 26/XXVI to TS 36.104 | Ericsson, ST-Ericsson, Sprint | imported from 3GU |
R4‑120743 | MPR for Band 41 CA contiguous RB allocation: TP for TR | Clearwire, Nokia | imported from 3GU |
R4‑120744 | MOP and REFSENS Relaxation for Carrier Aggregation for Band 4 and Band 17 | Motorola Mobility , AT&T | imported from 3GU |
R4‑120745 | ------------ | ------------ | imported from 3GU |
R4‑120746 | Introduction of Band 26/XXVI to TS 25.104 | Ericsson, ST-Ericsson, Sprint | imported from 3GU |
R4‑120747 | ------------ | ------------ | imported from 3GU |
R4‑120748 | ------------ | ------------ | imported from 3GU |
R4‑120749 | Impairment results for TDD CA demodulation tests | Intel Corporation | imported from 3GU |
R4‑120750 | TP for TR 37.806: Protection Limits toward the APAC 700 band DL from the Lower E850 band UL | NII Holdings | imported from 3GU |
R4‑120751 | MPR formula correction For intra-band contiguous CA Bandwidth Class C | Qualcomm Incorporated | imported from 3GU |
R4‑120752 | ------------ | ------------ | imported from 3GU |
R4‑120753 | ------------ | ------------ | imported from 3GU |
R4‑120754 | Introduction of Band 26/XXVI to TS 36.141 | Ericsson, ST-Ericsson, Sprint | imported from 3GU |
R4‑120755 | Introduction of Band 26/XXVI to TS 25. 141 | Ericsson, ST-Ericsson, Sprint | imported from 3GU |
R4‑120756 | Introduction of Band 26/XXVI to TS 36.133 | Ericsson, ST-Ericsson, Sprint | imported from 3GU |
R4‑120757 | Lower frequency edge for the E850 Lower Band | NII Holdings | imported from 3GU |
R4‑120758 | ------------ | ------------ | imported from 3GU |
R4‑120759 | Band 26 A-MPR for protection of narrowband networks at 851-859 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑120760 | Intraband Carrier Aggregation EVM | Qualcomm Incorporated | imported from 3GU |
R4‑120761 | Introduction of Band 26/XXVI to TS 25.133 | Ericsson, ST-Ericsson, Sprint | imported from 3GU |
R4‑120762 | ------------ | ------------ | imported from 3GU |
R4‑120763 | Intraband Carrier Aggregation EVM | Qualcomm Incorporated | imported from 3GU |
R4‑120764 | Update of general SEM for CA class C table: TP for TR | Clearwire | imported from 3GU |
R4‑120765 | Band 26 A-MPR for protection of wideband networks at 851 - 859 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑120766 | On channel matrix impairments for CSI tests | ST-Ericsson/Ericsson | imported from 3GU |
R4‑120767 | Lower E850 co-existence | Ericsson, ST-Ericsson, Telefónica | imported from 3GU |
R4‑120768 | Band 26 A-MPR for protection of narrowband networks at 806 - 816 MHz or 806 - 813.5 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑120769 | Impairment results of the CA soft buffer test | Intel Corporation | imported from 3GU |
R4‑120770 | Draft reply LS on enhanced performance requirements | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120771 | Draft reply LS on enhanced performance requirements | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120772 | ------------ | ------------ | imported from 3GU |
R4‑120773 | TR 37.806 cleanup | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120774 | Intraband Carrier Aggregation Power Control | Qualcomm Incorporated | imported from 3GU |
R4‑120775 | Band 26 A-MPR Tables for Protection of Adjacent Services | Motorola Mobility | imported from 3GU |
R4‑120776 | Intraband Carrier Aggregation Power Control | Qualcomm Incorporated | imported from 3GU |
R4‑120777 | Treatment of 2 UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑120778 | Impairment simulation results for TDD CA sustained data rate test | Intel Corporation | imported from 3GU |
R4‑120779 | ------------ | ------------ | imported from 3GU |
R4‑120780 | ------------ | ------------ | imported from 3GU |
R4‑120781 | TP for TR 36.820: APAC700 FDD UE dual duplexer | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120782 | ------------ | ------------ | imported from 3GU |
R4‑120783 | Band 41 REFSENS and MOP changes to accommodate single filter architecture | Clearwire | imported from 3GU |
R4‑120784 | A-MPR for APAC700 protection of broadcast services | Qualcomm Incorporated | imported from 3GU |
R4‑120785 | Simulation method for E-UTRA UL MIMO Relative Phase Discontinuity | Qualcomm Incorporated | imported from 3GU |
R4‑120786 | Clarification on applicability of the enhanced performance requirements type 2 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120787 | TP for 36.820: Co-existence between APAC700 and other 3GPP bands | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120788 | Band 7 and Band 38 UE spurious emission | Intel Corporation | imported from 3GU |
R4‑120789 | Band 26 A-MPR tables | Qualcomm Incorporated | imported from 3GU |
R4‑120790 | Introduction of Band [27] to TS 25.461 | NII Holdings, TELUS | imported from 3GU |
R4‑120791 | Band 26 A-MPR analysis for APAC700 | Qualcomm Incorporated | imported from 3GU |
R4‑120792 | TP for 36.820: Co-existence between APAC700 and DTV | Ericsson, ST-Ericsson | imported from 3GU |
R4‑120793 | ------------ | ------------ | imported from 3GU |
R4‑120794 | Band 26 A-MPR analysis for APAC700 | Qualcomm Incorporated | imported from 3GU |
R4‑120795 | ------------ | ------------ | imported from 3GU |
R4‑120796 | ------------ | ------------ | imported from 3GU |
R4‑120797 | Utilization of left hand phantoms in OTA testing | Intel Corporation | imported from 3GU |
R4‑120798 | Introduction of Band [27] to TS 25.466 | NII Holdings, TELUS | imported from 3GU |
R4‑120799 | Introduction of Band [27] to TS 36.101 | NII Holdings, TELUS | imported from 3GU |
R4‑120800 | Introduction of Band [27] to TS 36.104 | NII Holdings, TELUS | imported from 3GU |
R4‑120801 | ------------ | ------------ | imported from 3GU |
R4‑120802 | ------------ | ------------ | imported from 3GU |
R4‑120803 | MPR for CA_7C | Qualcomm Incorporated | imported from 3GU |
R4‑120804 | ------------ | ------------ | imported from 3GU |
R4‑120805 | Band 41 CA CR for TS36.101, section 5 | Clearwire | imported from 3GU |
R4‑120806 | Clarification on applicability of the enhanced performance requirements type 2 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120807 | Clarification on applicability of the enhanced performance requirements type 2 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120808 | Introduction of Band [27] to TS 36.106 | NII Holdings, TELUS | imported from 3GU |
R4‑120809 | Band 41 CA CR for TS36.101, section 6 | Clearwire | imported from 3GU |
R4‑120810 | Introduction of Band [27] to TS 36.113 | NII Holdings, TELUS | imported from 3GU |
R4‑120811 | ------------ | ------------ | imported from 3GU |
R4‑120812 | Applicability of the enhanced performance requirements type 2 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120813 | Applicability of the enhanced performance requirements type 2 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120814 | Applicability of the enhanced performance requirements type 2 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120815 | Applicability of the enhanced performance requirements type 2 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑120816 | ------------ | ------------ | imported from 3GU |
R4‑120817 | ------------ | ------------ | imported from 3GU |
R4‑120818 | ------------ | ------------ | imported from 3GU |
R4‑120819 | Introduction of Band [27] to TS 36.124 | NII Holdings, TELUS | imported from 3GU |
R4‑120820 | ------------ | ------------ | imported from 3GU |
R4‑120821 | ------------ | ------------ | imported from 3GU |
R4‑120822 | ------------ | ------------ | imported from 3GU |
R4‑120823 | ------------ | ------------ | imported from 3GU |
R4‑120824 | ------------ | ------------ | imported from 3GU |
R4‑120825 | MPR for CA_41C | Qualcomm Incorporated | imported from 3GU |
R4‑120826 | ------------ | ------------ | imported from 3GU |
R4‑120827 | ------------ | ------------ | imported from 3GU |
R4‑120828 | ------------ | ------------ | imported from 3GU |
R4‑120829 | Timestamp Accuracy Requirements for MDT | Intel Corporation, MediaTek | imported from 3GU |
R4‑120830 | Band 41 CA CR for TS36.101, section 7 | Clearwire | imported from 3GU |
R4‑120831 | Introduction of Band [27] to TS 36.133 | NII Holdings, TELUS | imported from 3GU |
R4‑120832 | Introduction of Band [27] to TS 36.141 | NII Holdings, TELUS | imported from 3GU |
R4‑120833 | ------------ | ------------ | imported from 3GU |
R4‑120834 | DL-UL interference analysis for single operator Macro-Femto deployment scenario in adjacent channel | Intel Corporation | imported from 3GU |
R4‑120835 | Introduction of Band [27] to TS 36.143 | NII Holdings, TELUS | imported from 3GU |
R4‑120836 | Introduction of Band [27] to TS 36.307 | NII Holdings, TELUS | imported from 3GU |
R4‑120837 | DL-UL interference analysis for single operator Macro-Outdoor Pico deployment scenario in adjacent channel | Intel Corporation | imported from 3GU |
R4‑120838 | Introduction of Band [27] to TS 36.307 | NII Holdings, TELUS | imported from 3GU |
R4‑120839 | Introduction of Band [27] to TS 36.307 | NII Holdings, TELUS | imported from 3GU |
R4‑120840 | CR for 36.101: B41 REFSENS and MOP changes to accommodate single filter architecture | Clearwire | imported from 3GU |
R4‑120841 | Introduction of Band [27] to TS 36.307 | NII Holdings, TELUS | imported from 3GU |
R4‑120842 | Introduction of Band [27] to TS 37.104 | NII Holdings, TELUS | imported from 3GU |
R4‑120843 | Introduction of Band [27] to TS 37.113 | NII Holdings, TELUS | imported from 3GU |
R4‑120844 | Addition of missing UE coexistence requirements | Nokia Siemens Networks | imported from 3GU |
R4‑120845 | Addition of missing UE coexistence requirements | Nokia Siemens Networks | imported from 3GU |
R4‑120846 | ------------ | ------------ | imported from 3GU |
R4‑120847 | ------------ | ------------ | imported from 3GU |
R4‑120848 | ------------ | ------------ | imported from 3GU |
R4‑120849 | CR for 36.133: B41 REFSENS and MOP changes to accommodate single filter architecture | Clearwire | imported from 3GU |
R4‑120850 | System level evaluation of advanced receiver | Intel Corporation | imported from 3GU |
R4‑120851 | Introduction of Band [27] to TS 37.141 | NII Holdings, TELUS | imported from 3GU |
R4‑120852 | Requirements for Band 23 UE coexistence with Band 25 | Nokia Siemens Networks | imported from 3GU |
R4‑120853 | Requirements for Band 23 UE coexistence with Band 25 | Nokia Siemens Networks | imported from 3GU |
R4‑120854 | Requirements for Band 23 UE coexistence with Band 25 | Nokia Siemens Networks | imported from 3GU |
R4‑120855 | Results and discussion on advanced receiver link level performance | Intel Corporation | imported from 3GU |
R4‑120856 | ------------ | ------------ | imported from 3GU |
R4‑120857 | TR for Enhanced performance reuirements | NTT DOCOMO | imported from 3GU |
R4‑120858 | Results and discussion for eDL-MIMO TDD PMI tests | Intel Corporation | imported from 3GU |
R4‑120859 | Simulation results for eDL-MIMO fading CQI tests | Intel Corporation | imported from 3GU |
R4‑120860 | Link simulation results for eICIC ABS pattern evaluation | Motorola Mobility | imported from 3GU |
R4‑120861 | ------------ | ------------ | imported from 3GU |
R4‑120862 | Discussion of Band 26 UE protection limits into the Lower E850 band | NII Holdings | imported from 3GU |
R4‑120863 | Overview of FeICIC Performance Requirements and Work Plan | Qualcomm Incorporated | imported from 3GU |
R4‑120864 | DRAFT reply LS on Antenna Port Mapping onto Geographically Separated Antennas | Qualcomm Incorporated | imported from 3GU |
R4‑120865 | UE receiver requirements for Band 41 CA: TP for TR | Clearwire | imported from 3GU |
R4‑120866 | UE receiver requirements for 100RB + 75RB combination: TP for TR | Clearwire, Nokia | imported from 3GU |
R4‑120867 | Performance Evaluation for LTE TDD eIMTA | LG Electronics | imported from 3GU |
R4‑120868 | LTE in the 1670-1675MHz Band for the United States | LightSquared Inc. | imported from 3GU |
R4‑120869 | Simulation result for LTE TDD eIMTA | Samsung | imported from 3GU |
R4‑120870 | RAN4#61 Meeting report | MCC | imported from 3GU |
R4‑120871 | Response LS on physical-layer measurement for network-based positioning (R1-114454 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: TSG RAN WG3) | TSG RAN WG1 | imported from 3GU |
R4‑120872 | Reply LS to “UL Interference in the scope of the Carrier-Based Hetnet ICIC WID” (R1-114460 Source: TSG RAN WG1, To: TSG RAN WG3, Cc: TSG RAN WG4) | TSG RAN WG1 | imported from 3GU |
R4‑120873 | LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA (R1-114462 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: []) | TSG RAN WG1 | imported from 3GU |
R4‑120874 | LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA (R1-114463 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3, Cc: TSG RAN WG4) | TSG RAN WG1 | imported from 3GU |
R4‑120875 | LS on feICIC (R1-114468 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1 | imported from 3GU |
R4‑120876 | LS on additional special subframe configuration for E-UTRA TDD in Rel-11 (R1-114469 Source: TSG RAN WG1, To: TSG RAN, Cc: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4) | TSG RAN WG1 | imported from 3GU |
R4‑120877 | LS on Parallel transmissions of PRACH and PUSCH/PUCCH/SRS (R2-116552 Source: TSG RAN WG2, To: TSG RAN WG1, Cc: TSG RAN WG4) | TSG RAN WG2 | imported from 3GU |
R4‑120878 | CSG proximity indicator testing (R5-115775 Source: TSG RAN WG5 (RAN5), To: TSG RAN WG4 (RAN4), Cc: TSG RAN) | TSG RAN WG5 (RAN5) | - |
R4‑120879 | LS to RAN4 on UE Tx Timing tests (R5-115780 Source: TSG RAN WG5, To: TSG RAN WG4, Cc: ) | TSG RAN WG5 | - |
R4‑120880 | Response to LS on Handover support between LTE FDD and LTE TDD (R5-115781 Source: TSG RAN WG5 (RAN5), To: Global TDLTE Initiative (GTI), Cc: TSG RAN,TSG RAN WG4 (RAN4)) | TSG RAN WG5 (RAN5) | - |
R4‑120881 | LS on enhanced performance requirements (R5-115865 Source: TSG RAN WG5, To: TSG RAN WG4, Cc: ) | TSG RAN WG5 | - |
R4‑120882 | LS Reply to RAN4 on Channel matrix impairments for CSI tests (R5-115874 Source: TSG RAN WG5, To: TSG RAN WG4, Cc: ) | TSG RAN WG5 | - |
R4‑120883 | Reply LS on FDD/TDD and HRPD/CDMA2000 RRM tests (RP-111763 Source: TSG RAN, To: TSG RAN WG4, Cc: TSG RAN WG5) | TSG RAN | - |
R4‑120884 | LS on Enabling operation of 4 Tx support in LTE networks^^ (RP-111777 Source: TSG RAN, To: TSG RAN WG4,TSG RAN WG5, Cc: ) | TSG RAN | - |
R4‑120885 | CHANNELIZATION SCENARIOS FOR PUBLIC PROTECTION AND DISASTER RELIEF OPERATIONS IN SOME PARTS OF THE UHF BAND IN ACCORDANCE WITH RESOLUTION 646 (WRC-03) ( Source: , To: , Cc: ) | ITU - Radiocommunication Study Groups - Working Party 5A | - |
R4‑120886 | LS to 3GPP RAN WG4 on status of the OTA Antenna Study Item for Head & Hand Measurements (S-11-221 Source: GCF Steering Group, To: RAN4, Cc: ) | GCF Steering Group | - |
R4‑120887 | LS on H(e)NB air interface activation (C6-110601 Source: TSG CT, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG CT | - |
R4‑120888 | Reply LS to “Approval of New WI on E-UTRA medium range and MSR medium range/local area BS class requirements” (GP-111859 Source: TSG GERAN, To: TSG RAN,TSG RAN WG4, Cc: ) | TSG GERAN | - |
R4‑120889 | Reply LS on Physical Layer Measurement for network positioning (R1-114456 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑120890 | LS on feICIC (R1-114468 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑120891 | Information of KCC plan on new 2.1GHz Spectrum Re-allocation in Korea | TTA | - |
R4‑120892 | Verification of Channel Model Implementations | Elektrobit | - |
R4‑120893 | Considerations on Band7 & Band38 UE coexistence | ZTE | - |
R4‑120894 | Fixed reference channel for PDSCH demodulation performance requirements on eDL-MIMO | ZTE | - |
R4‑120895 | eDLMIMO RI results | ST-Ericsson/Ericsson | - |
R4‑120896 | RAN4#61 Meeting report | MCC | - |
R4‑120897 | TP of UE RRM requirements for LTE_CA_B7 | China Unicom, China Telecom | - |
R4‑120898 | Simulation results for eICIC PDSCH demodulation requirements | Fujitsu | - |
R4‑120899 | Simulation results for eICIC CQI reporting | Fujitsu | - |
R4‑120900 | Simulation results for eDL MIMO CQI requirements | Fujitsu | - |
R4‑120901 | Simulation results for eDL MIMO PMI requirements | Fujitsu | - |
R4‑120902 | Simulation results for eDL MIMO RI requirements | Fujitsu | - |
R4‑120903 | Simulation results with impairments for CA demodulation requirements | Fujitsu | - |
R4‑120904 | Simulation results for CA soft buffer limitation | Fujitsu | - |
R4‑120905 | Spatial domain impact on AAS specification work | Ericsson | - |
R4‑120906 | PUCCH over-provisioning based A-MPR solution for Band 26 UL | Nokia Corporation | - |
R4‑120907 | Inter-freq RRM Requirements for feICIC | Alcatel-Lucent | - |
R4‑120908 | Antenna Model for Active Antenna Array Systems | Kathrein | - |
R4‑120909 | AMPR Requirements for APC700 Protection from Band 26 | Fujitsu | - |
R4‑120910 | AMPR Tables for Protection of Public Safety DL from B26 | Fujitsu | - |
R4‑120911 | Link level performance in Scenario 1 (TM6) of enhanced UE receiver | Nokia Siemens Networks, Nokia | - |
R4‑120912 | Link level performance in Scenario 2 (TM9) of enhanced UE receiver | Nokia, Nokia Siemens Networks | - |
R4‑120913 | Upper Extended 850 MHz addition to 36.113 | Sprint | - |
R4‑120914 | Upper Extended 850 MHz addition to 36.124 | Sprint | - |
R4‑120915 | Antenna Performance Item : test methodology discussion (PAG-12-024 Source: GCF Performance Criteria Agreement Group, To: RAN4, Cc: GCF CAG) | GCF Performance Criteria Agreement Group | - |
R4‑120916 | Update on the Status of Radiated Testing Methods for MIMO OTA Performance within CTIA (LS to RAN4 on CTIA MIMO OTA Activities Source: TSG CT, To: TSG RAN WG4, Cc: TSG RAN WG5) | TSG CT | - |
R4‑120917 | Preparation Work in 3GPP for ITU related to Final Submission to ITU-R towards Rev.11 of Rec. ITU-R M.1457 (RT-120017 Source: ITUR Ad Hoc, To: RAN4, Cc: ) | ITUR Ad Hoc | - |
R4‑120918 | eDLMIMO CQI results and parameters | ST-Ericsson/Ericsson | - |
R4‑120919 | Link level simulation results for advanced receiver | ST-Ericsson/Ericsson | - |
R4‑120920 | UE spurious emissions for Band 7 and Band 38 coexistence | Nokia Corporation, Deutsche Telekom, CMCC, TeliaSo | - |
R4‑120921 | UE spurious emissions for Band 7 and Band 38 coexistence | Nokia Corporation, Deutsche Telekom, CMCC, TeliaSo | - |
R4‑120922 | UE spurious emissions for Band 7 and Band 38 coexistence | Nokia Corporation | - |
R4‑120923 | Simulation results for RI test of TDD mode | Samsung | - |
R4‑120924 | Corrections to Configured Transmitted Power | Renesas Mobile Europe Ltd. | - |
R4‑120925 | RSTD signalling modifications | Spirent Communications, Ericsson, ST-Ericsson | - |
R4‑120926 | RSTD signalling modifications | Spirent Communications, Ericsson, ST-Ericsson | - |
R4‑120927 | WF on Latency Requirements on inter-frequency Measurements without Measurement Gaps | Ericsson, ST-Ericsson, et al. | - |
R4‑120928 | WF on the side conditions for MIB and SIB1 reading | Ericsson, ST-Ericsson, et al. | - |
R4‑120929 | Editorial corrections | Ericsson, ST-Ericsson | - |
R4‑120930 | eICIC measurement accuracy | Huawei, HiSilicon, Ericsson, ST-Ericsson, LG Elect | - |
R4‑120931 | TS36.101 CR: Correction to MBMS Performance Test Parameters | Huawei, HiSilicon | - |
R4‑120932 | Correction of Actual code rate for CSI RMCs | CATT, Ericsson, ST-Ericsson | - |
R4‑120933 | Way forward on Simulation assumptions of measurement bandwidth impacts on RSRQ | Renesas et al | - |
R4‑120934 | Simulation results for eDL-MIMO CQI TDD tests | NEC | - |
R4‑120935 | Clarification of colliding CRS in MBSFN ABS | NTT DOCOMO, Ericsson, ST-Ericsson, Alcatel-Lucent | - |
R4‑120936 | Side condition clarification for eICIC with MBSFN | Ericsson, ST-Ericsson, Samsung, NTT DOCOMO, CMCC, Renesas Mobile Europe Ltd. | - |
R4‑120937 | Link level simulation results for advanced receiver | LG Electronics | - |
R4‑120938 | Thresholds and margins in RRM test case A.8.11.4 | Anritsu | - |
R4‑120939 | Thresholds and margins in RRM test case A.8.11.4 | Anritsu | - |
R4‑120940 | Thresholds and margins in RRM test case A.8.11.4 | Anritsu | - |
R4‑120941 | CA & eICIC RRM Adhoc Minutes, 7 February 2012 | Renesas | - |
R4‑120942 | Compilation of SB management | Huawei | - |
R4‑120943 | Summary of link level and system level simulations for advanced receiver | NTT Docomo | - |
R4‑120944 | Summary of link level and system level simulations for advanced receiver | NTT Docomo | - |
R4‑120945 | Simulation results for eICIC demodulation test cases | Qualcomm Incorporated | - |
R4‑120946 | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | Anritsu | - |
R4‑120947 | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | Anritsu | - |
R4‑120948 | PDSCH and OCNG pattern in PRACH Test cases A.6.2.1 and A.6.2.3 | Anritsu | - |
R4‑120949 | eICIC ad hoc meeting minutes | huawei | - |
R4‑120950 | Summary of RLM simulation results for eICIC | Ericsson | - |
R4‑120951 | Add Missing Case for RSTD CA Measurement Accuracy Requirements | Alcatel-Lucent | - |
R4‑120952 | 36.826 TP: on R-PDCCH performance requirements | Huawei | - |
R4‑120953 | Introduction of TM9 demodulation performance requirements | ST-Ericsson, Ericsson | - |
R4‑120954 | TS36.101 CR: on eDL-MIMO channel model using cross-polarized antennas | Huawei, Renesas Mobile Europe Ltd., ST-Ericsson, Ericsson, HiSilicon | - |
R4‑120955 | TS36.101 RF editorial corrections Rel 9 | Motorola Solutions | - |
R4‑120956 | TS36.101 RF editorial corrections Rel 10 | Motorola Solutions | - |
R4‑120957 | Editorial corrections in BS output power requirements | Ericsson | - |
R4‑120958 | Editorial corrections in BS output power requirements | Ericsson, ST-Ericsson | - |
R4‑120959 | Clarification on test procedure for BS In-channel selectivity test | Alcatel-Lucent | - |
R4‑120960 | Correction on the table of Regional requirements | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120961 | Correction on the table of Regional requirements | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120962 | Introduction of operating frequency band XXII | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120963 | Introduction of operating frequency band XXII | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120964 | Introduction of operating frequency band XXV and protection limits towards E-UTRA Band 23 | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120965 | Introduction of operating frequency band XXV and protection limits towards E-UTRA Band 23 | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120966 | Introduction of protection limits towards E-UTRA Band 24, 33, 34, 38, 39, 40, 41, 42 and 43 | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120967 | Introduction of protection limits towards E-UTRA Band 24, 33, 34, 38, 39, 40, 41, 42 and 43 | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120968 | Correction on the tables of Unwanted Emission and Input Intermodulation | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120969 | Correction on the table of Regional requirements, and on tables of Unwanted Emission and Input Intermodulation | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120970 | Introduction of operating frequency bands 23 and 25 | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120971 | Introduction of operating frequency bands 23 and 25 | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120972 | Correction on the table of Regional requirements | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120973 | Update of the abbreviations clause | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑120974 | Correction of frequency range for spurious emission requirements | Rohde & Schwarz | - |
R4‑120975 | Correction of frequency range for spurious emission requirements | Rohde & Schwarz | - |
R4‑120976 | Correction of frequency range for spurious emission requirements | Rohde & Schwarz | - |
R4‑120977 | REL-10 CA specification editorial consistency | Nokia Corporation | - |
R4‑120978 | RAN4#62 Band 26 Ad-Hoc meeting minutes | Alcatel | - |
R4‑120979 | Updated way forward for Band 26 on coexistence with other adjacent services | Alcatel | - |
R4‑120980 | TP for TR 37.976, BS Antenna details to Align Channel Models | Spirent | - |
R4‑120981 | TP Coexistence simulation results in CA | Huawei, Hisilicon | - |
R4‑120982 | Text proposal on UE receiver characteristics for CA in Band 38 | ZTE | - |
R4‑120983 | TP for TR 37.976, Verification of Channel Model Implementations | Eloktobit | - |
R4‑120984 | TP of backhaul link Transmitter Spurious Emission in TR 36.826 | ZTE | - |
R4‑120985 | Text proposal on reference sensitivity for high power class RN access link | CMCC | - |
R4‑120986 | Minutes of UE RF CA intra-band Ad-Hoc | Nokia Corporation | - |
R4‑120987 | Further considerations of AAS study item | Huawei | - |
R4‑120988 | TP for Overview of international regulation related to AAS | Ericsson, Huawei, NTT DOCOMO | - |
R4‑120989 | Harmonized AAS Nomenclature | Nokia Siemens Networks | - |
R4‑120990 | Radio Reference Architecture for BS with AAS | Alcatel-Lucent | - |
R4‑120991 | TP subclause 5.1 Applications | Huawei | - |
R4‑120992 | TP subclause 4.1 SI Objective and methodologies | Huawei | - |
R4‑120993 | TP subclause 6.1 General review of the transmitter characteristic | Huawei | - |
R4‑120994 | TP subclause 6.2 The transmitter spatial characteristics | Huawei | - |
R4‑120995 | TP subclause 7.1: General review of receiver characteristics | Huawei | - |
R4‑120996 | LTE in the 1670-1675MHz Band for the United States | LightSquared Inc. | - |
R4‑120997 | Harmonics and/or Inter-Modulation distortions analysis on Inter-band CA for Band 1+18 | KDDI | - |
R4‑120998 | TP for 3GPP TR 37.976 V1.6.0 | Vodafone | - |
R4‑120999 | MIMO-OTA WF | Vodafone | - |
R4‑121000 | TP for TR 37.976, Verification of Channel Model Implementations | Eloktobit | - |
R4‑121001 | eDL MIMO CSI requirements | NTT DOCOMO, Huawei, HiSilicon, Ericsson, ST-Ericsson, Renesas, Fujitsu | - |
R4‑121002 | Meeting minutes for eDL-MIMO ad hoc sessoins | Huawei | - |
R4‑121003 | Summary of soft buffer UE Cat 4 simulation results | Huawei | - |
R4‑121004 | Introduction of requirements of CQI reporting definition for ecICIC | Huawei, HiSilicon, Qualcomm | - |
R4‑121005 | Simulation assumptions for TM3 rank-2 test on non-MBSFN ABS | huawei | - |
R4‑121006 | On eICIC ABS pattern | Huawei, HiSilicon, Qualcomm | - |
R4‑121007 | On eICIC interference models | Huawei, HiSilicon, Qualcomm | - |
R4‑121008 | LS to RAN5: UE Tx Timing tests | Anritsu | - |
R4‑121009 | Introduction of a CA demodulation test for UE soft buffer management testing | Intel Corporation, Huawei, HiSilicon, LGE | - |
R4‑121010 | Way Forward on Interruptions at Activation/Deactivation and Configuration/Deconfiguration | Qualcomm | - |
R4‑121011 | CA demodulation performance requirements for LTE TDD | ST-Ericsson, Ericsson | - |
R4‑121012 | RLM test cases with SNRs for OOS and INS for E-UTRAN TDD in eICIC | Huawei, HiSilicon, Ericsson, ST-Ericsson | - |
R4‑121013 | SNR levels in out-of-sync RLM test cases for eICIC | Ericsson, ST-Ericsson, LGE, Huawei, HiSilicon, Qualcomm Incorporated, Samsung, Nokia, Nokia Siemens Networks, ZTE | - |
R4‑121014 | Introduction of reference channel for eICIC demodulation | Ericsson, ST Ericsson | - |
R4‑121015 | TM3 tests for eICIC | Qualcomm | - |
R4‑121016 | RLM requirements with autonomous gaps | Ericsson, ST-Ericsson | - |
R4‑121017 | Correction of PRS BW definition for RSTD measurements | LG Electronics, Renesas Mobile Europe, Qualcomm Incorporated, Samsung | - |
R4‑121018 | Way Forward on CSG proximity detection | Huawei | - |
R4‑121019 | Test case for E-UTRA TDD RRC connection release redirection to UTRA TDD without SI provided for R9 | CATT, Huawei, ZTE | - |
R4‑121020 | Test case for E-UTRA TDD RRC connection release redirection to UTRA TDD without SI provided for R10 | CATT, Huawei, ZTE | - |
R4‑121021 | Test case for E-UTRA FDD RRC connection release redirection to UTRA TDD without SI provided for R9 | CATT, Huawei, ZTE | - |
R4‑121022 | Test case for E-UTRA FDD RRC connection release redirection to UTRA TDD without SI provided for R10 | CATT, Huawei, ZTE | - |
R4‑121023 | Simulatoin assumptions for RLM Tests for eICIC with MBSFN ABS | Ericsson | - |
R4‑121024 | Framework for the CSI reporting accuracy performance requirements on eDL MIMO (Revision 4) | NTT DOCOMO | - |
R4‑121025 | Way forward on Simulation assumptions of measurement bandwidth impacts on RSRQ | Renesas et al | - |
R4‑121026 | RLM requirements with autonomous gaps | Ericsson, ST-Ericsson, Huawei, HiSilicon, Qualcomm | - |
R4‑121027 | Advanced receiver ad hoc minutes | Renesas | - |
R4‑121028 | Corrections on test case of Event triggered reporting on deactivated Scell in non-DRX | CATT | - |
R4‑121029 | TP for Enhanced performance requirements for LTE UE SI | NTT Docomo | - |
R4‑121030 | Summary of link level and system level simulations for advanced receiver | NTT Docomo | - |
R4‑121031 | Way forward on BS issues about lower power ABS | NTT Docomo | - |
R4‑121032 | Definition of synchronized operation | Ericsson | - |
R4‑121033 | Definition of synchronized operation | Ericsson | - |
R4‑121034 | Definition of synchronized operation | Ericsson | - |
R4‑121035 | Definition of synchronized operation | Ericsson | - |
R4‑121036 | Definition of synchronized operation | Ericsson, ST-Ericsson | - |
R4‑121037 | TP of relay power class in TR 36.826 | ZTE | - |
R4‑121038 | Inter-band CA for Band 20 and Band 8 categorization based on #UL carriers | Vodafone | - |
R4‑121039 | Intra band contiguos CA Ue to Ue Co-ex | Nokia Corporation | - |
R4‑121040 | Introduction of Band 26/XXVI to TS 36.101 | Ericsson, ST-Ericsson, Sprint | - |
R4‑121041 | Introduction of Band 26/XXVI to TS 25.101 | Qualcomm Incorporated, Sprint | - |
R4‑121042 | Introduction of Band 26/XXVI to TS 36.133 | Qualcomm Incorporated, Sprint | - |
R4‑121043 | Introduction of Band 26/XXVI to TS 25.133 | Qualcomm Incorporated, Sprint | - |
R4‑121044 | Way Forward on B18 co-existance with APAC 700 | NTT Docomo | - |
R4‑121045 | Correcting UE Coexistence Requirements for Band 23 | DBSD, TerreStar Networks and Dish Network | - |
R4‑121046 | RAN4 feedbacks on Preparation Work in 3GPP for ITU related to Final Submission to ITU-R towards Rev.11 of Rec. ITU-R M.1457 | Telecom Italia | - |
R4‑121047 | APAC 700 ad-hoc minutes | Ericsson, ST-Ericsson | - |
R4‑121048 | Lower frequency edge for the E850 Lower Band | NII Holdings | - |
R4‑121049 | TP for TR 37.806: Protection Limits toward the APAC 700 band DL from the Lower E850 band UL | NII Holdings | - |
R4‑121050 | Band 27 / APAC700 coexistence requirements Way Forward. | NII | - |
R4‑121051 | Introduction of non-contiguous operation for 4C-HSDPA | Nokia Siemens Networks | - |
R4‑121052 | BS classes Work Item TR 37.xxx v0.2.0 | Ericsson | - |
R4‑121053 | Ad hoc minutes: BS classes | Ericsson | - |
R4‑121054 | LS to GERAN on Status of the work on BS classes for MSR | Ericsson | - |
R4‑121055 | TP for Medium Range BS class simulation assumptions and scenarios | Ericsson | - |
R4‑121056 | TP for MR E-UTRA BS ACLR absolute limit | Ericsson, Huawei, Alcatel-Lucent, CATT | - |
R4‑121057 | TR 37.806v1.3.0 | Ericsson, ST-Ericsson | - |
R4‑121058 | Introduction of non-contiguous operation for 4C-HSDPA | Nokia Siemens Networks | - |
R4‑121059 | Addition of missing UE coexistence requirements | Nokia Siemens Networks | - |
R4‑121060 | Introduction of intra-band non-contiguous operation for E-UTRA | Nokia Siemens Networks | - |
R4‑121061 | Conventional A-MPR tables for Band 26 | Nokia Corporation | - |
R4‑121062 | Band 41 REFSENS and MOP changes to accommodate single filter architecture | Clearwire | - |
R4‑121063 | CR for 36.101: B41 REFSENS and MOP changes to accommodate single filter architecture | Clearwire | - |
R4‑121064 | TP on Rx spurious emissions for MR BS | Huawei, Ericsson | - |
R4‑121065 | TP for 36.820: Co-existence between APAC700 and DTV | Ericsson, ST-Ericsson | - |
R4‑121066 | TP to TR 36.820: UE reference sensitivity for APAC700 and blocking requirements for adjacent bands (FDD) | Ericsson, ST-Ericsson | - |
R4‑121067 | TP for TR 36.820: APAC700 FDD UE dual duplexer | Ericsson, ST-Ericsson | - |
R4‑121068 | TP for 36.820: Co-existence between APAC700 and other 3GPP bands | Ericsson, ST-Ericsson | - |
R4‑121069 | Reply LS on Antenna Performance Item: test methodology discussion | CATR | - |
R4‑121070 | Co-existence with Band 27 | Huawei | - |
R4‑121071 | Way Forward on APAC 700 (FDD) REFSENS | NTT Docomo | - |
R4‑121072 | TP for 36.820: Co-existence between APAC700 and DTV | Ericsson, ST-Ericsson | - |
R4‑121073 | TP for TR APAC700: Carrier arrangement limitation for 20MHz CBW, and raster size | Vodafone | - |
R4‑121074 | TR 37.976 , version 1.7.0 (updates from R4#62) | Elektrobit | - |
R4‑121075 | Band 27 / APAC700 coexistence requirements Way Forward. | NII | - |
R4‑121076 | Introduction of non-contiguous operation for 4C-HSDPA | Nokia Siemens Networks, Alcatel-Lucent, Ericsson, Huawei | - |
R4‑121077 | Email discussion summary on the feasibility study for LTE TDD eIMTA | CATT | - |
R4‑121078 | LS on the feasibility of applying different UL-DL configurations in multi-cell scenarios | CATT | - |
R4‑121079 | Introduction of intra-band non-contiguous operation for E-UTRA | Nokia Siemens Networks, Alcatel-Lucent, Ericsson, CATT, Huawei, ZTE,^^NTT DOCOMO | - |
R4‑121080 | Discussion for subset of CA band combination | NTT Docomo | - |
R4‑121081 | TR 37.976 , version 1.7.0 (updates from R4#62) | Elektrobit | - |
R4‑121082 | Introduction of NC operation for TDD in 37.104 | Ericsson, Nokia Siemens Networks, Alcatel-Lucent, CMCC, Huawei, CATT | - |
R4‑121083 | Introduction of NC operation for TDD in 37.141 | Ericsson, Nokia Siemens Networks, Alcatel-Lucent, CMCC, Huawei, CATT | - |
R4‑121084 | Band 41 CA CR for TS36.101, section 5 | Clearwire | - |
R4‑121085 | Band 41 CA CR for TS36.101, section 6 | Clearwire | - |
R4‑121086 | UE receiver requirements for Band 41 CA: TP for TR | Clearwire | - |
R4‑121087 | RF: PDCCH wrong detection in receiver spurious emissions test (Rel-8) | Rohde & Schwarz | - |
R4‑121088 | RF: PDCCH wrong detection in receiver spurious emissions test (Rel-9) | Rohde & Schwarz | - |
R4‑121089 | RF: PDCCH wrong detection in receiver spurious emissions test (Rel-10) | Rohde & Schwarz | - |
R4‑121090 | Addition of Band 23 HeNB specifications in 36.104 | DBSD, TerreStar Networks and Dish Network | - |
R4‑121091 | Addition of Band 23 HeNB specifications in 36.141 | DBSD, TerreStar Networks and Dish Network | - |
R4‑121092 | Addition of Band 23 HeNB specifications in 25.104 | DBSD, TerreStar Networks and Dish Network | - |
R4‑121093 | Addition of Band 23 HeNB specifications in 25.141 | DBSD, TerreStar Networks and Dish Network | - |
R4‑121094 | Harmonized AAS Nomenclature | Nokia Siemens Networks | - |
R4‑121095 | Finalizing Home BS Output Power parameter for co-channel E-UTRA protection in 36.104 | Nokia Siemens Networks, Nokia, Picochip, NEC, III | - |
R4‑121096 | Finalizing Home BS Output Power parameters for co-channel E-UTRA protection in 36.141 | Nokia Siemens Networks, Nokia, Picochip, NEC, III | - |
R4‑121097 | Reference sensitivity for the backhaul link | Ericsson, ST-Ericsson | - |
R4‑121098 | Response LS on enabling operation of 4Tx support in LTE networks | Huawei | - |
R4‑121099 | Way forward on CLTD | Huawei | - |
R4‑121100 | way forward on DC-HSUPA test | ST-Ericsson, Ericsson, Qualcomm | - |
R4‑121101 | Corrections to Configured Transmitted Power | Renesas Mobile Europe Ltd. | - |
R4‑121102 | TP for 36.809: Simulation Methodology and Parameters | Polaris Wireless | - |
R4‑121103 | Introduction of Band 26/XXVI to TS 36.101 | Ericsson, ST-Ericsson, Sprint | - |
R4‑121104 | Introduction of Band 26/XXVI to TS 36.133 | Qualcomm Incorporated, Sprint | - |
R4‑121105 | On the need of turning on/off CLTD feature based on UE implementation | Qualcomm Incorporated | - |
R4‑121106 | CR for 36.133: B41 REFSENS and MOP changes to accommodate single filter architecture | Clearwire | - |
R4‑121107 | Simulation assumptions for TM3 rank-2 test on non-MBSFN ABS | huawei | - |
R4‑121108 | TR 37.976 , version 1.8.0 (updates from R4#62) | Agilent | - |
R4‑121109 | LS on Geographically separated antenna and impact on CSI estimation | ST-Ericsson | - |
R4‑121110 | LS on support of bandwidth combinations for carrier aggregation | Ericsson | - |
R4‑121111 | TP for 36.820: Co-existence between APAC700 and other 3GPP bands | Ericsson, ST-Ericsson | - |
R4‑121112 | Band 27 / APAC700 coexistence requirements Way Forward. | NII | - |
R4‑121113 | TP for 36.820: Co-existence between APAC700 and other 3GPP bands | Ericsson, ST-Ericsson | - |
R4‑121114 | On the need of turning on/off CLTD feature based on UE implementation | Qualcomm Incorporated | - |
R4‑121115 | LS on support of bandwidth combinations for carrier aggregation | Ericsson | - |
R4‑121116 | LS on Geographically separated antenna and impact on CSI estimation | ST-Ericsson | - |
R4‑121117 | Reply LS on Antenna Performance Item: test methodology discussion | CATR | - |
R4‑121118 | Inter-RAT E-UTRA RSRP, RSRQ band dependency | Anritsu | - |
R4‑121119 | Introduction of requirements of CQI reporting definition for ecICIC | Huawei, HiSilicon, Qualcomm | - |
page generated from database: 2024-10-07 07:52:06