3GPP TDocs (written contributions) at meeting
Meeting: R1-74 - 2013-08-19 to 2013-08-23, Barcelona
meeting id: R1-74 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑132860 | Draft Agenda for RAN1#74 meeting | RAN1 Chairman | Approved |
R1‑132861 | Final Report of RAN1#73 meeting | MCC | Noted - Revised |
R1‑132862 | Selected highlights from RAN#60 of relevance to RAN1 | RAN1 Chairman | Noted |
R1‑132863 | LS on Decoupling UL 64QAM from UE category | RAN2, Huawei | Noted |
R1‑132864 | LS on UE receiver window for Inter-band CA | RAN4, NTT DoCoMo | Noted |
R1‑132865 | LS to RAN1 on DL CoMP deployment implications | RAN4, NTT DoCoMo | Noted |
R1‑132866 | Performance evaluations of S-NCT vs BCT | Huawei, HiSilicon | Revised |
R1‑132867 | Extension of non-standalone NCT | Huawei, HiSilicon | Not treated |
R1‑132868 | PSS/SSS transmissions on NCT | Huawei, HiSilicon | Not treated |
R1‑132869 | Mobility support across carrier types | Huawei, HiSilicon | Not treated |
R1‑132870 | Evolution of transmission mode 10 for NCT | Huawei, HiSilicon | Not treated |
R1‑132871 | PMCH on NCT | Huawei, HiSilicon | Not treated |
R1‑132872 | Transport block size optimization for NCT | Huawei, HiSilicon | Not treated |
R1‑132873 | Physical layer signaling design for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑132874 | HARQ timing design for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑132875 | Backward compatibility for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑132876 | CSI enhancements for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑132877 | Analysis on the reduction of peak rate | Huawei, HiSilicon | Noted |
R1‑132878 | LS to RAN2 on UE category and capability | Huawei, HiSilicon | Not treated |
R1‑132879 | Analysis and discussion on bandwidth reduction | Huawei, HiSilicon | Not treated |
R1‑132880 | Further discussion on PBCH coverage improvement for low cost MTC | Huawei, HiSilicon | Noted |
R1‑132881 | Further discussion on PRACH coverage improvement for Low-Cost MTC UEs | Huawei, HiSilicon | Not treated |
R1‑132882 | The impact of PSD boosting on applicable channels | Huawei, HiSilicon | Not treated |
R1‑132883 | Discussion on PHICH and PCFICH for coverage limited MTC UEs | Huawei, HiSilicon | Not treated |
R1‑132884 | Discussion on PUCCH and (e)PDCCH for coverage limited MTC UEs | Huawei, HiSilicon | Not treated |
R1‑132885 | Deployment scenarios and requirements of TDD-FDD joint operation | Huawei, HiSilicon | Noted |
R1‑132886 | Potential solutions of TDD-FDD joint operation | Huawei, HiSilicon | Noted |
R1‑132887 | Draft TR 36.872 update of small cell enhancements | Huawei, HiSilicon | Not treated |
R1‑132888 | Enhancements of small cell on/off | Huawei, HiSilicon | Noted |
R1‑132889 | Load shifting/balancing and UE association enhancements | Huawei, HiSilicon | Not treated |
R1‑132890 | Performance evaluation of small cell on/off | Huawei, HiSilicon | Noted |
R1‑132891 | Evaluations of legacy PSS/SSS/CRS for small cell discovery | Huawei, HiSilicon | Noted |
R1‑132892 | Potential enhancements for small cell discovery | Huawei, HiSilicon | Noted |
R1‑132893 | Radio-interface based synchronization mechanisms | Huawei, HiSilicon | Noted |
R1‑132894 | Physical layer support of upper layer aspects of small cell enhancements | Huawei, HiSilicon | Noted |
R1‑132895 | Discussion on remaining path loss and LOS probability issues | Huawei, HiSilicon | Noted |
R1‑132896 | Initial calibration of channel model | Huawei, HiSilicon | Not treated |
R1‑132897 | Channel coefficients generation and remaining antenna modeling issues | Huawei, HiSilicon | Not treated |
R1‑132898 | Evaluations for D2D communication | Huawei, HiSilicon | Noted |
R1‑132899 | System-level simulation results for D2D discovery | Huawei, HiSilicon | Not treated |
R1‑132900 | Link-level simulation results for D2D discovery | Huawei, HiSilicon | Noted |
R1‑132901 | CoMP scenarios and simulation assumptions for non-ideal backhaul | Huawei, HiSilicon | Not treated |
R1‑132902 | CoMP schemes for non-ideal backhaul and inter-eNodeB signaling | Huawei, HiSilicon | Not treated |
R1‑132903 | 3GPP Internal LS on the technologies for public protection and disaster relief communications associated with work on wrc-15 agenda item 1.3 | 3GPP ITU-R Ad Hoc, Telecom Italia | Noted |
R1‑132904 | Remaining Details of Path Loss for 3D Channel Modeling | Broadcom Corporation | Not treated |
R1‑132905 | Rel-12 SA WG2 Dependencies on RAN decisions | SA2 chair (Samsung) | Noted |
R1‑132906 | ProSe, GCSE_LTE and UPCON Analysis for Prioritization | SA2 chair (Samsung), SA1 chair (Vodafone) | Noted |
R1‑132907 | CFO and other results for PBCH correlation decoder for MTC coverage improvement | Sierra Wireless | Not treated |
R1‑132908 | An Analysis of Repetition and “Keep Trying” PBCH Decoding Methods | Sierra Wireless | Noted |
R1‑132909 | RAN2 Analyse SIB Decoding Techniques ASAP and new method | Sierra Wireless | Not treated |
R1‑132910 | System Acquisition Time Guidance | Sierra Wireless | Not treated |
R1‑132911 | Synchronization Procedures and Signals for D2D Discovery and Communication | Ericsson, ST-Ericsson | Noted |
R1‑132912 | Beacon Channel Design for D2D | Ericsson, ST-Ericsson | Not treated |
R1‑132913 | Evaluation on standalone NCT | Intel Corporation | Noted |
R1‑132914 | Solution for the collision between PSS/SSS and DM RS in NCT | Intel Corporation | Not treated |
R1‑132915 | Discussion on RRM measurement for NCT | Intel Corporation | Not treated |
R1‑132916 | Reduced CRS design for NCT | Intel Corporation | Not treated |
R1‑132917 | Views on transmission mode and QCL for NCT | Intel Corporation | Not treated |
R1‑132918 | MBMS support in NCT | Intel Corporation | Not treated |
R1‑132919 | Consideration on CSI-RS transmission for NCT | Intel Corporation | Not treated |
R1‑132920 | Discussion on downlink transmission for special subframe in TDD | Intel Corporation | Not treated |
R1‑132921 | Discussion on NCT indication | Intel Corporation | Not treated |
R1‑132922 | Remaining details of 4Tx codebook subsampling | Intel Corporation | Revised |
R1‑132923 | Discussion on performance and further details of UL PC for DL-UL interference mitigation | Intel Corporation | Noted |
R1‑132924 | Discussion on CSI measurements, reporting and transmission modes for LTE-TDD eIMTA | Intel Corporation | Not treated |
R1‑132925 | On DL-UL interference management in LTE-TDD systems with non-ideal backhaul | Intel Corporation | Noted |
R1‑132926 | Signaling mechanism for TDD UL/DL reconfiguration | Intel Corporation | Not treated |
R1‑132927 | HARQ aspect for TDD eIMTA | Intel Corporation | Not treated |
R1‑132928 | Discussion on details of new UE category/type for low cost MTC devices | Intel Corporation | Not treated |
R1‑132929 | Discussion on PSS/SSS coverage enhancements for low-cost MTC | Intel Corporation | Not treated |
R1‑132930 | Discussion on PRACH Coverage Enhancement for Low Cost MTC | Intel Corporation | Noted |
R1‑132931 | FDD-TDD joint operation: Deployment scenario and network/UE requirements | Intel Corporation | Withdrawn |
R1‑132932 | Solutions for FDD-TDD joint operation | Intel Corporation | Not treated |
R1‑132933 | Performance evaluation of small cell on/off | Intel Corporation | Noted |
R1‑132934 | Discussion and evaluation on small cell discovery | Intel Corporation | Revised |
R1‑132935 | EPDCCH ICIC in small cell environment | Intel Corporation | Noted |
R1‑132936 | Discussion on potential physical layer impact from higher-layer aspects of small cell enhancement | Intel Corporation | Noted |
R1‑132937 | UL control enhancements for small cell Environments | Intel Corporation | Not treated |
R1‑132938 | On 3D channel model extension | Intel Corporation | Not treated |
R1‑132939 | Initial calibration results of 3D channel model | Intel Corporation | Not treated |
R1‑132940 | On D2D communication design aspects in public safety scenarios | Intel Corporation | Noted |
R1‑132941 | D2D Discovery Design for Public Safety and General Scenarios | Intel Corporation | Not treated |
R1‑132942 | System-level Analysis of LTE-based D2D Discovery Protocol | Intel Corporation | Not treated |
R1‑132943 | Link-level Analysis of LTE-based D2D Discovery Design | Intel Corporation | Noted |
R1‑132944 | Discussion on backhaul link signalling for downlink CoMP | Intel Corporation | Not treated |
R1‑132945 | Evaluation of downlink CS/CB CoMP with non-ideal backhaul link | Intel Corporation | Not treated |
R1‑132946 | Simulation results and proposal for power control optimization in wind up | InToTally | Noted |
R1‑132947 | Downlink simulation results for multi-carrier HetNet in bursty traffic | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑132948 | Consideration on Common E-RGCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132949 | Considerations on NAISC in HetNet | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132950 | Considerations on SHO operation in HetNet | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑132951 | Downlink control channels reception in CRE region | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑132952 | Considerations on stand-alone NCT | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132953 | Handling of PRBs containing PSS/SSS on NCT | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132954 | RRM measurements for NCT | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132955 | Reduced CRS design on NCT | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132956 | Transmission modes and QCL behavior on NCT | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132957 | MBMS support on NCT | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132958 | (E)PHICH on NCT | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132959 | 36.211 CR0184R1 (Rel-12, B) Introduction of Rel 12 feature for Downlink MIMO Enhancement | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Noted - Revised |
R1‑132960 | 36.212 CR0154R1 (Rel-12, B) Introduction of Rel 12 feature for Downlink MIMO Enhancement | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Noted - Revised |
R1‑132961 | 36.213 CR0431R1 (Rel-12, B) Introduction of Rel 12 feature for Downlink MIMO Enhancement | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Noted - Revised |
R1‑132962 | Proposals for codebook subsampling for DL MIMO Enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132963 | Summary of Email Discussion for MU-CSI for DL MIMO Enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑132964 | Potential backhaul signalling enhancements for eIMTA interference mitigation | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132965 | Explicit L1 signalling of TDD UL-DL reconfiguration by UE-group-common EPDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132966 | Discussion on HARQ/scheduling in TDD eIMTA | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132967 | Considerations on UE category and capability for low cost MTC | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132968 | Coverage enhancement requirement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132969 | On scalable spectral efficiency for coverage enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132970 | Simplification of MTC UE operation in coverage enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132971 | Coverage enhancement for PRACH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132972 | Coverage enhancement for PBCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132973 | Coverage enhancement for (E)PDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132974 | Coverage enhancement for PDSCH/PUSCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑132975 | Deployment scenarios and network/UE requirements for TDD-FDD joint operation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132976 | Possible solutions for FDD-TDD joint operation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132977 | Coverage enhancement mode operations | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132978 | Possible solutions for FDD-TDD joint operation other than CA in LTE TDD-FDD joint operation | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Withdrawn |
R1‑132979 | Detection mechanism in determination of small cell on/off | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132980 | Performance analysis of semi-static and dynamic small cell ON/OFF | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Withdrawn |
R1‑132981 | Discussion of small cell discovery | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132982 | UL power control enhancement for small cell enhancement | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132983 | System analysis of radio-interface based synchronization | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132984 | Issues on L1 for dual connectivity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132985 | UCI consideration for dual connectivity | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132986 | 3D MIMO Performance under High-rise Scenario | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132987 | Proposals for 3D MIMO Channel Modelling in UMa | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, China Unicom | Noted |
R1‑132988 | Proposals for 3D MIMO Channel Modelling in UMi | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, China Unicom | Revised |
R1‑132989 | Proposals and Initial Calibration of 3D Channel model | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132990 | D2D Communication System design for broadcast, groupcast, and relay | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132991 | Groupcast resource allocation and performance analysis | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Withdrawn |
R1‑132992 | D2D Relay and performance analysis | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132993 | D2D interference mitigation and power control | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132994 | D2D timing | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132995 | D2D Discovery design for groupcast, broadcast, and relay | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132996 | D2D Discovery performance | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132997 | Evalution Results of eCoMP with non-ideal backhaul | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Withdrawn |
R1‑132998 | Proposals for X2 signalling enhancement for eCoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132999 | Evaluations on the benefits of standalone NCT | CATT | Noted |
R1‑133000 | Handling of PRBs containing PSS/SSS on NCT | CATT | Not treated |
R1‑133001 | RRM measurement for NCT | CATT | Not treated |
R1‑133002 | Discussion on reduced CRS for NCT | CATT | Not treated |
R1‑133003 | Transmission mode on NCT | CATT | Not treated |
R1‑133004 | Usage of TDD special subframes on NCT | CATT | Not treated |
R1‑133005 | Discussion on CSI-RS transmission on NCT | CATT | Not treated |
R1‑133006 | TBS optimization for NCT | CATT | Not treated |
R1‑133007 | MBMS support on NCT | CATT | Not treated |
R1‑133008 | EPHICH on NCT | CATT | Not treated |
R1‑133009 | Codebook subsampling for DL MIMO enhancement | CATT | Revised |
R1‑133010 | Remaining details of enhanced UL power control | CATT | Not treated |
R1‑133011 | UE measurements in TDD eIMTA | CATT | Revised |
R1‑133012 | Backhaul signaling of CCIM in TDD eIMTA | CATT | Noted |
R1‑133013 | Discussion on other interference mitigation schemes | CATT | Not treated |
R1‑133014 | Design of L1 signaling for UL-DL reconfiguration | CATT | Not treated |
R1‑133015 | HARQ design for TDD eIMTA | CATT | Not treated |
R1‑133016 | Other issues for TDD eIMTA | CATT | Not treated |
R1‑133017 | Discussion on new UE category/type for low cost MTC UE for LTE | CATT | Noted |
R1‑133018 | Downlink bandwidth reduction for low cost MTC UEs for LTE | CATT | Not treated |
R1‑133019 | [DRAFT] LS on low cost MTC UE for LTE | CATT | Not treated |
R1‑133020 | Coverage improvement for MTC UEs | CATT | Not treated |
R1‑133021 | Deployment scenarios of LTE FDD-TDD joint operation | CATT | Noted |
R1‑133022 | Potential solutions for LTE FDD-TDD joint operation | CATT | Noted |
R1‑133023 | Small cell DTX | CATT | Not treated |
R1‑133024 | Small cell discovery | CATT | Noted |
R1‑133025 | Air interface synchronization for small cells | CATT | Noted |
R1‑133026 | L1 support for dual connectivity | CATT | Noted |
R1‑133027 | Remaining details of large scale parameters for 3D channel modelling | CATT | Not treated |
R1‑133028 | Initial calibration results for 3D channel modelling | CATT | Not treated |
R1‑133029 | On topology and corresponding design of D2D communication | CATT | Not treated |
R1‑133030 | Considerations on D2D communication | CATT | Noted |
R1‑133031 | D2D broadcast communication | CATT | Noted |
R1‑133032 | Views on D2D discovery design | CATT | Not treated |
R1‑133033 | Resource allocation for D2D discovery | CATT | Revised |
R1‑133034 | Synchronization for D2D discovery | CATT | Not treated |
R1‑133035 | Preliminary evaluation results of D2D discovery | CATT | Withdrawn |
R1‑133036 | Preliminary evaluation results of coordinated scheduling with non-ideal backhaul | CATT | Not treated |
R1‑133037 | Signaling design for inter-eNB CoMP | CATT | Not treated |
R1‑133038 | Reduced CRS design for NCT | Sony | Not treated |
R1‑133039 | Details of narrow bandwidth design for low-complexity MTC UE | Sony | Revised |
R1‑133040 | On the dependency of UE outage on simulation time in bursty traffic simulation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑133041 | Paging and broadcast services for MTC UEs operating under coverage enhancement mode | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑133042 | Discussion of MBMS operation for NCT | ZTE | Not treated |
R1‑133043 | RRM measurement and Reduced CRS for NCT | ZTE | Not treated |
R1‑133044 | NCT scenarios for evaluation and deployment | ZTE | Not treated |
R1‑133045 | On Transport Block Sizes for NCT | ZTE | Not treated |
R1‑133046 | Further evaluation on stand-alone NCT | ZTE | Noted |
R1‑133047 | Collision between DMRS and PSS/SSS in NCT | ZTE | Not treated |
R1‑133048 | Transmission modes and QCL behaviour for NCT | ZTE | Not treated |
R1‑133049 | Evaluation of coordinated scheduling and coordinated beamforming with non ideal backhaul | ZTE | Not treated |
R1‑133050 | Signalling for inter-eNB operation | ZTE | Not treated |
R1‑133051 | Details of Signaling for TDD UL-DL Reconfiguration | ZTE | Not treated |
R1‑133052 | Issues about HARQ timing in eIMTA | ZTE | Noted |
R1‑133053 | UL PC enhancement in multi-cell scenario | ZTE | Not treated |
R1‑133054 | OI enhancement in multi-cell scenario | ZTE | Not treated |
R1‑133055 | DL interference measurement and CSI feedback enhancement in multi-cell scenario | ZTE | Noted |
R1‑133056 | Deployment Scenarios and Network/UE Requirements for LTE FDD-TDD Jonit Operation | ZTE | Not treated |
R1‑133057 | Possible Solutions for LTE FDD-TDD Jonit Operation other than CA | ZTE | Withdrawn |
R1‑133058 | New MTC UE category for LTE | ZTE | Noted |
R1‑133059 | Physical Broadcast Channel Coverage Enhancement | ZTE | Not treated |
R1‑133060 | Draft LS on new UE category for low cost MTC Ues | ZTE | Not treated |
R1‑133061 | Simplification of PHICH and PCFICH functionalities for coverage improvement MTC UE | ZTE | Not treated |
R1‑133062 | Discussion on Repetition for Control and Traffic Channel | ZTE | Not treated |
R1‑133063 | Physical Random Access Channel Coverage Enhancement | ZTE | Noted |
R1‑133064 | Discussion and perfomance evaluation on sub-sampling for 4Tx Rank1-2 codebook | ZTE | Noted |
R1‑133065 | Discussion and perfomance evaluation on sub-sampling for 4Tx Rank3-4 codebook | ZTE | Noted |
R1‑133066 | Initial calibration of 3D channel model | ZTE | Revised |
R1‑133067 | Consideration on LOS probability and pathloss model for 3D channel | ZTE | Not treated |
R1‑133068 | Discussion on fast fading model for 3D channel | ZTE | Not treated |
R1‑133069 | Evaluation and design considerations on small cell on/off scheme | ZTE | Revised |
R1‑133070 | Evalulation results on small cell discovery including link-level signal generation and detection | ZTE | Revised |
R1‑133071 | Performance impact on small cell scenarios with different number of detectable cells | ZTE | Not treated |
R1‑133072 | Measurements using small cell discovery signal | ZTE | Withdrawn |
R1‑133073 | ABS enhancement for small cell | ZTE | Noted |
R1‑133074 | Consideration on Radio-interface Based Synchronization | ZTE | Noted |
R1‑133075 | Physical layer aspects of dual connectivity | ZTE | Not treated |
R1‑133076 | Performance evaluation on power setting for small cell | ZTE | Withdrawn |
R1‑133077 | Discussion and perfomance evaluation on sub-sampling for 4Tx Rank1-2 codebook | ZTE | Withdrawn |
R1‑133078 | Discussion and perfomance evaluation on sub-sampling for 4Tx Rank3-4 codebook | ZTE | Withdrawn |
R1‑133079 | Initial calibration of 3D channel model | ZTE | Withdrawn |
R1‑133080 | Consideration on LOS probability and pathloss model for 3D channel | ZTE | Withdrawn |
R1‑133081 | Discussion on fast fading model for 3D channel | ZTE | Withdrawn |
R1‑133082 | Discussion on RRC parameter name in RAN1 specifications | Samsung | Revised |
R1‑133083 | Draft CR on EPDCCH search space for cross-carrier scheduling | Samsung | Noted - Revised |
R1‑133084 | NCT considerations and implications | Samsung | Noted |
R1‑133085 | Performance evaluations of NCT and BCT | Samsung | Revised |
R1‑133086 | Discussion on MCH support on NCT | Samsung | Not treated |
R1‑133087 | Discussion on codebook subsampling for 4Tx DL MIMO enhancement | Samsung | Not treated |
R1‑133088 | Discussion on support for MU-CSI | Samsung | Not treated |
R1‑133089 | Inter-eNB coordination for eIMTA | Samsung | Noted |
R1‑133090 | UL power control for eIMTA | Samsung | Noted |
R1‑133091 | CRS handling in flexible subframes | Samsung | Not treated |
R1‑133092 | Subframe set based mechanism to support TDD UL-DL reconfiguration | Samsung | Not treated |
R1‑133093 | Evaluation results for power control based inteference mitigation | Samsung | Not treated |
R1‑133094 | Signaling for TDD UL-DL reconfiguration | Samsung | Not treated |
R1‑133095 | On PDSCH HARQ transmission | Samsung | Not treated |
R1‑133096 | On PUSCH HARQ transmission | Samsung | Not treated |
R1‑133097 | Discussion on transmisson modes to support eIMTA | Samsung | Not treated |
R1‑133098 | Discussion on other potential issues for TDD UL/DL reconfigurations | Samsung | Not treated |
R1‑133099 | UE category/type for low cost and enhanced coverage MTC UE | Samsung | Not treated |
R1‑133100 | Coverage enhancements for MTC UEs | Samsung | Not treated |
R1‑133101 | Deployment scenarios and network/UE requirements for LTE TDD/FDD CA | Samsung | Not treated |
R1‑133102 | Solutions for FDD-TDD joint operation | Samsung | Noted |
R1‑133103 | Evaluation results for small cell on/off in SCE scenario 1 | Samsung | Not treated |
R1‑133104 | Evaluation results for small cell on/off in SCE scenario 2a | Samsung | Not treated |
R1‑133105 | Evaluation results for small cell on/off in SCE scenario 3 | Samsung | Not treated |
R1‑133106 | Performance evaluation of dynamic on/off operation for small cells | Samsung | Not treated |
R1‑133107 | Discussion on small cell discovery | Samsung | Revised |
R1‑133108 | ABS enhancements for interference mitigation in small cells | Samsung | Noted |
R1‑133109 | ICIC for EPDCCH in SCE | Samsung | Noted |
R1‑133110 | Discussion on load shifting for small cells | Samsung | Noted |
R1‑133111 | Physical layer considerations for dual connectivity | Samsung, CHTTL | Not treated |
R1‑133112 | SLS results for 256QAM in small cell scenario 3 | Samsung | Not treated |
R1‑133113 | Remaining details of PL for 3D channel Modeling | Samsung | Revised |
R1‑133114 | Channel coefficient generation in 3D channel modeling | Samsung | Not treated |
R1‑133115 | Initial calibration of 3D channel modeling | Samsung | Not treated |
R1‑133116 | Remaining details on evaluation assumptions for 3D channel modeling | Samsung, CHTTL | Not treated |
R1‑133117 | Discussion on D2D group communication | Samsung | Not treated |
R1‑133118 | Discussion on relay functionality for D2D group communication | Samsung | Not treated |
R1‑133119 | Performance and design considerations for D2D groupcast/broadcast | Samsung | Revised |
R1‑133120 | Performance evaluation of D2D discovery | Samsung | Not treated |
R1‑133121 | Inband emission impact on D2D discovery | Samsung | Not treated |
R1‑133122 | TR skeleton of CoMP for LTE with non-ideal backhaul | Samsung | Noted - Revised |
R1‑133123 | Evaluation assumptions for CoMP with non-ideal backhaul | Samsung | Noted |
R1‑133124 | Discussion on signalling for inter-eNB CoMP operation | Samsung | Not treated |
R1‑133125 | Consideration on TBS of NCT | Fujitsu | Not treated |
R1‑133126 | Discussion on remaining details of CSI feedback modes | Fujitsu | Noted |
R1‑133127 | Discussion on resource usage for MTC-UE coverage enhancement | Fujitsu | Withdrawn |
R1‑133128 | New UE category/type for MTC operation | Fujitsu | Not treated |
R1‑133129 | MTC PBCH Limitations | Fujitsu | Not treated |
R1‑133130 | Repetitive Patterns Impact upon MTC Device Overall Access Latency | Fujitsu | Revised |
R1‑133131 | Discussion on the impact of repetition on EPDCCH | Fujitsu | Not treated |
R1‑133132 | Clarification on MTC Band Allocation | Fujitsu | Not treated |
R1‑133133 | MTC PRACH Limitations | Fujitsu | Revised |
R1‑133134 | Evaluation and discussion on small cell on/off | Fujitsu | Withdrawn |
R1‑133135 | Discussion on efficient discovery of small cells | Fujitsu | Noted |
R1‑133136 | Consideration on Interference coordination for EPDCCH in small cell | Fujitsu | Noted |
R1‑133137 | CQI measurement/feedback considering dynamic change of traffic in small-cell deployment | Fujitsu | Not treated |
R1‑133138 | Discussion on physical layer impacts of dual-connecitivity | Fujitsu | Noted |
R1‑133139 | Initial calibration results for 3D channel modeling | Fujitsu | Revised |
R1‑133140 | Cluster-based unified D2D direct communication | Fujitsu | Not treated |
R1‑133141 | High-level views on D2D physical channel design and multiple-access scheme | Fujitsu | Withdrawn |
R1‑133142 | On D2D broadcast communication | Fujitsu | Not treated |
R1‑133143 | D2D discovery and synchronization based on cluster | Fujitsu | Not treated |
R1‑133144 | Discussion on D2D discovery | Fujitsu | Not treated |
R1‑133145 | Views on signaling for inter-eNB CoMP operation | Fujitsu | Not treated |
R1‑133146 | Discussions on Public Safety Broadcast Communication | ZTE | Noted |
R1‑133147 | Discussions on LTE Device to Device Communication | ZTE | Withdrawn |
R1‑133148 | Study On D2D Communication | ZTE | Not treated |
R1‑133149 | Discussion of D2D Discovery | ZTE | Not treated |
R1‑133150 | Handling PSS/SSS on NCT | Broadcom | Not treated |
R1‑133151 | MU-CSI for Release 12 | Broadcom | Not treated |
R1‑133152 | Spectral efficiency enhancements for SCE | Broadcom | Withdrawn |
R1‑133153 | discussion on S-NCT for release 12 | Broadcom | Noted |
R1‑133154 | discussion on TDD-FDD joint operations and scenarios | Broadcom | Withdrawn |
R1‑133155 | eICIC / CoMP signalling extensions for NCT | Intel Corporation | Not treated |
R1‑133156 | Discussion on PUCCH Coverage Enhancement for Low Cost MTC | Intel Corporation | Not treated |
R1‑133157 | Discussion on PBCH Coverage Enhancement for Low Cost MTC | Intel Corporation | Not treated |
R1‑133158 | Inter-SC UE reallocation to support SC on-off operation | Intel Corporation | Not treated |
R1‑133159 | Preliminary results for the second phase calibration of 3D channel model | Intel Corporation | Not treated |
R1‑133160 | System level analysis of D2D broadcast communication in public safety scenarios | Intel Corporation | Noted |
R1‑133161 | System level analysis of D2D groupcast communication in public safety scenarios | Intel Corporation | Not treated |
R1‑133162 | Discussion on synchronization options for D2D operation | Intel Corporation | Not treated |
R1‑133163 | Evaluation of uplink CoMP schemes with non-ideal backhaul link | Intel Corporation | Not treated |
R1‑133164 | System-Level Performance of Standalone NCT | Texas Instruments | Revised |
R1‑133165 | On Reduced CRS design for NCT | Texas Instruments | Not treated |
R1‑133166 | Remaining issues of 4Tx codebook subsampling | Texas Instruments | Revised |
R1‑133167 | Dynamic signaling for TDD UL/DL Reconfiguration | Texas Instruments | Not treated |
R1‑133168 | Deployment Scenarios and Requirements for Joint TDD-FDD Operation | Texas Instruments | Not treated |
R1‑133169 | System-Level Performance of Dynamic eNodeB Dormancy | Texas Instruments | Revised |
R1‑133170 | Physical layer aspects of Dual Connectivity | Texas Instruments | Noted |
R1‑133171 | Consideration on CoMP signaling for non-ideal backhaul | Texas Instruments | Not treated |
R1‑133172 | Transmission Mode and QCL behavior for NCT | InterDigital | Not treated |
R1‑133173 | On eMBMS support and PMCH operation for NCT | InterDigital | Not treated |
R1‑133174 | Evaluation results for interference mitigation schemes | InterDigital | Withdrawn |
R1‑133175 | On signaling and fallback operation for TDD UL-DL reconfiguration | InterDigital | Not treated |
R1‑133176 | Specification impacts of cost-reduction techniques for low cost UE | InterDigital | Not treated |
R1‑133177 | Scenarios and requirements for LTE TDD-FDD joint operation | InterDigital | Noted |
R1‑133178 | D2D Communications | InterDigital | Noted |
R1‑133179 | Evaluation results for D2D Discovery with PRACH and SRS | InterDigital | Not treated |
R1‑133180 | Design aspects for D2D discovery | ETRI | Not treated |
R1‑133181 | Unicast, groupcast/broadcast, and relay for public safety D2D communications | ETRI | Not treated |
R1‑133182 | Physical layer aspects of dual connectivity | ETRI | Not treated |
R1‑133183 | Mechanisms and signal design for small cell discovery | ETRI | Not treated |
R1‑133184 | Discussion on FDD-TDD joint operation solutions | ETRI | Not treated |
R1‑133185 | Considerations on Pilot Design for D2D Communications | ETRI | Not treated |
R1‑133186 | Typical Public Safety Use Cases , Performance Values, and E-UTRAN Characteristics of D2D ProSe Group Communication | U.S. Department Of Commerce | Noted |
R1‑133187 | Reusing Single Cell MBMS for D2D Group Communication | III | Not treated |
R1‑133188 | UE-Relay for Device-to-Device Proximity Services | III | Not treated |
R1‑133189 | Improving MTC coverage for PUSCH in FDD | III | Not treated |
R1‑133190 | Discussion on Standalone NCT | China Telecom | Noted |
R1‑133191 | Performance Evaluation and Procedure Analysis of Small Cell On/Off for SCE | China Telecom | Noted |
R1‑133192 | Small Cell Discovery | China Telecom | Not treated |
R1‑133193 | Discussion on dual connectivity | China Telecom | Not treated |
R1‑133194 | Proposed Work Plan for LTE Coverage Enhancements WI | China Telecom | Revised |
R1‑133195 | 36.213 CR0432 (Rel-11, F) Correction for EPDCCH Search Space | Panasonic | Agreed |
R1‑133196 | 36.211 draft CR: Correction to QCL behaviour on CRS | Panasonic, Renesas Mobile Europe Ltd, Fujitsu | Noted - Revised |
R1‑133197 | 36.213 draft CR: Correction to QCL behaviour on CRS | Panasonic, Renesas Mobile Europe Ltd, Fujitsu | Noted - Revised |
R1‑133198 | Discussion on CP length and intra-band CA | Panasonic | Revised |
R1‑133199 | Discussion on multiple subframe channel estimation | Panasonic | Noted |
R1‑133200 | Evaluation of S-NCT compared to BCT | Panasonic | Not treated |
R1‑133201 | UL power control method to mitigate interference in eIMTA | Panasonic | Not treated |
R1‑133202 | Downlink measurement set in eIMTA | Panasonic | Not treated |
R1‑133203 | Analysis and proposal for explicit+implicit reconfiguration signalling | Panasonic | Not treated |
R1‑133204 | Reconfiguration message transmission details | Panasonic | Not treated |
R1‑133205 | HARQ timing and behaviour during reconfiguration | Panasonic | Noted |
R1‑133206 | Evaluation of small cell on/off with feasible time scale | Panasonic | Revised |
R1‑133207 | Performance evaluation on small cell discovery | Panasonic | Noted |
R1‑133208 | ICIC of EPDCCH | Panasonic | Noted |
R1‑133209 | Number of event calculation regarding HO and ICIC | Panasonic | Withdrawn |
R1‑133210 | Minimum function discussion in D2D communication | Panasonic | Not treated |
R1‑133211 | Master-slave and peer-to-peer structure comparison in D2D communication | Panasonic | Not treated |
R1‑133212 | D2D synchronization requirements | Panasonic | Not treated |
R1‑133213 | Beamforming with Coordinated Sounding (BF-CoS) exploiting TDD channel reciprocity | DAC-UPC, IAESI | Not treated |
R1‑133214 | Coordinated Sounding for CoMP BF (CoMP BF-CoS) exploiting TDD channel reciprocity | DAC-UPC, IAESI | Not treated |
R1‑133215 | Collaborative distributed scheduling | IAESI, DAC-UPC | Not treated |
R1‑133216 | X2 support for collaborative distributed scheduling | IAESI | Not treated |
R1‑133217 | Scennarios of TDD-FDD joint operation in the same frequency band | IAESI | Revised |
R1‑133218 | Solutions for TDD-FDD joint operation in the same frequency band | IAESI | Revised |
R1‑133219 | Justification of over-the-air X2 transport for LTE CoMP | IAESI | Revised |
R1‑133220 | Inter-cell collaboration for a correct decission on Small Cell on-off | IAESI | Not treated |
R1‑133221 | Further PBCH coverage extension requirement in low-complexity UEs | Sony | Not treated |
R1‑133222 | Correction on the ratio of PDSCH EPRE to CRS EPRE for TM10 | Sharp | Noted - Revised |
R1‑133223 | Evaluation of benefits for standalone NCT | Sharp | Revised |
R1‑133224 | Evaluation of the number of subframe sets required for enhanced UL PC | Sharp | Not treated |
R1‑133225 | Separate TPC command and accumulation for enhanced UL PC | Sharp | Not treated |
R1‑133226 | Details of application of open-loop PC parameters for each uplink physical channel | Sharp | Not treated |
R1‑133227 | Enhancements of DL CSI measurements for eIMTA | Sharp | Noted |
R1‑133228 | Fallback operation and reliability improvement of explicit L1 signalling for DL-UL reconfiguration | Sharp | Not treated |
R1‑133229 | UE-group-common EPDCCH for TDD DL-UL reconfiguration signaling | Sharp | Not treated |
R1‑133230 | Comparison of HARQ-ACK timing approaches for eIMTA cell | Sharp | Not treated |
R1‑133231 | Frequency location of PDSCH for low-cost MTC UE | Sharp | Not treated |
R1‑133232 | Deployment scenarios and requirements for TDD-FDD CA | Sharp | Not treated |
R1‑133233 | Discussion on Network Assisted Interference Cancellation in Heterogeneous Networks | Renesas Mobile Europe Ltd | Noted |
R1‑133234 | Discussion on TDM scheduling | Renesas Mobile Europe Ltd | Noted |
R1‑133235 | PSS/SSS mapping in NCT | Renesas Mobile Europe Ltd | Not treated |
R1‑133236 | RRM for non-standalone NCT | Renesas Mobile Europe Ltd | Not treated |
R1‑133237 | CSI measurement and reporting in TDD eIMTA | Renesas Mobile Europe Ltd | Not treated |
R1‑133238 | Performance Comparison of Interference Mitigation Schemes with Dynamic TDD UL/DL configuration in Multi-Cell Pico Deployment Scenario | Renesas Mobile Europe Ltd | Not treated |
R1‑133239 | Cell-Clustering in Rel-12 Deployment Scenarios | Renesas Mobile Europe Ltd | Not treated |
R1‑133240 | Cell-Clustering in Modified Rel-12 Small-Cell Scenarios | Renesas Mobile Europe Ltd | Not treated |
R1‑133241 | Discussions on common signaling design in TDD eIMTA | Renesas Mobile Europe Ltd | Not treated |
R1‑133242 | HARQ aspects in TDD eIMTA | Renesas Mobile Europe Ltd | Not treated |
R1‑133243 | Backwards compatibility in TDD eIMTA | Renesas Mobile Europe Ltd | Not treated |
R1‑133244 | Simulation results on small cell discovery | Renesas Mobile Europe Ltd | Noted |
R1‑133245 | On the number of physical cell identities in small cell scenarios | Renesas Mobile Europe Ltd | Noted |
R1‑133246 | Cell association and load balancing/shifting | Renesas Mobile Europe Ltd | Noted |
R1‑133247 | ProSe Broadcast transmission | Renesas Mobile Europe Ltd | Noted |
R1‑133248 | Synchronization in ProSe UE discovery | Renesas Mobile Europe Ltd | Not treated |
R1‑133249 | CoMP operation with non-ideal backhaul | Renesas Mobile Europe Ltd | Noted |
R1‑133250 | Usage of PRBs containing PSS/SSS in NCT | HTC | Not treated |
R1‑133251 | On Aperiodic CSI Reporting in TDD eIMTA Systems | HTC | Not treated |
R1‑133252 | Discussion on TDD UL-DL Reconfiguration in TDD eIMTA Systems | HTC | Not treated |
R1‑133253 | On HARQ Timing Issues in TDD eIMTA Systems | HTC | Not treated |
R1‑133254 | UL DMRS Enhancement in MBSFN Subframes in TDD eIMTA Systems | HTC | Not treated |
R1‑133255 | Deployment Scenarios of Joint FDD/TDD Operation | HTC | Not treated |
R1‑133256 | FDD-TDD Joint Operation Other Than CA | HTC | Not treated |
R1‑133257 | Small cell on/off for interference mitigation | HTC | Not treated |
R1‑133258 | Discussion on small cell discovery | HTC | Not treated |
R1‑133259 | Interference avoidance and coordination for small cells | HTC | Withdrawn |
R1‑133260 | Discussion on Radio-interface based Synchronization for Small Cell | HTC | Noted |
R1‑133261 | Physical Layer Considerations on Dual Connectivity | HTC | Not treated |
R1‑133262 | Construction of D2D relay communication in public safety scenario | HTC | Not treated |
R1‑133263 | Construction of D2D group-cast communication in public safety scenario | HTC | Not treated |
R1‑133264 | D2D Communication and Resource Allocation | HTC | Withdrawn |
R1‑133265 | Considerations on designs for D2D discovery | HTC | Not treated |
R1‑133266 | D2D Discovery Schemes | HTC | Withdrawn |
R1‑133267 | Considerations on Assumptions for CoMP Evaluations | Ericsson, ST-Ericsson | Not treated |
R1‑133268 | Signaling for Inter-eNB Operation of CoMP | Ericsson, ST-Ericsson | Not treated |
R1‑133269 | NLOS path loss for 3D-Channel Model | Ericsson, ST-Ericsson | Not treated |
R1‑133270 | LOS path loss for 3D-Channel Model | Ericsson, ST-Ericsson | Not treated |
R1‑133271 | Elevation Direction of Departure Characteristics for 3D-Channel Model | Ericsson, ST-Ericsson | Not treated |
R1‑133272 | Additional Metrics to Calibrate for 3D-Channel Model | Ericsson, ST-Ericsson | Not treated |
R1‑133273 | Height Dependent LOS Probability for 3D-Channel Model | Ericsson, ST-Ericsson | Not treated |
R1‑133274 | Traffic model for evaluation of CoMP with non-ideal backhaul | Samsung | Not treated |
R1‑133275 | Backhaul signalling support and simulation evaluations for eCCIM | Coolpad | Not treated |
R1‑133276 | Discussion on eIMTA control signaling mechanisms | Coolpad | Not treated |
R1‑133277 | The performance evaluation for legacy and R12 UE in hybrid networking scenario | Coolpad | Not treated |
R1‑133278 | Discussion on dynamic ON/OFF scheme | Coolpad | Not treated |
R1‑133279 | Considerations on dynamic ON/OFF scheme | Coolpad | Not treated |
R1‑133280 | Views on support of standalone NCT in Release 12 | MediaTek Inc. | Not treated |
R1‑133281 | Uplink power control in TDD eIMTA | MediaTek Inc. | Not treated |
R1‑133282 | Discussion on HARQ-ACK resource in TDD eIMTA systems | MediaTek Inc. | Not treated |
R1‑133283 | HARQ details in TDD eIMTA | MediaTek Inc. | Not treated |
R1‑133284 | New UE category/type for MTC | MediaTek Inc. | Noted |
R1‑133285 | Discussion on the functionality of PHICH and PUCCH for the coverage improvement | MediaTek Inc. | Not treated |
R1‑133286 | Evaluation and discussion on the coverage improvement for PBCH | MediaTek Inc. | Not treated |
R1‑133287 | Evaluation and analysis on downlink control channel | MediaTek Inc. | Not treated |
R1‑133288 | Deployment scenarios of FDD-TDD joint operation | MediaTek Inc. | Not treated |
R1‑133289 | Dual mode operation in the FDD-TDD scenario | MediaTek Inc. | Noted |
R1‑133290 | Performance evaluation for small cell discovery using legacy schemes | MediaTek Inc. | Revised |
R1‑133291 | Performance evaluation for small cell discovery using new schemes based on CSI-RS and PRS | MediaTek Inc. | Noted |
R1‑133292 | Performance evaluation for small cell discovery using new scheme based on CRS | MediaTek Inc. | Revised |
R1‑133293 | Performance evaluation on schemes of small cell load balancing | MediaTek Inc. | Noted |
R1‑133294 | Views on physical-layer support of dual connectivity | MediaTek Inc. | Noted |
R1‑133295 | DPCH Slot Format Optimization Performance Update | MediaTek Inc. | Noted - Revised |
R1‑133296 | Early Termination Performance Update | MediaTek Inc. | Agreed |
R1‑133297 | Time Division Multiplexing Feature Performance Update | MediaTek Inc. | Noted |
R1‑133298 | TP on DCH Enhancements | MediaTek Inc. | Not treated |
R1‑133299 | Link Level Simulations to Clarify the Impact of CRS Interference | KDDI | Not treated |
R1‑133300 | Scenarios and Requirements for TDD-FDD Joint Operation | KDDI | Noted |
R1‑133301 | Necessity of Small Cell on/off for Common Channel Interference Mitigation | KDDI | Not treated |
R1‑133302 | Views on Radio-Interface Based Synchronization | KDDI | Noted |
R1‑133303 | Impacts of Dual Connectivity for Single RF UEs | KDDI | Noted |
R1‑133304 | Views on the Use of 3D Distance in 3D Pathloss Formulas | KDDI | Not treated |
R1‑133305 | Views on the BP Distance in 3D Pathloss Modeling and Suggestion of a “Breakpoint Height” | KDDI | Not treated |
R1‑133306 | Views on the Minimum Distance in 3D UMa and 3D UMi | KDDI | Not treated |
R1‑133307 | A Case for the Introduction of High-Rise-Building Scenario(s) with Supporting Initial Calibration Results | KDDI | Revised |
R1‑133308 | Views on the Setting of Correlation Parameter in the Array Antenna Pattern for 3D MIMO Channel Modeling | KDDI | Not treated |
R1‑133309 | Preferences for the Tilting Angle in Calibration Case 1 Based upon Observations Drawn from Initial Calibration Results | KDDI | Not treated |
R1‑133310 | On the Misalignment of RAN1 and RAN4 Definitions of the Electrical Tilt Angle: Views and Reconciliation Preferences | KDDI | Not treated |
R1‑133311 | Views on D2D communication | KDDI | Not treated |
R1‑133312 | Discussion on D2D discovery signaling | KDDI | Not treated |
R1‑133313 | Discussion of CoMP with Non-Ideal Backhaul | ITRI | Not treated |
R1‑133314 | HARQ feedback issue in TDD eIMTA system | ITRI | Not treated |
R1‑133315 | HARQ timeline for TDD eIMTA | ITRI | Not treated |
R1‑133316 | UL power control enhancement and CSI enhancement for TDD eIMTA | ITRI | Not treated |
R1‑133317 | UL power control enhancement with multiple sets of power control parameters for TDD eIMTA | ITRI | Not treated |
R1‑133318 | Views on small cell discovery | ITRI | Not treated |
R1‑133319 | PBCH Coverage Extension for MTC Devices | ITRI | Not treated |
R1‑133320 | Timing Offset and Carrier Frequency Offset Impacts to ProSe Discovery Preamble Detection Algorithms | ITRI | Not treated |
R1‑133321 | Power consumption evaluation for D2D discovery | ITRI | Not treated |
R1‑133322 | Discussion on HARQ for eIMTA | CATR | Not treated |
R1‑133323 | Scenarios and requirements for LTE TDD-FDD Joint operation | CATR | Not treated |
R1‑133324 | Views and evaluations on small cell on/off | CATR | Noted |
R1‑133325 | Radio –interface based synchronization enhancements | CATR | Not treated |
R1‑133326 | Initial calibration results of 3D channel model | CATR | Not treated |
R1‑133327 | Considerations on Small Cell Discovery signal | CATR | Not treated |
R1‑133328 | Discussion on support of TDD special subframes in NCT | CATR | Not treated |
R1‑133329 | [Draft] CR on correction to higher layer parameter name for EPDCCH resource mapping | NEC Group | Noted - Revised |
R1‑133330 | Miscellaneous corrections to TS36.213 ver.11.3.0 | NEC Group | Noted |
R1‑133331 | Collision between PRS and EPDCCH in different CP case | NEC Group | Noted - Revised |
R1‑133332 | Performance results of stand-alone NCT vs. BCT | NEC Group | Noted |
R1‑133333 | Flexible time locations for PSS/SSS on the NCT | NEC Group | Not treated |
R1‑133334 | On Reduced-CRS transmission bandwidth and subframes for NCT | NEC Group | Not treated |
R1‑133335 | ePHICH design for NCT | NEC Group | Not treated |
R1‑133336 | Codebook subsampling for enhanced 4TX Codebook | NEC Group | Revised |
R1‑133337 | Discussions on Interference Mitigation Schemes for LTE TDD eIMTA | NEC Group | Not treated |
R1‑133338 | Reconfiguration signalling for eIMTA system | NEC Group | Not treated |
R1‑133339 | Backward compatibility for TDD eIMTA system | NEC Group | Not treated |
R1‑133340 | HARQ-timing for TDD eIMTA system | NEC Group | Not treated |
R1‑133341 | UL&DL timing coupling issue for TDD eIMTA system | NEC Group | Not treated |
R1‑133342 | Techniques for data channel coverage improvement | NEC Group | Not treated |
R1‑133343 | Deployment scenarios and requirements for TDD – FDD joint operation | NEC Group | Not treated |
R1‑133344 | Possible solutions other than CA for TDD – FDD joint operation | NEC Group | Withdrawn |
R1‑133345 | Physical layer aspects for dual layer connectivity in small cells | NEC Group | Noted |
R1‑133346 | Remaining Issues for UMi Path loss in 3D Channel Model | NEC Group | Not treated |
R1‑133347 | Initial calibration of Large Scale channel modeling | NEC Group | Not treated |
R1‑133348 | Discussion on D2D communication | NEC Group | Not treated |
R1‑133349 | Network-assisted Device Discovery mechanism | NEC Group | Not treated |
R1‑133350 | Analysis of Alternatives for Modifying SCM for D2D channel | NEC Group | Not treated |
R1‑133351 | Doppler filter for a D2D link level simulator | NEC Group | Not treated |
R1‑133352 | Further consideration on the collision between PSS/SSS and DMRS | FiberHome | Not treated |
R1‑133353 | Consideration on detail designs for Reduced CRS | FiberHome | Not treated |
R1‑133354 | Load Aware Assisted Cell (re)selection for Small Cell Deployments | FiberHome | Not treated |
R1‑133355 | Correction on EPDCCH assignment procedure | FiberHome | Noted |
R1‑133356 | Correction to the PUCCH power control in Rel-11 | LG Electronics | Noted |
R1‑133357 | Evaluation results on standalone NCT compared to BCT | LG Electronics | Noted |
R1‑133358 | Discussions on PSS/SSS and DM-RS collision in NCT | LG Electronics | Not treated |
R1‑133359 | On QCL behavior in NCT | LG Electronics | Not treated |
R1‑133360 | PHICH for NCT | LG Electronics | Not treated |
R1‑133361 | Support of TDD special subframe for the new carrier type | LG Electronics | Not treated |
R1‑133362 | Consideration on 4Tx codebook subsampling | LG Electronics | Not treated |
R1‑133363 | Uplink Power Control for Dynamic TDD UL-DL Reconfigurations | LG Electronics | Noted |
R1‑133364 | CSI Measurement and Report for TDD eIMTA | LG Electronics | Noted |
R1‑133365 | Backhaul Signaling for Dynamic TDD UL-DL Reconfigurations | LG Electronics | Not treated |
R1‑133366 | Details of UL-DL Reconfiguration Message | LG Electronics | Not treated |
R1‑133367 | HARQ Timeline and Feedback for TDD eIMTA | LG Electronics | Not treated |
R1‑133368 | Other Design Aspects for TDD eIMTA | LG Electronics | Not treated |
R1‑133369 | Support of low cost features and enhanced coverage for the MTC UEs | LG Electronics | Not treated |
R1‑133370 | Initial procedure and consideration points for the coverage enhancement of MTC UEs | LG Electronics | Not treated |
R1‑133371 | Discussions on PBCH coverage enhancement for MTC | LG Electronics | Not treated |
R1‑133372 | CA-based aspects for FDD-TDD joint operation | LG Electronics | Not treated |
R1‑133373 | Discussion on scenarios and UE requirements for TDD-FDD joint operation | LG Electronics | Noted |
R1‑133374 | Solutions for TDD-FDD joint operation | LG Electronics | Not treated |
R1‑133375 | Discussions on small cell on/off mechanisms with discovery signals | LG Electronics | Not treated |
R1‑133376 | Simulation results on small cell on/off schemes | LG Electronics | Revised |
R1‑133377 | Evaluation results of small cell discovery | LG Electronics | Noted |
R1‑133378 | Discussions on ICIC enhancement for efficient small cell operation | LG Electronics | Noted |
R1‑133379 | Discussions on physical layer support on dual connectivity | LG Electronics | Not treated |
R1‑133380 | Remaing details of height-dependent pathloss modeling | LG Electronics | Not treated |
R1‑133381 | Clarification on distance measure assumptions | LG Electronics | Revised |
R1‑133382 | Discussion on 3D-channel fast fading modeling | LG Electronics | Not treated |
R1‑133383 | Initial results and discussion for 3D-channel calibration | LG Electronics | Not treated |
R1‑133384 | Synchronization for D2D Communications | LG Electronics | Noted |
R1‑133385 | Resource Management for D2D Communications | LG Electronics | Revised |
R1‑133386 | Enhancements for Efficient Relaying Operations | LG Electronics | Not treated |
R1‑133387 | Synchronization for D2D Discovery | LG Electronics | Not treated |
R1‑133388 | Resource Allocation and UE Behavior for Discovery Type 1 and Type 2 | LG Electronics | Not treated |
R1‑133389 | Issues in Signal Transmissions and Receptions in D2D Operations | LG Electronics | Not treated |
R1‑133390 | Evaluation results for CoMP with non-ideal backhaul | LG Electronics | Not treated |
R1‑133391 | Inter-eNB signaling for semi-static CoMP operations | LG Electronics | Not treated |
R1‑133392 | Mechanisms for Small Cell On/Off Operation | InterDigital | Noted |
R1‑133393 | Enhancements for Cell Association with Small Cell On/Off | InterDigital | Not treated |
R1‑133394 | Discovery of Small Cells | InterDigital | Noted |
R1‑133395 | System Performance Benefits of Dual connectivity | InterDigital | Noted |
R1‑133396 | Physical layer aspects of dual connectivity | InterDigital | Noted |
R1‑133397 | Remaining Details on 3D Channel Model | InterDigital | Not treated |
R1‑133398 | Evaluation Results for Initial Calibration of 3D Channel Model | InterDigital | Not treated |
R1‑133399 | Spectral efficiency gains with the standalone NCT | Ericsson, ST-Ericsson | Noted |
R1‑133400 | Discussion on benefits with the standalone NCT | Ericsson, ST-Ericsson | Noted |
R1‑133401 | PSS/SSS considerations on the NCT | Ericsson, ST-Ericsson | Not treated |
R1‑133402 | RRM on the NCT | Ericsson, ST-Ericsson | Noted |
R1‑133403 | On bandwidth of ESS | Ericsson, ST-Ericsson | Not treated |
R1‑133404 | Transmission mode handling for NCT | Ericsson, ST-Ericsson | Not treated |
R1‑133405 | Quasi Co-Location Assumptions for NCT | Ericsson, ST-Ericsson | Not treated |
R1‑133406 | On CSI-RS and CSI-IM for NCT | Ericsson, ST-Ericsson | Not treated |
R1‑133407 | On EPDCCH operation for NCT | Ericsson, ST-Ericsson | Not treated |
R1‑133408 | On ePHICH operation for NCT | Ericsson, ST-Ericsson | Not treated |
R1‑133409 | Handling of TBS table on NCT | Ericsson, ST-Ericsson | Not treated |
R1‑133410 | On Dynamic TDD on NCT | Ericsson, ST-Ericsson | Not treated |
R1‑133411 | Codebook subsampling for PUCCH mode 1-1, sub-mode 1 | Ericsson, ST-Ericsson | Not treated |
R1‑133412 | Codebook subsampling for PUCCH mode 1-1, sub-mode 2 | Ericsson, ST-Ericsson | Not treated |
R1‑133413 | Codebook subsampling for PUCCH mode 2-1 | Ericsson, ST-Ericsson | Not treated |
R1‑133414 | On CSI enhancements for Dynamic TDD | Ericsson, ST-Ericsson | Not treated |
R1‑133415 | Further details on enhanced uplink power control | Ericsson, ST-Ericsson | Noted |
R1‑133416 | Efficient use of explicit signaling | Ericsson, ST-Ericsson | Not treated |
R1‑133417 | On efficient transmission of explicit signaling | Ericsson, ST-Ericsson | Not treated |
R1‑133418 | HARQ and scheduling timing for eIMTA | Ericsson, ST-Ericsson | Not treated |
R1‑133419 | Low complexity MTC UE | Ericsson, ST-Ericsson | Noted |
R1‑133420 | Coverage enhancement targets for MTC UE | Ericsson, ST-Ericsson | Not treated |
R1‑133421 | Control of amount of coverage enhancement for MTC UE | Ericsson, ST-Ericsson | Not treated |
R1‑133422 | System information for enhanced coverage MTC UE | Ericsson, ST-Ericsson | Not treated |
R1‑133423 | Random access for enhanced coverage MTC UE | Ericsson, ST-Ericsson | Noted |
R1‑133424 | Paging for enhanced coverage MTC UE | Ericsson, ST-Ericsson | Withdrawn |
R1‑133425 | Mobility for enhanced coverage MTC UE | Ericsson, ST-Ericsson | Not treated |
R1‑133426 | Data transmission for enhanced coverage MTC UE | Ericsson, ST-Ericsson | Not treated |
R1‑133427 | Physical downlink control channel for enhanced coverage MTC UE | Ericsson, ST-Ericsson | Not treated |
R1‑133428 | Physical uplink control channel for enhanced coverage MTC UE | Ericsson, ST-Ericsson | Not treated |
R1‑133429 | Applicable deployment scenarios and network/UE requirements for joint TDD-FDD operation | Ericsson, ST-Ericsson | Noted |
R1‑133430 | Views on joint TDD-FDD operation solutions other than CA | Ericsson, ST-Ericsson | Noted |
R1‑133431 | On dynamic Small cell on/off | Ericsson, ST-Ericsson | Noted |
R1‑133432 | Long-term based small cell on/off | Ericsson, ST-Ericsson | Not treated |
R1‑133433 | Evaluation and discussion on small cell discovery | Ericsson, ST-Ericsson | Noted |
R1‑133434 | On Measurement Performance of Small Cell Discovery | Ericsson, ST-Ericsson | Noted |
R1‑133435 | On Radio-Interface based synchronization mechanisms | Ericsson, ST-Ericsson | Noted |
R1‑133436 | Physical layer aspects of dual connectivity | Ericsson, ST-Ericsson | Noted |
R1‑133437 | ProSe device-to-device discovery modes and characteristics | General Dynamics Broadband UK | Not treated |
R1‑133438 | ProSe device-to-device operation in an asynchronous environment | General Dynamics Broadband UK | Not treated |
R1‑133439 | ProSe device-to-device operation when out of network coverage | General Dynamics Broadband UK | Noted |
R1‑133440 | Discussion on PRBs containing PSS/SSS | Pantech | Not treated |
R1‑133441 | Discussion on QCL definition in TM10 on NCT | Pantech | Not treated |
R1‑133442 | Discussion on eMBMS in NCT | Pantech | Not treated |
R1‑133443 | Considerations on usage of TDD special subframes for NCT | Pantech | Not treated |
R1‑133444 | Considerations on CSI-RS transmission in TDD special subframes | Pantech | Not treated |
R1‑133445 | On the design of DCI format 0/1A for low cost & enhanced coverage MTC | Pantech | Not treated |
R1‑133446 | Signaling for CoMP inter-eNB coordination operation with non-Ideal backhaul | Pantech | Not treated |
R1‑133447 | CR for DL CoMP deployment implication | NTT DOCOMO | Noted - Revised |
R1‑133448 | Performance Evaluation on S-NCT and BCT | NTT DOCOMO | Revised |
R1‑133449 | Additional interference mitigation schemes for eIMTA | NTT DOCOMO | Noted |
R1‑133450 | Discussion on backhaul signaling for eIMTA | NTT DOCOMO | Not treated |
R1‑133451 | HARQ design for eIMTA | NTT DOCOMO | Noted |
R1‑133452 | Views on low cost MTC UE and coverage improvement | NTT DOCOMO | Noted |
R1‑133453 | RNTI handling in (E)PDCCH coverage enhancement | NTT DOCOMO | Not treated |
R1‑133454 | Views on deployment scenarios and NW/UE requirements for TDD-FDD joint operation | NTT DOCOMO | Noted |
R1‑133455 | Views on possible solutions for TDD-FDD joint operation | NTT DOCOMO | Not treated |
R1‑133456 | Views on Small Cell On/Off Mechanisms | NTT DOCOMO | Noted |
R1‑133457 | Small Cell Discovery for Efficient Small Cell On/Off Operation | NTT DOCOMO | Noted |
R1‑133458 | Views on Benefit of Small Cell Discovery based on Discovery Signal | NTT DOCOMO | Noted |
R1‑133459 | Performance Evaluation on ICIC for SCE | NTT DOCOMO | Noted |
R1‑133460 | Discussion on radio-interface based synchronization for small cell enhancement | NTT DOCOMO | Noted |
R1‑133461 | Physical Layer Design for Dual Connectivity | NTT DOCOMO | Noted |
R1‑133462 | HetNet Scenarios for 3D MIMO | NTT DOCOMO | Not treated |
R1‑133463 | Remaining Details of Pathloss Modeling | NTT DOCOMO | Noted |
R1‑133464 | Views on Fast Fading Model for 3D-Channel | NTT DOCOMO | Noted |
R1‑133465 | Initial Calibration for 3D-Channel Model | NTT DOCOMO | Not treated |
R1‑133466 | Discussion on D2D Discovery with asynchronous eNBs | NTT DOCOMO | Not treated |
R1‑133467 | System level simulation results of D2D discovery | NTT DOCOMO | Not treated |
R1‑133468 | Initial PHY-layer performance evaluation on the impact of frequency error | NTT DOCOMO | Withdrawn |
R1‑133469 | Evaluation of gains from stand-alone NCT | NSN, Nokia | Noted |
R1‑133470 | On Stand-Alone NCT and TDD | NSN, Nokia | Noted |
R1‑133471 | Remaining Details of Further Downlink MIMO Enhancement | NSN, Nokia | Revised |
R1‑133472 | Views on MU-CSI | NSN, Nokia | Not treated |
R1‑133473 | Enhanced UL power control for TDD eIMTA | NSN, Nokia | Not treated |
R1‑133474 | Cell clustering interference mitigation for dynamic TDD UL/DL reconfiguration | NSN, Nokia | Not treated |
R1‑133475 | Performance evaluation of different UL-DL reconfiguration sets for TDD eIMTA | Nokia, NSN | Not treated |
R1‑133476 | On UL-DL reconfiguration signalling | NSN, Nokia | Not treated |
R1‑133477 | On HARQ timing for TDD eIMTA | NSN, Nokia | Not treated |
R1‑133478 | On Transmission Modes for TDD eIMTA | NSN, Nokia | Not treated |
R1‑133479 | Low-Cost MTC UE Category | NSN, Nokia | Noted |
R1‑133480 | Bandwidth Reduction for Low-Cost MTC UEs | NSN, Nokia | Not treated |
R1‑133481 | Applicability of Coverage Improvement Features | NSN, Nokia | Not treated |
R1‑133482 | Mechanism for Identifying and Communicating Coverage Shortfall | NSN, Nokia | Not treated |
R1‑133483 | PBCH Coverage Enhancement for Low-Cost MTC UEs | NSN, Nokia | Not treated |
R1‑133484 | Interference Management with Operational Carrier Selection | NSN, Nokia | Not treated |
R1‑133485 | On small cell on/off switching | NSN, Nokia | Noted |
R1‑133486 | Small Cell Detection Statistics for Scenario 2a | NSN, Nokia | Noted |
R1‑133487 | Interference coordination for EPDCCH | NSN, Nokia | Noted |
R1‑133488 | On physical layer aspects of dual connectivity | NSN, Nokia | Noted |
R1‑133489 | Performance and Load Balancing for Scenario 1 and 2a | NSN, Nokia | Noted |
R1‑133490 | TP for TR on 3D channel model | NSN, Nokia | Noted |
R1‑133491 | Remaining details of pathloss modeling | NSN, Nokia | Revised |
R1‑133492 | Fast fading modeling details | NSN, Nokia | Revised |
R1‑133493 | Initial calibration results | NSN, Nokia | Not treated |
R1‑133494 | D2D Communication within network coverage | Nokia, NSN | Noted |
R1‑133495 | D2D Communication without network coverage | Nokia, NSN | Not treated |
R1‑133496 | D2D Synchronization – Out of network coverage/partial network coverage | Nokia, NSN | Noted |
R1‑133497 | D2D Synchronization – with network coverage | Nokia, NSN | Noted |
R1‑133498 | D2D Discovery Signal Considerations | Nokia, NSN | Not treated |
R1‑133499 | On non-ideality modelling in D2D system level evaluations | Nokia, NSN | Not treated |
R1‑133500 | eCoMP simulation assumptions | NSN, Nokia | Not treated |
R1‑133501 | Signaling design considerations to support inter-eNB CoMP | NSN, Nokia | Not treated |
R1‑133502 | Draft TS36.213CR on correction to PDSCH mapping for CoMP | Huawei, HiSilicon | Noted - Revised |
R1‑133503 | Draft TS36.213CR on correction to a higher-layer parameter name for EPDCCH mapping | Huawei, HiSilicon | Noted |
R1‑133504 | RRM measurements for NCT | Huawei, HiSilicon | Not treated |
R1‑133505 | On antenna port definition for the Reduced CRS | Huawei, HiSilicon | Not treated |
R1‑133506 | Considerations on reduced CRS transmission on NCT based on LS response from RAN4 | Huawei, HiSilicon | Not treated |
R1‑133507 | Further aspects of NCT | Huawei, HiSilicon | Noted |
R1‑133508 | EPHICH design for NCT | Huawei, HiSilicon | Not treated |
R1‑133509 | Usage for shortest DwPTS in TDD special subframes on NCT | Huawei, HiSilicon | Not treated |
R1‑133510 | Remaining details of codebook subsampling | Huawei, HiSilicon | Noted |
R1‑133511 | Discussion on eNB-to-eNB interference signalling in TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑133512 | Further study on closed loop power control for TDD eIMTA | Huawei, HiSilicon | Noted |
R1‑133513 | Further discussion on coverage improvement for the data channels | Huawei, HiSilicon | Not treated |
R1‑133514 | Evaluations on network listening synchronization methods | Huawei, HiSilicon | Noted |
R1‑133515 | Introduction of elevation related parameters in 3D channel model | Huawei, HiSilicon | Noted |
R1‑133516 | Clarification on path loss model for D2D evaluations | Huawei, HiSilicon | Not treated |
R1‑133517 | Physical layer options for D2D communication | Huawei, HiSilicon | Not treated |
R1‑133518 | Principles of broadcast D2D communication for public safety | EADS | Not treated |
R1‑133519 | Discussion on SS in NCT | CMCC | Not treated |
R1‑133520 | Discussion on HARQ timeline for TDD eIMTA | CMCC | Noted |
R1‑133521 | Considerations on TDD MTC UE Category/Type | CMCC | Not treated |
R1‑133522 | Discussion on service fast switch and return in TDD and FDD joint operation | CMCC | Noted |
R1‑133523 | Cell discovery for efficient small cell operation | CMCC | Noted |
R1‑133524 | Discussion on air-interface based small cell synchronization | CMCC | Noted |
R1‑133525 | UMi Channel measurement results on elevation related parameters | CMCC | Noted |
R1‑133526 | O2I Channel measurements results on elevation related parameters | CMCC | Not treated |
R1‑133527 | Initial 3D MIMO large-scale parameter calibration results | CMCC | Not treated |
R1‑133528 | On Optional High Rise Scenario | CMCC | Noted |
R1‑133529 | Inter-eNB Signalling in support of CoMP with Non-ideal Backhaul | CMCC | Noted |
R1‑133530 | Discussion on feasibility and benefits of radio-interface based synchronization | BlackBerry UK Limited | Not treated |
R1‑133531 | Further consideration on frequency domain power control enhancement for EPDCCH | BlackBerry UK Limited | Noted |
R1‑133532 | Mechanisms to enable efficient small cell on/off | BlackBerry UK Limited | Noted |
R1‑133533 | PHY Layer aspects of small cell dual connectivity | BlackBerry UK Limited | Not treated |
R1‑133534 | On solutions for FDD-TDD joint operation | BlackBerry UK Limited | Revised |
R1‑133535 | D2D Proximity Requirements and Identity Mechanisms | BlackBerry UK Limited | Not treated |
R1‑133536 | D2D Direct Proximity Discovery Performance and Design Aspects | BlackBerry UK Limited | Not treated |
R1‑133537 | D2D Direct Communication Performance and Scenario Observations | BlackBerry UK Limited | Noted |
R1‑133538 | Power headroom reporting in TDD eIMTA | MediaTek Inc. | Not treated |
R1‑133539 | Considerations for E-DCH Decoupling in UMTS HetNets | ZTE | Noted |
R1‑133540 | Link Analysis for Uplink CS Voice for LCR FDD UMTS | ZTE | Noted |
R1‑133541 | Simulation Results for HSUPA Rate Adaptation | ZTE | Noted |
R1‑133542 | Evaluation of FET for 10ms TTI E-DCH | ZTE | Noted |
R1‑133543 | Draft TR 25.701 of scalable UMTS FDD bandwidth | China Unicom | Noted - Revised |
R1‑133544 | Text Proposal on Applicable Scenarios for Standalone S-UMTS | China Unicom | Noted |
R1‑133545 | Text Proposal on Applicable Scenarios for S-UMTS carrier aggregation | China Unicom | Noted |
R1‑133546 | Text Proposal on Conclusion for S-UMTS | China Unicom | Noted - Revised |
R1‑133547 | Further discussion on PSS/SSS location on the New Carrier Type | Texas Instruments | Not treated |
R1‑133548 | Remaining aspects of Rel-12 DL-MIMO enhancements | Motorola Mobility | Not treated |
R1‑133549 | Standalone NCT evaluation | Motorola Mobility | Not treated |
R1‑133550 | Evaluation Scenarios for eCoMP | Motorola Mobility | Revised |
R1‑133551 | Further considerations on Small Cell Dormancy | Motorola Mobility | Not treated |
R1‑133552 | Overhead of common control channels with Standalone NCT | Motorola Mobility | Not treated |
R1‑133553 | Polarization Modelling for 3D MIMO | Motorola Mobility | Revised |
R1‑133554 | Phase 1 Calibration for 3D-MIMO UMa and UMi Scenarios | Hitachi Ltd. | Not treated |
R1‑133555 | Evaluation of Small Cell ON/OFF schemes | Hitachi Ltd. | Revised |
R1‑133556 | Scenarios and Impacts for CA-based TDD-FDD Joint Operation | Hitachi Ltd. | Not treated |
R1‑133557 | Performance Evaluation of Standalone NCT in Small Cell Scenario 2a | Hitachi Ltd. | Withdrawn |
R1‑133558 | Physical layer impact of dual connectivity | Hitachi Ltd. | Noted |
R1‑133559 | TDD special subframe with short DwPTS | Potevio | Not treated |
R1‑133560 | Discussion on D2D communication | Potevio | Not treated |
R1‑133561 | On signalling mechanism for TDD UL-DL reconfiguration | Potevio | Not treated |
R1‑133562 | On HARQ issues for TDD UL-DL reconfiguration | Potevio | Not treated |
R1‑133563 | Impact of Doppler spread on D2D link performance | Kyocera | Not treated |
R1‑133564 | Small Cell Discovery | ASUSTeK | Not treated |
R1‑133565 | Physical Layer Impacts of Dual Connectivity for Small Cell Enhancement | ASUSTeK | Not treated |
R1‑133566 | Design Guideline for D2D Communication | ASUSTeK | Not treated |
R1‑133567 | Design Guideline for D2D Discovery | ASUSTeK | Not treated |
R1‑133568 | Discussion of PUCCH power control | Qualcomm Inc. | Noted |
R1‑133569 | Clarification on Rel-8 PRACH related operation | Qualcomm Inc. | Noted |
R1‑133570 | Clarification on UE port based CRC masking | Qualcomm Inc. | Agreed in principle |
R1‑133571 | Standalone NCT | Qualcomm Inc. | Noted |
R1‑133572 | Discussion of handling PSS/SSS collision with DM-RS | Qualcomm Inc. | Not treated |
R1‑133573 | Discussion of CRS bandwidth | Qualcomm Inc. | Not treated |
R1‑133574 | Reduced CRS design | Qualcomm Inc. | Not treated |
R1‑133575 | Transmission modes and QCL behavior in NCT | Qualcomm Inc. | Not treated |
R1‑133576 | Remaining details of codebook design and subsampling | Qualcomm Inc. | Not treated |
R1‑133577 | CSI feedback enhancements for improved MU-MIMO operation | Qualcomm Inc. | Not treated |
R1‑133578 | Interference mitigation schemes for eIMTA | Qualcomm Inc. | Not treated |
R1‑133579 | Evaluation of interference mitigation schemes for LTE TDD eIMTA | Qualcomm Inc. | Not treated |
R1‑133580 | CSI measurement for eIMTA | Qualcomm Inc. | Noted |
R1‑133581 | Signalling mechanisms for TDD UL-DL reconfiguration | Qualcomm Inc. | Not treated |
R1‑133582 | DRX operation for eIMTA | Qualcomm Inc. | Not treated |
R1‑133583 | HARQ Design for TDD UL-DL reconfiguration | Qualcomm Inc. | Not treated |
R1‑133584 | Soft buffer management for IMTA | Qualcomm Inc. | Not treated |
R1‑133585 | New UE category for MTC | Qualcomm Inc. | Not treated |
R1‑133586 | General Considerations for Coverage Enhancements for MTC | Qualcomm Inc. | Not treated |
R1‑133587 | Implementation Considerations for Coverage Enhancements for MTC | Qualcomm Inc. | Not treated |
R1‑133588 | Deployment Scenarios and Network/UE Requirements for TDD-FDD Joint Operation | Qualcomm Inc. | Not treated |
R1‑133589 | Possible solutions other than CA for TDD-FDD joint operation | Qualcomm Inc. | Not treated |
R1‑133590 | Small cell on/off | Qualcomm Inc. | Noted |
R1‑133591 | Backward compatible small cell on/off | Qualcomm Inc. | Noted |
R1‑133592 | Small cell discovery | Qualcomm Inc. | Noted |
R1‑133593 | Network synchronization by network listening | Qualcomm Inc. | Not treated |
R1‑133594 | Remaining details of path loss modeling for elevation beamforming and FD-MIMO | Qualcomm Inc. | Not treated |
R1‑133595 | Details of fast fading modeling for elevation beamforming and FD-MIMO | Qualcomm Inc. | Not treated |
R1‑133596 | Initial calibration of channel models for elevation beamforming and FD-MIMO | Qualcomm Inc. | Not treated |
R1‑133597 | Techniques for D2D Broadcast Communication | Qualcomm Inc. | Not treated |
R1‑133598 | Techniques for Synchronization | Qualcomm Inc. | Noted |
R1‑133599 | Support of relay mode in D2D communications | Qualcomm Inc. | Not treated |
R1‑133600 | Techniques for D2D Discovery | Qualcomm Inc. | Not treated |
R1‑133601 | Remaining details of D2D performance evaluation | Qualcomm Inc. | Not treated |
R1‑133602 | Text Proposal for TR 36.843 | Qualcomm Inc. | Revised |
R1‑133603 | Coordinated scheduling in homogeneous and small-cell deployments. | Qualcomm Inc. | Noted |
R1‑133604 | Coordinated scheduling based on inter-eNB signaling | Qualcomm Inc. | Not treated |
R1‑133605 | DL Control Channel Evaluation | Huawei, HiSilicon | Noted |
R1‑133606 | TP on DL Control Channel Performance in HetNet | Huawei, HiSilicon | Noted |
R1‑133607 | Further Results on the restricted TF solution for UEs with NAIC capability | Huawei, HiSilicon | Noted |
R1‑133608 | Discussion on signalling for NAIC UE | Huawei, HiSilicon | Noted |
R1‑133609 | TP on Restricted Resource Subframes on Transport Format for NAIC | Huawei, HiSilicon | Noted |
R1‑133610 | Considerations on MIMO enhancements in NAIC | Huawei, HiSilicon | Not treated |
R1‑133611 | Updated TR 25.800 v1.0.2 on UMTS Heterogeneous Networks | Huawei, HiSilicon | Noted - Revised |
R1‑133612 | System simulation results of HetNet in co-channel scenarios | Huawei, HiSilicon | Noted - Revised |
R1‑133613 | TP on discussion on noise padding | Huawei, HiSilicon | Noted - Revised |
R1‑133614 | TP on impact on legacy terminals | Huawei, HiSilicon | Noted |
R1‑133615 | TP on impact on specifications | Huawei, HiSilicon | Noted - Revised |
R1‑133616 | 25.212 CR0321 (Rel-11, F) Correction of type 4 HS-SCCH order | Huawei, HiSilicon | Agreed |
R1‑133617 | 25.214 CR0709 (Rel-11, F) Corrections to Discontinuous downlink reception when the UE is in Multiflow mode | Huawei, HiSilicon | Agreed |
R1‑133618 | TP on Solutions for S-UMTS Carrier Aggregation | Huawei, HiSilicon | Noted - Revised |
R1‑133619 | TP on Section 6.1 Channel Model and Section 6.2 Link Level Simulation | Huawei, HiSilicon | Noted |
R1‑133620 | Further link level simulation results for standalone S-UMTS | Huawei, HiSilicon | Not treated |
R1‑133621 | TP on Link Level Simulation Results for S-UMTS | Huawei, HiSilicon | Noted |
R1‑133622 | Impacts on the network for S-UMTS | Huawei, HiSilicon | Noted - Revised |
R1‑133623 | Further Analysis on Initial Access Delay for Standalone S-UMTS | Huawei, HiSilicon | Noted |
R1‑133624 | System level evaluations for S-UMTS | Huawei, HiSilicon | Not treated |
R1‑133625 | TP on impact on coverage of S-UMTS | Huawei, HiSilicon | Noted |
R1‑133626 | Further considerations on Lean Carrier | Huawei, HiSilicon | Noted |
R1‑133627 | Evaluation on Solutions for FEUL Rate Adaptation | Huawei, HiSilicon | Noted |
R1‑133628 | TP for modified 2-loop scheme for FEUL Rate Adaptation | Huawei, HiSilicon | Agreed |
R1‑133629 | Evaluation of E-DPCCH Overhead Reduction | Huawei, HiSilicon | Noted |
R1‑133630 | Evaluation of HS-DPCCH Overhead Reduction | Huawei, HiSilicon | Noted |
R1‑133631 | TP on solutions for UL Control Channel overhead reduction | Huawei, HiSilicon | Noted |
R1‑133632 | Overview of D2D communication modes | Ericsson, ST-Ericsson | Noted |
R1‑133633 | On data channel design | Ericsson, ST-Ericsson | Noted |
R1‑133634 | 25214 CR0710 (Rel-11, F) Random Access Procedure | Ericsson, ST-Ericsson | Agreed |
R1‑133635 | Downlink System and Link Level Simulation Results in Co-Channel Deployment with Multiple Transmit Antennas | Ericsson, ST-Ericsson | Noted |
R1‑133636 | Analysis of Downlink Control Channel Performance in Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑133637 | Downlink Performance of Dual-Frequency Dual-Cell for Full Buffer Traffic in UMTS Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑133638 | Impact of Co-Channel Interference on Channel Estimation in Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑133639 | Performance Impact due to Additional Overhead Channel for Network Assistance | Ericsson, ST-Ericsson | Noted |
R1‑133640 | Analysis of Network Assistance for Interference Cancelation for Cell Range Expansion | Ericsson, ST-Ericsson | Noted |
R1‑133641 | Downlink Control Channel Performance with Network Assistance | Ericsson, ST-Ericsson | Noted |
R1‑133642 | On Solutions for UL Control Channel Reception in Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑133643 | System Level Analysis of Legacy UE Performance in Combined Cell Deployment | Ericsson, ST-Ericsson | Noted |
R1‑133644 | Link Level Analysis of Legacy UE Performance in Combined Cell Deployment | Ericsson, ST-Ericsson | Noted |
R1‑133645 | Analysis of Orthogonal Code Allocation in Combined Cell Deployment | Ericsson, ST-Ericsson | Noted |
R1‑133646 | Link Level Simulation Results for Combined Cell Deployment | Ericsson, ST-Ericsson | Noted |
R1‑133647 | Impact of Shadow Fading in Combined Cell Deployment | Ericsson, ST-Ericsson | Noted |
R1‑133648 | Text Proposal on System Performance of Combined Cell Deployments | Ericsson, ST-Ericsson | Noted - Revised |
R1‑133649 | Text Proposal on Network Assisted Interference Cancellation | Ericsson, ST-Ericsson | Noted |
R1‑133650 | Text Proposal on Legacy UE Performance in Combined Cell Deployment | Ericsson, ST-Ericsson | Noted - Revised |
R1‑133651 | Text Proposal on Sailent Features of Combined Cell Deployment | Ericsson, ST-Ericsson | Noted |
R1‑133652 | Text Proposal on Range Expansion with Network Assisted Interference Cancellation | Ericsson, ST-Ericsson | Noted |
R1‑133653 | Text Proposal on Performance of Multi-Carrier Based Range Expansion in UMTS Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑133654 | Text Proposal on Reliable Uplink Reception for Heterogeneous Networks | Ericsson, ST-Ericsson | Noted - Revised |
R1‑133655 | Review Comments on TR 25.800 for UMTS Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑133656 | Technology Alternatives for Small Bandwidths | Ericsson, ST-Ericsson | Noted |
R1‑133657 | On the Impact of Time Dilation on Bursty and Smartphone Traffic Handling | Ericsson, ST-Ericsson | Noted |
R1‑133658 | User Plane Latency Impacts of Time Dilation | Ericsson, ST-Ericsson | Noted |
R1‑133659 | System Simulation Results for Time-Dilated UMTS Considering Inter-Carrier Leakage | Ericsson, ST-Ericsson | Not treated |
R1‑133660 | Text Proposal on Time-dilated UMTS - Impact on RAN1 specifications | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NSN | Noted |
R1‑133661 | Text Proposal on Time-dilated UMTS - Impacts on Network and UE | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd., NSN, Intel Corporation | Noted |
R1‑133662 | Text Proposal on Time-dilated UMTS - Link-Level Simulations | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑133663 | Text Proposal on Time-dilated UMTS - Objectives and Scenarios | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Intel Corporation | Noted |
R1‑133664 | Text Proposal on Time-dilated UMTS - System-Level Simulations | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑133665 | Text Proposal on System Simulation Results for Time-Dilated UMTS Considering Inter-Carrier Leakage | Ericsson, ST-Ericsson | Not treated |
R1‑133666 | Deployment Scenarios for Clean Carriers | Ericsson, ST-Ericsson | Noted |
R1‑133667 | CPC and Power Control Considerations for Clean Carriers | Ericsson, ST-Ericsson | Noted |
R1‑133668 | Soft Handover Considerations for Clean Carriers | Ericsson, ST-Ericsson | Noted |
R1‑133669 | SHO Operation in HSUPA with Rate Adaptation | Ericsson, ST-Ericsson | Not treated |
R1‑133670 | An Overview of CQI Report Reduction for Multi-RABs with Speech | Ericsson, ST-Ericsson | Noted |
R1‑133671 | ProSe device-to-device broadcast communications | General Dynamics Broadband UK | Not treated |
R1‑133672 | Link Analysis of F-DPCH performance in Hetnets for different CIOs | Qualcomm Inc. | Revised |
R1‑133673 | Link Analysis of E-HICH performance in Hetnets for different CIOs | Qualcomm Inc. | Noted |
R1‑133674 | Link Analysis of HS-SCCH performance in Hetnets for different CIOs | Qualcomm Inc. | Revised |
R1‑133675 | Performance of Network Assisted IC in a Hetnet Framework | Qualcomm Inc. | Revised |
R1‑133676 | Updated Performance Results for Legacy UE Performance in Combined Cells | Qualcomm Inc. | Withdrawn |
R1‑133677 | Updated Performance Results for Rel-12 UEs in Spatial Reuse Mode in Combined Cells | Qualcomm Inc. | Withdrawn |
R1‑133678 | An Alternate Solution for DL DCH Enhancements | Qualcomm Inc. | Noted |
R1‑133679 | Updated Link Performance of DL VoHSPA | Qualcomm Inc. | Not treated |
R1‑133680 | Updated Link Performance of UL VoHSPA | Qualcomm Inc. | Not treated |
R1‑133681 | Downlink System Performance of DCH Enhancements | Qualcomm Inc. | Noted |
R1‑133682 | Uplink System Performance of DCH Enhancements | Qualcomm Inc. | Noted |
R1‑133683 | Downlink System Performance of VoHSPA | Qualcomm Inc. | Not treated |
R1‑133684 | Uplink System Performance of VoHSPA | Qualcomm Inc. | Not treated |
R1‑133685 | UE Modem Gating Analysis due to Alternate Solution | Qualcomm Inc. | Noted |
R1‑133686 | TP on Link simulation results for DL DCH Enhancments | Qualcomm Inc. | Revised |
R1‑133687 | TP on Link simulation results for UL DCH Enhancments | Qualcomm Inc. | Noted |
R1‑133688 | TP on ACK channel Design for FET | Qualcomm Inc. | Withdrawn |
R1‑133689 | TP on Link Analysis of VoHSPA | Qualcomm Inc. | Not treated |
R1‑133690 | TP on System Performance of DCH Enhancements | Qualcomm Inc. | Noted |
R1‑133691 | TP on System Performance of VoHSPA | Qualcomm Inc. | Not treated |
R1‑133692 | TP on UE Modem Gating Analysis | Qualcomm Inc. | Noted |
R1‑133693 | TP on Impact to Specifications | Qualcomm Inc. | Agreed |
R1‑133694 | TP on Impact on Network and UE Implementation | Qualcomm Inc. | Noted |
R1‑133695 | TP on Uplink DCH enhancements | Qualcomm Inc. | Not treated |
R1‑133696 | TP on Downlink DCH enhancements | Qualcomm Inc. | Not treated |
R1‑133697 | TP on Conclusions | Qualcomm Inc. | Not treated |
R1‑133698 | Draft TR 25.702 Study on Dedicated Channel (DCH) enhancements for UMTS | Qualcomm Inc. | Noted |
R1‑133699 | Updated DL Link Evaluation for Data Transmissions in Standalone Scalable UMTS | Qualcomm Inc. | Revised |
R1‑133700 | Updated DL Link Evaluation for Data Transmissions in Multicarrier Scalable UMTS | Qualcomm Inc. | Revised |
R1‑133701 | Link Evaluation Results for AMR 12.2kbps for Standalone Scalable UMTS | Qualcomm Inc. | Noted |
R1‑133702 | Updated Uplink Evaluation Results for Data Transmissions in Scalable UMTS | Qualcomm Inc. | Noted |
R1‑133703 | Updated System Analysis of Scalable UMTS | Qualcomm Inc. | Revised |
R1‑133704 | TP on Link and System Evaluations of Scalable UMTS | Qualcomm Inc. | Not treated |
R1‑133705 | Latency Analysis for Standalone Scalable UMTS | Qualcomm Inc. | Noted |
R1‑133706 | Coverage Analysis for Scalable UMTS | Qualcomm Inc. | Revised |
R1‑133707 | TP on Impacts identified due to scalable UMTS | Qualcomm Inc. | Noted |
R1‑133708 | TP on the assumptions of PSD and P-CCPCH | Qualcomm Inc. | Noted - Revised |
R1‑133709 | TP on Access and Call Setup Latency In Scalable UMTS | Qualcomm Inc. | Noted |
R1‑133710 | TP on Coverage Aspects of Scalable UMTS | Qualcomm Inc. | Noted |
R1‑133711 | TP on Impacts to UE Implementation due to Scalable UMTS | Qualcomm Inc. | Revised |
R1‑133712 | TP on Time Dilation Solution for Scalable UMTS | Qualcomm Inc. | Noted - Revised |
R1‑133713 | Consideration on Dedicated Secondary Carrier | Qualcomm Inc. | Withdrawn |
R1‑133714 | Link Evaluation Results for SINR based Scheduling | Qualcomm Inc. | Not treated |
R1‑133715 | System Simulation Results for SINR based Schedulink | Qualcomm Inc. | Noted |
R1‑133716 | Fast Carrier Hopping for Load Balancing | Qualcomm Inc. | Noted |
R1‑133717 | On backhaul signaling for IM in eIMTA | Ericsson, ST-Ericsson | Not treated |
R1‑133718 | CCIM performance evaluation | Ericsson, ST-Ericsson | Revised |
R1‑133719 | Initial results for 3D Channel UMa Calibration Case 1 | Orange | Not treated |
R1‑133720 | Initial results for 3D Channel UMa Calibration Case 3 | Orange | Not treated |
R1‑133721 | NAICS: How to coordinate link adaptation for CWIC receivers | Orange | Not treated |
R1‑133722 | Physical layer abstraction for turbo-CWIC receivers | Orange | Not treated |
R1‑133723 | Link performance results for DCH enhancements in downlink | NSN | Noted |
R1‑133724 | Link performance results for DCH enhancements in uplink | NSN | Noted |
R1‑133725 | Performance of user pairing on a DL DPCH | NSN | Withdrawn |
R1‑133726 | Pilotless DL DPCH performance | NSN | Noted |
R1‑133727 | Uplink ACK transmission | NSN | Noted |
R1‑133728 | Downlink ACK transmission | NSN | Noted |
R1‑133729 | Uplink control channel design | NSN | Withdrawn |
R1‑133730 | Warm-up preamble for DCH enhancements in uplink | NSN | Noted |
R1‑133731 | TP on user pairing on a DL DPCH | NSN | Revised |
R1‑133732 | TP on code-space and UE power efficient SRB design | NSN | Not treated |
R1‑133733 | DCH Enhancements feature overview | NSN | Not treated |
R1‑133734 | Downlink system performance of Voice over HSPA | NSN | Not treated |
R1‑133735 | Uplink system performance of Voice over HSPA | NSN | Not treated |
R1‑133736 | Scalable Bandwidth UMTS by filtering, initial simulation results | NSN | Noted |
R1‑133737 | Multiflow and CLTD with the assisting cell feedback | NSN | Noted |
R1‑133738 | Considerations on efficient TDM operation for HSUPA | NSN | Noted |
R1‑133739 | Considerations on E-DPCCH overhead reduction | NSN | Noted |
R1‑133740 | System Level Simulation Results for Improved Rate Adaptation | NSN | Revised |
R1‑133741 | System Level Simulation Results for Fast Carrier Hopping | NSN | Noted |
R1‑133742 | Agreed TP on Rate Adaptation motivation and descritpion of 2-loop and 3-loop approaches | NSN | Agreed |
R1‑133743 | General considerations on design of the low-complexity uplink load balancing | NSN | Noted |
R1‑133744 | SHO options for Improved Rate Adaptation | NSN | Noted |
R1‑133745 | Link Level Simulation Results for Improved Rate Adaptation | NSN | Noted |
R1‑133746 | TP on low-complexity load balancing solutions | NSN | Agreed |
R1‑133747 | Considerations on bursty traffic simulations for UMTS HetNet studies | NSN | Noted |
R1‑133748 | Performance evaluation of method minimising interference from macro Ues in Strong Mismatch Zone | NSN | Noted |
R1‑133749 | E-DCH decoupling Results in HetNet environment | NSN | Revised |
R1‑133750 | Network Assistance for Interference Suppressing Receievers | NSN | Noted |
R1‑133751 | On details of Low complexity UE category | Vodafone Group | Noted |
R1‑133752 | Discussion of CIO Range | BlackBerry UK Limited | Noted |
R1‑133753 | Options to handle DMRS collision with PSS/SSS | BlackBerry UK Limited | Not treated |
R1‑133754 | Inter-WG impact of MTC coverage enhancement feature | MediaTek Inc. | Not treated |
R1‑133755 | Text Proposal on Mechanical and Electrical Antenna Tilting | Fraunhofer IIS | Not treated |
R1‑133756 | Coordinated Scheduling Benefits in SCE Scenario 2B/3 | Qualcomm Inc. | Withdrawn |
R1‑133757 | Summary of Email Discussion for MU-CSI for DL MIMO Enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑133758 | Proposals for 3D MIMO Channel Modelling in UMi | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, China Unicom | Not treated |
R1‑133759 | Proposed Work Plan for LTE Coverage Enhancements WI | China Telecom | Noted |
R1‑133760 | Discussion on RRC parameter name in RAN1 specifications | Samsung | Noted |
R1‑133761 | Discussion on CP length and intra-band CA | Panasonic | Noted |
R1‑133762 | Evaluation of small cell on/off with feasible time scale | Panasonic | Noted |
R1‑133763 | Evaluation of benefits for standalone NCT | Sharp | Revised |
R1‑133764 | Solutions for TDD-FDD joint operation in the same frequency band | IAESI | Not treated |
R1‑133765 | Justification of over-the-air X2 transport for LTE CoMP | IAESI | Withdrawn |
R1‑133766 | CCIM performance evaluation | Ericsson, ST-Ericsson | Not treated |
R1‑133767 | Remaining details of 4Tx codebook subsampling | Intel Corporation | Noted |
R1‑133768 | Codebook subsampling for DL MIMO enhancement | CATT | Noted |
R1‑133769 | Simulation results on small cell on/off schemes | LG Electronics | Noted |
R1‑133770 | Draft Agenda for RAN1#74 meeting | RAN1 Chairman | Not treated |
R1‑133771 | UE measurements in TDD eIMTA | CATT | Noted |
R1‑133772 | Repetitive Patterns Impact upon MTC Device Overall Access Latency | Fujitsu | Not treated |
R1‑133773 | MTC PRACH Limitations | Fujitsu | Not treated |
R1‑133774 | Discussion on small cell discovery | Samsung | Revised |
R1‑133775 | Polarization Modelling for 3D MIMO | Motorola Mobility | Not treated |
R1‑133776 | E-DCH decoupling Results in HetNet environment | NSN | Noted |
R1‑133777 | TP on user pairing on a DL DPCH | NSN | Not treated |
R1‑133778 | System Level Simulation Results for Improved Rate Adaptation | NSN | Noted |
R1‑133779 | Initial calibration results for 3D channel modeling | Fujitsu | Not treated |
R1‑133780 | On solutions for FDD-TDD joint operation | BlackBerry UK Limited | Not treated |
R1‑133781 | System-Level Performance of Standalone NCT | Texas Instruments | Not treated |
R1‑133782 | System-Level Performance of Dynamic eNodeB Dormancy | Texas Instruments | Noted |
R1‑133783 | TP on UL DCH Enhancements | MediaTek, NSN | Revised |
R1‑133784 | TP on DL DCH Enhancements | MediaTek, NSN | Revised |
R1‑133785 | TP on Simulation Assumptions for DCH Enhancements | MediaTek, NSN | Not treated |
R1‑133786 | Resource allocation for D2D discovery | CATT | Not treated |
R1‑133787 | Preliminary evaluation results of D2D discovery | CATT | Not treated |
R1‑133788 | A Case for the Introduction of High-Rise-Building Scenario(s) with Supporting Initial Calibration Results | KDDI | Not treated |
R1‑133789 | Scennarios of TDD-FDD joint operation in the same frequency band | IAESI | Not treated |
R1‑133790 | Discussion on the time scales for evaluations of small cell ON/OFF | Panasonic | Noted |
R1‑133791 | Resource Management for D2D Communications | LG Electronics | Noted |
R1‑133792 | Link Analysis of F-DPCH performance in Hetnets for different CIOs | Qualcomm Inc. | Noted |
R1‑133793 | Link Analysis of HS-SCCH performance in Hetnets for different CIOs | Qualcomm Inc. | Noted |
R1‑133794 | TP on Link simulation results for DL DCH Enhancments | Qualcomm Inc. | Noted |
R1‑133795 | Updated DL Link Evaluation for Data Transmissions in Standalone Scalable UMTS | Qualcomm Inc. | Noted |
R1‑133796 | Updated DL Link Evaluation for Data Transmissions in Multicarrier Scalable UMTS | Qualcomm Inc. | Noted |
R1‑133797 | Updated System Analysis of Scalable UMTS | Qualcomm Inc. | Not treated |
R1‑133798 | Coverage Analysis for Scalable UMTS | Qualcomm Inc. | Noted |
R1‑133799 | Remaining details of pathloss modeling | NSN, Nokia | Noted |
R1‑133800 | Fast fading modeling details | NSN, Nokia | Noted |
R1‑133801 | Performance evaluations of NCT and BCT | Samsung | Noted |
R1‑133802 | Mechanical tilt for 3D channel model | NSN, Nokia | Not treated |
R1‑133803 | Final Report of RAN1#73 meeting | MCC | Approved |
R1‑133804 | [DRAFT] Reply LS to 3GPP Internal LS on the technologies for public protection and disaster relief communications associated with work on wrc-15 agenda item 1.3 | Telecom Italia | Noted - Revised |
R1‑133805 | Evaluation of benefits for standalone NCT | Sharp | Noted |
R1‑133806 | 36.211 CR0185 (Rel-11, F) on Correction to QCL behaviour on CRS | Panasonic, Fujitsu, Texas Instruments, Renesas Mobile Europe Ltd, Huawei, HiSilicon, Ericsson, ST-Ericsson | Agreed |
R1‑133807 | 36.213 CR0433 (Rel-11, F) on Correction to QCL behaviour on CRS | Panasonic, Fujitsu, Texas Instruments, Renesas Mobile Europe Ltd, Huawei, HiSilicon, Ericsson, ST-Ericsson | Agreed |
R1‑133808 | 36.213 CR0434 (Rel-11,F) on Correction on PUCCH power control | LG Electronics, Intel, Ericsson, ST-Ericsson | Agreed |
R1‑133809 | 36.213 CR0435 (Rel-11, F) on Correction on the ratio of PDSCH EPRE to CRS EPRE for TM10 | Sharp | Agreed |
R1‑133810 | 36.213 CR0436 (Rel-11, F) on EPDCCH Search Space for Cross-Carrier Scheduling | Samsung, LG Electronics | Agreed |
R1‑133811 | Email discussion summary on FDD and TDD joint operation | CMCC | Noted |
R1‑133812 | 36.213 CR0437 (Rel-11, F) on Correction to the UE behaviour in case of collision between PRS and EPDCCH in different CP case | NEC Group | Agreed |
R1‑133813 | 36.213 CR0438 (Rel-11, F) on correction to higher layer parameter name for EPDCCH resource mapping | NEC Group | Agreed |
R1‑133814 | 36.213 CR0439 (Rel-11, F) on Correction to PDSCH mapping for CoMP | Huawei, HiSilicon | Agreed |
R1‑133815 | 36.212 CR0155 (Rel-11, F) Correction on parameter ue-Category | Samsung | Not treated |
R1‑133816 | 36.213 CR0440 (Rel-11, F) Correction on parameter ue-Category | Samsung | Not treated |
R1‑133817 | Performance evaluations of S-NCT vs BCT | Huawei, HiSilicon | Noted |
R1‑133818 | 36.819 CR0002 (Rel-11, F) CR for DL CoMP deployment implication | NTT DoCoMo | Agreed |
R1‑133819 | Polarization Modelling for 3D MIMO | Motorola Mobility | Not treated |
R1‑133820 | Performance Evaluation on S-NCT and BCT | NTT DOCOMO | Noted |
R1‑133821 | Considerations on MIMO enhancements in NAIC | Huawei, HiSilicon | Noted |
R1‑133822 | Remaining Details of Further Downlink MIMO Enhancement | NSN, Nokia | Revised |
R1‑133823 | Evalulation results on small cell discovery including link-level signal generation and detection | ZTE | Not treated |
R1‑133824 | Initial calibration of 3D channel model | ZTE | Not treated |
R1‑133825 | TP on Implementation Complexity for DCH enhancements | MediaTek, NSN | Noted |
R1‑133826 | Performance evaluation for small cell discovery using legacy schemes | MediaTek Inc. | Noted |
R1‑133827 | Handling of collision between PSS/SSS and DMRS on NCT | ZTE, Qualcomm, CATT, China Telecom, CMCC, HTC, Intel, LG Electronics, Mediatek, Pantech | Not treated |
R1‑133828 | Discussion on small cell discovery | Samsung | Noted |
R1‑133829 | Evaluation of Small Cell ON/OFF schemes | Hitachi Ltd. | Noted |
R1‑133830 | Reply LS on the support of radio-interface based synchronization mechanism | RAN3, Qualcomm | Noted |
R1‑133831 | Summary of evaluation results of standalone NCT | Ericsson, ST-Ericsson, Huawei, Hi-Silicon | Noted - Revised |
R1‑133832 | Way Forward on definition of enhanced dual mode TDD-FDD joint operation | Huawei, HiSilicon, CMCC | Not treated |
R1‑133833 | Remaining Details of Further Downlink MIMO Enhancement | NSN, Nokia | Revised |
R1‑133834 | Remaining issues of 4Tx codebook subsampling | Texas Instruments | Noted |
R1‑133835 | Way-forward on 4Tx subsampling for PUCCH mode 1-1, submode 1 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, Huawei, HiSilicon, LG Electronics, Nokia, Nokia Solutions and Networks, Motorola Mobility, Qualcomm, Renesas, Samsung, Texas Instruments | Agreed |
R1‑133836 | Performance evaluation for small cell discovery using new scheme based on CRS | MediaTek Inc. | Noted |
R1‑133837 | Performance of Network Assisted IC in a Hetnet Framework | Qualcomm Inc. | Noted |
R1‑133838 | Draft TP on small cell on/off performance | Huawei, HiSilicon | Noted - Revised |
R1‑133839 | Draft TP on physical layer support of dual connectivity | Huawei, HiSilicon | Not treated |
R1‑133840 | Draft text proposal for FDD and TDD joint operation | CMCC | Noted - Revised |
R1‑133841 | TP for Downlink Control Channel Evaluations | Huawei, HiSilicon | Agreed |
R1‑133842 | Text Proposal on Performance of Multi-Carrier Based Range Expansion in UMTS Heterogeneous Networks | Ericsson, ST-Ericsson | Withdrawn |
R1‑133843 | Text Proposal on Network Assisted Interference Cancellation | Ericsson, ST-Ericsson | Not treated |
R1‑133844 | TP on E-DCH Decoupling | NSN | Revised |
R1‑133845 | Text Proposal on Reliable Uplink Reception for Heterogeneous Networks | Ericsson, ST-Ericsson | Agreed |
R1‑133846 | Text Proposal on Legacy UE Performance in Combined Cell Deployment | Ericsson, ST-Ericsson | Withdrawn |
R1‑133847 | Text Proposal on System Performance of Combined Cell Deployments | Ericsson, ST-Ericsson | Withdrawn |
R1‑133848 | System simulation results of HetNet in co-channel scenarios | Huawei, HiSilicon | Agreed |
R1‑133849 | TP on discussion on noise padding | Huawei, HiSilicon | Agreed |
R1‑133850 | TP on impact on specifications | Huawei, HiSilicon | Agreed |
R1‑133851 | TP on the conclusion of HetNet TR | Huawei, HiSilicon | Noted - Revised |
R1‑133852 | Summary of UMTS Heterogeneous Networks session | Ad-Hoc Chair (Huawei) | Endorsed |
R1‑133853 | TP on CIO Range (Cell Detectability) | BlackBerry UK Limited | Agreed |
R1‑133854 | TR 25.800 v1.0.3 on UMTS heterogeneous networks | Huawei, HiSilicon | Noted - Revised |
R1‑133855 | DPCH Slot Format Optimization Performance Update | MediaTek Inc. | Noted |
R1‑133856 | TP on Uplink DCH enhancements | MediaTek, NSN, ZTE | Noted |
R1‑133857 | TP on Downlink DCH Enhancements | MediaTek, NSN, ZTE | Not treated |
R1‑133858 | TP on Uplink DCH enhancements | Qualcomm Inc. | Noted |
R1‑133859 | TP on UE Modem Gating Analysis | Qualcomm Inc. | Withdrawn |
R1‑133860 | TP on Implementation Complexity for DCH enhancements | MediaTek, Qualcomm, NSN | Withdrawn |
R1‑133861 | TP on Link simulation results for DL DCH Enhancements | QUALCOMM Incorporated, MediaTek Inc | Agreed |
R1‑133862 | TP on Conclusions | QUALCOMM Incorporated, MediaTek Inc, NSN | Not treated |
R1‑133863 | TP on Impacts to UE Implementation due to Scalable UMTS | QUALCOMM Incorporated, Renesas Mobile Europe Ltd | Agreed |
R1‑133864 | TP on Solutions for S-UMTS Carrier Aggregation | Huawei, HiSilicon | Agreed |
R1‑133865 | TP on Time Dilation Solution for Scalable UMTS | Qualcomm Inc. | Agreed |
R1‑133866 | Text Proposal on Section 6.1 Channel Model and Section 6.2 Link Level Simulation | Huawei, HiSilicon, Ericsson, ST-Ericsson | Agreed |
R1‑133867 | TP on Link Level Simulation Results for S-UMTS | Huawei, Qualcomm, ZTE | Noted - Revised |
R1‑133868 | TP on User Plane Latency Impacts of Time Dilation | Ericsson, ST-Ericsson | Withdrawn |
R1‑133869 | TR 25.701 V0.2.0; Scalable UMTS FDD bandwidth | China Unicom | Endorsed |
R1‑133870 | Text Proposal on Conclusion for S-UMTS | China Unicom, Huawei, HiSilicon, Qualcomm, ZTE | Noted |
R1‑133871 | Evaluation and design considerations on small cell on/off scheme | ZTE | Not treated |
R1‑133872 | Way Forward on Small cell on/off | LG Electronics, Ericsson, ST-Ericsson, InterDigital, Intel | Not treated |
R1‑133873 | Text Proposal of TR36.872 on efficient discovery of small cells | NTT DOCOMO, Huawei, HiSilicon, ZTE, MediaTek, ETRI | Noted - Revised |
R1‑133874 | Evaluation Scenarios for eCoMP | Motorola Mobility | Not treated |
R1‑133875 | Codebook subsampling for enhanced 4TX Codebook | NEC Group | Not treated |
R1‑133876 | Discussion and evaluation on small cell discovery | Intel Corporation | Noted |
R1‑133877 | Way Forward on interference mitigation in TDD eIMTA | LG Electronics, LG Uplus, Ericsson, ST-Ericsson, Sharp | Noted |
R1‑133878 | Way Forward on RRM/RLM in TDD eIMTA | LG Electronics, LG Uplus, CATT, Sharp, Intel | Noted |
R1‑133879 | Remaining details of PL for 3D channel Modeling | Samsung | Noted |
R1‑133880 | Way Forward on PL for 3D channel modeling | Samsung, CATT, CMCC, Motolora Mobility, NSN, Nokia, Broadcom, Interdigital, LG Electronics | Noted |
R1‑133881 | Draft TP for TR36.872 on small cell on/off energy savings | NSN, Nokia | Noted - Revised |
R1‑133882 | Draft text proposal on small cell on/off performance | Huawei, HiSilicon, NTT DOCOMO, CATR | Noted - Revised |
R1‑133883 | Wayforward on rank1 4Tx codebook subsampling for PUCCH mode 1-1 submode 2 | CATT, Intel, Texas Instruments, Motorola Mobility, Fujitsu, Qualcomm, NEC, Renesas Mobile Europe, CMCC, CATR | Noted |
R1‑133884 | Text proposal of TR 36.872 on efficient discovery of small cells | NTT DOCOMO, Huawei, HiSilicon | Noted - Revised |
R1‑133885 | Text proposal of TR 36.872 on efficient discovery of small cells | NTT DOCOMO, Huawei, HiSilicon | Agreed |
R1‑133886 | Way Forward for 4Tx codebook sub-sampling of PUCCH mode 2-1 with Rank 2 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Texas Instruments, Ericsson, ST- Ericsson, Fujitsu, AT&T, NEC, ZTE | Agreed |
R1‑133887 | Way Forward on CoMP-NIB | Huawei, HiSilicon, Ericsson, ST-Ericsson, Nokia Solutions and Networks, Nokia | Noted |
R1‑133888 | Remaining Details of Further Downlink MIMO Enhancement | NSN, Nokia | Noted |
R1‑133889 | Way Forward on backhaul signaling for TDD eIMTA | CATT, Samsung, Huawei, Hisilicon, CMCC, CATR, Coolpad, NTT DoCoMo, LG Electronics | Not treated |
R1‑133890 | Way Forward on CoMP NIB evaluation assumptions | Samsung, CATT, CMCC, KDDI, KT Corp., LG Electronics, Orange, IAESI, Intel, ZTE | Noted - Revised |
R1‑133891 | Way Forward on CoMP NIB scenarios | Samsung, CATT, CMCC, KDDI, KT Corp., LG Electronics, Orange, IAESI, Intel, ZTE | Noted |
R1‑133892 | Way Forward on Relaying Operation | LG Electronics, LG Uplus | Withdrawn |
R1‑133893 | 4Tx codebook subsampling for PUCCH mode 1-1-2 | LG Electronics, ST- Ericsson, Ericsson, Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, ZTE, Broadcom | Agreed |
R1‑133894 | Rank 3&4 4Tx codebook subsampling for PUCCH mode 2-1 | LG Electronics, CATT, TI, Samsung, ST- Ericsson, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, ZTE, NEC | Noted |
R1‑133895 | Way Forward on HARQ and scheduling timing for eIMTA | Ericsson, ST-Ericsson, LG Electronics, Nokia, NSN, Sharp | Noted |
R1‑133896 | NLOS Path Loss for 3D-Channel Model | Ericsson, ST-Ericsson | Noted |
R1‑133897 | Elevation of Departure Characteristics for 3D-Channel Model | Ericsson, ST-Ericsson | Noted |
R1‑133898 | Clarification on distance measure assumptions | LG Electronics | Not treated |
R1‑133899 | Way Forward on distance measure assumptions | LG Electronics, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks, Samsung | Agreed |
R1‑133900 | Way Forward on coordination assumptions for CoMP with non-ideal backhaul | LG Electronics, Ericsson, ST-Ericsson, Deutsche Telekom, Orange, Telecomitalia, Samsung | Noted |
R1‑133901 | 36.211 CR0184R2 (Rel-12, B) Introduction of Rel 12 feature for Downlink MIMO Enhancement | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Endorsed |
R1‑133902 | 36.212 CR0154R2 (Rel-12, B) Introduction of Rel 12 feature for Downlink MIMO Enhancement | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Endorsed |
R1‑133903 | 36.213 CR0431R2 (Rel-12, B) Introduction of Rel 12 feature for Downlink MIMO Enhancement | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Noted - Revised |
R1‑133904 | Details of narrow bandwidth design for low-complexity MTC UE | Sony | Not treated |
R1‑133905 | Performance and design considerations for D2D groupcast/broadcast | Samsung | Noted |
R1‑133906 | TR 36.874 v0.1.0 on CoMP for LTE with non-ideal backhaul | Samsung | Agreed |
R1‑133907 | Text proposal of TR36.872 on other interference avoidance and coordination mechanisms | Intel Corporation, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, BlackBerry UK Limited, CMCC, CATR, Coolpad, Fujitsu, LGE, MediaTek, NSN, Nokia, Panasonic, ZTE | Noted - Revised |
R1‑133908 | Way Forward on D2D Communication | Qualcomm, US Department of Commerce, Ericsson, ST-Ericsson, General Dynamics Broadband, ZTE | Noted |
R1‑133909 | Text Proposal for TR 36.843 | Qualcomm Inc. | Noted - Revised |
R1‑133910 | Way Forward on CoMP-NIB Scenarios | Samsung, CATT, CMCC, KDDI, KT Corp., LG Electronics, Orange, IAESI, Intel, ZTE | Agreed |
R1‑133911 | Way Forward on D2D Control | Huawei, HiSilicon, Fujitsu, KDDI, Intel, Panasonic | Noted |
R1‑133912 | Way Forward on 3D MIMO Scenario for Higher Frequency | NTT DOCOMO, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Anite, AT&T, Broadcom, CATT, Deutsche Telekom, Ericsson, ST-Ericsson, Fraunhofer IIS, Hitachi, Intel, I2R, KDDI, LG Electronics, NEC, Nokia, NSN, Panasonic, Samsung, Sharp | Agreed |
R1‑133913 | Asymmetrical backhaul capacity CoMP-NIB | IAESI, CHTTL | Noted |
R1‑133914 | - | RAN1 Chairman | Not treated |
R1‑133915 | [DRAFT] LS on notifying for information of including Annex about Public Safety ProSe Communication in TR 36.843 | U.S. Department Of Commerce | Noted - Revised |
R1‑133916 | Way Forward on High Rise Scenario | CMCC, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ANITE, CATR, CATT, Elektrobit, Fraunhofer IIS, Huawei, HiSilicon, KDDI, Nokia, NSN, Samsung, ZTE | Noted |
R1‑133917 | Text proposal on Public Safety ProSe Communication Use Cases | Nokia | Agreed |
R1‑133918 | Draft text proposal on physical layer support of dual connectivity | Huawei, HiSilicon, CATR | Noted - Revised |
R1‑133919 | Draft text proposal on feasibility and benefits of radio-interface based synchronization mechanisms | Huawei, HiSilicon, CATR, Telecom Italia, Deutsche Telekom, KDDI, T-Mobile USA, Orange, CMCC, IAESI, AT&T, BlackBerry UK Limited, Vodafone Group, CATT | Noted - Revised |
R1‑133920 | Draft text proposal on load shifting/balancing and UE association enhancements | Huawei, HiSilicon | Noted - Revised |
R1‑133921 | Draft text proposal on small cell on/off | Huawei, HiSilicon, NTT DOCOMO, CATR | Noted - Revised |
R1‑133922 | Way Forward on the LS for new UE category and additional coverage improvement to RAN2 | Huawei, HiSilicon | Noted |
R1‑133923 | [Draft] LS for new UE category and additional coverage improvement to RAN2 | Huawei | Not treated |
R1‑133924 | Way Forward on PBCH coverage enhancement | Huawei, HiSilicon | Noted |
R1‑133925 | Way Forward on PRACH coverage improvement | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon | Noted |
R1‑133926 | TP on E-DCH decoupling | NSN | Agreed |
R1‑133927 | Text Proposal on Time-dilated UMTS FDD – Impact to RAN1 specifications | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NSN | Agreed |
R1‑133928 | TP on Lean Carrier | Ericsson, ST-Ericsson | Agreed |
R1‑133929 | TP on link level simulation assumptions for Lean Carrier | Ericsson, ST-Ericsson | Agreed |
R1‑133930 | LS to RAN2 on RAN1 input to Further EUL Enhancements TR | RAN1, Ericsson | Withdrawn |
R1‑133931 | Downlink System Performance of DCH Enhancements | QUALCOMM Incorporated, MediaTek Inc | Agreed |
R1‑133932 | TP on Conclusions | QUALCOMM Incorporated, MediaTek Inc., NSN, ZTE | Agreed |
R1‑133933 | Uplink System Performance of DCH Enhancement | QUALCOMM Incorporated, MediaTek Inc | Agreed |
R1‑133934 | TP on Uplink DCH Enhancements | Qualcomm Incorporated, MediaTek Inc., ZTE | Agreed |
R1‑133935 | TP on Impact to Specifications due to DCH Enhancements | QUALCOMM Incorporated, MediaTek Inc, NSN, ZTE | Agreed |
R1‑133936 | TP on Simulation Assumptions | QUALCOMM Incorporated, MediaTek Inc, NSN, ZTE | Agreed |
R1‑133937 | TP on Implementation Complexity for DCH enhancements | QUALCOMM Incorporated, NSN, MediaTek Inc, ZTE | Agreed |
R1‑133938 | TP on DL DCH Enhancements | QUALCOMM Incorporated, MediaTek Inc, NSN, ZTE | Agreed |
R1‑133939 | TP on UE Modem Gating Analysis | QUALCOMM Incorporated, MediaTek Inc | Agreed |
R1‑133940 | TP on Link simulation results for UL DCH Enhancements | QUALCOMM Incorporated, MediaTek Inc | Agreed |
R1‑133941 | TR 25.702 v0.2.1 on DCH Enhancements for UMTS | Qualcomm Inc. | Noted - Revised |
R1‑133942 | TR 25.702 v0.3.0 on DCH Enhancements for UMTS | Qualcomm Inc. | Noted - Revised |
R1‑133943 | TP on Power Spectral Density and Design Options of the P-CCPCH Channel | Qualcomm Inc. | Agreed |
R1‑133944 | Text Proposal on System Level Results with Multiple Transmit Antennas | Ericsson, ST-Ericsson | Agreed |
R1‑133945 | Text Proposal on Network Assisted Interference Cancellation | Ericsson, ST-Ericsson | Noted - Revised |
R1‑133946 | Text Proposal on Legacy UE Performance in Combined Cell Deployment | Ericsson, ST-Ericsson | Agreed |
R1‑133947 | Text Proposal on System Performance of Combined Cell Deployments | Ericsson, ST-Ericsson | Noted - Revised |
R1‑133948 | TP on the conclusion of HetNet TR | Huawei, HiSilicon | Noted - Revised |
R1‑133949 | TP on Impacts to UE Implementation due to Scalable UMTS | QUALCOMM Incorporated, Renesas Mobile Europe Ltd | Withdrawn |
R1‑133950 | Text Proposal on Link Level Simulation Results for Time-Dilated UMTS | Huawei, HiSilicon, Qualcomm, ZTE, China Unicom | Noted |
R1‑133951 | TR 25.701 V0.2.1 on Scalable UMTS FDD bandwidth | China Unicom | Noted - Revised |
R1‑133952 | Chairman's summary of the UMTS sessions 6.1, 6.3, 6.4, 6.5 and 6.6 | Ad-Hoc Chair (NSN) | Endorsed |
R1‑133953 | Simulation assumptions for the evaluation of E-DPCCH overhead reduction | Huawei, HiSilicon | Agreed |
R1‑133954 | TP on Rate adaptation motivation and description of 2-loop and 3-loop approaches | NSN, Ericsson, Huawei, HiSilicon | Agreed |
R1‑133955 | TR 25.701 V0.3.0 on Scalable UMTS FDD bandwidth | China Unicom | Agreed |
R1‑133956 | Way Forward on UE coverage improvements | CMCC, Vodafone | Not treated |
R1‑133957 | TP for TR on 3D channel model | NSN, Nokia | Noted - Revised |
R1‑133958 | Fast fading modeling details | NSN, Nokia | Withdrawn |
R1‑133959 | Way Forward on fast fading model | NSN, Nokia, Samsung, Huawei, HiSilicon, CMCC,NTT DOCOMO, CATT, LG, Anite | Noted |
R1‑133960 | Draft text proposal on small cell on/off performance | Huawei, HiSilicon, NTT DOCOMO, CATR | Agreed |
R1‑133961 | Draft text proposal on small cell on/off | Huawei, HiSilicon, NTT DOCOMO, CATR | Noted - Revised |
R1‑133962 | Draft TP for TR36.872 on small cell on/off energy savings | NSN, Nokia | Agreed |
R1‑133963 | Text proposal of TR 36.872 on efficient discovery of small cells | NTT DOCOMO, Huawei, HiSilicon, ZTE, LG Electronics | Agreed |
R1‑133964 | Way Forward on PBCH coverage enhancement for MTC | LGE, Alcatel Lucent, Alcatel Lucent Shanghai Bell, ZTE | Noted |
R1‑133965 | Way Forward on TDD eIMTA reconfiguration signaling | ZTE, LG Electronics, Huawei, HiSilicon, Coolpal, Intel | Noted |
R1‑133966 | Way Forward on evaluation assumptions for the second phase calibration | LG Electronics, NTT DOCOMO, Samsung, ZTE | Noted |
R1‑133967 | Way Forward on UE attachment modeling | LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia, Nokia Siemens Networks, Qualcomm | Noted |
R1‑133968 | Outcome of the offline discussion on D2D evaluation methodology | Intel Corporation | Noted |
R1‑133969 | Way Forward on Mechanical Tilt | NSN, Nokia, Fraunhofer IIS, Motorola Mobility, Broadcom, Ericsson, ST-Ericsson | Noted |
R1‑133970 | Way Forward on Downlink DTX | Ericsson, ST-Ericsson | Not treated |
R1‑133971 | Text proposal of TR36.872 on other interference avoidance and coordination mechanisms | Intel Corporation, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, BlackBerry UK Limited, CMCC, CATR, Coolpad, Fujitsu, IAESI, LGE, MediaTek, NSN, Nokia, Panasonic, ZTE | Agreed |
R1‑133972 | Way Forward on Inter-Cell D2D Discovery | NTT DOCOMO, Ericsson, ST-Ericsson, Qualcomm, LG Electronics | Not treated |
R1‑133973 | Draft text proposal on load shifting/balancing and UE association enhancements | Huawei, HiSilicon | Noted - Revised |
R1‑133974 | Way Forward on 3D Coordinate System | Anite, Fraunhofer IIS, Broadcom | Noted |
R1‑133975 | Way Forward on channel coefficients generation in 3D channel modeling | Huawei, HiSilicon, Motorola Mobility, Samsung, Broadcom, InterDigital, Fraunhofer IIS, Anite, NSN, Nokia, CATT, KDDI | Agreed |
R1‑133976 | Summary of evaluation results of standalone NCT | Ericsson, ST-Ericsson, Huawei, Hi-Silicon | Noted - Revised |
R1‑133977 | [DRAFT] LS on Benefits of Standalone NCT | Ericsson, ST-Ericsson | Noted - Revised |
R1‑133978 | Way Forward on D2D Inband Emission Modeling | Nokia, NSN, Qualcomm Inc., Huawei, HiSilicon, Fujitsu, Harris | Noted |
R1‑133979 | Way Forward on Downlink DTX | Panasonic | Noted |
R1‑133980 | Way Forward on Type 1 Discovery | Qualcomm Inc, Fujitsu, General Dynamics Broadband UK, BlackBerry | Not treated |
R1‑133981 | Summary of Ad-hoc session on Low-cost MTC UEs based on LTE | Ad-Hoc Chairman (NTT DoCoMo) | Endorsed |
R1‑133982 | Summary of Ad-hoc session on 3D-channel model for Elevation Beamforming and FD-MIMO | Ad-Hoc Chairman (Samsung) | Endorsed |
R1‑133983 | Summary of Ad-hoc session on Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | Ad-Hoc Chairman (Samsung) | Endorsed |
R1‑133984 | LS on notifying for information of including Annex about Public Safety ProSe Communication in TR 36.843 | RAN1, U.S. Department Of Commerce | Agreed |
R1‑133985 | Reply LS on the support of radio-interface based synchronization mechanisms | RAN4, Huawei | Noted |
R1‑133986 | LS on D2D Inband Emission Modeling for D2D System Level Simulations | RAN1, Nokia | Agreed |
R1‑133987 | Conclusion on support of TDD-FDD joint operation with dual connectivity | LGE | Not treated |
R1‑133988 | Proposal on in-band emissions parameters | Qualcomm Inc. | Not treated |
R1‑133989 | void | - | Withdrawn |
R1‑133990 | Draft TR36.874 v0.2.0 on CoMP for LTE with non-ideal backhaul | Samsung | Noted - Revised |
R1‑133991 | Draft WID of small cell enhancements - physcal layer aspects | Huawei, HiSilicon, CATR | Not treated |
R1‑133992 | Summary of evaluation results of standalone NCT | Ericsson, ST-Ericsson, Huawei, Hi-Silicon | Endorsed |
R1‑133993 | LS on Benefits of Standalone NCT | RAN1, Ericsson | Agreed |
R1‑133994 | Draft text proposal on feasibility and benefits of radio-interface based synchronization mechanisms | Huawei, HiSilicon, CATR, Telecom Italia, Deutsche Telekom, KDDI, T-Mobile USA, Orange, CMCC, IAESI, AT&T, BlackBerry UK Limited, Vodafone Group, CATT | Noted - Revised |
R1‑133995 | Dynamic eNB Downlink DTX – Way Forward | Ericsson, ST-Ericsson | Not treated |
R1‑133996 | Text proposal on small cell on/off | Huawei, HiSilicon, NTT DOCOMO, CATR | Agreed |
R1‑133997 | Draft text proposal on physical layer support of dual connectivity | Huawei, HiSilicon, CATR | Noted - Revised |
R1‑133998 | LS on RAN2 TP for UMTS Heterogeneous Networks | RAN2, Huawei | Noted |
R1‑133999 | WF on RRC parameter name with and without release extension | Panasonic, Samsung | Noted |
R1‑134000 | WI Proposal on LTE Energy Consumption Optimization | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑134001 | Draft text proposal on load shifting/balancing and UE association enhancements | Huawei, HiSilicon | Agreed |
R1‑134002 | [DRAFT] LS on LTE_TDD_eIMTA | CATT | Noted - Revised |
R1‑134003 | TR 36.872 v0.4.0 Study on Small Cell Enhancements for E-UTRA and E-UTRAN – Physical-layer Aspects | Huawei, HiSilicon | Noted - Revised |
R1‑134004 | Way Forward on TDD/FDD joint operation | CMCC, Huawei, HiSilicon | Not treated |
R1‑134005 | LS on Scalable UMTS TP | RAN2, China Unicom | Noted |
R1‑134006 | Text Proposal on System Performance of Combined Cell Deployments | Ericsson, ST-Ericsson | Agreed |
R1‑134007 | 36.213 CR0431R3 (Rel-12, B) Introduction of Rel 12 feature for Downlink MIMO Enhancement | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Endorsed |
R1‑134008 | TP on the conclusion of HetNet TR | Huawei, HiSilicon | Noted - Revised |
R1‑134009 | LS on RRC parameter names with and without extension in L1 specs | RAN1, Ericsson | Agreed |
R1‑134010 | Reply LS to 3GPP Internal LS on the technologies for public protection and disaster relief communications associated with work on wrc-15 agenda item 1.3 | RAN1, Telecom Italia | Agreed |
R1‑134011 | TR 25.800 v1.1.0 on UMTS heterogeneous networks | Huawei, HiSilicon | Noted - Revised |
R1‑134012 | TR 25.800 v2.0.0 on UMTS heterogeneous networks | Huawei, HiSilicon | Agreed |
R1‑134013 | Text Proposal on Network Assisted Interference Cancellation | Ericsson, ST-Ericsson | Agreed |
R1‑134014 | TP on the conclusions of UMTS HetNet SI | Huawei, HiSilicon | Agreed |
R1‑134015 | TR 25.702 v1.0.0 on DCH Enhancements for UMTS | Qualcomm Inc. | Agreed |
R1‑134016 | Impacts on the network for S-UMTS | Huawei, HiSilicon | Agreed |
R1‑134017 | Text proposal on feasibility and benefits of radio-interface based synchronization mechanisms | Huawei, HiSilicon, CATR, Telecom Italia, Deutsche Telekom, KDDI, T-Mobile USA, Orange, CMCC, IAESI, AT&T, BlackBerry UK Limited, Vodafone Group, CATT | Agreed |
R1‑134018 | Text proposal on physical layer support of dual connectivity | Huawei, HiSilicon, CATR | Agreed |
R1‑134019 | LS on LTE_TDD_eIMTA | RAN1, CATT | Agreed |
R1‑134020 | Text proposal for FDD and TDD joint operation | CMCC | Agreed |
R1‑134021 | TR 36.847 v0.1.0 on LTE TDD - FDD joint operation including CA | CMCC | Noted - Revised |
R1‑134022 | TR 36.847 v1.0.0 on LTE TDD - FDD joint operation including CA | CMCC | Agreed |
R1‑134023 | TR 36.872 v1.0.0 Study on Small Cell Enhancements for E-UTRA and E-UTRAN – Physical-layer Aspects | Huawei, HiSilicon | Agreed |
R1‑134024 | TP for TR on 3D channel model | NSN, Nokia | Agreed |
R1‑134025 | Text Proposal for TR 36.843 | Qualcomm Inc. | Agreed |
R1‑134026 | TR36.874 v0.2.0 on CoMP for LTE with non-ideal backhaul | Samsung | Agreed |
R1‑134027 | LS to RAN2 on RAN1 input to Further EUL Enhancements TR | RAN1, Ericsson | Agreed |
page generated from database: 2024-10-07 07:52:06