3GPP TDocs (written contributions) at meeting
Meeting: R3-96 - 2017-05-15 to 2017-05-19, Hangzhou
meeting id: R3-96 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R3‑171411 | RAN3-96 meeting Agenda | MCC | imported from 3GU |
R3‑171412 | RAN3-95Bis meeting Report | MCC | imported from 3GU |
R3‑171413 | Reply LS on security in E-UTRA-NR Dual Connectivity | 3GPP WG CT1 | imported from 3GU |
R3‑171414 | Reply LS on LTE call redirection to GERAN | 3GPP WG CT1 | imported from 3GU |
R3‑171415 | Reply LS on eDRX Configuration and IMSI-paging | 3GPP WG CT4 | imported from 3GU |
R3‑171416 | LS reply to SA2 on maximum data rate | 3GPP WG RAN1 | imported from 3GU |
R3‑171417 | LS on QoS support of UE-to-Network Relay over LTE sidelink | 3GPP WG RAN2 | imported from 3GU |
R3‑171418 | Reply LS on UE Radio Capability handling for Option 3/3a/3x | 3GPP WG RAN2 | imported from 3GU |
R3‑171419 | LS to RAN3 on RAN2 LTE NR interworking procedure related conclusions | 3GPP WG RAN2 | imported from 3GU |
R3‑171420 | Reply LS on SA3 LS in S3-170944 “LS on security termination for the User Plane in 5G” and RAN3 LS in R3-171306 on LS on LS on Status of Higher-Layer Functional split between Central and Distributed unit. | 3GPP WG RAN2 | imported from 3GU |
R3‑171421 | LS on QoE Measurement Collection for streaming | 3GPP WG RAN2 | imported from 3GU |
R3‑171422 | LS on paging remote UEs over relays | 3GPP WG RAN2 | imported from 3GU |
R3‑171423 | LS reply on RAN-Assisted Codec Adaptation | 3GPP WG RAN2 | imported from 3GU |
R3‑171424 | Reply LS on eVoLP parameters | 3GPP WG RAN2 | imported from 3GU |
R3‑171425 | LS on the need for EPS Bearer ID knowledge in NG-RAN for (inter-RAT) inter-system handover | 3GPP WG SA2 | imported from 3GU |
R3‑171426 | LS on Dual Connectivity with 5GC | 3GPP WG SA2 | imported from 3GU |
R3‑171427 | LS on MBMS bearer event notification | 3GPP WG SA6 | imported from 3GU |
R3‑171428 | TR 36.742 v1.1.1 on Study on SON for eCoMP | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171429 | Alignment of CU/DU terminology in F1 Signalling Transport | Interdigital Asia LLC | imported from 3GU |
R3‑171430 | Proposed Baseline for 38.472 | Interdigital Asia LLC | imported from 3GU |
R3‑171431 | General description of gNB-CU/DU split in TS 38.300 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171432 | gNB-CU/DU architecture | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171433 | Definition and naming of CU and DU | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171434 | Resolution of open issues on F1 interface functions | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171435 | Initiation of SCG association on F1-C | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171436 | Introduction of F1 interface functions | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171437 | Introduction of load management procedure | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171438 | Introduction of F1 User Plane protocol | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171439 | SCG bearer / SCG Split bearer Addition and bearer type change | LG Electronics Inc. | imported from 3GU |
R3‑171440 | Discussion on Secondary Node Change Procedure | LG Electronics Inc. | imported from 3GU |
R3‑171441 | Consideration on TNL address discovery of SgNB | LG Electronics Inc. | imported from 3GU |
R3‑171442 | UE capability coordination between Master node and Secondary node | LG Electronics Inc. | imported from 3GU |
R3‑171443 | Draft TS 38.471 (F1 layer 1) | Fujitsu | imported from 3GU |
R3‑171444 | Enhancements to the X2 UP | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171445 | UP enhancement for X2-based DC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171446 | UP enhancement for Xn-based DC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171447 | Split of the stage-2 description for the EPC-based LTE-NR interworking | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171448 | Network Interfaces for EPC-based LTE-NR DC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171449 | Issue on QoS in RAN | LG Electronics | imported from 3GU |
R3‑171450 | Fast re-transmission of lost RLC PDU | LG Electronics | imported from 3GU |
R3‑171451 | Decoupling DL-UL Operation for NB-IoT Small Cell Support | Telekom R&D Sdn Bhd | imported from 3GU |
R3‑171452 | TP of gNB-CU/DU architecture | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171453 | TP of Definition and naming of CU and DU | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171454 | TP of Resolution of open issues on F1 interface functions | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171455 | TP of General description of gNB-CU/DU split in TS 38.300 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171456 | Discussion on RRC message transfer between CU and DU | CATT | imported from 3GU |
R3‑171457 | Discussion on L2 measurements support in case of CU/DU split | CATT | imported from 3GU |
R3‑171458 | Discussion on UE Context Management | CATT | imported from 3GU |
R3‑171459 | Discussion on the open issues for ANR and Xn setup | CATT | imported from 3GU |
R3‑171460 | Stage 2 TP for RRC message transfer between CU and DU | CATT | imported from 3GU |
R3‑171461 | Stage 3 TP for RRC message transfer in F1 interface | CATT | imported from 3GU |
R3‑171462 | Stage 2 TP for L2 measurements support in case of CU/DU split | CATT | imported from 3GU |
R3‑171463 | Stage 3 TP for L2 measurements support in case of CU/DU split | CATT | imported from 3GU |
R3‑171464 | Stage 2 TP for UE context management in F1AP | CATT | imported from 3GU |
R3‑171465 | Stage 3 TP for UE context management in F1AP | CATT | imported from 3GU |
R3‑171466 | Stage 2 TP for ANR and Xn setup | CATT | imported from 3GU |
R3‑171467 | Stage 3 TP for ANR and Xn setup | CATT | imported from 3GU |
R3‑171468 | Changes needed to the LTE DC procedures to support EN-DC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171469 | Description of EN-DC procedures | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171470 | Addition of a reference to the EN DC procedures | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171471 | Changes needed to the LTE DC and EN DC procedures to support NGEN-DC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171472 | Description of NGEN-DC procedures | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171473 | Single NGAP for both 3GPP access and non-3GPP access | Nokia, Alcatel-Lucent Shanghai Bell, AT&T | imported from 3GU |
R3‑171474 | Corrections to draft TS38.401 | IAESI, Thales, Fairspectrum, VTT | imported from 3GU |
R3‑171475 | Central RRM functions and gNB-DU reporting | IAESI, Thales, Fairspectrum,VTT | imported from 3GU |
R3‑171476 | Cell selection in NR RAN | IAESI, Thales, Fairspectrum, VTT | imported from 3GU |
R3‑171477 | General aspects and functions for F1 UP and CP | IAESI, Thales, Fairspectrum,VTT | imported from 3GU |
R3‑171478 | TP for Functions and frame formats for F1-U protocol | IAESI,Thales, Fairspectrum, VTT | imported from 3GU |
R3‑171479 | TP for TS 38.300 | IAESI, Thales, Fairspectrum,VTT | imported from 3GU |
R3‑171480 | Rapporteur's update of TS 38.413 (V0.0.2) | Nokia | imported from 3GU |
R3‑171481 | TP for TS 38.413 with rapporteur's updates | Nokia | imported from 3GU |
R3‑171482 | Draft TS 38.424 Xn data transport V 0.0.2 | Mitsubishi Electric RCE | imported from 3GU |
R3‑171483 | Overall architecture | Nokia, Alcatel-Lucent Shanghai Bell, Deutsche Telekom | imported from 3GU |
R3‑171484 | TP for TS 38.300 on overall architecture | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171485 | Support of RLF with UE Context Retrieval for CP CIoT Optimisation | Ericsson | imported from 3GU |
R3‑171486 | Support of RLF with UE Context Retrieval for CP CIoT Optimisation | Ericsson | imported from 3GU |
R3‑171487 | Support of RLF with UE Context Retrieval for CP CIoT Optimisation | Ericsson | imported from 3GU |
R3‑171488 | Rapporteurs review of 25.423 Editorials | Ericsson | imported from 3GU |
R3‑171489 | Rapporteur’s Review of LPPa Editorials | Ericsson | imported from 3GU |
R3‑171490 | Rapporteur review | Huawei | imported from 3GU |
R3‑171491 | Introduction of option 3 | Ericsson | imported from 3GU |
R3‑171492 | Basline TP for the RAN2 TR | Huawei | imported from 3GU |
R3‑171493 | Further Discussion on Stage2 NW Slicing | ZTE Corporation | imported from 3GU |
R3‑171494 | TP for Stage2 NW Slicing | ZTE Corporation | imported from 3GU |
R3‑171495 | TP for Stage2 NW Slicing | ZTE Corporation | imported from 3GU |
R3‑171496 | TP for Stage2 NW Slicing | ZTE Corporation | imported from 3GU |
R3‑171497 | TP for Stage2 NW Slicing | ZTE Corporation | imported from 3GU |
R3‑171498 | Further Discussion on Bearer Option Selection Principles for 5GC Based DC | ZTE Corporation | imported from 3GU |
R3‑171499 | Support of MT signaling in RRC-inactive state | LG Electronics | imported from 3GU |
R3‑171500 | Discussion on functionality in RRC-INACTIVE state | LG Electronics | imported from 3GU |
R3‑171501 | Exchange of S-NSSAI list between NG-RAN and CN | LG Electronics | imported from 3GU |
R3‑171502 | Features from LTE not applicable for NR Phase 1 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171503 | Discussion on NGAP UE Context Management messages | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171504 | TP for NGAP UE Context Management | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171505 | Discussion on NAS Transport messages | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171506 | TP for Bearer Option Selection Principles | ZTE Corporation | imported from 3GU |
R3‑171507 | TP for NGAP NAS Transport | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171508 | Further Consideration on SN Change Procedure | ZTE Corporation | imported from 3GU |
R3‑171509 | Progress Updates on TS 37.340 for RAN3#96 | ZTE Corporation | imported from 3GU |
R3‑171510 | Latest TS 37.340 Endorsed by RAN2 | ZTE Corporation | imported from 3GU |
R3‑171511 | TP of Initial RAN3 part for TS 37.340 | ZTE Corporation, , Nokia, Alcatel Lucent Shanghai Bell | imported from 3GU |
R3‑171512 | Discussion on Section 10 for TS 37.340 | ZTE Corporation | imported from 3GU |
R3‑171513 | TP of Section 10 for TS 37.340 | ZTE Corporation | imported from 3GU |
R3‑171514 | Latest TS 38.414 NR NG Data Transport | ZTE Corporation | imported from 3GU |
R3‑171515 | Consideration on UE differentiation | Huawei | imported from 3GU |
R3‑171516 | Introduction of Tenant information | Huawei | imported from 3GU |
R3‑171517 | Introduction of Tenant information | Huawei | imported from 3GU |
R3‑171518 | UE-AMBR for NB-IoT UE using CP solution | Huawei | imported from 3GU |
R3‑171519 | [DRAFT] LS on UE-AMBR for NB-IoT UE using CP solution | Huawei | imported from 3GU |
R3‑171520 | Correction on UE-AMBR for NB-IoT UE using CP solution | Huawei, NTT DOCOMO, INC. | imported from 3GU |
R3‑171521 | Correction on UE-AMBR for NB-IoT UE using CP solution | Huawei, NTT DOCOMO, INC. | imported from 3GU |
R3‑171522 | Consideration on Inter UE QoS Procedures | Huawei | imported from 3GU |
R3‑171523 | Introduction of S-TMSI in DL NAS Transport | Huawei | imported from 3GU |
R3‑171524 | Overload action for exception reporting | Huawei | imported from 3GU |
R3‑171525 | Correction on Overload action for exception reporting | Huawei | imported from 3GU |
R3‑171526 | Correction on Overload action for exception reporting | Huawei | imported from 3GU |
R3‑171527 | Consideration on solutions of group mobility | Huawei | imported from 3GU |
R3‑171528 | TP for solution 3-1 and 3-2 | Huawei | imported from 3GU |
R3‑171529 | TP for Conclusion of FeD2D Wearable Study | Huawei | imported from 3GU |
R3‑171530 | Discussion on bear type change between SCG bear and SCG split bear | CATT | imported from 3GU |
R3‑171531 | Discussion on Notification Control | CATT | imported from 3GU |
R3‑171532 | Stage 2 update for Xn-AP Notification Control | CATT | imported from 3GU |
R3‑171533 | Stage 3 update for Xn-AP Notification Control | CATT | imported from 3GU |
R3‑171534 | Stage 3 update for NG-AP Notification Control | CATT | imported from 3GU |
R3‑171535 | Discussion on default NAS-level QoS profile | CATT | imported from 3GU |
R3‑171536 | Considerations on Inactive state | CATT | imported from 3GU |
R3‑171537 | Stage 2 update for Inactive state procedures | CATT | imported from 3GU |
R3‑171538 | Stage 3 update for RAN paging | CATT | imported from 3GU |
R3‑171539 | Discussion on PDU session modification indication | CATT | imported from 3GU |
R3‑171540 | Stage 3 update for Pdu Session Modification Indication | CATT | imported from 3GU |
R3‑171541 | Discussion on NAS Msg Transfer | CATT | imported from 3GU |
R3‑171542 | Stage 2 update for NAS Msg Transfer | CATT | imported from 3GU |
R3‑171543 | Stage 3 update for NAS Msg Transfer | CATT | imported from 3GU |
R3‑171544 | Discussion on inter-system handover | CATT | imported from 3GU |
R3‑171545 | Stage 2 update for inter-system handover | CATT | imported from 3GU |
R3‑171546 | Stage 3 update for inter-system handover | CATT | imported from 3GU |
R3‑171547 | Response LS on the need for EPS Bearer ID knowledge in NG-RAN for inter-system handover | CATT | imported from 3GU |
R3‑171548 | Functions of the F1 interface | LG Electronics Inc. | imported from 3GU |
R3‑171549 | Paging related Information over NG interface for inactive mode UE | Huawei | imported from 3GU |
R3‑171550 | NG context fetch for inactive mode UE | Huawei | imported from 3GU |
R3‑171551 | Whether to merge Initial UE Message and UL NAS Transport | Huawei | imported from 3GU |
R3‑171552 | Multiple NAS PDUs handling | Huawei | imported from 3GU |
R3‑171553 | Introduction of multiple NAS PDUs transport | Huawei | imported from 3GU |
R3‑171554 | Consideration on NAS Rerouting function | Huawei | imported from 3GU |
R3‑171555 | Introduction of NAS Rerouting function | Huawei | imported from 3GU |
R3‑171556 | Configuration of SCG SRB and Split/Duplicated SRB | ZTE Corporation | imported from 3GU |
R3‑171557 | Further Discussion on SCG Split Bearer Configuration | ZTE Corporation | imported from 3GU |
R3‑171558 | Roaming and Access Restriction for MR-DC and Intra-NR DC | ZTE Corporation | imported from 3GU |
R3‑171559 | Support of MBMS Session Start Partial Success for MCPTT | Hytera Communications Corp. | imported from 3GU |
R3‑171560 | Discussion on Termination point(s) of NG, Xn interfaces | Deutsche Telekom, Verzion, AT&T, T-Mobile USA, Telecom Italia, China Unicom | imported from 3GU |
R3‑171561 | NG-RAN identifiers | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171562 | TP for 38.413 on NG-RAN identifiers | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171563 | Rapporteur editorial review | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
R3‑171564 | X2/Xn Interface Development for LTE-NR Tight Integration | AT&T | imported from 3GU |
R3‑171565 | Traffic Offloading in DC 5GS | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171566 | Text Proposal for Traffic Offloading in DC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171567 | Response LS on Dual Connectivity with 5GC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171568 | Format of NG-U Encapsulation Header | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171569 | Skeleton for User Plane Format | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171570 | LS on defining GTP extension header for 5G | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171571 | RAN Impact from NAS Reflective QoS | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171572 | Text Proposal for Default QoS profile | Nokia, Alcatel-Lucent Shanghai Bell, Intel Corporation | imported from 3GU |
R3‑171573 | Configuration aspects of Network Slicing | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171574 | Text Proposal for Configuration of network slicing | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171575 | Evaluation and Use of Path Switch Options | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171576 | Text Proposal for Path Switch Request | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171577 | RAN-based Notification Area | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171578 | Text Proposal for RRC_Inactive mode | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171579 | Text Proposal for general aspects of TS 38.410 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171580 | Text Proposal for procedures of TS 38.410 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171581 | Use of SCTP Associations and Text Proposal for TS 38.412 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171582 | PDU Session Management and NG protocol structure with AMF/SMF separation | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171583 | Text Proposal for PDU Session Management procedures | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171584 | Text Proposal for PDU Session Management messages | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171585 | Discussion on NAS Transport procedure | LG Electronics Inc. | imported from 3GU |
R3‑171586 | TP for UE-AMBR derivation in NG procedures | LG Electronics Inc. | imported from 3GU |
R3‑171587 | TP for UE-AMBR derivation in Xn procedure | LG Electronics Inc. | imported from 3GU |
R3‑171588 | TP for functions of the F1 interface | LG Electronics Inc. | imported from 3GU |
R3‑171589 | Stage 2 TP for bearer type change between SCG bear and SCG split bear | CATT | imported from 3GU |
R3‑171590 | CU-DU interface - On RRC message transport | China Telecommunications | imported from 3GU |
R3‑171591 | Stage 3 TP for bear type change between SCG bear and SCG split bear | CATT | imported from 3GU |
R3‑171592 | Discussion on SCG change procedure | CATT | imported from 3GU |
R3‑171593 | Solution on RRC message transmission | ZTE Corporation | imported from 3GU |
R3‑171594 | Stage 2 TP for SCG change procedure | CATT | imported from 3GU |
R3‑171595 | Stage 3 TP for SCG change procedure | CATT | imported from 3GU |
R3‑171596 | TP for RRC message transmission | ZTE Corporation | imported from 3GU |
R3‑171597 | Discussion on UE Radio Bearer Management over F1 interface | ZTE Corporation | imported from 3GU |
R3‑171598 | TP for UE Radio Bearer Management | ZTE Corporation | imported from 3GU |
R3‑171599 | Discussion on flow control over F1-U | ZTE Corporation | imported from 3GU |
R3‑171600 | TP for F1-U flow control | ZTE Corporation | imported from 3GU |
R3‑171601 | Stage2 TP update for TS38.300 | ZTE Corporation | imported from 3GU |
R3‑171602 | Stage2 TP of NR ANRF for TS38.300 | ZTE Corporation | imported from 3GU |
R3‑171603 | Discussion on Inactive mode | ZTE Corporation | imported from 3GU |
R3‑171604 | Data forwarding for intra NG-RAN mobility | ZTE Corporation | imported from 3GU |
R3‑171605 | TP for Data forwarding for intra NG-RAN mobility | ZTE Corporation | imported from 3GU |
R3‑171606 | Discussion on gNB-eNB interface setup | ZTE Corporation | imported from 3GU |
R3‑171607 | Discussion on inter RAT HO path selection | ZTE Corporation | imported from 3GU |
R3‑171608 | Discussion on refining QoS related IEs over NG | ZTE Corporation | imported from 3GU |
R3‑171609 | TP for QoS related IEs over NG | ZTE Corporation | imported from 3GU |
R3‑171610 | Correction on UL TNL address in CIoT UP Solution | Huawei | imported from 3GU |
R3‑171611 | Introduction of UL TNL address in CIoT UP Solution | Huawei | imported from 3GU |
R3‑171612 | Introduction of UL TNL address in CIoT UP Solution | Huawei | imported from 3GU |
R3‑171613 | Discussion on the open issue for option 3 | CATT | imported from 3GU |
R3‑171614 | Stage 2 TP on the open issues for option 3 | CATT | imported from 3GU |
R3‑171615 | Stage 3 TP on the open issues for option 3 | CATT | imported from 3GU |
R3‑171616 | Solution Evaluation for Path switch over NG-C | LG Electronics Inc. | imported from 3GU |
R3‑171617 | Multiple preparation of UE context for inactive state UEs | HuaWei Technologies Co., Ltd | imported from 3GU |
R3‑171618 | Text proposal for support of multiple preparation UE context for inactive UEs | HuaWei Technologies Co., Ltd | imported from 3GU |
R3‑171619 | Discussion on PDU session AMBR split | ZTE Corporation | imported from 3GU |
R3‑171620 | TP for PDU session AMBR split | ZTE Corporation | imported from 3GU |
R3‑171621 | Overall NG RAN Architecture | Samsung | imported from 3GU |
R3‑171622 | TP for overall NG RAN Architecture | Samsung | imported from 3GU |
R3‑171623 | Intra NG-RAN handover procedure | Samsung | imported from 3GU |
R3‑171624 | TP for intra NG-RAN handover procedure | Samsung | imported from 3GU |
R3‑171625 | TP for intra NG-RAN handover procedure | Samsung | imported from 3GU |
R3‑171626 | Inter-RAT mobility between NR and E-UTRA | Samsung | imported from 3GU |
R3‑171627 | TP for Inter-RAT mobility with E-UTRA | Samsung | imported from 3GU |
R3‑171628 | Inter-system Inter-RAT mobility between NR and E-UTRA | Samsung | imported from 3GU |
R3‑171629 | Correction on handover procedures to support inter-system mobility | Samsung | imported from 3GU |
R3‑171630 | TS38.475 F1 user plane | Samsung | imported from 3GU |
R3‑171631 | Relationship among gNB-CU, gNB-DU and cell | Samsung | imported from 3GU |
R3‑171632 | Text proposal for TS38.401 on definition of gNB-DU | Samsung | imported from 3GU |
R3‑171633 | RRC messages over F1 interface | Samsung | imported from 3GU |
R3‑171634 | Text proposal for TS38.401 on RRC messages over F1 interface | Samsung | imported from 3GU |
R3‑171635 | Interface between gNB-CU/gNB-DU and O&M | Samsung | imported from 3GU |
R3‑171636 | Text proposal for TS38.401 on gNB-DU management | Samsung | imported from 3GU |
R3‑171637 | F1AP functions | Samsung | imported from 3GU |
R3‑171638 | Text proposal for TS38.401 on F1-C functions | Samsung | imported from 3GU |
R3‑171639 | NG tunnelling to support of dual connectivity in 5G | Samsung | imported from 3GU |
R3‑171640 | Text Proposal for NG tunnelling to support dual Connectivity in 5G | Samsung | imported from 3GU |
R3‑171641 | Discussion on the Open issues in option 3/3a/3x | Samsung | imported from 3GU |
R3‑171642 | 5G QoS model Support in Xn for Dual Connectivity | Samsung | imported from 3GU |
R3‑171643 | Text Proposal for QoS Mapping Principle in NR DC | Samsung | imported from 3GU |
R3‑171644 | Text Proposal for QoS Support in NR Dual Connectivity | Samsung | imported from 3GU |
R3‑171645 | Data Forwarding in Handover | Samsung | imported from 3GU |
R3‑171646 | Xx interface Setup | Samsung | imported from 3GU |
R3‑171647 | NG PDU Session Related | Samsung | imported from 3GU |
R3‑171648 | TP for PDU Session Setup Procedure | Samsung | imported from 3GU |
R3‑171649 | TP for PDU Session Release and PDU Session Notify Procedures | Samsung | imported from 3GU |
R3‑171650 | TP for PDU Session Modify and PDU Session Modify Indication Procedures | Samsung | imported from 3GU |
R3‑171651 | NG UE Context and UE Connection Related | Samsung | imported from 3GU |
R3‑171652 | TP for UE Context Procedure | Samsung | imported from 3GU |
R3‑171653 | Consideration on the counter check procedure in LTE-NR tight interworking | ZTE Corporation | imported from 3GU |
R3‑171654 | Relay to Relay Path Switch in feD2D | ZTE Corporation | imported from 3GU |
R3‑171655 | TP for Relay to Relay Path Switch in feD2D | ZTE Corporation | imported from 3GU |
R3‑171656 | TP to update solution 2a-2 in feD2D | ZTE Corporation | imported from 3GU |
R3‑171657 | Consideration on the intra-MN handover without SCG change involved | ZTE Corporation | imported from 3GU |
R3‑171658 | CU/DU ID and conception discussion | ZTE Corporation | imported from 3GU |
R3‑171659 | Further Consideration on QOS Flow and DRB Mapping Management | ZTE Corporation | imported from 3GU |
R3‑171660 | TP for CU/DU ID and conception in TS38.401 | ZTE Corporation | imported from 3GU |
R3‑171661 | Solution on PDCP PDU retransmission | ZTE Corporation | imported from 3GU |
R3‑171662 | Consideration on SN RRC message indirect forward | ZTE Corporation | imported from 3GU |
R3‑171663 | TP for gNB-DU measurement report | ZTE Corporation | imported from 3GU |
R3‑171664 | Architecture for Local Caching Solution | China Mobile E-Commerce Co. | imported from 3GU |
R3‑171665 | User data forwarding for SCG split bearer | ZTE Corporation | imported from 3GU |
R3‑171666 | Impact of Slice Availability on Dual Connectivity | China Mobile E-Commerce Co. | imported from 3GU |
R3‑171667 | Further considerations on the CU-DU relationship | China Mobile E-Commerce Co. | imported from 3GU |
R3‑171668 | TP for User data forwarding for Dual connectivity | ZTE Corporation | imported from 3GU |
R3‑171669 | Discussion on intra-NR mobility scenario in RRC_CONNECTED | China Mobile E-Commerce Co. | imported from 3GU |
R3‑171670 | UE Unreachable Notification for RRC_INACTIVE UE | China Mobile E-Commerce Co. | imported from 3GU |
R3‑171671 | pCR of UE Unreachable Notification for RRC_INACTIVE UE | China Mobile E-Commerce Co. | imported from 3GU |
R3‑171672 | Text Proposa of Split SRB Configuration for 36.423 | Samsung | imported from 3GU |
R3‑171673 | Text Proposa of HRL for 36.423 | Samsung | imported from 3GU |
R3‑171674 | Text Proposal of X2 Setup for 36.423 | Samsung | imported from 3GU |
R3‑171675 | Rapporteur editorial review | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
R3‑171676 | Correction to Path Switch Request for RRC Resume Cause | NEC | imported from 3GU |
R3‑171677 | Correction to Path Switch Request for RRC Resume Cause | NEC | imported from 3GU |
R3‑171678 | Correction to Path Switch Request for RRC Resume Cause | NEC | imported from 3GU |
R3‑171679 | Discussion on the skeleton and TP for 38.401 | NEC | imported from 3GU |
R3‑171680 | Update skeleton to 38.401 | NEC | imported from 3GU |
R3‑171681 | reflection of the TP to 38.401 | NEC | imported from 3GU |
R3‑171682 | Whether a gNB-DU can be connected with multiple gNB-Cus | NEC | imported from 3GU |
R3‑171683 | pCR for Whether a gNB-DU can be connected with multiple gNB-Cus | NEC | imported from 3GU |
R3‑171684 | Transferring of RRC messages over F1 interface | NEC | imported from 3GU |
R3‑171685 | pCR for Transferring of RRC messages over F1 interface | NEC | imported from 3GU |
R3‑171686 | Tunnel to transfer logical channel data over F1-U | NEC | imported from 3GU |
R3‑171687 | SCTP Association Initiation in F1 interface | NEC | imported from 3GU |
R3‑171688 | TP for SCTP Association Initiation in F1 interface | NEC | imported from 3GU |
R3‑171689 | Specification of L1/L2 configuration Info in F1AP | NEC | imported from 3GU |
R3‑171690 | UE assisted local caching | Qualcomm Incorporated | imported from 3GU |
R3‑171691 | Reliability for Core Network and RRC Signalling | Vodafone Group Services Ltd | imported from 3GU |
R3‑171692 | Conclusion for solutions #1 and #2 | Fujitsu | imported from 3GU |
R3‑171693 | Many to Many connections of CUs and DUs | Vodafone Group Services Ltd | imported from 3GU |
R3‑171694 | Architecture terminology update | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
R3‑171695 | Evolved LTE RAN Architecture | Vodafone Group Services Ltd | imported from 3GU |
R3‑171696 | Global gNB ID (gNB-CU ID & gNB-DU ID) & Cell ID | Samsung | imported from 3GU |
R3‑171697 | Intra-CU/Inter-DU Handover support | Samsung, KT, SK Telecom | imported from 3GU |
R3‑171698 | Intra-CU/Inter-DU Handover support | Samsung, KT, SK Telecom | imported from 3GU |
R3‑171699 | Termination of NG and S1-U Interface | Samsung, KT, SK Telecom | imported from 3GU |
R3‑171700 | Evolved LTE RAN Architecture | Vodafone Group Services Ltd | imported from 3GU |
R3‑171701 | Introduction of option 3 – Dual Connectivity with NR in E-UTRAN | Ericsson | imported from 3GU |
R3‑171702 | F1 interface setup and the delivery of gNB-DU capability | Samsung, KT, SK Telecom | imported from 3GU |
R3‑171703 | F1 interface setup and the delivery of gNB-DU capability | Samsung, KT, SK Telecom | imported from 3GU |
R3‑171704 | General aspects of NG interface | KT Corp. | imported from 3GU |
R3‑171705 | MBMS Bearer Event Notification in the EPC | Ericsson | imported from 3GU |
R3‑171706 | Enabling MBMS bearer event notification | Ericsson | imported from 3GU |
R3‑171707 | [DRAFT] Reply LS on MBMS Bearer Event Notification | Ericsson | imported from 3GU |
R3‑171708 | QoS – Continuation of stage 3 work | Ericsson | imported from 3GU |
R3‑171709 | Data forwarding at handover | Ericsson | imported from 3GU |
R3‑171710 | Inter System QoS interworking | Ericsson | imported from 3GU |
R3‑171711 | PDU session split at UPF | Ericsson | imported from 3GU |
R3‑171712 | [DRAFT] Reply to LS on Dual Connectivity with 5GC | Ericsson | imported from 3GU |
R3‑171713 | NW slicing support at NG-C establishment and update | Ericsson | imported from 3GU |
R3‑171714 | TP for NW slicing support at NG-C establishment and update in TS 38.300 | Ericsson | imported from 3GU |
R3‑171715 | TP for NW slicing support at NG-C establishment and update in TS 38.413 | Ericsson | imported from 3GU |
R3‑171716 | NW slicing support during PDU session resource management | Ericsson | imported from 3GU |
R3‑171717 | TP for NW slicing support during PDU session resource management | Ericsson | imported from 3GU |
R3‑171718 | Discussion on PWS for NG-RAN | Ericsson | imported from 3GU |
R3‑171719 | Stage 2 Work for Option 3 | Ericsson | imported from 3GU |
R3‑171720 | Further Stage 2 topics for Option 3 | Ericsson | imported from 3GU |
R3‑171721 | Further details on specifying stage 2 for option 3 | Ericsson | imported from 3GU |
R3‑171722 | Further Considerations on Xn for Options 7/7a/7x | Ericsson | imported from 3GU |
R3‑171723 | GTP-U RAN Container for Xn | Ericsson | imported from 3GU |
R3‑171724 | F1 interface functions | Ericsson | imported from 3GU |
R3‑171725 | Separation of CP and UP | Ericsson, Vodafone | imported from 3GU |
R3‑171726 | Transmission of RRC messages | Ericsson, Vodafone | imported from 3GU |
R3‑171727 | On the functional distribution over the F1 interface | Ericsson | imported from 3GU |
R3‑171728 | Fast centralized retransmission of lost PDUs | Ericsson | imported from 3GU |
R3‑171729 | TP for Fast centralized retransmission of lost PDUs | Ericsson | imported from 3GU |
R3‑171730 | OAM for the CU-DU deployment | Ericsson | imported from 3GU |
R3‑171731 | TP on OAM for the CU-DU deployment | Ericsson | imported from 3GU |
R3‑171732 | Overall NG RAN Architecture and related topics | Ericsson, Interdigital | imported from 3GU |
R3‑171733 | On physical implementation and logical definition of RAN nodes | Ericsson | imported from 3GU |
R3‑171734 | On NG RAN nodes supporting E-UTRA and NR access | Ericsson | imported from 3GU |
R3‑171735 | Alternative depiction of the NG RAN architecture | Ericsson | imported from 3GU |
R3‑171736 | Mobility Restrictions in NR | Ericsson | imported from 3GU |
R3‑171737 | TP for Mobility Restrictions in NR | Ericsson | imported from 3GU |
R3‑171738 | Further Considerations on Stage 2 for Option 7/7a/7x | Ericsson | imported from 3GU |
R3‑171739 | TP for F1 interface functions | Ericsson | imported from 3GU |
R3‑171740 | TP for Transmission of RRC messages | Ericsson, Vodafone | imported from 3GU |
R3‑171741 | TP for the functional distribution over the F1 interface | Ericsson | imported from 3GU |
R3‑171742 | Rapporteur’s update of TS 38.423 XnAP (V0.0.2) | Ericsson | imported from 3GU |
R3‑171743 | Rapporteur’s update of TS 38.425 Xn-UP (V0.0.2) | Ericsson | imported from 3GU |
R3‑171744 | Some Considerations on CSG | Ericsson | imported from 3GU |
R3‑171745 | Local Caching Solutions | Ericsson | imported from 3GU |
R3‑171746 | Framework for Discussions on Local Caching | Ericsson | imported from 3GU |
R3‑171747 | CR to 25.461: Introduction of Band 49 (3.5 GHz LAA in US) | Ericsson | imported from 3GU |
R3‑171748 | CR to 25.466: Introduction of Band 49 (3.5 GHz LAA in US ) | Ericsson | imported from 3GU |
R3‑171749 | Group Mobility for Wearable Devices | Ericsson | imported from 3GU |
R3‑171750 | Group Mobility Solution - Text Proposal | Ericsson | imported from 3GU |
R3‑171751 | Correction on Dual Cell E-DCH operation enhancements | Ericsson | imported from 3GU |
R3‑171752 | Correction of the abnormal case in Dual Cell E-DCH operation enhancements configuration | Ericsson | imported from 3GU |
R3‑171753 | Correction on Dual Cell E-DCH operation enhancements | Ericsson | imported from 3GU |
R3‑171754 | Discussion on support of redirection for VoLTE | Ericsson | imported from 3GU |
R3‑171755 | Remove the description of Inter RAT Redirection value for MMTEL | Ericsson | imported from 3GU |
R3‑171756 | On RRC message transport over CU-DU interface | China Telecommunications | imported from 3GU |
R3‑171757 | Framework for X2AP support for NR ANR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171758 | Support for New Radio ANR | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171759 | RAN supported TNL discovery for EN-DC | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171760 | How to determine spatial distribution of UEs w.r.t. cell border based on RSRP | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171761 | Correction of solution 4 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171762 | Evaluation of solution 3, 4 and 5 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171763 | Miscellaneous updates and conclusion for TR 36.742 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171764 | Open issues for CU-DU functional split and F1 interface | KT Corp. | imported from 3GU |
R3‑171765 | Reflective QoS and Reflective Mapping | Huawei | imported from 3GU |
R3‑171766 | Default QoS | Huawei | imported from 3GU |
R3‑171767 | Slice exchange during NG Setup | Huawei | imported from 3GU |
R3‑171768 | TP for TS 38.300 on Slice exchange during NG Setup | Huawei | imported from 3GU |
R3‑171769 | [DRAFT] Reply LS on the need for EPS Bearer ID knowledge in NG-RAN for (inter-RAT) inter-system handover | Intel Corporation | imported from 3GU |
R3‑171770 | EPS bearer id in NR RAN for inter-RAT HO | Intel Corporation | imported from 3GU |
R3‑171771 | Common 5GC | Intel Corporation, Deutsche Telekom | imported from 3GU |
R3‑171772 | Transfer of RRC messages on the F1 interface | Intel Corporation | imported from 3GU |
R3‑171773 | Inter-DU Mobility | Intel Corporation | imported from 3GU |
R3‑171774 | Draft TS 38.474 | Intel Corporation | imported from 3GU |
R3‑171775 | QoS profile for Default DRB and Default QoS profile | Intel Corporation, Nokia, Alcatel-Lucent Shanghai Bell, LGE | imported from 3GU |
R3‑171776 | UE capability coordination for EN-DC | Intel Corporation | imported from 3GU |
R3‑171777 | In supporting unified split bearer option for EN-DC | Intel Corporation | imported from 3GU |
R3‑171778 | Consideration on RAN-based Notification Area | Intel Corporation | imported from 3GU |
R3‑171779 | Interaction between RAN-initiated paging and CN-initiated paging | Intel Corporation | imported from 3GU |
R3‑171780 | TP for TS 38.413 on Slice exchange during NG Setup | Huawei | imported from 3GU |
R3‑171781 | Updated skeleton of 38.470 | Huawei | imported from 3GU |
R3‑171782 | Capturing agreed procedures into 38.470 | Huawei | imported from 3GU |
R3‑171783 | Updated skeleton of 38.473 | Huawei | imported from 3GU |
R3‑171784 | Correction to Stage 2 Specifications on RAN Selection of CN entity | Huawei | imported from 3GU |
R3‑171785 | TP for Correction to RAN Selection of CN entity | Huawei | imported from 3GU |
R3‑171786 | Xn based mobility for slicing | Huawei | imported from 3GU |
R3‑171787 | TP: Xn based mobility for slicing | Huawei | imported from 3GU |
R3‑171788 | Slice exchange and update over Xn | Huawei | imported from 3GU |
R3‑171789 | Slice impact on mobility | Huawei | imported from 3GU |
R3‑171790 | TP: Slice impact on mobility | Huawei | imported from 3GU |
R3‑171791 | Slice Information Exchange over NG interface | Huawei | imported from 3GU |
R3‑171792 | eComp evaluation | Huawei | imported from 3GU |
R3‑171793 | eComp conclusions | Huawei | imported from 3GU |
R3‑171794 | Data forwarding in handover | Qualcomm Incorporated | imported from 3GU |
R3‑171795 | Data forwarding in handover | Qualcomm Incorporated | imported from 3GU |
R3‑171796 | Flow QoS impact to DC | Qualcomm Incorporated | imported from 3GU |
R3‑171797 | SgNB change procedure | Qualcomm Incorporated | imported from 3GU |
R3‑171798 | Analysis of ANR for option 3 | Qualcomm Incorporated | imported from 3GU |
R3‑171799 | RRC_INACTIVE princples | Qualcomm Incorporated | imported from 3GU |
R3‑171800 | UE capability handling | Qualcomm Incorporated | imported from 3GU |
R3‑171801 | UE capability handling | Qualcomm Incorporated | imported from 3GU |
R3‑171802 | Rapporteur update for TS 36.463 | Qualcomm Incorporated | imported from 3GU |
R3‑171803 | Solutions for re-establishment of CP CIoT | Qualcomm Incorporated | imported from 3GU |
R3‑171804 | Support of RLF for CP CIoT Optimisation | Qualcomm Incorporated | imported from 3GU |
R3‑171805 | Support of RLF for CP CIoT Optimisation | Qualcomm Incorporated | imported from 3GU |
R3‑171806 | TP for TS 38.420 | Qualcomm Incorporated | imported from 3GU |
R3‑171807 | Rapporteur baseline for TS 38.420 | Qualcomm Incorporated | imported from 3GU |
R3‑171808 | Considerations on NG RAN architecture | Huawei | imported from 3GU |
R3‑171809 | Text Proposal on NG RAN architecture | Huawei | imported from 3GU |
R3‑171810 | Data Forwarding For QoS Flow Remapping During Mobility | HUawei | imported from 3GU |
R3‑171811 | TP for Data Forwarding For QoS Flow Remapping During Mobility | Huawei | imported from 3GU |
R3‑171812 | version 002 of TS 38.410 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171813 | Discussions on fundamental F1 AP procedures | Huawei | imported from 3GU |
R3‑171814 | Discussions on enhancement of retransmissions over F1 interface | Huawei | imported from 3GU |
R3‑171815 | Discussions on mobility procedure | Huawei | imported from 3GU |
R3‑171816 | Central RRM functions and high level information | IAESI, Thales, Fairspectrum, VTT | imported from 3GU |
R3‑171817 | TP for TS 38.413 on overall architecture | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171818 | HLS Architecture Principles | Altiostar Networks | imported from 3GU |
R3‑171819 | Consideration of RRM Functions in CU-DU Split Architecture | Altiostar Networks | imported from 3GU |
R3‑171820 | Flow Control in CU-DU Split Architecture | Altiostar Networks | imported from 3GU |
R3‑171821 | Discussion on CU-DU interface issues X.6 and X.9 | NEC | imported from 3GU |
R3‑171822 | F1 interface: Radio resource configuration management | NTT DOCOMO, INC. | imported from 3GU |
R3‑171823 | F1 interface: Radio resource configuration management | NTT DOCOMO, INC. | imported from 3GU |
R3‑171824 | Skeleton for 38.412 | NTT DOCOMO, INC. | imported from 3GU |
R3‑171825 | Skeleton for 38.422 | NTT DOCOMO, INC. | imported from 3GU |
R3‑171826 | NR parts of inter-system inter-RAT mobility between NR and E-UTRA | Ericsson | imported from 3GU |
R3‑171827 | Introduction of option 3 – Dual Connectivity with NR in E-UTRAN – RAN3 parts | Ericsson | imported from 3GU |
R3‑171828 | TP for CP and UP split | Ericsson | imported from 3GU |
R3‑171829 | Discussion on UE differentiation in NB-IoT | Ericsson | imported from 3GU |
R3‑171830 | QoE for streaming services in E-UTRAN | Ericsson | imported from 3GU |
R3‑171831 | Consideration of introducing Inter-RAT redirection cause in RANAP | Ericsson | imported from 3GU |
R3‑171832 | F1 interface: Further consideration on M-plane aspects | NTT DOCOMO, INC. | imported from 3GU |
R3‑171833 | F1 interface: Work Plan on F1 | NTT DOCOMO, INC. | imported from 3GU |
R3‑171834 | F1 interface: RRC message transfer over C-plane or U-plane | NTT DOCOMO, INC. | imported from 3GU |
R3‑171835 | Latest RAN2-endorsed version of TS 38.300 (V0.2.0) | Nokia (rapporteur) | imported from 3GU |
R3‑171836 | Discussion on solutions to address backhaul long latency issue | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171837 | UE Assisted Local Caching | Huawei | imported from 3GU |
R3‑171838 | Network architecture aspects for local caching | Huawei | imported from 3GU |
R3‑171839 | On inter SN change procedure in EN-DC | NTT DOCOMO, INC. | imported from 3GU |
R3‑171840 | TP on Mobility Management to 38.401 | Huawei | imported from 3GU |
R3‑171841 | Paging message delivery over F1 | Huawei | imported from 3GU |
R3‑171842 | TP for paging message delivery over F1 (38.473) | Huawei | imported from 3GU |
R3‑171843 | TP for paging message delivery over F1 (38.470) | Huawei | imported from 3GU |
R3‑171844 | TP for paging message delivery over F1 (38.401) | Huawei | imported from 3GU |
R3‑171845 | UE RRC messages transfer on F1 | Huawei | imported from 3GU |
R3‑171846 | F1AP procedures design for RRC Connection Setup | Huawei | imported from 3GU |
R3‑171847 | TP of RRC message transfer on F1 (38470) | Huawei | imported from 3GU |
R3‑171848 | TP of RRC message transfer on F1 (38401) | Huawei | imported from 3GU |
R3‑171849 | TP of RRC message transfer on F1 (38473) | Huawei | imported from 3GU |
R3‑171850 | System information delivery over F1 | Huawei | imported from 3GU |
R3‑171851 | TP of System information delivery over F1 (38401) | Huawei | imported from 3GU |
R3‑171852 | UE Context management on F1 | Huawei | imported from 3GU |
R3‑171853 | TP of Context management on F1 (38470) | Huawei | imported from 3GU |
R3‑171854 | TP of Context management on F1 (38401) | Huawei | imported from 3GU |
R3‑171855 | TP of Context management on F1 (38473) | Huawei | imported from 3GU |
R3‑171856 | Discussions on management for CU and DU of gNB v01 | Huawei | imported from 3GU |
R3‑171857 | TP on management fo CU and DU of gNB (38.401) | Huawei | imported from 3GU |
R3‑171858 | Bearer management over F1 v3 | Huawei | imported from 3GU |
R3‑171859 | TP Bearer management over F1 (38.470) | Huawei | imported from 3GU |
R3‑171860 | TP Bearer management over F1 (38.473) | Huawei | imported from 3GU |
R3‑171861 | Rapporteur's update of TS 38.411 (V0.0.2) | LG Electronics Inc. | imported from 3GU |
R3‑171862 | TP for TS 38.411 | LG Electronics Inc. | imported from 3GU |
R3‑171863 | Discussion on the defintion of RAN identifier | China Telecom | imported from 3GU |
R3‑171864 | Considerations on function split for 5G deployment | SK Telecom | imported from 3GU |
R3‑171865 | TNL address discovery for Option 3/3a/3x | Huawei | imported from 3GU |
R3‑171866 | General aspects and principles for Option 3/3a/3x | Huawei | imported from 3GU |
R3‑171867 | Working Document for stage-3 of Option 3/3a/3x | Huawei, LG Electronics Inc., CATT, ZTE | imported from 3GU |
R3‑171868 | Some updates to stage-3 for Option 3/3a/3x | Huawei | imported from 3GU |
R3‑171869 | Detailed procedure of Secondary Node change | Huawei | imported from 3GU |
R3‑171870 | TP for Secondary node change procedure | Huawei | imported from 3GU |
R3‑171871 | [DRAFT] Response LS on RAN2 LTE-NR interworking procedure related conclusions | Huawei | imported from 3GU |
R3‑171872 | Considerations on bearer types | Huawei | imported from 3GU |
R3‑171873 | SCG SRB establishment procedure | Huawei | imported from 3GU |
R3‑171874 | TP on SCG SRB establishment procedure | Huawei | imported from 3GU |
R3‑171875 | MCG split SRB establishment procedure | Huawei | imported from 3GU |
R3‑171876 | TP on MCG split SRB establishment procedure | Huawei | imported from 3GU |
R3‑171877 | S-KeNB related issues for EN-DC | Huawei | imported from 3GU |
R3‑171878 | RRC information exchange for EN-DC | Huawei | imported from 3GU |
R3‑171879 | TP on RRC information exchange for EN-DC | Huawei | imported from 3GU |
R3‑171880 | Consideration on counter check procedure | Huawei | imported from 3GU |
R3‑171881 | DL Flow control for EN-DC | Huawei | imported from 3GU |
R3‑171882 | Introduction of flow control for EN-DC | Huawei | imported from 3GU |
R3‑171883 | Introduction of flow control for EN-DC | Huawei | imported from 3GU |
R3‑171884 | Flow control to support RLC UM | Huawei, , Deutsche Telekom | imported from 3GU |
R3‑171885 | TP on support of flow control for RLC UM | Huawei | imported from 3GU |
R3‑171886 | Granularity of offload in Option 7 | Huawei | imported from 3GU |
R3‑171887 | NGAP support for Option 7 | Huawei | imported from 3GU |
R3‑171888 | TP on NGAP support for Option 7 | Huawei | imported from 3GU |
R3‑171889 | Support of QoS and Slice for Option 7 | Huawei | imported from 3GU |
R3‑171890 | UMTS and LTE inter-RAT mobility enhancements | Huawei | imported from 3GU |
R3‑171891 | Introduction of the Inter-RAT Redirection cause | Huawei | imported from 3GU |
R3‑171892 | LS to RAN2 and RAN3 on security for RLFs for DoNAS UEs | SA3, Vodafone | imported from 3GU |
R3‑171893 | Reply LS on RAN-Assisted Codec Adaptation | SA WG4, Intel | imported from 3GU |
R3‑171894 | Reply LS on the progress of QoE Measurement Collection for Streaming | SA WG4, Ericsson | imported from 3GU |
R3‑171895 | LS on QMC session measurements | SA WG4, Ericsson | imported from 3GU |
R3‑171896 | Reply LS on QoE Measurement Collection for streaming | SA WG4, Huawei | imported from 3GU |
R3‑171897 | LS on eVoLP parameters | SA WG4, Qualcomm | imported from 3GU |
R3‑171898 | Response to R3-171711 (PDU Session split at UPF) | NTT DOCOMO, INC. | imported from 3GU |
R3‑171899 | Reply to LS on Dual Connectivity with 5GC | NTT DOCOMO, INC. | imported from 3GU |
R3‑171900 | Response to R3-171485 Support of NAS Security Option A | Huawei | imported from 3GU |
R3‑171901 | Response to R3-171486 Support of NAS Security Option A | Huawei | imported from 3GU |
R3‑171902 | Response to R3-171487 Support of NAS Security Option A | Huawei | imported from 3GU |
R3‑171903 | TR 38.300 V0.2.1 | Nokia (rapporteur) | imported from 3GU |
R3‑171904 | Baseline pCR for TS 38.300 | Nokia | imported from 3GU |
R3‑171905 | Response to R3-171892 | Ericsson | imported from 3GU |
R3‑171906 | Response to R3-171725 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171907 | Reply LS on Data rates and Latency with NR, E-UTRA, EPS and 5GS | SA1, Vodafone | imported from 3GU |
R3‑171908 | LS reply to RAN2 on ”the progress of QoE Measurement Collection for Streaming to RAN3, SA4, SA5 and CT1” | SA5, Ericsson | imported from 3GU |
R3‑171909 | Enabling MBMS bearer event notification | Ericsson | imported from 3GU |
R3‑171910 | [DRAFT] Reply LS on MBMS Bearer Event Notification | Ericsson | imported from 3GU |
R3‑171911 | Correction of the abnormal case in Dual Cell E-DCH operation enhancements configuration | Ericsson | imported from 3GU |
R3‑171912 | Correction on Dual Cell E-DCH operation enhancements | Ericsson | imported from 3GU |
R3‑171913 | Rapporteur update for TS 36.463 | Qualcomm Incorporated | imported from 3GU |
R3‑171914 | CR to 25.461: Introduction of Band 49 (3.5 GHz LAA in US) | Ericsson | imported from 3GU |
R3‑171915 | Separation of CP and UP | Ericsson, Vodafone, AT&T, SK Telecom | imported from 3GU |
R3‑171916 | Update for TS 38.421 | CATT | imported from 3GU |
R3‑171921 | Discussion on Termination point(s) of NG, Xn interfaces | Deutsche Telekom, Verzion, AT&T, T-Mobile USA, Telecom Italia, China Unicom | imported from 3GU |
R3‑171923 | Single NGAP for both 3GPP access and non-3GPP access | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171929 | Discussion on functionality in RRC-INACTIVE state | LG Electronics | imported from 3GU |
R3‑171934 | Considerations on function split for 5G deployment | SK Telecom | imported from 3GU |
R3‑171935 | NG RAN architecture | NTT Docomo | imported from 3GU |
R3‑171936 | Conclusion for solutions #1 and #2 | Fujitsu | imported from 3GU |
R3‑171937 | TR 36.742 v1.2.0 on Study on SON for eCoMP | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171939 | Termination of NG and S1-U Interface | Samsung, KT, SK Telecom | imported from 3GU |
R3‑171942 | Support of RLF for CP CIoT Optimisation | Qualcomm Incorporated | imported from 3GU |
R3‑171943 | Support of RLF for CP CIoT Optimisation | Qualcomm Incorporated | imported from 3GU |
R3‑171944 | Retrieval of NAS PDUs for NAS recovery in CP CIoT | Quelcomm | imported from 3GU |
R3‑171945 | Retrieval of NAS PDUs for NAS recovery in CP CIoT | Quelcomm | imported from 3GU |
R3‑171946 | Introduction of UL TNL address in CIoT UP Solution | Huawei | imported from 3GU |
R3‑171947 | Introduction of UL TNL address in CIoT UP Solution | Huawei | imported from 3GU |
R3‑171948 | Correction on UE-AMBR for NB-IoT UE using CP solution | Huawei, NTT DOCOMO, INC. | imported from 3GU |
R3‑171949 | Correction on UE-AMBR for NB-IoT UE using CP solution | Huawei, NTT DOCOMO, INC. | imported from 3GU |
R3‑171950 | TP of Initial RAN3 part for TS 37.340 | ZTE Corporation | imported from 3GU |
R3‑171951 | HLS Architecture Principles | Altiostar Networks, SK Telecom | imported from 3GU |
R3‑171952 | Consideration of RRM Functions in CU-DU Split Architecture | Altiostar Networks, Orange, SK Telecom | imported from 3GU |
R3‑171953 | Flow Control in CU-DU Split Architecture | Altiostar Networks, Orange, SK Telecom | imported from 3GU |
R3‑171954 | feNB-IoT Session report | Ericsson (Session Chair) | imported from 3GU |
R3‑171955 | Wearables Session report | Ericsson (Session Chair) | imported from 3GU |
R3‑171956 | NR-SON Session report | Ericsson (Session Chair) | imported from 3GU |
R3‑171957 | TP for Conclusion of FeD2D Wearable Study | Huawei | imported from 3GU |
R3‑171958 | TP for solution 3-1 and 3-2 | Huawei | imported from 3GU |
R3‑171959 | Group Mobility Solution – Text Proposal | Ericsson | imported from 3GU |
R3‑171962 | TS 38.401 v0.2.0 | NEC | imported from 3GU |
R3‑171965 | TS 38.410 0.1.0 | Nokia | imported from 3GU |
R3‑171967 | TS 38.420 v0.1.0 | Qualcomm | imported from 3GU |
R3‑171968 | Updated skeleton of 38.470 | Huawei | imported from 3GU |
R3‑171969 | TS 38.470 0.1.0 | Huawei | imported from 3GU |
R3‑171970 | Rapporteur's update of TS 38.411 (V0.1.0) | LG Electronics Inc. | imported from 3GU |
R3‑171971 | Considerations on function split for 5G deployment | SK Telecom, Deutsche Telekom, T-Mobile USA, Altiostar Networks | imported from 3GU |
R3‑171973 | Update for TS 38.421 | CATT | imported from 3GU |
R3‑171975 | Rapporteur's update of TS 38.413 (V0.1.0) | Nokia | imported from 3GU |
R3‑171983 | TS 38.423 v0.1.0 | Ericsso | imported from 3GU |
R3‑171984 | TS 38.473 v0.1.0 | Huawei | imported from 3GU |
R3‑171985 | Miscellaneous updates and conclusion for TR 36.742 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171986 | Draft TS 38.424 Xn data transport V 0.1.0 | Mitsubishi Electric RCE | imported from 3GU |
R3‑171987 | Draft TS 38.474 | Intel Corporation | imported from 3GU |
R3‑171988 | LS on EUTRAN sharing enhancement | RAN2 | imported from 3GU |
R3‑171989 | TS38.475 F1 user plane v0.1.0 | Samsung | imported from 3GU |
R3‑171990 | Features from LTE not applicable for NR Phase 1 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171992 | Addition of a reference to the EN DC procedures | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R3‑171993 | stage-3 of Option 3/3a/3x | Huawei, LG Electronics Inc., CATT, ZTE | imported from 3GU |
R3‑171994 | Response LS on RAN2 LTE-NR interworking procedure related conclusions | Huawei | imported from 3GU |
R3‑171998 | Summary of offline discussion of F1 interface | Ericsson | imported from 3GU |
R3‑172000 | Discussions on fundamental F1 AP procedures | Huawei | imported from 3GU |
R3‑172001 | TP on C_RNTI allocation to 38.473 | Huawei | imported from 3GU |
R3‑172002 | [DRAFT] Reply LS on the need for EPS Bearer ID knowledge in NG-RAN for (inter-RAT) inter-system handover | Intel Corporation | imported from 3GU |
R3‑172003 | Reply to LS on Dual Connectivity with 5GC | Ericsson | imported from 3GU |
R3‑172004 | Reply to LS on Dual Connectivity with 5GC | Ericsson | imported from 3GU |
R3‑172005 | LS on EUTRAN sharing enhancement | Ericsson | imported from 3GU |
R3‑172006 | TP Bearer management over F1 (38.473) | Huawei | imported from 3GU |
R3‑172007 | [DRAFT] Reply LS on MBMS Bearer Event Notification | Ericsson | imported from 3GU |
R3‑172008 | Support of RLF for CP CIoT Optimisation | Qualcomm Incorporated | imported from 3GU |
R3‑172009 | Support of RLF for CP CIoT Optimisation | Qualcomm Incorporated | imported from 3GU |
R3‑172010 | Retrieval of NAS PDUs for NAS recovery in CP CIoT | Quelcomm | imported from 3GU |
R3‑172011 | Retrieval of NAS PDUs for NAS recovery in CP CIoT | Quelcomm | imported from 3GU |
R3‑172013 | Response LS on RAN2 LTE-NR interworking procedure related conclusions | Huawei | imported from 3GU |
R3‑172018 | Draft TS 38.474 | Intel Corporation | imported from 3GU |
R3‑172019 | TS 38.410 0.1.1 | Nokia | imported from 3GU |
R3‑172020 | Draft TS 38.424 Xn data transport V 0.1.0 | Mitsubishi Electric RCE | imported from 3GU |
R3‑172021 | Roaming and Access Restriction for MR-DC and Intra-NR DC | ZTE Corporation | imported from 3GU |
R3‑172024 | Correction on UE-AMBR for NB-IoT UE using CP solution | Huawei, NTT DOCOMO, INC. | imported from 3GU |
R3‑172025 | Rapporteur review | Huawei | imported from 3GU |
R3‑172026 | LS on EUTRAN sharing enhancement | Ericsson | imported from 3GU |
R3‑172027 | [DRAFT] Reply LS on the need for EPS Bearer ID knowledge in NG-RAN for (inter-RAT) inter-system handover | Intel Corporation | imported from 3GU |
R3‑172028 | [DRAFT] Reply LS on the need for EPS Bearer ID knowledge in NG-RAN for (inter-RAT) inter-system handover | Intel Corporation | imported from 3GU |
R3‑172031 | TS 38.401 v0.2.0 | NEC | imported from 3GU |
R3‑172032 | nn | nn | imported from 3GU |
R3‑172033 | nn | nn | imported from 3GU |
R3‑172034 | Support of RLF for CP CIoT Optimisation | Qualcomm Incorporated | imported from 3GU |
R3‑172035 | Support of RLF for CP CIoT Optimisation | Qualcomm Incorporated | imported from 3GU |
page generated from database: 2024-10-07 07:52:06