3GPP TDocs (written contributions) at meeting
Meeting: R1-69 - 2012-05-21 to 2012-05-25, Prague
meeting id: R1-69 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑121925 | Draft Agenda for RAN1#69 meeting | RAN1 Chairman | Approved |
R1‑121926 | Final report of RAN1#68bis meeting | MCC Support | Revised |
R1‑121927 | RAN2 status on CA enhancements | RAN2, Samsung | Noted |
R1‑121928 | Response LS on network-based positioning | RAN3, TruePosition | Noted |
R1‑121929 | LS response on Physical Layer Measurement for Network Positioning | RAN3, TruePosition | Noted |
R1‑121930 | LS to RAN1 - UE measurements in support of the two-stage MIMO OTA test method | RAN4, Agilent | Noted |
R1‑121931 | Clarifications on CSI-RS based measurement for CoMP | RAN4, CATT | Noted |
R1‑121932 | Size of CoMP measurement set for Rel-11 CoMP | NTT DOCOMO, NEC Group | Noted |
R1‑121933 | Investigation of aggregated CQI feedback in Rel-11 CoMP | NTT DOCOMO | Noted |
R1‑121934 | CQI definition for Rel-11 CoMP | NTT DOCOMO | Not treated |
R1‑121935 | Interference measurement mechanisms for Rel-11 | NTT DOCOMO | Revised |
R1‑121936 | Multi-cell periodic CSI reporting in a subframe | Huawei, HiSilicon | Not treated |
R1‑121937 | Simultaneous transmission of periodic CSI and HARQ-ACK | Huawei, HiSilicon | Not treated |
R1‑121938 | Simultaneous transmission of SRS and periodic CSI | Huawei, HiSilicon | Not treated |
R1‑121939 | SORTD for format 1b with channel selection | Huawei, HiSilicon | Noted |
R1‑121940 | PDSCH HARQ timing design for TDD inter-band CA with different UL-DL configurations | Huawei, HiSilicon | Not treated |
R1‑121941 | Cross-carrier scheduling design for TDD inter-band CA with different UL-DL configurations | Huawei, HiSilicon | Not treated |
R1‑121942 | Considerations on power limitation due to multiple TA | Huawei, HiSilicon | Not treated |
R1‑121943 | Maximum size of CoMP measurement set | Huawei, HiSilicon | Not treated |
R1‑121944 | CoMP CQI definition and configuration | Huawei, HiSilicon | Noted |
R1‑121945 | On CoMP with transmission modes 3 and 4 | Huawei, HiSilicon | Not treated |
R1‑121946 | CSI feedback modes for CoMP | Huawei, HiSilicon | Noted |
R1‑121947 | Interference measurement resource configuration and CQI calculation | Huawei, HiSilicon | Noted |
R1‑121948 | Granularity of interference measurement resources | Huawei, HiSilicon | Noted |
R1‑121949 | Details of CSI-RS based received signal quality measurements | Huawei, HiSilicon | Not treated |
R1‑121950 | Remaining issues for DL DMRS | Huawei, HiSilicon | Noted |
R1‑121951 | Remaining details of CSI-RS | Huawei, HiSilicon | Noted |
R1‑121952 | Considerations on DL and UL DCI for CoMP | Huawei, HiSilicon | Not treated |
R1‑121953 | Higher layer signalling requirements for CoMP | Huawei, HiSilicon | Noted |
R1‑121954 | Remaining details of PUSCH DMRS for UL CoMP | Huawei, HiSilicon | Not treated |
R1‑121955 | Enhancements of SRS for Rel-11 | Huawei, HiSilicon | Noted |
R1‑121956 | PUCCH Transmission Enhancement | Huawei, HiSilicon | Not treated |
R1‑121957 | Uplink timing advance for CoMP | Huawei, HiSilicon | Not treated |
R1‑121958 | Antenna port association for ePDCCH | Huawei, HiSilicon | Not treated |
R1‑121959 | Spatial diversity for ePDCCH transmission | Huawei, HiSilicon | Noted |
R1‑121960 | Details of ePDCCH scrambling sequence generator initialization | Huawei, HiSilicon | Not treated |
R1‑121961 | Usage of ePDCCH signature for ePDCCH detection | Huawei, HiSilicon | Not treated |
R1‑121962 | Comparison between puncturing and rate-matching for ePDCCH | Huawei, HiSilicon | Noted |
R1‑121963 | eCCE definition for ePDCCH | Huawei, HiSilicon | Not treated |
R1‑121964 | Aggregation levels of ePDCCH for localized and distributed transmission | Huawei, HiSilicon | Not treated |
R1‑121965 | Need of multiplexing localized and distributed transmission in one PRB pair | Huawei, HiSilicon | Noted |
R1‑121966 | Fallback operation for ePDCCH | Huawei, HiSilicon | Not treated |
R1‑121967 | Discussion on CSI feedback for ePDCCH | Huawei, HiSilicon | Not treated |
R1‑121968 | On the need for ePHICH and ePCFICH | Huawei, HiSilicon | Noted |
R1‑121969 | PUCCH ACK/NACK resource allocation for ePDCCH | Huawei, HiSilicon | Noted |
R1‑121970 | Text proposal for the technique “Reduction of supported downlink transmission modes” | Huawei, HiSilicon | Noted |
R1‑121971 | Recommendations on technique candidates for low-cost MTC | Huawei, HiSilicon | Noted |
R1‑121972 | PDSCH HARQ Timing of SCell and PUCCH Collision for Cross-Carrier Scheduling | NTT DOCOMO | Not treated |
R1‑121973 | PDCCH Enhancement for Different TDD UL-DL Configuration on Different Bands | NTT DOCOMO | Not treated |
R1‑121974 | DM-RS Antenna Port Determination for E-PDCCH | NTT DOCOMO | Not treated |
R1‑121975 | Views on Spatial Diversity Scheme for E-PDCCH | NTT DOCOMO | Not treated |
R1‑121976 | Design Principle for E-PDCCH Multiplexing | NTT DOCOMO | Not treated |
R1‑121977 | Views on Resource Mapping for E-PDCCH | NTT DOCOMO | Noted |
R1‑121978 | Search Space Design for E-PDCCH Transmission Scheme | NTT DOCOMO | Revised |
R1‑121979 | CSI feedback scheme for Rel-11 CoMP | NTT DOCOMO | Noted |
R1‑121980 | Downlink control signaling for Rel-11 CoMP | NTT DOCOMO | Withdrawn |
R1‑121981 | Simulation results for discontinuous CQI reporting | TD Tech | Noted |
R1‑121982 | Further discussion on HSPA signalling enhancement for more efficient resource usage | TD Tech | Noted |
R1‑121983 | TR25.874 v0.2.0 for "HSPA feedback and Signalling Efficiency Enhancements for LCR TDD" | TD Tech | Agreed |
R1‑121984 | 36.213 CR0378R2 (Rel-10, F) Correction of FDD channel selection HARQ-ACK and SR transmission | Ericsson, ST-Ericsson, CATT, Texas Instruments | Noted - Revised |
R1‑121985 | On PDCCH enhancements for CA | Ericsson, ST-Ericsson | Not treated |
R1‑121986 | Multi-cell periodic CSI transmission | Ericsson, ST-Ericsson | Not treated |
R1‑121987 | Multi-cell HARQ-ACK and Periodic CSI | Ericsson, ST-Ericsson | Not treated |
R1‑121988 | PUCCH resource mapping | Ericsson, ST-Ericsson | Noted |
R1‑121989 | Support of half-duplex operations in aggregation of TDD carriers with different UL/DL configurations | Ericsson, ST-Ericsson | Not treated |
R1‑121990 | Remaining details for DL cross-carrier scheduling | Ericsson, ST-Ericsson | Not treated |
R1‑121991 | Remaining details for UL cross-carrier scheduling | Ericsson, ST-Ericsson | Revised |
R1‑121992 | PSS/SSS on the new carrier type | Ericsson, ST-Ericsson | Noted |
R1‑121993 | Design for synchronized and unsynchronized new carriers | Ericsson, ST-Ericsson | Not treated |
R1‑121994 | Transmission modes for the new carrier type | Ericsson, ST-Ericsson | Not treated |
R1‑121995 | Resource allocation for the new carrier type | Ericsson, ST-Ericsson | Withdrawn |
R1‑121996 | Channel Prioritization due to Multiple TA | Ericsson, ST-Ericsson | Not treated |
R1‑121997 | Antenna ports for ePDCCH | Ericsson, ST-Ericsson | Not treated |
R1‑121998 | Spatial diversity for ePDCCH | Ericsson, ST-Ericsson | Noted |
R1‑121999 | DMRS scrambling for ePDCCH | Ericsson, ST-Ericsson | Not treated |
R1‑122000 | Mapping of ePDCCH to RE | Ericsson, ST-Ericsson | Noted |
R1‑122001 | DCI multiplexing by eREG | Ericsson, ST-Ericsson | Not treated |
R1‑122002 | On aggregation levels for ePDCCH | Ericsson, ST-Ericsson | Not treated |
R1‑122003 | Multiplexing of two ePDCCH types | Ericsson, ST-Ericsson | Noted |
R1‑122004 | Fallback with ePDCCH | Ericsson, ST-Ericsson | Not treated |
R1‑122005 | Reaching peak rate when scheduled with ePDCCH | Ericsson, ST-Ericsson | Noted |
R1‑122006 | On the restriction of Transport Channel bits | Ericsson, ST-Ericsson | Not treated |
R1‑122007 | On the ePHICH | Ericsson, ST-Ericsson | Not treated |
R1‑122008 | TBS determination for additional special subframe configuration | Ericsson, ST-Ericsson | Not treated |
R1‑122009 | On DMRS support for additional special subframe configuration | Ericsson, ST-Ericsson | Noted |
R1‑122010 | Reduction of supported downlink transmission modes for low-cost MTC UEs | Ericsson, ST-Ericsson | Noted |
R1‑122011 | Conclusions from study item on low-cost MTC UEs | Ericsson, ST-Ericsson | Noted |
R1‑122012 | Further performance evaluation for low-cost MTC UEs | Ericsson, ST-Ericsson | Noted |
R1‑122013 | On TTI bundling enhancements | Ericsson, ST-Ericsson | Noted |
R1‑122014 | Conclusions from Coverage Enhancements study item | Ericsson, ST-Ericsson | Withdrawn |
R1‑122015 | Traffic adaptation performance in Heterogeneous outdoor deployment | Ericsson, ST-Ericsson | Noted |
R1‑122016 | On standardization impact of TDD UL-DL adaptation | Ericsson, ST-Ericsson | Not treated |
R1‑122017 | Conclusions on dynamic TDD UL-DL adaptation | Ericsson, ST-Ericsson | Noted |
R1‑122018 | Response to LS on CSI-RS based RSRP measurement | CATT | Noted |
R1‑122019 | Draft LS response on CSI-RS based RSRP measurement | CATT | Not treated |
R1‑122020 | Discussion on non-rectangular resource allocation | CATT | Noted |
R1‑122021 | 36.212 CR0137 (Rel-10, F) Removal of square brackets for beta_{offset}^{PUSCH} | CATT | Rejected |
R1‑122022 | System level evaluation on compact DCI formats | CATT | Not treated |
R1‑122023 | Enhancements on PDCCH search space for CA-capable UEs | CATT | Not treated |
R1‑122024 | Periodic CSI reporting for multiple DL CCs in LTE-A Rel-11 | CATT | Not treated |
R1‑122025 | Transmission methods for multi-CC periodic CSI | CATT | Not treated |
R1‑122026 | Simultaneous transmission of ACK/NAK and periodic CSI in Rel-11 | CATT | Not treated |
R1‑122027 | Enhancements on HARQ-ACK for Rel-11 carrier aggregation | CATT | Not treated |
R1‑122028 | Transmit diversity for PUCCH format 1b with channel selection | CATT | Noted |
R1‑122029 | Half duplex operations for TDD inter-band CA | CATT | Not treated |
R1‑122030 | Cross carrier scheduling and HARQ-ACK timing for TDD inter-band CA | CATT | Not treated |
R1‑122031 | HARQ-ACK feedback for TDD interband CA | CATT | Noted |
R1‑122032 | Bandwidth of RS on new carrier type | CATT | Not treated |
R1‑122033 | Analysis on remaining issues for new carrier type | CATT | Noted |
R1‑122034 | Discussion on NCT measurement performance | CATT | Withdrawn |
R1‑122035 | UL power control with multiple timing advances in Rel-11 | CATT | Not treated |
R1‑122036 | CQI definition for CoMP | CATT | Noted |
R1‑122037 | CQI definition for TDD CoMP | CATT | Not treated |
R1‑122038 | TxD CQI based on CSI-RS | CATT | Not treated |
R1‑122039 | On CSI feedback modes for CoMP | CATT | Not treated |
R1‑122040 | Discussion on interference measurement mechanisms | CATT | Noted |
R1‑122041 | Considerations on CSI-RS based RSRP measurement | CATT | Not treated |
R1‑122042 | Remaining issues on CSI-RS | CATT | Noted |
R1‑122043 | On downlink control signaling for CoMP | CATT | Not treated |
R1‑122044 | On configuration of UE-specific UL DMRS | CATT | Not treated |
R1‑122045 | SRS enhancement for CoMP | CATT | Noted |
R1‑122046 | SRS power control for DL and UL CoMP | CATT | Not treated |
R1‑122047 | On PUCCH enhancement | CATT | Not treated |
R1‑122048 | Discussion on DMRS associated issues in E-PDCCH | CATT | Not treated |
R1‑122049 | Evaluation of DMRS based distributed transmission for E-PDCCH | CATT | Noted |
R1‑122050 | Search space design for E-PDCCH | CATT | Not treated |
R1‑122051 | Multiplexing and resource mapping for E-PDCCH | CATT | Not treated |
R1‑122052 | PUCCH resource for E-PDCCH | CATT | Not treated |
R1‑122053 | Reference signals and transmission schemes for additional TDD special subframe configuration | CATT | Noted |
R1‑122054 | 36.211 CR0170 (Rel-11, B) Inclusion of additional TDD special subframe configurations | CATT, CMCC | Noted - Revised |
R1‑122055 | Discussion on reduction of supported downlink transmission modes for low-cost MTC LTE UEs | CATT | Not treated |
R1‑122056 | Recommendation for reduction of peak rate for low-cost MTC LTE UEs | CATT | Not treated |
R1‑122057 | Recommendations for low-cost MTC UEs based on LTE | CATT | Noted |
R1‑122058 | Analysis on TTI bundling enhancement and specification impact | CATT | Noted |
R1‑122059 | Evaluation on TDD UL/DL reconfiguration in co-channel macro/pico scenario | CATT | Noted |
R1‑122060 | Evaluation on TDD UL/DL reconfiguration in adjacent channel macro/pico scenario | CATT | Noted |
R1‑122061 | Discussion on interference migitation schemes for FS_LTE_TDD_eIMTA | CATT | Noted |
R1‑122062 | Methods to support different UL/DL reconfiguration time scales for FS_LTE_TDD_eIMTA | CATT | Not treated |
R1‑122063 | Draft TP for TR36.828 section 6 | CATT | Noted - Revised |
R1‑122064 | Draft TP for TR36.828 section 7 | CATT | Noted - Revised |
R1‑122065 | Draft TP for TR36.828 section 8 | CATT | Noted - Revised |
R1‑122066 | Definition and configuration of antenna port mapping for ePDCCH | Fujitsu | Not treated |
R1‑122067 | Rate matching vs puncturing of ePDCCH | Fujitsu | Noted |
R1‑122068 | Definition of eREG and eCCE | Fujitsu | Not treated |
R1‑122069 | UE-specific Search Space Design for ePDCCH | Fujitsu | Not treated |
R1‑122070 | ePDCCH multiplexing efficiency for localised and distributed ePDCCH | Fujitsu | Noted |
R1‑122071 | UE behaviour with ePDCCH and large transport blocks | Fujitsu | Not treated |
R1‑122072 | Diversity schemes for distributed ePDCCH transmission | Fujitsu | Noted |
R1‑122073 | Motivation, requirements and design for ePHICH | Fujitsu | Noted |
R1‑122074 | Motivation, requirements and design for ePCFICH: | Fujitsu | Noted |
R1‑122075 | Motivation, requirements and design for CSS on ePDCCH | Fujitsu | Not treated |
R1‑122076 | Discussion on CQI definition and Rank reporting for DL CoMP | Fujitsu | Not treated |
R1‑122077 | Discussion on CSI feedback modes for CoMP transmission | Fujitsu | Noted |
R1‑122078 | Zero-Power CSI-RS Configurations for Interference Measurements in CoMP | Fujitsu | Not treated |
R1‑122079 | Discussion on CSI-RS based received signal quality measurement for CoMP | Fujitsu | Not treated |
R1‑122080 | Discussion on transmission power setting for DL CoMP | Fujitsu | Noted |
R1‑122081 | Discussion on DL CoMP control signalling | Fujitsu | Not treated |
R1‑122082 | Consideration on PUCCH transmission enhancement | Fujitsu | Not treated |
R1‑122083 | Low-cost MTC UE LSI ASIC: Cost reduction particularities | Fujitsu | Not treated |
R1‑122084 | Low-cost MTC UE. Study Item Conclusions | Fujitsu | Noted |
R1‑122085 | Discussion on the features and signaling support for non-zero transmit power ABS | Fujitsu | Noted |
R1‑122086 | Discussion on the signaling design to address issues for 9dB bias | Fujitsu | Not treated |
R1‑122087 | Uplink timing in CoMP scenario Discussion and Decision | New Postcom | Not treated |
R1‑122088 | SRS enhancement for CoMP scenario Discussion and Decision | New Postcom | Noted |
R1‑122089 | Uplink control signaling in CoMP scenario Discussion and Decision | New Postcom | Not treated |
R1‑122090 | Remaining issues on SRS power control in CoMP scenario | New Postcom | Not treated |
R1‑122091 | Remaining issues on PUSCH DMRS in CoMP scenario | New Postcom | Not treated |
R1‑122092 | Multi-cell periodic CSI multiplexing issues on uplink control signalling enhancement | New Postcom | Not treated |
R1‑122093 | Multi-cell HARQ-ACK and periodic CSI multiplexing issues on uplink control signalling enhancement | New Postcom | Not treated |
R1‑122094 | HARQ-ACK bundling considerations for uplink control signalling enhancement | New Postcom | Not treated |
R1‑122095 | Consideration on PDSCH/PUSCH timing issues for TDD inter-band CA with different UL-DL configuration | New Postcom | Not treated |
R1‑122096 | CSI-RS based RRM measurement for additional carrier type | New Postcom | Not treated |
R1‑122097 | A subset-CRS based tracking reference signal for unsynschronized new carrier type | New Postcom | Not treated |
R1‑122098 | Methods to support different time scales for TDD UL-DL reconfiguration | New Postcom | Noted |
R1‑122099 | Views on Detection of SS,MIB and SIB1 for 9dB bias | New Postcom | Noted |
R1‑122100 | Evaluation of TDD dynamic reconfiguration in multi-cell pico scenario with macro layer | CHTTL | Not treated |
R1‑122101 | Discussion on DMRS usage for enhanced PDCCH | ZTE | Revised |
R1‑122102 | Discussion on DM-RS based enhanced PDCCH transmission | ZTE | Not treated |
R1‑122103 | Discussion on DMRS scrambling sequence for enhanced PDCCH | ZTE | Not treated |
R1‑122104 | Handling of mapping of ePDCCH in presence of other signals | ZTE | Not treated |
R1‑122105 | The definitions of eREG and eCCE | ZTE | Revised |
R1‑122106 | Discussion on ePDCCH candidates design | ZTE | Not treated |
R1‑122107 | Consideration on UE monitoring set | ZTE | Not treated |
R1‑122108 | Need for multiplexing of localised and distributed ePDCCH parts in same PRBs | ZTE | Revised |
R1‑122109 | TrCH bits restriction for PDSCH scheduled by ePDCCH | ZTE | Not treated |
R1‑122110 | HARQ timing of PDSCH on cross-carrier scheduled SCell for TDD CA with different UL-DL configurations | ZTE | Not treated |
R1‑122111 | Scheduling and HARQ timing for cross-carrier PUSCH scheduling for TDD CA with different UL-DL configurations | ZTE | Not treated |
R1‑122112 | Draft CR to 36.213 on Clarification on Cyclic shift for DM RS and OCC index in UL grant | ZTE | Rejected |
R1‑122113 | Transmit diversity for PUCCH format 1b with channel selection | ZTE | Noted |
R1‑122114 | Details of Multi-Cell Periodic CSI Multiplexing | ZTE | Not treated |
R1‑122115 | Details of Multi-cell HARQ-ACK and Periodic CSI Multiplexing | ZTE | Not treated |
R1‑122116 | Discussion on TBS scaling factor for additional TDD special subframe configurations | ZTE | Noted |
R1‑122117 | Evaluation/analysis on reduction of supported downlink transmission modes and Text Proposal | ZTE | Noted |
R1‑122118 | Conclusion and recommended cost saving techniques for LTE MTC UEs | ZTE | Noted |
R1‑122119 | Consideration on remaining issues related to multiple TA | ZTE | Not treated |
R1‑122120 | SRS power control for UL COMP | ZTE | Not treated |
R1‑122121 | Discussion on Compact DCI format application in PDCCH | ZTE | Not treated |
R1‑122122 | RS for unsynchronised New Carrier Type and transmission mode | ZTE | Not treated |
R1‑122123 | Discussion on synchronization signal mapping for New Carrier Type | ZTE | Not treated |
R1‑122124 | On synchronized New Carrier Type | ZTE | Not treated |
R1‑122125 | Further evaluation of TDD IMTA with co-channel deployment of macro-cells and pico-cells | ZTE | Not treated |
R1‑122126 | Suggestions to IMTA SI conclusions | ZTE | Not treated |
R1‑122127 | On signalling for reduced power ABS | ZTE | Revised |
R1‑122128 | Consideration on PDSCH rate matching around CRS of neighbour cells | ZTE | Not treated |
R1‑122129 | TTI bundling enhancements details for UL VoIP | ZTE | Noted |
R1‑122130 | TTI bundling enhancements details for PUSCH medium data rate | ZTE | Noted |
R1‑122131 | Views on size of CoMP measurement set | ZTE | Noted |
R1‑122132 | CQI definition for CoMP | ZTE | Noted |
R1‑122133 | CoMP CQI for TDD | ZTE | Not treated |
R1‑122134 | Consideration on CoMP support based on CRS | ZTE | Not treated |
R1‑122135 | CSI feedback modes for CoMP | ZTE | Noted |
R1‑122136 | Discussion on aggregated PMI feedback | ZTE | Not treated |
R1‑122137 | Discussion on interference measurement | ZTE | Revised |
R1‑122138 | Configuration of Interference Measurement Resource | ZTE | Withdrawn |
R1‑122139 | Discussion on CoMP Resource Management Set | ZTE | Not treated |
R1‑122140 | Further study of restriction in CSI-RS configuration | ZTE | Not treated |
R1‑122141 | Other issues on CSI-RS configuration | ZTE | Not treated |
R1‑122142 | Further study on dynamic selection in DMRS sequence initialization | ZTE | Not treated |
R1‑122143 | Downlink control signaling for CoMP | ZTE | Not treated |
R1‑122144 | Consideration on uplink DMRS isssues for UL CoMP | ZTE | Noted |
R1‑122145 | Considerations on the enhancement for SRS | ZTE | Noted |
R1‑122146 | Consideration for PUCCH enhancement | ZTE | Not treated |
R1‑122147 | Uplink timing for CoMP | ZTE | Not treated |
R1‑122148 | Further discussion and TP for reduced bandwidth options and cost analysis | MediaTek Inc. | Noted |
R1‑122149 | Analysis on TTI bundling enhancement for UL VoIP | China Telecom, China Unicom | Not treated |
R1‑122150 | Analysis on TTI bundling enhancement for medium rate PUSCH | China Telecom, China Unicom | Revised |
R1‑122151 | Considerations on eCCE design and transmission schemes in ePDCCH | China Telecom | Revised |
R1‑122152 | Time location of PSS/SSS in new carrier type | MediaTek Inc. | Noted |
R1‑122153 | Transmission modes in new carrier type | MediaTek Inc. | Not treated |
R1‑122154 | Need for signaling support for non-zero transmit power ABS | MediaTek Inc. | Not treated |
R1‑122155 | Obtaining of system information at 9dB CRE bias | MediaTek Inc. | Not treated |
R1‑122156 | UE assumptions on network deployment | MediaTek Inc. | Not treated |
R1‑122157 | On the size of CoMP measurement set for CSI feedback | MediaTek Inc. | Not treated |
R1‑122158 | CQI feedback to support downlink CoMP | MediaTek Inc. | Noted |
R1‑122159 | Periodic CSI feedback | MediaTek Inc. | Noted |
R1‑122160 | Further discussion on interference measurement for CoMP | MediaTek Inc. | Noted |
R1‑122161 | Further details on CSI-RS based measurement for CoMP resource management set | MediaTek Inc. | Not treated |
R1‑122162 | Performance comparison of ePDCCH using single and multiple DRS antenna ports | MediaTek Inc. | Not treated |
R1‑122163 | DRS antenna port determination for ePDCCH decoding | MediaTek Inc. | Not treated |
R1‑122164 | ePDCCH performance analysis for TxD transmission schemes | MediaTek Inc. | Noted |
R1‑122165 | Mapping of ePDCCH in presence of other signals | MediaTek Inc. | Not treated |
R1‑122166 | Physical structure for DCI multiplexing in ePDCCH | MediaTek Inc. | Not treated |
R1‑122167 | eCCE structure of ePDCCH | MediaTek Inc. | Not treated |
R1‑122168 | Necessity of multiplexing of localized and distributed ePDCCH parts in the same PRBs | MediaTek Inc. | Noted |
R1‑122169 | Analysis of transmission mode support for MTC devices | MediaTek Inc. | Not treated |
R1‑122170 | Observations and views on techniques for low-cost MTC | MediaTek Inc. | Noted |
R1‑122171 | Multiplexing of periodic CSI for carrier aggregation | Panasonic | Not treated |
R1‑122172 | Multiplexing of periodic CSI and HARQ-ACK for carrier aggregation | Panasonic | Not treated |
R1‑122173 | Remaining issues on TDD inter-band CA with different UL-DL configurations | Panasonic | Revised |
R1‑122174 | Location of PSS/SSS on additional carrier type | Panasonic | Noted |
R1‑122175 | Channels and signals for additional carrier type | Panasonic | Not treated |
R1‑122176 | Discussion of the synchronization on additional carrier type | Panasonic | Not treated |
R1‑122177 | UE behavior for power limitation in multiple TA | Panasonic | Not treated |
R1‑122178 | SCell PRACH transmission timing | Panasonic | Not treated |
R1‑122179 | TDD CA timing difference handling | Panasonic | Not treated |
R1‑122180 | L1 autonomous stopping behaviour for SCell | Panasonic | Not treated |
R1‑122181 | Performance of Low Power ABS with Modulation Restrictions | Panasonic | Noted |
R1‑122182 | On the Handling of colliding CRS in HetNet Scenarios with CRE | Panasonic | Not treated |
R1‑122183 | System Information Aquisition in HetNet Scenarios with CRE | Panasonic | Not treated |
R1‑122184 | CQI feedback levels in ABS | Panasonic | Not treated |
R1‑122185 | Discussion on Size of CoMP Measurement Set | Panasonic | Not treated |
R1‑122186 | Further Discussions on Aggregated CQI | Panasonic | Noted |
R1‑122187 | CQI Definition for CoMP | Panasonic | Not treated |
R1‑122188 | CSI feedback configuration, triggering, and behaviour | Panasonic | Not treated |
R1‑122189 | Views on CSI-RS based received signal quality measurements | Panasonic | Noted |
R1‑122190 | Views on Remaining issues for Downlink DMRS sequence initialization | Panasonic | Noted |
R1‑122191 | Views on Remaining issues for CSI-RS configuration | Panasonic | Not treated |
R1‑122192 | eNB configurations for multiple CSI reporting | Panasonic | Not treated |
R1‑122193 | DCI for Rel-11 CoMP operation | Panasonic | Not treated |
R1‑122194 | Enhancement of PUSCH DMRS orthogonality | Panasonic | Not treated |
R1‑122195 | Discussion on PUSCH DMRS configuration and signalling | Panasonic | Not treated |
R1‑122196 | SRS power control enhancement in Rel.11 | Panasonic | Not treated |
R1‑122197 | PUCCH enhancement for UL CoMP | Panasonic | Not treated |
R1‑122198 | Association between antenna ports and ePDCCH transmission | Panasonic | Not treated |
R1‑122199 | ePDCCH performance analysis on Tx diversity | Panasonic | Noted |
R1‑122200 | ePDCCH rate matching / puncturing and colliding signals analysis | Panasonic | Not treated |
R1‑122201 | Definitions of eREG and eCCE | Panasonic | Not treated |
R1‑122202 | ePDCCH search space design and configuration | Panasonic | Not treated |
R1‑122203 | Localized and distributed transmission of ePDCCH | Panasonic | Not treated |
R1‑122204 | “Fallback” operation for ePDCCH transmission | Panasonic | Not treated |
R1‑122205 | Type 0 and type 2 PDSCH assignment on resources including ePDCCH allocation | Panasonic | Noted |
R1‑122206 | Restrict the maximum TBS receivable in a TTI | Panasonic | Not treated |
R1‑122207 | The necessity of enhanced PHICH | Panasonic | Not treated |
R1‑122208 | Support of transmission schemes and transmission modes | Panasonic | Noted |
R1‑122209 | Evaluation on TDD UL/DL reconfiguration with interference mitigation in multi-cell pico scenario | CATT | Revised |
R1‑122210 | Single cell indoor deployment where CRS ports are not co-located | Andrew Wireless Systems GmbH | Noted |
R1‑122211 | Draft Reply LS on Clarifications on CSI-RS based measurement for CoMP | Samsung, Ericsson, ST-Ericsson | Noted |
R1‑122212 | Multi-Cell Periodic CSI Reporting | Samsung | Not treated |
R1‑122213 | HARQ-ACK and Periodic CSI Multiplexing | Samsung | Not treated |
R1‑122214 | TDD HARQ-ACK Bundling for PUCCH Format 3 | Samsung | Not treated |
R1‑122215 | HARQ-ACK feedback Enhancement for TDD configuration 5 | Samsung | Not treated |
R1‑122216 | HARQ-ACK Bundling in PUSCH | Samsung | Not treated |
R1‑122217 | UL DAI Field in FDD | Samsung | Not treated |
R1‑122218 | SORTD for PUCCH Format 1b with Channel Selection | Samsung | Noted |
R1‑122219 | Discussion on the maximum number of aggregated cells | Samsung | Not treated |
R1‑122220 | Discussion on PUCCH HARQ-ACK transmission | Samsung | Noted |
R1‑122221 | HARQ timing for PUSCH Case D on Scheduled Cell | Samsung | Not treated |
R1‑122222 | PUSCH HARQ timing for case of 10ms RTT in scheduling cell | Samsung | Not treated |
R1‑122223 | Issues on PHICH-less PUSCH HARQ operation in TDD CA | Samsung | Not treated |
R1‑122224 | Pcell vs. Scell based timing in case of PDSCH cross-carrier scheduling | Samsung | Not treated |
R1‑122225 | PDSCH HARQ timing for more than 2 cell configuration | Samsung | Not treated |
R1‑122226 | Details on synchronization signal mapping for New Carrier Type | Samsung | Not treated |
R1‑122227 | Further discussions on signalling support for non-zero transmit power ABS | Samsung | Not treated |
R1‑122228 | Discussions on cell detection issues for FeICIC | Samsung | Not treated |
R1‑122229 | Discussion on the size of CoMP measurement set | Samsung | Noted |
R1‑122230 | Need for aggregated CQI across CSI-RS resources | Samsung | Noted |
R1‑122231 | Definition of CQI in CoMP | Samsung | Not treated |
R1‑122232 | Discussion on CRS-based CoMP | Samsung | Not treated |
R1‑122233 | CSI feedback modes for DL CoMP | Samsung | Noted |
R1‑122234 | Feedback support for multiple interference assumptions | Samsung | Not treated |
R1‑122235 | CoMP Feedback including preferred-TP indicator | Samsung | Not treated |
R1‑122236 | Interference Measurement Resource for Downlink CoMP | Samsung | Not treated |
R1‑122237 | Remaining issues on CSI-RS based received signal quality measurement | Samsung | Not treated |
R1‑122238 | Downlink power control allocation for CoMP | Samsung | Noted |
R1‑122239 | CSI-RS measurement restriction for DL CoMP | Samsung | Not treated |
R1‑122240 | Additional Details on Dynamic Switching of DMRS Scrambling for Downlink CoMP | Samsung | Noted |
R1‑122241 | PDSCH RE mapping for CoMP among multiple cells | Samsung | Noted |
R1‑122242 | Downlink Control Signaling for CoMP | Samsung | Noted |
R1‑122243 | CoMP RRC parameters | Samsung | Noted |
R1‑122244 | Further discussions on enhanced UL DM RS for UL CoMP | Samsung | Not treated |
R1‑122245 | SRS Enhancements for CoMP | Samsung | Noted |
R1‑122246 | SRS Transmission Power Control for CoMP | Samsung | Not treated |
R1‑122247 | PUCCH resource allocation for UL CoMP | Samsung | Not treated |
R1‑122248 | Remaining issues on CoMP timing | Samsung | Revised |
R1‑122249 | Association between antenna ports and ePDCCH transmission | Samsung | Not treated |
R1‑122250 | Discussion on the Spatial Diversity Transmission Scheme for ePDCCH | Samsung | Noted |
R1‑122251 | DMRS scrambling for ePDCCH | Samsung | Not treated |
R1‑122252 | Mapping Enhanced Control Channels | Samsung | Not treated |
R1‑122253 | Distributed Operation and Search Space Design of eCCHs | Samsung | Not treated |
R1‑122254 | Localized Operation and Search Space Design of eCCHs | Samsung | Not treated |
R1‑122255 | ePDCCH design according to the vailable REs in a PRB pair | Samsung | Withdrawn |
R1‑122256 | Multiplexing Distributed and Localized ePDCCHs | Samsung | Noted |
R1‑122257 | Fallback Operation for ePDCCH Scheduling | Samsung | Not treated |
R1‑122258 | ePHICH design for Rel-11 | Samsung | Noted |
R1‑122259 | HARQ-ACK PUCCH Resources in Response to ePDCCH Detections | Samsung | Noted |
R1‑122260 | Restrictions on Maximum Number of TrCH Bits for ePDCCH Operation | Samsung | Not treated |
R1‑122261 | Enhanced PCFICH | Samsung | Noted |
R1‑122262 | Additional special subframe configuration for LTE TDD | Samsung | Not treated |
R1‑122263 | Reduction of Downlink transmission modes for MTC devices | Samsung | Noted |
R1‑122264 | Cost reduction techniques for low cost MTC UE based on LTE | Samsung | Noted |
R1‑122265 | Performance evaluation for co-channel macro-pico scenario | Samsung | Revised |
R1‑122266 | Semi-static reconfiguration of TDD UL-DL configuration | Samsung | Noted |
R1‑122267 | Dynamic reconfiguration of TDD UL-DL configuration | Samsung | Noted |
R1‑122268 | Draft CR for ACK/NACK on SR resource in case of FDD channel selection | LG Electronics | Noted - Revised |
R1‑122269 | Multi-cell Periodic CSI Transmission | LG Electronics | Not treated |
R1‑122270 | Multi-cell HARQ-ACK and CSI on PUCCH format 3 | LG Electronics | Not treated |
R1‑122271 | Simulation results for joint coding and separate coding of HARQ-ACK and CSI on PUCCH format 3 | LG Electronics | Not treated |
R1‑122272 | Transmit diversity for PUCCH format 1b with channel selection in Rel-11 | LG Electronics | Noted |
R1‑122273 | Details on full-duplex based TDD CA with different UL-DL configurations | LG Electronics | Not treated |
R1‑122274 | Issues on half-duplex based TDD CA with different UL-DL configurations | LG Electronics | Not treated |
R1‑122275 | Handling the Conflict of PSS/SSS and DM-RS in NCT | LG Electronics | Noted |
R1‑122276 | Discussions on synchronized new carrier type | LG Electronics | Not treated |
R1‑122277 | Considerations on Transmission Modes and Tracking RS Design in NCT | LG Electronics | Not treated |
R1‑122278 | Power limitation in multiple TA | LG Electronics | Not treated |
R1‑122279 | SRS transmission in multiple TA | LG Electronics | Not treated |
R1‑122280 | Analysis of Spatial Multiplexing Processing Reduction | LG Electronics | Not treated |
R1‑122281 | Discussions on Low Cost MTC Study Item Conclusions | LG Electronics | Noted |
R1‑122282 | Joint proposal on SRS transmission with multiple TA – full overlap case | LG Electronics, CATT, Ericsson, ST-Ericsson | Revised |
R1‑122283 | Consideration on necessary signaling for non-zero transmit power ABS | LG Electronics | Noted |
R1‑122284 | signaling support for CRS interference handling | LG Electronics | Not treated |
R1‑122285 | Signaling support for 9dB CRE bias | LG Electronics | Not treated |
R1‑122286 | Consideration on CSI Derivation in FeICIC | LG Electronics | Not treated |
R1‑122287 | Support for rate matching around CRS of neighbor cells | LG Electronics | Not treated |
R1‑122288 | Discussions on Interference Coordination between CoMP Clusters | LG Electronics | Not treated |
R1‑122289 | Enhancement to Time-domain Resource Partitioning | LG Electronics | Not treated |
R1‑122290 | Considerations on Rel-11 CoMP standardization | LG Electronics | Noted |
R1‑122291 | Discussion on Size of CoMP measurement set for per-CSI-RS-resource CSI feedback | LG Electronics | Not treated |
R1‑122292 | CQI definition for DL CoMP | LG Electronics | Not treated |
R1‑122293 | Views on Per-cell Rel-8 CRS-based feedback | LG Electronics | Not treated |
R1‑122294 | Consideration on CoMP CSI feedback modes | LG Electronics | Noted |
R1‑122295 | Consideration on interference measurement resource | LG Electronics | Not treated |
R1‑122296 | Considerations on the definition of CSI-RS based signal quality measurement | LG Electronics | Not treated |
R1‑122297 | Remaining details of DL DM-RS sequence for CoMP | LG Electronics | Revised |
R1‑122298 | Considerations on CSI-RS configuration for CoMP | LG Electronics | Not treated |
R1‑122299 | Required downlink control signalling for CoMP | LG Electronics | Not treated |
R1‑122300 | Enhancement of PUSCH DMRS for uplink CoMP | LG Electronics | Not treated |
R1‑122301 | SRS Enhancements for CoMP | LG Electronics | Noted |
R1‑122302 | Enhancement of SRS power control for CoMP | LG Electronics | Not treated |
R1‑122303 | PUCCH enhancement for uplink CoMP | LG Electronics | Not treated |
R1‑122304 | Discussions on the association between antenna ports and ePDCCH | LG Electronics | Not treated |
R1‑122305 | Considerations on Spatial Diversity in ePDCCH | LG Electronics | Not treated |
R1‑122306 | Further discussion on DMRS for ePDCCH | LG Electronics | Revised |
R1‑122307 | Handling of mapping of ePDCCH in presence of other signals | LG Electronics | Not treated |
R1‑122308 | Discussion on eREG/eCCE definition | LG Electronics | Not treated |
R1‑122309 | On ePDCCH Search Space Design Supporting Localized and Distributed Transmission | LG Electronics | Not treated |
R1‑122310 | Multiplexing of Localised and Distributed ePDCCH parts in same PRBs | LG Electronics | Noted |
R1‑122311 | Fallback Operation for a UE configured with ePDCCH | LG Electronics | Not treated |
R1‑122312 | Discussion on PDSCH mapping in presence of ePDCCH | LG Electronics | Not treated |
R1‑122313 | Details on TBS Restriction and UE Behaviour | LG Electronics | Not treated |
R1‑122314 | Discussion on PUCCH Resource for ePDCCH | LG Electronics | Noted |
R1‑122315 | Considerations on Other Control Channels | LG Electronics | Noted |
R1‑122316 | Discussion on extended TTI bundling for UL VoIP with Semi-Persistent Scheduling | LG Electronics | Noted |
R1‑122317 | Performance Evaluation for LTE_TDD_eIMTA in Multi-cell Scenario | LG Electronics | Noted |
R1‑122318 | TDD DL-UL Reconfiguration Methods for eIMTA | LG Electronics | Not treated |
R1‑122319 | Interference Coordination Issues for LTE_TDD_eIMTA | LG Electronics | Noted |
R1‑122320 | Transmissions of PSS/SSS and DM-RS in Unsynchronised New Carriers | HTC | Not treated |
R1‑122321 | Synchronised New Carriers in Rel-11 LTE | HTC | Not treated |
R1‑122322 | Resource Allocation in Rel-11 New Carriers | HTC | Noted |
R1‑122323 | CQI Definition and Feedback Reduction Mechanism for CoMP | HTC | Not treated |
R1‑122324 | CSI-RS based IMR in CoMP | HTC | Noted |
R1‑122325 | Remaining issues on CoMP resource management set | HTC | Not treated |
R1‑122326 | UL DM-RS considerations for CoMP | HTC | Not treated |
R1‑122327 | UL SRS enhancement for CoMP | HTC | Noted |
R1‑122328 | SRS power control enhancement for UL CoMP | HTC | Not treated |
R1‑122329 | Discussion on ePDCCH Antenna Port Association | HTC | Not treated |
R1‑122330 | Evaluation on TxD Transmission for ePDCCH | HTC | Not treated |
R1‑122331 | eREG and eCCE Definitions for ePDCCH | HTC | Not treated |
R1‑122332 | Fallback Operation for ePDCCH | HTC | Not treated |
R1‑122333 | Downlink Control Channels for Bandwidth-reduced Low-cost MTC UEs | HTC | Not treated |
R1‑122334 | UE assumptions on colocation of antennas | Renesas Mobile Europe Ltd | Noted |
R1‑122335 | Further Results on impact of four branch MIMO pilot channel design | Renesas Mobile Europe Ltd. | Noted |
R1‑122336 | HS-SCCH design for Four4 Branch Downlink MIMO | Renesas Mobile Europe Ltd. | Noted |
R1‑122337 | Further discussion on feedback design for 4 Branch Downlink MIMO | Renesas Mobile Europe Ltd. | Noted |
R1‑122338 | Discussions on Multi-Cell Periodic CSI Multiplexing | Renesas Mobile Europe Ltd | Not treated |
R1‑122339 | On HARQ-ACK and Periodic CSI Multiplexing in PUCCH Format 3 | Renesas Mobile Europe Ltd | Not treated |
R1‑122340 | Multi-cell HARQ-ACK and Periodic CSI Multiplexing in PUCCH format 2b | Renesas Mobile Europe Ltd | Not treated |
R1‑122341 | On Encoding for HARQ-ACK and Periodic CSI Multiplexing in PUCCH Format 3 | Renesas Mobile Europe Ltd | Not treated |
R1‑122342 | On UL Control Enhancement for Macro-RRH Deployments | Renesas Mobile Europe Ltd | Not treated |
R1‑122343 | Left Issues for half duplex mode of CC specific TDD Configuration | Renesas Mobile Europe Ltd | Not treated |
R1‑122344 | Discussion on DL cross-carrier scheudling for CC specific TDD configuration | Renesas Mobile Europe Ltd | Not treated |
R1‑122345 | Remain Issues on PUSCH HARQ-scheduling for CC specific TDD configuration | Renesas Mobile Europe Ltd | Not treated |
R1‑122346 | On PSS/SSS Mapping in NCT | Renesas Mobile Europe Ltd | Noted |
R1‑122347 | On Synchronized New Carrier Type | Renesas Mobile Europe Ltd | Not treated |
R1‑122348 | On Use cases for receiver-based techniques | Renesas Mobile Europe Ltd | Not treated |
R1‑122349 | Size of CoMP measurement set | Renesas Mobile Europe Ltd | Not treated |
R1‑122350 | On CSI feedback processing complexity in CoMP | Renesas Mobile Europe Ltd | Noted |
R1‑122351 | On CQI definition for CoMP | Renesas Mobile Europe Ltd | Not treated |
R1‑122352 | On the CSI feedback modes for CoMP | Renesas Mobile Europe Ltd | Not treated |
R1‑122353 | DL CoMP rank reporting | Renesas Mobile Europe Ltd | Not treated |
R1‑122354 | Study on remaining open issues for interference measurement resources | Renesas Mobile Europe Ltd | Not treated |
R1‑122355 | CoMP Resource Management Set Configuration | Renesas Mobile Europe Ltd | Not treated |
R1‑122356 | UE Assumptions on CSI-RS Transmission | Renesas Mobile Europe Ltd | Noted |
R1‑122357 | Transmission mode and DCI content for Release 11 | Renesas Mobile Europe Ltd | Noted |
R1‑122358 | Diversity schemes for ePDCCH | Renesas Mobile Europe Ltd | Noted |
R1‑122359 | Resource mapping for ePDCCH | Renesas Mobile Europe Ltd | Noted |
R1‑122360 | Definition of eCCE and eREG | Renesas Mobile Europe Ltd | Not treated |
R1‑122361 | On the need of PHICH enhancements | Renesas Mobile Europe Ltd | Noted |
R1‑122362 | Transmission mode for Low-Cost MTC LTE UEs | Renesas Mobile Europe Ltd | Noted |
R1‑122363 | Discussion on enhancements for Dynamic TDD UL-DL Configuration | Renesas Mobile Europe Ltd | Noted |
R1‑122364 | Further discussion on signalling support for reduced power ABS | New Postcom | Not treated |
R1‑122365 | Discussion on the size of CoMP measurement set | New Postcom | Not treated |
R1‑122366 | Discussion on CQI definition for CoMP | New Postcom | Not treated |
R1‑122367 | Considerations on interference measurement resource for CoMP | New Postcom | Noted |
R1‑122368 | Remaining issues for downlink reference signals for CoMP | New Postcom | Not treated |
R1‑122369 | Evaluation results for eIMTA Phase-3 scenario | New Postcom | Revised |
R1‑122370 | Search space and multiplexing design for ePDCCH | New Postcom | Not treated |
R1‑122371 | Spatial diversity for ePDCCH | New Postcom | Noted |
R1‑122372 | Updated Phase-2 eIMTA evaluation results | New Postcom | Not treated |
R1‑122373 | UL Control Signaling Enhancements for Rel-11 CA Scenarios | NTT DOCOMO | Not treated |
R1‑122374 | DL Signals for Unsynchronized New Carrier Type | NTT DOCOMO | Not treated |
R1‑122375 | Further View on Synchronized New Carrier Type Scenarios | NTT DOCOMO | Not treated |
R1‑122376 | UL Transmissions in Case of Power Limitation for Multiple TA | NTT DOCOMO | Not treated |
R1‑122377 | Performance Evaluation of Non-zero Transmit Power ABS for FeICIC | NTT DOCOMO | Not treated |
R1‑122378 | Views on UE-Specific DMRS for UL CoMP | NTT DOCOMO | Not treated |
R1‑122379 | Enhancement on SRS Power Control | NTT DOCOMO | Not treated |
R1‑122380 | Consideration on Multiplexing of Localized and Distributed ePDCCH | China Unicom | Not treated |
R1‑122381 | Correction for DMRS group hopping and sequence hopping | Sharp, Panasonic | Noted - Revised |
R1‑122382 | PUSCH DMRS for UL CoMP | Sharp | Not treated |
R1‑122383 | SRS configuration for UL CoMP | Sharp | Noted |
R1‑122384 | SRS power control for UL CoMP | Sharp | Not treated |
R1‑122385 | PUCCH configuration for UL CoMP | Sharp | Not treated |
R1‑122386 | TPC enhancements of PUCCH for UL-CoMP | Sharp | Not treated |
R1‑122387 | DMRS port determination for ePDCCH | Sharp | Not treated |
R1‑122388 | Resource mapping for ePDCCH | Sharp | Not treated |
R1‑122389 | CCE Aggregation Levels for ePDCCH | Sharp | Not treated |
R1‑122390 | Common search space in ePDCCH and fallback operation in Rel-11 | Sharp | Not treated |
R1‑122391 | PUCCH resource for ePDCCH | Sharp | Revised |
R1‑122392 | Consideration on non 10ms RTT configuration in cross scheduling | Potevio | Not treated |
R1‑122393 | HARQ/Scheduling timing details for different TDD configurations | Potevio | Not treated |
R1‑122394 | Periodic CSI multiplexing for Carrier Aggregation | Nokia Siemens Networks, Nokia | Not treated |
R1‑122395 | Multiplexing of periodic CSI and CA HARQ-ACK on PUCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑122396 | On SORTD for PUCCH Format 1b with channel selection | Nokia Siemens Networks, Nokia | Not treated |
R1‑122397 | Full duplex operation with inter-band CA with different TDD configurations on different bands | Nokia Siemens Networks, Nokia | Not treated |
R1‑122398 | Half duplex operation with inter-band CA with different TDD configurations on different bands | Nokia Siemens Networks, Nokia | Not treated |
R1‑122399 | On the bandwidth of NCT RS port | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑122400 | PSS/SSS location on un-synchronized NCT | Nokia Siemens Networks, Nokia | Not treated |
R1‑122401 | New Carrier Type for Synchronized Carriers | Nokia Siemens Networks, Nokia | Not treated |
R1‑122402 | UL transmissions in case of multiple TA | Nokia Siemens Networks, Nokia | Not treated |
R1‑122403 | Performance of LP-ABS in uniform and non-uniform topologies | Nokia Siemens Networks, Nokia | Not treated |
R1‑122404 | Remaining issues for signalling support for CRS IC | Nokia Siemens Networks, Nokia | Noted |
R1‑122405 | Remaining issues for improving cell detection | Nokia Siemens Networks, Nokia | Noted |
R1‑122406 | On UE complexity related to DL CoMP CSI | Nokia, Nokia Siemens Networks | Not treated |
R1‑122407 | Size of CoMP measurement set for per-CSI-RS-resource CSI feedback | Nokia, Nokia Siemens Networks | Noted |
R1‑122408 | CQI definition for CoMP | Nokia Siemens Networks, Nokia | Noted |
R1‑122409 | Per-cell Rel-8 CRS-based feedback | Nokia Siemens Networks, Nokia | Not treated |
R1‑122410 | CSI feedback modes for CoMP | Nokia Siemens Networks, Nokia | Noted |
R1‑122411 | Interference measurement support for Rel-11 | Nokia Siemens Networks, Nokia | Not treated |
R1‑122412 | CSI-RS based channel quality measurement | Nokia Siemens Networks, Nokia | Not treated |
R1‑122413 | Remaining issues in DMRS for CoMP | Nokia Siemens Networks, Nokia | Noted |
R1‑122414 | Remaining issues in CSI-RS for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑122415 | Downlink control signaling and transmission mode design for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑122416 | On DM RS Enhancements for UL CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑122417 | On Uplink Sounding Enhancements for CoMP | Nokia Siemens Networks, Nokia | Noted |
R1‑122418 | UL CoMP enhancement for PUCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑122419 | Details of association between antenna ports and ePDCCH transmission | Nokia, Nokia Siemens Networks | Not treated |
R1‑122420 | Spatial diversity transmission for ePDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑122421 | On DM-RS scrambling sequence initialization for ePDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑122422 | Handling of mapping of ePDCCH in presence of other signals | Nokia, Nokia Siemens Networks | Noted |
R1‑122423 | CCE and REG definitions for ePDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑122424 | Considerations on search spaces | Nokia, Nokia Siemens Networks | Not treated |
R1‑122425 | Need for multiplexing of localised and distributed ePDCCH parts in same PRBs | Nokia, Nokia Siemens Networks | Noted |
R1‑122426 | Fallback of ePDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑122427 | Control channel region for ePDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑122428 | HARQ-ACK resource allocation for data scheduled via ePDCCH | Nokia Siemens Networks, Nokia | Noted |
R1‑122429 | TBS optimization for additional special subframe configuration | Nokia Siemens Networks, Nokia | Not treated |
R1‑122430 | DM RS for additional special subframe configuration | Nokia Siemens Networks, Nokia | Not treated |
R1‑122431 | Analysis of reduction of supported downlink transmission modes for low-cost MTC | Nokia Siemens Networks, Nokia | Not treated |
R1‑122432 | Conclusions of Low-cost MTC UEs Study Item | Nokia Siemens Networks, Nokia | Noted |
R1‑122433 | Coverage Enhancements for VoIP and Medium Data Rate | Nokia Siemens Networks, Nokia | Noted |
R1‑122434 | Evaluation results for LTE_TDD_eIMTA in Macro – outdoor Pico cell scenario | Nokia, Nokia Siemens Networks | Not treated |
R1‑122435 | Discussion on Methods to support different time scales for TDD UL-DL reconfiguration | Nokia, Nokia Siemens Networks | Not treated |
R1‑122436 | Discussion on study item conclusions | Nokia, Nokia Siemens Networks | Noted |
R1‑122437 | Feedback Mechanisms for DL CoMP Operations | ITRI | Not treated |
R1‑122438 | Observations on email discussion of calibration on eIMTA evaluation | ITRI | Not treated |
R1‑122439 | Evaluation of eIMTA in outdoor-pico scenario with macro layer included | ITRI | Revised |
R1‑122440 | Interference mitigation for TDD reconfiguration | ITRI | Noted |
R1‑122441 | Investigation on TDD ULDL reconfiguration methods for multiple outdoor pico cell scenario | ITRI | Not treated |
R1‑122442 | On half duplex UE operation for TDD CA different TDD UL-DL configuration | Pantech | Not treated |
R1‑122443 | PUSCH HARQ/scheduling timing in inter-band CA with different TDD UL-DL configuration | Pantech | Not treated |
R1‑122444 | Remaining PDSCH HARQ timing on SCell for inter-band CA TDD | Pantech | Not treated |
R1‑122445 | CSI feedback mode for DL CoMP | Pantech | Not treated |
R1‑122446 | Aggregated PMI feedback to support DL CoMP | Pantech | Not treated |
R1‑122447 | CSI-RS signal quality measurement and measured parameters for CoMP measurement set management | Pantech | Not treated |
R1‑122448 | DL DM-RS enhancements for Rel-11 | Pantech | Noted |
R1‑122449 | Remaining issues on CSI-RS for DL CoMP | Pantech | Not treated |
R1‑122450 | Downlink Control signaling to support CoMP | Pantech | Not treated |
R1‑122451 | UL DM-RS enhancements for Rel-11 | Pantech | Not treated |
R1‑122452 | SRS enhancements for CoMP | Pantech | Noted |
R1‑122453 | Enhancement on SRS power control | Pantech | Not treated |
R1‑122454 | Enhancement for PUCCH in Rel-11 | Pantech | Not treated |
R1‑122455 | DM RS sequence configuration for ePDCCH | Pantech | Not treated |
R1‑122456 | PUCCH resource allocation in response to E-PDCCH | Pantech | Not treated |
R1‑122457 | Views on enhanced PHICH | Pantech | Not treated |
R1‑122458 | Further discussion of quasi-co-located antenna ports | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122459 | Pilot design for 4-branch HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122460 | Considerations on transport block sizes for UL MIMO rank 2 transmissions | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122461 | Rank selection in UL MIMO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122462 | Considerations on S-E-DPCCH for UL MIMO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122463 | Uplink power control for HSUPA UL MIMO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122464 | HARQ retransmission in UL MIMO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122465 | Support of Multiple Periodic CSI Reports for Carrier Aggregation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122466 | Support of Multi-Cell HARQ-ACK and Periodic CSI Multiplexing for Carrier Aggregation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122467 | On SORTD for PUCCH Format 1b with channel selection | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122468 | Remaining issues on support of different TDD UL-DL configurations on different bands | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Withdrawn |
R1‑122469 | On the time location of PSS/SSS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122470 | On synchronized new carriers | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122471 | On the transmission mode(s) for the new carrier type | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122472 | On resource allocation for the new carrier type | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122473 | Simultaneous transmissions of multiple UL channels with multiple TA groups | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122474 | On signalling support for non-zero transmit power ABS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122475 | Signaling Assist for Broadcast Information for UE in CRE Region | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122476 | Discussion of CRS Related Functionalities under CRS Collision | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122477 | 36.214 CR0018R3 (Rel-11, B) UL Relative Time of Arrival | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed in principle |
R1‑122478 | Size of CoMP measurement set for per-CSI-RS-resource CSI feedback | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122479 | CQI definition for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122480 | CSI feedback modes for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑122481 | Companion CSI feedback | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122482 | Interference measurements for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122483 | CSI-RS based received signal quality measurements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑122484 | Remaining issues for downlink DM-RS for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122485 | Remaining issues for CSI-RS for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122486 | CRS and PDCCH collisions with PDSCH for downlink CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122487 | Downlink control signalling for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122488 | Some Remaining Aspects of PUCCH Enhancement for UL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Revised |
R1‑122489 | Multiple CSI Reports on PUCCH for DL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Revised |
R1‑122490 | Simultaneous Transmission Situations of Multiple UCI Reports on PUCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Withdrawn |
R1‑122491 | UCI multiplexing on PUSCH for DL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122492 | Remaining issues of uplink timing for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122493 | Association between antenna ports and ePDCCH transmissions | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122494 | On spatial diversity for ePDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122495 | Remaining Aspects of DMRS for ePDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122496 | Handling of RE Mapping for ePDCCH in Presence of Legacy Signals | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122497 | eCCE/eREG Definition for ePDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122498 | Aggregation Levels for ePDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122499 | Multiplexing of Localized and Distributed ePDCCH in Same PRBs | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122500 | Fallback operation for ePDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122501 | Restriction of the maximum number of TrCH bits receivable in a TTI | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122502 | Remaining issues for ePDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122503 | PHICH Enhancements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑122504 | Reference Signals and Transmission Modes for new Special Subframe Configuration | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122505 | On the study item conclusions for low-cost MTC UEs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122506 | Details of possible TTI bundling enhancements for coverage enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑122507 | Evaluations for multiple outdoor pico-cell scenario with macro layer and discussion of interference mitigation | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑122508 | Methods to support different time scales for TDD UL-DL reconfiguration | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122509 | On the study item conclusions for LTE TDD for DL-UL IMTA | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑122510 | Discussion on timing issues with dynamic TDD UL-DL configuration | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122511 | Draft LS response on geographically separated antennas | Huawei | Not treated |
R1‑122512 | Discussion on antenna ports collocation | Huawei, HiSilicon | Noted |
R1‑122513 | Draft LS response on clarifications on CSI-RS based measurement for CoMP | Huawei | Not treated |
R1‑122514 | Discussion on CSI-RS based measurement and the usage of the CoMP Resource Management Set | Huawei, HiSilicon | Noted |
R1‑122515 | Correction on precoding with DMRS for single layer transmission | Huawei, HiSilicon | Noted - Revised |
R1‑122516 | Channel coding for periodic CSI and HARQ-ACK on PUCCH format 3 | Huawei, HiSilicon | Revised |
R1‑122517 | Reduced-CRS transmission | Huawei, HiSilicon | Not treated |
R1‑122518 | PSS/SSS collisions with DM-RS | Huawei, HiSilicon | Noted |
R1‑122519 | DM-RS patterns for additional carrier types | Huawei, HiSilicon | Noted |
R1‑122520 | Aspects for the synchronized carrier case | Huawei, HiSilicon | Not treated |
R1‑122521 | SRS on a PUCCH-less carrier | Huawei, HiSilicon | Not treated |
R1‑122522 | Evaluation of reduced power ABS based on RAN 4 feedback | Huawei, HiSilicon | Noted |
R1‑122523 | Remaining issues of 9dB CRE bias | Huawei, HiSilicon | Noted |
R1‑122524 | Draft LS on higher-layer signaling requirements for CoMP | Huawei | Not treated |
R1‑122525 | TPC enhancements for SRS power control for CoMP | Huawei, HiSilicon | Not treated |
R1‑122526 | On the restriction of the maximum TB size with ePDCCH | Huawei, HiSilicon | Not treated |
R1‑122527 | Analysis and evaluation of reduction of supported downlink transmission modes | Huawei,HiSilicon | Noted |
R1‑122528 | Proposal on the conclusions for coverage enhancement | Huawei, HiSilicon | Not treated |
R1‑122529 | Evaluation of TDD traffic adaptive DL-UL reconfiguration in the multi-pico cell scenario | Huawei, HiSilicon | Noted |
R1‑122530 | Text Proposal on the observations for multi-cell scenario evaluation | Huawei, HiSilicon | Noted |
R1‑122531 | Discussion on the signalling support for non-zero transmit power ABS | KDDI | Noted |
R1‑122532 | Sequence Configuration for PUSCH DMRS | KDDI | Not treated |
R1‑122533 | SRS Enhancements for UL CoMP | KDDI | Noted |
R1‑122534 | Enhancements on PUCCH for CoMP | KDDI | Not treated |
R1‑122535 | Remaining aspects of DMRS for ePDCCH | KDDI | Not treated |
R1‑122536 | Fallback operations for ePDCCH | KDDI | Not treated |
R1‑122537 | Details about UL DMRS configuration and signaling | Ericsson, ST-Ericsson | Revised |
R1‑122538 | Details about SRS configuration and power control | Ericsson, ST-Ericsson | Revised |
R1‑122539 | Enhancements for UL control signaling | Ericsson, ST-Ericsson | Revised |
R1‑122540 | Draft LS response on reference scenarios for antenna ports co-location | Ericsson, ST-Ericsson | Noted |
R1‑122541 | Further study on RS and transmission mode for additional special subframe configuration for LTE TDD | ZTE | Not treated |
R1‑122542 | Multi cell AN single cell P-CSI multiplexing with PUCCH F1B / CS | InterDigital Communications, LLC | Not treated |
R1‑122543 | Multi cell AN single cell P-CSI multiplexing with PUCCH F3 | InterDigital Communications, LLC | Not treated |
R1‑122544 | Cross-carrier scheduling for TDD inter-band CA | InterDigital Communications, LLC | Not treated |
R1‑122545 | AN bit mapping and resource allocation for TDD inter-band CA | InterDigital Communications, LLC | Noted |
R1‑122546 | Power control performance with multiple TA | InterDigital Communications, LLC | Noted |
R1‑122547 | Size of CoMP measurement set | InterDigital Communications, LLC | Noted |
R1‑122548 | CQI definition for CoMP | InterDigital Communications, LLC | Noted |
R1‑122549 | Interference measurements for CoMP | InterDigital Communications, LLC | Noted |
R1‑122550 | CSI-RS based received signal quality measurements | InterDigital Communications, LLC | Not treated |
R1‑122551 | DM-RS for UL CoMP | InterDigital Communications, LLC | Not treated |
R1‑122552 | SRS for UL CoMP | InterDigital Communications, LLC | Noted |
R1‑122553 | SRS power control for UL CoMP | InterDigital Communications, LLC | Revised |
R1‑122554 | PUCCH enhancements for UL CoMP | InterDigital Communications, LLC | Not treated |
R1‑122555 | Antenna port association for ePDCCH transmission | InterDigital Communications, LLC | Not treated |
R1‑122556 | Spatial tiversity for ePDCCH distributed transmission | InterDigital Communications, LLC | Noted |
R1‑122557 | Remaining DM-RS issues for ePDCCH | InterDigital Communications, LLC | Not treated |
R1‑122558 | ePDCCH RE mapping with other signals | InterDigital Communications, LLC | Not treated |
R1‑122559 | Definition of eREG and eCCE | InterDigital Communications, LLC | Not treated |
R1‑122560 | On eCCE aggregation levels for ePDCCH | InterDigital Communications, LLC | Not treated |
R1‑122561 | Multiplexing of localized and distributed transmissions | InterDigital Communications, LLC | Noted |
R1‑122562 | On fallback operation in ePDCCH | InterDigital Communications, LLC | Not treated |
R1‑122563 | Restriction of maximum TBS for ePDCCH | InterDigital Communications, LLC | Not treated |
R1‑122564 | Consideration on ePHICH in Rel-11 | InterDigital Communications, LLC | Not treated |
R1‑122565 | Recommended conclusions for R11 SI Low-Cost UE | InterDigital Communications, LLC | Noted |
R1‑122566 | Link-level evaluation results for improved LTE UL VoIP coverage | InterDigital Communications, LLC | Noted |
R1‑122567 | System-level design consideration for improved LTE UL VoIP coverage | InterDigital Communications, LLC | Noted |
R1‑122568 | 25212 CR0307 (Rel-11, F), Addition of missing 8C-HSDPA CQI reporting case indices | Nokia Siemens Networks | Noted - Revised |
R1‑122569 | Pilot design for 4-branch MIMO | Nokia Siemens Networks | Noted |
R1‑122570 | HS-SCCH signaling for 4-branch MIMO | Nokia Siemens Networks | Noted |
R1‑122571 | HS-DPCCH design options for 4-branch MIMO | Nokia Siemens Networks | Noted |
R1‑122572 | Email discussion summary of cell deactivation with HS-SCCH orders | Nokia Siemens Networks | Noted |
R1‑122573 | HARQ-ACK and CQI formats for Multiflow | Nokia Siemens Networks | Not treated |
R1‑122574 | Multiflow HS-DPCCH, HARQ-ACK codebooks and cell grouping | Nokia Siemens Networks | Noted |
R1‑122575 | Multiflow HS-DPCCH timing | Nokia Siemens Networks | Noted |
R1‑122576 | 25211 CRdraft, Introduction of HSDPA Multiflow | Nokia Siemens Networks | Noted - Revised |
R1‑122577 | 25212 CRdraft, Introduction of HSDPA Multiflow | Nokia Siemens Networks | Noted - Revised |
R1‑122578 | 25213 CRdraft, Introduction of HSDPA Multiflow | Nokia Siemens Networks | Noted - Revised |
R1‑122579 | 25214 CRdraft, Introduction of HSDPA Multiflow | Nokia Siemens Networks | Noted - Revised |
R1‑122580 | SINR-based scheduling for UL MIMO | Nokia Siemens Networks | Noted |
R1‑122581 | Simulation results for SINR-based scheduling for UL MIMO | Nokia Siemens Networks | Noted |
R1‑122582 | SINR based scheduling for SIMO and CLTD transmission modes | Nokia Siemens Networks | Noted |
R1‑122583 | Analysis of DPCCH, E-DPCCH, and S-E-DPCCH power allocation for UL MIMO | Nokia Siemens Networks | Noted |
R1‑122584 | S-DPCCH power with rank-2 transmissions | Nokia Siemens Networks | Noted |
R1‑122585 | Extension of SF, modulation scheme, and number of PhCHs selection algorithm for 64QAM and UL MIMO | Nokia Siemens Networks | Not treated |
R1‑122586 | E-TFC tables design for 64QAM | Nokia Siemens Networks | Noted |
R1‑122587 | DL control signalling for UL MIMO | Nokia Siemens Networks | Noted |
R1‑122588 | HSUPA MIMO and Soft Handover | Nokia Siemens Networks | Noted |
R1‑122589 | Interaction of MIMO and CLTD_Enabled/CLTD_Active | Nokia Siemens Networks | Noted |
R1‑122590 | 25211 CRdraft, Introduction of UL MIMO and 64QAM | Nokia Siemens Networks | Revised |
R1‑122591 | 25212 CRdraft, Introduction of UL MIMO and 64QAM | Nokia Siemens Networks | Revised |
R1‑122592 | 25213 CRdraft, Introduction of UL MIMO and 64QAM | Nokia Siemens Networks | Revised |
R1‑122593 | 25214 CRdraft, Introduction of UL MIMO and 64QAM | Nokia Siemens Networks | Revised |
R1‑122594 | DM-RS antenna port association with ePDCCH transmission | NEC Group | Not treated |
R1‑122595 | ePDCCH search space design | NEC Group | Not treated |
R1‑122596 | Physical resources block (PRB) configurations for ePDCCH transmission | NEC Group | Not treated |
R1‑122597 | ePDCCH transmission schemes and performance evaluations | NEC Group | Noted |
R1‑122598 | Configuration of CoMP measurement set | NEC Group | Not treated |
R1‑122599 | Remained issues of IMRs for CoMP | NEC Group | Noted |
R1‑122600 | ePDCCH with JT/DPS CoMP | NEC Group | Not treated |
R1‑122601 | Transmission modes on additional carrier type | NEC Group | Not treated |
R1‑122602 | CQI definition for CoMP TDD system | NEC Group | Not treated |
R1‑122603 | PDSCH mapping issues in CoMP | NEC Group | Noted |
R1‑122604 | PSS/SSS time locations on the NCT | NEC Group | Not treated |
R1‑122605 | Signaling support for non-zero transmission power ABS | NEC Group | Not treated |
R1‑122606 | Localised E-PDCCH resource configuration and fallback operation | NEC Group | Not treated |
R1‑122607 | On the reuse of ePDCCH resources | Nokia, Nokia Siemens Networks | Noted |
R1‑122608 | Issues with path loss estimation for power control with CoMP reception | Huawei, HiSilicon | Not treated |
R1‑122609 | Calibration results of multi-cell scenario for LTE TDD DL-UL Interference Management and Traffic Adaptation | Huawei | Noted - Revised |
R1‑122610 | Open issues for different TDD UL-DL configurations | ASUSTeK | Not treated |
R1‑122611 | Power control for multiple timing advances | ASUSTeK | Not treated |
R1‑122612 | SRS power control for CoMP | ASUSTeK | Not treated |
R1‑122613 | Localized and Distributed ePDCCH USS Candidates in Same Subframe | ASUSTeK | Not treated |
R1‑122614 | PUCCH Resource Allocation Corresponding to ePDCCH | ASUSTeK | Noted |
R1‑122615 | 25.214 CR0679 (Rel-11, F) Clarification of TPI timing for UL CLTD | ZTE | Noted - Revised |
R1‑122616 | Reference cell for MF-HSDPA | ZTE | Noted |
R1‑122617 | HARQ-ACK codebook for MF-HSDPA | ZTE | Noted |
R1‑122618 | HS-DPCCH formats for MF-HSDPA | ZTE | Not treated |
R1‑122619 | Remaining issues of DRX / DTX for MF-HSDPA | ZTE | Noted |
R1‑122620 | SG interpretation and E-TFC selection for HSUPA MIMO | InterDigital Communications, LLC | Noted |
R1‑122621 | Impact of Inter-Stream Interference, HSUPA MIMO | InterDigital Communications, LLC | Noted |
R1‑122622 | Performance analysis of uplink 64QAM HSUPA Switching Point | InterDigital Communications, LLC | Not treated |
R1‑122623 | Traffic-to-total-pilot power for 64QAM operations for HSUPA | InterDigital Communications, LLC | Noted |
R1‑122624 | PDSCH RE mapping indication for multi-cell JP CoMP | ETRI | Not treated |
R1‑122625 | Consideration on eREG definition | ETRI | Withdrawn |
R1‑122626 | Signal quality metrics for measurement on CoMP resource management set | Intel Corporation | Revised |
R1‑122627 | Remaining issues of interference measurements | Intel Corporation | Revised |
R1‑122628 | Periodic and aperiodic CSI feedback modes for DL CoMP | Intel Corporation | Noted |
R1‑122629 | Downlink control signaling for DL CoMP | Intel Corporation | Not treated |
R1‑122630 | Discussion on the maximum size of CoMP measurement set | Intel Corporation | Not treated |
R1‑122631 | Discussion on rank indicator (RI) report for CoMP | Intel Corporation | Not treated |
R1‑122632 | Discussion on DCI content for DL CoMP | Intel Corporation | Not treated |
R1‑122633 | Discussion on cell-specific parameters configuration for CSI-RS | Intel Corporation | Noted |
R1‑122634 | Discussion on aggregated CQI feedback for JT CoMP | Intel Corporation | Not treated |
R1‑122635 | Configuration and Signaling for UE-specific PUSCH DM-RS | Intel Corporation | Not treated |
R1‑122636 | SRS Enhancements for UL CoMP | Intel Corporation | Noted |
R1‑122637 | UL CoMP Control and Signaling Principles | Intel Corporation | Not treated |
R1‑122638 | Discussion on reduction of supported downlink transmission modes for low-cost MTC UEs | Intel Corporation | Not treated |
R1‑122639 | Discussion on low-cost MTC UE study item conclusions | Intel Corporation | Noted |
R1‑122640 | Discussion on TTI bundling enhancements for PUSCH VoIP coverage improvement | Intel Corporation | Noted |
R1‑122641 | Discussion on TTI bundling enhancements for PUSCH medium data rate coverage improvement | Intel Corporation | Noted |
R1‑122642 | Conclusions on the LTE Coverage Enhancements Study Item | Intel Corporation | Not treated |
R1‑122643 | Discussion on MCS mismatch between regular and flexible subframes in multi-cell outdoor Pico scenario | Intel Corporation | Not treated |
R1‑122644 | Discussion on adaptation time scale in multi-cell outdoor Pico scenario | Intel Corporation | Noted |
R1‑122645 | Discussion on network energy saving due to traffic adaptation in multi-cell outdoor Pico scenario | Intel Corporation | Noted |
R1‑122646 | Evaluation of Macro-Pico co-channel scenario for the case of dynamic UL-DL reconfiguration on the Pico nodes | Intel Corporation | Noted |
R1‑122647 | Discussion on methods to support different time scales for TDD UL-DL reconfiguration | Intel Corporation | Noted |
R1‑122648 | Discussion on the eIMTA study item conclusions | Intel Corporation | Noted |
R1‑122649 | UE-RS association for ePDCCH | Intel Corporation | Not treated |
R1‑122650 | On distributed ePDCCH transmission | Intel Corporation | Not treated |
R1‑122651 | Further details of ePDCCH Search Space | Intel Corporation | Not treated |
R1‑122652 | On the definition of eCCE/eREG | Intel Corporation | Not treated |
R1‑122653 | Impact of ePDCCH on PDSCH PRB Bundling | Intel Corporation | Not treated |
R1‑122654 | Considerations on ePHICH Design | Intel Corporation | Not treated |
R1‑122655 | Views on CRS/PDSCH RE Collision in Joint Transmission | Intel Corporation | Noted |
R1‑122656 | CRS design for NCT – discussion on cell-specific frequency shift | Intel Corporation | Not treated |
R1‑122657 | DL Scheduling/HARQ timing issue for inter-band TDD CA | Intel Corporation | Not treated |
R1‑122658 | Consideration on Location of PSS/SSS signaling in NCT | Intel Corporation | Not treated |
R1‑122659 | Remaining UL transmission issues for inter-band TDD CA | Intel Corporation | Not treated |
R1‑122660 | Remaining aspects of non-zero power ABS for FeICIC | Motorola Mobility | Not treated |
R1‑122661 | Network Assistance Signaling for FeICIC | Motorola Mobility | Not treated |
R1‑122662 | CCE design for EPDCCH | Motorola Mobility | Not treated |
R1‑122663 | Handling mapping of EPDCCH in presence of other signals | Motorola Mobility | Noted |
R1‑122664 | TrCH restriction for EPDCCH | Motorola Mobility | Not treated |
R1‑122665 | SRS Power Offset Determination for DL CoMP | Motorola Mobility | Not treated |
R1‑122666 | Uplink Control Signaling for UL CoMP | Motorola Mobility | Not treated |
R1‑122667 | DL Timing Reference for UL CoMP | Motorola Mobility | Revised |
R1‑122668 | PSS/SSS Placement in new carrier type | Motorola Mobility | Not treated |
R1‑122669 | Distributed EPDCCH with Random Precoding | Motorola Mobility | Noted |
R1‑122670 | CQI definition for CoMP | Motorola Mobility | Not treated |
R1‑122671 | Clarification of DTX/DRX and HS-SCCH less activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑122672 | 25.214 CR0672R1 (Rel-7, F) Clarification of DTX/DRX activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑122673 | 25.214 CR0673R1 (Rel-8, A) Clarification of DTX/DRX activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑122674 | 25.214 CR0674R1 (Rel-9, A) Clarification of DTX/DRX activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑122675 | 25.214 CR0675R1 (Rel-10, A) Clarification of DTX/DRX activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑122676 | 25.214 CR0676R1 (Rel-11, A) Clarification of DTX/DRX activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑122677 | 25.214 CR0680 (Rel-8, F) Clarification of HS-SCCH less activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑122678 | 25.214 CR0681 (Rel-9, A) Clarification of HS-SCCH less activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑122679 | 25.214 CR0682 (Rel-10, A) Clarification of HS-SCCH less activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑122680 | 25.214 CR0683 (Rel-11, A) Clarification of HS-SCCH less activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑122681 | 25.214 CR0684 (Rel-11, F) Clarification of F-TPICH Transmission | Huawei, HiSilicon, Qualcomm Incorporated | Noted - Revised |
R1‑122682 | Further evaluation on pilot design for DL MIMO | Huawei, HiSilicon | Noted |
R1‑122683 | HS-SCCH design for DL 4-branch MIMO | Huawei, HiSilicon | Noted |
R1‑122684 | HS-DPCCH design for DL 4-branch MIMO | Huawei, HiSilicon | Noted |
R1‑122685 | Interleaving design for DL MIMO | Huawei, HiSilicon | Noted |
R1‑122686 | Criterion of common E-RGCH monitoring | Huawei, HiSilicon | Noted |
R1‑122687 | HARQ Codebook for MF-Tx with MIMO | Huawei, HiSilicon | Noted |
R1‑122688 | HS-DPCCH Timing in Case of 7 HARQ Processes | Huawei, HiSilicon | Noted |
R1‑122689 | Remaining Timing Issues for HS-DPCCH | Huawei, HiSilicon | Noted |
R1‑122690 | HARQ-ACK Repetition in MF-Tx | Huawei, HiSilicon | Noted |
R1‑122691 | E-TFC selection and grant signalling for UL MIMO | Huawei, HiSilicon | Noted |
R1‑122692 | Discussion on SINR feedback channel design | Huawei, HiSilicon | Noted |
R1‑122693 | Boosting design for UL MIMO | Huawei, HiSilicon | Noted |
R1‑122694 | On the Design of Power Control for UL MIMO | Huawei,HiSilicon | Noted |
R1‑122695 | Simulation results with Uplink 64QAM | Huawei, HiSilicon | Not treated |
R1‑122696 | E-HICH design in Uplink MIMO | Huawei, HiSilicon | Noted |
R1‑122697 | (De-)Activation of UL MIMO | Huawei, HiSilicon | Noted |
R1‑122698 | Further Consideration on the Signaling Support for Reduced Power ABS | Hitachi Ltd. | Not treated |
R1‑122699 | CQI Estimation for CoMP | Hitachi Ltd. | Noted |
R1‑122700 | Discussion on CSI feedback modes for CoMP | Hitachi Ltd. | Revised |
R1‑122701 | Discussion on Aggregated CSI Feedback | Hitachi Ltd. | Not treated |
R1‑122702 | Remaining Issues in Interference Measurement | Hitachi Ltd. | Not treated |
R1‑122703 | Remaining issues for CSI-RS based receive signal quality measurement | Hitachi Ltd. | Not treated |
R1‑122704 | Discussion on parameters configured per CSI-RS port for CoMP | Hitachi Ltd. | Not treated |
R1‑122705 | Consideration on signaling of the bandwidth information for CSI-RS | Hitachi Ltd. | Noted |
R1‑122706 | Consideration for DL DMRS for CoMP | Hitachi Ltd. | Not treated |
R1‑122707 | DMRS scrambling sequence for ePDCCH | Hitachi Ltd. | Not treated |
R1‑122708 | Email summary on inter-band TDD CA | CMCC | Noted |
R1‑122709 | Bandwidth of the RS port for additional carrier types | CMCC | Withdrawn |
R1‑122710 | Autonomous inter-cell interference cancellation | CMCC | Revised |
R1‑122711 | System information detection for Rel-11 FeICIC | CMCC | Noted |
R1‑122712 | Discussion on SRS Power Control Enhancement | CMCC | Not treated |
R1‑122713 | E-CCE/E-REG definition and fallback operation for signaling independent mapping | CMCC | Not treated |
R1‑122714 | Discussion of Aggregation Levels for Localized ePDCCH Transmission | CMCC | Not treated |
R1‑122715 | Designing the scaling factor of DwPTS for new special subframe configurations | CMCC | Not treated |
R1‑122716 | Draft CR on TBS scaling factor for special subframe configuration 9 with normal cyclic prefix and special subframe configuration 7 with extended cyclic prefix | CMCC, Huawei, HiSilicon | Noted - Revised |
R1‑122717 | RS and transmission mode of DwPTS for new special subframe configurations | CMCC | Not treated |
R1‑122718 | Draft CR on DMRS patterns for special subframe configuration 9 with normal cyclic prefix | CMCC, Huawei, HiSilicon | Agreed in principle |
R1‑122719 | Coverage enhancemnet for TTI bundling | CMCC | Noted |
R1‑122720 | Simulation results of flexible TDD UL-DL configuration for Set 2 assumption | CMCC | Noted |
R1‑122721 | Consideration on E-PDCCH Search Sapce and Multipelxing Design | Research In Motion UK Limited | Not treated |
R1‑122722 | On Spatial diversity for E-PDCCH | Research In Motion UK Limited | Not treated |
R1‑122723 | DMRS Port Assignment to E-PDCCH and Channel Estimation Complexity | Research In Motion UK Limited | Not treated |
R1‑122724 | Other Control Channel for E-PDCCH | Research In Motion UK Limited | Noted |
R1‑122725 | Rel-11 Channel Selection Transmit Diversity Alternatives | Research In Motion UK Limited | Not treated |
R1‑122726 | HARQ-ACK Transmission for cross-carrier scheduling in Inter-band CA with Different UL/DL Configurations | Research In Motion UK Limited | Not treated |
R1‑122727 | SRS Enhancements for Release 11 | Research In Motion UK Limited | Noted |
R1‑122728 | Views on SRS power control enhancements | Research In Motion UK Limited | Not treated |
R1‑122729 | Design considerations for multi-cell periodic CSI reporting | Texas Instruments | Not treated |
R1‑122730 | Design aspects of multiplexing CSI and multi-cell HARQ-ACK on PUCCH | Texas Instruments | Not treated |
R1‑122731 | On the maximum size of CoMP measurement set | Texas Instruments | Not treated |
R1‑122732 | CSI feedback contents for downlink CoMP | Texas Instruments | Not treated |
R1‑122733 | CSI feedback modes for downlink CoMP | Texas Instruments | Not treated |
R1‑122734 | Uplink DMRS Configuration for CoMP | Texas Instruments | Not treated |
R1‑122735 | Further Discussion on SRS power control for CoMP | Texas Instruments | Not treated |
R1‑122736 | Further consideration on uplink control for CoMP | Texas Instruments | Revised |
R1‑122737 | On the Need for Timing Advance Specification Changes for UL CoMP | Texas Instruments | Not treated |
R1‑122738 | Antenna port configuration for ePDCCH transmissions | Texas Instruments | Not treated |
R1‑122739 | On the Need for Transmit Diversity in ePDCCH Transmission | Texas Instruments | Not treated |
R1‑122740 | Scrambling sequence initialization of DMRS for ePDCCH | Texas Instruments | Not treated |
R1‑122741 | Mapping of ePDCCH in presence of other signals | Texas Instruments | Not treated |
R1‑122742 | Aggregation level of ePDCCH under distributed/localized transmission | Texas Instruments | Not treated |
R1‑122743 | Need for multiplexing localized and distributed ePDCCHs in one PRB | Texas Instruments | Noted |
R1‑122744 | Need for localized and distributed ePDCCH candidates in one sub-frame | Texas Instruments | Not treated |
R1‑122745 | Design considerations for an enhanced PHICH | Texas Instruments | Noted |
R1‑122746 | Analysis of supported downlink transmission modes for low-cost MTC UEs based on LTE | IPWireless Inc. | Noted |
R1‑122747 | Preferred combination of features for a low-cost MTC UE based on LTE | IPWireless Inc. | Noted |
R1‑122748 | Low-cost MTC UE Study Item: Conclusions and Recommendations | IPWireless Inc. | Not treated |
R1‑122749 | Modified Template for Evaluation Methodology on Link Budget | Institute for Information Industry (III) | Not treated |
R1‑122750 | Text Proposal for TR 36.888 on Restriction of Techniques to Low Performance MTC Ues | Institute for Information Industry (III) | Not treated |
R1‑122751 | Discussion and Text Proposal for MTC Spectral Efficiency | Institute for Information Industry (III) | Not treated |
R1‑122752 | Text Proposal for clause 8 of 3GPP TR 36.888 | Vodafone Group, Orange | Noted - Revised |
R1‑122753 | Text Proposal on some aspects of section 9 of 3GPP TR 36.888 | Vodafone Group | Noted |
R1‑122754 | Update to 3GPP TR 36.888 to include agreements | Vodafone Group | Revised |
R1‑122755 | Discussion on cost savings identified for low-cost MTC LTE UEs | MStar Semiconductor, Inc. | Noted |
R1‑122756 | ePDCCH in MBSFN subframes | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑122757 | Draft LS on UE measurements in support of the two-stage MIMO OTA test method | Qualcomm Inc. | Not treated |
R1‑122758 | Text proposal for 36.214 | Qualcomm Inc. | Not treated |
R1‑122759 | Discussion corrections for handling CSI-RS patterns | Qualcomm Inc. | Noted |
R1‑122760 | Discussion of transport block vs codeword for CA | Qualcomm Inc. | Noted |
R1‑122761 | DL control channel enhancements for CA operation | Qualcomm Inc. | Not treated |
R1‑122762 | On reducing periodic CSI dropping for CA operation | Qualcomm Inc. | Not treated |
R1‑122763 | On enhanced A/N bundling for CA operation | Qualcomm Inc. | Not treated |
R1‑122764 | TxD scheme for PUCCH format 1b with channel selection | Qualcomm Inc. | Not treated |
R1‑122765 | TxD scheme for PUCCH format 3 | Qualcomm Inc. | Not treated |
R1‑122766 | Support of CA for different TDD UL-DL configurations | Qualcomm Inc. | Not treated |
R1‑122767 | RS for unsynchronized carriers | Qualcomm Inc. | Not treated |
R1‑122768 | PSS-SSS for new carriers | Qualcomm Inc. | Not treated |
R1‑122769 | Synchronized new carrier | Qualcomm Inc. | Not treated |
R1‑122770 | Transmission modes for NCT | Qualcomm Inc. | Noted |
R1‑122771 | Resource allocation methods for NCT | Qualcomm Inc. | Revised |
R1‑122772 | Power control aspects of multiple TA operation | Qualcomm Inc. | Noted |
R1‑122773 | Signalling support for non-zero transmit power ABS | Qualcomm Inc. | Not treated |
R1‑122774 | Signaling assistance for CRS cancellation | Qualcomm Inc. | Noted |
R1‑122775 | Need for transmitter based solutions | Qualcomm Inc. | Not treated |
R1‑122776 | On the size of the CoMP measurement set | Qualcomm Inc. | Noted |
R1‑122777 | CQI definition for downlink CoMP | Qualcomm Inc. | Not treated |
R1‑122778 | Supporting CRS-based CoMP operation | Qualcomm Inc. | Not treated |
R1‑122779 | CSI feedback reporting in support of CoMP | Qualcomm Inc. | Not treated |
R1‑122780 | Performance of Dynamic Point Selection in HetNet CoMP | Qualcomm Inc. | Not treated |
R1‑122781 | Interference measurement in support of downlink CoMP | Qualcomm Inc. | Noted |
R1‑122782 | CoMP resource management set accuracy, link results | Qualcomm Inc. | Not treated |
R1‑122783 | CoMP resource management set, system simulation results | Qualcomm Inc. | Not treated |
R1‑122784 | Remaining issues on DL reference signals for CoMP | Qualcomm Inc. | Noted |
R1‑122785 | Downlink control signaling in support of downlink CoMP | Qualcomm Inc. | Not treated |
R1‑122786 | DM-RS Enhancements in support of Uplink CoMP | Qualcomm Inc. | Not treated |
R1‑122787 | SRS enhancements in support of Uplink CoMP | Qualcomm Inc. | Noted |
R1‑122788 | SRS power control | Qualcomm Inc. | Not treated |
R1‑122789 | Uplink control signaling for CoMP | Qualcomm Inc. | Not treated |
R1‑122790 | Uplink timing advance | Qualcomm Inc. | Noted |
R1‑122791 | Reference signals for e-PDCCH | Qualcomm Inc. | Not treated |
R1‑122792 | Spatial diversity for e-PDCCH | Qualcomm Inc. | Not treated |
R1‑122793 | Remaining aspects of DM-RS for ePDCCH | Qualcomm Inc. | Not treated |
R1‑122794 | Mapping of ePDCCH in presence of other signals | Qualcomm Inc. | Noted |
R1‑122795 | eREG-eCCE definitions | Qualcomm Inc. | Not treated |
R1‑122796 | On Aggregation Levels for ePDCCH | Qualcomm Inc. | Not treated |
R1‑122797 | Multiplexing localized and distributed ePDCCH in the same PRBs | Qualcomm Inc. | Not treated |
R1‑122798 | On Fallback Operation for e-PDCCH | Qualcomm Inc. | Not treated |
R1‑122799 | Restriction of maximum TrCh bits | Qualcomm Inc. | Not treated |
R1‑122800 | On the need of ePHICH in Rel-11 | Qualcomm Inc. | Noted |
R1‑122801 | TBS scaling factor for new special subframe configuration | Qualcomm Inc. | Not treated |
R1‑122802 | Downlink transmission modes for MTC | Qualcomm Inc. | Noted |
R1‑122803 | Evaluation of narrow BW operation | Qualcomm Inc. | Withdrawn |
R1‑122804 | Additional comments on Cost Evaluation for MTC | Qualcomm Inc. | Noted |
R1‑122805 | Coverage Enhancement for Medium Data Rate and VOIP | Qualcomm Inc. | Noted |
R1‑122806 | Evaluation of multiple outdoor pico-cell scenario | Qualcomm Inc. | Noted |
R1‑122807 | Methods to support different time scales for reconfiguration | Qualcomm Inc. | Not treated |
R1‑122808 | Scheduled Common Pilot Performance in a Four branch MIMO System | Ericsson | Noted |
R1‑122809 | Dedicated Pilot Perforamnce in a Four branch MIMO System | Ericsson | Noted |
R1‑122810 | Overall Summary of Pilot Design Schemes in Four branch MIMO System | Ericsson | Noted |
R1‑122811 | HS-SCCH design for Four branch MIMO System | Ericsson | Noted |
R1‑122812 | Uplink Feedback Channel Design for Four branch MIMO Sytem | Ericsson | Noted |
R1‑122813 | Layer mapping for Four branch MIMO System | Ericsson | Noted |
R1‑122814 | Retransmission Operation in a 2 codeword MIMO System | Ericsson | Noted |
R1‑122815 | Two Codeword MIMO Structure for Four branch MIMO System | Ericsson | Noted |
R1‑122816 | HARQ functionalities in Four branch MIMO System | Ericsson | Noted |
R1‑122817 | On VAM for 4-branch MIMO | Ericsson | Noted |
R1‑122818 | 25.214 Draft CR (HS-DSCH Releated Procedures) | Ericsson | Withdrawn |
R1‑122819 | HARQ-ACK codebook for SF-DC MF-HSDPA with MIMO | Ericsson, ST-Ericsson | Noted |
R1‑122820 | On Remaining Aspects of Grant and E-TFC Selection for Uplink MIMO with 64QAM | Ericsson, ST-Ericsson | Noted |
R1‑122821 | On Power Setting of S-E-DPCCH for Uplink MIMO with 64QAM | Ericsson, ST-Ericsson | Noted |
R1‑122822 | On Remaining Aspects Related to 64QAM for UL MIMO with 64QAM | Ericsson, ST-Ericsson | Not treated |
R1‑122823 | On Remaining Aspects of the DL Control Channel Design for Uplink MIMO with 64QAM | Ericsson, ST-Ericsson | Noted |
R1‑122824 | Email Discussion Summary – HARQ re-transmission | Ericsson, ST-Ericsson | Noted |
R1‑122825 | Consideration on Reduction of Transmission Modes for Low-Cost MTC UEs | China Unicom | Not treated |
R1‑122826 | On interference mitigation for dynamic TDD traffic adaptation | Ericsson, ST-Ericsson | Noted |
R1‑122827 | Performance evaluations on FeICIC based on RAN4 LS | Ericsson, ST-Ericsson | Noted |
R1‑122828 | On signalling support for reduced power ABS | Ericsson, ST-Ericsson | Noted |
R1‑122829 | On detection of MIB and SIB1 for 9 dB bias | Ericsson, ST-Ericsson | Not treated |
R1‑122830 | On rate matching around CRS of neighbour cells | Ericsson, ST-Ericsson | Not treated |
R1‑122831 | Correction to assumed CSI-RS transmissions in subfames used for paging | Ericsson, ST-Ericsson | Revised |
R1‑122832 | Interpretation of CSI-RS transmissions in subfames used for paging | Ericsson, ST-Ericsson | Noted |
R1‑122833 | Size of CoMP Measurement Set | Ericsson, ST-Ericsson | Noted |
R1‑122834 | Evaluation of the performance of aggregated CQI | Ericsson, ST-Ericsson | Noted |
R1‑122835 | Implicit CSI Feedback Framework for DL CoMP | Ericsson, ST-Ericsson | Noted |
R1‑122836 | RI and PMI sharing between multiple CSI Processes | Ericsson, ST-Ericsson | Not treated |
R1‑122837 | CQI Definition of UE Emulated Intra CoMP Cluster Interference | Ericsson, ST-Ericsson | Noted |
R1‑122838 | On per-cell Rel-8 CRS-based feedback | Ericsson, ST-Ericsson | Withdrawn |
R1‑122839 | On CSI feedback modes | Ericsson, ST-Ericsson | Withdrawn |
R1‑122840 | Interference Measurements for CoMP CSI Reporting | Ericsson, ST-Ericsson | Noted |
R1‑122841 | Definition of Measurements for CoMP Resource Management | Ericsson, ST-Ericsson | Noted |
R1‑122842 | Dimensioning of the CoMP Resource Management Set | Ericsson, ST-Ericsson | Noted |
R1‑122843 | Control Signaling in Support of CoMP | Ericsson, ST-Ericsson | Not treated |
R1‑122844 | Recommendation on defining a new UE category for low-cost MTC | Orange, Vodafone Group | Not treated |
R1‑122845 | Text proposal for TR 36.888 on restriction of techniques to low performance MTC UEs | Orange | Withdrawn |
R1‑122846 | Views on coverage enhancements | Orange | Withdrawn |
R1‑122847 | Standalone HS-DPCCH in CELL_FACH | Qualcomm Incorporated | Withdrawn |
R1‑122848 | Common Relative Grant for Interference Control | Qualcomm Incorporated | Not treated |
R1‑122849 | 25.211 Rel-11 CR Introduction of Further Enhancements of CELL_FACH | Qualcomm Incorporated | Noted - Revised |
R1‑122850 | 25.212 Rel-11 CR Introduction of Further Enhancements of CELL_FACH | Qualcomm Incorporated | Noted - Revised |
R1‑122851 | 25.214 Rel-11 CR Introduction of Further Enhancements of CELL_FACH | Qualcomm Incorporated | Noted - Revised |
R1‑122852 | Multiflow HSDPA Timing Details | Qualcomm Incorporated | Noted |
R1‑122853 | HS-SCCH orders in Multiflow HSDPA and associated HS-DPCCH formats | Qualcomm Incorporated | Noted |
R1‑122854 | DF-DC Configuration in Multiflow HSDPA | Qualcomm Incorporated | Revised |
R1‑122855 | E-TFC Selection and SG interpretation for UL MIMO | Qualcomm Incorporated | Not treated |
R1‑122856 | Details of UL Channel Structure in UL MIMO | Qualcomm Incorporated | Not treated |
R1‑122857 | DL Control Channel Design in UL MIMO | Qualcomm Incorporated | Not treated |
R1‑122858 | HARQ retransmission operation for UL MIMO | Qualcomm Incorporated | Not treated |
R1‑122859 | Text proposal for TR 36.888 on restriction of techniques to low performance MTC Ues | Telecom Italia | Revised |
R1‑122860 | Recommendation on defining an MTC specific UE category | Telecom Italia | Revised |
R1‑122861 | HARQ operation for UL MIMO | Huawei, HiSilicon | Noted |
R1‑122862 | HARQ timing and cross-carrier scheduling for the support of different TDD UL-DL configurations on different bands | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122863 | Considerations on DMRS for additional special subframe configuration for LTE TDD | CATR | Not treated |
R1‑122864 | Consideration on spatial diversity for distributed transmission of ePDCCH | CATR | Not treated |
R1‑122865 | Views of how to handle mapping of ePDCCH in presence of other signals | CATR | Not treated |
R1‑122866 | Text Proposal on solutions for LTE Coverage Enhancements | ZTE, China Telecom, China Unicom, Orange, Ericsson, ST-Ericsson, Intel, Alcatel Lucent, Alcatel Lucent Shanghai Bell, InterDigital, Nokia Siemens Networks, Nokia, Huawei, HiSilicon, LG Electronics | Noted |
R1‑122867 | Need for multiplexing of localised and distributed ePDCCH parts in same PRBs | ZTE | Not treated |
R1‑122868 | Discussion on interference measurement | ZTE | Noted |
R1‑122869 | Evaluation of eIMTA in outdoor-pico scenario with macro layer included | ITRI | Noted |
R1‑122870 | Remaining issues on TDD inter-band CA with different UL-DL configurations | Panasonic | Not treated |
R1‑122871 | Discussion on rules to obey common E-RGCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122872 | TDD DL-UL Reconfiguration Methods in Carrier Aggregation | LG Electronics | Not treated |
R1‑122873 | Remaining details for UL cross-carrier scheduling | Ericsson, ST-Ericsson | Not treated |
R1‑122874 | CSI-RS based received signal quality measurements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑122875 | DF-DC Configuration in Multiflow HSDPA | Qualcomm Incorporated, Orange | Noted |
R1‑122876 | Resource allocation methods for NCT | Qualcomm Inc. | Noted |
R1‑122877 | The definitions of eREG and eCCE | ZTE | Not treated |
R1‑122878 | Some Remaining Aspects of PUCCH Enhancement for UL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122879 | Evaluation on TDD UL/DL reconfiguration with interference mitigation in multi-cell pico scenario | CATT | Noted |
R1‑122880 | Signal quality metrics for measurement on CoMP resource management set | Intel Corporation | Noted |
R1‑122881 | Remaining issues of interference measurements | Intel Corporation | Not treated |
R1‑122882 | Details about UL DMRS configuration and signaling | Ericsson, ST-Ericsson | Revised |
R1‑122883 | Details about SRS configuration and power control | Ericsson, ST-Ericsson | Not treated |
R1‑122884 | Enhancements for UL control signaling | Ericsson, ST-Ericsson | Not treated |
R1‑122885 | Performance evaluation for co-channel macro-pico scenario | Samsung | Noted |
R1‑122886 | Further discussion on DMRS for ePDCCH | LG Electronics | Not treated |
R1‑122887 | Discussion on DMRS usage for enhanced PDCCH | ZTE | Not treated |
R1‑122888 | Multiple CSI Reports on PUCCH for DL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑122889 | Evaluation results for eIMTA Phase-3 scenario | New Postcom | Noted |
R1‑122890 | Autonomous inter-cell interference cancellation | CMCC | Not treated |
R1‑122891 | Remaining details of DL DM-RS sequence for CoMP | LG Electronics | Not treated |
R1‑122892 | Final report of RAN1#68bis meeting | MCC Support | Approved |
R1‑122893 | Considerations on eCCE design and transmission schemes in ePDCCH | China Telecom | Not treated |
R1‑122894 | Draft CR on DMRS patterns for special subframe configuration 9 with normal cyclic prefix | CMCC, Huawei, HiSilicon | Noted |
R1‑122895 | Way Forward on the Maximum Size of CoMP Measurement Set | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CMCC, ETRI, Fujitsu, HiSilicon, Hitachi, HTC, Huawei, KDDI, KT, LG Electronics, NEC, NTT DOCOMO, Orange, Panasonic, Pantech, Samsung, Sharp, ZTE | Noted |
R1‑122896 | Draft reply LS on UE measurements in support of the two-stage MIMO OTA test method | Qualcomm | Noted - Revised |
R1‑122897 | LS on ITU-T response LS (R3-120470) to NGMN LS (RP-110476) on coordination between ITU-T and 3GPP on synchronization | RAN3, Ericsson | Noted |
R1‑122898 | Draft LS response on clarifications on CSI-RS based measurement for CoMP | Huawei | Noted - Revised |
R1‑122899 | Search Space Design for E-PDCCH Transmission Scheme | NTT DOCOMO | Not treated |
R1‑122900 | 36.211 CR0171 (Rel-10, F) Correction for DMRS group hopping and sequence hopping | Sharp, Panasonic | Agreed |
R1‑122901 | 36.213 CR0381 (Rel-10, F) Correction on transmission mode 9 with a single antenna port transmission | Huawei, HiSilicon, CATT, Ericsson, ST-Ercisson, Panasonic, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm | Agreed |
R1‑122902 | 36.213 CR0378R3 (Rel-10, F) Correction of FDD channel selection HARQ-ACK and SR transmission | Ericsson, ST-Ericsson, CATT, Texas Instruments, LG Electronics | Agreed |
R1‑122903 | Way Forward on localized transmission fallback to distributed transmission on ePDCCH | CATT, CATR, CMCC, Potevio, Samsung, Panasonic, Intel, Alcatel Lucent, Altcatel Lucent Shanghai Bell, ASUSTeK, Renesas Mobile Europe Ltd., InterDigital, ITRI | Not treated |
R1‑122904 | WF on ePDCCH building block | CATT, CATR, LG Electronics, Potevio, Huawei, HiSilicon, CMCC, Qualcomm | Noted |
R1‑122905 | Joint proposal on SRS transmission with multiple TA – full overlap case | LG Electronics, CATT, Ericsson, ST-Ericsson, ZTE, Pantech | Noted |
R1‑122906 | Channel coding for periodic CSI and HARQ-ACK on PUCCH format 3 | Huawei, HiSilicon | Not treated |
R1‑122907 | WF on ePDCCH | InterDigital, Ericsson, ST-Ericsson, NTT DoCoMo, Renesas Mobile Europe Ltd., Panasonic, Pantech, Intel, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom, KDDI, Texas Instruments | Noted |
R1‑122908 | Evaluation of TDD traffic adaptive DL-UL reconfiguration in the co-channels macro and pico scenario | Huawei, HiSilicon | Not treated |
R1‑122909 | Methods to support different time scales for TDD UL-DL reconfiguration | Huawei, HiSilicon | Not treated |
R1‑122910 | Draft LS on the RAN1 agreements on Further Enhancements to Cell_FACH for HSPA | Qualcomm Incorporated | Noted - Revised |
R1‑122911 | 25.214 Rel-11 CR Introduction of Further Enhancements of CELL_FACH | Qualcomm Incorporated | Withdrawn |
R1‑122912 | 25212 CR0307R1 (Rel-11, F), Addition of missing 8C-HSDPA CQI reporting case indices | Nokia Siemens Networks | Agreed |
R1‑122913 | 25.214 CR0679R1 (Rel-11, F) Clarification of TPI timing for UL CLTD | ZTE, Huawei, HiSilicon, Qualcomm Incorporated, Research In Motion UK Limited, Nokia Siemens Networks, Ericsson, ST-Ericsson | Revised |
R1‑122914 | Draft LS on the RAN1 agreements on Four Branch MIMO transmission for HSDPA | Ericsson | Revised |
R1‑122915 | 25.214 CR0679R2 (Rel-11, F) Clarification of TPI timing for UL CLTD | ZTE, Huawei, HiSilicon, Qualcomm Incorporated, Research In Motion UK Limited, Nokia Siemens Networks, Ericsson, ST-Ericsson | Agreed |
R1‑122916 | LS on RAN1 agreements on MIMO with 64QAM for HSUPA | RAN1, Nokia Siemens Networks | Agreed |
R1‑122917 | void | - | Withdrawn |
R1‑122918 | void | - | Withdrawn |
R1‑122919 | void | - | Withdrawn |
R1‑122920 | void | - | Withdrawn |
R1‑122921 | void | - | Withdrawn |
R1‑122922 | void | - | Withdrawn |
R1‑122923 | void | - | Withdrawn |
R1‑122924 | void | - | Withdrawn |
R1‑122925 | void | - | Withdrawn |
R1‑122926 | void | - | Withdrawn |
R1‑122927 | void | - | Withdrawn |
R1‑122928 | void | - | Withdrawn |
R1‑122929 | void | - | Withdrawn |
R1‑122930 | Summary of email discussion [69-10]: Details of collision handling and compression/multiplexing in case of 2 or more CSIs being configured in the same reporting instance for CoMP CSI feedback | Fujitsu | Noted |
R1‑122931 | Summary of email discussion [69-11]: FFS aspects of aperiodic CSI feedback for CoMP | Fujitsu | Noted |
R1‑122932 | void | - | Withdrawn |
R1‑122933 | void | - | Withdrawn |
R1‑122934 | void | - | Withdrawn |
R1‑122935 | void | - | Withdrawn |
R1‑122936 | void | - | Withdrawn |
R1‑122937 | void | - | Withdrawn |
R1‑122938 | void | - | Withdrawn |
R1‑122939 | void | - | Withdrawn |
R1‑122940 | Way Forward PUCCH format 1b with channel selection Transmit Diversity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, RIM, LGE | Not treated |
R1‑122941 | Remaining details for S-E-DPDCH and S-DPCCH power setting | InterDigital Communications, LLC | Noted |
R1‑122942 | 36.213 CR0380 (Rel-11, B) CR for Additional special subframe | CMCC, Huawei, HiSilicon, CATT | Noted - Revised |
R1‑122943 | 36.211 CR0170R1 (Rel-11, B) CR on additional special configuration | CMCC, CATT, Huawei, HiSilicon | Noted - Revised |
R1‑122944 | TP for TR36.828 section 8 | CATT | Agreed |
R1‑122945 | Calibration results of multi-cell scenario for LTE TDD DL-UL Interference Management and Traffic Adaptation | Rapporteur (Huawei) | Not treated |
R1‑122946 | WF on PUSCH DMRS Signaling | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATR,CHTTL, Potevio, HTC, Qualcomm, Texas Instrument, Motorola Mobility | Noted |
R1‑122947 | Further consideration on uplink control for CoMP | Texas Instruments | Not treated |
R1‑122948 | TP for TR36.828 section 7 | CATT | Agreed |
R1‑122949 | TP for TR36.828 section 9 | CATT | Agreed |
R1‑122950 | TR36.828 v2.0.0 for Rel-11 FS_LTE_TDD_eIMTA | CATT | Agreed |
R1‑122951 | WF on Interference measurement in Rel-11 | NTT DOCOMO, AT&T, Deutsche Telekom, KT, Vodafone, Institute for Infocomm Research, NEC group, Panasonic, Sharp, Sony | Noted |
R1‑122952 | WF on CQI definition in Rel-11 | NTT DOCOMO | Noted |
R1‑122953 | Interference measurement mechanisms for Rel-11 | NTT DOCOMO | Not treated |
R1‑122954 | DL Timing Reference for UL CoMP | Motorola Mobility | Not treated |
R1‑122955 | Way Forward on Interference Measurements and Rel-11 CQI | Huawei, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, HiSilicon, Hitachi, Intel, NEC, Nokia, Nokia Siemens Networks, Samsung, ZTE | Noted |
R1‑122956 | WF on CQI definition | CATT, CMCC, LG Electronics, Nokia, Nokia Siemens Networks | Noted |
R1‑122957 | Analysis on TTI bundling enhancement for medium rate PUSCH | China Telecom, China Unicom | Not treated |
R1‑122958 | Way Forward on CSI-RS Restriction | Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, ETRI, Fujitsu, KT, New Postcom, Panasonic, Pantech, Qualcomm | Noted |
R1‑122959 | Update to 3GPP TR 36.888 to include agreements | Vodafone Group | Noted |
R1‑122960 | Summary of the ad-hoc session on quasi-co-located antenna ports | Ad-hoc chair (Ericsson) | Endorsed |
R1‑122961 | Way Forward on PDSCH DMRS Sequence | Huawei, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, HiSilicon, Nokia, Nokia Siemens Networks,Qualcomm, ST-Ericsson | Noted |
R1‑122962 | WF on PUSCH DMRS parameter details | LG Electronics, CATT, ETRI, Huawei, HiSilicon, Intel, InterDigital, KDDI, Nokia, Nokia Siemens Networks, Pantech, Qualcomm, Samsung | Noted |
R1‑122963 | WF on PUSCH DMRS enhancement | LG Electronics, Ericsson, ST-Ericsson, ETRI, Intel, InterDigital, Panasonic, Samsung, Sharp | Noted |
R1‑122964 | Way forward on SRS power control | LG Electronics, Fujitsu, InterDigital, New Postcom, Pantech, Research In Motion, Samsung, Sharp | Noted |
R1‑122965 | Remaining issues on CoMP timing | Samsung | Noted |
R1‑122966 | WF on HARQ-ACK transmission for TDD inter-band CA | CATT, Ericsson, ST-Ericsson | Noted |
R1‑122967 | SRS power control for UL CoMP | InterDigital Communications, LLC | Not treated |
R1‑122968 | PUCCH resource for ePDCCH | Sharp | Noted |
R1‑122969 | Draft LS on Multiflow Timing | Qualcomm | Noted - Revised |
R1‑122970 | WF on Power Control | Huawei, Ericsson, ETRI, HiSilicon, Hitachi, HTC, Intel Corporation, InterDigital, ITRI, KDDI, KT, LG Electronics, LG-Ericsson, Mediatek, New Postcom, Pantech, Research In Motion, Samsung, Sharp, ST-Ericsson | Noted |
R1‑122971 | Way forward on DL resource assignment on resources including E-PDCCH | LG Electronics, CATT, Intel, Pantech | Withdrawn |
R1‑122972 | Way Forward on ePDCCH Antenna Port | Huawei, HiSilicon, LG Electronics, RIM, Panasonic | Noted |
R1‑122973 | 25.211 CR0295 (Rel-11, B) Introduction of HSDPA Multiflow | Nokia Siemens Networks | Agreed in principle |
R1‑122974 | 25.212 CR0308 (Rel-11, B) Introduction of HSDPA Multiflow | Nokia Siemens Networks | Agreed in principle |
R1‑122975 | 25.213 CR0113 (Rel-11, B) Introduction of HSDPA Multiflow | Nokia Siemens Networks | Agreed |
R1‑122976 | 25.214 CR0685 (Rel-11, B) Introduction of HSDPA Multiflow | Nokia Siemens Networks | Agreed in principle |
R1‑122977 | Way forward on AP association | Ericsson, ST-Ericsson, Samsung, InterDigital, Alcatel-Lucent, Alcatel Lucent Shanghai Bell | Noted |
R1‑122978 | WF on SRS Power Control enhancement | CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, CATR, CHTTL, CMCC, Motorola Mobility, Nokia, Nokia Siemens Networks, NTT DoCoMo, Panasonic, Qualcomm, ZTE | Noted |
R1‑122979 | WF on ePDCCH search space | Panasonic, Sharp, NTT DOCOMO | Noted |
R1‑122980 | Details about UL DMRS configuration and signaling | Ericsson, ST-Ericsson | Noted |
R1‑122981 | Way Forward on UE-specific configurations for SRS | KDDI, CATT, Ericsson, HTC, InterDigital, LG Electronics, New Postcom, Nokia, Nokia Siemens Networks, Panasonic, Qualcomm, Research In Motion, Samsung, Sharp, ST-Ericsson, ZTE | Noted |
R1‑122982 | Way Forward on frequency hopping for aperiodic SRS | KDDI, Ericsson, LG Electronics, NEC Group, NTT DOCOMO, Nokia Siemens Networks, Nokia, Panasonic, Sharp, ST-Ericsson | Not treated |
R1‑122983 | WF on PUCCH enhancement | Panasonic, ETRI, Huawei, HiSilicon, Intel, InterDigital, KDDI, Motorola Mobility, Pantech, Qualcomm | Noted |
R1‑122984 | Discussion on CSI feedback modes for CoMP | Hitachi Ltd. | Not treated |
R1‑122985 | Way Forward on SRS Power Control | Huawei, Ericsson, HiSilicon, ST-Ericsson | Noted |
R1‑122986 | [DRAFT] LS on Low-Cost MTC UEs based on LTE | Huawei | Noted - Revised |
R1‑122987 | Text proposal for TR 36.888 on restriction of techniques to low performance MTC Ues | Telecom Italia | Noted |
R1‑122988 | Recommendation on defining an MTC specific UE category | Telecom Italia | Not treated |
R1‑122989 | Response LS on UL positioning parameters | RAN3, TruePosition | Noted |
R1‑122990 | LS on Definition of LMU as Physical Node | RAN3, Ericsson | Noted |
R1‑122991 | Way Forward on ePDCCH Antenna Port | LG Electronics, CATT, MediaTek | Noted |
R1‑122992 | WF on signalling details for reduced power ABS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Ericsson, Fujitsu, Hitatchi Ltd., Intel, LG Electronics, MediaTek Inc., Motorola Mobility, NEC Group, NTT DOCOMO, Panasonic, Qualcomm Inc., Renesas Mobile Europe Ltd., ST-Ericsson, ZTE | Revised |
R1‑122993 | WF on X2 signalling for reduced power ABS for feICIC | ZTE, CMCC, Ericsson, Hitachi, Renesas Mobile Europe Ltd, ST-Ericsson | Noted |
R1‑122994 | Summary of UL COMP Ad-hoc Session | Ad-hoc chairman (Samsung) | Endorsed |
R1‑122995 | Summary of PUCCH TxD and CA TDD Session | Ad-hoc chairman (Samsung) | Endorsed |
R1‑122996 | Summary of DL CoMP RS session | Ad-hoc chairman (NTT DoCoMo) | Endorsed |
R1‑122997 | Summary of FeICIC session | Ad-hoc chairman (NTT DoCoMo) | Endorsed |
R1‑122998 | Summary of CoMP feedback session | Ad-hoc chairman (Samsung) | Endorsed |
R1‑122999 | WF on cell detection in FeICIC | LG Electronics, New Postcom, ETRI | Not treated |
R1‑123000 | Way Forward on reduced power ABS | Huawei, CMCC, HiSilicon, KDDI, Nokia Siemens Networks, Sharp | Noted |
R1‑123001 | WF on UE behaviour for colliding CRS scenario | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, Nokia Siemens Networks, Qualcomm, Renesas Mobile Europe Ltd, Samsung, ST-Ericsson | Noted |
R1‑123002 | On signalling for reduced power ABS | ZTE | Not treated |
R1‑123003 | Way forward on system information detection | CMCC, CATT, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE,LGE, CATR | Noted |
R1‑123004 | WF on the recommendation of Coverage Enhancements | China Telecom, China Unicom, AT&T, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Huawei, HiSilicon, InterDigital, LG Electronics, Intel, Nokia, Nokia Siemens Networks, ZTE | Noted |
R1‑123005 | LS response on the CP length assumption with FeICIC | RAN4, Ericsson | Noted |
R1‑123006 | Text proposal on reduction of supported downlink transmission modes for Section 6.7 of TR 36.888 | Huawei, HiSilicon (Rapporteur) | Noted - Revised |
R1‑123007 | Text Proposal for clause 8 of 3GPP TR 36.888 | Vodafone Group, Orange, [Telecom Italia] | Noted - Revised |
R1‑123008 | WF on Synchronized Carrier in NCT | LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Panasonic, CATT, New Postcom, ZTE, Huawei, HiSilicon, NTT Docomo, China Telecom, Pantech | Not treated |
R1‑123009 | Harmonized proposal for SRS power control | LG Electronics, CATT, CHTTL, ETRI, Huawei, HiSilicon, HTC, InterDigital, New Postcom | Not treated |
R1‑123010 | [DRAFT] LS on Low-Cost MTC UEs based on LTE | Huawei | Noted - Revised |
R1‑123011 | Way Forward on timing for UL CoMP | ZTE, CATT, Qualcomm, Texas Instruments | Noted |
R1‑123012 | WF on Handling of PSS/SSS and DM RS in NCT | Intel Corporation, Samsung, InterDigital Communications, ITRI, Broadcom, NEC, ETRI, III | Noted |
R1‑123013 | WF on PUCCH Format 1a/1b resource allocation for ePDCCH based HARQ-ACKs | Sharp, Nokia Siemens Networks, Nokia, Pantech, Samsung | Noted |
R1‑123014 | Summary of offline discussions on CSI-RSRP measurements for CoMP | Huawei | Noted |
R1‑123015 | Summary of ad-hoc session on AI 6.4 Further Enhancements for Cell_FACH | Rapporteur (Alcatel-Lucent) | Endorsed |
R1‑123016 | Way Forward on Aperiodic CSI Feedback for CoMP | NEC, CATT, Fujitsu, Hitachi, Huawei, HiSilicon, Intel, LG Electronics, Panasonic, Texas Instruments, ZTE | Noted |
R1‑123017 | void | - | Withdrawn |
R1‑123018 | TR36.824 v2.0.0 LTE Coverage Enhancements | ChinaTelecom (Rapporteur) | Agreed |
R1‑123019 | WF on simultaneous transmission of multiple CSIs | Huawei, Hisilicon, Qualcomm, CATT, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Network, ZTE | Not treated |
R1‑123020 | WF on HARQ-ACK enhancements in Rel-11 | CATT, CATR, Nokia Siemens Networks, Nokia, Potevio, ITRI, ZTE, Ericsson, ST-Ericsson, Texas Instruments, InterDigital, Panasonic | Not treated |
R1‑123021 | WF on signalling details for reduced power ABS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Ericsson, Fujitsu, Hitatchi Ltd., Intel, LG Electronics, MediaTek Inc., Motorola Mobility, NEC Group, NTT DOCOMO, Panasonic, Qualcomm Inc., Renesas Mobile Europe Ltd., ST-Ericsson, ZTE | Noted |
R1‑123022 | Report of off line discussions on Power Control for multiple TA | Panasonic | Noted |
R1‑123023 | Aspect of Pcmax definition from offline discussion on multiple TA | LGE | Noted |
R1‑123024 | WF on PDSCH RE Mapping for CoMP | LG Electronics, ETRI, Huawei, HiSilicon, Pantech, ZTE | Noted |
R1‑123025 | [DRAFT] LS on simultaneous transmission of PUSCH/PUCCH/SRS for multiple TA | Panasonic, Alcatel Lucent | Noted - Revised |
R1‑123026 | WF on CoMP Transmission Modes | Nokia Siemens Networks, Nokia, ALU, ASB, KDDI, Qualcomm, ZTE | Not treated |
R1‑123027 | Way Forward on ePDCCH location determination | Huawei, HiSilicon, Nokia, Nokia Siemens Networks | Noted |
R1‑123028 | Way Forward on CoMP Resource Management Set and CSI-RSRP Definition | Huawei, Ericsson, HiSilicon, InterDigital, Samsung, ST-Ericsson | Noted |
R1‑123029 | WF on system information and paging detection | CMCC, CATT, LGE, Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑123030 | Chairman’s notes of the UTRA maintenance, MIMO with 64QAM for HSUPA and LCR TDD HSPA feedback and signaling efficiency enhancement study sessions | HSPA session chairman (Nokia Siemens Networks) | Endorsed |
R1‑123031 | Summary of Handling Rel-10 CSI-RS Pattern issues | Qualcomm Inc., CATT, Panasonic, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, CMCC, Samsung, Ericsson, ST-Ericsson, Nokia Siemens Networks, Nokia | For email discussion till RAN#70 |
R1‑123032 | Way forward on mapping PDSCH scheduled by ePDCCH | LG Electronics, CATT, Ericsson, ST-Ericsson, MediaTek, NEC, Panasonic, Qualcomm | Noted |
R1‑123033 | [Draft] LS on MIB detection in feICIC | CMCC | Noted - Revised |
R1‑123034 | LS on TP for co-existence study of FS_LTE_TDD_eIMTA | RAN4, CATT | Noted |
R1‑123035 | Summary of 4-branch MIMO for HSPA session | HSPA session chairman (Huawei) | Endorsed |
R1‑123036 | 36.212 DraftCR on Correction to CSI request field size in DCI format 0 and DCI format 4 | Panasonic, Huawei | Noted - Revised |
R1‑123037 | Draft LS on RAN1 agreements on Multiflow HSDPA | Qualcomm | Noted - Revised |
R1‑123038 | Correction to assumed CSI-RS transmissions in subfames used for paging | Ericsson, ST-Ericsson, Panasonic | Noted - Revised |
R1‑123039 | Draft LS on specifying paging subframes of any UE in a Cell | Ericsson, Panasonic | Noted - Revised |
R1‑123040 | WF on Interference measurement in Rel-11 | NTT DOCOMO, AT&T, China Telecom, CMCC, Deutsche Telekom, Vodafone, Ericsson, ST-Ericsson, Fujitsu, Institute for Infocom Research, Hitachi, Motorola Mobility, NEC group, NSN, Nokia, Panasonic, Sharp, Sony, Texas Instruments | Noted |
R1‑123041 | Text Proposal for clause 8 of 3GPP TR 36.888 | Vodafone Group, Orange, [Telecom Italia] | Noted - Revised |
R1‑123042 | Draft LS on the RAN1 agreements on Four Branch MIMO transmission for HSDPA | Ericsson | Noted - Revised |
R1‑123043 | 36.213 CR0380R1 (Rel-11, B) CR for Additional special subframe | CMCC | Noted - Revised |
R1‑123044 | Reply LS on UE measurements in support of the two-stage MIMO OTA test method | RAN1, Qualcomm | Agreed |
R1‑123045 | LS response on Physical Layer Measurement for Network Positioning | RAN4, TruePosition | Noted |
R1‑123046 | void | - | Withdrawn |
R1‑123047 | 25211 CRdraft, Introduction of UL MIMO and 64QAM | Nokia Siemens Networks | For email discussion till RAN#70 |
R1‑123048 | 25212 CRdraft, Introduction of UL MIMO and 64QAM | Nokia Siemens Networks | For email discussion till RAN#70 |
R1‑123049 | 25213 CRdraft, Introduction of UL MIMO and 64QAM | Nokia Siemens Networks | For email discussion till RAN#70 |
R1‑123050 | 25214 CRdraft, Introduction of UL MIMO and 64QAM | Nokia Siemens Networks | For email discussion till RAN#70 |
R1‑123051 | Draft LS on UE behavior for colliding CRS scenario | Qualcomm | Noted - Revised |
R1‑123052 | LS on the RAN1 agreements on Four Branch MIMO transmission for HSDPA | RAN1, Ericsson | Agreed |
R1‑123053 | 25.211 Rel-11 CR Introduction of Further Enhancements of CELL_FACH | Qualcomm Incorporated | For email approval till RAN#70 |
R1‑123054 | 25.212 Rel-11 CR Introduction of Further Enhancements of CELL_FACH | Qualcomm Incorporated | For email approval till RAN#70 |
R1‑123055 | 25.214 Rel-11 CR Introduction of Further Enhancements of CELL_FACH | Qualcomm Incorporated | For email approval till RAN#70 |
R1‑123056 | LS on Multiflow Timing | RAN1, Qualcomm | Agreed |
R1‑123057 | LS on RAN1 agreements on Multiflow HSDPA | RAN1, Qualcomm | Agreed |
R1‑123058 | LS on MIB detection in feICIC | RAN1, CMCC | Agreed |
R1‑123059 | LS on UE behavior for colliding CRS scenario | RAN1, Qualcomm | Agreed |
R1‑123060 | LS on Low-Cost MTC UEs based on LTE | RAN1, Huawei, Vodafone | Agreed |
R1‑123061 | 36.212 CR0138 (Rel-10, F) on Correction to CSI request field size in DCI format 0 and DCI format 4 | Panasonic, Huawei | Agreed |
R1‑123062 | 36.213 CR0380R2 (Rel-11, B) CR for Additional special subframe | CMCC | Agreed |
R1‑123063 | 36.211 CR0170R2 (Rel-11, B) CR on additional special configuration | CMCC, CATT, Huawei, HiSilicon | Agreed |
R1‑123064 | Text Proposal for clause 8 of 3GPP TR 36.888 | Vodafone Group, Orange, Telecom Italia | Agreed |
R1‑123065 | 36.211 CR0172 (Rel-10, F) Correction to assumed CSI-RS transmissions in subfames used for paging | Ericsson, ST-Ericsson, Panasonic | Agreed |
R1‑123066 | LS on specifying paging subframes of any UE with the cell-specific paging configuration | RAN1, Ericsson, Panasonic | Agreed |
R1‑123067 | LS on simultaneous transmission of PUSCH/PUCCH/SRS for multiple TA | RAN1, Panasonic, Alcatel Lucent | Agreed |
R1‑123068 | TP for TR36.828 section 6 | CATT, Huawei, HiSilicon | Agreed |
R1‑123069 | Collection of evaluation results for TR36.828 section 6 | CATT | Agreed |
R1‑123070 | Text proposal on reduction of supported downlink transmission modes for Section 6.7 of TR 36.888 | Huawei, HiSilicon (Rapporteur) | Agreed |
R1‑123071 | LS response on clarifications on CSI-RS based measurement for CoMP | RAN1, Huawei | Agreed |
R1‑123072 | E-mail discussion summary for TP to clause 7 of 3GPP TR 36.888 | Vodafone Group | Agreed |
R1‑123073 | Text Proposal for clause 7 of 3GPP TR 36.888 | Vodafone Group | Agreed |
R1‑123074 | Text Proposal on some aspects of section 9 of 3GPP TR 36.888 | Vodafone Group | Agreed |
R1‑123075 | TR 36.888 v2.0.0 update to include agreements from RAN1#69 | Vodafone Group | Agreed |
R1‑123076 | LS on SIB-1 acquisition in feICIC | RAN1, CMCC | Agreed |
R1‑123077 | LS on CSI-RSRP and CoMP Resource Management Set | RAN1, Huawei | Agreed |
R1‑123078 | LS on RAN1 agreements and CRs on Further Enhancements to CELL_FACH | RAN1, Qualcomm | Agreed |
R1‑123079 | void | - | Withdrawn |
page generated from database: 2024-10-07 07:52:06