3GPP TDocs (written contributions) at meeting
Meeting: GP-32 - 2006-11-13 to 2006-11-17, Sophia Antipolis
meeting id: GP-32 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
GP‑061926 | - | - | - |
GP‑061927 | - | - | - |
GP‑061928 | - | - | - |
GP‑061929 | - | - | Approved |
GP‑061930 | 70.8.2, 70.8.5.2 Incorrect references to SACCH | - | Agreed |
GP‑061931 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Aeroflex | Revised |
GP‑061932 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Aeroflex | Agreed |
GP‑061933 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Aeroflex | Agreed |
GP‑061934 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Aeroflex | Agreed |
GP‑061935 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Aeroflex | Agreed |
GP‑061936 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Aeroflex | Agreed |
GP‑061937 | 26.16.x PICS/PIXIT clean-up | - | Agreed |
GP‑061938 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Aeroflex | Agreed |
GP‑061939 | 26.17.x, 26.18.x, 26.19.x PICS/PIXIT clean-up | - | Agreed |
GP‑061940 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Aeroflex | Agreed |
GP‑061941 | 26.19.x, incorrect PICS for AMR WB | - | Agreed |
GP‑061942 | section 47, PICS/PIXIT clean up | - | Agreed |
GP‑061943 | section 57, PICS/PIXIT clean up | - | Agreed |
GP‑061944 | - | - | Revised |
GP‑061945 | - | - | Revised |
GP‑061946 | PICS/PIXIT clean up | - | Agreed |
GP‑061947 | - | - | Revised |
GP‑061948 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Ericsson | Withdrawn |
GP‑061949 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Ericsson | Agreed |
GP‑061950 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Ericsson | Revised |
GP‑061951 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Ericsson | Agreed |
GP‑061952 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Ericsson | Agreed |
GP‑061953 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Ericsson | Agreed |
GP‑061954 | -If the MS was provisioned with an IP address of the GANC-SEGW, (or received it in the GA-RC DISCOVERY ACCEPT OR GA-RC REGISTER REDIRECT message), then the certificate shall contain an IPaddress SubjectAltName that matches that address. The MS may in | Ericsson | Withdrawn |
GP‑061955 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Ericsson | Withdrawn |
GP‑061956 | - | - | Revised |
GP‑061957 | 81.1.3.3, clarification on IP Sec tunnel | - | Withdrawn |
GP‑061958 | -If the MS was provisioned with an IP address of the GANC-SEGW, (or received it in the GA-RC DISCOVERY ACCEPT OR GA-RC REGISTER REDIRECT message), then the certificate shall contain an IPaddress SubjectAltName that matches that address. The MS may in | Ericsson | Agreed |
GP‑061959 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Ericsson | Agreed |
GP‑061960 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Ericsson | Withdrawn |
GP‑061961 | Max Response Time defined for A-GPS Minimum Performance requirements | Spirent Communications // G1 | - |
GP‑061962 | Clarifications to A-GPS Minimum Performance requirements | Spirent Communications // G1 | - |
GP‑061963 | Test methodology for A-GPS Minimum Performance Test Cases | Spirent Communications | Noted |
GP‑061964 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Spirent Communications | Agreed |
GP‑061965 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Spirent Communications | Revised |
GP‑061966 | - | - | Revised |
GP‑061967 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Spirent Communications | Agreed |
GP‑061968 | - | - | Revised |
GP‑061969 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Spirent Communications | Revised |
GP‑061970 | Statistical requirements for A-GPS Minimum Performance Test Cases | - | Agreed |
GP‑061971 | - | - | Revised |
GP‑061972 | Correction to the title of the section of 81.3.2.1. | - | Agreed |
GP‑061973 | - | - | Revised |
GP‑061974 | 46.1.2.7.6 - Correction to the expiry time of I+S frame | - | Agreed |
GP‑061975 | - | - | Revised |
GP‑061976 | - | - | Revised |
GP‑061977 | - | - | Revised |
GP‑061978 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Wavecom | Agreed |
GP‑061979 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Wavecom | Revised |
GP‑061980 | 46.x – Removal of the check on the number of octets sent | - | Agreed |
GP‑061981 | - | - | Revised |
GP‑061982 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Wavecom | Revised |
GP‑061983 | - | - | Revised |
GP‑061984 | Update of Apllicability for some GPRS tests with a CS call | - | Agreed |
GP‑061985 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Wavecom | Revised |
GP‑061986 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Wavecom | Withdrawn |
GP‑061987 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Wavecom | Agreed |
GP‑061988 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | CGC | Revised |
GP‑061989 | - | - | Revised |
GP‑061990 | - | - | Revised |
GP‑061991 | Reply LS on co-ordination of work on GERAN-LTE Interworking. | TSG RAN | - |
GP‑061992 | LS on Workshop organization on LTE GSM Handovers | TSG SA | - |
GP‑061993 | LS on 3GPP SAE<E Workplan | SA | Noted |
GP‑061994 | - | Nokia | - |
GP‑061995 | - | Nokia | - |
GP‑061996 | - | - | - |
GP‑061997 | - | - | - |
GP‑061998 | LS on no inclusion of ASI in 3GPP TS 29.060 already from Rel-6 | SA2 | - |
GP‑061999 | LS on “Normative specification work for Direct Tunnel solution” | SA2 | - |
GP‑062000 | - | - | Revised |
GP‑062001 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | MCC272 | Agreed |
GP‑062002 | [H11] Enter the source of the CR. This is either (a) one or several companies or, (b) if a (sub)working group has already reviewed and agreed the CR, then list the group as the source. | MCC272 | Agreed |
GP‑062003 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | MCC272 | Agreed |
GP‑062004 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | MCC272 | Agreed |
GP‑062005 | PICS/PIXIT and Band Dependency modifications in 30.x | - | Agreed |
GP‑062006 | PICS/PIXIT and Band Dependency modifications in 32.x | - | Agreed |
GP‑062007 | - | - | Revised |
GP‑062008 | - | - | Revised |
GP‑062009 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | RIM | Agreed |
GP‑062010 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | RIM | Revised |
GP‑062011 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | RIM | Revised |
GP‑062012 | 47.3.4.1: Removal of step 20, 21 and 24 from the expected sequence | - | Agreed |
GP‑062013 | 40.x - Serving cell ARFCN shall not be included in the neighbour cell list. | - | Withdrawn |
GP‑062014 | 42.4.8.4.x - Serving cell ARFCN shall not be included in the neighbour cell list. | - | Withdrawn |
GP‑062015 | Section 40 - Rel-6 network simulation | - | Withdrawn |
GP‑062016 | s00-s10 – Provide missing and correct incomplete statements on Frequency Bands | - | Agreed |
GP‑062017 | 17 – Remove redundant references to Frequency Bands | - | Withdrawn |
GP‑062018 | 27 - PICS/PIXIT rationalisation | - | Agreed |
GP‑062019 | 28 - PICS/PIXIT rationalisation | - | Agreed |
GP‑062020 | 29 - PICS/PIXIT rationalisation | - | Agreed |
GP‑062021 | - | - | Revised |
GP‑062022 | Section 14: PICS/PIXIT Clean-Up | - | Agreed |
GP‑062023 | - | - | Revised |
GP‑062024 | Sections 21-25: PICS/PIXIT Clean-Up | - | Agreed |
GP‑062025 | - | - | Revised |
GP‑062026 | - | - | Revised |
GP‑062027 | - | - | Revised |
GP‑062028 | - | - | Revised |
GP‑062029 | Introduction of performance requirements for DARP phase II (MSRD) | Ericsson, Freescale, Motorola, Nokia, Philips, RIM // | - |
GP‑062030 | Introduction of Downlink Advanced Receiver Performance – phase II capability. | Nokia // | - |
GP‑062031 | - | WI Rapporteur | - |
GP‑062032 | 26.10.2.4.1 – Invalid hopping frequency allocation for target cell | - | Agreed |
GP‑062033 | - | - | Revised |
GP‑062034 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Revised |
GP‑062035 | 26.16.10.1 and 2 – The channel mode modify procedure is not checked correctly | - | Withdrawn |
GP‑062036 | 26.17.10 - The channel mode modify procedure is not checked correctly | - | Withdrawn |
GP‑062037 | 26.19.10 - The channel mode modify procedure is not checked correctly | - | Withdrawn |
GP‑062038 | 34.2.2 – Handling of retransmitted messages | - | Withdrawn |
GP‑062039 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Revised |
GP‑062040 | 42.3.1.1.9 – Cell allocation in GSM850, GSM700 and T-GSM810 band reduced from 17 to 16 frequencies | - | Withdrawn |
GP‑062041 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Revised |
GP‑062042 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Withdrawn |
GP‑062043 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Withdrawn |
GP‑062044 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Agreed |
GP‑062045 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Revised |
GP‑062046 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Revised |
GP‑062047 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Revised |
GP‑062048 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Revised |
GP‑062049 | - | - | Revised |
GP‑062050 | Removal of not allowed characters used in mnemonics | - | Agreed |
GP‑062051 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | setcom | Withdrawn |
GP‑062052 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | CGC | Revised |
GP‑062053 | 44.2.1.2.2: Corrected PICS statement: Automatic MM IMSI attach procedure at switch-on/power-on. | - | Withdrawn |
GP‑062054 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | setcom | Agreed |
GP‑062055 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | setcom | Revised |
GP‑062056 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Setcom | Revised |
GP‑062057 | Comments on the relaxation of some of the GSM radio requirements proposal | Nortel Networks | - |
GP‑062058 | - | - | Revised |
GP‑062059 | 27 - PICS/PIXIT rationalisation | - | Agreed |
GP‑062060 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Anite | Agreed |
GP‑062061 | - | - | Revised |
GP‑062062 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Motorola | Agreed |
GP‑062063 | Discussion paper: GAN certificate requirements | Aeroflex | Noted |
GP‑062064 | GAN cell selection : Alignment with stage 3 | Alcatel // G1 | - |
GP‑062065 | Proposed Way Forward on GNSS support in GERAN in Rel-7 and beyond | Ericsson, QUALCOMM Europe | - |
GP‑062066 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Nokia | Revised |
GP‑062067 | 81.3.2.2 - Correction to content of the test procedure | - | Agreed |
GP‑062068 | - | - | Revised |
GP‑062069 | - | - | Revised |
GP‑062070 | Requirement for Mandatory Response Time element in Measure Position Request | Spirent Communications | - |
GP‑062071 | Addition of Mandatory Response Time element in Measure Position Request | Spirent Communications // G2 | - |
GP‑062072 | The default value of HCS_THR | LG Electronics, Nokia // G1 | - |
GP‑062073 | The unit of HCS_THR | LG Electronics, Nokia // G2 | - |
GP‑062074 | Random access failure at the expiry of T3170 in case of packet measurement report | LG Electronics // G2 | - |
GP‑062075 | Addition of Reset MS Positioning Stored Information command | Spirent Communications // G2 | - |
GP‑062076 | - | - | - |
GP‑062077 | Flexible timeslot assignment | Siemens // G1 | - |
GP‑062078 | Flexible Timeslot Assignment | Siemens // G2 | - |
GP‑062079 | Flexible Timeslot Assignment support indication | Siemens // CT1 | - |
GP‑062080 | [DRAFT] LS on Flexible Timeslot Assignment support indication | GERAN | - |
GP‑062081 | The report on MEAN_BEP and CV_BEP in packet transfer mode | LG Electronics // G1 | - |
GP‑062082 | - | - | - |
GP‑062083 | Removal of inconsistencies in the BTS intermodulation and blocking requirements. | Alcatel // | - |
GP‑062084 | Removal of inconsistencies in the BTS intermodulation and blocking requirements. | Alcatel // | - |
GP‑062085 | Discussion paper: Inconsistent Numbering of Test Cases | Anite | Noted |
GP‑062086 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Anite | Withdrawn |
GP‑062087 | - | - | Noted |
GP‑062088 | LS on SIM/ICC Test Case Redundancy in Dual Mode (GERAN/UTRAN) | CT6 | Noted |
GP‑062089 | Reply LS on 3GPP SAE<E workplan | CT6 | - |
GP‑062090 | - | - | - |
GP‑062091 | - | - | - |
GP‑062092 | - | - | - |
GP‑062093 | - | - | - |
GP‑062094 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Sasken | Revised |
GP‑062095 | TC_42_1_2_1_18- Clarification to PSI2_CHANGE_MARK used. | - | Agreed |
GP‑062096 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Sasken | Agreed |
GP‑062097 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Sasken | Agreed |
GP‑062098 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Sasken | Revised |
GP‑062099 | Introduction of the MBMS Session Update procedure | Telecom Italia S.p.A. // G1 | - |
GP‑062100 | CR 43.064-0047 dual downlink carrier multislot class support for DTM | Panasonic // | - |
GP‑062101 | - | - | - |
GP‑062102 | - | - | - |
GP‑062103 | - | - | - |
GP‑062104 | Invalid characters in mnemonics | - | Agreed |
GP‑062105 | Combining of the (E)GPRS Uplink data blocks from one user with the speech pauses periods from another user(s) | Motorola | - |
GP‑062106 | Introduction of Downlink Dual Carrier | Siemens, Panasonic // G1 | - |
GP‑062107 | Downlink Dual carrier multislot class indication | Siemens, Panasonic // G1 | - |
GP‑062108 | [DRAFT] LS on Downlink Dual Carrier multislot capability indication | GERAN | - |
GP‑062109 | - | - | - |
GP‑062110 | Ciphering Mode Setting Support in DTM Assignment Command | CT1 | - |
GP‑062111 | LS on Common reference for the MBMS Session Repetition Number parameter | CT3 | - |
GP‑062112 | Reply LS on 3GPP SAE & LTE Work Plan | SA5 | - |
GP‑062113 | Introduction of Reduced TTI | Ericsson // G1 | - |
GP‑062114 | Introduction of CAMEL Trigger Points | Ericsson // G1 | - |
GP‑062115 | Various updates to TS 43.129 | Ericsson // G1 | - |
GP‑062116 | Clarification of PS Handover Cancel behaviour | Ericsson // G1 | - |
GP‑062117 | Improved behaviour in case of inactive PFCs/RABs | Ericsson // G1 | - |
GP‑062118 | PS Handover Support for GAN | Ericsson // G1 | - |
GP‑062119 | PS Handover Support for GAN | Ericsson // G1 | - |
GP‑062120 | - | - | - |
GP‑062121 | - | - | - |
GP‑062122 | - | - | - |
GP‑062123 | - | - | - |
GP‑062124 | - | - | - |
GP‑062125 | - | - | - |
GP‑062126 | Multislot capabilities for dual carrier mobiles | Ericsson // G1 | - |
GP‑062127 | Removal of dependencies between uplink and downlink dual carrier configurations | Ericsson // G1 | - |
GP‑062128 | - | Samsung | - |
GP‑062129 | - | Nokia | - |
GP‑062130 | - | Nokia | - |
GP‑062131 | - | - | - |
GP‑062132 | Correction to the inclusion of the NPM Transfer Time IE in the MBMS Channel Parameters IE | Telecom Italia S.p.A. // G2 | - |
GP‑062133 | Correction to the inclusion of the NPM Transfer Time IE in the MBMS Channel Parameters IE | Telecom Italia S.p.A. // G2 | - |
GP‑062134 | Correction for the inclusion of the NPM Transfer Time IE in the MBMS Session Parameters List IE | Telecom Italia S.p.A. // G2 | - |
GP‑062135 | Correction for the inclusion of the NPM Transfer Time IE in the MBMS Session Parameters List IE | Telecom Italia S.p.A. // G2 | - |
GP‑062136 | Correction to the MBMS Session Repetition Number IE | Telecom Italia S.p.A. // G2 | - |
GP‑062137 | Correction to the MBMS Session Repetition Number IE | Telecom Italia S.p.A. // G2 | - |
GP‑062138 | Correction to the name of the MBMS In-band Signalling Indicator IE in the CSN.1 coding in the MBMS NEIGHBOURING CELL INFORMATION message | Telecom Italia S.p.A. // G2 | - |
GP‑062139 | Clarification of the procedure at the expiry of T3186/T3170 on MPRACH | Telecom Italia S.p.A. // G2 | - |
GP‑062140 | Inter-RAT DTM Handover. | Nokia // G2 | - |
GP‑062141 | Impossible requirement for inclusion of IMSI in RA-CAPABILITY-UPDATE-ACK PDU | Ericsson // G2 | - |
GP‑062142 | NPM Transfer Time in MBMS data channel report | Siemens // G2 | - |
GP‑062143 | NPM Transfer Time in MBMS data channel report | Siemens // G2 | - |
GP‑062144 | Correction to the MBMS Session Start procedure | Telecom Italia S.p.A. // G2 | - |
GP‑062145 | Correction to the MBMS Session Start procedure | Telecom Italia S.p.A. // G2 | - |
GP‑062146 | Alignment to General Protocol Error Handling for RIM | Ericsson // G2 | - |
GP‑062147 | Alignment to General Protocol Error Handling for RIM | Ericsson // G2 | - |
GP‑062148 | Alignment to General Protocol Error Handling for RIM | Ericsson // G2 | - |
GP‑062149 | HCS in PSI3 | LG Electronics // G2 | - |
GP‑062150 | Introduction of RLC Non-persistent mode | Siemens // G2 | - |
GP‑062151 | Clarification of DA, EDA and shifted USF operation | Siemens Networks // G2 | - |
GP‑062152 | Clarification of DA, EDA and shifted USF operation | Siemens Networks // G2 | - |
GP‑062153 | Mobile Allocation in IMMEDIATE ASSIGNMENT message | LG Electronics // G2 | - |
GP‑062154 | Introduction of the MBMS Session Update procedure | Telecom Italia S.p.A. // G2 | - |
GP‑062155 | Introduction of the MBMS Session Update procedure | Telecom Italia S.p.A. // G2 | - |
GP‑062156 | Introduction of the MBMS Session Update procedure | Telecom Italia S.p.A. // G2 | - |
GP‑062157 | Abnormal conditions related to load sharing function for an IP sub-network | Nortel Networks // G2 | - |
GP‑062158 | Enhanced Power Control mode field information element in power command | Research in Motion Limited // G2 | - |
GP‑062159 | Cryptographic algorithm update | Nokia // G2 | - |
GP‑062160 | Cryptographic algorithm update | Nokia // G2 | - |
GP‑062161 | Timer Handling for GAN | Nokia, Ericsson // G2 | - |
GP‑062162 | Timer Handling for GAN | Nokia, Ericsson // G2 | - |
GP‑062163 | PDUs and messages references cleanup | Nortel Networks // G2 | - |
GP‑062164 | MBMS In-band Signalling Indicator in MBMS data channel report | Siemens // G2 | - |
GP‑062165 | MBMS In-band Signalling Indicator in MBMS data channel report | Siemens // G2 | - |
GP‑062166 | Correction of PS Handover to UTRAN procedure and message | Siemens Networks // G2 | - |
GP‑062167 | Correction of PS Handover to UTRAN procedure and message | Siemens Networks // G2 | - |
GP‑062168 | Inter-RAT DTM Handover | Nokia // G2 | - |
GP‑062169 | Correction of DTM Handover Command for inter-RAT Handover | Siemens Networks // G2 | - |
GP‑062170 | A-If link sharing cell re-establishment | Nortel Networks, Siemens Networks // G2 | - |
GP‑062171 | Enhanced Power Control mode field information element in power command | Research in Motion Limited // G2 | - |
GP‑062172 | Clarication of SGSN behaviour in PS Handover Cancel procedure | Siemens Networks // G2 | - |
GP‑062173 | Clarication of SGSN behaviour in PS Handover Cancel procedure | Siemens Networks // G2 | - |
GP‑062174 | - | - | - |
GP‑062175 | - | Siemens Networks | - |
GP‑062176 | - | - | - |
GP‑062177 | - | - | - |
GP‑062178 | A-GNSS, Status and a Way Forward | Nokia, Siemens Networks, Motorola, Global Locate | - |
GP‑062179 | Option B_rev1: Open Items Covered | Nokia | - |
GP‑062180 | Background for CRs “Add GNSS as a New Positioning Method for Galileo” | Siemens Networks, Nokia | - |
GP‑062181 | Add GNSS Assistance Data as a New Positioning Method for Galileo | Nokia, Siemens Networks // G2 | - |
GP‑062182 | Add GNSS Assistance Data as a New Positioning Method for Galileo | Nokia, Siemens Networks // G2 | - |
GP‑062183 | Add GNSS Assistance Data as a New Positioning Method for Galileo | Nokia, Siemens Networks // G2 | - |
GP‑062184 | Add GNSS as a New Positioning Method for Galileo | Nokia, Siemens Networks // G2 | - |
GP‑062185 | A-GNSS support to RRLP | Nokia, Siemens Networks, Motorola, Global Locate // G2 | - |
GP‑062186 | Add GNSS Assistance Data as a New Positioning Method for Galileo | Nokia, Siemens Networks // G2 | - |
GP‑062187 | - | - | - |
GP‑062188 | - | - | - |
GP‑062190 | Definition of Lost MS | Siemens Networks // G1 | - |
GP‑062191 | Enhanced Layer 2 Multi-block Handover Command Signaling | Motorola | - |
GP‑062192 | Enhanced Layer 2 Multi-block Handover Command Signaling | Motorola | - |
GP‑062193 | - | - | - |
GP‑062194 | Additional system level performance of HOT | Ericsson // G1 | - |
GP‑062195 | Blind modulation detection performance for HOT | Ericsson // G1 | - |
GP‑062196 | Impact of using HOT on the BCCH carrier | Ericsson // G1 | - |
GP‑062197 | Multiplexing HOT with legacy MS | Ericsson // G1 | - |
GP‑062198 | Correction of 16QAM results with alternative transmit pulse shaping | Ericsson // G1 | - |
GP‑062200 | - | - | - |
GP‑062201 | - | - | - |
GP‑062202 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | 7layers AG | Agreed |
GP‑062203 | Background for CR set “Introduction of Assisted Galileo Capabilityas an Assisted GNSS into the GERAN” | Ericsson, QUALCOMM Europe | - |
GP‑062204 | Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN | Ericsson, QUALCOMM Europe // G2 | - |
GP‑062205 | Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN | Ericsson, QUALCOMM Europe // G2 | - |
GP‑062206 | Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN | Ericsson, QUALCOMM Europe // G2 | - |
GP‑062207 | Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN | Ericsson, QUALCOMM Europe // G2 | - |
GP‑062208 | Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN | Ericsson, QUALCOMM Europe // G2 | - |
GP‑062209 | - | - | - |
GP‑062210 | Blind Modulation Detection performance for HOT | Intel Corporation // G1 | - |
GP‑062212 | - | - | - |
GP‑062213 | Updated new WID on higher order modulation and turbo coding (HOT) for downlink | - | - |
GP‑062214 | Updated new WID on higher order modulation and turbo coding (HOT) for downlink: Stage 2 | - | - |
GP‑062215 | Updated new WID on higher order modulation and turbo coding (HOT) for downlink: Stage 3 | - | - |
GP‑062216 | Updated new WID on higher order modulation and turbo coding (HOT) for downlink: MS conformance tests | - | - |
GP‑062217 | Updated new WID on higher order modulation and turbo coding (HOT) for downlink: BSS conformance tests | - | - |
GP‑062218 | Applicability for repeated ACCH performance requirements. | Research In Motion // G2 | - |
GP‑062219 | Release indication and additional discovery reject cause | Research In Motion // G2 | - |
GP‑062220 | Release indication and additional discovery reject cause | Research In Motion // G2 | - |
GP‑062221 | - | - | Revised |
GP‑062222 | Introduction of Downlink Dual Carrier - Assignment Messages | Siemens // G2 | - |
GP‑062223 | - | Siemens | - |
GP‑062224 | Addition of extension mechanism to PS HANDOVER COMMAND message | Siemens // G2 | - |
GP‑062225 | Introduction of Downlink Dual Carrier messages | Siemens Networks // G2 | - |
GP‑062226 | Introduction of Downlink Dual Carrier procedures | Siemens Networks // G2 | - |
GP‑062227 | - | - | - |
GP‑062228 | Sending SMS to the group call | Siemens // G2 | - |
GP‑062229 | Introduction of Downlink Dual Carrier - Procedures | Siemens // G2 | - |
GP‑062230 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062231 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062232 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062233 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062234 | Removal of duplicate cause value | Nortel Networks // G2 | - |
GP‑062235 | Removal of duplicate cause value | Nortel Networks // G2 | - |
GP‑062236 | - | - | - |
GP‑062237 | Usage of TLLI for BSSGP | Nortel Networks // G2 | - |
GP‑062238 | Clarification of the FLUSH-LL procedure | Nortel Networks // G2 | - |
GP‑062239 | - | - | - |
GP‑062240 | Possible Use of Extended Dynamic Allocation in Loopback Needed. | Qualcomm Europe S.A.R.L., CETECOM S.A // G2 | - |
GP‑062241 | - | - | - |
GP‑062242 | Correction on action at expiry of transmitter NPM timer | Huawei // G2 | - |
GP‑062243 | - | - | - |
GP‑062244 | Enhancement to the RLC Non-persistent mode | Huawei // G2 | - |
GP‑062245 | Correction on GANC action of Registration Update procedure | Huawei // G2 | - |
GP‑062246 | Missing Cell discriminators for Cell Identifier List Segment | Huawei // G2 | - |
GP‑062247 | Clarification of delete PFC behaviour | Huawei // G2 | - |
GP‑062248 | Clarification of delete PFC behaviour | Huawei // G2 | - |
GP‑062249 | Preparation for future additions to the PS Handover Command message | Ericsson // G2 | - |
GP‑062250 | Active PFCs in PS Handover Required | Ericsson // G2 | - |
GP‑062251 | Active PFCs in PS Handover Required | Ericsson // G2 | - |
GP‑062252 | Cause value for CS interaction | Ericsson // G2 | - |
GP‑062253 | Cause value for CS interaction | Ericsson // G2 | - |
GP‑062254 | Inclusion of Dual Carrier in Downlink | Ericsson // G2 | - |
GP‑062255 | - | - | - |
GP‑062256 | - | - | - |
GP‑062258 | PS Handover for GAN | Ericsson // GERAN WG2 | - |
GP‑062259 | PS Handover for GAN | Ericsson // G2 | - |
GP‑062260 | PS Handover Support for GAN | Ericsson // G2 | - |
GP‑062261 | Introduction of NPM Transfer Time | Siemens Networks // G1 | - |
GP‑062262 | Introduction of NPM Transfer Time | Siemens Networks // G1 | - |
GP‑062263 | Clarification on the PS HO execution phase | Siemens Networks // G1 | - |
GP‑062264 | Introduction RLC non-persistent mode | Siemens Networks // G1 | - |
GP‑062265 | Decoupling support of mTBF and RLC non-persistent mode | Siemens Networks // G2 | - |
GP‑062266 | - | Siemens | - |
GP‑062267 | Response from the serving BSS when RIM application is disabled | Nokia // G2 | - |
GP‑062268 | Response from the serving BSS when RIM application is disabled | Nokia // G2 | - |
GP‑062269 | Response from the serving BSS when RIM application is disabled | Nokia // G2 | - |
GP‑062270 | GAN 3G Early Classmark correction | Nokia // G2 | - |
GP‑062271 | GAN 3G Early Classmark correction | Nokia // G2 | - |
GP‑062272 | Cryptographic algorithm update | Nokia // G1 | - |
GP‑062273 | Multiple TBF Capability description | Nokia // G2 | - |
GP‑062274 | Multiple TBF Capability description | Nokia // G2 | - |
GP‑062275 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Anite | Revised |
GP‑062276 | - | - | - |
GP‑062277 | Bit efficient support of extended orbit for GNSS | QUALCOMM Europe | - |
GP‑062278 | - | - | Noted |
GP‑062279 | - | - | Noted |
GP‑062280 | Enhanced Layer 2 Multi-block Handover Command Signaling | Motorola | - |
GP‑062281 | - | Nokia | - |
GP‑062282 | - | - | - |
GP‑062283 | New WID on Modulation Order and symbol Rate Enhancement (MORE) for downlink | - | - |
GP‑062284 | New WID on Modulation Order and symbol Rate Enhancement (MORE) for downlink – Stage 2 | - | - |
GP‑062285 | New WID on Modulation Order and symbol Rate Enhancement (MORE) for downlink – Stage 3 | - | - |
GP‑062286 | New WID on Modulation Order and symbol Rate Enhancement (MORE) for downlink – MS conformance tests | - | - |
GP‑062287 | New WID on Modulation Order and symbol Rate Enhancement (MORE) for downlink – BSS conformance tests | - | - |
GP‑062288 | Addition of MORE to chapter 8 on higher order modulations and turbo codes | Siemens // G1 | - |
GP‑062290 | - | - | - |
GP‑062291 | - | - | Noted |
GP‑062292 | Reply LS on 3GPP SAE & LTE Work Plan | SA5 | - |
GP‑062293 | LS on "protected MBMS services over MBMS broadcast" | SA3 | - |
GP‑062294 | LS on Proposed Mapping between BSSGP and RANAP cause values for PS HO | CT4 | - |
GP‑062295 | LS on on Workshop organization on LTE GSM Handovers | 3GPP SA WG1 | - |
GP‑062296 | GAN Enhancements | 3GPP TSG SA WG1 | - |
GP‑062297 | LS on UE Performance related to cell/PLMN reselection | TSG RAN WG2 | - |
GP‑062298 | - | - | - |
GP‑062299 | Combining of the (E)GPRS Uplink data blocks from one user with the speech pauses periods from another user(s) | Motorola, Freescale | - |
GP‑062300 | Introduction of Downlink Dual Carrier | Siemens, Panasonic // G1 | - |
GP‑062301 | PICS/PIXIT Cleaning for GPRS section 44 | - | Agreed |
GP‑062302 | PICS/PIXIT Cleaning for GPRS section 45 | - | Agreed |
GP‑062303 | PICS/PIXIT Cleaning for GPRS section 46 | - | Agreed |
GP‑062304 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | RIM | Agreed |
GP‑062305 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | RIM | Agreed |
GP‑062306 | - | - | Noted |
GP‑062307 | PICS/PIXIT and Band Dependency modifications in 33.x | - | Agreed |
GP‑062308 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Aeroflex | Agreed |
GP‑062309 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | 7layers AG | Revised |
GP‑062310 | 13.3, 13.16.2, 13.17.3 - Clarification of required output levels in Transmitter output power test cases | - | Withdrawn |
GP‑062311 | Sections 80-90: PICS/PIXIT Clean-Up | - | Agreed |
GP‑062312 | Sections 15-20: PICS/PIXIT Clean-Up | - | Agreed |
GP‑062313 | - | - | Revised |
GP‑062314 | 29 - PICS/PIXIT rationalisation | - | Withdrawn |
GP‑062315 | 13.16.2, 13.17.3 – PICS cleanup | - | Withdrawn |
GP‑062316 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | CGC | Revised |
GP‑062317 | - | - | Revised |
GP‑062318 | section 60, PICS/PIXIT clean up | - | Agreed |
GP‑062319 | section 70, PICS/PIXIT clean up | - | Agreed |
GP‑062320 | PICS/PIXIT and Band Dependency modifications in 34.x | - | Agreed |
GP‑062321 | PICS Cleaning for GPRS section 44 in table B1 | - | Agreed |
GP‑062322 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Wavecom | Agreed |
GP‑062323 | TCs 80-90: PICS/PIXIT Clean-Up | - | Agreed |
GP‑062324 | Response to PTCRB LS on Cell Bar Qualify | TSG GERAN WG3 | Agreed |
GP‑062325 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Sasken | Agreed |
GP‑062326 | LS on Test Case Redundancy in Dual Mode (GERAN/UTRAN) | GERAN3 | Agreed |
GP‑062327 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Agreed |
GP‑062328 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Agreed |
GP‑062329 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Agreed |
GP‑062330 | Introduction of GEA2 and GEA3 encryption | - | Agreed |
GP‑062331 | PICS Cleaning for GPRS section 46 in table B1 | - | Agreed |
GP‑062332 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Agreed |
GP‑062333 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Agreed |
GP‑062334 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Agreed |
GP‑062335 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Sasken | Agreed |
GP‑062336 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | RIM | Agreed |
GP‑062337 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | RIM | Agreed |
GP‑062338 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Ericsson | Agreed |
GP‑062339 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Setcom | Agreed |
GP‑062340 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Setcom | Agreed |
GP‑062341 | Sections 11-13: PICS/PIXIT Clean-Up | - | Agreed |
GP‑062342 | - | - | Agreed |
GP‑062343 | - | - | Agreed |
GP‑062344 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Nokia | Agreed |
GP‑062345 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Wavecom | Agreed |
GP‑062346 | 26.6.3.9 – Corrections to cell configurations and specific message contents | - | Agreed |
GP‑062347 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Rohde & Schwarz | Agreed |
GP‑062348 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | setcom | Agreed |
GP‑062349 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Spirent Communications | Agreed |
GP‑062350 | GPS Scenarios and Assistance Data for A-GPS Minimum Performance Test Cases | - | Agreed |
GP‑062351 | A-If link sharing cell re-establishment | Nortel Networks, Siemens Networks // G2 | - |
GP‑062352 | Response from the serving BSS when RIM application is disabled | Nokia // G2 | - |
GP‑062353 | Response from the serving BSS when RIM application is disabled | Nokia // G2 | - |
GP‑062354 | Response from the serving BSS when RIM application is disabled | Nokia // G2 | - |
GP‑062355 | Introduction of NPM Transfer Time | Siemens Networks // G1 | - |
GP‑062356 | Introduction of NPM Transfer Time | Siemens Networks // G1 | - |
GP‑062357 | GAN cell selection : Alignment with stage 3 | Alcatel // G1 | - |
GP‑062358 | Reply LS on “Normative specification work for Direct Tunnel solution” | RAN3 | - |
GP‑062359 | LS on Answer on proposed mapping between BSSGP and RANAP cause values for PS Handover | RAN3 | - |
GP‑062360 | LS on Directed Retry based on PS Handover and DTM Handover | RAN3 | - |
GP‑062361 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062362 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062363 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062364 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062365 | Clarification of PS Handover Cancel behaviour | Ericsson // G1 | - |
GP‑062366 | Improved behaviour in case of inactive PFCs/RABs | Ericsson // G1 | - |
GP‑062367 | Active PFCs in PS Handover Required | Ericsson // G2 | - |
GP‑062368 | Active PFCs in PS Handover Required | Ericsson // G2 | - |
GP‑062369 | Correction to the inclusion of the NPM Transfer Time IE in the MBMS Channel Parameters IE | Telecom Italia S.p.A. // G2 | - |
GP‑062370 | Correction to the inclusion of the NPM Transfer Time IE in the MBMS Channel Parameters IE | Telecom Italia S.p.A. // G2 | - |
GP‑062371 | Correction for the inclusion of the NPM Transfer Time IE in the MBMS Session Parameters List IE | Telecom Italia S.p.A. // G2 | - |
GP‑062372 | Correction for the inclusion of the NPM Transfer Time IE in the MBMS Session Parameters List IE | Telecom Italia S.p.A. // G2 | - |
GP‑062373 | Clarification on the PS HO execution phase | Siemens Networks // G1 | - |
GP‑062374 | Preparation for future additions to the PS Handover Command message | Ericsson, Siemens Networks // G2 | - |
GP‑062375 | Cause value for CS interaction | Ericsson // G2 | - |
GP‑062376 | Cause value for CS interaction | Ericsson // G2 | - |
GP‑062377 | Multiple TBF Capability description | Nokia // G2 | - |
GP‑062378 | Multiple TBF Capability description | Nokia // G2 | - |
GP‑062379 | Sending SMS to the group call | Siemens // G2 | - |
GP‑062380 | Introduction of new cause values for PS Handover | Nortel Networks // G2 | - |
GP‑062381 | The report on MEAN_BEP and CV_BEP in packet transfer mode | LG Electronics // G1 | - |
GP‑062382 | Flexible timeslot assignment | Siemens Networks // G1 | - |
GP‑062383 | Blind Modulation Detection performance for HOT | Marvell Semiconductor // G1 | - |
GP‑062384 | Addition of MORE to chapter 8 on higher order modulations and turbo codes | Siemens // G1 | - |
GP‑062385 | Correction of 16QAM results with alternative transmit pulse shaping | Ericsson // G1 | - |
GP‑062386 | LS on Introduction of CAMEL Trigger Points for PS handover | 3GPP TSG GERAN WG2 | - |
GP‑062387 | Downlink Dual carrier multislot class indication | Siemens, Panasonic // G1 | - |
GP‑062388 | CR 43.064-0047 dual downlink carrier multislot class support for DTM | Panasonic // WG1 | - |
GP‑062389 | Introduction of Downlink Dual Carrier | Siemens, Panasonic // G1 | - |
GP‑062390 | Downlink Dual carrier multislot class indication | Siemens, Panasonic // G1 | - |
GP‑062391 | Introduction of new cause values for PS Handover | Nortel Networks // G2 | - |
GP‑062392 | LS on Downlink Dual Carrier multislot capability indication | TSG GERAN | - |
GP‑062393 | Introduction of Downlink Dual Carrier messages | Siemens Networks // G2 | - |
GP‑062394 | Introduction of Downlink Dual Carrier - Assignment Messages | Siemens Networks, Ericsson // G2 | - |
GP‑062395 | Introduction of Reduced TTI | Ericsson // G1 | - |
GP‑062396 | Introduction RLC non-persistent mode | Siemens Networks // G1 | - |
GP‑062397 | Correction on action at expiry of transmitter NPM timer | Huawei // G2 | - |
GP‑062398 | PS Handover Support for GAN | Ericsson // G1 | - |
GP‑062401 | CS Handover Support for GAN | Nokia // | - |
GP‑062402 | Flexible Timeslot Assignment | Siemens // G2 | - |
GP‑062403 | Flexible Timeslot Assignment support indication | Siemens // CT1 | - |
GP‑062404 | Random access failure at the expiry of T3170 in case of packet measurement report | LG Electronics // G2 | - |
GP‑062405 | HCS in PSI3 | LG Electronics, Nokia // G2 | - |
GP‑062406 | Decoupling support of mTBF and RLC non-persistent mode | Siemens Networks // G2 | - |
GP‑062407 | A-GNSS support to RRLP | Nokia, Siemens Networks // G2 | - |
GP‑062408 | Add GNSS Assistance Data as a New Positioning Method for Galileo | Nokia, Siemens Networks // G2 | - |
GP‑062409 | LS on DARP Phase II support indication | GERAN | - |
GP‑062410 | Usage of TLLI for BSSGP | Nortel Networks // G2 | - |
GP‑062411 | Introduction of NPM Transfer Time | Siemens Networks // G1 | - |
GP‑062412 | Introduction of NPM Transfer Time | Siemens Networks // G1 | - |
GP‑062413 | Addition of Reset MS Positioning Stored Information command | Spirent Communications // G2 | - |
GP‑062414 | Response from the serving BSS when RIM application is disabled | Nokia // G2 | - |
GP‑062415 | Improved behaviour in case of inactive PFCs/RABs | Ericsson // G1 | - |
GP‑062416 | Active PFCs in PS Handover Required | Ericsson // G2 | - |
GP‑062417 | Active PFCs in PS Handover Required | Ericsson // G2 | - |
GP‑062418 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062419 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062420 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062421 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Spirent Communications | Agreed |
GP‑062422 | - | - | Revised |
GP‑062423 | Missing PICS for A-GPS | - | Agreed |
GP‑062424 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | Wavecom | Agreed |
GP‑062425 | 2G/3G test case redundancy | - | Agreed |
GP‑062426 | Five Test Cases for A-GPS Minimum Performance Test Cases | - | Agreed |
GP‑062427 | Section 14: PICS/PIXIT Clean-Up | - | Agreed |
GP‑062428 | Sections 15-20: PICS/PIXIT Clean-Up | - | Agreed |
GP‑062429 | Sections 21-25: PICS/PIXIT Clean-Up | - | Agreed |
GP‑062430 | - | - | Noted |
GP‑062431 | - | - | Noted |
GP‑062432 | Work Plan on Clean-Up of PICS/PIXIT statements in 51.010-1 | GERAN WG3 | Noted |
GP‑062433 | One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. | CGC | Agreed |
GP‑062434 | Sections 11-13: PICS/PIXIT Clean-Up | - | Agreed |
GP‑062435 | Addition of PICS for new A-GPS Minimum Performance Test Cases | - | Agreed |
GP‑062436 | Reply LS on August 2006 RFT Activity – GERAN (NITZ) | GERAN3 | Agreed |
GP‑062437 | - | - | Noted |
GP‑062438 | LS on status of GERAN WG3 activity | GERAN WG3 | Agreed |
GP‑062439 | - | - | Noted |
GP‑062440 | - | - | - |
GP‑062441 | GP-061929Source GERAN WG3 Chairman: Draft Agenda for TSG GERAN WG3 during TSG GERAN no. 32 in Sophia Antipolis | ource GERAN WG3 ChairmanTitle: Draft Agenda for TSG GERAN WG3 during TSG GERAN no. 32 in Sophia Antipolis | - |
GP‑062442 | Introduction of Downlink Dual Carrier | Siemens, Panasonic // G1 | - |
GP‑062443 | LS on Downlink Dual Carrier multislot capability indication | TSG GERAN | - |
GP‑062444 | LS on Introduction of CAMEL Trigger Points for PS handover | TSG GERAN, TSG GERAN WG1, TSG GERAN WG2 | - |
GP‑062445 | - | - | - |
GP‑062446 | - | - | - |
GP‑062447 | Draft Report of TSG GERAN WG1 during TSG GERAN #32, version 0.0.1 | Secretary TSG GERAN WG1, Paolo Usai | - |
GP‑062448 | - | - | - |
GP‑062449 | Draft Report of TSG GERAN WG1 during TSG GERAN #32, version 0.0.2 | Secretary TSG GERAN WG1, Paolo Usai | - |
GP‑062451 | CR 43.064-0047 dual downlink carrier multislot class support for DTM | Panasonic // WG1 | - |
GP‑062452 | Introduction of performance requirements for DARP phase II (MSRD) | Ericsson, Freescale, Motorola, Nokia, Philips, RIM // G1 | - |
GP‑062453 | LS on DARP Phase II support indication | GERAN | - |
GP‑062454 | - | - | - |
GP‑062455 | The report on MEAN_BEP and CV_BEP in packet transfer mode | LG Electronics // G1 | - |
GP‑062456 | The report on MEAN_BEP and CV_BEP in packet transfer mode | LG Electronics // G1 | - |
GP‑062457 | Random access failure at the expiry of T3170 in case of packet measurement report | LG Electronics // G2 | - |
GP‑062461 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062462 | Introduction of new cause values for PS Handover | Nortel Networks // G2 | - |
GP‑062463 | Introduction of new cause values for PS Handover | Nortel Networks // G2 | - |
GP‑062464 | Multiple TBF Capability description | Nokia // G2 | - |
GP‑062465 | Multiple TBF Capability description | Nokia // G2 | - |
GP‑062466 | LS on Proposed Mapping between BSSGP and RANAP cause values for PS Handover | TSG GERAN WG2 | - |
GP‑062467 | Sending SMS to the group call | Siemens // G2 | - |
GP‑062468 | Introduction RLC non-persistent mode | Siemens Networks // G1 | - |
GP‑062469 | Correction on action at expiry of transmitter NPM timer | Huawei // G2 | - |
GP‑062470 | PS Handover Support for GAN | Ericsson // G1 | - |
GP‑062471 | Random access failure at the expiry of T3170 in case of packet measurement report | LG Electronics // G2 | - |
GP‑062472 | - | - | - |
GP‑062474 | - | - | - |
GP‑062475 | Introduction of Downlink Dual Carrier messages | Siemens Networks // G2 | - |
GP‑062476 | Introduction of Reduced TTI | Ericsson // G1 | - |
GP‑062477 | CS Handover Support for GAN | Nokia // | - |
GP‑062478 | GAN CS Handover and PS Handover Impacts on 3GPP TS 25.922 | 3GPP TSG GERAN WG2 | - |
GP‑062479 | Introduction of Reduced TTI | Ericsson // G1 | - |
GP‑062480 | Introduction of Downlink Dual Carrier - Assignment Messages | Siemens Networks, Ericsson // G2 | - |
GP‑062481 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062482 | Non-critical PS handover reject | Nortel Networks // G2 | - |
GP‑062483 | Introduction of Reduced TTI | Ericsson // G1 | - |
GP‑062484 | GAN CS Handover and PS Handover Impacts on 3GPP TS 25.922 | 3GPP TSG GERAN WG2 | - |
GP‑062485 | Random access failure at the expiry of T3170 in case of packet measurement report | LG Electronics // G2 | - |
GP‑062486 | - | - | - |
GP‑062487 | - | - | - |
GP‑062488 | New WID on reduced symbol duration, higher order modulation and turbo coding (RED HOT) for downlink | - | - |
GP‑062489 | New WID on reduced symbol duration, higher order modulation and turbo coding (RED HOT) for downlink: Stage 2 | - | - |
GP‑062490 | New WID on reduced symbol duration, higher order modulation and turbo coding (RED HOT) for downlink: Stage 3 | - | - |
GP‑062491 | New WID on reduced symbol duration, higher order modulation and turbo coding (RED HOT) for downlink: MS conformance tests | - | - |
GP‑062492 | New WID on reduced symbol duration, higher order modulation and turbo coding (RED HOT) for downlink: BTS conformance tests | - | - |
page generated from database: 2024-09-26 11:02:35