3GPP TDocs (written contributions) at meeting
Meeting: R1-60 - 2010-02-22 to 2010-02-26, San Francisco
meeting id: R1-60 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑100838 | Draft Agenda for RAN1#60 meeting | RAN1 Chairman | Approved |
R1‑100839 | Final report of RAN1#59bis meeting | MCC Support | Revised |
R1‑100840 | On PCFICH for carrier aggregation | Ericsson, ST-Ericsson | Not treated |
R1‑100841 | On PHICH for carrier aggregation | Ericsson, ST-Ericsson | Noted |
R1‑100842 | On the mapping of CIF to component carriers | Ericsson, ST-Ericsson | Not treated |
R1‑100843 | On blind decodes for carrier aggregation | Ericsson, ST-Ericsson | Revised |
R1‑100844 | Summary from email discussion on CIF | Ericsson | Revised |
R1‑100845 | On PUCCH resource allocation for carrier aggregation | Ericsson, ST-Ericsson | Noted |
R1‑100846 | On remaining details for uplink power control with carrier aggregation | Ericsson, ST-Ericsson | Not treated |
R1‑100847 | Further discussion on PRB bundling | Ericsson, ST-Ericsson | Not treated |
R1‑100848 | Layer-to-antenna port mapping | Ericsson, ST-Ericsson | Noted |
R1‑100849 | Discussion on DM RS power boosting | Ericsson, ST-Ericsson | Noted |
R1‑100850 | DM-RS pattern for extended CP | Ericsson, ST-Ericsson | Not treated |
R1‑100851 | On MU-MIMO and the relation to Rel-9 | Ericsson, ST-Ericsson | Not treated |
R1‑100852 | PMI-based multi-granular feedback for SU/MU-MIMO operation | Ericsson, ST-Ericsson | Noted |
R1‑100853 | Channel reciprocity in FDD systems including systems with large duplex distance | Ericsson, ST-Ericsson | Not treated |
R1‑100854 | Codebook design for multi-granular PMI-based feedback | Ericsson, ST-Ericsson | Withdrawn |
R1‑100855 | Performance evaluation of intra-site DL CoMP | Ericsson, ST-Ericsson | Revised |
R1‑100856 | Standardization impact of DL CoMP | Ericsson, ST-Ericsson | Noted |
R1‑100857 | Aspects on evaluation of layer shifting/no layer shifting | Ericsson, ST-Ericsson | Noted |
R1‑100858 | Uplink rank 3 codebook size and design | Ericsson, ST-Ericsson | Noted |
R1‑100859 | Control information on multi-Tx PUSCH | Ericsson, ST-Ericsson | Withdrawn |
R1‑100860 | Further Discussion on SRS Enhancements | Ericsson, ST-Ericsson | Not treated |
R1‑100861 | Overhead analysis of R-PDCCH and PDCCH | Ericsson, ST-Ericsson | Not treated |
R1‑100862 | DL timing | Ericsson, ST-Ericsson | Withdrawn |
R1‑100863 | UL timing | Ericsson, ST-Ericsson | Withdrawn |
R1‑100864 | Un/Uu HARQ timing alternatives | Ericsson, ST-Ericsson | Not treated |
R1‑100865 | Use of R-PHICH on Un interface | Ericsson, ST-Ericsson | Not treated |
R1‑100866 | Allocation of Un subframes | Ericsson, ST-Ericsson | Not treated |
R1‑100867 | Considerations on hot spot modelling for heterogeneous networks | Ericsson, ST-Ericsson | Revised |
R1‑100868 | Further technical aspects on heterogeneous network support in Release 10 | Ericsson, ST-Ericsson | Noted |
R1‑100869 | Draft CR on the ratio of PDSCH EPRE to UE-specific RS EPRE for Rel-9 enhanced DL transmissions | CATT | Noted - Revised |
R1‑100870 | PCFICH detection in LTE-A | CATT | Not treated |
R1‑100871 | PHICH for LTE-A | CATT | Noted |
R1‑100872 | Remaining issues on CIF in LTE-A | CATT | Not treated |
R1‑100873 | PDCCH false detection in LTE-A | CATT | Noted |
R1‑100874 | PDCCH blind decoding in LTE-A | CATT | Not treated |
R1‑100875 | Design of UL ACK/NACK Transmission for TDD with CA | CATT | Noted |
R1‑100876 | Design of UL ACK/NACK Transmission for FDD with CA | CATT | Not treated |
R1‑100877 | Dynamic ACK/NACK Resource Reservation in LTE-A | CATT | Noted |
R1‑100878 | CQI feedback for LTE-A | CATT | Not treated |
R1‑100879 | PUCCH Format 1/1a/1b Resource Allocation with SORTD | CATT | Not treated |
R1‑100880 | Further considerations on LTE-A uplink power control | CATT | Not treated |
R1‑100881 | Design of UL non-contiguous resource allocation | CATT | Noted |
R1‑100882 | Evaluation of UL CM in LTE-A | CATT | Not treated |
R1‑100883 | DMRS design for extended CP | CATT | Not treated |
R1‑100884 | Discussion on PRB bundling for rank1-8 | CATT | Not treated |
R1‑100885 | Intra cell and inter cell CSI RS design for LTE-A | CATT | Noted |
R1‑100886 | Control signaling for DL MIMO | CATT | Withdrawn |
R1‑100887 | Discussion on MU-MIMO operation in LTE-A | CATT | Not treated |
R1‑100888 | Layer to DM-RS port mapping for DL MIMO in LTE-A | CATT | Not treated |
R1‑100889 | On extension of Rel-8 PMI feedback | CATT | Noted |
R1‑100890 | Codebook design for 8Tx DL MIMO | CATT | Noted |
R1‑100891 | Performance Evaluation of Intra-eNodeB CoMP | CATT | Noted |
R1‑100892 | UL DMRS design for LTE-A | CATT | Not treated |
R1‑100893 | SRS Enhancements for LTE-A | CATT | Not treated |
R1‑100894 | Design of Relay Backhaul Control Channels in LTE-A | CATT | Not treated |
R1‑100895 | Design of Relay Frame Timing in LTE-A | CATT | Not treated |
R1‑100896 | Backhaul Subframe Allocation and HARQ Operations | CATT | Not treated |
R1‑100897 | Considerations on Relay Backhaul Control Channels in LTE-A | CATT | Not treated |
R1‑100898 | Considerations on Backhaul UCI Transmission | CATT | Not treated |
R1‑100899 | Design of Relay Reference Signal on Backhaul in LTE-A | CATT | Not treated |
R1‑100900 | System Evaluation of Relay Performance | CATT | Not treated |
R1‑100901 | Technology Aspects for Heterogeneous Networks | CATT | Noted |
R1‑100902 | Considerations on Interference Coordination in Het-Net | CATT | Noted |
R1‑100903 | Uplink Interference Mitigation via Power Control | CATT | Not treated |
R1‑100904 | DL Interference Mitigation via Direction Information in Het-Net | CATT | Not treated |
R1‑100905 | 25.221 CR0201 (Rel-8, F) Clarification of TPC and SS transmission on HS-SICH type 2 | CATT | Noted - Revised |
R1‑100906 | 25.221 CR0202 (Rel-9, A) Clarification of TPC and SS transmission on HS-SICH type 2 | CATT | Noted - Revised |
R1‑100907 | Physical channel allocation and design for LCR TDD MC-HSUPA | CATT | Noted |
R1‑100908 | Discussion on activation and deactivation of UL carrier by physical layer in MC-HSUPA | CATT | Noted |
R1‑100909 | Design of PUCCH format for carrier aggregation | Ericsson, ST-Ericsson | Noted |
R1‑100910 | HS-DPCCH design for 4C-HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑100911 | Carrier activation and deactivation for 4C-HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑100912 | Carrier-specific configurations for 4C-HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑100913 | System-level simulation results for uplink transmit diversity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑100914 | Network Energy Saving: NodeB DRX/DTX | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑100915 | Way Forward on PHICH design | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑100916 | Dynamic PDCCH Monitoring Set Configuration | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑100917 | Method for multiple ACK.NACK transmission on PUCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑100918 | A/N resource allocation for PUCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑100919 | Pathloss offset signalling for non-contiguous carrier aggregation | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100920 | Power scaling method for maximum power | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100921 | Power headroom reporting for carrier aggregation | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100922 | Signalling to support non-contiguous PUSCH resource allocations | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑100923 | UL non-contiguous resource allocation: performance analysis and signalling design | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑100924 | CSI-RS inter-cell design considerations | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑100925 | DCI formats for MU-MIMO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑100926 | Clarification on explicit feedback vs. implicit feedback | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑100927 | Hierarchical feedback - further details and evaluation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑100928 | Performance with worst companion PMI reporting | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑100929 | Performance with best companion PMI reporting | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑100930 | Feedback for subset of UE antennas | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100931 | Correlation-based explicit feedback | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100932 | Simultaneous eNB and UE calibration | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100933 | Design principles for feedback codebook for 8 downlink tx antennas | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑100934 | Feedback bitwidth requirement for 8 tx codebook | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑100935 | Feedback overhead for DL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100936 | CoMP JT in FDD downlink | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑100937 | Layer shifting and HARQ bundling for UL MIMO | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑100938 | DCI format design for LTE-A PUSCH transmission | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑100939 | Summary of SRS enhancements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑100940 | Timing synchronisation for TDD type 1 relay | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100941 | R-PDCCH multiplexing | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100942 | Need for R-PHICH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100943 | FDD 4x2 evaluation results for MU-MIMO | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑100944 | Performance with worst companion PMI reporting | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑100945 | DL Pico-Macro HetNet Performance: Cell Selection | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100946 | DL Pico-Macro HetNet Performance: Transmit Power | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100947 | Technical aspects for heterogeneous networks | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑100948 | HARQ timeline for LTE-Advanced relay in FDD | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100949 | Performance evaluation for Type 2 Relay | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100950 | DL Type 2 Relay-Macro HetNet Performance: Adaptive FFR | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑100951 | Type 2 Relay Summary | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑100952 | eNB Energy Saving Possibilities in Times of Reduced Cell Traffic | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑100953 | LS on multiple timing advance for inter-band CA | RAN2, Verizon Wireless | Noted |
R1‑100954 | Reply LS on PDCCH monitoring set for carrier aggregation in LTE-Advanced | RAN2, CATT | Noted |
R1‑100955 | LS on power split agreements for DC-HSUPA | RAN2, InterDigital | Noted |
R1‑100956 | Reply LS on mobility measurements for carrier aggregation | RAN4, Nokia | Noted |
R1‑100957 | Consideration on UPH and SNPL calculation for 1.28Mcps TDD MC-HSUPA | CATT | Noted |
R1‑100958 | PDCCH blind decoding and search space for carrer aggregation of LTE-A | ZTE | Noted |
R1‑100959 | Further discussion on carrier indicator field | ZTE | Not treated |
R1‑100960 | Views for PHICH design aspects | ZTE | Noted |
R1‑100961 | PCFICH detection error handling | ZTE | Not treated |
R1‑100962 | Multi-antenna transmission scheme for PUCCH format 2/2a/2b | ZTE | Not treated |
R1‑100963 | Consideration on ACK transmission for multi-antenna PUCCH Format 2b | ZTE | Not treated |
R1‑100964 | Method for UL ACK/NACK resource allocation in LTE-A | ZTE | Revised |
R1‑100965 | Uplink Non-contiguous Resource Allocation for LTE-Advanced | ZTE | Noted |
R1‑100966 | Evaluation for increased SRS multiplexing capacity | ZTE | Not treated |
R1‑100967 | Remaining issues in DMRS mapping | ZTE | Not treated |
R1‑100968 | DMRS design under extended CP | ZTE | Not treated |
R1‑100969 | CSI-RS pattern design for LTE-Advanced | ZTE | Noted |
R1‑100970 | Analysis of network energy saving solutions | ZTE | Noted |
R1‑100971 | Analysis on R-PHICH | ZTE | Revised |
R1‑100972 | Discussion on Backhaul Uplink Control Channel with UL Timing | ZTE | Not treated |
R1‑100973 | Link Level Performance Study of R-PDCCH | ZTE | Not treated |
R1‑100974 | Reference Signals for R-PDCCH Demodulation | ZTE | Not treated |
R1‑100975 | R-PDCCH Multiplexing and relevant problems | ZTE | Not treated |
R1‑100976 | Synchronization in Backhaul Link | ZTE | Not treated |
R1‑100977 | Timing of backhaul and access link in downlink | ZTE | Not treated |
R1‑100978 | Timing of backhaul and access link in uplink | ZTE | Not treated |
R1‑100979 | Scenarios and Specification Impact of Type 2 Relay | ZTE | Noted |
R1‑100980 | Considerations on CQI/PCI feedback cycle in DC-HSDPA and MIMO operation | ZTE | Noted |
R1‑100981 | Carrier Mapping in HS-DPCCH Design for 4-carrier HSDPA | ZTE | Noted |
R1‑100982 | Optimization of HS-DPCCH Design for Some Special Cases in 4C-HSDPA | ZTE | Noted |
R1‑100983 | HS-SCCH Order Mapping for Secondary Carrier (De-) Activation in 4C-HSDPA | ZTE | Noted |
R1‑100984 | Metrics aspects for evaluation of UMTS energy saving concepts | ZTE | Noted |
R1‑100985 | Discussion about power scaling for CA in LTE-Advanced | Potevio | Not treated |
R1‑100986 | Further discussions on RB-bundling for DM-RS in LTE-Advanced | Potevio | Not treated |
R1‑100987 | Considerations on explicit feedback in LTE-A | Potevio | Not treated |
R1‑100988 | On the PCFICH detection in cross-carrier scheduling | Pantech | Not treated |
R1‑100989 | On the non-contiguous UL resource allocation | Pantech | Noted |
R1‑100990 | Inter-cell CSI-RS Pattern Design for LTE-A | Pantech | Noted |
R1‑100991 | DMRS Indicator of DL signalling for Non-transparent MU-MIMO | Pantech | Not treated |
R1‑100992 | PMI type feedback to support MU-MIMO | Pantech | Not treated |
R1‑100993 | Further consideration on Aperiodic/Periodic Sounding RS | Pantech | Not treated |
R1‑100994 | PHICH resource allocation in LTE-A | ASUSTeK | Noted |
R1‑100995 | Power control for multiple carriers | ASUSTeK | Not treated |
R1‑100996 | Non-contiguous uplink resource allocation for LTE-A | ASUSTeK | Noted |
R1‑100997 | Discussion on Dynamic Aperiodic Sounding | ASUSTeK | Not treated |
R1‑100998 | 25.224 CR0247R1 (Rel-8, F) Clarification of ePCH modulation scheme | New Postcom | Withdrawn |
R1‑100999 | 25.224 CR0248R1 (Rel-9, A) Clarification of ePCH modulation scheme | New Postcom | Withdrawn |
R1‑101000 | 25.222 CR0202 (Rel-8, F) Correction to UL Sync and Power Control of CPC UEs for LCR TDD | New Postcom | Noted |
R1‑101001 | 25.222 CR0203 (Rel-9, A) Correction to UL Sync and Power Control of CPC UEs for LCR TDD | New Postcom | Noted |
R1‑101002 | System level simulation of MU-MIMO with 4U vs 2U | New Postcom | Withdrawn |
R1‑101003 | PDCCH monitoring set and carrier activation | New Postcom | Not treated |
R1‑101004 | Link level simulation results for beam-forming UL Tx Div on HSUPA | Magnolia broadband Inc. | Noted |
R1‑101005 | System simulation results for beam-forming UL Tx Div on HSUPA | Magnolia broadband Inc. | Noted |
R1‑101006 | Text Proposal of Beam-forming algorithm for UL Tx Div on HSPA | Magnolia broadband Inc. | Noted |
R1‑101007 | LTE Spectral Efficiency and LTE-Advanced Targets | Ericsson, ST-Ericsson | Revised |
R1‑101008 | Uplink DM-RS Resource Configuration for LTE-Advanced | Ericsson, ST-Ericsson | Not treated |
R1‑101009 | Enhanced PMI indication for refining MIMO precoder codebook | HTC Corporation | Not treated |
R1‑101010 | Performance Evaluations on the Coverage Extensionin in Type II Relays | HTC Corporation | Revised |
R1‑101011 | Relay Node with different Carriers | HTC Corporation | Withdrawn |
R1‑101012 | Physical layer perspective of 1.28Mcps TDD MC-HSUPA | TD Tech | Noted |
R1‑101013 | ULPC and ULSC of E-PUCH for MC-HSUPA UE | TD Tech | Noted |
R1‑101014 | UPH definitions for MC-HSUPA UE | TD Tech | Noted |
R1‑101015 | Use of E-AGCH in MC-HSUPA LCR TDD | TD Tech | Noted |
R1‑101016 | On the antenna calibration in TDD CoMP | TD Tech | Not treated |
R1‑101017 | Consideration on Inter-CC Subframe Synchronization | Mitsubishi Electric | Not treated |
R1‑101018 | Consideration on SRS Configuration for UL MIMO | Mitsubishi Electric | Not treated |
R1‑101019 | UE Feedback Extension for SU/MU-MIMO | Sony Corporation | Not treated |
R1‑101020 | Discussion of Carrier Indicator Field | MediaTek Inc. | Not treated |
R1‑101021 | Views on Non-contiguous Resource Allocation in Uplink LTE-A | MediaTek Inc. | Not treated |
R1‑101022 | Further Comments on SRS Issues | MediaTek Inc. | Not treated |
R1‑101023 | UL ACK/NACK feedback for LTE-A | Fujitsu | Noted |
R1‑101024 | 8 Tx Codebook for LET-Advanced | Fujitsu | Noted |
R1‑101025 | Further Results on Rank3 Precoding Codebook | Fujitsu | Noted |
R1‑101026 | Views on layer mapping to DM-RS ports and downlink signalling for rank 3-8 | CATR | Not treated |
R1‑101027 | Resource wastage in R-PDCCH for TDM+FDM configuration | LG-Nortel | Not treated |
R1‑101028 | Dynamic R-PDCCH for TDM+FDM configuration | LG-Nortel | Not treated |
R1‑101029 | Considerations for timing regarding relay backhaul subframe | LG-Nortel | Not treated |
R1‑101030 | 25.214 CR0595R1 (Rel-9, F) Modification on PCI/CQI feedback cycle when secondary carrier is deactivated in DC-MIMO operation | Huawei, ZTE | Noted |
R1‑101031 | Cubic metric evaluation of HS-DPCCH design options for 4-carrier HSDPA | Huawei | Noted |
R1‑101032 | General principles for 3&4-carrier HSDPA design | Huawei, ChinaUnicom | Noted |
R1‑101033 | Discussion on HS-DPCCH design for 3-carrier HSDPA without MIMO | Huawei | Noted |
R1‑101034 | Discussion on HS-DPCCH design options for 3-carrier HSDPA with MIMO configured | Huawei | Noted |
R1‑101035 | HS-DPCCH remapping scheme for 4-carrier HSDPA | Huawei | Noted |
R1‑101036 | HS-SCCH order mapping scheme for 4-carrier HSDPA | Huawei | Noted |
R1‑101037 | Considerations on UE categories for 4-carrier HSDPA | Huawei | Not treated |
R1‑101038 | Imbalance analysis for transmit diversity antennas | Huawei | Withdrawn |
R1‑101039 | Updated link simulation results for switched antenna diversity | Huawei | Noted |
R1‑101040 | Updated link simulation results for beamforming diversity | Huawei | Noted - Revised |
R1‑101041 | Updated System Simulation Results for UL Switched Antenna Diversity | Huawei | Noted - Revised |
R1‑101042 | Updated System Simulation Results for UL Beamforming Diversity | Huawei | Noted - Revised |
R1‑101043 | Scenarios and further thoughts on Energy Saving in UMTS | Huawei, ChinaUnicom | Noted |
R1‑101044 | 36.213(Rel-9, F) Correction to CQI Calculation for Mode 7&8 | Huawei | Noted |
R1‑101045 | PCFICH on Cross-Carrier scheduling | Huawei | Not treated |
R1‑101046 | Considerations on PHICH mapping in LTE-A | Huawei | Noted |
R1‑101047 | Remaining Issues on Carrier Indicator Field | Huawei | Not treated |
R1‑101048 | LTE-A PDCCH blind decoding | Huawei | Noted |
R1‑101049 | PDCCH design to reduce the BD computation load on DSS from 32 to 2 | Huawei | Not treated |
R1‑101050 | SORTD resource allocation for PUCCH format 1a/1b | Huawei | Not treated |
R1‑101051 | UL ACK/NACK resource allocation for carrier aggregation | Huawei | Noted |
R1‑101052 | Consideration of DCI 3/3A for carrier aggregation | Huawei | Not treated |
R1‑101053 | Some open issues on power control in carrier aggregation | Huawei | Not treated |
R1‑101054 | Power scaling for UL PC in LTE-A | Huawei | Not treated |
R1‑101055 | DCI design for non-contiguous PUSCH transmission | Huawei | Not treated |
R1‑101056 | Remaining issues for DMRS | Huawei | Not treated |
R1‑101057 | CSI-RS pattern design | Huawei | Noted |
R1‑101058 | CSI-RS design to support multiple-cell measurements | Huawei | Noted |
R1‑101059 | Signaling support for transparent MU MIMO | Huawei | Not treated |
R1‑101060 | DMRS considerations for MU MIMO | Huawei | Not treated |
R1‑101061 | CQI enhancement for interference varying environments | Huawei | Not treated |
R1‑101062 | Feedback of Long Term Channel Information for Adaptive Codebook | Huawei | Not treated |
R1‑101063 | Further discussion on the adaptive codebook | Huawei | Not treated |
R1‑101064 | Differential feedback with system level evaluation | Huawei | Not treated |
R1‑101065 | Hierarchical Feedback from Single-cell MIMO to Multi-cell MIMO | Huawei | Not treated |
R1‑101066 | DL 8TX codebook | Huawei | Noted |
R1‑101067 | Evaluation of DL Coordinated Beam Switching with Voice Traffic | Huawei | Noted |
R1‑101068 | Performance evaluation of CBF | Huawei | Noted |
R1‑101069 | Evaluation of DL CoMP for High Load and Low Load Scenarios | Huawei | Noted |
R1‑101070 | UL MIMO performance for Layer-Shifting | Huawei | Noted |
R1‑101071 | Codebook for uplink rank 3 precoding | Huawei | Noted |
R1‑101072 | Transmit diversity for PUCCH format 2/2a/2b | Huawei | Not treated |
R1‑101073 | Multiplexing Schemes of control and data in multi-layer PUSCH transmission | Huawei | Not treated |
R1‑101074 | Channel interleaver and codeword to layer mapping for UL MIMO | Huawei | Not treated |
R1‑101075 | Impacts of OCC on UL DM RS for LTE-A | Huawei | Not treated |
R1‑101076 | Views on SRS capacity enhancements in Rel.10 | Huawei | Not treated |
R1‑101077 | Sounding capacity enhancements using DMRS | Huawei | Not treated |
R1‑101078 | Comparison between PDCCH and R-PDCCH for Type1 Half Duplex Relay | Huawei | Not treated |
R1‑101079 | TDM+FDM/FDM Solution for R-PDCCH | Huawei | Not treated |
R1‑101080 | R-PDCCH design | Huawei | Not treated |
R1‑101081 | RS for R-PDCCH | Huawei | Not treated |
R1‑101082 | RTT for HARQ on the Backhaul Link | Huawei | Not treated |
R1‑101083 | Cell association analysis in outdoor Hotzone of heterogeneous networks | Huawei | Noted |
R1‑101084 | Energy saving techniques to support low load scenarios | Huawei | Noted |
R1‑101085 | Views on ACK/NACK Resource Allocation | Texas Instruments | Noted |
R1‑101086 | Views on PUSCH Resource Allocation | Texas Instruments | Noted |
R1‑101087 | On MU-MIMO transparency and DMRS dimensioning | Texas Instruments | Not treated |
R1‑101088 | Downlink MIMO transmission modes in LTE-Advanced | Texas Instruments | Not treated |
R1‑101089 | Multi-rank implicit feedback for MU-MIMO | Texas Instruments | Not treated |
R1‑101090 | Codebook-Based Feedback Issues on 8Tx Downlink MIMO | Texas Instruments | Noted |
R1‑101091 | Layer Shifting vs. No Layer Shifting for Rel-10 UL SU-MIMO | Texas Instruments | Noted |
R1‑101092 | Finalizing the Size of 4Tx Rank-3 Codebook | Texas Instruments | Noted |
R1‑101093 | Comparison of 4Tx Rank-3 Codebook Proposals | Texas Instruments | Not treated |
R1‑101094 | Considerations on Aperiodic SRS | Texas Instruments | Not treated |
R1‑101095 | Analysis of Type I Backhaul Timing | Texas Instruments | Not treated |
R1‑101096 | Evaluation of LTE-Advanced performance against 3GPP requirement | Texas Instruments | Noted |
R1‑101097 | Outdoor Hotzone Cell Performance: A Cell Selection Analysis | Texas Instruments | Not treated |
R1‑101098 | DL CoMP configuration | SOFTBANK MOBILE | Revised |
R1‑101099 | Blind Decoding for Carrier Aggregation | Research In Motion UK Limited | Not treated |
R1‑101100 | Remaining issues for cross-carrier scheduling | Research In Motion UK Limited | Revised |
R1‑101101 | PH reporting for Carrier Aggregation | Research In Motion UK Limited | Not treated |
R1‑101102 | CSI feedback Enhancement for LTE-A MU-MIMO | Research In Motion UK Limited | Not treated |
R1‑101103 | Feedback Reduction in DL MU-MIMO using Pre-Assigned Companion Susets | Research In Motion UK Limited | Not treated |
R1‑101104 | Companion Subset Based PMI/CQI Feedback for LTE-A MU-MIMO | Research In Motion UK Limited | Not treated |
R1‑101105 | Multiplexing Capacity for LTE-A PUCCH Format 2/2a/2b with Transmit Diversity | Research In Motion UK Limited | Not treated |
R1‑101106 | PDCCH Interference Management for Heterogeneous Network | Research In Motion UK Limited | Noted |
R1‑101107 | DL Performance of Type-II Relay with Intra-cell Frequency Reuse | Research In Motion UK Limited | Not treated |
R1‑101108 | Further details on CIF design | Motorola | Not treated |
R1‑101109 | DCI Formats for uplink non-contiguous RB allocations | Motorola | Not treated |
R1‑101110 | PDCCH False Detection for LTE-A control signalling | Motorola | Noted |
R1‑101111 | PCFICH in Carrier Aggregation | Motorola | Not treated |
R1‑101112 | Blind Decoding and Search Space configuation | Motorola | Noted |
R1‑101113 | Further signaling details for UL PC | Motorola | Withdrawn |
R1‑101114 | UE Maximum Power Scaling | Motorola | Revised |
R1‑101115 | UL Power Control for Multi-Antenna UE | Motorola | Not treated |
R1‑101116 | Relay Performance Evaluation with Backhaul Subframe Dynamic Partitioning and Enhancement Techniques - discussion | Motorola | Not treated |
R1‑101117 | Relay Performance Evaluation with Backhaul Subframe Dynamic Partitioning and Enhancement Techniquesl - system simulations | Motorola | Not treated |
R1‑101118 | On R-PDCCH design | Motorola | Revised |
R1‑101119 | Relay UL/DL timing discussion | Motorola | Not treated |
R1‑101120 | Relay backhaul HARQ Discussion | Motorola | Not treated |
R1‑101121 | HeNB interference management | Motorola | Noted |
R1‑101122 | Downlink Control Protection in LTE | Motorola | Noted |
R1‑101123 | Performance of Indoor HeNB(CSG) Deployment and Technical Aspects Observations | Motorola | Noted |
R1‑101124 | Effect of Cell Association and Frequency Allocation With and Without FSS and BF --- Outdoor Hotzone Scenario | Motorola | Not treated |
R1‑101125 | Further Results on 4-Tx Rank-2 Codebook Design in UL-MIMO | Motorola | Not treated |
R1‑101126 | 4-Tx Rank-3 CMP Codebook Evaluation and Further Codebook Consideration | Motorola | Noted |
R1‑101127 | Comparison Results of Layer Shifting versus No Shifting in UL-MIMO | Motorola | Noted |
R1‑101128 | Efficient Feedback of Spatial Covariance Information | Motorola | Not treated |
R1‑101129 | On Extensions to Rel-8 PMI Feedback | Motorola | Noted |
R1‑101130 | CoMP Support in Rel-10: Performance with Intra-eNB CoBF and Cell-edge Improvement | Motorola | Noted |
R1‑101131 | CSI-RS Pattern based on Cyclic Shift Multiplexing (CSM) | Motorola | Noted |
R1‑101132 | UE impact of Network energy savings | Motorola | Noted |
R1‑101133 | Views on Remaining Issues on Uplink DM-RS for LTE-A | Motorola | Not treated |
R1‑101134 | Views on SRS Enhancements for LTE-A | Motorola | Not treated |
R1‑101135 | DM-RS Design for Extended CP | Motorola | Not treated |
R1‑101136 | Component Carrier Types in Rel-10 | Samsung | Not treated |
R1‑101137 | PCFICH Detection Errors with Cross-Carrier Scheduling | Samsung | Not treated |
R1‑101138 | PHICH Transmission Aspects in Rel-10 | Samsung | Noted |
R1‑101139 | Configuration Aspects for Carrier Indicator Field | Samsung | Noted |
R1‑101140 | Adequacy of 16-Bit CRC Length in Rel-10 | Samsung | Noted |
R1‑101141 | PDCCH Blind Decoding Operations in Rel-10 | Samsung | Not treated |
R1‑101142 | PDCCH Extension to Support Operation with Cross-Carrier Scheduling | Samsung | Not treated |
R1‑101143 | DAI design for LTE-A TDD | Samsung | Not treated |
R1‑101144 | Component carreir activation and deactivation | Samsung | Not treated |
R1‑101145 | Concurrent PUSCH and PUCCH Transmissions | Samsung | Not treated |
R1‑101146 | UL HARQ-ACK Signal Transmission in Rel-10 | Samsung | Noted |
R1‑101147 | CSI Feedback Signaling in Rel-10 | Samsung | Not treated |
R1‑101148 | Power Scaling for UL TPC with Carrier Aggregation | Samsung | Not treated |
R1‑101149 | UL power headroom report and SU-MIMO power control | Samsung | Not treated |
R1‑101150 | Cross-carrier uplink power control | Samsung | Not treated |
R1‑101151 | Non-Contiguous UL Resource Allocation: Performance | Samsung | Noted |
R1‑101152 | Non-Contiguous UL Resource Allocation: DCI Format | Samsung | Not treated |
R1‑101153 | Discussions on RB bundling for DM-RS | Samsung | Not treated |
R1‑101154 | Discussion on Layer to DMRS mapping | Samsung | Not treated |
R1‑101155 | Discussion on PRB Sparse Transmission of CSI-RS. | Samsung | Noted |
R1‑101156 | Necessity of orthogonal inter-cell CSI-RS patterns. | Samsung | Noted |
R1‑101157 | Inter-cell CSI RS design in heterogeneous network | Samsung | Noted |
R1‑101158 | Performance evaluation of transparent vs. non-transparent MU-MIMO | Samsung | Not treated |
R1‑101159 | Transparency in DL control signalling for LTE-A MU-MIMO | Samsung | Not treated |
R1‑101160 | Performance comparison among DM-RS configurations for MU-MIMO | Samsung | Withdrawn |
R1‑101161 | Discussion on PDCCH capacity considering MU-MIMO | Samsung | Not treated |
R1‑101162 | Discussions on implicit feedback framework for enhanced SU/MU-MIMO | Samsung | Noted |
R1‑101163 | Generalized transformation for adaptive codebooks | Samsung | Not treated |
R1‑101164 | Further performance evaluations of differential codebooks for Rel. 8 PMI enhancements | Samsung | Not treated |
R1‑101165 | Discussions on a unified design of CQI/PMI/RI feedback for LTE-A | Samsung | Not treated |
R1‑101166 | Discussion on multiple PMI feedback | Samsung | Not treated |
R1‑101167 | Enhancement of Rel. 8 CQI feedback for MU-MIMO | Samsung | Not treated |
R1‑101168 | Discussion on CSI-RS based CQI Reporting for Rel-10 | Samsung | Not treated |
R1‑101169 | Discussion on feedback testing procedure | Samsung | Not treated |
R1‑101170 | 8Tx Codebook Design for Channel Feedback in support of DL SU-MIMO in LTE-A | Samsung | Noted |
R1‑101171 | Periodic feedback of PMI/CQI responding to sparse CSI-RS | Samsung | Not treated |
R1‑101172 | Furhter discussions on CoMP Standard Issues | Samsung | Noted |
R1‑101173 | Performance evaluation of CoMP CS/CB | Samsung | Noted |
R1‑101174 | Performance evaluation of CoMP JP | Samsung | Withdrawn |
R1‑101175 | Interference mitigation based on rank restriction and recommendation | Samsung | Not treated |
R1‑101176 | Discussion on open-loop CoMP schemes | Samsung | Not treated |
R1‑101177 | Antenna calibrations for TDD CoMP | Samsung | Not treated |
R1‑101178 | DMRS design for CoMP | Samsung | Not treated |
R1‑101179 | TX diversity on MBSFN subframe | Samsung | Not treated |
R1‑101180 | Summary of Reflector Discussions on UL MIMO open issues | Samsung | Noted |
R1‑101181 | Performance evaluation on layer shifting and HARQ spatial bundling for LTE-A UL MIMO | Samsung | Noted |
R1‑101182 | Further Discussion on Rank 3 Codebook Design for 4 TX UL SU-MIMO | Samsung | Noted |
R1‑101183 | Transmit Diversity for PUCCH Format 1a/1b with Dynamic Scheduling | Samsung | Revised |
R1‑101184 | Transmit Diversity for PUCCH Formats 2/2a/2b | Samsung | Not treated |
R1‑101185 | Discussions on UL MIMO signaling requirements | Samsung | Noted |
R1‑101186 | Disucssion on Data and Control Multiplexing in UL MIMO Transmissions | Samsung | Not treated |
R1‑101187 | UL DM RS Aspects in Rel.10 | Samsung | Not treated |
R1‑101188 | Evaluation of DM RS orthogonal covering for SU-MIMO | Samsung | Not treated |
R1‑101189 | SRS Enhancements in Rel-10 | Samsung | Not treated |
R1‑101190 | Summary of Reflector Discussions on SRS Enhancements | Samsung | Noted |
R1‑101191 | Downlink Subframe Alignment in Type I Relay | Samsung | Not treated |
R1‑101192 | Further evaluation on the interference issue of TDD configuration paring scheme | Samsung | Withdrawn |
R1‑101193 | Timing of uplink Un and Uu subframes | Samsung | Withdrawn |
R1‑101194 | R-PDCCH design | Samsung | Not treated |
R1‑101195 | HARQ operation in Un dowlink and uplink | Samsung | Not treated |
R1‑101196 | Considerations on Multiple HARQs in Type I Backhaul Link Transmission | Samsung | Not treated |
R1‑101197 | Full duplex multiplexing of Un and Uu subframes | Samsung | Not treated |
R1‑101198 | Inter-cell CSI-RS design considering Type 1 Relay | Samsung | Not treated |
R1‑101199 | Text proposal to clarify Un and Uu subframe multiplexing in TR36.814 and TR36.912 | Samsung | Noted |
R1‑101200 | Evaluation of LTE-Advanced performance of TDD system towards 3GPP requirements | Samsung | Noted |
R1‑101201 | LTE / LTE-A FDD system performance vs. 3GPP requirements | Samsung | Noted |
R1‑101202 | Performance evaluation of femto-based HetNet | Samsung | Not treated |
R1‑101203 | System performance of Heterogeneous networks with range expansion | Samsung | Noted |
R1‑101204 | Further Simulation Results on RSRP Measurement Performance with Extended Cell DTX | Samsung | Noted |
R1‑101205 | Further Considerations on Extended Cell DTX | Samsung | Noted |
R1‑101206 | PCFICH for Cross-carrier Assignment | NTT DOCOMO | Not treated |
R1‑101207 | Views on details for CIF | NTT DOCOMO | Not treated |
R1‑101208 | UE Assignment Methods During CIF Configuration | NTT DOCOMO | Not treated |
R1‑101209 | Uplink ACK/NACK Transmission Scheme on PUCCH for LTE-Advanced | NTT DOCOMO | Noted |
R1‑101210 | Clarification of UCI Transmission Scheme with Simultaneous Data Transmission | NTT DOCOMO | Not treated |
R1‑101211 | PUSCH Resource Allocation for Clustered DFT-Spread OFDM | NTT DOCOMO | Noted |
R1‑101212 | Anchor Component Carrier for Carrier Aggregation | NTT DOCOMO | Not treated |
R1‑101213 | Length-4 OCC Mapping Scheme for DM-RS Rank 5-8 in LTE-Advanced | NTT DOCOMO, CATT | Not treated |
R1‑101214 | CSI-RS Design for LTE-Advanced | NTT DOCOMO | Noted |
R1‑101215 | Views on Transparent or Non-transparent MU-MIMO in LTE-Advanced | NTT DOCOMO | Revised |
R1‑101216 | Investigation on DMRS Configuration for MU-MIMO in LTE-Advanced | NTT DOCOMO | Revised |
R1‑101217 | Views on CSI Feedback Scheme for MU-MIMO in LTE-Advanced | NTT DOCOMO | Noted |
R1‑101218 | Performance of DL MU-MIMO Based on Implicit Feedback Scheme in LTE-Advanced | NTT DOCOMO | Noted |
R1‑101219 | Views on Codebook Design for Downlink 8Tx MIMO | NTT DOCOMO | Noted |
R1‑101220 | Investigation on Quantization Scheme of Explicit Spatial Channel Feedback for CoMP Joint Transmission in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑101221 | Investigation of Layer Shifting and HARQ Spatial Bundling for UL SU-MIMO | NTT DOCOMO | Revised |
R1‑101222 | Further Investigation on Necessity of PUSCH Tx Diversity in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑101223 | Uplink DM-RS Resource Assignment for LTE-Advanced | NTT DOCOMO | Not treated |
R1‑101224 | Views on SRS Enhancement for LTE-Advanced | NTT DOCOMO | Not treated |
R1‑101225 | Downlink Interference Coordination between eNB and HeNB | NTT DOCOMO | Not treated |
R1‑101226 | Performance Evaluations of Heterogeneous Networks | NTT DOCOMO | Noted |
R1‑101227 | PCFICH False Detection in Cross-Carrier Scheduling | LG Electronics | Not treated |
R1‑101228 | PHICH Design in Carrier Aggregation Scenarios | LG Electronics | Noted |
R1‑101229 | Blind Decoding Reduction Methods | LG Electronics | Not treated |
R1‑101230 | Upper Limit of Blind Decoding for Carrier Aggregation | LG Electronics | Not treated |
R1‑101231 | UL ACK/NACK Transmission in Carrier Aggregation | LG Electronics | Not treated |
R1‑101232 | Resource Allocation for SORTD | LG Electronics | Not treated |
R1‑101233 | Remaining Issues for DL DM-RS Design | LG Electronics | Not treated |
R1‑101234 | Consideration on Downlink DM-RS PRB-bundling | LG Electronics | Not treated |
R1‑101235 | Consideration on CSI-RS Pattern Design | LG Electronics | Noted |
R1‑101236 | CSI-RS Design Aspects for ICI Measurement in LTE-A | LG Electronics | Noted |
R1‑101237 | Discussion on Transparency Support of MU-MIMO | LG Electronics | Not treated |
R1‑101238 | Discussion on Resource Allocation for MU-MIMO | LG Electronics | Not treated |
R1‑101239 | Investigation on feedback for MU-MIMO | LG Electronics | Not treated |
R1‑101240 | Discussion on DM-RS Port Mapping Definition | LG Electronics | Not treated |
R1‑101241 | Remaining Issues on Downlink TxD in LTE-A Subframe | LG Electronics | Not treated |
R1‑101242 | Performance evaluation on layer shifting for UL SU-MIMO in LTE-A | LG Electronics | Noted |
R1‑101243 | Performance evaluation on uplink rank-3 codebook for LTE-Advanced | LG Electronics | Noted |
R1‑101244 | Further Evaluations on Transmit Diversity for PUCCH format 2/2a/2b | LG Electronics | Not treated |
R1‑101245 | Payload Increase for PUCCH Format 2/2a/2b | LG Electronics | Not treated |
R1‑101246 | Consideration on DM-RS design for UL MIMO in LTE-A | LG Electronics | Not treated |
R1‑101247 | SRS Enhancements for UL MIMO in LTE-Advanced | LG Electronics | Not treated |
R1‑101248 | PCFICH in cross carrier operation | Panasonic | Not treated |
R1‑101249 | PDCCH with cross carrier operation | Panasonic | Noted |
R1‑101250 | DCI format design for new transmission schemes | Panasonic | Not treated |
R1‑101251 | Blind decoding in carrier aggregation | Panasonic | Noted |
R1‑101252 | PUCCH resource indication for carrier aggregation and SORTD | Panasonic | Noted |
R1‑101253 | Support of UL ACK/NACK channel selection for carrier aggregation | Panasonic | Not treated |
R1‑101254 | Simultaneous transmission of Scheduling request indicator and ACK/NACK information for LTE-Advanced | Panasonic | Not treated |
R1‑101255 | ACK/NACK transmission schemes for carrier aggregation | Panasonic | Noted |
R1‑101256 | Limited UL ACK/NACK transmission on PUCCH for carrier aggregation | Panasonic | Not treated |
R1‑101257 | Discussion on Format 2-type UL ACK/NACK transmission for carrier aggregation | Panasonic | Not treated |
R1‑101258 | Periodic CQI Reporting for Carrier Aggregation | Panasonic | Not treated |
R1‑101259 | Required number of clusters for non-contiguous resource allocation | Panasonic | Noted |
R1‑101260 | Signalling for UL non-contiguous resource allocation | Panasonic | Not treated |
R1‑101261 | Discussion on the UE capabilities and carrier aggregation configurations | Panasonic | Not treated |
R1‑101262 | Aperiodic CQI Reporting for Carrier Aggregation | Panasonic | Not treated |
R1‑101263 | Link level analysis on inter-cell CSI-RS issues | Panasonic | Noted |
R1‑101264 | DMRS port indication with MU-MIMO considerations | Panasonic | Not treated |
R1‑101265 | Feedback frame structure in support of DL SU/MU MIMO transmission | Panasonic | Not treated |
R1‑101266 | SORTD configurations for ACK/NACK information and SRI | Panasonic | Not treated |
R1‑101267 | OCC and CS for UL DMRS in SU/MU-MIMO | Panasonic | Not treated |
R1‑101268 | CM reduction for UL RS on multiple component carriers | Panasonic | Not treated |
R1‑101269 | R-PDCCH placement | Panasonic | Not treated |
R1‑101270 | RN DL/UL subframe timing of backhaul and access link | Panasonic | Not treated |
R1‑101271 | Necessity of R-PHICH for backhaul | Panasonic | Not treated |
R1‑101272 | UL/DL HARQ timing for Un interface | Panasonic | Not treated |
R1‑101273 | Downlink relay performance evaluation | Panasonic | Not treated |
R1‑101274 | Possibility of UE side ICI cancellation in Hetnet | Panasonic | Not treated |
R1‑101275 | Discussion on Extension Carriers and Carrier Segments from LTE-A Bandwidth Extension Perspective | HTC Corp., CHTTL | Not treated |
R1‑101276 | Network Energy Saving during Low Load | HTC Corp., CHTTL | Noted |
R1‑101277 | TR36.814 v 1.6.1 | Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑101278 | TP for TR36.814 on Heterogeneous Networks | Rapporteur (NTT DOCOMO) | Agreed |
R1‑101279 | TP for TR36.814 for peformance evaluation results on 3GPP requirements | Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑101280 | 36.912 CR0004 (Rel-9, F) Conclusion of TR36.912 | Rapporteur (NTT DOCOMO) | Agreed |
R1‑101281 | 36.912 CR0005 (Rel-9, F) Type 1 relay definition | Rapporteur (NTT DOCOMO) | Agreed |
R1‑101282 | Summary of e-mail discussion on CoMP traffic models | NTT DOCOMO | Noted |
R1‑101283 | WF on Un HARQ timeline | Nokia, Nokia Siemens Networks, Ericsson, ST- Ericsson, Huawei | Revised |
R1‑101284 | WF on R-PHICH for Un UL HARQ | Nokia, Nokia Siemens Networks, Ericsson, ST- Ericsson, Panasonic, Motorola | Revised |
R1‑101285 | PDCCH Search Space Design for Carrier Aggregation | Philips | Noted |
R1‑101286 | RS design and network synchronisation | Philips | Noted |
R1‑101287 | Configuration of feedback mode for MIMO transmission | Philips | Not treated |
R1‑101288 | Mitigation of control channel interference | Philips | Not treated |
R1‑101289 | Reuse of Release 8 codebook design for Release 10 DL MIMO UE feedback | Philips | Noted |
R1‑101290 | Hybrid feedback and precoding for MU-MIMO & JT-CoMP | Tokyo Tech. | Not treated |
R1‑101291 | 25.214 CR0598 (Rel-9, F) Disallow interruption at carrier (de)activation for DB-DC-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑101292 | 25.214 CR0599 (Rel-9, F) Decrease DC-HSPA carrier activation application time to 18 slots | Ericsson, ST-Ericsson | Noted - Revised |
R1‑101293 | HS-DPCCH design for 4C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑101294 | HS-SCCH orders for 4C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑101295 | Dual-band optimizations for 4C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑101296 | Uplink load balancing for 4C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑101297 | Link level results for HSUPA beamforming diversity | Ericsson, ST-Ericsson | Noted |
R1‑101298 | Link level results for HSUPA antenna switching diversity | Ericsson, ST-Ericsson | Noted |
R1‑101299 | System results for HSUPA beamforming diversity with 2D atennas | Ericsson, ST-Ericsson | Noted |
R1‑101300 | System results for HSUPA beamforming diversity with 3D atennas | Ericsson, ST-Ericsson | Noted |
R1‑101301 | System results for HSUPA antenna switching diversity with 3D antennas | Ericsson, ST-Ericsson | Noted |
R1‑101302 | System results for HSUPA antenna switching diversity with 2D antennas | Ericsson, ST-Ericsson | Noted |
R1‑101303 | TP for TR 25.863 on evaluation methodology for HSPA UL Tx Diversity | Ericsson, ST-Ericsson | Noted |
R1‑101304 | Some considerations on UL Tx Diversity for HSUPA | Ericsson, ST-Ericsson | Noted |
R1‑101305 | UTRA Node B energy saving | Ericsson, ST-Ericsson | Withdrawn |
R1‑101306 | Discussion on transparency of LTE-A MU-MIMO | InterDigital Communications, LLC | Not treated |
R1‑101307 | Discussion on Feedback Accuracy for Interference Nulling | InterDigital Communications, LLC | Not treated |
R1‑101308 | Hybrid PMI/Analog - Further Details and Extensions | InterDigital Communications, LLC | Not treated |
R1‑101309 | Enabling Enhanced Cell DTX in LTE | Ericsson, ST-Ericsson | Noted |
R1‑101310 | Inclusion of CFI in PDCCH for DL scheduling assignment | Fujitsu | Not treated |
R1‑101311 | Inclusion of CIF in DCI format | Fujitsu | Not treated |
R1‑101312 | UTDOA Support in LTE | TruePosition | Not treated |
R1‑101313 | DVRB assignment with antenna port 7 | NEC Group, Qualcomm Inc. | Noted |
R1‑101314 | Minimising the impact of cross carrier scheduling on blind decoding | NEC Group | Not treated |
R1‑101315 | Further discussion on DCI format for clustered DFT-S-OFDM | NEC Group | Not treated |
R1‑101316 | Discussion on required maximum number of clusters for non-contiguous resource allocation within one CC | NEC Group | Noted |
R1‑101317 | Views on MU-MIMO transparency | NEC Group | Not treated |
R1‑101318 | On the use of of DM RS ports / scrambling sequences for MU-MIMO | NEC Group | Not treated |
R1‑101319 | CM reduction of UL RS for carrier aggregation in LTE-A | NEC Group | Not treated |
R1‑101320 | Supporting frequency diversity and frequency selective R-PDCCH transmissions | NEC Group | Not treated |
R1‑101321 | R-PDCCH blind decoding for Frequency Diversity and Frequency Selective R-PDCCH transmissions | NEC Group | Not treated |
R1‑101322 | Reference signals for demodulating R-PDCCH channel | NEC Group | Not treated |
R1‑101323 | PCI/CQI feedback cycle in DC-HSDPA and MIMO operation | Qualcomm Inc | Noted |
R1‑101324 | 25.214 CR0600 (Rel-9, F) Timer based de-activation of secondary carrier in Dual Band DC-HSDPA | Qualcomm Inc | Noted |
R1‑101325 | Timer based de-activation of secondary carrier in Dual-Band DC-HSDPA | Qualcomm Inc | Noted |
R1‑101326 | Cubic Metric Analysis for HS-DPCCH design options for 4C-HSDPA | Qualcomm Inc | Noted |
R1‑101327 | Link Analysis for HS-DPCCH design options for 4C-HSDPA | Qualcomm Inc | Withdrawn |
R1‑101328 | HS-DPCCH Design for 4C-HSDPA: Open Issues | Qualcomm Inc | Noted |
R1‑101329 | HS-SCCH orders for activation and de-activation of secondary HS-DSCH cells in 4C-HSDPA | Qualcomm Inc | Noted |
R1‑101330 | Physical Layer Design for 4C-HSDPA: Outstanding Issues | Qualcomm Inc | Noted |
R1‑101331 | Dynamic Load Balancing in 4C-HSDPA | Qualcomm Inc | Noted |
R1‑101332 | 25.211 Introduction of 4C-HSDPA | Qualcomm Inc | Noted |
R1‑101333 | 25.212 Introduction of 4C-HSDPA | Qualcomm Inc | Noted |
R1‑101334 | 25.213 Introduction of 4C-HSDPA | Qualcomm Inc | Noted |
R1‑101335 | 25.214 Introduction of 4C-HSDPA | Qualcomm Inc | Noted |
R1‑101336 | 25.215 Introduction of 4C-HSDPA | Qualcomm Inc | Noted |
R1‑101337 | Link Results for Reference Practical Beamforming ULTD Scheme | Qualcomm Inc | Noted |
R1‑101338 | Link study of HS-DPCCH impact due to SATD in Soft Handover Conditions | Qualcomm Inc | Noted |
R1‑101339 | System Simulation results for Switched Antenna ULTD | Qualcomm Inc | Revised |
R1‑101340 | System Simulation results for Beam forming ULTD | Qualcomm Inc | Noted |
R1‑101341 | Analysis of Transmit Antenna Imbalance in ULTD Devices | Qualcomm Inc | Noted |
R1‑101342 | 25.863 TP on ULTD Algorithms Description (Ch 4) | Qualcomm Inc | Noted |
R1‑101343 | Scope of Energy Savings for UMTS NodeB Study | Qualcomm Inc | Withdrawn |
R1‑101344 | TP to Skeleton TR 25.9xx "Energy saving within UTRA Node" | Qualcomm Inc | Noted |
R1‑101345 | Correction on PDSCH EPRE with UE specific RS | CATT | Noted - Revised |
R1‑101346 | Carrier indicator field related issues for cross-carrier scheduling in carrier aggregation | LG Electronics | Not treated |
R1‑101347 | Construction of PDCCH search spaces for cross-carrier scheduling in carrier aggregation | LG Electronics | Noted |
R1‑101348 | Basic approaches on UL ACK/NACK PUCCH design in LTE-Advanced | LG Electronics | Noted |
R1‑101349 | Further details on UL power control methods in LTE-Advanced | LG Electronics | Not treated |
R1‑101350 | UL TPC issues | LG Electronics | Not treated |
R1‑101351 | DCI format for UL noncontiguous resource allocation | LG Electronics | Not treated |
R1‑101352 | UCI piggyback onto PUSCH in LTE-Advanced | LG Electronics | Not treated |
R1‑101353 | CC types in LTE-Advanced | LG Electronics | Not treated |
R1‑101354 | System level performance with CoMP CB | LG Electronics | Not treated |
R1‑101355 | System level performance with CoMP JT | LG Electronics | Noted |
R1‑101356 | CQI contents & measurement for SU-MIMO/MU-MIMO/CoMP | LG Electronics | Noted |
R1‑101357 | Inter-Cell CSI-RS design and Inter-Cell measurement consideration | LG Electronics | Revised |
R1‑101358 | Consideration on R-PDCCH design | LG Electronics | Not treated |
R1‑101359 | Necessity of R-PHICH | LG Electronics | Not treated |
R1‑101360 | Demodulation RS in DL Backhaul | LG Electronics | Not treated |
R1‑101361 | Backhaul Subframe Allocation and HARQ Timeline | LG Electronics | Not treated |
R1‑101362 | ACK/NACK Repetition Usages in Type 1 Relay | LG Electronics | Not treated |
R1‑101363 | Further Comments on DL/UL Timing Alternatives | LG Electronics | Not treated |
R1‑101364 | R-PUCCH Design Impact according to Uplink Timing Alternatives | LG Electronics | Not treated |
R1‑101365 | Downlink performance with relay | LG Electronics | Not treated |
R1‑101366 | Performance evaluation results for LTE-A DL system | LG Electronics | Noted |
R1‑101367 | Performance evaluation results for LTE-A UL system | LG Electronics | Noted |
R1‑101368 | SIC based ICIC in heterogeneous network | LG Electronics | Not treated |
R1‑101369 | Considerations on interference coordination in heterogeneous networks | LG Electronics | Noted |
R1‑101370 | Further considerations on TDD relaying methods | LG Electronics | Noted |
R1‑101371 | Implicit indication of cross-carrier control region | Sharp | Not treated |
R1‑101372 | Solution to PHICH resource collision | Sharp | Noted |
R1‑101373 | Dynamic update of PDCCH monitoring set | Sharp | Not treated |
R1‑101374 | Issues with per-antenna uplink power control | Sharp | Not treated |
R1‑101375 | Performance Improvement in Non-Contiguous UL Resource Allocation | Sharp | Noted |
R1‑101376 | Network Configuration of Antenna Port mode for LTE-A UL | Sharp | Revised |
R1‑101377 | [DRAFT] LS on Network Configuration of the UE Antenna Port mode for LTE-A UL | Sharp | Revised |
R1‑101378 | A simple PUCCH TxD for format 2/2a/2b for LTE-Advanced | Sharp | Not treated |
R1‑101379 | Precoding Codebooks for 8TX | Marvell | Noted |
R1‑101380 | MIMO Feedback for XPOL Antennas | Marvell | Not treated |
R1‑101381 | Assumptions on Precoding Granularity (“PRB Bundling”) | Marvell | Not treated |
R1‑101382 | Codebook Adaptation for ULA Antenna | Marvell | Not treated |
R1‑101383 | DMRS indication in DL enhanced Multiple antenna transmission | CMCC | Not treated |
R1‑101384 | Considerations on Backhaul Interference and Synchronization for Relay | CMCC | Not treated |
R1‑101385 | Discussion on DL DM-RS PRB-bundling | CMCC | Not treated |
R1‑101386 | Performance evaluation for DL intra-eNB CoMP | CMCC | Noted |
R1‑101387 | Performance evaluation for UL intra-eNB CoMP | CMCC | Noted |
R1‑101388 | Fast-fading modeling for outdoor Relay scenario | CMCC | Noted |
R1‑101389 | Email discussion summary [59bis-15-LTE-A]: Channel Models for femtocell | CMCC | Withdrawn |
R1‑101390 | Decreasing block probability for cross carrier PDCCH | CMCC, Huawei, ZTE | Noted |
R1‑101391 | Interference Coordination for HetNet with One or Multiple Component Carriers | CMCC | Not treated |
R1‑101392 | Timing of backhaul and access links in uplink | ETRI | Not treated |
R1‑101393 | ACK/NACK transmission on PUCCH for carrier aggregation | ETRI | Not treated |
R1‑101394 | PUCCH ACK/NAK resources for carrier aggregation | ETRI | Noted |
R1‑101395 | UCI multiplexing with data on PUSCH | ETRI | Not treated |
R1‑101396 | HeNB over-the-air interference coordination | ETRI | Noted |
R1‑101397 | Control Channel Power in Carrier Aggregated CSG cell | ETRI | Not treated |
R1‑101398 | ACK/NACK design for LTE-A | ZTE | Withdrawn |
R1‑101399 | Multiple granularity feedback design for LTE-A | ZTE | Not treated |
R1‑101400 | DL Codebook Design for 8 Tx MIMO in LTE-A | ZTE | Noted |
R1‑101401 | Intra-eNB CoMP performance evaluation | ZTE | Noted |
R1‑101402 | Considerations for MU-MIMO feedback schemes in LTE-Advanced | ZTE | Withdrawn |
R1‑101403 | Power offset issue on DMRS mapping | ZTE | Not treated |
R1‑101404 | Consideration on DL Signalling for MU-MIMO | ZTE | Not treated |
R1‑101405 | Performance study on quasi-orthogonal MU-MIMO with different scrambling sequences | ZTE | Revised |
R1‑101406 | Performance Comparison between Explicit Feedback and Implicit Feedback | ZTE | Not treated |
R1‑101407 | Evaluation of LTE-A Performance against 3GPP Requirements | ZTE | Noted |
R1‑101408 | HS-DPCCH Cubic Metric Analysis for 4-carrier HSDPA | InterDigital Communications, LLC | Noted |
R1‑101409 | On 4C-HSDPA Carrier Activation and Deactivation HS-SCCH Order Design | InterDigital Communications, LLC | Noted |
R1‑101410 | PMCH Reception Issue | Nokia, Nokia Siemens Networks | Noted |
R1‑101411 | PCFICH Issues with Cross-Component Carrier Scheduling | Nokia Siemens Networks, Nokia | Not treated |
R1‑101412 | PHICH resources in LTE-Advanced | Nokia, Nokia Siemens Networks | Noted |
R1‑101413 | Remaining Details of Carrier Indicator Field | Nokia Siemens Networks, Nokia | Not treated |
R1‑101414 | Cross-CC scheduling and blind decoding | Nokia, Nokia Siemens Networks | Noted |
R1‑101415 | Handling DCI formats and blind decoding in LTE-Advanced | Nokia, Nokia Siemens Networks | Not treated |
R1‑101416 | Considerations on alternative ways of implementing DCI formats for LTE-Advanced | Nokia, Nokia Siemens Networks | Not treated |
R1‑101417 | PUCCH resource allocation for carrier aggregation | Nokia Siemens Networks, Nokia | Noted |
R1‑101418 | Performance comparison of PUCCH ACK/NACK transmission schemes for CC aggregation | Nokia Siemens Networks, Nokia | Noted |
R1‑101419 | UL ACK/NAK Feedback in LTE-A TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑101420 | Power reduction rule for uplink carrier aggregation | Nokia Siemens Networks, Nokia | Not treated |
R1‑101421 | Power headroom reporting for LTE-Advanced | Nokia Siemens Networks, Nokia | Not treated |
R1‑101422 | Cross-CC Scheduling with DCI Format 3/3A in LTE-Advanced | Nokia, Nokia Siemens Networks | Not treated |
R1‑101423 | PUSCH resource allocation | Nokia Siemens Networks, Nokia | Noted |
R1‑101424 | On PRB-bunded channel estimation over downlink DM-RS | Nokia, Nokia Siemens Networks | Not treated |
R1‑101425 | UE specific reference signal design for extended CP | Nokia, Nokia Siemens Networks | Not treated |
R1‑101426 | Further details on intra-cell CSI-RS design | Nokia, Nokia Siemens Networks | Noted |
R1‑101427 | On the need of inter-cell CSI-RS muting | Nokia, Nokia Siemens Networks | Noted |
R1‑101428 | On the downlink DM-RS support for MU-MIMO in LTE Rel-10 | Nokia, Nokia Siemens Networks | Not treated |
R1‑101429 | On UE feedback design | Nokia, Nokia Siemens Networks | Noted |
R1‑101430 | 8 Tx codebook design considerations | Nokia, Nokia Siemens Networks | Noted |
R1‑101431 | CoMP performance evaluation | Nokia Siemens Networks, Nokia | Noted |
R1‑101432 | Performance evaluation of uplink SU-MIMO layer shifting | Nokia Siemens Networks, Nokia | Noted |
R1‑101433 | Uplink rank 3 precoding codebook | Nokia Siemens Networks, Nokia | Noted |
R1‑101434 | On transmission diversity for PUCCH Format 2/2a/2b | Nokia Siemens Networks, Nokia | Not treated |
R1‑101435 | On uplink SU-MIMO signaling | Nokia Siemens Networks, Nokia | Noted |
R1‑101436 | Performance evaluation of DMRS structure for uplink SU-MIMO | Nokia Siemens Networks, Nokia | Not treated |
R1‑101437 | Way Forward on UL DM-RS | Nokia Siemens Networks, CATT, LGE, NEC, Nokia, NTT DOCOMO, Panasonic, Texas Instruments | Noted |
R1‑101438 | Channel sounding enhancements for LTE Advanced uplink | Nokia Siemens Networks, Nokia | Not treated |
R1‑101439 | Improved Access-backhaul Partition Scheme for TDD Relay | Nokia, Nokia Siemens Networks | Not treated |
R1‑101440 | Interference mitigation for configuration pairing in TDD relay | Nokia, Nokia Siemens Networks | Not treated |
R1‑101441 | Use of Special Time Slot for backhaul link in TDD relay | Nokia, Nokia Siemens Networks | Not treated |
R1‑101442 | Mapping of access-backhaul partitioning solutions to TDD configurations | Nokia, Nokia Siemens Networks | Not treated |
R1‑101443 | Timing alignment of DL backhaul | Nokia Siemens Networks, Nokia | Not treated |
R1‑101444 | Timing alignment of UL backhaul | Nokia Siemens Networks, Nokia | Not treated |
R1‑101445 | On the need for PHICH | Nokia Siemens Networks, Nokia | Not treated |
R1‑101446 | On DL Backhaul Design Aspects | Nokia Siemens Networks, Nokia | Not treated |
R1‑101447 | FDD HARQ Issues over Un with 8ms SF Periodicity | Nokia, Nokia Siemens Networks | Not treated |
R1‑101448 | FDD HARQ Issues over Un with 10ms SF Periodicity | Nokia, Nokia Siemens Networks | Not treated |
R1‑101449 | Discussion on Symmetry and Asymmetry SF Allocation for Backhaul | Nokia, Nokia Siemens Networks | Revised |
R1‑101450 | Uplink Performance of Autonomous CC selection | Nokia Siemens Networks, Nokia | Not treated |
R1‑101451 | Downlink CCH performance aspects for co-channel deployed macro and HeNBs | Nokia Siemens Networks, Nokia | Noted |
R1‑101452 | Simulation results for Mobility in Heterogeneous Networks | Nokia, Nokia Siemens Networks | Not treated |
R1‑101453 | Macro+HeNB performance with escape carrier | Nokia Siemens Networks, Nokia | Not treated |
R1‑101454 | Type-1 Relay Performance for Uplink | Nokia, Nokia Siemens Networks | Not treated |
R1‑101455 | Impact of Load Balancing via Biased Cell Selection on Relay performance | Nokia Siemens Networks, Nokia | Noted |
R1‑101456 | Fractional power control setting in relay deployment | Nokia Siemens Networks, Nokia | Noted |
R1‑101457 | Guard periods and timing for backhauling in Type 1 relays | Mitsubishi Electric | Not treated |
R1‑101458 | Uplink DM-RS design | Mitsubishi Electric | Not treated |
R1‑101459 | PUSCH resource allocation with clustered DFT-S-OFDM | Mitsubishi Electric | Noted |
R1‑101460 | Open Issues in Antenna Port transitions | Sharp | Revised |
R1‑101461 | Covariance matrix quantization for CSI feedback | Motorola | Not treated |
R1‑101462 | Codebook for 8Tx DL for LTE-A | Motorola | Noted |
R1‑101463 | Views on inter-cell aspects of CSI-RS design | Motorola | Noted |
R1‑101464 | CSI-RS design for single cell operation | Motorola | Withdrawn |
R1‑101465 | Views on Spatial Feedback and CQI feedback for MU-MIMO | Motorola | Noted |
R1‑101466 | Bursty Traffic model for Intra-eNB CoMP evaluation | Motorola | Noted |
R1‑101467 | PHICH for Carrier Aggregation | Motorola | Noted |
R1‑101468 | Uplink ACK/NACK for Carrier Aggregation | Motorola | Noted |
R1‑101469 | Performance of transmit diversity schemes for LTE-A uplink in intereference limited scenarios | CEWiT | Not treated |
R1‑101470 | 36.213 Draft CR on clarifying DL EPRE definition | Qualcomm Incorporated | Noted |
R1‑101471 | 36.213 Draft CR on UE-RS to CRS ratio for CQI measurement | Qualcomm Incorporated | Withdrawn |
R1‑101472 | 36.213 Draft CR on UE-RS to PDSCH ratio for UE-RS based PDSCH Tx with rank larger than 1 | Qualcomm Incorporated | Noted - Revised |
R1‑101473 | PCFICH for CA operation | Qualcomm Incorporated | Not treated |
R1‑101474 | PHICH for CA operation | Qualcomm Incorporated | Noted |
R1‑101475 | Interpreting the carrier indicator field | Qualcomm Incorporated | Not treated |
R1‑101476 | PDCCH for CA: monitoring set and blind decodes | Qualcomm Incorporated | Not treated |
R1‑101477 | UL ACK for MC operation | Qualcomm Incorporated | Noted |
R1‑101478 | CQI for MC operation | Qualcomm Incorporated | Not treated |
R1‑101479 | UL-ACK resource allocation for DL transmission with single CCE | Qualcomm Incorporated | Not treated |
R1‑101480 | Details on UL power control in carrier aggregation setting | Qualcomm Incorporated | Not treated |
R1‑101481 | UL resource allocation for PUSCH | Qualcomm Incorporated | Not treated |
R1‑101482 | Non SC-FDMA transmissions in UL of LTE-A | Qualcomm Incorporated | Not treated |
R1‑101483 | Benefits of RB bundling | Qualcomm Incorporated | Withdrawn |
R1‑101484 | UE-RS patterns for rank 1-4 and extended CP | Qualcomm Incorporated | Not treated |
R1‑101485 | Further details on CSI-RS | Qualcomm Incorporated | Revised |
R1‑101486 | Transparent vs. non-transparent MU-MIMO operation | Qualcomm Incorporated | Not treated |
R1‑101487 | Spatial multiplexing of UEs in Rel-10 | Qualcomm Incorporated | Not treated |
R1‑101488 | Extending the UE feedback for efficient MU-MIMO | Qualcomm Incorporated | Noted |
R1‑101489 | Enhancing UE feedback for Rel-10 SU/MU-MIMO operation | Qualcomm Incorporated | Not treated |
R1‑101490 | Codebook design for DL LTE-A MIMO operation | Qualcomm Incorporated | Noted |
R1‑101491 | Link Analyses of SU-MIMO operation for UL of LTE-A for agreed simulation assumptions | Qualcomm Incorporated | Noted |
R1‑101492 | Transmit diversity for PUCCH format 2 | Qualcomm Incorporated | Not treated |
R1‑101493 | UL grants for MIMO transmissions | Qualcomm Incorporated | Noted |
R1‑101494 | DM RS in support of UL spatial multiplexing | Qualcomm Incorporated | Not treated |
R1‑101495 | SRS enhancements for LTE-A | Qualcomm Incorporated | Not treated |
R1‑101496 | R-PDCCH design | Qualcomm Incorporated | Not treated |
R1‑101497 | On the need of R-PHICH | Qualcomm Incorporated | Not treated |
R1‑101498 | DM-RS for R-PDCCH | Qualcomm Incorporated | Not treated |
R1‑101499 | Considerations on reusing Rel 8 PDCCH for relay operation | Qualcomm Incorporated | Not treated |
R1‑101500 | Access-backhaul timing relationship for DL | Qualcomm Incorporated | Not treated |
R1‑101501 | Access-backhaul timing relationship for UL | Qualcomm Incorporated | Not treated |
R1‑101502 | Views on HARQ timeline for relays | Qualcomm Incorporated | Not treated |
R1‑101503 | TP for HetNets | Qualcomm Incorporated | Revised |
R1‑101504 | Enhanced interference management for co-channel support of HetNet deployments | Qualcomm Incorporated | Not treated |
R1‑101505 | Extending Rel-8/9 ICIC into Rel-10 | Qualcomm Incorporated | Noted |
R1‑101506 | Importance of serving cell association in HetNets | Qualcomm Incorporated | Noted |
R1‑101507 | Enhancing link adaptation in HetNets | Qualcomm Incorporated | Not treated |
R1‑101508 | Updated performance for interference coordination for delay sensitive traffic in CSG environment | Qualcomm Incorporated | Not treated |
R1‑101509 | Updated performance modeling fast fading | Qualcomm Incorporated | Not treated |
R1‑101510 | Enabling range expansion for Type I relays | Qualcomm Incorporated | Not treated |
R1‑101511 | DL performance for Type I relays with and without range expansion | Qualcomm Incorporated | Not treated |
R1‑101512 | Evaluation for Impact of UE Cluster Position and PeNB TX Power in Outdoor Hotzone Scenario | Kyocera | Noted |
R1‑101513 | Performance Evaluation in Indoor Hotzone Scenario | Kyocera | Noted |
R1‑101514 | Performance Evaluation of HeNB Interference Control Techniques | Kyocera, PicoChip Designs | Noted |
R1‑101515 | DCI format 3/3A for cross carrier operation | Panasonic | Not treated |
R1‑101516 | HS-DPCCH for 4-carrier HSDPA | Nokia Siemens Networks, Nokia | Noted |
R1‑101517 | Further cubic metric results for HS-DPCCH design options for 4-carrier HSDPA | Nokia, Nokia Siemens Networks | Noted |
R1‑101518 | Discussion on UE categories for 4-carrier HSDPA | Nokia, Nokia Siemens Networks | Not treated |
R1‑101519 | Discussion on details of 4-carrier HSDPA | Nokia, Nokia Siemens Networks | Noted |
R1‑101520 | 4-carrier HSDPA system performance | Nokia Siemens Networks, Nokia | Noted |
R1‑101521 | TR25.863 text proposal on link level simulation results | Nokia Siemens Networks | Revised |
R1‑101522 | TR25.863 text proposal on conclusions of link level simulation results | Nokia Siemens Networks | Noted |
R1‑101523 | Further Link Level Results on Practical Beamforming for UL Tx Diversity | Nokia Siemens Networks, Nokia | Noted |
R1‑101524 | UL Tx Diversity Link Level Simulations with Discontinuous Transmission | Nokia Siemens Networks, Nokia | Noted |
R1‑101525 | System Level Results on switched antenna Tx Diversity | Nokia Siemens Networks, Nokia | Noted |
R1‑101526 | System Level Results on beamforming Tx Diversity | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑101527 | Requirements for Cell DTX in UMTS | Nokia Siemens Networks, Nokia | Noted |
R1‑101528 | Discussion on Network Energy Saving in LTE | Nokia, Nokia Siemens Networks | Noted |
R1‑101529 | Discussions on Intra-eNB CoMP for Rel-10 LTE-A | CHTTL | Not treated |
R1‑101530 | Summary of email discussion on scope of Energy Saving study | Vodafone Group | Revised |
R1‑101531 | Skelton TR 25.927 "Solutions for energy saving within UTRA Node B" | Vodafone Group | Noted |
R1‑101532 | Link-level results for R-PDCCH multiplexing using FDM and TDM+FDM | InterDigital Communications, LLC | Not treated |
R1‑101533 | Outstanding Issues with Cross-CC Scheduling | Texas Instruments | Withdrawn |
R1‑101534 | Views on PCFICH detection in LTE-A | Texas Instruments | Not treated |
R1‑101535 | HSPA Uplink Tx Diversity – Link Level Simulation Results | Icera Inc. | Revised |
R1‑101536 | Enhanced PMI feedback by sub-space signalling | Toshiba | Not treated |
R1‑101537 | Uplink Open Loop Transmit Diversity Link Level Simulation Results | InterDigital Communications, LLC | Noted |
R1‑101538 | A UE initiated frequency partitioning based CoMP scheme for downlink cellular communications | Hitachi Ltd | Not treated |
R1‑101539 | LS response on assistance information for OTDOA positioning support for LTE - remaining issues | RAN4, Ericsson | Noted |
R1‑101540 | Report Mapping of UE Measurements for Positioning | RAN4, Ericsson | Noted |
R1‑101541 | DL Single-cell MU-MIMO: Scrambling Code Design and Signaling Aspects | Motorola | Not treated |
R1‑101542 | UE Maximum Power Scaling | Motorola | Not treated |
R1‑101543 | Considerations on hot spot modelling for heterogeneous networks | Ericsson, ST-Ericsson, Kyocera | Noted |
R1‑101544 | TP to clean up simulation parameters table for relays | Nokia Siemens Networks, Nokia, CMCC | Revised |
R1‑101545 | Network Configuration of Antenna Port mode for LTE-A UL | Sharp | Noted |
R1‑101546 | [DRAFT] LS on Network Configuration of the UE Antenna Port mode for LTE-A UL | Sharp | Noted |
R1‑101547 | Open Issues in Antenna Port transitions | Sharp | Noted |
R1‑101548 | 36.213 Draft CR Clarifying CQI definition for mode 8 | Qualcomm Incorporated | Noted |
R1‑101549 | Clarification of peak rate calculation for ITU submission | Rapporteur (NTT DOCOMO) | Revised |
R1‑101550 | Inter-Cell CSI-RS design and Inter-Cell measurement consideration | LG Electronics | Not treated |
R1‑101551 | DL Codebook Design for 8 Tx MIMO in LTE-A | ZTE | Noted |
R1‑101552 | UE impacts of Cell DTX in LTE | Ericsson, ST-Ericsson | Noted |
R1‑101553 | Summary of email discussion on DL timing relation between eNB and RN | WI Rapporteur (Ericsson) | Noted |
R1‑101554 | Summary of email discussion on UL timing relation between eNB and RN | WI Rapporteur (Ericsson) | Noted |
R1‑101555 | Considerations on TDD Relay Frame Structure | CATT | Noted |
R1‑101556 | Performance Evaluations on the Coverage Extensionin in Type II Relays | HTC Corporation | Not treated |
R1‑101557 | 36.213 CR0259R2 (Rel-9, F) UE behavior when collision of antenna port 7/8 with PBCH or SCH happened and when distributed VRB is used with antenna port 7 | NEC Group, Qualcomm Incorporated, Nokia, Nokia Siemens Networks, ST-Ericsson, Ericsson, CMCC, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, HTC, Huawei, InterDigital, Motorola, Panasonic, Texas Instruments, Samsung | Noted - Revised |
R1‑101558 | Final report of RAN1#59bis meeting | MCC Support | Approved |
R1‑101559 | LTE Spectral Efficiency and LTE-Advanced Targets | Ericsson, ST-Ericsson | Noted |
R1‑101560 | TP to Skeleton TR 25.927 "Energy saving within UTRA Node B" | ZTE | Noted |
R1‑101561 | Method for UL ACK/NACK resource allocation in LTE-A | ZTE | Noted |
R1‑101562 | 36.213 CR0263 (Rel-9, F) Correction on PDSCH EPRE and UE specific RS EPRE for Rel-9 enhanced DL transmissions | CATT, Qualcomm Incorporated, CMCC, Panasonic, Huawei, NEC, Nokia Siemens Networks, Nokia, Ericsson, ST-Ericsson, Marvell, Motorola | Agreed |
R1‑101563 | void | void | void |
R1‑101564 | Analysis on R-PHICH | ZTE, Huawei | Noted |
R1‑101565 | Minutes from RAN1#60 HSPA sessions | Ad Hoc Chairman (Ericsson) | Endorsed |
R1‑101566 | 25.221 CR0201R1 (Rel-8, F) Clarification of TPC and SS transmission on HS-SICH type 2 | CATT | Agreed |
R1‑101567 | 25.221 CR0202R1 (Rel-9, A) Clarification of TPC and SS transmission on HS-SICH type 2 | CATT | Agreed |
R1‑101568 | Draft LS on E-RUCCH structure in MC-HSUPA for 1.28Mcps TDD | CATT | Revised |
R1‑101569 | 25.214 CR0598R1 (Rel-9, F) Disallow interruption at carrier (de)activation for DB-DC-HSDPA | Ericsson, ST-Ericsson | Withdrawn |
R1‑101570 | Draft LS on DB-DC-HSDPA secondary carrier activation | Motorola | Noted - Revised |
R1‑101571 | 25.214 CR0599R1 (Rel-9, F) Decrease DC-HSPA carrier activation application time to 18 slots | Ericsson, ST-Ericsson | Agreed |
R1‑101572 | [DRAFT] LS on DC-HSPA carrier activation application time | Qualcomm Inc. | Noted - Revised |
R1‑101573 | Updated System Simulation Results for UL Switched Antenna Diversity | Huawei | Noted |
R1‑101574 | Updated System Simulation Results for UL Beamforming Diversity | Huawei | Noted |
R1‑101575 | Short-term antenna imbalance assumption | Magnolia broadband Inc. | Revised |
R1‑101576 | Way forward for Beam-forming simulation | Magnolia broadband Inc. | Noted |
R1‑101577 | Short-term antenna imbalance assumption | Magnolia broadband Inc. | Noted |
R1‑101578 | TP on SATD link level simulation results | Qualcomm Inc. | Noted - Revised |
R1‑101579 | TR25.863 text proposal on beam forming link level simulation results | Qualcomm Inc. | Noted - Revised |
R1‑101580 | Further Link Results on switched antenna Tx Diversity | Nokia Siemens Networks, Nokia | Not treated |
R1‑101581 | Link-level simulation results for antenna switching with antenna correlation | Qualcomm Inc. | Noted |
R1‑101582 | Link simulation results for practical beam-forming (2) using non-causal channel estimation | Magnolia broadband Inc. | Noted |
R1‑101583 | TP to Chs 4 and 5 to the TR25.863 | Qualcomm Inc. | Revised |
R1‑101584 | [Draft] LS on RAN1 Findings on UL Transmit Diversity for HSPA and TP to 25.863 TR | Qualcomm Inc. | Revised |
R1‑101585 | Link-level simulation results for beamforming with antenna correlation | Qualcomm Inc. | Noted |
R1‑101586 | Updated system simulation results for practical beam-forming UL Tx Div on HSUPA | Magnolia broadband Inc. | Noted |
R1‑101587 | void | void | void |
R1‑101588 | void | void | void |
R1‑101589 | TR25.863 text proposal on conclusions of link level simulation results | Nokia Siemens Networks | Agreed |
R1‑101590 | TP for system simulation results for antenna switching | Ericsson, ST-Ericsson | Agreed |
R1‑101591 | TP for system simulation results for beam forming | Ericsson, ST-Ericsson | Agreed |
R1‑101592 | TP for conclusion on system evaluation results | Ericsson, ST-Ericsson | Noted |
R1‑101593 | System Level Results on switched antenna Tx Diversity | Nokia Siemens Networks, Nokia | Not treated |
R1‑101594 | TP on heterogeneous networks | Ericsson | Agreed |
R1‑101595 | Text Proposal for 36.814 on Heterogeneous Network Configurations | Ericsson, ST-Ericsson, Kyocera, Huawei, Texas Instruments, Motorola, CATT | Agreed |
R1‑101596 | Summary of Ad-hoc session on UL-MIMO | Ad hoc chairman (Samsung) | Endorsed |
R1‑101597 | Draft LS on E-RUCCH structure in MC-HSUPA for 1.28Mcps TDD | CATT | Noted - Revised |
R1‑101598 | Further Comments on the Evaluation of UTDOA | Ericsson | Not treated |
R1‑101599 | Way Forward for CoMP in Release 10 | NTT DOCOMO, CHTTL, CMCC, Deutsche Telekom, KDDI, Orange, Telecom Italia, Softbank, Vodafone, Huawei, CATT, CATR, Ericsson, Fujitsu, Hitachi, HTC, LGE, Mitsubishi Electric, MediaTek, Motorola, NEC, Panasonic, Pantech, Qualcomm, RIM, Samsung, Sharp, Sony, | Not treated |
R1‑101600 | 25.214 CR0601 (Rel-8, F) Clarification of DC-HSDPA carrier activation application time | Ericsson, ST-Ericsson | Agreed |
R1‑101601 | Way forward on TDD Un UL Backhaul Subframe Allocation | CATT, ALU, ASB, CATR, CMCC, Ericsson, ST-Ericsson, Huawei, ITRI, LGE, Motorola, Nokia, Nokia Siemens Networks, Qualcomm Incorporated, ZTE | Agreed |
R1‑101602 | Way forward CFI Signalling in MBSFN subframes | Nokia, Nokia Siemens Networks, ZTE, Panasonic, Texas Instruments, Qualcomm, NEC, Samsung, Motorola | Noted |
R1‑101603 | Way Forward on PHICH | Qualcomm Inc., Samsung, ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia, Nokia Siemens Networks, NEC, Sharp, LGE, Panasonic, AsusTek, NTT DoCoMo | Noted |
R1‑101604 | Way forward for Rel-10 MU-MIMO | Huawei, LG Electronics, Motorola, NEC, Philips, Pantech, Qualcomm, Research In Motion, Samsung, TD-Tech, ITRI, ZTE | Not treated |
R1‑101605 | Link simulation results for beamforming diversity | Huawei | Not treated |
R1‑101606 | Way forward on TxD scheme for PUCCH format 1a/1b with dynamic scheduling (no CA) | Huawei, Nokia, Nokia Siemens Networks, RIM, Interdigitial | Not treated |
R1‑101607 | 36.213 CR0259R3 (Rel-9, F) UE behavior when collision of antenna port 7/8 with PBCH or SCH happened and when distributed VRB is used with antenna port 7 | NEC Group, Qualcomm Incorporated, Nokia, Nokia Siemens Networks, ST-Ericsson, Ericsson, CMCC, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, HTC, Huawei, InterDigital, Motorola, Panasonic, Texas Instruments, Samsung | Agreed |
R1‑101608 | Way forward of 1.28Mcps TDD MC-HSPA | TD Tech | Noted |
R1‑101609 | Alignment of indoor relay and femtocell channel models | Orange | Agreed |
R1‑101610 | Transmit Diversity for PUCCH Format 1a/1b with Dynamic Scheduling | Samsung | Not treated |
R1‑101611 | HSPA Uplink Tx Diversity – Link Level Simulation Results | Icera Inc. | Noted |
R1‑101612 | 36.912 CR0006 (Rel-9, F) Performance evaluation of LTE-A technologies against 3GPP targets | Rapporteur (NTT DOCOMO) | Agreed |
R1‑101613 | TR25.863 text proposal on link level simulation results | Nokia Siemens Networks | Noted |
R1‑101614 | System Simulation results for Switched Antenna ULTD | Qualcomm Inc | Noted |
R1‑101615 | Summary of email discussion on scope of Energy Saving study | Vodafone Group | Noted |
R1‑101616 | Summary of email discussion of remaining aspects of Hetnet Modelling | Qualcomm Inc. | Noted |
R1‑101617 | DL CoMP configuration | SOFTBANK MOBILE | Not treated |
R1‑101618 | TP to clean up simulation parameters table for relays | Nokia Siemens Networks, Nokia, CMCC | Agreed |
R1‑101619 | Discussion on Symmetry and Asymmetry SF Allocation for Backhaul | Nokia, Nokia Siemens Networks | Not treated |
R1‑101620 | Consideration on Possible Solutions for Network Energy Saving | CMCC | Noted |
R1‑101621 | Remaining issues for cross-carrier scheduling | Research In Motion UK Limited | Noted |
R1‑101622 | Way forward for Rel-10 MU-MIMO | Huawei, LG Electronics, Motorola, NEC, Philips, Pantech, Research In Motion, Samsung, TD-Tech, ITRI, ZTE | Revised |
R1‑101623 | Performance evaluation of Intra-eNB CoMP with non-full-buffer traffic | CHTTL, Deutsche Telekom, NTT DOCOMO, Orange, Telecom Italia, Vodafone | Agreed |
R1‑101624 | Way forward on Enhanced Energy Efficiency | Ericsson, Motorola, Nokia, Nokia Siemens Networks, NTT DOCOMO, Samsung, ST-Ericsson | Noted |
R1‑101625 | Proposal for Rel-10 Feedback framework | Ericsson, ST-Ericsson, CMCC, Huawei, Nokia, Nokia Siemens Networks, NTT DoCoMo, Panasonic, Research In Motion, Marvell | Noted |
R1‑101626 | Proposal on CSI feedback in Rel-10 | Samsung, TI, LGE, RIM | Noted |
R1‑101627 | TP for HetNets | Alcatel-Lucent, Kyocera, Qualcomm Incorporated | Noted - Revised |
R1‑101628 | TR36.814 v 1.7.0 | Rapporteur (NTT DOCOMO) | Endorsed |
R1‑101629 | TP for TR36.814 for peformance evaluation results on 3GPP requirements | Rapporteur (NTT DOCOMO) | Agreed |
R1‑101630 | TP for HetNets | Alcatel-Lucent, Kyocera, Qualcomm Incorporated | Revised |
R1‑101631 | Way forward for CSI-RS | LG Electronics, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks, NTT DoCoMo, Huawei, NEC, Panasonic, Texas Instruments, CMCC | Noted |
R1‑101632 | CSI-RS simulation assumptions | Huawei | Revised |
R1‑101633 | Summary of Email discussion on remaining aspects of Type 1 relay backhaul design | Email discussion rapporteur (Panasonic) | Noted |
R1‑101634 | Further details on CSI-RS | Qualcomm Incorporated | Noted |
R1‑101635 | Way forward on CSI-RS design for Rel-10 | CATT | Withdrawn |
R1‑101636 | Way Forward on UE-Specific UL CC for PUCCH Transmissions in Rel-10 | Samsung, NTT DOCOMO, Motorola, Ericsson, ST-Ericsson, ETRI, Panasonic, RIM, LGE, NEC, ZTE, Philips, Alcatel-Lucent, ASB, Nokia, Nokia Siemens Networks, Mitsubishi, Texas Instruments, Huawei, Sharp | Noted |
R1‑101637 | Way Forward on Rel-10 DL MU MIMO | CATT, CEWiT, CHTTL, CMCC, Ericsson, Fujitsu, HTC, HT mMobile, ITRI, Marvell, MediaTek, NewPostCom, Nokia, Nokia Siemens Networks, Potevio, ST-Ericsson, Texas Instruments | Not treated |
R1‑101638 | 36.912 CR0007 (Rel-9, F) U-Plane interruption for TDD RIT | RAN2, Nokia Siemens Networks | Noted - Revised |
R1‑101639 | [Draft] LS on 4C HSDPA physical layer parameters and RAN1 agreements | Alcatel-Lucent | Noted - Revised |
R1‑101640 | Layer Shifting Support for UL SU-MIMO | CATT, CEWiT, CMCC, Fujitsu, Hitachi, Huawei, Kyocera, Marvell, Mitsubishi Electric, Motorola, Nokia, Nokia-Siemens Networks, NEC, NTT DoCoMo, Orange, Potevio, Sharp, Sony Corporation, Texas Instruments, ZTE | Noted |
R1‑101641 | Finalizing 4Tx Codebook for UL SU-MIMO | Texas Instruments, CATT, Ericsson, Huawei, LG Electronics, Nokia, Nokia Siemens Networks, NTT DoCoMo, Panasonic, ST-Ericsson | Noted |
R1‑101642 | TP on heterogeneous networks | Ericsson | Noted - Revised |
R1‑101643 | Way Forward for CoMP in Release 10 | Huawei, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATR, CHTTL, CMCC,Hitachi,HTC, ITRI, LGE, Panasonic, Pantech, Potevio, RIM, ZTE | Noted |
R1‑101644 | TR25.927 v0.0.1 Solutions for energy saving within UTRA Node B | Vodafone Group | Revised |
R1‑101645 | LS on 4C HSDPA physical layer parameters and RAN1 agreements | RAN1, Alcatel-Lucent | Agreed |
R1‑101646 | Performance evaluation of intra-site DL CoMP | Ericsson, ST-Ericsson | Noted |
R1‑101647 | Way Forward on R-PDCCH starting symbol | ZTE, CATT, Huawei, Nokia, NSN, Panasonic, Samsung, Qualcomm, ETRI, CATR | Noted |
R1‑101648 | Text proposal for TR36.814 on CoMP | Huawei, NTT DoCoMo, CMCC, Orange | Revised |
R1‑101649 | [Draft] LS on UE-Specific UL CC for PUCCH Transmissions | Samsung | Noted - Revised |
R1‑101650 | Summary of downlink CoMP evaluation results | Huawei | Revised |
R1‑101651 | TP for TR36.814 on Traffic Model | Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑101652 | LS on UE-Specific UL CC for PUCCH Transmissions | RAN1, Samsung | Agreed |
R1‑101653 | Way Forward for CoMP for Release 10 | Ericsson, ST-Ericsson, MediaTek, Nokia, Nokia Siemens Networks, Qualcomm, Texas Instruments | Noted |
R1‑101654 | Summary of downlink CoMP evaluation results | Huawei | Noted |
R1‑101655 | Investigation of Layer Shifting and HARQ Spatial Bundling for UL SU-MIMO | NTT DOCOMO | Noted |
R1‑101656 | Summary of downlink CoMP evaluation results | Huawei | Revised |
R1‑101657 | On blind decodes for carrier aggregation | Ericsson, ST-Ericsson | Noted |
R1‑101658 | Summary from email discussion on CIF | Ericsson | Revised |
R1‑101659 | Text proposal on Inband full duplex relay for TR36.814 | Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, ETRI, Huawei, NEC, Panasonic, Qualcomm Incorporated, Texas Instruments, ZTE | Agreed |
R1‑101660 | Way Forward on PHICH | Qualcomm Inc., Samsung, ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia, Nokia Siemens Networks, NEC, Sharp, LGE, Panasonic, AsusTek | Revised |
R1‑101661 | Summary from email discussion on CIF | Ericsson | Noted |
R1‑101662 | Way forward on Un HARQ in FDD | LG Electronics, Potevio, Panasonic, RIM, Samsung, HTC | Noted |
R1‑101663 | WF on UL Timing between RN and eNB | Huawei, Ericsson, ST Ericsson, ZTE, LGE, ETRI, Panasonic, Qualcomm Inc., Samsung, Nokia, Nokia Siemens Networks, Texas Instruments, LG-Nortel, Mitsubishi, NEC | Noted |
R1‑101664 | WF on DL Timing between RN and eNB | Huawei, Ericsson, ST Ericsson, ZTE, LGE, Qualcomm Inc., ETRI, Panasonic, Samsung, Motorola, Texas Instruments, LG-Nortel, Mitsubishi, Nokia and Nokia Siemens Networks, NEC | Noted |
R1‑101665 | WF on Un HARQ timeline | Nokia, Nokia Siemens Networks, Ericsson, ST- Ericsson, CATT, Huawei, ZTE, NEC, InterDigital | Noted |
R1‑101666 | Views on Transparent or Non-transparent MU-MIMO in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑101667 | Investigation on DMRS Configuration for MU-MIMO in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑101668 | WF on R-PHICH for Un UL HARQ | Nokia, Nokia Siemens Networks, Ericsson, ST- Ericsson, Panasonic, Motorola, LGE, ETRI | Noted |
R1‑101669 | Way forward on R-PDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, ST-Ericsson, NEC, Panasonic, Qualcomm Inc., Vodafone | Noted |
R1‑101670 | Performance study on quasi-orthogonal MU-MIMO with different scrambling sequences | ZTE | Not treated |
R1‑101671 | Way forward on 8Tx Codebook design for DL MIMO | NTT DOCOMO, Ericsson, ST-Ericsson, TI, Panasonic, Nokia, Nokia Siemens Networks, Fujitsu | Noted |
R1‑101672 | On R-PDCCH design | Motorola | Not treated |
R1‑101673 | DL RS Chairman’s notes | Ad hoc chairman (NTT DOCOMO) | Endorsed |
R1‑101674 | 8Tx codebook Chairman’s notes | Ad hoc chairman (NTT DOCOMO) | Endorsed |
R1‑101675 | Clarification of peak rate calculation for ITU submission | Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑101676 | CSI-RS simulation assumptions | Huawei | Noted |
R1‑101677 | Text proposal for TR36.814 on CoMP | Huawei | Revised |
R1‑101678 | Draft LS on DL CoMP in Rel-10 | Huawei | Noted - Revised |
R1‑101679 | Text proposal for TR36.814 on CoMP | Huawei | Noted - Revised |
R1‑101680 | TR25.863 text proposal on Algorithm Description and Evaluation Methodology | Qualcomm Inc. | Noted - Revised |
R1‑101681 | [Draft] LS on RAN1 Findings on UL Transmit Diversity for HSPA and TP to 25.863 TR | Qualcomm Inc. | Noted - Revised |
R1‑101682 | Draft LS on CFI Signalling in MBSFN subframes | Nokia Siemens Networks | Noted - Revised |
R1‑101683 | Way forward for Rel-10 Feedback framework | Ericsson, Huawei, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LG Electronics, Marvell, Nokia, Nokia Siemens Networks, NTT DoCoMo, Panasonic, Philips, Qualcomm Inc., Research In Motion, Samsung, ST-Ericsson, Texas Instruments, ZTE | Agreed |
R1‑101684 | LS on CFI Signalling in MBSFN subframes | RAN1, Nokia Siemens Networks | Agreed |
R1‑101685 | LS on DB-DC-HSDPA secondary carrier activation | RAN1, Motorola | Agreed |
R1‑101686 | Draft TR25.927 v0.0.1 Solutions for energy saving within UTRA Node B | Vodafone Group | Noted - Revised |
R1‑101687 | LS on E-RUCCH structure in MC-HSUPA for 1.28Mcps TDD | RAN1, CATT | Agreed |
R1‑101688 | Further Link Results on switched antenna Tx Diversity | Nokia Siemens Networks, Nokia | Noted |
R1‑101689 | Further System Simulation Results for Switched Antenna Transmit Diversity | Qualcomm Inc. | Noted |
R1‑101690 | TR25.927 v0.0.1 Solutions for energy saving within UTRA Node B | Vodafone Group | Agreed |
R1‑101691 | Draft LS on CSI RS boosting impact on BS transmission distorsion | Ericsson | Noted - Revised |
R1‑101692 | LS on CSI RS boosting impact on BS transmission distortion | RAN1, Ericsson | Agreed |
R1‑101693 | void | void | void |
R1‑101694 | LS on DL-CoMP in Rel-10 | RAN1, Huawei | Agreed |
R1‑101695 | TP for 3GPP TR36.814 on CoMP | Huawei, NTT DOCOMO, CMCC | Agreed |
R1‑101696 | TP on SATD link level simulation results | Qualcomm Inc. | Agreed |
R1‑101697 | TR25.863 text proposal on beam forming link level simulation results | Qualcomm Inc. | Agreed |
R1‑101698 | TR25.863 text proposal on Algorithm Description and Evaluation Methodology | Qualcomm Inc. | Agreed |
R1‑101699 | LS on RAN1 Findings on UL Transmit Diversity for HSPA and TP to 25.863 TR | Qualcomm Inc. | Agreed |
R1‑101700 | TR25.863 text proposal based on RAN1 study | Qualcomm Inc. | Agreed |
R1‑101701 | 36.912 CR0007R1 (Rel-9, F) U-Plane interruption for TDD RIT | RAN2, Nokia Siemens Networks | Agreed |
R1‑101702 | LS on DC-HSPA carrier activation application time | RAN1, Qualcomm Inc. | Agreed |
R1‑101703 | Clarification of peak rate calculation for ITU submission | Rapporteur (NTT DOCOMO) | Agreed |
R1‑101704 | TP for TR36.814 on Traffic Model | Rapporteur (NTT DOCOMO) | Agreed |
R1‑101705 | TR36.814 v 1.7.2 | Rapporteur (NTT DOCOMO) | Agreed |
R1‑101706 | TR36.814 v 2.0.0 | Rapporteur (NTT DOCOMO) | Endorsed |
page generated from database: 2024-12-12 15:02:31