3GPP TDocs (written contributions) at meeting
Meeting: R4-60 - 2011-08-22 to 2011-08-26, Athens
meeting id: R4-60 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑113941 | Proposed agenda | Chairman | - |
R4‑113942 | RAN4 MIMO-OTA adhoc report | Adhoc convener | - |
R4‑113943 | E-mail discussion summary after RAN4#59AH | Chair | - |
R4‑113944 | E-meeting discussion summary (up to start of R4#60) | Chair | - |
R4‑113945 | RAN4#59 Meeting report | MCC | - |
R4‑113946 | RAN4#59AH Meeting report | MCC | - |
R4‑113947 | Removal of Lower Humidity Limit in Normal Conditions in TS 36.101 | Korea Testing Laboratory | - |
R4‑113948 | LTE inter-band Carrier Aggregation (Band 4 + Band 7) | Rogers Wireless | - |
R4‑113949 | Band 26 Issues | KDDI | - |
R4‑113950 | Co-existence study with Band 18 | KDDI | - |
R4‑113951 | Simulation results (I) Co-existence with Band 18 | KDDI, Nokia | - |
R4‑113952 | Simulation results (II) Co-existence with Band 18 | KDDI | - |
R4‑113953 | Simulation results (III) Co-existence with Band 18 | KDDI | - |
R4‑113954 | LTE-Advanced CA of Band 1 and Band 7 | China Telecommunications | - |
R4‑113955 | TR 36.809 at the end of the eMeeting#2011 | Polaris Wireless | - |
R4‑113956 | Additional results for RFPM LTE simulations in TR 36.809 | Polaris Wireless | - |
R4‑113957 | Use case for Non-contiguous 4C-HSDPA | T-Mobile USA | - |
R4‑113958 | Removal of Lower Humidity Limit in Normal Conditions in TS 25.101 | Korea Testing Laboratory | - |
R4‑113959 | Editorial corrections for 36.133 (Rel-8) | Alcatel-Lucent | - |
R4‑113960 | Editorial corrections for 36.133 (Rel-9) | Alcatel-Lucent | - |
R4‑113961 | Editorial corrections for 36.133 (Rel-10) | Alcatel-Lucent | - |
R4‑113962 | Editorial corrections for 25.133 (Rel-8) | Alcatel-Lucent | - |
R4‑113963 | Editorial corrections for 25.133 (Rel-9) | Alcatel-Lucent | - |
R4‑113964 | Editorial corrections for 25.133 (Rel-10) | Alcatel-Lucent | - |
R4‑113965 | Introduction of Pcmax,c reporting requirements for carrier aggregation | Alcatel-Lucent | - |
R4‑113966 | Further Discussion on RRM Test Cases for Carrier Aggregation | Alcatel-Lucent | - |
R4‑113967 | Discussion on RSRP and RSRQ Test Cases for Carrier Aggregation | Alcatel-Lucent | - |
R4‑113968 | RSRP and RSRQ Test Cases for Carrier Aggregation | Alcatel-Lucent | - |
R4‑113969 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 12) | Alcatel-Lucent | - |
R4‑113970 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (5 + 12) | Alcatel-Lucent | - |
R4‑113971 | Discussion of SCell timing advance calculation using time difference measurement | Alcatel-Lucent | - |
R4‑113972 | [Draft] LS Reply on timing advance calculation using time difference measurement | Alcatel-Lucent | - |
R4‑113973 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS25.307 (Rel-4) | Alcatel-Lucent | - |
R4‑113974 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS25.307 (Rel-5) | Alcatel-Lucent | - |
R4‑113975 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS25.307 (Rel-6) | Alcatel-Lucent | - |
R4‑113976 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS25.307 (Rel-7) | Alcatel-Lucent | - |
R4‑113977 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS25.307 (Rel-8) | Alcatel-Lucent | - |
R4‑113978 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS25.307 (Rel-9) | Alcatel-Lucent | - |
R4‑113979 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS25.307 (Rel-10) | Alcatel-Lucent | - |
R4‑113980 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS34.124 (Rel-10) | Alcatel-Lucent, Sprint | - |
R4‑113981 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS37.104 (Rel-10) | Alcatel-Lucent | - |
R4‑113982 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS37.113 (Rel-10) | Alcatel-Lucent | - |
R4‑113983 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS37.141 (Rel-10) | Alcatel-Lucent | - |
R4‑113984 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band 2, 4 or 5 plus additional new 716-728 downlink | Alcatel-Lucent | - |
R4‑113985 | BS to BS coexistence between Band 12/17 and additional new 716-728 downlink | Alcatel-Lucent | - |
R4‑113986 | TP on E-UTRA UE related Issues to the UMTS/LTE in 900 MHz band SI TR | SOFTBANK MOBILE | - |
R4‑113987 | CA PUCCH performance requirements for 36.141 | Nokia Siemens Networks, Huawei | - |
R4‑113988 | Material of laptop ground plane phantom | Telecom Italia | - |
R4‑113989 | Way forward on insertion loss discussion for inter-band non-contiguous CA for band combination classes A and C | Telecom Italia | - |
R4‑113990 | New study item proposal: RF Requirement for Multi-Mode UE Type(TDD-LTE and LCR TDD) | CATR | - |
R4‑113991 | Spurious emissions band UE Co-existence for adjacent bands | Rohde&Schwarz | - |
R4‑113992 | Clarification of Radio link monitoring test requirements | Rohde&Schwarz | - |
R4‑113993 | Clarification of Radio link monitoring test requirements | Rohde&Schwarz | - |
R4‑113994 | Sustained data rate: Correction of the ACK/NACK feedback mode | Rohde&Schwarz | - |
R4‑113995 | Sustained data rate: Correction of the ACK/NACK feedback mode | Rohde&Schwarz | - |
R4‑113996 | Reference sensitivity: Corrections to the supported channel bandwidths | Rohde&Schwarz | - |
R4‑113997 | Reference sensitivity: Corrections to the supported channel bandwidths | Rohde&Schwarz | - |
R4‑113998 | Reference sensitivity: Corrections to the supported channel bandwidths | Rohde&Schwarz | - |
R4‑113999 | Corrections on proposal for E-UTRA/UTRA UE-UE co-existence spurious emission level between Band 5 and Band 8 in Korea | KT | - |
R4‑114000 | TP for Issues about the possibility of a harmonized WI proposal for the different frequency allocations in the 900 MHz ranges Japan and Korea | KT | - |
R4‑114001 | Proposal for Carrier Aggregation for Band 1 and Band 3 | KT | - |
R4‑114002 | TP for Study of Korean regulation for 900 MHz band | KT | - |
R4‑114003 | Test configurations for non-contiguous MSR operation | Nokia Siemens Networks | - |
R4‑114004 | Correction to UL MIMO | ZTE | - |
R4‑114005 | Some experimental results about Band 7 and Band 38 coexistence | ZTE | - |
R4‑114006 | CR to TS 36.104 Minimum requirements of Operating Band Unwanted Emissions | ZTE | - |
R4‑114007 | CR to TS 36.104 Minimum requirements of Operating Band Unwanted Emissions | ZTE | - |
R4‑114008 | CR to TS 36.141 Test requirements of Operating Band Unwanted Emissions | ZTE | - |
R4‑114009 | CR to TS 36.141 Test requirements of Operating Band Unwanted Emissions | ZTE | - |
R4‑114010 | Correction for TS 36.141 | ZTE | - |
R4‑114011 | CR to TS36.101: Correction on the accuracy test of CQI. | ZTE | - |
R4‑114012 | CR to TS36.101: Correction on the accuracy test of CQI. | ZTE | - |
R4‑114013 | CR to TS36.101: Correction on the accuracy test of CQI. | ZTE | - |
R4‑114014 | CR to TS36.101: Correction on CQI mapping index of TDD RI test | ZTE | - |
R4‑114015 | CR to TS36.101: Correction on CQI mapping index of TDD RI test | ZTE | - |
R4‑114016 | CR to TS36.101: Correction on CQI mapping index of TDD RI test | ZTE | - |
R4‑114017 | Further clarification for the dual-layer beamforming demodulation requirements | ZTE | - |
R4‑114018 | Further clarification for the dual-layer beamforming demodulation requirements | ZTE | - |
R4‑114019 | Discussion on the CQI test under static channel | ZTE | - |
R4‑114020 | Simulation results for eDL-MIMO PMI reporting | ZTE | - |
R4‑114021 | Considerations on PMI tests for 8Tx cross-polarized antennas | ZTE | - |
R4‑114022 | CR to TS36.101: Reference measurement channel for FDD PMI reporting on eDL-MIMO | ZTE | - |
R4‑114023 | CR to TS36.101: Reference measurement channel for TDD PMI reporting on eDL-MIMO | ZTE | - |
R4‑114024 | CR to TS36.101: FDD PMI reporting requirements for transmission mode 9 | ZTE | - |
R4‑114025 | Consideration on measurements regarding MBSFN configuration for eICIC | ZTE | - |
R4‑114026 | Consideration on cell identification test cases for eICIC | ZTE | - |
R4‑114027 | cell identification delay performance results for eICIC | ZTE | - |
R4‑114028 | CR to TS36.133: Cell identification requirement for eICIC | ZTE | - |
R4‑114029 | Discussion on Test Configuration for MSR_NC | ZTE | - |
R4‑114030 | Introduction of the downlink CA demodulation requirements | ZTE | - |
R4‑114031 | Correction to RRC connection mobility control in CA | ZTE | - |
R4‑114032 | TP of relay dynamic range in TR 36.826 | ZTE | - |
R4‑114033 | TP of access link output power for high power class in TR 36.826 | ZTE | - |
R4‑114034 | TP for the operating band unwanted emission requirement for high power class in TR 36.826 | ZTE | - |
R4‑114035 | Some experimental results about in-band emission for intra-band contiguous carrier aggregation | ZTE | - |
R4‑114036 | CR for 36.101: Transmitter part | ZTE | - |
R4‑114037 | CR for 36.101: Receiver part | ZTE | - |
R4‑114038 | Discussion on TA in the uplink-only or downlink-only repeater scenarios | ZTE | - |
R4‑114039 | Terminology of Intra-band non-contiguous CA | ZTE | - |
R4‑114040 | Discuss on Intra-band non-contiguous CA BS Transmitter requirements | ZTE | - |
R4‑114041 | Discuss on Intra-band non-contiguous CA BS Receiver Requirements | ZTE | - |
R4‑114042 | Handling the OOB Interference by NetworkPlan and ACIC for NC_4C_HSDPA | ZTE | - |
R4‑114043 | Overview on the testing configuration of LME OTA test | ZTE^^ | - |
R4‑114044 | CR for TR 25.914: Supplement of the testing configuration for LME OTA testing | ZTE | - |
R4‑114045 | Adding average TRP and TRS definitions for LME OTA testing | ZTE | - |
R4‑114046 | Adding TRP and TRS minimum requirements for LME OTA Testing | ZTE | - |
R4‑114047 | Adding TRP and TRS recommended requirements for LME OTA Testing | ZTE | - |
R4‑114048 | Discussion on the Electromagnetic Compatibility (EMC) for Multi-Standard mobile terminals and ancillary equipment | ZTE | - |
R4‑114049 | Some Deterministic Studies information of 700M in AWG | ZTE | - |
R4‑114050 | Filters Configuration and Band Partition on APT700MHz | ZTE | - |
R4‑114051 | Different deployment scenarios for co-existence study for TDD-LTE | ZTE | - |
R4‑114052 | Test plan for MIMO OTA testing using two channels | Rohde & Schwarz | - |
R4‑114053 | Updated TR v0.0.2 for LTE Advanced Carrier Aggregation in Band 41 (LTE_CA_B41) WI | Clearwire | - |
R4‑114054 | NS signalling requirements for Band 41 CA | Clearwire | - |
R4‑114055 | Spectrum emission mask requirements for Band 41 CA | Clearwire | - |
R4‑114056 | MPR and A-MPR aspects for Band 41 CA | Clearwire | - |
R4‑114057 | Considerations regarding support for 1 CC UL in intra-band CA | Clearwire | - |
R4‑114058 | Final requirements for Band 42 | Clearwire | - |
R4‑114059 | Restricted Measurements with MBSFN Configuration | Alcatel-Lucent | - |
R4‑114060 | Neighbor Cells List for Restricted Patterns | Alcatel-Lucent | - |
R4‑114061 | Requirements for Home BS output Power for Co-Channel E-UTRA Channel Protection | Alcatel-Lucent | - |
R4‑114062 | Requirements for Home BS Co-channel E-UTRA Protection | Alcatel-Lucent | - |
R4‑114063 | TDD DL-UL Reconfiguration Study Item | Alcatel-Lucent | - |
R4‑114064 | The Upper Limit of Pcmax and P-MPR | InterDigital | - |
R4‑114065 | TP for TR 37.806: E850 Coexistence Scenarios | NII | - |
R4‑114066 | Work plan for the E850 Lower Band WI | NII | - |
R4‑114067 | TP for 900 MHz band SI TR: Study of UTRA UE specific issues | eAccess | - |
R4‑114068 | TP for 900 MHz band SI TR: Definition of a new UMTS band for Japanese 900 MHz band | eAccess | - |
R4‑114069 | Clarification of ACLR requirements for DC-HSUPA | Qualcomm Incorporated | - |
R4‑114070 | Clarification of ACLR requirements for DC-HSUPA | Qualcomm Incorporated | - |
R4‑114071 | Introduction of HS-DPCCH detection requirements for 4C-HSDPA | Qualcomm Incorporated | - |
R4‑114072 | On the need of "per band CLTD capability" | Qualcomm Incorporated | - |
R4‑114073 | Disabling CLTD feature in CELL_FACH | Qualcomm Incorporated | - |
R4‑114074 | On the need of turning on/off CLTD feature based on UE implementation | Qualcomm Incorporated | - |
R4‑114075 | UE Tx Core Requirements for UL CLTD | Qualcomm Incorporated | - |
R4‑114076 | RRM requirements for high priority search in CELL_FACH | Qualcomm Incorporated | - |
R4‑114077 | Analysis of UE core requirements for single band 4C-HSDPA II-4 | Qualcomm Incorporated | - |
R4‑114078 | Initial discussion on UE Rx core requirements for non-contiguous 4C-HSDPA | Qualcomm Incorporated | - |
R4‑114079 | Simulation of DC-HSUPA receiver characteristics for Band XXV | Qualcomm Incorporated | - |
R4‑114080 | Analysis of UE Tx core requirements for band XXV | Qualcomm Incorporated | - |
R4‑114081 | UE core requirements for Band XXV | Qualcomm Incorporated | - |
R4‑114082 | Simulation of DC-HSUPA receiver characteristics for Band XXVI | Qualcomm Incorporated | - |
R4‑114083 | Analysis of UE core requirements for band XXVI | Qualcomm Incorporated | - |
R4‑114084 | UE core requirements for Band XXVI | Qualcomm Incorporated | - |
R4‑114085 | 800 MHz coexistence for UMTS Band XXVI | Qualcomm Incorporated | - |
R4‑114086 | Bounding Intra/Inter Frequency search requirements for Enhanced UE DRX in CELL_FACH | Qualcomm Incorporated | - |
R4‑114087 | Proposed format of LTE MIMO OTA round robin data | Intel Corporation | - |
R4‑114088 | Simulation results for the evaluation of PDCCH performance in eICIC | Intel Corporation | - |
R4‑114089 | Simulation results for cell identification delay in eICIC | Intel Corporation | - |
R4‑114090 | Downlink CA demodulation performance for TDD | Intel Corporation | - |
R4‑114091 | Downlink intra-band contiguous CA demodulation performance with frequency error | Intel Corporation | - |
R4‑114092 | Discussion on RI testing methodologies and penalty of advanced receivers | Intel Corporation | - |
R4‑114093 | Simulation results for eDL-MIMO CQI tests | Intel Corporation | - |
R4‑114094 | Discussion on PMI test cases for eDL-MIMO TDD | Intel Corporation | - |
R4‑114095 | Discussion on inter-band CA with harmonic or intermodulation relation | Motorola Mobility | - |
R4‑114096 | Performance requirements for UE supporting intra-band carrier aggregation | Motorola Mobility | - |
R4‑114097 | Simulation results for CA UE performance requirements | Motorola Mobility | - |
R4‑114098 | Discussion on RI test methodology for eDL-MIMO | Motorola Mobility | - |
R4‑114099 | Discussion about two-stage method | Nokia Corporation | - |
R4‑114100 | Way forward for coexistence issue between band 5 and Public Safety band | LG Uplus,SK Telecom | - |
R4‑114101 | Way forward for the Study Item on Interference analysis between 800~900 MHz bands | LG Uplus,SK Telecom | - |
R4‑114102 | Opinion on Harmonization between Korea and Japan | LG Uplus,SK Telecom | - |
R4‑114103 | Method for IL mapping for inter-band CA | Renesas Mobile Europe Ltd. | - |
R4‑114104 | Considerations on B22 refsens | Renesas Mobile Europe Ltd. | - |
R4‑114105 | Clarification of demodulation in static propagation and Multipath fading case 1 for Home BS | TD Tech, Huawei | - |
R4‑114106 | Discussion and results for UE demodulation testing for CA | NEC | - |
R4‑114107 | On CSI performance testing using CSI-RS | NEC | - |
R4‑114108 | Applying CSI reports during rank switching in RI FDD test | NEC | - |
R4‑114109 | On ABS pattern for CSI and demodulation testing | NEC | - |
R4‑114110 | Further discussion on radio conditions for CSFB to UTRA TDD | CATT | - |
R4‑114111 | Simulation results of cell search for CSFB to UTRA TDD | CATT | - |
R4‑114112 | Adding enhanced UTRA TDD cell identification requirements for Rel-9 | CATT | - |
R4‑114113 | Adding enhanced UTRA TDD cell identification requirements for Rel-10 | CATT | - |
R4‑114114 | Discussion on UTRA TDD RRC release redirection | CATT | - |
R4‑114115 | Modifications on TDD inter frequency measurements with autonomous gaps | CATT | - |
R4‑114116 | Correction of code block numbers for some RMCs | CATT | - |
R4‑114117 | Correction of code block numbers for some RMCs | CATT | - |
R4‑114118 | Correction of code block numbers for some RMCs | CATT | - |
R4‑114119 | Considerations on 8-Tx PMI reporting verification for eDL-MIMO | CATT | - |
R4‑114120 | Further considerations on CA UE time mask | CATT | - |
R4‑114121 | Updated Ideal Simulation results for TDD CA UE Demodulation requirements | CATT | - |
R4‑114122 | Discussion on RRM test cases for CA | CATT | - |
R4‑114123 | TP for output power of Relay | CATT | - |
R4‑114124 | TP for output power dynamics of Relay | CATT | - |
R4‑114125 | Updated simulation results for R-PDCCH performance | CATT | - |
R4‑114126 | Discussion on multi-TA in Rel-11 | CATT | - |
R4‑114127 | Considerations of co-existence study for APAC700 | CATT | - |
R4‑114128 | Interference analysis on Pico scenarios for LTE TDD eIMTA | CATT | - |
R4‑114129 | Analysis on UE-UE interference for LTE TDD eIMTA | CATT | - |
R4‑114130 | Proposal on feasible scenarios and assumptions for co-existence study of LTE TDD eIMTA | CATT, CMCC | - |
R4‑114131 | Correction to UL RMC for FDD and TDD | Anritsu | - |
R4‑114132 | Correction to UL RMC for FDD and TDD | Anritsu | - |
R4‑114133 | Correction to UL RMC for FDD and TDD | Anritsu | - |
R4‑114134 | Control channel SNR in RRM Test cases | Anritsu | - |
R4‑114135 | Clarify time points and time duration for RLM tests A.7.3.x | Anritsu | - |
R4‑114136 | Clarify time points and time duration for RLM tests A.7.3.x | Anritsu | - |
R4‑114137 | Clarify time points and time duration for RLM tests A.7.3.x | Anritsu | - |
R4‑114138 | Correction to FRC for H-set 8A | Anritsu | - |
R4‑114139 | Correction to FRC for H-set 8A | Anritsu | - |
R4‑114140 | Correction to FRC for H-set 8A | Anritsu | - |
R4‑114141 | Thresholds and margins for reporting of neighbour cells in RRM tests A.5.4a, A.5.4b | Anritsu | - |
R4‑114142 | Thresholds and margins for reporting of neighbour cells in RRM tests A.5.4a, A.5.4b | Anritsu | - |
R4‑114143 | Thresholds and margins for reporting of neighbour cells in RRM tests A.5.4a, A.5.4b | Anritsu | - |
R4‑114144 | Specify Es/Noc in RRM tests A 4.5.1 and A 4.5.2 | Anritsu | - |
R4‑114145 | Specify Es/Noc in RRM tests A 4.5.1 and A 4.5.2 | Anritsu | - |
R4‑114146 | Specify Es/Noc in RRM tests A 4.5.1 and A 4.5.2 | Anritsu | - |
R4‑114147 | Correction to Inter-system Handover TCs | Anritsu | - |
R4‑114148 | Correction to Inter-system Handover TCs | Anritsu | - |
R4‑114149 | Correction to Inter-system Handover TCs | Anritsu | - |
R4‑114150 | Uncertainties and Test Tolerances for 3000MHz to 4200MHz | Anritsu | - |
R4‑114151 | LS to RAN5: Channel matrix impairments for CSI tests | Anritsu | - |
R4‑114152 | Introduction of DL power control, initial convergence | CMCC, STE, Marvell, CATR | - |
R4‑114153 | Introduction of new DL power control TC, initial convergence for 1.28Mcps TDD | CMCC, STE, Marvell, CATR | - |
R4‑114154 | Introduction of new DL power control TC, initial convergence for 1.28Mcps TDD | CMCC, STE, Marvell, CATR | - |
R4‑114155 | Introduction of new DL power control TC, initial convergence for 1.28Mcps TDD | CMCC, STE, Marvell, CATR | - |
R4‑114156 | Introduction of new DL power control TC, initial convergence for 1.28Mcps TDD | CMCC, STE, Marvell, CATR | - |
R4‑114157 | Analysis of aggregated channel bandwidth for CA_38 | CMCC | - |
R4‑114158 | Text proposals on operating bands and channel bandwidth for CA_38 | CMCC | - |
R4‑114159 | UE demodulation performance requirements under multiple-cell scenario for 1.28Mcps TDD | CMCC | - |
R4‑114160 | LCR TDD UE performance requirements under multiple-cell scenario TR xy.abc v0.1.0 | CMCC | - |
R4‑114161 | eICIC Autonomous Power setting parameters finalization | Picochip | - |
R4‑114162 | TRP and TRS uncertainty budgets for Reverberation Chamber Methodology | Bluetest | - |
R4‑114163 | Complementary information about the reverberation chamber methodology | Bluetest | - |
R4‑114164 | LTE Advanced Carrier Aggregation in Band 7 | China Unicom | - |
R4‑114165 | CR on E-UTRAN inter frequency measurements | LG Electronics | - |
R4‑114166 | CR on E-UTRAN inter frequency measurements | LG Electronics | - |
R4‑114167 | CR on E-UTRAN inter frequency measurements | LG Electronics | - |
R4‑114168 | Simulation results of the evaluation of PDCCH performance for TDM eICIC | LG Electronics | - |
R4‑114169 | Draft LS on UE measurements with blank MBSFN subframes for eICIC | LG Electronics | - |
R4‑114170 | Consideration on the Pico cell list for eICIC RRM measurements | LG Electronics | - |
R4‑114171 | Further evaluation on simulation results of cell identification for TDM eICIC | LG Electronics | - |
R4‑114172 | Test cases of cell identification for eICIC | LG Electronics | - |
R4‑114173 | RSRQ test cases for eICIC | LG Electronics | - |
R4‑114174 | Sustained data rate test results for LTE-A CA | LG Electronics | - |
R4‑114175 | Way forward on the simulation assumption for MPR mask of multi-cluster simultaneous transmission for LTE-A | LG Electronics | - |
R4‑114176 | RF Simulation results for multi-clustered simultaneous transmission for single CA and multi CA | LG Electronics | - |
R4‑114177 | TRP and TRS requirements for UMTS band XIX | NTT DOCOMO | - |
R4‑114178 | LTE Round Robin Test Result (Pool 1 and 2 DUTs) | NTT DOCOMO | - |
R4‑114179 | Operator requirements for the MIMO OTA testing | NTT DOCOMO, Orange | - |
R4‑114180 | Update the objective of the MIMO OTA Study Item | NTT DOCOMO | - |
R4‑114181 | MOP lower tolerance for Band XXV | NTT DOCOMO | - |
R4‑114182 | Introduction of Band 22 | NTT DOCOMO, Ericsson, ST-Ericsson | - |
R4‑114183 | E-UTRA Band 22 requirements | NTT DOCOMO | - |
R4‑114184 | A way forward for Band 26/XXVI REFSENS | NTT DOCOMO | - |
R4‑114185 | Scenarios for Non-contiguous 4C-HSDPA operation | Orange | - |
R4‑114186 | FDD/ TDD co-existence considerations | TeliaSonera | - |
R4‑114187 | TIB and RIB for inter-band CA B3 + B7 | TeliaSonera | - |
R4‑114188 | LTE MIMO OTA test results and analysis | Agilent Technologies, TMC | - |
R4‑114189 | LTE throughput stability dependencies on the initial states of different channel model implementations | Agilent Technologies | - |
R4‑114190 | Active Antenna Pattern Measurement Sensitivity Experiment and Analysis | Agilent Technologies, TMC | - |
R4‑114191 | Analysis of measurement campaign results | Agilent Technologies | - |
R4‑114192 | BS transmitter configuration for receiver tests | NTT DOCOMO | - |
R4‑114193 | Further discussion and way forward on DTX detection of PUCCH format 2 | NTT DOCOMO | - |
R4‑114194 | TP on 900 MHz band specific issues to the UMTS/LTE in 900 MHz band SI TR | NTT DOCOMO | - |
R4‑114195 | TP to the UMTS/LTE in 900 MHz band TR about co-existence between Band 5/19 BS and Band 8 BS | NTT DOCOMO | - |
R4‑114196 | Japanese operators preference about possible options on 900 MHz band in Japan | NTT DOCOMO, eAccess, SBM, KDDI | - |
R4‑114197 | TR (v0.2.0) of UMTS/LTE in 900 MHz band SI | NTT DOCOMO | - |
R4‑114198 | New Work item proposal for 900MHz UMTS/LTE operation | NTT DOCOMO | - |
R4‑114199 | UE coexistence in the OOBE domain | Qualcomm Incorporated | - |
R4‑114200 | UE coexistence in the OOBE domain | Qualcomm Incorporated | - |
R4‑114201 | UE coexistence in the OOBE domain | Qualcomm Incorporated | - |
R4‑114202 | UE coexistence in the OOBE domain | Qualcomm Incorporated | - |
R4‑114203 | Band 3 in Japan | Qualcomm Incorporated | - |
R4‑114204 | Band 7 and Band 38 coexistence | Qualcomm Incorporated | - |
R4‑114205 | On explicit and implicit MCS signaling in DCI for HARQ retransmissions | Qualcomm Incorporated | - |
R4‑114206 | Adding codebook subset restriction for single layer closed-loop spatial multiplexing test: | Qualcomm Incorporated | - |
R4‑114207 | Adding codebook subset restriction for single layer closed-loop spatial multiplexing test | Qualcomm Incorporated | - |
R4‑114208 | Adding codebook subset restriction for single layer closed-loop spatial multiplexing test | Qualcomm Incorporated | - |
R4‑114209 | Simulation results for eDL-MIMO demodulation requirements | Qualcomm Incorporated | - |
R4‑114210 | CSI-RS rate matching test for non TM9 capable UEs | Qualcomm Incorporated | - |
R4‑114211 | On the remaining aspects of PMI and RI reporting accuracy tests for eDL-MIMO | Qualcomm Incorporated | - |
R4‑114212 | Relative phase discontinuity | Qualcomm Incorporated | - |
R4‑114213 | ABS configuration for demodulation requirements for eICIC | Qualcomm Incorporated | - |
R4‑114214 | System level simulation on side conditions for eICIC | Qualcomm Incorporated | - |
R4‑114215 | PDCCH performance for eICIC | Qualcomm Incorporated | - |
R4‑114216 | On MBSFN configuration in RRM tests for eICIC | Qualcomm Incorporated | - |
R4‑114217 | On measSubframeCellList when eICIC is configured | Qualcomm Incorporated | - |
R4‑114218 | RRM test cases for eICIC | Qualcomm Incorporated | - |
R4‑114219 | CR on RLM test cases for eICIC with short DRX | Qualcomm Incorporated | - |
R4‑114220 | Cell identification requirements for eICIC | Qualcomm Incorporated | - |
R4‑114221 | CR on cell identification delay for eICIC | Qualcomm Incorporated | - |
R4‑114222 | Cell identification test cases for eICIC | Qualcomm Incorporated | - |
R4‑114223 | CR on cell identification test cases for eICIC | Qualcomm Incorporated | - |
R4‑114224 | RSRP RSRQ measurement accuracy test | Qualcomm Incorporated | - |
R4‑114225 | CR on test cases for RSRP RSRQ measurement accuracy | Qualcomm Incorporated | - |
R4‑114226 | Carrier Aggregation RRM Tests | Qualcomm Incorporated | - |
R4‑114227 | Carrier Aggregation PHR and Pcmax,c | Qualcomm Incorporated | - |
R4‑114228 | Requirements for inter-frequency measurements for CA capable UEs | Qualcomm Incorporated | - |
R4‑114229 | MPR for intra-band CA with single cluster on each component carrier | Qualcomm Incorporated | - |
R4‑114230 | MPR for Multi-cluster CA Bandwidth Class A | Qualcomm Incorporated | - |
R4‑114231 | Configured transmit power limit for carrier aggregation | Qualcomm Incorporated | - |
R4‑114232 | Demodulation requirements for carrier aggregation | Qualcomm Incorporated | - |
R4‑114233 | Impact of relative frequency error for contiguous intra-band CA performance | Qualcomm Incorporated | - |
R4‑114234 | Considerations on soft buffer limitations | Qualcomm Incorporated | - |
R4‑114235 | Multiple Timing Advance | Qualcomm Incorporated | - |
R4‑114236 | Requirements for Bands 42 and 43 | Qualcomm Incorporated | - |
R4‑114237 | Requirements for Band 22 | Qualcomm Incorporated | - |
R4‑114238 | Band 26 UE Coexistence Requirements | Qualcomm Incorporated | - |
R4‑114239 | 700 MHz band in Asia | Qualcomm Incorporated | - |
R4‑114240 | 900 MHz coexistence | Qualcomm Incorporated | - |
R4‑114241 | Active antenna patterns in two-stage methods | Qualcomm Incorporated | - |
R4‑114242 | Refinement of RSRP levels for measurement accuracy test cases | NTT DOCOMO | - |
R4‑114243 | Issues on narrow measurement bandwidth | NTT DOCOMO | - |
R4‑114244 | Addition of test case for SCell/ SCC measurements when SCell is deactivated | NTT DOCOMO | - |
R4‑114245 | Introduction of UE Measurement Capability for non configured frequencies without measurement gaps | NTT DOCOMO | - |
R4‑114246 | Configurations of inter-freq measurement test cases for CA capable UEs | NTT DOCOMO | - |
R4‑114247 | Way forward for restricted measurements with MBSFN subframes on measured cells | NTT DOCOMO | - |
R4‑114248 | Comparison of the rank indication test proposals | Renesas Mobile Europe Ltd | - |
R4‑114249 | Discussion on PMI testing for eDL-MIMO | Renesas Mobile Europe Ltd | - |
R4‑114250 | PDCCH performance evaluation for eICIC | Renesas Mobile Europe Ltd | - |
R4‑114251 | UE demodulation under colliding RS in eICIC | Renesas Mobile Europe Ltd | - |
R4‑114252 | Impact of the RX impairments and frequency error in CA demodulation | Renesas Mobile Europe Ltd | - |
R4‑114253 | Further considerations on calculated timing advance for carrier aggregation | Renesas Mobile Europe Ltd. | - |
R4‑114254 | Response LS on timing advance calculation using time difference measurement | Renesas Mobile Europe Ltd. | - |
R4‑114255 | Improvement of higher priority reselection | Renesas Mobile Europe Ltd. | - |
R4‑114256 | Improvement of higher priority reselection | Renesas Mobile Europe Ltd. | - |
R4‑114257 | Reselection from UTRA to E-UTRA in CELL-FACH | Renesas Mobile Europe Ltd. | - |
R4‑114258 | Simulations of reselection from UTRA to E-UTRA | Renesas Mobile Europe Ltd. | - |
R4‑114259 | Non-contiguous 4C-HSDPA with single receiver | Renesas Mobile Europe Ltd. | - |
R4‑114260 | Measurement events for NC-4C-HSDPA | Renesas Mobile Europe Ltd. | - |
R4‑114261 | System simulations for eICIC cell search | Renesas Mobile Europe Ltd. | - |
R4‑114262 | Cell identification results for eICIC | Renesas Mobile Europe Ltd. | - |
R4‑114263 | Bandwidth class signalling for non CA bands | Renesas Mobile Europe Ltd | - |
R4‑114264 | Simulation Results for CA demodulation with power imbalanace | Renesas Mobile Europe Ltd | - |
R4‑114265 | BS TR for CA WI, TR 36.808, V1.7.0 | Nokia Siemens Networks | - |
R4‑114266 | TRs for Rel-11 CA | Nokia Siemens Networks, Nokia, Ericsson and ST-Ericsson | - |
R4‑114267 | Work plan for LTE CA enhancements | Nokia Siemens Networks, Nokia | - |
R4‑114268 | FDD TDD Co-existence | Nokia | - |
R4‑114269 | FDD TDD Co-existence | Nokia | - |
R4‑114270 | Intra-band contiguous CA power control | Nokia | - |
R4‑114271 | Intra-band contiguous CA power control | Nokia | - |
R4‑114272 | Intra-band contiguous CA Ue to UE Co-ex | Nokia | - |
R4‑114273 | Intra-band contiguous CA Ue to UE Co-ex | Nokia | - |
R4‑114274 | Alternative way to define channel bandwidths per operating band for CA | Nokia | - |
R4‑114275 | Alternative way to define channel bandwidths per operating band for CA | Nokia | - |
R4‑114276 | MPR and A-MPR for multi-cluster allocation in single carrier transmission | Nokia | - |
R4‑114277 | CQI reporting accuracy test on eDL MIMO | NTT DOCOMO | - |
R4‑114278 | Introduction of TM9 PMI reporting accuracy requirements | NTT DOCOMO, Huawei, HiSilicon, Intel, ZTE, LG Electronics | - |
R4‑114279 | Introduction of TM9 RI reporting accuracy requirements | NTT DOCOMO | - |
R4‑114280 | UE demodulation test scenario for CA soft buffer issue | NTT DOCOMO | - |
R4‑114281 | Performance of Interference Rejection Combining Receiver in asynchronous network for LTE | NTT DOCOMO | - |
R4‑114282 | Typical antenna efficiency for WWAN antennas | Ericsson, ST-Ericsson | - |
R4‑114283 | Adding sections for TRP and TRS requirements for data transfer position | Ericsson, ST-Ericsson, Intel | - |
R4‑114284 | Modifications to Band 3/III for operation in Japan | Ericsson, ST-Ericsson | - |
R4‑114285 | Modifications to Band 3/III for operation in Japan to 36.104 | Ericsson, ST-Ericsson | - |
R4‑114286 | Band 3/III operation in Japan | Ericsson, ST-Ericsson | - |
R4‑114287 | Modifications to Band 3/III for operation in Japan to 36.104 | Ericsson, ST-Ericsson | - |
R4‑114288 | Co-existence and co-location corrections in 36.104 | Ericsson, ST-Ericsson | - |
R4‑114289 | Co-existence and co-location corrections in 37.104 | Ericsson, ST-Ericsson | - |
R4‑114290 | Frequency band related requirements to 36.133 | Ericsson, ST-Ericsson | - |
R4‑114291 | Modifications to Band 3/III for operation in Japan to 36.141 | Ericsson, ST-Ericsson | - |
R4‑114292 | Band 3/III operation in Japan | Ericsson, ST-Ericsson | - |
R4‑114293 | Band 3/III operation in Japan | Ericsson, ST-Ericsson | - |
R4‑114294 | Co-existence and co-location corrections in 36.141 | Ericsson, ST-Ericsson | - |
R4‑114295 | Co-existence and co-location corrections in 37.141 | Ericsson, ST-Ericsson | - |
R4‑114296 | Fixing UARFCN numbers in 25.101 R8 | Ericsson, ST-Ericsson | - |
R4‑114297 | Fixing UARFCN numbers in 25.101 R9 | Ericsson, ST-Ericsson | - |
R4‑114298 | Fixing UARFCN numbers in 25.101 R10 | Ericsson, ST-Ericsson | - |
R4‑114299 | Modifications to Band 3/III for operation in Japan to 25.104 | Ericsson, ST-Ericsson | - |
R4‑114300 | Modifications to Band 3/III for operation in Japan to 25.104 | Ericsson, ST-Ericsson | - |
R4‑114301 | Modifications to Band 3/III for operation in Japan to 25.104 | Ericsson, ST-Ericsson | - |
R4‑114302 | Co-existence requirements on TS 25.104 | Ericsson, ST-Ericsson | - |
R4‑114303 | Co-existence requirements on TS 25.141 | Ericsson, ST-Ericsson | - |
R4‑114304 | Modifications to Band 3/III for operation in Japan to 25.141 | Ericsson, ST-Ericsson | - |
R4‑114305 | Modifications to Band 3/III for operation in Japan to 25.141 | Ericsson, ST-Ericsson | - |
R4‑114306 | Modifications to Band 3/III for operation in Japan to 25.141 | Ericsson, ST-Ericsson | - |
R4‑114307 | Intra band Carrier Aggregation for LTE TR proposal | Ericsson, ST-Ericsson, Nokia Siemens Networks, Nok | - |
R4‑114308 | Inter band Carrier Aggregation for LTE TR proposal | Ericsson, ST-Ericsson, Nokia and Nokia Siemens Networks | - |
R4‑114309 | Band 25/XXV co-existence fix in TS 36.104 | Ericsson, ST-Ericsson | - |
R4‑114310 | MoM of 3500 MHz open issues Telco (August 3, 2011) | Ericsson, ST-Ericsson | - |
R4‑114311 | Add Band 42 and 43 for LTE 3500 (TDD) to TS 25.104 | Ericsson, ST-Ericsson | - |
R4‑114312 | Add Band 42 and 43 for LTE 3500 (TDD) to TS 25.141 | Ericsson, ST-Ericsson | - |
R4‑114313 | Band 42 and 43 for LTE 3500 (TDD) correction to TS 36.104 | Ericsson, ST-Ericsson | - |
R4‑114314 | Band 42 and 43 for LTE 3500 (TDD) correction to TS 36.141 | Ericsson, ST-Ericsson | - |
R4‑114315 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 25.104 | Ericsson, ST-Ericsson | - |
R4‑114316 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 25.141 | Ericsson, ST-Ericsson | - |
R4‑114317 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 25.113 | Ericsson, ST-Ericsson | - |
R4‑114318 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 25.461 | Ericsson, ST-Ericsson | - |
R4‑114319 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 34.124 | Ericsson, ST-Ericsson | - |
R4‑114320 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 36.104 | Ericsson, ST-Ericsson | - |
R4‑114321 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 36.141 | Ericsson, ST-Ericsson | - |
R4‑114322 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 36.113 | Ericsson, ST-Ericsson | - |
R4‑114323 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 36.124 | Ericsson, ST-Ericsson | - |
R4‑114324 | Band 26 co-existence | Ericsson, ST-Ericsson | - |
R4‑114325 | TP for TR ab.cde (APAC700): APAC700 co-existence with 3GPP legacy bands | Ericsson, ST-Ericsson | - |
R4‑114326 | Lower E850 co-existence | Ericsson, ST-Ericsson | - |
R4‑114327 | Option analysis for 900MHz in Japan and Korea | Ericsson, ST-Ericsson | - |
R4‑114328 | KCC requirements applicability | Ericsson, ST-Ericsson | - |
R4‑114329 | LS Out to GERAN on new operating bands | Ericsson, ST-Ericsson | - |
R4‑114330 | Correcting the time alignment text in the applicability tables | Ericsson | - |
R4‑114331 | Correcting the time alignment text in the applicability tables | Ericsson | - |
R4‑114332 | Introduction of HS-DPCCH detection requirements for 4C-HSDPA | Ericsson, ST-Ericsson, Qualcomm Inc. | - |
R4‑114333 | 4C-HSDPA HS-DPCCH Summary of Simulation Results | Ericsson, ST-Ericsson | - |
R4‑114334 | Introduction of S-CPICH power offset accuracy test | Ericsson, ST-Ericsson, Qualcomm Inc. | - |
R4‑114335 | Impact of non-contiguous 4C-HSDPA introduction on BS specifications. | Ericsson, ST-Ericsson | - |
R4‑114336 | Scenarios and simulation assumptions for co-existence study of TDD with different UL/DL configurations | Ericsson, ST-Ericsson | - |
R4‑114337 | Initial coexistence analysis of TDD cells with different UL/DL configurations | Ericsson, ST-Ericsson | - |
R4‑114338 | Traffic model and user distribution for co-existence study of TDD with different UL/DL configurations | Ericsson, ST-Ericsson | - |
R4‑114339 | Test case for enhanced interfrequency measurements | Ericsson, ST-Ericsson | - |
R4‑114340 | Test case for interfrequency detected set without compressed mode | Ericsson, ST-Ericsson | - |
R4‑114341 | Test case for interfrequency detected set with compressed mode | Ericsson, ST-Ericsson | - |
R4‑114342 | Inter-frequency detected set CPICH measurement requirements without compressed mode | Ericsson, ST-Ericsson | - |
R4‑114343 | Correction to measurement reporting requirements | Ericsson, ST-Ericsson | - |
R4‑114344 | Simulation results for CA UE demodulation with no RF impairments | Ericsson, ST-Ericsson | - |
R4‑114345 | Simulation results for CA UE demodulation with frequency error | Ericsson, ST-Ericsson | - |
R4‑114346 | Way forward on carrier aggregation test configuration | Ericsson, ST-Ericsson | - |
R4‑114347 | Frequency offsets between CCs for test system | Ericsson, ST-Ericsson | - |
R4‑114348 | Consideration on PDCCH/PDSCH test for non-ABS subframes | Ericsson, ST-Ericsson | - |
R4‑114349 | Simulation results for PDCCH performance in eICIC | Ericsson, ST-Ericsson | - |
R4‑114350 | Basic framework for eICIC performance requirement and test cases | Ericsson, ST-Ericsson | - |
R4‑114351 | PDSCH performance for colliding/non-colliding non-MBSFN ABS | Ericsson, ST-Ericsson | - |
R4‑114352 | Priority list for performance requirement and test cases for eICIC | Ericsson, ST-Ericsson | - |
R4‑114353 | R-PDCCH performance considering PRG-based precoding and reduced DMRS | Ericsson, ST-Ericsson | - |
R4‑114354 | HeNB Autonomous Power Setting Parameter Optimization for Macro-eNB Scenario; | Ericsson, ST-Ericsson | - |
R4‑114355 | HeNB Autonomous Power Setting for Macro-eNB Scenario (Option B) | Ericsson, ST-Ericsson | - |
R4‑114356 | APAC700 TR v0.1.0 | Ericsson, ST-Ericsson | - |
R4‑114357 | Relay TR 36.826 v 0.9.0 | Ericsson, ST-Ericsson | - |
R4‑114358 | Relay coexistence study summary | Ericsson, ST-Ericsson | - |
R4‑114359 | Test configuration aspects for MSR-NC | Ericsson | - |
R4‑114360 | Test configuration to test case matching | Ericsson | - |
R4‑114361 | Introduction of MSR-NC in TS 37.141; TX conformance testing | Ericsson | - |
R4‑114362 | Introduction of MSR-NC in TS 37.141; RX conformance testing | Ericsson | - |
R4‑114363 | Alignment of TC carrier position with channel raster in TS 37.141 | Ericsson | - |
R4‑114364 | Alignment of TC carrier position with channel raster in TS 37.141 | Ericsson | - |
R4‑114365 | Consideration on transmitter configuration for receiver testing | Ericsson | - |
R4‑114366 | Benefits and drawbacks of introducing DTX detection for PUCCH format 2 | Ericsson, ST-Ericsson | - |
R4‑114367 | Additional test case for aggregate power control accuracy | Ericsson, ST-Ericsson | - |
R4‑114368 | Band 7 and Band 38 coexistence: UE unwanted emissions | Ericsson, ST-Ericsson | - |
R4‑114369 | UE spurious emissions for Band 7 and Band 38 coexistence | Ericsson, ST-Ericsson | - |
R4‑114370 | UE spurious emissions for Band 7 and Band 38 coexistence | Ericsson, ST-Ericsson | - |
R4‑114371 | UE spurious emissions for Band 7 and Band 38 coexistence | Ericsson, ST-Ericsson | - |
R4‑114372 | The upper limit of Pcmax | Ericsson, ST-Ericsson | - |
R4‑114373 | Modification of the upper limit of Pcmax | Ericsson, ST-Ericsson | - |
R4‑114374 | Test configuration for verifying power control accuracy for intra-band CA | Ericsson, ST-Ericsson | - |
R4‑114375 | Power control accuracy for intra-band carrier aggregation | Ericsson, ST-Ericsson | - |
R4‑114376 | Test configuration for in-band emission and EVM | Ericsson, ST-Ericsson | - |
R4‑114377 | In-band emissions requirements for intra-band carrier aggregation | Ericsson, ST-Ericsson | - |
R4‑114378 | On the test configuration for inter-band CA with one active UL | Ericsson, ST-Ericsson | - |
R4‑114379 | More on UE requirements for Band 22 and Band 42/43 | Ericsson, ST-Ericsson | - |
R4‑114380 | Introduction of Band 22 | Ericsson, ST-Ericsson | - |
R4‑114381 | Band 26/XXVI and Band 5/V coexistence with services in the 800 MHz range | Ericsson, ST-Ericsson | - |
R4‑114382 | TR 37.806 v1.1.0 | Ericsson, ST-Ericsson | - |
R4‑114383 | Additional carrier types | Ericsson, ST-Ericsson | - |
R4‑114384 | Timing advance calculation using time difference measurement | Ericsson, ST-Ericsson | - |
R4‑114385 | LS on timing advance calculation using time difference measurement | Ericsson, ST-Ericsson | - |
R4‑114386 | Removal of Annex A in TR 37.802 | Ericsson | - |
R4‑114387 | TP for General corrections in TR 37.801 | Ericsson, ST-Ericsson | - |
R4‑114388 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 37.113 | Ericsson, ST-Ericsson | - |
R4‑114389 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 37.104 | Ericsson, ST-Ericsson | - |
R4‑114390 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 37.141 | Ericsson, ST-Ericsson | - |
R4‑114391 | Add Band 22 for LTE/UMTS 3500 (FDD) to TS 36.307 | Ericsson, ST-Ericsson | - |
R4‑114392 | Add Band 22 for LTE/UMTS 3500 (FDD) to TS 36.307 | Ericsson, ST-Ericsson | - |
R4‑114393 | Add Band 22 for LTE/UMTS 3500 (FDD) to TS 36.307 | Ericsson, ST-Ericsson | - |
R4‑114394 | Add Band XXII for LTE/UMTS 3500 (FDD) to TS 25.101 | Ericsson, ST-Ericsson | - |
R4‑114395 | Add Band XXII for LTE/UMTS 3500 (FDD) to TS 25.133 | Ericsson, ST-Ericsson | - |
R4‑114396 | Add Band 42/43 for LTE/UMTS 3500 (FDD) to TS 25.101 | Ericsson, ST-Ericsson | - |
R4‑114397 | Add Band 42/43 for LTE/UMTS 3500 (FDD) to TS 25.133 | Ericsson, ST-Ericsson | - |
R4‑114398 | Reference receiver for Closed Loop Transmit Diversity | ST-Ericsson, Ericsson | - |
R4‑114399 | Analysis of UE Tx core requirements for UL CLTD | ST-Ericsson, Ericsson | - |
R4‑114400 | Clarification on non contiguous carrier aggregation | ST-Ericsson, Ericsson | - |
R4‑114401 | [Draft] Feedbacks on non contiguous carrier aggregation feasibility | ST-Ericsson, Ericsson | - |
R4‑114402 | Analysis of the applicability of the legacy requirements to out-of-gap requirements for non contiguous carrier aggregation | ST-Ericsson, Ericsson | - |
R4‑114403 | Initial analysis of in-gap requirements for non contiguous carrier aggregation | ST-Ericsson, Ericsson | - |
R4‑114404 | Introduction of requirements for band XXV | ST-Ericsson, Ericsson | - |
R4‑114405 | Introduction of requirements for band XXVI | ST-Ericsson, Ericsson | - |
R4‑114406 | CQI testing for eDLMIMO | ST-Ericsson, Ericsson | - |
R4‑114407 | PMI testing for 8TX eDLMIMO | ST-Ericsson, Ericsson | - |
R4‑114408 | Discussion on RI metrics for eDLMIMO | ST-Ericsson, Ericsson | - |
R4‑114409 | Correction in home BS output power requirements | Ericsson, ST-Ericsson | - |
R4‑114410 | Correction of references | Ericsson, ST-Ericsson | - |
R4‑114411 | Correction of references | Ericsson, ST-Ericsson | - |
R4‑114412 | Correction of references | Ericsson, ST-Ericsson | - |
R4‑114413 | Alignment of the carrier aggregation terminology | Ericsson, ST-Ericsson | - |
R4‑114414 | Band simplification for core requirements | Ericsson, ST-Ericsson | - |
R4‑114415 | Clarification in inter-frequency RSTD accuracy tests | Ericsson, ST-Ericsson, Huawei | - |
R4‑114416 | Editorial corrections for RRM requirements | Ericsson, ST-Ericsson | - |
R4‑114417 | Cell identification requirements | Ericsson, ST-Ericsson | - |
R4‑114418 | On cell identification requirements | Ericsson, ST-Ericsson | - |
R4‑114419 | LS on UE measurements with blank MBSFN subframes for eICIC | Ericsson, ST-Ericsson | - |
R4‑114420 | On blank MBSFN issues | Ericsson, ST-Ericsson | - |
R4‑114421 | RLM L1 measurement period requirements | Ericsson, ST-Ericsson | - |
R4‑114422 | Requirements for UE Rx-Tx time difference measurement | Ericsson, ST-Ericsson | - |
R4‑114423 | Measurement requirements for UE Rx-Tx time difference measurement | Ericsson, ST-Ericsson | - |
R4‑114424 | Accuracy requirements for UE Rx-Tx time difference measurement | Ericsson, ST-Ericsson | - |
R4‑114425 | On RLM L1 measurement period requirements | Ericsson, ST-Ericsson | - |
R4‑114426 | Impact of system information reading on eICIC requirements | Ericsson, ST-Ericsson | - |
R4‑114427 | Additional system results | Ericsson, ST-Ericsson | - |
R4‑114428 | Correction to inter-RAT signal levels for band 17 | Ericsson, ST-Ericsson | - |
R4‑114429 | Correction to inter-RAT signal levels for band 17 | Ericsson, ST-Ericsson | - |
R4‑114430 | Correction to inter-RAT signal levels for band 17 | Ericsson, ST-Ericsson | - |
R4‑114431 | Correction to inter-RAT signal levels for band 17 | Ericsson, ST-Ericsson | - |
R4‑114432 | Correction to inter-RAT signal levels for band 17 | Ericsson, ST-Ericsson | - |
R4‑114433 | Correction to inter-RAT signal levels for band 17 | Ericsson, ST-Ericsson | - |
R4‑114434 | Missing RSRQ in Intra-frequency measurement requirements | Ericsson, ST-Ericsson | - |
R4‑114435 | Missing RSRQ in Intra-frequency measurement requirements | Ericsson, ST-Ericsson | - |
R4‑114436 | Missing RSRQ in Intra-frequency measurement requirements | Ericsson, ST-Ericsson | - |
R4‑114437 | Missing RSRQ in E-UTRA carrier aggregation measurement requirements | Ericsson, ST-Ericsson | - |
R4‑114438 | Inter-RAT UTRAN FDD SI Reading Requirements | Ericsson, ST-Ericsson | - |
R4‑114439 | Inter-RAT UTRAN FDD SI Reading Requirements | Ericsson, ST-Ericsson | - |
R4‑114440 | List of test cases for RRC connection release with redirection | Ericsson, ST-Ericsson | - |
R4‑114441 | Test Configuration for eICIC RRM Test Cases | Ericsson, ST-Ericsson | - |
R4‑114442 | List of RRM Test Cases for eICIC | Ericsson, ST-Ericsson | - |
R4‑114443 | Test Configuration for Carrier Aggregation RRM Test Cases | Ericsson, ST-Ericsson | - |
R4‑114444 | List of RRM Test Cases for Carrier Aggregation | Ericsson, ST-Ericsson | - |
R4‑114445 | Test case on event triggered measurement reporting in CA | Ericsson, ST-Ericsson | - |
R4‑114446 | Band 3/III operation in Japan | Ericsson, ST-Ericsson | - |
R4‑114447 | Test cases for eICIC demodulation | Huawei, HiSilicon | - |
R4‑114448 | Discussion on relative frequency offset and power imbalance test | Huawei, HiSilicon | - |
R4‑114449 | Remaining issues on the R-PDCCH working assumptions and simulation results | Huawei, HiSilicon | - |
R4‑114450 | 36.826 TP: on R-PDCCH performance requirements | Huawei, HiSilicon | - |
R4‑114451 | 36.101 CR on MBSFN FDD requirements(R9) | Huawei, HiSilicon, CATT | - |
R4‑114452 | 36.101 CR on MBSFN FDD requirements(R10) | Huawei, HiSilicon, CATT | - |
R4‑114453 | Discussion on CQI and PMI tests | Huawei, HiSilicon | - |
R4‑114454 | Test methodology of RI test | Huawei, HiSilicon | - |
R4‑114455 | Impact of CLTD on BS performance requirement | Huawei, HiSilicon | - |
R4‑114456 | Way forward for coexistence of band 7 and band 38 | Huawei | - |
R4‑114457 | BS transmitter impact on BS receiver performance | Huawei | - |
R4‑114458 | Clarification of spectrum emission mask requirements | HiSilicon, Huawei, TD Tech, China Unicom | - |
R4‑114459 | Clarification of spectrum emission mask requirements | HuaweiHiSilicon, Huawei, TD Tech, China Unicom | - |
R4‑114460 | Correction of UE Relative code domain power accuracy requirements for TS 25.101 REL-8 | Huawei | - |
R4‑114461 | Correction of UE Relative code domain power accuracy requirements for TS 25.101 REL-9 | Huawei | - |
R4‑114462 | Correction of UE Relative code domain power accuracy requirements for TS 25.101 REL-10 | HiSilicon, Huawei, TD Tech, China Unicom | - |
R4‑114463 | Adding the operating band for UL-MIMO | Huawei | - |
R4‑114464 | Adding the operating band for UL-MIMO | Huawei | - |
R4‑114465 | UL-MIMO Phase Continuity Requirements | Huawei | - |
R4‑114466 | UL-MIMO Phase Continuity Requirements | Huawei | - |
R4‑114467 | On MSR_NC Test Configuration | Huawei | - |
R4‑114468 | Introduction of Test Configurations for MSR_NC | Huawei | - |
R4‑114469 | Update of test requirements for MSR_NC | Huawei | - |
R4‑114470 | Correction on TR 37.141 sub-clause 6.6.2.5 | Huawei | - |
R4‑114471 | Correction on TR 37.141 sub-clause 6.6.2.5 | Huawei | - |
R4‑114472 | Working method of Relay WI | Huawei | - |
R4‑114473 | Relay transmitter RF requirements | Huawei | - |
R4‑114474 | Relay classification | Huawei | - |
R4‑114475 | Time alignment error requirement for relay backhaul link | Huawei | - |
R4‑114476 | Spurious emission requirements for relay access link | Huawei | - |
R4‑114477 | Band 38 spectrum and regulatory review | Huawei | - |
R4‑114478 | Technical Report for LTE Advanced Carrier Aggregation in Band 38 v002 | Huawei | - |
R4‑114479 | UE requirements for Inter-band CA | Huawei | - |
R4‑114480 | ULTD Transmitter characteristics: General | Huawei | - |
R4‑114481 | ULTD Transmitter characteristics: Transmit power | Huawei | - |
R4‑114482 | ULTD Transmitter characteristics: Output power dynamics | Huawei | - |
R4‑114483 | ULTD Transmitter characteristics: Transmit ON/OFF power | Huawei | - |
R4‑114484 | ULTD Transmitter characteristics: Output RF spectrum emissions | Huawei | - |
R4‑114485 | ULTD Transmitter characteristics: Time alignment error | Huawei | - |
R4‑114486 | Skeleton Technical Report for OL/CL Tx Diversity | Huawei | - |
R4‑114487 | UE current consumption for Tx Diversity | Huawei | - |
R4‑114488 | Co-existence with TV broadcasting | Huawei | - |
R4‑114489 | Coexistence with lower E850 sub-band | Huawei | - |
R4‑114490 | Co-existence with PPDR and TETRA systems | Huawei | - |
R4‑114491 | Coexistence with band 5 | Huawei | - |
R4‑114492 | Study Item Description of AAS BS station | Huawei | - |
R4‑114493 | New WID for Multi-band and Multi-standard radio (MB-MSR) Base Station | Huawei | - |
R4‑114494 | RF requirements for Multi-band MSR BS station | Huawei | - |
R4‑114495 | Side condition for Cell identification in eICIC | Huawei, HiSilicon | - |
R4‑114496 | The impacts on cell search in eICIC from system perspective | Huawei, HiSilicon | - |
R4‑114497 | DRX requirement for cell identification in eICIC | Huawei, HiSilicon | - |
R4‑114498 | eICIC test cases consideration and work plan | Huawei, HiSilicon | - |
R4‑114499 | RSRP accuracy test case in eICIC | Huawei, HiSilicon | - |
R4‑114500 | RLM simulation in eICIC | Huawei, HiSilicon | - |
R4‑114501 | Test cases for carrier aggregation | Huawei, HiSilicon | - |
R4‑114502 | Further discussion on timing advance calculation using time difference measurement | Huawei, HiSilicon | - |
R4‑114503 | Draft LS reply on timing advance calculation using time difference measurement | Huawei, HiSilicon | - |
R4‑114504 | Discussion for RRC Connection Release with Redirection for TDD | Huawei, HiSilicon | - |
R4‑114505 | Requirements for RRC Connection Release with Redirection for TDD in R9 | Huawei, HiSilicon | - |
R4‑114506 | Requirements for RRC Connection Release with Redirection for TDD in R10 | Huawei, HiSilicon | - |
R4‑114507 | Discussion for the enhanced cell search time for UTRA TDD | Huawei, HiSilicon | - |
R4‑114508 | Requirement for the enhanced cell search time for UTRA TDD in R9 | Huawei, HiSilicon | - |
R4‑114509 | Requirement for the enhanced cell search time for UTRA TDD in R10 | Huawei, HiSilicon | - |
R4‑114510 | Discussion on RF pattern matching for positioning | Huawei, HiSilicon | - |
R4‑114511 | Discussion on CGI reading requirement in eICIC | Huawei, HiSilicon | - |
R4‑114512 | CR for E-UTRAN FDD GSM event triggered reporting in AWGN with enhanced BSIC identification in R9 | Huawei, HiSilicon | - |
R4‑114513 | CR for E-UTRAN FDD GSM event triggered reporting in AWGN with enhanced BSIC identification in R10 | Huawei, HiSilicon | - |
R4‑114514 | Discussion on positioning in HetNet | Huawei, HiSilicon | - |
R4‑114515 | CR for intra frequency cell identification time | Huawei, HiSilicon | - |
R4‑114516 | CR for intra frequency cell identification time | Huawei, HiSilicon | - |
R4‑114517 | Measurement reporting test cases for E-UTRA FDD SCC with deactivated SCell when no common DRX is used | Huawei, HiSilicon | - |
R4‑114518 | Flexible placement of carriers for MSR test cases. | Alcatel-Lucent | - |
R4‑114519 | Two carriers test case for MSR | Alcatel-Lucent | - |
R4‑114520 | proposal for MSR-NC TX/RX testing | Alcatel-Lucent | - |
R4‑114521 | Two carrier test case for MSR | Alcatel-Lucent | - |
R4‑114522 | Considerations on carrier aggregation in Band 7 | China Unicom | - |
R4‑114523 | Additional spurious emission requirmenet for band 20 | Samsung | - |
R4‑114524 | Additional spurious emission requirmenet for band 20 | Samsung | - |
R4‑114525 | Considerations on CSI tests for e-DL MIMIO with 8 CSI-RS ports | Samsung | - |
R4‑114526 | eICIC measurement for MBSFN configuration | Samsung | - |
R4‑114527 | CR on number of non-MBSFN subframe within restricted resource pattern | Samsung | - |
R4‑114528 | RLM evaluation period for eICIC | Samsung | - |
R4‑114529 | CR on RLM evaluation period for eICIC | Samsung | - |
R4‑114530 | eICIC PDSCH demodulation performance | Samsung | - |
R4‑114531 | Cell identification simulation result | Samsung | - |
R4‑114532 | Performance impact of CA frequency error | Samsung | - |
R4‑114533 | Simulation result for downlink CA demod requirement (TDD) | Samsung | - |
R4‑114534 | Scenarios consideration for system simulation interference analysis for LTE TDD eIMTA | Samsung | - |
R4‑114535 | CA_B5_B12: Core requirement considerations and text proposal | US Cellular | - |
R4‑114536 | Discussion on timing advance calculation using a time difference measurement | Mediatek inc | - |
R4‑114537 | Draft LS reply on timing advance calculation using time difference measurement | Mediatek inc | - |
R4‑114538 | Discussion on UE interruption requirements in deactivated SCell measurements | Research In Motion UK Limited | - |
R4‑114539 | Further discussion on SCell timing advance calculation | Research In Motion UK Limited | - |
R4‑114540 | Discussion on the impact of the system loading on RSRQ | Research In Motion UK Limited | - |
R4‑114541 | Status of Measurement Campaign for MIMO OTA | Vodafone Group | - |
R4‑114542 | Correct to 25.123 intra frequency Cell re-selection | ZTE | - |
R4‑114543 | Correct to 25.123 intra frequency Cell re-selection | ZTE | - |
R4‑114544 | Simulation results for LTE CA performance requirements | Renesas Mobile Europe Ltd | - |
R4‑114545 | List of in coming LSs / Out going LSs handled in AN4#59AH | Chair | - |
R4‑114546 | List of Technically agreed documents and CRs in RAN4#59AH | Chair | - |
R4‑114547 | Agreed documents in R4#59AH (4.1^^EUTRA Essential Corrections) | Chair | - |
R4‑114548 | Agreed documents in R4#59AH (5^^Maintenance / Remaining works in Work items for Rel-10) | Chair | - |
R4‑114549 | Agreed documents in R4#59AH (5.1.2^^Enhanced Downlink Multiple Antenna Transmission for LTE) | Chair | - |
R4‑114550 | Agreed documents in R4#59AH (5.4.1^^Enhanced ICIC for non-CA based deployments of heterogeneous networks for LTE) | Chair | - |
R4‑114551 | Agreed documents in R4#59AH (5.5.1^^Multi-standard radio Base Station RF requirements for non-contiguous spectrum deployments) | Chair | - |
R4‑114552 | Agreed documents in R4#59AH (5.7.1.2^^Maintenance of intra Band Carrier Aggregation for LTE (CA_1, CA_40)A) | Chair | - |
R4‑114553 | Agreed documents in R4#59AH (5.7.2.1^^Carrier Aggregation for LTE) | Chair | - |
R4‑114554 | Agreed documents in R4#59AH (6.1^^RAN4 aspects for Relays for LTE) | Chair | - |
R4‑114555 | Agreed documents in R4#59AH (6.1.2^^RAN4 aspects for Relays for LTE [Core part]) | Chair | - |
R4‑114556 | Agreed documents in R4#59AH (6.1.4^^RAN4 aspects for Relays for LTE [Perf. part]) | Chair | - |
R4‑114557 | Agreed documents in R4#59AH (6.2.1.2^^Intra Band Carrier Aggregation for LTE (CA_1, CA_40)) | Chair | - |
R4‑114558 | Agreed documents in R4#59AH (6.2.2^^LTE Advanced Carrier Aggregation in Band 38) | Chair | - |
R4‑114559 | Agreed documents in R4#59AH (6.2.3^^Intra Band Carrier Aggregation for LTE (CA_41) | Chair | - |
R4‑114560 | Agreed documents in R4#59AH (6.3^^Inter Band Carrier Aggregation for LTE) | Chair | - |
R4‑114561 | Agreed documents in R4#59AH (6.4^^UE demodulation performance requirements under multiple-cell scenario for 1.28Mcps TDD) | Chair | - |
R4‑114562 | Agreed documents in R4#59AH (6.11^^Uplink Transmit Diversity for HSPA) | Chair | - |
R4‑114563 | Agreed documents in R4#59AH (6.12.1^^Core part: Introduction of New Configuration for 4C-HSDPA) | Chair | - |
R4‑114564 | Agreed documents in R4#59AH (8.1^^Maintenance of TR30.007) | Chair | - |
R4‑114565 | Agreed documents in R4#59AH (8.2^^UMTS/LTE 3500 MHz) | Chair | - |
R4‑114566 | Agreed documents in R4#59AH (8.3.1^^Extending 850 MHz Upper Band (814 849 MHz)) | Chair | - |
R4‑114567 | Agreed documents in R4#59AH (8.4.1^^LTE E850 - Lower Band for Region 2 (non-US)) | Chair | - |
R4‑114568 | Agreed documents in R4#59AH (8.5.2^^New Band LTE Downlink FDD 716-728 MHz) | Chair | - |
R4‑114569 | Agreed documents in R4#59AH (8.6^^LTE for 700 MHz Digital Dividend) | Chair | - |
R4‑114570 | Agreed documents in R4#59AH (9.2.2^^Study on UMTS/LTE in 900 MHz band (Japan, Korea)) | Chair | - |
R4‑114571 | Agreed CRs in R4#59AH (4.1.1^^EUTRA Essential Corrections, UE RF (core)) | Chair | - |
R4‑114572 | Agreed CRs in R4#59AH (4.1.2^^EUTRA Essential Corrections, BS RF requirements (core / conformance)) | Chair | - |
R4‑114573 | Agreed CRs in R4#59AH (4.1.3^^EUTRA Essential Corrections, RRM aspects) | Chair | - |
R4‑114574 | Agreed CRs in R4#59AH (4.1.4^^EUTRA Essential Corrections, Demodulation (performance)) | Chair | - |
R4‑114575 | Agreed CRs in R4#59AH (4.2.3^^UTRA Essential Corrections, RRM aspects) | Chair | - |
R4‑114576 | Agreed CRs in R4#59AH (5.2.1^^Uplink Multiple Antenna Transmission for LTE), BS Performance aspect, BS Conformance test) | Chair | - |
R4‑114577 | Agreed CRs in R4#59AH (5.3.2^^Four carrier HSDPA, UE Performance aspect) | Chair | - |
R4‑114578 | Agreed CRs in R4#59AH (5.4.1^^Enhanced ICIC for non-CA based deployments of heterogeneous networks for LTE, Core part) | Chair | - |
R4‑114579 | Agreed CRs in R4#59AH (5.4.3^^Enhanced ICIC for non-CA based deployments of heterogeneous networks for LTE, RRM Performance aspect | Chair | - |
R4‑114580 | Agreed CRs in R4#59AH (5.5.1^^Multi-standard radio Base Station RF requirements for non-contiguous spectrum deployments) | Chair | - |
R4‑114581 | Agreed CRs in R4#59AH (5.6.2^^S band ATC maintenance) | Chair | - |
R4‑114582 | Agreed CRs in R4#59AH (5.7.1^^Maintenance for the core requirements in Release-10) | Chair | - |
R4‑114583 | Agreed CRs in R4#59AH (5.7.1.1^^Reselection from UTRAN to EUTRAN) | Chair | - |
R4‑114584 | Agreed CRs in R4#59AH (5.7.1.2^^Maintenance of intra Band Carrier Aggregation for LTE (CA_1, CA_40)) | Chair | - |
R4‑114585 | Agreed CRs in R4#59AH (5.7.2.1^^Maintenance for the performance requirements in Release-10) | Chair | - |
R4‑114586 | Agreed CRs in R4#59AH (6.2.1.4^^Intra Band Carrier Aggregation for LTE (CA_1, CA_40), RRM aspect (Core part)) | Chair | - |
R4‑114587 | Agreed CRs in R4#59AH (6.2.1.6^^Intra Band Carrier Aggregation for LTE (CA_1, CA_40), UE/BS Demodulation (performance)) | Chair | - |
R4‑114588 | Agreed CRs in R4#59AH (6.4^^UE demodulation performance requirements under multiple-cell scenario for 1.28Mcps TDD) | Chair | - |
R4‑114589 | Agreed documents in R4 MOMO-OTA-AH | Chair | - |
R4‑114590 | Considerations for NC 4C-HSDPA | Alcatel-Lucent | - |
R4‑114591 | Correct to 25.123 intra frequency Cell re-selection | ZTE | - |
R4‑114592 | Device to device coexistence study at LTE E850 bands | Motorola Solutions | - |
R4‑114593 | Band 26 co-existence scenarios | Motorola solutions | - |
R4‑114594 | Test Configuration for RRC connection release with redirection | Ericsson, ST-Ericsson | - |
R4‑114595 | Removal of Lower Humidity Limit in Normal Conditions in TS 36.101 | Korea Testing Laboratory | - |
R4‑114596 | Removal of Lower Humidity Limit in Normal Conditions in TS 25.101 | Korea Testing Laboratory | - |
R4‑114597 | Introduction of the downlink CA demodulation requirements | Renesas Mobile Europe Ltd, ZTE | - |
R4‑114598 | Draft WID for Intra-band, Non-contiguous CA for Band 25 | Sprint | - |
R4‑114599 | Channel Model Polarization, Power Normalization, and Correlation | Spirent Communications, SATIMO, Elektrobit | - |
R4‑114600 | Proposed Requirements on Algorithm for OL ULTD Enabled UE | Magnolia Broadband | - |
R4‑114601 | Correction for TR 37.806 Coexistence text | NSN | - |
R4‑114602 | Changes to eNB specifications TS 36.104 and TS 36.141 for B41 CA | NSN | - |
R4‑114603 | eNB coexistence between e850 LB and band 5 | NSN | - |
R4‑114604 | eNB coexistence in band 26 | NSN | - |
R4‑114605 | Spatial correlation matrix for cross-polarized antenna arrays and comparison with other methods | Azimuth Systems | - |
R4‑114606 | Additional LTE round robin test results | Azimuth Systems | - |
R4‑114607 | Extending 850 MHz upper part (814-849) addition to 25.101 | Sprint | - |
R4‑114608 | Add upper 850MHz band in TS25.104 | Sprint | - |
R4‑114609 | Add upper 850MHz band in TS25.113 | Sprint | - |
R4‑114610 | Extending 850 MHz upper part (814-849) addition to 25.133 | Sprint | - |
R4‑114611 | Add upper 850MHz band in TS25.141 | Sprint | - |
R4‑114612 | Introduction of Band 26 | Sprint | - |
R4‑114613 | CR upper Extended 850 MHz addition to 36.104 | Sprint | - |
R4‑114614 | CR upper Extended 850 MHz addition to 36.113 | Sprint | - |
R4‑114615 | CR upper Extended 850 MHz addition to 36.124 | Sprint | - |
R4‑114616 | Introduction of Band 26 | Sprint | - |
R4‑114617 | CR upper Extended 850 MHz addition to 36.141 | Sprint | - |
R4‑114618 | CR upper Extended 850 MHz addition to 36.307 | Sprint | - |
R4‑114619 | CR upper Extended 850 MHz addition to 36.307 | Sprint | - |
R4‑114620 | CR upper Extended 850 MHz addition to 36.307 | Sprint | - |
R4‑114621 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS37.104 (Rel-10) | Alcatel-Lucent, Sprint | - |
R4‑114622 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS37.113 (Rel-10) | Alcatel-Lucent, Sprint | - |
R4‑114623 | Add Extending 850 MHz Upper Band (814 849 MHz) to TS37.141 (Rel-10) | Alcatel-Lucent, Sprint | - |
R4‑114624 | Band 26 REFSENS way forward | Sprint | - |
R4‑114625 | Band 26 Coexistance way forward | Sprint | - |
R4‑114626 | Band 26 Open issues | Sprint | - |
R4‑114627 | Consideration for support of multiple band combinations | Qualcomm Incorporated | - |
R4‑114628 | MPR masks for non-contiguous allocations | Motorola Mobility | - |
R4‑114629 | CR on 36.141 for Home BS Output Power for co-channel E-UTRA protection | Nokia Siemens Networks | - |
R4‑114630 | Simulation results for eDL MIMO CSI requirements | Fujitsu | - |
R4‑114631 | Cell identification simulation results for eICIC | Fujitsu | - |
R4‑114632 | Simulation results for CA demodulation requirements | Fujitsu | - |
R4‑114633 | Introduction of CA UE demodulation requirements for TDD | CATT | - |
R4‑114634 | Explanation of two-stage method power calibration | Agilent Technologies | - |
R4‑114635 | TDD MBMS performance requirements for 64QAM mode | CATT, Huawei, HiSilicon | - |
R4‑114636 | TDD MBMS performance requirements for 64QAM mode | CATT, Huawei, HiSilicon | - |
R4‑114637 | Adding requirements of RRC release redirection to UTRA TDD for Rel-9 | CATT | - |
R4‑114638 | Adding requirements of RRC release redirection to UTRA TDD for Rel-10 | CATT | - |
R4‑114639 | Clarification of Radio link monitoring test requirements | Rohde&Schwarz | - |
R4‑114640 | Clarification of Radio link monitoring test requirements | Rohde&Schwarz | - |
R4‑114641 | Correction for TR 37.806 Coexistence text | NSN | - |
R4‑114642 | RSTD Accuracy Requirements for Carrier Aggregation | Alcatel-Lucent, RIM, Qualcomm, Ericsson, ST-Ericsson, Huawei, Verizon | - |
R4‑114643 | Response to Liaison “NGMN coordination between ITU-T and 3GPP on synchronization topic^^ (OLS-305 Source: ITU-T Study Group 15, To: NGMN P-OSB, 3GPP RAN 1, RAN 3, RAN 4, Cc: ) | ITU-T Study Group 15 | - |
R4‑114644 | UE demodulation performance requirements | ST-Ericsson/Ericsson, Qualcomm Incorporated, Renesas Mobile Europe Ltd | - |
R4‑114645 | Work plan for the E850 Lower Band WI | NII | - |
R4‑114646 | Introduction of Carrier Aggregation for LTE in TS 37.141 | Nokia Siemens Networks,Alcatel-Lucent,CATT,Ericsson,Huawei,NTT DoCoMo,ZTE | - |
R4‑114647 | Correction of references | Ericsson, ST-Ericsson | - |
R4‑114648 | Correction of references | Ericsson, ST-Ericsson | - |
R4‑114649 | Correction of references | Ericsson, ST-Ericsson | - |
R4‑114650 | LTE-Advanced CA of Band 1 and Band 7 | China Telecommunications | - |
R4‑114651 | Effect of host laptop on device performance. | Azimuth Systems | - |
R4‑114652 | CRS covariance matrix estimation for MMSE-IRC receiver | Huawei, HiSilicon | - |
R4‑114653 | MIMO OTA Reference Antennas | Motorola Mobility | - |
R4‑114654 | Simplified SCME test method | Motorola Mobility | - |
R4‑114655 | Transmitter ON/OFF for RF receiver requirements | Nokia Siemens Networks | - |
R4‑114656 | Requirements for Bands 42 and 43 | Qualcomm Incorporated | - |
R4‑114657 | CR to TS36.101: Fixed reference channel for PDSCH demodulation performance requirements on eDL-MIMO | ZTE | - |
R4‑114658 | Introduction of DL power control, initial convergence | CMCC, STE, Marvell, CATR | - |
R4‑114659 | Introduction of new DL power control TC, initial convergence for 1.28Mcps TDD | CMCC, STE, Marvell, CATR | - |
R4‑114660 | Introduction of new DL power control TC, initial convergence for 1.28Mcps TDD | CMCC, STE, Marvell, CATR | - |
R4‑114661 | Introduction of new DL power control TC, initial convergence for 1.28Mcps TDD | CMCC, STE, Marvell, CATR | - |
R4‑114662 | Introduction of new DL power control TC, initial convergence for 1.28Mcps TDD | CMCC, STE, Marvell, CATR | - |
R4‑114663 | UE demodulation performance requirements under multiple-cell scenario for 1.28Mcps TDD | CMCC, Mediatek | - |
R4‑114664 | Band 26 co-existence | Ericsson, ST-Ericsson | - |
R4‑114665 | MPR and A-MPR for multi-cluster allocation in single carrier transmission | Nokia | - |
R4‑114666 | Further considerations on BS transmitter configuration for receiver tests | Alcatel-Lucent | - |
R4‑114667 | Downlink intra-band contiguous CA demodulation performance with frequency error | Intel Corporation | - |
R4‑114668 | LTE MIMO OTA test results in three different methods | CATR | - |
R4‑114669 | Additional LTE round robin test results | Azimuth Systems | - |
R4‑114670 | Basic framework for eICIC performance requirement and test cases | Ericsson, ST-Ericsson | - |
R4‑114671 | Coexistence with band 5 | Huawei | - |
R4‑114672 | Applicability of requirements and test configurations | Nokia Siemens Networks | - |
R4‑114673 | Introduction of TM9 demodulation performance requirements | Ericsson, ST-Ericsson | - |
R4‑114674 | Reply LS to “LS on Status of the MSR-NC work item” (GP-110998 Source: TSG GERAN WG1, To: TSG RAN WG4, Cc: TSG RAN) | TSG GERAN WG1 | - |
R4‑114675 | LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA (R1-111993 Source: Huawei, HiSilicon, To: TSG RAN WG2,TSG RAN WG3, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑114676 | LS on the RAN1 agreements for 8C-HSDPA (R1-111995 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑114677 | LS on Removal of MDT M3 LTE Measurement (R2-113651 Source: TSG RAN WG2, To: TSG SA WG5,TSG RAN WG3,TSG RAN WG1,TSG RAN WG4, Cc: ) | TSG RAN WG2 | - |
R4‑114678 | LS on on MDT UL Measurements (S5-112126 Source: TSG SA WG5, To: TSG RAN WG2, Cc: TSG RAN WG3,TSG RAN WG1,TSG RAN WG4) | TSG SA WG5 | - |
R4‑114679 | - | - | - |
R4‑114680 | E-meeting discussion summary (up to start of R4#60) | Chair | - |
R4‑114681 | Requirements for Band 22 | Qualcomm Incorporated | - |
R4‑114682 | Frequency band related requirements to 36.133 | Ericsson, ST-Ericsson | - |
R4‑114683 | LS on Radio metrics with respect to QoE (S4-110800 Source: TSG SA WG4, To: TSG RAN WG1,TSG RAN WG4,TSG SA WG5, Cc: TSG RAN WG2) | TSG SA WG4 | - |
R4‑114684 | Further evaluation on simulation results of cell identification for TDM eICIC | LG Electronics | - |
R4‑114685 | Method for IL mapping for inter-band CA | Renesas Mobile Europe Ltd. | - |
R4‑114686 | Terminology of Intra-band non-contiguous CA | ZTE | - |
R4‑114687 | Two carrier test case for MSR | Alcatel-Lucent, Ericsson, Nokia-Siemens Networks | - |
R4‑114688 | Removal of Lower Humidity Limit in Normal Conditions in TS 25.101 | Korea Testing Laboratory | - |
R4‑114689 | Removal of Lower Humidity Limit in Normal Conditions in TS 36.101 | Korea Testing Laboratory | - |
R4‑114690 | Correction of UE Relative code domain power accuracy requirements for TS 25.101 REL-9 | HiSilicon, Huawei, TD Tech, China Unicom | - |
R4‑114691 | Fixing UARFCN numbers in 25.101 | Ericsson, ST-Ericsson | - |
R4‑114692 | Fixing UARFCN numbers in 25.101 | Ericsson, ST-Ericsson | - |
R4‑114693 | Fixing UARFCN numbers in 25.101 | Ericsson, ST-Ericsson | - |
R4‑114694 | Considerations on CSI tests for e-DL MIMIO with 8 CSI-RS ports | Samsung | - |
R4‑114695 | Add Band XXII for LTE/UMTS 3500 (FDD) to TS 25.307 | Ericsson, ST-Ericsson | - |
R4‑114696 | Add Band XXII for LTE/UMTS 3500 (FDD) to TS 25.307 | Ericsson, ST-Ericsson | - |
R4‑114697 | Add Band XXII for LTE/UMTS 3500 (FDD) to TS 25.307 | Ericsson, ST-Ericsson | - |
R4‑114698 | Add Band XXII for LTE/UMTS 3500 (FDD) to TS 25.307 | Ericsson, ST-Ericsson | - |
R4‑114699 | Add Band XXII for LTE/UMTS 3500 (FDD) to TS 25.307 | Ericsson, ST-Ericsson | - |
R4‑114700 | Add Band XXII for LTE/UMTS 3500 (FDD) to TS 25.307 | Ericsson, ST-Ericsson | - |
R4‑114701 | Add Band XXII for LTE/UMTS 3500 (FDD) to TS 25.307 | Ericsson, ST-Ericsson | - |
R4‑114702 | Add Band XXII for LTE/UMTS 3500 (FDD) to TS 25.331 | Ericsson, ST-Ericsson | - |
R4‑114703 | CR to TS 36.104 Minimum requirements of Operating Band Unwanted Emissions | ZTE | - |
R4‑114704 | CR to TS 36.141 Test requirements of Operating Band Unwanted Emissions | ZTE | - |
R4‑114705 | Correction for TS 36.141 | ZTE | - |
R4‑114706 | Adding sections for TRP and TRS requirements for data transfer position | Ericsson, ST-Ericsson, Intel | - |
R4‑114707 | TP for TR 37.806: E850 Coexistence Scenarios | NII | - |
R4‑114708 | LTE Advanced Carrier Aggregation in Band 7 | China Unicom | - |
R4‑114709 | Adding codebook subset restriction for single layer closed-loop spatial multiplexing test: | Qualcomm Incorporated | - |
R4‑114710 | Adding codebook subset restriction for single layer closed-loop spatial multiplexing test | Qualcomm Incorporated | - |
R4‑114711 | Adding codebook subset restriction for single layer closed-loop spatial multiplexing test | Qualcomm Incorporated | - |
R4‑114712 | TRP and TRS requirements for UMTS band XIX | NTT DOCOMO | - |
R4‑114713 | CR for TR 25.914: Supplement of the testing configuration for LME OTA testing | ZTE | - |
R4‑114714 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 25.141 | Ericsson, ST-Ericsson | - |
R4‑114715 | Editorial corrections for 36.133 (Rel-10) | Alcatel-Lucent | - |
R4‑114716 | TP for 900 MHz band SI TR: Study of UTRA UE specific issues | eAccess | - |
R4‑114717 | Summary of Band 26 Coexistence proposals following Band 26 AH on 22 August | Sprint | - |
R4‑114718 | Proposal for Carrier Aggregation for Band 1 and Band 3 | KT | - |
R4‑114719 | DRAFT LS on Ongoing standardisation work in 3GPP on harmonised frequency arrangements for the band 698-806 MHz | Ericsson, ST-Ericsson | - |
R4‑114720 | System level simulation on side conditions for eICIC | Qualcomm Incorporated | - |
R4‑114721 | Simulation results for CA UE demodulation with no RF impairments | Ericsson, ST-Ericsson | - |
R4‑114722 | Simulation results for CA UE demodulation with frequency error | Ericsson, ST-Ericsson | - |
R4‑114723 | Frequency offsets between CCs for test system | Ericsson, ST-Ericsson | - |
R4‑114724 | TP for defining the format of LTE MIMO OTA round robin data | Intel Corporation | - |
R4‑114725 | Discussion on relative frequency offset and power imbalance test | Huawei, HiSilicon | - |
R4‑114726 | Editorial corrections for RRM requirements | Ericsson, ST-Ericsson | - |
R4‑114727 | LS reply on timing advance calculation using time difference measurement (R1-112790 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑114728 | Relay TR 36.826 v 0.10.0 | Ericsson, ST-Ericsson | - |
R4‑114729 | LTE Advanced Carrier Aggregation in Band 7 | China Unicom | - |
R4‑114730 | Relay transmitter RF requirements | Huawei | - |
R4‑114731 | TP for output power dynamics of Relay | CATT | - |
R4‑114732 | TP of relay dynamic range in TR 36.826 | ZTE | - |
R4‑114733 | LME OTA AdHoc Meeting report | CATR | - |
R4‑114734 | Introduction of correlation matrices for UL MIMO | Huawei, HiSilicon, Ericsson, ST-Ericsson, Agilent Technologies, TMC | - |
R4‑114735 | Way forward on Home BS Co-channel power output | Alcatel Lucent | - |
R4‑114736 | TS36.141 CR: on PUSCH tests | Huawei, Nokia Siemens Networks | - |
R4‑114737 | TS36.104 CR: on PUSCH performance | Huawei | - |
R4‑114738 | MIMO OTA ad hoc meeting notes | Azimuth Systems | - |
R4‑114739 | Meeting minutes for Band 26 Ad-Hoc in RAN4#60 | Alcatel-Lucent | - |
R4‑114740 | Response LS on timing advance calculation using time difference measurement | Renesas | - |
R4‑114741 | Additional system results | Ericsson, ST-Ericsson | - |
R4‑114742 | Clarification on applying CSI reports during rank switching in RI FDD test | NEC | - |
R4‑114743 | Clarification on applying CSI reports during rank switching in RI FDD test | NEC | - |
R4‑114744 | Clarification on applying CSI reports during rank switching in RI FDD test | NEC | - |
R4‑114745 | Summary of latest alignment and impairments results for TM9 demodulation tests | NEC | - |
R4‑114746 | UE Demod ad-hoc session agreements | NEC | - |
R4‑114747 | Considerations for NC 4C-HSDPA | Alcatel-Lucent | - |
R4‑114748 | List of RRM Test Cases for Carrier Aggregation | Ericsson, ST-Ericsson | - |
R4‑114749 | Band 42 and 43 for LTE 3500 (TDD) correction to TS 36.104 | Ericsson, ST-Ericsson | - |
R4‑114750 | Band 42 and 43 for LTE 3500 (TDD) correction to TS 36.141 | Ericsson, ST-Ericsson | - |
R4‑114751 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 36.104 | Ericsson, ST-Ericsson | - |
R4‑114752 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 36.141 | Ericsson, ST-Ericsson | - |
R4‑114753 | Modifications of Band 42 and 43 | Ericsson, ST-Ericsson | - |
R4‑114754 | Add Band 22/XXII for LTE/UMTS 3500 (FDD) to TS 37.104 | Ericsson, ST-Ericsson | - |
R4‑114755 | Add Band XXII for LTE/UMTS 3500 (FDD) to TS 25.101 | Ericsson, ST-Ericsson, Intel | - |
R4‑114756 | Removal of Lower Humidity Limit in Normal Conditions in TS 36.101 | Korea Testing Laboratory | - |
R4‑114757 | Correction to RRC connection mobility control in CA | ZTE | - |
R4‑114758 | CR to TS36.101: Correction on the accuracy test of CQI. | ZTE | - |
R4‑114759 | CR to TS36.101: Correction on the accuracy test of CQI. | ZTE | - |
R4‑114760 | CR to TS36.101: Correction on the accuracy test of CQI. | ZTE | - |
R4‑114761 | Way forward on insertion loss discussion for inter-band non-contiguous CA for band combination classes A and C | Telecom Italia | - |
R4‑114762 | Introduction of Band 22 | NTT DOCOMO, Ericsson, ST-Ericsson | - |
R4‑114763 | Requirements for RRC Connection Release with Redirection for TDD in R9 | Huawei, HiSilicon | - |
R4‑114764 | Requirements for RRC Connection Release with Redirection for TDD in R10 | Huawei, HiSilicon | - |
R4‑114765 | TIB and RIB for inter-band CA B3 + B7 | TeliaSonera | - |
R4‑114766 | CR for TR 25.914: Supplement of the testing configuration for LME OTA testing | ZTE | - |
R4‑114767 | Complementary information about the reverberation chamber methodology | Bluetest | - |
R4‑114768 | Simulation results for CA UE demodulation with no RF impairments | Ericsson, ST-Ericsson | - |
R4‑114769 | List of test cases for RRC connection release with redirection | Ericsson, ST-Ericsson | - |
R4‑114770 | Work plan for the E850 Lower Band WI | NII | - |
R4‑114771 | Introduction of Pcmax,c reporting requirements for carrier aggregation | Alcatel-Lucent | - |
R4‑114772 | General guide line of CR handling in RAN or RAN4 | Chair, MCC | - |
R4‑114773 | Adding enhanced UTRA TDD cell identification requirements for Rel-9 | CATT, Huawei, HiSilicon | - |
R4‑114774 | Adding enhanced UTRA TDD cell identification requirements for Rel-10 | CATT, Huawei, HiSilicon | - |
R4‑114775 | Way forward on RFPM simulation assumption | Huawei, HiSilicon, Polaris wireless | - |
R4‑114776 | UMTS/LTE 3500 Work Item TR 37.801 v1.1.0 | Ericsson, ST-Ericsson | - |
R4‑114777 | Ad hoc minutes: UMTS-LTE 3500 MHz | Ericsson | - |
R4‑114778 | LS to ECC PT1 on Status of the UMTS-LTE 3500 MHz Work | Ericsson, ST-Ericsson | - |
R4‑114779 | LS to GERAN on CRs for MSR specifications | Ericsson | - |
R4‑114780 | LS to GERAN on Status of the MSR-NC work item | Ericsson | - |
R4‑114781 | Band 42 and 43 UE refsens for UMTS/LTE 3500 (TDD) for TS 36.101 | NII Holdings, CMCC, CATT Clearwire, Huawei, Bollor | - |
R4‑114782 | LTE-Advanced CA of Band 1 and Band 7 | China Telecommunications | - |
R4‑114783 | Analysis of Initial States of Different Channel Model Implementations | Elektrobit, Spirent Communications, Satimo | - |
R4‑114784 | Response LS on power imbalance between adjacent component carriers (R2-114776 Source: TSG RAN WG2, To: TSG RAN WG4, Cc: None) | TSG RAN WG2 | - |
R4‑114785 | TR 36.809 v0.4.0 at the end of the eMeeting#2011 | Polaris Wireless | - |
R4‑114786 | Bandwidth class signalling for non CA bands | Renesas Mobile Europe Ltd | - |
R4‑114787 | Introduction of TM9 demodulation performance requirements | Ericsson, ST-Ericsson | - |
R4‑114788 | Changes to eNB specifications TS 36.104 and TS 36.141 for B41 CA | NSN | - |
R4‑114789 | Introduction of test requirements for MSR-NC in 37.141 | Alcatel-Lucent, Ericsson, Huawei, Nokia Siemens Networks | - |
R4‑114790 | CR on 36.141 for Home BS Output Power for co-channel E-UTRA protection | Nokia Siemens Networks, Picochip | - |
R4‑114791 | Modifications of Band 42 and 43 ^^ | Ericsson, ST-Ericsson | - |
R4‑114792 | Introduction of CA UE demodulation requirements for TDD | CATT | - |
R4‑114793 | Introduction of HS-DPCCH detection requirements for 4C-HSDPA | Qualcomm Incorporated, Ericsson, ST-Ericsson | - |
R4‑114794 | 4C-HSDPA HS-DPCCH Summary of Simulation Results | Ericsson, ST-Ericsson | - |
R4‑114795 | Introduction of requirements for band XXVI | ST-Ericsson, Ericsson | - |
R4‑114796 | Introduction of Band 26 | Sprint | - |
R4‑114797 | Add upper 850MHz band in TS25.104 | Sprint | - |
R4‑114798 | CR upper Extended 850 MHz addition to 36.104 | Sprint | - |
R4‑114799 | Extending 850 MHz upper part (814-849) addition to 25.133 | Sprint | - |
R4‑114800 | Introduction of Band 26 | Sprint | - |
R4‑114801 | Correction for TS 36.141 | ZTE | - |
R4‑114802 | TP for TR ab.cde (APAC700): APAC700 co-existence with 3GPP legacy bands | Ericsson, ST-Ericsson | - |
R4‑114803 | way forward on UMTS/LTE in 900 MHz band SI | NTT Docomo | - |
R4‑114804 | eICIC Way Forward on measurement regarding MBSFN configuration | Samsung | - |
R4‑114805 | Way forward on CA demodulation performance with power imbalance | Huawei, Renesas Mobile Europe Ltd, Fujitsu, HiSili | - |
R4‑114806 | Way forward on studies for TM9 rank indication | Renesas Mobile Europe Ltd, Ericsson, ST-Ericsson, | - |
R4‑114807 | Way forward for eICIC under colliding RS and non-MBSFN-ABS | Renesas Mobile Europe Ltd, Qualcomm Inc., NTT DOCO | - |
R4‑114808 | Way forward on insertion loss discussion for inter-band non-contiguous CA for band combination classes A and C | Telecom Italia | - |
R4‑114809 | WF for co-existence study of TDD eIMTA | CATT | - |
R4‑114810 | CR on RLM evaluation period for eICIC | Samsung | - |
R4‑114811 | Complementary information about the reverberation chamber methodology | Bluetest | - |
R4‑114812 | Band 26 open issues/ Way Forward following RAN4#60 | Sprint | - |
R4‑114813 | Add upper 850MHz band in TS25.141 | Sprint | - |
R4‑114814 | List of RRM Test Cases for eICIC | Ericsson, ST-Ericsson | - |
R4‑114815 | CR for TS 36.101 Annex B: Static channels for CQI tests | Huawei, HiSilicon, Intel | - |
R4‑114816 | Note on restricted uplink transmission bandwidths | Ericsson, ST-Ericsson | - |
R4‑114817 | Note on restricted uplink transmission bandwidths | Ericsson, ST-Ericsson | - |
R4‑114818 | Note on restricted uplink transmission bandwidths | Ericsson, ST-Ericsson | - |
R4‑114819 | UE spurious emissions for Band 7 and Band 38 coexistence | Ericsson, ST-Ericsson | - |
R4‑114820 | UE spurious emissions for Band 7 and Band 38 coexistence | Ericsson, ST-Ericsson | - |
R4‑114821 | UE spurious emissions for Band 7 and Band 38 coexistence | Ericsson, ST-Ericsson | - |
R4‑114822 | Power control accuracy for intra-band carrier aggregation | Ericsson, ST-Ericsson | - |
R4‑114823 | In-band emissions requirements for intra-band carrier aggregation | Ericsson, ST-Ericsson, ZTE | - |
R4‑114824 | Way Forward on Scheduling Patterns in eICIC Demod and CSI Reporting Requirements | Qualcomm Incorporated | - |
R4‑114825 | Way Forward on interference level setting for eICIC Demod Requirements | Qualcomm Incorporated | - |
R4‑114826 | Framework for the CSI reporting accuracy performance requirements on eDL MIMO (Revision 2) | NTT DOCOMO | - |
R4‑114827 | Modifications of Band 42 and 43 | Ericsson, ST-Ericsson | - |
R4‑114828 | Way forward on eICIC ABS pattern for demodulation performance and CSI reporting tests | Huawei, HiSilicon, Qualcomm, et al | - |
R4‑114829 | UMTS/LTE 3500 Work Item TR 37.801 v1.2.0 | Ericsson, ST-Ericsson | - |
R4‑114830 | Operator requirements for the MIMO OTA testing | NTT DOCOMO, Orange, Telecom Italia, Vodafone, Sprint | - |
R4‑114831 | Reselection from UTRA to E-UTRA in CELL-FACH | Renesas Mobile Europe Ltd. | - |
R4‑114832 | CR on 36.141 for Home BS Output Power for co-channel E-UTRA protection | Nokia Siemens Networks, Picochip | - |
R4‑114833 | UE core requirements for Band XXV | Qualcomm Incorporated | - |
R4‑114834 | Meeting minutes for eICIC ad hoc in RAN4#60 | Qualcomm Incorporated^^ ^^ ^^ Qualcomm Incorporated^^ ^^ ^^ Qualcomm Incorporated | - |
R4‑114835 | Relay transmitter RF requirements | Huawei | - |
R4‑114836 | Way Forward on interference level setting for eICIC Demod Requirements | Ericsson, ST ericsson, LGE | - |
R4‑114837 | Adding the operating band for UL-MIMO | HiSilicon, Huawei | - |
R4‑114838 | LS on UE measurements with blank MBSFN subframes for eICIC | Ericsson, ST-Ericsson | - |
R4‑114839 | Way forward on RFPM simulation assumption | Huawei, HiSilicon, Polaris wireless | - |
R4‑114840 | CR upper Extended 850 MHz addition to 36.307 | Sprint | - |
R4‑114841 | CR upper Extended 850 MHz addition to 36.307 | Sprint | - |
R4‑114842 | UE Demod ad-hoc session agreements | NEC | - |
R4‑114843 | Response LS on timing advance calculation using time difference measurement | Renesas | - |
R4‑114844 | Reselection from UTRA to E-UTRA in CELL-FACH | Renesas Mobile Europe Ltd. | - |
R4‑114845 | Way forward on studies for TM9 rank indication | Renesas Mobile Europe Ltd, Ericsson, ST-Ericsson, | - |
R4‑114846 | Way Forward on Scheduling Patterns in eICIC Demod and CSI Reporting Requirements | Qualcomm Incorporated | - |
R4‑114847 | Framework for the CSI reporting accuracy performance requirements on eDL MIMO (Revision 2) | NTT DOCOMO | - |
R4‑114848 | WF for co-existence study of TDD eIMTA | CATT | - |
R4‑114849 | List of RRM Test Cases for Carrier Aggregation | Ericsson, ST-Ericsson | - |
R4‑114850 | DRAFT LS on Ongoing standardisation work in 3GPP on harmonised frequency arrangements for the band 698-806 MHz | Ericsson, ST-Ericsson | - |
R4‑114851 | Introduction of Band 26 | Sprint | - |
R4‑114852 | Add upper 850MHz band in TS25.141 | Sprint | - |
R4‑114853 | LS on UE measurements with blank MBSFN subframes for eICIC | Ericsson, ST-Ericsson | - |
R4‑114854 | Way forward on RFPM simulation assumption | Huawei, HiSilicon, Polaris wireless | - |
R4‑114855 | LS to ECC PT1 on Status of the UMTS-LTE 3500 MHz Work | Ericsson, ST-Ericsson | - |
R4‑114856 | Introduction of S-CPICH power offset accuracy test | Ericsson, ST-Ericsson. | - |
R4‑114857 | RSTD Measurement Requirements under Handover | Ericsson, ST-Ericsson, Alcatel-Lucent, Qualcomm | - |
R4‑114858 | RSTD Measurement Requirements under Pcell Switching | Ericsson, ST-Ericsson, Alcatel-Lucent, Qualcomm | - |
page generated from database: 2024-10-07 07:52:06