3GPP TDocs (written contributions) at meeting
Meeting: R2-87 - 2014-08-18 to 2014-08-22, Dresden
meeting id: R2-87 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R2‑142960 | Void | - | - |
R2‑142961 | Void | - | - |
R2‑142962 | Void | - | - |
R2‑142963 | Void | - | - |
R2‑142964 | Void | - | - |
R2‑142965 | Void | - | - |
R2‑142966 | Void | - | - |
R2‑142967 | Void | - | - |
R2‑142968 | Void | - | - |
R2‑142969 | Void | - | - |
R2‑142970 | Void | - | - |
R2‑142971 | Void | - | - |
R2‑142972 | Void | - | - |
R2‑142973 | Void | - | - |
R2‑142974 | Void | - | - |
R2‑142975 | Void | - | - |
R2‑142976 | Void | - | - |
R2‑142977 | Void | - | - |
R2‑142978 | Void | - | - |
R2‑142979 | Void | - | - |
R2‑142980 | Void | - | - |
R2‑142981 | Void | - | - |
R2‑142982 | Void | - | - |
R2‑142983 | Void | - | - |
R2‑142984 | Void | - | - |
R2‑142985 | Void | - | - |
R2‑142986 | Void | - | - |
R2‑142987 | Void | - | - |
R2‑142988 | Void | - | - |
R2‑142989 | Void | - | - |
R2‑142990 | Void | - | - |
R2‑142991 | Void | - | - |
R2‑142992 | Void | - | - |
R2‑142993 | Void | - | - |
R2‑142994 | Void | - | - |
R2‑142995 | Void | - | - |
R2‑142996 | Void | - | - |
R2‑142997 | Void | - | - |
R2‑142998 | Void | - | - |
R2‑142999 | Void | - | - |
R2‑143000 | Proposed agenda for RAN2 #87, Dresden, Germany, 18.08.-22.08.2014 | Ericsson (RAN2 chairman) | Agenda |
R2‑143001 | Draft report of RAN2 #86, Seoul, South Korea, 19.05.-23.05.2014 | ETSI MCC | Report |
R2‑143002 | Further reply LS to R2-141855 on WLAN signal measurements for WLAN/3GPP Radio interworking (IEEE 802.11-14/0936r3; contact: Qualcomm) | IEEE 802.11 | LSin |
R2‑143003 | Reply LS to GP-1400245 on provisioning of E-UTRA capabilities in GERAN (C1-142482; contact: Ericsson) | CT1 | LSin |
R2‑143004 | Reply LS to R2-141790 on per CN domain timer (C1-142970 ; contact: Huawei) | CT1 | LSin |
R2‑143005 | Reply LS to R2-142932 on parameter synchronization (C1-142971; contact: Qualcomm) | CT1 | LSin |
R2‑143006 | Reply LS to R2-142931 on RRC Connection Establishment for ProSe Direct Communication (C1-143021 ; contact: NSN) | CT1 | LSin |
R2‑143007 | LS on ProSe direct services provisioning parameters (C1-143310; contact: Qualcomm) | CT1 | LSin |
R2‑143008 | Reply LS to R2-142955 on WLAN/3GPP Radio Interworking (C1-143355 ; contact: Huawei) | CT1 | LSin |
R2‑143009 | LS on New QCIs for MCPTT Signalling and Voice (C1-143362 ; contact: NSN) | CT1 | LSin |
R2‑143010 | LS on ACB skipping solution for MMTEL and SMS access attempts (C1-143387; contact: LGE) | CT1 | LSin |
R2‑143011 | LS on E-UTRAN inter-frequency measurements that exceeds maxEARFCN (CP-140462; contact: LGE) | CT | LSin |
R2‑143012 | Reply LS to S2-124911 on the problem of UE Radio Capability information size (C4-141163; contact: Huawei) | CT4 | LSin |
R2‑143013 | LS Response to S2-140847 = R2-141062 on Provisioning of ProSe configuration information in a public safety ProSe enabled UE (C6-140314; contact: Qualcomm) | CT6 | LSin |
R2‑143014 | LS on HS-DPCCH overhead reduction (R1-142616; contact: Huawei) | RAN1 | LSin |
R2‑143015 | LS on RAN1 Decisions for Enhanced DCH Work Item (R1-142708; contact: Qualcomm) | RAN1 | LSin |
R2‑143016 | LS to RAN2 on 36.306 for low cost MTC UE (R1-142745; contact: Hisilicon) | RAN1 | LSin |
R2‑143017 | LS on eNB knowledge of low complexity UEs (R1-142748; contact: Ericsson) | RAN1 | LSin |
R2‑143018 | LS on simultaneous reception of low complexity UEs (R1-142750; contact: Vodafone) | RAN1 | LSin |
R2‑143019 | LS on RAN1 agreements on Physical layer functionalities required for operation of Dual Connectivity in RAN1#77 (R1-142755; contact: NTT DOCOMO) | RAN1 | LSin |
R2‑143020 | LS on the support of TDD/FDD CA in Dual Connectivity (R1-142768; contact: Huawei) | RAN1 | LSin |
R2‑143021 | LS on the support of PUCCH on two serving cells in CA (R1-142769; contact: Huawei) | RAN1 | LSin |
R2‑143022 | LS on RAN1 agreements on DRS design (R1-142775 ; contact: LGE) | RAN1 | LSin |
R2‑143023 | LS on updated LTE Rel-12 UE feature list (R1-142777; contact: NTT DOCOMO) | RAN1 | LSin |
R2‑143024 | Reply LS to R2-141849 on SFN handling in the dual connectivity (R3-141479; contact: NSN) | RAN3 | LSin |
R2‑143025 | Reply LS to S2-141435 = R2-140850 on Questions to RAN on UPCON (R3-141494; contact: Ericsson) | RAN3 | LSin |
R2‑143026 | LS on clarification of data forwarding in SeNB initiated SeNB Modification procedure (R3-141516; contact: NSN) | RAN3 | LSin |
R2‑143027 | LS on TAI reporting of last serving cell (R3-141521; contact: Huawei) | RAN3 | LSin |
R2‑143028 | Reply LS to S5-143421 = R2-141894 on clarifications about MOCN and GWCN (R3-141523; contact: Orange) | RAN3 | LSin |
R2‑143029 | Reply LS to R2-141849 on SFN handling issue in dual connectivity (R4-143843; contact: Huawei) | RAN4 | LSin |
R2‑143030 | Reply LS to R1-141240 on Synchronization aspects for dual connectivity (R4-143842; contact: Ericsson) | RAN4 | LSin |
R2‑143031 | LS on Increasing value range for RSRQ (R4-143914; contact: Ericsson) | RAN4 | LSin |
R2‑143032 | LS on Further agreements on increased carrier monitoring (R4-143917; contact: Ericsson) | RAN4 | LSin |
R2‑143033 | Reply LS to GP-130844 = R2-130875 on extending E-UTRA band number and EARFCN numbering space (R4-144044; contact: Broadcom) | RAN4 | LSin |
R2‑143034 | Reply LS to R1-141897 = R2-141880 on LTE Rel-12 UE feature list (R4-143828; contact: NTT DOCOMO) | RAN4 | LSin |
R2‑143035 | Reply LS to RP-140501 on FGI bit handling for bits 31 (R5-142967; contact: KDDI) | RAN5 | LSin |
R2‑143036 | LS on CSG Cell Reselection Performance Requirements (R5-142862; contact: Qualcomm) | RAN5 | LSin |
R2‑143037 | LS on user preferences in RAN rules (RP-141012 ; contact: Broadcom) | RAN | LSin |
R2‑143038 | LS Out to RAN2 on introducing the new RSRQ measurements definition (RP-141024 ; contact: Nokia) | RAN | LSin |
R2‑143039 | LS to RAN WG2 on availability of RAN assistance information (S2-142199; contact: Qualcomm) | SA2 | LSin |
R2‑143040 | LS on Usage of WLAN thresholds for traffic steering (S2-142200; contact:) | SA2 | LSin |
R2‑143041 | Reply LS to R2-142889 on availability of ProSe Direct Communication in limited service state (S2-142898; contact: Qualcomm) | SA2 | LSin |
R2‑143042 | Reply LS to R2-141826 on eMBMS broadcast areas with EUTRAN Cell Granularity (S2-142901 ; contact: NSN) | SA2 | LSin |
R2‑143043 | LS Response to R1-142748 = R2-143017 on eNB knowledge of low complexity UEs (S2-142936; contact: Ericsson) | SA2 | LSin |
R2‑143044 | Reply LS to R1-142652 = R2-142759 on D2D Multicarrier Capabilities (S2-142938; contact: Qualcomm) | SA2 | LSin |
R2‑143045 | LS on the impacts of packet marking on RAN user plane handling of DL traffic (S2-142939; contact: Alcatel-Lucent) | SA2 | LSin |
R2‑143046 | Reply LS to R2-141014 on Core Network assisted eNodeB parameters tuning (S2-142263; contact: Alcatel-Lucent) | SA2 | LSin |
R2‑143047 | Reply LS to R3-141444 = R2-142866 on Introducing the ProSe Authorized IE (S2-142277; contact: Huawei) | SA2 | LSin |
R2‑143048 | Reply LS to RP-141012 = R2-143037 on user preferences in RAN rules (S2-142838; contact: NSN) | SA2 | LSin |
R2‑143049 | Reply LS to S4-140750 on introducing the EVS codec in MTSI (S2-142913; contact:) | SA2 | LSin |
R2‑143050 | LS on new QCI values for Push To Talk (S2-142926; contact: Motorolasolutions) | SA2 | LSin |
R2‑143051 | Reply LS to R2-142955 on WLAN/3GPP Radio Interworking (S2-142943; contact: Alcatel-Lucent) | SA2 | LSin |
R2‑143052 | LS on RAN1 agreements on Physical layer functionalities required for operation of Dual Connectivity in RAN1#77 (R1-142755; contact: NTT DOCOMO) | RAN1 | LSin |
R2‑143053 | Reply LS to S2-142913 = R2-143049 on stage 2 related aspects of introducing the EVS codec in MTSI (S4-141042; contact: Ericsson ) | SA4 | LSin |
R2‑143054 | Reply LS to S2-141826 on eMBMS broadcast areas with EUTRAN Cell Granularity (S4-141052; contact: Samsung) | SA4 | LSin |
R2‑143055 | LS reply to R2-142938 on RAN counting for MooD (S4-141035; contact: Huawei) | SA4 | LSin |
R2‑143056 | LS on 256QAM (R1-142767; contact: Huawei) | RAN1 | LSin |
R2‑143057 | LS on RRC parameters for ProSe LTE D2D (R1-142787; contact: Qualcomm) | RAN1 | LSin |
R2‑143058 | LS on L1 parameters for SCE-PHY on efficient operation (R1-142788; contact: Huawei) | RAN1 | LSin |
R2‑143059 | LS on Maximum Number of Transport Block Bits in Dual-Connectivity (R1-142784; contact: Ericsson) | RAN1 | LSin |
R2‑143060 | LS on half-duplex FDD operation for low-complexity MTC UEs (R1-143429; contact: Ericsson) | RAN1 | LSin |
R2‑143061 | LS on updated LTE Rel-12 UE feature list (R1-143509; contact: NTT DOCOMO) | RAN1 | LSin |
R2‑143062 | Reply LS to R2-142942 on normal and low performance group signalling (R4-144881; contact: Ericsson) | RAN4 | LSin |
R2‑143063 | Reply LS to R2-142858 on increased number of LTE frequencies to monitor in UMTS (R4-144882; contact: Ericsson) | RAN4 | LSin |
R2‑143064 | LS on RAN1 agreements for UMTS Heterogeneous Networks Enhancements (R1-143477; contact: Huawei) | RAN1 | LSin |
R2‑143065 | LS on RAN1 agreements on Further EUL Enhancements (R1-143481; contact: Qualcomm) | RAN1 | LSin |
R2‑143066 | LS on RAN1 agreements for DCH Enhancements (R1-143482; contact: Qualcomm) | RAN1 | LSin |
R2‑143067 | LS for Rel-12 NAICS (R1-143535; contact: Mediatek) | RAN1 | LSin |
R2‑143068 | LS on 256QAM (R1-143541; contact: Huawei) | RAN1 | LSin |
R2‑143069 | LS on L1 parameters for 256QAM (R1-143542; contact: Huawei) | RAN1 | LSin |
R2‑143070 | 3GPP TSG RAN WG2 compendium v24.0 (status after RAN #64) | ETSI Secretariat | Info |
R2‑143071 | Report of RAN2 #86, Seoul, South Korea, 19.05.-23.05.2014 | ETSI MCC | imported from 3GU |
R2‑143072 | Additional Cat0 UE capability signalling | Samsung | imported from 3GU |
R2‑143073 | Support of PUCCH on SCell for CA - RAN2 aspects | NTT DOCOMO, INC. | imported from 3GU |
R2‑143074 | [DRAFT] Reply LS on the support of PUCCH on two serving cells in CA | NTT DOCOMO, INC. | imported from 3GU |
R2‑143075 | Idle mode support on new RSRQ measurement definition | NTT DOCOMO, INC. | imported from 3GU |
R2‑143076 | Further consideration on RAN rules | China Telecom | imported from 3GU |
R2‑143077 | Correction to stop condition for "Chiba offset" | Samsung | imported from 3GU |
R2‑143078 | Correction to stop condition for "Chiba offset" | Samsung | imported from 3GU |
R2‑143079 | eNB knowledge of low complexity UE's | Samsung | imported from 3GU |
R2‑143080 | Measurement gap handling in SeNB in asynchronuous deployments | Samsung | imported from 3GU |
R2‑143081 | Overall PDCP operation in Dual-Connectivity | Samsung | imported from 3GU |
R2‑143082 | PUCCH on SCell (non urgent topic) | Samsung | imported from 3GU |
R2‑143083 | Further details regarding "exception conditions" | Samsung | imported from 3GU |
R2‑143084 | Corrections in default radio configuration for CELL_FACH and introduction of HS-DACH/RACH and HS-DSCH/E-DCH combinations | Nokia Networks | imported from 3GU |
R2‑143085 | Corrections in default radio configuration for CELL_FACH and introduction of HS-DACH/RACH and HS-DSCH/E-DCH combinations | Nokia Networks | imported from 3GU |
R2‑143086 | Further considerations on extension of HANDOVER TO UTRAN COMMAND message | Nokia Networks | imported from 3GU |
R2‑143087 | System information content change notification | Nokia Networks | imported from 3GU |
R2‑143088 | Enhanced UL TTI switching and ACTIVE SET UPDATE | Nokia Networks | imported from 3GU |
R2‑143089 | Mode Switching in D2D Communication | General Dynamics UK Ltd | imported from 3GU |
R2‑143090 | Reporting on resource pool utilization | General Dynamics UK Ltd | imported from 3GU |
R2‑143091 | Resource pool forwarding on the PD2DSCH | General Dynamics UK Ltd | imported from 3GU |
R2‑143092 | Including the target Group ID in the ProSe-BSR | General Dynamics UK Ltd | imported from 3GU |
R2‑143093 | Configuration of parameters for D2D Communication | General Dynamics UK Ltd | imported from 3GU |
R2‑143094 | MBMS counting procedure for the UE in idle mode | Acer Incorporated | imported from 3GU |
R2‑143095 | Priority order of CA band combination capability signalling | NTT DOCOMO, INC. | imported from 3GU |
R2‑143096 | Further Thoughts on GBR for Split Bearer | ZTE | imported from 3GU |
R2‑143097 | Discussion on the update of SI in PSCell | ZTE | imported from 3GU |
R2‑143098 | Discussion on LCP issue without uplink split | ZTE | imported from 3GU |
R2‑143099 | Discussion on the PHR of DC | ZTE | imported from 3GU |
R2‑143100 | Discussion on the coexist of eIMTA and Small Cell DC | ZTE | imported from 3GU |
R2‑143101 | Further Thoughts on RRM Measurements of DC | ZTE | imported from 3GU |
R2‑143102 | When to stop PDCP re-ordering | ZTE | imported from 3GU |
R2‑143103 | DRX in Dual Connectivity | ZTE | imported from 3GU |
R2‑143104 | Extended measurement ID and MEASUREMENT CONTROL FAILURE message | Nokia Networks | imported from 3GU |
R2‑143105 | Load balancing enhancements for multiple carrier deployments | NTT DOCOMO, INC., CMCC | imported from 3GU |
R2‑143106 | Avoiding burst of WLAN offloads by using offload rate per OPI | Broadcom Corporation | imported from 3GU |
R2‑143107 | WLAN Network Selection and Traffic Steering based on WLAN minimum achievable throughput policies and network capabilities | Broadcom Corporation | imported from 3GU |
R2‑143108 | Backwards compatible introduction of shorter MCH scheduling period and MCCH modification period | ZTE, CMCC, CATR, Qualcomm, CATT | imported from 3GU |
R2‑143109 | Introduction of shorter MCH scheduling period and MCCH modification period | ZTE, CMCC, CATR, Qualcomm, CATT | imported from 3GU |
R2‑143110 | [Draft] Short MCCH MP and MSP for MBMS | ZTE | imported from 3GU |
R2‑143111 | Analysis for Small Cell/TP ON/OFF Procedure | ZTE | imported from 3GU |
R2‑143112 | Analysis for use cases of unavailability of RAN assistance information | ZTE | imported from 3GU |
R2‑143113 | Hash algorithm based idle UE distribution | ZTE | imported from 3GU |
R2‑143114 | Correction of RAN assisted WLAN interworking rules | ZTE | imported from 3GU |
R2‑143115 | Critical issues on DRS RRM measurement | ZTE | imported from 3GU |
R2‑143116 | Discussion on stopping PDCP reordering function | Institute for Information Industry (III) | imported from 3GU |
R2‑143117 | Discussion on PHR triggering due to SCell activation | Samsung | imported from 3GU |
R2‑143118 | Correction on PHR triggering due to SCell activation | Samsung | imported from 3GU |
R2‑143119 | Correction on PHR triggering due to SCell activation | Samsung | imported from 3GU |
R2‑143120 | Discussion on DC UE capability | Samsung | imported from 3GU |
R2‑143121 | Discussion on UE measurement gap for DC | Samsung | imported from 3GU |
R2‑143122 | [draft] LS on measurement gap handling in the dual connectivity | Samsung | imported from 3GU |
R2‑143123 | Necessity of PDCP status report on S-RLF | Fujitsu | imported from 3GU |
R2‑143124 | Usage of Type 1 and Type 2 resources | Fujitsu | imported from 3GU |
R2‑143125 | Report on [86#30][LTE/DC] Implementation of PDCP reordering function in PDCP specification (Samsung) | Samsung | imported from 3GU |
R2‑143126 | PDCP reordering window for split bearer | Samsung | imported from 3GU |
R2‑143127 | Further details on BSR in dual connectivity | Samsung | imported from 3GU |
R2‑143128 | Text proposal for PDCP SDU recovery upon bearer reconfiguration | Samsung | imported from 3GU |
R2‑143129 | MAC functions in the secondary MAC | Samsung | imported from 3GU |
R2‑143130 | Mapping between logical channels and transport channels in the secondary MAC | Samsung | imported from 3GU |
R2‑143131 | How to capture DC in the MAC specification | Samsung | imported from 3GU |
R2‑143132 | Discussion on SCG random access | Samsung | imported from 3GU |
R2‑143133 | Discussion on PBR handling for 3C bearer | Samsung | imported from 3GU |
R2‑143134 | Text propsal for Logical channel prioritization | Samsung | imported from 3GU |
R2‑143135 | TAT expiry in dual connectivity | Samsung | imported from 3GU |
R2‑143136 | Scheduling Request in SCG | Samsung | imported from 3GU |
R2‑143137 | Remaining issues on Activation/Deactivation | Samsung | imported from 3GU |
R2‑143138 | Remaining issues on PHR | Samsung | imported from 3GU |
R2‑143139 | [draft] LS on P_XeNB | Samsung | imported from 3GU |
R2‑143140 | Remaining issues on split bearer PDCP operation | Samsung | imported from 3GU |
R2‑143141 | Removal of subfeature Exclusion of cells from inter-frequency detected set measurements | Intel Corporation | imported from 3GU |
R2‑143142 | Removal of subfeature Exclusion of cells from inter-frequency detected set measurements | Intel Corporation | imported from 3GU |
R2‑143143 | Clarification of subfeature Exclusion of cells from intra-frequency detected set measurements | Intel Corporation | imported from 3GU |
R2‑143144 | Clarification of subfeature Exclusion of cells from intra-frequency detected set measurements | Intel Corporation | imported from 3GU |
R2‑143145 | Further considerations on the mode configuration and exceptional cases | Fujitsu | imported from 3GU |
R2‑143146 | Considerations on discovery resource allocation | Fujitsu | imported from 3GU |
R2‑143147 | Introduction of inter-PLMN discovery | Deutsche Telekom, LG Electronics Inc.,TeliaSonera, Qualcomm, Samsung. | imported from 3GU |
R2‑143148 | Correction of ASN.1 of MDT logged connection establishment failure reporting (Alternative 1) | Intel Corporation | imported from 3GU |
R2‑143149 | Correction of ASN.1 of MDT logged connection establishment failure reporting (Alternative 1) | Intel Corporation | imported from 3GU |
R2‑143150 | Correction of ASN.1 of MDT logged connection establishment failure reporting (Alternative 2) | Intel Corporation | imported from 3GU |
R2‑143151 | D2D Measurement Reporting | Sony | imported from 3GU |
R2‑143152 | D2D Resource Allocation Mode Selection and exceptional cases | Sony | imported from 3GU |
R2‑143153 | Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | imported from 3GU |
R2‑143154 | D2D Resource Pool Access Restrictions | Sony | imported from 3GU |
R2‑143155 | Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | imported from 3GU |
R2‑143156 | Type 1 discovery open issues | Sony | imported from 3GU |
R2‑143157 | Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | imported from 3GU |
R2‑143158 | Open Issues on RRC Signalling for resource authorization | Sony | imported from 3GU |
R2‑143159 | Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | imported from 3GU |
R2‑143160 | Correction of ASN.1 of MDT logged connection establishment failure reporting (Alternative 2) | Intel Corporation | imported from 3GU |
R2‑143161 | Low-complexity UE single RX indication | Sony | imported from 3GU |
R2‑143162 | Ue capabilities for WLAN Interworking | Sony | imported from 3GU |
R2‑143163 | Addition of Ue capabilities for WLAN Interworking | Sony | imported from 3GU |
R2‑143164 | Addition of Ue capabilities for WLAN Interworking | Sony | imported from 3GU |
R2‑143165 | Addition of Ue capabilities for WLAN Interworking | Sony | imported from 3GU |
R2‑143166 | Addition of Ue capabilities for WLAN Interworking | Sony | imported from 3GU |
R2‑143167 | Alignment of stage 2 with stage 3 of EUTRA UE M1 reporting triggers for MDT | Intel Corporation | imported from 3GU |
R2‑143168 | Alignment of stage 2 with stage 3 of EUTRA UE M1 reporting triggers for MDT | Intel Corporation | imported from 3GU |
R2‑143169 | Addition of new AdditionalSpectrumEmission IE to SIB2 | Intel Corporation | imported from 3GU |
R2‑143170 | Addition of new AdditionalSpectrumEmission IE to SIB2 | Intel Corporation | imported from 3GU |
R2‑143171 | Addition of new AdditionalSpectrumEmission IE to SIB2 | Intel Corporation | imported from 3GU |
R2‑143172 | Addition of new AdditionalSpectrumEmission IE to SIB2 | Intel Corporation | imported from 3GU |
R2‑143173 | Discussion for problems of UE Radio Capability information size | Intel Corporation | imported from 3GU |
R2‑143174 | Draft reply LS on the problem of UE Radio Capability information size | Intel Corporation | imported from 3GU |
R2‑143175 | Corrections to UE capabilities and features | Intel Corporation | imported from 3GU |
R2‑143176 | Corrections to UE capabilities and features | Intel Corporation | imported from 3GU |
R2‑143177 | Stage-2 details of WLAN/3GPP Radio Interworking for LTE | Intel Corporation | imported from 3GU |
R2‑143178 | Procedures of WLAN/3GPP Radio Interworking for LTE | Intel Corporation | imported from 3GU |
R2‑143179 | Connected mode procedures and RRC signaling of WLAN/3GPP Radio Interworking for LTE | Intel Corporation | imported from 3GU |
R2‑143180 | Stage-2 details of WLAN/3GPP Radio Interworking for UMTS | Intel Corporation | imported from 3GU |
R2‑143181 | Procedures of WLAN/3GPP Radio Interworking for UMTS | Intel Corporation | imported from 3GU |
R2‑143182 | Connected mode procedures and RRC signaling of WLAN/3GPP Radio Interworking for UMTS | Intel Corporation | imported from 3GU |
R2‑143183 | Remaining open issues of WLAN/3GPP radio interworking | Intel Corporation | imported from 3GU |
R2‑143184 | SCG release handling | Intel Corporation | imported from 3GU |
R2‑143185 | PSCell change | Intel Corporation | imported from 3GU |
R2‑143186 | Details on S-RLF | Intel Corporation | imported from 3GU |
R2‑143187 | Re-establishment in dual connectivity | Intel Corporation | imported from 3GU |
R2‑143188 | RRM Measurement for dual connectivity | Intel Corporation | imported from 3GU |
R2‑143189 | PHR MAC control element for Dual Connectivity | Intel Corporation | imported from 3GU |
R2‑143190 | Introduction of Access Control in Connected Mode | Ericsson | imported from 3GU |
R2‑143191 | Remaining Issues on DRX Alignment in Dual Connectivity | Intel Corporation | imported from 3GU |
R2‑143192 | Introduction of Access Control improvements | Ericsson | imported from 3GU |
R2‑143193 | Email discussion 86#40 Access group mechanisms | Ericsson | imported from 3GU |
R2‑143194 | Dual connectivity and in-device coexistence | Intel Corporation | imported from 3GU |
R2‑143195 | Introduction of EUL coverage improvements | Ericsson | imported from 3GU |
R2‑143196 | SPS in dual connectivity | Intel Corporation | imported from 3GU |
R2‑143197 | Uplink Transmissions for DL Bearer Split | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143198 | Logical channel prioritization in dual connectivity | Intel Corporation | imported from 3GU |
R2‑143199 | Introduction of EUL coverage improvements | Ericsson | imported from 3GU |
R2‑143200 | Cross Reporting for Dual Connectivity | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143201 | Introduction of EUL coverage improvements | Ericsson | imported from 3GU |
R2‑143202 | Total UE L2 Buffer Size for Dual Connectivity | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143203 | Introduction of DTX/DRX enhancements and HS-DPCCH overhead reduction aspects of Further EUL enhancements | Ericsson | imported from 3GU |
R2‑143204 | Introduction of Implicit Grant handling and Improved power control after long DTX gap on secondary uplink frequency | Ericsson | imported from 3GU |
R2‑143205 | Introduction of Implicit Grant handling and Power Control improvements aspects of Further EUL enhancements | Ericsson | imported from 3GU |
R2‑143206 | Support of HS-DPCCH overhead reduction and Enabling higher user bitrates | Ericsson | imported from 3GU |
R2‑143207 | Considerations on the UE capabilities needed for Further EUL enhancements sub-features | Ericsson | imported from 3GU |
R2‑143208 | Introduction of the UE capabilities for Further EUL enhancements features | Ericsson | imported from 3GU |
R2‑143209 | UE capability signalling for Further EUL enhancements features | Ericsson | imported from 3GU |
R2‑143210 | Rapporteur corrections for 25.331 RRC specification | Ericsson (Rapporteur) | imported from 3GU |
R2‑143211 | System information update for PSCell | Intel Corporation | imported from 3GU |
R2‑143212 | PDCP reordering for split bearer | Intel Corporation | imported from 3GU |
R2‑143213 | Planning of the Rel-12 RRC message and ASN.1 review for UTRA | Ericsson (Rapporteur) | imported from 3GU |
R2‑143214 | DRS measurement for small cell on/off and discovery | Intel Corporation | imported from 3GU |
R2‑143215 | ProSe BSR content | Intel Corporation | imported from 3GU |
R2‑143216 | PDCP reordering and its operation during mobility | ZTE | imported from 3GU |
R2‑143217 | PUCCH on SCell for CA | Huawei, HiSilicon | imported from 3GU |
R2‑143218 | Remaining issues on X2 for split bearer | Sharp | imported from 3GU |
R2‑143219 | Draft LS Reply on the support of PUCCH on two serving cells in CA | Huawei, HiSilicon | imported from 3GU |
R2‑143220 | Intra-SCG PSCell change and other PSCell remaining issues | Huawei, HiSilicon | imported from 3GU |
R2‑143221 | Triggering synchronized reconfiguration of SCG | Huawei, HiSilicon | imported from 3GU |
R2‑143222 | Further discussion of layer 2 parameter configuration for ProSe communication | Intel Corporation | imported from 3GU |
R2‑143223 | Operation and procedure to handle S-RLF | Huawei, HiSilicon | imported from 3GU |
R2‑143224 | RRC Connection Establishment for ProSe (Communication and Discovery) | Intel Corporation | imported from 3GU |
R2‑143225 | PDCP reordering after split bearer reconfiguration towards MCG bearer | Huawei, HiSilicon | imported from 3GU |
R2‑143226 | Efficient use of Power Saving Mode | Huawei, HiSilicon | imported from 3GU |
R2‑143227 | Security for ProSe direct communication | Intel Corporation | imported from 3GU |
R2‑143228 | LCP in dual connectivity | Huawei, HiSilicon | imported from 3GU |
R2‑143229 | Indication of Layer 3 PDU type in PDCP header | Intel Corporation | imported from 3GU |
R2‑143230 | Support of power saving mode in TS 36.306 | Huawei, HiSilicon | imported from 3GU |
R2‑143231 | TP for BSR in dual connectivity | Huawei, HiSilicon | imported from 3GU |
R2‑143232 | Smart Congestion Mitigation open issues | Huawei, HiSilicon | imported from 3GU |
R2‑143233 | ProSe capability signaling | Intel Corporation | imported from 3GU |
R2‑143234 | Multi-Carrier WAN-ProSe operation | Intel Corporation | imported from 3GU |
R2‑143235 | UE capability coordination in dual connectivity | Huawei, HiSilicon | imported from 3GU |
R2‑143236 | Capability report for low cost MTC UEs | Huawei, CMCC, HiSilicon | imported from 3GU |
R2‑143237 | Remaining issues on exceptional cases using Mode 2 | Intel Corporation | imported from 3GU |
R2‑143238 | Downlink PDCP SDU limitation for low cost MTC UEs | Huawei, HiSilicon | imported from 3GU |
R2‑143239 | Resource allocation signaling for ProSe discovery | Intel Corporation | imported from 3GU |
R2‑143240 | Open Issues of PDCP Operation in Dual Connectivity | Huawei, HiSilicon | imported from 3GU |
R2‑143241 | Further discussion on downlink parallel receptions for low cost MTC | Huawei, HiSilicon | imported from 3GU |
R2‑143242 | Transmission resource allocation for partial coverage | Intel Corporation | imported from 3GU |
R2‑143243 | MAC impact due to Half-Duplex FDD operation for low cost MTC UEs | Huawei, HiSilicon | imported from 3GU |
R2‑143244 | Draft LS on name of the new UE category for low cost MTC | Huawei | imported from 3GU |
R2‑143245 | Corrections to extended RLC LI field | Intel Corporation | imported from 3GU |
R2‑143246 | Draft Reply LS to S2-142936 = R2-14xxxx on eNB knowledge of low complexity UEs | Huawei | imported from 3GU |
R2‑143247 | Support of low cost MTC in TS 36.302 | Huawei, HiSilicon | imported from 3GU |
R2‑143248 | Corrections to configuration of extended RLC LI field | Intel Corporation | imported from 3GU |
R2‑143249 | Modeling of UE Actions after SCG-RLF | Samsung | imported from 3GU |
R2‑143250 | Introduction of Category 0 for low complexity UEs | Huawei, HiSilicon | imported from 3GU |
R2‑143251 | Clarification on half-duplex FDD support | Intel Corporation | imported from 3GU |
R2‑143252 | DRX Coordination in Dual Connectivity | Samsung | imported from 3GU |
R2‑143253 | Considerations to E-UTRAN inter-frequency measurements that exceeds maxEARFCN | Intel Corporation | imported from 3GU |
R2‑143254 | RAN2 impacts of 256QAM | Huawei, HiSilicon | imported from 3GU |
R2‑143255 | Summary of email discussion [86#32][LTE/SCE-L1] RRM framework for DRS measurements | Huawei (Rapporteur) | imported from 3GU |
R2‑143256 | Support of 256QAM in TS 36.306 | Huawei, HiSilicon | imported from 3GU |
R2‑143257 | Discussion and proposed way-forward on Idle mode load balancing | Intel Corporation | imported from 3GU |
R2‑143258 | Support of 256QAM in TS 36.331 | Huawei, HiSilicon | imported from 3GU |
R2‑143259 | Discussion on Simulation results for suitability of WLAN parameters | IIT Bombay / Punit Rathod | imported from 3GU |
R2‑143260 | Support of DRS measurements in TS 36.331 | Huawei, HiSilicon | imported from 3GU |
R2‑143261 | Stage-2 description of small cell enhancements physical layer aspects | Huawei, HiSilicon | imported from 3GU |
R2‑143262 | Discovery Resources & UE-eNB Transmissions in Uplink | Samsung | imported from 3GU |
R2‑143263 | MAC PDU Structure for D2D Communication | Samsung | imported from 3GU |
R2‑143264 | Handover Aspects of Discovery Resource Allocation | Samsung | imported from 3GU |
R2‑143265 | Discovery Monitoring in RRC Connected State | Samsung | imported from 3GU |
R2‑143266 | Priority Handling Function for ProSe Direct Discovery | Samsung | imported from 3GU |
R2‑143267 | Prirotisation between Random Access Procedure and Discovery | Samsung | imported from 3GU |
R2‑143268 | Prirotisation between Random Access Procedure and D2D communication | Samsung | imported from 3GU |
R2‑143269 | Discovery Resource Configuration Parameters in Dedicated RRC signalling | Samsung | imported from 3GU |
R2‑143270 | Inter PLMN Discovery Monitoring in RRC Idle | Samsung | imported from 3GU |
R2‑143271 | Extended EHICH and ERGCH mobility management aspects | Nokia Networks | imported from 3GU |
R2‑143272 | Location update collision during RAB release | Nokia Networks | imported from 3GU |
R2‑143273 | Clarification on the common E-DCH resource implicit release procedure | Nokia Networks | imported from 3GU |
R2‑143274 | Clarification on Service Continuity | HTC | imported from 3GU |
R2‑143275 | Clarification on Service Continuity | HTC | imported from 3GU |
R2‑143276 | Addition of an Early Position Fix in LPP | Qualcomm Incorporated | imported from 3GU |
R2‑143277 | Addition of an Early Position Fix to LPP | Qualcomm Incorporated | imported from 3GU |
R2‑143278 | Introducing MBSFN measurement by extension of logged measurements | Qualcomm Incorporated | imported from 3GU |
R2‑143279 | Introduction of MBSFN MDT | Qualcomm Incorporated | imported from 3GU |
R2‑143280 | Introduction of MBSFN MDT capability | Qualcomm Incorporated | imported from 3GU |
R2‑143281 | Introducing MBSFN measurement by extension of logged measurements - idle mode only | Qualcomm Incorporated | imported from 3GU |
R2‑143282 | Introduction of MBSFN MDT - idle mode only | Qualcomm Incorporated | imported from 3GU |
R2‑143283 | Introduction of MBSFN MDT capability - idle mode only | Qualcomm Incorporated | imported from 3GU |
R2‑143284 | Introduction of ACB skip for MMTEL voice/video and SMS | Qualcomm Incorporated, NTT DOCOMO, INC., LG Electronics Inc., KDDI | imported from 3GU |
R2‑143285 | Limitations of current UE E-UTRA capability handling | Qualcomm Incorporated | imported from 3GU |
R2‑143286 | Summary of email discussion: [86#06][LTE/MBMS-MDT] 36.331 and 36.306 CRs | Qualcomm Incorporated | imported from 3GU |
R2‑143287 | Further study on UE distribution in Idle mode | China Telecom | imported from 3GU |
R2‑143288 | Discussion on L2 measurement in DC | Fujitsu, NEC | imported from 3GU |
R2‑143289 | Further considerations for DRS measurements | Fujitsu | imported from 3GU |
R2‑143290 | CA Band Combination Signalling | Nokia Networks | imported from 3GU |
R2‑143291 | RRC impact of SI update of PSCell | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143292 | RRC PDU for bearer configuration for DC | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143293 | SeNB Initiated Bearer Release procedure | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143294 | RRC impact of SCG release procedure | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143295 | Impact of the TBS restriction of Cat-0 UE | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143296 | RLF for Split Bearer | Panasonic | imported from 3GU |
R2‑143297 | Multi-carrier configuration support at inter-RAT handover | Ericsson | imported from 3GU |
R2‑143298 | SR issues for D2D communication | Panasonic | imported from 3GU |
R2‑143299 | Multi-carrier configuration support at inter-RAT handover | Ericsson | imported from 3GU |
R2‑143300 | Multi-carrier configuration in Handover to UTRAN command | Ericsson | imported from 3GU |
R2‑143301 | ProSe BSR procedure for D2D communication | Panasonic | imported from 3GU |
R2‑143302 | Correction of E-UTRAN UE capabilities description in HandoverPreparationInformation message field descriptions | Ericsson | imported from 3GU |
R2‑143303 | Multi-carrier configuration in Handover to UTRAN command | Ericsson | imported from 3GU |
R2‑143304 | Support of SPS for D2D | Panasonic | imported from 3GU |
R2‑143305 | Logical channel prioritization for split bearer | Panasonic | imported from 3GU |
R2‑143306 | D2D interest indication and resource pool | Panasonic | imported from 3GU |
R2‑143307 | Correction of E-UTRAN UE capabilities description in HandoverPreparationInformation message field descriptions | Ericsson | imported from 3GU |
R2‑143308 | Low Latency Vehicle to Vehicle communication based on GCSE | General Motors | imported from 3GU |
R2‑143309 | Motivation of SPS support in small cell | CMCC, Nokia Networks, ZTE, CATT | imported from 3GU |
R2‑143310 | Way Forward of SPS support in DC | CMCC, Nokia Networks, ZTE, CATT, Qualcomm Incorporated | imported from 3GU |
R2‑143311 | Leftover issues on PSCell change and SI update for PSCell | NTT DOCOMO, INC. | imported from 3GU |
R2‑143312 | DRX configuration alignment | Ericsson | imported from 3GU |
R2‑143313 | Power control for Dual Connectivity | Ericsson | imported from 3GU |
R2‑143314 | UE capabilities for WLAN/3GPP Radio interworking | Ericsson | imported from 3GU |
R2‑143315 | UE capabilities for WLAN/3GPP Radio interworking | Ericsson | imported from 3GU |
R2‑143316 | UE capabilities for WLAN/3GPP Radio interworking | Ericsson | imported from 3GU |
R2‑143317 | UE capability signalling for WLAN/3GPP Radio interworking | Ericsson | imported from 3GU |
R2‑143318 | UE capability signalling for WLAN/3GPP Radio interworking | Ericsson | imported from 3GU |
R2‑143319 | WLAN metrics in RAN rules | Ericsson, LG Electronics | imported from 3GU |
R2‑143320 | RAN assistance parameter handling | Ericsson | imported from 3GU |
R2‑143321 | RRC signaling for PSCell | Intel Corporation | imported from 3GU |
R2‑143322 | Public safety concerns on D2D resource allocation | U.S. Department Of Commerce | imported from 3GU |
R2‑143323 | Clarification on double indication of SAI in SIB15 | Ericsson | imported from 3GU |
R2‑143324 | Clarification on double indication of SAI in SIB15 | Ericsson | imported from 3GU |
R2‑143325 | Public safety multi-carrier D2D operations | U.S. Department Of Commerce | imported from 3GU |
R2‑143326 | Single Rx antenna capability and paging | Ericsson | imported from 3GU |
R2‑143327 | DRAFT LS reply on eNB knowledge of low complexity UEs | Ericsson | imported from 3GU |
R2‑143328 | Paging enhancements for low complexity UEs | Ericsson | imported from 3GU |
R2‑143329 | Summary of email discussion on running 36.331 CR to capture the agreements | Ericsson | imported from 3GU |
R2‑143330 | Introduction of signaling support for low complexity UEs | Ericsson | imported from 3GU |
R2‑143331 | Indication of category for low complexity UEs | Ericsson | imported from 3GU |
R2‑143332 | TBS limitation and indication of category for low complexity UEs | Ericsson | imported from 3GU |
R2‑143333 | Cell-specific prioritization for idle mode load balancing | Ericsson, Verizon | imported from 3GU |
R2‑143334 | Cell-specific prioritization for idle mode load balancing | Ericsson | imported from 3GU |
R2‑143335 | Cell-specific prioritization for idle mode load balancing (Alt 1) | Ericsson | imported from 3GU |
R2‑143336 | Cell-specific prioritization for idle mode load balancing (Alt 2) | Ericsson | imported from 3GU |
R2‑143337 | Extending the value range of Wait Time IE CELL UPDATE CONFIRM message | Ericsson | imported from 3GU |
R2‑143338 | Traffic Volume Measurement reporting for UE when Access Group is blocked | Ericsson | imported from 3GU |
R2‑143339 | Further considerations on new Granting scheme | Ericsson | imported from 3GU |
R2‑143340 | Access control in connected mode for High Priority UE Access Classes | Ericsson | imported from 3GU |
R2‑143341 | Message size analysis for low complexity UE | Intel Corporation | imported from 3GU |
R2‑143342 | CAT 0 indication solution evaluation | Sierra Wireless | imported from 3GU |
R2‑143343 | DRB configuration and switch in dual connectivity | Huawei, HiSilicon | imported from 3GU |
R2‑143344 | Remaining issues for SCG release and SCG change | Huawei, HiSilicon | imported from 3GU |
R2‑143345 | Remaining issues of PHR for dual connectivity | Huawei, HiSilicon | imported from 3GU |
R2‑143346 | Remaining issues of random access in dual connectivity | Huawei, HiSilicon | imported from 3GU |
R2‑143347 | Report and summary of email discussion [86#29][LTE/DC] RRM measurements | Huawei (Rapporteur) | imported from 3GU |
R2‑143348 | Introduction of RRM measurement for DC - Option 1 | Huawei, HiSilicon | imported from 3GU |
R2‑143349 | Introduction of RRM measurement for DC - Option 2 | Huawei, HiSilicon | imported from 3GU |
R2‑143350 | Rel-12 sub-features grouping and UE capabilities | Qualcomm Incorporated | imported from 3GU |
R2‑143351 | Allowing UL RLC control PDUs during access blocking | Qualcomm Incorporated | imported from 3GU |
R2‑143352 | Draft Rel-13 Work Item proposal on UL data compression | Qualcomm Incorporated | imported from 3GU |
R2‑143353 | Considerations on resource pool monitoring for inter cell D2D discovery | Sharp | imported from 3GU |
R2‑143354 | Consideration on mobility of D2D UE | Sharp | imported from 3GU |
R2‑143355 | Clarification to physical channel combinations regarding MIMO operation | Huawei, HiSilicon | imported from 3GU |
R2‑143356 | Clarification to physical channel combinations regarding MIMO operation | Huawei, HiSilicon | imported from 3GU |
R2‑143357 | Clarification to physical channel combinations regarding MIMO operation | Huawei, HiSilicon | imported from 3GU |
R2‑143358 | Discussion on improved HARQ retransmission for HSDPA | Huawei, HiSilicon | imported from 3GU |
R2‑143359 | CR to 25.331 on F-DPCH capability | Huawei, HiSilicon | imported from 3GU |
R2‑143360 | Introduction of UE eIMTA capabilities | CATT | imported from 3GU |
R2‑143361 | Introduction of UE eIMTA capabilities | CATT | imported from 3GU |
R2‑143362 | Corrections on UTRA measurements and some editorials | CATT | imported from 3GU |
R2‑143363 | Correction on MBMS reception on deactivated SCell | CATT | imported from 3GU |
R2‑143364 | PHR for dual connectivity | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143365 | Discussion on PDCP reordering after split bearer reconfiguration towards MCG bearer | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143366 | Mode switching and exceptional cases for D2D Communication | Institute for Information Industry (III) | imported from 3GU |
R2‑143367 | Correction on MBMS reception on deactivated SCell | CATT | imported from 3GU |
R2‑143368 | Introduction of Security Related Parameters for D2D Communication | CATT | imported from 3GU |
R2‑143369 | PDCP window handling for split bearers | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143370 | CR_Impacts of ProSe Direct Communication Security on RRC | CATT | imported from 3GU |
R2‑143371 | Further clarification on eIMTA | CATT | imported from 3GU |
R2‑143372 | CR to 25.300 on DSAC and PPAC update in CELL_DCH | Huawei, HiSilicon | imported from 3GU |
R2‑143373 | Detailed Signaling Flow for D2D Discovery | CATT | imported from 3GU |
R2‑143374 | Disscussion on Inter-cell Discovery | CATT | imported from 3GU |
R2‑143375 | HFN de-synchronization | Samsung | imported from 3GU |
R2‑143376 | Further Discussion on ProSe-BSR | CATT | imported from 3GU |
R2‑143377 | CR to 25.331 on DSAC and PPAC update in CELL_DCH | Huawei, HiSilicon | imported from 3GU |
R2‑143378 | Clarification on FDD-TDD CA WI objectives | CATT | imported from 3GU |
R2‑143379 | Glitch issue for D2D | CATT | imported from 3GU |
R2‑143380 | Handling of HFN de-synchronization | Samsung | imported from 3GU |
R2‑143381 | Handling of HFN de-synchronization | Samsung | imported from 3GU |
R2‑143382 | CR to 25.306 on DSAC and PPAC update in CELL_DCH | Huawei, HiSilicon | imported from 3GU |
R2‑143383 | UE capability/information for the RAN-assisted WLAN interworking | Samsung | imported from 3GU |
R2‑143384 | D2D UE Capability and Interest Reporting | CATT | imported from 3GU |
R2‑143385 | Handling of dedicated signalling during cell re-selection/handover | Samsung | imported from 3GU |
R2‑143386 | Need of randomization for RAN-assisted WLAN interworking | Samsung | imported from 3GU |
R2‑143387 | Clarification on the DL parallel reception | Samsung | imported from 3GU |
R2‑143388 | Open Issues for D2D Communication | CATT | imported from 3GU |
R2‑143389 | Updates for low complexity UEs | Samsung | imported from 3GU |
R2‑143390 | CR to 25.306 on Per CN domain Wait time | Huawei, HiSilicon | imported from 3GU |
R2‑143391 | D2D discovery during mobility and RLF | CATT | imported from 3GU |
R2‑143392 | CR to 25.300 on Per CN domain Wait time | Huawei, HiSilicon | imported from 3GU |
R2‑143393 | 3GPP network and WLAN interworking solution during handover | CATT | imported from 3GU |
R2‑143394 | CR to 25.331 on per CN domain Wait time | Huawei, HiSilicon | imported from 3GU |
R2‑143395 | Signalling enhancements for UMTS | Huawei, HiSilicon | imported from 3GU |
R2‑143396 | Relation between ProSe-BSR and resource allocation mode | ASUSTeK | imported from 3GU |
R2‑143397 | Transmission of delay tolerant access during SRNS relocation | Huawei, HiSilicon | imported from 3GU |
R2‑143398 | Discussion on improved DL control channels | Huawei, HiSilicon | imported from 3GU |
R2‑143399 | SI update for PSCell | Microsoft Corporation | imported from 3GU |
R2‑143400 | Introduction of improved DL control channels | Huawei, HiSilicon | imported from 3GU |
R2‑143401 | SI update for PSCell | Microsoft Corporation | imported from 3GU |
R2‑143402 | Introduction of improved DL control channels | Huawei, HiSilicon | imported from 3GU |
R2‑143403 | Discussion on exit conditions for RLF based exceptional cases | Microsoft Corporation | imported from 3GU |
R2‑143404 | Introduction of improved DL control channels | Huawei, HiSilicon | imported from 3GU |
R2‑143405 | Introduction of improved DL control channels | Huawei, HiSilicon | imported from 3GU |
R2‑143406 | Considerations on UE capability for enhanced TTI switching | Huawei, HiSilicon | imported from 3GU |
R2‑143407 | DRS RRM Measurement with DRS | MediaTek Inc. | imported from 3GU |
R2‑143408 | Small Cell PHY Fast Switch | MediaTek Inc. | imported from 3GU |
R2‑143409 | Discussion on S-RLF in Dual Connectivity | ETRI | imported from 3GU |
R2‑143410 | Discussion on LCP in Dual Connectivity | ETRI | imported from 3GU |
R2‑143411 | Stage-2 for NAICS | MediaTek Inc. | imported from 3GU |
R2‑143412 | Adding NAICS Capability | MediaTek Inc. | imported from 3GU |
R2‑143413 | RRC Parameters for NAICS | MediaTek Inc. | imported from 3GU |
R2‑143414 | Introduction of increased number of frequencies to monitor | Ericsson | imported from 3GU |
R2‑143415 | UE capability for IncMon | Ericsson | imported from 3GU |
R2‑143416 | UE capability for IncMon | Ericsson | imported from 3GU |
R2‑143417 | Introduction of Dual Connectivity | NTT DOCOMO, INC. (rapporteur) | imported from 3GU |
R2‑143418 | [86#25 Joint/IncMon] Running 36.331 CR – email discussion report | Ericsson | imported from 3GU |
R2‑143419 | Resource allocation after the reception of SR | Samsung | imported from 3GU |
R2‑143420 | Discussion on repetition factors for assisting cells | Huawei, HiSilicon | imported from 3GU |
R2‑143421 | Clarification on repetition factors for assisting cells | Huawei, HiSilicon, Nokia Networks, Qualcomm Incorporated | imported from 3GU |
R2‑143422 | Clarification on repetition factors for assisting cells | Huawei, HiSilicon, Nokia Networks, Qualcomm Incorporated | imported from 3GU |
R2‑143423 | Consideration of random access procedure for D2D communication | Samsung | imported from 3GU |
R2‑143424 | ProSe BSR format | Samsung | imported from 3GU |
R2‑143425 | Absence of 3GPP / WLAN interworking parameters | Nokia Corporation, Nokia Networks | imported from 3GU |
R2‑143426 | Further aspects of ProSe BSR | Samsung | imported from 3GU |
R2‑143427 | Motivation of Study on HSPA and LTE Joint Operation | China Unicom | imported from 3GU |
R2‑143428 | Impacts of new RSRQ definition | Nokia Corporation, Nokia Networks | imported from 3GU |
R2‑143429 | Release handling in ProSe | Ericsson | imported from 3GU |
R2‑143430 | Mobility support for D2D communication | Samsung, Qualcomm Incorporated | imported from 3GU |
R2‑143431 | Power headroom report | Samsung | imported from 3GU |
R2‑143432 | The Motivation of Decoupling Uplink 64QAM from UE Categories from Rel-10 | CMCC | imported from 3GU |
R2‑143433 | Secondary Radio Link Failure (S-RLF) | Ericsson | imported from 3GU |
R2‑143434 | The Updating and Notification Mechanism for Control Bits of ACB Skipping | CMCC | imported from 3GU |
R2‑143435 | RRC connection establishment for ProSe | Samsung | imported from 3GU |
R2‑143436 | PDCP for split bearer in dual connectivity | Ericsson | imported from 3GU |
R2‑143437 | Dual connectivity: Merge of RAN2 and RAN3 sections in 36.300 | Samsung | imported from 3GU |
R2‑143438 | Measurements in dual connectivity | Ericsson | imported from 3GU |
R2‑143439 | Measurements in dual connectivity | Ericsson | imported from 3GU |
R2‑143440 | Consideration of System Information Update for Prose Communication | Samsung | imported from 3GU |
R2‑143441 | MAC & Layer 2 Structure for D2D Communication | Samsung | imported from 3GU |
R2‑143442 | Dual connectivity: Main issues remaining regarding procedures | Samsung | imported from 3GU |
R2‑143443 | UE operation indication for D2D discovery | ETRI | imported from 3GU |
R2‑143444 | Details of ProSe BSR | ETRI | imported from 3GU |
R2‑143445 | Dual connectivity: Need for 3 SCG reconfiguration types | Samsung, Qualcomm Incorporated | imported from 3GU |
R2‑143446 | Remaining issue on PHR MAC CE for Dual Connectivity | ITL Inc. | imported from 3GU |
R2‑143447 | ProSe BSR operation at exceptional cases | ITL Inc. | imported from 3GU |
R2‑143448 | Discussion on UE capability report for D2D communication | Huawei, Hisilicon | imported from 3GU |
R2‑143449 | Discussion on D2D Discovery Monitoring | Huawei, Hisilicon | imported from 3GU |
R2‑143450 | ACB and Network Sharing | TeliaSonera, Deutsche Telekom, CMCC, France Telecom | imported from 3GU |
R2‑143451 | Report on [86#28][LTE/DC] RRC Procedure and PDU specification | Samsung | imported from 3GU |
R2‑143452 | Discussion on ProSe-BSR Format | Huawei, Hisilicon | imported from 3GU |
R2‑143453 | D2D Impact on Random Access | Huawei, Hisilicon | imported from 3GU |
R2‑143454 | ACB per PLMN | TeliaSonera, Deutsche Telekom, CMCC, France Telecom | imported from 3GU |
R2‑143455 | D2D impact on scheduling request | Huawei, Hisilicon | imported from 3GU |
R2‑143456 | ACB per PLMN | TeliaSonera, Deutsche Telekom, CMCC, France Telecom | imported from 3GU |
R2‑143457 | Conditions to exit mode 2 for D2D communication | Huawei, Hisilicon | imported from 3GU |
R2‑143458 | ProSe-BSR Triggering and Cancelling Mechanisms | Huawei, Hisilicon | imported from 3GU |
R2‑143459 | Discussion on UE Interest Indication | ITRI | imported from 3GU |
R2‑143460 | RRM Measurement Framework for DRS | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143461 | Discussion on Access Control for ProSe D2D Service | ITRI | imported from 3GU |
R2‑143462 | Report and summary of email discussion [86#43] | Huawei | imported from 3GU |
R2‑143463 | On Discovery Resource Management | ITRI | imported from 3GU |
R2‑143464 | Support of HD-FDD operation for low cost MTC UEs | Huawei, Intel, Samsung, Nokia Networks, ZTE, HiSilicon | imported from 3GU |
R2‑143465 | [DRAFT] Reply LS on the impacts of packet marking on RAN user plane handling of DL traffic | Ericsson, Nokia Networks | imported from 3GU |
R2‑143466 | Clarification of exclusion of cells from inter-frequency detected set measurements | Huawei, HiSilicon | imported from 3GU |
R2‑143467 | Access class barring skip mechanism in RRC | ITRI | imported from 3GU |
R2‑143468 | Discussion on DC RRM Measurements | ITRI | imported from 3GU |
R2‑143469 | Further Discussion on S-RLF | ITRI | imported from 3GU |
R2‑143470 | Table format alignment | Ericsson | imported from 3GU |
R2‑143471 | Open issues on SCM work | NTT DOCOMO, INC., KDDI | imported from 3GU |
R2‑143472 | Clarification of exclusion of cells from inter-frequency detected set measurements | Huawei, HiSilicon | imported from 3GU |
R2‑143473 | DPCP Re-ordering Functionality Termination | ITRI | imported from 3GU |
R2‑143474 | DRX for Dual Connectivity | ITRI | imported from 3GU |
R2‑143475 | The usage of RAN assistance parameters during handover | ITRI | imported from 3GU |
R2‑143476 | Introduction of Dual Connectivity | Samsung | imported from 3GU |
R2‑143477 | UE behaviour upon WLAN selection and re-selection | ITRI | imported from 3GU |
R2‑143478 | Correction of Cell Reselection Indication Reporting | Huawei, HiSilicon | imported from 3GU |
R2‑143479 | Introduction of bypass of ACB in RRC | Ericsson | imported from 3GU |
R2‑143480 | SeNB initiated procedure clean up (Related to email discussion [86#27] phase 3) | NTT DOCOMO, INC. | imported from 3GU |
R2‑143481 | SFN offset handling in Dual Connectivity | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143482 | RRM measurements for Dual Connectivity | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143483 | Introduction of bypass of ACB | Ericsson | imported from 3GU |
R2‑143484 | HFN De-Synchronisation at SeNB | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143485 | On RRC signalling for NAICS | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143486 | CR to 25.331 on the introduction of E-DCH decoupling operation | Huawei, HiSilicon, Nokia Networks | imported from 3GU |
R2‑143487 | Text proposal for merging Stage-2 signalling flows | Ericsson | imported from 3GU |
R2‑143488 | Clarification on MBMSCountingResponse | Samsung | imported from 3GU |
R2‑143489 | Clarification of the decompressor state and mode after handover | NTT DOCOMO, INC, LG Electronics Inc., Nokia Networks | imported from 3GU |
R2‑143490 | CR to 25.306 on the introduction of E-DCH decoupling operation | Huawei, HiSilicon, Nokia Networks | imported from 3GU |
R2‑143491 | Clarification of the decompressor state and mode after handover | NTT DOCOMO, INC, LG Electronics Inc., Nokia Networks | imported from 3GU |
R2‑143492 | Clarification on MBMSCountingResponse | Samsung | imported from 3GU |
R2‑143493 | Minor corrections to MDT Stage-2 | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143494 | CR to 25.319 on the introduction of E-DCH decoupling operation | Huawei, HiSilicon, Nokia Networks | imported from 3GU |
R2‑143495 | SeNB Failure Reporting and Recovery | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑143496 | Mobility Aspects of D2D Discovery | ETRI | imported from 3GU |
R2‑143497 | CR to 25.302 on the introduction of E-DCH decoupling operation | Huawei, HiSilicon, Nokia Networks | imported from 3GU |
R2‑143498 | Open issues on RRC and ASN.1 in dual connectivity | Ericsson | imported from 3GU |
R2‑143499 | D2D discovery resource allocation | Panasonic | imported from 3GU |
R2‑143500 | CR to 25.331 on introduction of the extended E-HICH and common E-RGCH for DCH | Huawei, HiSilicon | imported from 3GU |
R2‑143501 | Inter node RRC messages for dual connectivity | Ericsson | imported from 3GU |
R2‑143502 | DRX coordination for dual connectivity | Nokia Corporation, Nokia Networks | imported from 3GU |
R2‑143503 | UE capability signalling for dual connectivity | Ericsson | imported from 3GU |
R2‑143504 | PDCP Re-ordering Functionality Termination | ITRI | imported from 3GU |
R2‑143505 | RRC procedures and L2 handling in dual connectivity | Ericsson | imported from 3GU |
R2‑143506 | CR to 25.306 on introduction of the Extended E-HICH and Common E-RGCH | Huawei, HiSilicon | imported from 3GU |
R2‑143507 | Open issues for MAC in dual connectivity | Ericsson | imported from 3GU |
R2‑143508 | CR to 25.319 on introduction of the Extended E-HICH and Common E-RGCH | Huawei, HiSilicon | imported from 3GU |
R2‑143509 | NAICS Parameters | Ericsson | imported from 3GU |
R2‑143510 | Further considerations on Per CN domain Wait time | Huawei, HiSilicon | imported from 3GU |
R2‑143511 | CR to 25.302 on introduction of the extended E-HICH and Common E-RGCH for DCH | Huawei, HiSilicon | imported from 3GU |
R2‑143512 | CR to 25.331 on introduction of the DPCCH2 | Huawei, HiSilicon | imported from 3GU |
R2‑143513 | CR to 25.306 on introduction of the DPCCH2 | Huawei, HiSilicon | imported from 3GU |
R2‑143514 | Remaining issues on increased carrier monitoring | Samsung | imported from 3GU |
R2‑143515 | CR to 25.308 on introduction of the DPCCH2 | Huawei, HiSilicon | imported from 3GU |
R2‑143516 | HARQ operation of D2D Communications | Samsung | imported from 3GU |
R2‑143517 | CR to 25.302 on introduciton of the DPCCH2 | Huawei, HiSilicon | imported from 3GU |
R2‑143518 | Broadcast of ProSe Control Information and Related Procedures | Ericsson | imported from 3GU |
R2‑143519 | Release 12: Features, UE capabilities, and their mandatory/optional support | Ericsson | imported from 3GU |
R2‑143520 | CR to 25.300 on the introduction of Heterogeneous Networks Enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑143521 | Dual connectivity: procedural specification of layer 2 reconfiguration (a.o. on SCG change) | Samsung | imported from 3GU |
R2‑143522 | Dual Connectivity layer 2 reconfiguration (a.o. on SCG change) | Samsung | imported from 3GU |
R2‑143523 | Introduction of dual connectivity in MAC | Ericsson | imported from 3GU |
R2‑143524 | Analysis on layer 2 measurements considering dual connectivity | CATT | imported from 3GU |
R2‑143525 | Keeping dedicated ProSe resources upon leaving connected mode | HTC | imported from 3GU |
R2‑143526 | L2 measurement modifications for Dual Connectivity | CATT | imported from 3GU |
R2‑143527 | How does 3GPP network obtain WLAN load information | ASUSTeK | imported from 3GU |
R2‑143528 | UE capabilities for Hetnet mobility in TS 36.331 | Huawei, Hisilicon | imported from 3GU |
R2‑143529 | Consideration on inconsistent WLAN offloading configuration due to handover | ASUSTeK | imported from 3GU |
R2‑143530 | UE capabilities for Hetnet mobility in TS 36.306 | Huawei, Hisilicon | imported from 3GU |
R2‑143531 | Consideration on the Counter Check procedure | CATT | imported from 3GU |
R2‑143532 | Considerations on admission control of D | CATT | imported from 3GU |
R2‑143533 | Considerations on admission control of DC | CATT | imported from 3GU |
R2‑143534 | Details of IDC function for Dual Connectivity | CATT | imported from 3GU |
R2‑143535 | Selective UE capability reporting | Alcatel-Lucent | imported from 3GU |
R2‑143536 | Network-requested LTE Band Combination Capability Signalling | Alcatel-Lucent | imported from 3GU |
R2‑143537 | MBMS Reception on SCG Cells | LG Electronics Inc. | imported from 3GU |
R2‑143538 | D2D operation on SCG cells | LG Electronics Inc. | imported from 3GU |
R2‑143539 | Handling of IDC for Dual Connectivity | LG Electronics Inc. | imported from 3GU |
R2‑143540 | Details on S-RLF | CATT | imported from 3GU |
R2‑143541 | UPCON: Impacts of packet marking on RAN | Alcatel-Lucent | imported from 3GU |
R2‑143542 | Draft Response LS on the Impacts of Packet Marking on RAN user plane handling of DL traffic | Alcatel-Lucent | imported from 3GU |
R2‑143543 | Issues on Scheduling Request for D2D Communication | LG Electronics Inc. | imported from 3GU |
R2‑143544 | Issues on ProSe BSR | LG Electronics Inc. | imported from 3GU |
R2‑143545 | Using ProSe BSR for Resource Request in D2D Discovery | LG Electronics Inc. | imported from 3GU |
R2‑143546 | Discussion on M-RLF | CATT | imported from 3GU |
R2‑143547 | Discussion on ProSe-BSR format | ASUSTeK | imported from 3GU |
R2‑143548 | Issue on resource allocation for ProSe-BSR | ASUSTeK | imported from 3GU |
R2‑143549 | Discussion on SCG random access | CATT | imported from 3GU |
R2‑143550 | DRX configuration exchange between MeNB and SeNB | CATT | imported from 3GU |
R2‑143551 | Improve the representation of the reception requirements in TS36.302 | Alcatel-Lucent | imported from 3GU |
R2‑143552 | LCP for dual connectivity | CATT | imported from 3GU |
R2‑143553 | Parallel Configuration between MeNB and SeNB | CATT | imported from 3GU |
R2‑143554 | Draft LS on parallel procedures between MeNB and SeNB | CATT | imported from 3GU |
R2‑143555 | Remaining issue of BSR reporting | CATT | imported from 3GU |
R2‑143556 | Clarification on MBMS frequency prioritisation | Samsung | imported from 3GU |
R2‑143557 | Remaining issues of SCG R | CATT | imported from 3GU |
R2‑143558 | Further discussion on mode switching | Ericsson | imported from 3GU |
R2‑143559 | System Information change for PSCell | CATT | imported from 3GU |
R2‑143560 | Dual connectivity: Overal signalling structure | Samsung | imported from 3GU |
R2‑143561 | Clarification on MBMS frequency prioritisation | Samsung | imported from 3GU |
R2‑143562 | HARQ processes for ProSe Operation | Ericsson | imported from 3GU |
R2‑143563 | UE capability coordination | CATT | imported from 3GU |
R2‑143564 | MAC aspects for ProSe operation | Ericsson | imported from 3GU |
R2‑143565 | Introduction of ProSe | Samsung | imported from 3GU |
R2‑143566 | Clarification on MBMS frequency prioritisation | Samsung | imported from 3GU |
R2‑143567 | Remaining issue on PHR in DC | LG Electronics Inc. | imported from 3GU |
R2‑143568 | ProSe Communication: Signalling of SA reception resources | Samsung | imported from 3GU |
R2‑143569 | Draft CR to 36 321 on PHR format for DC | LG Electronics Inc. | imported from 3GU |
R2‑143570 | Analysis of ProSe Identifiers | Ericsson | imported from 3GU |
R2‑143571 | Rel-12 ASN.1 correction | Nokia Networks | imported from 3GU |
R2‑143572 | ProSe Multi-Carrier Support | Ericsson | imported from 3GU |
R2‑143573 | Rel-12 ASN.1 correction | Nokia Networks | imported from 3GU |
R2‑143574 | Clarification on MBMS frequency prioritisation | Samsung | imported from 3GU |
R2‑143575 | Proposals on open aspects in low complexity UE specification | Vodafone, Intel, CATT, ZTE, MediaTek, SIERRA WIRELESS | imported from 3GU |
R2‑143576 | Introduction of ProSe | Ericsson (rapporteur) | imported from 3GU |
R2‑143577 | Introduction of ProSe (including ProSe BSR triggers) | Ericsson (rapporteur) | imported from 3GU |
R2‑143578 | Discussion on open aspects in low complexity UE specification | Vodafone, Intel | imported from 3GU |
R2‑143579 | Introduction of Multiple Power Levels for different Discovery Range Classes | Deutsche Telekom | imported from 3GU |
R2‑143580 | Clarification to usage of 15-bit Length indicator in RLC PDU formats | Intel Corporation | imported from 3GU |
R2‑143581 | Capability supported in SCG PSCell for Dual Connectivity | NTT DOCOMO, INC. | imported from 3GU |
R2‑143582 | UE capability for increased number of frequencies to monitor | Ericsson | imported from 3GU |
R2‑143583 | Misalignment of Layer 2 ID for D2D communication | ETRI | imported from 3GU |
R2‑143584 | UE capability and scaling factor signalling for IncMon | Ericsson | imported from 3GU |
R2‑143585 | MAC operation related to PSCell | NTT DOCOMO, INC. | imported from 3GU |
R2‑143586 | draft LS on MAC operation during PSCell related procedure | NTT DOCOMO, INC. | imported from 3GU |
R2‑143587 | eNB knowledge of low-complexity UE | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143588 | Introduction of UE capability for Increased UE carrier monitoring | Ericsson | imported from 3GU |
R2‑143589 | [Draft] LS Response on eNB knowledge of low complexity UEs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143590 | Measurement release enhancement | Ericsson, Nokia Networks | imported from 3GU |
R2‑143591 | Radio Paging Information Container | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143592 | SPS support in small cells | Blackberry UK Limited | imported from 3GU |
R2‑143593 | draft LS on Re-name of SCC | NTT DOCOMO, INC. | imported from 3GU |
R2‑143594 | Measurement release enhancement | Ericsson, Nokia Networks | imported from 3GU |
R2‑143595 | Measurement release enhancement | Ericsson, Nokia Networks | imported from 3GU |
R2‑143596 | On D2D UE capability, D2D interest and prioritization | ZTE | imported from 3GU |
R2‑143597 | Exceptional conditions for Mode 2 | ZTE | imported from 3GU |
R2‑143598 | SA reception resource pool configuration | ZTE | imported from 3GU |
R2‑143599 | Inter-PLMN and inter-frequency support | ZTE | imported from 3GU |
R2‑143600 | Discussion on user inactivity of ProSe UE | ZTE | imported from 3GU |
R2‑143601 | Consideration on push to talk operation in D2D communication | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143602 | ProSe user plane aspects | ZTE | imported from 3GU |
R2‑143603 | Contents of ProSe BSR | ZTE | imported from 3GU |
R2‑143604 | Inter-cell discovery relevant signalling | ZTE | imported from 3GU |
R2‑143605 | Extended measurements ID support mandatory | Ericsson | imported from 3GU |
R2‑143606 | Consideration on simultaneous D2D communication and Cellular operation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143607 | Introduction of increased number of frequencies to monitor | Ericsson | imported from 3GU |
R2‑143608 | Discovery Monitoring for a single receiver UE | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143609 | Introduction of UE capability of RAN assistance WLAN interworking | Alcatel-Lucent | imported from 3GU |
R2‑143610 | Email discussion report [86#42] Enhancements to SIB | Ericsson | imported from 3GU |
R2‑143611 | Introduction of a second broadcast channel | Ericsson | imported from 3GU |
R2‑143612 | Introduction of a second broadcast channel | Ericsson | imported from 3GU |
R2‑143613 | Discussion on DC capability structure | NTT DOCOMO, INC. | imported from 3GU |
R2‑143614 | Introduction of a second broadcast channel | Ericsson | imported from 3GU |
R2‑143615 | draft LS on Dual Connectivity capability | NTT DOCOMO, INC. | imported from 3GU |
R2‑143616 | L2 handling for SCGSplit bearer | NTT DOCOMO, INC. | imported from 3GU |
R2‑143617 | Introduction of a second broadcast channel | Ericsson | imported from 3GU |
R2‑143618 | Framework for TAG in DC | NTT DOCOMO, INC. | imported from 3GU |
R2‑143619 | Priority handling for ProSe | BlackBerry UK Limited | imported from 3GU |
R2‑143620 | Acquisition method for SIB carrying Access Group control information | Ericsson | imported from 3GU |
R2‑143621 | Introduction of a second broadcast channel | Ericsson | imported from 3GU |
R2‑143622 | Impacts of packet marking on RAN user plane handling of DL traffic | Huawei, HiSilicon,CMCC | imported from 3GU |
R2‑143623 | Draft reply LS on impacts of packet marking on RAN user plane handling of DL traffic | Huawei | imported from 3GU |
R2‑143624 | Activation of the new TTI length | Ericsson | imported from 3GU |
R2‑143625 | TAI reporting of last serving cell | Huawei, HiSilicon | imported from 3GU |
R2‑143626 | Remaining issues of S-RLF handling | Sharp | imported from 3GU |
R2‑143627 | TAI reporting of last serving cell | Huawei, HiSilicon | imported from 3GU |
R2‑143628 | Collision of MeNB and SeNB reconfigurations | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143629 | SCG reconfiguration handling during SCG change/release | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143630 | DRB addition and release in Dual connectivity 1A | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143631 | Draft reply LS on TAI reporting of last serving cell | Huawei | imported from 3GU |
R2‑143632 | DRB handling during re-establishment for dual connectivity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143633 | Cell selection during Re-establishment in Dual connectivity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143634 | PDCP SN size change during HO for RLC-UM mode bearers | Alcatel-Lucent | imported from 3GU |
R2‑143635 | The PDCP SDU number limitation for Category 9-10 UE | Huawei, HiSilicon | imported from 3GU |
R2‑143636 | The PDCP SDU number limitation for Category 9-10 UE | Huawei, HiSilicon | imported from 3GU |
R2‑143637 | Type 0 SRS sending for eIMTA | Huawei, HiSilicon | imported from 3GU |
R2‑143638 | Idle UE Distribution in Macro Only System and HetNets | Alcatel-Lucent, Verizon | imported from 3GU |
R2‑143639 | Correction for type 0 SRS sending for eIMTA | Huawei, HiSilicon | imported from 3GU |
R2‑143640 | Enhancement for Idle UE Redistribution | Alcatel-Lucent | imported from 3GU |
R2‑143641 | Discussion on PSCell change | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143642 | Alignment of RAN2 and RAN3 stage 2 discussions | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143643 | System information update in dual connectivity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143644 | e-mail discussion summary and way-forward proposal on cell barring due to reception failure of MIB or SIB1 | Cassidian | imported from 3GU |
R2‑143645 | Discussion on PHR remaining issues | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143646 | Reselection Enhancement for Idle UE Redistribution | Alcatel-Lucent | imported from 3GU |
R2‑143647 | MDT enhancement for CHIBA issue | Huawei, HiSilicon | imported from 3GU |
R2‑143648 | Discussion on PHR transmission for power limited scenario | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143649 | Consideration on DRX coordination in dual connectivity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143650 | Log and report the Chiba issue | NEC | imported from 3GU |
R2‑143651 | Discussion on PDCP reordering | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143652 | Further Aspects about D2D Communication Resource Pool Configurations | Sharp | imported from 3GU |
R2‑143653 | MDT enhancment for CHIBA issue | Huawei, HiSilicon | imported from 3GU |
R2‑143654 | DRS Measurement Impact | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑143655 | Consecutive RRC Connection Establishment failure report-36.331 CR | NEC | imported from 3GU |
R2‑143656 | Consecutive RRC Connection Establishment failure report-36.306 CR | NEC | imported from 3GU |
R2‑143657 | Consecutive Connection Establishment failure Report-25.331CR | NEC | imported from 3GU |
R2‑143658 | Low Latency Vehicle to Vehicle communication based on GCSE | General Motors | imported from 3GU |
R2‑143659 | Quality of service measurement per PLMN ID basis | NEC Corporation, Orange | imported from 3GU |
R2‑143660 | TP on Layer 2 Structure for UL with CA and DC configured | NEC, NTT DOCOMO | imported from 3GU |
R2‑143661 | UE assistance information in dual connectivity | NEC | imported from 3GU |
R2‑143662 | Response LS on discovery message size | Qualcomm Incorporated | imported from 3GU |
R2‑143663 | Response LS on RRC Connection Establishment for ProSe Direct Communication | Qualcomm Incorporated | imported from 3GU |
R2‑143664 | Split Bearer PDCP Reordering After Handover | NVIDIA | imported from 3GU |
R2‑143665 | Introduction of ProSe Direct Communication | Qualcomm Incorporated, Samsung | imported from 3GU |
R2‑143666 | NW based solution for Chiba issue in E-UTRAN | Ericsson, Broadcom | imported from 3GU |
R2‑143667 | NW based solution for Chiba issue in E-UTRAN | Ericsson, Broadcom | imported from 3GU |
R2‑143668 | DRS RRM and small cell on/off procedure considerations | NVIDIA | imported from 3GU |
R2‑143669 | Limitation of radio link monitoring in the system | Ericsson | imported from 3GU |
R2‑143670 | PDCP header format for ProSe Direct Communication | Qualcomm Incorporated | imported from 3GU |
R2‑143671 | Signaling for ProSe Direct Communication | Qualcomm Incorporated | imported from 3GU |
R2‑143672 | Introduction of ProSe | Qualcomm Incorporated, Samsung | imported from 3GU |
R2‑143673 | Signaling Details for ProSe Direct Discovery | Qualcomm Incorporated | imported from 3GU |
R2‑143674 | Discussion on UE capability report for D2D discovery | Huawei, HiSilicon | imported from 3GU |
R2‑143675 | Data Resource pool for ProSe Direct Communication | Qualcomm Incorporated | imported from 3GU |
R2‑143676 | Draft LS on RRM measurement for DC | Huawei, HiSilicon | imported from 3GU |
R2‑143677 | ProSe Capability Signaling | Qualcomm Incorporated | imported from 3GU |
R2‑143678 | Introduction of ProSe Direct Communication | Qualcomm Incorporated, Samsung | imported from 3GU |
R2‑143679 | Network based timing difference acquisition in dual connectivity | Qualcomm Incorporated | imported from 3GU |
R2‑143680 | System Information change for the PSCell | Qualcomm Incorporated | imported from 3GU |
R2‑143681 | SPS for dual connectivity | Qualcomm Incorporated | imported from 3GU |
R2‑143682 | DRX for dual connectivity | Qualcomm Incorporated | imported from 3GU |
R2‑143683 | Signaling support for NAICS | Qualcommm Incorporated | imported from 3GU |
R2‑143684 | Introduction of DCH Enhancements | Qualcomm Incorporated | imported from 3GU |
R2‑143685 | Introduction of DCH Enhancements | Qualcomm Incorporated | imported from 3GU |
R2‑143686 | Introduction of DCH Enhancements | Qualcomm Incorporated | imported from 3GU |
R2‑143687 | Introduction of DCH Enhancements | Qualcomm Incorporated | imported from 3GU |
R2‑143688 | Open issues for DCH enhancements | Qualcomm Incorporated | imported from 3GU |
R2‑143689 | Clarification for time-domain resource restriction pattern applicable to neighbour cell RSRQ measurements | Qualcomm Incorporated | imported from 3GU |
R2‑143690 | User Preferences | Mediatek Inc | imported from 3GU |
R2‑143691 | Clarification for time-domain resource restriction pattern applicable to neighbour cell RSRQ measurements | Qualcomm Incorporated | imported from 3GU |
R2‑143692 | Clarification for time-domain resource restriction pattern applicable to neighbour cell RSRQ measurements | Qualcomm Incorporated | imported from 3GU |
R2‑143693 | RAN parameters in OOS | Mediatek Inc | imported from 3GU |
R2‑143694 | Throughput rules for QoS assurance | Mediatek Inc | imported from 3GU |
R2‑143695 | Discussion on WLAN scanning for power consumption reduction | IIT Bombay | imported from 3GU |
R2‑143696 | Disable default configuration 23 | Qualcomm Incorporated | imported from 3GU |
R2‑143697 | Disable default configuration 23 | Qualcomm Incorporated | imported from 3GU |
R2‑143698 | Disable default configuration 23 | Qualcomm Incorporated | imported from 3GU |
R2‑143699 | Closing of open issues for MBMS MDT | Mediatek Inc | imported from 3GU |
R2‑143700 | Implementation of WLAN priority | Huawei, HiSilicon | imported from 3GU |
R2‑143701 | Disable default configuration 23 | Qualcomm Incorporated | imported from 3GU |
R2‑143702 | Discussion on traffic volume measurement report in Cell_PCH state | Qualcomm Incorporated | imported from 3GU |
R2‑143703 | Rules and measurements for UE configured with DCH only | Huawei, HiSilicon | imported from 3GU |
R2‑143704 | Clarification of multiflow configurations | Qualcomm Incorporated | imported from 3GU |
R2‑143705 | Clarification of multiflow configurations | Qualcomm Incorporated | imported from 3GU |
R2‑143706 | Small Cell On/Off and Discovery Procedures | Samsung | imported from 3GU |
R2‑143707 | Remaining open issues for MBMS MDT | Huawei, HiSilicon | imported from 3GU |
R2‑143708 | HS-SCCH order handling for multiflow operation | Qualcomm Incorporated | imported from 3GU |
R2‑143709 | DRS Measurement and Configuration Details | Samsung | imported from 3GU |
R2‑143710 | Clarification on MCCH and MTCH transmission | Huawei, HiSilicon | imported from 3GU |
R2‑143711 | Paging Considerations for Low Cost MTC UEs | InterDigital Communications | imported from 3GU |
R2‑143712 | UE behaviour in GERAN or after moving all PDN connections to WLAN | Huawei, HiSilicon | imported from 3GU |
R2‑143713 | Handling of dedicated thresholds upon cell selection | Huawei, HiSilicon | imported from 3GU |
R2‑143714 | How to change the PSCell | LG Electronics Inc. | imported from 3GU |
R2‑143715 | Further consideration on RA in SCG | LG Electronics Inc. | imported from 3GU |
R2‑143716 | Discussion on introducing shorter MSP | Huawei, HiSilicon | imported from 3GU |
R2‑143717 | Bearer handling at MeNB handover | LG Electronics Inc. | imported from 3GU |
R2‑143718 | LCP procedure in dual connectivity | LG Electronics Inc. | imported from 3GU |
R2‑143719 | Further clarification on eIMTA operation | LG Electronics Inc. | imported from 3GU |
R2‑143720 | Considerations for Resource Management for Discovery | InterDigital Communications | imported from 3GU |
R2‑143721 | Priority Handling for ProSe communications | InterDigital Communications | imported from 3GU |
R2‑143722 | Remaining issues for mode selection | InterDigital Communications | imported from 3GU |
R2‑143723 | Handling of the RAN assistance information | LG Electronics Inc. | imported from 3GU |
R2‑143724 | Issue regarding steering from WLAN | LG Electronics Inc. | imported from 3GU |
R2‑143725 | Restriction for per-APN based traffic steering | LG Electronics Inc. | imported from 3GU |
R2‑143726 | Dynamic switching of CDRX configurations | Qualcomm Incorporated | imported from 3GU |
R2‑143727 | PDCP reordering after Split Bearer release | LG Electronics Inc. | imported from 3GU |
R2‑143728 | Discussion on HFN de-synchronization and its impact to a VoLTE call | Qualcomm Incorporated | imported from 3GU |
R2‑143729 | PDCP/RLC handling at bearer type change | LG Electronics Inc. | imported from 3GU |
R2‑143730 | Discussion on Restricted Subframe Pattern Configuration for TDD | Qualcomm Incorporated | imported from 3GU |
R2‑143731 | Use of RCPI and RSNI for RAN Rules | Qualcomm Incorporated | imported from 3GU |
R2‑143732 | Split Bearer Reconfiguration to MCG Bearer | LG Electronics Inc. | imported from 3GU |
R2‑143733 | Consideration on in-coverage definition | LG Electronics Inc. | imported from 3GU |
R2‑143734 | MCG Bearer Reconfiguration to Split Bearer | LG Electronics Inc. | imported from 3GU |
R2‑143735 | Clarification on provding system information notfication on a DL only carier with MBMS service | Qualcomm Incorporated | imported from 3GU |
R2‑143736 | D2D operation upon mobility | LG Electronics Inc. | imported from 3GU |
R2‑143737 | Clarification on providing system information notification on a DL only carrier with MBMS service | Qualcomm Incorporated | imported from 3GU |
R2‑143738 | Partial coverage communication | LG Electronics Inc. | imported from 3GU |
R2‑143739 | Split Bearer Reconfiguration to Split Bearer | LG Electronics Inc. | imported from 3GU |
R2‑143740 | Prioritized reselection of D2D supported frequency | LG Electronics Inc. | imported from 3GU |
R2‑143741 | Clarification on determining MBMS frequencies of interest in MBMSInterestIndication | Qualcomm Incorporated | imported from 3GU |
R2‑143742 | Temporal use of mode2 - details and expansion | LG Electronics Inc. | imported from 3GU |
R2‑143743 | Transmission of PDCP Control PDU in split bearer | LG Electronics Inc. | imported from 3GU |
R2‑143744 | Response to CT1 LS | LG Electronics Inc. | imported from 3GU |
R2‑143745 | RRC connection state management | LG Electronics Inc. | imported from 3GU |
R2‑143746 | RLC/PDCP state variable initialization for D2D communication | LG Electronics Inc. | imported from 3GU |
R2‑143747 | UE behaviors upon RRC connection establishment (ACB, cause) | LG Electronics Inc. | imported from 3GU |
R2‑143748 | UE capability signaling for multi-carrier capable UEs | LG Electronics Inc. | imported from 3GU |
R2‑143749 | RRC connection for D2D discovery | LG Electronics Inc. | imported from 3GU |
R2‑143750 | Inter-cell discovery support | LG Electronics Inc. | imported from 3GU |
R2‑143751 | UE assistance information | LG Electronics Inc. | imported from 3GU |
R2‑143752 | Clarification on determining MBMS frequencies of interest in MBMSInterestIndication | Qualcomm Incorporated | imported from 3GU |
R2‑143753 | Corrections for MBMS reception on Non-Serving Cell | Qualcomm Incorporated | imported from 3GU |
R2‑143754 | Corrections for MBMS reception on Non-Serving Cell | Qualcomm Incorporated | imported from 3GU |
R2‑143755 | Intra-frequency and inter-frequency neighbor cell support | Kyocera | imported from 3GU |
R2‑143756 | Inter-PLMN D2D discovery | Kyocera | imported from 3GU |
R2‑143757 | PDCP and RLC functionalities for D2D | Kyocera | imported from 3GU |
R2‑143758 | Measurement reports associated with S-RLF | Kyocera | imported from 3GU |
R2‑143759 | UE behavior without RAN assistance parameters | Kyocera | imported from 3GU |
R2‑143760 | D2D carrier selection with UE assistance info | LG Electronics Inc. | imported from 3GU |
R2‑143761 | s-Measure enhancement for DRS measurement | LG Electronics Inc | imported from 3GU |
R2‑143762 | New events for CSI-RS based DRS measurement | LG Electronics Inc | imported from 3GU |
R2‑143763 | DRS measurement configurability | LG Electronics Inc | imported from 3GU |
R2‑143764 | Comparing CRS measurement and DRS measurement | LG Electronics Inc | imported from 3GU |
R2‑143765 | eNB knowledge of low complexity UEs | LG Electronics Inc. | imported from 3GU |
R2‑143766 | Corrections on Paging | Huawei, HiSilicon | imported from 3GU |
R2‑143767 | Parameter Configuration for D2D Radio Bearers | Huawei, HiSilicon | Disc |
R2‑143768 | Some Consideration of inter-cell discovery | Potevio | Disc |
R2‑143769 | Dual receiver 1xCSFB support indication in SIB8 | Nokia Networks, Qualcomm Incorporated | CR |
R2‑143770 | Dual receiver 1xCSFB support indication in SIB8 | Nokia Networks, Qualcomm Incorporated | CR |
R2‑143771 | Dual receiver 1xCSFB support indication in SIB8 | Nokia Networks, Qualcomm Incorporated | CR |
R2‑143772 | Dual receiver 1xCSFB support indication in SIB8 | Nokia Networks, Qualcomm Incorporated | CR |
R2‑143773 | Corrections for TS36.314 | Huawei, HiSilicon, CATT | CR |
R2‑143774 | Clarification on the setting of SupportedBandCombination-v1130 | Huawei, HiSilicon | CR |
R2‑143775 | Clarification on the setting of SupportedBandCombination-v1130 | Huawei, HiSilicon | CR |
R2‑143776 | Value range increase for RSRQ | Huawei, HiSilicon | Disc |
R2‑143777 | Alt 1 CR on value range increase for RSRQ | Huawei, HiSilicon | CR |
R2‑143778 | Alt 2 CR on value range increase for RSRQ | Huawei, HiSilicon | CR |
R2‑143779 | Draft Response LS on increasing value range for RSRQ | Huawei, HiSilicon | LSout |
R2‑143780 | Further consideration on FDD&TDD split for CA | Huawei, HiSilicon | Disc |
R2‑143781 | FDD&TDD split for CA | Huawei, HiSilicon | CR |
R2‑143782 | Further consideration on CA bandcombination capability signalling | Huawei, HiSilicon | Disc |
R2‑143783 | Clarification on CA bandcombination capability signalling | Huawei, HiSilicon | CR |
R2‑143784 | L2 measurements in Dual Connectivity | Samsung | Disc |
R2‑143785 | On the reporting TAI of last serving cell | Samsung | Disc |
R2‑143786 | Clarification on inter-freq RSTD measurement | Samsung | CR |
R2‑143787 | On skipping ACB for MMTEL-voice, video and SMS | Samsung | CR |
R2‑143788 | Reestablishment in dual connectivity | Pantech | Disc |
R2‑143789 | Evaluation of deactivation timer value per Scell | NTT DOCOMO, INC., Qualcomm Incorporated, NEC, Fujitsu | Disc |
R2‑143790 | RAN2 response related to RAN1 LS on “Maximum Number of Transport Block Bits in Dual-Connectivity” | Samsung | Disc |
R2‑143791 | Introduction of DCH Enhancements | Qualcomm Incorporated | CR |
R2‑143792 | Discussion on PDCP reordering after split bearer reconfiguration towards MCG bearer | Nokia Networks | Report |
R2‑143793 | Correction of E-UTRAN UE capabilities description in HandoverPreparationInformation message field descriptions | Ericsson | CR |
R2‑143794 | Correction of E-UTRAN UE capabilities description in HandoverPreparationInformation message field descriptions | Ericsson | CR |
R2‑143795 | WLAN Metrics and Alignment of Assistance Threshold Parameters | AT&T/InterDigital | Disc |
R2‑143796 | [DRAFT] Reply LS on WLAN/3GPP Radio Interworking | AT&T | Disc |
R2‑143797 | DRX in Dual Connectivity | ZTE | Disc |
R2‑143798 | Further Discussion on ProSe-BSR | CATT | Disc |
R2‑143799 | RRC Parameters for NAICS | MediaTek Inc. | CR |
R2‑143800 | UE capabilities for WLAN Interworking | Sony | Disc |
R2‑143801 | Addition of UE capabilities for WLAN Interworking | Sony | CR |
R2‑143802 | Remaining open issues of WLAN/3GPP radio interworking | Intel Corporation | Disc |
R2‑143803 | Avoid | - | - |
R2‑143804 | Draft Reply LS to R2-143054 on eMBMS broadcast areas with EUTRAN Cell Granularity | Samsung | LSout |
R2‑143805 | Reporting and measurement collection triggers for immediate MDT | Mediatek Inc, Intel Corporation | CR |
R2‑143806 | Reporting and measurement collection triggers for immediate MDT | Intel Corporation | CR |
R2‑143807 | Introduction of increased number of frequencies to monitor | Ericsson | CR |
R2‑143808 | Report and summary of email discussion [86#29][LTE/DC] RRM measurements | Huawei (Rapporteur) | Report |
R2‑143809 | Introduction of increased number of frequencies to monitor | Ericsson | CR |
R2‑143810 | Discussion on ProSe-BSR Format | Huawei, Hisilicon | Disc |
R2‑143811 | Draft Reply LS on the impacts of packet marking on RAN user plane handling of DL traffic | Ericsson | LSout |
R2‑143812 | Draft Reply LS to R2-141894 on clarifications about MOCN and GWCN | NEC Corporation, Orange | LSout |
R2‑143813 | Draft Reply LS to RP-141024 on new RSRQ measurement definition | Nokia Corporation, Nokia Networks | LSout |
R2‑143814 | Further consideration on RAN rules | China Telecom | Disc |
R2‑143815 | Correction to stop condition for "Chiba offset" | Samsung | CR |
R2‑143816 | Correction to stop condition for "Chiba offset" | Samsung | CR |
R2‑143817 | SeNB initiated procedure clean up (Related to email discussion [86#27] phase 3) | NTT DOCOMO, INC. | Disc |
R2‑143818 | Introduction of Category 0 for low complexity UEs | Huawei, HiSilicon | CR |
R2‑143819 | Support of HD-FDD operation for low cost MTC UEs | Huawei, Intel, Samsung, Nokia Networks, ZTE, HiSilicon | CR |
R2‑143820 | Draft LS LS on WLAN/3GPP Radio Interworking WLAN metrics | Intel Corporation | LSout |
R2‑143821 | Introduction of ACB skip for MMTEL voice/video and SMS | Qualcomm Incorporated, NTT DOCOMO, INC., LG Electronics Inc., KDDI | CR |
R2‑143822 | DRS measurement for small cell on/off and discovery | Intel Corporation | Disc |
R2‑143823 | Clarification on CA bandcombination capability signalling | Ericsson | CR |
R2‑143824 | Clarification on CA bandcombination capability signalling | Ericsson | CR |
R2‑143825 | FDD&TDD split for CA | Huawei, HiSilicon | CR |
R2‑143826 | FDD&TDD split for CA | Huawei, HiSilicon | CR |
R2‑143827 | FDD&TDD split for CA | Huawei, HiSilicon | CR |
R2‑143828 | Introduction of Multiple Power Levels for different Discovery Range Classes | Deutsche Telekom, Qualcomm | Disc |
R2‑143829 | Introduction of stage 2 aspects of low complexity MTC UE features | Vodafone | CR |
R2‑143830 | Report of the LTE UP ad hoc meeting | LG Electronics (Vice-Chairman) | Report |
R2‑143831 | Clarification of the decompressor state and mode after PDCP re-establishment | NTT DOCOMO, INC, LG Electronics Inc., Nokia Networks | CR |
R2‑143832 | Clarification of the decompressor state and mode after PDCP re-establishment | NTT DOCOMO, INC, LG Electronics Inc., Nokia Networks | CR |
R2‑143833 | The PDCP SDU number limitation for Category 9-10 UE | Huawei, HiSilicon | CR |
R2‑143834 | The PDCP SDU number limitation for Category 9-10 UE | Huawei, HiSilicon | CR |
R2‑143835 | Draft LS on RRM measurement for DC | Huawei, HiSilicon | LSout |
R2‑143836 | Draft LS on number of HARQ processes for ProSe Direct Communication | ZTE | LSout |
R2‑143837 | Reply LS on discovery message size (to: RAN1; cc -; contact: qualcomm) | RAN2 | LSout |
R2‑143838 | Draft LS on number of HARQ processes for ProSe Direct Communication | ZTE | LSout |
R2‑143839 | UE capabilities for Hetnet mobility in TS 36.331 | Huawei, Hisilicon | CR |
R2‑143840 | UE capabilities for Hetnet mobility in TS 36.306 | Huawei, Hisilicon | CR |
R2‑143841 | Introduction of UE eIMTA capabilities | CATT | CR |
R2‑143842 | Introduction of UE eIMTA capabilities | CATT | CR |
R2‑143843 | Further clarification on eIMTA | CATT | CR |
R2‑143844 | Rel-12 ASN.1 correction | Nokia Networks | CR |
R2‑143845 | Draft LS on eIMTA and eICIC Measurement Subframe Restrictions | CATT | LSout |
R2‑143846 | Corrections to extended RLC LI field | Intel Corporation | CR |
R2‑143847 | Corrections to configuration of extended RLC LI field | Intel Corporation | CR |
R2‑143848 | Corrections for TS36.314 | Huawei, HiSilicon, CATT | CR |
R2‑143849 | Introduction of shorter MCH scheduling period and MCCH modification period | ZTE, CMCC, CATR, Qualcomm, CATT, LG, Alcatel-Lucent | CR |
R2‑143850 | [Draft] Short MCCH MP and MSP for MBMS | ZTE | LSout |
R2‑143851 | TAI reporting of last serving cell | Huawei, HiSilicon | CR |
R2‑143852 | Correction to Network-requested CA Band Combination Capability Signalling | Ericsson | CR |
R2‑143853 | Correction to Network-requested CA Band Combination Capability Signalling | Ericsson | CR |
R2‑143854 | Stage-2 details of WLAN/3GPP Radio Interworking for LTE | Intel Corporation | CR |
R2‑143855 | Stage-2 details of WLAN/3GPP Radio Interworking for UMTS | Intel Corporation | CR |
R2‑143856 | Clarification for time-domain resource restriction pattern applicable to neighbour cell RSRQ measurements | Qualcomm Incorporated | CR |
R2‑143857 | Correction to stop condition for "Chiba offset" | Samsung | CR |
R2‑143858 | Correction to stop condition for "Chiba offset" | Samsung | CR |
R2‑143859 | Way forward on UE Capability Indication | Vodafone, Orange, Deutsche Telekom, Intel Corporation, Samsung, Nokia Networks, Nokia Corporation, Ericsson, Panasonic, NTTdocmo, Broadcom Corporation, Qualcomm, KT Corp., SoftBank Mobile, VerizonWireless | Disc |
R2‑143860 | Removal of subfeature Exclusion of cells from inter-frequency detected set measurements | Intel Corporation | CR |
R2‑143861 | Removal of subfeature Exclusion of cells from inter-frequency detected set measurements | Intel Corporation | CR |
R2‑143862 | Corrections in default radio configuration for CELL_FACH | Nokia Networks | CR |
R2‑143863 | Multi-carrier configuration support at inter-RAT handover | Ericsson | CR |
R2‑143864 | Multi-carrier configuration support at inter-RAT handover | Ericsson | CR |
R2‑143865 | Multi-carrier configuration in Handover to UTRAN command | Ericsson | CR |
R2‑143866 | Introduction of Access Control in Connected Mode | Ericsson | CR |
R2‑143867 | Introduction of Access Control improvements | Ericsson | CR |
R2‑143868 | Introduction of EUL coverage improvements | Ericsson | CR |
R2‑143869 | Introduction of EUL coverage improvements | Ericsson | CR |
R2‑143870 | Introduction of EUL coverage improvements | Ericsson | CR |
R2‑143871 | Introduction of new default configuration for HS-DACH/RACH and HS-DSCH/E-DCH combinations | Nokia Networks | CR |
R2‑143872 | Introduction of new default configuration for HS-DACH/RACH and HS-DSCH/E-DCH combinations | Nokia Networks | CR |
R2‑143873 | Corrections in default radio configuration for CELL_FACH | Nokia Networks | CR |
R2‑143874 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑143875 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑143876 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑143877 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑143878 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑143879 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑143880 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑143881 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑143882 | Introduction of DCH Enhancements | Qualcomm Incorporated | CR |
R2‑143883 | Introduction of DCH Enhancements | Qualcomm Incorporated | CR |
R2‑143884 | Introduction of DCH Enhancements | Qualcomm Incorporated | CR |
R2‑143885 | Introduction of DCH Enhancements | Qualcomm Incorporated | CR |
R2‑143886 | Introduction of DSAC and PPAC update in CELL_DCH | Huawei, HiSilicon | CR |
R2‑143887 | Introduction of DSAC and PPAC update in CELL_DCH | Huawei, HiSilicon | CR |
R2‑143888 | Introduction of DSAC and PPAC update in CELL_DCH | Huawei, HiSilicon | CR |
R2‑143889 | Clarification of exclusion of cells from inter-frequency detected set measurements | Huawei, HiSilicon | CR |
R2‑143890 | Clarification on Service Continuity | HTC | CR |
R2‑143891 | Clarification on Service Continuity | HTC | CR |
R2‑143892 | Clarification on double indication of SAI in SIB15 | Ericsson | CR |
R2‑143893 | Clarification on double indication of SAI in SIB15 | Ericsson | CR |
R2‑143894 | Clarification on determining MBMS frequencies of interest in MBMSInterestIndication | Qualcomm Incorporated | CR |
R2‑143895 | Clarification on determining MBMS frequencies of interest in MBMSInterestIndication | Qualcomm Incorporated | CR |
R2‑143896 | Clarification on MBMSCountingResponse | Samsung | CR |
R2‑143897 | Clarification on MBMSCountingResponse | Samsung | CR |
R2‑143898 | Clarification on the setting of SupportedBandCombination-v1130 | Huawei, HiSilicon | CR |
R2‑143899 | Clarification on the setting of SupportedBandCombination-v1130 | Huawei, HiSilicon | CR |
R2‑143900 | Corrections to UE capabilities and features | Intel Corporation | CR |
R2‑143901 | Corrections to UE capabilities and features | Intel Corporation | CR |
R2‑143902 | Correction of E-UTRAN UE capabilities description in HandoverPreparationInformation message field descriptions | Ericsson | CR |
R2‑143903 | Correction of E-UTRAN UE capabilities description in HandoverPreparationInformation message field descriptions | Ericsson | CR |
R2‑143904 | ACB per PLMN | TeliaSonera, Deutsche Telekom, CMCC, France Telecom | CR |
R2‑143905 | Draft LS on Network Sharing support for access barring | TeliaSonera | LSout |
R2‑143906 | Draft reply LS on the support of PUCCH on two serving cells in CA | Huawei | LSout |
R2‑143907 | LS on WLAN/3GPP Radio Interworking WLAN metrics (to: RAN1, RAN4, SA2, CT1; cc: -; contact: Intel) | RAN2 | LSout |
R2‑143908 | Introduction of stage 2 aspects of low complexity MTC UE features | Vodafone | CR |
R2‑143909 | Draft reply LS on “Maximum Number of Transport Block Bits in Dual-Connectivity” | Huawei | LSout |
R2‑143910 | LS on Re-name of SCC (to: SA3; cc: RAN3; contact: NTT DOCOMO) | RAN2 | LSout |
R2‑143911 | Introducing MBSFN measurement by extension of logged measurements | Qualcomm Incorporated | CR |
R2‑143912 | Introduction of MBSFN MDT | Qualcomm Incorporated | CR |
R2‑143913 | Introduction of MBSFN MDT capability | Qualcomm Incorporated | CR |
R2‑143914 | Minor corrections to MDT Stage-2 | Nokia Networks, Nokia Corporation, CATT, Intel Corporation | CR |
R2‑143915 | Radio Paging Information Container | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CR |
R2‑143916 | SSAC per PLMN | TeliaSonera, Deutsche Telekom, Orange, CMCC, Softbank | CR |
R2‑143917 | Introduction of ACB skip for MMTEL voice/video and SMS | Qualcomm Incorporated, NTT DOCOMO, INC., LG Electronics Inc., KDDI, Intel Corporation, Samsung, MediaTek Inc., Huawei, HiSilicon | CR |
R2‑143918 | Introduction of signaling support for low complexity UEs | Ericsson | CR |
R2‑143919 | Introduction of Category 0 for low complexity UEs | Huawei, HiSilicon | CR |
R2‑143920 | Introduction of low complexity UEs in TS 36.321 | Huawei, Intel, Samsung, Nokia Networks, ZTE, HiSilicon, Interdigital, Sony, Vodafone | CR |
R2‑143921 | Network-requested LTE Band Combination Capability Signalling | Alcatel-Lucent | CR |
R2‑143922 | Updates for low complexity UEs | Samsung | CR |
R2‑143923 | Reply LS on RRC Connection Establishment for ProSe Direct Communication (to: CT1; cc: -; contact: Qualcomm) | RAN2 | LSout |
R2‑143924 | RRC Parameters for NAICS | MediaTek Inc. | CR |
R2‑143925 | LS on the size of the neighbour TP list for small cell discovery (R1-143552; contact: Huawei) | RAN1 | LSin |
R2‑143926 | LS on DRS measurements | Huawei | LSout |
R2‑143927 | LS on range and resolution of P_MeNB and P_SeNB in dual connectivity (R1-143597; contact: NEC) | RAN1 | LSin |
R2‑143928 | LS on agreements on small cell discovery (R1-143610; contact: Huawei) | RAN1 | LSin |
R2‑143929 | LS on 256QAM for PMCH (R1-143612; contact: Huawei) | RAN1 | LSin |
R2‑143930 | Introduction of E-DCH decoupling operation | Huawei, HiSilicon, Nokia Networks | CR |
R2‑143931 | Introduction of E-DCH decoupling operation | Huawei, HiSilicon, Nokia Networks | CR |
R2‑143932 | Introduction of E-DCH decoupling operation | Huawei, HiSilicon, Nokia Networks | CR |
R2‑143933 | The introduction of E-DCH decoupling operation | Huawei, HiSilicon, Nokia Networks | CR |
R2‑143934 | Correction of ASN.1 of MDT logged connection establishment failure reporting (Alternative 1) | Intel Corporation | CR |
R2‑143935 | Correction of ASN.1 of MDT logged connection establishment failure reporting (Alternative 1) | Intel Corporation | CR |
R2‑143936 | Multi-carrier configuration in Handover to UTRAN command | Ericsson | CR |
R2‑143937 | Multi-carrier configuration in Handover to UTRAN command | Ericsson | CR |
R2‑143938 | Disable default configuration 23 | Qualcomm Incorporated | CR |
R2‑143939 | Disable default configuration 23 | Qualcomm Incorporated | CR |
R2‑143940 | Disable default configuration 23 | Qualcomm Incorporated | CR |
R2‑143941 | Disable default configuration 23 | Qualcomm Incorporated | CR |
R2‑143942 | Clarification on repetition factors for assisting cells | Huawei, HiSilicon, Nokia Networks, Qualcomm Incorporated | CR |
R2‑143943 | Clarification on repetition factors for assisting cells | Huawei, HiSilicon, Nokia Networks, Qualcomm Incorporated | CR |
R2‑143944 | Introduction of DSAC and PPAC update in CELL_DCH | Huawei, HiSilicon | CR |
R2‑143945 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑143946 | Clarification on repetition factors for assisting cells | Huawei, HiSilicon, Nokia Networks, Qualcomm Incorporated | CR |
R2‑143947 | Clarification on repetition factors for assisting cells | Huawei, HiSilicon, Nokia Networks, Qualcomm Incorporated | CR |
R2‑143948 | Multi-carrier configuration support at inter-RAT handover | Ericsson, Qualcomm Incorporated, Huawei, Orange, Telecom Italia | CR |
R2‑143949 | Multi-carrier configuration support at inter-RAT handover | Ericsson, Qualcomm Incorporated, Huawei, Orange, Telecom Italia | CR |
R2‑143950 | Multi-carrier configuration in Handover to UTRAN command | Ericsson | CR |
R2‑143951 | Introduction of DCH Enhancements | Qualcomm Incorporated | CR |
R2‑143952 | Clarification on repetition factors for assisting cells | Huawei, HiSilicon, Nokia Networks, Qualcomm Incorporated | CR |
R2‑143953 | Clarification on repetition factors for assisting cells | Huawei, HiSilicon, Nokia Networks, Qualcomm Incorporated | CR |
R2‑143954 | Disable default configuration #23 | Qualcomm Incorporated | CR |
R2‑143955 | LS on Rel-12 Capabilities | Ericsson | LSout |
R2‑143956 | Disable default configuration #23 | Qualcomm Incorporated | CR |
R2‑143957 | Disable default configuration #23 | Qualcomm Incorporated | CR |
R2‑143958 | Clarification of exclusion of cells from inter-frequency detected set measurements | Huawei, HiSilicon | CR |
R2‑143959 | Disable default configuration #23 | Qualcomm Incorporated | CR |
R2‑143960 | LS on Rel-12 capabilities | Ericsson | LSout |
R2‑143961 | Extended measurements ID support mandatory | Ericsson | CR |
R2‑143962 | LS on Rel-12 capabilities (to: RAN; cc: RAN1; contact: Ericsson) | RAN2 | LSout |
R2‑143963 | Multi-carrier configuration in Handover to UTRAN command | Ericsson, Qualcomm Incorporated, Huawei, Orange, Telecom Italia | CR |
R2‑143964 | Multi-carrier configuration in Handover to UTRAN command | Ericsson, Qualcomm Incorporated, Huawei, Orange, Telecom Italia | CR |
R2‑143965 | Introduction of DCH Enhancements | Qualcomm Incorporated | CR |
R2‑143966 | Introduction of DCH Enhancements | Qualcomm Incorporated | CR |
R2‑143967 | Introduction of Further EUL enhancements | Ericsson | CR |
R2‑143968 | Introduction of Further EUL enhancements | Ericsson | CR |
R2‑143969 | Introduction of DSAC and PPAC update in CELL_DCH | Huawei, HiSilicon | CR |
R2‑143970 | LS to SA1 on Network Sharing support for access barring (to: SA1; cc: CT1, RAN3; contact: TeliaSonera) | RAN2 | LSout |
R2‑143971 | Response LS on the support of PUCCH on two serving cells in CA (to: RAN1; cc: -; contact: Huawei) | RAN2 | LSout |
R2‑143972 | Clarification on determining MBMS frequencies of interest in MBMSInterestIndication | Qualcomm Incorporated | CR |
R2‑143973 | Clarification on determining MBMS frequencies of interest in MBMSInterestIndication | Qualcomm Incorporated | CR |
R2‑143974 | Response LS on Maximum Number of Transport Block Bits in Dual-Connectivity (to: RAN1; cc: -; contact: Huawei) | RAN2 | LSout |
R2‑143975 | LS on RRM measurement for DC (to: RAN4; cc: RAN3; contact: Huawei) | RAN2 | LSout |
R2‑143976 | LS on DRS measurements (to: RAN4; cc: RAN1; contact: Huawei) | RAN2 | LSout |
R2‑143977 | Introduction of signaling support for low complexity UEs | Ericsson, Alcatel-Lucent, InterDigital, Huawei, HiSilicon, Sony | CR |
R2‑143978 | Introduction of Category 0 for low complexity UEs | Huawei, HiSilicon, Sony, Ericsson, Vodafone, Intel, Samsung, Interdigital | CR |
R2‑143979 | Updates for low complexity UEs, and the improvements for the representation of the reception requirements | Samsung, Alcatel-Lucent, Huawei, HiSilicon | CR |
R2‑143980 | Introduction of stage 2 aspects of low complexity MTC UE features | Vodafone | CR |
R2‑143981 | LS on eIMTA and eICIC Measurement Subframe Restrictions (to: RAN1; cc; -; contact: CATT) | RAN2 | LSout |
R2‑143982 | Rel-12 ASN.1 correction | Nokia Networks | CR |
R2‑143983 | Reply LS on TAI reporting of last serving cell (to: RAN3; cc: -; contact: Huawei) | RAN2 | LSout |
R2‑143984 | LS on introduction of shorter MCH scheduling period (to: SA2, RAN3; cc -; contact: ZTE) | RAN2 | LSout |
R2‑143985 | Introduction of shorter MCH scheduling period | ZTE, CMCC, CATR, Qualcomm, CATT, LG, Alcatel-Lucent | CR |
R2‑143986 | Stage 2 aspects of low complexity UE features | Vodafone | CR |
R2‑143987 | Clarification for time-domain resource restriction pattern applicable to neighbour cell RSRQ measurements | Qualcomm Incorporated | CR |
R2‑143988 | Clarification for time-domain resource restriction pattern applicable to neighbour cell RSRQ measurements | Qualcomm Incorporated | CR |
R2‑143989 | Clarification for time-domain resource restriction pattern applicable to neighbour cell RSRQ measurements | Qualcomm Incorporated | CR |
R2‑143990 | Reply LS on eMBMS broadcast areas with EUTRAN Cell Granularity (to: SA4, cc: SA2; contact: Samsung) | RAN2 | LSout |
R2‑143991 | Reporting and measurement collection triggers for immediate MDT | Mediatek Inc, Intel Corporation | CR |
R2‑143992 | Reporting and measurement collection triggers for immediate MDT | Intel Corporation | CR |
R2‑143993 | Way forward for RAN assistance parameter handling at cell reselection | Ericsson, Intel, LG, Kyocera, Sony | Disc |
R2‑143994 | Network-requested LTE Band Combination Capability Signalling | Alcatel-Lucent | CR |
R2‑143995 | Reply LS on RAN4 RF check of PA Values for NAICS (R4-145579; contact: MediaTek) | RAN4 | LSin |
R2‑143996 | LS on WLAN/3GPP radio interworking WI completion (to: SA2, CT1, RAN5; cc: -; contact: Intel) | RAN2 | LSout |
R2‑143997 | Reply LS on the impacts of packet marking on RAN user plane handling of DL traffic (to: SA2; cc: RAN3; contact: Ericsson) | RAN2 | LSout |
R2‑143998 | Reply LS on clarifications about MOCN and GWCN (to: SA5; cc: RAN3, SA1, SA2; contact: NEC) | RAN2 | LSout |
R2‑143999 | Reply LS on introducing the new RSRQ measurements definition (to: RAN4; cc: RAN1; contact: NTT DOCOMO) | RAN2 | LSout |
R2‑144000 | Introduction of EUL coverage improvements | Ericsson | CR |
R2‑144001 | Introduction of EUL coverage improvements | Ericsson | CR |
R2‑144002 | Introduction of EUL coverage improvements | Ericsson | CR |
R2‑144003 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑144004 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑144005 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑144006 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑144007 | Introduction of a second broadcast channel | Ericsson | CR |
R2‑144008 | CR to 25.331 on introduction of Radio Links without DPCH/F-DPCH | Huawei, HiSilicon | CR |
R2‑144009 | CR to 25.319 on introduction of the Radio Links without DPCH/F-DPCH | Huawei, HiSilicon | CR |
R2‑144010 | Introduction of Radio link without F-DPCH | Huawei, HiSilicon | CR |
R2‑144011 | CR to 25.306 on introduction of Radio Links without DPCH/F-DPCH | Huawei, HiSilicon | CR |
R2‑144012 | CR to 25.331 on introduction of the DPCCH2 | Huawei, HiSilicon | CR |
R2‑144013 | CR to 25.306 on introduction of the DPCCH2 | Huawei, HiSilicon | CR |
R2‑144014 | CR to 25.308 on introduction of the DPCCH2 | Huawei, HiSilicon | CR |
R2‑144015 | CR to 25.302 on the introduction of DPCCH2 | Huawei, HiSilicon | CR |
R2‑144016 | Adding NAICS Capability | MediaTek Inc. | CR |
R2‑144017 | RRC Parameters for NAICS | MediaTek Inc. | CR |
R2‑144018 | Introduction of Further EUL enhancements | Ericsson | CR |
R2‑144019 | Introduction of Further EUL enhancements | Ericsson | CR |
R2‑144020 | Procedures of WLAN/3GPP Radio Interworking for LTE | Intel Corporation | CR |
R2‑144021 | Connected mode procedures and RRC signaling of WLAN/3GPP Radio Interworking for LTE | Intel Corporation | CR |
R2‑144022 | Procedures of WLAN/3GPP Radio Interworking for UMTS | Intel Corporation | CR |
R2‑144023 | Connected mode procedures and RRC signaling of WLAN/3GPP Radio Interworking for UMTS | Intel Corporation | CR |
R2‑144024 | Correction to stop condition for "Chiba offset" | Samsung | CR |
R2‑144025 | Correction to stop condition for "Chiba offset" | Samsung | CR |
R2‑144026 | LS on 256QAM UE category (R1-143675; contact: Huawei) | RAN1 | LSin |
R2‑144027 | Introduction of Dual Connectivity (RAN3 topics) | RAN3 (contact: NEC) | CR |
R2‑144028 | Procedures of WLAN/3GPP Radio Interworking for LTE | Intel Corporation | CR |
R2‑144029 | Connected mode procedures and RRC signaling of WLAN/3GPP Radio Interworking for LTE | Intel Corporation | CR |
R2‑144030 | Procedures of WLAN/3GPP Radio Interworking for UMTS | Intel Corporation | CR |
R2‑144031 | Connected mode procedures and RRC signaling of WLAN/3GPP Radio Interworking for UMTS | Intel Corporation | CR |
R2‑144032 | Introduction of Further EUL enhancements | Ericsson | CR |
R2‑144033 | Introduction of Further EUL enhancements | Ericsson | CR |
R2‑144034 | Introduction of the UE history reported from the UE | RAN3 (contact: Huawei) | CR |
R2‑144035 | Corrections to MBMS SAI 0 | RAN3 (contact: Nokia Networks) | CR |
R2‑144036 | Corrections to MBMS SAI 0 | RAN3 (contact: Nokia Networks) | CR |
R2‑144037 | Introduction of inter-eNB CoMP | RAN3 (contact: Samsung) | CR |
R2‑144038 | Stage 2 alignment following introduction of context fetch | RAN3 (contact: Alcatel-Lucent, AT&T, Nokia Networks, Qualcomm Incorporated, Samsung, NTT Docomo, CMCC, InterDigital, Verizon, SoftBank Mobile, Huawei) | CR |
R2‑144039 | Delete stage 3 detail on cause of the RLF | RAN3 (contact: Samsung) | CR |
R2‑144040 | Support of Radio-interface Based Synchronization by OAM configuration | RAN3 (contact: Huawei) | CR |
R2‑144041 | CR to 25.300 on the introduction of Heterogeneous Networks Enhancements | Huawei, HiSilicon | CR |
R2‑144042 | Introduction of CN assistance information | RAN3 (contact: Nokia Networks, Ericsson, Alcatel-Lucent, NEC, ZTE) | CR |
R2‑144043 | Clarification on double indication of SAI in SIB15 | Ericsson | CR |
R2‑144044 | RRC Parameters for NAICS | MediaTek Inc. | CR |
R2‑144045 | Introduction of EUL coverage improvements | Ericsson | CR |
R2‑144046 | Introduction of EUL coverage improvements | Ericsson | CR |
R2‑144047 | Introduction of DSAC and PPAC update in CELL_DCH | Huawei, HiSilicon | CR |
R2‑144048 | Introduction of new default configuration for HS-DACH/RACH and HS-DSCH/E-DCH combinations | Nokia Networks | CR |
R2‑144049 | CR to 25.331 on introduction of Radio Links without DPCH/F-DPCH | Huawei, HiSilicon | CR |
R2‑144050 | Introduction of Further EUL enhancements | Ericsson | CR |
R2‑144051 | CR to 25.306 on introduction of Radio Links without DPCH/F-DPCH | Huawei, HiSilicon | CR |
R2‑144052 | The PDCP SDU number limitation for Category 9-10 UE | Huawei, HiSilicon | CR |
R2‑144053 | The PDCP SDU number limitation for Category 9-10 UE | Huawei, HiSilicon | CR |
R2‑144054 | Avoid | - | - |
R2‑144055 | Avoid | - | - |
R2‑144056 | Avoid | - | - |
R2‑144057 | Avoid | - | - |
R2‑144058 | Avoid | - | - |
R2‑144059 | Avoid | - | - |
page generated from database: 2024-09-26 11:02:35