3GPP TDocs (written contributions) at meeting
Meeting: R1-63b - 2011-01-17 to 2011-01-21, Dublin
meeting id: R1-63b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑110000 | Draft Agenda for RAN1#63bis meeting | RAN1 Chairman | Approved |
R1‑110001 | Final report of RAN1#63 meeting | MCC Support | Approved |
R1‑110002 | Reply LS on Radio Link Monitoring for Carrier Aggregation | RAN2, NTT DoCoMo | Noted |
R1‑110003 | LS on HARQ feedback for RNs configured with R-PDCCH | RAN2, Ericsson | Noted |
R1‑110004 | LS on Power Headroom Reporting | RAN2, Nokia | Noted |
R1‑110005 | Response LS on Timing Requirements for Activation and Deactivation of Scells | RAN4, Nokia | Noted |
R1‑110006 | Reply LS on Rel-10 UE category | RAN4, NTT DoCoMo | Noted |
R1‑110007 | LS on exception to SA WG3 to continue working on Relay Node | SA, Huawei | Noted |
R1‑110008 | Soft buffer allocation for Rel-10 downlink | Huawei, HiSilicon | Not treated |
R1‑110009 | Coding and resource mapping for UCI on PUSCH | Huawei, HiSilicon | Not treated |
R1‑110010 | Overview of Simultaneous Transmissions of Uplink Channels or Signals | Huawei, HiSilicon | Not treated |
R1‑110011 | Simultaneous CQI and A/N with the baseline of no carrier-domain A/N bundling | Huawei, HiSilicon | Noted |
R1‑110012 | Final details of CSI-RS | Huawei, HiSilicon | Not treated |
R1‑110013 | Discussion on non-PMI based feedback in Rel-10 | Huawei, HiSilicon | Not treated |
R1‑110014 | Refinements to UL CoMP simulation assumptions | Huawei, HiSilicon | Withdrawn |
R1‑110015 | Remaining issues in aperiodic CQI-only PUSCH | Huawei, HiSilicon | Not treated |
R1‑110016 | Final details of SRS | Huawei, HiSilicon | Not treated |
R1‑110017 | SGH for UL DM RS | Huawei, HiSilicon | Not treated |
R1‑110018 | Further considerations on muting for R-PDCCH | Huawei, HiSilicon | Not treated |
R1‑110019 | Reserved DMRS for R-PDCCH Mapping | Huawei, HiSilicon | Not treated |
R1‑110020 | Measurement definitions for resource-restricted measurements | Huawei, HiSilicon | Noted |
R1‑110021 | Open issues for aperiodic and periodic CSI reporting | Huawei, HiSilicon | Noted |
R1‑110022 | Refinements to CoMP simulation assumptions | Huawei, HiSilicon | Not treated |
R1‑110023 | DL and UL CoMP schemes for consideration | Huawei, HiSilicon | Noted |
R1‑110024 | Update on L1 parameters for WIs CA, ULMA and eDLMA | Ericsson, ST-Ericsson | Agreed |
R1‑110025 | On ACK/NACK for TDD with PUCCH format 1b and channel selection | Ericsson, ST-Ericsson | Not treated |
R1‑110026 | PUCCH format 3 resource selection | Ericsson, ST-Ericsson | Not treated |
R1‑110027 | Periodic CSI reporting for CA | Ericsson, ST-Ericsson | Not treated |
R1‑110028 | Power control for PUCCH format 3 with SORTD | Ericsson, ST-Ericsson | Noted |
R1‑110029 | On use cases of DCI format 3/3A | Ericsson, ST-Ericsson | Not treated |
R1‑110030 | Coding and resource utilization for UCI on PUSCH | Ericsson, ST-Ericsson | Withdrawn |
R1‑110031 | Remaining details for CA based HetNets | Ericsson, ST-Ericsson | Not treated |
R1‑110032 | DL Carrier Aggregation together with UL Subframe Bundling | Ericsson, ST-Ericsson | Not treated |
R1‑110033 | Views on soft buffer handling for Rel-10 UEs | Ericsson, ST-Ericsson | Not treated |
R1‑110034 | Views on handling of orphan RE for transmit diversity in CSI-RS subframes | Ericsson, ST-Ericsson | Not treated |
R1‑110035 | Remaining details of aperiodic SRS | Ericsson, ST-Ericsson | Not treated |
R1‑110036 | Design of PUCCH Format 1b with channel selection for Rel-10 TDD ACK/NAK | CATT | Noted |
R1‑110037 | Randomization of PUCCH format 3 | CATT | Noted |
R1‑110038 | Periodic CQI/PMI/RI reporting in Rel-10 | CATT | Not treated |
R1‑110039 | Concurrent transmission of uplink signals on PUSCH in Rel-10 | CATT | Not treated |
R1‑110040 | Concurrent transmission of uplink signals on PUCCH in Rel-10 | CATT | Not treated |
R1‑110041 | UCI transmission on PUSCH in Rel-10 | CATT | Not treated |
R1‑110042 | Remaining details of aperiodic CSI triggering in Rel-10 | CATT | Withdrawn |
R1‑110043 | SCell selection for UCI transmission | CATT | Not treated |
R1‑110044 | Soft buffer partitioning in Rel-10 | CATT | Not treated |
R1‑110045 | Dual RM segmentation and format 3 power control | CATT | Noted |
R1‑110046 | SRS transmission with PUSCH/PUCCH/SRS | CATT | Not treated |
R1‑110047 | UL power control for DCI format 3/3A | CATT | Not treated |
R1‑110048 | Considerations on interference measurement | CATT | Not treated |
R1‑110049 | Interference measurement over muted RE | CATT | Not treated |
R1‑110050 | Discussion on CQI definition | CATT | Not treated |
R1‑110051 | UL transmission scheme with antenna switching | CATT | Noted |
R1‑110052 | Clarification on resource size of UCI in PUSCH | CATT | Noted |
R1‑110053 | Remaining issues on transmission of aperiodic SRS | CATT | Not treated |
R1‑110054 | On triggering of aperiodic SRS via DL grants | CATT | Not treated |
R1‑110055 | Clarification on timing of aperiodic SRS | CATT | Not treated |
R1‑110056 | Remaining details of Un specification in Rel-10 | CATT | Not treated |
R1‑110057 | Considerations on Remaining Issues of CSI Feedback | CATT | Not treated |
R1‑110058 | Considerations on RSRP/RSRQ Definition | CATT | Noted |
R1‑110059 | Considerations on scenarios and simulation assumptions of CoMP | CATT | Not treated |
R1‑110060 | Views on CoMP transmission schemes | CATT | Noted |
R1‑110061 | Views on remaining issues for SGH | Ericsson, ST-Ericsson | Withdrawn |
R1‑110062 | On the Configuration of SRS-Related parameters by DCI Format 4 | Ericsson, ST-Ericsson | Withdrawn |
R1‑110063 | Coordinated Antenna Calibration for CoMP | Sony Corporation | Noted |
R1‑110064 | Remaining details on dual-RM coded UCI on PUSCH | Samsung | Revised |
R1‑110065 | SRS Multiplexing in carrier aggregation | Samsung | Not treated |
R1‑110066 | Resource indexing for PUCCH format 3 | Samsung | Noted |
R1‑110067 | Multiplexing periodic CSI reports on subframes with PUSCH | Samsung | Not treated |
R1‑110068 | Cross-carrier group UL PC for LTE-A | Samsung | Not treated |
R1‑110069 | CSI reporting and SRS timing upon Scell activation/deactivation | Samsung | Not treated |
R1‑110070 | Discussion on high payload HARQ-ACK transmission on PUSCH | Samsung | Not treated |
R1‑110071 | PUCCH Resource Indication for Channel Selection and DL CA | Samsung | Not treated |
R1‑110072 | HARQ-ACK Payload for PUCCH Format 3 and TDD | Samsung | Not treated |
R1‑110073 | Periodic CSI Reporting for DL CA | Samsung | Noted |
R1‑110074 | PUCCH Transmission Power with HARQ-ACK bundling for DL CA | Samsung | Not treated |
R1‑110075 | Scell Selection for UCI Multiplexing | Samsung | Not treated |
R1‑110076 | Resources for HARQ-ACK and RI Multiplexing in PUSCH | Samsung | Not treated |
R1‑110077 | UL DAI Design for DL CA | Samsung | Not treated |
R1‑110078 | Simultaneous PUCCH and PUSCH Transmissions in Case of Aperiodic CSI | Samsung | Not treated |
R1‑110079 | Simultaneous PUSCH and PUCCH Transmissions | Samsung | Not treated |
R1‑110080 | Discussion on channel selection for TDD | Samsung | Revised |
R1‑110081 | Remaining Issues on concurrent transmission of SRI and CA ACK/NACK in Rel-10 | Samsung | Noted |
R1‑110082 | Correction of text on aperiodic CSI triggering | Samsung, Panasonic, Motorola Mobility, Qualcomm Inc. | Not treated |
R1‑110083 | Correction of the equation for UL transmit power scaling | Samsung | Not treated |
R1‑110084 | PDSCH transmission in MBSFN subframes | Samsung | Not treated |
R1‑110085 | WF on DCI Format for 1 Port CSI-RS | CATT, CMCC, Ericsson, ETRI, Hitachi, HTC, KDDI, NTT DOCOMO, Pantech, RIM, Samsung, ST-Ericsson | Noted |
R1‑110086 | Reference Transmission Scheme for CQI calculation in TM9 | Samsung | Noted |
R1‑110087 | Reference Resource size for CQI calculation in LTE-A | Samsung | Not treated |
R1‑110088 | Collision avoidance of DMRS with PSS and SSS in Rel-10 | Samsung | Not treated |
R1‑110089 | CQI Reference Resource Timing for LTE-A | Samsung | Not treated |
R1‑110090 | CQI-only transmissions in LTE-A uplink | Samsung | Noted |
R1‑110091 | UCI Resources for Single Codeword Multiplexing in SU-MIMO PUSCH | Samsung | Noted |
R1‑110092 | UL DMRS Sequence Group Hopping in Rel.10 | Samsung | Not treated |
R1‑110093 | Aperiodic SRS Configuration Aspects | Samsung | Not treated |
R1‑110094 | R-PDCCH Search Space Design | Samsung | Not treated |
R1‑110095 | CSI measurement issue for macro-femeto secnarios | Samsung | Not treated |
R1‑110096 | Periodic CSI reporting configuration and collision handling for two subsets | Samsung | Noted |
R1‑110097 | Discussions on CoMP simulation assumptions | Samsung | Not treated |
R1‑110098 | High-level Discussion on COMP schemes | Samsung | Noted |
R1‑110099 | CoMP/JP Scheme for UE Receiving Multiple Radio Bearers in Heterogeneous Cells | ETRI | Noted - Revised |
R1‑110100 | Discussion on remaining issues in CSI-RS and muting | New Postcom | Not treated |
R1‑110101 | Remaining details on UCI transmission for simultaneous PUCCH and PUSCH | New Postcom | Not treated |
R1‑110102 | Remaining details on PUSCH selection | New Postcom | Not treated |
R1‑110103 | Considerations on periodic CSI reporting and RLM in eICIC | New Postcom | Not treated |
R1‑110104 | Considerations on interference avoidance for common control information in LTE-A | New Postcom | Not treated |
R1‑110105 | Considerations on TD-based eICIC for Macro-Femto | New Postcom | Not treated |
R1‑110106 | High-level view of existing CoMP schemes proposed for Rel-11 | New Postcom | Noted |
R1‑110107 | Analysis of the capacity and latency constraints in CoMP | New Postcom | Not treated |
R1‑110108 | Refinements to simulation assumptions for CoMP | New Postcom | Not treated |
R1‑110109 | Remaining details on power control for SRS transmissions | New Postcom | Not treated |
R1‑110110 | OCC remapping for PUCCH Format 3 | InterDigital Communications, LLC | Not treated |
R1‑110111 | Inter-cell interference randomization for PUCCH Format 3 | InterDigital Communications, LLC | Noted |
R1‑110112 | Open issues on R10 TDD PUCCH A/N | InterDigital Communications, LLC | Not treated |
R1‑110113 | PUCCH resource assignment with channel selection | InterDigital Communications, LLC | Not treated |
R1‑110114 | R11 COMP simulation assumptions | InterDigital Communications, LLC | Not treated |
R1‑110115 | Considerations on R11 COMP proposals | InterDigital Communications, LLC | Noted |
R1‑110116 | Simulation Assumptions for Link Evaluation of Closed Loop ULTD | Qualcomm Incorporated | Noted |
R1‑110117 | Simulation Assumptions for System Evaluation of Closed Loop ULTD | Qualcomm Incorporated | Noted |
R1‑110118 | Physical Layer Design Considerations for CLTD | Qualcomm Incorporated | Noted |
R1‑110119 | UL Pilot Channel Structure for Closed Loop ULTD | Qualcomm Incorporated | Revised |
R1‑110120 | Interaction of CPC and Closed Loop ULTD | Qualcomm Incorporated | Noted |
R1‑110121 | Feedback Design for Closed Loop ULTD | Qualcomm Incorporated | Noted |
R1‑110122 | Work Plan for Multi-Point HSDPA SI | Qualcomm Incorporated | Noted |
R1‑110123 | Candidate schemes for Multi-Point HSDPA | Qualcomm Incorporated | Noted |
R1‑110124 | Simulation Framework for System Evaluation of Multi-Point HSDPA | Qualcomm Incorporated | Noted - Revised |
R1‑110125 | Impact to HS-DPCCH timing due to Multi-Point HSDPA | Qualcomm Incorporated | Not treated |
R1‑110126 | DL Scheduling, RLC and Flow Control assumption for Inter-NodeB Multi-point Transmissions | Qualcomm Incorporated | Noted |
R1‑110127 | Work Plan for UL MIMO SI | Qualcomm Incorporated | Noted |
R1‑110128 | 25.8xx TR skeleton for UL MIMO for HSPA | Qualcomm Incorporated | Noted |
R1‑110129 | Design Objective of UL MIMO for HSPA | Qualcomm Incorporated | Noted |
R1‑110130 | Simulation Framework for Link Evaluation of UL MIMO | Qualcomm Incorporated | Noted |
R1‑110131 | Physical Channels for UL MIMO operation | Qualcomm Incorporated | Noted |
R1‑110132 | Channel Coding and Multiplexing Design Considerations for UL MIMO | Qualcomm Incorporated | Noted |
R1‑110133 | Uplink Power Control Design for UL MIMO | Qualcomm Incorporated | Noted |
R1‑110134 | Initial Link Analysis of UL MIMO | Qualcomm Incorporated | Noted |
R1‑110135 | Introducing small cell system scenarios for HSPA. | Qualcomm Incorporated | Not treated |
R1‑110136 | Views on A/N Feedback Modes for TDD in Carrier Aggregation | MediaTek Inc. | Not treated |
R1‑110137 | Views on Resource Allocation for PUCCH Format 1b with Channel Selection in Carrier Aggregation | MediaTek Inc. | Not treated |
R1‑110138 | Views on Periodic PMI/CQI/RI Feedback in Carrier Aggregation | MediaTek Inc. | Not treated |
R1‑110139 | Obtaining the SFN of target cell during handover | MediaTek Inc. | Noted - Revised |
R1‑110140 | Specification impact of CSI measurements and reporting in subframe subsets | MediaTek Inc. | Not treated |
R1‑110141 | Working assumption for aperiodic CSI reporting in subframe subsets | MediaTek Inc. | Not treated |
R1‑110142 | Collision handling for periodic CSI reporting in subframe subsets | MediaTek Inc. | Not treated |
R1‑110143 | Discussions on remaining issues of aperiodic SRS | MediaTek Inc. | Revised |
R1‑110144 | Discussions on CQI reference resource | MediaTek Inc. | Not treated |
R1‑110145 | Discussion on Rel-10 LTE Feature List and UE Capability from RAN1 Perspective | MediaTek Inc. | Noted |
R1‑110146 | On inter-cell interference for PUCCH format 3 | ITRI | Noted |
R1‑110147 | Further considerations on PUCCH format 3 | ITRI | Not treated |
R1‑110148 | PUCCH format 3 ACK/NACK performance equalization for carrier aggregation | ITRI | Not treated |
R1‑110149 | Performance Consideration of CoMP | ITRI | Revised |
R1‑110150 | Issues on delay spread for UL CoMP | ITRI | Not treated |
R1‑110151 | Consideration on 8C-HSDPA UE categories | China Unicom, Huawei | Not treated |
R1‑110152 | Some considerations on multi-point transmission | China Unicom | Not treated |
R1‑110153 | Resource size for CSI reporting PUSCH considering activation status | ASUSTeK | Not treated |
R1‑110154 | TB association for DCI format 0 when UL MIMO is configured | ASUSTeK | Noted |
R1‑110155 | On aperiodic CSI triggering for CA | Pantech | Not treated |
R1‑110156 | PUCCH resource allocation with SORTD in Rel-10 CA | Pantech | Not treated |
R1‑110157 | Usage of PUCCH format 3 in Non-CA environment for TDD | Pantech | Not treated |
R1‑110158 | Remain details on SGH in uplink DM-RS | Pantech | Not treated |
R1‑110159 | Details on aperiodic SRS triggering | Pantech | Not treated |
R1‑110160 | Methods to inform femto-specific ABS pattern | Pantech | Not treated |
R1‑110161 | Simulation assumptions for intra/inter-site CoMP | Pantech | Not treated |
R1‑110162 | Enhanced UL and DL transmission for CoMP | Pantech | Noted |
R1‑110163 | A/N for TDD with PUCCH Format 1b with channel selection | ZTE | Noted |
R1‑110164 | Multiplexing of periodic CSI and ACK/NACK on PUCCH | ZTE | Not treated |
R1‑110165 | Remaining Open Issues of simultaneous transmission of UL channels | ZTE | Not treated |
R1‑110166 | Remaining details of UCI multiplexing on PUSCH | ZTE | Not treated |
R1‑110167 | Remaining issues of Aperiodic SRS | ZTE | Not treated |
R1‑110168 | Power control of PUCCH for LTE-A TDD | ZTE | Not treated |
R1‑110169 | Remaining issues for Q' funciton | ZTE | Not treated |
R1‑110170 | View point for CSI-RS sequence for different antenna ports | ZTE | Noted |
R1‑110171 | Cyclic prefix for positioning reference signal | ZTE | Not treated |
R1‑110172 | Views on Rel-11 CoMP | ZTE | Revised |
R1‑110173 | Discussion on simulation assumptions for CoMP evaluation | ZTE | Not treated |
R1‑110174 | Remaining issues on CSI Feedback | ZTE | Not treated |
R1‑110175 | Remaining issues of Rel-10 eICIC | ZTE | Not treated |
R1‑110176 | Views of Further Studies on Downlink CoMP | Hitachi | Noted |
R1‑110177 | Prioritization Proposals for CoMP study in LTE Release 11 | HTC, CHTTL | Noted |
R1‑110178 | Triggering of aperiodic CSI | HTC | Withdrawn |
R1‑110179 | PUSCH selection for UCI transmission | HTC | Not treated |
R1‑110180 | Views of schemes for CoMP | HTC | Revised |
R1‑110181 | Remaining details of aperiodic SRS | HTC | Withdrawn |
R1‑110182 | Initial System Level Simulation Results on Closed Loop Transmit Diversity with LMMSE receiver and ISD of 1000 m | Renesas Electronics Europe, Nokia Siemens Networks, Nokia | Not treated |
R1‑110183 | Initial System Level Simulation Results on Closed Loop Transmit Diversity with LMMSE receiver and ISD of 2800 m | Renesas Electronics Europe, Nokia Siemens Networks, Nokia | Not treated |
R1‑110184 | Discussion on 8-carrier HSDPA | Renesas Electronics Europe | Noted |
R1‑110185 | Soft buffer partitioning | Renesas Electronics Europe | Withdrawn |
R1‑110186 | On the orphan RE issue in CSI-RS subframes | Renesas Electronics Europe | Not treated |
R1‑110187 | On CQI reference resource | Renesas Electronics Europe | Noted |
R1‑110188 | UE capabilities for DL MIMO Extension and UL Multiple Antenna transmission | Renesas Electronics Europe | Noted |
R1‑110189 | Views on CoMP schemes | Renesas Electronics Europe | Noted |
R1‑110190 | Periodic CSI reporting | InterDigital Communications, LLC | Noted |
R1‑110191 | Aperiodic CSI triggering | InterDigital Communications, LLC | Not treated |
R1‑110192 | Text Proposal for PUCCH Resource Allocation for channel selection | Panasonic | Not treated |
R1‑110193 | Discussion on various UL transmission configurations | Panasonic | Not treated |
R1‑110194 | Simultaneous transmission of ACK/NACK information and SRI for channel selection | Panasonic | Not treated |
R1‑110195 | SORTD configurations for ACK/NACK information and SRI | Panasonic | Not treated |
R1‑110196 | ACK/NACK resource indication for SORTD and SDM | Panasonic | Not treated |
R1‑110197 | Remaining details of PUSCH/PUCCH/SRS simultaneous transmissions in Rel. 10 | Panasonic | Not treated |
R1‑110198 | Summary of email discussion: Aperiodic CQI Triggering in common search space | Panasonic | Agreed |
R1‑110199 | Aperiodic CSI reports size mismatch issue | Panasonic | Not treated |
R1‑110200 | Periodic CQI for Carrier Aggregation | Panasonic | Not treated |
R1‑110201 | Power reduction for virtual PHR | Panasonic | Not treated |
R1‑110202 | Remaining details for enhanced ICIC | Panasonic | Noted |
R1‑110203 | Soft buffer partitioning | Panasonic | Not treated |
R1‑110204 | Discussion on remaining details for CSI-RS | Panasonic | Not treated |
R1‑110205 | CSI-RS sequence considerations | Panasonic | Noted |
R1‑110206 | Clarification on PTI reporting | Panasonic | Not treated |
R1‑110207 | PMI Disabling in TM9 | Panasonic | Noted |
R1‑110208 | Discussion on remaining details of signalling for SU-MIMO | Panasonic | Not treated |
R1‑110209 | Sequence Group Hopping of UL DMRS for MU-MIMO | Panasonic | Not treated |
R1‑110210 | Remaining issues on aperiodic SRS triggering | Panasonic | Not treated |
R1‑110211 | CS offset values and comb assignment for multi-antenna SRS | Panasonic | Not treated |
R1‑110212 | Number of reserved DMRS antenna ports in 1st slot with R-PDCCH | Panasonic | Not treated |
R1‑110213 | Transmission mode and RS types supported in Un link | Panasonic | Not treated |
R1‑110214 | Resource allocation schemes of R-PDCCH | Panasonic | Not treated |
R1‑110215 | CoMP Targeted Scnearios and Simulation Assumptions | Panasonic | Not treated |
R1‑110216 | High Level Views of CoMP Schemes | Panasonic | Revised |
R1‑110217 | Considerations for closed-loop uplink transmit diversity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110218 | Considerations for 8C-HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110219 | Periodic CQI/PMI/RI reporting in case of multiple DL CCs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110220 | Simultaneous Uplink Transmissions and Uplink Transmission Combinations with Carrier Aggregation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110221 | Remaining details of UCI coding / resource mapping on PUSCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110222 | Triggering of Aperiodic CSI with Carrier Aggregation in Common Search Space | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑110223 | On selection of PUSCH for UCI transmission | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110224 | Remaining Issues on CSI-RS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110225 | Remaining Issues on CSI feedback | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110226 | TxD for PUCCH Format 1b with channel selection | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110227 | Remaining Issues on Aperiodic SRS | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑110228 | Specification considerations related to ABS for RLM and RSRP/RSRQ Measurements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑110229 | Draft CR to 36.214 for RSRQ Measurement with ABS | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑110230 | Specification Considerations on Restricted CSI Measurements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Revised |
R1‑110231 | Specification Considerations on Restricted CSI Measurements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑110232 | Evaluation assumptions for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110233 | Overview of CoMP schemes for study | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑110234 | Practical constraints of the communication link between transmission points | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑110235 | CoMP considerations for TDD | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑110236 | Remaining issues regarding channel selection | NTT DOCOMO | Not treated |
R1‑110237 | Views on combination of uplink signaling | NTT DOCOMO | Not treated |
R1‑110238 | Email summary of A/N for TDD with PUCCH format 1b with channel selection | NTT DOCOMO | Noted |
R1‑110239 | Views on simultaneous SRS transmissions | NTT DOCOMO | Not treated |
R1‑110240 | Soft Buffer Partitioning and Rate Matching for Downlink CA | NTT DOCOMO | Revised |
R1‑110241 | Higher layer signaling of CSI-RS and muting configurations | NTT DOCOMO | Withdrawn |
R1‑110242 | Remaining issues for aperiodic SRS | NTT DOCOMO | Not treated |
R1‑110243 | Combination of Carrier Aggregation and Relay in Rel-10 | NTT DOCOMO | Not treated |
R1‑110244 | System Evaluation of Relay Performance | NTT DOCOMO | Not treated |
R1‑110245 | Remaining issues on Rel-10 eICIC | NTT DOCOMO | Not treated |
R1‑110246 | Rel-10 DL/UL MIMO capabilities | NTT DOCOMO | Revised |
R1‑110247 | Refinements to simulation assumptions for Rel. 11 CoMP | NTT DOCOMO | Not treated |
R1‑110248 | Views for Rel-11 CoMP | NTT DOCOMO | Revised |
R1‑110249 | Remaining details of CSI-RS structure | Intel Corporation (UK) Ltd | Noted |
R1‑110250 | Proposal on CoMP evaluation methodology | Intel Corporation (UK) Ltd | Not treated |
R1‑110251 | Coordinated multi-point schemes with centralized and distributed scheduling | Intel Corporation (UK) Ltd | Noted |
R1‑110252 | Coordinated beamforming schemes for CoMP | Intel Corporation (UK) Ltd | Not treated |
R1‑110253 | PMI disabling in TM9 | Intel Corporation (UK) Ltd | Noted |
R1‑110254 | Resource Allocation for PUCCH Format 1b with Channel Selection | Intel Corporation (UK) Ltd | Not treated |
R1‑110255 | Finalizing resource mapping for PUCCH format 3 | Texas Instruments | Revised |
R1‑110256 | Remaining issues on aperiodic CSI reporting for CA | Texas Instruments | Not treated |
R1‑110257 | On periodic CSI reporting for Carrier Aggregation | Texas Instruments | Noted |
R1‑110258 | UCI Multiplexing for Simultaneous PUSCH/PUCCH Configuration | Texas Instruments | Not treated |
R1‑110259 | On CSI-RS reference sequence and handling in TM-2 | Texas Instruments | Not treated |
R1‑110260 | CQI reference resource with CSI-RS | Texas Instruments | Noted |
R1‑110261 | Outstanding aspects for aperiodic SRS configuration | Texas Instruments | Not treated |
R1‑110262 | On frequency hopping for aperiodic SRS transmission | Texas Instruments | Not treated |
R1‑110263 | CSI reporting based on restricted measurements in Rel-10 | Texas Instruments | Noted |
R1‑110264 | Study on Coordinated Multi-Point operation for LTE | Texas Instruments | Noted |
R1‑110265 | Comparison of UL CLTD Pilot Channel Structures | InterDigital Communications, LLC | Revised |
R1‑110266 | HS-DPCCH Design Considerations for 8C-HSDPA | InterDigital Communications, LLC | Noted |
R1‑110267 | Initial design considerations for HSPA UL MIMO | InterDigital Communications, LLC | Noted |
R1‑110268 | High level views on CoMP Feedback for Release 11 | Marvell | Not treated |
R1‑110269 | Performance Evaluation of Intrasite Coordinated Beamforming | Marvell | Not treated |
R1‑110270 | Activation of Q'min for UCI on PUSCH | Sharp | Not treated |
R1‑110271 | Simultaneous SRS Transmission with PUSCH/PUCCH/SRS | Sharp | Not treated |
R1‑110272 | Priority Rules for Periodic CQI/PMI/RI Reporting for CA | Sharp | Not treated |
R1‑110273 | Simultaneous CSI and ACK/NACK reporting on PUCCH for CA in Rel-10 | Sharp | Not treated |
R1‑110274 | Concatenation of Dual RM Coding Bits for UCI on PUSCH | Sharp | Not treated |
R1‑110275 | Cross carrier power control with group TPC commands | Sharp | Not treated |
R1‑110276 | HARQ-ACK codebook definition for TDD | Sharp | Not treated |
R1‑110277 | Clarification on OCC Application for UL DMRS | Sharp | Not treated |
R1‑110278 | Remaining Issues on Dynamic Aperiodic SRS Signaling | Sharp | Not treated |
R1‑110279 | Corrections on RAN1 spec for Rel-10 | Research In Motion UK Limited | Not treated |
R1‑110280 | Simultaneous transmission of uplink channels | Research In Motion UK Limited | Not treated |
R1‑110281 | Discussion on soft buffer partitioning | Research In Motion UK Limited | Not treated |
R1‑110282 | ACK/NACK bit ordering in case of >11 bits | Research In Motion UK Limited | Not treated |
R1‑110283 | Clarification of Rel-10 UE category and MIMO layer capability definition | Research In Motion UK Limited | Noted |
R1‑110284 | Supporting Format 1A in MBSFN Subframes for Rel-10 UE | Research In Motion UK Limited | Not treated |
R1‑110285 | Views on Supporting PMI Disabling in TM9 | Research In Motion UK Limited | Not treated |
R1‑110286 | On the remaining details of aperiodic SRS | Research In Motion UK Limited | Not treated |
R1‑110287 | High Level View of CoMP System for Rel-11 | Research In Motion UK Limited | Noted |
R1‑110288 | Channel Selection Transmit Diversity in Release 10 | Research In Motion UK Limited | Noted |
R1‑110289 | 25.224 CR0264 (Rel-9, F) Correction of the special burst transmission power calculation for 1.28Mcps TDD | ZTE | Noted - Revised |
R1‑110290 | 25.224 CR0265 (Rel-10, A) Correction of the special burst transmission power calculation for 1.28Mcps TDD | ZTE | Noted - Revised |
R1‑110291 | Proposals for consideration for CoMP enhancements | Motorola Solutions | Noted |
R1‑110292 | New System Simulation Assumptions for CoMP in Heterogeneous Networks | Motorola Solutions | Not treated |
R1‑110293 | Simulation considerations on distributed RRHs for COMP | Motorola Solutions | Not treated |
R1‑110294 | Simulation considerations on heterogeneous networks for COMP | Motorola Solutions | Not treated |
R1‑110295 | Soft Buffer Partitioning for Carrier Aggregation | Motorola Mobility | Not treated |
R1‑110296 | Periodic CQI/PMI/RI Reporting for CA | Motorola Mobility | Not treated |
R1‑110297 | On remaining details of Aperiodic CQI Triggering in common search space | Motorola Mobility | Withdrawn |
R1‑110298 | On UL DM-RS SGH Disabling | Motorola Mobility | Not treated |
R1‑110299 | On Remaining details on aperiodic SRS | Motorola Mobility | Not treated |
R1‑110300 | CoMP with high latency constraints | Motorola Mobility | Not treated |
R1‑110301 | Overview of Coordinated Multi-Point Operation | Motorola Mobility | Not treated |
R1‑110302 | Feedback channel for uplink closed loop transmit diversity | ZTE | Noted |
R1‑110303 | Some aspects on 8C-HSDPA | ZTE | Revised |
R1‑110304 | HARQ codebook performance evaluation in HSDPA multipoint transmission | ZTE | Not treated |
R1‑110305 | System performance evaluation of SF-DC-HSDPA | ZTE | Not treated |
R1‑110306 | Further discussion on synchronization for DC-HSUPA | Huawei, HiSilicon | Noted |
R1‑110307 | 25.214 CR0632r2 (Rel-9, F) Correction to CPC procedure for DC-HSUPA | Huawei, HiSilicon | Noted - Revised |
R1‑110308 | 25.214 CR0633r2 (Rel-10, A) Correction to CPC procedure for DC-HSUPA | Huawei, HiSilicon | Noted - Revised |
R1‑110309 | Initial considerations on Uplink Closed Loop Transmit Diversity | Huawei, HiSilicon | Noted |
R1‑110310 | Comparison of Transmission Schemes for CLTD | Huawei, HiSilicon | Noted |
R1‑110311 | Link Simulation Assumptions and Metrics for CLTD | Huawei, HiSilicon | Revised |
R1‑110312 | System Simulation Assumptions and Metrics for CLTD | Huawei, HiSilicon | Noted - Revised |
R1‑110313 | Initial system performance of CLTD | Huawei, HiSilicon | Not treated |
R1‑110314 | Analysis of Pilot Design for CLTD | Huawei, HiSilicon | Noted |
R1‑110315 | On Downlink PCI Feedback Scheme | Huawei, HiSilicon | Noted |
R1‑110316 | Precoding Codebook Design | Huawei, HiSilicon | Noted |
R1‑110317 | Initial considerations on 8C-HSDPA | Huawei, HiSilicon | Noted |
R1‑110318 | Specification impact analysis of 8C-HSDPA | Huawei, HiSilicon | Not treated |
R1‑110319 | HS-DPCCH design for 8C-HSDPA | Huawei, HiSilicon | Noted |
R1‑110320 | Cubic metric analysis for HS-DPCCH design of 8C-HSDPA | Huawei, HiSilicon | Noted |
R1‑110321 | System simulation assumptions on HSDPA multipoint transmission | Huawei, HiSilicon | Noted |
R1‑110322 | Considerations on HSDPA multipoint transmission | Huawei, HiSilicon | Noted |
R1‑110323 | Overview of UL MIMO | Huawei, HiSilicon | Withdrawn |
R1‑110324 | List of open issues for inclusion of LTE-A features in 36.212 | Qualcomm Incorporated | Not treated |
R1‑110325 | ACK/NACK transmission with PUCCH format 1b and channel selection for TDD | Qualcomm Incorporated | Not treated |
R1‑110326 | Remaining details of PUCCH format 3 | Qualcomm Incorporated | Not treated |
R1‑110327 | Inter-cell randomization for PUCCH format 3 | Qualcomm Incorporated | Noted |
R1‑110328 | Periodic CQI reporting in case of multiple DL CCs configured | Qualcomm Incorporated | Noted |
R1‑110329 | UCI and SRS transmission for CA with and without PUSCH present | Qualcomm Incorporated | Not treated |
R1‑110330 | Aperiodic CQI triggering | Qualcomm Incorporated | Not treated |
R1‑110331 | Soft buffer partitioning for CA | Qualcomm Incorporated | Not treated |
R1‑110332 | Text proposal for miscellaneous issues to include CA support in 36.212 | Qualcomm Incorporated | Not treated |
R1‑110333 | SFBC PDSCH transmission in CSI-RS subframes | Qualcomm Incorporated | Not treated |
R1‑110334 | DCI format for 1-port CSI-RS | Qualcomm Incorporated | Not treated |
R1‑110335 | Applicability of muting to certain messages | Qualcomm Incorporated | Not treated |
R1‑110336 | Impact of PRB bundling on TDD operation with asymmetric UE antenna configuration | Qualcomm Incorporated | Not treated |
R1‑110337 | CSI measurement reference | Qualcomm Incorporated | Noted |
R1‑110338 | Remaining details of feedback for TM9 | Qualcomm Incorporated | Noted |
R1‑110339 | CQI UCI CW selection details | Qualcomm Incorporated | Not treated |
R1‑110340 | Remaining details of UCI transmission on PUSCH | Qualcomm Incorporated | Not treated |
R1‑110341 | Remaining details of UCI transmission on PUCCH | Qualcomm Incorporated | Not treated |
R1‑110342 | UL transmission mode configuration | Qualcomm Incorporated | Not treated |
R1‑110343 | Remaining details on CQI only transmission on PUSCH | Qualcomm Incorporated | Not treated |
R1‑110344 | TxD scheme for PUCCH format 1 with channel selection | Qualcomm Incorporated | Noted |
R1‑110345 | Precoder switching for UL Tx | Qualcomm Incorporated | Noted |
R1‑110346 | Antenna switching for UL MIMO | Qualcomm Incorporated | Noted |
R1‑110347 | Sequence Group Hopping for MU-MIMO operation | Qualcomm Incorporated | Not treated |
R1‑110348 | Further details on aperiodic dynamic SRS | Qualcomm Incorporated | Not treated |
R1‑110349 | Text proposal for resource specific CSI specification in 36.213 | Qualcomm Incorporated | Not treated |
R1‑110350 | Remaining aspects for resource specific CSI reporting | Qualcomm Incorporated | Not treated |
R1‑110351 | On the measurements definitions for resource specific RRM | Qualcomm Incorporated | Noted |
R1‑110352 | Considerations of UE capabilities for Rel-10 DL MIMO support | Qualcomm Incorporated | Noted |
R1‑110353 | Considerations of UE capabilities for Rel-10 UL MIMO support | Qualcomm Incorporated | Noted |
R1‑110354 | On the simulation assumptions for CoMP evaluations | Qualcomm Incorporated | Not treated |
R1‑110355 | High level views on CoMP | Qualcomm Incorporated | Noted |
R1‑110356 | On backhaul imperfections for CoMP operation | Qualcomm Incorporated | Not treated |
R1‑110357 | Views on RRC configuration for linking periodic CSI reports and subframe subsets | KDDI | Withdrawn |
R1‑110358 | Downlink Performance Evaluations of the Time Domain eICIC with the Cell Range Expansion for Macro-Pico deployments in HetNet | KDDI | Not treated |
R1‑110359 | Triggering of aperiodic CSI in common search space | Potevio | Not treated |
R1‑110360 | UCI Multiplexing for Simultaneous PUSCH/PUCCH | Potevio | Not treated |
R1‑110361 | Remaining issues of CSI-RS | Potevio | Not treated |
R1‑110362 | A HeNB Power Setting Solution without New Coordination Message | Potevio | Not treated |
R1‑110363 | Remaining Details on Multi-antenna SRS | Potevio | Not treated |
R1‑110364 | Correction on carrier indicator field in TS36.213 | Potevio | Not treated |
R1‑110365 | Remaining issues for aperiodic CSI triggering | LG Electronics | Not treated |
R1‑110366 | Rank adaptation in ACK/NACK channel selection mapping | LG Electronics | Not treated |
R1‑110367 | Resource allocation for ACK/NACK channel selection in FDD | LG Electronics | Not treated |
R1‑110368 | Resource allocation for ACK/NACK mode b in TDD | LG Electronics | Not treated |
R1‑110369 | ACK/NACK piggyback on PUSCH in TDD | LG Electronics | Not treated |
R1‑110370 | SRS multiplexing method | LG Electronics | Not treated |
R1‑110371 | Periodic CSI transmission on PUCCH for carrier aggregation | LG Electronics | Not treated |
R1‑110372 | TPC in multiple DL grants | LG Electronics | Not treated |
R1‑110373 | Cross carrier PC with DCI format 3/3A | LG Electronics | Not treated |
R1‑110374 | Resource Assignment in Un DL | LG Electronics | Not treated |
R1‑110375 | Determination of transport block size for Un link | LG Electronics | Not treated |
R1‑110376 | Discussion on the Un DL subframe configuration in the presence of almost blank subframe | LG Electronics | Not treated |
R1‑110377 | Discussion on Un UL subframe configuration | LG Electronics | Not treated |
R1‑110378 | Clarification of PRB Bundling in Un Link | LG Electronics | Not treated |
R1‑110379 | Specification of two essential parameters for relaying operation | LG Electronics | Not treated |
R1‑110380 | Considerations on measurement mismatch problem | LG Electronics | Revised |
R1‑110381 | Details of CSI Reporting in Time-domain eICIC | LG Electronics | Not treated |
R1‑110382 | Resource specific RRM | LG Electronics | Not treated |
R1‑110383 | Consideration on CoMP Simulation Assumption | LG Electronics | Not treated |
R1‑110384 | High-level View of DL CoMP Schemes | LG Electronics | Noted |
R1‑110385 | Consideration of low-capacity/high-latency backhaul for CoMP | LG Electronics | Not treated |
R1‑110386 | Details of channel coding for UCI on PUSCH | LG Electronics | Not treated |
R1‑110387 | Discussion on ACK/NACK repetition in Rel-10 | LG Electronics | Not treated |
R1‑110388 | Details on Mode 1 and Mode a for TDD ACK/NACK feedback in Rel-10 | LG Electronics | Not treated |
R1‑110389 | Details on Mode b for TDD ACK/NACK feedback in Rel-10 | LG Electronics | Not treated |
R1‑110390 | Remaining Details on PUCCH Format 3 | LG Electronics | Not treated |
R1‑110391 | Discussion on Transmission Mode for PUCCH Format 3 | LG Electronics | Not treated |
R1‑110392 | UL CC Selection for UCI Transmission on PUSCH | LG Electronics | Not treated |
R1‑110393 | Simultaneous UCI Transmission on PUCCH | LG Electronics | Not treated |
R1‑110394 | Discussion on UCI combination for UL transmission | LG Electronics | Not treated |
R1‑110395 | UCI transmission for Simultaneous PUCCH/PUSCH configuration | LG Electronics | Not treated |
R1‑110396 | Remaining Issues on CSI-RS in Rel-10 | LG Electronics | Not treated |
R1‑110397 | Remaining Issues on CSI Feedback in Rel-10 | LG Electronics | Not treated |
R1‑110398 | Remaining Issues on CQI-only Transmission | LG Electronics | Not treated |
R1‑110399 | Minimum value of Res for H-ARQ/RI on dual RM coding | LG Electronics | Not treated |
R1‑110400 | Sequence and Sequence Group Hopping for UL MU-MIMO with Non-equal BW | LG Electronics | Not treated |
R1‑110401 | Remaining Issues on Dynamic Aperiodic Sounding for LTE-A | LG Electronics | Not treated |
R1‑110402 | Remaining Issues for CSI-RS | CATR | Not treated |
R1‑110403 | Introduction of MC HSUPA for 1.28Mcps TDD | TD Tech | Noted - Revised |
R1‑110404 | Clarification on HS-SCCH type 1 and HS-SCCH type 2 for 1.28Mcps TDD | TD Tech | Not treated |
R1‑110405 | Clarification on SPS HS-PDSCH resource allocation for 1.28Mcps TDD | TD Tech | Not treated |
R1‑110406 | Multi-carrier HSPA enhancement for 1.28Mcps TDD | TD Tech | Not treated |
R1‑110407 | Remaining details on R-PDCCH | ETRI | Not treated |
R1‑110408 | Resource allocation for PUCCH Format 1b with channel selection | ETRI | Not treated |
R1‑110409 | OCC and DM RS resource mapping for PUCCH format 3 | ETRI | Not treated |
R1‑110410 | Selection of SCell for multiplexing UCI on PUSCH | Huawei/HiSilicon | Not treated |
R1‑110411 | Remaining details of aperiodic CSI triggering | Huawei/HiSilicon | Not treated |
R1‑110412 | Ordering of HARQ-ACK bits for TDD | Huawei, HiSilicon | Revised |
R1‑110413 | Simultaneous A/N and SR with the baseline of no carrier-domain A/N bundling | Huawei, HiSilicon | Not treated |
R1‑110414 | Remaining open issues on simultaneous PUCCH/PUSCH/SRS transmission | Huawei, HiSilicon | Not treated |
R1‑110415 | Details on ACK/NACK time domain bundling for TDD | Huawei, HiSilicon | Noted |
R1‑110416 | Periodic CQI/PMI/RI reporting for CA | Huawei, HiSilicon | Noted |
R1‑110417 | PDSCH and CSI-RS transmissions in MBSFN subframes in Rel-10 | Huawei, HiSilicon | Noted |
R1‑110418 | Supported DCI formats for Un PDSCH/PUSCH transmission | Huawei, HiSilicon | Not treated |
R1‑110419 | Un DL HARQ Process | Huawei, HiSilicon | Not treated |
R1‑110420 | UE capabilities for MIMO | Huawei, HiSilicon | Revised |
R1‑110421 | Consideration on capacity and latency of communication between transmission points | Huawei, HiSilicon | Not treated |
R1‑110422 | On non-PMI based feedback in Rel-10 | CMCC, CATT | Revised |
R1‑110423 | Un TBS Determination | CMCC, CATT | Not treated |
R1‑110424 | Discussion on the remaining issues in eICIC for Rel-10 | CMCC | Not treated |
R1‑110425 | Further refinements to the simulation assumptions | CMCC | Not treated |
R1‑110426 | Some considerations on CoMP deployment scenarios | CMCC | Noted |
R1‑110427 | TxD for format 1b with channel selection | Huawei, HiSilicon | Noted |
R1‑110428 | Remaining details of FDD ACK/NACK channel selection | Huawei, HiSilicon | Not treated |
R1‑110429 | Discussion on the PRS transmission collided with CSI-RS in Rel-10 | Huawei, HiSilicon | Not treated |
R1‑110430 | A/N feedback for TDD with PUCCH Format 1b with channel selection, mode b | Nokia Siemens Networks, Nokia | Not treated |
R1‑110431 | On Mapping Table for Channel Selection | Nokia Siemens Networks, Nokia | Not treated |
R1‑110432 | UCI multiplexing combinations in Rel-10 | Nokia Siemens Networks, Nokia | Not treated |
R1‑110433 | UCI details for carrier aggregation PUSCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑110434 | Periodic CSI reporting for Carrier Aggregation | Nokia Siemens Networks, Nokia | Not treated |
R1‑110435 | CSI Ambiguity handling with CC activation/deactivation | Nokia Siemens Networks, Nokia | Not treated |
R1‑110436 | OCC and cyclic shift remapping in PUCCH format 3 | Nokia Siemens Networks, Nokia | Not treated |
R1‑110437 | Remaining issues on uplink power control | Nokia Siemens Networks, Nokia | Not treated |
R1‑110438 | On remaining details for PUSCH multiple antenna transmission | Nokia Siemens Networks, Nokia | Not treated |
R1‑110439 | UE-specific configuration of sequence group hopping | Nokia Siemens Networks, Nokia | Not treated |
R1‑110440 | Remaining details on SRS | Nokia Siemens Networks, Nokia | Not treated |
R1‑110441 | Discussion on the UL Backhaul Design Aspects | Nokia Siemens Networks, Nokia | Not treated |
R1‑110442 | Summary of e-mail discussion on Number of bits assumed reserved for DM-RS in R-PDCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑110443 | Remaining Issues on Un Subframe Configuration | Nokia Siemens Networks, Nokia | Not treated |
R1‑110444 | Remaining Issues on DM RS port number determination for Non-Interleaved R-PDCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑110445 | On DL MIMO Extensions and UL Multiple Antenna transmission UE capabilities | Nokia, Nokia Siemens Networks | Noted |
R1‑110446 | CoMP simulation assumptions | Nokia Siemens Networks, Nokia | Not treated |
R1‑110447 | CoMP schemes | Nokia Siemens Networks, Nokia | Noted |
R1‑110448 | Backhaul transport interface constraints for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑110449 | LS response on HARQ feedback for RNs configured with R-PDCCH | Ericsson | Noted |
R1‑110450 | Inter-Cell Interference Mitigation for PUCCH Format 3 | Ericsson, ST-Ericsson | Noted |
R1‑110451 | Application of Qmin in the UCI Resource Allocation | Ericsson, ST-Ericsson | Noted |
R1‑110452 | CQI codeword selection | Ericsson, ST-Ericsson | Not treated |
R1‑110453 | Views on remaining issues for SGH | Ericsson, ST-Ericsson | Not treated |
R1‑110454 | On the Configuration of SRS-Related parameters by DCI Format 4 | Ericsson, ST-Ericsson | Not treated |
R1‑110455 | Determination of DMRS antenna ports for R-PDCCH-to-RE mapping | Ericsson, ST-Ericsson | Not treated |
R1‑110456 | Processing of R-PDCCH without cross-interleaving | Ericsson, ST-Ericsson | Not treated |
R1‑110457 | Resources used for HARQ feedback transmission | Ericsson, ST-Ericsson | Not treated |
R1‑110458 | On the configuration of the R-PDCCH control region | Ericsson, ST-Ericsson | Not treated |
R1‑110459 | On Rel-10 UE capabilities | Ericsson, ST-Ericsson | Revised |
R1‑110460 | CoMP simulation assumption | Ericsson, ST-Ericsson | Not treated |
R1‑110461 | Baseline Schemes and Focus of CoMP Studies | Ericsson, ST-Ericsson | Noted |
R1‑110462 | Deployment and backhaul constraints for CoMP | Ericsson, ST-Ericsson | Revised |
R1‑110463 | Considerations on coordinated multi-point operation for LTE Rel. 11 | Mitsubishi Electric | Noted |
R1‑110464 | Summary of email discussion on simultaneous PUSCH/PUCCH/SRS | Fujitsu | Noted |
R1‑110465 | Remaining Issues for Aperiodic SRS triggering and configuration^^ | Fujitsu | Not treated |
R1‑110466 | Review of proposals for UE feedback supporting CoMP | Fujitsu | Not treated |
R1‑110467 | CSG femto eNB assisted eICIC for macro UE | Fujitsu | Revised |
R1‑110468 | Inter-cell CSI-RS interference coordination for common channels in HetNet | Fujitsu | Not treated |
R1‑110469 | DL carrier aggregation for power-limited UE | Fujitsu | Not treated |
R1‑110470 | Refinement of CoMP simulation assumptions in TR36.814 | IPWireless | Not treated |
R1‑110471 | Text proposal for CoMP simulation assumptions in TR36.814 | IPWireless | Not treated |
R1‑110472 | The use of CoMP for interference cancellation in LTE | IPWireless | Noted |
R1‑110473 | Uplink Closed Loop Beamforming: Link Level Results | Nokia Siemens Networks, Nokia | Noted |
R1‑110474 | Initial Simulation Results on Pilot Precoding | Nokia Siemens Networks, Nokia | Noted |
R1‑110475 | Options for uplink closed loop beamforming | Nokia Siemens Networks, Nokia | Noted |
R1‑110476 | Expected RAN1 impacts of 5-8 Carrier HSDPA | Nokia Siemens Networks, Nokia | Noted |
R1‑110477 | HS-SFN performance evaluation | Nokia Siemens Networks, Nokia | Not treated |
R1‑110478 | HS-SFN performance with UE feedback | Nokia Siemens Networks, Nokia | Not treated |
R1‑110479 | Multiflow performance evaluation | Nokia Siemens Networks, Nokia | Not treated |
R1‑110480 | HS-DDTX performance evaluation | Nokia Siemens Networks, Nokia | Not treated |
R1‑110481 | HSUPA MIMO Discussion | Nokia Siemens Networks, Nokia | Noted |
R1‑110482 | Further corrections to TS 36.213 | Texas Instruments | Not treated |
R1‑110483 | Views on CoMP evaluation methodology | Deutsche Telekom, NTT DOCOMO, Orange, Telefónica, Vodafone | Revised |
R1‑110484 | DPCCH pilot design for uplink CLTD and uplink MIMO | Ericsson, ST-Ericsson | Noted |
R1‑110485 | System simulation results for closed loop beam forming | Ericsson, ST-Ericsson | Not treated |
R1‑110486 | Channel sounding for closed loop transmit diversity | Ericsson, ST-Ericsson | Noted |
R1‑110487 | Codebook design for uplink closed loop transmit diversity | Ericsson, ST-Ericsson | Noted |
R1‑110488 | Pre-coding selection for uplink closed loop transmit diversity | Ericsson, ST-Ericsson | Noted |
R1‑110489 | On the design of uplink closed loop transmit diversity | Ericsson, ST-Ericsson | Noted |
R1‑110490 | RAN1 design considerations for 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑110491 | Carrier (de)activation for 8C-HSDPA | Ericsson, ST-Ericsson | Not treated |
R1‑110492 | HS-DPCCH for 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑110493 | On the need to bundle 8C-HSDPA with DC-HSUPA | Ericsson, ST-Ericsson | Noted |
R1‑110494 | Initial system performance evaluation of SF-DC-HSDPA | Ericsson, ST-Ericsson | Not treated |
R1‑110495 | Initial cubic metric analysis for uplink MIMO | Ericsson, ST-Ericsson | Noted |
R1‑110496 | Initial considerations on the design of uplink MIMO | Ericsson, ST-Ericsson | Noted |
R1‑110497 | On remaining details for non-CA based enhanced ICIC | Ericsson, ST-Ericsson | Noted |
R1‑110498 | System simulation results for UL Closed-Loop Transmit Diversity, HSPA | InterDigital Communications, LLC | Not treated |
R1‑110499 | Link level simulation results for UL Closed-Loop Transmit Diversity, HSPA. | InterDigital Communications, LLC | Noted |
R1‑110500 | CSI-RS sequence for different antenna ports | Qualcomm Incorporated | Noted |
R1‑110501 | RB restriction for CQI-only transmission on PUSCH in CA | Fujitsu | Not treated |
R1‑110502 | EICIC Management via Fake Hybrid Mode in Femto Cell | Fujitsu | Not treated |
R1‑110503 | Discussion on MDT UL measurements | MediaTek Inc. | Not treated |
R1‑110504 | UCI on Simultaneous PUCCH/PUSCH Transmission | HTC | Not treated |
R1‑110505 | Cross Carrier Group Power Control in Rel-10 | HTC | Not treated |
R1‑110506 | System performance evaluation of UL CLTD | ZTE | Not treated |
R1‑110507 | System performance evaluation of HS-SFN | ZTE | Not treated |
R1‑110508 | Considerations for Downlink CoMP in Rel. 11 | CEWiT | Withdrawn |
R1‑110509 | Discussions on remaining issues of aperiodic SRS | MediaTek Inc. | Not treated |
R1‑110510 | LS on a PRELIMINARY DRAFT NEW REPORT ITU-R M.[LMS.PPDR.UHF TECH] | RAN, ITU R WP 5A | Noted |
R1‑110511 | CQI-only triggering for DCI format 4 | Texas Instruments | Noted |
R1‑110512 | UE capability for DL and UL MIMO in Rel-10 | CATT | Noted |
R1‑110513 | Selected highlights from RAN#50 | RAN1 Chairman | Noted |
R1‑110514 | On Rel-10 UE capabilities | Ericsson, ST-Ericsson | Noted |
R1‑110515 | Femto eNB assisted eICIC for macro UE | Fujitsu | Not treated |
R1‑110516 | Finalizing resource mapping for PUCCH format 3 | Texas Instruments | Not treated |
R1‑110517 | Views on UE capabilities for Rel-10 DL MIMO | CMCC | Not treated |
R1‑110518 | PUCCH format 3 Freq/Time-Domain Cyclic Shift Hopping Comparison | Qualcomm Inc. | Noted |
R1‑110519 | Discussion on channel selection for TDD | Samsung | Noted |
R1‑110520 | Some aspects on 8C-HSDPA | ZTE | Noted |
R1‑110521 | UE capabilities for MIMO | Huawei, HiSilicon | Noted |
R1‑110522 | Rel-10 DL/UL MIMO capabilities | NTT DOCOMO | Noted |
R1‑110523 | 36.211 CR0149 (Rel-10, F) Correction on UE behavior for PRACH preamble format 4 | MediaTek Inc., Ericsson, ST-Ericsson | Noted |
R1‑110524 | LS on the consideration of Relay Nodes in the LTE-Advanced material for Rec. ITU-R M.[IMT.RSPEC] to be submitted to ITU-R WP5D#10 (6-13 April, 2011) | RAN ITU-R Ad Hoc, Telecom Italia | Noted |
R1‑110525 | Minutes from RAN1#63bis HSPA sessions | HSPA AdHoc chairman (Ericsson) | Endorsed |
R1‑110526 | 25.214 CR0632r3 (Rel-9, F) Correction to CPC procedure for DC-HSUPA | Huawei, HiSilicon | Withdrawn |
R1‑110527 | 25.214 CR0633r3 (Rel-10, A) Correction to CPC procedure for DC-HSUPA | Huawei, HiSilicon | Withdrawn |
R1‑110528 | 25.224 CR0264R1 (Rel-9, F) Correction of the special burst transmission power calculation for 1.28Mcps TDD | ZTE | Agreed |
R1‑110529 | 25.224 CR0265R1 (Rel-10, A) Correction of the special burst transmission power calculation for 1.28Mcps TDD | ZTE | Agreed |
R1‑110530 | 25.222 CR0209 (Rel-10, F) Introduction of MC HSUPA for 1.28Mcps TDD | TD Tech | Noted - Revised |
R1‑110531 | 25.222 CR0209r1 (Rel-10, F) Corrections to MC-HSUPA for 1.28Mcps TDD | TD Tech | Agreed |
R1‑110532 | Link-level simulation assumptions for UL CLTD for HSPA | Huawei, HiSilicon, Qualcomm Incorporated | Noted - Revised |
R1‑110533 | System-level simulation assumptions for UL CLTD for HSPA | Qualcomm | Noted - Revised |
R1‑110534 | Way forward on PUCCH format 3 randomization | InterDigital, Samsung, ETRI, Pantech, HTC, Qualcomm Inc. | Noted - Revised |
R1‑110535 | Way forward on CQI reference subframe definition | Qualcomm Inc., Ericsson, ST-Ericsson | Not treated |
R1‑110536 | Way forward on CW selection for CQI on PUSCH | Qualcomm Inc., Ericsson, ST-Ericsson | Not treated |
R1‑110537 | Proposal on SFBC handling in CSI-RS subframes | Qualcomm Inc | Noted |
R1‑110538 | WF on remaining details of PUCCH Format 3 in 36.211 | Ericsson, ST-Ericsson, CATT, Texas Instruments, LG Electronics, LG-Ericsson, CMCC | Noted - Revised |
R1‑110539 | WF on channel selection mode b | Samsung, ETRI, Intel, LGE, Motorola Solutions, Nokia, Nokia Siemens Networks, Pantech, Renesas, RIM, Sharp, Panasonic | Noted |
R1‑110540 | Draft LS on Simultaneous SRS on more than one carrier | Fujitsu | Not treated |
R1‑110541 | DL RS Chairman’s note | Ad Hoc chairman (NTT DoCoMo) | Not treated |
R1‑110542 | Summary of UL MIMO and RS Ad-hoc Session | Ad Hoc chairman (Samsung) | Not treated |
R1‑110543 | Performance Consideration of CoMP | ITRI | Noted |
R1‑110544 | Link Simulation Assumptions and Metrics for CLTD | Huawei, HiSilicon | Noted - Revised |
R1‑110545 | Considerations on measurement mismatch problem | LG Electronics | Not treated |
R1‑110546 | Views on CoMP evaluation methodology | Deutsche Telekom, NTT DOCOMO, Orange, Telecom Italia, Telefónica, Vodafone | Noted |
R1‑110547 | UL Pilot Channel Structure for Closed Loop ULTD | Qualcomm Incorporated | Noted |
R1‑110548 | - | Qualcomm Incorporated | For email approval until 11/02 |
R1‑110549 | Comparison of UL CLTD Pilot Channel Structures | InterDigital Communications, LLC | Noted |
R1‑110550 | On non-PMI based feedback in Rel-10 | CMCC, CATT | Noted |
R1‑110551 | Views of schemes for CoMP | HTC | Noted |
R1‑110552 | Draft LS for RLM/RSRQ/RSRP Measurement Definitions for eICIC | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted - Revised |
R1‑110553 | Ordering of HARQ-ACK bits for TDD | Huawei, HiSilicon | Not treated |
R1‑110554 | WF on PUSCH A/N codebook size in Rel-10 TDD | Huawei, HiSilicon, Samsung, LG Electronics , Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Renesas Electronics Europe, Research In Motion UK Limited, InterDigital Communications, ETRI | Noted |
R1‑110555 | Soft Buffer Partitioning and Rate Matching for Downlink CA | NTT DOCOMO | Not treated |
R1‑110556 | Power control for PUCCH Format 3 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, Motorola Mobility, Motorola Solutions, Nokia Siemens Networks, Nokia, Panasonic, Qualcomm | Noted |
R1‑110557 | Outcome of offline discussions on remaining issues of aperiodic SRS | Sharp | Noted |
R1‑110558 | Wayforward on aperiodic SRS triggering | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATR, CATT, CMCC, HT mMobile, HTC, ITRI, MediaTek, Motorola Mobility, Motorola Solutions, New Postcom, Panasonic, Potevio, Qualcomm | Noted |
R1‑110559 | Wayforward on handling of SFBC splitting on CSI-RS subframes | Ericsson, CATT, Mediatek, NEC, Nokia, Nokia Siemens Networks, Panasonic, Pantech, Renesas, RIM, Samsung, ST-Ericsson | Noted |
R1‑110560 | Wayforward on Sequence Group Hopping for UL DM RS | Ericsson, ETRI, HiSilicon, Huawei, LG Electronics, Research in Motion, Samsung, ST-Ericsson, ZTE | Noted |
R1‑110561 | TP of coding and resource mapping for UCI on PUSCH | Huawei, HiSilicon, Renesas Electronics Europe, ZTE, LG Electronics, CATT | Agreed |
R1‑110562 | Wayforward on CQI only transmiussion | LG Electronics, Panasonic, Ericsson, ST-Ericsson, Huawei, HiSilicon | Noted |
R1‑110563 | Simulation Framework for System Evaluation of Multi-Point HSDPA | QUALCOMM Incorporated, Ericsson, ST-Ericsson, Nokia Siemens Networks, Nokia, Huawei, HiSilicon, ZTE | Agreed |
R1‑110564 | Report from offline discussion on CoMP simulation assumptions | NTT DOCOMO | Noted |
R1‑110565 | PUCCH 3 Inter-Cell Randomization with non-orthogonal DM-RS | Qualcomm Inc. | Not treated |
R1‑110566 | PUCCH 3 Intra-Cell Orthogonality | Qualcomm Inc. | Not treated |
R1‑110567 | Wayforward on CoMP scenario prioritization | CMCC, Deutsche Telekom, KDDI, NTT DOCOMO, Orange, Telecom Italia, Telefonica, Vodafone | Noted |
R1‑110568 | Deployment and backhaul constraints for CoMP | Ericsson, ST-Ericsson | Not treated |
R1‑110569 | CoMP simulation assumptions | RAN1 Chairman | Noted - Revised |
R1‑110570 | WF on DCI Format for 1 Port CSI-RS | AT&T, CATT, CMCC, Deutsche Telekom, Ericsson, ETRI, Fujitsu, Hitachi, HTC, KDDI, NTT DOCOMO, Pantech, RIM, Samsung, ST-Ericsson | Not treated |
R1‑110571 | Way forward on single codeword fallback on MIMO Cell with channel selection for FDD | LG Electronics, NTT DoCoMo, Huawei, HiSilicon, Panasonic | Agreed |
R1‑110572 | High Level Views of CoMP Schemes | Panasonic | Not treated |
R1‑110573 | Views on Rel-11 CoMP | ZTE | Not treated |
R1‑110574 | Views for Rel-11 CoMP | NTT DOCOMO | Not treated |
R1‑110575 | WF on PUCCH Format 3 Power Control in Rel-10 | CATT, CATR, CMCC, Ericsson, ST-Ericsson | Noted |
R1‑110576 | Remaining details on dual-RM coded UCI on PUSCH | Samsung | Not treated |
R1‑110577 | WF on remaining details on dual RM coding | Samsung, SHARP | Not treated |
R1‑110578 | WF on SFBC Transmission along with CSI-RS and muting | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, Intel, New Postcom | Noted |
R1‑110579 | Further discussion on TDD A/N channel selection | CATT | Not treated |
R1‑110580 | PUCCH format 3 performance comparison | ITRI | Not treated |
R1‑110581 | WF on Simultaneous transmission of HARQ-ACK and CSI on PUCCH | Sharp, ZTE, Huawei, HiSilicon | Not treated |
R1‑110582 | WF on PUCCH resource allocation scheme for channel selection for FDD | Panasonic, NTT DOCOMO, LG Electronics, Samsung, InterDigital, Qualcomm | Noted |
R1‑110583 | Draft LS on Rel-10 UE capability | NTT DOCOMO | Noted - Revised |
R1‑110584 | Updated table of uplink channel/signal combinations | Qualcomm | Not treated |
R1‑110585 | Proposal for CoMP coordination cell layout for scenario 1 and 2 | LG Electronics | Not treated |
R1‑110586 | Proposal for UE receiver assumption in CoMP simulations | LG Electronics, Motorola Mobility, Intel, Marvell, Samsung, ETRI, Orange, Renesas, Huawei | Agreed |
R1‑110587 | Proposal on implicit derivation of Comb per antenna port for SRS | Ericsson, LGE, MediaTek, Panasonic, Samsung, Sharp, ST-Ericsson | Not treated |
R1‑110588 | A proposal and WF on Soft buffer size allocation for Rel-10 UE | Panasonic | Noted |
R1‑110589 | CoMP simulation assumptions | NTT DOCOMO | Revised |
R1‑110590 | LS on UE receiver window for Inter-band non-contiguous CA | RAN4, NTT DoCoMo | Noted |
R1‑110591 | Draft LS on phase continuity for UL MIMO | NTT DOCOMO | Noted - Revised |
R1‑110592 | WF on handling of SFBC splitting on CSI-RS subframes | Ericsson, HTC, LG, Mediatek, NEC, Nokia, Nokia Siemens Networks, Panasonic, Pantech, Renesas, RIM, Samsung, ST-Ericsson, Texas Instruments | Noted |
R1‑110593 | LS for periodic CQI/PMI/RI reporting priority | RAN1, Panasonic | Agreed |
R1‑110594 | System-level simulation assumptions for UL CLTD for HSPA | Qualcomm Incorporated, Huawei, HiSilicon, Ericsson, ST-Ericsson, Nokia Siemens Networks, Nokia, ZTE, Renesas Electronics Europe, Alcatel Lucent, Alcatel Lucent Shanghai Bell | Agreed |
R1‑110595 | LS for RLM/RSRQ/RSRP Measurement Definitions for eICIC | RAN1, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑110596 | Text proposal on CQI reference subframe definition | Qualcomm Inc. | Noted - Revised |
R1‑110597 | LS on Rel-10 UE capability | RAN1, NTT DOCOMO | Agreed |
R1‑110598 | CoMP simulation assumptions | NTT DOCOMO | Noted - Revised |
R1‑110599 | LS on phase continuity for UL MIMO | RAN1, NTT DOCOMO | Agreed |
R1‑110600 | CoMP/JP Scheme for UE Receiving Multiple Radio Bearers in Heterogeneous Cells | ETRI | Noted |
R1‑110601 | LS on Simultaneous SRS on more than one carrier | RAN1, Fujitsu | Agreed |
R1‑110602 | Link-level simulation assumptions for UL CLTD for HSPA | Huawei, HiSilicon, Qualcomm Incorporated, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Nokia Siemens Networks, Nokia, Ericsson, ST-Ericsson | Agreed |
R1‑110603 | CoMP simulation assumptions | NTT DOCOMO | Noted - Revised |
R1‑110604 | void | - | - |
R1‑110605 | void | - | - |
R1‑110606 | void | - | - |
R1‑110607 | Text proposal on CQI reference subframe definition for periodic CQI reporting with restricted subframes configured | RAN1 Chairman | Agreed |
R1‑110608 | CoMP simulation assumptions | NTT DOCOMO | Agreed |
R1‑110609 | Way forward on PUCCH format 3 randomization | RAN1 Chairman | Agreed |
page generated from database: 2024-09-26 11:02:35