3GPP TDocs (written contributions) at meeting
Meeting: R1-66 - 2011-08-22 to 2011-08-26, Athens
meeting id: R1-66 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑112020 | Draft Agenda for RAN1#66 meeting | RAN1 Chairman | Revised |
R1‑112021 | Final report of RAN1#65 meeting | MCC Support | Approved |
R1‑112022 | LS on the frequency band specific compressed mode | RAN2, Nokia Siemens Networks | Noted |
R1‑112023 | LS on Removal of MDT M3 LTE Measurement | RAN2, MediaTek | Noted |
R1‑112024 | LS on timing advance calculation using time difference measurement | RAN2, Renesas | Noted |
R1‑112025 | Reply LS on signalling support to de-activate HS-SCCH orders | RAN3, Qualcomm | Noted |
R1‑112026 | Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization | RAN, Orange | Noted |
R1‑112027 | LS on MDT UL Measurements | SA5, Nokia Siemens Networks | Noted |
R1‑112028 | LS on Equivalent PLMN identities and MDT | SA, Teliasonera | Noted |
R1‑112029 | Multiple timing advance for carrier aggregation in Rel-11 | Huawei, HiSilicon | Noted |
R1‑112030 | Draft reply LS on timing advance calculation using time difference measurement | Huawei | Not treated |
R1‑112031 | 36.212 CR0118 (Rel-10, F) Corrections on payload size alignment of DCI formats in common or UE-specific search space | Huawei, HiSilicon | Withdrawn |
R1‑112032 | 36.212 CR0119 (Rel-10, F) Corrections on transport block processing for UL-SCH | Huawei, HiSilicon, I2R | Noted - Revised |
R1‑112033 | draft 36.212 CR on channel coding of control information, DCI Format 2C and 4 | Huawei, HiSilicon, CATT | Noted - Revised |
R1‑112034 | Uplink signaling enhancements in Rel-11 carrier aggregation | Huawei, HiSilicon | Not treated |
R1‑112035 | TxD for format 1b with channel selection in Rel-11 | Huawei, HiSilicon | Noted |
R1‑112036 | Discussion on different UL-DL configuration for TDD with inter-band CA | Huawei, HiSilicon | Noted |
R1‑112037 | Considerations on further enhancements of Rel-10 eICIC | Huawei, Hisilicon | Not treated |
R1‑112038 | Full buffer performance evaluation of DL CS/CB in scenarios 3 and 4 | Huawei, HiSilicon | Not treated |
R1‑112039 | Full buffer performance evaluation of DL JT in scenarios 3 and 4 | Huawei, HiSilicon | Noted |
R1‑112040 | Non-Full buffer performance evaluation of DL JT in scenarios 3 and 4 | Huawei, HiSilicon | Not treated |
R1‑112041 | UL CoMP phase 2 evaluations in scenario 3 | Huawei, HiSilicon | Revised |
R1‑112042 | Text proposal for standard impacts and design principles of CoMP in Rel-11 | Huawei, HiSilicon | Revised |
R1‑112043 | Cooperating set management and control channel access consideration | Huawei, HiSilicon | Not treated |
R1‑112044 | Coordinated beamforming solution for Rel-11 | Huawei, HiSilicon | Withdrawn |
R1‑112045 | Prioritization of real-life network deployment issues | Huawei, HiSilicon | Noted |
R1‑112046 | Analysis of closed-loop DL MIMO rank adaptaion with received power imbalance | Huawei, HiSilicon | Noted |
R1‑112047 | Investigation on CSI feedback enhancements for closed-loop MIMO | Huawei, HiSilicon | Not treated |
R1‑112048 | CSI feedback and utilization for MU-MIMO and considerations for testing | Huawei, HiSilicon | Not treated |
R1‑112049 | Design principles of enhanced PDCCH | Huawei, HiSilicon | Not treated |
R1‑112050 | Open-loop DL MIMO for Rel.11 | Huawei, HiSilicon | Not treated |
R1‑112051 | DMRS enhancements for geographically distributed antennas | Huawei, HiSilicon | Not treated |
R1‑112052 | CSI-RS port selection for distributed antennas | Huawei, HiSilicon | Not treated |
R1‑112053 | Skeleton TR for UL Enhancement Study Item | Huawei, HiSilicon | Noted |
R1‑112054 | UL Reference Signal enhancements in Rel.11 | Huawei, HiSilicon | Not treated |
R1‑112055 | Enhancement for transmission of UCI on PUSCH | Huawei, HiSilicon | Not treated |
R1‑112056 | Uplink power control enhancements in Rel.11 | Huawei, HiSilicon | Noted |
R1‑112057 | Uplink timing advance for geographically distributed antennas | Huawei, HiSilicon | Noted |
R1‑112058 | Channel-independent UL MIMO | Huawei, HiSilicon | Not treated |
R1‑112059 | Response to Liaison “NGMN coordination between ITU-T and 3GPP on synchronization topic” | ITU-T Study Group 15, Calnex Solutions, Ericsson | Noted |
R1‑112060 | System Performance of JT-CoMP in Phase 2 TDD | CATT | Noted |
R1‑112061 | System Performance of CS/CB-CoMP in Phase2 TDD | CATT | Noted |
R1‑112062 | Performance Evaluations of JT-CoMP and TDM eICIC in the CoMP Scenario 3 | KDDI Corporation | Noted |
R1‑112063 | Feedback channel design and considerations for UL CLTD | InterDigital Communications LLC | Noted |
R1‑112064 | Dynamic antenna selection via HS-SCCH order for UL CLTD | InterDigital Communications LLC | Not treated |
R1‑112065 | S-DPCCH channelization code and power offset range | InterDigital Communications LLC | Noted |
R1‑112066 | Synchronization and radio link monitoring for UL CLTD | InterDigital Communications LLC | Noted |
R1‑112067 | Selection of Channelization Codes for HS-DPCCH when DPDCH is configured in 8-carrier HSDPA | InterDigital Communications LLC | Noted |
R1‑112068 | Physical Channel Mapping for 2xSF128 HS-DPCCH in 8C-HSDPA | InterDigital Communications LLC | Noted |
R1‑112069 | System simulation summary for MP-HSDPA | InterDigital Communications LLC | Noted |
R1‑112070 | System simulation text proposal for MP-HSDPA | InterDigital Communications LLC | Noted |
R1‑112071 | Draft LS reply on timing advance calculation using time difference measurement | Ericsson, ST-Ericsson | Not treated |
R1‑112072 | On timing advance calculation using time difference measurement | Ericsson, ST-Ericsson | Noted |
R1‑112073 | 36.213 CR0324 (Rel-10, Cat F) Accumulation of power control commands from DCI format 3/3A with UL transmission | Ericsson, ST-Ericsson | Noted |
R1‑112074 | Views on trade-off analysis method for CA enhancements | Ericsson, ST-Ericsson | Noted |
R1‑112075 | On timing advance calculation using random access | Ericsson, ST-Ericsson | Withdrawn |
R1‑112076 | On PDCCH capacity for CA | Ericsson, ST-Ericsson | Noted |
R1‑112077 | On collision handling of periodic CSI feedback | Ericsson, ST-Ericsson | Not treated |
R1‑112078 | Enhanced transmit diversity for PUCCH | Ericsson, ST-Ericsson | Noted |
R1‑112079 | Operating principles of interband TDD CA with different UL-DL configurations | Ericsson, ST-Ericsson | Noted |
R1‑112080 | Hardware impact of supporting interband TDD CA with different UL-DL configurations | Ericsson, ST-Ericsson | Noted |
R1‑112081 | Considerations on use cases for introduction of additional carrier types | Ericsson, ST-Ericsson | Not treated |
R1‑112082 | Discussion on design principles for additional carrier types | Ericsson, ST-Ericsson | Not treated |
R1‑112083 | Simulation assumptions for evaluation of dynamic traffic adaptation for LTE TDD | Ericsson, ST-Ericsson | Not treated |
R1‑112084 | UL/DL interference scenarios in LTE TDD | Ericsson, ST-Ericsson | Not treated |
R1‑112085 | Potential Enhancements for SRS in Rel-11 | Ericsson, ST-Ericsson | Not treated |
R1‑112086 | Potential Enhancements for DMRS in Rel-11 | Ericsson, ST-Ericsson | Not treated |
R1‑112087 | Potential enhancements for CQI-only transmission | Ericsson, ST-Ericsson | Not treated |
R1‑112088 | Enhancements to UL power control for Rel-11 | Ericsson, ST-Ericsson | Noted |
R1‑112089 | First analysis of UL channel independent transmission schemes for Rel-11 | Ericsson, ST-Ericsson | Not treated |
R1‑112090 | Draft 36.213 CR on UL HARQ ACK determination | Ericsson, ST-Ericsson | Noted - Revised |
R1‑112091 | Discussion on Real-life DL MIMO issues | Ericsson, ST-Ericsson | Noted |
R1‑112092 | Enhanced CSI for DL MIMO | Ericsson, ST-Ericsson | Not treated |
R1‑112093 | DL CoMP Phase 2 Evaluation Results | Ericsson, ST-Ericsson | Noted |
R1‑112094 | Standardization Impact of CoMP | Ericsson, ST-Ericsson | Noted |
R1‑112095 | CoMP Phase 2 evaluation results | Panasonic | Revised |
R1‑112096 | Proposal of a CoMP study focused on relay-based networks | DAC-UPC | Not treated |
R1‑112097 | PHICH over booking can occur in narrow BW operation | Sequans Communications | Noted |
R1‑112098 | 36.211 Draft CR (Rel-8, F) PHICH overbooking can occure in narrow BW | Sequans Communications | Revised |
R1‑112099 | 36.211 Draft CR (Rel-9, A) PHICH overbooking can occure in narrow BW | Sequans Communications | Revised |
R1‑112100 | 36.211 Draft CR (Rel-10, A) PHICH overbooking can occure in narrow BW | Sequans Communications | Revised |
R1‑112101 | Draft CR to 36.213 on PDSCH transmission scheme assumed for CSI reference resource of TM9 | CATT | Noted |
R1‑112102 | Overview and tradeoff analysis for Rel-11 carrier aggregation | CATT | Noted |
R1‑112103 | Enhancements on UL ACK/NACK in Rel-11 carrier aggregation | CATT | Not treated |
R1‑112104 | Enhancement for CSI transmission in LTE-A Rel-11 with CA | CATT | Not treated |
R1‑112105 | Transmit diversity for Format 3 and Format 1b with channel selection | CATT | Noted |
R1‑112106 | TDD Inter-band Carrier Aggregation | CATT | Noted |
R1‑112107 | Support of multiple timing advances in LTE-A Rel-11 with CA | CATT | Not treated |
R1‑112108 | Discussion on CoMP Specification Impact | CATT | Noted |
R1‑112109 | Considerations on CoMP in TDD Mode | CATT, CMCC | Not treated |
R1‑112110 | Considerations on Interference Measurement and its Specification Impact in CoMP | CATT | Noted |
R1‑112111 | CQI Feedback and its Specification Impact in CoMP | CATT | Not treated |
R1‑112112 | Considerations on SRS Enhancement for CoMP Transmission | CATT, CMCC | Not treated |
R1‑112113 | Impact of time alignment error on real-life transmission | CATT, CMCC | Not treated |
R1‑112114 | Discussion on Rank adaptation | CATT | Noted |
R1‑112115 | Overall discussion on real life issues of DL MIMO | CATT | Noted |
R1‑112116 | CSI feedback for geographically-separated antennas | CATT | Not treated |
R1‑112117 | Codebook enhancements for DL MIMO | CATT | Not treated |
R1‑112118 | Views on control signalling enhancements for Rel-11 DL-MIMO | CATT | Not treated |
R1‑112119 | Design of enhanced PDCCH in Rel-11 | CATT | Not treated |
R1‑112120 | Discussion on enhancement for CQI-only transmission in Rel-11 | CATT | Not treated |
R1‑112121 | Considerations on UL MIMO enhancement for new deployment scenarios | CATT | Not treated |
R1‑112122 | Traffic adaptation evaluation methodologies and assumptions for LTE TDD eIMTA | CATT | Not treated |
R1‑112123 | Work plan for SI on LTE TDD eIMTA | CATT | Not treated |
R1‑112124 | Draft Agenda for RAN1#66 meeting | RAN1 Chairman | Approved |
R1‑112125 | Further clarification on PDSCH transmission in MBSFN subframes | NEC Group | Noted |
R1‑112126 | Clarification on cyclic prefix of PDSCH in MBSFN subframes | NEC Group | Noted - Revised |
R1‑112127 | Correction to the information of modulation and coding scheme for PUSCH transport block 1 in DCI format 4 | NEC Group | Noted |
R1‑112128 | Miscellaneous corrections to 36.213 | NEC Group | Noted - Revised |
R1‑112129 | Views on Extension carrier and Carrier segments | NEC Group | Not treated |
R1‑112130 | Performance of Cell Range Extension with Time-domain solutions | NEC Group | Noted |
R1‑112131 | Evaluation Results for TDD CoMP JT Scenario 3 | NEC Group | Not treated |
R1‑112132 | Evaluation Results for FDD CoMP CB Scenario 3 | NEC Group | Not treated |
R1‑112133 | Specification Impact of HARQ Retransmission for Downlink CoMP | NEC Group | Not treated |
R1‑112134 | Enhancements to DL MU-MIMO CSI Feedback | NEC Group | Revised |
R1‑112135 | DL control channel enhancements for Rel-11 | NEC Group | Noted |
R1‑112136 | Performance aspects of DL control channel enhancements for Rel-11 | NEC Group | Noted |
R1‑112137 | DL Control channel enhancements with carrier aggregation solutions | NEC Group | Not treated |
R1‑112138 | Open-loop DL MIMO using UE specific RS | NEC Group | Not treated |
R1‑112139 | Downlink DM-RS enhancements | NEC Group | Not treated |
R1‑112140 | Phase 2 downlink CoMP evaluation results | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑112141 | Proposed update to TSG RAN1 Terms of Reference | RAN1 Chairman | Endorsed |
R1‑112142 | Enhancement for UL RS in Rel-11 | CATT | Not treated |
R1‑112143 | Performance evaluation of CS/CB for CoMP Scenario3 | Sony Corporation | Revised |
R1‑112144 | Performance evaluation of JP for CoMP Scenario3 | Sony Corporation | Revised |
R1‑112145 | Correction on RI feedback of Mode 2-1 for TM9 with 8 CSI-RS ports configuration and RI feedback description. | China Telecom, ZTE, Huawei, Ericsson, ST-Ericsson | Withdrawn |
R1‑112146 | 36.214 CR0017 (Rel-10, Cat F) Alignment of UE RX-TX time difference measurement with RAN2 definition | Ericsson, ST-Ericsson | Noted |
R1‑112147 | Discussions on certain open issues in ICIC | New Postcom | Noted |
R1‑112148 | Feedback enhancements for CoMP | New Postcom | Not treated |
R1‑112149 | Discussions on timing difference based TA calculation | New Postcom | Noted |
R1‑112150 | Scenario 3 results and analysis for CoMP Phase 2 | New Postcom | Not treated |
R1‑112151 | Discussions on cell clustering for CoMP | New Postcom | Withdrawn |
R1‑112152 | Consideration of CA Enhancements for Rel-11 | Texas Instruments | Noted |
R1‑112153 | Support of Multiple Timing Advance Commands | Texas Instruments | Not treated |
R1‑112154 | System Performance Gains with Rel-10 ICIC and Het-Net Enhancements for Rel-11 | Texas Instruments | Noted |
R1‑112155 | Performance evaluation of CoMP in Phase II hetergeneous environment | Texas Instruments | Not treated |
R1‑112156 | On standardization impact of CoMP | Texas Instruments | Not treated |
R1‑112157 | Aspects of downlink control signaling enhancements in Rel.11 | Texas Instruments | Not treated |
R1‑112158 | Proposed Enhancements for Rel-11 SRS | Texas Instruments | Not treated |
R1‑112159 | Discussion on UCI Transmission Enhancements for Rel.11 Enhanced Uplink | Texas Instruments | Not treated |
R1‑112160 | Rel.11 Enhanced Uplink Improvements for New Deployment Scenarios | Texas Instruments | Not treated |
R1‑112161 | On supporting reduced power transmission in non-CA-based ICIC | KDDI Corporation | Not treated |
R1‑112162 | Downlink control signaling enhancement in CoMP scenario 4 | KDDI Corporation | Not treated |
R1‑112163 | Considerations on downlink control signaling enhancement | KDDI Corporation | Noted |
R1‑112164 | Downlink CSI feedback accuracy enhancement for MU-MIMO | KDDI Corporation | Revised |
R1‑112165 | CQI reports in frequency specific compressed mode | Huawei, HiSilicon | Noted |
R1‑112166 | Performance of absolute and recursive feedback methods | Huawei, HiSilicon | Noted |
R1‑112167 | CLTD Performance with CPC and Impact of Feedback | Huawei, HiSilicon | Noted |
R1‑112168 | Downlink PCI feedback channel timing design | Huawei, HiSilicon | Revised |
R1‑112169 | Performance of asymmetric and enhanced symmetric beamforming in SHO for CLTD | Huawei, HiSilicon | Noted |
R1‑112170 | Antenna selection scheme for UL CLTD | Huawei, HiSilicon | Not treated |
R1‑112171 | HS-SCCH Orders for UL CLTD Activation/Deactivation | Huawei, HiSilicon | Noted |
R1‑112172 | Channelisation code allocation and I/Q mapping for S-DPCCH | Huawei, HiSilicon | Noted |
R1‑112173 | On the use of remaining 2 bits in a slot of S-DPCCH | Huawei, HiSilicon | Noted |
R1‑112174 | E-DPCCH boosting for UL CLTD | Huawei, HiSilicon | Noted |
R1‑112175 | UL CLTD support in CELL_FACH state | Huawei, HiSilicon | Noted |
R1‑112176 | Interaction with DC-HSUPA | Huawei, HiSilicon | Noted |
R1‑112177 | CR for 25.211: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Revised |
R1‑112178 | CR for 25.212: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Revised |
R1‑112179 | CR for 25.213: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Revised |
R1‑112180 | CR for 25.214: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Revised |
R1‑112181 | CR for 25.215: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112182 | Carriers remapping on HS-DPCCH after activation/deactivation for 8C-HSDPA | Huawei, HiSilicon | Revised |
R1‑112183 | Cubic metric analysis for HS-DPCCH designs of 8C-HSDPA | Huawei, HiSilicon | Noted |
R1‑112184 | On the benefits of DC-HSDPA operation in CELL_FACH state | Huawei, HiSilicon | Not treated |
R1‑112185 | Discussion on stand-alone HS-DPCCH | Huawei, HiSilicon | Noted |
R1‑112186 | Co-existence of 2ms and 10ms TTI | Huawei, HiSilicon | Not treated |
R1‑112187 | UE based TTI length decision in CELL-FACH state | Huawei, HiSilicon | Noted |
R1‑112188 | Solution of Fallback to R99 PRACH | Huawei, HiSilicon | Noted |
R1‑112189 | Blocking and Collision Probability Analysis for E-RACH | Huawei, HiSilicon | Not treated |
R1‑112190 | System Performance Evaluation of Intra-NodeB SF-DC Aggregation in uniform loading and 100% penetration | Huawei, HiSilicon | Not treated |
R1‑112191 | System Performance Evaluation of Intra-NodeB SF-DC Aggregation in uniform loading and 30% penetration | Huawei, HiSilicon | Not treated |
R1‑112192 | System Performance Evaluation of Intra-NodeB SF-DC Aggregation in non uniform loading and 100% penetration | Huawei, HiSilicon | Not treated |
R1‑112193 | System Performance Evaluation of Intra-NodeB SF-DC Aggregation in non uniform loading and 30% penetration | Huawei, HiSilicon | Not treated |
R1‑112194 | System Performance Evaluation of Inter-NodeB SF-DC Aggregation in uniform loading and 100% penetration | Huawei, HiSilicon | Not treated |
R1‑112195 | System Performance Evaluation of Inter-NodeB SF-DC Aggregation in uniform loading and 30% penetration | Huawei, HiSilicon | Not treated |
R1‑112196 | System Performance Evaluation of Inter-NodeB SF-DC Aggregation in non uniform loading and 100% penetration | Huawei, HiSilicon | Not treated |
R1‑112197 | System Performance Evaluation of Inter-NodeB SF-DC Aggregation in non uniform loading and 30% penetration | Huawei, HiSilicon | Not treated |
R1‑112198 | System Performance Evaluation of Inter-NodeB SF-DC Aggregation in uniform loading and 100% penetration with realistic RLC and flow control | Huawei, HiSilicon | Not treated |
R1‑112199 | System Performance Evaluation of Inter-NodeB SF-DC Aggregation in uniform loading and 30% penetration with realistic RLC and flow control | Huawei, HiSilicon | Not treated |
R1‑112200 | System Performance Evaluation of Inter-NodeB SF-DC Aggregation in non uniform loading and 30% penetration with realistic RLC and flow control | Huawei, HiSilicon | Not treated |
R1‑112201 | System Performance Evaluation of Inter-NodeB SF-DC Aggregation in non uniform loading and 100% penetration with realistic RLC and flow control | Huawei, HiSilicon | Not treated |
R1‑112202 | Summary of System performance for SF-DC Aggregation | Huawei, HiSilicon | Noted |
R1‑112203 | Text Proposal on System Performance Evaluation of SF-DC aggregation with ideal flow control | Huawei, HiSilicon | Not treated |
R1‑112204 | Text Proposal on System Performance Evaluation of SF-DC aggregation with realistic RLC and flow control | Huawei, HiSilicon | Not treated |
R1‑112205 | TP on Impact on performance of legacy Ues due to SF-DC aggregation | Huawei, HiSilicon | Noted |
R1‑112206 | TP on Specification impact due to SF-DC aggregation | Huawei, HiSilicon | Noted |
R1‑112207 | HS-DPCCH Timing Analysis for MP-HSDPA | Huawei, HiSilicon | Noted |
R1‑112208 | Initial link-level simulation results for UL MIMO | Huawei, HiSilicon | Noted |
R1‑112209 | TP on performance evaluation results for UL MIMO | Huawei, HiSilicon | Noted |
R1‑112210 | Considerations on UL MIMO | Huawei, HiSilicon | Noted |
R1‑112211 | Discussions on enhanced PDCCH structure | ETRI | Not treated |
R1‑112212 | Uplink power control for CoMP Scenarios 3 and 4 | ETRI | Noted |
R1‑112213 | Control/Timing Issues related to Mixed TDD Configurations in Inter-band CA | Intel Corporation | Not treated |
R1‑112214 | Supporting Different UL-DL Configurations for LTE-TDD Inter-band Carrier Aggregation | Intel Corporation | Noted |
R1‑112215 | On New Carrier Types: Extension Carriers and Carrier Segments | Intel Corporation | Not treated |
R1‑112216 | Discussion on RAN2 LS - timing advance calculation using time difference | Intel Corporation | Not treated |
R1‑112217 | Rank adaptatoin in heterogeneous networks | Intel Corporation | Noted |
R1‑112218 | CSI feedback enhancement in heterogeneous networks | Intel Corporation | Not treated |
R1‑112219 | Futther discussions on downlink control signaling enhancement | Intel Corporation | Not treated |
R1‑112220 | Discussions on UE-RS based open loop MIMO | Intel Corporation | Not treated |
R1‑112221 | On CSI-RS configuration/reconfiguration | Intel Corporation | Not treated |
R1‑112222 | Futher analysis on Macro-Pico scenario | Intel Corporation | Noted |
R1‑112223 | CoMP performance analysis in Scenarios 3 and 4 for full buffer traffic model | Intel Corporation | Revised |
R1‑112224 | CoMP performance analysis in Scenarios 3 and 4 for non full buffer traffic model | Intel Corporation | Not treated |
R1‑112225 | Analysis of PDCCH capacity for Scenario 3 and 4 | Intel Corporation | Not treated |
R1‑112226 | Analysis of CRS and PDSCH collisions in Scenarios 3 and 4 | Intel Corporation | Not treated |
R1‑112227 | Standardization impact for CoMP | Intel Corporation | Not treated |
R1‑112228 | Uplink Power Control Discussion for CoMP Scenario 4 | Intel Corporation | Not treated |
R1‑112229 | Interference environment and DL-UL traffic asymmetry in LTE-TDD systems | Intel Corporation | Not treated |
R1‑112230 | Deployment scenarios and evaluation assumptions for LTE-TDD SI | Intel Corporation | Not treated |
R1‑112231 | Discussion on LTE-TDD traffic asymmetry modeling | Intel Corporation | Not treated |
R1‑112232 | Discussion of UCI only transmission on PUSCH | Intel Corporation | Not treated |
R1‑112233 | Discussion on uplink DM-RS enhancements for Release 11 | Intel Corporation | Not treated |
R1‑112234 | Discussion on Timing Advance calculation using time difference measurement | InterDigital Communications, LLC | Noted |
R1‑112235 | Additional carrier types for R11 CA Enhancements | InterDigital Communications, LLC | Not treated |
R1‑112236 | Scenarios for FeICIC techniques | InterDigital Communications, LLC | Not treated |
R1‑112237 | Evaluation of FeICIC in R11 | InterDigital Communications, LLC | Not treated |
R1‑112238 | CoMP Phase 2 performance results | InterDigital Communications, LLC | Not treated |
R1‑112239 | Study on Enhanced MIMO for Geographically-Separated Antennas | InterDigital Communications, LLC | Not treated |
R1‑112240 | CSI Feedback for Non-Uniform Networks | InterDigital Communications, LLC | Not treated |
R1‑112241 | DL Control Signaling Enhancements | InterDigital Communications, LLC | Not treated |
R1‑112242 | Discussion on MIMO Enhancements for Backhaul Relays | InterDigital Communications, LLC | Not treated |
R1‑112243 | Study of Open-Loop MIMO using UE-specific RS | InterDigital Communications, LLC | Not treated |
R1‑112244 | Multiple Timing Advance related issues | ZTE | Revised |
R1‑112245 | Further CA enhancement on PDCCH | ZTE | Noted |
R1‑112246 | Consideration on uplink control channel enhancement | ZTE | Not treated |
R1‑112247 | On support of inter-band CA with different TDD UL-DL configurations | ZTE | Not treated |
R1‑112248 | Introduction of additional carrier types | ZTE | Not treated |
R1‑112249 | Considerations on the enhancement for UL RS | ZTE | Not treated |
R1‑112250 | Consideration on power control of UL MIMO | ZTE | Revised |
R1‑112251 | Uplink channel-independent MIMO schemes | ZTE | Not treated |
R1‑112252 | Draft CR 36.213 on PHICH-triggered retransmission and UE transmit antenna selection | ZTE | Noted - Revised |
R1‑112253 | 36.213 CR0325 (Rel-10, F) on Corrections in UE procedure for reporting HARQ-ACK | ZTE | Revised |
R1‑112254 | 36.213 CR0326 (Rel-10, F) on Corrections in Physical Uplink Control Channel Procedure | ZTE | Revised |
R1‑112255 | 36.212 CR0120 (Rel-10, F) on correction of channel coding of control information and format 3/3a effective cell | ZTE | Noted - Revised |
R1‑112256 | Considerations on the enhancement for Partial Reciprocity in TDD | ZTE | Not treated |
R1‑112257 | CoMP Phase 2 CS/CB Evaluation Results | ZTE | Noted |
R1‑112258 | CoMP Phase 2 JP Evaluation Results | ZTE | Noted |
R1‑112259 | Consideration on specification impact of CoMP^^ | ZTE | Not treated |
R1‑112260 | Performance Evaluation of CS/CB and JP with non-zero X2 latency | ZTE | Noted |
R1‑112261 | Evaluation on impact of synchronization error between CoMP transmission points^^ | ZTE | Not treated |
R1‑112262 | Consideration on SRS enhancement for CoMP^^ | ZTE | Not treated |
R1‑112263 | Evaluation on necessity of DMRS enhancement under HetNet CoMP scenarios^^ | ZTE | Not treated |
R1‑112264 | Considerations on the enhancement for Partial Reciprocity in TDD | ZTE | Withdrawn |
R1‑112265 | Discussion on rank adaptation and CSI feedback granularity in real-life DL MIMO deployments | ZTE | Noted |
R1‑112266 | Feedback Enhancements for geographically-separated antennas | ZTE | Not treated |
R1‑112267 | DL MIMO Enhancements for Single-Cell with RRHs | ZTE | Not treated |
R1‑112268 | Discussion on codebook enhancement under 4Tx widely spaced XPOL Antenna | ZTE | Not treated |
R1‑112269 | Discussion on Power unbalance in Single-Cell with RRHs | ZTE | Withdrawn |
R1‑112270 | Aspects on DL control signaling enhancements | ZTE | Noted |
R1‑112271 | 36.212 DraftCR (Rel-10, F) Clarification and correction to configuration signalling condition for channel quality information formats | ZTE | Noted - Revised |
R1‑112272 | 36.213 CR0327 (Rel-10, F) Clarification and correction to CRS overhead assumption to derive CQI index | ZTE | Noted |
R1‑112273 | 36.213 CR0328 (Rel-10, F) Correction to PDSCH transmission assumption for CQI calculation | ZTE | Noted - Revised |
R1‑112274 | 36.213 DraftCR (Rel-10, F) Correction to the condition of enabling PMI feedback | ZTE | Noted - Revised |
R1‑112275 | Draft CR 212 _ Reordering UCI fields for joint report of RI and PTI | ZTE, Samsung | Noted |
R1‑112276 | 36.213 CR0330 (Rel-10, F) Correction to UE procedure for reporting Channel State Information (CSI) | ZTE | Withdrawn |
R1‑112277 | 36.211CR0161 (Rel-10, F) Correction on UE-Specific resource mapping formula | ZTE | Revised |
R1‑112278 | Usage of S-DPCCH remaining two bits for UL CLTD | ZTE | Not treated |
R1‑112279 | Further design considerations for UL MIMO | ZTE | Noted |
R1‑112280 | Views on support of different TDD configuration in Rel-11 | Pantech | Not treated |
R1‑112281 | Views on additional carrier types for CA in Rel-11 | Pantech | Not treated |
R1‑112282 | Discussions on different network configurations in eICIC | Pantech | Not treated |
R1‑112283 | Aperiodic CSI feedback trigging for joint transmission CoMP | Pantech | Not treated |
R1‑112284 | E-PDCCH resource management | Pantech | Not treated |
R1‑112285 | On PDCCH bundling | Pantech | Noted |
R1‑112286 | Enhance MIMO operation for low power node RRH | Pantech | Not treated |
R1‑112287 | Discussion on demodulation RS for DL MIMO enhancements in Rel-11 | Pantech | Not treated |
R1‑112288 | The SRS frequency hopping with multi-shot in Rel-11 | Pantech | Not treated |
R1‑112289 | The aperiodic sounding using non-precoded DMRS | Pantech | Not treated |
R1‑112290 | Considerations on UL DM-RS enhancements for Rel-11 | Pantech | Not treated |
R1‑112291 | Uplink configuration for a single cell with RRH | Pantech | Not treated |
R1‑112292 | On Downlink control signalling enhancements | Ericsson, ST-Ericsson | Not treated |
R1‑112293 | Transmit diversity schemes for PUCCH Format 3 | Mitsubishi Electric | Revised |
R1‑112294 | Evaluation Results for UL-CoMP | Sharp | Noted |
R1‑112295 | Standardization Impact of UL-CoMP | Sharp | Noted |
R1‑112296 | DL control channel enhancement for DL MIMO in Rel.11 | Sharp | Not treated |
R1‑112297 | UL RS Proposed Enhancements in Rel-11 | Sharp | Not treated |
R1‑112298 | TPC Issues on New Deployment Scenario | Sharp | Revised |
R1‑112299 | UL MIMO Proposed Enhancements in Rel-11 | Sharp | Not treated |
R1‑112300 | Fast uplink-downlink re-configuration with traffic adaptation by PHY layer signaling | Sharp | Revised |
R1‑112301 | Discussion on TDOA based TA calculation scheme | Renesas Mobile Europe Ltd | Noted |
R1‑112302 | Discussion on the remaining issues of UL CL Tx diversity | Renesas Mobile Europe Ltd | Noted |
R1‑112303 | System Performance Evaluation of SF-DC Inter-NodeB aggregation with Type 3 and Type 3i receivers in Pedestrian A channel | Renesas Mobile Europe Ltd | Noted |
R1‑112304 | System Performance Evaluation of SF-DC Inter-NodeB aggregation with Type 3 and Type 3i receivers in Vehicular A channel | Renesas Mobile Europe Ltd | Noted |
R1‑112305 | Transmit Diversity for PUCCH Format 3 and 1b with channel selection | Renesas Mobile Europe Ltd | Noted |
R1‑112306 | Operation Principles of CC specific TDD Configuration | Renesas Mobile Europe Ltd | Noted |
R1‑112307 | Initial Discussions on New Carrier Types for LTE Rel-11 | Renesas Mobile Europe Ltd | Not treated |
R1‑112308 | Discussion on Rel’11 eICIC scenarios | Renesas Mobile Europe Ltd | Revised |
R1‑112309 | Simulation results of CoMP in HetNet scenarios | Renesas Mobile Europe Ltd | Withdrawn |
R1‑112310 | On CoMP standardization impacts | Renesas Mobile Europe Ltd | Not treated |
R1‑112311 | Interference aware receiver modeling at system level | Renesas Mobile Europe Ltd | Not treated |
R1‑112312 | System level results on UE MMSE receiver modeling | Renesas Mobile Europe Ltd | Not treated |
R1‑112313 | On the real life DL MIMO issues | Renesas Mobile Europe Ltd | Not treated |
R1‑112314 | CSI feedback enhancements | Renesas Mobile Europe Ltd | Not treated |
R1‑112315 | On control signaling enhancements | Renesas Mobile Europe Ltd | Not treated |
R1‑112316 | System-level evaluation of PDCCH capacity impact on MU-MIMO performance | Renesas Mobile Europe Ltd | Noted |
R1‑112317 | Link-level evaluation of E-PDCCH design aspects | Renesas Mobile Europe Ltd | Not treated |
R1‑112318 | Need of standardized open-loop MIMO based on UE-specific RS | Renesas Mobile Europe Ltd | Not treated |
R1‑112319 | UCI-only PUSCH transmission enhancements | Renesas Mobile Europe Ltd | Revised |
R1‑112320 | Uplink enhancements for new deployments scenarios | Renesas Mobile Europe Ltd | Noted |
R1‑112321 | Discussion on simulation assumptions for TDD DL-UL interference management and traffic adaptation | Renesas Mobile Europe Ltd | Not treated |
R1‑112322 | Views on the use cases and scenarios for TDD DL-UL interference management | Renesas Mobile Europe Ltd | Not treated |
R1‑112323 | Draft LS response on timing advance calculation using time difference measurement | LG Electronics | Noted |
R1‑112324 | Draft CR for correction on nHARQ equation for TDD with PUCCH format 3 | LG Electronics | Noted - Revised |
R1‑112325 | Draft CR for clarification on UL DAI value for multiple UL grants in TDD | LG Electronics | Noted |
R1‑112326 | Draft CR for search space sharing in case of same DCI size | LG Electronics | Not treated |
R1‑112327 | Draft CR for a description of the HARQ-ACK feedback bits | LG Electronics | Noted |
R1‑112328 | TDD UL ACK/NACK mode 1 enhancements | LG Electronics | Not treated |
R1‑112329 | Simultaneous CSI+ACK/NACK transmission on PUCCH format 3 | LG Electronics | Not treated |
R1‑112330 | Discussion on multiple TA for carrier aggregation | LG Electronics | Not treated |
R1‑112331 | Performance Evaluation in Heterogeneous Networks | LG Electronics | Noted |
R1‑112332 | Handling the legacy transmission in ABS | LG Electronics | Not treated |
R1‑112333 | Enhancement to Time-domain Resource Partitioning | LG Electronics | Not treated |
R1‑112334 | Full-buffer Simulation results for scenario 3 & 4 | LG Electronics | Noted |
R1‑112335 | Non Full-buffer Simulation results for scenario 3 & 4 | LG Electronics | Noted |
R1‑112336 | Consideration points on E-PDCCH design | LG Electronics | Not treated |
R1‑112337 | Consideration of CSI Feedback Structure for CoMP | LG Electronics | Not treated |
R1‑112338 | Considerations on the Specification Impact of CoMP | LG Electronics | Not treated |
R1‑112339 | CoMP Performance Evaluation under Low-capacity/High-latency Backhaul | LG Electronics | Noted |
R1‑112340 | Consideration of X2 Backhaul for CoMP | LG Electronics | Not treated |
R1‑112341 | Simulation Assumptions for Further Enhancements to LTE TDD | LG Electronics | Not treated |
R1‑112342 | Simulation Results for Phase-2 CoMP Evaluation | MediaTek | Noted |
R1‑112343 | Further Discussions of Standardization Impacts on CoMP | MediaTek | Not treated |
R1‑112344 | Discussion on The Necessity of Additional Carrier Types | MediaTek | Not treated |
R1‑112345 | Discussion on Signaling Methods for UE-Specific PDCCH | MediaTek | Not treated |
R1‑112346 | Discussion on CSI-RS Reconfiguration for CoMP Scenario 4 | MediaTek | Not treated |
R1‑112347 | Definition of SRS measurements for Network-Based Positioning | MediaTek | Noted |
R1‑112348 | Identification of scenarios for Rel-11 Non-CA-based e2ICIC | MediaTek | Not treated |
R1‑112349 | HARQ Feedback Mechanism in CA with Different TDD Configurations | MediaTek | Not treated |
R1‑112350 | Comparison of Uplink Time Alignment Synchronization methods for SCell TA groups | Panasonic | Not treated |
R1‑112351 | 36.212 CR0122 (Rel-10, F) on size alignment of DCI format 0, 1A and 1 | Panasonic | Noted - Revised |
R1‑112352 | Clarification on combination of RS on R-PDCCH and RS on PDSCH | Panasonic | Noted |
R1‑112353 | 36.213 CR0331 (Rel-10, F) Correction to uplink transmission scheme usage for random access response and PHICH-triggered retransmissions | Panasonic | Noted - Revised |
R1‑112354 | Clarification of one shot SRS | Panasonic | Noted |
R1‑112355 | Range for virtual PHR | Panasonic | Noted |
R1‑112356 | draft CR 36.213: Clarification on Search space description for SPS C-RNTI | Panasonic | Noted - Revised |
R1‑112357 | Carrier aggregation enhancement for Rel.11 | Panasonic | Not treated |
R1‑112358 | Issues on TDD different DL/UL configurations on different bands for Rel-11 | Panasonic | Not treated |
R1‑112359 | Standardization Impact of CoMP | Panasonic | Not treated |
R1‑112360 | Operation of Traffic Offloading in RRH-based Heterogeneous Network and Possible Spec Impact | Panasonic | Not treated |
R1‑112361 | Comparison between CoMP Scenario 3 and 4 | Panasonic | Not treated |
R1‑112362 | Flexible CoMP Operation based on Dedicated CSI-RS Configuration | Panasonic | Not treated |
R1‑112363 | Views on issues from real-life DL MIMO deployments | Panasonic | Not treated |
R1‑112364 | DL MIMO CSI Feedback Enhancements in Rel-11 | Panasonic | Not treated |
R1‑112365 | Considerations on PDCCH Enhancements for Release 11 | Panasonic | Not treated |
R1‑112366 | Initial system level performance comparison of Enhanced-PDCCH and PDCCH | Panasonic | Noted |
R1‑112367 | Uplink enhancement for Rel.11 | Panasonic | Noted |
R1‑112368 | PCFICH Detection in an eICIC Enabled Heterogeneous Network | Research In Motion UK Limited | Not treated |
R1‑112369 | PSS/SSS Detection in Heterogeneous Networks | Research In Motion UK Limited | Not treated |
R1‑112370 | Transmit Diversity for Channel Selection | Research In Motion UK Limited | Noted |
R1‑112371 | Discussion on Downlink MIMO CSI Enhancement in CoMP | Research In Motion UK Limited | Not treated |
R1‑112372 | PRACH Enhancement and UL Power Control for CoMP Scenario 4 | Research In Motion UK Limited | Noted |
R1‑112373 | Design Consideration for E-PDCCH | Research In Motion UK Limited | Not treated |
R1‑112374 | Phase 2 Evaluation Results for CoMP | Research In Motion UK Limited | Noted |
R1‑112375 | Traffic Scenario for dynamic UL/DL TDD configuration | Research In Motion UK Limited | Not treated |
R1‑112376 | PDCCH Enhancement in Rel-11 Carrier Aggregation | Research In Motion UK Limited | Noted |
R1‑112377 | 36.213 CR0332 (Rel-10, Cat F) Clarification on mapping table in PUCCH format 1b with channel selection | Research In Motion UK Limited, Panasonic | Noted |
R1‑112378 | On PUCCH transmit diversity for Format 3 and Format 1b with Channel Selection | Nokia Siemens Networks, Nokia | Noted |
R1‑112379 | Views on inter-band CA with different TDD configurations on different bands | Nokia Siemens Networks, Nokia | Not treated |
R1‑112380 | Rel’11 considerations on common control channel performance in connection to TDM eICIC | Nokia Siemens Networks, Nokia | Not treated |
R1‑112381 | Uplink co-channel HetNet performance and PC optimization | Nokia Siemens Networks, Nokia | Not treated |
R1‑112382 | On TDM eICIC Performance with Different Receiver Models | Nokia Siemens Networks, Nokia | Not treated |
R1‑112383 | Potential for uplink capacity enhancement when applying TDM eICIC | Nokia Siemens Networks, Nokia | Not treated |
R1‑112384 | DL CoMP phase2 simulation results | Nokia Siemens Networks, Nokia | Not treated |
R1‑112385 | UL CoMP phase 2 simulation results | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑112386 | Uplink Power Control with UL CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑112387 | On the PUCCH Modifications for UL CoMP | Nokia Siemens Networks, Nokia | Noted |
R1‑112388 | Inter-cell orthogonal reference signal impact on UL CoMP performance | Nokia Siemens Networks, Nokia | Not treated |
R1‑112389 | Standardization impact of CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑112390 | Cell aggregation: A unified approach to CoMP and carrier aggregation | Nokia Siemens Networks, Nokia | Revised |
R1‑112391 | CoMP performance in non-ideal backhaul | Nokia Siemens Networks, Nokia | Noted |
R1‑112392 | CoMP and the X2 interface | Nokia Siemens Networks, Nokia | Not treated |
R1‑112393 | Channel Estimation Modeling for Uplink in System Level Simulation | Nokia Siemens Networks, Nokia | Not treated |
R1‑112394 | On cell-edge enhancements via inter-cell orthogonal DM RS | Nokia Siemens Networks, Nokia | Not treated |
R1‑112395 | Need for Enhanced SR Multiplexing Capacity and Coverage | Nokia Siemens Networks, Nokia | Not treated |
R1‑112396 | On CSI Transmission Enhancements | Nokia Siemens Networks, Nokia | Not treated |
R1‑112397 | On uplink channel-independent MIMO schemes | Nokia Siemens Networks, Nokia | Not treated |
R1‑112398 | [Draft] LS reply on timing advance calculation using time difference measurement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑112399 | Closed Loop UL Transmit Diversity operation under CPC | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑112400 | HS-SCCH orders for UL TxD (de-)activation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑112401 | Discussion on spare information bits in the S-DPCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑112402 | Standalone HS-DPCCH in Enhanced CELL_FACH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑112403 | Further evaluations of HSDPA multipoint transmission | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑112404 | CR36.212 UE-specific search space | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑112405 | Proposal for trade-off analysis method for CA enhancements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm Incorporated | Noted |
R1‑112406 | New DCI Formats with Differential Information | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑112407 | Transmit Diversity for PUCCH Format 1b with Channel Selection | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑112408 | CC-specific TDD configuration for enhanced CA in Re11 | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑112409 | Discussions on Additional Carrier Types in LTE Rel 11 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑112410 | CA-based Het Net operation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑112411 | Scenarios for UE performance requirements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑112412 | UL Reference Signal Time Difference Measurement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑112413 | CoMP Phase 2 evaluations for Scenario 3 (DL: FDD and TDD) | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Revised |
R1‑112414 | CoMP Phase 2 evaluations for Scenario 3 (UL) | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑112415 | Uplink Power Control Considerations for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑112416 | Overview of DL MIMO enhancements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑112417 | Analysis of geographically-separated antenna systems | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑112418 | Antenna calibration for TDD HTN CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑112419 | Evaluation assumptions for scenarios / antenna configurations to be evaluated for CSI feedback enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑112420 | Considerations on CSI feedback enhancements for high-priority antenna configurations | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑112421 | PDCCH Enhancement in Rel-11 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑112422 | On UL beamforming | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑112423 | Individual Setting of UL Open-loop Power Control for Heterogeneous Networks with Shared Cell-ID | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑112424 | Simulation assumption of dynamicl TDD UL-DL configuration | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑112425 | Dynamic UL-DL allocation for TDD HTN networks | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑112426 | Standardization Support for UL CoMP | Ericsson, ST-Ericsson | Noted |
R1‑112427 | Views on carrier aggregation enhancement for Rel-11 | NTT DOCOMO | Noted |
R1‑112428 | On need of additional carrier type in Rel-11 CA | NTT DOCOMO | Not treated |
R1‑112429 | Investigation on performance improvement by CRE | NTT DOCOMO | Noted |
R1‑112430 | System performance of JP-CoMP in Scenario 3 | NTT DOCOMO | Revised |
R1‑112431 | System performance of CS/CB-CoMP in Scenario 3 | NTT DOCOMO | Revised |
R1‑112432 | Views on UL power control for HetNet scenario | NTT DOCOMO | Noted |
R1‑112433 | Scenarios and potential CSI feedback enhancements for DL MIMO in Rel-11 | NTT DOCOMO | Noted |
R1‑112434 | Capacity enhancement of DL MU-MIMO with increased feedback bits for small cells scenario | NTT DOCOMO | Not treated |
R1‑112435 | Enhanced operation for geographically distributed antennas in Rel-11 | NTT DOCOMO | Not treated |
R1‑112436 | Enhanced PDCCH for DL MIMO in Rel-11 | NTT DOCOMO | Not treated |
R1‑112437 | Operators scenarios for DL MIMO enhancements | Orange, AT&T, CMCC, Deutsche Telekom, KDDI, NTT DOCOMO, Telecom Italia, Telefónica, Vodafone | Noted |
R1‑112438 | Additional carrier types for LTE Rel-11 | Motorola Mobility | Not treated |
R1‑112439 | DL Performance results for eICIC | Motorola Mobility | Not treated |
R1‑112440 | Phase-2 Evaluations of Joint Transmission (JT) and Dynamic Cell Selection (DCS) Schemes | Motorola Mobility | Not treated |
R1‑112441 | Coordinated Scheduling (CS) Schemes with Low Power RRH: Details and Phase-2 Evaluations Results | Motorola Mobility | Noted |
R1‑112442 | Standardization Impact of CoMP with Coordinated Scheduling (CS) Schemes | Motorola Mobility | Not treated |
R1‑112443 | Views on Real-life DL-MIMO Deployment Issues and Prioritization | Motorola Mobility | Not treated |
R1‑112444 | Scenario and Modeling Discussion for DL-MIMO Enhancement | Motorola Mobility | Noted |
R1‑112445 | CSI Feedback Enhancement for Rel-11 | Motorola Mobility | Not treated |
R1‑112446 | Enhanced control channels for LTE Rel-11 | Motorola Mobility | Not treated |
R1‑112447 | Issues in Practical Multi-antenna Uplink Transmission - Relative Phase Continuity | Motorola Mobility | Not treated |
R1‑112448 | Clarification for the chanel coding of channel quality information | ITRI | Withdrawn |
R1‑112449 | Clarification for the definition of rank indicator | ITRI | Noted - Revised |
R1‑112450 | Correction of HARQ-ACK and_or RI multiplexed with UL-SCH | ITRI | Withdrawn |
R1‑112451 | Support cell-specific TDD UL-DL configuration for inter-band CA | ITRI | Noted |
R1‑112452 | Discussion on CA-based Heterogeneous Networks | ITRI | Not treated |
R1‑112453 | Clarification of CoMP Joint Transmission Operation | ITRI | Not treated |
R1‑112454 | Preliminary Study on Codebook Design for JT-CoMP in Scenario 4 | ITRI | Not treated |
R1‑112455 | Opportunistic Coordinated Multi-Point Reception for Multi-Codeword Uplink Transmission | I2R | Not treated |
R1‑112456 | Clustering Methods for Base Station Cooperation in LTE-A | I2R | Not treated |
R1‑112457 | 36.213 CR0333 (Rel-10, D) Editorial Corrections to 36.213 | I2R, NTT DoCoMo | Agreed in principle |
R1‑112458 | Draft 36.213 CR Corrections on reporting Channel State Information | Huawei, HiSilicon | Noted - Revised |
R1‑112459 | Draft 36.213 CR on HARQ-ACK feedback procedures | Huawei, HiSilicon | Noted - Revised |
R1‑112460 | Trade-off analysis of CA enhancements for Rel-11 | Huawei, Hisilicon | Noted |
R1‑112461 | PDCCH enhancement in Rel-11 carrier aggregation | Huawei, HiSilicon | Noted |
R1‑112462 | TxD scheme enhancement for PUCCH format 3 | Huawei, HiSilicon | Noted |
R1‑112463 | Additional carrier types – motivations and issues | Huawei, HiSilicon | Not treated |
R1‑112464 | Interference scenario analysis in further eICIC | Huawei, Hisilicon | Noted |
R1‑112465 | Small cell scenarios and assumptions for enhanced DL MIMO | Huawei, Hisilicon | Noted |
R1‑112466 | MIMO enhancements for downlink relay backhaul | Huawei, HiSilicon | Not treated |
R1‑112467 | Investigation on PUCCH enhancements in Rel.11 | Huawei, HiSilicon | Not treated |
R1‑112468 | Spatial multiplexing for 8Tx Uplink relay backhaul | Huawei, HiSilicon | Not treated |
R1‑112469 | Discussion on Evaluation of TDD DL-UL re-configuration dependent on traffic adaptation | Huawei, Hisilicon | Not treated |
R1‑112470 | Draft CR 36.212 correction on ACK/NACK mapping | LG Electronics | Agreed in principle |
R1‑112471 | Draft CR 36.213 correction on TBS translation table | LG Electronics | Noted - Revised |
R1‑112472 | Transmit Diversity for PUCCH Format 1b with Channel Selection in Rel-11 | LG Electronics | Noted |
R1‑112473 | Transmit Diversity for PUCCH Format 3 in Rel-11 | LG Electronics | Noted |
R1‑112474 | Consideration on Different TDD UL/DL Configurations for Inter-band CA | LG Electronics | Not treated |
R1‑112475 | Consideration on Additional Carrier Type | LG Electronics | Not treated |
R1‑112476 | Consideration on Issue Prioritization for Real-life DL MIMO Deployment | LG Electronics | Not treated |
R1‑112477 | Consideration on Rel-11 MIMO feedback enhancement | LG Electronics | Not treated |
R1‑112478 | Consideration on CSI feedback for geographically separated antennas | LG Electronics | Not treated |
R1‑112479 | Discussion on downlink control signaling enhancement | LG Electronics | Not treated |
R1‑112480 | Discussion on UL RS Enhancements for Rel-11 | LG Electronics | Not treated |
R1‑112481 | Consideration on UL DM RS for High-speed UEs in LTE-A | LG Electronics | Not treated |
R1‑112482 | Discussion on UCI transmission enhancement | LG Electronics | Not treated |
R1‑112483 | Enhancements to uplink power control in Rel-11 | LG Electronics | Noted |
R1‑112484 | Discussion on UL MIMO improvements in practical multi-antenna UE implementation | LG Electronics | Withdrawn |
R1‑112485 | Discussion on the potential benefit of X2 interface for downlink CoMP | SOFTBANK MOBILE | Not treated |
R1‑112486 | TPC Issues on New Deployment Scenario | Sharp | Noted |
R1‑112487 | Fast uplink-downlink re-configuration with traffic adaptation by PHY layer signaling | Sharp | Not treated |
R1‑112488 | Discussion on timing advance calculation using time difference measurement | Samsung | Not treated |
R1‑112489 | Draft 36.213 CR on HARQ-ACK Multiplexing in PUSCH for UL CA in TDD | Samsung | Noted |
R1‑112490 | Discussion on TTI bundling in TDD | Samsung, CATT | Noted |
R1‑112491 | 36.211 CR0162 (Rel-10, F) Corrections on DMRS for Extended CP | Samsung, Renesas Mobile Europe, Panasonic, LG Electronics, TI, Qualcomm, Research in Motion, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, Motorola Mobility | Agreed |
R1‑112492 | 36.213 CR0334 (Rel-10, F) Corrections on PUCCH mode 1-1 | Samsung | Noted - Revised |
R1‑112493 | 36.213 CR0335 (Rel-10, F) Corrections on PUCCH mode 2-1 | Samsung, LG Electronics, ZTE | Agreed in principle |
R1‑112494 | 36.213 CR0336 (Rel-10, F) Corrections on transmission mode 9 | Samsung | Agreed |
R1‑112495 | Trade-off Considerations for CA Enhancements | Samsung | Noted |
R1‑112496 | Multi-Cell Periodic CSI Reporting | Samsung | Not treated |
R1‑112497 | HARQ-ACK and CSI Multiplexing in PUCCH for DL CA | Samsung | Not treated |
R1‑112498 | Enhancements to HARQ-ACK Multiplexing in PUSCH for DL CA | Samsung | Not treated |
R1‑112499 | HARQ-ACK Bundling for PUCCH Format 3 | Samsung | Not treated |
R1‑112500 | PUCCH Format 3 Transmit Diversity for Rel-11 | Samsung | Noted |
R1‑112501 | Discussion on transmit diversity for PUCCH format 1b with channel selection | Samsung | Noted |
R1‑112502 | DL/UL HARQ-ACK transmission in CA with different TDD configurations | Samsung | Not treated |
R1‑112503 | Data scheduling in CA with different TDD UL-DL configurations | Samsung | Not treated |
R1‑112504 | Additional Carrier Types for Rel.11 | Samsung | Not treated |
R1‑112505 | Open issues and scenarios for Rel-11 eICIC | Samsung | Not treated |
R1‑112506 | PDSCH performance under various macro-pico scenarios | Samsung | Noted |
R1‑112507 | CRS interference cancellation in HetNet scenarios for UE performance requirements | Samsung | Not treated |
R1‑112508 | Full buffer evaluation results for CoMP scenario 3 and 4 | Samsung | Revised |
R1‑112509 | Non-full buffer evaluation results for CoMP scenario 3 and 4 | Samsung | Noted |
R1‑112510 | Discussion on the performance aspects of CoMP and eICIC in heterogeneous networks | Samsung | Not treated |
R1‑112511 | Summary of CoMP evaluation results for phase 2 (scenarios 3 and 4) | Samsung | Withdrawn |
R1‑112512 | Discussion on the specification impact of CoMP | Samsung | Not treated |
R1‑112513 | Summary of email discussion on specification impacts of CoMP | Samsung | Noted |
R1‑112514 | Discussion on CSI Feedback for DL MIMO with Geographically Separated Tx Points | Samsung | Not treated |
R1‑112515 | Prioritization of CSI feedback enhancement scenarios for DL-MIMO | Samsung | Noted |
R1‑112516 | Compact DCI Format for PUSCH Assignments | Samsung | Noted |
R1‑112517 | Discussion on ePDCCH design issues | Samsung | Not treated |
R1‑112518 | Discussion on CSI Feedback for MU-MIMO Enhancement | Samsung | Not treated |
R1‑112519 | Discussion on CSI feedback enhancement for DL MIMO | Samsung | Not treated |
R1‑112520 | UL DM RS enhancement in Rel-11 | Samsung | Not treated |
R1‑112521 | SRS Enhancements in Rel.11 | Samsung | Not treated |
R1‑112522 | Discussion on UCI transmission enhancments in Rel-11 | Samsung | Not treated |
R1‑112523 | UL PC for Networks with Geographically Distributed RRHs | Samsung | Noted |
R1‑112524 | Traffic model for evaluating benefits of TDD UL-DL reconfiguration | Samsung | Not treated |
R1‑112525 | Preliminary evaluation of TDD uplink-downlink reconfiguration performance | Samsung | Not treated |
R1‑112526 | SC-FDMA symbol? | Panasonic | Noted |
R1‑112527 | Considerations on additional carrier types | Nokia / Nokia Siemens Networks | Not treated |
R1‑112528 | Priority Issues from Real-Life DL MIMO Deployments | Nokia / Nokia Siemens Networks | Noted |
R1‑112529 | Rel. 11 CSI Feedback Enhancement Studies | Nokia / Nokia Siemens Networks | noted |
R1‑112530 | On enhanced downlink control signalling for Rel-11 | Nokia / Nokia Siemens Networks | Noted |
R1‑112531 | Considerations on which gain mechanisms to evaluate when considering E-PDCCH | Nokia / Nokia Siemens Networks | Not treated |
R1‑112532 | Clarification on the codebook size for PUCCH format 3 based ACK/NAK feedback in TDD | Qualcomm Incorporated | Noted - Revised |
R1‑112533 | Clarification of Ambiguous DCI Formats 0 and 1A | Qualcomm Incorporated | Noted - Revised |
R1‑112534 | Clarification of reference power for CSI-RS based channel state information feedback | Qualcomm Incorporated | Noted - Revised |
R1‑112535 | Clarification of of PUCCH 2-1 operation | Qualcomm Incorporated | Noted |
R1‑112536 | CR Clarification of of PUCCH 2-1 operation | Qualcomm Incorporated | Not treated |
R1‑112537 | Tradeoff analysis method for CA enhancements | Qualcomm Incorporated | Noted |
R1‑112538 | Signalling enhancements for CA | Qualcomm Incorporated | Noted |
R1‑112539 | PUCCH transmit diversity for Format 3 and Format 1b with Channel selection | Qualcomm Incorporated | Noted |
R1‑112540 | Support of different TDD UL-DL configurations on different bands | Qualcomm Incorporated | Noted |
R1‑112541 | Use Cases for Extension Carriers | Qualcomm Incorporated | Not treated |
R1‑112542 | Summary of Rel-10 requirements for eICIC and scenarios for Rel-11 requirements | Qualcomm Incorporated | Not treated |
R1‑112543 | Scenarios for eICIC evaluations | Qualcomm Incorporated | Noted |
R1‑112544 | Phase 2 evaluation results for HetNet CoMP scenarios | Qualcomm Incorporated | Noted |
R1‑112545 | Comparison of CoMP Scenarios 3 and 4 | Qualcomm Incorporated | Not treated |
R1‑112546 | CoMP standardization impact | Qualcomm Incorporated | Not treated |
R1‑112547 | HetNet CoMP performance in Macro/Pico scenarios | Qualcomm Incorporated | Not treated |
R1‑112548 | Leveraging the existing X2 interface in HetNet CoMP deployments | Qualcomm Incorporated | Not treated |
R1‑112549 | Issues from real-life DL MIMO deployments | Qualcomm Incorporated | Not treated |
R1‑112550 | CSI feedback enhancements | Qualcomm Incorporated | Not treated |
R1‑112551 | UL RS enhancements | Qualcomm Incorporated | Not treated |
R1‑112552 | UCI transmission enhancements | Qualcomm Incorporated | Not treated |
R1‑112553 | Open loop UL MIMO | Qualcomm Incorporated | Not treated |
R1‑112554 | Power control enhancements for UL MIMO | Qualcomm Incorporated | Noted |
R1‑112555 | Codebook design for distributed antennas^^ | Marvell | Not treated |
R1‑112556 | Multiuser CQI enhancement for distributed antennas | Marvell | Not treated |
R1‑112557 | 36.213 CR0337 (Rel-8, C) PDSCH EPRE for transmission mode 7 | CATT | Noted |
R1‑112558 | 36.213 CR0338 (Rel-10, F) Corrections on aperiodic CSI transmission on PUSCH related to RACH procedure | CATT | Noted |
R1‑112559 | 36.213 CR0339 (Rel-10, F) Corrections on HARQ-ACK codebook size determination | CATT | Agreed |
R1‑112560 | 36.213 CR0340 (Rel-10, F) Corrections on TDD PUCCH format 1b with channel selection and HARQ-ACK transmission on PUSCH | CATT | Agreed |
R1‑112561 | 36.213 CR0341 (Rel-10, F) Corrections on NACK generation | CATT | Agreed |
R1‑112562 | 36.212 CR0123 (Rel-10, F) Corrections on N_{SRS} | CATT | Noted - Revised |
R1‑112563 | 36.213 CR0342 (Rel-10, F) Corrections on power headroom reporting | CATT | Agreed |
R1‑112564 | 36.213 CR0343 (Rel-10, F) Corrections on TDD HARQ-ACK modes | CATT | Noted |
R1‑112565 | 36.213 CR0344 (Rel-10, F) Corrections on FDD HARQ-ACK procedure | CATT | Agreed in principle |
R1‑112566 | 25.223 CR0064 (Rel-8, F) Clarification of 64QAM for LCR TDD | TD Tech | Noted - Revised |
R1‑112567 | 25.223 CR0065 (Rel-9, A) Clarification of 64QAM for LCR TDD | TD Tech | Noted - Revised |
R1‑112568 | 25.223 CR0066 (Rel-10, A) Clarification of 64QAM for LCR TDD | TD Tech | Noted - Revised |
R1‑112569 | 25.221 CR0217 (Rel-7,F) Modifications for LCR TDD | TD Tech | Noted |
R1‑112570 | 25.221 CR0218 (Rel-8,A) Modifications for LCR TDD | TD Tech | Noted |
R1‑112571 | 25.221 CR0219 (Rel-9,A) Modifications for LCR TDD | TD Tech | Noted |
R1‑112572 | 25.221 CR0220 (Rel-10,A) Modifications for LCR TDD | TD Tech | Noted - Revised |
R1‑112573 | 25.224 CR0267 (Rel-7,F) Modifications for LCR TDD | TD Tech | Noted |
R1‑112574 | 25.224 CR0268 (Rel-8,A) Modifications for LCR TDD | TD Tech | Noted |
R1‑112575 | 25.224 CR0269 (Rel-9,A) Modifications for LCR TDD | TD Tech | Noted |
R1‑112576 | 25.224 CR0270 (Rel-10,A) Modifications for LCR TDD | TD Tech | Noted - Revised |
R1‑112577 | Simulation results for Phase 2 CoMP scenario 3/4 | CMCC | Not treated |
R1‑112578 | Extension carrier in Rel-11 | Potevio | Not treated |
R1‑112579 | Support of different TDD UL-DL configurations on different bands | Potevio | Not treated |
R1‑112580 | Discussion on downlink control channel enhancements | Potevio | Not treated |
R1‑112581 | Discussion on UL-RS enhancements | Potevio | Not treated |
R1‑112582 | Considerations on RRH subset selection mechanism | Potevio | Not treated |
R1‑112583 | The enhancements of transmission schemes for downlink MIMO | Potevio | Not treated |
R1‑112584 | Cross-carrier scheduling on different TDD configurations | MediaTek | Not treated |
R1‑112585 | On Simulation Methodology for Study of LTE TDD Enhancement | ZTE | Not treated |
R1‑112586 | Further Considerations on Scenario3 | Hitachi Ltd. | Not treated |
R1‑112587 | System Design Considerations for CoMP and eICIC | Hitachi Ltd. | Not treated |
R1‑112588 | Scenarios identification for further enhanced non-CA-based ICIC | ZTE | Not treated |
R1‑112589 | Discussion of UL-MIMO Enhancement for LTE Rel-11 | ZTE | Not treated |
R1‑112590 | Further Discussion on UL/DL asymmetry for TDD system | CMCC | Not treated |
R1‑112591 | Discussion on the common solution for FDD and TDD on improving PCI and system information detection in the presence of dominant interferer | CMCC | Not treated |
R1‑112592 | Application scenario for introducing enhanced PDCCH in Rel-11 | CMCC | Noted |
R1‑112593 | Special subframe configuration | CMCC | Not treated |
R1‑112594 | Collision of Msg3 transmission and UE-specific Aperiodic SRS subframe | ASUSTeK | Noted |
R1‑112595 | PUSCH resource mapping for Msg3 in UE-specific aperiodic SRS subframe | ASUSTeK | Not treated |
R1‑112596 | Channel interleaving for Msg3 in UE-specific aperiodic SRS subframe | ASUSTeK | Not treated |
R1‑112597 | Discussion on different TDD UL-DL configurations on different bands in Carrier Aggregation | HTC | Not treated |
R1‑112598 | Discussion on Additional Carrier Types in Carrier Aggregation for Release 11 | HTC | Not treated |
R1‑112599 | Possible Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | HTC | Not treated |
R1‑112600 | Investigation of Specification Impact for Rel. 11 CoMP | NTT DOCOMO | Not treated |
R1‑112601 | Coordinated beamforming based on interference measurement | ITRI | Withdrawn |
R1‑112602 | Further discussions on the channelizaton for HS-DPCCH | Ericsson, ST-Ericsson | Noted |
R1‑112603 | Open issues related to 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑112604 | 25.211 CR288R1 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑112605 | 25.212 CR0296R1 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑112606 | 25.213 CR0109R1 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑112607 | 25.214 CR0652R1 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑112608 | Activation and deactivation of CLTD | Ericsson, ST-Ericsson | Noted |
R1‑112609 | On the quality of PCI feedback for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑112610 | Power based deactivation for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑112611 | Remaining design consideration for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑112612 | 25.863 CR0001 (Rel-11,B) Inclusion of CLTD in the ULTD technical report | Ericsson, ST-Ericsson | Revised |
R1‑112613 | Performance evaluation of Inter+Intra Node-B Aggregation for SF-DC-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑112614 | Performance evaluation of Intra Node-B Aggregation for SF-DC-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑112615 | Text proposal on the cubic metric impact from pre-coding for rank-2 transmissions | Ericsson, ST-Ericsson | Noted |
R1‑112616 | Further downlink enhancements to CELL_FACH | Ericsson, ST-Ericsson | Noted |
R1‑112617 | Further uplink enhancements to CELL_FACH | Ericsson, ST-Ericsson | Noted |
R1‑112618 | On the benefit of introducing UL 64 QAM for HSUPA | Ericsson | Not treated |
R1‑112619 | Frequency band-specific compressed mode | Nokia Siemens Networks, Nokia | Noted |
R1‑112620 | F-PCICH design | Nokia Siemens Networks, Nokia | Noted |
R1‑112621 | UL CLTD UE Behaviour | Nokia Siemens Networks, Nokia | Noted |
R1‑112622 | UL CLTD Operation in the Presence of CPC | Nokia Siemens Networks, Nokia | Noted |
R1‑112623 | UL CLTD compatibility with E-DCH in Cell_FACH | Nokia Siemens Networks, Nokia | Noted |
R1‑112624 | Draft 25.211 CR on Introduction of F-PCICH channel | Nokia Siemens Networks, Nokia | Noted |
R1‑112625 | HS-DPCCH for 8C-HSDPA | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑112626 | Node B controlled HS-DPCCH setup for HS-FACH | Nokia Siemens Networks, Nokia | Noted |
R1‑112627 | Multiflow impact on legacy UEs | Nokia Siemens Networks, Nokia | Noted |
R1‑112628 | Multiflow RRH system results for balanced load | Nokia Siemens Networks, Nokia | Noted |
R1‑112629 | Multiflow RRH system results for unbalanced load | Nokia Siemens Networks, Nokia | Revised |
R1‑112630 | TP to 25.872 on SI conclusions | Nokia Siemens Networks, Nokia | Noted |
R1‑112631 | TP to 25.871 on pysical layer structures | Nokia Siemens Networks, Nokia | Noted |
R1‑112632 | TP to 25.871 link level performance of UL MIMO | Nokia Siemens Networks, Nokia | Noted |
R1‑112633 | TP to 25.871 system level performance of UL MIMO | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑112634 | UL MIMO SHO operation | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑112635 | TP to 25.871 on specification impacts | Nokia Siemens Networks, Nokia | Revised |
R1‑112636 | TR25.872 v1.0.1 | Rapporteur (Nokia Siemens Networks) | Noted - Revised |
R1‑112637 | Performance Evaluation Results for Phase 2 CoMP under Full-Buffer Traffic | CHTTL | Not treated |
R1‑112638 | CA Enhancement on Signalling | HTC | Noted |
R1‑112639 | Considerations for CoMP Operation | HTC | Not treated |
R1‑112640 | Real Life Issues for DL-MIMO | HTC | Not treated |
R1‑112641 | Enhanced PMI Indication for Refining MIMO Precoder Codebook^^ | HTC | Not treated |
R1‑112642 | Adaptive cell clustering scheme for CoMP in baseband pool deployment | China Unicom | Not treated |
R1‑112643 | Consideration on codebook enhancement for Rel-11 DL MIMO | China Unicom | Not treated |
R1‑112644 | DL MIMO Enhanment requirement for Different Scenarios | China Unicom | Not treated |
R1‑112645 | Performance evaluation for JP CoMP of scenario 3 | China Unicom | Not treated |
R1‑112646 | Enhancement of the cell-edge performance in the future evolution | ChinaUnicom | Not treated |
R1‑112647 | Discussions on CSI feedback enhancment for non-uniform networks with low-power nodes | ChinaUnicom | Not treated |
R1‑112648 | On scenarios for further time domain ICIC evaluations | Ericsson, ST-Ericsson | Noted |
R1‑112649 | Capacity enhancement for CQI-only transmission ^^ | New Postcom^^ | Not treated |
R1‑112650 | Frequency hopping and multi-shot A-SRS for A-SRS enhancements ^^ | New Postcom^^ | Not treated |
R1‑112651 | Non-precoded DMRS bearing A-SRS for capacity enhancement for A-SRS ^^ | New Postcom^^ | Not treated |
R1‑112652 | Support for openloop spatial multiplexing in R11 ^^ | New Postcom^^ | Not treated |
R1‑112653 | Consideration on how to get Femto ABS pattern | New Postcom^^ | Not treated |
R1‑112654 | Common Search Space for RACH on Scell | New Postcom^^ | Not treated |
R1‑112655 | Enhancements to MU-MIMO for LTE-A | New Postcom^^ | Not treated |
R1‑112656 | Inter-band CA with different UL-DL configuration in TDD | New Postcom^^ | Not treated |
R1‑112657 | DL MIMO without PMI | Fujitsu | Not treated |
R1‑112658 | Possibilities of using global precoding scheme in^^enhanced DL MIMO for geographically separated antennas | Fujitsu | Not treated |
R1‑112659 | Standard impact of antenna virtualization schemes in DL CoMP JP | Fujitsu | Not treated |
R1‑112660 | Phase 2 performance evaluation of JT CoMP | Fujitsu | Noted |
R1‑112661 | CS/CB performance evaluation for CoMP Scenario 3/4 | Fujitsu | Not treated |
R1‑112662 | Enhanced MU-MIMO for system with geographically-separated antenna deployments | Fujitsu | Not treated |
R1‑112663 | Control Signaling Enhancements for DL-MIMO | Fujitsu | Not treated |
R1‑112664 | Consideration on CSI Feedback for DL CoMP | Fujitsu | Not treated |
R1‑112665 | Considerations on Uplink Power Control for Scenario4 | Fujitsu | Withdrawn |
R1‑112666 | Consideration on SRS enhancement for DL CoMP | Fujitsu | Not treated |
R1‑112667 | DL-MIMO performance with time alignment error | Fujitsu | Not treated |
R1‑112668 | Non backward component carrier | Fujitsu | Not treated |
R1‑112669 | On support of low-cost MTC terminals with reduced Tx/Rx bandwidths | Fujitsu | Not treated |
R1‑112670 | Clarification of applicability of precoding power scaling factors for PDSCH | Agilent Technologies, Motorola | Noted - Revised |
R1‑112671 | On the use of Sync A procedure during transition from CELL_FACH to CELL_DCH | Qualcomm Incorporated | Revised |
R1‑112672 | 25.214 CR0654 (Rel-8, F) Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH | Qualcomm Incorporated | Noted - Revised |
R1‑112673 | Impact of PCI Update Rate on CLTD Performance in CPC | Qualcomm Incorporated | Noted |
R1‑112674 | Sensitivity to PCI Feedback Delay for UL CLTD | Qualcomm Incorporated | Noted |
R1‑112675 | Dynamic control of UL CLTD via HS-SCCH orders | Qualcomm Incorporated | Not treated |
R1‑112676 | On the reliability of sending control information on S-DPCCH in UL CLTD | Qualcomm Incorporated | Noted |
R1‑112677 | Impact to RAN1 Specifications due to UL CLTD | Qualcomm Incorporated | Noted |
R1‑112678 | Further analysis on Enhanced Symmetric Beamforming | Qualcomm Incorporated | Noted |
R1‑112679 | On the merits of Standalone HS-DPCCH in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑112680 | Physical channels and procedures to support standalone HS-DPCCH in CELL_FACH | Qualcomm Incorporated | Revised |
R1‑112681 | On the limitation of H-RNTIs in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑112682 | Comparison of link efficiency of transmission of small packets between R99 and EUL in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑112683 | On the benefits of signaling based Interference control in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑112684 | System Performance Evaluation of DF-DC Inter NodeB aggregation in uniform loading scenario- 100% penetration | Qualcomm Incorporated | Noted |
R1‑112685 | System Performance Evaluation of SF-DC Inter NodeB aggregation assuming realistic RLC and flow control in a uniform loading scenario | Qualcomm Incorporated | Noted |
R1‑112686 | TCP Performance Evaluation of SF-DC Inter NodeB aggregation assuming realistic RLC, flow control and congestion control | Qualcomm Incorporated | Noted |
R1‑112687 | TP to 27.871 on Updated System Performance Evaluations for MP-Tx | Qualcomm Incorporated | Noted |
R1‑112688 | TP on Impact to RAN specifications due to HSDPA MP-Tx | Qualcomm Incorporated | Noted |
R1‑112689 | TP on Conclusions of HSDPA MP-Tx feature | Qualcomm Incorporated | Noted |
R1‑112690 | TP on 25.871 on Chapter 5 "Physical Layer Structure Alternatives due to UL MIMO in HSPA" | Qualcomm Incorporated | Noted |
R1‑112691 | TP to 25.871 on Chapter 10 " Impact to UE and UTRAN implementation due to UL MIMO in HSPA" | Qualcomm Incorporated | Noted |
R1‑112692 | TP to 25.871 on "Conclusions on UL MIMO in HSPA" | Qualcomm Incorporated | Noted |
R1‑112693 | 36.212 CR0124 (Rel-10, F) Corrections on DCI format 1B/1D | CATT | Noted - Revised |
R1‑112694 | Multiple timing advance commands | Qualcomm Incorporated | Not treated |
R1‑112695 | Multiple TA for CA with RRH and repeater | Pantech | Not treated |
R1‑112696 | CoMP Phase 2 evaluations for Scenario 3 (DL: TDD) | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑112697 | Performance evaluation of CS/CB for CoMP Scenario3 | Sony Corporation | Not treated |
R1‑112698 | Performance evaluation of JP for CoMP Scenario3 | Sony Corporation | Not treated |
R1‑112699 | PRACH antenna port | Panasonic | Noted - Revised |
R1‑112700 | UCI-only PUSCH transmission enhancements | Renesas Mobile Europe Ltd | Not treated |
R1‑112701 | Transmit diversity schemes for PUCCH Format 3 | Mitsubishi Electric | Noted |
R1‑112702 | TP to 25.871 on specification impacts | Nokia Siemens Networks, Nokia | Noted |
R1‑112703 | 36.211CR0161R1 (Rel-10, F) Correction on UE-Specific resource mapping formula | ZTE | Noted |
R1‑112704 | 36.213 CR0329 (Rel-10, F) Correction on type3 feedback of Mode 2-1 for TM9 with 8 CSI-RS ports | China Telecom, ZTE, Huawei, Ericsson, ST-Ericsson | Agreed in principle |
R1‑112705 | Carriers remapping on HS-DPCCH after activation/deactivation for 8C-HSDPA | Huawei, HiSilicon | Noted |
R1‑112706 | Soft buffer handling in TS36.213 and TS36.321 | NTT DOCOMO | Noted |
R1‑112707 | Multiple Timing Advance related issues | ZTE | Noted |
R1‑112708 | Consideration on power control of UL MIMO | ZTE | Noted |
R1‑112709 | Full buffer evaluation results for CoMP scenario 3 and 4 | Samsung | Noted |
R1‑112710 | Selected highlights from RAN#52 of relevance to RAN1 | RAN1 Chairman | Noted |
R1‑112711 | Cell aggregation: A unified approach to CoMP and carrier aggregation | Nokia Siemens Networks, Nokia | Noted |
R1‑112712 | 25.863 DraftCR (Rel-11,B) Inclusion of CLTD in the ULTD technical report | Ericsson, ST-Ericsson | Noted |
R1‑112713 | Multiflow RRH system results for unbalanced load | Nokia Siemens Networks, Nokia | Noted |
R1‑112714 | On the use of Sync A procedure during transition from CELL_FACH to CELL_DCH | Qualcomm Incorporated | Noted |
R1‑112715 | Physical channels and procedures to support standalone HS-DPCCH in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑112716 | LS on Radio metrics with respect to QoE | SA4, Qualcomm | Noted |
R1‑112717 | On the applicability of UL CLTD in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑112718 | Update of CoMP Phase 2 evaluation results for JT with non full buffer traffic model | Panasonic | Not treated |
R1‑112719 | 36.213 CR0345 (Rel-10, F) Corrections on PUCCH mode 1-0 and 1-1 | Samsung, LGE | Noted |
R1‑112720 | Downlink PCI feedback channel timing design | Huawei, HiSilicon | Noted |
R1‑112721 | System performance of JP-CoMP in Scenario 3 | NTT DOCOMO | Not treated |
R1‑112722 | System performance of CS/CB-CoMP in Scenario 3 | NTT DOCOMO | Not treated |
R1‑112723 | Minutes from RAN1#66 HSPA sessions | HSPA session chairman | Endorsed |
R1‑112724 | Draft Reply LS on the frequency band specific compressed mode | NSN | Noted - Revised |
R1‑112725 | 25.214 CR0657 (Rel-10, F) Frequency band specific compressed mode | NSN | Withdrawn |
R1‑112726 | 25.214 CR0654R1 (Rel-8, F) Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH | Qualcomm Inc. | Agreed |
R1‑112727 | 25.214 CR0655 (Rel-9, A) Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH | Qualcomm Inc. | Agreed |
R1‑112728 | 25.214 CR0656 (Rel-10, A) Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH | Qualcomm Inc. | Agreed |
R1‑112729 | 25.223 CR0064R1 (Rel-8, F) Clarification of 64QAM for LCR TDD | TD Tech | Revised |
R1‑112730 | 25.223 CR0065R1 (Rel-9, A) Clarification of 64QAM for LCR TDD | TD Tech | Revised |
R1‑112731 | 25.223 CR0066R1 (Rel-10, A) Clarification of 64QAM for LCR TDD | TD Tech | Revised |
R1‑112732 | 25.221 CR0220R1 (Rel-10, F) Clarifications on HSUPA for LCR TDD | TD Tech | Revised |
R1‑112733 | 25.224 CR0270R1 (Rel-10, F) Clarifications on SYNC-UL signatures for E-RUCCH procedure for LCR TDD | TD Tech | Revised |
R1‑112734 | 25.872 v1.0.3 HSDPA Multipoint Transmission | Nokia Siemens Networks | Noted - Revised |
R1‑112735 | Simulation result summary for HSDPA Multipoint Transmission | InterDigital Communications | Noted - Revised |
R1‑112736 | 25.211 CR0288R2 (Rel-11, B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Endorsed |
R1‑112737 | 25.212 CR0296R2 (Rel-11, B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑112738 | 25.213 CR0109R2 (Rel-11, B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑112739 | 25.214 CR0652R2 (Rel-11, B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑112740 | Draft LS on RAN1 agreements on 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑112741 | [DRAFT] LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112742 | 25.871 v1.0.2 Uplink MIMO for HSPA | Qualcomm Inc. | Noted - Revised |
R1‑112743 | 25.211 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112744 | 25.212 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112745 | 25.213 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112746 | 25.214 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112747 | 25.215 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112748 | void | - | Withdrawn |
R1‑112749 | void | - | Withdrawn |
R1‑112750 | void | - | Withdrawn |
R1‑112751 | void | - | Withdrawn |
R1‑112752 | void | - | Withdrawn |
R1‑112753 | void | - | Withdrawn |
R1‑112754 | void | - | Withdrawn |
R1‑112755 | void | - | Withdrawn |
R1‑112756 | void | - | Withdrawn |
R1‑112757 | void | - | Withdrawn |
R1‑112758 | void | - | Withdrawn |
R1‑112759 | void | - | Withdrawn |
R1‑112760 | Draft LS reply on timing advance calculation using time difference measurement | Huawei | Noted - Revised |
R1‑112761 | 36.211 Draft CR (Rel-8, F) PHICH overbooking can occure in narrow BW | Sequans Communications | Not treated |
R1‑112762 | 36.211 Draft CR (Rel-9, A) PHICH overbooking can occure in narrow BW | Sequans Communications | Not treated |
R1‑112763 | 36.211 Draft CR (Rel-10, A) PHICH overbooking can occure in narrow BW | Sequans Communications | Not treated |
R1‑112764 | [Draft] LS on the unicast usage in MBSFN subframe | Panasonic | Noted - Revised |
R1‑112765 | 36.211 CR0163 (Rel-10, F) Clarification of applicability of precoding power scaling factors for PDSCH | Agilent Technologies, Motorola | Agreed |
R1‑112766 | 36.211 CR0164 (Rel-10, F) Correction to modulation and upconversion on PRACH | Panasonic | Agreed |
R1‑112767 | Draft LS on soft buffer handling in TS36.213 and TS36.321 | NTT DOCOMO | Noted - Revised |
R1‑112768 | CoMP performance analysis in Scenarios 3 and 4 for full buffer traffic model | Intel Corporation | Not treated |
R1‑112769 | 36.213 CR0325R1 (Rel-10, F) on Corrections in UE procedure for reporting HARQ-ACK | ZTE | Noted - Revised |
R1‑112770 | 36.212 CR0128 (Rel-10, F) Corrections on channel coding of control information and DCI Format 4 | Huawei, HiSilicon, CATT | Agreed |
R1‑112771 | 36.212 CR0120R1 (Rel-10, F) on correction of channel coding of control information | ZTE | Noted - Revised |
R1‑112772 | 36.212 CR0125 (Rel-10, F) Minor Correction on DCI Format 1 Description | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑112773 | 36.212 CR0126 (Rel-9, F) Correction on ACK/NACK mapping | LG Electronics | Agreed |
R1‑112774 | 36.212 CR0127 (Rel-10, A) Correction on ACK/NACK mapping | LG Electronics | Agreed |
R1‑112775 | 36.212 CR0128 (Rel-10, F) Clarification and correction to configuration signalling condition for channel quality information formats | ZTE | Withdrawn |
R1‑112776 | 36.213 CR0277R1 (Rel-10, F) Correction to reception of PRS in MBSFN subframes | Qualcomm Incorporated, Panasonic, NEC, Ericsson, ST-Ericsson, ZTE | Agreed |
R1‑112777 | 36.212 CR0123R1 (Rel-10, F) Corrections on N_{SRS} | CATT | Agreed |
R1‑112778 | 36.213 CR0346 (Rel-10, F) Correction on TBS translation table | LG Electronics | Agreed |
R1‑112779 | 36.213 CR0347 (Rel-10, F) Correction to the condition of enabling PMI feedback | ZTE, China Telecom., ITRI | Revised |
R1‑112780 | 36.213 CR0348 (Rel-10, F) Miscellaneous corrections to 36.213 | NEC Group | Agreed |
R1‑112781 | Downlink CSI feedback accuracy enhancement for MU-MIMO | KDDI Corporation | Not treated |
R1‑112782 | 36.213 CR0326R1 (Rel-10, F) on Corrections in Physical Uplink Control Channel Procedure | ZTE | Noted - Revised |
R1‑112783 | 36.213 CR0349 (Rel-10, F) Corrections on PUSCH and PUCCH modes | Samsung, LG Electronics, Intel, ZTE, Motorola Mobility | Agreed |
R1‑112784 | UL CoMP phase 2 evaluations in scenario 3 | Huawei, HiSilicon | Noted |
R1‑112785 | Text proposal for standard impacts and design principles of CoMP in Rel-11 | Huawei, HiSilicon | Noted |
R1‑112786 | 36.213 CR0328R1 (Rel-10, F) A correction to PDSCH transmission assumption for CQI calculation | Fujitsu | Noted |
R1‑112787 | 36.213 CR0325R2 (Rel-10, F) on Corrections in UE procedure for reporting HARQ-ACK | ZTE, Qualcomm Incorporated, Huawei, HiSilicon, CATT, Samsung, I2R, Ericsson, ST-Ericsson | Noted - Revised |
R1‑112788 | void | - | Withdrawn |
R1‑112789 | 36.213 CR0350 (Rel-10, F) CR on UL HARQ ACK determination | Ericsson, ST-Ericsson, CATT | Noted - Revised |
R1‑112790 | LS reply on timing advance calculation using time difference measurement | RAN1, Huawei | Agreed |
R1‑112791 | 36.212 CR0124R1 (Rel-10, F) Corrections on DCI format 1B/1D | CATT | Noted - Revised |
R1‑112792 | 36.213 CR0339R1 (Rel-10, F) Corrections on HARQ-ACK codebook size determination | CATT | Withdrawn |
R1‑112793 | CoMP Phase 2 evaluations for Scenario 3 (DL: FDD and TDD) | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑112794 | Conclusions of offline session on CoMP Phase 2 evaluations | Samsung | Noted |
R1‑112795 | 36.213 CR0326R2 (Rel-10, F) Corrections on Physical Uplink Control Channel Procedure | ZTE, CATT, I2R, NTT DoCoMo, LG Electronics, Qualcomm Incorporated, Samsung, Ericsson, ST-Ericsson | Agreed |
R1‑112796 | LS on soft buffer handling in TS36.213 and TS36.321 | RAN1, NTT DOCOMO | Agreed |
R1‑112797 | New DCI Formats with Differential Information | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑112798 | Discussion on Rel’11 eICIC scenarios | Renesas Mobile Europe Ltd | Noted |
R1‑112799 | Example error case in support of Draft CR R1-112090 | Ericsson, ST-Ericsson | Not treated |
R1‑112800 | Offline discussion summary on UL CoMP evaluation | Sharp | Not treated |
R1‑112801 | Way forward on identification of scenarios for eICIC | Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, AT&T, CATT, CMCC, Deutsche Telekom, Fujitsu, Qualcomm Inc, Samsung | Revised |
R1‑112802 | 36.212 CR0122R1 (Rel-10, F) Size adjustment of DCI format 0, 1A and 1 | Panasonic, Qualcomm, ZTE, Ericsson, ST-Ericsson, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, LG, TI, CATT | Agreed |
R1‑112803 | Way forward on scenarios for further eICIC | Ericsson, Huawei, HiSilicon, ST-Ericsson | Noted |
R1‑112804 | Measurement definition for SRS | MediaTek | Withdrawn |
R1‑112805 | Enhancements to DL MU-MIMO CSI Feedback | NEC Group | Not treated |
R1‑112806 | Way forward on identification of scenarios for eICIC | Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, AT&T, CATT, CMCC, Deutsche Telekom, Fujitsu, Qualcomm Inc, Samsung | Noted |
R1‑112807 | 36.213 CR0351 (Rel-10, F) Correction on UL DMRS resources for PHICH-triggered retransmission | ZTE, Texas Instruments, LG Electronics | Noted - Revised |
R1‑112808 | RAN1 Phase 2 CoMP Results | Samsung | Revised |
R1‑112809 | UL Time of Arrival | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Andrew | Noted |
R1‑112810 | Draft LS on Physical Layer Measurement for network positioning | Alcatel-Lucent | Noted - Revised |
R1‑112811 | RAN1 Phase 2 CoMP Results | Samsung | Not treated |
R1‑112812 | CR for 25.211: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112813 | CR for 25.212: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112814 | CR for 25.213: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112815 | CR for 25.214: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112816 | Summary of offline session on simulation assumptions for LTE TDD eIMTA | CATT | Not treated |
R1‑112817 | 25.223 CR0064R2 (Rel-8, F) Clarification of 64QAM for LCR TDD | TD Tech | Agreed |
R1‑112818 | 25.223 CR0065R2 (Rel-9, A) Clarification of 64QAM for LCR TDD | TD Tech | Agreed |
R1‑112819 | 25.223 CR0066R2 (Rel-10, A) Clarification of 64QAM for LCR TDD | TD Tech | Agreed |
R1‑112820 | 25.221 CR0220R2 (Rel-10, F) Clarifications on HSUPA for LCR TDD | TD Tech | Agreed |
R1‑112821 | 25.224 CR0270R2 (Rel-10, F) Clarifications on SYNC-UL signatures for E-RUCCH procedure for LCR TDD | TD Tech | Agreed |
R1‑112822 | 36.213 CR0331R1 (Rel-10, F) Correction to uplink transmission scheme usage for random access response and PHICH-triggered retransmissions | Panasonic, ZTE, Texas Instruments | Withdrawn |
R1‑112823 | [Draft] LS on TDD inter-band CA with different UL-DL configurations on different bands | CATT | Noted - Revised |
R1‑112824 | DL and UL CoMP Chairman’s Notes | NTT DOCOMO, Samsung | Endorsed |
R1‑112825 | UL_enh Chairman’s Notes | Samsung | Endorsed |
R1‑112826 | RS relation between R-PDCCH and PDSCH for the 2nd slot configuration 0 | Panasonic | Noted |
R1‑112827 | Way forward on "SC-FDMA symbol" | Panasonic | Not treated |
R1‑112828 | 36.213 CR0352 (Rel-10, F) Clarification on the common search space description | Panasonic, Qualcomm Inc, ZTE, NEC, Huawei, HiSilicon, Motorola Mobility, Ericsson, ST-Ericsson | Agreed |
R1‑112829 | Way forward on CoMP performance gains | Huawei, Orange, CMCC, Telefónica, CATT, CATR, HiSilicon | Noted |
R1‑112830 | 36.211 CR0165 (Rel-10, F) Clarification on cyclic prefix of PDSCH in MBSFN subframes | NEC group, Panasonic, Qualcomm Incorporated, Samsung, Renesas Mobile Europe, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, Ericsson, ST-Ericsson | Agreed |
R1‑112831 | 36.211 CR0166 (Rel-10, F) Corrections on indication in scrambling identity field in DCI format 2B and 2C | Huawei, HiSilicon, Fujitsu, ZTE, Qualcomm Inc | Noted - Revised |
R1‑112832 | 36.213 CR0353 (Rel-10, F) Clarification on ambiguous DCI information between UE-specific search space and common search space for DCI formats 0 and 1A | Qualcomm Inc., LGE, ETRI | Noted - Revised |
R1‑112833 | 36.213 CR0354 (Rel-10, F) Clarification of Reference PDSCH Power for CSI-RS based CSI Feedback | Qualcomm Inc. | Agreed |
R1‑112834 | Way forward on DCI format 3/3A | Ericsson, ST-Ericsson, LG Electronics, Panasonic, Qualcomm, Huawei, HiSilicon, NTT DoCoMo | Agreed |
R1‑112835 | 36.213 CR0331R1 (Rel-10, F) Correction to uplink transmission scheme usage for random access response and PHICH-triggered retransmissions | Panasonic, ZTE, Texas Instruments | Agreed |
R1‑112836 | 36.213 CR0355 (Rel-10, F) Corrections on reporting Channel State Information | Huawei, HiSilicon,Qualcomm Incorporated, CATT, ZTE, Ericsson, ST-Ericsson | Noted - Revised |
R1‑112837 | 36.211 CR0166R1 (Rel-10, F) Corrections on indication in scrambling identity field in DCI format 2B and 2C | Huawei, HiSilicon, Fujitsu, ZTE, Qualcomm Inc, Texas Instruments, Ericsson, ST-Ericsson | Revised |
R1‑112838 | 36.212 CR0120R2 (Rel-10, F) on correction of channel coding of control information | ZTE | Agreed |
R1‑112839 | 36.212 CR0124R2 (Rel-10, F) Corrections on DCI format 1B/1D | CATT | Agreed |
R1‑112840 | 36.213 CR0351R1 (Rel-10, F) Correction on UL DMRS resources for PHICH-triggered retransmission | ZTE, Texas Instruments, LG Electronics | Agreed |
R1‑112841 | - | - | Not treated |
R1‑112842 | 36.213 CR0347R1 (Rel-10, F) Correction to the condition of enabling PMI feedback | ZTE, China Telecom., ITRI | Noted - Revised |
R1‑112843 | 36.213 CR0347R2 (Rel-10, F) Correction to the condition of enabling PMI feedback | ZTE, China Telecom., ITRI | Agreed |
R1‑112844 | 36.213 CR0355R1 (Rel-10, F) Corrections on reporting Channel State Information | Huawei, HiSilicon,Qualcomm Incorporated, CATT, ZTE, Ericsson, ST-Ericsson | Noted - Revised |
R1‑112845 | 36.213 CR0353R1 (Rel-10, F) Clarification on ambiguous DCI information between UE-specific search space and common search space for DCI formats 0 and 1A | Qualcomm Inc., LGE, ETRI, Panasonic | Agreed |
R1‑112846 | 36.213 CR0349R1 (Rel-10, F) Corrections on PUSCH and PUCCH modes | Samsung, LG Electronics, Intel, ZTE, Motorola Mobility, NSN | Withdrawn |
R1‑112847 | 36.212 CR0119R1 (Rel-10, F) Corrections on transport block processing for UL-SCH | Huawei, HiSilicon, I2R | Agreed |
R1‑112848 | 36.213 CR0356 (Rel-10, F) Corrections on HARQ-ACK feedback procedures | Huawei, HiSilicon, CATT, LGE | Noted - Revised |
R1‑112849 | 36.213 CR0325R3 (Rel-10, F) on Corrections in UE procedure for reporting HARQ-ACK | ZTE, Qualcomm Incorporated, Huawei, HiSilicon, CATT, Samsung, I2R, Ericsson, ST-Ericsson | Agreed |
R1‑112850 | 36.213 CR0350R1 (Rel-10, F) CR on UL HARQ ACK determination | Ericsson, ST-Ericsson, CATT | Agreed |
R1‑112851 | Draft of TR36.819 v1.1.0 for CoMP SI | Samsung | Noted - Revised |
R1‑112852 | Proposal for DL CoMP standardization impact | Ericsson, Motorola Mobility, Nokia, Nokia Siemens Networks, Qualcomm, ST-Ericsson | Noted |
R1‑112853 | LS on the unicast usage in MBSFN subframe | RAN1, Panasonic | Agreed |
R1‑112854 | Report from the offline discussion on scenarios priorities and evaluation assumptions for the DL MIMO enhancements SI | Ad hoc Chairman (Orange) | Endorsed |
R1‑112855 | Way forward | Chairman emeritus | Noted |
R1‑112856 | Summary of ad hoc session on FeICIC simulation assumptions | Ad hoc Chairman (NTT DoCoMo) | Agreed |
R1‑112857 | 36.211 CR0166R2 (Rel-10, F) Corrections on indication in scrambling identity field in DCI format 2B and 2C | Huawei, HiSilicon, Fujitsu, ZTE, Qualcomm Inc, Texas Instruments, Ericsson, ST-Ericsson | Noted - Revised |
R1‑112858 | 36.213 CR0355R2 (Rel-10, F) Corrections on reporting Channel State Information | Huawei, HiSilicon,Qualcomm Incorporated, CATT, ZTE, Ericsson, ST-Ericsson | Agreed |
R1‑112859 | 36.213 CR0356R1 (Rel-10, F) Corrections on HARQ-ACK feedback procedures | Huawei, HiSilicon, CATT, LGE | Noted |
R1‑112860 | Reply LS on the frequency band specific compressed mode | RAN1, Nokia Siemens Networks | Agreed |
R1‑112861 | [DRAFT] LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112862 | LS on RAN1 agreements on 8C-HSDPA | RAN1, Ericsson | Agreed |
R1‑112863 | 36.211 CR0166R3 (Rel-10, F) Corrections on indication in scrambling identity field in DCI format 2B and 2C | Huawei, HiSilicon, Fujitsu, ZTE, Qualcomm Inc, Texas Instruments, Ericsson, ST-Ericsson | Agreed |
R1‑112864 | LS on Physical Layer Measurement for network positioning | RAN1, Alcatel-Lucent | Agreed |
R1‑112865 | 36.819 v1.1.0 for Coordinated Multi-Point Operation for LTE | Samsung | Noted - Revised |
R1‑112866 | 36.212 CR0129 (Rel-10, F) Clarification and correction to configuration signalling condition for channel quality information formats | ZTE | Agreed |
R1‑112867 | LS on TDD inter-band CA with different UL-DL configurations on different bands | RAN1, CATT | Agreed |
R1‑112868 | 25.211 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Endorsed |
R1‑112869 | 25.212 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Endorsed |
R1‑112870 | 25.213 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Endorsed |
R1‑112871 | 25.214 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Endorsed |
R1‑112872 | 25.215 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Endorsed |
R1‑112873 | [Draft] LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA | Huawei | Noted - Revised |
R1‑112874 | void | - | Withdrawn |
R1‑112875 | 25.212 CR0296R3 (Rel-11, B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Endorsed |
R1‑112876 | 25.213 CR0109R3 (Rel-11, B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Endorsed |
R1‑112877 | 25.214 CR0652R3 (Rel-11, B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Endorsed |
R1‑112878 | 25.871 v2.0.0 Uplink MIMO for HSPA | Qualcomm Inc. | Agreed |
R1‑112879 | 25.872 v2.0.0 HSDPA Multipoint Transmission | Nokia Siemens Networks | Agreed |
R1‑112880 | Simulation result summary for HSDPA Multipoint Transmission | InterDigital Communications, LLC., Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, Ericsson, HiSilicon, Huawei, Nokia, Nokia Siemens Networks, Qualcomm Incorporated, Renesas Mobile Europe Ltd., ST-Ericsson | Agreed |
R1‑112881 | LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA | RAN1, Huawei | Agreed |
R1‑112882 | 36.819 v1.2.0 for Coordinated Multi-Point Operation for LTE | Samsung | Agreed |
R1‑112883 | Report from email discussion on scenarios and assumptions for DL MIMO feedback enhancements | Orange (rapporteur) | Agreed |
R1‑112884 | Summary of email discussion on simulation assumptions for study on further enhancements to LTE TDD for DL-UL interference management and traffic adaptation | Rapporteur (CATT) | Agreed |
page generated from database: 2025-01-24 14:24:14