3GPP TDocs (written contributions) at meeting
Meeting: R1-64 - 2011-02-21 to 2011-02-25, Taipei
meeting id: R1-64 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑110610 | Draft Agenda for RAN1#64 meeting | RAN1 Chairman | Approved |
R1‑110611 | Final report of RAN1#63bis meeting | MCC Support | Approved |
R1‑110612 | LS on Power Headroom Reporting | RAN2, Panasonic | Noted |
R1‑110613 | LS on CQI reporting at SCell activation | RAN2, Nokia Siemens Networks | Noted |
R1‑110614 | LS on MDT UL measurements | RAN2, MediaTek | Noted |
R1‑110615 | Reply LS on inclusion of RF measurements into MDT report | RAN2, Nokia Siemens Networks | Noted |
R1‑110616 | LS on RSRQ measurement accuracy with eICIC | RAN2, Qualcomm | Noted |
R1‑110617 | Response LS on UL Mobility Load Balancing utilizing ULTPC Parameters | RAN3, Nokia Siemens Networks | Noted |
R1‑110618 | LS on coexistence of frequency domain and time domain ICIC | RAN3, Alcatel-Lucent | Noted |
R1‑110619 | LS to RAN1 on the tail issues for TDD mode with configuration 0/6 in eICIC | RAN3, CATT | Noted |
R1‑110620 | Reply LS on Power Headroom Reporting | RAN4, CATT, Huawei | Noted |
R1‑110621 | LS on Security for LTE relay nodes | SA3, Vodafone | Noted |
R1‑110622 | Selection of SCell for multiplexing UCI on PUSCH | Huawei, HiSilicon | Noted |
R1‑110623 | Multiple triggers for aperiodic CSI in a subframe | Huawei, HiSilicon | Not treated |
R1‑110624 | PDSCH and CSI-RS transmissions in MBSFN subframes in Rel-10 | Huawei, HiSilicon | Not treated |
R1‑110625 | Remaining issues in aperiodic CQI-only PUSCH | Huawei, HiSilicon | Not treated |
R1‑110626 | Final details of SRS | Huawei, HiSilicon | Not treated |
R1‑110627 | Working assumption for aperiodic CSI reporting | Huawei, HiSilicon | Not treated |
R1‑110628 | Performance Evaluation of Phase 1 Downlink Homogeneous network with high Tx power RRHs | Huawei, HiSilicon | Noted |
R1‑110629 | Further details of scenarios | Huawei, HiSilicon | Noted |
R1‑110630 | Refinements to other simulation assumptions for Phase 2 | Huawei, HiSilicon | Not treated |
R1‑110631 | Proposals for backhaul constraint modelling on latency and capacity | Huawei, HiSilicon | Not treated |
R1‑110632 | Some considerations for scenario 3 and 4 | Sony Corporation | Not treated |
R1‑110633 | Coordinated Antenna Calibration for CoMP in HetNet | Sony Corporation | Not treated |
R1‑110634 | On collision handling between A/N and periodic CSI | Ericsson, ST-Ericsson | Noted |
R1‑110635 | Remaining details of CSI coding and resource mapping on PUSCH | Ericsson, ST-Ericsson | Noted |
R1‑110636 | Remaining details for CA based HetNet in Rel-10 | Ericsson, ST-Ericsson | Not treated |
R1‑110637 | On use cases of DCI format 3/3A | Ericsson, ST-Ericsson | Not treated |
R1‑110638 | DL Carrier Aggregation together with UL Subframe Bundling | Ericsson, ST-Ericsson | Noted |
R1‑110639 | Final details on CQI-only transmission | Ericsson, ST-Ericsson | Not treated |
R1‑110640 | SRS triggering by DL grants | Ericsson, ST-Ericsson | Noted |
R1‑110641 | Remaining details on SRS transmission | Ericsson, ST-Ericsson | Not treated |
R1‑110642 | WF on Determination of DMRS antenna ports for R-PDCCH-to-RE mapping | Ericsson, ST-Ericsson, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NEC, ZTE, InterDigital | Not treated |
R1‑110643 | TP on processing of R-PDCCH without cross-interleaving | Ericsson, ST-Ericsson | Not treated |
R1‑110644 | TP on resources used for HARQ feedback transmission | Ericsson, ST-Ericsson | Not treated |
R1‑110645 | WF on PUCCH feedback on Un for TDD | Ericsson, ST-Ericsson, CATT, CMCC, InterDigital | Not treated |
R1‑110646 | PUCCH feedback on Un for TDD | Ericsson, ST-Ericsson | Not treated |
R1‑110647 | TP on ACK delivery from PHY to MAC | Ericsson, ST-Ericsson | Not treated |
R1‑110648 | Initial Evaluations of CoMP in Homogeneous Deployments | Ericsson, ST-Ericsson | Noted |
R1‑110649 | Aspects on distributed RRUs with shared cell-id for heterogeneous deployments | Ericsson, ST-Ericsson | Noted |
R1‑110650 | On simulation assumptions for Phase 2 CoMP evaluations | Ericsson, ST-Ericsson | Not treated |
R1‑110651 | Deployment and backhaul constraints for CoMP evaluations | Ericsson, ST-Ericsson | Not treated |
R1‑110652 | UCI on Simultaneous PUCCH/PUSCH Transmission | HTC | Not treated |
R1‑110653 | Cross Carrier Group Power Control in Rel-10 | HTC | Not treated |
R1‑110654 | PUSCH selection for UCI transmission | HTC | Not treated |
R1‑110655 | Initial Evaluation Results for Coordinated Beamforming | Marvell | Withdrawn |
R1‑110656 | Link Analysis of PCI Codebook design for UL CLTD: Sensitivity to PCI feedback channel update rate, delay and error rates | Qualcomm Incorporated | Noted |
R1‑110657 | Link Analysis of PCI Codebook design for UL CLTD: Quantization of PCI feedback channel | Qualcomm Incorporated | Revised |
R1‑110658 | Link Analysis of PCI Codebook design for UL CLTD: Comparison of Direct and Recursive schemes | Qualcomm Incorporated | Noted - Revised |
R1‑110659 | PCI Codebook design for UL CLTD | Qualcomm Incorporated | Noted |
R1‑110660 | Applicability of UL CLTD in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑110661 | Applicability of UL CLTD when DPDCH is configured | Qualcomm Incorporated | Noted |
R1‑110662 | Link Analysis of Pilot structures for UL CLTD | Qualcomm Incorporated | Noted |
R1‑110663 | Analysis of Pilot structures for UL CLTD | Qualcomm Incorporated | Noted |
R1‑110664 | Link Analysis of mechanisms to improve impact of phase discontinuity due to to CLTD on NodeB receiver | Qualcomm Incorporated | Revised |
R1‑110665 | Link Analysis of UL CLTD in Soft Handover Scenarios | Qualcomm Incorporated | Revised |
R1‑110666 | On the choice of DL physical channel to carry UL PCI feedback | Qualcomm Incorporated | Noted |
R1‑110667 | Dynamic control of UL CLTD via HS-SCCH orders | Qualcomm Incorporated | Noted |
R1‑110668 | UE power scaling algorithms when UL CLTD is configured | Qualcomm Incorporated | Withdrawn |
R1‑110669 | System Performance Evaluation of SF-DC Intra NodeB aggregation in uniform loading scenario- 100% penetration | Qualcomm Incorporated | Not treated |
R1‑110670 | System Performance Evaluation of SF-DC Intra NodeB aggregation in uniform loading scenario- 30% penetration | Qualcomm Incorporated | Not treated |
R1‑110671 | System Performance Evaluation of SF-DC Intra NodeB aggregation in non-uniform loading scenario- 100% penetration | Qualcomm Incorporated | Not treated |
R1‑110672 | System Performance Evaluation of SF-DC Intra NodeB aggregation in non-uniform loading scenario- 30% penetration | Qualcomm Incorporated | Not treated |
R1‑110673 | System Performance Evaluation of SF-DC Inter NodeB aggregation in uniform loading scenario- 100% penetration | Qualcomm Incorporated | Not treated |
R1‑110674 | System Performance Evaluation of SF-DC Inter NodeB aggregation in uniform loading scenario- 30% penetration | Qualcomm Incorporated | Not treated |
R1‑110675 | System Performance Evaluation of SF-DC Inter NodeB aggregation in non-uniform loading scenario-100% penetration | Qualcomm Incorporated | Not treated |
R1‑110676 | System Performance Evaluation of SF-DC Inter NodeB aggregation in non-uniform loading scenario-30% penetration | Qualcomm Incorporated | Not treated |
R1‑110677 | System Performance Evaluation of SF-DC Intra-NodeB switching in uniform loading scenario - 100% penetration | Qualcomm Incorporated | Not treated |
R1‑110678 | System Performance Evaluation of SF-DC Intra-NodeB switching in uniform loading scenario - 30% penetration | Qualcomm Incorporated | Not treated |
R1‑110679 | System Performance Evaluation of SF-DC Intra-NodeB switching in non-uniform loading scenario- 100 % penetration | Qualcomm Incorporated | Not treated |
R1‑110680 | System Performance Evaluation of SF-DC Intra-NodeB switching in non-uniform loading scenario- 30 % penetration | Qualcomm Incorporated | Not treated |
R1‑110681 | Link Evaluation of UL MIMO using different link simulation methodologies | Qualcomm Incorporated | Noted |
R1‑110682 | Simulation Framework for Link Evaluation of UL MIMO | Qualcomm Incorporated | Noted |
R1‑110683 | 25.8xx TR skeleton for UL MIMO for HSPA | Qualcomm Incorporated | Noted - Revised |
R1‑110684 | Design Objective of UL MIMO for HSPA | Qualcomm Incorporated | Noted - Revised |
R1‑110685 | System Simulation Framework for UL MIMO | Qualcomm Incorporated | Noted |
R1‑110686 | Introducing small cell system scenarios for HSPA. | Qualcomm Incorporated | Noted |
R1‑110687 | Interference issues in heterogeneous networks for HSPA | Qualcomm Incorporated | Noted |
R1‑110688 | Introducing further enhancements to CELL_FACH operation | Qualcomm Incorporated | Noted |
R1‑110689 | Discussion on LS on MDT UL Measurements | MediaTek Inc. | Noted |
R1‑110690 | Further Details for Periodic CSI Reporting in Carrier Aggregation | MediaTek Inc. | Noted |
R1‑110691 | 36.211 CR0149R1 (Rel-10, F) Correction on UE behavior for PRACH preamble format 4 | MediaTek Inc., Ericsson, ST-Ericsson, Panasonic | Agreed |
R1‑110692 | Remaining details for Rel-10 eICIC | MediaTek Inc. | Not treated |
R1‑110693 | Modeling of constraints from lower-capacity/higher-latency backhauls | MediaTek Inc. | Not treated |
R1‑110694 | Remaining issues of aperiodic SRS | MediaTek Inc. | Not treated |
R1‑110695 | On remaining details of periodic CQI/PMI/RI reporting for carrier aggregation | Texas Instruments | Not treated |
R1‑110696 | On UL CC selection for UCI transmission | Texas Instruments | Noted |
R1‑110697 | CSI reporting at SCell activation/deactivation | Texas Instruments | Not treated |
R1‑110698 | Overhead considerations during CQI reporting | Texas Instruments | Noted |
R1‑110699 | On Frequency Hopping for Aperiodic SRS Transmission | Texas Instruments | Not treated |
R1‑110700 | Outstanding aspects for aperiodic SRS configuration | Texas Instruments | Noted |
R1‑110701 | Aperiodic CSI reporting based in restricted measurements in Rel-10 | Texas Instruments | Not treated |
R1‑110702 | Considerations on the Tail Issues for TDD Mode with Configuration 0/6 in eICIC | CATT | Noted |
R1‑110703 | Considerations on Coexistence of Frequency Domain and Time Domain ICIC | CATT | Noted |
R1‑110704 | Further discussion on channel selection mode b | CATT | Not treated |
R1‑110705 | Remaining issues for TDD ACK/NACK transmission | CATT | Not treated |
R1‑110706 | Concurrent transmission of uplink signals on PUSCH in Rel-10 | CATT | Not treated |
R1‑110707 | Concurrent transmission of uplink signals on PUCCH in Rel-10 | CATT | Not treated |
R1‑110708 | SCell selection for UCI transmission | CATT | Not treated |
R1‑110709 | UL power control for DCI format 3/3A | CATT | Not treated |
R1‑110710 | Discussions on multi-SRS simultaneous transmission on different CCs | CATT | Not treated |
R1‑110711 | Soft buffer partitioning in Rel-10 | CATT | Not treated |
R1‑110712 | Activation/deactivation timing for TDD | CATT | Not treated |
R1‑110713 | Remaining issues on CSI-RS | CATT | Not treated |
R1‑110714 | Further discussion on triggering of aperiodic SRS via DL grants | CATT | Not treated |
R1‑110715 | Clarification on timing of aperiodic SRS | CATT | Revised |
R1‑110716 | Remaining details of Un specification in Rel-10 | CATT | Not treated |
R1‑110717 | Remaining Issue on Aperiodic CSI Reporting | CATT | Not treated |
R1‑110718 | Refinement on simulation assumptions for DL CoMP | CATT | Not treated |
R1‑110719 | Backhaul modeling for CoMP | CATT | Not treated |
R1‑110720 | Further considerations on scenario 3 and 4 | CATT | Not treated |
R1‑110721 | CQI reporting at SCell activation | Samsung | Not treated |
R1‑110722 | HARQ-ACK Payload for PUCCH Format 3 in TDD Systems | Samsung | Noted |
R1‑110723 | HARQ-ACK and CSI Multiplexing in PUCCH with DL CA | Samsung | Noted |
R1‑110724 | PUCCH Transmission Power with HARQ-ACK Bundling and for TDD | Samsung | Not treated |
R1‑110725 | Scell Selection for UCI Multiplexing with UL CA | Samsung | Noted |
R1‑110726 | Resources for HARQ-ACK Multiplexing in PUSCH for DL CA | Samsung | Noted |
R1‑110727 | UL DAI for DL CA | Samsung | Not treated |
R1‑110728 | Simultaneous PUCCH and PUSCH Transmissions with Aperiodic CSI | Samsung | Not treated |
R1‑110729 | Simultaneous PUSCH and PUCCH Transmissions | Samsung | Not treated |
R1‑110730 | Resource Indication for PUCCH Format 3 in TDD Systems | Samsung | Not treated |
R1‑110731 | Cross-carrier group UL PC for LTE-A | Samsung, CHTTL | Not treated |
R1‑110732 | PUCCH Performance and Error Event Probability for Mode b | Samsung | Not treated |
R1‑110733 | Discussion on remaining issues for channel selection mode b | Samsung | Not treated |
R1‑110734 | Correction of text on aperiodic CSI triggering | Samsung, Motorola Mobility, Panasonic, Qualcomm Inc. | Noted |
R1‑110735 | Priority rules for periodic CSI feedback in carrier aggregation | Samsung | Noted |
R1‑110736 | PDSCH transmission in MBSFN subframes | Samsung | Revised |
R1‑110737 | Reference Resource size for CQI calculation in LTE-A | Samsung, CHTTL | Noted |
R1‑110738 | Remaining details on CQI-only reporting for DCI format 4 | Samsung | Not treated |
R1‑110739 | Remaining Issues for Aperiodic SRS in Rel.10 | Samsung | Not treated |
R1‑110740 | Remaining details on R-PDCCH search space | Samsung | Not treated |
R1‑110741 | Discussion on ambiguity in R-PDCCH blind decoding | Samsung | Not treated |
R1‑110742 | Preliminary performance evaluation of CS/CB in homogeneous networks | Samsung | Noted |
R1‑110743 | Preliminary CoMP JP results for Homogenous Networks based on compulsary MMSE receiver | Samsung | Noted |
R1‑110744 | Discussion on Intra-cell CoMP Operation | Samsung | Noted |
R1‑110745 | On the design of CoMP CS/CB for Rel. 11 | Samsung | Not treated |
R1‑110746 | Views on reference model and definition of resource utilization for phase 2 | NEC Group | Not treated |
R1‑110747 | Collision of PMCH and PRS transmission in the same MBSFN subframe | NEC Group | Noted |
R1‑110748 | Usage of RRHs in different scenarios | HTC | Not treated |
R1‑110749 | Non-contiguous RA by DCI format 1A | Pantech | Not treated |
R1‑110750 | On CSI ambiguity handling with activation/deactivation | Pantech | Not treated |
R1‑110751 | Usage of PUCCH format 3 in Non-CA environment and TDD | Pantech | Not treated |
R1‑110752 | Remaining details for HARQ A/N payload of PUCCH format 3 in TDD | Pantech | Not treated |
R1‑110753 | Discussion on collision avoidance between CSI-RS and PRS | Pantech | Not treated |
R1‑110754 | Remaining details on aperiodic SRS | Pantech | Not treated |
R1‑110755 | Aperiodic CSI report triggering on eICIC | Pantech | Not treated |
R1‑110756 | Feedback issues for Macro site CoMP | Pantech | Not treated |
R1‑110757 | Uniform CSI feedback for both JP CoMP and CS CoMP | Pantech | Not treated |
R1‑110758 | Remaining details of UCI on PUSCH for TM9 with 8 antennas | Sharp | Agreed |
R1‑110759 | Ordering of HARQ-ACK bits for RM coding | Sharp | Noted |
R1‑110760 | Remaining Issues on Dynamic Aperiodic SRS Signaling | Sharp | Not treated |
R1‑110761 | CQI reporting at SCell activation | Panasonic | Noted |
R1‑110762 | Draft LS reply to RAN2 LS on virtual PHR | Panasonic | Noted - Revised |
R1‑110763 | Power reduction for virtual PHR | Panasonic, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110764 | Collision handling between PRS and actual MBMS transmission | Panasonic | Noted |
R1‑110765 | Correction on physical layer part on TS36.300 | Panasonic | Revised |
R1‑110766 | Channel selection resource allocation for SPS for FDD | Panasonic | Not treated |
R1‑110767 | Discussion on various UL transmission configurations | Panasonic | Not treated |
R1‑110768 | Aperiodic CSI reports size mismatch issue | Panasonic | Not treated |
R1‑110769 | Reporting priorities for periodic CQI reports | Panasonic | Not treated |
R1‑110770 | UE beahviour around CSI-RS | Panasonic | Noted |
R1‑110771 | Clarification on PTI reporting | Panasonic | Not treated |
R1‑110772 | Open issues for aperiodic CQI triggering | Panasonic | Not treated |
R1‑110773 | Discussion on remaining details of signalling for SU-MIMO | Panasonic | Not treated |
R1‑110774 | Aperiodic SRS triggering with DL DCI | Panasonic | Not treated |
R1‑110775 | Discussion on remaining issues in relay | Panasonic | Not treated |
R1‑110776 | TM for R-PDCCH and RS for DCI format 1A | Panasonic | Noted |
R1‑110777 | Resource allocation schemes of R-PDCCH | Panasonic | Not treated |
R1‑110778 | UE capability: Soft buffer | Panasonic | Not treated |
R1‑110779 | UE capability: Layer capability | Panasonic | Noted |
R1‑110780 | On the coexistence of frequency domain and time domain ICIC | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110781 | On the tail issues for TDD mode with configuration 0/6 in eICIC | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑110782 | Codebook size for CL UL TxD | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110783 | Consideration of feedback types for CL UL TxD | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110784 | Link level simulation results for CL UL TxD | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110785 | Design Principles for 8C-HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110786 | HS-DPCCH design for 8C-HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110787 | Carrier activation and deactivation for 8C-HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110788 | HS-SCCH for 8C-HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110789 | Impact of MCS restriction for SPS VoIP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110790 | Remaining issues for PUCCH Format 1b channel selection A/N for TDD | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑110791 | Simultaneous Uplink Transmissions and Uplink Transmission Combinations with Carrier Aggregation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110792 | On selection of PUSCH for UCI transmission | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑110793 | On Simultaneous Configuration of DL Carrier Aggregation and UL Subframe Bundling | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑110794 | Remaining Issues of CSI-RS and Muting Configurations in MBSFN subframes | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110795 | Remaining details of Aperiodic SRS Triggering and Frequency Hopping | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, CHTTL | Not treated |
R1‑110796 | Further remaining aspects of Aperiodic SRS Triggering | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, CHTTL | Not treated |
R1‑110797 | Specification considerations related to ABS for RLM and RSRP/RSRQ Measurements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, CHTTL | Not treated |
R1‑110798 | Draft CR to 36.214 for RSRQ Measurement with ABS | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, CHTTL | Noted - Revised |
R1‑110799 | Remaining Specification Considerations for Restricted CSI Measurements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, CHTTL | Not treated |
R1‑110800 | Initial performance evaluation for CoMP Scenario 2 | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑110801 | Cell clustering for CoMP Scenario 2 | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑110802 | Further details of CoMP Scenarios for evaluation, especially Scenario 4 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110803 | Simulation Assumptions for Evaluation of Uplink CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑110804 | Modelling of Channel Reciprocity Errors for TDD CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑110805 | Modelling of communication constraints between CoMP transmission points | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110806 | CoMP considerations for TDD | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑110807 | 36.213 CR0271 (Rel-9, F) A clarification for redundancy version of PMCH | ZTE, NEC | Noted - Revised |
R1‑110808 | Remaining Issues of UL Channel Combinations For Rel-10 | ZTE | Not treated |
R1‑110809 | Resource allocation schemes of R-PDCCH | ZTE | Not treated |
R1‑110810 | Remaining issues on OFDM symbols usable for Un link transmission | ZTE | Not treated |
R1‑110811 | Consideration on subframe configuration modification in Un link | ZTE | Not treated |
R1‑110812 | Remaining issues on CSI-RS | ZTE | Not treated |
R1‑110813 | Initial CoMP evaluation for homogeneous network with high Tx power RRHs | ZTE | Revised |
R1‑110814 | Further consideration for CoMP scenarios | ZTE | Not treated |
R1‑110815 | Discussion on simulation assumptions for Phase2 CoMP Study | ZTE | Withdrawn |
R1‑110816 | Periodic CSI report transmission on PUSCH | ZTE | Not treated |
R1‑110817 | Remaining issues on CQI reference resource | ZTE | Noted |
R1‑110818 | PDSCH transmission in MBSFN subframe for LTE-A UE | ZTE | Not treated |
R1‑110819 | SRS remaning issues | ZTE | Not treated |
R1‑110820 | Remaining issues of Rel-10 eICIC | ZTE | Not treated |
R1‑110821 | Remaining issues on ACK/NACK feedback for TDD | ZTE | Not treated |
R1‑110822 | Handling of TDD configuration 5 | ZTE | Noted |
R1‑110823 | Remaining issues on CQI only triggering | ZTE | Not treated |
R1‑110824 | Multiple A-CSI transmission on PUSCH | ZTE | Revised |
R1‑110825 | Remaining details of UCI multiplexing on PUSCH | ZTE | Not treated |
R1‑110826 | Remaining issues related to CA for random access procedure in LTE-A | ZTE | Not treated |
R1‑110827 | Impact of Codebook Size and Weight Update Delays on System Level CLTx Diversity Performance with RAKE receiver and ISD of 2800 m | Renesas Electronics Europe | Noted |
R1‑110828 | Impact of Weight Signaling errors and Signaling Source on System Level CLTx Diversity Performance with RAKE receiver and ISD of 2800 m | Renesas Electronics Europe | Revised |
R1‑110829 | Precoding feedback information transmission in the downlink for the UL CL Tx diversity | Renesas Electronics Europe | Noted |
R1‑110830 | System Level Performance of Closed Loop Tx Diversity with pre-coded pilots, RAKE receiver and ISD of 1000 m | Renesas Electronics Europe | Noted |
R1‑110831 | System Level Performance Closed Loop Tx Diversity with pre-coded pilots, RAKE receiver and ISD of 2800 m | Renesas Electronics Europe | Noted |
R1‑110832 | System Level Performance of Closed Loop Tx Diversity with pre-coded pilots, LMMSE receiver and ISD of 1000 m | Renesas Electronics Europe | Noted |
R1‑110833 | System Level Performance of Closed Loop Tx Diversity with pre-coded pilots, LMMSE receiver and ISD of 2800 m | Renesas Electronics Europe | Noted |
R1‑110834 | Discussion on UL CL Tx diversity design aspects | Renesas Electronics Europe | Not treated |
R1‑110835 | Discussion on HS-DPCCH solution for 8-carrier HSDPA | Renesas Electronics Europe | Noted |
R1‑110836 | TDD ACK/NACK Feedback in PUCCH Format 1b with Channel Selection mode b | Renesas Electronics Europe | Not treated |
R1‑110837 | On TDD ACK/NACK Spatial Bundling for PUCCH Format 3 mode 1 | Renesas Electronics Europe | Noted |
R1‑110838 | On PUSCH A/N Codebook Size in Rel-10 TDD | Renesas Electronics Europe | Not treated |
R1‑110839 | DCI format for 1Tx CSI-RS | Renesas Electronics Europe | Not treated |
R1‑110840 | Coordinated transmission in support of interference aware receivers | Renesas Electronics Europe | Not treated |
R1‑110841 | Resource Allocation for TDD PUCCH format 3 | LG Electronics | Noted |
R1‑110842 | Details on Spatial Bundling for TDD Mode 1 using PUCCH format 3 | LG Electronics | Not treated |
R1‑110843 | Remaining details on periodic CSI reporting for carrier aggregation | LG Electronics | Not treated |
R1‑110844 | Discussion on UCI combination for UL transmission | LG Electronics | Not treated |
R1‑110845 | Discussion on ACK/NACK Repetition in Rel-10 | LG Electronics | Noted |
R1‑110846 | Discussion on Transmission Mode for PUCCH Format 3 | LG Electronics | Not treated |
R1‑110847 | UCI transmission for Simultaneous PUCCH/PUSCH configuration | LG Electronics | Not treated |
R1‑110848 | UL CC selection for UCI transmission on PUSCH | LG Electronics | Not treated |
R1‑110849 | Remaining Details on CSI-RS in LTE-A | LG Electronics | Not treated |
R1‑110850 | Minimum value of REs for HARQ-ACK/RI on dual RM coding | LG Electronics | Not treated |
R1‑110851 | Remaining Issues on Dynamic Aperiodic Sounding for LTE-A | LG Electronics | Not treated |
R1‑110852 | Multiplexing of A/N and Periodic CSI on PUCCH | InterDigital Communications, LLC | Not treated |
R1‑110853 | Resource Allocation for TDD PUCCH Format 1b with Channel-Selection | InterDigital Communications, LLC | Withdrawn |
R1‑110854 | 16QAM for UCI-only PUSCH | InterDigital Communications, LLC | Not treated |
R1‑110855 | System-level performance for CoMP Deployment Scenarios 1 and 2 with CS/CB | InterDigital Communications, LLC | Noted |
R1‑110856 | CoMP Joint Transmission using Multiple Redundancy Versions | InterDigital Communications, LLC | Not treated |
R1‑110857 | Remaining issue regarding resource allocation for channel selection | NTT DOCOMO | Noted |
R1‑110858 | Views on simultaneous transmission of UCI and aperiodic CSI | NTT DOCOMO | Not treated |
R1‑110859 | Views on combination of uplink signaling | NTT DOCOMO | Not treated |
R1‑110860 | Soft buffer allocation for CA | NTT DOCOMO | Noted |
R1‑110861 | CSIRS configuration for supporting 4Tx MIMO UE in 8Tx network | NTT DOCOMO | Not treated |
R1‑110862 | Remaining issues for aperiodic SRS | NTT DOCOMO | Not treated |
R1‑110863 | Remaining issues on eICIC | NTT DOCOMO | Revised |
R1‑110864 | PCFICH protection by Indicating MBSFN subframe configuration in handover command | NTT DOCOMO | Not treated |
R1‑110865 | System performance for JP-CoMP in Homogeneous network with high Tx power RRHs | NTT DOCOMO | Revised |
R1‑110866 | System performance for CS/CB-CoMP in Homogeneous network with high Tx power RRHs | NTT DOCOMO | Noted |
R1‑110867 | CoMP with lower Tx power RRH in Heterogeneous network | NTT DOCOMO | Noted |
R1‑110868 | Joint Transmission with RRH - Phase 1 Evaluation | Motorola Mobility | Noted |
R1‑110869 | Discussion of RRH Deployment with Single Cell ID | Motorola Mobility | Not treated |
R1‑110870 | Remaining Issues on Simulation Assumption for CoMP in Heterogeneous Deployment | Motorola Mobility | Not treated |
R1‑110871 | CoMP with Backhaul Constraints and Modeling Discussion | Motorola Mobility | Not treated |
R1‑110872 | CQI Measurements for Release-11 | Motorola Mobility | Withdrawn |
R1‑110873 | Soft Buffer Partitioning for Carrier Aggregation | Motorola Mobility | Noted |
R1‑110874 | Remaining Details of CSI reporting for CA | Motorola Mobility | Not treated |
R1‑110875 | Remaining Details on aperiodic SRS | Motorola Mobility | Noted |
R1‑110876 | Final details on aperiodic CQI reporting and CQI reference subframe definition | Motorola Mobility | Not treated |
R1‑110877 | Resource allocation for FDD channel selection | LG Electronics | Not treated |
R1‑110878 | Resource allocation for TDD channel selection | LG Electronics | Not treated |
R1‑110879 | ACK/NACK transmission on PUSCH in TDD | LG Electronics | Not treated |
R1‑110880 | Remaining issues on UCI transmission on PUCCH | LG Electronics | Not treated |
R1‑110881 | Remaining issues on SRS multiplexing | LG Electronics | Not treated |
R1‑110882 | Cross carrier PC with DCI format 3/3A | LG Electronics | Not treated |
R1‑110883 | TPC in multiple DL grants | LG Electronics | Noted |
R1‑110884 | R-PDCCH resource mapping | LG Electronics | Not treated |
R1‑110885 | Un PDSCH transmission | LG Electronics | Not treated |
R1‑110886 | Un DL subframe configuration | LG Electronics | Not treated |
R1‑110887 | Un UL subframe configuration | LG Electronics | Not treated |
R1‑110888 | Un transmission modes | LG Electronics | Not treated |
R1‑110889 | Considerations on coexistence of frequency and time domain ICIC | LG Electronics | Noted |
R1‑110890 | RRM and CQI measurement in time domain ICIC | LG Electronics | Not treated |
R1‑110891 | Details of CSI reporting in time domain eICIC | LG Electronics | Not treated |
R1‑110892 | Initial evaluation results for Full buffer phase 1 | LG Electronics | Not treated |
R1‑110893 | Initial evaluation results for Non-Full buffer model | LG Electronics | Not treated |
R1‑110894 | CoMP set configuration for evaluation | LG Electronics | Not treated |
R1‑110895 | Clarification on UE dropping for non-full buffer model 1 | LG Electronics | Agreed |
R1‑110896 | Low-Capacity/High-Latency Backhaul for CoMP | LG Electronics | Not treated |
R1‑110897 | Remaining details of FDD ACK/NACK channel selection | Huawei, HiSilicon | Noted |
R1‑110898 | Soft buffer partitioning for Rel-10 downlink | Huawei, HiSilicon | Not treated |
R1‑110899 | One Codeword to Two Codewords Mapping for PUCCH format 3 | Huawei, HiSilicon | Not treated |
R1‑110900 | Details on ACK/NACK time domain bundling for TDD | Huawei, HiSilicon | Not treated |
R1‑110901 | Proposal on ordering and segmentation of HARQ-ACK bits | Huawei, HiSilicon, Research In Motion, CMCC, CATR, Samsung, CHTTL, New Postcom, Media Tek | Agreed |
R1‑110902 | Discussion on the priority among CCs | Huawei, HiSilicon | Not treated |
R1‑110903 | Handling of SFBC splitting on CSI-RS subframes | Huawei, HiSilicon | Withdrawn |
R1‑110904 | Remaining Issues on CQI reference resource in Rel-10 | Huawei, HiSilicon | Noted |
R1‑110905 | Remaining issues non-PMI based feedback | Huawei, HiSilicon | Withdrawn |
R1‑110906 | TP for CQI reference resource with restricted subsets | Huawei, HiSilicon | Not treated |
R1‑110907 | Inter-cell randomization for PUCCH format 3 | Qualcomm Incorporated | Withdrawn |
R1‑110908 | On multiplexing ACK/NAK with CQI on PUCCH | Qualcomm Incorporated | Noted |
R1‑110909 | On UCI transmission under simultaneous PUCCH and PUSCH | Qualcomm Incorporated | Noted |
R1‑110910 | Aperiodic CQI triggering | Qualcomm Incorporated | Withdrawn |
R1‑110911 | Soft buffer partitioning for CA | Qualcomm Incorporated | Noted |
R1‑110912 | Text proposal for miscellaneous issues to include CA support in 36.212 | Qualcomm Incorporated | Not treated |
R1‑110913 | On ACK/NAK codebook size determination with respect to special subframes in TDD | Qualcomm Incorporated | Not treated |
R1‑110914 | CSI-RS sequence for different antenna ports | Qualcomm Incorporated | Withdrawn |
R1‑110915 | DCI format for 1-port CSI-RS | Qualcomm Incorporated | Withdrawn |
R1‑110916 | Applicability of muting to certain messages | Qualcomm Incorporated | Noted |
R1‑110917 | Impact of PRB bundling on TDD operation with asymmetric UE antenna configuration | Qualcomm Incorporated | Not treated |
R1‑110918 | CSI measurement reference | Qualcomm Incorporated | Not treated |
R1‑110919 | Remaining details of feedback for TM9 | Qualcomm Incorporated | Not treated |
R1‑110920 | Remaining details of UCI transmission on PUSCH | Qualcomm Incorporated | Not treated |
R1‑110921 | Remaining details of UCI transmission on PUCCH | Qualcomm Incorporated | Not treated |
R1‑110922 | UL transmission mode configuration | Qualcomm Incorporated | Withdrawn |
R1‑110923 | Remaining details on CQI only transmission on PUSCH | Qualcomm Incorporated | Not treated |
R1‑110924 | PVS scheme for PUCCH format 1 with channel selection | Qualcomm Incorporated | Withdrawn |
R1‑110925 | Precoder switching for UL Tx | Qualcomm Incorporated | Not treated |
R1‑110926 | Antenna switching for UL MIMO | Qualcomm Incorporated | Withdrawn |
R1‑110927 | Sequence Group Hopping for MU-MIMO operation | Qualcomm Incorporated | Withdrawn |
R1‑110928 | Further details on aperiodic dynamic SRS | Qualcomm Incorporated | Not treated |
R1‑110929 | On ambiguous R-PDCCH aggregation levels in multiplexing R-PDCCH with Un PDSCH | Qualcomm Incorporated | Not treated |
R1‑110930 | Text proposal for resource specific CSI specification in 36.213 | Qualcomm Incorporated | Noted |
R1‑110931 | Remaining aspects for resource specific CSI reporting | Qualcomm Incorporated | Not treated |
R1‑110932 | On the measurements definitions for resource specific RRM | Qualcomm Incorporated | Withdrawn |
R1‑110933 | Considerations of UE capabilities for Rel-10 DL MIMO support | Qualcomm Incorporated | Withdrawn |
R1‑110934 | Considerations of UE capabilities for Rel-10 UL MIMO support | Qualcomm Incorporated | Withdrawn |
R1‑110935 | Initial evaluation results for Phase 1 | Qualcomm Incorporated | Noted |
R1‑110936 | Further details on CoMP configurations | Qualcomm Incorporated | Noted |
R1‑110937 | On the simulation assumptions for CoMP evaluations | Qualcomm Incorporated | Not treated |
R1‑110938 | High level views on CoMP | Qualcomm Incorporated | Withdrawn |
R1‑110939 | On backhaul imperfections for CoMP operation | Qualcomm Incorporated | Not treated |
R1‑110940 | Refinements to CoMP Phase 2 simulation assumptions | New Postcom | Not treated |
R1‑110941 | Modelling of constraints from lower-capacity or higher-latency CoMP transmissions | New Postcom | Not treated |
R1‑110942 | Soft buffer size allocation for Rel-10 UEs | New Postcom | Not treated |
R1‑110943 | Discussion on coexistence of frequency-domain and time-domain ICIC schemes | New Postcom | Noted |
R1‑110944 | Discussion on remaining ABS-related issues in eICIC for TDD-LTE | New Postcom | Not treated |
R1‑110945 | Interference avoidance for common control information in eICIC | New Postcom | Not treated |
R1‑110946 | Considerations on Macro-Femto eICIC | New Postcom | Not treated |
R1‑110947 | UCI transmission in simultaneous PUCCH and PUSCH in CA | New Postcom | Not treated |
R1‑110948 | Discussions on multiple PUSCH transmissions in CA | New Postcom | Not treated |
R1‑110949 | Corrections on RAN1 spec V10.0.0 | Research In Motion UK Limited | Noted |
R1‑110950 | On remaining issues of aperiodic SRS | Research In Motion UK Limited | Not treated |
R1‑110951 | Some design consideration for CoMP scenario 4 | Research In Motion UK Limited | Not treated |
R1‑110952 | Correction on UE behavior upon receiving DCI format 1B | Research In Motion UK Limited, LG Electronics | Noted - Revised |
R1‑110953 | Combinations of Uplink Channels and Signals | Research In Motion UK Limited | Not treated |
R1‑110954 | CQI reporting with SCell Activation | Research In Motion UK Limited | Not treated |
R1‑110955 | New System Simulation Assumptions for CoMP in Heterogeneous Networks | Motorola | Not treated |
R1‑110956 | Simulation considerations on distributed RRHs for COMP | Motorola | Not treated |
R1‑110957 | Simulation considerations on heterogeneous networks for COMP | Motorola | Not treated |
R1‑110958 | SCell selection for UCI multiplexing on PUSCH | Motorola | Not treated |
R1‑110959 | Cross-carrier group power control using DCI format 3/3A | Motorola | Not treated |
R1‑110960 | Initial evaluation results for CoMP | Motorola | Noted |
R1‑110961 | Remaining Details on the combinations of uplink channels / signals | Potevio | Not treated |
R1‑110962 | Resource size for CSI reporting PUSCH considering activation status | ASUSTeK | Not treated |
R1‑110963 | Application of antenna selection for CA | CATT | Not treated |
R1‑110964 | UCI Multiplexing for Simultaneous PUSCH/PUCCH Configuration | Texas Instruments | Not treated |
R1‑110965 | Discussion on the CQI reporting for Rel-10 | CMCC | Not treated |
R1‑110966 | Initial evaluation results for CoMP in homogeneous network | CMCC | Noted |
R1‑110967 | SRS channel estimation error modling in CoMP simulation | CMCC, CATT, ZTE | Not treated |
R1‑110968 | Simultaneous transmission of SR on PUCCH and UL-SCH on PUSCH | New Postcom | Not treated |
R1‑110969 | Remaining issues on reserved DMRS antenna ports for non-interleaved R-PDCCH | New Postcom | Not treated |
R1‑110970 | Possible Solutions to Improve PCFICH performance in HetNet | New Postcom | Withdrawn |
R1‑110971 | Preliminary evaluation results of downlink CoMP schemes in scenario 2 | Intel Corporation (UK) Ltd | Noted |
R1‑110972 | Proposal on functional evaluation of the low power RRHs deployment with common Cell ID (Scenario 4) | Intel Corporation (UK) Ltd | Not treated |
R1‑110973 | Clarifications and Design Requiremens for CoMP Scenarios 1-3 | Intel Corporation (UK) Ltd | Not treated |
R1‑110974 | Views on the remaining details of CoMP evaluation methodology | Intel Corporation (UK) Ltd | Not treated |
R1‑110975 | Channel estimation and measurement error models for system level simulations | Intel Corporation (UK) Ltd | Not treated |
R1‑110976 | Standardized UE-RS Based Open Loop SU-MIMO | Intel Corporation (UK) Ltd | Not treated |
R1‑110977 | Considerations on control schemes for CoMP scheduling | Mitsubishi Electric | Not treated |
R1‑110978 | Further simulation result for inter-cell interference of PUCCH Format 3 | ITRI | Not treated |
R1‑110979 | Views on simulation assumption for CoMP Scenario 3 | ITRI | Not treated |
R1‑110980 | On PUCCH format 3 individual ACK-NACK performance equalization | ITRI | Not treated |
R1‑110981 | Issues on delay spread for UL CoMP | ITRI | Not treated |
R1‑110982 | Feedback design for UL CLTD | ZTE | Noted |
R1‑110983 | DPCCH pilot design for UL CLTD | ZTE | Noted |
R1‑110984 | Power control of PUCCH for LTE-A TDD | ZTE | Not treated |
R1‑110985 | Views on Resource Allocation for PUCCH Format 1b with Channel Selection in Carrier Aggregation | MediaTek Inc. | Not treated |
R1‑110986 | 25.214 CR0632r3 (Rel-9, F) Correction to CPC procedure for DC-HSUPA | Huawei, Ericsson, HiSilicon, ST-Ericsson | Revised |
R1‑110987 | 25.214 CR0633r3 (Rel-10, A) Correction to CPC procedure for DC-HSUPA | Huawei, Ericsson, HiSilicon, ST-Ericsson | Revised |
R1‑110988 | Evaluation of feedback requirements for CLTD | Huawei, HiSilicon | Noted |
R1‑110989 | Evaluation of feedback types for CLTD | Huawei, HiSilicon | Withdrawn |
R1‑110990 | Cubic metric evaluation of different UL pilot schemes | Huawei, HiSilicon | Noted |
R1‑110991 | Link-level Performance evaluation of different UL pilot schemes | Huawei, HiSilicon | Noted |
R1‑110992 | System-level performance evaluation of CLTD | Huawei, HiSilicon | Noted |
R1‑110993 | Evaluation of beamforming implementation options | Huawei, HiSilicon | Withdrawn |
R1‑110994 | HS-DPCCH design for 8C-HSDPA | Huawei, HiSilicon | Noted |
R1‑110995 | Activation and deactivation for 8C-HSDPA | Huawei, HiSilicon | Noted |
R1‑110996 | Considerations on some issues for 8C-HSDPA | Huawei, HiSilicon | Not treated |
R1‑110997 | System performance evaluation of SF-DC Aggregation | Huawei, HiSilicon | Noted |
R1‑110998 | Simulation assumptions for UL MIMO | Huawei, HiSilicon | Noted |
R1‑110999 | Further enhancement for CELL_FACH state FDD | Huawei, HiSilicon | Noted |
R1‑111000 | Discussion on further details of Scenario 4 | ETRI | Not treated |
R1‑111001 | Remaining details on R-PDCCH | ETRI | Withdrawn |
R1‑111002 | PUCCH Performances for TDD Mode b | LG Electronics | Not treated |
R1‑111003 | On aperiodic CSI reporting for non-CA based enhanced ICIC | Ericsson, ST-Ericsson | Not treated |
R1‑111004 | TP on resource restricted CSI reporting | Ericsson, ST-Ericsson | Not treated |
R1‑111005 | Preliminary Performance Evaluation of Downlink CoMP with Scenario 2 | CHTTL | Noted |
R1‑111006 | Views on deployment scenarios for distributed RRHs | CHTTL | Not treated |
R1‑111007 | Range for virtual PHR | Panasonic | Noted |
R1‑111008 | Opportunistic coordinated multi-point reception for multi-codeword uplink transmission | I2R | Not treated |
R1‑111009 | Support for DPDCH and Cell_FACH for UL CLTD | InterDigital Communications, LLC | Noted |
R1‑111010 | S-DPCCH Design for UL CLTD | InterDigital Communications, LLC | Noted |
R1‑111011 | Control Signaling and OH Reduction for 8-carrier HSDPA | InterDigital Communications, LLC | Withdrawn |
R1‑111012 | Carrier Activation/Deactivation for 8-carrier HSDPA | InterDigital Communications, LLC | Noted |
R1‑111013 | Addressing the tail problem with ABS patterns for TDD configurations 0 & 6. | Nokia Siemens Networks, Nokia | Not treated |
R1‑111014 | On coexistence of frequency domain and time domain ICIC | Nokia Siemens Networks, Nokia | Noted |
R1‑111015 | Multiplexing CSI and carrier aggregation ACK/NACK on PUCCH | Nokia Siemens Networks, Nokia | Noted |
R1‑111016 | Remaining UCI multiplexing details for simultaneous PUCCH and PUSCH transmission | Nokia Siemens Networks, Nokia | Not treated |
R1‑111017 | UCI details for carrier aggregation PUSCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑111018 | Remaining PUCCH resource allocation details for channel selection (FDD) | Nokia Siemens Networks, Nokia | Not treated |
R1‑111019 | CSI Ambiguity handling with CC activation/deactivation | Nokia Siemens Networks, Nokia | Not treated |
R1‑111020 | Remaining details on periodic CSI priorities with CA | Nokia Siemens Networks, Nokia | Not treated |
R1‑111021 | Remaining issues on uplink power control | Nokia Siemens Networks, Nokia | Noted |
R1‑111022 | On remaining details for PUSCH SU-MIMO | Nokia Siemens Networks, Nokia | Not treated |
R1‑111023 | On remaining SRS details | Nokia Siemens Networks, Nokia | Not treated |
R1‑111024 | Discussion on the UL Backhaul Design Aspects | Nokia Siemens Networks, Nokia | Not treated |
R1‑111025 | Remaining Issues on Un Subframe Configuration | Nokia Siemens Networks, Nokia | Not treated |
R1‑111026 | Remaining Issues on DM RS port number determination for Non-Interleaved R-PDCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑111027 | Summary of e-mail discussion on Number of bits assumed reserved for DM-RS in R-PDCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑111028 | Initial CoMP phase 1 simulation results | Nokia Siemens Networks, Nokia | Noted |
R1‑111029 | Further details on CoMP scenarios | Nokia Siemens Networks, Nokia | Noted |
R1‑111030 | CoMP phase 2 simulation assumptions | Nokia Siemens Networks, Nokia | Not treated |
R1‑111031 | On improved modelling of UE MMSE receiver for system level investigations | Nokia, Nokia Siemens Networks | Not treated |
R1‑111032 | Effect of UE MMSE receiver modelling on DL system performance | Nokia, Nokia Siemens Networks | Not treated |
R1‑111033 | Backhaul transport constraints considerations for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑111034 | Summary of email discussion on simultaneous PUSCH/SRS | Fujitsu | Noted |
R1‑111035 | Femto eNB assisted eICIC for macro UE | Fujitsu | Not treated |
R1‑111036 | Inter-cell CSI-RS interference coordination for common channels in^^HetNet | Fujitsu | Not treated |
R1‑111037 | eICIC management via Fake Hybrid mode in Femto cell | Fujitsu | Not treated |
R1‑111038 | Consideration on Uplink CoMP | Fujitsu | Not treated |
R1‑111039 | UL CoMP for PUCCH | Fujitsu | Not treated |
R1‑111040 | Some considerations for modelling of inter-eNB backhaul | IPWireless | Not treated |
R1‑111041 | Codebook Size for UL TX Diversity, System Level Results | Nokia Siemens Networks, Nokia | Noted |
R1‑111042 | Codebook Size and Feedback Rate for UL TX Diversity, Link Level Results | Nokia Siemens Networks, Nokia | Noted |
R1‑111043 | Performance of the Combined BF-AS Codebook | Nokia Siemens Networks, Nokia | Noted |
R1‑111044 | Impact of Feedback Errors, Link Level Results | Nokia Siemens Networks, Nokia | Noted |
R1‑111045 | On the DPDCH compatibility with S-DPCCH | Nokia Siemens Networks, Nokia | Noted |
R1‑111046 | Evaluation of Receiver Performance in Serving and Non-Serving Cells | Nokia Siemens Networks, Nokia | Noted |
R1‑111047 | Further consideration on the HS-DPCCH structure for 8-Carrier HSDPA | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑111048 | System simulation results for 8-Carrier HSDPA | Nokia Siemens Networks, Nokia | Not treated |
R1‑111049 | TR Skeleton for HSDPA multipoint transmission | Nokia Siemens Networks, Nokia, Qualcomm Incorporated | Noted |
R1‑111050 | Text Proposal on Candidate MP-HSDPA scheme descriptions | Nokia Siemens Networks, Nokia, Qualcomm Incorporated | Agreed |
R1‑111051 | Text Proposal on Simulation Assumptions | Nokia Siemens Networks, Nokia | Agreed |
R1‑111052 | HS-SFN performance evaluation | Nokia Siemens Networks, Nokia | Not treated |
R1‑111053 | HS-SFN performance with UE feedback | Nokia Siemens Networks, Nokia | Not treated |
R1‑111054 | HS-SFN performance with 6-sectors | Nokia Siemens Networks, Nokia | Revised |
R1‑111055 | Multiflow performance evaluation | Nokia Siemens Networks, Nokia | Revised |
R1‑111056 | Multiflow performance with 6 sectors | Nokia Siemens Networks, Nokia | Not treated |
R1‑111057 | Multipoint transmission and MIMO considerations | Nokia Siemens Networks, Nokia | Not treated |
R1‑111058 | HS-DDTx performance evaluation | Nokia Siemens Networks, Nokia | Not treated |
R1‑111059 | Signalling needs for Uplink MIMO for HSDPA | Nokia Siemens Networks, Nokia | Noted |
R1‑111060 | Aggregating HSDPA and LTE carriers | Nokia Siemens Networks, Nokia | Not treated |
R1‑111061 | Way forward on PUSCH A/N codebook size in Rel-10 TDD | Huawei, HiSilicon, Samsung, LG Electronics , Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Renesas Electronics Europe, Research In Motion UK Limited, InterDigital Communications, ETRI | Revised |
R1‑111062 | Backhaul modelling for CoMP | Orange | Revised |
R1‑111063 | Work plan for 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑111064 | RAN1 considerations for 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑111065 | 8C-HSDPA HS-DPCCH | Ericsson, ST-Ericsson | Noted |
R1‑111066 | CM analysis for HS-DPCCH in 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑111067 | Carrier (de)activation for 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑111068 | Link level simulation framework for UL MIMO | Ericsson, ST-Ericsson | Noted |
R1‑111069 | System level simulation framework for UL MIMO | Ericsson, ST-Ericsson | Noted |
R1‑111070 | General design consideration for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑111071 | Physical feedback channel for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑111072 | Channel sounding for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑111073 | Feedback scheme for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑111074 | Codebook design for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑111075 | System performance evaluations for CLTD with 2D antennas for PA3 channel | Ericsson, ST-Ericsson | Noted |
R1‑111076 | CELL_FACH enhancements | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111077 | Summary of System Performance Evaluation of SF-DC aggregation and switching schemes | Qualcomm Incorporated | Noted |
R1‑111078 | Remaining details of PUCCH format 3 | Qualcomm Incorporated | Not treated |
R1‑111079 | CW selection for CQI on PUSCH | Qualcomm Incorporated, Ericsson, ST-Ericsson | Noted |
R1‑111080 | Impact of Weight Signaling errors and Signaling Source on System Level CLTx Diversity Performance with RAKE receiver and ISD of 2800 m | Renesas Electronics Europe | Noted |
R1‑111081 | Remaining issues for aperiodic CSI triggering | HTC | Withdrawn |
R1‑111082 | TPC Commands in Multiple DL grants | HTC | Noted |
R1‑111083 | Block-interleaved information-assisted HARQ scheme for CoMP | HTC | Withdrawn |
R1‑111084 | Issues on aperiodic CQI | HTC | Withdrawn |
R1‑111085 | Text-proposal on resource-restricted CSI measurements in Rel-10 | Texas Instruments | Not treated |
R1‑111086 | Further consideration on PDSCH starting position | ZTE | Not treated |
R1‑111087 | System performance evaluations for CLTD with 3D antennas for PA3 channel | Ericsson, ST-Ericsson | Noted |
R1‑111088 | On the impact of the codebook size for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑111089 | Spectrum migration from HSPA to LTE | Ericsson, ST-Ericsson | Not treated |
R1‑111090 | On the tail issues for TDD mode with configuration 0/6 in eICIC | Ericsson, ST-Ericsson | Not treated |
R1‑111091 | On coexistence of frequency domain and time domain ICIC | Ericsson, ST-Ericsson | Noted |
R1‑111092 | Identification of Remaining Issues in Rel-10 Relay | LG Electronics | Not treated |
R1‑111093 | Initial system performance evaluation of SF-DC multiflow aggregation | InterDigital Communications, LLC | Noted |
R1‑111094 | Link-level HSUPA CLTD Analysis of Codebook Type and S-DPCCH Power Offset for UL CLTD | InterDigital Communications, LLC | Noted |
R1‑111095 | Link-level HSPA UL CLTDAnalysis of UL CLTD Feedback RequirementsAnalysis for UL CLTD | InterDigital Communications, LLC | Noted |
R1‑111096 | Summary of email discussion on soft buffer size allocation for Rel-10 UEs | Panasonic | Noted |
R1‑111097 | Correction on physical layer part on TS36.300 | Panasonic | Noted - Revised |
R1‑111098 | Link Analysis of PCI Codebook design for UL CLTD: Quantization of PCI feedback channel | Qualcomm Incorporated | Noted |
R1‑111099 | Link Analysis of mechanisms to improve impact of phase discontinuity due to to CLTD on NodeB receiver | Qualcomm Incorporated | Noted |
R1‑111100 | Further views on soft buffer handling for Rel-10 UEs | Ericsson, ST-Ericsson | Noted |
R1‑111101 | Draft LS on updated parameters for Rel-10 | Ericsson | Noted - Revised |
R1‑111102 | Multiple A-CSI transmission on PUSCH | ZTE | Not treated |
R1‑111103 | Consideration of low-capacity/high-latency backhaul for CoMP | Samsung | Not treated |
R1‑111104 | Refinements of CoMP Scenario 3 and 4 | LG Electronics | Not treated |
R1‑111105 | Modeling CSI-RS in CoMP simulations | LG Electronics | Not treated |
R1‑111106 | Minutes from RAN1#64 HSPA sessions | HSPA session chairman | Endorsed |
R1‑111107 | CELL_FACH enhancements | Ericsson, ST-Ericsson | Not treated |
R1‑111108 | 25.214 CR0632r5 (Rel-9, F) Correction to CPC procedure for DC-HSUPA | Huawei | Agreed |
R1‑111109 | 25.214 CR0633r5 (Rel-10, A) Correction to CPC procedure for DC-HSUPA | Huawei | Agreed |
R1‑111110 | Link Analysis of PCI Codebook design for UL CLTD: Comparison of Direct and Recursive schemes | Qualcomm Incorporated | Not treated |
R1‑111111 | 25.8xx TR skeleton for UL MIMO for HSPA | Qualcomm Incorporated | Noted - Revised |
R1‑111112 | Design Objective of UL MIMO for HSPA | Qualcomm Incorporated | Agreed |
R1‑111113 | 25.8xx TR skeleton for UL MIMO for HSPA | Qualcomm Incorporated | Agreed |
R1‑111114 | Way Forward on CA ACK/NACK transmission on PUSCH in Rel-10 | CATT | Noted |
R1‑111115 | Simulation assumptions for UL MIMO for HSPA | Ericsson, ST-Ericsson, Huawei, HiSilicon, InterDigital Communications, Nokia Siemens Networks, Nokia Corporation, Qualcomm Incorporated, ZTE | Agreed |
R1‑111116 | TR25.8xx v0.1.3 HSDPA Multipoint Transmission | Nokia Siemens Networks | Agreed |
R1‑111117 | LS reply to RAN2 LS on virtual PHR | RAN1, Panasonic | Agreed |
R1‑111118 | Reply LS on MDT UL measurements | RAN1, Nokia Siemens Networks | Agreed |
R1‑111119 | 36.213 CR0272 (Rel-10, C) RLM Procedure with restricted measurements | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Agreed |
R1‑111120 | LS on Radio Interface Standards that could be used for Public Protection and Disaster Relief Operations | RAN1, Alcatel-Lucent | Agreed |
R1‑111121 | Text Proposal of Simulation Assumptions for Evaluation of UL CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑111122 | CoMP simulation assumptions | NTT DOCOMO | Noted - Revised |
R1‑111123 | 36.214 CR0016 (Rel-10, C) RSRQ Measurement with ABS | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, CHTTL | Agreed |
R1‑111124 | LS on CQI Reference | RAN1, Qualcomm Incorporated | Agreed |
R1‑111125 | CoMP simulation assumptions | NTT DOCOMO | Agreed |
R1‑111126 | Migration scenarios and possible aggregation between HSPA and LTE | Huawei, HiSilicon | Not treated |
R1‑111127 | Draft LS reply to RAN2 LS on virtual PHR | Panasonic | Noted - Revised |
R1‑111128 | [DRAFT] Reply LS on CQI reporting at SCell activation | Nokia Siemens Networks | Noted - Revised |
R1‑111129 | VoIP Results for FDD UL with SPS | Renesas Electronics Europe | Noted |
R1‑111130 | [DRAFT] LS reply on coexistence of frequency domain and time domain ICIC | Ericsson | Revised |
R1‑111131 | On selection of PUSCH for UCI transmission | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑111132 | On Simultaneous Configuration of DL Carrier Aggregation and UL Subframe Bundling | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑111133 | [DRAFT] Reply LS on MDT UL measurements | Nokia Siemens Networks | Noted - Revised |
R1‑111134 | 36.213 CR0271R1 (Rel-10, F) A clarification for redundancy version of PMCH | ZTE, NEC | Agreed |
R1‑111135 | 36.212 CR0101 (Rel-10, F) Correction on UE behavior upon receiving DCI format 1B | Research In Motion UK Limited, LG Electronics | Agreed |
R1‑111136 | LS on updated parameters for Rel-10 | RAN1, Ericsson | Agreed |
R1‑111137 | Correction on physical layer part on TS36.300 | Panasonic, CATT, Qualcomm, Samsung | Noted - Revised |
R1‑111138 | Way Forward on Resource Mapping of R-PDCCH without Cross-Interleaving | Nokia Siemens Networks, Nokia, Motorola Mobility, CATT, Samsung, LG Electronics, ETRI, CMCC | Not treated |
R1‑111139 | Initial CoMP evaluation for homogeneous network with high Tx power RRHs | ZTE | Noted |
R1‑111140 | HS-SFN performance with 6-sectors | Nokia Siemens Networks, Nokia | Not treated |
R1‑111141 | Multiflow performance evaluation | Nokia Siemens Networks, Nokia | Not treated |
R1‑111142 | Proposal to TDD ACK/NACK mode b with channel selection | Huawei, HiSilicon, MediaTek | Noted |
R1‑111143 | Way forward on reporting priorities for periodic CQI reports | Panasonic, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ETRI, LG Electronics, Mediatek, NEC, Pantech, Research In Motion, Samsung, Sharp, Sony, ZTE | Agreed |
R1‑111144 | Remaining issues on eICIC | NTT DOCOMO | Not treated |
R1‑111145 | Clarification on OCC application for UL DMRS | Sharp | Not treated |
R1‑111146 | Summary of Offline session on Relay | Ad hoc Chair (Ericsson) | Noted |
R1‑111147 | System performance for JP-CoMP in Homogeneous network with high Tx power RRHs | NTT DOCOMO | Noted |
R1‑111148 | Link Analysis of UL CLTD in Soft Handover Scenarios | Qualcomm Incorporated | Noted |
R1‑111149 | Way forward on CA ACK/NAK transmission on PUSCH in Rel-10 | CATT, CATR, Potevio, MediaTek, Qualcomm Incorporated | Revised |
R1‑111150 | Clarification on timing of aperiodic SRS | CATT | Noted |
R1‑111151 | Remaining issues on A-SRS | CATT | Noted |
R1‑111152 | [Draft] LS on the support of UL subframe bundling together with DL CA | Ericsson | Noted - Revised |
R1‑111153 | WF on remaining details on CQI-only triggreing | Samsung, ZTE, LG Electronics, Alcatel Lucent, Alcatel Lucent Shanghai Bell | Noted |
R1‑111154 | PDSCH transmission in MBSFN subframes | Samsung | Noted |
R1‑111155 | Reply LS for periodic CQI/PMI/RI reporting priority | RAN2, Samsung | Noted |
R1‑111156 | Consideration on CSI-RS configuration | Huawei, HiSilicon | Not treated |
R1‑111157 | Outcomes of the eICIC ad hoc session | Ericsson | Noted |
R1‑111158 | Way Forward on CSI-RS Transmissions in MBMS Subframes | Huawei, HiSilicon, Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑111159 | Summary of Adhoc session on Soft Buffer Partitioning for Carrier Aggregation | Motorola Mobility | Noted |
R1‑111160 | Text proposal to TS36.216 for DM RS overhead in R-PDCCH decoding | LG Electronics | Noted |
R1‑111161 | Way Forward on Definition of Q’min for Dual RM | LG Electronics, Samsung, Ericsson, ST-Ericsson, Research In Motion, Motorola, Huawei, HiSilicon | Noted |
R1‑111162 | 25.214 CR0632r4 (Rel-9, F) Correction to CPC procedure for DC-HSUPA | Huawei, HiSilicon, Ericsson, ST-Ericsson, Motorola Mobility | Noted - Revised |
R1‑111163 | 25.214 CR0633r4 (Rel-10, A) Correction to CPC procedure for DC-HSUPA | Huawei, HiSilicon, Ericsson, ST-Ericsson, Motorola Mobility | Noted - Revised |
R1‑111164 | HSDPA Multipoint Transmission Simulation Result Summary | Nokia Siemens Networks, Nokia | Noted |
R1‑111165 | Way Forward on Channel Model for scenario 3 and 4 | LG Electronics, Intel, ZTE, CATT | Not treated |
R1‑111166 | TR25.8xx v0.1.1 HSDPA Multipoint Transmission | Nokia Siemens Networks | Revised |
R1‑111167 | TR Skeleton for Coordinated Multi-Point Operation for LTE | Samsung | Endorsed |
R1‑111168 | CoMP simulation assumptions | NTT DOCOMO | Noted - Revised |
R1‑111169 | [Draft] LS Reply to RAN3 on the tail issues for TDD mode with configuration 0/6 in eICIC | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑111170 | UL MIMO and RS chairman’s note | Ad Hoc chair (Samsung) | Endorsed |
R1‑111171 | Relay chairman’s note | Ad Hoc chair (NTT DoCoMo) | Endorsed |
R1‑111172 | DL RS chairman’s note | Ad Hoc chair (NTT DoCoMo) | Endorsed |
R1‑111173 | Carrier Aggregation for LTE and HSPA | ZTE | Not treated |
R1‑111174 | Backhaul modelling for CoMP | Orange, Telefonica | Not treated |
R1‑111175 | Proposals for the transmission scheme for compact feedback in TDD system | CMCC | Noted |
R1‑111176 | Text Proposal of Simulation Assumptions for Evaluation of UL CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑111177 | CoMP simulation assumptions | RAN1 | Noted - Revised |
R1‑111178 | Way forward on CA ACK/NAK transmission on PUSCH in Rel-10 | CATT, CATR, Potevio, MediaTek, Qualcomm Incorporated, Intel, Texas Instruments | Not treated |
R1‑111179 | void | - | Not treated |
R1‑111180 | Way forward on PUSCH A/N codebook size in Rel-10 TDD | Huawei, HiSilicon, Samsung, LG Electronics , Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Renesas Electronics Europe, Research In Motion UK Limited, InterDigital Communications, ETRI, ITRI | Noted |
R1‑111181 | Way forward on coding scheme of CQI/PMI for aperiodic CSI reporting | ZTE, Samsung, Huawei, HiSilicon, Taxes Instrument, Motorola Mobility,NSN, Nokia, Potevio | Revised |
R1‑111182 | WF on Soft buffer allocation for CA | Motorola Mobility | Revised |
R1‑111183 | WF on TDD ACK/NACK with channel selection Mode b in Rel-10 | CATT, ITRI | Noted |
R1‑111184 | WF on mode b resource allocation | LGE, Samsung | Revised |
R1‑111185 | WF on transmission mode | LG Electronics, Panasonic, Ericsson, ST-Ericsson, Texas Instruments, ETRI, ITRI | Revised |
R1‑111186 | LS on the support of UL subframe bundling together with DL CA | RAN1, Ericsson | Agreed |
R1‑111187 | WF on mode b resource allocation | LGE, Samsung, Nokia, NSN | Noted |
R1‑111188 | LS Reply on RSRQ measurement accuracy with eICIC | RAN4, Huawei | Noted |
R1‑111189 | Way forward on coding scheme of CQI/PMI for aperiodic CSI reporting | ZTE, Samsung, Huawei, HiSilicon, Texas Instruments, Motorola Mobility, NSN, Nokia, Potevio ,Qualcomm | Noted |
R1‑111190 | WF on ACK/NACK codebook size determination regarding special subframe in TDD | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, CMCC, Ericsson, Motorola Mobility, Nokia, Nokia Siemens Networks, Qualcomm Inc., Renesas Electronics Europe, Samsung, ST-Ericsson, Texas Instruments, ZTE | Agreed |
R1‑111191 | [DRAFT] LS reply on coexistence of frequency domain and time domain ICIC | Ericsson | Noted - Revised |
R1‑111192 | WF on PUCCH format 3 for TDD | ZTE, LG Electronics, Pantech, ETRI, Ericsson, ST-Ericsson, Samsung, Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CMCC | Not treated |
R1‑111193 | Combinations of Uplink Channels and Signals | Ad Hoc chair (Qualcomm) | Endorsed |
R1‑111194 | Discussion status of Soft buffer allocation for CA | Motorola Mobility, Panasonic, Ericsson, ST_E, Huawei, HiSilicon, CATT | Not treated |
R1‑111195 | CoMP simulation assumptions | NTT DOCOMO | Revised |
R1‑111196 | WF on CRC length of TBCC encoding of aperiodic CSI transmission | ZTE | Noted |
R1‑111197 | LS reply on coexistence of frequency domain and time domain ICIC | RAN1, Ericsson | Agreed |
R1‑111198 | LS Reply to RAN3 on the tail issues for TDD mode with configuration 0/6 in eICIC | RAN1, Alcatel-Lucent | Agreed |
R1‑111199 | WF on transmission mode | LG Electronics, Panasonic, Ericsson, ST-Ericsson, Texas Instruments, ETRI, ITRI, Huawei, HiSilicon | Noted |
R1‑111200 | WF on TDD ACK/NACK on Un PUCCH in Rel-10 | CATT | Noted |
R1‑111201 | Draft LS on CQI Reference | Qualcomm Incorporated | Noted - Revised |
R1‑111202 | [DRAFT] LS on Radio Interface Standards that could be used for Public Protection and Disaster Relief Operations | Alcatel-Lucent | Noted - Revised |
R1‑111203 | Draft LS on correction on physical layer part on TS36.300 | Panasonic | Noted - Revised |
R1‑111204 | TR25.8xx v0.1.2 HSDPA Multipoint Transmission | Nokia Siemens Networks | Noted - Revised |
R1‑111205 | Correction on physical layer part on TS36.300 | Panasonic, CATT, Qualcomm, Samsung, LGE | Endorsed |
R1‑111206 | WF on handling of collision between CSI-RS and PMCH | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm, Huawei, HiSilicon, LG Electronics, Texas Instruments, Panasonic, Motorola Mobility, Renesas, Samsung, Nokia, Nokia Siemens Networks, CATT | Agreed |
R1‑111207 | LS rely on RLM/RSRQ/RSRP measurement definitions for eICIC | RAN4, NTT DoCoMo | Noted |
R1‑111208 | CoMP simulation assumptions | NTT DOCOMO | Noted - Revised |
R1‑111209 | Reply LS on CQI reporting at SCell activation | RAN1, Nokia Siemens Networks | Agreed |
R1‑111210 | 36.213 draftCR on RLM Procedure with restricted measurements | Alcatel Lucent | Noted - Revised |
R1‑111211 | WF for soft buffer for Rel-10 CA | ALU, ASB, NTT DOCOMO, Panasonic, Qualcomm, Renesas, Fujitsu, Huawei, HiSilicon, NSN, Nokia, KDDI, Sharp, NEC | Noted |
R1‑111212 | LS on correction on physical layer part on TS36.300 | RAN1, Panasonic | Agreed |
R1‑111213 | Draft LS on updated parameters for Rel-10 | Ericsson | Noted - Revised |
R1‑111214 | 36.211 CR0150 (Rel-10, F) Corrections to Rel-10 LTE-Advanced features in 36.211 | Ericsson | Agreed |
R1‑111215 | 36.212 CR0102 (Rel-10, F) Corrections to Rel-10 LTE-Advanced features in 36.212 | Qualcomm Incorporated | Agreed |
R1‑111216 | 36.213 CR0273 (Rel-10, F) Corrections to Rel-10 LTE-Advanced features in 36.213 | Motorola | Agreed |
R1‑111217 | 36.216 CR0002 (Rel-10, B) Capturing of agreements on relaying from RAN1#64 | Panasonic | Agreed |
R1‑111218 | LS on updated parameters for Rel-10 | RAN1, Ericsson | Agreed |
R1‑111219 | Combinations of Uplink Channels and Signals | Ad Hoc chair (Qualcomm) | Agreed |
page generated from database: 2024-10-07 07:52:06