3GPP TDocs (written contributions) at meeting
Meeting: R1-58 - 2009-08-24 to 2009-08-28, Shenzhen
meeting id: R1-58 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑092990 | Draft Agenda for RAN1#58 meeting | RAN1 Chairman | Approved |
R1‑092991 | Draft report of RAN1#57bis meeting | MCC Support | Approved |
R1‑092992 | LS on H(e)NB Inbound Mobility | RAN2, Motorola | Noted |
R1‑092993 | LS on positioning subframe configuration for OTDOA | RAN2, Huawei | Noted |
R1‑092994 | LS on mobility measurements for carrier aggregation | RAN2, Ericsson | Noted |
R1‑092995 | Response LS on conformance test procedure change for the UE with two transmit chains/antenna ports | RAN4, Vodafone | Noted |
R1‑092996 | LTE-A Evaluation Results | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑092997 | Adequacy of Bandwidth Aggregation Simulation Scenarios | AT&T | Noted |
R1‑092998 | Results for U-TDOA Positioning Simulations | TruePosition, Inc. | Noted |
R1‑092999 | 25.214 CR0558 (Rel-7, F) Clarification of DTX Cycle transitions and UL DPCCH burst transmissions | Qualcomm Europe | Noted - Revised |
R1‑093000 | 25.214 CR0559 (Rel-8, A) Clarification of DTX Cycle transitions and UL DPCCH burst transmissions | Qualcomm Europe | Noted - Revised |
R1‑093001 | 25.214 CR0560 (Rel-7, F) Clarification of the start of the CQI_DTX_Timer | Qualcomm Europe | Noted - Revised |
R1‑093002 | 25.214 CR0561 (Rel-8, A) Clarification of the start of the CQI_DTX_Timer | Qualcomm Europe | Noted - Revised |
R1‑093003 | Clarification of some aspects of CPC operation | Qualcomm Europe | Noted |
R1‑093004 | 25.214 CR0562 (Rel-7, F) Unequal power setting of P-CPICH/S-CPICH | Qualcomm Europe | Noted - Revised |
R1‑093005 | 25.214 CR0563 (Rel-8, A) Unequal power setting of P-CPICH/S-CPICH | Qualcomm Europe | Noted - Revised |
R1‑093006 | 25.211 CR0269 (Rel-7, F) Clarification to applicability of TX diversity in MIMO | Qualcomm Europe | Noted - Revised |
R1‑093007 | 25.211 CR0270 (Rel-8, A) Clarification to applicability of TX diversity in MIMO | Qualcomm Europe | Noted - Revised |
R1‑093008 | 25.214 CR0564 (Rel-7, F) Signaling of S-CPICH channelization code information | Qualcomm Europe | Noted |
R1‑093009 | 25.214 CR565 (Rel-8, A) Signaling of S-CPICH channelization code information | Qualcomm Europe | Noted |
R1‑093010 | Limit on DPCCH power in secondary carrier | Qualcomm Europe | Noted |
R1‑093011 | Analysis of Baseline ACK/NACK code for DC-HSDPA and MIMO | Qualcomm Europe | Noted |
R1‑093012 | 25.212 CR0279 (Rel-9, B) Combination of DC-HSDPA with MIMO | Qualcomm Europe | Noted - Revised |
R1‑093013 | HS-DPCCH Design for 3/4 carriers | Qualcomm Europe | Missing |
R1‑093014 | Support of carrier aggregation for FDD and related control signalling with blind ^^decoding reduction | Alcatel-Lucent | Noted |
R1‑093015 | Estimation of extended PMI feedback signalling required for user intra-cell and^^inter-cell coordination | Alcatel-Lucent | Not treated |
R1‑093016 | Consideration on performance of coordinated beamforming with PMI feedback | Alcatel-Lucent | Not treated |
R1‑093017 | Uplink multi-point reception performance results for LTE-A | Alcatel-Lucent | Not treated |
R1‑093018 | Coping with the multi-cell timing issues in uplink COMP joint processing | Alcatel-Lucent | Not treated |
R1‑093019 | Definition of Backhaul according to Level of Cooperation in CoMP UL | Alcatel-Lucent | Not treated |
R1‑093020 | Draft Liaison response to R2-094108 for positioning subframe configuration | Huawei | Noted |
R1‑093021 | Positioning subframe configuration for OTDOA | Huawei | Noted |
R1‑093022 | On time-varying shifting of PRS pattern | Huawei | Noted |
R1‑093023 | Further analysis on site/cell muting | Huawei | Noted |
R1‑093024 | Discussion on PDSCH in PRS subframe | Huawei | Noted |
R1‑093025 | PRS in MBSFN subframe | Huawei | Noted |
R1‑093026 | Hardware calibration requirement for dual layer beamforming | Huawei | Not treated |
R1‑093027 | Downlink control signaling for dual-layer beamforming | Huawei | Not treated |
R1‑093028 | DM-RS pattern design for dual-layer beamforming | Huawei | Not treated |
R1‑093029 | Feedback schemes for dual layer beamforming | Huawei | Not treated |
R1‑093030 | DMRS design consideration for LTE-A | Huawei | Noted |
R1‑093031 | Consideration on CSI-RS design for CoMP and text proposal to 36.814 | Huawei | Noted |
R1‑093032 | draft LS on impact of CoMP on backhauling and upper layer procedure | Huawei | Not treated |
R1‑093033 | Wayforward on CoMP Feedback | Huawei, CMCC, CATT, Panasonic, HTC, ETRI, TI, CHTTL, Fujitsu, Qualcomm Europe, ITRI, Interdigital, LGE, Vodafone | Revised |
R1‑093034 | Discussions on Common Feedback Framework for DL CoMP | Huawei | Not treated |
R1‑093035 | Feedback capacity analysis for different feedback mechanizms^^ | Huawei | Not treated |
R1‑093036 | Practical Analysis of CoMP Coordinated Beamforming | Huawei | Not treated |
R1‑093037 | Performance of DL Coordinated Beam Switching with Bursty traffic | Huawei | Not treated |
R1‑093038 | Downlink CoMP JP Evaluation and Feedback design | Huawei | Not treated |
R1‑093039 | Interference analysis on SRS for CoMP | Huawei | Not treated |
R1‑093040 | Proposal on Relay channel model for 36.814 | Huawei, Qualcomm, CMCC | Revised |
R1‑093041 | Optimized LOS possibility of macro to relay link through site planning | Huawei, Qualcomm, Research in Motion | Not treated |
R1‑093042 | R-PDCCH Design | Huawei | Not treated |
R1‑093043 | Backhaul Subframe Configuration with Access Link Improvement for Type 1 Relay | Huawei | Not treated |
R1‑093044 | Issues of type 2 Relay | Huawei | Noted |
R1‑093045 | Physical channels for cell identification | Huawei | Noted |
R1‑093046 | PUCCH design for carrier aggregation | Huawei | Not treated |
R1‑093047 | Issues on cross-carrier PDCCH indication for carrier aggregation | Huawei | Not treated |
R1‑093048 | Improvements on Control Channel for Carrier Aggregation | Huawei | Not treated |
R1‑093049 | Further discussion on multiple antenna transmission for PUCCH | Huawei | Not treated |
R1‑093050 | Tx diversity scheme criteria for PUSCH | Huawei | Not treated |
R1‑093051 | Comparison of UL TX diversity schemes for PUSCH | Huawei | Not treated |
R1‑093052 | Peformance of UL multiple antenna transmission for PUCCH | Huawei | Not treated |
R1‑093053 | Further Results on Layer Shifting and Bundling | Huawei | Not treated |
R1‑093054 | CW-to-layer mapping | Huawei | Not treated |
R1‑093055 | Precoding for UL 4Tx MIMO | Huawei | Noted |
R1‑093056 | Power distribution of UL 4Tx precoding | Huawei | Noted |
R1‑093057 | DL MIMO Codebook for eight antenna ports | Huawei | Not treated |
R1‑093058 | Discussion on DL MU-MIMO in LTE-A | Huawei | Not treated |
R1‑093059 | Adaptive Feedback: A New Perspective of Adaptive Codebooks | Huawei | Not treated |
R1‑093060 | Rank analysis for 8 antenna transmission | Huawei | Not treated |
R1‑093061 | Evaluation of PMI Feedback Schemes for MU-MIMO Paring | Huawei | Not treated |
R1‑093062 | LTE and LTE-A TDD system performance for ITU submission | Huawei | Noted |
R1‑093063 | LTE and LTE-A FDD system performance for ITU submission | Huawei | Noted |
R1‑093064 | LTE link budget for ITU submission | Huawei | Revised |
R1‑093065 | Paging and OTDOA PRS subframes | InterDigital Communications, LLC | Noted |
R1‑093066 | DL Control Signalling for LTE Rel-9 Dual-Layer Beamforming | InterDigital Communications, LLC | Not treated |
R1‑093067 | Cross-Carrier Operation for LTE-A Bandwidth Extension | InterDigital Communications, LLC | Not treated |
R1‑093068 | Overview and discussion on design options for Carrier Indication | InterDigital Communications, LLC | Missing |
R1‑093069 | Simulation results for implicit and explicit Carrier Indication approaches | InterDigital Communications, LLC | Not treated |
R1‑093070 | Proposed Way Forward on UL Tx power control for LTE-A Bandwidth Extension | InterDigital Communications, LLC | Not treated |
R1‑093071 | FDD Relay Type I Backhaul Collision and H-ARQ issues | InterDigital Communications, LLC | Not treated |
R1‑093072 | Further considerations of power limit for secondary carrier in DC-HSUPA | InterDigital Communications LLC | Noted |
R1‑093073 | Minimum reduced E-DPDCH gain factor range for DC-HSUPA | InterDigital Communications LLC | Noted |
R1‑093074 | Performance Analysis for EUL Coverage Extension in CELL_FACH State | InterDigital Communications LLC | Noted |
R1‑093075 | 25.222 CR0182 (Rel-8, F) Correction to Xptr field definition for LCR TDD | New Postcom, RITT, CATT, ZTE, TD Tech, Potevio | Revised |
R1‑093076 | 25.222 CR0183 (Rel-8, F) Correction to HS-SCCH Type 2 definition for LCR TDD | New Postcom, CATT, ZTE, TD Tech, Potevio | Revised |
R1‑093077 | 25.222 DraftCR (Rel-8, F) Definition of HS-SCCH Order types against HS-SCCH types | New Postcom, ZTE, TD Tech, Potevio | Revised |
R1‑093078 | 25.221 DraftCR (Rel-8, F) Timing association between HS-SCCH and SPS HS-PDSCH for LCR TDD | New Postcom, ZTE, Potevio | Revised |
R1‑093079 | 25.222 DraftCR (Rel-8, F) Delivery of TPC, SS and Pebase for LCR TDD CPC UEs | New Postcom, ZTE, Potevio | Noted |
R1‑093080 | Some considerations on DL CoMP | New Postcom | Revised |
R1‑093081 | Distributed Dynamic CoMP for LTE-Advanced | Tokyo Institute of Technology | Revised |
R1‑093082 | 25.224 CR0225 (Rel-7,F) Clarification of SNPL calculation and reporting for 1.28Mcps TDD | CATT | Revised |
R1‑093083 | 25.224 CR0226 (Rel-8,A) Clarification of SNPL calculation and reporting for 1.28Mcps TDD | CATT | Revised |
R1‑093084 | 25.224 CR0227 (Rel-8,F) Clarification of SNPL reporting in CELL-DCH and enhanced CELL-FACH state for 1.28Mcps TDD | CATT | Revised |
R1‑093085 | 25.222 CR0180 (Rel-8,F) Modification of HS-SCCH types for CPC in 1.28Mcps TDD | CATT, CATR, TD-TECH, Potevio, Newpostcom, ZTE | Agreed |
R1‑093086 | 25.225 CR0093 (Rel-8,F) Clarification of UE measurement definitions for RX diversity of LCR TDD | CATT | Agreed |
R1‑093087 | Discussion on special default midamble allocation scheme for 1.28Mcps TDD | CATT | Noted |
R1‑093088 | 25.221 CR0186 (Rel-8,F) Modification of special default midamble allocation scheme for 1.28Mcps TDD | CATT | Noted |
R1‑093089 | 25.222 CR0181 (Rel-8,F) Modification of special default midamble allocation scheme for 1.28Mcps TDD | CATT | Noted |
R1‑093090 | UE positioning based on propagation delay | NTT DOCOMO | Noted |
R1‑093091 | TR36.814 v 1.2.2 | Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093092 | Summary of the performance evaluation | Rapporteur (NTT DOCOMO) | Revised |
R1‑093093 | TP for 36.912 on performance evaluation | Rapporteur (NTT DOCOMO) | Revised |
R1‑093094 | TP for 36.912 on technical description | Rapporteur (NTT DOCOMO) | Agreed |
R1‑093095 | Draft LS reply on positioning from RAN2 | Qualcomm Europe | Noted |
R1‑093096 | Draft LS reply on MC from RAN2 | Qualcomm Europe | Noted |
R1‑093097 | Clarifying inter-cell synchronization text | Qualcomm Europe | Noted - Revised |
R1‑093098 | Clarifying RSSI definition | Qualcomm Europe | Noted |
R1‑093099 | Revised CR for 36.214 | Qualcomm Europe | Noted - Revised |
R1‑093100 | Link analyses of different reference signal designs for dual-stream beamforming | Qualcomm Europe | Not treated |
R1‑093101 | Enabling MU-MIMO operation with dual-stream beamforming | Qualcomm Europe | Not treated |
R1‑093102 | Specification impact of dual-stream beamforming | Qualcomm Europe | Not treated |
R1‑093103 | Benefits of blank subframes in Rel-9 | Qualcomm Europe | Noted |
R1‑093104 | CSI RS function in LTE-A | Qualcomm Europe | Not treated |
R1‑093105 | DM-RS patterns for LTE-A | Qualcomm Europe | Noted |
R1‑093106 | RS patterns vs. peak data rate | Qualcomm Europe | Noted |
R1‑093107 | DL CoMP: Summary of gains and use cases | Qualcomm Europe | Withdrawn |
R1‑093108 | Bounds on JP performance benefits | Qualcomm Europe | Withdrawn |
R1‑093109 | Feedback in support of DL CoMP: general views | Qualcomm Europe | Not treated |
R1‑093110 | Hierarchical feedback in support of DL CoMP operation | Qualcomm Europe | Not treated |
R1‑093111 | Short-term vs. long-term channel state information in support of DL CoMP | Qualcomm Europe | Not treated |
R1‑093112 | Comparison between MDC and MLC feedback encoding techniques | Qualcomm Europe | Not treated |
R1‑093113 | Challenges with Type II relay operation | Qualcomm Europe | Noted |
R1‑093114 | Techniques to maximize the Type 1 relay gains | Qualcomm Europe | Revised |
R1‑093115 | Backhaul link design in support of relaying operation | Qualcomm Europe | Not treated |
R1‑093116 | Type I relay performance characterization: dependency with channel model assumptions | Qualcomm Europe | Not treated |
R1‑093117 | LOS Probability of the eNB-UE Direct Link | Qualcomm Europe, Huawei, Research In Motion | Revised |
R1‑093118 | Multi-carrier control for LTE-A | Qualcomm Europe | Not treated |
R1‑093119 | Notions of segment and non-backwards compatible carriers for LTE-A | Qualcomm Europe | Noted |
R1‑093120 | PHICH for MC operation | Qualcomm Europe | Not treated |
R1‑093121 | CQI for MC operation | Qualcomm Europe | Not treated |
R1‑093122 | UL ACK for MC operation | Qualcomm Europe | Not treated |
R1‑093123 | Cubic Metric with Carrier Aggregation | Qualcomm Europe | Not treated |
R1‑093124 | PUCCH transmit diversity | Qualcomm Europe | Not treated |
R1‑093125 | PUSCH transmit diversity | Qualcomm Europe | Not treated |
R1‑093126 | Further Link Analyses of SU-MIMO operation for UL of LTE-A | Qualcomm Europe | Not treated |
R1‑093127 | DM-RS in support of UL MIMO and TxD | Qualcomm Europe | Not treated |
R1‑093128 | Goals of codebook design for UL MIMO operation in LTE-A | Qualcomm Europe | Noted |
R1‑093129 | DL MU-MIMO operation in LTE-A | Qualcomm Europe | Not treated |
R1‑093130 | DL MIMO transmission modes | Qualcomm Europe | Not treated |
R1‑093131 | Feedback considerations for DL MIMO and CoMP | Qualcomm Europe | Not treated |
R1‑093132 | DL performance of LTE-A: FDD | Qualcomm Europe | Noted |
R1‑093133 | UL performance of LTE-A: FDD | Qualcomm Europe | Noted |
R1‑093134 | DL performance of LTE-A: TDD | Qualcomm Europe | Noted |
R1‑093135 | UL performance of LTE-A: TDD | Qualcomm Europe | Noted |
R1‑093136 | Mobility evaluations | Qualcomm Europe | Noted |
R1‑093137 | Measurements in support of various LTE-A techniques | Qualcomm Europe | Not treated |
R1‑093138 | Time synchronization requirements for different LTE-A techniques | Qualcomm Europe | Not treated |
R1‑093139 | Flexible Data and Reference Signal Multiplexing for LTE-Advanced Uplink | Qualcomm Europe | Not treated |
R1‑093140 | Evaluations for heterogeneous networks | Qualcomm Europe | Not treated |
R1‑093141 | Signaling for Spatial Coordination in DL CoMP | Qualcomm Europe | Not treated |
R1‑093142 | DL Performance with hotzone cells | Qualcomm Europe | Not treated |
R1‑093143 | UL performance with hotzone cells | Qualcomm Europe | Not treated |
R1‑093144 | Advantages of interference coordination for delay sensitive traffic in CSG environment | Qualcomm Europe | Not treated |
R1‑093145 | DL carrier aggregation performance in heterogeneous network | Qualcomm Europe | Not treated |
R1‑093146 | UL carrier aggregation performance in heterogeneous network | Qualcomm Europe | Not treated |
R1‑093147 | Necessity of checking channel reciprocity in TDD | Mitsubishi Electric | Not treated |
R1‑093148 | Over-the-air Inter-node Carrier Phase Synchronization for LTE-advanced | Mitsubishi Electric | Not treated |
R1‑093149 | Discussion on over-the-air communication for CoMP | Mitsubishi Electric | Not treated |
R1‑093150 | Performance evaluation of Rank-1 Precoded SRS | Mitsubishi Electric | Not treated |
R1‑093151 | On the ACK/NACK signalling in PUCCH for LTE-Advanced | Mitsubishi Electric | Withdrawn |
R1‑093152 | CSI-RS Design for Virtualized LTE Antenna in LTE-A System | Fujitsu | Noted |
R1‑093153 | CSI-RS and DRS Design for LTE-A System | Fujitsu | Withdrawn |
R1‑093154 | Efficient HARQ Protocol for SIC based DL CoMP | Fujitsu | Not treated |
R1‑093155 | Performance Evaluation of Coherent SU and MU CoMP for LTE-A | Fujitsu | Not treated |
R1‑093156 | Different Types of DL CoMP Transmission for LTE-A | Fujitsu | Not treated |
R1‑093157 | Relaying with Channel Resource Reuse and SIC for LTE-Advanced | Fujitsu | Not treated |
R1‑093158 | Discussion on Backhaul link of Type-1 Relay for LTE-A TDD | Fujitsu | Not treated |
R1‑093159 | Considerations on using Type II relay for UL transmission | Fujitsu | Not treated |
R1‑093160 | UL-MIMO Enhancement with Codebook Size Adaptation and Nested Codebook Group | Fujitsu | Not treated |
R1‑093161 | A Design of Rank1, Rank2 and Rank3 Precoding Codebook for 4x4 UL-MIMO | Fujitsu | Noted - Revised |
R1‑093162 | Layer Power Distribution for Rank3 UL-MIMO | Fujitsu | Noted |
R1‑093163 | Hierarchical Modulation based DL MIMO for LTE-Advanced | Fujitsu | Not treated |
R1‑093164 | Discussion on DL MU-MIMO in LTE-A | Fujitsu | Not treated |
R1‑093165 | Grouped and Encoded Packet based HARQ for LTE-Advanced | Fujitsu | Not treated |
R1‑093166 | Comparison between Long-term and Short-term Dual-Layer Beamforming | Texas Instruments | Not treated |
R1‑093167 | CSI Measurement with Downlink Reference Signal | Texas Instruments | Not treated |
R1‑093168 | Timing Advance Commands in Support of UL COMP Operation | Texas Instruments | Not treated |
R1‑093169 | Design of the UL Backhaul for a Type I Relay | Texas Instruments | Not treated |
R1‑093170 | Resolving CM and Cell ID Issues Associated with Aggregated Carriers | Texas Instruments | Not treated |
R1‑093171 | On PUCCH for Multiple Component Carriers | Texas Instruments | Not treated |
R1‑093172 | 4Tx Codebook for UL SU-MIMO: Results with Rank Adaptation | Texas Instruments | Noted |
R1‑093173 | Discussion on UL DM RS for SU - MIMO | Texas Instruments | Not treated |
R1‑093174 | HARQ Bundling for Uplink SU-MIMO | Texas Instruments | Not treated |
R1‑093175 | Precoding-Related Issues on 8Tx Downlink SU-MIMO | Texas Instruments | Not treated |
R1‑093176 | Implicit feedback in support of DL MU-MIMO | Texas Instruments | Not treated |
R1‑093177 | DL performance evaluation for ITU-R submission | Texas Instruments | Noted |
R1‑093178 | UL performance evaluation for ITU-R submission | Texas Instruments | Noted |
R1‑093179 | Doppler Impact of Higher Carrier Frequencies on LTE – A Uplink | Texas Instruments | Not treated |
R1‑093180 | Downlink Multi-Cell DM-RS Considerations | WOASiS | Not treated |
R1‑093181 | Opportunistic uplink coordinated multi-point reception for LTE-A | Institute for Infocomm Research | Not treated |
R1‑093182 | Performance of SFN and AS-SFN Precoding Schemes for DL CoMP | SHARP | Not treated |
R1‑093183 | HARQ Retransmission Options for DL-CoMP | SHARP | Not treated |
R1‑093184 | PDCCH structure for carrier aggregation in LTE-Advanced | SHARP | Not treated |
R1‑093185 | The Need for Improved PUSCH Control Formats | SHARP | Not treated |
R1‑093186 | Control Overhead Analysis on Aperiodic PUSCH | SHARP | Not treated |
R1‑093187 | The UE PA Architecture for LTE-Advanced | SHARP | Not treated |
R1‑093188 | Simulation Result for UL 4x4 rank 1 codebook | SHARP | Noted |
R1‑093189 | SRS Options for LTE-A UL multi-antenna transmission | SHARP | Not treated |
R1‑093190 | Remaining issue about PRS | ZTE | Noted |
R1‑093191 | DL Control Signaling for Dual-layer BF in LTE Rel-9 | ZTE | Not treated |
R1‑093192 | Comments to LS on positioning subframe configuration for OTDOA | ZTE | Noted |
R1‑093193 | DM RS Design for downlink transmission | ZTE | Revised |
R1‑093194 | Performance evaluation of downlink DMRS design | ZTE | Not treated |
R1‑093195 | DMRS Design with v-shift Enabled | ZTE | Not treated |
R1‑093196 | DL Reference Signal Design for CSI generation in LTE-Advanced | ZTE | Noted |
R1‑093197 | Performance Sensitivity to Feedback Types | ZTE | Not treated |
R1‑093198 | Draft CR on scrambling sequence selection for TDD AN bundling | ZTE | Noted |
R1‑093199 | Impact of insufficient link adaptation in type II relay | ZTE | Not treated |
R1‑093200 | Performance of type II relay with 2x2 MIMO backhaul | ZTE | Not treated |
R1‑093201 | Control channel of backhaul link | ZTE | Not treated |
R1‑093202 | Backhaul link packet aggregted transmission | ZTE | Not treated |
R1‑093203 | Subframe structure and timing offset for UL measurement | ZTE | Not treated |
R1‑093204 | Cosiderations on demodulation reference signal in backhaul downlink | ZTE | Not treated |
R1‑093205 | Uplink Non-contiguous Resource allocation for LTE-Advanced | ZTE | Not treated |
R1‑093206 | Designing issues for carrier aggregation | ZTE | Revised |
R1‑093207 | Considerations on carrier indicator | ZTE | Not treated |
R1‑093208 | ACK Design for LTE-A. | ZTE | Not treated |
R1‑093209 | Uplink Control Channel Design for LTE-A | ZTE | Not treated |
R1‑093210 | DL codebook Design for 8Tx MIMO in LTE-A | ZTE | Not treated |
R1‑093211 | Investigation on channel and codebook for DL 8Tx MIMO | ZTE | Not treated |
R1‑093212 | Latest draft 36.912 | LTE-Advanced Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093213 | Updated technical description template for ITU-R submission | LTE-Advanced Rapporteur (NTT DOCOMO) | Endorsed |
R1‑093214 | Some considerations on non-transparent MU Dual-Layer Beamforming | TD Tech | Missing |
R1‑093215 | 25.224 CR0228 (Rel-8, F) on correction on HS-SCCH,HS-DSCH and HS-SICH Association and Timing | TD Tech | Withdrawn |
R1‑093216 | 25.224 CR0229 (Rel-8, F)on correction on E-AGCH and SPS E-PUCH Association and Timing for 1.28Mcps TDD | TD Tech | Noted |
R1‑093217 | 25.224 CR0219R3 (Rel-8, F) on clarification on HS-DSCH procedure when using BCCH specific H-RNTI in CELL_PCH or URA_PCH state for 1.28Mcps TDD | TD Tech | Noted - Revised |
R1‑093218 | 25.224 CR0230 (Rel-8, F) on correction on DRX description in CELL_DCH state for 1.28Mcps TDD | TD Tech | Noted |
R1‑093219 | 25.224 CR0231 (Rel-8, F) on correction on SPS resource assignment, reassignment and release procedure for 1.28Mcps TDD | TD Tech | Noted |
R1‑093220 | 25.224 CR0217R1 (Rel-8, F) Correction of Out of synchronisation handling for 1.28Mcps TDD CPC usage | TD Tech | Noted |
R1‑093221 | 36.212 CR0093 (Rel-8, F) Correction to the references for UL index for TDD | NEC Group | Noted |
R1‑093222 | Rel-8 cell-specific RS as CSI-RS for LTE-A | NEC Group | Not treated |
R1‑093223 | CSI-RS design for LTE-Advanced | NEC Group | Noted |
R1‑093224 | Further details of the Relay type 1 control design | NEC Group | Not treated |
R1‑093225 | Views on PDCCH Carrier Indicator | NEC Group | Not treated |
R1‑093226 | Further refinement to DL control signalling for carrier aggregation | NEC Group | Not treated |
R1‑093227 | PHICH carrier linkage for carrier aggregation | NEC Group | Not treated |
R1‑093228 | MU-MIMO: Demodulation at the UE | NEC Group | Revised |
R1‑093229 | Multi-resolution Precoding Codebook | NEC Group | Not treated |
R1‑093230 | DL Performance evaluation for ITU-R submission | NEC Group | Noted |
R1‑093231 | UL Performance evaluation for ITU-R submission | NEC Group | Noted |
R1‑093232 | Remaining Issues on Positioning Support | LG Electronics | Noted |
R1‑093233 | DM-RS Design for Dual-layer Beam-forming | LG Electronics | Not treated |
R1‑093234 | Consideration on MU-MIMO for Dual-layer Beam-forming | LG Electronics | Not treated |
R1‑093235 | CSI-RS Design for LTE-Advanced | LG Electronics | Noted |
R1‑093236 | DM-RS Design for Higher Order MIMO | LG Electronics | Noted |
R1‑093237 | Views on Downlink RS for LTE-Advanced | LG Electronics | Not treated |
R1‑093238 | Feedback information for downlink coordinated scheduling/beamforming | LG Electronics | Not treated |
R1‑093239 | Multi-layered Rate Control for SIC-based CoMP | LG Electronics | Not treated |
R1‑093240 | Multi-layered Rate Control for Uplink CoMP | LG Electronics | Not treated |
R1‑093241 | Backhaul subframe allocation considering HARQ operation | LG Electronics | Not treated |
R1‑093242 | DL/UL TX/RX timing relationship considering Relay Node | LG Electronics | Not treated |
R1‑093243 | Backhaul subframe structure considering guard time position | LG Electronics | Not treated |
R1‑093244 | PUSCH Forwarding in Type II Relay | LG Electronics | Not treated |
R1‑093245 | Further consideration on TDD in-band relaying methods | LG Electronics | Not treated |
R1‑093246 | Resource Allocation and Downlink Control Channel Structure for Relay Backhaul Link | LG Electronics | Not treated |
R1‑093247 | Physical cell ID allocation in component carrier aggregation | LG Electronics | Not treated |
R1‑093248 | Transmission of uplink control information in case of transmit power limitation | LG Electronics | Not treated |
R1‑093249 | Cross carrier scheduling by PDCCH for multiple carrier | LG Electronics | Not treated |
R1‑093250 | Uplink transmission under UE transmit power limitation in LTE-Advanced | LG Electronics | Not treated |
R1‑093251 | ACK/NACK PUCCH for LTE-Advanced | LG Electronics | Not treated |
R1‑093252 | Issues on DL/UL Control Signalling in Asymmetric Carrier Aggregation | LG Electronics | Not treated |
R1‑093253 | UE-specific Carrier Assignment for LTE-Advanced | LG Electronics | Not treated |
R1‑093254 | PUCCH TxD Schemes for LTE-A | LG Electronics | Not treated |
R1‑093255 | Performance evaluation of PUSCH 2Tx transmit diversity schemes in LTE-A | LG Electronics | Not treated |
R1‑093256 | Performance evaluation of PUSCH 4Tx transmit diversity schemes in LTE-A | LG Electronics | Not treated |
R1‑093257 | Consideration on rank 3 codebook design for UL SU-MIMO in LTE-A | LG Electronics | Noted |
R1‑093258 | Further details on layer shifting for UL SU-MIMO in LTE-A | LG Electronics | Not treated |
R1‑093259 | Consideration on DMRS design for UL SU-MIMO in LTE-A | LG Electronics | Not treated |
R1‑093260 | Comparison between uplink frequency selective and non-selective precoding | LG Electronics | Not treated |
R1‑093261 | Uplink Codebook for 4Tx SU-MIMO – Rank 1 and Rank 2 | LG Electronics | Noted |
R1‑093262 | Discussion on UE class category and numbers of Tx PA and Tx/Rx antenna configurations | LG Electronics | Not treated |
R1‑093263 | Remaining Issues on Higher Order MIMO | LG Electronics | Not treated |
R1‑093264 | Consideration on MU-MIMO for LTE-Advanced | LG Electronics | Not treated |
R1‑093265 | Evaluation for 8Tx CL-MIMO | LG Electronics | Not treated |
R1‑093266 | DL codebook design for 8Tx precoding | LG Electronics | Not treated |
R1‑093267 | Performance evaluation results for LTE-A DL system | LG Electronics | Noted |
R1‑093268 | Related issues on PDDCH carrier indication | CMCC | Not treated |
R1‑093269 | UL ACK/NACK and CQI feedback in Carrier Aggregation | CMCC | Not treated |
R1‑093270 | Consideration on eNB-UE channel model | CMCC | Revised |
R1‑093271 | Consideration of site planning on relay evaluation methodology | CMCC | Agreed in principle |
R1‑093272 | Considerations on the synchronization of relay nodes | CMCC | Not treated |
R1‑093273 | SRS feedback mechanism based CoMP schemes in TD-LTE-Advanced | CMCC | Not treated |
R1‑093274 | Performance of Transparent MU-BF and Non-transparent MU-BF | CMCC | Not treated |
R1‑093275 | On blank subframes for LTE evolution in Rel-9 | Huawei | Withdrawn |
R1‑093276 | 25.212 CR0280 (Rel-8, F) Alignment with RAN2 decisions on HS-SCCH orders for activation and deactivation of DTX and DRX operation | ChinaUnicom, ZTE | Noted - Revised |
R1‑093277 | Consideration on HS-SCCH orders for activation and deactivation of DRX and DTX operation for DC-HSDPA | ChinaUnicom, ZTE | Noted |
R1‑093278 | Cognitive Interference Management for Type I Relays | CEWiT | Not treated |
R1‑093279 | Downlink CoMP based on Cooperative Precoding | CEWiT | Not treated |
R1‑093280 | Blind decoding in LTE-Advanced | ASUSTeK | Not treated |
R1‑093281 | Non-contiguous uplink resource allocation for LTE-A | ASUSTeK | Not treated |
R1‑093282 | Multi-carrier UL power control for LTE-A | ASUSTeK | Not treated |
R1‑093283 | Downlink DM-RS Design Considerations for LTE-A | Research In Motion UK Limited | Not treated |
R1‑093284 | 4-tx Transmission Configuration in LTE-A | Research In Motion UK Limited | Not treated |
R1‑093285 | Configurations of Transparent Relay using Rel-9 Dual-Layer Beamforming | Research In Motion UK Limited | Not treated |
R1‑093286 | Control Signal Design for Rel-9 Dual-layer BF Transmission | Research In Motion UK Limited | Not treated |
R1‑093287 | Performance Study on LTE-A UL MIMO with TP | Research In Motion UK Limited | Not treated |
R1‑093288 | UE Power Saving in the LTE-A Uplink 2 Element Codebook with TP | Research In Motion UK Limited | Noted |
R1‑093289 | Support of Carrier Aggregation with Heterogeneous Deployment of Component Carriers | Research In Motion UK Limited | Not treated |
R1‑093290 | UE Association in a Type-II relay network | Research In Motion UK Limited | Not treated |
R1‑093291 | LOS Probability of the Backhaul Link | Research In Motion UK Limited, Qualcomm, Huawei | Agreed in principle |
R1‑093292 | Relay Link Control Signalling | Research In Motion UK Limited | Not treated |
R1‑093293 | Relay Link HARQ Operation | Research In Motion UK Limited | Not treated |
R1‑093294 | Type-II Relay DL/UL Transmission Schemes and Performance Analysis | Research In Motion UK Limited | Not treated |
R1‑093295 | Blind Decoding for Carrier Aggregation | Research In Motion UK Limited | Not treated |
R1‑093296 | Carrier Indication for Carrier Aggregation | Research In Motion UK Limited | Noted |
R1‑093297 | Uplink Power Control for Carrier Aggregation | Research In Motion UK Limited | Not treated |
R1‑093298 | 36.213 CR0247 (Rel-8, F) Correction to DVRB operation in TDD transmission mode 7 | Nokia, Nokia Siemens Networks | Revised |
R1‑093299 | Performance study on Tx/Rx mismatch in LTE TDD Dual-layer beamforming | Nokia, Nokia Siemens Networks, CATT, ZTE | Not treated |
R1‑093300 | DL Control Signalling for Dual-layer Beamforming in Rel’9 | Nokia, Nokia Siemens Networks | Not treated |
R1‑093301 | UE-specific reference symbols for dual-layer beamforming | Nokia, Nokia Siemens Networks | Not treated |
R1‑093302 | Performance of layer-shifting for dual-layer beamforming | Nokia, Nokia Siemens Networks | Not treated |
R1‑093303 | UE-specific reference symbol multiplexing for LTE-Advanced downlink | Nokia, Nokia Siemens Networks | Noted |
R1‑093304 | Considerations on Initialization and Mapping of DM-RS Sequence | Nokia Siemens Networks, Nokia | Not treated |
R1‑093305 | CoMP cell set selection and performance evaluation considerations | Nokia Siemens Networks, Nokia | Not treated |
R1‑093306 | CSI payload extension using PUCCH and periodic PUSCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑093307 | Uplink DM RS performance evaluation from CoMP viewpoint | Nokia Siemens Networks, Nokia | Not treated |
R1‑093308 | UL CoMP performance evaluation in link level | Nokia Siemens Networks, Nokia | Not treated |
R1‑093309 | Improved Access-backhaul Partition Scheme for TDD Relay | Nokia, Nokia Siemens Networks | Not treated |
R1‑093310 | Interference mitigation for configuration pairing in TDD relay | Nokia, Nokia Siemens Networks | Not treated |
R1‑093311 | Use of Special TimeSlot for backhaul link in TDD relay | Nokia, Nokia Siemens Networks | Not treated |
R1‑093312 | Timing alignment of DL backhaul | Nokia Siemens Networks, Nokia | Not treated |
R1‑093313 | On Multiplexing of data and control signaling on backhaul | Nokia Siemens Networks, Nokia | Not treated |
R1‑093314 | On Mapping of Access-backhaul Partitioning Solutions to TDD Configurations | Nokia, Nokia Siemens Networks | Not treated |
R1‑093315 | Comparing Relays vs. Pico eNBs deployments in coverage limited scenario | Nokia Siemens Networks, Nokia | Not treated |
R1‑093316 | Handling DCI formats and blind decoding in LTE-Advanced | Nokia, Nokia Siemens Networks | Not treated |
R1‑093317 | PHICH in LTE-Advanced | Nokia, Nokia Siemens Networks | Not treated |
R1‑093318 | Considerations on alternative ways of implementing DCI formats for LTE-Advanced | Nokia, Nokia Siemens Networks | Not treated |
R1‑093319 | UL control signalling for carrier aggregation | Nokia Siemens Networks, Nokia | Not treated |
R1‑093320 | Mechanism for Cell Specific Component Carrier Usage | Nokia Siemens Networks, Nokia, China Unicom, Qualcomm | Not treated |
R1‑093321 | Autonomous CC selection results for dense urban area | Nokia Siemens Networks, Nokia | Not treated |
R1‑093322 | Uplink Power Control for LTE-Advanced | Nokia Siemens Networks, Nokia | Not treated |
R1‑093323 | Way forward on LTE-A UL PC | Nokia Siemens Networks, Nokia, Samsung, LGE, Research In Motion | Revised |
R1‑093324 | RANK 3 codebook design for LTE-Advanced UL | Nokia Siemens Networks, Nokia | Noted |
R1‑093325 | On MIMO transmission configurations for Multi-Tx UEs | Nokia Siemens Networks, Nokia | Not treated |
R1‑093326 | Tx Diversity for LTE-Advanced PUCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑093327 | Tx Diversity for LTE-Advanced PUSCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑093328 | CQI payload extension on PUCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑093329 | Initial Results and Assumptions for LTE-Advanced Heterogeneous Scenarios | Nokia Siemens Networks, Nokia | Not treated |
R1‑093330 | DL MIMO Precoding and Feedback Issues | Alcatel-Lucent | Not treated |
R1‑093331 | Grid of Beams: A realization for downloadable codebooks | Alcatel-Lucent | Not treated |
R1‑093332 | Improving MIMO for LTE-Advanced via Downloadable Codebooks | Alcatel-Lucent | Not treated |
R1‑093333 | Best Companion reporting for improved single-cell MU-MIMO pairing | Alcatel-Lucent | Not treated |
R1‑093334 | CQI and CSI Feedback Compression | Alcatel-Lucent | Not treated |
R1‑093335 | Draft LS reply to RAN2 on Carrier Aggregation | Alcatel-Lucent | Noted |
R1‑093336 | UL Coverage Extension in 2 ms TTI HSUPA | Alcatel-Lucent | Noted |
R1‑093337 | Transmit Diversity with F-DPCH, | Alcatel-Lucent | Noted |
R1‑093338 | OTDOA performance in asynchronous Network | Alcatel-Lucent | Noted |
R1‑093339 | Power offset in DRS based dual-layer beamforming | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093340 | Blank Subframes for LTE | Alcatel-Lucent | Noted |
R1‑093341 | Multi-cell cooperative RS in CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093342 | Discussion on the DM RS for dual/multi-layer beamforming | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Missing |
R1‑093343 | Comparison of CSI feedback schemes | Alcatel-Lucent | Not treated |
R1‑093344 | Consideration of Backhaul Technology Evolution in Support of CoMP | Alcatel-Lucent | Not treated |
R1‑093345 | Efficient uplink coordinated multi-point reception with reduced backhauling cost | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093346 | A progressive multi-cell MIMO transmission with sequential linear precoding design in TDD systems | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093347 | Algorithm and performance evaluations for DL non-coherent multi-user joint transmission scheme | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093348 | TDD Transmitting adjustment and compensation for the DL coherent COMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093349 | Generic Configuration of DL CoMP Mode | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093350 | Weighted CSI Feedback aided DL CoMP transmissions | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Revised |
R1‑093351 | Non-Coherent CoMP with Phase Adjustment Based on QR Decomposition for TDD DL | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093352 | Concatenated codebook for DL CoMP in LTE-A | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093353 | Text Proposal to support Type II relay | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, CMCC, CHTTL, HTC, InterDigital, ITRI, Qualcomm, Research In Motion, RITT, Vodafone, ZTE | Revised |
R1‑093354 | DL Performance evaluation for LTE-Advanced Type II relay | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093355 | System design framework to support Type II Relay Operation | Alcatel-Lucent | Not treated |
R1‑093356 | Network coded relay and its chase combining | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093357 | Type II relay considerations with the separation of control and data | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093358 | Timing synchronization for TDD Type 1 relay | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093359 | Consideration on Type II Relay UE selection and CRS Channel Estimation Performance | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093360 | A Precoded DL cooperative transmission for Type II relay | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093361 | Control Channel Association for DL/UL asymmetrical Carrier aggregation | Alcatel-Lucent | Not treated |
R1‑093362 | Component carrier indication for bandwidth extension in LTE-A | Alcatel-Lucent | Not treated |
R1‑093363 | CM/PAPR Reduction of Aggregated Carriers for Uplink of LTE-Advanced | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093364 | STBC-II Scheme with Non-Paired Symbols for LTE-Advanced Uplink Transmit Diversity | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093365 | Codeword Shifting for Clustered DFT-S-OFDM and N x DFT-S-OFDM for LTE-Advanced Uplink SU-MIMO | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093366 | Uplink coordinated multi-point reception with distributed inter-cell interference suppression for LTE-A | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093367 | HARQ Bundling with Layer Shifting for LTE-Advanced Uplink SU-MIMO | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093368 | Interleaved Antenna Grouping for Clustered DFT-S-OFDM | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093369 | An Over-the-Air-Calibration Scheme for ZF based MU-MIMO | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093370 | Coherent Time-Frequency Precoding for the non-codebook based TDD DL transmission | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093371 | Issue on Codeword-to-Layer Mapping of Dual-Layer Beamforming | ITRI | Not treated |
R1‑093372 | Carrier Indication in PDCCH | ITRI | Not treated |
R1‑093373 | Discussion on DCI formats for enhanced DL beamforming | Samsung | Not treated |
R1‑093374 | Performance evaluation results for enhanced DL beamforming | Samsung | Not treated |
R1‑093375 | Discussion on CSI-RS for LTE-Advanced | Samsung | Noted |
R1‑093376 | Discussion on DM-RS for LTE-Advanced | Samsung | Noted |
R1‑093377 | Discussion on open-loop CoMP schemes | Samsung | Not treated |
R1‑093378 | Calibration for TDD CoMP | Samsung | Not treated |
R1‑093379 | Impact of propagation attenuations and delays of CoMP composite channels | Samsung | Not treated |
R1‑093380 | Comparison between Explicit and Implicit Feedbacks for CoMP | Samsung | Not treated |
R1‑093381 | CSI Feedback Signaling in LTE-A | Samsung | Not treated |
R1‑093382 | Design considerations for COMP Joint Transmission | Samsung | Not treated |
R1‑093383 | CoMP Implicit CQI Feedback Discussions | Samsung | Not treated |
R1‑093384 | DL backhaul physical channel design for Type I relay | Samsung | Not treated |
R1‑093385 | Guard period in UL backhaul subframes and DL/UL timing design | Samsung | Not treated |
R1‑093386 | Downlink Subframe Alignment in Type I Relay | Samsung | Not treated |
R1‑093387 | Considerations for DCI formats for Type-1 Relay | Samsung | Not treated |
R1‑093388 | Considerations on Multiple HARQs in Type I Backhaul Link Transmission | Samsung | Not treated |
R1‑093389 | Initial access in LTE-A DL and UL with carrier aggregation | Samsung | Noted |
R1‑093390 | LTE-A PDCCH: Number of Blind Decoding Operations and CRC Length Issues | Samsung | Not treated |
R1‑093391 | Control Signaling for Non-Contiguous UL Resource Allocations | Samsung | Not treated |
R1‑093392 | PHICH Transmission in LTE-A | Samsung | Not treated |
R1‑093393 | UL ACK/NAK Transmission in LTE-A | Samsung | Not treated |
R1‑093394 | Concurrent PUSCH and PUCCH Transmissions | Samsung | Not treated |
R1‑093395 | UL Transmission Power Control in LTE-A | Samsung | Not treated |
R1‑093396 | PHICH mapping in Asymmetric Carrier aggregation | Samsung | Not treated |
R1‑093397 | UL Transmit diversity for PUCCH format 1/1a/1b in LTE-A | Samsung | Not treated |
R1‑093398 | Rank 3 Codebook Design for 4 TX UL SU-MIMO | Samsung | Noted |
R1‑093399 | Performance evaluation on layer shifting and HARQ spatial bundling for LTE-A UL MIMO | Samsung | Not treated |
R1‑093400 | Transmit Diversity and Frequency Hopping Aspects for PUCCH Formats 2/2a/2b | Samsung | Not treated |
R1‑093401 | UL PUSCH 4Tx Transmit Diversity Schemes in LTE-A | Samsung | Not treated |
R1‑093402 | Discussions on UL PUSCH 2Tx Transmit Diversity Schemes in LTE-A | Samsung | Not treated |
R1‑093403 | Transmit diversity in MBSFN subframes | Samsung | Not treated |
R1‑093404 | Codebook Design for 8 Tx Transmission in LTE-A | Samsung | Not treated |
R1‑093405 | System level performance evaluations for LTE and LTE-A | Samsung | Revised |
R1‑093406 | Positioning Subframe Muting for OTDOA Measurements | Motorola | Noted |
R1‑093407 | Some UE Considerations for Supporting Dual-layer Beamforming in LTE Rel-9 - MU Receiver and UE Calibration | Motorola | Not treated |
R1‑093408 | Control Signaling for LTE Rel-9 Enhanced DL transmission | Motorola | Not treated |
R1‑093409 | Performance Evaluation of DRS Designs for LTE Rel-9 Enhanced DL transmission | Motorola | Not treated |
R1‑093410 | Coordinated Beamforming Based on Spatial Covariance Feedback and Its Gain Over Single-point SU/MU Beamforming | Motorola | Not treated |
R1‑093411 | MU/CoMP Performance Comparison of Several Feedback Types | Motorola | Not treated |
R1‑093412 | Backhaul options for Type 1 Relays for TDD LTE-A | Motorola | Not treated |
R1‑093413 | Relay System Simulation results with Coverage Boosting and Control Channel Modeling | Motorola | Not treated |
R1‑093414 | Relay Backhaul Design | Motorola | Not treated |
R1‑093415 | Relay Impact on LTE System Performance | Motorola | Not treated |
R1‑093416 | Heterogeneous Support for Reliable DL Control | Motorola | Not treated |
R1‑093417 | PDCCH Design for Carrier Aggregation and Post Rel8 features | Motorola | Not treated |
R1‑093418 | PDCCH False Detection and Dropped UL Packet rate | Motorola | Not treated |
R1‑093419 | Further Results on Layer Shifting Issue in UL-MIMO and Simulation Alignment Discussion | Motorola | Not treated |
R1‑093420 | 4-Tx UL-MIMO Codebook Design and Performance | Motorola | Noted |
R1‑093421 | Comparison of PMI-based and Spatial Covariance Based MU-MIMO | Motorola | Not treated |
R1‑093422 | ITU SPS VoIP Performance | Motorola | Noted |
R1‑093423 | MU-MIMO Subband ITU performance vs feedback filtering | Motorola | Noted |
R1‑093424 | DCI Formats for uplink non-contiguous RB allocations | Motorola | Not treated |
R1‑093425 | Modeling Heterogeneous Network using IMT.EVAL Channel Models | Motorola | Not treated |
R1‑093426 | Draft CR to 36.213 on PUSCH hopping for CQI only transmissions | Motorola | Noted |
R1‑093427 | Impact of Biasing Cell Selection on Relay System DL Performance | Motorola | Not treated |
R1‑093428 | Relay System Performance for Downlink with Latest Backhaul Link Models | Motorola | Not treated |
R1‑093429 | Codebook for 8Tx DL for LTE-A | Motorola | Not treated |
R1‑093430 | Enhanced DL MU-MIMO Scheme and associated performance for ITU Scenarios | Motorola | Revised |
R1‑093431 | LTE Release-8 UL FB Performance for ITU Scenarios | Motorola | Noted |
R1‑093432 | LTE Release-8 VoIP Performance for ITU Scenarios - Dynamic Scheduling | Motorola | Noted |
R1‑093433 | Uplink performance evaluation in heterogeneous deployment | Kyocera Corporation | Not treated |
R1‑093434 | UL/DL timing and guard periods in backhaul subframes | ETRI | Not treated |
R1‑093435 | Reference signals for eNB-relay backhaul link | ETRI | Not treated |
R1‑093436 | Discussion on DM RS for Uplink SU-MIMO in LTE-A | ETRI | Not treated |
R1‑093437 | Discussion on Layer Shifting Pattern for uplink SU-MIMO in LTE-A | ETRI | Not treated |
R1‑093438 | Multi-cell PMI coordination for downlink CoMP | ETRI | Not treated |
R1‑093439 | UE feedback for downlink CoMP | ETRI | Not treated |
R1‑093440 | PMI/CQI Feedback mechanism analysis of dual layer beamforming for TDD system | Potevio | Not treated |
R1‑093441 | Discussion on DL Control Signaling for Dual-layer Beamforming | Potevio | Not treated |
R1‑093442 | Impact of user pairing on TDD transparent MU-MIMO dual-layer beamforming | Potevio | Not treated |
R1‑093443 | Considerations on the Resource Indication of R-PDCCH | Potevio | Not treated |
R1‑093444 | On the interference coordination intra-cell through R-PDCCH | Potevio | Not treated |
R1‑093445 | on the COMP intra-cell based on Type I relay | Potevio | Not treated |
R1‑093446 | Open-Loop Transmit Diversity for LTE-A PUSCH | Potevio | Not treated |
R1‑093447 | DL 8-Tx MIMO Codebook Design for LTE-A systems | RITT | Not treated |
R1‑093448 | Common R-PDCCH Design for Backhaul Control in Type I Relay | LG-Nortel | Not treated |
R1‑093449 | RN Performance regarding backhaul link capability | LG-Nortel | Not treated |
R1‑093450 | Simulation results for remaining issues in the RAN1 draft CRs of LTE Rel-9 Positioning | Pantech&Curitel | Noted |
R1‑093451 | Further consideration on enhanced SRS scheme for CoMP | Pantech&Curitel | Not treated |
R1‑093452 | Considerations on Carrier indicator for Carrier Aggregation | Pantech&Curitel | Not treated |
R1‑093453 | Differential PMI Feedback for Overhead Reduction in LTE-A DL MIMO | Pantech&Curitel | Not treated |
R1‑093454 | Further considerations on MU MIMO in Rel-9 | Panasonic | Not treated |
R1‑093455 | Views on CSI-RS and Rel-8 CRS configuration | Panasonic | Not treated |
R1‑093456 | Downlink DM-RS with inter-cell considerations | Panasonic | Not treated |
R1‑093457 | Downlink CSI-RS design for inter-cell scenarios | Panasonic | Noted |
R1‑093458 | Discussion on Combined/Non-Combined CoMP Reporting | Panasonic | Not treated |
R1‑093459 | CoMP Operation Image and UE Configuration | Panasonic | Not treated |
R1‑093460 | Comparison of Orthogonal/Non-orthogonal CoMP transmission for PUCCH | Panasonic | Not treated |
R1‑093461 | Control Signalling Placement design for Relay Nodes | Panasonic | Not treated |
R1‑093462 | Relay Control Issues | Panasonic | Not treated |
R1‑093463 | RN UL subframe timing of backhaul and access link | Panasonic | Not treated |
R1‑093464 | PDCCH with cross carrier assignment for carrier aggregation | Panasonic | Revised |
R1‑093465 | Component carrier indication scheme for carrier aggregation | Panasonic | Not treated |
R1‑093466 | Component carrier operation without PDCCH | Panasonic | Revised |
R1‑093467 | Component carrier types in LTE-A | Panasonic | Not treated |
R1‑093468 | Further considerations on PHICH Linkage for carrier aggregation | Panasonic | Not treated |
R1‑093469 | UL ACK/NACK transmission on PUCCH for carrier aggregation | Panasonic | Not treated |
R1‑093470 | Discussion on the rel-8 operation mode for PUCCH of LTE-Advanced UE | Panasonic | Not treated |
R1‑093471 | Discussion on the application of SORTD for PUCCH | Panasonic | Not treated |
R1‑093472 | Number of PRS sequence | Panasonic | Noted |
R1‑093473 | Results for LTE-A Evaluation | Panasonic | Noted |
R1‑093474 | DL MU-MIMO with coordinated beamforming | Texas Instruments | Not treated |
R1‑093475 | Draft 36.213 CR clarifying UL ACKNAK transmission in Response to Broadcast PDSCH | Qualcomm Europe | Noted |
R1‑093476 | Further clarification of SRS cell-specific and UE-specific periodicity and offset configurations | Qualcomm Europe | Noted - Revised |
R1‑093477 | Answer to LS “R1-092993 LS on positioning subframes configuration for OTDOA” | Ericsson, ST-Ericsson | Noted |
R1‑093478 | Draft CR 36.211 Introduction of LTE Positioning | Ericsson, ST-Ericsson | Revised |
R1‑093479 | Draft CR 36.214 Introduction of LTE Positioning | Ericsson, ST-Ericsson | Revised |
R1‑093480 | Assistance information for the UE | Ericsson, ST-Ericsson | Noted |
R1‑093481 | Time varying PRS pattern | Ericsson, ST-Ericsson | Noted |
R1‑093482 | LTE positioning measurements | Ericsson, ST-Ericsson | Revised |
R1‑093483 | Some further considerations on dual layer beamforming | Ericsson, ST-Ericsson | Not treated |
R1‑093484 | DM RS design in DwPTS for Rel-9 dual layer beamforming | Ericsson, ST-Ericsson | Not treated |
R1‑093485 | Downlink demodulation RS design for Rel-9 and beyond | Ericsson, ST-Ericsson | Noted |
R1‑093486 | Impact of Relay site planning on LOS probability of the backhaul link | Ericsson, ST-Ericsson | Not treated |
R1‑093487 | Uplink SU-MIMO in LTE-Advanced | Ericsson, ST-Ericsson | Not treated |
R1‑093488 | LTE Spectral Efficiency and IMT-Advanced Requirements | Ericsson, ST-Ericsson | Noted |
R1‑093489 | Text proposal on simulator calibration for TR 36.814 | Ericsson, ST-Ericsson | Noted |
R1‑093490 | Discussion on power scaling for DC-HSUPA | Huawei | Noted |
R1‑093491 | Power limitation on DPCCH of secondary carrier | Huawei | Noted |
R1‑093492 | Analysis of cubic metric on carrier power imbalance for DC-HSUPA | Huawei | Noted |
R1‑093493 | Draft 25.214 CR for introduction of DC-HSUPA | Huawei | Noted |
R1‑093494 | Dicussion on the HARQ-ACK detection criteria | Huawei | Noted |
R1‑093495 | Discussion on the power offset setting of ACK/NACK | Huawei | Noted |
R1‑093496 | 25.211 CR0271 (Rel-6, F) Clarification to the associated channel for HS-DSCH | Huawei | Agreed |
R1‑093497 | 25.211 CR0272 (Rel-7, A) Clarification to the associated channel for HS-DSCH | Huawei | Agreed |
R1‑093498 | 25.211 CR0273 (Rel-8, A) Clarification to the associated channel for HS-DSCH | Huawei | Agreed |
R1‑093499 | Clarification to the procedure of composite PCICQI reports type determination | Huawei | Noted |
R1‑093500 | 25.214 CR0566 (Rel-7, F) Clarification to the procedure of composite PCICQI reports type determination | Huawei | Noted |
R1‑093501 | 25.214 CR0567 (Rel-8, A) Clarification to the procedure of composite PCICQI reports type determination | Huawei | Noted |
R1‑093502 | DL DM-RS Design for Rel. 9 LTE | NTT DOCOMO | Not treated |
R1‑093503 | DL DM-RS Design for LTE-Advanced | NTT DOCOMO | Noted |
R1‑093504 | Investigation on Advanced CoMP Scheme with MU-MIMO Techniques for LTE-Advanced Downlink | NTT DOCOMO | Not treated |
R1‑093505 | Inter-cell Radio Resource Management for Heterogeneous Networks | NTT DOCOMO | Not treated |
R1‑093506 | UL RS Enhancement for LTE-Advanced | NTT DOCOMO | Not treated |
R1‑093507 | Views on Component Carrier Types for Carrier Aggregation in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑093508 | UL Transmit Diversity Schemes in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑093509 | 4Tx SU-MIMO Codebook in LTE-Advanced Uplink | NTT DOCOMO | Noted |
R1‑093510 | Investigation on DL 8-Tx MIMO Codebook Precoding for LTE-Advanced | NTT DOCOMO | Not treated |
R1‑093511 | Investigation on Enhanced DL MU-MIMO Processing Based on Channel Vector Quantization for LTE-Advanced | NTT DOCOMO | Not treated |
R1‑093512 | DL Performance Evaluation for LTE/LTE-Advanced in ITU Test Environments | NTT DOCOMO | Noted |
R1‑093513 | UL Performance Evaluation for LTE/LTE-Advanced in ITU Test Environments | NTT DOCOMO | Noted |
R1‑093514 | Draft CR 36.214 on LTE AOA+TA based positioning | CATT | Withdrawn |
R1‑093515 | Single User beamforming based on partial channel information | CATT | Not treated |
R1‑093516 | Performance evaluation results for beamforming based MU-MIMO | CATT | Not treated |
R1‑093517 | Performance of layer shifting for dual-layer beamforming | CATT | Not treated |
R1‑093518 | Consideration on Rel-8 CRS and Rel-10 CSI RS in LTE-A | CATT | Not treated |
R1‑093519 | Downlink Demodulation RS Design | CATT, CMCC | Noted |
R1‑093520 | Further investigations on the configurations of CSI-RS for LTE-A | CATT | Noted |
R1‑093521 | Considerations on design criteria for DL CoMP | CATT | Not treated |
R1‑093522 | Implicit feedback in support of downlink CoMP | CATT | Not treated |
R1‑093523 | Analysis of long-term channel state information acquisition for CoMP | CATT | Not treated |
R1‑093524 | Further Consideration on Feedback for Downlink CoMP in LTE-A with Draft Text Proposal | CATT, CMCC, Huawei, RITT, Potevio | Noted |
R1‑093525 | Design of backhaul control channel for type I relay in LTE-A | CATT | Not treated |
R1‑093526 | Considerations on Backhaul Subframes Assignment | CATT | Not treated |
R1‑093527 | Application of Type II Relay in LTE-A | CATT | Not treated |
R1‑093528 | Considerations on TDD Relay Frame Structure | CATT | Not treated |
R1‑093529 | Way Forward on DL/UL Component Carrier Linkage in LTE-A | CATT, Panasonic, Samsung, ITRI | Noted |
R1‑093530 | Design of DL Control Channel for LTE-A with Carrier Aggregation | CATT, RITT, Potevio | Not treated |
R1‑093531 | Issues on cross carrier scheduling | CATT | Not treated |
R1‑093532 | PHICH for LTE-A | CATT | Not treated |
R1‑093533 | Multi-channel Transmission for UL ACK/NACK in LTE-A | CATT | Not treated |
R1‑093534 | UL ACK/NACK transmission scheme for LTE-A | CATT | Not treated |
R1‑093535 | Discussion on UE behavior during initial access for carrier aggregation system | CATT, ZTE | Noted |
R1‑093536 | Physical cell ID for carrier aggregation system | CATT | Not treated |
R1‑093537 | Benefits of carrier indicator on multi-channel AN transmission | CATT, Potevio | Not treated |
R1‑093538 | CQI feedback for LTE-A | CATT | Not treated |
R1‑093539 | Multi-antenna Technique for PUCCH Payload Increase | CATT | Not treated |
R1‑093540 | Transmit Diversity Schemes for PUCCH format 1a | CATT | Not treated |
R1‑093541 | Discussion on precoding granularity for downlink MIMO | CATT | Not treated |
R1‑093542 | Study on channel reciprocity in LTE-A | CATT | Not treated |
R1‑093543 | Feedback mechanisms for LTE-A downlink transmission | CATT | Not treated |
R1‑093544 | Additional LTE-TDD evaluation results for ITU submission | CATT | Noted |
R1‑093545 | Comparison of uplink 2-TX transmit diversity schemes for LTE-Advanced | Mitsubishi Electric | Not treated |
R1‑093546 | Comparison of uplink 4-TX transmit diversity schemes for LTE-Advanced | Mitsubishi Electric | Not treated |
R1‑093547 | Spatial Correlation based transmission schemes for LTE-A DL | Marvell Semiconductor | Not treated |
R1‑093548 | Feedback for Dual Layer Beamforming in LTE-TDD | ZTE | Not treated |
R1‑093549 | RS design and network synchronisation | Philips | Not treated |
R1‑093550 | Multi-cell co-operative beamforming: TP for TR36.814 | Philips | Not treated |
R1‑093551 | Codebook design issues for COMP | Philips | Not treated |
R1‑093552 | PDCCH for Carrier Aggregation | Philips | Not treated |
R1‑093553 | PDCCH Search Space design for Carrier Aggregation | Philips | Not treated |
R1‑093554 | DL MIMO for LTE-A: interference management aspects | Philips | Not treated |
R1‑093555 | STTD configuration for MIMO | Vodafone Group | Noted |
R1‑093556 | Remaining issues for DC-HSUPA synchronization and carrier activation | Ericsson, ST-Ericsson | Noted |
R1‑093557 | Remaining issues for DC-HSUPA power control | Ericsson, ST-Ericsson | Noted |
R1‑093558 | 25.211 CR draft (Rel-9, B) Introduction of DC-HSUPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑093559 | 25.212 CR draft (Rel-9, B) Introduction of DC-HSUPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑093560 | 25.213 CR draft (Rel-9, B) Introduction of DC-HSUPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑093561 | 25.214 CR draft (Rel-9,B) Introduction of DC-HSUPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑093562 | Relay System level simulation | CMCC | Not treated |
R1‑093563 | consideration on further relay channel modeling | CMCC | Not treated |
R1‑093564 | [DRAFT] Response LS on positioning subframe configuration for OTDOA | Nokia Siemens Networks | Noted |
R1‑093565 | Simulation results of reduced S-CPICH transmit power | Nokia Siemens Networks, Nokia | Noted |
R1‑093566 | TTI repetition for 2msec TTI coverage enhancement | Nokia Siemens Networks, Nokia | Noted |
R1‑093567 | Another option for 2msec TTI coverage enhancement | Nokia Siemens Networks, Nokia | Noted |
R1‑093568 | 25.212 CR0276r3 (Rel-9, B) Introduction ot TxAA exxtension for non-MIMO UEs | Nokia, Nokia Siemens Networks | Noted - Revised |
R1‑093569 | 25.214 CR0548r3 (Rel-9, B) Introduction ot TxAA exxtension for non-MIMO UEs | Nokia, Nokia Siemens Networks | Noted - Revised |
R1‑093570 | Simulation results on OTDOA performance | Nokia, Nokia Siemens Networks | Withdrawn |
R1‑093571 | Further discussion on Component Carrier terminology | InterDigital Communications, LLC | Not treated |
R1‑093572 | Selection Threshold and Maximum Size of CoMP Cooperating Set | CHTTL | Not treated |
R1‑093573 | Performance Study on Control signalling Operation for Relay | CHTTL | Not treated |
R1‑093574 | MCS Determination in MU Operation based on Explicit Feedback | Motorola | Not treated |
R1‑093575 | 25.214 CR0568 (Rel-8, F) HS-DPCCH ACK/NACK Power Offset setting for DC-HSDPA | Qualcomm Europe | Noted - Revised |
R1‑093576 | Performance of MIMO UEs due to asymmetric power allocation of P-CPICH/S-CPICH | Qualcomm Europe | Noted |
R1‑093577 | 25.211 CR0264R1 (Rel-9, B) Introduction of DC-HSUPA | Qualcomm Europe | Noted |
R1‑093578 | 25.212 CR0275R1 (Rel-9, B) Introduction of DC-HSUPA | Qualcomm Europe | Noted |
R1‑093579 | 25.213 CR0102R1 (Rel-9, B) Introduction of DC-HSUPA | Qualcomm Europe | Noted |
R1‑093580 | 25.214 CR0547R1 (Rel-9, B) Introduction of DC-HSUPA | Qualcomm Europe | Noted |
R1‑093581 | Efficient UE signaling in support of DL CoMP | CHTTL | Not treated |
R1‑093582 | Downlink DM-RS Design for LTE-Advanced | Hitachi | Not treated |
R1‑093583 | Consideration on Feedback Information for Downlink CoMP in LTE-Advanced | Hitachi | Not treated |
R1‑093584 | System Level Evaluation of Non-Linear Multiuser Precoding | Hitachi | Not treated |
R1‑093585 | Performance of Simple Coordinated Scheduling for Downlink CoMP | Hitachi | Not treated |
R1‑093586 | Adaptive cell clustering for CoMP and some related issues | Hitachi | Not treated |
R1‑093587 | Capacity-based relay UE selection scheme for Type II Relay | Hitachi | Not treated |
R1‑093588 | Modification of Type II relay for measuring RN-UE channel | Hitachi | Not treated |
R1‑093589 | Enhanced DL MU-MIMO Scheme and associated performance for ITU Scenarios | Motorola | Noted |
R1‑093590 | Further Assessment of “Blank” Subframes in LTE Release 9 | Motorola | Noted |
R1‑093591 | A Design of Rank1, Rank2 and Rank3 Precoding Codebook for 4x4 UL-MIMO | Fujitsu | Noted |
R1‑093592 | MU-MIMO: Demodulation at the UE | NEC Group | Not treated |
R1‑093593 | Consideration on eNB-UE channel model | CMCC | Not treated |
R1‑093594 | Precoded RS for link adaptation: performance gains in CSG deployments | Qualcomm Europe | Not treated |
R1‑093595 | Views on cross-carrier resource assignment | Texas Instruments | Not treated |
R1‑093596 | DM RS Design for downlink transmission | ZTE | Noted |
R1‑093597 | PDCCH with cross component carrier assignment | Panasonic | Not treated |
R1‑093598 | Component carrier operation without PDCCH | Panasonic | Not treated |
R1‑093599 | TP for Characteristic template for ITU-R submission | Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093600 | TP for compliance template for ITU-R submission | Rapporteur (NTT DOCOMO) | Withdrawn |
R1‑093601 | LTE link budget for ITU submission | Huawei | Noted - Revised |
R1‑093602 | LIAISON TO IMT-ADVANCED CANDIDATE TECHNOLOGY PROPONENTS AND THE EVALUATION GROUPS ON UPDATED INFORMATION ON IMT-ADVANCED | ITU-WP5D | Noted |
R1‑093603 | Draft CR 36.211 Introduction of LTE Positioning | Ericsson, ST-Ericsson | Noted - Revised |
R1‑093604 | Draft CR 36.213 Introduction of LTE Positioning | Ericsson, ST-Ericsson | Noted - Revised |
R1‑093605 | Draft CR 36.214 Introduction of LTE Positioning | Ericsson, ST-Ericsson | Noted - Revised |
R1‑093606 | LTE positioning measurements | Ericsson, ST-Ericsson | Noted |
R1‑093607 | Full buffer, VoIP and mobility results for ITU submission | CMCC | Noted |
R1‑093608 | Distributed Dynamic CoMP for LTE-Advanced | Tokyo Institute of Technology | Not treated |
R1‑093609 | LS Request for PSS and MBMS Error Patterns | SA4, Fraunhofer | Noted |
R1‑093610 | Draft compliance template for LTE-Advanced ITU-submission. | LTE-Advanced Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093611 | Overhead assumption for performance evaluation for ITU submission | LTE-Advanced Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093612 | 36.211 Draft CR on TDD SRS hopping on two consecutive UpPTS symbols | Motorola | Noted |
R1‑093613 | 36.214 CR0011 (Rel-9, B) Introduction of LTE Positioning | Ericsson, ST-Ericsson, Alcatel-Lucent, Motorola, CATT, Huawei, InterDigital, Pantech & Curitel, Samsung, LG Electronics, ZTE, Qualcomm Europe, NTT DOCOMO | Agreed |
R1‑093614 | 36.213 CR0247R1 (Rel-8, F) Correction to DVRB operation in TDD transmission mode 7 | Nokia, Nokia Siemens Networks | Noted - Revised |
R1‑093615 | LS to RAN2 on UTDOA Positioning | TruePosition, Inc. | Noted |
R1‑093616 | Summary of the performance evaluation | Rapporteur (NTT DOCOMO) | Noted |
R1‑093617 | Draft CR on clarification of concurrent ACK/NACK and periodic PMI/RI transmission on PUCCH for TDD | ZTE | Noted - Revised |
R1‑093618 | 25.224 CR0225R1 (Rel-7,F) Clarification of SNPL calculation and reporting for 1.28Mcps TDD | CATT | Noted - Revised |
R1‑093619 | 25.224 CR0226R1 (Rel-8,A) Clarification of SNPL calculation and reporting for 1.28Mcps TDD | CATT | Noted - Revised |
R1‑093620 | 25.224 CR0227R1 (Rel-8,F) Clarification of SNPL reporting in CELL-DCH and enhanced CELL-FACH state for 1.28Mcps TDD | CATT | Noted |
R1‑093621 | 25.222 CR0182R1 (Rel-8, F) Correction to Xptr field definition for LCR TDD | New Postcom, RITT, CATT, ZTE, TD Tech, Potevio | Agreed |
R1‑093622 | 25.222 CR0183R1 (Rel-8, F) Correction to HS-SCCH Type 2 definition for LCR TDD | New Postcom, CATT, ZTE, TD Tech, Potevio | Agreed |
R1‑093623 | 25.222 DraftCR (Rel-8, F) Definition of HS-SCCH Order types against HS-SCCH types | New Postcom, ZTE, TD Tech, Potevio | Noted - Revised |
R1‑093624 | 25.221 DraftCR (Rel-8, F) Timing association between HS-SCCH and SPS HS-PDSCH for LCR TDD | New Postcom, ZTE, Potevio | Noted - Revised |
R1‑093625 | [DRAFT] LS on assistance information for OTDOA positioning support for LTE | Ericsson, ST-Ericsson, Alcatel-Lucent, Motorola, Huawei, InterDigital, Pantech & Curitel, Samsung, LG Electronics, ZTE, Qualcomm Europe, NTT DOCOMO | Noted - Revised |
R1‑093626 | 36.211 CR0139 (Rel-9, B) Introduction of LTE Positioning | Ericsson, ST-Ericsson, Alcatel-Lucent, Nokia, Nokia Siemens Networks, Motorola, Huawei, InterDigital, Pantech & Curitel, Samsung, LG Electronics, ZTE, Qualcomm Europe, NTT DOCOMO | Agreed |
R1‑093627 | 36.213 CR0248 (Rel-9, B) Introduction of LTE Positioning | Ericsson, ST-Ericsson, Alcatel-Lucent, Nokia, Nokia Siemens Networks, Motorola, Huawei, InterDigital, Pantech & Curitel, Samsung, LG Electronics, ZTE, Qualcomm Europe, NTT DOCOMO | Agreed |
R1‑093628 | [Draft] LS on positioning support for LTE | Ericsson, ST-Ericsson, Alcatel-Lucent, Motorola, CATT, Huawei, InterDigital, Pantech & Curitel, Samsung, LG Electronics, ZTE, Qualcomm Europe, NTT DOCOMO | Noted - Revised |
R1‑093629 | Summary of ad-hoc session on evaluations consolidation | Ad-hoc chair (NTT DoCoMo) | Endorsed |
R1‑093630 | HSPA Ad-hoc summary | HSPA Ad-hoc chair (Ericsson) | Endorsed |
R1‑093631 | 25.214 CR0562R1 (Rel-7, F) Unequal power setting of P-CPICH/S-CPICH | Qualcomm Europe | Agreed |
R1‑093632 | 25.214 CR0563R1 (Rel-8, A) Unequal power setting of P-CPICH/S-CPICH | Qualcomm Europe | Agreed |
R1‑093633 | 25.211 CR0269R1 (Rel-7, F) Clarification to applicability of TX diversity in MIMO | Qualcomm Europe | Noted - Revised |
R1‑093634 | 25.211 CR0270R1 (Rel-8, A) Clarification to applicability of TX diversity in MIMO | Qualcomm Europe | Noted - Revised |
R1‑093635 | LS on HSDPA MIMO | RAN1, Nokia Siemens Networks | Agreed |
R1‑093636 | 25.212 CR0280R1 (Rel-8, F) Alignment with RAN2 decisions on HS-SCCH orders for activation and deactivation of DTX and DRX operation | ChinaUnicom, ZTE | Agreed |
R1‑093637 | 25.222 CR0184 (Rel-8, F) Clarification of HS-SCCH Order types against HS-SCCH types | New Postcom, ZTE, TD Tech, Potevio | Agreed |
R1‑093638 | 25.221 CR0187 (Rel-8, F) Timing association between HS-SCCH and SPS HS-PDSCH for LCR TDD | New Postcom, ZTE, Potevio | Missing |
R1‑093639 | 25.224 CR0219R4 (Rel-8, F) on clarification on HS-DSCH procedure when using BCCH specific H-RNTI in CELL_PCH or URA_PCH state for 1.28Mcps TDD | TD Tech | Withdrawn |
R1‑093640 | 25.214 CR0568R1 (Rel-8, F) HS-DPCCH ACK/NACK Power Offset setting for DC-HSDPA | Qualcomm Europe | Agreed |
R1‑093641 | 25.211 CR0274 (Rel-9, B) Introduction of DC-HSUPA | Ericsson, Alcatel-Lucent, Huawei, InterDigital, Motorola, Nokia, Nokia Siemens Networks, Qualcomm Europe, Samsung, ST-Ericsson | Agreed |
R1‑093642 | 25.212 CR0281 (Rel-9, B) Introduction of DC-HSUPA | Ericsson, Alcatel-Lucent, Huawei, InterDigital, Nokia, Nokia Siemens Networks, Qualcomm Europe, Samsung, ST-Ericsson | Agreed |
R1‑093643 | 25.213 CR0103 (Rel-9, B) Introduction of DC-HSUPA | Ericsson, Alcatel-Lucent, Huawei, InterDigital, Nokia, Nokia Siemens Networks, Qualcomm Europe, Samsung, ST-Ericsson | Agreed |
R1‑093644 | 25.214 CR0570 (Rel-9,B) Introduction of DC-HSUPA | Ericsson, Alcatel-Lucent, Huawei, InterDigital, Nokia, Nokia Siemens Networks, Qualcomm Europe, Samsung, ST-Ericsson | Agreed |
R1‑093645 | 25.215 CR0196 (Rel-9,B) Introduction of DC-HSUPA | Ericsson, Alcatel-Lucent, Huawei, InterDigital, Nokia, Nokia Siemens Networks, Qualcomm Europe, Samsung, ST-Ericsson | Agreed |
R1‑093646 | 25.212 CR0282 (Rel-9, B) Combination of DC-HSDPA with MIMO | Ericsson, Alcatel-Lucent, Huawei, InterDigital, Nokia, Nokia Siemens Networks, Samsung, ST-Ericsson | Noted - Revised |
R1‑093647 | 25.214 CR0569 (Rel-9, B) Combination of DC-HSDPA with MIMO | Ericsson, Alcatel-Lucent, Huawei, InterDigital, Nokia, Nokia Siemens Networks, Samsung, ST-Ericsson | Agreed |
R1‑093648 | 25.212 CR0276R4 (Rel-9, B) Introduction ot TxAA exxtension for non-MIMO UEs | Nokia, Nokia Siemens Networks | Agreed |
R1‑093649 | 25.214 CR0548R4 (Rel-9, B) Introduction ot TxAA exxtension for non-MIMO UEs | Nokia, Nokia Siemens Networks | Agreed |
R1‑093650 | 25.214 CR0560R1 (Rel-7, F) Clarification of the start of the CQI_DTX_Timer | Qualcomm Europe, Ericsson, ST-Ericsson | Agreed |
R1‑093651 | 25.214 CR0561R1 (Rel-8, A) Clarification of the start of the CQI_DTX_Timer | Qualcomm Europe, Ericsson, ST-Ericsson | Agreed |
R1‑093652 | 2nd LS on DC-HSUPA agreements | RAN1, Nokia Siemens Networks | Agreed |
R1‑093653 | avoid | avoid | - |
R1‑093654 | avoid | avoid | - |
R1‑093655 | avoid | avoid | - |
R1‑093656 | avoid | avoid | - |
R1‑093657 | avoid | avoid | - |
R1‑093658 | avoid | avoid | - |
R1‑093659 | avoid | avoid | - |
R1‑093660 | 25.215 CR0195R1 (Rel-8, F) Clarification on reference point of RSRP and RSRQ for EUTRA | Ericsson, ST-Ericsson, CATT | Agreed |
R1‑093661 | avoid | avoid | - |
R1‑093662 | avoid | avoid | - |
R1‑093663 | avoid | avoid | - |
R1‑093664 | avoid | avoid | - |
R1‑093665 | avoid | avoid | - |
R1‑093666 | avoid | avoid | - |
R1‑093667 | avoid | avoid | - |
R1‑093668 | Draft LS on implication of CM difference on transmit power and PA efficiency | Motorola | Noted - Revised |
R1‑093669 | 25.211 CR0269R2 (Rel-7, F) Clarification to applicability of TX diversity in MIMO | Qualcomm Europe | Agreed |
R1‑093670 | 25.211 CR0270R2 (Rel-8, A) Clarification to applicability of TX diversity in MIMO | Qualcomm Europe | Agreed |
R1‑093671 | 36.213 CR0250 (Rel-8, F) Clarifying inter-cell synchronization text | Qualcomm Europe, Samsung, Panasonic, Huawei, Alcatel-Lucent, Motorola, Nokia, Nokia Siemens Networks, Ericsson, ST-Ericsson | Agreed |
R1‑093672 | Overhead assumption for LTE Rel-8 single layer beamforming for ITU submission performance evaluation | LTE-Advanced Rapporteur (NTT DOCOMO) | Agreed |
R1‑093673 | 36.213 CR0247R2 (Rel-8, F) Correction to DVRB operation in TDD transmission mode 7 | Nokia, Nokia Siemens Networks, Ericsson, ST-Ericsson, Alcatel Lucent, Motorola, LGE, Qualcomm Europe, Samsung | Agreed |
R1‑093674 | LTE TDD link budget for ITU submission | Huawei | Noted - Revised |
R1‑093675 | Some considerations on DL CoMP | New Postcom | Not treated |
R1‑093676 | TP for 36.912 on updated simulation assumptions | LTE-Advanced Rapporteur (NTT DOCOMO) | Agreed |
R1‑093677 | TP for relay backhaul channel model | Ericsson, ST-Ericsson, Huawei, Research In Motion UK Limited, Qualcomm | Agreed in principle |
R1‑093678 | 36.213 CR0249 (Rel-8, F) on clarification of concurrent ACK/NACK and periodic PMI/RI transmission on PUCCH for TDD | ZTE | Agreed |
R1‑093679 | System level performance evaluations for LTE and LTE-A | Samsung | Noted |
R1‑093680 | TR36.814 v 1.3.0 | Rapporteur (NTT DOCOMO) | Endorsed |
R1‑093681 | TP for Characteristic template for ITU-R submission | Rapporteur (NTT DOCOMO) | Agreed |
R1‑093682 | Final version of Compliance template for LTE-Advanced ITU-submission. | LTE-Advanced Rapporteur (NTT DOCOMO) | Endorsed |
R1‑093683 | LTE link budget for ITU submission | Huawei | Revised |
R1‑093684 | LTE TDD link budget for ITU submission | Huawei | Revised |
R1‑093685 | TR36.912 v 0.2.0 | LTE-Advanced Rapporteur (NTT DOCOMO) | Agreed |
R1‑093686 | TP for 36.912 on performance evaluation | Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093687 | TP for 36.912 on performance evaluation | Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093688 | Further discussion on the codebook for DC+MIMO | Huawei | Noted |
R1‑093689 | Mode transition signaling schemes for 2msTTI coverage extension | Qualcomm Europe | Noted |
R1‑093690 | Weighted CSI Feedback aided DL CoMP transmissions | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑093691 | 25.214 CR0558R1 (Rel-7, F) Clarification of DTX Cycle transitions and UL DPCCH burst transmissions | Qualcomm Europe | Agreed |
R1‑093692 | 25.214 CR0559R1 (Rel-8, A) Clarification of DTX Cycle transitions and UL DPCCH burst transmissions | Qualcomm Europe | Agreed |
R1‑093693 | Way forward on LTE-A UL PC | Nokia Siemens Networks, Nokia, Samsung, LGE, Research In Motion, Huawei, ASUSTeK | Not treated |
R1‑093694 | 25.224 CR0225R2 (Rel-7, F) Clarification of SNPL calculation and reporting for 1.28Mcps TDD | CATT, New Postcom | Agreed |
R1‑093695 | 25.224 CR0226R2 (Rel-8, A) Clarification of SNPL calculation and reporting for 1.28Mcps TDD | CATT, New Postcom | Agreed |
R1‑093696 | Addition of section 16.8, conclusions of the self evaluation to TR36.912 | AT&T, NTT DoCoMo | Agreed |
R1‑093697 | Proposed Way forward on Rel-9 Dual-layer beamforming for TDD and FDD | Alcatel-Lucent, CATT, CHTTL, CMCC, Huawei, Ericsson, ST-Ericsson, Philips, NEC, Nokia, Nokia Siemens Networks, Qualcomm, Texas Instruments, Panasonic, NTT Docomo, ZTE, ITRI | Noted |
R1‑093698 | Way Forward on Uplink Single Antenna Port Mode for UEs with Multiple Transmit Antennas | CATT, Huawei, LG, Motorola, NEC, Nokia, Nokia Siemens Networks, NTT DoCoMo, Panasonic, RIM, Sharp, Samsung, Texas Instruments, ZTE | Noted |
R1‑093699 | Way Forward on PDCCH for Bandwidth Extension in LTE-A | Alcatel-Lucent, AT&T, ASUSTeK, CATT, CEWiT, CHTTL, Ericsson, Huawei, Interdigital, Motorola, NEC, Nokia, Nokia Siemens Networks, Philips, Potevio, Qualcomm, RITT, Samsung, ST-Ericsson, Texas Instruments, Vodafone | Agreed |
R1‑093700 | Techniques to maximize the Type 1 relay gains | Qualcomm Europe | Not treated |
R1‑093701 | Way Forward of UL SU-MIMO rank 3 codebook design | Huawei, Fujitsu, ZTE, Research In Motion, RITT, TD-Tech, Potevio | Noted |
R1‑093702 | Designing issues for carrier aggregation | ZTE | Not treated |
R1‑093703 | Proposal on Relay channel model for 36.814 | Huawei, Qualcomm, CMCC, Ericsson, ST-Ericsson | Agreed in principle |
R1‑093704 | Way Forward for PUCCH Transmit Diversity Scheme | LG Electronics, Samsung, Huawei, Nokia, Nokia Siemens Network, Qualcomm, ZTE, Texas Instruments, Sharp, ETRI, NEC, Motorola, Ericsson, ST-Ericsson, Research In Motion, NTT-DoCoMo, Mitsubishi | Noted |
R1‑093705 | Text Proposal to support Type II relay | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, CMCC, CHTTL, HTC, Hitachi, InterDigital, ITRI, Qualcomm, Research In Motion, RITT, Vodafone, ZTE | Withdrawn |
R1‑093706 | Text proposal for 36.912 on section 16.1 peak sprectrum efficiency | Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093707 | [Draft] LS Reply to RAN2 on Carrier Aggregation | Alcatel-Lucent, Qualcomm | Noted - Revised |
R1‑093708 | Text proposal on eNB-UE channel model | CMCC, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, ZTE | Agreed in principle |
R1‑093709 | LS Reply to RAN2 on Carrier Aggregation | RAN1, Alcatel-Lucent | Agreed |
R1‑093710 | LOS Probability of the eNB-UE Direct Link | Qualcomm Europe, Huawei, Research In Motion, ZTE | Noted |
R1‑093711 | Text proposal for Channel Model and Evaluation Methodology | CMCC | Revised |
R1‑093712 | LTE link budget for ITU submission | Huawei | Agreed |
R1‑093713 | LTE TDD link budget for ITU submission | Huawei | Agreed |
R1‑093714 | TP for 36.912 on section 16.1 Peak spectral efficiency | LTE-Advanced Rapporteur (NTT DOCOMO) | Agreed |
R1‑093715 | TP for 36.912 on performance evaluation | LTE-Advanced Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093716 | Draft TR36.912 v 2.0.0 | LTE-Advanced Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093717 | Final version of the Characteristics template | LTE-Advanced Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093718 | Text Proposal to support Type II relay | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, CEWiT, CMCC, CHTTL, Hitachi, InterDigital, ITRI, Research In Motion, RITT, Vodafone, ZTE | Revised |
R1‑093719 | Wayforward on CoMP Feedback | Huawei, Ericsson, ST-Ericsson, Samsung, CMCC, CATT, Panasonic, ETRI, TI, CHTTL, Fujitsu, Qualcomm Europe, ITRI, Interdigital, LGE, Vodafone, NTT DoCoMo, Alcatel-Lucent, ZTE, Research In Motion | Noted |
R1‑093720 | CoMP email summary | Qualcomm | Noted |
R1‑093721 | MIMO AH Chairman Notes | Ad Hoc Chair (Samsung) | Endorsed |
R1‑093722 | Text proposal to correct relaying text in TR36.912 | Ericsson | Not treated |
R1‑093723 | Further clarification of SRS cell-specific and UE-specific periodicity and offset configurations | Qualcomm Europe, Panasonic, LGE, Motorola, Samsung, NEC | Noted |
R1‑093724 | Final version of Link Budget template for ITU-R submission | LTE-Advanced Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑093725 | Text Proposal to support Type II relay | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, CEWiT, CMCC, CHTTL, Fujitsu, Hitachi, InterDigital, ITRI, LGE, Research In Motion, RITT, Vodafone, ZTE | Noted |
R1‑093726 | Text proposal for Channel Model and Evaluation Methodology | CMCC | Agreed |
R1‑093727 | LS on positioning support for LTE | RAN1, Ericsson | Agreed |
R1‑093728 | 25.212 CR0279R1 (Rel-9, B) Combination of DC-HSDPA with MIMO | Qualcomm Europe | Noted - Revised |
R1‑093729 | LS on assistance information for OTDOA positioning support for LTE | RAN1, Ericsson | Agreed |
R1‑093730 | Final version of Link Budget template for ITU-R submission | LTE-Advanced Rapporteur (NTT DOCOMO) | Endorsed |
R1‑093731 | Final version of characteristic template | LTE-Advanced Rapporteur (NTT DOCOMO) | Endorsed |
R1‑093732 | Draft LS on dual layer beamforming | CMCC | Noted - Revised |
R1‑093733 | 25.224 CR0219R4 (Rel-8, F) on clarification on HS-DSCH procedure when using BCCH specific H-RNTI in CELL_PCH or URA_PCH state for 1.28Mcps TDD | TD Tech | Agreed |
R1‑093734 | LS on Outbound Mobility | RAN1 Chairman | Agreed |
R1‑093735 | LS on implication of CM difference on transmit power and PA efficiency | RAN1, Motorola | Agreed |
R1‑093736 | TR 36.912 v2.0.0 | LTE-Advanced Rapporteur (NTT DOCOMO) | Endorsed |
R1‑093737 | LS on dual layer beamforming | RAN1, CMCC | Agreed |
R1‑093738 | 25.212 CR0282R1 (Rel-9, B) Combination of DC-HSDPA with MIMO | Ericsson, Alcatel-Lucent, Huawei, InterDigital, Nokia, Nokia Siemens Networks, Samsung, ST-Ericsson | Agreed |
R1‑093739 | TP for 36.912 on performance evaluation | LTE-Advanced Rapporteur (NTT DOCOMO) | Agreed |
R1‑093740 | Overhead assumption for performance evaluation for ITU submission | LTE-Advanced Rapporteur (NTT DOCOMO) | Agreed |
R1‑093741 | TP on LTE Link Budget for ITU-R Submission Template | Huawei, Ericsson, Motorola, Nokia, Nokia Siemens Networks, NTT DOCOMO | Agreed |
page generated from database: 2024-09-26 11:02:35