3GPP TDocs (written contributions) at meeting
Meeting: R4-88 - 2018-08-20 to 2018-08-24, Gothenburg
meeting id: R4-88 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑1809600 | Agenda for RAN4#88 | RAN4 Chairman | imported from 3GU |
R4‑1809601 | RAN4#87 Meeting Report | ETSI MCC | imported from 3GU |
R4‑1809602 | RAN4-AH-1807 Meeting Report | ETSI MCC | imported from 3GU |
R4‑1809603 | Reply LS on RLM Qin/Qout Targets for URLLC | RAN1, Nokia | imported from 3GU |
R4‑1809604 | LS on Rel-14 NPRS enhancements | RAN1, Qualcomm | imported from 3GU |
R4‑1809605 | LS on NPBCH for RRM measurements | RAN1, Huawei | imported from 3GU |
R4‑1809606 | LS on adjacent TDM combinations of SRS for antenna switching and other UL physical channels | RAN1, Qualcomm | imported from 3GU |
R4‑1809607 | LS on DMRS positions of PUSCH | RAN1, Vivo | imported from 3GU |
R4‑1809608 | LS on useServingCellTimingForSync definition | RAN1, Intel | imported from 3GU |
R4‑1809609 | Reply LS on RMSI CORESET configuration for a band with 15kHz SSB SCS and 10MHz minimum channel bandwidth | RAN1, CATT | imported from 3GU |
R4‑1809610 | LS reply on Coexistence of NR-NR and NR-LTE networks with synchronised, unsynchronised and semi-synchronised operation in 3400-3800 MHz | RAN1, Huawei | imported from 3GU |
R4‑1809611 | Reply LS on simultaneous configuration of EN-DC and NR PUCCH SCell | RAN1, NTT Docomo | imported from 3GU |
R4‑1809612 | Reply LS on bandwidth configuration for initial BWP | RAN1, Mediatek | imported from 3GU |
R4‑1809613 | LS on Initial Active BWP for Pattern 2 and Pattern 3 | RAN1, Huawei | imported from 3GU |
R4‑1809614 | LS on NR UE feature list | RAN1, NTT Docomo, AT&T | imported from 3GU |
R4‑1809615 | Reply LS on LTE peak data rate for EN-DC | RAN1, Huawei | imported from 3GU |
R4‑1809616 | LS on signalling of transmitter-side DC location | RAN1, Mediatek | imported from 3GU |
R4‑1809617 | Reply LS on Type 3 UE capabilities | RAN1, NTT Docomo, AT&T | imported from 3GU |
R4‑1809618 | LS on LTE V2X UE Categories and Reception Capabilities | RAN1, Intel | imported from 3GU |
R4‑1809619 | Reply LS on RAN4 agreement on intraband EN-DC A-MPR | RAN1, Qualcomm | imported from 3GU |
R4‑1809620 | Reply LS on EARFCN provisioning for Release 15 MTC and Release 15 NB-IOT UE | RAN2, Ericsson | imported from 3GU |
R4‑1809621 | Reply LS on narrowband measurement | RAN2, Huawei | imported from 3GU |
R4‑1809622 | Reply LS on RMSI CORESET configuration for a band with 15kHz SSB SCS and 10MHz minimum channel bandwidth | RAN2, CATT | imported from 3GU |
R4‑1809623 | Reply LS on UE power class and UE capability on SRS carrier switch | RAN2, NTT Docomo | imported from 3GU |
R4‑1809624 | LS for UE capability of measurement gap for inter-RAT NR measurement not yet configured with EN-DC | RAN2, Nokia | imported from 3GU |
R4‑1809625 | LS on high quality signal threshold in NB-IoT and eMTC | RAN2, Ericsson | imported from 3GU |
R4‑1809626 | Ls on RAN2 progress on ANR | RAN2, Vivo | imported from 3GU |
R4‑1809627 | LS on final RAN2 agreements for euCA | RAN2, Nokia | imported from 3GU |
R4‑1809628 | LS on Discrepancy on the number of NS values | RAN2, Qualcomm | imported from 3GU |
R4‑1809629 | LS on gap-assisted serving cell measurement | RAN2, Qualcomm | imported from 3GU |
R4‑1809630 | Reply LS on NR Cell Information signalled over X2 for EN-DC | RAN2, Ericsson | imported from 3GU |
R4‑1809631 | Reply LS on Bandwidth configuration for initial BWP | RAN2, NTT Docomo | imported from 3GU |
R4‑1809632 | LS on additional TDD configuration periodicities | RAN2, Nokia | imported from 3GU |
R4‑1809633 | LS on Active DL BWPs overlapping/non-overlapping with Initial DL BWP | RAN2, ZTE | imported from 3GU |
R4‑1809634 | LS on NR Cell Information signalled over X2 for EN-DC | RAN3, Ericsson | imported from 3GU |
R4‑1809635 | Reply LS to GTI input to the 5G NR UE Conformance Test | RAN5, Chinamobile | imported from 3GU |
R4‑1809636 | Response LS to Over-the-Air Radiated Performance Testing for 5G mm-Wave (FR2) User Equipment | RAN5, Pctest | imported from 3GU |
R4‑1809637 | Reply LS to RAN2 on early implementation | RAN5, NTT Docomo | imported from 3GU |
R4‑1809638 | LS on RAN4-RAN5 5G-NR RF pending issues | RAN5, NTT Docomo | imported from 3GU |
R4‑1809639 | LS reply on Coexistence of NR-NR and NR-LTE networks with synchronised, unsynchronised and semi-synchronised operation in 3400-3800 MHz | RAN, Huawei | imported from 3GU |
R4‑1809640 | LS reply on minimum number of RX antennae for NR vehicular UEs | RAN, Samsung | imported from 3GU |
R4‑1809641 | LS on NR UE feature list | RAN, NTT Docomo | imported from 3GU |
R4‑1809642 | LS on potential enhancement of DR-mode of operation | SA2, Intel | imported from 3GU |
R4‑1809643 | Definition of and test methods for OTA unwanted emissions of IMT radio equipment | ITU-R WP5D | imported from 3GU |
R4‑1809644 | IEEE 802.11 Working Group Liaison Statement to 3GPP RAN4 in relation to certain channel combinations for LAA in 5GHz | IEEE 802.11 | imported from 3GU |
R4‑1809645 | Wi-Fi Alliance Coexistence Test Plan for LTE-LAA Version 1.1.10 | Wi-Fi Alliance | imported from 3GU |
R4‑1809646 | Field measurement of TRP regulatory limits and Category B Spurious emission limits | ECC PT1 | imported from 3GU |
R4‑1809647 | Corrections to generic CA RRM test cases (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1809648 | Corrections to NB-IoT RSTD test cases (Rel-14) | Rohde & Schwarz | imported from 3GU |
R4‑1809649 | Corrections to NB-IoT RSTD test cases (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1809650 | On de-prioritized features in NR UE demodulation requirements | China Telecom | imported from 3GU |
R4‑1809651 | Views on channel bandwidth and TDD DL/UL configuration for FR1 UE demodulation requirements | China Telecom | imported from 3GU |
R4‑1809652 | Further discussion on NR PDSCH demodulation requirements | China Telecom | imported from 3GU |
R4‑1809653 | Remaining issues for NR PDCCH demodulation requirements | China Telecom | imported from 3GU |
R4‑1809654 | On NR PBCH demodulation requirements | China Telecom | imported from 3GU |
R4‑1809655 | On NR CSI reporting requirements | China Telecom | imported from 3GU |
R4‑1809656 | On de-prioritized features in NR BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1809657 | Structure for TS 38.104 clause 8 on conducted performance requirements | China Telecom | imported from 3GU |
R4‑1809658 | TP to TS 38.141-1: Structure for clause 8 on conducted performance requirements | China Telecom | imported from 3GU |
R4‑1809659 | On general part for NR BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1809660 | Further discussion on BS test applicability for different SCSes and CHBWs | China Telecom | imported from 3GU |
R4‑1809661 | Further discussion on NR PUSCH demodulation requirements | China Telecom | imported from 3GU |
R4‑1809662 | Further discussion on NR PUCCH demodulation requirements | China Telecom | imported from 3GU |
R4‑1809663 | Further discussion on NR PRACH demodulation requirements | China Telecom | imported from 3GU |
R4‑1809664 | Correction on the typo in subclause 9.11.1 | China Telecom | imported from 3GU |
R4‑1809665 | Correction on the typo in subclause 9.11.1 | China Telecom | imported from 3GU |
R4‑1809666 | On the combination of (electronic) beam sweeping and mechanical positioning techniques in OTA measurements | Fraunhofer HHI, Fraunhofer IIS, Spirent, Ericsson | imported from 3GU |
R4‑1809667 | Correct 5MHz eCell PRB# for Cat NB1 Test Case A.4.2.18 | ANRITSU LTD | imported from 3GU |
R4‑1809668 | Correct 5MHz eCell PRB# for Cat NB1 Test Case A.4.2.18 | ANRITSU LTD | imported from 3GU |
R4‑1809669 | Correction of cqi-pmi-ConfigurationIndex for PUCCH 1-0 static test on multiple cells | ANRITSU LTD | imported from 3GU |
R4‑1809670 | Correction of cqi-pmi-ConfigurationIndex for PUCCH 1-0 static test on multiple cells | ANRITSU LTD | imported from 3GU |
R4‑1809671 | Correction of cqi-pmi-ConfigurationIndex for PUCCH 1-0 static test on multiple cells | ANRITSU LTD | imported from 3GU |
R4‑1809672 | Proposals for NR and NB-IoT Coexistence Studies | T-Mobile USA Inc. | imported from 3GU |
R4‑1809673 | Bandwidth combination sets for CA_n71B | T-Mobile USA Inc. | imported from 3GU |
R4‑1809674 | Bandwidth combination sets for DC_(n)71AA | T-Mobile USA Inc. | imported from 3GU |
R4‑1809675 | CR to TS 36.141: Specification of Annex E: General rules for statistical testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809676 | CR to TS 36.141: Specification of Annex E: General rules for statistical testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809677 | CR to TS 36.141: Specification of Annex E: General rules for statistical testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809678 | CR to TS 36.141: Specification of Annex E: General rules for statistical testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809679 | CR to TS 36.141: Specification of Annex E: General rules for statistical testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809680 | CR to TS 36.141: Specification of Annex E: General rules for statistical testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809681 | CR to TS 36.141: Specification of Annex E: General rules for statistical testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809682 | CR to TS 36.141: Specification of Annex E: General rules for statistical testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809683 | CR to TS 37.145-1: Clarification on manufacturers declarations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809684 | CR to TS 37.145-1: Clarification on manufacturers declarations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809685 | CR to TS 37.145-1: Clarification on manufacturers declarations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809686 | CR to TS 37.145-2: Clarification on manufacturers declarations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809687 | CR to TS 37.145-2: Clarification on manufacturers declarations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809688 | CR to TS 37.145-2: Clarification on manufacturers declarations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809689 | CR to TS 36.104: Corrections on NB-IoT operating band unwanted emission and blocking requirements (6.6.3.3, 7.6.1.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809690 | CR to TS 36.141: Finalization of NB-IoT TDD test model and correction on NB-IoT operating band unwanted emission requirement (6.1.1, 6.1.3, 6.6.3.5.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809691 | Proposals on TT for eAAS OTA receiver requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809692 | Proposals on MU for eAAS OTA receiver spurious emissions requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809693 | Proposals on MU for eAAS OTA receiver out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809694 | Proposals on MU for eAAS OTA receiver co-location blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809695 | Draft CR to TS 37.145-2: Clarification on demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809696 | Draft CR to TS 38.104: Clarifications on receiver narrowband blocking, out-of-band blocking and intermodulation requirements (7.4.2.2, 10.6.3, 10.8.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809697 | Proposals on MU for NR FR1 OTA receiver requirements for operating bands above 4.2GHz | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809698 | Proposals on MU for NR FR1 OTA receiver sensitivity and reference sensitivity requirements for operating bands above 4.2GHz | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809699 | Proposals on MU for NR FR1 OTA receiver dynamic range requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809700 | Proposals on MU for NR FR1 OTA receiver adjacent channel selectivity and in-band narrowband blocking requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809701 | Proposals on MU for NR FR1 OTA receiver in-channel selectivity requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809702 | Proposals on MU for NR FR1 OTA receiver in-band general blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809703 | Proposals on MU for NR FR1 OTA receiver intermodulation requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809704 | Proposals on MU for NR FR1 OTA receiver out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809705 | Proposals on MU for NR FR1 OTA receiver co-location blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809706 | Proposals on MU for NR FR1 OTA receiver spurious emissions requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809707 | Proposals on TT for NR FR1 OTA receiver requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809708 | Proposals on MU and TT for NR FR2 OTA receiver requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809709 | Proposal on NR BS type 2-O out-of-band blocking measurement step size for interfering signal at frequency above 6 GHz | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809710 | Draft CR to TR 37.812-02: Finalizing the measurement step size for BS type 2-O out-of-band blocking conformance testing (10.6.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809711 | TP to TR 38.141-1: NR BS manufacturers declarations for conducted test requirements (4.6) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809712 | TP to TR 38.141-2: NR BS OTA manufacturers declarations for radiated test requirements (4.6) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809713 | CR on TRx RF test metrics for mmWave | Anritsu Corporation | imported from 3GU |
R4‑1809714 | Draft CR to correct in-band blocking parameters for FR1 | Anritsu Corporation | imported from 3GU |
R4‑1809715 | Draft CR on ACS interferer frequency range for FR2 | Anritsu Corporation | imported from 3GU |
R4‑1809716 | TP for TR 36.716-03-01: CA_3-18-42 | KDDI Corporation | imported from 3GU |
R4‑1809717 | TP for TR 36.716-03-01: CA_1-18-42 | KDDI Corporation | imported from 3GU |
R4‑1809718 | TP for TR 36.716-04-01: CA_1-3-18-42 | KDDI Corporation | imported from 3GU |
R4‑1809719 | TP for TR 36.716-04-01: CA_1-3-41-42 | KDDI Corporation | imported from 3GU |
R4‑1809720 | TP for TR 36.716-02-01: CA_18-42 | KDDI Corporation | imported from 3GU |
R4‑1809721 | TP for TR 36.716-02-02: CA_3-11 | KDDI Corporation | imported from 3GU |
R4‑1809722 | Introduction of CA_4DL_1A-3A-42C_3UL_CA_1A-42C and CA_4DL_1A-3A-42C_3UL_CA_3A-42C into TS36.101 | KDDI Corporation | imported from 3GU |
R4‑1809723 | Draft CR to TS 38.101-1 for Corrections on synchronization raster entries for band n41 | ZTE Corporation | imported from 3GU |
R4‑1809724 | Usage of SDL bands for dedicated MBMS | European Broadcasting Union, Qualcomm Incorporated | imported from 3GU |
R4‑1809725 | Test Equipment uncertainty values update for FR1/FR2 | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1809726 | CR on A-SE, A-SEM and A-MPR for V2X Service in Band 47 | Qualcomm Inc. | imported from 3GU |
R4‑1809727 | CR on A-SE, A-SEM and A-MPR for V2X Service in Band 47 | Qualcomm Inc. | imported from 3GU |
R4‑1809728 | Further considerations on early reporting of SCell candidates for euCA | Ericsson | imported from 3GU |
R4‑1809729 | Reply LS on gap-assisted serving cell measurement | Ericsson | imported from 3GU |
R4‑1809730 | Reply LS on ANR progress | Ericsson | imported from 3GU |
R4‑1809731 | Discussion on ANR for NR | Ericsson | imported from 3GU |
R4‑1809732 | Overview of requirements for NE-DC | Ericsson | imported from 3GU |
R4‑1809733 | Way forward on RRM requirements for NE-DC | Ericsson | imported from 3GU |
R4‑1809734 | Impact of dual SMTC on measurement procedures | Ericsson | imported from 3GU |
R4‑1809735 | Tolerance of useServingCellTimingForSync | Ericsson | imported from 3GU |
R4‑1809736 | Measurement requirements for multiple layers | Ericsson | imported from 3GU |
R4‑1809737 | Measurement in gaps or fully overlapped with gaps with multiple layers | Ericsson | imported from 3GU |
R4‑1809738 | Measurement requirements for deactivated SCells in FR2 | Ericsson | imported from 3GU |
R4‑1809739 | Introduction of deactivated SCell measurement requirements for FR2 | Ericsson | imported from 3GU |
R4‑1809740 | CR on TS38.133 for interruption in EN-DC | Ericsson | imported from 3GU |
R4‑1809741 | Interuption requirements for EN-DC in 36.133 | Ericsson | imported from 3GU |
R4‑1809742 | Discussion on per FR gap capable UE and interruption requirements | Ericsson | imported from 3GU |
R4‑1809743 | CR on TS36.133 for handover from E-UTRAN to NR | Ericsson | imported from 3GU |
R4‑1809744 | NR handover requirements | Ericsson | imported from 3GU |
R4‑1809745 | Discussion on handover requirements | Ericsson | imported from 3GU |
R4‑1809746 | Kca scaling for FR2 and FR1+FR2 carrier aggregation | Ericsson | imported from 3GU |
R4‑1809747 | Further discussion on Kca scaling for FR2 and FR1/FR2 CA | Ericsson | imported from 3GU |
R4‑1809748 | Capabilities for FR2 beamforming | Ericsson | imported from 3GU |
R4‑1809749 | FR2 measurement procedures with UE RX beamforming | Ericsson | imported from 3GU |
R4‑1809750 | Further considerations on UE RX beamforming in FR2 RRM requirements | Ericsson | imported from 3GU |
R4‑1809751 | Accuracy requirements and correction to report mapping for SS-SINR | Ericsson | imported from 3GU |
R4‑1809752 | Pcmax,f,c mapping discussion | Ericsson | imported from 3GU |
R4‑1809753 | Pcmax,f,c mapping in 38,.133 | Ericsson | imported from 3GU |
R4‑1809754 | Discussion on principles of measurement accuracy testing in NR | Ericsson | imported from 3GU |
R4‑1809755 | Introduction of SS-RSRP intrafrequency accuracy test for FR1 | Ericsson | imported from 3GU |
R4‑1809756 | Introduction of SS-RSRP intrafrequency accuracy test for FR2 | Ericsson | imported from 3GU |
R4‑1809757 | CR on Interruption and Delay of CC addition/release | Qualcomm Inc. | imported from 3GU |
R4‑1809758 | Pcmax for NR CA considerations in FR1 | InterDigital, Inc. | imported from 3GU |
R4‑1809759 | Pcmax for intra-band contiguous NR CA FR1 draft CR | InterDigital, Inc. | imported from 3GU |
R4‑1809760 | Pcmax for intra-band non-contiguous NR CA FR1 draft CR | InterDigital, Inc. | imported from 3GU |
R4‑1809761 | Pcmax for inter-band NR CA FR1 draft CR | InterDigital, Inc. | imported from 3GU |
R4‑1809762 | MPR applicability for multiple slot transmission type for FR1 draft CR | InterDigital, Inc. | imported from 3GU |
R4‑1809763 | A-MPR applicability for multiple slot transmission type for FR1 draft CR | InterDigital, Inc. | imported from 3GU |
R4‑1809764 | Intra-band EN-DC options for Pcmax | InterDigital, Inc. | imported from 3GU |
R4‑1809765 | Pcmax for intra-band contiguous EN-DC FR1 draft CR | InterDigital, Inc. | imported from 3GU |
R4‑1809766 | Pcmax for intra-band non-contiguous EN-DC FR1 draft CR | InterDigital, Inc. | imported from 3GU |
R4‑1809767 | Inter-band EN-DC - Pcmax approach explained | InterDigital, Inc. | imported from 3GU |
R4‑1809768 | Pcmax for inter-band EN-DC FR1 draft CR | InterDigital, Inc. | imported from 3GU |
R4‑1809769 | Correction of test parameters for LAA Test cases A.9.1.60 and A.9.1.61 | ANRITSU LTD | imported from 3GU |
R4‑1809770 | Correction of test parameters for LAA Test cases A.9.1.60 and A.9.1.61 | ANRITSU LTD | imported from 3GU |
R4‑1809771 | Correction of test parameters for LAA Test cases A.9.1.60 and A.9.1.61 | ANRITSU LTD | imported from 3GU |
R4‑1809772 | Specification and SNR range for Demodulation requirements | ANRITSU LTD | imported from 3GU |
R4‑1809773 | MU factors contributing to DL SNR for demodulation and CSI | ANRITSU LTD | imported from 3GU |
R4‑1809774 | MU factors contributing to DL SNR in RRM Test cases | ANRITSU LTD | imported from 3GU |
R4‑1809775 | Simulation result for FDD sPDSCH demodulation | Qualcomm Incorporated | imported from 3GU |
R4‑1809776 | Simulation result for CRS-based FDD sPDCCH demodulation | Qualcomm Incorporated | imported from 3GU |
R4‑1809777 | Discussion on sTTI CSI reporting test | Qualcomm Incorporated | imported from 3GU |
R4‑1809778 | Simulation result for 1024QAM FDD PDSCH demodulation | Qualcomm Incorporated | imported from 3GU |
R4‑1809779 | Discussion on 1024QAM FDD CQI reporting test | Qualcomm Incorporated | imported from 3GU |
R4‑1809780 | Simulation result for reduced DMRS FDD PDSCH demodulation | Qualcomm Incorporated | imported from 3GU |
R4‑1809781 | Discussion on LTE HRLLC performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1809782 | Draft CR to 38.104: Corrections on synchronization raster entries for band n260 | ZTE Corporation | imported from 3GU |
R4‑1809783 | Draft CR to 38.104: Corrections on description of channel raster entries in section 5.4.2 | ZTE Corporation | imported from 3GU |
R4‑1809784 | Draft CR to 38.101-1: Corrections on CA bandwidth classes for FR1 | ZTE Corporation | imported from 3GU |
R4‑1809785 | Draft CR to TS 38.101-1 for Corrections on UE transmitter power | ZTE Corporation | imported from 3GU |
R4‑1809786 | Extending FR2 power class requirements to multi-band UEs | Apple Inc. | imported from 3GU |
R4‑1809787 | Draft CR to TS 38.101-2: Introducing multi-band applicability for PC3 | Apple Inc. | imported from 3GU |
R4‑1809788 | Applicability of FR2 UL RMCs to maximum output power requirements | Apple Inc. | imported from 3GU |
R4‑1809789 | Views on Beam Correspondence | Apple Inc. | imported from 3GU |
R4‑1809790 | Draft CR to TS 38.101-2: Introduction of the requirement on beam correspondence | Apple Inc. | imported from 3GU |
R4‑1809791 | Network Performance Analysis for Power Control Tolerance | Apple Inc. | imported from 3GU |
R4‑1809792 | Issues with DC_41A-41A_n41A and Intra-band EN-DC Definition in Release 15 38.101-3 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1809793 | Draft CR to 38.101-1: Corrections on additional spectrum emission mask | ZTE Corporation | imported from 3GU |
R4‑1809794 | ^^SSUL as a Low Cost and Roaming Band Option for Some EN-DC Combinations | Skyworks Solutions Inc. | imported from 3GU |
R4‑1809795 | Optimum EN-DC Performance with Dynamic Support of 2UL and SSUL | Skyworks Solutions Inc. | imported from 3GU |
R4‑1809796 | MSD and AMPR Issues for DC_3A_n3A | Skyworks Solutions Inc. | imported from 3GU |
R4‑1809797 | TP on the general part for x bands DL (x=3,4,5) with 2 bands UL inter-band CA in rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1809798 | Initial simulation results and discussion on NR CQI tests | Intel Corporation | imported from 3GU |
R4‑1809799 | Initial simulation results and discussion on NR PMI tests | Intel Corporation | imported from 3GU |
R4‑1809800 | Initial simulation results and discussion on NR RI tests | Intel Corporation | imported from 3GU |
R4‑1809801 | WF on NR CSI feedback tests | Intel Corporation | imported from 3GU |
R4‑1809802 | Discussion on eFeMTC UE demodulation performance requirements | Intel Corporation | imported from 3GU |
R4‑1809803 | Discussion on applicability of performance requirements for 8Rx UEs | Intel Corporation | imported from 3GU |
R4‑1809804 | PDSCH simulation results and discussion for 8Rx UEs | Intel Corporation | imported from 3GU |
R4‑1809805 | Simulation results and discussion for 8Rx SDR tests | Intel Corporation | imported from 3GU |
R4‑1809806 | Discussion on 8Rx UE CSI performance requirement tests | Intel Corporation | imported from 3GU |
R4‑1809807 | On remaining issues PSCell addition requirements | Intel Corporation | imported from 3GU |
R4‑1809808 | CR on NR PSCell addition requirements in TS36.133 | Intel Corporation | imported from 3GU |
R4‑1809809 | Further discussion on requirements in NR RRC_Idle | Intel Corporation | imported from 3GU |
R4‑1809810 | CR for NR idle/inactive requirements in TS38.133 | Intel Corporation | imported from 3GU |
R4‑1809811 | Discussion on euCA SCell direct activation with HO | Intel Corporation | imported from 3GU |
R4‑1809812 | Draft LS on euCA SCell direct activation | Intel Corporation | imported from 3GU |
R4‑1809813 | On intra-band EN-DC phase discontinuty and power sharing assumptions | Intel Corporation | imported from 3GU |
R4‑1809814 | Correction on single UL capability for DC_B2_n66 | Intel Corporation | imported from 3GU |
R4‑1809815 | TP to TS 38.101-3 on single UL capability for DC_B2_n66 | Intel Corporation | imported from 3GU |
R4‑1809816 | TP to TS 38.101-3 on band combination and UL configuration discrepancy | Intel Corporation | imported from 3GU |
R4‑1809817 | TP to TS 38.101-2 on ON/OFF time mask | Intel Corporation | imported from 3GU |
R4‑1809818 | CR on 1RX CRS-IM requirements corrections | Intel Corporation | imported from 3GU |
R4‑1809819 | CR on FeCoMP requirements corrections | Intel Corporation | imported from 3GU |
R4‑1809820 | eV2X UE performance requirements | Intel Corporation | imported from 3GU |
R4‑1809821 | UE Demodulation and CSI requirements for HRLLC | Intel Corporation | imported from 3GU |
R4‑1809822 | Remaining details of DL/UL RMCs for UE RF requirements | Intel Corporation | imported from 3GU |
R4‑1809823 | Draft CR on NR DL FRCs for FR1 UE RF requirements | Intel Corporation | imported from 3GU |
R4‑1809824 | NR PDSCH UE demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1809825 | NR PDSCH simulation results | Intel Corporation | imported from 3GU |
R4‑1809826 | NR SDR performance requirements | Intel Corporation | imported from 3GU |
R4‑1809827 | NR FR2 UE PDSCH demodulation performance requirements | Intel Corporation | imported from 3GU |
R4‑1809828 | Enhanced CA utilization CSI reporting requirments | Intel Corporation | imported from 3GU |
R4‑1809829 | NR UE Demodulation and CSI reporting requirements scenarios and common parameters | Intel Corporation | imported from 3GU |
R4‑1809830 | Views on NR FR1 2RX/4RX requirements | Intel Corporation | imported from 3GU |
R4‑1809831 | Views on NR HARQ soft buffer and soft combining requirements | Intel Corporation | imported from 3GU |
R4‑1809832 | Views on the remaining details of the NR FR2 RRM testing methodology | Intel Corporation | imported from 3GU |
R4‑1809833 | Views on the remaining details of the NR FR2 UE Demodulation and CSI testing methodology | Intel Corporation | imported from 3GU |
R4‑1809834 | TP to TR 38.810 on editorial corrections | Intel Corporation | imported from 3GU |
R4‑1809835 | TP to TR 38.810 on the remaining details of channel modelling methodology | Intel Corporation | imported from 3GU |
R4‑1809836 | TP to TR 38.810 on the remaining details of NR RRM testing methodology | Intel Corporation | imported from 3GU |
R4‑1809837 | TP to TR 38.810 on the remaining details of NR FR2 UE Demodulation and CSI testing methodology | Intel Corporation | imported from 3GU |
R4‑1809838 | Enhanced performance alternatives for RF exposure compliance for FR2 | Intel Corporation | imported from 3GU |
R4‑1809839 | Beam Correspondence in FR2 | Intel Corporation | imported from 3GU |
R4‑1809840 | Configured transmitted power tolerance in FR2 | Intel Corporation | imported from 3GU |
R4‑1809841 | PCG vs MPR in FR2 | Intel Corporation | imported from 3GU |
R4‑1809842 | On PA calibration gap | Intel Corporation | imported from 3GU |
R4‑1809843 | On Pulse shaped Pi/2 BPSK in FR2 | Intel Corporation | imported from 3GU |
R4‑1809844 | On Pulse shaped Pi/2 BPSK in FR1 | Intel Corporation | imported from 3GU |
R4‑1809845 | On almost contiguous UL CP-OFDM | Intel Corporation | imported from 3GU |
R4‑1809846 | Draft CR to 38101-2 MPR for CA | Intel Corporation | imported from 3GU |
R4‑1809847 | Draft CR to 38101-2 MPR for single CC | Intel Corporation | imported from 3GU |
R4‑1809848 | Draft CR to 38101-2 Spectrum Emission Mask for CA | Intel Corporation | imported from 3GU |
R4‑1809849 | Draft CR to TS 38.101-2 add interruption requirement in Applicability of minimum requirements | Intel Corporation | imported from 3GU |
R4‑1809850 | Draft CR to TS 38.101-2 update the Pumax tolerance table for configured transmitted power | Intel Corporation | imported from 3GU |
R4‑1809851 | PDSCH Demodulation requirements under fading conditions with 1024QAM | Intel Corporation | imported from 3GU |
R4‑1809852 | SDR Requirements with 1024QAM | Intel Corporation | imported from 3GU |
R4‑1809853 | Rx beamforming for Intra-frequency measurements | Intel Corporation | imported from 3GU |
R4‑1809854 | Discussion on link reconfiguration requirements | Intel Corporation | imported from 3GU |
R4‑1809855 | CR on link reconfiguration requirements | Intel Corporation | imported from 3GU |
R4‑1809856 | NR UE PDCCH demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1809857 | NR UE PBCH demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1809858 | Simplification of TDL channel models | Intel Corporation | imported from 3GU |
R4‑1809859 | Channel models for FR2 demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1809860 | On UE measurement with MOs configured by MN and SN | Intel Corporation | imported from 3GU |
R4‑1809861 | CR on UE measurement capability with MOs configured by MN and SN in TS38.133 | Intel Corporation | imported from 3GU |
R4‑1809862 | CR on UE measurement capability with MOs configured by MN and SN in TS36.133 | Intel Corporation | imported from 3GU |
R4‑1809863 | On gap-assisted serving cell measurement | Intel Corporation | imported from 3GU |
R4‑1809864 | Reply LS on gap-assisted serving cell measurement | Intel Corporation | imported from 3GU |
R4‑1809865 | On UE capability of measurement gap for inter-RAT NR measurement | Intel Corporation | imported from 3GU |
R4‑1809866 | Reply LS on UE capability of measurement gap for inter-RAT NR measurement | Intel Corporation | imported from 3GU |
R4‑1809867 | On test case design for TA accuracy | Intel Corporation | imported from 3GU |
R4‑1809868 | CR on UE Timing Advance Adjustment Accuracy Test with FDD E-UTRAN PCell and FDD PScell in FR1 | Intel Corporation | imported from 3GU |
R4‑1809869 | CR on UE Timing Advance Adjustment Accuracy Test with FDD PCell in FR1 | Intel Corporation | imported from 3GU |
R4‑1809870 | Motivation to introduce new WI of measurement gap enhancement | Intel Corporation | imported from 3GU |
R4‑1809871 | New WI proposal measurement gap enhancement | Intel Corporation | imported from 3GU |
R4‑1809872 | On WU and CD subframes for NW based CRS-IM | Intel Corporation | imported from 3GU |
R4‑1809873 | CR on applicability requirement for non-BL CE UE in eFeMTC scenarios | Intel Corporation | imported from 3GU |
R4‑1809874 | On SFTD measurement for new scenarios | Intel Corporation | imported from 3GU |
R4‑1809875 | Further discussion on BWP switching Delay | Intel Corporation | imported from 3GU |
R4‑1809876 | Further discussion on interruption due to BWP switching | Intel Corporation | imported from 3GU |
R4‑1809877 | CR on interruption due to BWP switching | Intel Corporation | imported from 3GU |
R4‑1809878 | LS on Type 3 delay for BWP switching | Intel Corporation | imported from 3GU |
R4‑1809879 | On SFTD Accuracy Requirement | Intel Corporation | imported from 3GU |
R4‑1809880 | Discussion about evaluation time for CSI-RS based NR RLM | Intel Corporation | imported from 3GU |
R4‑1809881 | Discussion about NR RLM remaining issue | Intel Corporation | imported from 3GU |
R4‑1809882 | Discussion about NR RRM performance accuracy for FR2 | Intel Corporation | imported from 3GU |
R4‑1809883 | Discussion about L1-RSRP measurement accuracy for beam management | Intel Corporation | imported from 3GU |
R4‑1809884 | NR FR2 OTA measurement uncertainty value for CATR | Keysight Technologies, NSI-MI Technologies | imported from 3GU |
R4‑1809885 | On gap based inter-frequency requirements | Intel | imported from 3GU |
R4‑1809886 | Editor CR on TS38.133 after RAN4#AH1807 | Intel | imported from 3GU |
R4‑1809887 | Motivation for Power Class 2 UE for EN-DC (1 LTE band +1 NR band) | CMCC | imported from 3GU |
R4‑1809888 | New WID on Power Class 2 UE for EN-DC (1 LTE band +1 NR band) | CMCC | imported from 3GU |
R4‑1809889 | Further discussion on FR2 OTA reference sensitivity requirement | CMCC | imported from 3GU |
R4‑1809890 | Discussion on FR2 OTA TDD transient time | CMCC | imported from 3GU |
R4‑1809891 | DraftCR to TS 38.104: Adding table for FR2 reference sensitivity level range | CMCC | imported from 3GU |
R4‑1809892 | DraftCR to TS 38.104: fractional bandwidth definition corrections | CMCC | imported from 3GU |
R4‑1809893 | DraftCR to TS 38.104: Change table 10.3.3-1 for FR2 reference sensitivity requirement | CMCC | imported from 3GU |
R4‑1809894 | Further discussion on Scell activation requirements in FR2 | CATT | imported from 3GU |
R4‑1809895 | CR on Scell activation requirements in FR2 | CATT | imported from 3GU |
R4‑1809896 | CR to 36.133 on NR PSCell addition and release delay | CATT | imported from 3GU |
R4‑1809897 | CR on MTTD and MRTD for inter-band CA | CATT | imported from 3GU |
R4‑1809898 | Discussion on interruptions test cases for EN-DC | CATT | imported from 3GU |
R4‑1809899 | Test cases for interruptions at transitions in EN-EC | CATT | imported from 3GU |
R4‑1809900 | Discussion on eV2X demodulation requirements | CATT | imported from 3GU |
R4‑1809901 | Initial simulation results for NR PDCCH | CATT | imported from 3GU |
R4‑1809902 | Discussion on NR PDCCH demodulation requirement | CATT | imported from 3GU |
R4‑1809903 | Discussion on general part for NR BS demodulation requirements | CATT | imported from 3GU |
R4‑1809904 | Draft CR for TS38.104: Correction on radiated receiver characteristics.doc | CATT | imported from 3GU |
R4‑1809905 | Draft CR for TS38.104: Correction on radiated transmitter characteristics | CATT | imported from 3GU |
R4‑1809906 | Draft CR for TS38.104: Correction on conducted transmitter characteristics | CATT | imported from 3GU |
R4‑1809907 | Draft CR for TS38.104: Interfering signal for In-Channel selectivity | CATT | imported from 3GU |
R4‑1809908 | Discussion on NR Test model | CATT | imported from 3GU |
R4‑1809909 | Sync rater for Band 41 | CATT | imported from 3GU |
R4‑1809910 | Transmitter ON/OFF power | CATT | imported from 3GU |
R4‑1809911 | Receiver spurious emission | CATT | imported from 3GU |
R4‑1809912 | EN DC_41-79 | CATT | imported from 3GU |
R4‑1809913 | Correction on general clause for 36.141-1 | CATT | imported from 3GU |
R4‑1809914 | Correction on general clause for 36.141-1 | CATT | imported from 3GU |
R4‑1809915 | Extendng loewer frequecy range in Band 41 for EN DC_41_79 | CATT | imported from 3GU |
R4‑1809916 | Consideration on TAE requirement | CATT | imported from 3GU |
R4‑1809917 | TAE requirement | CATT | imported from 3GU |
R4‑1809918 | Correction on UE transmitter requirement for FR1 | CATT | imported from 3GU |
R4‑1809919 | Correction on UE receiver requirement for FR1 | CATT | imported from 3GU |
R4‑1809920 | Correction on UE transmitter requirement for FR2 | CATT | imported from 3GU |
R4‑1809921 | Discussion on Measurement period of PRACH time mask | CATT | imported from 3GU |
R4‑1809922 | Measurement period of PRACH time mask | CATT | imported from 3GU |
R4‑1809923 | Reverberation Chambers in EMC testing | Ericsson | imported from 3GU |
R4‑1809924 | EMC immunity conformance tests for FR2 | Ericsson | imported from 3GU |
R4‑1809925 | LS on EMC Immunity test methods and levels for FR2 | Ericsson | imported from 3GU |
R4‑1809926 | Draft CR to TS 38.113: BS Test Configurations | Ericsson | imported from 3GU |
R4‑1809927 | Draft CR to TS 37.113: Spatial Exclusion | Ericsson | imported from 3GU |
R4‑1809928 | Draft CR to TS 38.113: Spatial Exclusion | Ericsson | imported from 3GU |
R4‑1809929 | Skeleton of SUL TR 37.716-00-00 | Huawei, HiSilicon | imported from 3GU |
R4‑1809930 | Coverage related issues for 2Rx RF requirements of vehicle mounted NR UE as exception case | Samsung, LG Electronics, Volkswagen AG, | imported from 3GU |
R4‑1809931 | Discussion on TR 38.826 Clause 6: Evaluation on the coverage related issue | Samsung | imported from 3GU |
R4‑1809932 | Discussion on BWP Switching Delay | Samsung | imported from 3GU |
R4‑1809933 | Remaining issues for NR measurement gap | Samsung | imported from 3GU |
R4‑1809934 | Simulation results for RRM measurement accuracy | Samsung | imported from 3GU |
R4‑1809935 | Clarification on Sync/Async EN-DC scenarios | Samsung, NTT DOCOMO, INC. | imported from 3GU |
R4‑1809936 | Darft CR for EN-DC MTTD and MRTD requirement | Samsung, NTT DOCOMO, INC. | imported from 3GU |
R4‑1809937 | Darft CR for FR2 Power Classes in TS38.307 | Samsung | imported from 3GU |
R4‑1809938 | Remaining Issues for UE Measurement Capability | Samsung | imported from 3GU |
R4‑1809939 | Remaining Issues for Requirements with Multiple SCells | Samsung | imported from 3GU |
R4‑1809940 | Discussion on RX beam selection for RRM measurement | Samsung | imported from 3GU |
R4‑1809941 | Test Case for Contention-based Random Access | Samsung | imported from 3GU |
R4‑1809942 | Test Case for Non-Contention-based Random Access | Samsung | imported from 3GU |
R4‑1809943 | Overall Scope for NR-NR Dual Connectivity RRM Requirement | Samsung | imported from 3GU |
R4‑1809944 | Discussion on UE Measurement for NR-NR Dual Connectivity | Samsung | imported from 3GU |
R4‑1809945 | Discussion on Timing for NR-NR Dual Connectivity | Samsung | imported from 3GU |
R4‑1809946 | Discussion on Interruption and Delay for NR-NR Dual Connectivity | Samsung | imported from 3GU |
R4‑1809947 | Simulation results for sPUCCH Format4 | Samsung | imported from 3GU |
R4‑1809948 | Initial simulation results for eFeMTC | Samsung | imported from 3GU |
R4‑1809949 | Discussion on BS demodulation requirements for eFeMTC | Samsung | imported from 3GU |
R4‑1809950 | Discussion on BS demodulation requirements for NR PUSCH | Samsung | imported from 3GU |
R4‑1809951 | Discussion on BS demodulation requirements for NR PUCCH | Samsung | imported from 3GU |
R4‑1809952 | Discussion on BS demodulation requirements for NR PRACH | Samsung | imported from 3GU |
R4‑1809953 | Initial simulation results for NR PUSCH | Samsung | imported from 3GU |
R4‑1809954 | Initial simulation results for NR PUCCH | Samsung | imported from 3GU |
R4‑1809955 | Initial simulation results for NR PRACH | Samsung | imported from 3GU |
R4‑1809956 | Draft CR on corrections for TS38.104 | Samsung | imported from 3GU |
R4‑1809957 | Discussion on (C)ACLR within sub-block gap | Samsung | imported from 3GU |
R4‑1809958 | Discussion on absolute ACLR for MMW | Samsung | imported from 3GU |
R4‑1809959 | NR inter-band DC band combinations | Samsung,KDDI,SKT,KT,LGU+ | imported from 3GU |
R4‑1809960 | Draft CR to TS 38.101-3: to introduce new NR inter-band DC band combinations | Samsung,KDDI,SKT,KT,LGU+ | imported from 3GU |
R4‑1809961 | Draft CR to TS 38.101-3: to add missing requirements for inter-band CA between FR1 and FR2. | Samsung | imported from 3GU |
R4‑1809962 | CR to TS36.133 for editorial correction of NR NSA measurement capability | Samsung | imported from 3GU |
R4‑1809963 | Initial simulation results for NR PDSCH (FR1) | Samsung | imported from 3GU |
R4‑1809964 | Initial simulation results for NR PDSCH (FR2) | Samsung | imported from 3GU |
R4‑1809965 | Over views on open issues of PDSCH demodulation test cases | Samsung | imported from 3GU |
R4‑1809966 | Over views on CSI test cases | Samsung | imported from 3GU |
R4‑1809967 | Test case design for static CQI test cases | Samsung | imported from 3GU |
R4‑1809968 | Test case design for fading CQI test cases | Samsung | imported from 3GU |
R4‑1809969 | Test case design for PMI test cases | Samsung | imported from 3GU |
R4‑1809970 | Simulation results summary for NR PDSCH (FR1 TDD) | Samsung | imported from 3GU |
R4‑1809971 | Simulation results summary for NR PDSCH (FR1 FDD) | Samsung | imported from 3GU |
R4‑1809972 | Simulation results summary for NR PDSCH (FR2 TDD) | Samsung | imported from 3GU |
R4‑1809973 | SSB SCS restriction with BWP operation | Samsung | imported from 3GU |
R4‑1809974 | UE and BS channel bandwidth and spacing descriptions | Ericsson | imported from 3GU |
R4‑1809975 | Draft CR for TS 38.104: Channel raster corrections (5.4.2) | Ericsson | imported from 3GU |
R4‑1809976 | Draft CR for TS 38.101-2: Channel raster corrections (5.4.2) | Ericsson | imported from 3GU |
R4‑1809977 | Draft CR for TS 38.104: Sync raster corrections (5.4.3) | Ericsson | imported from 3GU |
R4‑1809978 | Draft CR for TS 38.101-1: Sync raster corrections (5.4.3) | Ericsson | imported from 3GU |
R4‑1809979 | Draft CR for TS 38.101-2: Sync raster corrections (5.4.3) | Ericsson | imported from 3GU |
R4‑1809980 | BS Category B spurious emission in FR2 | Ericsson | imported from 3GU |
R4‑1809981 | Draft LS on Field measurement of TRP regulatory limits and Category B Spurious emission limits | Ericsson | imported from 3GU |
R4‑1809982 | TR 38.810 v2.3.0 | Intel Corporation (UK) Ltd | imported from 3GU |
R4‑1809983 | TS 38.104 Combined updates from RAN4 #88 | Ericsson | imported from 3GU |
R4‑1809984 | Handling of EN-DC/CA configurations including FR2 | NTT DOCOMO INC. | imported from 3GU |
R4‑1809985 | Handling of fallback modes | NTT DOCOMO INC. | imported from 3GU |
R4‑1809986 | On NR BS demodulation general aspects | ZTE Corporation | imported from 3GU |
R4‑1809987 | On NR BS PUSCH demodulation performance requirements | ZTE Corporation | imported from 3GU |
R4‑1809988 | On NR BS PUCCH demodulation performance requirements | ZTE Corporation | imported from 3GU |
R4‑1809989 | On NR BS PRACH performance requirements | ZTE Corporation | imported from 3GU |
R4‑1809990 | CR to TS 38.101-1: pi/2 BPSK with Spectrum Shaping | Indian Institute of Tech (M),Indian Institute of Tech (H), CEWiT, Nokia, Nokia Shanghai Bell),Indian Institute of Tech (H), CEWiT, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1809991 | CR to 38.101-3:Corrections on UE coexistence table for Table 6.5B.3.3.1-1 | MediaTek Inc. | imported from 3GU |
R4‑1809992 | Draft CR to TS 38.104: Adding missing symbols in terminology required for radiated transmit power requirement in sub-clause 3.2 and sub-clause 9.2 | Ericsson | imported from 3GU |
R4‑1809993 | Measurement uncertainty evaluation for radiated transmit power in extreme temperature | Ericsson | imported from 3GU |
R4‑1809994 | Draft CR to 37.843: Improvements of test procedure and MU evaluation for TX IMD in SAC in sub-clause 10.6.4.4 | Ericsson | imported from 3GU |
R4‑1809995 | Measurement uncertainty for co-location spurious emission | Ericsson | imported from 3GU |
R4‑1809996 | Measurement uncertainty for OTA transmitter intermodulation | Ericsson | imported from 3GU |
R4‑1809997 | Draft CR to 37.145-2: Improvement of specification text related to co-location spurious emission in sub-clause 6.7.6.5 | Ericsson | imported from 3GU |
R4‑1809998 | Draft CR to 37.145-2: Improvement of specification text related to receiver blocking in sub-clause 7.6 | Ericsson | imported from 3GU |
R4‑1809999 | Draft CR to 37.145-2: Improvement of specification text related to transmitter intermodulation in sub-clause 6.8 | Ericsson | imported from 3GU |
R4‑1810000 | TP to TS 38.141-2: Improvements of co-location requirement description in sub-clause 4.12 | Ericsson | imported from 3GU |
R4‑1810001 | Draft CR to 37.145-2: Improvement of specification text related to protection of the BS receiver of own or different BS in sub-clause 6.7.6.3 and Annex | Ericsson | imported from 3GU |
R4‑1810002 | Draft CR for TS 37.105 Introduction of rated total TRP output power in sub-clauses 3.1 and 3.2 | Ericsson | imported from 3GU |
R4‑1810003 | Draft CR for TS 37.145-2 Introduction of rated total TRP output power in sub-clauses 3.1 and 3.2 | Ericsson | imported from 3GU |
R4‑1810004 | TP to TS 38.141-2: Adding requirement text for OTA co-location blocking in subclause 7.6 and Annex E2.4.2 | Ericsson | imported from 3GU |
R4‑1810005 | TP to TS 38.141-2: Adding requirement text for OTA co-location spurious emission in subclause 6.7.5 and Annex E1.3 | Ericsson | imported from 3GU |
R4‑1810006 | TP to TS 38.141-2: Adding requirement text for OTA out-of-band blocking in subclause 7.6 and Annex E2.4.1 | Ericsson | imported from 3GU |
R4‑1810007 | TP to TS 38.141-2: Improvement of requirement text for OTA TX IMD in subclause 6.8 and Annex E.1.5 | Ericsson | imported from 3GU |
R4‑1810008 | Remaining Issue Discussion on Idle State for SA NR | MediaTek inc. | imported from 3GU |
R4‑1810009 | CR on TS38.133 for cell reselection in idle | MediaTek inc. | imported from 3GU |
R4‑1810010 | CR on TS36.133 for inter-RAT NR measurements in idle | MediaTek inc. | imported from 3GU |
R4‑1810011 | Remaining Issue on RRC re-establishment requirement for SA NR | MediaTek inc. | imported from 3GU |
R4‑1810012 | CR on TS38.133 for RRC re-establish | MediaTek inc. | imported from 3GU |
R4‑1810013 | Misalignment Issue on SCell Activation Delay and Interruption requirements | MediaTek inc. | imported from 3GU |
R4‑1810014 | CR on TS38.133 for SCell activation and deactivation delay | MediaTek inc. | imported from 3GU |
R4‑1810015 | Discussion on CGI reading requirement for NR | MediaTek inc. | imported from 3GU |
R4‑1810016 | Remaining issues for UE measurement capability | MediaTek inc. | imported from 3GU |
R4‑1810017 | Discussion on RAN2 LS about inter-RAT NR measurement before EN-DC | MediaTek inc. | imported from 3GU |
R4‑1810018 | Introduction on Gap sharing for EN-DC in TS36.133 | MediaTek inc. | imported from 3GU |
R4‑1810019 | MRTD for FR2 intra-band CA | MediaTek inc. | imported from 3GU |
R4‑1810020 | CR on MRTD requirement for FR2 intraband NR CA | MediaTek inc. | imported from 3GU |
R4‑1810021 | BWP Switching Delay | MediaTek inc. | imported from 3GU |
R4‑1810022 | Interruption Due to BWP Switching | MediaTek inc. | imported from 3GU |
R4‑1810023 | CR on updating requirement for BWP switching delay in TS38.133 | MediaTek inc. | imported from 3GU |
R4‑1810024 | CR on updating interruption requirement for BWP switching in TS38.133 | MediaTek inc. | imported from 3GU |
R4‑1810025 | CR on updating interruption requirement for BWP switching in TS36.133 | MediaTek inc. | imported from 3GU |
R4‑1810026 | Initial PDSCH simulation result | MediaTek inc. | imported from 3GU |
R4‑1810027 | Initial PDCCH simulation result | MediaTek inc. | imported from 3GU |
R4‑1810028 | Initial PBCH simulation result | MediaTek inc. | imported from 3GU |
R4‑1810029 | Initial CSI simulation result | MediaTek inc. | imported from 3GU |
R4‑1810030 | Discussion on 1024QAM DL demodulation requirements under fading propagation conditions | Huawei, HiSilicon | imported from 3GU |
R4‑1810031 | Draft CR: for 1024QAM DL demodulation under fading condition | Huawei, HiSilicon | imported from 3GU |
R4‑1810032 | Discussion on 1024QAM DL SDR tests | Huawei, HiSilicon | imported from 3GU |
R4‑1810033 | Draft CR: SDR test case with 1024QAM | Huawei, HiSilicon | imported from 3GU |
R4‑1810034 | Discussion on reduced DMRS tests | Huawei, HiSilicon | imported from 3GU |
R4‑1810035 | CR: test case for reduced DMRS | Huawei, HiSilicon | imported from 3GU |
R4‑1810036 | Discussion and simulation results on 1024QAM DL CSI requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1810037 | Discussion on NR PBCH demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1810038 | FR2 MOP Multiband Relaxation Discussion | MediaTek Beijing Inc. | imported from 3GU |
R4‑1810039 | A-MPR Band n50 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810040 | A-MPR Band n74 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810041 | Introduction of larger channel bandwidths for NR Band n7 | BT plc, Telstra | imported from 3GU |
R4‑1810042 | New PSD requirement for 5GHz operation in Korea | Korea Testing Laboratory | imported from 3GU |
R4‑1810043 | A-MPR Band n1 NS_08 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810044 | Draft CR to TS 38.101-1, Introduction of larger channel bandwidths for NR Band n7 | BT plc | imported from 3GU |
R4‑1810045 | Draft CR to TS 38.104, Introduction of larger channel bandwidths for NR Band n7 | BT plc | imported from 3GU |
R4‑1810046 | The RF measurement result for the 28GHz BS | Korea Testing Laboratory | imported from 3GU |
R4‑1810047 | TP for TR 37.716-11-11 Inter-band DC_5A-n260 Carrier Aggregation | Verizon UK Ltd | imported from 3GU |
R4‑1810048 | TP for TR 37.716-11-11 Inter-band DC_66A-n260 Carrier Aggregation | Verizon UK Ltd | imported from 3GU |
R4‑1810049 | TP for TR 37.716-11-11 Inter-band DC 5A-n261 Carrier Aggregation | Verizon UK Ltd | imported from 3GU |
R4‑1810050 | TP for TR 37.716-11-11 Inter-band DC_66A-n261 CA | Verizon UK Ltd | imported from 3GU |
R4‑1810051 | TP for TR 38.716-01-01 NR Intra-band n260 CA | Verizon UK Ltd | imported from 3GU |
R4‑1810052 | TP for TR 38.716-01-01 NR Intra-band n261 CA | Verizon UK Ltd | imported from 3GU |
R4‑1810053 | Simplification to CA Band Combination Management | AT&T GNS Belgium SPRL | imported from 3GU |
R4‑1810054 | Pcmax for Rel-15 inter-band EN-DC for FR1 and NR in FR2 | InterDigital, Inc. | imported from 3GU |
R4‑1810055 | Introduction of 30 kHz SSB pattern for Band n71 | Ericsson, T-Mobile | imported from 3GU |
R4‑1810056 | Power control for EN-DC: power back-off and UL timing | Ericsson | imported from 3GU |
R4‑1810057 | Pcmax for EN-DC | Ericsson | imported from 3GU |
R4‑1810058 | Configured output power for EN-DC | Ericsson | imported from 3GU |
R4‑1810059 | The NS signaling concept for NR | Ericsson | imported from 3GU |
R4‑1810060 | Correction of NS values (additional spectrum emission) | Ericsson | imported from 3GU |
R4‑1810061 | Reply LS on Discrepancy on the number of NS values | Ericsson | imported from 3GU |
R4‑1810062 | Verification of open loop power control for FR2 | Ericsson | imported from 3GU |
R4‑1810063 | Introduction of 30 kHz SSB pattern for Band n71 | Ericsson, T-Mobile | imported from 3GU |
R4‑1810064 | On the relation between core requirements, MU and TT for RF and RRM conformance tests | Ericsson | imported from 3GU |
R4‑1810065 | On EIS Spherical Coverage for FR2 UEs | Apple Inc. | imported from 3GU |
R4‑1810066 | Draft CR to TS 38.101-2: Introducing EIS spherical coverage requirements for PC3 | Apple Inc. | imported from 3GU |
R4‑1810067 | Channel emulation complexity for NR performance requirements | ANRITSU LTD | imported from 3GU |
R4‑1810068 | Noise emulation complexity for NR | ANRITSU LTD | imported from 3GU |
R4‑1810069 | TP to TR 36.716-04-01: CA_3A-7A-32A-46A, CA_3A-7A-32A-46C, CA_3A-7A-32A-46D and CA_3A-7A-32A-46E channel bandwidths per operating band | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑1810070 | TP to TR 36.716-03-01: CA_3A-32A-46A, CA_3A-32A-46C, CA_3A-32A-46D and CA_3A-32A-46E channel bandwidths per operating band and co-existence studies | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑1810071 | TP to TR 36.716-03-01: CA_7A-32A-46A, CA_7A-32A-46C, CA_7A-32A-46D and CA_7A-32A-46E channel bandwidths per operating band and co-existence studies | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑1810072 | draft CR to TS 36.101 - Addition of LTE CA 3A-7A-46E requirements | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑1810073 | AMPR for sub-PRB for CAT M2 | Qualcomm | imported from 3GU |
R4‑1810074 | AMPR for sub-PRB for CAT M1 | Qualcomm | imported from 3GU |
R4‑1810075 | CR to TS 36.141 - NB-IoT TDD introduction - TM updates | Ericsson | imported from 3GU |
R4‑1810076 | CR to TS 37.141 - NB-IoT TDD introduction | Ericsson | imported from 3GU |
R4‑1810077 | On NB-IoT and NR RF co-existence | Ericsson | imported from 3GU |
R4‑1810078 | Way forward on the study scope of RF co-existence of LTE MTC and NB-IoT with NR | Ericsson | imported from 3GU |
R4‑1810079 | Draft CR TS 38.104 - Introduction of Band n14 | Ericsson | imported from 3GU |
R4‑1810080 | Draft CR TS 38.101-1 - Introduction of Band n14 | Ericsson | imported from 3GU |
R4‑1810081 | Draft CR TS 38.141-1 - Introduction of Band n14 | Ericsson | imported from 3GU |
R4‑1810082 | Draft CR TS 38.104 - Introduction of Band n30 | Ericsson | imported from 3GU |
R4‑1810083 | Draft CR TS 38.101-1 - Introduction of Band n30 | Ericsson | imported from 3GU |
R4‑1810084 | Draft CR TS 38.141-1 - Introduction of Band n30 | Ericsson | imported from 3GU |
R4‑1810085 | NR Test Configurations - remaining issues | Ericsson | imported from 3GU |
R4‑1810086 | TP to TS 38.141-1 TC Applicability | Ericsson | imported from 3GU |
R4‑1810087 | NR Test Configurations for MSR conformance | Ericsson | imported from 3GU |
R4‑1810088 | Transient period limitation inside a slot or mini-slot | Ericsson | imported from 3GU |
R4‑1810089 | UE reporting supported transient time parameters | Ericsson | imported from 3GU |
R4‑1810090 | LS to RAN2 on UE reporting its supported transient time parameters | Ericsson | imported from 3GU |
R4‑1810091 | Draft CR TS 38.101-1 - UE ON-OFF mask clean up | Ericsson | imported from 3GU |
R4‑1810092 | Draft CR TS 38.101-2 - UE ON-OFF mask clean up | Ericsson | imported from 3GU |
R4‑1810093 | CR to TS 36.141 - sTTI introduction | Ericsson | imported from 3GU |
R4‑1810094 | CR to update the definition of Long and Short subslot for FR1 | Qualcomm | imported from 3GU |
R4‑1810095 | Clarification of the measurement gap offset in LAA inter-frequency measurement test R13 | Qualcomm Incorporated | imported from 3GU |
R4‑1810096 | Clarification of the measurement gap offset in LAA inter-frequency measurement test R14 | Qualcomm Incorporated | imported from 3GU |
R4‑1810097 | Clarification of the measurement gap offset in LAA inter-frequency measurement test R15 | Qualcomm Incorporated | imported from 3GU |
R4‑1810098 | Performance of NR PUCCH | AT&T | imported from 3GU |
R4‑1810099 | On NR PDSCH Performance | AT&T | imported from 3GU |
R4‑1810100 | On PUSCH Performance for NR | AT&T | imported from 3GU |
R4‑1810101 | On PDCCH Performance for 2 Tx and 4 Tx antennas | AT&T | imported from 3GU |
R4‑1810102 | On CSI performance for NR downlink | AT&T | imported from 3GU |
R4‑1810103 | A-MPR B41D Power Class 3 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810104 | n12 MSD measurements | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810105 | A-MPR for n41 NS_04 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810106 | Single UL allowed criteria for Mid band EN-DC combinations in FR1 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810107 | Corrections to single UL allowed criteria for EN-DC operation | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810108 | Corrections to single UL allowed criteria for EN-DC operation | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810109 | LS on fallback interpretation of UE FeatureSetDown(Up)LinkPerCC capability fields | RAN2, Intel | imported from 3GU |
R4‑1810110 | TP for TR 37.716-31-11: DC_1-3-18_n77 | KDDI Corporation | imported from 3GU |
R4‑1810111 | Single UL allowed corrections for DC_28A-n51A EN-DC in 38.101-3 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810112 | TP for TR 37.716-31-11: DC_1-3-18_n78 | KDDI Corporation | imported from 3GU |
R4‑1810113 | Inconsistencies in “Single UL allowed” EN-DC dual uplink operation for NR FR1 (two bands) | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810114 | TP for TR 37.716-31-11: DC_1-3-18_n79 | KDDI Corporation | imported from 3GU |
R4‑1810115 | Corrections for DC_66A-n78A EN-DC in 38-101-3 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810116 | TP for TR 37.716-31-11: DC_1-3-18_n257 | KDDI Corporation | imported from 3GU |
R4‑1810117 | Potential A-MPR for n258 related to spurious emissions and EESS protection | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810118 | TP for TR 37.716-31-11: DC_1-3-18_n257 | KDDI Corporation | imported from 3GU |
R4‑1810119 | Discussion on SRS carrier switching timing issues | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810120 | TP for TR 37.716-31-11: DC_1-3-41_n77 | KDDI Corporation | imported from 3GU |
R4‑1810121 | TP for TR 37.716-31-11: DC_1-3-41_n78 | KDDI Corporation | imported from 3GU |
R4‑1810122 | TP for TR 37.716-31-11: DC_1-3-41_n79 | KDDI Corporation | imported from 3GU |
R4‑1810123 | Draft CR to 38.101-3 Corrections to Single UL allowed criteria for EN-DC | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810124 | TP for TR 37.716-31-11: DC_1-3-41_n257 | KDDI Corporation | imported from 3GU |
R4‑1810125 | Draft CR to 38.101-3 Single UL allowed corrections for DC_28A_51A EN-DC | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810126 | TP for TR 37.716-21-11: DC_3-18_n77 | KDDI Corporation | imported from 3GU |
R4‑1810127 | TP for TR 37.716-21-11: DC_3-18_n78 | KDDI Corporation | imported from 3GU |
R4‑1810128 | Draft CR to 38.101-3 Single UL allowed corrections for EN-DC operation in NR FR1 (two bands) | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810129 | TP for TR 37.716-21-11: DC_3-18_n79 | KDDI Corporation | imported from 3GU |
R4‑1810130 | TP for TR 37.716-21-11: DC_3-18_n257 | KDDI Corporation | imported from 3GU |
R4‑1810131 | TP for TR 37.716-21-11: DC_3-41_n77 | KDDI Corporation | imported from 3GU |
R4‑1810132 | TP for TR 37.716-21-11: DC_3-41_n79 | KDDI Corporation | imported from 3GU |
R4‑1810133 | TP for TR 37.716-31-11: DC_3-41-42_n77 | KDDI Corporation | imported from 3GU |
R4‑1810134 | TP for TR 37.716-31-11: DC_3-41-42_n78 | KDDI Corporation | imported from 3GU |
R4‑1810135 | TP for TR 37.716-31-11: DC_3-41-42_n79 | KDDI Corporation | imported from 3GU |
R4‑1810136 | TP for TR 37.716-31-11: DC_3-41-42_n257 | KDDI Corporation | imported from 3GU |
R4‑1810137 | NB-IoT downlink channel quality determination and report | Ericsson | imported from 3GU |
R4‑1810138 | Introduction of MSG3-based channel quality report for NB-IoT | Ericsson | imported from 3GU |
R4‑1810139 | Introduction of MSG3-based channel quality report for NB-IoT | Ericsson | imported from 3GU |
R4‑1810140 | Simulation results of PDSCH demodulation for 1024QAM | Ericsson | imported from 3GU |
R4‑1810141 | Simulation results of CQI reporting test for 1024QAM | Ericsson | imported from 3GU |
R4‑1810142 | Discussion on UE demodulation requirements for eFeMTC | Ericsson | imported from 3GU |
R4‑1810143 | Discussion on CQI requirements for eFeMTC | Ericsson | imported from 3GU |
R4‑1810144 | Discussion on BS demodulation requirements for eFeMTC | Ericsson | imported from 3GU |
R4‑1810145 | Discussion on UE demodulation requirements for HRLLC | Ericsson | imported from 3GU |
R4‑1810146 | Introduction of PDSCH demodulation requirement for HRLLC | Ericsson | imported from 3GU |
R4‑1810147 | Discussion on BS demodulation requirements for HRLLC | Ericsson | imported from 3GU |
R4‑1810148 | Simulation results of PDSCH for sTTI UE demodulation requirements | Ericsson | imported from 3GU |
R4‑1810149 | Summary of simulation results for sTTI UE demodulation requirements | Ericsson | imported from 3GU |
R4‑1810150 | CQI reporting tests for CRS-based PDSCH | Ericsson | imported from 3GU |
R4‑1810151 | CQI reporting tests for DMRS-based PDSCH | Ericsson | imported from 3GU |
R4‑1810152 | Introduction of SPDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1810153 | Introduction of Slot/Subslot-PDSCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1810154 | Introduction of CQI tests for sTTI | Ericsson | imported from 3GU |
R4‑1810155 | New beam identification | Ericsson | imported from 3GU |
R4‑1810156 | Discussion on RMC for RRM performance requrements | Ericsson | imported from 3GU |
R4‑1810157 | Introduction of RMC for RRM performance requirements | Ericsson | imported from 3GU |
R4‑1810158 | Demodulation performance impacts due to simplified propagation channel models | Ericsson | imported from 3GU |
R4‑1810159 | Simplified propagation channel models based on TDL-D/E | Ericsson | imported from 3GU |
R4‑1810160 | Discussion on NR PBCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1810161 | Test model designs for NR | Huawei Telecommunication India, HiSilicon | imported from 3GU |
R4‑1810162 | TDD configurations for MSR considerations | Huawei Telecommunication India, HiSilicon | imported from 3GU |
R4‑1810163 | Test models with boosting/deboosting | Huawei Telecommunication India, HiSilicon | imported from 3GU |
R4‑1810164 | Examination of mixed numerology in test model | Huawei Telecommunication India, HiSilicon | imported from 3GU |
R4‑1810165 | Draft CR for introduction of DC_3A-41C_n78A and DC_3A-41C_n257A into TS38.101 | KDDI Corporation | imported from 3GU |
R4‑1810166 | Draft CR for introduction of CA_4DL_1A-3A-42C_3UL_CA_1A-42C and CA_4DL_1A-3A-42C_3UL_CA_3A-42C into TS36.101 | KDDI Corporation | imported from 3GU |
R4‑1810167 | TP for TR 37.863-01-01: MSD for DC_5A_n78A due to the 4th harmonic | MediaTek Inc. | imported from 3GU |
R4‑1810168 | Draft CR to TS38.104_ACLR(Section 9.7.3) | ZTE Corporation | imported from 3GU |
R4‑1810169 | Draft CR to TS38.104_UEM(Section 6.6.4 and 9.7.4) | ZTE Corporation | imported from 3GU |
R4‑1810170 | Further consideration on test configuration for NR CA OBW | ZTE Corporation | imported from 3GU |
R4‑1810171 | TP to TS 38.141-1 Applicability of test configurations(Section 4.8.3) | ZTE Corporation | imported from 3GU |
R4‑1810172 | TP to TS 38.141-1 Test configuration(Sections 4.7) | ZTE Corporation | imported from 3GU |
R4‑1810173 | TP to TS 38.141-2 Applicability of test configurations(Section 4.7) | ZTE Corporation | imported from 3GU |
R4‑1810174 | TP to TS 38.141-2: Test configuration(Sections 4.8) | ZTE Corporation | imported from 3GU |
R4‑1810175 | Discussion on NR single carrier test | ZTE Corporation | imported from 3GU |
R4‑1810176 | Proposal on the request format for Rel.16 NR CA combination | ZTE Corporation | imported from 3GU |
R4‑1810177 | TP for TR 38.716-02-00: CA_3A-n79A | ZTE Corporation | imported from 3GU |
R4‑1810178 | RF channel for NR OTA BS RF conformance test | ZTE Corporation | imported from 3GU |
R4‑1810179 | TP for TR38.141-1: RF channel for BS conducted conformance test | ZTE Corporation | imported from 3GU |
R4‑1810180 | TP for TR38.141-2: RF channel for BS OTA conformance test | ZTE Corporation | imported from 3GU |
R4‑1810181 | TP for TS38.141-1: Occupied bandwidth (section 4.1.2 and 6.6.2) | ZTE Corporation | imported from 3GU |
R4‑1810182 | TP for TS38.141-2: Occupied bandwidth (section 6.7.2) | ZTE Corporation | imported from 3GU |
R4‑1810183 | TP for TR38.716-02-00 1UL and 2UL for CA_n1-n78 | ZTE Corporation | imported from 3GU |
R4‑1810184 | CR to TS37.145-1_Adding RF channel for CA OBW (section 4.12.1) Rel.13 | ZTE Corporation | imported from 3GU |
R4‑1810185 | CR to TS37.145-1_Adding RF channel for CA OBW (section 4.12.1) Rel.14 | ZTE Corporation | imported from 3GU |
R4‑1810186 | Draft CR to TS37.145-1_Adding RF channel for CA OBW (section 4.12.1) Rel.15 | ZTE Corporation | imported from 3GU |
R4‑1810187 | Draft CR to 38.104: Corrections on narrow band blocking (section 7.4.2 and 10.5.2) | ZTE Corporation | imported from 3GU |
R4‑1810188 | Draft CR to 38.101-1: corrections on UE channel bandwidth for CA (section 5.3A) | ZTE Corporation | imported from 3GU |
R4‑1810189 | Skeleton TR37.716-51-11 v0.0.1 | Samsung | imported from 3GU |
R4‑1810190 | Views on UE demodulation requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810191 | Initial simulation results for SDR test | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810192 | Initial simulation results for SDR test | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810193 | Views on UE requirements for CSI reporting | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810194 | Views on channel models | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810195 | Release independent requirements for LTE Carrier Aggregation beyond 5 carriers | KDDI Corporation | imported from 3GU |
R4‑1810196 | NR FR2 system level simulation results with higher UE TX power | Intel Corporation | imported from 3GU |
R4‑1810197 | Correction on Table 6.6.3.2-1 Spurious emission band UE co-existence | Intel Corporation | imported from 3GU |
R4‑1810198 | Correction on Table 6.6.3.2A-0 Requirements for uplink inter-band carrier aggregation (two bands) | Intel Corporation | imported from 3GU |
R4‑1810199 | Correction on Table 6.6.3.2A-0 Requirements for uplink inter-band carrier aggregation (two bands) | Intel Corporation | imported from 3GU |
R4‑1810200 | Correction on Table 6.6.3.2A-0 Requirements for uplink inter-band carrier aggregation (two bands) | Intel Corporation | imported from 3GU |
R4‑1810201 | Correction on Table 6.6.3.2A-0 Requirements for uplink inter-band carrier aggregation (two bands) | Intel Corporation | imported from 3GU |
R4‑1810202 | Correction on Table 7.3.1A-0bE | Intel Corporation | imported from 3GU |
R4‑1810203 | Correction on Table 7.3.1A-0bE | Intel Corporation | imported from 3GU |
R4‑1810204 | Correction on Table 7.3.1A-5 | Intel Corporation | imported from 3GU |
R4‑1810205 | Correction on Table 7.3.1A-5 | Intel Corporation | imported from 3GU |
R4‑1810206 | Correction on Table 5.3A.5-1 | Intel Corporation | imported from 3GU |
R4‑1810207 | n41 sync raster entries | MediaTek Inc. | imported from 3GU |
R4‑1810208 | Draft CR for TS 38.101-1: n41 GSCN range modification | MediaTek Inc. | imported from 3GU |
R4‑1810209 | CR of release independent requirements for LTE Carrier Aggregation beyond 5 carriers (TS 36.307 Rel-13) | KDDI Corporation | imported from 3GU |
R4‑1810210 | Draft CR for TS 38.101-1: MPR inner and outer RB allocations formula correction | MediaTek Inc. | imported from 3GU |
R4‑1810211 | Draft CR for TS 38.101-2: MPR inner and outer RB allocations formula correction | MediaTek Inc. | imported from 3GU |
R4‑1810212 | CR on starting point to execute the measurement gap | Intel Corporation | imported from 3GU |
R4‑1810213 | Draft CR for TS 38.101-2: n261 CA configurations corrections | MediaTek Inc. | imported from 3GU |
R4‑1810214 | CR of release independent requirements for LTE Carrier Aggregation beyond 5 carriers (TS 36.307 Rel-14) | KDDI Corporation | imported from 3GU |
R4‑1810215 | TP for TR 37.863-01-01 self-interference analysis for DC_2A_n66A | MediaTek Inc. | imported from 3GU |
R4‑1810216 | CR of release independent requirements for LTE Carrier Aggregation beyond 5 carriers (TS 36.307 Rel-15) | KDDI Corporation | imported from 3GU |
R4‑1810217 | Discussion on RRM test configuration in FR2 | LG Electronics Inc. | imported from 3GU |
R4‑1810218 | Discussion on SS-RSRP intra frequency test parameters in FR2 | LG Electronics Inc. | imported from 3GU |
R4‑1810219 | TP for TR 37.863-01-01 self-interference analysis for DC_2A_n78A | MediaTek Inc. | imported from 3GU |
R4‑1810220 | Discussion on UE behavior in the slot immediately before/after measurement gap | LG Electronics Inc. | imported from 3GU |
R4‑1810221 | TP for TR 37.863-01-01 self-interference analysis for DC_5A_n66A | MediaTek Inc. | imported from 3GU |
R4‑1810222 | TP for TR 37.863-01-01 self-interference analysis for DC_12A_n66A | MediaTek Inc. | imported from 3GU |
R4‑1810223 | draft CR on UE behavior in the slot immediately before or after measurement gap | LG Electronics Inc. | imported from 3GU |
R4‑1810224 | TP for TR 37.863-01-01 self-interference analysis for DC_20A_n77A | MediaTek Inc. | imported from 3GU |
R4‑1810225 | draft CR on UE type for Power Class 2 in FR2 | LG Electronics Inc., SK Telecom, KT, LG Uplus | imported from 3GU |
R4‑1810226 | TP for TR 37.863-01-01 self-interference analysis for DC_66A_n5A | MediaTek Inc. | imported from 3GU |
R4‑1810227 | TP for TR 37.863-01-01 self-interference analysis for DC_66A_n78A | MediaTek Inc. | imported from 3GU |
R4‑1810228 | draft CR on UL-MIMO requirement for Power Class 2 in FR2 | LG Electronics Inc., SK Telecom, KT, LG Uplus | imported from 3GU |
R4‑1810229 | Draft CR for TS 38.101-1: Spurious emission for UE coexistence table corrections | MediaTek Inc. | imported from 3GU |
R4‑1810230 | Draft CR for TS38.101-1 to correct 90MHz UE CBW | LG Electronics Inc. | imported from 3GU |
R4‑1810231 | Discussion on n1 A-MPR | LG Electronics Inc. | imported from 3GU |
R4‑1810232 | Draft CR for TS 38.101-1: Table 7.3.2-1 n77 reference sensitivity corrections | MediaTek Inc. | imported from 3GU |
R4‑1810233 | Consideration on methods to distinguish vehicular UE from handheld UE | LG Electronics Inc. | imported from 3GU |
R4‑1810234 | Discussion on RRM core requirements with Rx beamforming in FR2 | LG Electronics Inc. | imported from 3GU |
R4‑1810235 | Out-of-band blocker issue for n77/n78 pairing with low-band in CA/SUL | MediaTek Inc. | imported from 3GU |
R4‑1810236 | Discussion on scheduling availability for RLM | LG Electronics Inc. | imported from 3GU |
R4‑1810237 | FR2 UE beam correspondence requirement | MediaTek Inc. | imported from 3GU |
R4‑1810238 | CR for scheduling availability on FR2 for RLM | LG Electronics Inc. | imported from 3GU |
R4‑1810239 | Discussion on scheduling availability for BFD | LG Electronics Inc. | imported from 3GU |
R4‑1810240 | CR for scheduling availability on FR2 for Link Recovery Procedures | LG Electronics Inc. | imported from 3GU |
R4‑1810241 | Draft CR to TR 38.817-01: Update the definition of mmWave power class | Sumitomo Elec. Industries, Ltd | imported from 3GU |
R4‑1810242 | Discussion on test methodology for measurement accuracy in FR2 | LG Electronics Inc. | imported from 3GU |
R4‑1810243 | Remaining issues on RLM | MediaTek inc. | imported from 3GU |
R4‑1810244 | CR on TS38.133 for RLM requirements | MediaTek inc. | imported from 3GU |
R4‑1810245 | Discussion on SSB-based RLM tests | MediaTek inc. | imported from 3GU |
R4‑1810246 | SSB-based RLM test cases for EN-DC | MediaTek inc. | imported from 3GU |
R4‑1810247 | SSB-based RLM test cases for SA | MediaTek inc. | imported from 3GU |
R4‑1810248 | Discussion on requirements for L1-RSRP | MediaTek inc. | imported from 3GU |
R4‑1810249 | Discussion on requirements for beam failure detection | MediaTek inc. | imported from 3GU |
R4‑1810250 | CR on TS38.133 for link recovery procedure requirements | MediaTek inc. | imported from 3GU |
R4‑1810251 | Discussion on PSCell addition delay requirement | MediaTek inc. | imported from 3GU |
R4‑1810252 | CR on TS36.133 for NR PSCell addition delay | MediaTek inc. | imported from 3GU |
R4‑1810253 | Discussion on SCell activation delay requirement | MediaTek inc. | imported from 3GU |
R4‑1810254 | Discussion on SSB Measurement Accuracy | MediaTek inc. | imported from 3GU |
R4‑1810255 | TP on summary of interference studies for new x bands DL (x=3,4,5) with 2 bands UL inter-band CA combinations in rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1810256 | TP for TR 37.864-11-11 DC_1A_n257 | SK Telecom | imported from 3GU |
R4‑1810257 | TP for TR 37.864-11-11 DC_3A_n257 | SK Telecom | imported from 3GU |
R4‑1810258 | TP for TR 37.864-11-11 DC_5A_n257F_n257M | SK Telecom | imported from 3GU |
R4‑1810259 | TP for TR 37.864-11-11 DC_7A_n257F_n257M | SK Telecom | imported from 3GU |
R4‑1810260 | TR skeleton for x bands DL (x=3,4,5) with 2 bands UL inter-band CA in rel-16 | LG Electronics France | imported from 3GU |
R4‑1810261 | TP for TR 37.864-11-11 DC_7A-7A_n257F_n257M | SK Telecom | imported from 3GU |
R4‑1810262 | TP for TR 37.716-21-11 DC_1A-3A_n257 | SK Telecom | imported from 3GU |
R4‑1810263 | TP for TR 37.716-21-11 DC_1A-5A_n257F_n257M | SK Telecom | imported from 3GU |
R4‑1810264 | TP for TR 37.716-21-11 DC_1A-7A_n257F_n257M | SK Telecom | imported from 3GU |
R4‑1810265 | TP on MSD analysis for remaining LTE(2DL/1UL) + NR(1DL/1UL) DC UE | LG Electronics France | imported from 3GU |
R4‑1810266 | TP for TR 37.716-21-11 DC_3A-5A_n257F_n257M | SK Telecom | imported from 3GU |
R4‑1810267 | TP for TR 37.716-21-11 DC_3A-7A_n257F_n257M | SK Telecom | imported from 3GU |
R4‑1810268 | TP for TR 37.716-21-11 DC_5A-7A_n257F_n257M | SK Telecom | imported from 3GU |
R4‑1810269 | TP for TR 37.716-31-11 DC_1A-3A-5A_n257 | SK Telecom | imported from 3GU |
R4‑1810270 | TP for TR 37.716-31-11 DC_1A-3A-7A_n257 | SK Telecom | imported from 3GU |
R4‑1810271 | TP for TR 37.716-31-11 DC_1A-5A-7A_n257 | SK Telecom | imported from 3GU |
R4‑1810272 | TP for TR 37.716-31-11 DC_1A-3A-7A-7A_n257 | SK Telecom | imported from 3GU |
R4‑1810273 | TP for TR 37.716-31-11 DC_1A-5A-7A-7A_n257 | SK Telecom | imported from 3GU |
R4‑1810274 | TP for TR 37.716-31-11 DC_3A-5A-7A_n257 | SK Telecom | imported from 3GU |
R4‑1810275 | TP for TR 37.716-31-11 DC_3A-5A-7A-7A_n257 | SK Telecom | imported from 3GU |
R4‑1810276 | TP for TR 37.716-41-11 DC_1A-3A-5A-7A_n257 | SK Telecom | imported from 3GU |
R4‑1810277 | TP for TR 37.716-41-11 DC_1A-3A-5A-7A-7A_n257 | SK Telecom | imported from 3GU |
R4‑1810278 | TP to TR 36.716-04-01: UE co-existence studies and requirements for CA_1A-3A-3A-7A-7A-8A | CHTTL | imported from 3GU |
R4‑1810279 | TP to TR 36.716-04-01: UE co-existence studies and requirements for CA_1A-3A-3A-7A-8A | CHTTL | imported from 3GU |
R4‑1810280 | TP for TR 37.864-xx-21 DC_1A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810281 | TP to TR 36.716-04-01: UE co-existence studies and requirements for CA_1A-3A-7A-7A-8A | CHTTL | imported from 3GU |
R4‑1810282 | TP for TR 37.864-xx-21 DC_3A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810283 | TP for TR 37.864-xx-21 DC_5A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810284 | TP for TR 37.864-xx-21 DC_7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810285 | TP for TR 37.864-xx-21 DC_7A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810286 | TP for TR 37.864-xx-21 DC_1A-3A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810287 | TP for TR 37.864-xx-21 DC_1A-5A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810288 | TP for TR 37.864-xx-21 DC_1A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810289 | TP for TR 37.864-xx-21 DC_1A-7A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810290 | Discussion on the possible solution of SS-SINR underestimation issue | CMCC | imported from 3GU |
R4‑1810291 | Discussion on the applicability for gap pattern configuration | CMCC | imported from 3GU |
R4‑1810292 | Discussion on measurement accuracy of SS-SINR measurement | CMCC | imported from 3GU |
R4‑1810293 | Discussion on channel quality report for NB-IoT | CMCC | imported from 3GU |
R4‑1810294 | Discussion on accuracy requirements of channel quality report for NB-IoT | CMCC | imported from 3GU |
R4‑1810295 | TDD UL-DL configuration for NR UE demodulation | CMCC | imported from 3GU |
R4‑1810296 | Simulation results on NR PDSCH | CMCC | imported from 3GU |
R4‑1810297 | Discussion on NR PDCCH demodulation requirements | CMCC | imported from 3GU |
R4‑1810298 | Simulation results on NR PUSCH | CMCC | imported from 3GU |
R4‑1810299 | Simulation results on NR PUCCH | CMCC | imported from 3GU |
R4‑1810300 | Simulation results on NR PRACH | CMCC | imported from 3GU |
R4‑1810301 | TP for TR 37.864-xx-21 DC_3A-5A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810302 | TP for TR 37.864-xx-21 DC_3A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810303 | TP for TR 37.864-xx-21 DC_3A-7A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810304 | TR skeleton for LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1810305 | TP for TR 37.864-xx-21 DC_5A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810306 | TP for TR 37.864-xx-21 DC_5A-7A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810307 | TP on general part for EN-DC LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1810308 | n65 requirements | Dish Network | imported from 3GU |
R4‑1810309 | TP for TR 37.864-xx-21 DC_1A-3A-5A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810310 | TP for TR 37.864-xx-21 DC_1A-3A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810311 | TP for TR 37.864-xx-21 DC_1A-3A-7A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810312 | Draft CR to 38.101-1: Corrections on description of channel raster entries | ZTE Corporation | imported from 3GU |
R4‑1810313 | TP for TR 37.864-xx-21 DC_1A-5A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810314 | Draft CR to TS 38.113 RF electromagnetic filed test method and level (subclause 9.2.2 | ZTE Corporation | imported from 3GU |
R4‑1810315 | Draft CR to TS 38.113 Arrangements for establishing a communication link (subclause 4.2) | ZTE Corporation | imported from 3GU |
R4‑1810316 | Draft CR to TS 38.113 Test Configuration (subclause 4.5) | ZTE Corporation | imported from 3GU |
R4‑1810317 | on wanted signal level and spatial exclusion | ZTE Corporation | imported from 3GU |
R4‑1810318 | NR – NB-IoT Co-existence | Dish Network | imported from 3GU |
R4‑1810319 | TP to TR 37.864-xx-21: channel bandwidth and co-existence studies for DC_3_n1-n77 | CHTTL | imported from 3GU |
R4‑1810320 | TP for TR 37.864-xx-21 DC_1A-5A-7A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810321 | MRTD and MTTD Requirements for Inter-band FR1-FR2 NR CA | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810322 | TP for TR 37.864-xx-21 DC_3A-5A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810323 | TP for TR 37.864-xx-21 DC_3A-5A-7A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810324 | Assumptions for 4Rx NR PDCCH demodulation performance tests | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810325 | TP for TR 37.864-xx-21 DC_1A-3A-5A-7A_n78A-n257 | SK Telecom | imported from 3GU |
R4‑1810326 | Assumptions for NR PDSCH Demodulation Performance Tests | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810327 | Draft CR to 38.101-2: Corrections on description of channel raster entries | ZTE Corporation | imported from 3GU |
R4‑1810328 | Correction for DC_3_n3 to Rel.15 TR 37.863-01-01 | CHTTL | imported from 3GU |
R4‑1810329 | NR intra-band CA requirements <2700MHz | Dish Network | imported from 3GU |
R4‑1810330 | Assumptions for NR CSI Reporting Tests | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810331 | TP for TR 37.716-11-11: DC band combination of Band 5 and n79 | China Telecom | imported from 3GU |
R4‑1810332 | TP for TR 37.716-21-11: DC band combination of Band 1, 5 and n79 | China Telecom | imported from 3GU |
R4‑1810333 | TP for TR 37.716-21-11: DC band combination of Band 3, 5 and n79 | China Telecom | imported from 3GU |
R4‑1810334 | TP for TR 37.716-21-11: DC band combination of Band 5, 41 and n79 | China Telecom | imported from 3GU |
R4‑1810335 | New WID Add high power UE (power class 2) to NR CA for Rel-16 | China Telecom | imported from 3GU |
R4‑1810336 | New WID Add support of DL 256QAM for NR FR2 | China Telecom | imported from 3GU |
R4‑1810337 | Motivations on NR DL 256QAM support for FR2 | China Telecom | imported from 3GU |
R4‑1810338 | TP for TR38.716-01-01: Requirements for CA_n66(2A) and CA_n66B | Dish Network | imported from 3GU |
R4‑1810339 | Doppler Spread for NR FR2 UE Performance Tests | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810340 | NR PDCCH Demodulation Performance Simulation Results | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810341 | Draft CR on revised A-MPR equations for intra-band contiguous EN-DC UE | LG Electronics France | imported from 3GU |
R4‑1810342 | NR PDSCH Demodulation Performance Simulation Results | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810343 | TP for TR38.716-02-00: Requirements for CA_n66A-n71A and CA_n66A-n70A | Dish Network | imported from 3GU |
R4‑1810344 | TP for TR 37.716-21-11 DC_1A-7A-7A_n257 | SK Telecom | imported from 3GU |
R4‑1810345 | Simplification of TDL Channel Models | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810346 | TP for TR 37.716-21-11 DC_3A-7A-7A_n257 | SK Telecom | imported from 3GU |
R4‑1810347 | H3 MSD requirements for Inter-band NR CA | Dish Network | imported from 3GU |
R4‑1810348 | TP for TR 37.716-21-11 DC_5A-7A-7A_n257 | SK Telecom | imported from 3GU |
R4‑1810349 | Discussion on BWP switching | OPPO | imported from 3GU |
R4‑1810350 | Test tolerance for FR1 TX regulatory requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810351 | Test tolerance for FR2 TX regulatory requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810352 | BS NR test model | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810353 | Test tolerance for FR1 and FR2 RX regulatory requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810354 | Measurement points for FR1 and FR2 NR BS OBW | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810355 | TP to TS 38.141-1: NR BS occupied bandwidth (6.6.2) | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810356 | TP to TS 38.141-2: NR BS OTA occupied bandwidth (6.7.2) | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810357 | Absolute ACLR for FR2 NR BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810358 | General part of NR BS demodulation | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810359 | NR BS PUSCH demodulation | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810360 | NR BS PUCCH demodulation | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810361 | Preamble format for NR BS PRACH demodulation | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810362 | MU of OTA OBUE, SEM, ACLR absolute requirement | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810363 | MU of OTA ACLR relative requirement | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810364 | draftCR for TR37.843 –ACLR, OBUE, SEM - | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810365 | MU of OTA TX-IM | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810366 | draftCR for TR37.843 –TXIM - | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810367 | Draft CR to TS 38.101-3 correction for DC_3_n3-n77, DC_3_n3-n78 | CHTTL | imported from 3GU |
R4‑1810368 | Way Forward for^^impact analysis on Bluetooth and IEEE 802.11 operation for new TDD E-UTRA band as proposed by GlobalStar | BROADCOM CORPORATION, CableLabs | imported from 3GU |
R4‑1810369 | Draft CR to 38.101-1: Corrections on symbols and abbreviations in section 3 | ZTE Corporation | imported from 3GU |
R4‑1810370 | Draft CR: Corrections to NS_03 | Dish Network | imported from 3GU |
R4‑1810371 | Discussion on BWP SCS restriction based on UE CC BW | OPPO | imported from 3GU |
R4‑1810372 | Initial analysis for A-MPR and MSD for dual uplink transmission of DC_3_n3 | CHTTL | imported from 3GU |
R4‑1810373 | Draft CR to 38.101-2: Corrections on symbols and abbreviations in section 3 | ZTE Corporation | imported from 3GU |
R4‑1810374 | NR CSI Reporting Simulation Results | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810375 | WF for A-MPR and MSD of DC_3A_n3A | CHTTL | imported from 3GU |
R4‑1810376 | Draft CR: General corrections to n71 requirements | Dish Network | imported from 3GU |
R4‑1810377 | Revised WID: Basket WI for LTE Intra-band CA Rel-16 | Ericsson | imported from 3GU |
R4‑1810378 | Revised WID NR Intra-band Rel-16 | Ericsson | imported from 3GU |
R4‑1810379 | Revised WID LTE 3DL and one NR band Rel-16 | Ericsson | imported from 3GU |
R4‑1810380 | TR 36.716-01-01 v0.0.1 Rel-16 LTE Intra-band | Ericsson | imported from 3GU |
R4‑1810381 | TR 38.716-01-01 v0.0.1 Rel-16 NR Intra-band | Ericsson | imported from 3GU |
R4‑1810382 | TR 37.716-31-11 v0.0.1 Rel-16 DC combinations LTE 3DL and one NR band | Ericsson | imported from 3GU |
R4‑1810383 | Scope TP from RAN 80 for 36.716-01-01 | Ericsson | imported from 3GU |
R4‑1810384 | Introduction of Rel-16 LTE Intra-band combinations in 36.101 | Ericsson | imported from 3GU |
R4‑1810385 | Introduction of Rel-16 LTE Intra-band combinations in 36.104 | Ericsson | imported from 3GU |
R4‑1810386 | Introduction of Rel-16 LTE Intra-band combinations in 36.141 | Ericsson | imported from 3GU |
R4‑1810387 | draft CR introduction completed band combinations 38.716-01-01 -> 38.101-1 | Ericsson | imported from 3GU |
R4‑1810388 | draft CR introduction completed band combinations 38.716-01-01 -> 38.101-2 | Ericsson | imported from 3GU |
R4‑1810389 | draft CR introduction completed band combinations 37.716-31-11 -> 38.101-3 | Ericsson | imported from 3GU |
R4‑1810390 | Rel-12 CR towards TS 36.101 to remove square brackets for CA_4A-7A_12A | Ericsson | imported from 3GU |
R4‑1810391 | Mirror CR Rel-13 towards TS 36.101 to remove square brackets for CA_4A-7A_12A | Ericsson | imported from 3GU |
R4‑1810392 | Mirror CR Rel-14 towards TS 36.101 to remove square brackets for CA_4A-7A_12A | Ericsson | imported from 3GU |
R4‑1810393 | Mirror CR Rel-15 towards TS 36.101 to remove square brackets for CA_4A-7A_12A | Ericsson | imported from 3GU |
R4‑1810394 | Rel-15 CR towards TS 36.101 to correct errors in notes | Ericsson | imported from 3GU |
R4‑1810395 | Rel-14 CR towards TS 36.101 to correct error in note | Ericsson | imported from 3GU |
R4‑1810396 | TP to 37.716-11-11, DC_2A_n260(3A) (4A) | Ericsson, T-Mobile US | imported from 3GU |
R4‑1810397 | TP to 37.716-21-11, DC_2A-66A_n260(2A) (3A) (4A) | Ericsson, T-Mobile US | imported from 3GU |
R4‑1810398 | TP to 37.716-31-11, DC_1A-3C-7C_n78A, DC_1A-3A-7C_n78A | Ericsson, BT | imported from 3GU |
R4‑1810399 | TP to 37.716-21-11, DC_1A-7C_n78A | Ericsson, BT | imported from 3GU |
R4‑1810400 | TP to 36.716-02-01, CA_7A-7A-28A | Ericsson, Telefonica | imported from 3GU |
R4‑1810401 | TP to 36.716-03-01, CA_1-7-7-28 | Ericsson, Telefonica | imported from 3GU |
R4‑1810402 | TP to 36.716-03-01, CA_3-5-28 | Ericsson, Telefonica | imported from 3GU |
R4‑1810403 | TP to 36.716-04-01, six 1-3-7-28 LTE CA combinations | Ericsson, Telstra, Telefonica | imported from 3GU |
R4‑1810404 | TP to 36.716-02-01, 3C-28A_1UL_3C_BCS0 | Ericsson, Telstra | imported from 3GU |
R4‑1810405 | TP to 36.716-03-01, four 3-7-28 LTE CA combinations | Ericsson, Telstra, Telefonica | imported from 3GU |
R4‑1810406 | TP to 36.716-03-01, 1A-3C-28A_2CC_UL_3C | Ericsson, Telstra | imported from 3GU |
R4‑1810407 | Discussion on NR PBCH demodulation requirements | CMCC | imported from 3GU |
R4‑1810408 | Discussion on dynamic transient period location for NR | OPPO | imported from 3GU |
R4‑1810409 | Consideration on coexistence scenarios between NR and LTE-M/NB-IoT | CHTTL | imported from 3GU |
R4‑1810410 | Draft CR to 38.101-3: Corrections on symbols and abbreviations in section 3 | ZTE Corporation | imported from 3GU |
R4‑1810411 | CR correction of UL CA configuration CA_40D REFSENS requirement Rel-14 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810412 | CR correction of UL CA configuration CA_40D REFSENS requirement Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810413 | Clarification and corrections of EN-DC REFSENS exceptions requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810414 | E-UTRA (Evolved Universal Terrestrial Radio Access) - NR Dual Connectivity (EN-DC) of 4 bands LTE inter-band Carrier aggregation (CA) (4 Down Link (DL) / 1 Up Link (UL)) and 1 NR band (1 DL / 1 UL) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810415 | Revised WI: Dual Connectivity (EN-DC) of 4 bands LTE inter-band CA (4DL/1UL) and 1 NR band (1DL/1UL) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810416 | Introduction of 4 LTE and 1 NR band EN-DC into TS 38.101-3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810417 | Correction to DC_(n)71B MSD definition | Nokia | imported from 3GU |
R4‑1810418 | Correction to DC_(n)71B scs restriction for NR | Nokia | imported from 3GU |
R4‑1810419 | A-MPR results for n1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810420 | CP-OFDM almost contiguous allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810421 | CR CP- OFDM almost contiguous allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810422 | Intra-band EN-DC UE Tx power requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810423 | Draft CR to 38.104: Corrections on symbols and abbreviations in section 3 | ZTE Corporation | imported from 3GU |
R4‑1810424 | 30MHz channel bandwidth support for n41 | KDDI Corporation | imported from 3GU |
R4‑1810425 | Draft CR on active BWP switch delay in TS38.133 | OPPO | imported from 3GU |
R4‑1810426 | Draft CR for TS38.101-1 on transmit signal quality | OPPO | imported from 3GU |
R4‑1810427 | Relationship for the beam correspondence and spherical EIS requirements at FR2 | LG Electronics France | imported from 3GU |
R4‑1810428 | Draft CR on TS38.101-1 for UE maximum output power for UL-MIMO | OPPO | imported from 3GU |
R4‑1810429 | CR for introducing of beam correspondence and spherical EIS RF requirements in TS38.101-2 | LG Electronics France | imported from 3GU |
R4‑1810430 | Draft CR of 30MHz channel bandwidth support for n41 (TS38.101-1) | KDDI Corporation | imported from 3GU |
R4‑1810431 | PC1 FR2 MPR | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810432 | Draft CR of 30MHz channel bandwidth support for n41 (TS38.104) | KDDI Corporation | imported from 3GU |
R4‑1810433 | Correction on EN-DC 8A_n79A | SoftBank Corp.,ZTE | imported from 3GU |
R4‑1810434 | NR UE configured Tx power at FR2 | LG Electronics France | imported from 3GU |
R4‑1810435 | CR on UE category for DL 1024QAM in TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1810436 | CR on frame structure type for band 47 | Huawei, HiSilicon | imported from 3GU |
R4‑1810437 | CR on V2X reference measurement channel for R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1810438 | CR on V2X reference measurement channel for R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1810439 | CR on V2X reference measurment channel for 64QAM | Huawei, HiSilicon | imported from 3GU |
R4‑1810440 | Revised WID on Band combinations for SA NR Supplementary uplink (SUL), NSA NR SUL, NSA NR SUL with UL sharing from the UE perspective (ULSUP) | Huawei, HiSilicon | imported from 3GU |
R4‑1810441 | TP for TR 37.716-00-00: update scope of SUL combinations | Huawei, HiSilicon | imported from 3GU |
R4‑1810442 | TP for TR 37.716-00-00: Specific requirements for new SUL band combinations | Huawei, HiSilicon | imported from 3GU |
R4‑1810443 | CR on spurious emission requirement in 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1810444 | CR on spurious emission and BC in 37.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1810445 | CR on protecting NR bands in 25.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1810446 | CR on protecting NR bands in 36.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1810447 | Correction on some errors in 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1810448 | Discussion on SUL and SDL band pairing | Huawei, HiSilicon | imported from 3GU |
R4‑1810449 | TR38.826 Skeleton for Study on evaluation for 2Rx exception in rel-15 vehicle mounted UE for NR | LG Electronics France | imported from 3GU |
R4‑1810450 | Update FR2 CA MPR | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810451 | 2UL UE co-ex: a problem in co-ex table | SoftBank Corp. | imported from 3GU |
R4‑1810452 | TP on TR 36.716-02-01 for CA_3-42 | SoftBank Corp. | imported from 3GU |
R4‑1810453 | Draft CR to TS 38.104: FR2 EVM requirement (Section 9.6.2.3) | ZTE Corporation | imported from 3GU |
R4‑1810454 | Consideration on evaluation system performance of 2RX vehicle mounted NR UE at FR1 | LG Electronics France, Volswagen AG, Samsung | imported from 3GU |
R4‑1810455 | TP on TR 36.716-04-01 for CA_3-28-41-42 | SoftBank Corp. | imported from 3GU |
R4‑1810456 | UE-to-UE coexistence analysis for intra-band EN-DC B41/n41 UE | LG Electronics France | imported from 3GU |
R4‑1810457 | Draft CR for UE-to-UE coexistence requirements for intra-band B41/n41 EN-DC with NS_04 in TS38.101-3 | LG Electronics France | imported from 3GU |
R4‑1810458 | Analyzing CA MPR for non-contiguous RB allocations with multiple CC's | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810459 | Draft CR to TS 37.145-2: adding TRP measurement grids (Annex F) | ZTE Corporation | imported from 3GU |
R4‑1810460 | TP on TR 37.716-21-11 for EN-DC_3-8_n77 | SoftBank Corp. | imported from 3GU |
R4‑1810461 | Further discussion on FR2 OTA TDD transient time | ZTE Corporation | imported from 3GU |
R4‑1810462 | TP on TR 37.716-21-11 for EN-DC_3-8_n79 | SoftBank Corp. | imported from 3GU |
R4‑1810463 | Discussion on mixed numerology for NR test model | ZTE Corporation | imported from 3GU |
R4‑1810464 | TP on TR 37.716-21-11 for EN-DC_3-8_n257 | SoftBank Corp. | imported from 3GU |
R4‑1810465 | Discussion on PDCCH/PDSCH/DMRS/PTRS configuration for NR test model | ZTE Corporation | imported from 3GU |
R4‑1810466 | TP on TR 37.716-21-11 for EN-DC_28-41_n77 | SoftBank Corp. | imported from 3GU |
R4‑1810467 | Discussion on power boosting/de-boosting for NR test model | ZTE Corporation | imported from 3GU |
R4‑1810468 | TDD configuration for UE demodulation requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810469 | Soft combining verification for PDSCH demodulation requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810470 | Soft combining verification for PDSCH demodulation requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810471 | High level views on SDR requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810472 | Views on PDCCH demodulation requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810473 | Initial evalaution results for NR PDSCH | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810474 | Initial evalaution results for NR PDCCH | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810475 | Remaining issues on Rel.15 NR UE feature list | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810476 | Draft CR to TS 38.101-3 correction for DC_3_n3-n77, DC_3_n3-n78 | CHTTL | imported from 3GU |
R4‑1810477 | Discussion on power boosting/de-boosting PRB configuration for NR test model | ZTE Corporation | imported from 3GU |
R4‑1810478 | TP on TR 37.716-21-11 for EN-DC_28-41_n78 | SoftBank Corp. | imported from 3GU |
R4‑1810479 | Discussion on TDD configurations for NR test model | ZTE Corporation | imported from 3GU |
R4‑1810480 | TP on TR 37.716-21-11 for EN-DC_28-41_n79 | SoftBank Corp. | imported from 3GU |
R4‑1810481 | TP on TR 37.716-21-11 for EN-DC_28-41_n257 | SoftBank Corp. | imported from 3GU |
R4‑1810482 | Draft CR to TS 37.843: TRP measurement grids | ZTE Corporation | imported from 3GU |
R4‑1810483 | TP to TS 38.141-1: FR1 physical layer parameters setting (Section 6.1.1) | ZTE Corporation | imported from 3GU |
R4‑1810484 | TP to TS 38.141-1: FR1 TDD configuration (Section 6.1.1) | ZTE Corporation | imported from 3GU |
R4‑1810485 | TP to TS 38.141-2: FR2 physical layer parameters setting (Section 6.1.1) | ZTE Corporation | imported from 3GU |
R4‑1810486 | TP to TS 38.141-2: FR2 TDD configuration (Section 6.1.1 and 6.1.2) | ZTE Corporation | imported from 3GU |
R4‑1810487 | A-MPR of CAT-M1 device for subPRB allocation | Ericsson | imported from 3GU |
R4‑1810488 | A-MPR of CAT-M2 device for subPRB allocation | Ericsson | imported from 3GU |
R4‑1810489 | BS REFSENS for SubPRB | Ericsson | imported from 3GU |
R4‑1810490 | CR_BS REFSENSE for SubPRB_ Performance_36_141 | Ericsson | imported from 3GU |
R4‑1810491 | CR_BS REFSENSE for SubPRB_ Performance_37_141 | Ericsson | imported from 3GU |
R4‑1810492 | CR_BS REFSENSE for SubPRB_36_104 | Ericsson | imported from 3GU |
R4‑1810493 | CR_BS REFSENSE for SubPRB_37_104 | Ericsson | imported from 3GU |
R4‑1810494 | CR_UE RF requirement on low output power | Ericsson | imported from 3GU |
R4‑1810495 | CR_UE RF requirement on subPRB feature | Ericsson | imported from 3GU |
R4‑1810496 | On LTE MTC RF co-existence with NR | Ericsson | imported from 3GU |
R4‑1810497 | Remaining issues on requirements of intra-frequency measurement | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810498 | Remaining issues on requirements of inter-frequency measurement | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810499 | Inter-frequency requirements in DRX mode | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810500 | Discussion on remaining issues on beam management requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810501 | SCS for SSB in NR RRM test cases | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810502 | [draft] Correction CR on RSRP reported value | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810503 | TDD configuration for RRM RMC | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810504 | TP on TR 37.716-21-11 for EN-DC_28-41_n257 | SoftBank Corp. | imported from 3GU |
R4‑1810505 | Radiated transmit power and TX power dynamic range uncertainty budget for FR2 in anechoic chamber | Ericsson | imported from 3GU |
R4‑1810506 | Radiated transmit power and TX power dynamic range uncertainty budget for FR2 in CATR | Ericsson | imported from 3GU |
R4‑1810507 | MU framework and values for OBUE for CATR for FR2 | Ericsson | imported from 3GU |
R4‑1810508 | MU framework and values for OBUE for anechoic chamber for FR2 | Ericsson | imported from 3GU |
R4‑1810509 | MU framework and values for OTA Base station output power for CATR for FR2 | Ericsson | imported from 3GU |
R4‑1810510 | MU framework and values for OTA Base station output power for anechoic chamber for FR2 | Ericsson | imported from 3GU |
R4‑1810511 | Measurement uncertainties for EIS for FR2 in indoor anechoic chamber | Ericsson | imported from 3GU |
R4‑1810512 | Measurement uncertainties for EIS for FR2 in CATR | Ericsson | imported from 3GU |
R4‑1810513 | ACLR uncertainty budget for FR2 for CATR | Ericsson | imported from 3GU |
R4‑1810514 | Introduction of NR to 37.145-1: General sections | Ericsson | imported from 3GU |
R4‑1810515 | Introduction of NR to 37.145-1: TX sections | Ericsson | imported from 3GU |
R4‑1810516 | Introduction of NR to 37.145-1: Receiver sections | Ericsson | imported from 3GU |
R4‑1810517 | Background on Spurious emission uncertainty budget for FR1 | Ericsson | imported from 3GU |
R4‑1810518 | Background on Spurious emission uncertainty budget for FR2 | Ericsson | imported from 3GU |
R4‑1810519 | On Test Tolerances for OTA BS | Ericsson | imported from 3GU |
R4‑1810520 | Background on in-band blocking, ACS and ICS uncertainty budget for FR2 | Ericsson | imported from 3GU |
R4‑1810521 | Necessity of PA for OTA Rx directional requirements measurement for FR2 | Ericsson | imported from 3GU |
R4‑1810522 | How to calculate OTA Rx directional requirement uncertainty for FR2 | Ericsson | imported from 3GU |
R4‑1810523 | On remaining issues for NR TX directional requirements | Ericsson | imported from 3GU |
R4‑1810524 | Background on receiver intermodulation uncertainty budget for FR2 | Ericsson | imported from 3GU |
R4‑1810525 | Clarification of BS alignment text for the EIRP accuracy procedure | Ericsson | imported from 3GU |
R4‑1810526 | TR skeleton for LTE(xDL/1UL)+NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1810527 | Usage of SDL bands for dedicated MBMS | European Broadcasting Union, Qualcomm Incorporated | imported from 3GU |
R4‑1810528 | CR to add CA_1-21-42 in exception table | Qualcomm | imported from 3GU |
R4‑1810529 | n74 A-MPR: Band 21 emissions to B11 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810530 | CR to add CA_1-21-42 in exception table | Qualcomm | imported from 3GU |
R4‑1810531 | On downlink channel quality reporting in NB-IoT | Qualcomm Incorporated | imported from 3GU |
R4‑1810532 | Remaining open issues in the RSTD measurement gap for eFeMTC | Qualcomm Incorporated | imported from 3GU |
R4‑1810533 | RSTD measurement accuracy for colliding NPRS based on new NPRS sequence design | Qualcomm Incorporated | imported from 3GU |
R4‑1810534 | On applicability rule for 8Rx demodulation requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1810535 | UE demodulation requirement for FeNB-IoT TDD | Qualcomm Incorporated | imported from 3GU |
R4‑1810536 | Simulation result for 8Rx demodulation requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1810537 | Discussion on open issues in direct SCell activation | Qualcomm Incorporated | imported from 3GU |
R4‑1810538 | Discussion on CQI accuracy requirement for dormant SCell | Qualcomm Incorporated | imported from 3GU |
R4‑1810539 | Discussion on UE demodulation and CSI requirement for eFeMTC | Qualcomm Incorporated | imported from 3GU |
R4‑1810540 | Warm-up subframe for SIB1-BR in eFeMTC carrier under CRS muting | Qualcomm Incorporated | imported from 3GU |
R4‑1810541 | On the feasibility of NPBCH-based RRM measurement | Qualcomm Incorporated | imported from 3GU |
R4‑1810542 | Discussion on open issues in idle mode Scell candidate measurement | Qualcomm Incorporated | imported from 3GU |
R4‑1810543 | LS response on NPBCH-based RRM measurement for FeNB-IoT UE | Qualcomm Incorporated | imported from 3GU |
R4‑1810544 | Discussion on the remaining open issues in the network-based CRS interference mitigation | Qualcomm Incorporated | imported from 3GU |
R4‑1810545 | CR to add CA_1-21-42 in exception table | Qualcomm | imported from 3GU |
R4‑1810546 | TP to TS 38.141-2: zero test tolerance for regulatory requirements (Annex C) | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810547 | Clean up of UE maximum power | OPPO | imported from 3GU |
R4‑1810548 | Draft CR for 38.101-1: Addition of missing NR CA configurations n8-n75 and n28-n75 | Vodafone Italia SpA | imported from 3GU |
R4‑1810549 | Clearification of UL MIMO for FR2 | OPPO | imported from 3GU |
R4‑1810550 | Side Conditions for FR2 RRM Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1810551 | Introduction of SRS switch IL for 4.9GHz | OPPO | imported from 3GU |
R4‑1810552 | Correction of reference tables | OPPO | imported from 3GU |
R4‑1810553 | Discussion on additional IL caused by SRS switch | OPPO | imported from 3GU |
R4‑1810554 | Discussion on HPUE remaining open issues | OPPO | imported from 3GU |
R4‑1810555 | Discussion on test condition mapping from the reference point to UE BB | OPPO | imported from 3GU |
R4‑1810556 | Addition of Scell activation/interruption requiremetn for dormant SCell | Qualcomm Incorporated | imported from 3GU |
R4‑1810557 | Clarification on the number of warm-up subframes for SIB1-BR in eMTC CRS muting | Qualcomm Incorporated | imported from 3GU |
R4‑1810558 | Serving cell RRM relaxation requirement for WUS-capable UE | Qualcomm Incorporated | imported from 3GU |
R4‑1810559 | Clarification of the requirement for dense PRS gap in eFeMTC UE R15 | Qualcomm Incorporated | imported from 3GU |
R4‑1810560 | Correction to RSTD measurement accuracy requirement in NB-IoT R14 | Qualcomm Incorporated | imported from 3GU |
R4‑1810561 | Correction to RSTD measurement accuracy requirement in NB-IoT R15 | Qualcomm Incorporated | imported from 3GU |
R4‑1810562 | Channel Bandwidth Signalling | Qualcomm Incorporated | imported from 3GU |
R4‑1810563 | Testing Methodology for FR2 RRM Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1810564 | Noise Emulation for FR2 Testing | Qualcomm Incorporated | imported from 3GU |
R4‑1810565 | Effect of blanking one symbol for Highest Sub-carrier Spacing | Qualcomm | imported from 3GU |
R4‑1810566 | TR skeleton TR 37.716-21-11 V0.0.1 | Huawei, HiSilicon | imported from 3GU |
R4‑1810567 | Revised WID: Dual Connectivity (EN-DC) of 2 bands LTE inter-band CA (2DL/1UL) and 1 NR band (1DL/1UL) | Huawei, HiSilicon | imported from 3GU |
R4‑1810568 | TP for TR 36.716-02-01:CA_7-46 | Huawei, HiSilicon | imported from 3GU |
R4‑1810569 | TP for TR 36.716-03-01: CA_2-7-46 | Huawei, HiSilicon | imported from 3GU |
R4‑1810570 | TP for TR 36.716-03-01: CA_7-28-40 | Huawei, HiSilicon | imported from 3GU |
R4‑1810571 | TP for TR 36.716-03-01: CA_1-28-40 | Huawei, HiSilicon | imported from 3GU |
R4‑1810572 | NB-IoT co-existence with NR | Huawei, HiSilicon | imported from 3GU |
R4‑1810573 | Correction on unwanted emission mask for band n7, n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1810574 | Correction on unwanted emission mask for TS 37.105 | Huawei, HiSilicon | imported from 3GU |
R4‑1810575 | Draft TS 38.141-1 v0.4.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1810576 | Draft TS 38.141-2 v0.3.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1810577 | Discussion on RF channels | Huawei, HiSilicon | imported from 3GU |
R4‑1810578 | Test configurations for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1810579 | TP to TS 38.141-1:Annex | Huawei, HiSilicon | imported from 3GU |
R4‑1810580 | TP to TS 38.141-1: Regional requirements (4.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1810581 | TP to TS 38.141-1: Ancillary RF amplifiers (4.5.1.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1810582 | TP to TS 38.141-1: RF channels and test models (4.9.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1810583 | TBDs on acceptable uncertainty of Test System (4.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1810584 | TP to TS 38.141-1: 6.6.4 Operating band unwanted emissions | Huawei, HiSilicon | imported from 3GU |
R4‑1810585 | Clean up on TX requirements (6) | Huawei, HiSilicon | imported from 3GU |
R4‑1810586 | Clean up on RX requirements (7) | Huawei, HiSilicon | imported from 3GU |
R4‑1810587 | Correction to the applicability of CRS muting in efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810588 | Applicability of non-BL/CE UE requirements in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810589 | On BS demodulation requirements for efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810590 | Need for measurement gap before EN-DC configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810591 | Clarification of need for measurement gap before EN-DC configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810592 | [draft] reply LS for UE capability of measurement gap for inter-RAT NR measurement not yet configured with EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810593 | Intra-frequency measurement with multiple SCells | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810594 | CR for intra-frequency measurement requirements without gap for multiple SCells | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810595 | Applicability of DRX cycle for DRX requirements under EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810596 | Appplicability of DRX cycle in EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810597 | Further discussion on inter-frequency measurement requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810598 | Introduction of carrier scaling factor | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810599 | Clarification of MRTD and MTTD for inter-band EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810600 | On SFTD for NE-DC | Ericsson | imported from 3GU |
R4‑1810601 | DraftCR 38.133 Introduction of inter-RAT SFTD core requirements | Ericsson | imported from 3GU |
R4‑1810602 | DraftCR 38.133 Introduction of NE-DC SFTD core requirements | Ericsson | imported from 3GU |
R4‑1810603 | On SFTD for NR-NR DC | Ericsson | imported from 3GU |
R4‑1810604 | DraftCR 38.133 Introduction of inter-frequency SFTD core requirements | Ericsson | imported from 3GU |
R4‑1810605 | CR 36.133 Clarification of inter-RAT SFTD core requirements | Ericsson | imported from 3GU |
R4‑1810606 | CR 36.133 Correction of EN-DC SFTD core requirements | Ericsson | imported from 3GU |
R4‑1810607 | On SFTD measurement accuracy requirement | Ericsson | imported from 3GU |
R4‑1810608 | CR 36.133 EN-DC and inter-RAT SFTD performance requirements | Ericsson | imported from 3GU |
R4‑1810609 | On SCell activation for SCell in FR2 | Ericsson | imported from 3GU |
R4‑1810610 | On UE UL MIMO for FR2 | Sony | imported from 3GU |
R4‑1810611 | UE Spherical EIRP for the 28GHz and 39GHz bands | Sony | imported from 3GU |
R4‑1810612 | General Aspects Relating to NR Test Model Design | Ericsson | imported from 3GU |
R4‑1810613 | CR to TR 38.817-02: Update to OTA Modulation Quality | Ericsson | imported from 3GU |
R4‑1810614 | Physical Channel Parameters for NR Test Model Design in FR1 | Ericsson | imported from 3GU |
R4‑1810615 | TP to TS 38.141-1: Section 6.1 NR Test Models | Ericsson | imported from 3GU |
R4‑1810616 | Physical Channel Parameters for NR Test Model Design in FR2 | Ericsson | imported from 3GU |
R4‑1810617 | TP to TS 38.141-2: Section 6.1 NR Test Models | Ericsson | imported from 3GU |
R4‑1810618 | TP to TS 38.141-2: Section 6.7.2 OTA Occupied Bandwidth | Ericsson | imported from 3GU |
R4‑1810619 | Draft CR to TS 38.104: Update to Annex C.6 Estimation of TX chain amplitude and frequency response parameters | Ericsson, Keysight | imported from 3GU |
R4‑1810620 | NR TDD UL/DL configuration for BS conformance testing | Ericsson | imported from 3GU |
R4‑1810621 | MPR for NB-IoT Power Class 6 | Sony | imported from 3GU |
R4‑1810622 | Introduction of IFF method for RRM baseline measurement system | Rohde & Schwarz | imported from 3GU |
R4‑1810623 | On multiple antenna port capability for RRM baseline measurement system | Rohde & Schwarz | imported from 3GU |
R4‑1810624 | On spatially white AWGN for RRM baseline measurement system | Rohde & Schwarz | imported from 3GU |
R4‑1810625 | CR on inter-frequency RSTD measurement requirements for UE cat M1 and M2 | Huawei, HiSilicon | imported from 3GU |
R4‑1810626 | CR on inter-frequency RSTD measurement requirements for UE cat M1 and M2 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1810627 | On the RRM requirements for new gaps under dense PRS configuration | Huawei, HiSilicon | imported from 3GU |
R4‑1810628 | CR on applicability for dense PRS gaps | Huawei, HiSilicon | imported from 3GU |
R4‑1810629 | CR on RLM requirements for UE configured with dense PRS gaps | Huawei, HiSilicon | imported from 3GU |
R4‑1810630 | Way forward on new gaps for dense PRS configuration | Huawei, HiSilicon | imported from 3GU |
R4‑1810631 | LS on the applicability of dense PRS gap patterns | Huawei, HiSilicon | imported from 3GU |
R4‑1810632 | CR on WUS RRM requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1810633 | Test case list for R15 NB | Huawei, HiSilicon | imported from 3GU |
R4‑1810634 | Discussion on the enhanced PHR | Huawei, HiSilicon | imported from 3GU |
R4‑1810635 | CR on PHR enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑1810636 | Test cases list for LTE connected to NGCN | Huawei, HiSilicon | imported from 3GU |
R4‑1810637 | Introducing test cases for LTE connected to NGCN | Huawei, HiSilicon | imported from 3GU |
R4‑1810638 | Correcting UE measurement capability in Inactive state for 36133 | Huawei, HiSilicon | imported from 3GU |
R4‑1810639 | Remaining on the warm-up and cool-down in network based CRS IM | Huawei, HiSilicon | imported from 3GU |
R4‑1810640 | CR on the warm-up for network based CRS IM | Huawei, HiSilicon | imported from 3GU |
R4‑1810641 | CR on TS38.133 for UE measurement capability | Huawei, HiSilicon | imported from 3GU |
R4‑1810642 | Correcting UE measurement capability with same MO configured by MN and SN on TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1810643 | Correcting UE measurement capability with same MO configured by MN and SN on TS36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1810644 | Correcting IE name useServingCellTimingForSync | Huawei, HiSilicon | imported from 3GU |
R4‑1810645 | CR on 36133 RRC realease and redirection to NR | Huawei, HiSilicon | imported from 3GU |
R4‑1810646 | CR on TS38.133 for BWP switching delay | Huawei, HiSilicon | imported from 3GU |
R4‑1810647 | CR on TS36.133 for interruption due to BWP switching on LTE Pcell | Huawei, HiSilicon | imported from 3GU |
R4‑1810648 | CR on TS38.133 for interruption due to BWP switching in EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1810649 | CR on TS38.133 for interruption due to BWP switching in NR CA | Huawei, HiSilicon | imported from 3GU |
R4‑1810650 | Discussion on the ANR support in RAN4 | Huawei, HiSilicon | imported from 3GU |
R4‑1810651 | reply LS on the progress of ANR | Huawei, HiSilicon | imported from 3GU |
R4‑1810652 | Adding OCNG and patterns for NR test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1810653 | Discussion on intra-frequency test case methods | Huawei, HiSilicon | imported from 3GU |
R4‑1810654 | Intra-frequency test cases list | Huawei, HiSilicon | imported from 3GU |
R4‑1810655 | Test case for no gap TDD intra-frequency cell search in EN-DC PSCell in FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1810656 | Test case for no gap TDD intra-frequency cell search in EN-DC PSCell in FR1 with SSB index reading | Huawei, HiSilicon | imported from 3GU |
R4‑1810657 | Test case for TDD intra-frequency cell search in EN-DC PSCell in FR1 with per-UE gaps | Huawei, HiSilicon | imported from 3GU |
R4‑1810658 | Test case for no gap TDD intra-frequency cell search in SA NR FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1810659 | Test case for TDD intra-frequency cell search in SA NR FR1 with per-UE gaps | Huawei, HiSilicon | imported from 3GU |
R4‑1810660 | editorial CR on 38.133 for Interruptions | Huawei, HiSilicon | imported from 3GU |
R4‑1810661 | Discussion on Rx beam selection for RRM measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1810662 | Draft reply LS on Rx beam selection for RRM measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1810663 | Further discussion on merging of MOs configured by MN and SN | Huawei, HiSilicon | imported from 3GU |
R4‑1810664 | Further discussion on BWP switching delay | Huawei, HiSilicon | imported from 3GU |
R4‑1810665 | Discussion on the minimum BWP bandwidth | Huawei, HiSilicon | imported from 3GU |
R4‑1810666 | CR on modification of V2X initiation/cease of SLSS transmission test for eNB as Timing Reference R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1810667 | CR on modification of V2X initiation/cease of SLSS transmission test for eNB as Timing Reference R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1810668 | CR on modification of V2X initiation/cease of SLSS transmission test for SyncRef UE as Timing Reference R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1810669 | CR on modification of V2X initiation/cease of SLSS transmission test for SyncRef UE as Timing Reference R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1810670 | CR on modification of V2X congestion control measurement test R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1810671 | CR on modification of V2X congestion control measurement test R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1810672 | List of RRM test cases for R15 V2X CA | Huawei, HiSilicon | imported from 3GU |
R4‑1810673 | Discussion on Interruption and Delay Tests for R15 V2X CA | Huawei, HiSilicon | imported from 3GU |
R4‑1810674 | CR on Interruptions Tests for R15 V2X CA | Huawei, HiSilicon | imported from 3GU |
R4‑1810675 | Discussion on SyncRef UE Selection Reselection Tests for R15 V2X CA | Huawei, HiSilicon | imported from 3GU |
R4‑1810676 | CR on Synchronization Reference Selection/Reselection Tests for R15 V2X CA | Huawei, HiSilicon | imported from 3GU |
R4‑1810677 | Discussion on Rx beam sweeping for intra-frequency measurement in FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1810678 | CR on TS38.133 for intra-frequency measurements in FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1810679 | Discussion on scaling principles for intra-frequency measurements for NR CA | Huawei, HiSilicon | imported from 3GU |
R4‑1810680 | CR on TS38.133 for intra-frequency measurements for NR CA | Huawei, HiSilicon | imported from 3GU |
R4‑1810681 | Discussion on the methodology of defining the scaling factor CSFinter for inter-frequency measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1810682 | CR on TS38.133 for SSB based inter-frequency measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1810683 | CR on TS38.133 for SA NR - E-UTRAN measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1810684 | Discussion on L1-RSRP measurements for Candidate Beam Detection and Beam Management | Huawei, HiSilicon | imported from 3GU |
R4‑1810685 | CR on TS38.133 for candidate beam detection requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1810686 | CR on TS38.133 for L1-RSRP measurements for beam management | Huawei, HiSilicon | imported from 3GU |
R4‑1810687 | CR on TS38.133 for NTA_offset requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1810688 | Discussion on open issues on RLM and BFD requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1810689 | CR on TS38.133 for RLM and BFD requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1810690 | CR on TS38.133 for SS-SINR measurement accuracy requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1810691 | CR on TS38.133 for PDSCH and CORESET Reference Measurement Channel | Huawei, HiSilicon | imported from 3GU |
R4‑1810692 | Test case for no gap FDD intra-frequency cell search in EN-DC PSCell in FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1810693 | Test case for no gap FDD intra-frequency cell search in NR SA FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1810694 | Applicability of TDD configuration for CA in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1810695 | Further discussion on gap sharing | Huawei, HiSilicon | imported from 3GU |
R4‑1810696 | CR on TS38.133 for gap sharing | Huawei, HiSilicon | imported from 3GU |
R4‑1810697 | Discussion on UE capability of measurement gap for inter-RAT NR | Huawei, HiSilicon | imported from 3GU |
R4‑1810698 | LS reply on UE capability of measurement gap for inter-RAT NR measurement not yet configured with EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1810699 | Discussion on LS on gap-assisted serving cell measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1810700 | LS reply on gap-assisted serving cell measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1810701 | CR on intra-frequency measurement without gap definition | Huawei, HiSilicon | imported from 3GU |
R4‑1810702 | Discussion on remaining issue on UE requirements in IDLE state | Huawei, HiSilicon | imported from 3GU |
R4‑1810703 | CR on TS38.133 for UE measurement requirements in IDLE state | Huawei, HiSilicon | imported from 3GU |
R4‑1810704 | On RSSI measurement in idle and inactive mode | Huawei, HiSilicon | imported from 3GU |
R4‑1810705 | LS on RSSI measurement in Idle and Inactive mode | Huawei, HiSilicon | imported from 3GU |
R4‑1810706 | Discussion on remaining issues on handover requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1810707 | CR on TS38.133 for intra-NR handover | Huawei, HiSilicon | imported from 3GU |
R4‑1810708 | Correction on handover processing delay | Huawei, HiSilicon | imported from 3GU |
R4‑1810709 | CR on handover from E-UTRAN to NR in TS36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1810710 | CR on TS38.133 for Scell activation delay | Huawei, HiSilicon | imported from 3GU |
R4‑1810711 | Adding the explanition of deriveSSB-IndexFromCell | Huawei, HiSilicon | imported from 3GU |
R4‑1810712 | Correction on CSI-RS based RLM | Huawei, HiSilicon | imported from 3GU |
R4‑1810713 | Test case for EN-DC intra with PSCell in FR1 no gap TDD tests with DRX | Huawei, HiSilicon | imported from 3GU |
R4‑1810714 | Test case for SA intra with PSCell in FR1 no gap TDD tests with DRX | Huawei, HiSilicon | imported from 3GU |
R4‑1810715 | Draft CR to TS 37.843 –Section 10.9 - General | MVG Industries | imported from 3GU |
R4‑1810716 | Draft CR for FR2 Absolute and Relative Power Accuracy in Random Access | Samsung | imported from 3GU |
R4‑1810717 | Darft CR for Measurement Gap Sharing | Samsung | imported from 3GU |
R4‑1810718 | Views on TDD DL-UL configurations and number of HARQ process configurations | Samsung | imported from 3GU |
R4‑1810719 | Discussion on handing L1-RSRP in RAN4 | Samsung | imported from 3GU |
R4‑1810720 | Draft CR for EN-DC of 1 band LTE and1 band NR for TS 38.101-3 with FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810721 | Draft CR for EN-DC of 1 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810722 | Draft CR for EN-DC of 2 band LTE and1 band NR for TS 38.101-3 with FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810723 | Draft CR for EN-DC of 2 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810724 | Draft CR for EN-DC of 3 band LTE and1 band NR for TS 38.101-3 with FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810725 | Draft CR for EN-DC of 3 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810726 | Draft CR for EN-DC of 4 band LTE and1 band NR for TS 38.101-3 with FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810727 | Draft CR for EN-DC of 4 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810728 | A-MPR definition for n74 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810729 | Draft CR for introduction of Band n74 for TS 38.101-1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810730 | Draft CR for maintenace for CBW set on n77C, n78C, and n79C for TS 38.101-1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810731 | MPR maintenance for intra-band contiguous CA in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810732 | Draft CR for MPR maintenance for intra-band contiguous CA in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810733 | A-MPR revision for n1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810734 | Draft CR for A-MPR revision for n1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810735 | draft TR skeleton 37.716-11-11_V0.0.0_Rel16_DC band combo of 1 LTE band + 1 NR band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810736 | revised WID on EN-DC of 1 LTE band and 1 NR band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810737 | Draft CR to reflect agreed EN-DC of 1 LTE band and 1 NR band in TR 38.716-11-11 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1810738 | Further discussion on SFTD measurement accuracy requirements | ZTE | imported from 3GU |
R4‑1810739 | CR to 36.133 on introduction of SFTD measurement accuracy requirements | ZTE | imported from 3GU |
R4‑1810740 | Draft CR to 38.133 on UL transmission after measurement gap | ZTE | imported from 3GU |
R4‑1810741 | Draft CR to 38.133 on UE measurement capability requirements | ZTE | imported from 3GU |
R4‑1810742 | Discussion on UL transmission after measurement gap | ZTE | imported from 3GU |
R4‑1810743 | Further discussion on same carrier measurement configured by MN and SN | ZTE | imported from 3GU |
R4‑1810744 | Remaining issues on UE measurement capability for FR2 | ZTE | imported from 3GU |
R4‑1810745 | Remaining issues on CSI-RS based RLM | ZTE | imported from 3GU |
R4‑1810746 | Correction of terminology for non-BL CE UE for Rel-15 | Ericsson | imported from 3GU |
R4‑1810747 | Correction of terminology for non-BL CE UE for Rel-14 | Ericsson | imported from 3GU |
R4‑1810748 | Correction of terminology for non-BL CE UE for Rel-13 | Ericsson | imported from 3GU |
R4‑1810749 | Discussions on high quality signal threshold for category M1/M2 | Ericsson | imported from 3GU |
R4‑1810750 | Indicator for high-speed operation for Rel-15 cat-M1/M2 | Ericsson | imported from 3GU |
R4‑1810751 | Correction on gap ID usage for UE category M1/M2 | Ericsson | imported from 3GU |
R4‑1810752 | Correction on gap ID usage for UE category M1/M2 | Ericsson | imported from 3GU |
R4‑1810753 | Remaining work on CRS muting for Cat-M1/M2 | Ericsson | imported from 3GU |
R4‑1810754 | Discussions on test configurations for efeMTC | Ericsson | imported from 3GU |
R4‑1810755 | Discussions on test case scenarios for efeMTC | Ericsson | imported from 3GU |
R4‑1810756 | List of RRM test cases for Rel-15 MTC | Ericsson | imported from 3GU |
R4‑1810757 | Correcton to category M1 PDSCH RMCs | Ericsson | imported from 3GU |
R4‑1810758 | Correcton to category M1 PDSCH RMCs | Ericsson | imported from 3GU |
R4‑1810759 | Correcton to category M1 PDSCH RMCs | Ericsson | imported from 3GU |
R4‑1810760 | Discussions on high quality signal threshold for NB-IoT | Ericsson | imported from 3GU |
R4‑1810761 | Response LS on high quality signal threshold in NB-IoT | Ericsson | imported from 3GU |
R4‑1810762 | Discussions on remaining work on serving cell measurement relaxation | Ericsson | imported from 3GU |
R4‑1810763 | Enhanced PHR reporting for Rel-15 NB-IOT UEs | Ericsson | imported from 3GU |
R4‑1810764 | Introduction of enhanced PHR for category NB1 | Ericsson | imported from 3GU |
R4‑1810765 | Discussions on test configurations for Rel-15 NB-IoT | Ericsson | imported from 3GU |
R4‑1810766 | Discussions on test case scenarios for Rel-15 NB-IoT | Ericsson | imported from 3GU |
R4‑1810767 | List for RRM test cases for Rel-15 NB-IoT | Ericsson | imported from 3GU |
R4‑1810768 | Simulation results for WUS reception for NB-IoT | Ericsson | imported from 3GU |
R4‑1810769 | Remaining work on minimum WUS reception requirements for NB-IoT | Ericsson | imported from 3GU |
R4‑1810770 | Discussions on RRM requirements for WUS for efeMTC | Ericsson | imported from 3GU |
R4‑1810771 | Simulation results for WUS reception for efeMTC | Ericsson | imported from 3GU |
R4‑1810772 | Introducing WUS reception requirements for efeMTC | Ericsson | imported from 3GU |
R4‑1810773 | BWP Switching Delay Capabilities | Ericsson | imported from 3GU |
R4‑1810774 | Remaining issues on Interruption due to BWP switching | Ericsson | imported from 3GU |
R4‑1810775 | Interruption Requirements on NR Serving Cells in CA due to BWP Switching | Ericsson | imported from 3GU |
R4‑1810776 | Interruption Requirements on LTE Serving Cells due to BWP Switching | Ericsson | imported from 3GU |
R4‑1810777 | Analysis of RRC Re-establishment without serving cell timing | Ericsson | imported from 3GU |
R4‑1810778 | RRC Re-establishment Requirements without Serving Cell Timing | Ericsson | imported from 3GU |
R4‑1810779 | Impact of Paging Occasion Collision with SSB on Measurement Requirements | Ericsson | imported from 3GU |
R4‑1810780 | Measurement Requirements under Paging Occasion Collision with SSB | Ericsson | imported from 3GU |
R4‑1810781 | Analysis of OCNG Patterns and SSB configuration for NR Cells in RRM Tests | Ericsson | imported from 3GU |
R4‑1810782 | OCNG Patterns for RRM Tests | Ericsson | imported from 3GU |
R4‑1810783 | SSB configurations for RRM tests | Ericsson | imported from 3GU |
R4‑1810784 | Overview of RRM requirements for NR-NR DC | Ericsson | imported from 3GU |
R4‑1810785 | WF on RRM requirements for NR-NR DC | Ericsson | imported from 3GU |
R4‑1810786 | Analysis of Requirements for SCell Direct Activation at RRC Configuration | Ericsson | imported from 3GU |
R4‑1810787 | Requirements for SCell Direct Activation at RRC Configuration | Ericsson | imported from 3GU |
R4‑1810788 | Interruption Requirements under Dormant SCell State | Ericsson | imported from 3GU |
R4‑1810789 | Way Forward for Invalid CA configurations in Band 46 | Charter Communications, Inc | imported from 3GU |
R4‑1810790 | SNR control at reference point for Demodulation testing | Qualcomm Incorporated | imported from 3GU |
R4‑1810791 | SNR and signal control at reference point for RRM testing | Qualcomm Incorporated | imported from 3GU |
R4‑1810792 | Introduction of Event Triggered Reporting test cases with generic duplex modes for 6DL/7DL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1810793 | Introduction of Activation and Deactivation test cases with generic duplex modes for 6DL/7DL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1810794 | Introduction of generic duplex modes test cases on RSRP accuracy for 6DL/7DL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1810795 | Introduction of generic duplex modes test cases on RSRQ accuracy for 6DL/7DL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1810796 | Revised WID: Basket WI for Rel16 LTE inter-band CA for 2 bands DL with 1 band UL | Qualcomm Incorporated | imported from 3GU |
R4‑1810797 | TR 36.716-02-01 V0.0.1 | Qualcomm Incorporated | imported from 3GU |
R4‑1810798 | Introduction of Rel-16 LTE inter-band CA for 2 bands DL with 1 band UL combinations in 36.101 | Qualcomm Incorporated | imported from 3GU |
R4‑1810799 | Introduction of Rel-16 LTE inter-band CA for 2 bands DL with 1 band UL combinations in 36.104 | Qualcomm Incorporated | imported from 3GU |
R4‑1810800 | Introduction of Rel-16 LTE inter-band CA for 2 bands DL with 1 band UL combinations in 36.141 | Qualcomm Incorporated | imported from 3GU |
R4‑1810801 | Discussion on choosing EIS over RSRP beam peak scan for Rx RefSens test case | Qualcomm Incorporated | imported from 3GU |
R4‑1810802 | Introduction of LTE inter-band Carrier Aggregation for x bands DL (x=4, 5) with 1 band UL to TS36.101 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810803 | TP for TR 37.716-11-11 Introduction of DC_2A_n261A and DC_2A_n261(2A) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810804 | TP for TR 37.716-21-11 Introduction of DC_2A-66A_n261A, DC_2A-66A_n261(2A), DC_2A-66A_n257A and DC_2A-66A_n257(2A) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810805 | Draft CR to TS 38.101-2: Spurious emissions | Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | imported from 3GU |
R4‑1810806 | Corrections of Rel-15 CA specs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810807 | Corrections of REFSENS exceptions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810808 | Corrections of Rel-14 CA specs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810809 | Corrections of Rel-14 CA specs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810810 | Editorial corrections of CA notations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810811 | Draft CR to TS 38.104: wideband operation and fractional bandwidth corrections (9.2.1) | Huawei | imported from 3GU |
R4‑1810812 | Draft CR to TS 38.104: OTA Tx spurious correction for multi-band RIB (9.7.5.2.1) | Huawei | imported from 3GU |
R4‑1810813 | TP to TS 38.141-1: Operating bands and channel arrangement (5) | Huawei | imported from 3GU |
R4‑1810814 | TP to TS 38.141-1: Requirements for contiguous and non-contiguous spectrum (4.10) | Huawei | imported from 3GU |
R4‑1810815 | TP to TS 38.141-1: Remaining issues on conducted declarations (4.6) | Huawei | imported from 3GU |
R4‑1810816 | New declarations related to test configurations generation | Huawei | imported from 3GU |
R4‑1810817 | TP to TS 38.141-1: Conducted declarations renumbering (4.6) | Huawei | imported from 3GU |
R4‑1810818 | TP to TS 38.141-2: Operating bands and channel arrangement (5) | Huawei | imported from 3GU |
R4‑1810819 | TP to TS 38.141-2: wideband operation corrections and FBW declarations (4.6) | Huawei | imported from 3GU |
R4‑1810820 | TP to TS 38.141-2: Remaining issues and corrections for Radiated Tx power (EIRP) (6.2) | Huawei | imported from 3GU |
R4‑1810821 | TP to TS 38.141-2: Corrections and improvements to the OTA Tx spurious emissions test (6.7.5) | Huawei | imported from 3GU |
R4‑1810822 | TP to TS 38.141-2: initial conditions for FR2 Rx spur test (7.7) | Huawei | imported from 3GU |
R4‑1810823 | TP to TS 38.141-2: FRC annex (A) | Huawei | imported from 3GU |
R4‑1810824 | TP to TS 38.141-2: Calibration annex (D) | Huawei | imported from 3GU |
R4‑1810825 | TP to TS 38.141-1: cleanup | Huawei | imported from 3GU |
R4‑1810826 | CR to TR 38.817-02: cleanup of the FR2 spurious emission requirements | Huawei | imported from 3GU |
R4‑1810827 | DraftCR to TS 38.113: corrections related to the "signal port" definition (3.1) | Huawei | imported from 3GU |
R4‑1810828 | DraftCR to TS 38.113: NR operating band reference notes (4.1) | Huawei | imported from 3GU |
R4‑1810829 | DraftCR to TS 38.113: multi-band operation corrections (4.1, 4.5) | Huawei | imported from 3GU |
R4‑1810830 | DraftCR to TS 38.113: Narrow band response corrections (4.3) | Huawei | imported from 3GU |
R4‑1810831 | DraftCR to TS 38.113: Rx exclusion band corrections (4.4.2) | Huawei | imported from 3GU |
R4‑1810832 | DraftCR to TS 38.113: Editorial corrections | Huawei | imported from 3GU |
R4‑1810833 | CR to TS 37.113: correction of the exclusion band for BS radiated emission test (8.2.1) | Huawei | imported from 3GU |
R4‑1810834 | CR to TS 37.113: CISPR32 requirements tables correction | Huawei | imported from 3GU |
R4‑1810835 | CR to TS 37.105: corrections of the regional requirements (4.5) | Huawei | imported from 3GU |
R4‑1810836 | Discussion on the eAAS CR pack from RAN#80 | Huawei | imported from 3GU |
R4‑1810837 | CR to TS 37.145-1: Correction of Occupied BS test applicability for CA, Rel-13 | Huawei | imported from 3GU |
R4‑1810838 | CR to TS 37.145-1: Correction of Occupied BS test applicability for CA, Rel-14 | Huawei | imported from 3GU |
R4‑1810839 | CR to TS 37.145-1: Correction of Occupied BS test applicability for CA, Rel-15 | Huawei | imported from 3GU |
R4‑1810840 | CR to TS 37.145-1: E-UTRA DL RS power test requirement correction, Rel-13 | Huawei | imported from 3GU |
R4‑1810841 | CR to TS 37.145-1: E-UTRA DL RS power test requirement correction, Rel-14 | Huawei | imported from 3GU |
R4‑1810842 | CR to TS 37.145-1: E-UTRA DL RS power test requirement correction, Rel-15 | Huawei | imported from 3GU |
R4‑1810843 | Draft CR to TS 37.145-2: UTRA and E-UTRA specific corrections to the required signal conditions | Huawei | imported from 3GU |
R4‑1810844 | Draft CR to TS 37.145-2: Corrections of initial conditions for OTA spurious requirements | Huawei | imported from 3GU |
R4‑1810845 | CR to TS 37.105: Correction of the OTA blocking requirement (10.6.2.1) | Huawei | imported from 3GU |
R4‑1810846 | Category B spurious emissions and reference bandwidth mask | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810847 | Draft CR to TR 37.843: OOBB test method MU background | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810848 | On co-location test antenna related MU | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810849 | Correction on OBUE mask of NR BS type 2-O | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810850 | Draft CR to TR 37.843: Tx IMD MU correction | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810851 | Draft CR to TR 37.843: On interferer level in the out of band blocking test | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810852 | EIRP accuracy in extreme conditions for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810853 | EIRP accuracy in extreme conditions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810854 | On interferer level in out-of-band blocking test | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810855 | On measurements close to noise floor | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810856 | On transmitter intermodulation test case | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810857 | On Tx OFF power and transient time tests in FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810858 | Draft CR to TR 37.843: background for CLTA related MU | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810859 | Updated WID on Additional LTE bands for UE category M1 and/or NB1 in Rel-16 | Ericsson | imported from 3GU |
R4‑1810860 | Updated WID on Additional LTE bands for UE category M2 and/or NB2 in Rel-16 | Ericsson | imported from 3GU |
R4‑1810861 | PA calibration gaps for FR2 UEs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810862 | Draft CR to 38.101-1: Updates to Transmit Modulation Annex | Rohde & Schwarz | imported from 3GU |
R4‑1810863 | Draft CR to 38.101-2: Addition of Transmit Modulation Annex | Rohde & Schwarz | imported from 3GU |
R4‑1810864 | Draft CR to 38.101-1: Addition of Carrier Leakage table | Rohde & Schwarz | imported from 3GU |
R4‑1810865 | Channel Model simplification for FR2 | Rohde & Schwarz | imported from 3GU |
R4‑1810866 | Discussion on occupied bandwidth requirements | Rohde & Schwarz | imported from 3GU |
R4‑1810867 | Discussion on FR1 to FR2 UE coexistence requirements | Rohde & Schwarz | imported from 3GU |
R4‑1810868 | Draft CR to 38.101-1: Update to UE coexistence requirements for FR1 | Rohde & Schwarz | imported from 3GU |
R4‑1810869 | Corrections to Rel-15 CA configurations | Rohde & Schwarz | imported from 3GU |
R4‑1810870 | TP to 38.810: Update for Tx test procedures | Rohde & Schwarz | imported from 3GU |
R4‑1810871 | Discussion on CA channel bandwidth for channel modelling | Rohde & Schwarz | imported from 3GU |
R4‑1810872 | CR for 38.817-01: Formulas for the GSCN calculation | Huawei Telecommunication India | imported from 3GU |
R4‑1810873 | Draft CR to 38.101-2: Correct both Table 5.5A.2-1 and Table 5.5A.2-2 | Verizon UK Ltd | imported from 3GU |
R4‑1810874 | Text proposal to TR37.910 on bandwidth and spectrum requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1810875 | Rel-15 UE features and capabilities | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810876 | UE requirements for introducing FDM based ULSUP | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810877 | On remaining general issues for NR BS demodulation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810878 | On remaining issues for NR PRACH demodulation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810879 | On remaining issues for NR PUCCH demodulation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810880 | On remaining issues for NR PUSCH demodulation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810881 | Simulation results for NR PRACH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810882 | Simulation results for NR PUCCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810883 | Simulation results for NR PUSCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810884 | WF on NR PUSCH demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810885 | Draft CR to 38.101-2: On FR2 MPR for single CC PC1 and PC3 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810886 | Draft CR to 38.101-2: On FR2 CA MPR | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810887 | Draft CR to 38.101-2: On FR2 MPR for single CC PC1 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810888 | Performance Requirements for RAT-Independent Positioning | NextNav, European Commission, Rohde & Schwarz, Spirent | imported from 3GU |
R4‑1810889 | Draft CR to 38.101-2: On FR2 MPR for single CC PC3 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810890 | Draft CR to 38.101-1: On FR1 AMPR Band n41 NS_04 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810891 | Draft CR to 38.101-1: On FR1 AMPR Band n1 NS_08 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810892 | CR to update Table 6.2D.1-2 for FR1 | Qualcomm | imported from 3GU |
R4‑1810893 | System level performance evaluations of case 1 single Tx solutions | Ericsson | imported from 3GU |
R4‑1810894 | WP for n65 WI | Dish Network | imported from 3GU |
R4‑1810895 | Analysis and Correction of the Spherical Integration Formulation | ETS-Lindgren Europe | imported from 3GU |
R4‑1810896 | A-MPR B41D Power Class 3 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810897 | Draft CR to 36.101: On AMPR Band 41D CA_NS_04 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1810898 | Draft CR on DL Physical Channel for FR1 RF tests | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810899 | Draft CR on DL Physical Channel for FR2 RF tests | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810900 | Draft CR to TS 37.105: Clarification on polarization treatment for OTA blocking | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810901 | Draft CR on Interferer RMC for FR1 RF tests | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810902 | Proposal to remove Single UL allowed column from Table 7.3B.2.3.5.1-1 in 38101-3 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1810903 | Draft CR to TS 37.145-2: Clarification on polarization treatment for OTA blocking | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810904 | Draft CR on Interferer RMC for FR2 RF tests | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1810905 | Structural and editorial changes on clause 10.9 TRP methods | Ericsson | imported from 3GU |
R4‑1810906 | Description of pattern multiplication method | Ericsson | imported from 3GU |
R4‑1810907 | Introduction of Sparsity Factor for TRP measurements | Ericsson | imported from 3GU |
R4‑1810908 | Introduction of sparse sampling for spurious emissions TRP | Ericsson | imported from 3GU |
R4‑1810909 | Introduction of Annex X.Y: Beam sweeping test mode | Ericsson | imported from 3GU |
R4‑1810910 | Adding upper limit to reference steps | Ericsson | imported from 3GU |
R4‑1810911 | Background to systematic correction factor for TRP | Ericsson | imported from 3GU |
R4‑1810912 | Draft CR to 38.101-2: Correct both Table 5.5A.2-1 and Table 5.5A.2-2 | Verizon UK Ltd | imported from 3GU |
R4‑1810913 | Skeleton of TR 38.716-02-00 v001 Rel-16 NR inter-band CA DC for 2 bands DL with up to 2 bands UL | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1810914 | Draft CR to TS 38.104: Clarification on polarization treatment for OTA blocking | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1810915 | Regarding band 46 intra-band LAA combinations involving 4 or less carriers | Ericsson | imported from 3GU |
R4‑1810916 | CR for TS 36.104 Rel-13: Clarification on LAA and eLAA channel access | Ericsson | imported from 3GU |
R4‑1810917 | CR for TS 36.104 Rel-14: Clarification on LAA and eLAA channel access | Ericsson | imported from 3GU |
R4‑1810918 | CR for TS 36.104 Rel-15: Clarification on LAA and eLAA channel access | Ericsson | imported from 3GU |
R4‑1810919 | Reply LS to IEEE 802.11 working group in relation to certain channel combinations for LAA in 5GHz | Ericsson | imported from 3GU |
R4‑1810920 | LS to RAN2 on removing a sentence related to restriction for intra-band LAA aggregation with 4 or less carriers | Ericsson | imported from 3GU |
R4‑1810921 | Further discussions Oon absolute ACLR limits for FR2 NR BS | Ericsson | imported from 3GU |
R4‑1810922 | Draft CR for TS 38.104: Absolute ACLR for FR2 | Ericsson | imported from 3GU |
R4‑1810923 | Overview of UE RF requirements for NR-NR DC | Ericsson | imported from 3GU |
R4‑1810924 | MRTD and MTTD requirements for synchronous NR-NR DC | Ericsson | imported from 3GU |
R4‑1810925 | Draft CR for TS 38.133: MRTD and MTTD for inter-band synchornous NR-NR DC | Ericsson | imported from 3GU |
R4‑1810926 | Further discussions on FR1-FR2 inter-band NR CA MRTD requirements | Ericsson | imported from 3GU |
R4‑1810927 | MTTD requirements for Inter-band NR CA | Ericsson | imported from 3GU |
R4‑1810928 | Draft CR for TS 38.133: MRTD and MTTD for FR1-FR2 inter-band NR CA | Ericsson | imported from 3GU |
R4‑1810929 | Further discussions and proposed way forward for synchronous/asynchronous definitions for EN-DC | Ericsson | imported from 3GU |
R4‑1810930 | Input to WF on NR BS TAE for inter-BS for MIMO, TX diversity and continuous CA | Ericsson | imported from 3GU |
R4‑1810931 | Input to WF on NR BS TAE for inter-BS with respect to inter-band CA and non-contiguous CA | Ericsson | imported from 3GU |
R4‑1810932 | Draft CR for TS 38.104: Clarification on NR BS TAE for inter-BS | Ericsson | imported from 3GU |
R4‑1810933 | RAN4 work plan for Rel-15 NR unlicensed SI | Ericsson | imported from 3GU |
R4‑1810934 | Potential spectrum arrangements for NR-U | Ericsson | imported from 3GU |
R4‑1810935 | Assessing the need for adjacent channel coexistence studies in NR-U operation | Ericsson | imported from 3GU |
R4‑1810936 | On the term Systematic Error in MU Analysis | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1810937 | Definition of TRP Errors | Ericsson LM | imported from 3GU |
R4‑1810938 | Further clarification on PRB alignment for multiple numerologies | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1810939 | Remaining work on serving cell measurement relaxation for category NB1 | Ericsson | imported from 3GU |
R4‑1810940 | Draft CR to TS 38.104 channel raster to RE mapping (Section 5.4.2.2) | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1810941 | Draft CR to TS 38.101-1 channel raster to RE mapping (Section 5.4.2.2) | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1810942 | Draft CR to TS 38.101-2 channel raster to RE mapping (Section 5.4.2.2) | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1810943 | Test Equipment measurement uncertainty for directional requirement | Keysight Technologies | imported from 3GU |
R4‑1810944 | Editorial corrections for Section 8.10 of 37.865-01-01 | Verizon UK Ltd | imported from 3GU |
R4‑1810945 | CR on useServingCellTimingForSync | MediaTek inc. | imported from 3GU |
R4‑1810946 | CR on Definition of intra-frequency measurement without gap | MediaTek inc. | imported from 3GU |
R4‑1810947 | CR on scheduling availability during intra-frequency measurement | MediaTek inc. | imported from 3GU |
R4‑1810948 | Discussion on dual SMTC periodicity | MediaTek inc. | imported from 3GU |
R4‑1810949 | CR on measurement requirements for multiple layers | MediaTek inc. | imported from 3GU |
R4‑1810950 | Discussion on inter-frequency requirements | MediaTek inc. | imported from 3GU |
R4‑1810951 | Discussion on RRM measurement accuracy performance | MediaTek inc. | imported from 3GU |
R4‑1810952 | Test Equipment uncertainty values for FR1 EIS MU | Keysight Technologies | imported from 3GU |
R4‑1810953 | NR UE performance test scenarios and test lists | Ericsson | imported from 3GU |
R4‑1810954 | Impact of number of HARQ process | Ericsson | imported from 3GU |
R4‑1810955 | Simulation results for NR UE PDSCH demodulation tests | Ericsson | imported from 3GU |
R4‑1810956 | Simulation results for NR UE PDCCH demodulation tests | Ericsson | imported from 3GU |
R4‑1810957 | Simulation results for NR UE CSI tests | Ericsson | imported from 3GU |
R4‑1810958 | Simultaneous RxTx | Intel Corporation | imported from 3GU |
R4‑1810959 | ACS/IBB intra-band contiguous CA for FR1 | Intel Corporation | imported from 3GU |
R4‑1810960 | Out-of-band Blocking for intra-band contiguous CA for FR1 | Intel Corporation | imported from 3GU |
R4‑1810961 | CR on ACS minimum requirement | Intel Corporation | imported from 3GU |
R4‑1810962 | CR on ACS intra-band contiguous CA | Intel Corporation | imported from 3GU |
R4‑1810963 | CR on In-band Blocking minimum requirement | Intel Corporation | imported from 3GU |
R4‑1810964 | CR on In-band Blocking intra-band contiguous CA | Intel Corporation | imported from 3GU |
R4‑1810965 | CR on Out-of-Band Blocking minimum requirement | Intel Corporation | imported from 3GU |
R4‑1810966 | CR on Out-of-Band Blocking intra-band contiguous CA | Intel Corporation | imported from 3GU |
R4‑1810967 | CR on Rx Intermodulation characteristics for CA | Intel Corporation | imported from 3GU |
R4‑1810968 | CR on Out-of-Band Blocking requirement for FR2 | Intel Corporation | imported from 3GU |
R4‑1810969 | Editorial corrections for Section 8.10 of 37.865-01-01-f00 | Verizon UK Ltd | imported from 3GU |
R4‑1810970 | Draft CR on NR DL FRCs for FR2 UE RF requirements | Intel Corporation | imported from 3GU |
R4‑1810971 | Views on PDSCH requirements definition in TS 38.101-4 | Intel Corporation | imported from 3GU |
R4‑1810972 | Addition of NSSS-based RRM measurement accuracy requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1810973 | Applicability requirement for network-based CRS-IM | Qualcomm Incorporated | imported from 3GU |
R4‑1810974 | Annex lettering change for 38.101-1 | Qualcomm Incorporated | imported from 3GU |
R4‑1810975 | Annex lettering change for 38.101-2 | Qualcomm Incorporated | imported from 3GU |
R4‑1810976 | Annex lettering change for 38.101-3 | Qualcomm Incorporated | imported from 3GU |
R4‑1810977 | FR2 ULMIMO Updates and enhancements | Qualcomm Incorporated | imported from 3GU |
R4‑1810978 | Enabling two polarization transmissions for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1810979 | FR2 Spurious Emissions change | Qualcomm Incorporated | imported from 3GU |
R4‑1810980 | Pcmax for inter-band CA | Qualcomm Incorporated | imported from 3GU |
R4‑1810981 | Transient timing clarifications for EN-DC mode | Qualcomm Incorporated | imported from 3GU |
R4‑1810982 | Measurement capability for SSB based measurements | Ericsson | imported from 3GU |
R4‑1810983 | On remaining issues for frequency bands grouping | Ericsson | imported from 3GU |
R4‑1810984 | Remaining issues for frequency bands grouping | Ericsson | imported from 3GU |
R4‑1810985 | Conditions for measurements and accuracy requirements for RRC_IDLE in 38.133 | Ericsson | imported from 3GU |
R4‑1810986 | Conditions for measurements and accuracy requirements for RRC_CONNECTED in 38.133 | Ericsson | imported from 3GU |
R4‑1810987 | Adding references to requirements conditions for RRC_IDLE | Ericsson | imported from 3GU |
R4‑1810988 | Adding references to requirements conditions for RRC_CONNECTED | Ericsson | imported from 3GU |
R4‑1810989 | On side conditions in the requirements with CA, DC, and SUL | Ericsson | imported from 3GU |
R4‑1810990 | Side conditions in the requirements with CA, DC, and SUL | Ericsson | imported from 3GU |
R4‑1810991 | Editorial corrections | Ericsson | imported from 3GU |
R4‑1810992 | On SFN acquisition for inter-RAT RSTD measurements in autonomous gaps | Ericsson | imported from 3GU |
R4‑1810993 | SFN acquisition for inter-RAT RSTD measurements | Ericsson | imported from 3GU |
R4‑1810994 | Gap sharing for inter-RAT E-UTRA measurements | Ericsson | imported from 3GU |
R4‑1810995 | Gap sharing for inter-RAT RSTD positioning measurements | Ericsson | imported from 3GU |
R4‑1810996 | Correction in intra-frequency requirements for RRC_IDLE | Ericsson | imported from 3GU |
R4‑1810997 | Correction in inter-frequency requirements for RRC_IDLE | Ericsson | imported from 3GU |
R4‑1810998 | Corrections for 1bis UE | Ericsson | imported from 3GU |
R4‑1810999 | Corrections for 1bis UE | Ericsson | imported from 3GU |
R4‑1811000 | Inter-RAT E-UTRA RS-SINR accuracy requirements in RRC_CONNECTED for SA NR | Ericsson | imported from 3GU |
R4‑1811001 | Corrections in inter-RAT E-UTRA measurements accuracy requirements | Ericsson | imported from 3GU |
R4‑1811002 | Inter-RAT E-UTRA RSTD requirements in RRC_CONNECTED for SA NR | Ericsson | imported from 3GU |
R4‑1811003 | Inter-RAT E-UTRA E-CID requirements in RRC_CONNECTED for SA NR | Ericsson | imported from 3GU |
R4‑1811004 | Inter-RAT E-UTRA requirements in RRC_CONNECTED for SA NR | Ericsson | imported from 3GU |
R4‑1811005 | Correction in inter-frequency RSTD measurement period requirements in FeMTC | Ericsson | imported from 3GU |
R4‑1811006 | Correction in inter-frequency RSTD measurement period requirements in FeMTC | Ericsson | imported from 3GU |
R4‑1811007 | Remaining details on measurement gaps for dense PRS | Ericsson | imported from 3GU |
R4‑1811008 | Updated requirements for measurement gaps for dense PRS | Ericsson | imported from 3GU |
R4‑1811009 | RRM measurement requirements under new measurement gaps for RSTD based on dense PRS | Ericsson | imported from 3GU |
R4‑1811010 | RLM impact under new measurement gaps for RSTD based on dense PRS | Ericsson | imported from 3GU |
R4‑1811011 | On remaining issues for RRM with network-based CRS interference mitigation | Ericsson | imported from 3GU |
R4‑1811012 | Updated RRM requirements for network-based CRS interference mitigation | Ericsson | imported from 3GU |
R4‑1811013 | Draft CR TS 38.101-3 Corrections to Single UL Allowed Criteria for Mid-Band EN-DC in FR1 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1811014 | Draft CR to 38.101-1: FR1 Power Control | Qualcomm Incorporated | imported from 3GU |
R4‑1811015 | Draft CR to 38.101-2: FR2 Power Control | Qualcomm Incorporated | imported from 3GU |
R4‑1811016 | Draft CR to 38.101-2: FR2 Power Control for CA | Qualcomm Incorporated | imported from 3GU |
R4‑1811017 | Draft CR to 38.101-2: FR2 Max. Input Power | Qualcomm Incorporated | imported from 3GU |
R4‑1811018 | Draft CR to 38.101-1: FR1 Framework for pi/2 BPSK with transparent shaping | Qualcomm Incorporated | imported from 3GU |
R4‑1811019 | FR1 MPR for pi/2 BPSK with Spectrum Shaping | Qualcomm Incorporated | imported from 3GU |
R4‑1811020 | Draft CR to 38.101-2: FR2 EIRP and Beam Correspondence Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1811021 | FR2 Multiband Framework for PC3 UEs | Qualcomm Incorporated | imported from 3GU |
R4‑1811022 | Draft CR to 38.101-2: FR2 EIRP Multiband Framework | Qualcomm Incorporated | imported from 3GU |
R4‑1811023 | On FR2 Spherical Coverage EIS Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1811024 | Draft CR to 38.101-2: FR2 EIS Spherical Coverage Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1811025 | Draft CR to 38.101-2: FR2 UE Transmit Signal Quality update | Qualcomm Incorporated | imported from 3GU |
R4‑1811026 | Draft CR to 38.101-2: FR2 UE CA Transmit Signal Quality update | Qualcomm Incorporated | imported from 3GU |
R4‑1811027 | Handling of receiver requirements in EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1811028 | Discussion on NR Scell activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811029 | CR on NR Scell activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811030 | CR for 38.133 PSCell addition and release delay | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811031 | Discussion on NR PScell addition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811032 | CR on NR PScell addition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811033 | Discussion on measurement in intra-F and inter-F in idle mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811034 | CR for 38.133 measurement in intra-F and inter-F in idle mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811035 | On RX Beam Peak Search Measurement Grid Approaches | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811036 | Proposals on TR 38.810 maintenance | Intel Corporation | imported from 3GU |
R4‑1811037 | LS reply on RAN4-RAN5 5G-NR RF pending issues | Intel Corporation | imported from 3GU |
R4‑1811038 | LS on LTE 1RX CRS-IM UE capabilities | Intel Corporation | imported from 3GU |
R4‑1811039 | Network performance analysis for UE IBE relaxation in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1811040 | Draft CR to TS 38.104 – Modulation quality- addition of references to Annex B and C | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811041 | Draft CR to TS 38.104 Annex C.5.2 – Correction to EVM window length | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811042 | Draft CR to TS 38.104 Annex B.5.2 – Correction to EVM window length | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811043 | Test signal for test configurations for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811044 | TP to TS 38.141-2 Section 4.8.2.1 Test signal used to build Test Configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811045 | Remaining issues on NR test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811046 | On TDD configuration for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811047 | TP to TS 38.141-1: NR Test Models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811048 | TP to TS 38.141-2: NR Test Models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811049 | Draft CR for TR37.843 OTA adjacent channel selectivity, narrow-band blocking, and general blocking in a Near Field Test Range | MVG Industries | imported from 3GU |
R4‑1811050 | ad-hoc minutes | Huawei | imported from 3GU |
R4‑1811051 | Plan for completing the MU and TT values for the OTA conformance | Huawei | imported from 3GU |
R4‑1811052 | draft CR to TS37.145-2 - update after AH1807 | Huawei | imported from 3GU |
R4‑1811053 | draft CR to TR37.843 - update after AH1807 | Huawei | imported from 3GU |
R4‑1811054 | draft CR to TS 37.145-2 - update TX test set up annex D.1 | Huawei | imported from 3GU |
R4‑1811055 | draft CR to TS 37.145-2 - update RX test set up annex D.2 | Huawei | imported from 3GU |
R4‑1811056 | draft CR to TS 37.145-2 - Update MU tables | Huawei | imported from 3GU |
R4‑1811057 | draft CR to TS 37.145-2 - Update TT tables | Huawei | imported from 3GU |
R4‑1811058 | MU for extreme temperature tests | Huawei | imported from 3GU |
R4‑1811059 | draft CR to TR 37.843 - MU for extreme temperature tests | Huawei | imported from 3GU |
R4‑1811060 | draft CR to TS 37.145-2 - MU and TT for extreme temperature tests | Huawei | imported from 3GU |
R4‑1811061 | TT for Rx directional requirements | Huawei | imported from 3GU |
R4‑1811062 | draft CR to TS 37.145-2 updating TT for Rx directional requirements | Huawei | imported from 3GU |
R4‑1811063 | TT for 'regulatory' emissions limits | Huawei | imported from 3GU |
R4‑1811064 | MU for in-band wanted signal TRP requirements | Huawei | imported from 3GU |
R4‑1811065 | MU for in-band unwanted emissions TRP requirements | Huawei | imported from 3GU |
R4‑1811066 | draft CR to TS 37.145-2 - in-band TRP TT values | Huawei | imported from 3GU |
R4‑1811067 | MU for co-existence TRP requirements | Huawei | imported from 3GU |
R4‑1811068 | Out of band MU values for Tx spurious emissions | Huawei | imported from 3GU |
R4‑1811069 | Out of band MU values for Rx spurious emissions | Huawei | imported from 3GU |
R4‑1811070 | draft CR to TR 37.843 - co-existence TRP requirements | Huawei | imported from 3GU |
R4‑1811071 | draft CR to TR 37.843 - RX emissions requirements | Huawei | imported from 3GU |
R4‑1811072 | draft CR to TR 37.843 - out of band emissions | Huawei | imported from 3GU |
R4‑1811073 | draft CR to TS 37.145-2 - co-existence TRP requirements | Huawei | imported from 3GU |
R4‑1811074 | draft CR to TS 37.145-2 - receiver emissions requirements | Huawei | imported from 3GU |
R4‑1811075 | draft CR to TS 37.145-2 - out of band emissions requirements | Huawei | imported from 3GU |
R4‑1811076 | out of band blocking MU analysis | Huawei | imported from 3GU |
R4‑1811077 | draft CR to TR 37.843 out of band blocking | Huawei | imported from 3GU |
R4‑1811078 | draft CR to TS 37.145-2 - MU and TT for out of band blocking | Huawei | imported from 3GU |
R4‑1811079 | co-location blocking MU | Huawei | imported from 3GU |
R4‑1811080 | TX IMD blocking MU | Huawei | imported from 3GU |
R4‑1811081 | TX OFF MU budget | Huawei | imported from 3GU |
R4‑1811082 | TX ON/OFF transient test method | Huawei | imported from 3GU |
R4‑1811083 | MU for co-location emissions requirements | Huawei | imported from 3GU |
R4‑1811084 | draft CR to TR 37.843 co-location blocking | Huawei | imported from 3GU |
R4‑1811085 | draft CR to TR 37.843 TX OFF MU budget | Huawei | imported from 3GU |
R4‑1811086 | draft CR to TS 37.145-2 - MU and TT for co-location blocking | Huawei | imported from 3GU |
R4‑1811087 | draft CR to TS 37.145-2 - MU and TT for TX OFF requirements | Huawei | imported from 3GU |
R4‑1811088 | draft CR to TS 37.145-2 - MU and TT for co-location emissions requirements | Huawei | imported from 3GU |
R4‑1811089 | draft CR to TS 37.145-2 - MU and TT for TX IMD requirements | Huawei | imported from 3GU |
R4‑1811090 | On DUT/Reference AUT Re-Positioning | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811091 | On TRP Measurement Grids for mm-wave using Clenshaw-Curtis Weights | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811092 | On TRP Measurement Grids for mm-wave using Surface Integral based on Jacobian Matrix | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811093 | On TX Beam Peak Search Measurement Approaches | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811094 | On Beam Peak Search Measurement Grids for mm-wave for Constant Density Grids Types | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811095 | On Quality of Quiet Zone Frequencies | Keysight Technologies UK Ltd, PCTEST Engineering Lab | imported from 3GU |
R4‑1811096 | TP to TR38.810 on DUT Repositioning | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811097 | TP to TR38.810 on TRP Search Grids | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811098 | TP to TR38.810 on TX Beam Peak Search Grids | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811099 | TP to TR38.810 on RX Beam Peak Search Grids | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811100 | TP to 38.810 to Introduce IFF for single active probe scenario RRM test cases | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811101 | Minor revisions of FR2 spurious emission requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1811102 | UE power back-off for protection of EESS operating in 23.6-24GHz | Qualcomm Incorporated | imported from 3GU |
R4‑1811103 | Implementation of additional requirement to protect passive EESS in 23.6-24GHz | Qualcomm Incorporated | imported from 3GU |
R4‑1811104 | Finalization of SEM requirements in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1811105 | Update of OOBB requirement for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1811106 | Why an OOB blocking requirement for FR2 in needed | Qualcomm Incorporated | imported from 3GU |
R4‑1811107 | Revised WI: Rel'16 LTE inter-band CA for x bands DL (x=4, 5) with 1 band UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811108 | TR 36.716-04-01 v0.0.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811109 | Removal of CA bands list for E-UTRA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811110 | Removal of CA bands list for E-UTRA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811111 | Updated scope of TR: Rel'16 LTE inter-band CA for x bands DL (x=4, 5) with 1 band UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811112 | Clarification on UEM requirements applicability | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811113 | Simulation results on BS REFSENS for sub-PRB transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811114 | Indicating of the location of channel | Huawei Telecommunication India, HiSilicon | imported from 3GU |
R4‑1811115 | Moving Section 9 from 36.141 to 37.107 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811116 | Removing Section 9 from 36.141 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811117 | Simulation results for SPUCCH format 4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811118 | Usage of SSB and SMTC periodicity in delay requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811119 | How to count carriers with different SMTC configuration from MN and SN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811120 | Update on UE measurement capability requirements (38.133) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811121 | Update to UE measurement capability requirements (36.133) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811122 | Remaining RLM requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811123 | CR on remaining RLM requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811124 | BWP switching delay and interruptions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811125 | BWP switching delay for DCI-based BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811126 | Candidate beam detection for beam failure recovery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811127 | NE-DC requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811128 | NR-NR dual connectivity requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811129 | On Reference AUT Roll orientations for combined-axes systems | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811130 | E-UTRA 2.4 GHz TDD Band for US | Globalstar | imported from 3GU |
R4‑1811131 | TP to TS 38.141-2 – Overview of radiated Tx and Rx requirements (4.13) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811132 | On measurement uncertainty for OTA FR1 BS maximum output power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811133 | TP to TR 36.791 (E-UTRA 2.4 GHz TDD Band for US): Frequency Band Arrangement and Regulatory Background | Nokia and Globalstar | imported from 3GU |
R4‑1811134 | TP to TR 36.791 (E-UTRA 2.4 GHz TDD Band for US): Special Co-Existence Considerations for Unlicensed Operations in the 2.4 GHz ISM Band | Nokia and Globalstar | imported from 3GU |
R4‑1811135 | Effect of noise on measurement uncertainty of OTA ACLR, OBUE and SEM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811136 | On measurement uncertainty for OTA AAS BS maximum output power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811137 | Draft CR to TS 37.145-2: Adding spherical grids (Annex F) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811138 | Draft CR to TS 37.145-2: Overview of radiated Tx and Rx requirements (4.16) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811139 | Draft CR to TS 37.843: Measurement uncertainty for OTA base station output power in CATR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811140 | FR2 ULMIMO Updates and enhancements | Qualcomm Incorporated | imported from 3GU |
R4‑1811141 | Draft CR to TR 37.843: OTA receiver dynamic range measurement in Near Field Test Range | MVG Industries | imported from 3GU |
R4‑1811142 | n50 - AMPR study to protect EESS service (1400-1427MHz) | Huawei, Hisilicon | imported from 3GU |
R4‑1811143 | n50 - AMPR study to protect MSS service (1518-1559MHz) | Huawei, Hisilicon | imported from 3GU |
R4‑1811144 | Addition parameters about n50 in TS 38.101-1 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1811145 | Addition parameters about n50 in TS 38.104 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1811146 | Addition parameters about n51 in TS 38.101-1 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1811147 | Addition parameters about n50 & n51 in TS 37.104 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1811148 | Addition parameters about n50 in TS 37.141 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1811149 | Addition references for NR in TS 37.113 | Huawei, Hisilicon | imported from 3GU |
R4‑1811150 | TP: Add parameters band n50 in TS 38.141 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1811151 | TP to TS 38.141-2: OTA declarations cleanup (4.6) | Huawei | imported from 3GU |
R4‑1811152 | Additional OBUE requirement for Band n20 and DTT protection | Huawei | imported from 3GU |
R4‑1811153 | Draft CR to TS 38.104: OTA unwanted emissions correction (9.7.1) | Huawei | imported from 3GU |
R4‑1811154 | Draft CR to TS 38.101-1: Clarification on OCNG | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811155 | Draft CR to TS 38.101-2: Clarification on OCNG | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811156 | Provisional CR to TS 38.810: Updates to IFF uncertainty assessment for T-put test with defined SNR at reference point | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811157 | Discussion on FeNB-IoT enhancements UE demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811158 | Way forward for FeNB-IOT UE demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811159 | Discussion and simulation results on FeNB-IoT BS demodulation requirements | Huawei | imported from 3GU |
R4‑1811160 | Way forward for FeNB-IOT BS demodulation performance requirements | Huawei | imported from 3GU |
R4‑1811161 | Simulation results for sTTI BS SPUSCH demodulation requirements | Huawei | imported from 3GU |
R4‑1811162 | CR: SPUSCH conformance test for 36.141 | Huawei | imported from 3GU |
R4‑1811163 | Simulation results for sTTI BS SPUCCH demodulation requirements | Huawei | imported from 3GU |
R4‑1811164 | CR: SPUCCH conformance test for 36.141 | Huawei | imported from 3GU |
R4‑1811165 | Simulation results for sTTI PDSCH demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811166 | Simulation results for sTTI UE SPDCCH demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811167 | Discuss on sTTI UE CSI test | Huawei, HiSilicon | imported from 3GU |
R4‑1811168 | Simulation assumptions for 8Rx tests | Huawei, HiSilicon | imported from 3GU |
R4‑1811169 | Discuss and simulation results on 8Rx demodulation performance for rank lower than 4 | Huawei, HiSilicon | imported from 3GU |
R4‑1811170 | Discuss and simulation results on 8Rx demodulation performance for rank higher than 4 | Huawei, HiSilicon | imported from 3GU |
R4‑1811171 | Discuss and simulation results on 8Rx SDR tests | Huawei, HiSilicon | imported from 3GU |
R4‑1811172 | Summary of simulation results for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1811173 | Discuss on test applicability rule for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1811174 | Discuss and simulation results on 8Rx CQI and RI tests | Huawei, HiSilicon | imported from 3GU |
R4‑1811175 | Discussion on the Max number of HARQ process and HARQ timing for NR UE demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811176 | Simulation results for NR PDSCH demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811177 | Simulation results for NR PDCCH demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑1811178 | Discussion on NR FR1 channel model for UE demodulation performance and CSI requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811179 | Draft CR: FR1 channel model for UE demodulation and CSI performance requirements | Huawei,HiSilicon | imported from 3GU |
R4‑1811180 | Discussion on the general open issues for NR BS demodulation performance | Huawei | imported from 3GU |
R4‑1811181 | Discuss on NR PUSCH demodulation performance requirements | Huawei | imported from 3GU |
R4‑1811182 | Simulation results for PUSCH demodulation performance requirements | Huawei | imported from 3GU |
R4‑1811183 | Discussion on NR PUCCH demodulation performance requirements | Huawei | imported from 3GU |
R4‑1811184 | Simulation resultson for NR PUCCH demodulation performance | Huawei | imported from 3GU |
R4‑1811185 | Discussion on PRACH demodulation performance requirements | Huawei | imported from 3GU |
R4‑1811186 | Simulation results for PRACH demodulation performance requirements | Huawei | imported from 3GU |
R4‑1811187 | draftCR for clarification on channel bandwidth | Huawei,HiSilicon | imported from 3GU |
R4‑1811188 | draftCR on inter-band EN-DC Pc,max within FR1 for TS 38.101-3 | Huawei,HiSilicon | imported from 3GU |
R4‑1811189 | CR to add more details to Coherent UL MIMO spec for FR1 | Qualcomm | imported from 3GU |
R4‑1811190 | draftCR on intra-band EN-DC Pc,max for TS 38.101-3 | Huawei,HiSilicon | imported from 3GU |
R4‑1811191 | TR skeleton for TR 36.716-02-02 | Huawei, HiSilicon | imported from 3GU |
R4‑1811192 | Revised WID: Rel16 LTE inter-band CA for 2 bands DL with 2 bands UL | Huawei, HiSilicon | imported from 3GU |
R4‑1811193 | On intra-band EN-DC AMPR | Huawei,HiSilicon | imported from 3GU |
R4‑1811194 | Draft CR for TR37.843 OTA EIRP accuracy under extreme temperature conditions in a Near Field Test Range | MVG Industries | imported from 3GU |
R4‑1811195 | draftCR on intra-band EN-DC AMPR for TS 38.101-3 | Huawei,HiSilicon | imported from 3GU |
R4‑1811196 | TP to TS38.141-2: Regional requirements (4.4) | NEC | imported from 3GU |
R4‑1811197 | TP to TS38.141-1: Regional requirements (4.4) | NEC | imported from 3GU |
R4‑1811198 | Draft CR to 38.104: OTA out of band unwanted emissions (9.7.4) | NEC | imported from 3GU |
R4‑1811199 | Draft CR to 38.817-02: OTA operating band unwanted emission (9.7.4) | NEC | imported from 3GU |
R4‑1811200 | TP to TS38.141-2: OTA operating band unwanted emissions requirements (6.7.4) | NEC | imported from 3GU |
R4‑1811201 | Draft CR for TS 38.104: EIRP declarations for wide NR bands (9.2) | NEC | imported from 3GU |
R4‑1811202 | Interferer level for OTA out-of-band blocking conformance testing | NEC | imported from 3GU |
R4‑1811203 | Draft CR to TR 37.843: Interferer level for out of band blocking test (6.5.3) | NEC | imported from 3GU |
R4‑1811204 | CR on for Intra-frequency measurements | Intel Corporation | imported from 3GU |
R4‑1811205 | draftCR on multi-band EIRP for TS 38.101-2 | Huawei,HiSilicon | imported from 3GU |
R4‑1811206 | On beam correspondence | Huawei,HiSilicon | imported from 3GU |
R4‑1811207 | On calibration gap for FR2 | Huawei,HiSilicon | imported from 3GU |
R4‑1811208 | Further Work on Band 41 EN-DC A-MPR for 1 PA and PC3 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1811209 | draftCR on OOBB for TS 38.101-2 | Huawei,HiSilicon | imported from 3GU |
R4‑1811210 | Intra-band EN-DC A-MPR Improvement and Applicability to band 41 29dBm Power Class | Skyworks Solutions Inc. | imported from 3GU |
R4‑1811211 | draftCR on intra-band CA refsens for TS 38.101-2 | Huawei,HiSilicon | imported from 3GU |
R4‑1811212 | Activation timeline for intra-band SCell in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1811213 | alignment between handover command and measurement object | Huawei,HiSilicon | imported from 3GU |
R4‑1811214 | LS on adding band information | Huawei,HiSilicon | imported from 3GU |
R4‑1811215 | UL Timing Adjustment on Beam Switch | Qualcomm Incorporated | imported from 3GU |
R4‑1811216 | draftCR for sub-6 intra-band contiguous CA ACS/IBB | Huawei,HiSilicon | imported from 3GU |
R4‑1811217 | SCS restriction of BWP based on UE CC BW | Qualcomm Incorporated | imported from 3GU |
R4‑1811218 | Draft CR for TR37.843 OTA in channel selectivity measurement in Near Field Test Range | MVG Industries | imported from 3GU |
R4‑1811219 | TP for TR 36.716-03-01: CA_1A-3A-46A and CA_1A-3A-46C | Huawei, HiSilicon | imported from 3GU |
R4‑1811220 | Introduction of missing R15 2DL2UL band combinations to TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1811221 | A-MPR correction for n20 and n28 | Huawei, HiSilicon | imported from 3GU |
R4‑1811222 | A-MPR for n50 | Huawei, HiSilicon | imported from 3GU |
R4‑1811223 | 4Rx baseline for other NR bands | Huawei, HiSilicon | imported from 3GU |
R4‑1811224 | Clarification of EVM flatness requirement for Pi/2 BPSK | Huawei, HiSilicon | imported from 3GU |
R4‑1811225 | CR for 38.101-1 EVM flatness requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1811226 | Reply LS on adjacent TDM combinations of SRS for antenna switching and other UL physical channels | Huawei, HiSilicon | imported from 3GU |
R4‑1811227 | Reply LS on SRS switching | Huawei, HiSilicon | imported from 3GU |
R4‑1811228 | Further discussion on Handover in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1811229 | Views on spatially white AWGN noise | CATR, SAICT | imported from 3GU |
R4‑1811230 | Discussion on general setup for BS demodulation performance requirements | Ericsson | imported from 3GU |
R4‑1811231 | Discussion on NR PUSCH demodulation performance requirements | Ericsson | imported from 3GU |
R4‑1811232 | Simulation results for NR PUSCH | Ericsson | imported from 3GU |
R4‑1811233 | Discussion on NR PUCCH demodulation performance requirements | Ericsson | imported from 3GU |
R4‑1811234 | Simulation results for NR PUCCH | Ericsson | imported from 3GU |
R4‑1811235 | Discussion on NR PRACH demodulation performance requirements | Ericsson | imported from 3GU |
R4‑1811236 | Simulation results for NR PRACH | Ericsson | imported from 3GU |
R4‑1811237 | Simulation results for sPUCCH | Ericsson | imported from 3GU |
R4‑1811238 | Performance requirements for SPUCCH | Ericsson | imported from 3GU |
R4‑1811239 | Performance requirements for SPUSCH | Ericsson | imported from 3GU |
R4‑1811240 | results summary for sPUCCH and sPUSCH | Ericsson | imported from 3GU |
R4‑1811241 | Discussion on performance requirements for network-based CRS interference mitigation | Ericsson | imported from 3GU |
R4‑1811242 | TRP measurements – Test System Frequency Flatness measurement uncertainty | MVG Industries | imported from 3GU |
R4‑1811243 | revised WID on Rel16 LTE inter-band CA for 3 bands DL with 1 band UL | Huawei,HiSilicon | imported from 3GU |
R4‑1811244 | Revisiting A-MPR for refarmed bands | Qualcomm Incorporated | imported from 3GU |
R4‑1811245 | Editorial correction to MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1811246 | NS numbering for NR | Qualcomm Incorporated | imported from 3GU |
R4‑1811247 | NS numbering | Qualcomm Incorporated | imported from 3GU |
R4‑1811248 | EN-DC power class | Qualcomm Incorporated | imported from 3GU |
R4‑1811249 | Equal PSD assumption for MPR/A-MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1811250 | Modification to Intra-band EN-DC MPR and A-MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1811251 | PCMAX for intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1811252 | PCMAX for intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1811253 | [Draft] Reply LS on RAN4 agreement on intraband EN-DC A-MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1811254 | Interruptions for UL carrier addition/release via RRC | Qualcomm Incorporated | imported from 3GU |
R4‑1811255 | Draft CR to TS 37.843 OTA OBUE measurement in Near Field Test Range | MVG Industries | imported from 3GU |
R4‑1811256 | 29 dBm UE Power Class | SPRINT Corporation | imported from 3GU |
R4‑1811257 | Draft CR to TS 37.843 OTA Spectrum Emission Mask measurement in Near Field Test Range | MVG Industries | imported from 3GU |
R4‑1811258 | BWP switching time for baseband parameter change | Qualcomm Incorporated | imported from 3GU |
R4‑1811259 | Introduction of completed R16 3BDL to TS 36.101 | Huawei,HiSilicon | imported from 3GU |
R4‑1811260 | TP for TR 36.716-03-01: update scope of 3BDL CA | Huawei,HiSilicon | imported from 3GU |
R4‑1811261 | Draft CR for TR37.843 OTA Receiver intermodulation measurement in Near Field Test Range | MVG Industries | imported from 3GU |
R4‑1811262 | Draft CR TS 38.101-3: Corrections for B41/n41 | SPRINT Corporation | imported from 3GU |
R4‑1811263 | Draft CR TS 38.101-3: Changes to NS_04 A-MPR for Type 1 UEs to align with RAN1 Assumptions | SPRINT Corporation | imported from 3GU |
R4‑1811264 | Proposed MU budgets for OTA EIRP and EIS measurements of BS at mmWave in CATR | MVG Industries | imported from 3GU |
R4‑1811265 | Correction on Table 7.3.1-3 Network signalling value for reference sensitivity | Intel Corporation | imported from 3GU |
R4‑1811266 | Correction on Table 7.3.1-3 Network signalling value for reference sensitivity | Intel Corporation | imported from 3GU |
R4‑1811267 | Correction on Table 7.3.1-3 Network signalling value for reference sensitivity | Intel Corporation | imported from 3GU |
R4‑1811268 | Correction on Table 7.3.1-3 Network signalling value for reference sensitivity | Intel Corporation | imported from 3GU |
R4‑1811269 | Correction on Table 7.3.1-3 Network signalling value for reference sensitivity | Intel Corporation | imported from 3GU |
R4‑1811270 | Correction on Table 7.3.1-3 Network signalling value for reference sensitivity | Intel Corporation | imported from 3GU |
R4‑1811271 | Introduction of completed R16 2DL/2UL band combinations to TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1811272 | Discussion on HPUE behavior wording | vivo | imported from 3GU |
R4‑1811273 | Correction of HPUE behavior | vivo | imported from 3GU |
R4‑1811274 | Overview of NR FR1 CA requirements | vivo | imported from 3GU |
R4‑1811275 | FR1 CA Maximum Output Power | vivo | imported from 3GU |
R4‑1811276 | Addition of FR1 CA Maximum Output Power | vivo | imported from 3GU |
R4‑1811277 | Correction of Measurement period for UE MOP for FR1 single carrier | vivo | imported from 3GU |
R4‑1811278 | Inclusion of occupied bandwidth for intra-band contiguous and non-contiguous CA | vivo | imported from 3GU |
R4‑1811279 | Addition of FR1 CA Minimum output power and Transmit OFF power | vivo | imported from 3GU |
R4‑1811280 | Corrections of NR receiver characteristics titles | vivo | imported from 3GU |
R4‑1811281 | Correction of LTE UE maximum output power for inter-band CA | vivo | imported from 3GU |
R4‑1811282 | Initial Analysis on ANR measurement and T321 value for NR | vivo | imported from 3GU |
R4‑1811283 | [Draft] Reply LS on RAN2 progress on ANR | vivo | imported from 3GU |
R4‑1811284 | Remainging issues on NR ON/OFF time masks | vivo | imported from 3GU |
R4‑1811285 | Draft CR TS 38.101-1: NS_04 A-MPR’ and spurious emisison corrections | SPRINT Corporation | imported from 3GU |
R4‑1811286 | RRM Requirements for active TCI state switch | Qualcomm Incorporated | imported from 3GU |
R4‑1811287 | n258 UE power backoff for protecting EESS | Intel Corporation | imported from 3GU |
R4‑1811288 | RRM Test Case for UE Transmit Timing | Qualcomm Incorporated | imported from 3GU |
R4‑1811289 | TP to 38.810 on measurement grids of EIRP/EIS, TRP, Spherical Coverage | CATR, SAICT | imported from 3GU |
R4‑1811290 | RAN4 work plan for Rel-15 NR unlicensed SI | Ericsson | imported from 3GU |
R4‑1811291 | Potential spectrum arrangements for NR-U | Ericsson | imported from 3GU |
R4‑1811292 | Assessing the need for adjacent channel coexistence studies in NR-U operation | Ericsson | imported from 3GU |
R4‑1811293 | Work plan for Rel-16 NR MIMO OTA SI | CATR, OPPO, SAMSUNG | imported from 3GU |
R4‑1811294 | CR introducing enhanced utilization of CA and idle mode measurements for early reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811295 | CR introducing enhanced utilization of CA and dormant mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811296 | CR introducing enhanced utilization of CA and direct activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811297 | Finalization of euCA RRM requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811298 | Work plan for euCA performance part | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811299 | Discussion on the test cases for euCA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811300 | UE SSB monitoring requirement for intra-band SCC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811301 | UE scaling factor discussion for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811302 | Discussion on intra-frequency measurement requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811303 | LS on gap assisted intra-frequency measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811304 | LS on Initial Active BWP for Pattern 2 and Pattern 3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811305 | CR on SSB-based RRM, RLM and [BM] measurements when the initial DL BWP is active | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811306 | Rx beam selection for RRM measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811307 | CR on UE Rx beam selection and measurement averaging | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811308 | CR on UE spherical measurement coverage | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811309 | LS reply on Rx beam selection for RRM measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811310 | CR for capturing Inter-frequency measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811311 | CSI-RS and SSB L1 RSRP for beam management | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811312 | CSI-RS base measurements for L3 mobility | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811313 | CR for introducing measurement period for CSI-RS L3 measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811314 | NR RRM performance discussion | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811315 | On remaining issues for on/off mask | Huawei,HiSilicon | imported from 3GU |
R4‑1811316 | On the selection of Option 1 vs. Option 2 for channel model definition | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811317 | LS to RAN1 on the applicability of TR 38.901 TDL channel models | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811318 | Reply LS on Discrepancy on the number of NS values | Huawei, HiSilicon | imported from 3GU |
R4‑1811319 | On AMPR for DC_(n)71B without Dynamic Power Sharing | Motorola Mobility España SA | imported from 3GU |
R4‑1811320 | [draft] LS on Capabilities for UE E-UTRA power control lead-time | SPRINT Corporation | imported from 3GU |
R4‑1811321 | On UL duty cycle restriction in FR2 | Intel Corporation | imported from 3GU |
R4‑1811322 | Draft CR to 38.101-2: REFSENS of power class 1 | Intel Corporation | imported from 3GU |
R4‑1811323 | On fading correlation for carrier aggregation | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811324 | Draft CR to TS 38.141-2: Clarification on polarization treatment for OTA in-band selectivity and blocking | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811325 | DRAFT CR for PCmax FR2 correction | Qualcomm Incorporated | imported from 3GU |
R4‑1811326 | Noise Emulation for FR2 Testing | Qualcomm Japan Inc | imported from 3GU |
R4‑1811327 | Correct 5MHz eCell PRB# for Cat NB1 Test Case A.4.2.18 | ANRITSU LTD | imported from 3GU |
R4‑1811328 | Introduction of MSG3-based channel quality report for NB-IoT | Ericsson | imported from 3GU |
R4‑1811329 | Clarification of the requirement for dense PRS gap in eFeMTC UE R15 | Qualcomm Incorporated | imported from 3GU |
R4‑1811330 | CR on RLM requirements for UE configured with dense PRS gaps | Huawei, HiSilicon | imported from 3GU |
R4‑1811331 | Updated requirements for measurement gaps for dense PRS | Ericsson | imported from 3GU |
R4‑1811332 | Introducing WUS reception requirements for efeMTC | Ericsson | imported from 3GU |
R4‑1811333 | Correction of terminology for non-BL CE UE for Rel-13 | Ericsson | imported from 3GU |
R4‑1811334 | Correction of terminology for non-BL CE UE for Rel-14 | Ericsson | imported from 3GU |
R4‑1811335 | Clarification of inter-RAT SFTD core requirement | Ericsson | imported from 3GU |
R4‑1811336 | CR on NR PScell addition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811337 | CR on modification of V2X initiation/cease of SLSS transmission test for SyncRef UE as Timing Reference R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1811338 | Clarification of the measurement gap offset in LAA inter-frequency measurement test R13 | Qualcomm Incorporated | imported from 3GU |
R4‑1811339 | Corrections to generic CA RRM test cases (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1811340 | CR introducing enhanced utilization of CA and direct activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811341 | Summary of simulation results for eFeMTC BS demodulation requirements | Ericsson | imported from 3GU |
R4‑1811342 | Way forward on euCA performance part | Nokia | imported from 3GU |
R4‑1811343 | Updated RRM requirements for network-based CRS interference mitigation | Ericsson | imported from 3GU |
R4‑1811344 | Way forward on RRM requirements for NE-DC | Ericsson | imported from 3GU |
R4‑1811345 | Draft CR for TS 38.133: MRTD and MTTD for inter-band synchornous NR-NR DC | Ericsson | imported from 3GU |
R4‑1811346 | Way forward on NR-NR DC RRM | Samsung, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811347 | CR on TS38.133 for SS-SINR measurement accuracy requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811348 | SSB-based RLM test cases for EN-DC | MediaTek inc. | imported from 3GU |
R4‑1811349 | SSB-based RLM test cases for SA | MediaTek inc. | imported from 3GU |
R4‑1811350 | Test case design for fading CQI test cases | Samsung | imported from 3GU |
R4‑1811351 | Initial simulation results for NR PDSCH (FR2) | Samsung | imported from 3GU |
R4‑1811352 | Test case design for static CQI test cases | Samsung | imported from 3GU |
R4‑1811353 | Test case design for PMI test cases | Samsung | imported from 3GU |
R4‑1811354 | Simulation results for sPUCCH Format4 | Samsung | imported from 3GU |
R4‑1811355 | Initial simulation results for NR PUCCH | Samsung | imported from 3GU |
R4‑1811356 | Initial simulation results for NR PRACH | Samsung | imported from 3GU |
R4‑1811357 | Updated skeleton for TS38.101-4 | Samsung | imported from 3GU |
R4‑1811358 | SSB configurations for RRM tests | Ericsson | imported from 3GU |
R4‑1811359 | Intra-frequency test cases list | Huawei, HiSilicon | imported from 3GU |
R4‑1811360 | Specification structure of 38.133 for RRM performance part | Huawei, HiSilicon | imported from 3GU |
R4‑1811361 | CR on Interruption and Delay of CC addition/release | Qualcomm Inc. | imported from 3GU |
R4‑1811362 | Discussion on RRM measurement accuracy performance | MediaTek inc. | imported from 3GU |
R4‑1811363 | Test Case for Contention-based Random Access | Samsung | imported from 3GU |
R4‑1811364 | Test Case for Non-Contention-based Random Access | Samsung | imported from 3GU |
R4‑1811365 | Editorial corrections | Ericsson | imported from 3GU |
R4‑1811366 | Way forward on the possible solution of SS-SINR underestimation issue | CMCC | imported from 3GU |
R4‑1811367 | Applicability of TDD configuration for CA in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1811368 | Conditions for measurements and accuracy requirements for RRC_IDLE in 38.133 | Ericsson | imported from 3GU |
R4‑1811369 | Draft CR to 38.133 on UE measurement capability requirements | ZTE | imported from 3GU |
R4‑1811370 | Way forward for FeNB-IOT UE demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811371 | Way forward for FeNB-IOT BS demodulation performance requirements | Huawei | imported from 3GU |
R4‑1811372 | Way forward on eFeMTC UE demodulation and CSI | Ericsson | imported from 3GU |
R4‑1811373 | Way forward on eFeMTC PUSCH demodulation performance requirements | Ericsson | imported from 3GU |
R4‑1811374 | Summary of simulation results for 1024QAM | Huawei | imported from 3GU |
R4‑1811375 | Draft CR: for 1024QAM DL demodulation under fading condition | Huawei, HiSilicon | imported from 3GU |
R4‑1811376 | CR: test case for reduced DMRS | Huawei, HiSilicon | imported from 3GU |
R4‑1811377 | Discussion and simulation results on 1024QAM DL CSI requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811378 | Way forward on 1024QAM demodulation and CSI requirements | Huawei | imported from 3GU |
R4‑1811379 | CR: SPUSCH conformance test for 36.141 | Huawei | imported from 3GU |
R4‑1811380 | CR: SPUCCH conformance test for 36.141 | Huawei | imported from 3GU |
R4‑1811381 | Introduction of Slot/Subslot-PDSCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1811382 | Introduction of SPDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1811383 | Introduction of CQI tests for sTTI | Ericsson | imported from 3GU |
R4‑1811384 | Way forward on 8Rx UE demodulation and CSI requirements | Huawei | imported from 3GU |
R4‑1811385 | LS on LTE 1RX CRS-IM UE capabilities | Intel Corporation | imported from 3GU |
R4‑1811386 | LS response on NPBCH-based RRM measurement for FeNB-IoT UE | Qualcomm Incorporated | imported from 3GU |
R4‑1811387 | Correction to RSTD measurement accuracy requirement in NB-IoT R14 | Qualcomm Incorporated | imported from 3GU |
R4‑1811388 | Addition of Scell activation/interruption requiremetn for dormant SCell | Qualcomm Incorporated | imported from 3GU |
R4‑1811389 | Addition of NSSS-based RRM measurement accuracy requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1811390 | Simulation results for NR PDCCH demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑1811391 | Way forward on NR PBCH demodulation requirements | Huawei | imported from 3GU |
R4‑1811392 | Ad hoc meeting minutes for NR UE demodulation and CSI requirements | Samsung | imported from 3GU |
R4‑1811393 | Ad hoc minutes for BS demodulation | China Telecom | imported from 3GU |
R4‑1811394 | Way forward on NR UE PDSCH demodulation performance requirements | Intel | imported from 3GU |
R4‑1811395 | Way forward on NR PDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1811396 | Way forward on NR CSI requirements | Samsung | imported from 3GU |
R4‑1811397 | Way forward on channel model for NR performance requirements | Huawei | imported from 3GU |
R4‑1811398 | Ad hoc minutes for NR measurement gap and measurement capability | Intel | imported from 3GU |
R4‑1811399 | Ad hoc minutes for NR RRM measurement | Ericsson | imported from 3GU |
R4‑1811400 | Way forward on SFTD measurement requirements | Ericsson, MediaTek, Intel, Huawei, HiSilicon, ZTE, Nokia, Nokia-Shanghai Bell | imported from 3GU |
R4‑1811401 | Discussion on remaining issues on handover requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811402 | Correcting UE measurement capability with same MO configured by MN and SN on TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1811403 | Correcting UE measurement capability with same MO configured by MN and SN on TS36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1811404 | Reply LS on gap-assisted serving cell measurement | Intel Corporation | imported from 3GU |
R4‑1811405 | LS for UE capability of measurement gap for inter-RAT NR measurement not yet configured with EN-DC | Intel Corporation | imported from 3GU |
R4‑1811406 | CR on starting point to execute the measurement gap | Intel Corporation | imported from 3GU |
R4‑1811407 | Way forward on UE behaviour before or after measurement gap | ZTE | imported from 3GU |
R4‑1811408 | Way forward on gap sharing for measurement prioritization in different scenarios | Samsung, NTT DoCoMo, Verizon Wireless, KDDI | imported from 3GU |
R4‑1811409 | CR on TS38.133 for gap sharing | Huawei, HiSilicon | imported from 3GU |
R4‑1811410 | Summary of simulation results for PDCCH | LTE/NR RD | imported from 3GU |
R4‑1811411 | Demodulation performance impacts due to simplified propagation channel models | Ericsson | imported from 3GU |
R4‑1811412 | Simplified propagation channel models based on TDL-D/E | Ericsson | imported from 3GU |
R4‑1811413 | Interruptions for UL carrier addition/release via RRC | Qualcomm Incorporated | imported from 3GU |
R4‑1811414 | FR2 measurement procedures with UE RX beamforming | Ericsson | imported from 3GU |
R4‑1811415 | CR on measurement requirements for multiple layers | MediaTek inc. | imported from 3GU |
R4‑1811416 | Kca scaling for FR2 and FR1+FR2 carrier aggregation | Ericsson | imported from 3GU |
R4‑1811417 | LS on NSSS-based RRM measurement for FeNB-IoT UE | Qualcomm | imported from 3GU |
R4‑1811418 | Way forward on Rx beam selection for RRM measurements | Nokia | imported from 3GU |
R4‑1811419 | Adding the explanition of deriveSSB-IndexFromCell | Huawei, HiSilicon | imported from 3GU |
R4‑1811420 | CR on TS38.133 for SSB based inter-frequency measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1811421 | Summary of simulation results for NR BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1811422 | Structure for TS 38.104 clause 8 on conducted performance requirements | China Telecom | imported from 3GU |
R4‑1811423 | TP to TS 38.141-1: Structure for clause 8 on conducted performance requirements | China Telecom | imported from 3GU |
R4‑1811424 | CR on TS38.133 for candidate beam detection requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811425 | CR on TS38.133 for L1-RSRP measurements for beam management | Huawei, HiSilicon | imported from 3GU |
R4‑1811426 | Simulation assumption for evaluation of L1-RSRP measurement accuracy | Huawei | imported from 3GU |
R4‑1811427 | TP for TR 37.716-31-11: DC_3-41-42_n77 | KDDI Corporation | imported from 3GU |
R4‑1811428 | TP for TR 37.716-31-11: DC_3-41-42_n78 | KDDI Corporation | imported from 3GU |
R4‑1811429 | TP for TR 37.716-31-11: DC_3-41-42_n79 | KDDI Corporation | imported from 3GU |
R4‑1811430 | Draft CR for EN-DC of 1 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811431 | Draft CR for EN-DC of 2 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811432 | Draft CR for EN-DC of 3 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811433 | TP for TR38.716-01-01: Requirements for CA_n66(2A) and CA_n66B | Dish Network | imported from 3GU |
R4‑1811434 | TP to 37.716-21-11, DC_2A-66A_n260(2A) (3A) (4A) | Ericsson, T-Mobile US | imported from 3GU |
R4‑1811435 | TP on TR 36.716-04-01 for CA_3-28-41-42 | SoftBank Corp. | imported from 3GU |
R4‑1811436 | TP to TR 36.716-04-01: UE co-existence studies and requirements for CA_1-3-7-8 | CHTTL | imported from 3GU |
R4‑1811437 | TP to TR 36.716-04-01: UE co-existence studies and requirements for CA_1A-3A-3A-7A-8A | CHTTL | imported from 3GU |
R4‑1811438 | TP to TR 36.716-04-01: UE co-existence studies and requirements for CA_1A-3A-7A-7A-8A | CHTTL | imported from 3GU |
R4‑1811439 | TP for TR 37.716-11-11 Inter-band DC_66A-n260 Carrier Aggregation | Verizon UK Ltd | imported from 3GU |
R4‑1811440 | TP for TR 37.716-11-11 Inter-band DC_5A-n260 Carrier Aggregation | Verizon UK Ltd | imported from 3GU |
R4‑1811441 | TP for TR 38.716-01-01 NR Intra-band n260 CA | Verizon UK Ltd | imported from 3GU |
R4‑1811442 | TP for TR 38.716-01-01 NR Intra-band n261 CA | Verizon UK Ltd | imported from 3GU |
R4‑1811443 | TP for TR 37.716-11-11 Inter-band DC 5A-n261 Carrier Aggregation | Verizon UK Ltd | imported from 3GU |
R4‑1811444 | TP for TR 37.716-11-11 Inter-band DC_66A-n261 CA | Verizon UK Ltd | imported from 3GU |
R4‑1811445 | TP for TR 36.716-02-02: CA_3-11 | KDDI Corporation | imported from 3GU |
R4‑1811446 | TP to 36.716-04-01, six 1-3-7-28 LTE CA combinations | Ericsson, Telstra, Telefonica | imported from 3GU |
R4‑1811447 | TP for TR38.716-02-00 1UL and 2UL for CA_n1-n78 | ZTE Corporation | imported from 3GU |
R4‑1811448 | Rel-12 CR towards TS 36.101 to remove square brackets for CA_4A-7A_12A | Ericsson | imported from 3GU |
R4‑1811449 | Editorial corrections of CA notations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811450 | Corrections of Rel-15 CA specs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811451 | CR_UE RF requirement on low output power | Ericsson | imported from 3GU |
R4‑1811452 | TP for TR 36.716-02-01:CA_7-46 | Huawei, HiSilicon | imported from 3GU |
R4‑1811453 | TP for TR 36.716-02-01: CA_18-42 | KDDI Corporation | imported from 3GU |
R4‑1811454 | Introduction of missing R15 2DL2UL band combinations to TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1811455 | Draft CR on DL Physical Channel for FR1 RF tests | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1811456 | Draft CR on DL Physical Channel for FR2 RF tests | Qualcomm Europe Inc. (Spain) | imported from 3GU |
R4‑1811457 | NS numbering | Qualcomm Incorporated | imported from 3GU |
R4‑1811458 | Reply LS on Discrepancy on the number of NS values | Ericsson | imported from 3GU |
R4‑1811459 | Correction on UE transmitter requirement for FR1 | CATT | imported from 3GU |
R4‑1811460 | Draft CR to 38.101-2: Correct both Table 5.5A.2-1 and Table 5.5A.2-2 | Verizon UK Ltd | imported from 3GU |
R4‑1811461 | Clarification and corrections of EN-DC REFSENS exceptions requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811462 | Correction to DC_(n)71B scs restriction for NR | Nokia | imported from 3GU |
R4‑1811463 | Draft CR for 38.101-1: Addition of missing NR CA configurations n8-n75 and n28-n75 | Vodafone Italia SpA | imported from 3GU |
R4‑1811464 | WF on Transient timing clarifications for EN-DC mode | Qualcomm Incorporated | imported from 3GU |
R4‑1811465 | WF on handling of receiver requirements in EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1811466 | EN DC_41-79 | CATT | imported from 3GU |
R4‑1811467 | Draft CR TS 38.101-3 Corrections to Single UL Allowed Criteria for Mid-Band EN-DC in FR1 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1811468 | Draft CR to 38.101-3 Corrections to Single UL allowed criteria for EN-DC | Skyworks Solutions Inc. | imported from 3GU |
R4‑1811469 | CR for corrections for Section 8.10 of 37.865-01-01 | Verizon UK Ltd | imported from 3GU |
R4‑1811470 | CR to update the definition of Long and Short subslot for FR1 | Qualcomm | imported from 3GU |
R4‑1811471 | WF on Remainging issues on NR ON/OFF time masks | vivo | imported from 3GU |
R4‑1811472 | Addition parameters about n51 in TS 38.101-1 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1811473 | Draft CR TS 38.101-3: Corrections for B41/n41 | SPRINT Corporation | imported from 3GU |
R4‑1811474 | CR CP- OFDM almost contiguous allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811475 | Draft CR TS 38.101-3: Corrections for B41/n41 | SPRINT Corporation | imported from 3GU |
R4‑1811476 | Draft CR for UE-to-UE coexistence requirements for intra-band B41/n41 EN-DC with NS_04 in TS38.101-3 | LG Electronics France | imported from 3GU |
R4‑1811477 | Draft CR to 38.101-1: FR1 Power Control | Qualcomm Incorporated | imported from 3GU |
R4‑1811478 | A-MPR correction for n20 and n28 | Huawei, HiSilicon | imported from 3GU |
R4‑1811479 | TP for TR 36.716-03-01: CA_2-7-46 | Huawei, HiSilicon | imported from 3GU |
R4‑1811480 | TP for TR 36.716-03-01: CA_1A-3A-46A and CA_1A-3A-46C | Huawei, HiSilicon | imported from 3GU |
R4‑1811481 | Update of the Transmit Modulation Annex | Rohde & Schwarz | imported from 3GU |
R4‑1811482 | n258 UE power backoff for protecting EESS | Intel Corporation | imported from 3GU |
R4‑1811483 | Pcmax Ad-hoc minutes | InterDigital, Inc. | imported from 3GU |
R4‑1811484 | Pcmax for inter-band EN-DC FR1 draft CR | InterDigital, Inc. | imported from 3GU |
R4‑1811485 | Draft CR for Pcmax for FR1 | Qualcomm Incorporated | imported from 3GU |
R4‑1811486 | Analyzing CA MPR for non-contiguous RB allocations with multiple CC's | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1811487 | Update FR2 CA MPR | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1811488 | Draft CR to 38.101-2: On FR2 CA MPR | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1811489 | Draft CR to 38.101-2: FR2 Power Control | Qualcomm Incorporated | imported from 3GU |
R4‑1811490 | Draft CR to 38.101-1: Addition of Carrier Leakage table | Rohde & Schwarz | imported from 3GU |
R4‑1811491 | Draft CR for TS38.101-1 on transmit signal quality | OPPO | imported from 3GU |
R4‑1811492 | CR to TS 38.101-1: pi/2 BPSK with Spectrum Shaping | Indian Institute of Tech (M),Indian Institute of Tech (H), CEWiT, Nokia, Nokia Shanghai Bell),Indian Institute of Tech (H), CEWiT, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811493 | CR to TS 38.101-1: pi/2 BPSK with Spectrum Shaping | Indian Institute of Tech (M),Indian Institute of Tech (H), CEWiT, Nokia, Nokia Shanghai Bell),Indian Institute of Tech (H), CEWiT, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811494 | CR_UE RF requirement on subPRB feature | Ericsson | imported from 3GU |
R4‑1811495 | WF on PC2 UL MIMO | Huawei | imported from 3GU |
R4‑1811496 | Introdcution of x bands DL (x=3,4,5) with 2 bands UL inter-band CA in rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1811497 | CR on frame structure type for band 47 | Huawei, HiSilicon | imported from 3GU |
R4‑1811498 | CR on V2X reference measurment channel for 64QAM | Huawei, HiSilicon | imported from 3GU |
R4‑1811499 | Implementation of additional requirement to protect passive EESS in 23.6-24GHz | Qualcomm Incorporated | imported from 3GU |
R4‑1811500 | WF for A-MPR and MSD of DC_3A_n3A | CHTTL | imported from 3GU |
R4‑1811501 | The 2nd Pcmax Ad-hoc minutes | InterDigital, Inc. | imported from 3GU |
R4‑1811502 | Revised WID for LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1811503 | Revised WID for x bands DL (x=3,4,5) with 2 bands UL inter-band CA in rel-16 | LG Electronics France | imported from 3GU |
R4‑1811504 | TR 37.716-31-11 v0.0.1 Rel-16 DC combinations LTE 3DL and one NR band | Ericsson | imported from 3GU |
R4‑1811505 | E-UTRA (Evolved Universal Terrestrial Radio Access) - NR Dual Connectivity (EN-DC) of 4 bands LTE inter-band Carrier aggregation (CA) (4 Down Link (DL) / 1 Up Link (UL)) and 1 NR band (1 DL / 1 UL) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811506 | Draft CR for EN-DC of 4 band LTE and1 band NR for TS 38.101-3 with FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811507 | TP for TR 37.716-41-11 DC of 3-19-21-42_n77 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811508 | TP for TR 37.716-41-11 DC of 3-19-21-42_n78 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811509 | TP for TR 37.716-41-11 DC of 3-19-21-42_n79 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811510 | TP for TR 37.716-41-11 DC of 3-19-21-42_n257 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811511 | Revised WID for 29 dBm UE Power Class | SPRINT Corporation | imported from 3GU |
R4‑1811512 | Editorial corrections for Section 8.10 of 37.865-01-01-f00 | Verizon UK Ltd | imported from 3GU |
R4‑1811513 | A proposal on 2UL co-ex table modification | SoftBank Corp. | imported from 3GU |
R4‑1811514 | Draft CR to TS 38.101-1: Clarification on OCNG | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811515 | Draft CR to TS 38.101-2: Clarification on OCNG | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811516 | Draft CR on NR DL FRCs for FR1 UE RF requirements | Intel Corporation | imported from 3GU |
R4‑1811517 | Draft CR on NR DL FRCs for FR2 UE RF requirements | Intel Corporation | imported from 3GU |
R4‑1811518 | LS on introduction of IE to enable power boosting for pi/2 BPSK modulation | Indian Institute of Tech (M) | imported from 3GU |
R4‑1811519 | Draft CR to 38.101-2: On FR2 MPR for single CC PC1 and PC3 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1811520 | Draft CR to 38.101-2: FR2 Max. Input Power | Qualcomm Incorporated | imported from 3GU |
R4‑1811521 | Minute for multiple bands support | Apple Inc. | imported from 3GU |
R4‑1811522 | Minutes for FR2 EIS Spherical Coverage Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1811523 | minutes for On beam correspondence | Qualcomm | imported from 3GU |
R4‑1811524 | Clearification of UL MIMO for FR2 | OPPO | imported from 3GU |
R4‑1811525 | Draft CR TS 38.101-3 on missing requirements for FR1 EN-DC | Skyworks Solutions, Inc. | imported from 3GU |
R4‑1811526 | Correction on UE transmitter requirement for FR2 | CATT | imported from 3GU |
R4‑1811527 | Over-the-Air Radiated Performance Testing for 5G mm-Wave (FR2) User Equipment | CTIA 5G Millimeter-Wave OTA Sub-Working Group | imported from 3GU |
R4‑1811528 | LS from 5GAA for rel-15 2 RX vehicle mounted UE | 5GAA WG2 | imported from 3GU |
R4‑1811529 | Reply LS on RAN4-RAN5 5G-NR RF pending issue on the progress in RAN4 #88 | Intel | imported from 3GU |
R4‑1811530 | WF on UE feature list | NTT DOCOMO | imported from 3GU |
R4‑1811531 | LS on UE feature list for NR | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811532 | LS to RAN on the SUL and SDL band pairing | Huawei, HiSilicon | imported from 3GU |
R4‑1811533 | Reply LS on adjacent TDM combinations of SRS for antenna switching and other UL physical channels | Huawei, HiSilicon | imported from 3GU |
R4‑1811534 | Reply LS on SRS switching | Huawei, HiSilicon | imported from 3GU |
R4‑1811535 | Draft CR for introduction of Band n74 for TS 38.133 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811536 | Draft CR for introduction of Band n74 for TS 38.104 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811537 | TP for introducatin of band n74 for TS38.141-1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811538 | TP for introducatin of band n74 for TS38.141-2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811539 | Addition parameters about n50 in TS 38.101-1 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1811540 | Draft CR for introducatin of band n74 for TS 37.104 | NTT Docomo | imported from 3GU |
R4‑1811541 | Addition parameters about n50 & n51 in TS 37.104 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1811542 | Draft CR to 38.101-3 on correction on some errors | Huawei, HiSilicon | imported from 3GU |
R4‑1811543 | WF on data SCS restriction of BWP based on UE CC BW | Qualcomm | imported from 3GU |
R4‑1811544 | WF on BWP BW restriction for SSB SCS | Samsung | imported from 3GU |
R4‑1811545 | LS on RAN4 design on Channel Bandwidth | Qualcomm | imported from 3GU |
R4‑1811546 | Antenna Interface Function support in 5G | RAN3, Huawei | imported from 3GU |
R4‑1811547 | Draft CR to TS 38.101-1 channel raster to RE mapping (Section 5.4.2.2) | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1811548 | Draft CR to TS 38.101-2 channel raster to RE mapping (Section 5.4.2.2) | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1811549 | Draft CR to TS 38.104 on channel bandwidth and spacing descriptions | Ericsson | imported from 3GU |
R4‑1811550 | Draft CR to TS 38.101-1 on channel bandwidth and spacing descriptions | Ericsson | imported from 3GU |
R4‑1811551 | Draft CR to TS 38.101-2 on channel bandwidth and spacing descriptions | Ericsson | imported from 3GU |
R4‑1811552 | Draft CR to 38.104: Corrections on description of channel raster entries in section 5.4.2 | ZTE Corporation | imported from 3GU |
R4‑1811553 | Draft CR to 38.101-1: Corrections on description of channel raster entries | ZTE Corporation | imported from 3GU |
R4‑1811554 | Draft CR to 38.101-2: Corrections on description of channel raster entries | ZTE Corporation | imported from 3GU |
R4‑1811555 | Sync rater for Band 41 | CATT | imported from 3GU |
R4‑1811556 | CR for 38.817-01: Formulas for the GSCN calculation | Huawei Telecommunication India | imported from 3GU |
R4‑1811557 | Regarding band 46 intra-band LAA combinations involving 4 or less carriers | Ericsson | imported from 3GU |
R4‑1811558 | CR for TS 36.104 Rel-13: Clarification on LAA and eLAA channel access | Ericsson | imported from 3GU |
R4‑1811559 | CR for TS 36.104 Rel-14: Clarification on LAA and eLAA channel access | Ericsson | imported from 3GU |
R4‑1811560 | CR for TS 36.104 Rel-15: Clarification on LAA and eLAA channel access | Ericsson | imported from 3GU |
R4‑1811561 | Reply LS to IEEE 802.11 working group in relation to certain channel combinations for LAA in 5GHz | Ericsson | imported from 3GU |
R4‑1811562 | LS to RAN2 on removing a sentence related to restriction for intra-band LAA aggregation with 4 or less carriers | Ericsson | imported from 3GU |
R4‑1811563 | LS to RAN1 on intra-band LAA aggregation with 4 or less carriers | Ericsson | imported from 3GU |
R4‑1811564 | CR to TS 36.141: Specification of Annex E: General rules for statistical testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811565 | CR to TS 37.145-1: Clarification on manufacturers declarations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811566 | Draft CR to TS 37.145-1: Clarification on manufacturers declarations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811567 | CR to TS 37.145-2: Clarification on manufacturers declarations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811568 | Draft CR to TS 37.145-2: Clarification on manufacturers declarations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811569 | Way Forward forimpact analysis on Bluetooth and IEEE 802.11 operation for the new TDD E-UTRA band proposed by GlobalStar | CableLabs, Broadcom | imported from 3GU |
R4‑1811570 | TP to TR 36.791 (E-UTRA 2.4 GHz TDD Band for US): Special Co-Existence Considerations for Unlicensed Operations in the 2.4 GHz ISM Band | Nokia and Globalstar | imported from 3GU |
R4‑1811571 | CR to TS 36.141 - sTTI introduction | Ericsson | imported from 3GU |
R4‑1811572 | CR_BS REFSENSE for SubPRB_ Performance_36_141 | Ericsson, Nokia | imported from 3GU |
R4‑1811573 | CR_BS REFSENSE for SubPRB_ Performance_37_141 | Ericsson, Nokia | imported from 3GU |
R4‑1811574 | CR_BS REFSENSE for SubPRB_36_104 | Ericsson, Nokia | imported from 3GU |
R4‑1811575 | CR to TS 36.141: Finalization of NB-IoT TDD test model and correction on NB-IoT operating band unwanted emission requirement (6.1.1, 6.1.3, 6.6.3.5.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811576 | CR to TS 36.141 - NB-IoT TDD introduction - TM updates | Ericsson | imported from 3GU |
R4‑1811577 | CR to TS 37.141 - NB-IoT TDD introduction | Ericsson | imported from 3GU |
R4‑1811578 | LS on applying power class for inter-band CA | RAN2, Softbank | imported from 3GU |
R4‑1811579 | Draft CR on corrections for TS38.104 | Samsung | imported from 3GU |
R4‑1811580 | Correction on unwanted emission mask for band n7, n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1811582 | Draft CR for TS38.104: Correction on radiated transmitter characteristics | CATT | imported from 3GU |
R4‑1811583 | Draft CR to TS 38.104: wideband operation and fractional bandwidth corrections (9.2.1) | Huawei | imported from 3GU |
R4‑1811584 | Draft CR to TS 38.104: FR2 EVM requirement (Section 9.6.2.3) | ZTE Corporation | imported from 3GU |
R4‑1811585 | Draft CR to TS 38.104 – Modulation quality- addition of references to Annex B and C | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811586 | Draft CR to TS 38.104 Annex B.5.2 – Correction to EVM window length | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811587 | Draft CR to TS 38.104 Annex C.5.2 – Correction to EVM window length | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811588 | Draft CR to TS 38.104: Update to Annex C.6 Estimation of TX chain amplitude and frequency response parameters | Ericsson, Keysight | imported from 3GU |
R4‑1811589 | CR to TR 38.817-02: Update to OTA Modulation Quality | Ericsson | imported from 3GU |
R4‑1811590 | Draft CR for TS 38.104: Absolute ACLR for FR2 | Ericsson | imported from 3GU |
R4‑1811591 | LS on Field measurement of TRP regulatory limits and Category B Spurious emission limits | Ericsson | imported from 3GU |
R4‑1811592 | TP to TS38.141-2: OTA operating band unwanted emissions requirements (6.7.4) | NEC | imported from 3GU |
R4‑1811593 | Draft CR on spurious emission requirement in 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1811594 | Draft CR to TS38.104_UEM(Section 6.6.4 and 9.7.4) | ZTE Corporation | imported from 3GU |
R4‑1811595 | Correction on OBUE mask of NR BS type 2-O | Nokia, Nokia Shanghai Bell, NEC, Samsung | imported from 3GU |
R4‑1811596 | Draft CR to TS 38.104: OTA unwanted emissions correction (9.7.1) | Huawei | imported from 3GU |
R4‑1811597 | CR on protecting NR bands in 25.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1811598 | CR on protecting NR bands in 36.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1811599 | Draft CR to TS 38.104 on additional OBUE requirement for Band n20 and DTT protection | Huawei, HiSilicon | imported from 3GU |
R4‑1811600 | CR to 38.817-02: OTA operating band unwanted emission (9.7.4) | NEC | imported from 3GU |
R4‑1811601 | Draft CR to TS 38.104: Clarifications on receiver narrowband blocking, out-of-band blocking and intermodulation requirements (7.4.2.2, 10.6.3, 10.8.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811602 | DraftCR to TS 38.104: Adding table for FR2 reference sensitivity level range | CMCC | imported from 3GU |
R4‑1811603 | Draft CR to TS 38.104: Clarification on polarization treatment for OTA blocking | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811604 | Receiver spurious emission | CATT | imported from 3GU |
R4‑1811605 | CR to TS 37.113: correction of the exclusion band for BS radiated emission test (8.2.1) | Huawei | imported from 3GU |
R4‑1811606 | DraftCR to TS 38.113: corrections related to the "signal port" definition (3.1) | Huawei | imported from 3GU |
R4‑1811607 | DraftCR to TS 38.113: NR operating band reference notes (4.1) | Huawei | imported from 3GU |
R4‑1811608 | DraftCR to TS 38.113: Rx exclusion band corrections (4.4.2) | Huawei | imported from 3GU |
R4‑1811609 | Draft CR to TS 38.113: Spatial Exclusion | Ericsson | imported from 3GU |
R4‑1811610 | Draft CR to TS 38.113 RF electromagnetic filed test method and level (subclause 9.2.2 | ZTE Corporation | imported from 3GU |
R4‑1811611 | LS on EMC Immunity test methods and levels for FR2 | Ericsson | imported from 3GU |
R4‑1811612 | Draft CR to TS 38.113 Arrangements for establishing a communication link (subclause 4.2) | ZTE Corporation | imported from 3GU |
R4‑1811613 | Draft CR to TS 38.113 Test Configuration (subclause 4.5) | ZTE Corporation | imported from 3GU |
R4‑1811614 | Addition references for NR in TS 37.113 | Huawei, Hisilicon | imported from 3GU |
R4‑1811615 | Draft CR to TS 37.113: Spatial Exclusion | Ericsson | imported from 3GU |
R4‑1811616 | CR to TS 38.113 | ZTE Corporation | imported from 3GU |
R4‑1811617 | Correction on general clause for 38.141-1 | CATT | imported from 3GU |
R4‑1811618 | Correction on general clause for 38.141-2 | CATT | imported from 3GU |
R4‑1811619 | WF on test configurations for MSR | Ericsson, Nokia, Huawei, ZTE | imported from 3GU |
R4‑1811620 | draft TR36.716-03-01 v0.0.1 | Huawei, HiSilicon | imported from 3GU |
R4‑1811621 | TP to TS 38.141-2 Section 4.8.2.1 Test signal used to build Test Configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811622 | TP to TS 38.141-1 Test configuration(Sections 4.7) | ZTE Corporation | imported from 3GU |
R4‑1811623 | TP for TR38.141-1: RF channel for BS conducted conformance test | ZTE Corporation | imported from 3GU |
R4‑1811624 | TP for TR38.141-2: RF channel for BS OTA conformance test | ZTE Corporation | imported from 3GU |
R4‑1811625 | TP to TS 38.141-1: NR Test Models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811626 | TP to TS 38.141-2: Section 6.1 NR Test Models | Ericsson | imported from 3GU |
R4‑1811627 | TBDs on acceptable uncertainty of Test System (4.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1811628 | TP to TS 38.141-1:Annex | Huawei, HiSilicon | imported from 3GU |
R4‑1811629 | TP for TS38.141-1: Occupied bandwidth (section 4.1.2 and 6.6.2) | ZTE Corporation | imported from 3GU |
R4‑1811630 | TP to TS 38.141-1: Regional requirements (4.4) | Huawei, HiSilicon, NEC | imported from 3GU |
R4‑1811631 | TP to TS 38.141-1: Ancillary RF amplifiers (4.5.1.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1811632 | TP to TS 38.141-1: 6.6.4 Operating band unwanted emissions | Huawei, HiSilicon | imported from 3GU |
R4‑1811633 | TP to TS 38.141-2: Clarification on polarization treatment for OTA in-band selectivity and blocking | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811634 | WF on MU and TT for Rx requirements for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811635 | WF on MU and TT for transmission in-band TRP emission and directional requirements for FR2 | Ericsson | imported from 3GU |
R4‑1811636 | WF on MU and TT for extreme EIRP for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811637 | WF on MU and TT for Tx/Rx TRP supurious emission for FR2 | Huawei | imported from 3GU |
R4‑1811638 | draft CR to TS 37.145-2 - Update MU tables | Huawei | imported from 3GU |
R4‑1811639 | draft CR to TS 37.145-2 - Update TT tables | Huawei | imported from 3GU |
R4‑1811640 | Draft CR to TS 37.105: Clarification on polarization treatment for OTA blocking | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811641 | Draft CR to TS 37.145-2: Clarification on polarization treatment for OTA blocking | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811642 | Draft CR to TS 37.145-2: Overview of radiated Tx and Rx requirements (4.16) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811643 | Description of pattern multiplication method | Ericsson | imported from 3GU |
R4‑1811644 | Draft CR to TS 37.145-2: adding TRP measurement grids (Annex F) | ZTE Corporation | imported from 3GU |
R4‑1811645 | Draft CR to TS 37.145-2: Adding spherical grids (Annex F) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811646 | Draft CR to TS 37.843 OTA OBUE measurement in Near Field Test Range | MVG Industries | imported from 3GU |
R4‑1811647 | Receiver directional TT and out of band blocking MU and TT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811648 | WF on Transmitter in-band TRP emissions (wanted and unwanted) | Ericsson | imported from 3GU |
R4‑1811649 | WF on EIRP in extreme conditions for eAAS and NR FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811650 | Tx/Rx TRP spurious emissions | Huawei | imported from 3GU |
R4‑1811651 | Co-location – TX OFF, co-location emissions, TX IMD, RX co-location blocking (MU and TT) | Ericsson | imported from 3GU |
R4‑1811652 | Response LS on additional TDD configuration periodicities | RAN1, Nokia | imported from 3GU |
R4‑1811653 | LS on UE capability for the need of measurement gaps in NR standalone | RAN2, Qualcomm | imported from 3GU |
R4‑1811654 | draft CR to TR 37.843 - MU and TT for extreme temperature tests | Nokia | imported from 3GU |
R4‑1811655 | Draft CR for TR37.843 OTA EIRP accuracy under extreme temperature conditions in a Near Field Test Range | MVG Industries | imported from 3GU |
R4‑1811656 | Draft CR for TR37.843 OTA Rx requirements in a Near Field Test Range | MVG Industries | imported from 3GU |
R4‑1811657 | Draft CR to TS37.145-2 Update MU and TT in Test requirements subclauses | Huawei | imported from 3GU |
R4‑1811658 | draft CR to TR 37.843 updating MU and TT for Rx directional requirements | Huawei | imported from 3GU |
R4‑1811659 | draftCR for TR37.843 –MU and TT for Transmitter in-band TRP emissions (wanted and unwanted) | Ericsson | imported from 3GU |
R4‑1811660 | Structural and editorial changes on clause 10.9 TRP methods | Ericsson, MVG Industries, ZTE Corporation, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811661 | Introduction of sparse sampling for spurious emissions TRP | Ericsson | imported from 3GU |
R4‑1811662 | Introduction of Annex X.Y: Beam sweeping test mode | Ericsson | imported from 3GU |
R4‑1811663 | Adding upper limit to reference steps | Ericsson | imported from 3GU |
R4‑1811664 | draft CR to TR 37.843 - Tx and Rx out of band emissions | Huawei | imported from 3GU |
R4‑1811665 | Draft CR to TR 37.843: On interferer level in the out of band blocking test | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811666 | Draft CR to TR 37.843: OOBB test method MU background | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811667 | draft CR to TR 37.843 out of band blocking | Huawei | imported from 3GU |
R4‑1811668 | Draft CR to TR 37.843: MU and TT for co-location requirements | Ericsson | imported from 3GU |
R4‑1811669 | Draft CR to 37.145-2: Improvement of specification text related to transmitter intermodulation in sub-clause 6.8 | Ericsson | imported from 3GU |
R4‑1811670 | Draft CR for TS 37.145-2 Introduction of rated total TRP output power in sub-clauses 3.1 and 3.2 | Ericsson | imported from 3GU |
R4‑1811671 | Draft CR to TS 37.145-2: Clarification on demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811672 | Tx/Rx TRP spurious emissions for MU | Huawei | imported from 3GU |
R4‑1811673 | LS on RAN4-RAN5 5G-NR RF pending issues during RAN5#80 | RAN5, NTT Docomo | imported from 3GU |
R4‑1811674 | WF on Transmitter in-band TRP emissions (wanted and unwanted) | Ericsson | imported from 3GU |
R4‑1811675 | WF on EIRP in extreme conditions for eAAS and NR FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811676 | Receiver directional TT and out of band blocking MU and TT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811677 | Tx/Rx TRP spurious emissions for TT | Huawei | imported from 3GU |
R4‑1811678 | CR to TS 37.145-1: E-UTRA DL RS power test requirement correction, Rel-13 | Huawei | imported from 3GU |
R4‑1811679 | Drft CR on Clarification of BS alignment text for the EIRP accuracy procedure | Ericsson | imported from 3GU |
R4‑1811680 | CR for TS 37.105 Radiated transmitting power | CATT | imported from 3GU |
R4‑1811681 | CR on remaining RLM requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811682 | CR on TS38.133 for interruption in EN-DC | Ericsson | imported from 3GU |
R4‑1811683 | Way forward on interruptions for UL carrier addition/release via RRC | Qualcomm | imported from 3GU |
R4‑1811684 | Way forward for TS38.101-4 specfication draft plan | Samsung | imported from 3GU |
R4‑1811685 | TP: update of TS 38.101-4 | Samsung | imported from 3GU |
R4‑1811686 | Way forward on NR PDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1811687 | Way forward on NR PBCH demodulation requirements | Huawei, HiSilicon, China Telecom, CMCC, NTT DOCOMO, Vodafone, Orange, Sprint, AT&T, KDDI, SoftBank, Deutsche Telekom, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811688 | Way forward on dual SMTC periodicity | Mediatek | imported from 3GU |
R4‑1811689 | Ad hoc minutes on signalling characteristics | Intel | imported from 3GU |
R4‑1811690 | Way forward on WUS RRM requirements for Rel-15 MTC | Ericsson | imported from 3GU |
R4‑1811691 | Way forward on WUS RRM requirements for Rel-15 NB-IOT | Ericsson, Sony | imported from 3GU |
R4‑1811692 | draft CR on UE behavior in the slot immediately before or after measurement gap | LG Electronics Inc. | imported from 3GU |
R4‑1811693 | Way forward on NR CSI requirements | Samsung | imported from 3GU |
R4‑1811694 | WF on NR PUSCH demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811695 | Correction in inter-frequency RSTD measurement period requirements in FeMTC | Ericsson | imported from 3GU |
R4‑1811696 | Way forward on demodulation performance for eV2X UE | CATT | imported from 3GU |
R4‑1811697 | CR on Scell activation requirements in FR2 | CATT | imported from 3GU |
R4‑1811698 | CR on NR PScell addition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811699 | CR on updating requirement for BWP switching delay in TS38.133 | MediaTek inc. | imported from 3GU |
R4‑1811700 | CR on TS38.133 for interruption due to BWP switching | Huawei, HiSilicon | imported from 3GU |
R4‑1811701 | Measurement Requirements under Paging Occasion Collision with SSB | Ericsson | imported from 3GU |
R4‑1811702 | CR on TS38.133 for cell reselection in idle | MediaTek inc. | imported from 3GU |
R4‑1811703 | CR on TS36.133 for inter-RAT NR measurements in idle | MediaTek inc. | imported from 3GU |
R4‑1811704 | List of RRM test cases for Rel-15 MTC | Ericsson | imported from 3GU |
R4‑1811705 | List for RRM test cases for Rel-15 NB-IoT | Ericsson | imported from 3GU |
R4‑1811706 | LS on RSSI measurement in Idle and Inactive mode | Huawei, HiSilicon | imported from 3GU |
R4‑1811707 | CR on TS38.133 for intra-NR handover | Huawei, HiSilicon | imported from 3GU |
R4‑1811708 | CR on TS36.133 for handover from E-UTRAN to NR | Ericsson | imported from 3GU |
R4‑1811709 | RRC Re-establishment Requirements without Serving Cell Timing | Ericsson | imported from 3GU |
R4‑1811710 | CR on TS38.133 for NTA_offset requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811711 | Way forward on MRTD and MTTD for inter-band CA between FR1 and FR2 | Ericsson, Nokia, ZTE, CATT, Verizon, KDDI, Vodafone, AT&T, Orange, T-Mobile Inc, NTT Docomo | imported from 3GU |
R4‑1811712 | [Draft] Reply LS on RAN2 progress on ANR | vivo | imported from 3GU |
R4‑1811713 | Ad hoc minutes for RRM test cases | Huawei | imported from 3GU |
R4‑1811714 | LS on SFTD scenarios for late drop | Ericsson | imported from 3GU |
R4‑1811715 | SSB-based RLM test cases for EN-DC | MediaTek inc. | imported from 3GU |
R4‑1811716 | Side conditions in the requirements with CA, DC, and SUL | Ericsson | imported from 3GU |
R4‑1811717 | Remaining work on CRS muting for Cat-M1/M2 | Ericsson | imported from 3GU |
R4‑1811718 | Way forward on enhanced PHR reporting for Rel-15 NB-IOT | Ericsson | imported from 3GU |
R4‑1811719 | CR on link reconfiguration requirements | Intel Corporation | imported from 3GU |
R4‑1811720 | Way forward on channel model for NR performance requirements | Huawei | imported from 3GU |
R4‑1811721 | Simulation assumptions for NR UE PDSCH | Intel | imported from 3GU |
R4‑1811722 | Simulation assumptions for 8Rx tests | Huawei, HiSilicon | imported from 3GU |
R4‑1811723 | Simulation assumptions for NR UE PDSCH | Intel | imported from 3GU |
R4‑1811724 | Way forward on NR PDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1811725 | Way forward on channel model for NR performance requirements | Huawei | imported from 3GU |
R4‑1811726 | Way forward on genera part of NR BS demodulation performance | Huawei | imported from 3GU |
R4‑1811727 | Way forward on NR PUCCH demodulation performance | Huawei | imported from 3GU |
R4‑1811728 | Way forward on NR PRACH demodulation performance | Ericsson | imported from 3GU |
R4‑1811729 | Specification drafting plan for NR BS demodulation performance requirements | China Telecom | imported from 3GU |
R4‑1811730 | Way forward on NR PBCH demodulation requirements | Huawei, HiSilicon, China Telecom, CMCC, NTT DOCOMO, Vodafone, Orange, Sprint, AT&T, KDDI, SoftBank, Deutsche Telekom, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811731 | CR on WUS RRM requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1811732 | LS on the applicability of dense PRS gap patterns | Huawei, HiSilicon | imported from 3GU |
R4‑1811733 | Test cases list for LTE connected to NGCN | Huawei, HiSilicon | imported from 3GU |
R4‑1811734 | Introducing test cases for LTE connected to NGCN | Huawei, HiSilicon | imported from 3GU |
R4‑1811735 | Applicability requirement for network-based CRS-IM | Qualcomm Incorporated | imported from 3GU |
R4‑1811736 | CR introducing enhanced utilization of CA and idle mode measurements for early reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811737 | LS on the applicability of dense PRS gap patterns | Huawei, HiSilicon | imported from 3GU |
R4‑1811738 | Way forward on the possible solution of SS-SINR underestimation issue | CMCC | imported from 3GU |
R4‑1811739 | Adding references to requirements conditions for RRC_CONNECTED | Ericsson | imported from 3GU |
R4‑1811740 | Way forward on applicability for gap pattern | CMCC | imported from 3GU |
R4‑1811741 | LS on Rel-15 LTE UE feature list | RAN1, NTT Docomo | imported from 3GU |
R4‑1811742 | TP to TS38.141-2: Regional requirements (4.4) | NEC | imported from 3GU |
R4‑1811743 | TP to TS 38.141-2: Remaining issues and corrections for Radiated Tx power (EIRP) (6.2) | Huawei | imported from 3GU |
R4‑1811744 | TP for TS38.141-2: Occupied bandwidth (section 6.7.2) | ZTE Corporation | imported from 3GU |
R4‑1811745 | TP to TS 38.141-2: Corrections and improvements to the OTA Tx spurious emissions test (6.7.5) | Huawei | imported from 3GU |
R4‑1811746 | TP to TS 38.141-2: Calibration annex (D) | Huawei | imported from 3GU |
R4‑1811747 | TP to TS 38.141-2: Improvements of co-location requirement description in sub-clause 4.12 | Ericsson | imported from 3GU |
R4‑1811748 | TP to TS 38.141-2: NR BS OTA occupied bandwidth (6.7.2) | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811749 | TP to TS 38.141-2: Adding requirement text for OTA co-location spurious emission in subclause 6.7.5 and Annex E1.3 | Ericsson | imported from 3GU |
R4‑1811750 | TP to TS 38.141-2 on MU and TT for Rx requirements for FR1 and FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811751 | TP to TS 38.141-2 on MU and TT for transmission in-band TRP emission and directional requirements or FR2 and FR1 | Ericsson | imported from 3GU |
R4‑1811752 | TP to TS38.141-2 on MU and TT for extreme EIRP for FR1 and FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811753 | TP to TS38.141-2 on MU and TT for Tx/Rx TRP supurious emission for FR1 and FR2 | Huawei | imported from 3GU |
R4‑1811754 | TP to TS 38.141-2: Improvement of requirement text for OTA TX IMD in subclause 6.8 and Annex E.1.5 | Ericsson | imported from 3GU |
R4‑1811755 | TP to TS 38.141-2: Adding requirement text for OTA out-of-band blocking in subclause 7.6 and Annex E2.4.1 and E2.4.2 | Ericsson | imported from 3GU |
R4‑1811756 | TP to TS 38.141-2 – Overview of radiated Tx and Rx requirements (4.13) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811757 | LS on second BLER pair for RLM | RAN1, Ericsson | imported from 3GU |
R4‑1811758 | Draft CR to TR 37.812-02: Finalizing the measurement step size for BS type 2-O out-of-band blocking conformance testing (10.6.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811759 | WF on transient time test in FR2 | ZTE | imported from 3GU |
R4‑1811760 | TP to TS 38.141-2: test tolerance table (Annex C) | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811761 | TP: Add parameters band n50 in TS 38.141-1 | Huawei | imported from 3GU |
R4‑1811762 | CR to TS 37.113 Add parameters band n50 in TS 37.113 | Huawei | imported from 3GU |
R4‑1811763 | CR to TS 37.104 Add parameters band n50 in TS 37.104 | Huawei, HiSilicon, Etisalat | imported from 3GU |
R4‑1811764 | TP to TS 38.141-1: Remaining issues on conducted declarations (4.6) | Huawei | imported from 3GU |
R4‑1811765 | TP to TS 38.141-1: Conducted declarations renumbering (4.6) | Huawei | imported from 3GU |
R4‑1811766 | TP to TS 38.141-2: wideband operation corrections and FBW declarations (4.6) | Huawei | imported from 3GU |
R4‑1811767 | TP to TS 38.141-2: OTA declarations cleanup (4.6) | Huawei | imported from 3GU |
R4‑1811768 | WF on polarization in OTA Rx test | Nokia | imported from 3GU |
R4‑1811769 | WF on EIRP in extreme conditions for eAAS and NR FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811770 | Co-location – TX OFF, co-location emissions, TX IMD, RX co-location blocking (MU and TT) | Ericsson | imported from 3GU |
R4‑1811771 | WF on MU and TT for Rx requirements for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811772 | WF on MU and TT for transmission in-band TRP emission and directional requirements for FR2 | Ericsson | imported from 3GU |
R4‑1811773 | WF on NR-U work in RAN4 | Ericsson | imported from 3GU |
R4‑1811774 | NR Test Methods SI ad-hoc meeting notes | Intel | imported from 3GU |
R4‑1811775 | NR SA measurement in RC | Emite | imported from 3GU |
R4‑1811776 | WF on specifying NR demodulation | Anritsu, Rohde & Schwarz, Keysight, Spirent,^^Qualcomm | imported from 3GU |
R4‑1811777 | MU factors contributing to DL SNR for demodulation and CSI | ANRITSU LTD | imported from 3GU |
R4‑1811778 | MU factors contributing to DL SNR in RRM Test cases | ANRITSU LTD | imported from 3GU |
R4‑1811779 | TP to TR 38.810 on editorial corrections | Intel Corporation | imported from 3GU |
R4‑1811780 | TP to TR 38.810 on the remaining details of channel modelling methodology | Intel Corporation | imported from 3GU |
R4‑1811781 | WF on remaining issue RRM testing methodology | Qualcomm | imported from 3GU |
R4‑1811782 | TP to TR 38.810 on the remaining details of NR RRM testing methodology | Intel Corporation | imported from 3GU |
R4‑1811783 | Measurement period of PRACH time mask | CATT | imported from 3GU |
R4‑1811784 | WF on UE capability for transient time | Ericsson | imported from 3GU |
R4‑1811785 | Discussion on Measurement period of PRACH time mask | CATT | imported from 3GU |
R4‑1811786 | WF for NR PC2 fallback | Qualcomm | imported from 3GU |
R4‑1811787 | WF on handling of receiver requirements in EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1811788 | LS on introduction of UE capability for pi/2 BPSK modulation with power boosting capability | Indian Institute of Tech (M) | imported from 3GU |
R4‑1811789 | Draft CR TS 38.101-1: NS_04 A-MPR’ and spurious emisison corrections | SPRINT Corporation | imported from 3GU |
R4‑1811790 | NR UE ON/OFF mask Ad-Hoc minutes | Ericsson | imported from 3GU |
R4‑1811791 | WF on UE RF requirement on subPRB feature | Ericsson | imported from 3GU |
R4‑1811792 | Draft CR for A-MPR revision for n1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811793 | CR for corrections for Section 8.10 of 37.865-01-01 | Verizon, Ericsson | imported from 3GU |
R4‑1811794 | WF on how to treat additional channel bandwidth combination sets for C, n78C, and n79C for TS 38.101-1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811795 | WF on Transient timing clarifications for EN-DC mode | Qualcomm Incorporated | imported from 3GU |
R4‑1811796 | Draft CR to 38.101-3 Corrections to Single UL allowed criteria for EN-DC | Skyworks Solutions Inc. | imported from 3GU |
R4‑1811797 | WF on Intra-band EN-DC options for Pcmax | Media Tek | imported from 3GU |
R4‑1811798 | Draft CR for Pcmax for FR1 | Qualcomm Incorporated | imported from 3GU |
R4‑1811799 | Pcmax for inter-band NR CA FR1 draft CR | InterDigital, Inc. | imported from 3GU |
R4‑1811800 | DRAFT CR for PCmax FR2 correction | Qualcomm Incorporated | imported from 3GU |
R4‑1811801 | WF for NR PC2 fallback | Qualcomm | imported from 3GU |
R4‑1811802 | Draft CR to TS 38.101-2 update the Pumax tolerance table for configured transmitted power | Intel Corporation | imported from 3GU |
R4‑1811803 | AH minutes for on Beam Correspondence | Apple Inc. | imported from 3GU |
R4‑1811804 | LS on the beam correspondence requirement for FR2 UEs | Apple Inc. | imported from 3GU |
R4‑1811805 | WF on Beam Correspondence | Qualcomm | imported from 3GU |
R4‑1811806 | WF on ACS/IBB/OOBB for intra-band contiguous CA for FR1 | Intel Corporation | imported from 3GU |
R4‑1811807 | Draft CR to 38.101-2: FR2 UE Transmit Signal Quality update | Qualcomm Incorporated | imported from 3GU |
R4‑1811808 | WF for FR2 intra band UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1811809 | WF on FR2 EIS Spherical Coverage Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1811810 | Draft CR TS 38.101-3: Corrections for B41/n41 | SPRINT Corporation | imported from 3GU |
R4‑1811811 | Draft CR for introduction of EN-DC of 2 bands LTE inter-band CA (2DL/1UL) and 1 NR band (1DL/1UL) | Huawei, HiSilicon | imported from 3GU |
R4‑1811812 | Draft CR to 38.101-1: On FR1 AMPR Band n41 NS_04 | Qualcomm Tech. Netherlands B.V | imported from 3GU |
R4‑1811813 | Correction on UE transmitter requirement for FR2 | CATT | imported from 3GU |
R4‑1811814 | WF on handling of receiver requirements in EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1811815 | Extendng loewer frequecy range in Band 41 for EN DC_41_79 | CATT | imported from 3GU |
R4‑1811816 | CR to update the definition of Long and Short subslot for FR1 | Qualcomm | imported from 3GU |
R4‑1811817 | Updated ON/OFF mask for FR2 | vivo | imported from 3GU |
R4‑1811818 | CR to add CA_1-21-42 in exception table | Qualcomm | imported from 3GU |
R4‑1811819 | WF on handling of receiver requirements in EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1811820 | (reserved) | Void | imported from 3GU |
R4‑1811821 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 2 bands DL with x bands UL (x=1,2) | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1811822 | Draft CR for introducution of Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 2 bands DL with x bands UL (x=1,2) | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1811823 | (reserved) | Void | imported from 3GU |
R4‑1811824 | (reserved) | Void | imported from 3GU |
R4‑1811825 | (reserved) | Void | imported from 3GU |
R4‑1811826 | (reserved) | Void | imported from 3GU |
R4‑1811827 | (reserved) | Void | imported from 3GU |
R4‑1811828 | (reserved) | Void | imported from 3GU |
R4‑1811829 | (reserved) | Void | imported from 3GU |
R4‑1811830 | (reserved) | Void | imported from 3GU |
R4‑1811831 | (reserved) | Void | imported from 3GU |
R4‑1811832 | (reserved) | Void | imported from 3GU |
R4‑1811833 | Introduction of other methods for RRM baseline measurement system | Rohde & Schwarz | imported from 3GU |
R4‑1811834 | LS on UE capability for simultaneousTxSUL-NonSUL | RAN2, Huawei | imported from 3GU |
R4‑1811835 | On multiple antenna port capability for RRM baseline measurement system | Rohde & Schwarz | imported from 3GU |
R4‑1811836 | TP to TR 38.810 on the remaining details of NR FR2 UE Demodulation and CSI testing methodology | Intel Corporation | imported from 3GU |
R4‑1811837 | WF on Measurement Grid | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1811838 | TP to 38.810 on measurement grids of EIRP/EIS, TRP, Spherical Coverage | CATR, SAICT | imported from 3GU |
R4‑1811839 | WF on Evaluation for 2 RX exception in Rel-15 vehicle mounted UE | Volkswagen AG,LG Electronics, Samsung, General Motors | imported from 3GU |
R4‑1811840 | WF on Evaluation for 2 RX exception in Rel-15 vehicle mounted UE | Volkswagen AG,LG Electronics, Samsung, General Motors | imported from 3GU |
R4‑1811841 | LS to RAN on the scope of NR and NB-IoT/eMTC co-existence studies | Huawei | imported from 3GU |
R4‑1811842 | Draft CR to TS37.1451-2 update the CLTA definition in clause 4 | Ericsson | imported from 3GU |
R4‑1811843 | TP for TR38.141-1: RF channel for BS conducted conformance test | ZTE Corporation | imported from 3GU |
R4‑1811844 | WF on MU and TT for Rx requirements for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811845 | WF on MU and TT for transmission in-band TRP emission and directional requirements for FR2 | Ericsson | imported from 3GU |
R4‑1811846 | WF on MU and TT for Rx requirements for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811847 | Draft CR to TS37.145-2 Update MU and TT in Test requirements subclauses | Huawei | imported from 3GU |
R4‑1811848 | TP to TS 38.141-2: Adding requirement text for OTA out-of-band blocking in subclause 7.6 and Annex E2.4.1 and E2.4.2 | Ericsson | imported from 3GU |
R4‑1811849 | CR on intra-frequency measurement without gap definition | Huawei, HiSilicon | imported from 3GU |
R4‑1811850 | CR on TS38.133 for PDSCH and CORESET Reference Measurement Channel | Huawei, HiSilicon | imported from 3GU |
R4‑1811851 | Reply LS on RAN2 progress on ANR | vivo | imported from 3GU |
R4‑1811852 | CR on TS38.133 for cell reselection in idle | MediaTek inc. | imported from 3GU |
R4‑1811853 | Way forward on UE behaviour before or after measurement gap | ZTE | imported from 3GU |
R4‑1811854 | Way forward on gap sharing for measurement prioritization in different scenarios | Samsung, NTT DoCoMo, Verizon Wireless, KDDI | imported from 3GU |
R4‑1811855 | FR2 measurement procedures with UE RX beamforming | Ericsson | imported from 3GU |
R4‑1811856 | CR on TS38.133 for link recovery procedure requirements | MediaTek inc. | imported from 3GU |
R4‑1811857 | CR on TS36.133 for inter-RAT NR measurements in idle | MediaTek inc. | imported from 3GU |
R4‑1811858 | CR on TS38.133 for cell reselection in idle | MediaTek inc. | imported from 3GU |
R4‑1811859 | SFN acquisition for inter-RAT RSTD measurements | Ericsson | imported from 3GU |
R4‑1811860 | CR to 36.133 on introduction of SFTD measurement accuracy requirements | ZTE | imported from 3GU |
R4‑1811861 | CR on TS38.133 for PDSCH and CORESET Reference Measurement Channel | Huawei, HiSilicon | imported from 3GU |
R4‑1811862 | SSB configurations for RRM tests | Ericsson | imported from 3GU |
R4‑1811863 | OCNG Patterns for RRM Tests | Ericsson | imported from 3GU |
R4‑1811864 | WF for demodulation performance requirements for network-based CRS interference mitigation | Ericsson | imported from 3GU |
R4‑1811865 | Simulation assumptions for 8Rx tests | Huawei, HiSilicon | imported from 3GU |
R4‑1811866 | Way forward on UE behaviour before or after measurement gap | ZTE | imported from 3GU |
R4‑1811867 | LS on Initial Active BWP for Pattern 2 and Pattern 3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811868 | Way forward on 8Rx UE demodulation and CSI requirements | Huawei | imported from 3GU |
R4‑1811869 | Way forward on UE behaviour before or after measurement gap | ZTE | imported from 3GU |
R4‑1811870 | LS on Initial Active BWP for Pattern 2 and Pattern 3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811871 | CR on TS38.133 for L1-RSRP measurements for beam management | Huawei, HiSilicon | imported from 3GU |
R4‑1811872 | (reserved) | Void | imported from 3GU |
R4‑1811873 | (reserved) | Void | imported from 3GU |
R4‑1811874 | (reserved) | Void | imported from 3GU |
R4‑1811875 | (reserved) | Void | imported from 3GU |
R4‑1811876 | (reserved) | Void | imported from 3GU |
R4‑1811877 | (reserved) | Void | imported from 3GU |
R4‑1811878 | (reserved) | Void | imported from 3GU |
R4‑1811879 | TP to TS 38.141-2 – Overview of radiated Tx and Rx requirements (4.13) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811880 | Reply LS to IEEE 802.11 working group in relation to certain channel combinations for LAA in 5GHz | Ericsson | imported from 3GU |
R4‑1811881 | LS on EMC Immunity test methods and levels for FR2 | Ericsson | imported from 3GU |
R4‑1811882 | CR on spurious emission and BC in 37.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1811883 | Correction on unwanted emission mask for TS 37.105 | Huawei, HiSilicon | imported from 3GU |
R4‑1811884 | Response LS on Definition of and test methods for OTA unwanted emissions of IMT radio equipment | Ericsson | imported from 3GU |
R4‑1811885 | Draft CR on spurious emission requirement in 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1811886 | TP to TS 38.141-2: OBUE correction | Huawei | imported from 3GU |
R4‑1811887 | TP to TS 38.141-2 on OTA Tx ON/OFF power requirements | NEC | imported from 3GU |
R4‑1811888 | Draft CR to TS37.145-2 Update MU and TT in Test requirements subclauses | Huawei | imported from 3GU |
R4‑1811889 | WF on MU and TT for Tx/Rx TRP supurious emission for FR2 | Huawei | imported from 3GU |
R4‑1811890 | WF on remaining issue RRM testing methodology | Qualcomm | imported from 3GU |
R4‑1811891 | TP to 38.810 on measurement grids of EIRP/EIS, TRP, Spherical Coverage | CATR, SAICT | imported from 3GU |
R4‑1811892 | WF on specifying NR demodulation | Anritsu, Rohde & Schwarz, Keysight, Spirent,^^Qualcomm | imported from 3GU |
R4‑1811893 | TR 38.810 v2.4.0 | Intel Corporation (UK) Ltd | imported from 3GU |
R4‑1811894 | Addition parameters about n50 in TS 38.101-1 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1811895 | Addition parameters about n50 in TS 38.104 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1811896 | Draft CR for TS 38.101-1: n41 GSCN range modification | MediaTek Inc. | imported from 3GU |
R4‑1811897 | WF on Evaluation for 2 RX exception in Rel-15 vehicle mounted UE | Volkswagen AG,LG Electronics, Samsung, General Motors | imported from 3GU |
R4‑1811898 | draft CR to TS 37.145-2 - Update TT tables | Huawei | imported from 3GU |
R4‑1811899 | CR to TS 37.145-2 | Huawei | imported from 3GU |
R4‑1811900 | CR to TR 37.843 | Huawei | imported from 3GU |
R4‑1811901 | TS 38.141-1 v0.5.0 | Huawei | imported from 3GU |
R4‑1811902 | TS 38.141-1 v0.4.0 | Huawei | imported from 3GU |
R4‑1811903 | (reserved) | Void | imported from 3GU |
R4‑1811904 | LS on UE feature list for LTE | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811905 | LS on RAN4 design on Channel Bandwidth | Qualcomm | imported from 3GU |
R4‑1811906 | CR of release independent requirements for LTE Carrier Aggregation beyond 5 carriers (TS 36.307 Rel-14) | KDDI Corporation | imported from 3GU |
R4‑1811907 | CR of release independent requirements for LTE Carrier Aggregation beyond 5 carriers (TS 36.307 Rel-15) | KDDI Corporation | imported from 3GU |
R4‑1811908 | WF on UE feature list | NTT DOCOMO, INC. | imported from 3GU |
R4‑1811909 | Big CR for 38.101-1 | Qualcomm Incorporated | imported from 3GU |
R4‑1811910 | Big CR for 38.101-2 | Qualcomm Incorporated | imported from 3GU |
R4‑1811911 | Big CR for 38.101-3 | Qualcomm Incorporated | imported from 3GU |
R4‑1811912 | CR to TS38.307 | Nokia | imported from 3GU |
R4‑1811913 | CR to TS 38.133: Implementation of endorsed draft CRs from RAN4-AH-1807 and RAN4 #88 | Intel | imported from 3GU |
R4‑1811914 | Correction on Table 7.3.1-3 Network signalling value for reference sensitivity | Intel Corporation | imported from 3GU |
R4‑1811915 | Correction on Table 7.3.1-3 Network signalling value for reference sensitivity | Intel Corporation | imported from 3GU |
R4‑1811916 | Correction on Table 7.3.1-3 Network signalling value for reference sensitivity | Intel Corporation | imported from 3GU |
R4‑1811917 | Correction on Table 7.3.1-3 Network signalling value for reference sensitivity | Intel Corporation | imported from 3GU |
R4‑1811918 | Correction on Table 7.3.1-3 Network signalling value for reference sensitivity | Intel Corporation | imported from 3GU |
R4‑1811919 | CR introducing enhanced utilization of CA and direct activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811920 | CR: test case for reduced DMRS | Huawei, HiSilicon | imported from 3GU |
R4‑1811921 | CR to TS 36.141 - sTTI introduction | Ericsson | imported from 3GU |
R4‑1811922 | CR to TS 36.141 - NB-IoT TDD introduction - TM updates | Ericsson | imported from 3GU |
R4‑1811923 | CR to TS 37.141 - NB-IoT TDD introduction | Ericsson | imported from 3GU |
R4‑1811924 | CR to TR 38.817-02: Update to OTA Modulation Quality | Ericsson | imported from 3GU |
R4‑1811925 | CR introducing enhanced utilization of CA and idle mode measurements for early reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1811926 | CR on TS36.133 for inter-RAT NR measurements in idle | MediaTek inc. | imported from 3GU |
R4‑1811927 | CR of release independent requirements for LTE Carrier Aggregation beyond 5 carriers (TS 36.307 Rel-14) | KDDI Corporation | imported from 3GU |
R4‑1811928 | CR of release independent requirements for LTE Carrier Aggregation beyond 5 carriers (TS 36.307 Rel-15) | KDDI Corporation | imported from 3GU |
R4‑1811929 | CR to TS 37.145-1: E-UTRA DL RS power test requirement correction, Rel-13 | Huawei | imported from 3GU |
page generated from database: 2024-10-07 07:52:06