3GPP TDocs (written contributions) at meeting
Meeting: T1-07 - 2000-06-06 to 2000-06-09, LONDON
meeting id: T1-07 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
T1_index | - | - | - |
T1‑000047 | agenda | chairman | revised |
T1‑000048 | Draft report from T1#6 | ETSI MCC | agreed |
T1‑000049 | LS from RAN4 on inter-RAT cell re-selection and handover performance requirements | RAN4 | noted |
T1‑000050 | LS from RAN2 on Response to LS (T1-000025) on Clarification of UE behaviour on CRC error detection | RAN2 | noted |
T1‑000051 | LS from RAN1 on Answer to liaison on UE behaviour at CRC error | RAN1 | noted |
T1‑000052 | The typical radio parameter set v1.1 | NTT DoCoMo | withdrawn |
T1‑000053 | LS on Review and future ownership of TS 34.109 | RAN2 | noted |
T1‑000054 | LS on Changes to TR-25.926 UE radio access capabilities | RAN2 | noted |
T1‑000055 | Proposal for UE test loop modes in TS 34.109 | Ericsson | withdrawn |
T1‑000056 | CR to 34.124 on editorial changes | EMC subgroup | agreed |
T1‑000057 | LS from S1 on Request for feedback on TR22.976 Study on Release 2000 services and capabilities | S1 | noted |
T1‑000058 | LS from T2 on Future work of UE Capability Requirement TR21.904 | T2 | noted |
T1‑000059 | CR to 34.121 on Editorial corrections to clauses 2, 3, 4 and 5.1 | RF subgroup | agreed |
T1‑000060 | CR to 34.121 on Modifications to clause 5.4 "Output Power Dynamics in the Uplink" | RF subgroup | agreed |
T1‑000061 | CR to 34.121 on Out-of-synchronisation handling of the UE | RF subgroup | agreed |
T1‑000062 | CR to 34.121 on Modifications to clauses 5.8, 5.9, 5.10 and 5.11 | RF subgroup | agreed |
T1‑000063 | CR to 34.121 on Modifications to Chapter 6 "Receiver Characteristics" | RF subgroup | agreed |
T1‑000064 | CR to 34.121 on Blind transport format detection | RF subgroup | withdrawn |
T1‑000065 | CR to 34.121 on Modifications to Chapter 8 "Requirements for support of RRM" | RF subgroup | revised |
T1‑000066 | CR to 34.121 on Modifications to Annex C "Measurement channels" | RF subgroup | revised |
T1‑000067 | CR to 34.121 on Modifications to Annex D, Annex E, Annex G and Annex H | RF subgroup | agreed |
T1‑000068 | CR to 34.121 on Interpretation of measurement results | RF subgroup | agreed |
T1‑000069 | CR to 34.121 on Modifications to clauses 5.5, 5.6 and 5.7 | RF subgroup | agreed |
T1‑000070 | CR to 34.121 on Modifications to Chapter 7 "Performance requirements" | RF subgroup | agreed |
T1‑000071 | CR to 34.121 on Modifications to test power control in downlink | RF subgroup | agreed |
T1‑000072 | CR to 34.121 on Modifications to clause 5.13 "Transmit Modulation" | RF subgroup | agreed |
T1‑000073 | CR to 34.121 on Modifications to test for inner loop power control in the uplink | RF subgroup | agreed |
T1‑000074 | CR to 34.121 on Revision of Annex B: Global in-channel Tx test | RF subgroup | agreed |
T1‑000075 | CR to 34.121 on Blind transport format detection | RF subgroup | agreed |
T1‑000076 | CR to 34.121 on Idle mode test cases (test of performance requirements) | RF subgroup | revised |
T1‑000077 | CR to 34.121 on Removal of Annex I "Open Items" | RF subgroup | agreed |
T1‑000078 | LS to RAN4 on DL power control dynamic range | RF subgroup | agreed |
T1‑000079 | LS to RAN4 on the Definition of Confidence Levels | RF subgroup | agreed |
T1‑000080 | Status report from T1/RF | RF subgroup | - |
T1‑000081 | Not used | RF subgroup | - |
T1‑000082 | Not used | RF subgroup | - |
T1‑000083 | Presentation of TS 34.121 v3.1.0 for information | RF subgroup | withdrawn |
T1‑000084 | LS from CN1 on usage of terms GSM, UMTS and GERAN | CN1 | noted |
T1‑000085 | LS from R2 on changes to TR 25.926 UE radio access capabilities for TDD | RAN2 | noted |
T1‑000086 | Study of European Commission on automotive directive | ERM TG4 | not treated |
T1‑000087 | Draft report from SMG | ETSI MCC | noted |
T1‑000088 | Proposal for the Release 2000 Features, Building Blocks and Work Tasks Version 1.0 | ETSI MCC | noted |
T1‑000089 | Handling of measurement uncertainty | CSELT/TIM | noted |
T1‑000090 | Status report from Task Forces 160 and 161 | Mr Hu | noted |
T1‑000091 | Presentation on GCF | GSMA | noted |
T1‑000092 | Presentation of SMG7#25 report | ETSI MCC | noted |
T1‑000093 | Update in the European regulatory situation | ETSI MCC | noted |
T1‑000094 | LS to T on Definition of UE loopback behaviour with regard to the USIM | T1 | rejected |
T1‑000095 | revison of 47 (revised agenda) | chairman | agreed |
T1‑000096 | Proposed meeting schedule | chairman | revised |
T1‑000097 | Progress report on 34.122 | R&S | noted |
T1‑000098 | TS 34.122 v1.5.0 for approval + cover sheet for presentation | R&S | agreed |
T1‑000099 | Slide presentation for T1-000088 (Release 2000 Features, etc) | ETSI MCC | agreed |
T1‑000100 | E-mail on change request procedure | ETSI MCC | noted |
T1‑000101 | Problem with LS from RAN2 on changes to TR 25.926 (T1-000085) | RAN2 | noted |
T1‑000102 | Report from T1/Sig | T1/Sig chairman | agreed |
T1‑000103 | 34.123-1 v1.0.2 for approval | T1/Sig | agreed |
T1‑000104 | 34.108 v1.0.3 for approval | T1/Sig | agreed |
T1‑000105 | 34.123-2 v1.0.5 for information | ETSI MCC | noted |
T1‑000106 | Development plan for 34.123-3 | T1/Sig chairman | noted |
T1‑000107 | LS to RAN4 on low battery voltage testing | T1 | agreed |
T1‑000108 | 34.109 v.1.2.2 for approval + cover sheet | T1/Sig | revised |
T1‑000109 | Report from T1/EMC | T1/EMC chairman | agreed |
T1‑000110 | LS to RAN2 on response to T1-000054 | T1 | agreed |
T1‑000111 | CR to 34.124 on Adding End- user data besides BER and BLER for EMC data testing. | T1/EMC chairman | revised |
T1‑000112 | Revision of 96 (meeting schedule) | chairman | revised |
T1‑000113 | Revision of 111 | T1/EMC chairman | withdrawn |
T1‑000114 | Typical radio parameter sets document submission | GSMA ISG | noted |
T1‑000115 | Update of clause 6.10 "reference radio bearer configuration" in TS 34.108 | NTT DoCoMo | postponed |
T1‑000116 | Revision of 104 to incorporate changes in 115 | - | withdrawn |
T1‑000117 | CR to 34.121 on Modifications to Chapter 8 "Requirements for support of RRM" | RF subgroup | agreed |
T1‑000118 | CR to 34.121 on Modifications to Annex C "Measurement channels" | RF subgroup | agreed |
T1‑000119 | CR to 34.121 on Idle mode test cases (test of performance requirements) | RF subgroup | agreed |
T1‑000120 | Revision of 112 | chairman | agreed |
T1‑000121 | Revision of 108 | T1/sig | agreed |
T1‑000122 | LS to RAN2 on delay of transference of 34.109 | T1 | agreed |
T1‑000123 | Report from chairman to T | chairman | revised |
T1‑000124 | Revision of 123 | chairman | noted |
page generated from database: 2024-09-26 11:02:35