3GPP TDocs (written contributions) at meeting
Meeting: R1-72 - 2013-01-28 to 2013-02-01, Malta
meeting id: R1-72 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑130000 | Draft Agenda for RAN1#72 meeting | RAN1 Chairman | Revised |
R1‑130001 | Final Report from RAN1#71 | MCC | Approved |
R1‑130002 | LS on Release 11 UMTS capabilities and feature dependencies | RAN2, Huawei | Noted |
R1‑130003 | Reply LS on LTE Rel-11 UE capability list | RAN2, NTT DoCoMo | Noted |
R1‑130004 | LS to RAN2 on wideband RSRQ measurement | RAN4, NTT DoCoMo | Noted |
R1‑130005 | Draft CR for clarification on overlap subframes with different TAGs in 36.213 | Huawei, HiSilicon | Agreed |
R1‑130006 | Finalization of EPDCCH search space function and text proposal | Huawei, HiSilicon | Noted |
R1‑130007 | Finalization of implementation of Yk and text proposal | Huawei, HiSilicon | Noted |
R1‑130008 | Finalization of TDD PUCCH ACK/NACK issues | Huawei, HiSilicon | Noted |
R1‑130009 | Aspects of Rel.12 NCT | Huawei, HiSilicon | Noted |
R1‑130010 | PSS/SSS collisions with DM-RS | Huawei, HiSilicon | Noted |
R1‑130011 | PSS/SSS and DMRS collision and NCT identification | Huawei, HiSilicon | Not treated |
R1‑130012 | Performance evaluation of 4TX MU-MIMO in scenario A | Huawei, HiSilicon | Noted |
R1‑130013 | Proposals of 4TX CSI feedback enhancement in Rel-12 | Huawei, HiSilicon | Not treated |
R1‑130014 | Prioritized scenarios for TDD eIMTA | Huawei, HiSilicon | Noted |
R1‑130015 | Interference mitigation schemes for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑130016 | Text proposal for TR 36.888 on coverage improvement | Huawei, Hisilicon | Revised |
R1‑130017 | Coverage enhancement for physical channels and signals for low-cost MTC | Huawei, Hisilicon | Noted |
R1‑130018 | Performance evaluation and analysis on coverage improvement for low cost MTC | Huawei, Hisilicon | Noted |
R1‑130019 | TR skeleton of small cell enhancement | Huawei, HiSilicon | Noted |
R1‑130020 | Performance metrics and requirements for small cell enhancement | Huawei, HiSilicon | Not treated |
R1‑130021 | Evaluation of higher order modulation | Huawei, HiSilicon | Not treated |
R1‑130022 | Analysis and initial evaluation results for overhead reduction and control signaling enhancements | Huawei, HiSilicon | Noted |
R1‑130023 | Potential technologies for small cell enhancement - operation efficiency improvement | Huawei, HiSilicon | Noted |
R1‑130024 | Feasibility and benefits of radio-interface based synchronization mechanisms for operation efficiency improvement | Huawei, HiSilicon | Not treated |
R1‑130025 | Potential technologies for small cell enhancement - physical layer support of high-layer aspects | Huawei, HiSilicon | Not treated |
R1‑130026 | Discussion on 3D antenna model with 2D antenna array | Huawei, HiSilicon | Not treated |
R1‑130027 | Discussion on 3D channel model extension | Huawei, HiSilicon | Not treated |
R1‑130028 | Use scenarios for elevation beamforming | Huawei, HiSilicon | Noted |
R1‑130029 | Evaluation requirements for D2D | Huawei, HiSilicon | Noted |
R1‑130030 | Non-rectangular resource allocation for LCR TDD | CATT, New Postcom, Potevio, TD Tech, CATR | Not treated |
R1‑130031 | Draft LS on non-rectangular resource allocation for LCR TDD | CATT | Not treated |
R1‑130032 | Draft TS36.213CR for Correction on UE-specific RS overhead for deriving CQI when PMI/RI is configured in TM9 | CATT | Noted - Revised |
R1‑130033 | Discussion on corrections for SRS power scaling in UpPTS | CATT | Noted |
R1‑130034 | Draft TS36.213CR on corrections for SRS power scaling in UpPTS | CATT | Revised |
R1‑130035 | Remaining details on EPDCCH search space | CATT | Noted |
R1‑130036 | EPDCCH PUCCH resource allocation for TDD | CATT, CATR, CMCC | Noted |
R1‑130037 | DMRS AP-to-RE association for distributed EPDCCH transmission | CATT | Noted |
R1‑130038 | Handling of collision between PSS/SSS and DMRS for NCT | CATT | Noted |
R1‑130039 | RRM measurements for NCT | CATT | Noted |
R1‑130040 | Design of synchronized new carrier type | CATT | Not treated |
R1‑130041 | Impact of supporting new bandwidth on NCT | CATT | Not treated |
R1‑130042 | Resource allocation for NCT | CATT | Not treated |
R1‑130043 | Evaluation on DMRS optimization for NCT | CATT | Noted |
R1‑130044 | Discussion on CSI-RS transmission on NCT | CATT | Not treated |
R1‑130045 | Standalone and non-standalone NCT | CATT | Not treated |
R1‑130046 | Evaluation results for further enhanced DL-MIMO | CATT | Noted |
R1‑130047 | CSI feedback enhancements for LTE-A | CATT | Not treated |
R1‑130048 | Deployment scenarios for TDD eIMTA | CATT | Noted |
R1‑130049 | Interference mitigation schemes for TDD eIMTA | CATT | Not treated |
R1‑130050 | Further evaluation results for interference mitigation schemes in Macro-Pico scenarios | CATT | Noted |
R1‑130051 | Further evaluation results on TDD UL-DL reconfigurations | CATT | Not treated |
R1‑130052 | Signalling mechanisms for TDD UL-DL reconfigurations | CATT | Not treated |
R1‑130053 | Coverage improvement analysis for low-cost MTC UEs | CATT | Noted |
R1‑130054 | Text proposal on coverage improvement for low-cost MTC UEs | CATT | Not treated |
R1‑130055 | On Rel-12 small cell deployment scenarios | CATT | Not treated |
R1‑130056 | Support of 256QAM for small cells | CATT | Not treated |
R1‑130057 | Overhead reduction for spectrum efficiency improvement | CATT | Noted |
R1‑130058 | Mechanisms for efficient small cell operations | CATT | Noted |
R1‑130059 | Discussion on scenarios for UE-specific elevation beamforming and FD-MIMO | CATT | Not treated |
R1‑130060 | Channel modeling for 3D-MIMO | CATT | Not treated |
R1‑130061 | On evaluation methodology and channel model for D2D proximity services | CATT | Noted |
R1‑130062 | RAN1 scope for Rel-12 mobile relay SI | CATT | Not treated |
R1‑130063 | Text proposal for MTC coverage improvement through combined code spreading and tti bundling | Sierra Wireless | Not treated |
R1‑130064 | Text proposal for MTC coverage improvement through limiting the number of sub-carriers per resource block | Sierra Wireless | Not treated |
R1‑130065 | Text proposal for MTC PDCCH coverage improvement through blind HARQ combining | Sierra Wireless | Not treated |
R1‑130066 | 36.213 Draft CR (Rel-10, F) Correction on UE procedure for reporting HARQ-ACK | Intel Corporation, CATT, CMCC, Huawei, HiSilicon, Samsung, Ericsson, ST-Ericsson, Renesas Mobile Europe, Nokia Siemens Networks | Noted - Revised |
R1‑130067 | 36213 Draft CR (Rel-11, F) Correction to PRB bundling for transmission mode 10 | Intel Corporation | Noted |
R1‑130068 | Correction to RI-reference CSI process in case of subframe sets | Intel Corporation | Noted |
R1‑130069 | 36213 Draft CR (Rel-11, F) Correction to RI-reference CSI process in case of subframe sets | Intel Corporation | Not treated |
R1‑130070 | Corrections to UE assumptions for deriving CQI index | Intel Corporation | Noted |
R1‑130071 | 36213 Draft CR (Rel-11, F) Corrections to UE assumptions for deriving CQI index | Intel Corporation | Noted |
R1‑130072 | DM RS orthogonality between two antenna ports within a CDM group | Intel Corporation | Noted |
R1‑130073 | Remaining details of AP Association for Distributed EPDCCH | Intel Corporation | Noted |
R1‑130074 | Remaining details on PUCCH resource allocation for EPDCCH | Intel Corporation | Noted |
R1‑130075 | Search space equation for distributed EPDCCH | Intel Corporation | Noted |
R1‑130076 | On collision between DM RS and PSS/SSS in new carrier | Intel Corporation | Noted |
R1‑130077 | CRS design for NCT – discussion on cell-specific frequency shift | Intel Corporation | Not treated |
R1‑130078 | Reduced CRS in frequency domain for new carrier | Intel Corporation | Not treated |
R1‑130079 | Views on synchronized new carrier | Intel Corporation | Not treated |
R1‑130080 | UERS based downlink open loop MIMO for NCT | Intel Corporation | Not treated |
R1‑130081 | Evaluation results for DL MIMO enhancement | Intel Corporation | Noted |
R1‑130082 | On downlink MIMO enhancement | Intel Corporation | Not treated |
R1‑130083 | Discussion on Deployment Scenarios for TDD UL-DL Reconfigurations | Intel Corporation | Noted |
R1‑130084 | Discussion on Interference Mitigation Schemes for LTE-TDD eIMTA | Intel Corporation | Not treated |
R1‑130085 | Discussion on Signalling Mechanisms for TDD UL-DL Reconfiguration | Intel Corporation | Not treated |
R1‑130086 | Views on small cell evaluation methodology | Intel Corporation | Not treated |
R1‑130087 | Evaluation of specific enhancements for improved spectral efficiency | Intel Corporation | Noted |
R1‑130088 | Discussion on small cell discovery operation | Intel Corporation | Not treated |
R1‑130089 | Scenarios for 3D-MIMO and FD-MIMO | Intel Corporation | Noted |
R1‑130090 | Views on 3D channel modeling | Intel Corporation | Not treated |
R1‑130091 | Discussion on D2D Evaluation Methodology | Intel Corporation | Not treated |
R1‑130092 | Discussion on UE-UE Channel Model for D2D Studies | Intel Corporation | Not treated |
R1‑130093 | Techniques for CSI Feedback Enhancement | Broadcom Corporation | Noted |
R1‑130094 | Text Proposal on FDD PUCCH Resource Offset Mapping for EPDCCH | Texas Instruments | Noted |
R1‑130095 | TDD Dynamic PUCCH Resource Allocation for EPDCCH | Texas Instruments | Noted |
R1‑130096 | Location of PSS/SSS on the New Carrier Type | Texas Instruments | Revised |
R1‑130097 | Design of a Synchronized New Carrier Type | Texas Instruments | Revised |
R1‑130098 | Performance evaluation of CSI enhancements | Texas Instruments | Noted |
R1‑130099 | Discussion on further DL MIMO enhancement in Rel.12 | Texas Instruments | Revised |
R1‑130100 | General Evaluation Assumptions and Methodology for Small Cell Enhancements | Texas Instruments | Revised |
R1‑130101 | Evaluation Assumptions for Enhancements for Improved Spectral Efficiency | Texas Instruments | Noted |
R1‑130102 | Evaluation Assumptions for Mechanisms for Efficient Small Cell Operation | Texas Instruments | Not treated |
R1‑130103 | Scenarios and Requirements for Device to Device Proximity Services | Texas Instruments | Not treated |
R1‑130104 | Corrections to PDSCH mapping in 36.211 | Fujitsu | Noted |
R1‑130105 | Corrections to localized EPDCCH search space | Fujitsu | Noted |
R1‑130106 | Corrections to distributed EPDCCH search space | Fujitsu | Noted |
R1‑130107 | Discussion on CSI feedback enhancements for Rel.12 | Fujitsu | Noted |
R1‑130108 | Considerations on the issues of Low-cost MTC UEs based on LTE | Fujitsu | Not treated |
R1‑130109 | Evaluation assumptions and methodology for small cell enhancement | Fujitsu | Not treated |
R1‑130110 | Modifications from ITU-R channel models to 3D | Fujitsu | Not treated |
R1‑130111 | Considerations on the evaluation methodology and channel model of the LTE Device to Device proximity services | Fujitsu | Not treated |
R1‑130112 | Corrections on TDD HARQ-ACK transmission with different UL-DL configurations on different cells | CATT | Noted - Revised |
R1‑130113 | Corrections on SORTD for PUCCH format 1b with channel selection | CATT | Agreed |
R1‑130114 | Corrections on simultaneous transmission of HARQ-ACK and periodic CSI | CATT | Agreed |
R1‑130115 | Corrections on SRS for multiple TAGs | CATT | Agreed in principle |
R1‑130116 | Corrections on PDSCH and EPDCCH starting symbol | CATT | Noted - Revised |
R1‑130117 | Discussion on periodic CSI reporting with RI-reference CSI process | CATT | Not treated |
R1‑130118 | Discussion on RE mapping for NZP CSI-RS | CATT | Noted |
R1‑130119 | Corrections on CQI definition | CATT | Agreed |
R1‑130120 | Corrections on PDSCH RE mapping and QCL | CATT | Not treated |
R1‑130121 | Corrections on periodic CSI reporting | CATT | Noted |
R1‑130122 | Miscellaneous corrections for TS36.213 | CATT | Noted |
R1‑130123 | NCT scenarios for evaluation and deployment | ZTE | Not treated |
R1‑130124 | Synchronization signal and DMRS collision in NCT | ZTE | Not treated |
R1‑130125 | Consideration on measurement in New Carrier Type | ZTE | Noted |
R1‑130126 | On synchronized New Carrier Type | ZTE | Not treated |
R1‑130127 | Considerations for Non-standalone NCT | ZTE | Not treated |
R1‑130128 | Power Control Enhancement For Performance Improvement in Multi-cell Scenarios | ZTE | Noted |
R1‑130129 | Signaling to reconfigure TDD UL/DL allocation | ZTE | Not treated |
R1‑130130 | HARQ timing in TDD-eIMTA | ZTE | Not treated |
R1‑130131 | Channel model for LTE device-to-device proximity services | ZTE | Not treated |
R1‑130132 | Evaluation methodology for D2D communication within network coverage | ZTE | Not treated |
R1‑130133 | Evaluation methodology for D2D discovery | ZTE | Noted |
R1‑130134 | Considerations on evaluation assumptions and methodology for small cell enhancements^^ | ZTE | Not treated |
R1‑130135 | Mechanisms for interference avoidance and coordination in small cell scenarios^^ | ZTE | Noted |
R1‑130136 | Cosideration on high order modulation for Small cell | ZTE | Not treated |
R1‑130137 | Consideration in downlink control overhead reduction for small cell | ZTE | Not treated |
R1‑130138 | Downlink DMRS reduction for Small Cell | ZTE | Not treated |
R1‑130139 | Evaluation on the Uplink DMRS Overhead Reduction of Small Cells | ZTE | Not treated |
R1‑130140 | Discussion on scenarios of 3D beamforming and Massive MIMO | ZTE | Not treated |
R1‑130141 | Consideration on 3D channel model and evaluation methodology | ZTE | Revised |
R1‑130142 | Discussion on various CSI feedback enhancement schemes | ZTE | Not treated |
R1‑130143 | Evaluation results of CSI feedback enhancements | ZTE | Noted |
R1‑130144 | Discussions on Feedback Enhancements for MU-MIMO | ITRI | Noted |
R1‑130145 | On synchronized new carrier type | ITRI | Not treated |
R1‑130146 | Evaluation assumptions and metrics on small cell enhancements | ITRI | Not treated |
R1‑130147 | Evaluation of eIMTA with different reconfiguration time scales | ITRI | Not treated |
R1‑130148 | Evaluation of eIMTA with dual CSI feedbacks | ITRI | Not treated |
R1‑130149 | Evaluation of a flexible clustering-based interference mitigation scheme | ITRI | Not treated |
R1‑130150 | Considerations on evaluation scenarios for eIMTA | ITRI | Noted |
R1‑130151 | Coverage Enhancement for MTC Devices | ITRI | Noted |
R1‑130152 | WiFi System Level Evaluation as Reference for LTE Device to Device Communications | ITRI | Not treated |
R1‑130153 | Device to Device Communication Range Evaluation based on Link Budget Evaluation | ITRI | Noted |
R1‑130154 | Evaluation scenarios and channel models for D2D communications | New Postcom | Not treated |
R1‑130155 | Details of EPDCCH blind decoding number | New Postcom | Noted |
R1‑130156 | Remaining details of search space equation for EPDCCH | New Postcom | Not treated |
R1‑130157 | Correction on EPDCCH RE mapping | New Postcom | Noted |
R1‑130158 | Correction on EPDCCH assignment procedure | New Postcom | Noted |
R1‑130159 | Study on the scenarios for UE-specific elevation beamforming | New Postcom | Not treated |
R1‑130160 | Considerations on 3D channel model for 3D beamforming | New Postcom | Not treated |
R1‑130161 | Considerations on design of PSS and SSS for NCT | New Postcom | Not treated |
R1‑130162 | Discussion on the evaluation methodology for small cell enhancements | New Postcom | Not treated |
R1‑130163 | Discussion on different signalling mechanisms for TDD UL-DL reconfiguration | New Postcom | Not treated |
R1‑130164 | Remaining aspects of PUCCH resource allocation for TDD | New Postcom | Revised |
R1‑130165 | Evaluation results of further downlink MIMO enhancement for LTE-Advanced | New Postcom | Revised |
R1‑130166 | CSI feedback enhancements for downlink MIMO | New Postcom | Not treated |
R1‑130167 | Antenna port association for distributed EPDCCH | New Postcom | Noted |
R1‑130168 | Consideration of reference signals on NCT for potential use case of Rel-12 EPDDCH | Fujitsu | Not treated |
R1‑130169 | MTC Traffic Model/Characteristics concerning Large Scale Events | Fujitsu | Not treated |
R1‑130170 | MTC Traffic Models: Performance Evaluation Criteria | Fujitsu | Withdrawn |
R1‑130171 | MTC Traffic Overloading and Related Impacts | Fujitsu | Noted |
R1‑130172 | Evaluation assumptions for introduction of DL higher order modulation to small cell | Fujitsu | Noted |
R1‑130173 | Design aspects for higher order modulation | Fujitsu | Withdrawn |
R1‑130174 | Considerations on UE-specific RS for small cell enhancement | Fujitsu | Noted |
R1‑130175 | Evaluation assumptions for inter-site CA | ETRI | Not treated |
R1‑130176 | Synchronization information in NCT | Sony | Not treated |
R1‑130177 | Discussion on deployment scenarios for new carrier types | New Postcom | Not treated |
R1‑130178 | CSI-RS based RRM measurement for synchronized NCT | New Postcom | Not treated |
R1‑130179 | RRM measurement issue for unsynchronized NCT | New Postcom | Noted |
R1‑130180 | Legacy control channel configuration for new carrier types | New Postcom | Not treated |
R1‑130181 | The bandwidth configuration for the reduced CRS on unsynchronized NCT | New Postcom | Not treated |
R1‑130182 | Frequency hopping for unsynchronized NCT | New Postcom | Not treated |
R1‑130183 | Discussion on transmission modes and DCI formats on NCT | New Postcom | Noted |
R1‑130184 | CRS subframe configuration for unsynchronized NCT | New Postcom | Not treated |
R1‑130185 | A subset-CRS based tracking RS for unsynchronized NCT | New Postcom | Not treated |
R1‑130186 | Evaluation assumptions for enhancement for UE-specific RS and control signaling | New Postcom | Noted |
R1‑130187 | Modulation scheme selection of DL for small cells | New Postcom | Not treated |
R1‑130188 | Efficient discovery of small cells | New Postcom | Not treated |
R1‑130189 | Synchronization acquisition of small cells | New Postcom | Not treated |
R1‑130190 | Mechanisms For Interference Avoidance and Coordination Among Small Cells | New Postcom | Noted |
R1‑130191 | Spectrum Deployment and Application Scenarios of Small Cell Enhancement | New Postcom | Not treated |
R1‑130192 | Discussion on the deployment scenarios for TDD UL-DL reconfigurations | New Postcom | Not treated |
R1‑130193 | Discussion on Interference Mitigation schemes for eIMTA | New Postcom | Not treated |
R1‑130194 | Proposals on Down Link Coverage Enhancement for Low Cost MTC | New Postcom | Not treated |
R1‑130195 | Evaluations on Time Domain Repetition for Low Cost MTC | New Postcom | Noted |
R1‑130196 | UL Cell Coverage improvement for low cost MTC | New Postcom | Not treated |
R1‑130197 | Downlink control signalling enhancement for DL_RS in small cell | ZTE | Not treated |
R1‑130198 | Required system functionality TP for TR 36.888 on coverage improvement | ZTE | Not treated |
R1‑130199 | Text Proposal on concepts for coverage improvement for TR 36.888 | ZTE | Not treated |
R1‑130200 | Text proposal on Coverage Improvement Analysis of Physical channels and Signal for TR36.888 | ZTE | Not treated |
R1‑130201 | Remaining details of ePDCCH with cross-carrier scheduling | ZTE | Not treated |
R1‑130202 | Remaining details of ePDCCH with Non Cross-Carrier scheduling | ZTE | Not treated |
R1‑130203 | Clarification for the Scope of First Phase NCT | KDDI | Noted |
R1‑130204 | RRM Measurement and Elimination of CRS for First Phase NCT | KDDI | Not treated |
R1‑130205 | Initial Evaluation Results for Downlink Small Cell Enhancements with Dedicated Channel | KDDI | Revised |
R1‑130206 | Initial Evaluation Results for Uplink Small Cell Enhancements with Dedicated Channel | KDDI | Not treated |
R1‑130207 | Views on the Physical Layer Enhancements for Small Cells to Improve Spectral Efficiency | KDDI | Not treated |
R1‑130208 | Views on Efficient Small Cell Operations | KDDI | Noted |
R1‑130209 | Views on usage scenarios for FD-MIMO | KDDI | Noted |
R1‑130210 | Views on 3D MIMO Channel Modeling for Elevation Beamforming | KDDI | Not treated |
R1‑130211 | A proposal of evaluation conditions and performance metrics for non-public-safety device-to-device proximity service | KDDI | Noted |
R1‑130212 | Time-frequency location of PSS/SSS in non-synchronized NCT | MediaTek Inc. | Not treated |
R1‑130213 | Performance results of feedback mode 3-2 and enhanced MU-CQI | MediaTek Inc. | Revised |
R1‑130214 | CSI feedback enhancement considerations for Rel-12 | MediaTek Inc. | Revised |
R1‑130215 | Interference mitigation schemes for LTE adaptive TDD systems | MediaTek Inc. | Noted |
R1‑130216 | Discussion on signalling to support TDD UL-DL reconfiguration | MediaTek Inc. | Not treated |
R1‑130217 | Support for legacy UEs in adaptive TDD systems | MediaTek Inc. | Not treated |
R1‑130218 | On required system functionalities for MTC UEs operating in enhanced coverage mode | MediaTek Inc. | Noted |
R1‑130219 | Coverage results and analysis of PSS/SSS for MTC UEs | MediaTek Inc. | Noted |
R1‑130220 | Coverage analysis of PDSCH and enhancement techniques for MTC UEs | MediaTek Inc. | Not treated |
R1‑130221 | Coverage analysis of downlink control channel and enhancement techniques for MTC UEs | MediaTek Inc. | Not treated |
R1‑130222 | Evaluation methodology for small cell enhancements | MediaTek Inc. | Not treated |
R1‑130223 | On overhead reduction in small cell enhancements | MediaTek Inc. | Noted |
R1‑130224 | Methods for interference avoidance in small cell enhancements | MediaTek Inc. | Noted |
R1‑130225 | Methods for efficient discovery of small cells | MediaTek Inc. | Not treated |
R1‑130226 | Final details of EPDCCH search space equation | InterDigital | Noted |
R1‑130227 | Final details of EPDCCH hashing function | InterDigital | Noted |
R1‑130228 | Final details of EPDCCH antenna port mapping | InterDigital | Not treated |
R1‑130229 | On DMRS and PSS/SSS transmissions with NCT | InterDigital | Noted |
R1‑130230 | SCell RRM measurements and procedures for NCT | InterDigital | Withdrawn |
R1‑130231 | On NCT design for the synchronized case | InterDigital | Not treated |
R1‑130232 | Signaling mechanisms to support TDD UL-DL reconfiguration | InterDigital | Noted |
R1‑130233 | Recommendations for Small Cell evaluation methodology and assumptions | InterDigital | Not treated |
R1‑130234 | Evaluation methodology for 256QAM in Small Cell deployments | InterDigital | Noted |
R1‑130235 | Cell DTX for Small Cell operation | InterDigital | Noted |
R1‑130236 | Recommendations for D2D evaluation methodology and assumptions | InterDigital | Not treated |
R1‑130237 | Coverage enhancement by downlink power-density boosting for low-cost MTC UEs | Sony | Not treated |
R1‑130238 | Progressing coverage extension evaluations for low-cost MTC UEs | Sony | Not treated |
R1‑130239 | HARQ-ACK timing determination for CA with different TDD UL-DL configurations | LG Electronics | Noted - Revised |
R1‑130240 | DAI signalling in DL assignment for CA with different TDD UL-DL configurations | LG Electronics | Noted |
R1‑130241 | PHICH resource determination for CA with different TDD UL-DL configurations | LG Electronics | Noted |
R1‑130242 | PHICH reception for the PUSCH transmission scheduled by RAR grant with multiple TAGs | LG Electronics | Noted |
R1‑130243 | Overhead assumptions on CQI definition in TM10 | LG Electronics | Noted |
R1‑130244 | Remaining issue on MBSFN configuration mismatch in PQI behaviour | LG Electronics | Noted |
R1‑130245 | Remaining issue on PRB bundling in TM10 | LG Electronics | Noted |
R1‑130246 | Corrections to EPDCCH search space | LG Electronics | Noted |
R1‑130247 | Corrections to EPDCCH resource mapping | LG Electronics | Noted - Revised |
R1‑130248 | Corrections to HARQ-ACK in EPDCCH | LG Electronics | Noted |
R1‑130249 | Corrections to carrier aggregation in EPDCCH | LG Electronics | Not treated |
R1‑130250 | Handling the Conflict of PSS/SSS and DM-RS in NCT | LG Electronics | Noted |
R1‑130251 | Performance evaluation of DMRS pattern for new carrier type | LG Electronics | Noted |
R1‑130252 | RRM in new carrier type | LG Electronics | Not treated |
R1‑130253 | On synchronized new carrier type | LG Electronics | Not treated |
R1‑130254 | On transmission mode of new carrier type | LG Electronics | Noted |
R1‑130255 | Support of TDD special subframe for the new carrier type in Rel-12 | LG Electronics | Not treated |
R1‑130256 | PHICH for new carrier type | LG Electronics | Not treated |
R1‑130257 | Evaluation results on DL MIMO enhancement | LG Electronics | Noted |
R1‑130258 | Considerations on CSI feedback for DL MIMO enhancement | LG Electronics | Not treated |
R1‑130259 | On the Deployment Scenarios for TDD UL-DL Reconfigurations | LG Electronics | Not treated |
R1‑130260 | Interference mitigation schemes for TDD UL-DL reconfigurations | LG Electronics | Not treated |
R1‑130261 | Discussion on the signalling mechanisms for TDD UL-DL reconfiguration | LG Electronics | Not treated |
R1‑130262 | Considerations on TDD UL-DL reconfigurations | LG Electronics | Not treated |
R1‑130263 | Cell Acquisition and Reference Signals for Coverage Limiting MTC UEs | LG Electronics | Not treated |
R1‑130264 | Text Proposal on Coverage Enhancement for a MTC UE | LG Electronics | Not treated |
R1‑130265 | General evaluation assumptions for small cell enhancement | LG Electronics | Revised |
R1‑130266 | Initial evaluation of DM-RS reduction for small cell | LG Electronics | Revised |
R1‑130267 | Evaluation assumptions for the interference management in small cell environments | LG Electronics | Revised |
R1‑130268 | Evaluation assumptions for the small cell discovery | LG Electronics | Not treated |
R1‑130269 | Scenarios and antenna configurations for 3D-channel study | LG Electronics | Not treated |
R1‑130270 | Considerations on 3D-channel modelling | LG Electronics | Not treated |
R1‑130271 | Considerations for D2D Proximity Services Evaluation | LG Electronics | Noted |
R1‑130272 | Discussion for draft CR on the maximum number of configured cells in TDD CA | Samsung | Noted |
R1‑130273 | Draft CR on the maximum number of configured cells in TDD CA | Samsung | Not treated |
R1‑130274 | Draft CR for format 1b with channel selection in TDD CA | Samsung | Noted |
R1‑130275 | CRS RE assumption for TM10 CSI reporting | Samsung | Not treated |
R1‑130276 | Discussion for CR on RI-reference CSI process for periodic feedback | Samsung | Noted |
R1‑130277 | Draft CR on RI-reference CSI process for periodic feedback | Samsung | Noted - Revised |
R1‑130278 | Draft CR on subframe set configuration for CSI reporting | Samsung | Noted |
R1‑130279 | Remaining Aspects for EPDCCH Search Space Design | Samsung | Revised |
R1‑130280 | Remaining Aspects for HARQ-ACK Transmissions | Samsung | Noted |
R1‑130281 | Using PRB Pairs of EPDCCH Sets for PDSCH Reception | Samsung | Noted |
R1‑130282 | PSS/SSS Details on NCT carriers | Samsung | Noted |
R1‑130283 | RRM measurement for NCT | Samsung | Noted |
R1‑130284 | Discussion on synchronized new carriers | Samsung | Not treated |
R1‑130285 | Considerations for a Standalone NCT | Samsung | Not treated |
R1‑130286 | Evaluations results for CSI feedback enhancements | Samsung | Revised |
R1‑130287 | Proposals for CSI feedback enhancements | Samsung | Not treated |
R1‑130288 | Deployment and interference scenarios for TDD IMTA | Samsung | Not treated |
R1‑130289 | CRS interference in UL/DL flexible subframes | Samsung | Not treated |
R1‑130290 | Power control in flexible subframes | Samsung | Noted |
R1‑130291 | Interference mitigation through Macro UL subframe blanking | Samsung | Not treated |
R1‑130292 | False alarm handling in UL-DL reconfiguration | Samsung | Not treated |
R1‑130293 | Signaling methods for TDD UL-DL reconfiguration | Samsung | Not treated |
R1‑130294 | Coverage improvement techniques for low-cost MTC Ues | Samsung | Not treated |
R1‑130295 | Evaluation scenarios and assumptions for small cell enhancement | Samsung | Not treated |
R1‑130296 | Evaluation methodologies for small cell enhancement | Samsung | Not treated |
R1‑130297 | Evaluation-related Small Cell Enhancements SID Clarifications | Samsung | Not treated |
R1‑130298 | Discussion on higher-order modulation and UE-specific RS for small cells | Samsung | Not treated |
R1‑130299 | Control Signaling Enhancements for Small Cells | Samsung | Not treated |
R1‑130300 | Evaluation assumptions for discovery of small cells | Samsung | Not treated |
R1‑130301 | Evaluation assumptions for interference control among small cells | Samsung | Not treated |
R1‑130302 | Discussion on scenarios for elevation beamforming and FD-MIMO | Samsung | Revised |
R1‑130303 | Initial study and proposal for 3D Channel Modeling | Samsung | Not treated |
R1‑130304 | D2D ProSe Evaluation Methodology | Samsung | Noted |
R1‑130305 | D2D ProSe channel model | Samsung | Not treated |
R1‑130306 | Transmissions of PSS/SSS and DM-RS in Unsynchronised New Carriers | HTC | Not treated |
R1‑130307 | Synchronised New Carriers in Rel-12 LTE | HTC | Not treated |
R1‑130308 | MIMO CSI feedback enhancements for Rel 12 | HTC | Noted |
R1‑130309 | Methods to Support TDD UL-DL Reconfiguration | HTC | Not treated |
R1‑130310 | On HARQ Timing Issues for TDD UL-DL Reconfiguration | HTC | Not treated |
R1‑130311 | On Small Cell Enhancement for Improved Spectral Efficiency | HTC | Not treated |
R1‑130312 | 3D Channel Modelling | HTC | Not treated |
R1‑130313 | Modifications of evaluation methodology for elevation BF and FD-MIMO | HTC | Not treated |
R1‑130314 | Suggestions to channel model in D2D communication | HTC | Not treated |
R1‑130315 | Required channels for semi-static point selection | Panasonic | Noted |
R1‑130316 | Text proposal on CoMP related correction on TS36.213 | Panasonic | Noted |
R1‑130317 | EPDCCH search space equations | Panasonic | Not treated |
R1‑130318 | Remaining FFS aspects on PUCCH resource allocation for EPDCCH in TDD | Panasonic | Not treated |
R1‑130319 | Target scenarios for new carrier types | Panasonic | Revised |
R1‑130320 | CSI Feedback Enhancements for Further DL MIMO Enhancement | Panasonic | Noted |
R1‑130321 | Signalling mechanisms for TDD UL-DL reconfiguration | Panasonic | Not treated |
R1‑130322 | Small Cell Evaluation Assumptions | Panasonic | Not treated |
R1‑130323 | Techniques for efficient small cell operation | Panasonic | Revised |
R1‑130324 | Scenarios for UE-specific elevation beamforming and FD-MIMO | Panasonic | Not treated |
R1‑130325 | Views on the evaluation methodology for LTE D2D proximity services | Panasonic | Not treated |
R1‑130326 | Proposal of realistic traffic assumptions and adequate metrics | IAESI, CEA, DAC-UPC, SEQUANS | Not treated |
R1‑130327 | Impact of the xDSL backhaul delays on X2-based ICIC operation | IAESI, CEA | Revised |
R1‑130328 | Work Plan for DCH Enhancements for UMTS SI | MediaTek Inc. | Noted |
R1‑130329 | TR Skeleton for DCH Enhancements for UMTS | MediaTek Inc. | Noted |
R1‑130330 | Simulation Assumptions for DCH Enhancement | MediaTek Inc. | Noted |
R1‑130331 | DPCH Slot Format Optimization | MediaTek Inc. | Noted |
R1‑130332 | DPCH Frame Early Termination | MediaTek Inc. | Noted |
R1‑130333 | Optimization of Transmit Power Control Rate | MediaTek Inc. | Noted |
R1‑130334 | Soft Handover Optimization | MediaTek Inc. | Noted |
R1‑130335 | DPCH Time Division Multiplexing | MediaTek Inc. | Noted |
R1‑130336 | Interference coordination with UE-specific elevation beamforming | ITRI | Not treated |
R1‑130337 | Discussion on downlink transmission for special subframe in TDD | Intel Corporation | Not treated |
R1‑130338 | Consideration on CSI-RS transmission in TDD | Intel Corporation | Revised |
R1‑130339 | Enhanced CSI feedback solutions for DL MIMO enhancement | Hitachi Ltd. | Noted |
R1‑130340 | Evaluation results of DL-MIMO enhancement | Hitachi Ltd. | Withdrawn |
R1‑130341 | Views on 256QAM for small cell enhancement | Hitachi Ltd. | Not treated |
R1‑130342 | Efficient Small Cell Operation | Hitachi Ltd. | Noted |
R1‑130343 | Performance Evaluation of DM-RS Puncturing on NCT | Hitachi Ltd. | Noted |
R1‑130344 | Discussion on uplink aspect for carrier aggregated NCT | Hitachi Ltd. | Not treated |
R1‑130345 | Views on CSI feedback enhancements for DL-MIMO in Rel-12 | Potevio | Noted |
R1‑130346 | PSS/SSS and DMRS collision in NCT | Potevio | Not treated |
R1‑130347 | Scalable UMTS Deployment Scenarios | China Unicom, Huawei, HiSilicon | Noted |
R1‑130348 | Skeleton for Scalable UMTS FDD Technical Report | China Unicom | Noted - Revised |
R1‑130349 | Work Plan for Study on Scalable UMTS | China Unicom | Noted |
R1‑130350 | Discussion on simulation assumptions for small cell scenario | China Unicom | Not treated |
R1‑130351 | Discussion on scenarios for UE-specific elevation beamforming | China Unicom | Not treated |
R1‑130352 | Design for Synchronized NCT | China Telecom | Noted |
R1‑130353 | Discussion on coverage improvement for MTC | China Telecom | Not treated |
R1‑130354 | Discussion on spectral efficiency improvement for small cell enhancements | China Telecom | Not treated |
R1‑130355 | Draft Agenda for RAN1#71 meeting | RAN1 Chairman | Approved |
R1‑130356 | Selected highlights from RAN#58 of relevance to RAN1 | RAN1 Chairman | Noted |
R1‑130357 | MTC coverage improvement through precoding of spreading code | Institute for Information Industry (III) | Not treated |
R1‑130358 | Discussion on Small Cell handover | Institute for Information Industry (III) | Not treated |
R1‑130359 | D2D Propagation Channel Model | Institute for Information Industry (III) | Not treated |
R1‑130360 | Correction to EPDCCH monitoring subframes | NEC Group | Noted |
R1‑130361 | Requirements and necessary enhancements for Phase 1 NCT in Release 12 | NEC Group | Noted |
R1‑130362 | PSS/SSS time locations on the NCT | NEC Group | Noted |
R1‑130363 | Evaluation Results for DL MU-MIMO Enhancement Schemes | NEC Group | Revised |
R1‑130364 | DL MU-MIMO Enhancement Schemes | NEC Group | Not treated |
R1‑130365 | Deployment scenarios for TDD UL-DL reconfigurations | NEC Group | Not treated |
R1‑130366 | Cluster-specific Corporative Dynamic UL-DL Reconfiguration for^^Interference Avoidance and Traffic Adaptation | NEC Group | Not treated |
R1‑130367 | Coordinated Scheduling and Beamforming based Interference Mitigation^^Scheme in Dynamic TDD | NEC Group | Not treated |
R1‑130368 | Power Control Based Interference Mitigation Scheme for Dynamic TDD system | NEC Group | Noted |
R1‑130369 | The CSI Measurement for Dynamic TDD system | NEC Group | Not treated |
R1‑130370 | Reconfiguration signalling and HARQ-timing for TDD eIMTA system | NEC Group | Not treated |
R1‑130371 | Study of backward compatibility of TDD eIMTA system | NEC Group | Not treated |
R1‑130372 | Uplink coverage enhancement for MTC | NEC Group | Not treated |
R1‑130373 | Small cell operation under macro coverage | NEC Group | Not treated |
R1‑130374 | Discussion on interference characteristics and evaluation assumptions for various small cell scenarios | NEC Group | Not treated |
R1‑130375 | Consideration of approaches to extend the ITU-R channel models to 3D | NEC Group | Not treated |
R1‑130376 | Discussion and recommendations for D2D channel modelling | NEC Group | Not treated |
R1‑130377 | Evaluation Methodology for Proximity Services | General Dynamics Broadband UK | Noted |
R1‑130378 | Performance Metrics for Out of Coverage ProSe enabled UEs | General Dynamics Broadband UK | Not treated |
R1‑130379 | RAN1 ProSe Requirements Resulting from TR 22.803 | General Dynamics Broadband UK | Not treated |
R1‑130380 | PSS/SSS design consideration for NCT | Research In Motion UK Limited | Not treated |
R1‑130381 | Views on RRM measuremnet for NCT | Research In Motion UK Limited | Not treated |
R1‑130382 | Consideration on synchronized new carrier type | Research In Motion UK Limited | Not treated |
R1‑130383 | Discussion on scenarios and evaluation assumptions for small cell | Research In Motion UK Limited | Not treated |
R1‑130384 | On improved spectral efficiency for small cells | Research In Motion UK Limited | Not treated |
R1‑130385 | Discussion on mechanisms for efficient small cell operation | Research In Motion UK Limited | Not treated |
R1‑130386 | Channel Models and Scenarios for Proximity Services Under Network Coverage | Research In Motion UK Limited | Not treated |
R1‑130387 | Remaining details of TDD PUCCH Resource Allocation for EPDCCH | Research In Motion UK Limited | Not treated |
R1‑130388 | Discussion on interference mitigation schemes for TDD UL/DL reconfigurations | Research In Motion UK Limited | Not treated |
R1‑130389 | Signalling methods for TDD UL/DL reconfiguration with different time scales | Research In Motion UK Limited | Revised |
R1‑130390 | Indoor channel models for small cell evaluation | Research In Motion UK Limited | Not treated |
R1‑130391 | On uplink robustness at medium mobility and 3.5 GHz for small cell. | Research In Motion UK Limited | Not treated |
R1‑130392 | UL and DL Coverage Matching in the Co-channel Case | Research In Motion UK Limited | Noted |
R1‑130393 | Solutions to the Co-channel Scenario | Research In Motion UK Limited | Noted |
R1‑130394 | Deployment Scenarios for Scalable UMTS SI | Research In Motion UK Limited | Noted |
R1‑130395 | Remaining Issues Regarding Search Space Design for Localized EPDCCH | NTT DOCOMO | Not treated |
R1‑130396 | Remaining Issues Regarding Search Space Design for Distributed EPDCCH | NTT DOCOMO | Not treated |
R1‑130397 | Views on DL RS for New Carrier Type | NTT DOCOMO | Noted |
R1‑130398 | Design for Synchronized New Carrier Type | NTT DOCOMO | Noted |
R1‑130399 | Further Evaluations on Feedback Enhancement for DL MIMO | NTT DOCOMO | Noted |
R1‑130400 | Structured Codebook Design for DL MIMO Enhancement | NTT DOCOMO | Not treated |
R1‑130401 | Deployment scenarios and interference mitigation schemes for eIMTA | NTT DOCOMO | Revised |
R1‑130402 | Scenario and Candidate Technologies for Small Cell Enhancement | NTT DOCOMO | Revised |
R1‑130403 | Evaluation Assumptions for Small Cell Enhancement | NTT DOCOMO | Not treated |
R1‑130404 | Enhanced transmission scheme for SCE | NTT DOCOMO | Not treated |
R1‑130405 | Overview of Mobility Enhancement for Small Cell Enhancement | NTT DOCOMO | Not treated |
R1‑130406 | Mobility Enhancement in Small Cell Cluster | NTT DOCOMO | Not treated |
R1‑130407 | Mobility Enhancement with UE Speed Detection | NTT DOCOMO | Not treated |
R1‑130408 | Enhanced Coordination Aspects for Small Cell Enhancement | NTT DOCOMO | Noted |
R1‑130409 | Physical Layer Design for Dual Connectivity | NTT DOCOMO | Not treated |
R1‑130410 | Views on 3D-Channel Model for Elevation Beamforming and FD-MIMO | NTT DOCOMO | Not treated |
R1‑130411 | Evaluation methodology and channel model for D2D proximity services | NTT DOCOMO | Not treated |
R1‑130412 | Discussion on Scalable UMTS | Renesas Mobile Europe Ltd | Noted |
R1‑130413 | Remaining details of EPDCCH search space definitions | Renesas Mobile Europe Ltd | Not treated |
R1‑130414 | Further Discussions on PSS/SSS Mapping in NCT | Renesas Mobile Europe Ltd | Noted |
R1‑130415 | On Synchronized New Carrier Type | Renesas Mobile Europe Ltd | Not treated |
R1‑130416 | Performance of downlink MIMO enhancements | Renesas Mobile Europe Ltd | Withdrawn |
R1‑130417 | Downlink MIMO CSI feedback enhancements for Rel-12 | Renesas Mobile Europe Ltd | Not treated |
R1‑130418 | Discussions on scenarios for TDD UL-DL reconfiguration | Renesas Mobile Europe Ltd | Not treated |
R1‑130419 | Discussions on interference mitigation schemes for TDD UL-DL reconfiguration | Renesas Mobile Europe Ltd | Noted |
R1‑130420 | Performance Comparison of Interference Mitigation Schemes with Dynamic TDD UL/DL configuration in Multi-Cell Pico Deployment Scenario | Renesas Mobile Europe Ltd | Not treated |
R1‑130421 | Discussion on backward compatibility for TDD UL-DL reconfiguration | Renesas Mobile Europe Ltd | Not treated |
R1‑130422 | Discussion on signaling mechanisms for TDD UL-DL reconfiguration | Renesas Mobile Europe Ltd | Not treated |
R1‑130423 | Physical channels coverage enhancements for MTC | Renesas Mobile Europe Ltd | Noted |
R1‑130424 | Scenarios for small cell studies in Rel-12 | Renesas Mobile Europe Ltd | Not treated |
R1‑130425 | Performance Evaluation for 256-QAM | Renesas Mobile Europe Ltd | Not treated |
R1‑130426 | Scenarios for 3D channel modeling | Renesas Mobile Europe Ltd | Not treated |
R1‑130427 | Initial considerations for 3D channel modeling | Renesas Mobile Europe Ltd | Not treated |
R1‑130428 | Discussion on evaluation methodology for LTE Device to Device Proximity Services | Renesas Mobile Europe Ltd | Not treated |
R1‑130429 | Correction to PDSCH mapping for CoMP in 36.211 | Huawei, HiSilicon | Revised |
R1‑130430 | Correction to PDSCH and EPDCCH mapping for CoMP in 36.213 | Huawei, HiSilicon | Not treated |
R1‑130431 | Miscellaneous corrections to quasi co-location and starting symbol for CoMP in 36.213 | Huawei, HiSilicon | Not treated |
R1‑130432 | Correction to the definition of quasi co-location in 36.211. | Huawei, HiSilicon | Noted - Revised |
R1‑130433 | Correction to quasi co-location assumptions in 36.213 | Huawei, HiSilicon | Noted |
R1‑130434 | Correction to CSI feedback for CoMP in 36.213 | Huawei, HiSilicon | Revised |
R1‑130435 | Draft CR for the removal of brackets in the EPDCCH blind decoding assignment tables in 36.213 | Huawei, HiSilicon, Panasonic, Ericsson, ST-Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑130436 | RRM measurements for NCT | Huawei, HiSilicon | Not treated |
R1‑130437 | Mobility support across carrier types | Huawei, HiSilicon | Not treated |
R1‑130438 | Aspects of the synchronized carrier case | Huawei, HiSilicon | Not treated |
R1‑130439 | Discussion on quasi co-location aspects for NCT | Huawei, HiSilicon | Noted |
R1‑130440 | On the backwards compatibility of the new carrier type | Huawei, HiSilicon | Not treated |
R1‑130441 | Uplink new carrier type - channel sounding issues | Huawei, HiSilicon | Not treated |
R1‑130442 | EPDCCH transmission on NCT | Huawei, HiSilicon | Not treated |
R1‑130443 | Transmission schemes for NCT | Huawei, HiSilicon | Noted |
R1‑130444 | Views on the multiplexing of control channel and PMCH on NCT | Huawei, HiSilicon | Not treated |
R1‑130445 | Potential signaling enhancements for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑130446 | Proposed work plan for small cell enhancement SI | Huawei, HiSilicon | Noted |
R1‑130447 | Discussion on dual dormant/active state cells and cell discovery | Huawei, HiSilicon | Not treated |
R1‑130448 | Downlink System Level Simulation Results for UMTS HetNet | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑130449 | SHO operation in UMTS HetNet | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑130450 | Corrections on the Search Space Functions for EPDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑130451 | Corrections on the PUCCH resource allocation in TDD for EPDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑130452 | PSS and SSS for Unsynchronized New Carrier Type | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑130453 | Discussion on RRM Measurements for the New Carrier Type | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑130454 | On synchronized new carriers | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | Not treated |
R1‑130455 | Evaluation results for Further DL MIMO enhancement | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑130456 | Proposals for Further DL MIMO Enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑130457 | Summary of Evaluation Assumptions on Further Downlink MIMO Enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑130458 | Deployment scenarios for TDD IMTA | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑130459 | Discussion on signalling mechanisms for TDD UL-DL reconfiguration | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑130460 | Backward compatibility for TDD UL-DL IMTA | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑130461 | CSI reporting issue for TDD UL-DL IMTA | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Withdrawn |
R1‑130462 | Feasibility of coverage extension of physical channels for MTC devices | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑130463 | Channel characteristics and channel estimation for extended coverage MTC | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑130464 | Evaluation methodology for Small Cell Enhancement - Physical Layer Aspects | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑130465 | Evaluation of DL Higher Order Modulation for Small Cells | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑130466 | 3D MIMO scenarios and 3D UE dropping model | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑130467 | 3D MIMO Antenna and Channel Modelling | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑130468 | Simulation Verification of 3D Channel Model | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑130469 | LTE device to device evaluation methodology | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑130470 | Performance of Different Type of Receivers and Multi-flow in Heterogeneous Network Scenario | Renesas Mobile Europe Ltd | Noted |
R1‑130471 | System Simulation Results on Heterogeneous Networks with Cell Range Extension | Renesas Mobile Europe Ltd | Revised |
R1‑130472 | Discussion and Simulation Results on Transmission of uplink Scheduling Information in UMTS Heterogeneous Networks | Renesas Mobile Europe Ltd | Noted |
R1‑130473 | Discussion on DCH enhancements | Renesas Mobile Europe Ltd | Noted |
R1‑130474 | Performance evaluation on interference averaging effect | Nokia Siemens Networks, Nokia | Not treated |
R1‑130475 | Remaining issues on TDD HARQ-ACK resource allocation for data scheduled via EPDCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑130476 | EPDCCH search space starting point definition | Nokia, Nokia Siemens Networks | Revised |
R1‑130477 | EPDCCH search space equations | Nokia, Nokia Siemens Networks | Noted |
R1‑130478 | On PSS/SSS for NCT aggregated with a legacy LTE carrier | Nokia, Nokia Siemens Networks | Noted |
R1‑130479 | On RRM measurements for NCT aggregated with a legacy LTE carrier | Nokia, Nokia Siemens Networks | Not treated |
R1‑130480 | Synchronized New Carrier Type aggregated with a legacy LTE carrier | Nokia Siemens Networks, Nokia | Not treated |
R1‑130481 | On New Carrier Type and Backwards compatibility | Nokia Siemens Networks, Nokia | Not treated |
R1‑130482 | Simulation evaluation on downlink MIMO enhancement | Nokia Siemens Networks, Nokia | Noted |
R1‑130483 | CSI feedback enhancements -- MU-MIMO aspects | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑130484 | CSI feedback enhancements -- codebook enhancement | Nokia Siemens Networks, Nokia | Revised |
R1‑130485 | Considerations on CSI feedback enhancements | Nokia Siemens Networks, Nokia | Not treated |
R1‑130486 | Discussion on deployment scenarios for dynamic TDD UL-DL reconfigurations | Nokia, Nokia Siemens Networks | Noted |
R1‑130487 | Discussion on UL-DL interference mitigation for dynamic TDD UL-DL reconfigurations | Nokia, Nokia Siemens Networks | Not treated |
R1‑130488 | Discussion on signalling mechanisms for dynamic TDD UL-DL reconfiguration | Nokia, Nokia Siemens Networks | Not treated |
R1‑130489 | Coverage Improvement Performance Results for MTC UEs | Nokia Siemens Networks, Nokia | Noted |
R1‑130490 | Simulation assumptions for Rel-12 small cell studies | Nokia Siemens Networks, Nokia | Not treated |
R1‑130491 | Evaluation Assumptions on Schemes to Enhance Small Cell Spectral Efficiency | Nokia, Nokia Siemens Networks | Noted |
R1‑130492 | Small Cell Interference Management Considerations | Nokia Siemens Networks, Nokia | Not treated |
R1‑130493 | Dense Small Cell Mobility with Realistic Cell Detection | Nokia Siemens Networks, Nokia | Not treated |
R1‑130494 | Skeleton TR for 3D channel model for LTE | Nokia Siemens Networks | Noted - Revised |
R1‑130495 | TP for TR on 3D channel model for LTE | Nokia Siemens Networks | Not treated |
R1‑130496 | Scenarios for UE-Specific Elevation Beamforming and FD-MIMO | Nokia Siemens Networks, Nokia | Noted |
R1‑130497 | 3D Channel Modeling Issues and 3D Channel Model Proposal | Nokia Siemens Networks, Nokia | Not treated |
R1‑130498 | Shadow Fading Observations for the 3D Channel Model | Nokia Siemens Networks, Nokia | Not treated |
R1‑130499 | Evaluation Methodology Issues for UE-Specific Elevation Beamforming and FD-MIMO | Nokia Siemens Networks, Nokia | Not treated |
R1‑130500 | Detailed 3D Channel Model | Nokia Siemens Networks, Nokia | Not treated |
R1‑130501 | On LTE D2D Methodologies and Metrics | Nokia, Nokia Siemens Networks | Not treated |
R1‑130502 | LTE Device to Device Proximity Services – Deployment Scenarios | Nokia, Nokia Siemens Networks | Noted |
R1‑130503 | 25.214 CR0702 (Rel-11,F) Correction of HS-DPCCH power offset for four branch MIMO | Huawei, HiSilicon | Noted - Revised |
R1‑130504 | 25.214 CR0703 (Rel-11, F) Correction to the referenced variable for CELL-FACH enhancement | Huawei, HiSilicon | Noted - Revised |
R1‑130505 | HS-DPCCH timing in non-time reference cell when multiflow is configured | Huawei, HiSilicon | Noted |
R1‑130506 | 25.211 CR0309 (Rel-11, F) Correction to timing in non-time reference cell when multiflow is configured | Huawei, HiSilicon | Noted |
R1‑130507 | System Simulations for Downlink Co-channel Interference Scenario | Huawei, HiSilicon | Noted |
R1‑130508 | System Simulations for Uplink Co-channel Interference Scenario | Huawei, HiSilicon | Noted |
R1‑130509 | HS-DPCCH performance evaluation in Hetnet | Huawei, HiSilicon | Noted |
R1‑130510 | Restricted Resource Subframe for HetNet | Huawei, HiSilicon | Noted |
R1‑130511 | RE with multi-flow in single and multi-carrier scenarios | Huawei, HiSilicon | Noted |
R1‑130512 | Draft of UMTS Heterogeneous Networks Technical Report | Huawei, HiSilicon | Noted |
R1‑130513 | Scenarios for DCH enhancement | Huawei, HiSilicon | Noted |
R1‑130514 | Introduction of S-UMTS | Huawei, HiSilicon | Noted |
R1‑130515 | Link Level Simulation Assumptions for Scalable UMTS | Huawei, HiSilicon | Noted |
R1‑130516 | System Level Simulation Assumptions for Scalable UMTS | Huawei, HiSilicon | Noted |
R1‑130517 | Correction to indication of the parameter nSCID | Pantech | Agreed |
R1‑130518 | On PSS/SSS details for NCT | Pantech | Not treated |
R1‑130519 | The RRM measurements in new carrier type | Pantech | Not treated |
R1‑130520 | Synchronized New Carrier Types | Pantech | Not treated |
R1‑130521 | Further CSI Feedback Enhancement for DL MIMO in Rel. 12 | Pantech | Noted |
R1‑130522 | On deployment scenarios for TDD UL-DL reconfigurations based on traffic adaptation | Pantech | Not treated |
R1‑130523 | On interference mitigation schemes for TDD UL-DL reconfiguration | Pantech | Noted |
R1‑130524 | Discussion on signaling methods for TDD UL-DL reconfiguration | Pantech | Not treated |
R1‑130525 | Correction for PUSCH DMRS generation in RACH msg3 | Sharp, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, Ericsson, HiSilicon, Huawei, Intel, InterDigital, LG Electronics, Nokia, Nokia Siemens Networks, Panasonic, Qualcomm, Samsung, ST-Ericsson, Texas Instruments, ZTE | Agreed |
R1‑130526 | Correction to TDD CA special subframe configuration | Sharp | Not treated |
R1‑130527 | Special subframe configuration with UE capability considerations in TDD CA | Sharp | Noted |
R1‑130528 | Corrections for PDSCH starting symbol and PDSCH RE mapping | Sharp | Revised |
R1‑130529 | PDSCH starting symbol and PDSCH RE mapping | Sharp | Revised |
R1‑130530 | Scenarios for Rel-12 NCT | Sharp | Not treated |
R1‑130531 | Deployment scenarios for eIMTA in Rel-12 | Sharp | Not treated |
R1‑130532 | PHY layer signaling considerations of dynamic TDD UL-DL reconfiguration | Sharp | Not treated |
R1‑130533 | Backward compatibility for eIMTA | Sharp | Not treated |
R1‑130534 | Backward compatibility of Rel-12 small cell | Sharp | Not treated |
R1‑130535 | On flexible TDD UL-DL configuration | CMCC | Not treated |
R1‑130536 | Inclusion of indoor scenario for small cell evaluation | CMCC | Not treated |
R1‑130537 | Discussion on common solution to support efficient operation for Rel-12 small cell | CMCC | Not treated |
R1‑130538 | Considerations on scenarios for UE-specific elevation beamforming and FD-MIMO | CMCC | Noted |
R1‑130539 | Considerations on elevation dimension of channel parameters | CMCC | Not treated |
R1‑130540 | CR to 36.211 on clarification of CSI RS mapping to resource elements | Motorola Mobility | Noted - Revised |
R1‑130541 | Finalization of EPDCCH Search Space equations | Motorola Mobility | Revised |
R1‑130542 | NCT operation for unsynchronised and synchronised scenarios | Motorola Mobility | Not treated |
R1‑130543 | Scenarios and 3D-channel modeling considerations for elevation beamforming and FD-MIMO | Motorola Mobility | Not treated |
R1‑130544 | Aperiodic CSI report for Secondary cell or different processes | Ericsson,ST-Ericsson, Qualcomm | Noted |
R1‑130545 | Remaining issues of PUCCH resource allocation for EPDCCH in TDD | Ericsson,ST-Ericsson | Noted |
R1‑130546 | On New Carrier Type | Ericsson | Noted |
R1‑130547 | PSS/SSS and DM-RS on the New Carrier Type | Ericsson,ST-Ericsson | Noted |
R1‑130548 | RRM measurements on NCT | Ericsson,ST-Ericsson | Not treated |
R1‑130549 | Design for Synchronized and Unsynchronized New Carriers | Ericsson,ST-Ericsson | Not treated |
R1‑130550 | Views on DL transmission mode for NCT | Ericsson,ST-Ericsson | Noted |
R1‑130551 | Quasi Co-Location Assumptions for NCT | Ericsson,ST-Ericsson | Noted |
R1‑130552 | ePHICH operation on NCT | Ericsson,ST-Ericsson | Not treated |
R1‑130553 | Initial DL-MIMO evaluation results | Ericsson,ST-Ericsson | Noted |
R1‑130554 | On CSI feedback enhancements | Ericsson,ST-Ericsson | Not treated |
R1‑130555 | Deployment scenarios for dynamic TDD | Ericsson,ST-Ericsson | Not treated |
R1‑130556 | Interference control in dynamic TDD scenarios | Ericsson,ST-Ericsson | Noted |
R1‑130557 | Dynamic TDD on NCT | Ericsson,ST-Ericsson | Not treated |
R1‑130558 | Signalling support for dynamic TDD | Ericsson,ST-Ericsson | Not treated |
R1‑130559 | Channel models for MTC coverage enhancements | Ericsson,ST-Ericsson | Revised |
R1‑130560 | Sync acquisition for MTC coverage enhancements | Ericsson,ST-Ericsson | Revised |
R1‑130561 | System information for MTC coverage enhancements | Ericsson,ST-Ericsson | Noted |
R1‑130562 | Data transmission for MTC coverage enhancements | Ericsson,ST-Ericsson | Not treated |
R1‑130563 | Scenarios and Simulation Assumptions | Ericsson,ST-Ericsson | Not treated |
R1‑130564 | Overview of Candidate Spectrum Efficiency Improvements | Ericsson,ST-Ericsson | Noted |
R1‑130565 | Interference handling between low power nodes | Ericsson,ST-Ericsson | Withdrawn |
R1‑130566 | Physical layer aspects of dual connectivity | Ericsson,ST-Ericsson | Not treated |
R1‑130567 | Scenarios for 3D-Channel Modeling | Ericsson,ST-Ericsson | Noted |
R1‑130568 | 3D-Channel Modeling Extensions and Issues | Ericsson,ST-Ericsson | Not treated |
R1‑130569 | Elevation Angular Modeling and Impact on System Performance | Ericsson,ST-Ericsson | Not treated |
R1‑130570 | D2D Evaluation methodology and channel modeling | Ericsson,ST-Ericsson | Revised |
R1‑130571 | On remaining issues related to Coordinated MultiPoint operation | Qualcomm Inc. | Not treated |
R1‑130572 | On RNTI used for antenna port determination for localized EPDCCH | Qualcomm Inc. | Noted |
R1‑130573 | Antenna port association for distributed EPDCCH | Qualcomm Inc. | Noted |
R1‑130574 | On ambiguity in PUCCH resource allocation under two overlapped EPDCCH resource sets | Qualcomm Inc. | Noted |
R1‑130575 | On remaining issues for PUCCH resource allocation for EPDCCH in TDD | Qualcomm Inc. | Not treated |
R1‑130576 | On special subframe configuration 9 for EPDCCH in TDD | Qualcomm Inc. | Noted |
R1‑130577 | NCT deployment scenarios | Qualcomm Inc. | Not treated |
R1‑130578 | PSS/SSS details | Qualcomm Inc. | Noted |
R1‑130579 | RRM measurements for NCT | Qualcomm Inc. | Not treated |
R1‑130580 | Carrier segments and NCT | Qualcomm Inc. | Noted |
R1‑130581 | Synchronised new carriers | Qualcomm Inc. | Not treated |
R1‑130582 | Forward compatibility of NCT | Qualcomm Inc. | Not treated |
R1‑130583 | MIMO evaluation results | Qualcomm Inc. | Noted |
R1‑130584 | CSI feedback enhancements | Qualcomm Inc. | Not treated |
R1‑130585 | Deployment scenarios for IMTA | Qualcomm Inc. | Not treated |
R1‑130586 | Intrference mitigation schemes | Qualcomm Inc. | Not treated |
R1‑130587 | Signaling mechanisms for reconfiguration | Qualcomm Inc. | Noted |
R1‑130588 | Soft buffer management for IMTA | Qualcomm Inc. | Not treated |
R1‑130589 | Coverage enhancement techniques for MTC | Qualcomm Inc. | Not treated |
R1‑130590 | Evaluation for MTC coverage | Qualcomm Inc. | Not treated |
R1‑130591 | Channel models for indoor small cells | Qualcomm Inc. | Not treated |
R1‑130592 | Evaluation methodology for indoor small cell deployments | Qualcomm Inc. | Not treated |
R1‑130593 | Higher order modulation for small cells | Qualcomm Inc. | Not treated |
R1‑130594 | Overhead reduction | Qualcomm Inc. | Noted |
R1‑130595 | Mechanisms for efficient small cell operation | Qualcomm Inc. | Not treated |
R1‑130596 | Scenarios and simulation assumptions for elevation beamforming and FD-MIMO | Qualcomm Inc. | Not treated |
R1‑130597 | Evaluation methodology for elevation beamforming and FD-MIMO | Qualcomm Inc. | Not treated |
R1‑130598 | Channel models for D2D deployments | Qualcomm Inc. | Not treated |
R1‑130599 | D2D deployment and performance evaluation | Qualcomm Inc. | Noted |
R1‑130600 | Draft skeleton TR for "Study on LTE Device to Device Proximity Services" | Qualcomm Inc. | Not treated |
R1‑130601 | On remaining issues related to Coordinated MultiPoint operation | Qualcomm Inc. | Withdrawn |
R1‑130602 | Search space ambiguity handling | Qualcomm Inc. | Withdrawn |
R1‑130603 | Considerations on simulation assumptions and methodology for small cell enhancements | CATR | Not treated |
R1‑130604 | Simulations for small cell spectrum efficiency improvements-256QAM | CATR | Not treated |
R1‑130605 | Views on how to handle collision between PSS/SSS and DM RS | CATR | Not treated |
R1‑130606 | Considerations on how to extend ITU-R channel models to 3D | CATR | Not treated |
R1‑130607 | Simulation results of further enhanced DL MIMO | CATR | Noted |
R1‑130608 | 25.214 CR0704 (Rel-11, F) DTX E-DPCCH when Power Scaling in Multi-RAB | Ericsson, ST-Ericsson | Noted |
R1‑130609 | 25.214 CR0705 (Rel-11, F) Further Clarification of Power Control in Compressed Mode | Ericsson, ST-Ericsson | Noted |
R1‑130610 | Overview of Combined Cell Deployment in Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑130611 | Link Level Analysis of Single Frequency Network Mode for Combined Cell Deployments | Ericsson, ST-Ericsson | Noted |
R1‑130612 | Downlink Interference Analysis for Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑130613 | Link Level Analysis of Spatial Reuse Mode for Combined Cell Deployments | Ericsson, ST-Ericsson | Noted |
R1‑130614 | System Level Anlysis of Single Frequency Network Mode for Combined Cell Deployments | Ericsson, ST-Ericsson | Noted |
R1‑130615 | System Level Analysis of Spatial Reuse Mode for Combined Cell Deployments | Ericsson, ST-Ericsson | Noted |
R1‑130616 | Dowlink System Level Simulation Results in Co-Channel Deployment with Full Buffer Traffic | Ericsson, ST-Ericsson | Noted |
R1‑130617 | Dowlink System Level Simulation Results in Co-Channel Deployment with Burst Traffic | Ericsson, ST-Ericsson | Withdrawn |
R1‑130618 | Uplink System Level Simulation Results in Co-Channel Deployment | Ericsson, ST-Ericsson | Noted |
R1‑130619 | Downlink Control Channel Performance in Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑130620 | Analysis of UL Control Channel Reception for Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑130621 | Robust UL Control Channel Reception for Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑130622 | Cell Range Expansion in Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑130623 | TP on Deployment Scenarios in Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑130624 | TP on Downlink Transmission Modes for Combined Cell Deployment | Ericsson, ST-Ericsson | Noted |
R1‑130625 | TP on Interference Analysis in Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑130626 | TP on UL Control Channel Reception for Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑130627 | Initial Considerations on Scalable UMTS | Ericsson, ST-Ericsson | Noted |
R1‑130628 | Correction to Aperiodic CSI reporting with one configured CSI process | ZTE | Agreed |
R1‑130629 | Multiflow HSDPA and STTD | Qualcomm Incorporated | Noted |
R1‑130630 | UE behavior when the maximum delay between NodeBs is exceeded | Qualcomm Incorporated | Noted |
R1‑130631 | Downlink System Performance of Hetnets in Co-channel Scenarios with Full Buffer traffic | Qualcomm Incorporated | Noted |
R1‑130632 | Downlink System Performance of Hetnets in Co-channel Scenarios with Bursty traffic | Qualcomm Incorporated | Noted |
R1‑130633 | Uplink System Performance of Hetnets in Co-channel Scenarios with Full buffer traffic | Qualcomm Incorporated | Noted |
R1‑130634 | Link Evaluation of UL/DL imbalances caused by Hetnet Deployments | Qualcomm Incorporated | Noted |
R1‑130635 | System Performance of Range Expansion in Multicarrier Scenarios with Full Buffer Traffic | Qualcomm Incorporated | Noted |
R1‑130636 | System Performance of Range Expansion in Multicarrier Scenarios with Bursty Traffic | Qualcomm Incorporated | Noted |
R1‑130637 | TTI Partitioning in Hetnets | Qualcomm Incorporated | Not treated |
R1‑130638 | TP on Uplink Interference Issues in Co-channel Hetnet Scenarios | Qualcomm Incorporated | Noted |
R1‑130639 | TP on Range Expansion in Multicarrier and Multiflow Deployments | Qualcomm Incorporated | Noted |
R1‑130640 | TP on Uplink/Downlink Imbalance Issues in Co-channel Hetnet Scenarios | Qualcomm Incorporated | Noted |
R1‑130641 | Overview of DCH Enhancements and Work Plan | Qualcomm Incorporated | Noted |
R1‑130642 | TR Skeleton for DCH Enhancements for UMTS | Qualcomm Incorporated | Noted - Revised |
R1‑130643 | Simulation assumptions for DCH Enhancements for UMTS | Qualcomm Incorporated | Noted |
R1‑130644 | Initial UL link analysis on DCH enhancements | Qualcomm Incorporated | Noted |
R1‑130645 | Initial DL link analysis on DCH enhancements | Qualcomm Incorporated | Noted |
R1‑130646 | Initial DL system analysis on DCH enhancements | Qualcomm Incorporated | Noted |
R1‑130647 | Initial UL system analysis on DCH enhancements | Qualcomm Incorporated | Noted |
R1‑130648 | Scenarios for Scalable UMTS | Qualcomm Incorporated | Noted |
R1‑130649 | Initial Simulation Results for the performance of Scalable UMTS | Qualcomm Incorporated | Noted |
R1‑130650 | Introducing Fractional UMTS to enable Scalable Bandwidth Usage for UMTS FDD | Qualcomm Incorporated | Noted |
R1‑130651 | Simulation Assumptions for performance evaluation of Scalable UMTS | Qualcomm Incorporated | Noted |
R1‑130652 | UE Implementation Complexity due to Scalable UMTS | Qualcomm Incorporated | Noted |
R1‑130653 | Deployment scenarios considerations for TDD UL-DL reconfiguration | Coolpad | Noted |
R1‑130654 | Backward compatibility and potential reconfiguration gain for legacy UE | Coolpad | Not treated |
R1‑130655 | Discussion on small cell simulation scenarios and assuptions | Coolpad | Not treated |
R1‑130656 | Correction on determination of ECCEs number for one EPDCCH | ASUSTeK | Noted |
R1‑130657 | Correction on the case determination for EPDCCH candidates | ASUSTeK | Noted |
R1‑130658 | eMBMS in New Carrier Type | Orange, AT&T, DISH Network, Qualcomm Incorporated | Noted |
R1‑130659 | Scenario and Migration for Small Cell Enhancement | NTT DOCOMO, Deutsche Telekom, KDDI, Telefonica, Teliasonera, T-Mobile USA | Revised |
R1‑130660 | Update to TR 36.888 to include agreements from RAN1#71 | Vodafone Group | Agreed |
R1‑130661 | On evaluation methodology for D2D proximity services for Public safety | Vodafone Group | Noted |
R1‑130662 | Discussion on DCH Enhancements for UMTS | ZTE | Noted |
R1‑130663 | UL considerations for Small Cell Enhancements | Texas Instruments | Noted |
R1‑130664 | Potential Improvements for FE_DL-MIMO | AT&T | Noted |
R1‑130665 | NCT and Band Filling | AT&T | Noted |
R1‑130666 | 25.211 CR0310 (Rel-11, F) UE behaviour when non-time reference cell is out of time window | Nokia Siemens Networks | Noted - Revised |
R1‑130667 | Simulation results for UMTS HetNet co-channel scenarios | Nokia Siemens Networks | Noted |
R1‑130668 | Considerations on the TTI partitioning range expansion technique | Nokia Siemens Networks | Noted |
R1‑130669 | Comments on DL-UL Link Imbalance problems | Nokia Siemens Networks | Noted |
R1‑130670 | Circuit switched voice services over HSPA | Nokia Siemens Networks | Noted |
R1‑130671 | System simulation assumptions for baseline simulations | Nokia Siemens Networks | Noted |
R1‑130672 | On Scalable UMTS | Nokia Siemens Networks | Noted |
R1‑130673 | Introduction and initial system level simulations results for fast carrier hopping in HSUPA | Nokia Siemens Networks | Not treated |
R1‑130674 | Initial Simulation Results for SINR-based Scheduling in HSUPA | Nokia Siemens Networks | Not treated |
R1‑130675 | Improvements to EUL coverage | Nokia Siemens Networks | Not treated |
R1‑130676 | Consideration on evaluation methodology and channel model for D2D | CMCC | Noted |
R1‑130677 | Impact of the xDSL backhaul delays on X2-based ICIC operation | IAESI, CEA, Telefonica | Not treated |
R1‑130678 | Remaining Aspects for EPDCCH Search Space Design | Samsung | Noted |
R1‑130679 | Initial Evaluation Results for Downlink Small Cell Enhancements with Dedicated Channel | KDDI | Not treated |
R1‑130680 | Corrections for PDSCH starting symbol and PDSCH RE mapping | Sharp | Not treated |
R1‑130681 | D2D Evaluation methodology and channel modeling | Ericsson,ST-Ericsson | Noted |
R1‑130682 | EPDCCH search space starting point definition | Nokia, Nokia Siemens Networks | Noted |
R1‑130683 | Remaining aspects of PUCCH resource allocation for TDD | New Postcom | Not treated |
R1‑130684 | Target scenarios for new carrier types | Panasonic | Noted |
R1‑130685 | Techniques for efficient small cell operation | Panasonic | Revised |
R1‑130686 | Response to R1-130505/0506; Multiflow HS-DPCCH timing in the non-time reference cell | Nokia Siemens Networks | Noted - Revised |
R1‑130687 | Finalization of EPDCCH Search Space equations | Motorola Mobility | Not treated |
R1‑130688 | Design of a Synchronized New Carrier Type | Texas Instruments | Not treated |
R1‑130689 | General Evaluation Assumptions and Methodology for Small Cell Enhancements | Texas Instruments | Not treated |
R1‑130690 | Techniques for efficient small cell operation | Panasonic | Noted |
R1‑130691 | Initial evaluation of DM-RS reduction for small cell | LG Electronics | Noted |
R1‑130692 | Evaluation assumptions for the interference management in small cell environments | LG Electronics | Not treated |
R1‑130693 | Consideration on 3D channel model and evaluation methodology | ZTE | Not treated |
R1‑130694 | PDSCH starting symbol and PDSCH RE mapping | Sharp | Not treated |
R1‑130695 | Corrections to EPDCCH resource mapping | LG Electronics | Not treated |
R1‑130696 | Location of PSS/SSS on the New Carrier Type | Texas Instruments | Noted |
R1‑130697 | CR to 36.211 on clarification of CSI RS mapping to resource elements | Motorola Mobility | Noted - Revised |
R1‑130698 | Correction on UE-specific RS overhead for deriving CQI when PMI/RI is configured in TM9 | CATT, Huawei, HiSilicon, Texas Instruments, Ericsson, ST-Ericsson | Noted - Revised |
R1‑130699 | 36.213 CR0397 (Rel-10, F) Correction on UE procedure for reporting HARQ-ACK | Intel Corporation, CATT, CMCC, Huawei, HiSilicon, Samsung, Ericsson, ST-Ericsson, Renesas Mobile Europe, Nokia Siemens Networks | Agreed |
R1‑130700 | 36.213 CR0398 (Rel-11, A) Correction on UE procedure for reporting HARQ-ACK | Intel Corporation, CATT, CMCC, Huawei, HiSilicon, Samsung, Ericsson, ST-Ericsson, Renesas Mobile Europe, Nokia Siemens Networks | Agreed |
R1‑130701 | Signalling methods for TDD UL/DL reconfiguration with different time scales | Research In Motion UK Limited | Not treated |
R1‑130702 | Correction to PDSCH mapping for CoMP in 36.211 | Huawei, HiSilicon | Noted - Revised |
R1‑130703 | Correction to CSI feedback for CoMP in 36.213 | Huawei, HiSilicon | Agreed |
R1‑130704 | Channel models for MTC coverage enhancements | Ericsson,ST-Ericsson | Noted |
R1‑130705 | Sync acquisition for MTC coverage enhancements | Ericsson,ST-Ericsson | Noted |
R1‑130706 | Way Forward on ARO values for TDD | Nokia Siemens Networks, CATT, Ericsson, HiSilicon, Huawei, New Postcom, Nokia, Intel, Panasonic, Research in Motion, Samsung, ST-Ericsson, Texas Instruments, ZTE | Agreed |
R1‑130707 | General evaluation assumptions for small cell enhancement | LG Electronics | Not treated |
R1‑130708 | WF on PSS/SSS Details | Intel, MediaTek, Hitachi, CMCC, New Postcom, Pantech, ZTE, Potevio, CATR | Noted |
R1‑130709 | WF on Synchronized Carrier | Intel Corporation, CMCC, Ericsson, ST-Ericsson, CATR, Texas Instruments, CATT, Mediatek, Nokia Siemens Networks, Nokia, Renesas Mobile Europe Ltd, Interdigital, NEC, Qualcomm Inc., Samsung, HTC, China Telecom, Research In Motion, Kyocera, Broadcom | Noted |
R1‑130710 | Corrections on PDSCH and EPDCCH starting symbol | CATT | Not treated |
R1‑130711 | WF on DMRS and PSS/SSS collisions for NCT | Huawei, HiSilicon, Ericsson, ST-Ericsson, LGE, NTT DoCoMo, Interdigital | Noted |
R1‑130712 | Way forward on EREG mapping | LG Electronics, HiSilicon, Huawei, NTT DOCOMO, Intel | Noted |
R1‑130713 | Evaluation Results for DL MU-MIMO Enhancement Schemes | NEC Group | Noted |
R1‑130714 | 25.214 CR0702r1 (Rel-11,F) Correction of HS-DPCCH power offset for four branch MIMO | Huawei, HiSilicon | Agreed |
R1‑130715 | 25.214 CR0703r1 (Rel-11, F) Correction to the referenced variable for CELL-FACH enhancement | Huawei, HiSilicon | Noted - Revised |
R1‑130716 | 25.211 CR0310r1 (Rel-11, F) UE behaviour when non-time reference cell is out of time window | Qualcomm Incorporated | Agreed |
R1‑130717 | TR Skeleton for DCH Enhancements for UMTS | Qualcomm Incorporated | Agreed |
R1‑130718 | LS on non-rectangular resource allocation for LCR TDD | RAN1, CATT | Agreed |
R1‑130719 | LS on Simultaneous operation of Multiflow HSDPA and STTD | RAN1, Qualcomm Incorporated | Agreed |
R1‑130720 | Updated response to R1-130505/0506; Multiflow HS-DPCCH timing in the non-time reference cell | Nokia Siemens Networks, Huawei, HiSilicon | Noted |
R1‑130721 | LS on Multiflow HS-DPCCH reception timing in non-time reference cell | RAN1, Nokia Siemens Networks | Agreed |
R1‑130722 | Simulation assumptions for baseline voice over DCH | Qualcomm Incorporated | Withdrawn |
R1‑130723 | Simulation assumptions for enhanced voice over DCH | Qualcomm Incorporated | Withdrawn |
R1‑130724 | Simulation assumptions for baseline voice over HSPA | Nokia Siemens Networks | Withdrawn |
R1‑130725 | Summary of UMTS Heterogeneous Networks session | HSPA session chairman (Huawei) | Endorsed |
R1‑130726 | Chairman's summary of the UMTS sessions 6.1, 6.2, 6.4 and 6.5 | HSPA session chairman (Nokia Siemens Networks) | Endorsed |
R1‑130727 | DRAFT LS on Scalable-bandwidth UMTS | China Unicom | Noted - Revised |
R1‑130728 | void | - | Withdrawn |
R1‑130729 | void | - | Withdrawn |
R1‑130730 | void | - | Withdrawn |
R1‑130731 | void | - | Withdrawn |
R1‑130732 | void | - | Withdrawn |
R1‑130733 | void | - | Withdrawn |
R1‑130734 | void | - | Withdrawn |
R1‑130735 | void | - | Withdrawn |
R1‑130736 | void | - | Withdrawn |
R1‑130737 | void | - | Withdrawn |
R1‑130738 | Way forward on ARO values for TDD-EPDCCH | LG Electronics, CATT, Samsung, Intel | Agreed |
R1‑130739 | WF on Synchronized Carrier in NCT | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Huawei, HiSilicon, LG Electronics, New Postcom, Panasonic, Pantech, Sony Corporation, ZTE | Noted |
R1‑130740 | Scenario and Migration for Small Cell Enhancement | NTT DOCOMO, AT&T, China Telecom, CMCC, Deutsche Telekom, KDDI, KT Corp., Orange, Telecom Italia, Telefonica, Teliasonera, Verizon | Noted |
R1‑130741 | WF for SCE PHY scenarios | NTT DOCOMO, AT&T, CMCC, Deutsche Telekom, KDDI, KT Corp., Orange, Telecom Italia, Telefonica | Noted |
R1‑130742 | Simulation Assumptions for DM-RS Pattern in NCT | Huawei, HiSilicon | Agreed |
R1‑130743 | Scenario and Candidate Technologies for Small Cell Enhancement | NTT DOCOMO | Not treated |
R1‑130744 | WF on evaluation assumptions for SCE physical layer | Huawei, HiSilicon, CATR,CMCC | Noted |
R1‑130745 | Discussion on scenarios for elevation beamforming and FD-MIMO | Samsung | Noted |
R1‑130746 | WF on Small Cell Scenarios and Evaluation Methodology | CMCC, Nokia Siemens Networks, Qualcomm, Renesas, ZTE | Not treated |
R1‑130747 | WF on CRS overhead assumption on CQI definition in TM10 | LG Electronics, ETRI, Samsung | Noted |
R1‑130748 | Text Proposal for TR36.923 on Small Cell Enhancement Scenarios | NTT DOCOMO | Agreed |
R1‑130749 | Proposal on backhaul assumptions for SCE physical layer | Huawei, HiSilicon | Noted |
R1‑130750 | Evaluation assumptions for small cell enhancements-physical layer | Huawei, HiSilicon, CATR, Hitachi | Noted - Revised |
R1‑130751 | WF on UE assumption for PRB bundling in TM10 | LG Electronics, CATT, Renesas Mobile, Ericsson, ST-Ericsson, ZTE | Noted |
R1‑130752 | [DRAFT] LS on Higher Order Modulation Evaluation Assumptions | Fujitsu | Noted - Revised |
R1‑130753 | void | - | Withdrawn |
R1‑130754 | System Simulation Results on Heterogeneous Networks with Cell Range Extension | Renesas Mobile Europe Ltd | Noted |
R1‑130755 | Deployment scenarios and interference mitigation schemes for eIMTA | NTT DOCOMO | Noted |
R1‑130756 | Text proposal on support of PRB bundling in TM10 | Qualcomm, Samsung | Noted |
R1‑130757 | Joint proposal for corrections to PDSCH/EPDCCH resource mapping and PDSCH/EPDCCH starting position for CoMP in 36.213 | Huawei, HiSilicon, Sharp, CATT, LG Electronics | Noted - Revised |
R1‑130758 | HARQ-ACK timing determination for CA with different TDD UL-DL configurations | LG Electronics | Noted |
R1‑130759 | Corrections on TDD HARQ-ACK transmission with different UL-DL configurations on different cells | CATT | Agreed |
R1‑130760 | Way forward on deployment scenarios for TDD eIMTA WI | CATT, CMCC, CATR, NTT DOCOMO, Ericsson, ST-Ericsson, LGE, Nokia, NSN, Renesas mobile europe | Noted |
R1‑130761 | Discussion on further DL MIMO enhancement in Rel.12 | Texas Instruments | Not treated |
R1‑130762 | Evaluation results of further downlink MIMO enhancement for LTE-Advanced | New Postcom | Noted |
R1‑130763 | WF on ARO Usage for TDD | Texas Instruments, CATT, CMCC, CATR, Intel, LG Electronics, Nokia, Nokia Siemens Networks, Research In Motion, Samsung, Sharp, MediaTek, Panasonic | Noted |
R1‑130764 | Clarification on NZP CSI-RS resource configuration for UE supporting 1 CSI process | Samsung, Huawei, HiSilicon | Noted |
R1‑130765 | Data transmission for MTC coverage enhancements | Ericsson,ST-Ericsson | Not treated |
R1‑130766 | CSI feedback enhancements -- codebook enhancement | Nokia Siemens Networks, Nokia | Noted |
R1‑130767 | Draft CR on RI-reference CSI process for periodic feedback | Samsung | Noted |
R1‑130768 | WF on Scenarios for UE-specific elevation beamforming and FD- MIMO | Samsung, Broadcom, CATT, CMCC, ETRI, Huawei, HiSilicon, Intel Cooperation, KT Corp., LG Electronics, New Postcom, Nokia, NSN, NTT Docomo, Orange, Pantech, ZTE | Noted |
R1‑130769 | Way forward on interference mitigation schemes for TDD eIMTA WI | CATT, CMCC, CATR, Huawei, Hisilicon, Intel, LGE ,RIM, New Postcom, Qualcomm | Noted |
R1‑130770 | Way forward on UL-DL reconfiguration time scales for TDD eIMTA WI | CATT, CMCC, CATR, Huawei, Hisilicon, RIM, New Postcom, NTT DOCOMO, Nokia, NSN, Ericsson, ST-Ericsson, Renesas mobile europe, Panasonic | Not treated |
R1‑130771 | EPDCCH and PRS | NEC, Panasonic | Noted |
R1‑130772 | WF on 3D channel model | NSN, Nokia, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm, Motorola Mobility, Intel | Not treated |
R1‑130773 | WF on antenna model in 3D channel modeling | Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CMCC, Nokia, Nokia Siemens Networks, New Postcom | Not treated |
R1‑130774 | void | - | Withdrawn |
R1‑130775 | Evaluations results for CSI feedback enhancements | Samsung | Noted |
R1‑130776 | Corrections to PDSCH mapping | Fujitsu, CATT, Huawei, LG Electronics | Agreed |
R1‑130777 | Way forward on remaining details on ARO for TDD | Nokia Siemens Networks, Ericsson, Nokia, ST-Ericsson | Noted |
R1‑130778 | Way forward on simulation assumptions for data channel | Huawei, HiSilicon, MediaTek Inc., CATT, ZTE, Ericsson, ST-Ericsson, Qualcomm | Noted |
R1‑130779 | Way forward on sec 9.3 of TR 36.888 | Huawei, HiSilicon, Ericsson, ST-Ericsson, CATT, GDBB, MediaTek, ZTE, Alcatel-Lucent, ASB, Sony Europe | Noted |
R1‑130780 | TP for coverage improvement | Huawei, Ericsson, ZTE, HiSilicon, ST-Ericsson, LG Electronics | Noted - Revised |
R1‑130781 | Consideration on CSI-RS transmission in TDD | Intel Corporation | Not treated |
R1‑130782 | Way Forward on CSI Feedback Enhancement in Rel-12 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, ST-Ericsson, Intel, Qualcomm, CATT, NEC, CATR, AT&T, Panasonic | Noted |
R1‑130783 | Performance results of feedback mode 3-2 and enhanced MU-CQI | MediaTek Inc. | Noted |
R1‑130784 | CSI feedback enhancement considerations for Rel-12 | MediaTek Inc. | Not treated |
R1‑130785 | Sync FDD/TDD Details in NCT | Broadcom Corporation | Not treated |
R1‑130786 | WF on synchronized carrier and segment | Panasonic, KDDI, AT&T, Qualcomm, Motorola Mobility, New Postcom, Interdigital | Noted |
R1‑130787 | Simulation assumptions for data channel | Huawei, HiSilicon, MediaTek Inc., CATT, ZTE, Ericsson, ST-Ericsson, Qualcomm | Agreed |
R1‑130788 | Further corrections to EPDCCH search space equation | Fujitsu | Noted |
R1‑130789 | Joint proposal for corrections to PDSCH/EPDCCH resource mapping and PDSCH/EPDCCH starting position for CoMP in 36.213 | Huawei, HiSilicon, Sharp, CATT, LG Electronics | Agreed |
R1‑130790 | [DRAFT] LS on MCH support on NCT | Ericsson | Noted - Revised |
R1‑130791 | Summary of Ad-hoc session on Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | Ad-Hoc Chairman (Samsung) | Endorsed |
R1‑130792 | Summary of Ad-hoc session on Low-cost MTC UEs based on LTE | Ad-Hoc Chairman (NTT DoCoMo) | Endorsed |
R1‑130793 | Summary of Ad-hoc session on 3D-channel model for Elevation Beamforming and FD-MIMO | Ad-Hoc Chairman (Samsung) | Endorsed |
R1‑130794 | Summary of Ad-hoc session on LTE Device to Device Proximity Services | Ad-Hoc Chairman (NTT DoCoMo) | Endorsed |
R1‑130795 | Text proposal for TR 36.888 on coverage improvement | Huawei, MediaTek Inc. | Noted - Revised |
R1‑130796 | Draft TS36.213CR on corrections for SRS power scaling in UpPTS | CATT, Qualcomm, Intel, Texas Instruments, Nokia Siemens Networks, Nokia, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Samsung, Huawei, HiSilicon, Ericsson, ST-Ericsson | Noted - Revised |
R1‑130797 | Correction to PDSCH mapping for CoMP in 36.211 | Huawei, HiSilicon | Noted - Revised |
R1‑130798 | Further Corrections to PDSCH mapping | Fujitsu | Agreed |
R1‑130799 | LS on Higher Order Modulation Evaluation Assumptions | RAN1, Fujitsu | Agreed |
R1‑130800 | On the clarification in mapping SPS PDSCH | LG Electronics | Not treated |
R1‑130801 | Summary of discussion on Aperiodic CSI Report for CA and DL CoMP | Ericsson, ST-Ericsson, Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Renesas, Huawei, HiSilicon, CATT, Panasonic, AT&T, Texas Instruments, ZTE | Agreed |
R1‑130802 | Way forward on the evaluation of PRACH | Huawei, HiSilicon, CATT, MediaTek Inc., Qualcomm, Ericsson, ST-Ericsson | Noted |
R1‑130803 | WF on X2 transport latency | IAESI | Withdrawn |
R1‑130804 | Correction on PHICH resource determination for CA with different TDD UL-DL configurations | LG Electronics | Noted |
R1‑130805 | LS on Scalable-bandwidth UMTS | RAN1, ChinaUnicom | Agreed |
R1‑130806 | 36.211 CR0177 (Rel-10, F) on clarification of CSI RS mapping to resource elements | Motorola Mobility, Ericsson, ST-Ericsson, Fujitsu, Intel, Texas Instruments, Huawei, HiSilicon, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Agreed |
R1‑130807 | 36.211 CR0178 (Rel-11, A) on clarification of CSI RS mapping to resource elements | Motorola Mobility, Ericsson, ST-Ericsson, Fujitsu, Intel, Texas Instruments, Huawei, HiSilicon, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Agreed |
R1‑130808 | 36.213 CR0399 (Rel-10, F) Corrections for SRS power scaling in UpPTS | CATT, Qualcomm, Intel, Texas Instruments, Nokia Siemens Networks, Nokia, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Samsung, Huawei, HiSilicon, Ericsson, ST-Ericsson | Agreed |
R1‑130809 | 36.213 CR0400 (Rel-11, A) Corrections for SRS power scaling in UpPTS | CATT, Qualcomm, Intel, Texas Instruments, Nokia Siemens Networks, Nokia, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Samsung, Huawei, HiSilicon, Ericsson, ST-Ericsson | Agreed |
R1‑130810 | 36.213 CR0401 (Rel-10, F) Correction on UE-specific RS overhead for deriving CQI when PMI/RI is configured in TM9 | CATT, Huawei, HiSilicon, Texas Instruments, Ericsson, ST-Ericsson | Agreed |
R1‑130811 | Skeleton TR for 3D channel model for LTE | Nokia Siemens Networks | Noted - Revised |
R1‑130812 | 36.213 CR0402 (Rel-10, F) Correction to CSI Reference Signals | Huawei, HiSilicon | Withdrawn |
R1‑130813 | 36.213 CR0403 (Rel-11, A) Correction to CSI Reference Signals | Huawei, HiSilicon | Withdrawn |
R1‑130814 | LS on MCH support on NCT | RAN1, Ericsson | Agreed |
R1‑130815 | Skeleton TR for 3D channel model for LTE | Nokia Siemens Networks | Agreed |
R1‑130816 | LS on TP of Rel-12 Small Cell Scenarios for TR36.872 | RAN1, NTT DoCoMo | Agreed |
R1‑130817 | Four antenna port codebook | Ericsson, ST-Ericsson | Revised |
R1‑130818 | Enhanced codebook design for 4Tx | CATT | Not treated |
R1‑130819 | 36.211 CR0179 (Rel-10, F) Correction to CSI Reference Signals | Huawei, HiSilicon | Agreed |
R1‑130820 | 36.211 CR0180 (Rel-11, A) Correction to CSI Reference Signals | Huawei, HiSilicon | Agreed |
R1‑130821 | TR25.701 v0.1.0 for Scalable UMTS FDD | China Unicom | Agreed |
R1‑130822 | 36.213 CR0402 (Rel-10, F) on UE specific search and Common search space overlap on PDCCH | Ericsson, ST-Ericsson, Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Renesas, Huawei, HiSilicon, CATT, Panasonic, AT&T, Texas Instruments, ZTE, Nokia, Nokia Siemens Networks, Intel Corporation, LG Electronics, Ericsson-LG, LG Uplus | Agreed |
R1‑130823 | 36.213 CR0403 (Rel-11, A) on UE specific search and Common search space overlap on PDCCH | Ericsson, ST-Ericsson, Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Renesas, Huawei, HiSilicon, CATT, Panasonic, AT&T, Texas Instruments, ZTE, Nokia, Nokia Siemens Networks, Intel Corporation, LG Electronics, Ericsson-LG, LG Uplus | Agreed |
R1‑130824 | Text proposal for TR 36.888 on coverage improvement | Huawei, MediaTek Inc. | Agreed |
R1‑130825 | Codebook enhancements in Rel.12 | Texas Instruments | Not treated |
R1‑130826 | 36.211 CR0181 (Rel-11, F) Additional clarifications/corrections for introducing Rel-11 features | Editor (Ericsson) | Agreed |
R1‑130827 | 36.213 CR0404 (Rel-11, F) Additional clarifications/corrections for introducing Rel-11 features | Editor (Motorola Mobility) | Withdrawn |
R1‑130828 | 25.214 CR0703r2 (Rel-11, F) Correction to the referenced variable for CELL-FACH enhancement | Huawei, HiSilicon, Qualcomm Incorporated | Agreed |
R1‑130829 | Enhanced DMRS pattern for NCT | New Postcom | Not treated |
R1‑130830 | DMRS design for NCT | Hitachi Ltd | Not treated |
R1‑130831 | On 4Tx codebook enhancement | Intel Corporation | Not treated |
R1‑130832 | 36.212 CR0145 (Rel-11, F) Additional clarifications/corrections for introducing Rel-11 features | Editor (Huawei) | Agreed |
R1‑130833 | Alternate UE-specific pattern on NCT for evaluation | Ericsson | Not treated |
R1‑130834 | Candidate DM-RS Patterns for New Carrier Type | LG Electronics | Not treated |
R1‑130835 | Proposals on DMRS enhancements for NCT | CATT | Not treated |
R1‑130836 | 36.213 CR0404 (Rel-11, F) Additional clarifications/corrections for introducing Rel-11 features | Editor (Motorola Mobility) | Agreed |
R1‑130837 | Codebook design and CSI feedback for eMIMO | Qualcomm Inc. | Not treated |
R1‑130838 | 4Tx Codebook Design for Two-Component Feedback | Broadcom Corporation | Not treated |
R1‑130839 | Proposal for 4Tx Codebook Enhancement | Fujitsu | Not treated |
R1‑130840 | Proposal for 4Tx Codebook Enhancement | Nokia Siemens Networks, Nokia | Not treated |
R1‑130841 | Proposed codebooks for evaluation of DL MIMO enhancement | New Postcom | Not treated |
R1‑130842 | Proposal on 4Tx codebook enhancement | ZTE | Not treated |
R1‑130843 | Codebook Proposal for Further DL MIMO Enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑130844 | Double codebook for 4Tx antennas | Renesas Mobile Europe Ltd. | Revised |
R1‑130845 | On the 4TX Codebook Enhancement | NEC Group | Not treated |
R1‑130846 | Codebook Enhancement for Downlink 4 Tx MIMO | NTT DOCOMO | Not treated |
R1‑130847 | Proposal on 4Tx enhanced Codebook | LG Electronics | Not treated |
R1‑130848 | Summary of UL simulation assumption for small cell enhancements | Rapporteur (Alcatel-Lucent) | Agreed |
R1‑130849 | Proposals of 4TX codebook enhancement | Huawei, HiSilicon | Not treated |
R1‑130850 | A proposal for four-antenna-port codebook | Samsung | Not treated |
R1‑130851 | Enhanced 4 Tx Codebook | Motorola Mobility | Not treated |
R1‑130852 | Four antenna port codebook | AT&T | Not treated |
R1‑130853 | An Alternative Two-Component Codebook for 4Tx | Broadcom Corporation | Withdrawn |
R1‑130854 | Double codebook for 4Tx antennas | Renesas Mobile Europe Ltd. | Not treated |
R1‑130855 | Four antenna port codebook | Ericsson, ST-Ericsson | Not treated |
R1‑130856 | Evaluation assumptions for small cell enhancements-physical layer | Huawei, HiSilicon | Agreed |
R1‑130857 | void | - | Withdrawn |
R1‑130858 | void | - | Withdrawn |
R1‑130859 | void | - | Withdrawn |
page generated from database: 2024-10-07 07:52:06