3GPP TDocs (written contributions) at meeting
Meeting: GP-12 - 2002-11-18 to 2002-11-22, Sophia Antipolis
meeting id: GP-12 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
GP‑022830 | - | - | - |
GP‑022831 | - | - | - |
GP‑022832 | - | - | - |
GP‑022833 | - | - | - |
GP‑022834 | - | - | - |
GP‑022835 | LS on cause value #14 in networks using NMO I | CN1 | - |
GP‑022836 | LS reply on Subscriber or Equipment Trace Impacts | TSG SA WG2 | - |
GP‑022837 | LS on proposed TR for the architectural aspects of early UE handling | SA WG2 | - |
GP‑022838 | Response LS on MBMS related issues | SA2 | - |
GP‑022839 | Response LS on UEP/UED Gains for VoIP in GERAN | SA2 | - |
GP‑022840 | LS on Draft TR 26.937 "RTP Usage Model" for PSS | SA4 | - |
GP‑022841 | Reply LS on Subscriber and Equipment Trace Impacts | SA5 SWG-D | - |
GP‑022842 | Reply LS on Subscriber and Equipment Trace Impacts | SA5 SWGD | - |
GP‑022843 | LS on TS 11.10-4 R99 SIM Application Toolkit test specification. | TSG-T #17 | - |
GP‑022844 | - | - | - |
GP‑022845 | - | - | - |
GP‑022846 | - | - | - |
GP‑022847 | - | - | - |
GP‑022848 | [H8] Enter the source of the CR. This is either (a) one or several companies or, (b) if a (sub)working group has already reviewed and agreed the CR, then list the group as the source. | Motorola | - |
GP‑022849 | 51.010-2-082 Update of applicability table | - | - |
GP‑022850 | 51.010-1-1069 TC 51.2.3.2 Two-message assignment / Failure cases - Change to specific message contents | Setcom | - |
GP‑022851 | 51.010-1 Test cases 46.2.2.1.4 – Modification of the size of uplink data to transfer | Setcom | - |
GP‑022852 | 51.010-1-1071 TC 51.3.5.2 correction of some steps | Setcom | - |
GP‑022853 | 51.010-1-1072 TC 41.3.5.2 correction of some steps | Setcom | - |
GP‑022854 | 51.010-1-1073 TC 52.1.1.6.3 should be corrected to take care of MS set to do PRACH in fixed way | Setcom | - |
GP‑022855 | 51.010-1-1074 TC 42.1.1.4.3 should be corrected to take care of MS set to do PRACH in fixed way | Setcom | - |
GP‑022856 | 51.010-1-1075 TC 51.2.2.6 New Testcase added | Setcom | - |
GP‑022857 | 51.010-1-1076 TC 52.1.1.7 New Testcase added | Setcom | - |
GP‑022858 | 51.010-1-1077 Testcase 52.1.2.1.8.2.3 deleted and new Testcase 52.1.2.2.6 added | Setcom | - |
GP‑022859 | 51.010-1-1078 TC 53.1.1.21 Addition of optional steps to cater to MS reaction time | setcom | - |
GP‑022860 | 51.010-1-1079 TC 53.1.1.20 Addition of optional steps to cater to MS reaction time | - | - |
GP‑022861 | 51.010-1-1080 TC 53.1.1.18 Addition of optional steps to cater to MS reaction time | - | - |
GP‑022863 | 51.010-1-1082 Testcase 53.1.1.4 should be done in transfer mode. | Setcom | - |
GP‑022864 | 51.010-1-1083 TC 53.1.1.6 CV calculation was wrong | Setcom | - |
GP‑022865 | 51.010-1-1084 TC 53.1.1.5 Addition of optional steps to cater to MS reaction time | Setcom | - |
GP‑022866 | 51.010-1-1085 TC 53.1.1.3 Addition of optional steps to cater to MS reaction time | Setcom | - |
GP‑022867 | 51.010-1-1086 52.1.2.1.10.1- testcase not testing EGPRS Multislot class | Setcom | - |
GP‑022868 | 51.010-1-1087 TC 51.3.1.2 correction of some steps | Setcom | - |
GP‑022869 | 51.010-1-1088 TC 41.3.1.2 correction of some steps | Setcom | - |
GP‑022872 | 51.010-1-1091 TC 52.3.2.1 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Normal | Setcom | - |
GP‑022873 | 51.010-1-1092 TC 53.1.2.16 Acknowledged Mode/ Downlink TBF/ Received Block Bitmap/ Compressed Bitmap Starting Colour Code | Setcom | - |
GP‑022875 | 51.010-1-1094 TC 53.1.2.10 Acknowledged Mode/ Downlink TBF/ Split RLC Data Block | Setcom | - |
GP‑022876 | 51.010-1-1095 TC 53.1.1.11 Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '0'/ Negative Acknowledgement | Setcom | - |
GP‑022877 | 51.010-1-1096 TC 51.3.4.2 TBF Release / Downlink / Normal / Network initiated / Unacknowledged mode | Setcom | - |
GP‑022878 | 51.010-1-1097 TC 51.3.1.1 TBF Release / Uplink / Normal / MS initiated / Acknowledged mode | Setcom | - |
GP‑022879 | 51.010-1-1098 TC 51.2.3.8 One phase packet access / Contention resolution / 4 access repetition attempts | Setcom | - |
GP‑022880 | 51.010-1-1099 TC 51.2.5.1 Packet access rejection / wait indication | Setcom | - |
GP‑022881 | 51.010-1-1100 TC 52.1.2.1.9.2.2 : Deletion of steps 5 and 6. | Setcom | - |
GP‑022883 | 51.010-1-1102 New testcase 53.1.1.23 Acknowledged Mode/ Uplink TBF/ Interpretation of Compressed Bitmap | Setcom | - |
GP‑022884 | 51.010-1-1103 New testcase 53.1.1.22 Acknowledged Mode/ Uplink TBF/ Recalculation of CV on TBC change | Setcom | - |
GP‑022885 | Format of tests in section 9 | Ericsson | - |
GP‑022886 | Use of Cause #14 in networks using NMO I | Motorola | - |
GP‑022887 | Use of Cause #14 in networks using NMO I | Motorola | - |
GP‑022888 | CR.51.010-1-1105 TC 53.1.2.13 Acknowledged Mode/ Downlink TBF/ IR Operation | Siemens AG | - |
GP‑022889 | 51.010-1-1106 Two subsections, namely 14.1.5 and 14.1.6, have been duplicated | NEC | - |
GP‑022890 | 51.010-1- 1107 Correction of EOTD Test Cases | - | - |
GP‑022891 | Single Antenna Receiver Interference Cancellation (SAIC) | - | - |
GP‑022892 | - | Cingular Wireless | - |
GP‑022893 | 51010-1-1108 TBF release / Uplink / Normal / MS initiated / Whilst in DTM (Rel-5) | Vodafone Group | - |
GP‑022894 | 51010-1-1109 TBF release / Uplink / Normal / Network initiated / Whilst in DTM (Rel-5) | Vodafone Group | - |
GP‑022895 | 51010-1-1110 TBF release / Downlink / Normal / Network initiated / Whilst in DTM (Rel-5) | Vodafone Group | - |
GP‑022896 | 51010-1-1111 Uplink TBF establishment with no reallocation of CS resources / Abnormal cases / Inter System to UTRAN Handover Command (Rel-5) | - | - |
GP‑022897 | 51010-1-1112 Uplink TBF establishment with a downlink TBF established and no PS downlink reallocation (Rel-5) | Vodafone Group | - |
GP‑022898 | 51010-1-1113 Uplink TBF establishment with a downlink TBF established and PS downlink reallocation (Rel-5) | Vodafone Group | - |
GP‑022899 | 51010-1-1114 Downlink TBF establishment with a uplink TBF established and no PS uplink reallocation (Rel-5) | Vodafone Group | - |
GP‑022900 | 51010-1-1115 Downlink TBF establishment with a uplink TBF established and PS uplink reallocation (Rel-5) | Vodafone Group | - |
GP‑022901 | 51010-1-1116 Power control in exclusive allocation mode (Rel-5) | Vodafone Group | - |
GP‑022902 | 51010-1-1117 Timing advance whilst in DTM (Rel-5) | Vodafone Group | - |
GP‑022903 | 51010-1-1118 Corrections to WG4 DTM Test Cases (Rel-5) | - | - |
GP‑022904 | Specify Control Ack for each TBF in Multiple TBF assignment messages | - | - |
GP‑022905 | Handover Access and Physical Information | Nokia | - |
GP‑022906 | Correction RLC SDU Discard | Nokia | - |
GP‑022907 | Removal of timer T3197 | Nokia | - |
GP‑022908 | Clarification of (GMSK)/EDGE multislot class applicability | Alcatel | - |
GP‑022909 | Segmented retransmission of the final RLC data block | Nortel Networks, Ericsson, Mitsubishi | - |
GP‑022910 | Segmented retransmission of the final RLC data block | Nortel Networks, Ericsson, Mitsubishi | - |
GP‑022911 | Segmented retransmission of the final RLC data block | Nortel Networks, Ericsson, Mitsubishi | - |
GP‑022912 | Cleanup of section 7.8.1 Cell and GRA Update procedures | - | - |
GP‑022913 | Cleanup of section 7.8.4 Inter-mode Handover from GERAN Iu mode | Nokia | - |
GP‑022914 | Handling of unknown, unforeseen, and erroneous protocol data | - | - |
GP‑022915 | Corrections to PDCP info and RFC3095 context relocation | - | - |
GP‑022916 | Alignment UTRAN/GERAN on Iu mode procedures | - | - |
GP‑022917 | Corrections to Radio Resource Management procedures | - | - |
GP‑022918 | Addition of GERAN Iu Mode Support Indication in SI4, SI7 and SI8 | Nokia | - |
GP‑022919 | Utilization of Packet Uplink Dummy control block | - | - |
GP‑022920 | Correction Packet DBPSCH Assignment message | Nokia | - |
GP‑022921 | Missing G-RNTI in RLC/MAC control messages | - | - |
GP‑022922 | Add abnormal cases to section 8 | Siemens | - |
GP‑022923 | PACKET ACCESS REJECT for multiple TBFs | Siemens | - |
GP‑022924 | Addition of Uplink Control Timeslot to Packet Uplink Assignment and Timeslot Reconfigure messages | - | - |
GP‑022925 | Timers for Multiple TBFs | Siemens | - |
GP‑022926 | Invalid timeslot in Packet Control Acknowledgement | Siemens | - |
GP‑022927 | Correction of MS behaviour upon receiving DTM messages while in DTM | Vodafone Group | - |
GP‑022928 | Page: 1 | Nokia | - |
GP‑022929 | Corrections to Radio Bearer Control procedures | - | - |
GP‑022930 | Handover Access and Physical Information | - | - |
GP‑022931 | Handover Access and Physical Information | Nokia | - |
GP‑022932 | Addition of GERAN Iu Mode Support Indication in SI4, SI7 and SI8 | Nokia | - |
GP‑022933 | - | - | - |
GP‑022934 | - | Source-2nd-Level | - |
GP‑022935 | PDP Context Activation / Performed on main DCCH and TBFs | Vodafone Group | - |
GP‑022936 | Change of cell between two LAs in idle mode / RAU completes first | Vodafone Group | - |
GP‑022937 | Change of cell between two LAs in idle mode / LAU completes first / SS releases channel | Vodafone Group | - |
GP‑022938 | Change of cell between two LAs in idle mode / LAU completes first / SS maintains channel | Vodafone Group | - |
GP‑022939 | Change of routeing area whilst in dedicated mode | Vodafone Group | - |
GP‑022940 | Intra frequency reallocation of CS resources / DTM Assignment Command | Source:?[H10] | - |
GP‑022941 | Inter frequency reallocation of CS resources / DTM Assignment Command | Source:?[H10] | - |
GP‑022942 | Mobile originating CS release | Vodafone Group | - |
GP‑022943 | Network originating CS release | Vodafone Group | - |
GP‑022944 | Handover to different routeing area whilst in DM / Performed on main DCCH / RAU complete before CS release | Vodafone Group | - |
GP‑022945 | Handover to different routeing area whilst in DM / Performed on main DCCH / CS release before RAU complete | Vodafone Group | - |
GP‑022946 | Handover to UTRAN while in DTM | - | - |
GP‑022947 | 51.010-2-083 Addition of WG4 DTM Conformance Tests to the Applicability table (Rel-5) | - | - |
GP‑022948 | Addition of WG5 DTM Conformance Tests to the Applicability Table | Vodafone Group | - |
GP‑022950 | Corrections to WG5 DTM Test Cases | - | - |
GP‑022951 | Work Plan for DTM Test Cases | Vodafone Group | - |
GP‑022952 | 51.010-1-1132 TC 42.1.1.2 Packet Channel Request / Response to Packet Paging | Siemens AG | - |
GP‑022953 | 51.010-1-1133 TC 14.18.7 Incremental Redundancy Performance | Siemens AG | - |
GP‑022954 | Introduction of tests and requirements for AMR and WB-AMR on 8-PSK modulated channels | - | - |
GP‑022955 | Introduction of tests and requirements for WB-AMR on GMSK modulated channels | - | - |
GP‑022956 | NOTE:The higher levels of vibration may induce undue physical stress in to equipment after a prolonged series of tests. The testing body should only vibrate the equipment during the RF measurement process. | Ericsson | - |
GP‑022957 | NOTE:The higher levels of vibration may induce undue physical stress in to equipment after a prolonged series of tests. The testing body should only vibrate the equipment during the RF measurement process. | Ericsson | - |
GP‑022958 | 3)To verify that the frequency error during the active part of the time slot does not exceed the specified limits under normal and extreme test conditions and when subjected to vibration. | Ericsson | - |
GP‑022959 | 3)To verify that the frequency error during the active part of the time slot does not exceed the specified limits under normal and extreme test conditions and when subjected to vibration. | Ericsson | - |
GP‑022960 | Correction of requirements for PDTCH/CS-4 C/Ic | - | - |
GP‑022961 | Correction of requirements for PDTCH/CS-4 C/Ic | - | - |
GP‑022962 | - | Ericsson, Nokia | - |
GP‑022963 | Two-message packet downlink assignment on CCCH | - | - |
GP‑022964 | Two-message packet downlink assignment on CCCH | - | - |
GP‑022965 | Two-message packet downlink assignment on CCCH | - | - |
GP‑022966 | Two-message packet downlink assignment on CCCH | - | - |
GP‑022967 | Two-message packet downlink assignment on CCCH | - | - |
GP‑022968 | 51.010-1-1134 53.1.1.16 Acknowledged Mode/ Uplink TBF/ Retransmission/ Padding in the Data Field | Setcom | - |
GP‑022969 | - | - | - |
GP‑022970 | - | - | - |
GP‑022971 | - | - | - |
GP‑022972 | - | Source cell | - |
GP‑022973 | - | - | - |
GP‑022974 | - | Siemens | - |
GP‑022975 | - | - | - |
GP‑022976 | - | - | - |
GP‑022977 | - | - | - |
GP‑022978 | - | - | - |
GP‑022979 | - | - | - |
GP‑022980 | 51.010-1-1136 14.16.1 Minimum Input Level for Reference Performance, USF/CS-1 and USF/CS-2 to 4 | Anite Telecoms | - |
GP‑022981 | 51.010-1-1137 20.22.09 Correction of cell configuration in step p) | Anite Telecoms | - |
GP‑022982 | 51.010-1-1138 20.22.12 Removal of wrong step d) | Anite Telecoms | - |
GP‑022983 | 51.010-1-1139 20.20.1.2 Modify no. of channels to be searched for PCS 1900 band | Anite Telecoms | - |
GP‑022984 | 51.010-1-1140 20.22.3 Missing GPRS_RXLEV_ACCESS_MIN for carrier 2 and GPRS_RXLEV_ACCESS_MIN sepcified for BCCH | Anite Telecoms | - |
GP‑022985 | 51.010-1-1141 20.22.4 GPRS_RXLEV_ACCESS_MIN and GPRS_RESELECT_OFFSET sepcified for BCCH | Anite Telecoms | - |
GP‑022986 | 51.010-1-1142 20.20.1.4.1 modification in MNC value for PCS 1900 band | Anite Telecoms | - |
GP‑022987 | 51.010-1-1143 22.3 remove unnecessary constraint in initial conditions | Anite Telecoms | - |
GP‑022988 | 26.16.6 - Restricting repetition of procedure to FR and HR speech version 3. | Anite Telecom Ltd. | - |
GP‑022989 | 51.010-1-1145 20, Table 20.1 BA ARFCNs for PCS 1900 for Multiband test cases | Anite Telecoms | - |
GP‑022990 | 51.010-1-1146 41.3.1.2 Insufficient uplink data requested at step 16 | Anite Telecoms | - |
GP‑022991 | 51.010-1-1147 41.2.2.4 Initiation of the packet access procedure / timer T3146 | Anite Telecoms | - |
GP‑022992 | 51.010-1-1148 41.3.5.2 Correction of test procedure and expected sequence in order to clarify use of multiple timeslots | Anite Telecoms | - |
GP‑022993 | 51.010-1-1149 42.3.1.1.4 Insufficient Reaction time permitted for the MS for the DownLink Assignment in step 2 | Anite Telecoms | - |
GP‑022994 | 51.010-1-1150 42.4.2.3.1 Incorect step numbering in the and missing information about USF addressing the MS in the Test steps comments | Anite Telecoms | - |
GP‑022996 | 46.1.2.2.1.1 Move initiation of data transfer to new test step 4 | Anite Telecoms | - |
GP‑022997 | 46.2.2.1.3 Correction of T in SN-DATA PDU in step 11 | Anite Telecoms | - |
GP‑022998 | 46.1.2.2.2.2 - Removal of test step 6, 7, 8 and 13 | Anite Telecoms | - |
GP‑022999 | 46.2.2.4.1 Release and re-establishment of LLC added in step 3 to 6 | Anite Telecoms | - |
GP‑023000 | 46.1.2.2.1.4 New test step 5: Reception of an UI frame | Anite Telecoms | - |
GP‑023001 | 46.1.2.2.2.3 Correction of N(R) and N(S) values and removal of steps 12 and 13 | Anite Telecoms | - |
GP‑023002 | 46.1.2.2.3.2 Combining step 4 and 5 to one test step | Anite Telecoms | - |
GP‑023003 | 46.1.2.2.4.1 Add new test step 5 | Anite Telecoms | - |
GP‑023004 | 46.2.2.4.2 Algorithm type in step 2 removed | Anite Telecoms | - |
GP‑023005 | 46.1.2.2.1.5 Correction of test step 2: Remove Initiation of data transfer | Anite Telecoms | - |
GP‑023006 | 46.1.2.2.2.4 Removal of step 5 and correction of test procedure. | Anite Telecoms | - |
GP‑023007 | 46.1.2.7.2 – Removal of constraint for C/R bit in step 7) | Anite Telecoms | - |
GP‑023008 | 46.1.2.7.5 – Correction of amount of uplink data in step 12) | Anite Telecoms | - |
GP‑023009 | 46.1.2.7.6 – Correction of testing time and macro direction in step 14) | Anite Telecoms | - |
GP‑023010 | 51.010-1-1166 51.3.1.2 Insufficient uplink data requested at step 16 | Anite Telecoms | - |
GP‑023011 | 51.010-1-1167 51.3.1.3 The order of the optional steps A6 and A12 is incorrect. | Anite Telecoms | - |
GP‑023012 | 51.010-1-1168 51.2.2.4 Initiation of the packet access procedure / timer T3146 | Anite Telecoms | - |
GP‑023013 | 51.010-1-1169 51.3.5.2 Correction of test procedure and expected sequence in order to clarify use of multiple timeslots | Anite Telecoms | - |
GP‑023014 | 51.010-1-1170 52.3.1.1.4 Insufficient Reaction time permitted for the MS for the DownLink Assignment in step 2 | Anite Telecoms | - |
GP‑023015 | 51.010-1-1171 52.4.3.2.1 Incorect step numbering in the and missing information about USF addressing the MS in the Test steps comments | Anite Telecoms | - |
GP‑023016 | 26.16.4 and 26.16.4a To correct the specification of speech versions supported by MS. | Anite Telecom Ltd. | - |
GP‑023017 | 51.010-1-1173 Enhanced Measurement Report, All neighbors present | - | - |
GP‑023018 | Rice Doppler Spectrum definition | - | - |
GP‑023019 | Correction of antenna Feeder loss compensator requirements | Nokia | - |
GP‑023020 | Applicability of broadcast parameters versus default point-to-point messages | - | - |
GP‑023021 | Versio-Current | ETSI MCC | - |
GP‑023022 | PRD G4-02 v3: Handling of common issues between G5 and T1 | ETSI MCC | - |
GP‑023023 | [D1]LS on SIM toolkit test specification | TSG-T3 | - |
GP‑023024 | This Specification is provided for future development work within 3GPP only. The Organizational Partners accept no liability for any use of this Specification. | TSG-T3 | - |
GP‑023025 | Basic Self Location in Dedicated Mode Test Case for Assisted GPS | Qualcomm, Inc. | - |
GP‑023026 | Transfer to 3rd Party Test Case for Assisted GPS | Qualcomm, Inc. | - |
GP‑023027 | Applicability Table Update | Qualcomm, Inc. | - |
GP‑023028 | 51.010-1-1176 Correction of Initial Conditions and Expected Sequence for clause 41.1.5.3 - RR / Paging / on CCCH for GPRS service / paging reorganisation | Nokia | - |
GP‑023029 | 51.010-1-1177 Alignment of the Expected Sequence for clause 42.1.2.2.4 - Packet Downlink Assignment / Response to Packet Polling | Ericsson & Nokia | - |
GP‑023030 | 51.010-1-1178 Steps 9 to 24 are made optional for K=1 and the wait indication value for K=2 has been changed for clause 42.3.3.3 - Dynamic Allocation / Resource reallocation / Reject | Source:?[H10] | - |
GP‑023031 | 51.010-1-1179 Correction of Initial Conditions and Expected Sequence for clause 51.1.5.3 - RR / Paging / on CCCH for EGPRS service / paging reorganisation | Nokia | - |
GP‑023032 | 51.010-1-1180 Updates to allow the new Acces Type 'signalling' in clauses 51.2.2.1; 51.2.2.2 and 51.2.2.3 - Initiation of the packet access procedure | Nokia | - |
GP‑023033 | 51.010-2-087 Changed the name of clause 51.2.2.3. | Nokia | - |
GP‑023034 | 51.010-1-1181 Alignment of the Expected Sequence for clause 52.1.2.2.4 - Packet Downlink Assignment / Response to Packet Polling | Ericsson & Nokia | - |
GP‑023035 | 51.010-1-1182 Steps 9 to 24 are made optional for K=1 and the wait indication value for K=2 has been changed for clause 52.3.3.3 - Dynamic Allocation / Resource reallocation / Reject | Source:?[H10] | - |
GP‑023036 | 51.010-1-1183 Alignment of GERAN#7 CR GP-012786 and correction in Specific Message Content for step 4 in clauses 52.5.5.1, 52.5.5.2 and 52.5.5.3 - Downlink Transfer / Reestablishment | - | - |
GP‑023037 | 51.010-1-1184 Setting pre-emptive bit to 0 in step 3 in clause 53.1.1.10 - Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '0'/ PENDING_ACK Blocks | Nokia | - |
GP‑023038 | 51.010-1-1185 Correction of Conformance Requirement and Expected Sequence for clause 53.1.1.15 - Acknowledged Mode/ Uplink TBF/ Recalculation of CV on MCS change | Nokia | - |
GP‑023039 | 51.010-1-1186 Change of steps 8 and 10 of the Expected Sequence in clause 53.1.1.17 - Acknowledged Mode / Uplink TBF / Retransmission / Puncturing Scheme Cycle | Nokia | - |
GP‑023040 | 51.010-1-1187 Changing of Window Size in the Expected Sequence in order to avoid expiry of T3182 for clause 53.1.1.4 - Acknowledged Mode/ Uplink TBF/ Window Size/ Assigned Value | Nokia | - |
GP‑023041 | 51.010-1-1188 Preventing of T3182 expiry in clause 53.1.1.9 - Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '1' | Nokia | - |
GP‑023042 | 51.010-1-1189 Adding an uplink TBF in order to be able to test all the conformance requirements for´ clauses 53.1.2.3 and 53.1.2.4 - Acknowledged Mode / Downlink TBF / Window Size. | Nokia | - |
GP‑023043 | 51.010-1-1190 Changing of the data amount expression for section 53.1.1.x - Acknowledged Mode / Uplink TBF | - | - |
GP‑023044 | New EGPRS test cases for verification of correct Access Type when EGPRS PACKET CHANNEL REQUEST is supported and when it is not supported in the cell. Clauses 52.6 - EGPRS Packet Access for signalling | - | - |
GP‑023045 | - | - | - |
GP‑023046 | Alignment of Conformance Requirement, Test Procedure and Expected Sequence according to 24.008 for clause 44.2.3.2.5.3.1 - Combined routing area updating / rejected / roaming not allowed in this locat | - | - |
GP‑023047 | Change of Applicability for test case 44.2.1.1.8 - GPRS attach/abnormal cases/power off | Nokia | - |
GP‑023048 | 51.010-1-1194 Section 20.22.2 Cell reselection in Packet Idle mode | Rohde & Schwarz | - |
GP‑023049 | 51.010-1-1195 Section 20.22.9 Cell reselection when the best cell does not support GPRS | Rohde & Schwarz | - |
GP‑023050 | 51.010-1-1196 Section 20 Cell selection and reselection | Rohde & Schwarz | - |
GP‑023051 | 51.010-1-1197 Section 50 EGPRS Default Conditions, Message Contents and Macros | Rohde & Schwarz | - |
GP‑023052 | 51.010-1 Section 40.5 Test PDP contexts | - | - |
GP‑023053 | [H11] Enter the source of the CR. This is either (a) one or several companies or, (b) if a (sub)working group has already reviewed and agreed the CR, then list the group as the source. | Nokia | - |
GP‑023054 | - | - | - |
GP‑023055 | - | - | - |
GP‑023056 | - | - | - |
GP‑023057 | Simple model for total interruption of streaming services due to cell changes | Vodafone | - |
GP‑023058 | Issues with the Allocation/Retention Priority QoS attribute | Vodafone | - |
GP‑023059 | Uplink TDOA location determination for GSM/GPRS | - | - |
GP‑023060 | Inclusion of uplink TDOA location method | Document for: Discussion | - |
GP‑023061 | - | - | - |
GP‑023062 | Implementation of new frequency ranges into 43.022 | EP TETRA WG4 | - |
GP‑023063 | Implementation of new frequency ranges into 45.001 | EP TETRA WG4 | - |
GP‑023064 | Implementation of new frequency ranges into 45.005 | - | - |
GP‑023065 | Implementation of new frequency ranges into 45.050 | - | - |
GP‑023066 | Dynamic Allocation / Uplink Transfer / Normal / Starting time | Mitsubishi Electric Telecom Europe | - |
GP‑023067 | Dynamic Allocation / Uplink Transfer / Normal / Starting time | Mitsubishi Electric Telecom Europe | - |
GP‑023068 | 44.2.3.2.5 - Test purpose 1 - Cell re-selection due to power levels | Anite Telecoms | - |
GP‑023069 | Add AMR half rate optional applicability | Racal Instruments | - |
GP‑023072 | TC 26.16.9.11 correction of message flow and AMR threshold and hysteresis values | Racal Instruments | - |
GP‑023073 | TC 26.16.9.12 correction of AMR threshold and hysteresis values | Racal Instruments | - |
GP‑023074 | - | Ericsson, Nokia, Siemens and Philips Seminconductors | - |
GP‑023075 | Correction of performance requirements for O-TCH/WFS | - | - |
GP‑023076 | Correction of performance requirements for O-TCH/WHS | - | - |
GP‑023077 | Correction of performance requirements for O-TCH/AHS | - | - |
GP‑023078 | Correction of performance requirements for TCH/WFS | Ericsson, Nokia, Siemens, Philips | - |
GP‑023079 | Correction of performance requirements for O-FACCH channels | - | - |
GP‑023080 | Correction to reference performance for AMR Rel5 | Ericsson, Nokia, Siemens, Philips | - |
GP‑023081 | 51.010-1-1206 Introduction of NACC test cases in section 42.4.5 | - | - |
GP‑023082 | - | Ericsson | - |
GP‑023083 | Section 60 Inter-system hard handover from GSM to UTRAN | - | - |
GP‑023084 | Introduction of UTRAN Classmark Change test cases in section 26.6.11 | Ericsson | - |
GP‑023085 | Introduction of UTRAN Classmark Change test cases in section 26.6.11 | Ericsson | - |
GP‑023086 | Interworking between security mode procedure and relocation | - | - |
GP‑023087 | Page: 1 | Siemens AG | - |
GP‑023088 | CS data services for GERAN Iu Mode | Siemens | - |
GP‑023089 | QoS requirements for seamless support of Streaming Services for eGb | Siemens | - |
GP‑023090 | 51.010-1-1209 Sec 52.5.5.* - Modifications to specific message contents | - | - |
GP‑023091 | 51.010-1-1210 42.1.2.2.6 new testcase added and testcase 42.1.2.1.8.2.3 deleted | Setcom | - |
GP‑023092 | IMSI availability in BSS | Nokia | - |
GP‑023093 | Release allignement R99 to Rel-4 and Rel-5: SI16 Rest octets | Nokia | - |
GP‑023094 | Release allignement R99 to Rel-4 and Rel-5: SI16 Rest octets | Nokia | - |
GP‑023095 | 51.010-1-1211 Extended Uplink TBF Mode (New Test Cases) | Ericsson | - |
GP‑023096 | 51.010-2-092 Addition of Extended Uplink TBF Mode test cases to matrix | Ericsson | - |
GP‑023097 | Clarifications to inter-RAT cell reselection algorithm and procedure | Motorola | - |
GP‑023098 | Clarifications to inter-RAT cell reselection algorithm and procedure | Motorola | - |
GP‑023099 | Clarifications to inter-RAT cell reselection algorithm and procedure | Motorola | - |
GP‑023100 | - | - | - |
GP‑023101 | Simulation Assumptions for GSM SAIC | Motorola | - |
GP‑023102 | - | Nortel Networks | - |
GP‑023103 | Introduction of DBPSCH Message classification | Nokia | - |
GP‑023104 | Abnormal Cases for DBPSCH operation | Nokia | - |
GP‑023105 | Clarification on 51-multiframe structure and DBPSCH: inclusion of DBPSCH/S | Nokia | - |
GP‑023106 | - | - | - |
GP‑023107 | Definition of RLC Buffer | Nokia | - |
GP‑023108 | Definition of RLC Buffer | Nokia | - |
GP‑023109 | Layer 2 errors | Nokia | - |
GP‑023110 | - | - | - |
GP‑023111 | - | - | - |
GP‑023112 | - | Nokia | - |
GP‑023113 | CRC Sizes for AMR-WB | - | - |
GP‑023114 | Page: 1 | Nokia | - |
GP‑023115 | - | Nokia | - |
GP‑023116 | - | Nokia | - |
GP‑023117 | - | Nokia & Siemens | - |
GP‑023118 | - | Nokia | - |
GP‑023119 | - | - | - |
GP‑023120 | Inter-mode cell reselection between GERAN Iu mode and GERAN A/Gb mode | Nokia | - |
GP‑023121 | Clarifications to HFN handling for the Radio Bearer Control Procedures | Nokia | - |
GP‑023122 | Clarification of the security issues for intersytem handover | Nokia | - |
GP‑023123 | Corrections to Radio Resource Management procedures | Source:?[H10] | - |
GP‑023124 | Alignment UTRAN/GERAN on Iu mode procedures | - | - |
GP‑023125 | - | - | - |
GP‑023126 | On Streaming Service Requirements | - | - |
GP‑023127 | - | - | - |
GP‑023128 | - | - | - |
GP‑023129 | - | - | - |
GP‑023130 | - | - | - |
GP‑023131 | - | - | - |
GP‑023132 | - | Ericsson | - |
GP‑023133 | - | - | - |
GP‑023134 | - | - | - |
GP‑023135 | GRR Procedures (first sketch) | - | - |
GP‑023136 | - | - | - |
GP‑023137 | Correction of Multislot Capability Indication | Nokia | - |
GP‑023138 | Addition of DTM Multislot Class Indication | Nokia | - |
GP‑023139 | Addition of Additional DBPSCH in DTM downlink | Nokia | - |
GP‑023140 | Addition of Additional DBPSCH in DTM downlink | Nokia | - |
GP‑023141 | Mapping of SI13alt message on BCCH | Nokia | - |
GP‑023142 | Applicability Table for GMM Test Cases | Motorola | - |
GP‑023143 | EOTD MOLR Autonomous Location | Motorola | - |
GP‑023144 | EOTD MOLR Positioning Measurement | - | - |
GP‑023145 | Applicability Table for E-OTD MOLR test cases | Motorola | - |
GP‑023146 | 51.010-1-1214 Correction to test cases 42.3.1.2.2 and 42.3.1.2.3 | Motorola | - |
GP‑023147 | 3GPP TR 25.992 v1.1.0: "Multimedia Broadcast/Multicast Service (MBMS); UTRAN/GERAN requirements" | WI Editor (Nokia) | - |
GP‑023148 | 3GPP TS 25.346 1.1.0: "Introduction of Multimedia Broadcast/Multicast Service (MBMS) in the Radio Access Network (Stage-2)" | WI Editor (Nokia) | - |
GP‑023149 | - | - | - |
GP‑023150 | Security enhancements for GERAN | SA3 | - |
GP‑023151 | 51.010-1-1215 Error in test case 15.6 | Ericsson | - |
GP‑023152 | - | Ericsson | - |
GP‑023153 | - | Siemens | - |
GP‑023154 | - | - | - |
GP‑023155 | 51.010-1-1216 TC 52.3.1.1.4 Use of Packet Uplink Assignment instead of Packet Timeslot reconfigure | Setcom | - |
GP‑023156 | 51.010-1-1217 TC 53.1.1.14 Addition of optional steps to cater to MS reaction time | Setcom | - |
GP‑023157 | 51.010-1-1218 TC 51.1.4.2 Modification to test steps 5, 6 and 7 to align with test purpose | Setcom | - |
GP‑023158 | - | - | - |
GP‑023159 | Principles of Iu mode establishment causes | Siemens | - |
GP‑023160 | Section 8 - Multiple TBFs for Iu mode only | Siemens | - |
GP‑023161 | Section 8 - Clean-up for Multiple TBFs for Iu mode only | - | - |
GP‑023162 | Multiple TBF and Iu support in section 9. | - | - |
GP‑023163 | - | - | - |
GP‑023164 | - | - | - |
GP‑023165 | - | - | - |
GP‑023166 | - | - | - |
GP‑023167 | GPRS attach / rejected / GPRS services not allowed in this PLMN | Motorola | - |
GP‑023168 | GPRS detach / rejected / GPRS services not allowed in this PLMN | Motorola | - |
GP‑023170 | - | Siemens | - |
GP‑023171 | - | Siemens | - |
GP‑023172 | - | - | - |
GP‑023173 | 51.010-1-1221 Section 20.22 GPRS Cell Selection and Reselection | - | - |
GP‑023174 | 51.010-1-1222 Section 14.16.1 Minimum Input level for Reference Performance | Rohde & Schwarz | - |
GP‑023175 | 44.2.3.2.5 Combined routing area updating/rejected/roaming not allowed in this location area | - | - |
GP‑023176 | 44.2.3.2.4 Combined routing area updating / rejected / PLMN not allowed | Ericsson | - |
GP‑023177 | Clarification to cell selection parameter acquisition from neighbour cells while in packet idle mode in a cell witout PCCCH | ALCATEL | - |
GP‑023178 | Clarification to cells reselection list to use for an MS autonomous cell reselection | ALCATEL | - |
GP‑023179 | Clarification to GPRS cell reselection use in Packet Measurement Order message | - | - |
GP‑023180 | Clarification to GPRS cell reselection use in Packet Measurement Order message | - | - |
GP‑023182 | Clarification to the reallocation of uplink TBF in order to send upper layer PDUs at higher Radio Priority than the established TBF | ALCATEL | - |
GP‑023183 | Clarification to the condition of sending PACKET CONTROL ACKNOWLEDGEMENT message in case of RLC/MAC control message segmentation | ALCATEL | - |
GP‑023184 | Clarification to the handling of T3192 value set to 0 | ALCATEL | - |
GP‑023185 | Clarification of the presence of optional parameters in cell selection parameters broadcast on PBCCH | - | - |
GP‑023186 | Timer T3192 expiry handling | Alcatel | - |
GP‑023187 | d)The SS counts the number of blocks transmitted with current coding scheme and the number of these blocks not acknowledged based on the content of the Ack/Nack Description information element (see 3GPP TS 04.60, subclause 12.3) in the Packet Downlin | Nokia | - |
GP‑023188 | 51.010-1-1226 Clarification on test procedure for GPRS USF-sensitivity | Nokia | - |
GP‑023189 | 51.010-1-1227 Addition of missing parameters for DL Power Control and clarification on the test requirement in 14.18.1 | Nokia | - |
GP‑023190 | 51.010-1-1228 Clarification on required power level in 13.16.3, step b) | Work item code:?[H11] | - |
GP‑023191 | 51.010-1-1229 Clarification on required power level in 13.17.4, step b) | Nokia | - |
GP‑023192 | 51.010-1-1230 Editorial correction on default input level in sect.40 | - | - |
GP‑023193 | - | - | - |
GP‑023194 | RX_QUAL value clarification | ALCATEL | - |
GP‑023197 | Correction and cleanup of inter-system handover procedures | Nortel Networks | - |
GP‑023198 | Wrong references to MS Radio Access Capability | Nortel Networks | - |
GP‑023199 | Wrong references to MS Radio Access Capability | Nortel Networks | - |
GP‑023200 | Wrong references to MS Radio Access Capability | Nortel Networks | - |
GP‑023201 | Multiple TBF Timeslot Reconfigure message for A/Gb & Iu mode | Siemens | - |
GP‑023202 | MS Conformance Testing of Dual Transfer Mode | - | - |
GP‑023203 | Removal of DTM from the list of missing tests. | Vodafone Group | - |
GP‑023204 | Addition of PACKET TIMESLOT RECONFIGURE message to Section 40 | Vodafone Group | - |
GP‑023205 | Information on Acceleration of BER based receiver tests | Rohde & Schwarz | - |
GP‑023207 | - | - | - |
GP‑023208 | 51.010-2-095 Error in Conditional Expression C53 in Table B.1 | NEC | - |
GP‑023209 | - | Ericsson, Nokia | - |
GP‑023210 | Removal of clause 9.4.4 | Ericsson, Nokia | - |
GP‑023211 | Removal of clause 9.4.4 | Ericsson, Nokia | - |
GP‑023212 | Removal of clause 9.4.4 | Ericsson, Nokia | - |
GP‑023213 | - | - | - |
GP‑023214 | How to create CRs using this form: | Nokia, Motorola | - |
GP‑023215 | Conversational QoS over Gb | Nokia, Orange, AWS, Sonera | - |
GP‑023216 | - | Rapporteur | - |
GP‑023217 | REPLY LS on proposed TR for the architectural aspects of early UE handling | RAN WG3 | - |
GP‑023218 | 51.010-1 Section 40: Wrong HCS PRIORITY CLASS value for the near cell in PSI 3 and 3bis messages. | - | - |
GP‑023219 | - | - | - |
GP‑023220 | Modifications to allow introduction of the 11.10-4 R99 Test Spec | - | - |
GP‑023221 | Inter-SGSN RAU Macro | Ericsson | - |
GP‑023222 | 44.2.3.2.5 Combined routing area updating/rejected/roaming not allowed in this location area | - | - |
GP‑023223 | - | - | - |
GP‑023224 | - | - | - |
GP‑023225 | Conversational Services on Gb Interface | Orange, Sonera, AWS | - |
GP‑023226 | LS on Draft TR 26.937 "RTP Usage Model" for PSS | SA4 | - |
GP‑023227 | Proposal for the evolution of the GCF GPRS Recommended Set | GCF AdHoc Attendees: | - |
GP‑023228 | LS on HSCSD in GERAN Iu mode | TSG CN WG1 | - |
GP‑023229 | Potential transition problem when switching MSC revision from R98 to R99 | TSG CN1 | - |
GP‑023230 | [D1]Reply LS on CS data services for GERAN Iu-mode | CN4 | - |
GP‑023231 | Uplink TDOA location determination for GSM/GPRS | - | - |
GP‑023232 | 44.2.3.2.5 - Test purpose 1 - Cell re-selection due to power levels | Anite Telecoms | - |
GP‑023233 | 51.010-1-1235 Changing the wait time in steps 5, 10 and 15 of the Expected Sequence for clause 51.1.1.4 - RR / Paging / on PCCCH for EGPRS service / paging reorganisation successful | Nokia | - |
GP‑023234 | 51.010-1-1236 Changing the wait time in steps 5, 10 and 15 of the Expected Sequence for clause 41.1.1.4 - RR / Paging / on PCCCH for GPRS service / paging reorganisation successful | Nokia | - |
GP‑023235 | Work Item Description for Support of Conversational Services in A/Gb mode via the PS domain | Alcatel, Ericsson, Nortel, Siemens, T-Mobile, Vodafone Group Plc | - |
GP‑023236 | MS Conformance Testing of Dual Transfer Mode | - | WID |
GP‑023237 | - | - | - |
GP‑023238 | REPLY:LS on Draft TR 26.937 "RTP Usage Model" for PSS | GERAN | - |
GP‑023239 | Response LS on “Proposal for the evolution of the GCF GPRS Recommended Set” | TSG GERAN | - |
GP‑023240 | Use of Cause #14 in networks using NMO I | Motorola | - |
GP‑023241 | Use of Cause #14 in networks using NMO I | Motorola | - |
GP‑023242 | Two-message packet downlink assignment on CCCH | - | - |
GP‑023243 | Two-message packet downlink assignment on CCCH | - | - |
GP‑023244 | [H8] Enter the source of the CR. This is either (a) one or several companies or, (b) if a (sub)working group has already reviewed and agreed the CR, then list the group as the source. | Motorola | - |
GP‑023245 | [DRAFT][D1] LS on use of Allocation/Retention Priority | 3GPP TSG GERAN WG2 | - |
GP‑023246 | Wrong references to MS Radio Access Capability | Nortel Networks | - |
GP‑023247 | Wrong references to MS Radio Access Capability | Nortel Networks | - |
GP‑023248 | Layer 2 errors | Nokia | - |
GP‑023249 | Introduction of DBPSCH Message classification | Nokia | - |
GP‑023250 | Section 8 - Clean-up for Multiple TBFs for Iu mode only | - | - |
GP‑023251 | Multiple TBF and Iu support in section 9. | - | - |
GP‑023252 | Multiple TBF Timeslot Reconfigure message for A/Gb & Iu mode | Siemens | - |
GP‑023253 | Clarification on 51-multiframe structure and DBPSCH: inclusion of DBPSCH/S | Nokia | - |
GP‑023254 | Implementation of new frequency ranges | EP TETRA WG4 | - |
GP‑023255 | Definition of RLC Buffer | Nokia | - |
GP‑023256 | Clarification to GPRS cell reselection use in Packet Measurement Order message | - | - |
GP‑023257 | Clarification to the reallocation of uplink TBF in order to send upper layer PDUs at higher Radio Priority than the established TBF | ALCATEL | - |
GP‑023258 | Clarification to the handling of T3192 value set to 0 | ALCATEL | - |
GP‑023259 | Clarification of the presence of optional parameters in cell selection parameters broadcast on PBCCH | - | - |
GP‑023260 | CS data services for GERAN Iu Mode | Siemens | - |
GP‑023261 | Correction and cleanup of inter-system handover procedures | Nortel Networks | - |
GP‑023262 | LS on " High multislot classes for type 1 mobiles " | TSG GERAN | - |
GP‑023263 | Corrections to Radio Resource Management procedures | Source:?[H10] | - |
GP‑023264 | Alignment UTRAN/GERAN on Iu mode procedures | - | - |
GP‑023265 | Correction of Multislot Capability Indication | Nokia | - |
GP‑023266 | LS on Coding of Maximum Offset and Included Angle | Siemens | - |
GP‑023267 | - | - | - |
GP‑023268 | - | Siemens | - |
GP‑023269 | - | Siemens | - |
GP‑023270 | [DRAFT][D1] LS on MBMS requirements | TSG GERAN WG2 | - |
GP‑023271 | 51.010-1-1088 r1 TC 41.3.1.2 correction of some steps | Setcom | - |
GP‑023272 | 51.010-1-1072 r1 TC 41.3.5.2 correction of some steps | Setcom | - |
GP‑023273 | 51.010-1-1149 r1 42.3.1.1.4 Insufficient Reaction time permitted for the MS for the DownLink Assignment in step 2 | Anite Telecoms | - |
GP‑023274 | 51.010-1-1170 r152.3.1.1.4 Insufficient Reaction time permitted for the MS for the DownLink Assignment in step 2 | Anite Telecoms | - |
GP‑023275 | 51.010-1-1171 r152.4.3.2.1 Incorect step numbering in the and missing information about USF addressing the MS in the Test steps comments | Anite Telecoms | - |
GP‑023276 | 51.010-1-1210 r1 42.1.2.2.6 new testcase added and testcase 42.1.2.1.8.2.3 deleted | Setcom | - |
GP‑023277 | 51.010-1-1077 r1 Testcase 52.1.2.1.8.2.3 deleted and new Testcase 52.1.2.2.6 added | Setcom | - |
GP‑023278 | 51.010-1-1197 r1Section 50 EGPRS Default Conditions, Message Contents and Macros | Rohde & Schwarz | - |
GP‑023279 | 51.010-1-1135r1xxx S50 EGPRS Default Conditions, Message Contents and Macros for the Higher Layer Testcases | - | - |
GP‑023280 | 51.010-1-1169 r1 51.3.5.2 Correction of test procedure and expected sequence in order to clarify use of multiple timeslots | Setcom | - |
GP‑023281 | 51.010-1-1082 r1 Testcase 53.1.1.4 should be done in transfer mode. | Setcom | - |
GP‑023282 | 51.010-1-1087 r1 TC 51.3.1.2 correction of some steps | Setcom | - |
GP‑023283 | 51.010-1-1098 r1 TC 51.2.3.8 One phase packet access / Contention resolution / 4 access repetition attempts | Setcom | - |
GP‑023284 | 51.010-1-1215 r1 Error in test case 15.6 | Ericsson | - |
GP‑023285 | 51.010-1-1079 r1 TC 53.1.1.20 Addition of optional steps to cater to MS reaction time | - | - |
GP‑023286 | 51.010-1-1078 r1 TC 53.1.1.21 Addition of optional steps to cater to MS reaction time | Setcom | - |
GP‑023287 | 51.010-1-1085 r1 TC 53.1.1.3 Addition of optional steps to cater to MS reaction time | Setcom | - |
GP‑023288 | 51.010-1-1095 r1 TC 53.1.1.11 Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '0'/ Negative Acknowledgement | Setcom | - |
GP‑023289 | 51.010-1-1102 r1 New testcase 53.1.1.23 Acknowledged Mode/ Uplink TBF/ Interpretation of Compressed Bitmap | Setcom | - |
GP‑023290 | CR.51.010-1-1105 TC 53.1.2.13 Acknowledged Mode/ Downlink TBF/ IR Operation | Siemens AG | - |
GP‑023291 | SIM Application Toolkit Test Specification | TSG GERAN | - |
GP‑023292 | - | - | - |
GP‑023293 | This Specification is provided for future development work within 3GPP only. The Organizational Partners accept no liability for any use of this Specification. | TSG-T3 | - |
GP‑023294 | Modifications to allow introduction of the 11.10-4 R99 Test Spec | - | - |
GP‑023295 | Add AMR half rate optional applicability | Racal Instruments | - |
GP‑023296 | 26.16.6 - Restricting repetition of procedure to FR and HR speech version 3. | Anite Telecom Ltd. | - |
GP‑023297 | Change of cell between two LAs in idle mode / RAU completes first | Vodafone Group | - |
GP‑023298 | Change of cell between two LAs in idle mode / LAU completes first / SS releases channel | Vodafone Group | - |
GP‑023299 | Change of cell between two LAs in idle mode / LAU completes first / SS maintains channel | Vodafone Group | - |
GP‑023300 | Change of routeing area whilst in dedicated mode | Vodafone Group | - |
GP‑023301 | 26.16.4 and 26.16.4a To correct the specification of speech versions supported by MS. | Anite Telecom Ltd. | - |
GP‑023302 | Change of cell between two LAs in idle mode / RAU completes first | Vodafone Group | - |
GP‑023303 | Change of cell between two LAs in idle mode / LAU completes first / SS releases channel | Vodafone Group | - |
GP‑023304 | Change of cell between two LAs in idle mode / LAU completes first / SS maintains channel | Vodafone Group | - |
GP‑023305 | Corrections to WG5 DTM Test Cases | - | - |
GP‑023306 | Intra frequency reallocation of CS resources / DTM Assignment Command | Source:?[H10] | - |
GP‑023307 | Inter frequency reallocation of CS resources / DTM Assignment Command | Source:?[H10] | - |
GP‑023308 | Mobile originating CS release | Vodafone Group | - |
GP‑023309 | Network originating CS release | Vodafone Group | - |
GP‑023310 | Handover to different routeing area whilst in DM / Performed on main DCCH / RAU complete before CS release | Vodafone Group | - |
GP‑023311 | Clarification to cell selection parameter acquisition from neighbour cells while in packet idle mode in a cell witout PCCCH | ALCATEL | - |
GP‑023312 | Clarification to cells reselection list to use for an MS autonomous cell reselection | ALCATEL | - |
GP‑023313 | Clarification to GPRS cell reselection use in Packet Measurement Order message | - | - |
GP‑023314 | RX_QUAL value clarification | ALCATEL | - |
GP‑023315 | Clarifications to inter-RAT cell reselection algorithm and procedure | Motorola | - |
GP‑023316 | Uplink TDOA location determination for GSM/GPRS | - | - |
GP‑023318 | Implementation of new frequency ranges into 43.022 | EP TETRA WG4 | - |
GP‑023319 | Implementation of new frequency ranges into 45.005 | - | - |
GP‑023320 | Implementation of new frequency ranges into 45.050 | - | - |
GP‑023321 | Implementation of new frequency ranges into 45.001 | EP TETRA WG4 | - |
GP‑023322 | New test loops for AMR-NB | Motorola | - |
GP‑023323 | LS on ECSD and Ciphering | TSG GERAN | - |
GP‑023324 | LS on FDD/GSM co-existence | TSG RAN WG4 | - |
GP‑023325 | 51.010-1-1134 r1 53.1.1.16 Acknowledged Mode/ Uplink TBF/ Retransmission/ Padding in the Data Field | Setcom | - |
GP‑023326 | 51.010-1-1184 r1 Setting pre-emptive bit to 0 in step 3 in clause 53.1.1.10 - Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '0'/ PENDING_ACK Blocks | Nokia | - |
GP‑023327 | 51.010-1-1187 r1 Changing of Window Size in the Expected Sequence in order to avoid expiry of T3182 for clause 53.1.1.4 - Acknowledged Mode/ Uplink TBF/ Window Size/ Assigned Value | Nokia | - |
GP‑023328 | 51.010-1-1217 r1 TC 53.1.1.14 Addition of optional steps to cater to MS reaction time | Setcom | - |
GP‑023329 | 51.010-1-1214 r1 Correction to test cases 42.3.1.2.2 and 42.3.1.2.3 | Motorola | - |
GP‑023330 | 51.010-1-1195 r1 Section 20.22.9 Cell reselection when the best cell does not support GPRS | Rohde & Schwarz | - |
GP‑023331 | 51.010-1-1143 r1 22.3 remove unnecessary constraint in initial conditions | Anite Telecoms | - |
GP‑023332 | 51.010-1-1173 r1 Enhanced Measurement Report, All neighbors present | - | - |
GP‑023333 | 51.010-1-1228 r1 Clarification on required power level in 13.16.3, step b) | Nokia | - |
GP‑023334 | 51.010-2-095 r1 Error in Conditional Expression C53 in Table B.1 | NEC | - |
GP‑023335 | 51.010-2-083 r1 Addition of WG4 DTM Conformance Tests to the Applicability table (Rel-5) | - | - |
GP‑023336 | 51.010-1-1183 r1 Alignment of GERAN#7 CR GP-012786 and correction in Specific Message Content for step 4 in clauses 52.5.5.1, 52.5.5.2 and 52.5.5.3 - Downlink Transfer / Reestablishment | - | - |
GP‑023337 | New EGPRS test cases for verification of correct Access Type when EGPRS PACKET CHANNEL REQUEST is supported and when it is not supported in the cell. Clauses 52.6 - EGPRS Packet Access for signalling | - | - |
GP‑023338 | 51.010-2-097 Addition of 4 new EGPRS test cases. | - | - |
GP‑023339 | 51.010-1-1216 r1 TC 52.3.1.1.4 Use of Packet Uplink Assignment instead of Packet Timeslot reconfigure | Setcom | - |
GP‑023340 | 51010-1-1109 r1 TBF release / Uplink / Normal / Network initiated / Whilst in DTM (Rel-5) | Vodafone Group | - |
GP‑023341 | 51010-1-1111 r1 Uplink TBF establishment with no reallocation of CS resources / Abnormal cases / Inter System to UTRAN Handover Command (Rel-5) | - | - |
GP‑023342 | 51010-1-1116 r1 Power control in exclusive allocation mode (Rel-5) | Vodafone Group | - |
GP‑023343 | 51.010-1-1211 Extended Uplink TBF Mode (New Test Cases) | Ericsson | - |
GP‑023344 | 51.010-1-1133 TC 14.18.7 Incremental Redundancy Performance | Siemens AG | - |
GP‑023345 | 51.010-1-1167 51.3.1.3 The order of the optional steps A6 and A12 is incorrect. | Anite Telecoms | - |
GP‑023346 | Handover to different routeing area whilst in DM / Performed on main DCCH / CS release before RAU complete | Vodafone Group | - |
GP‑023347 | PDP Context Activation / Performed on main DCCH and TBFs | Vodafone Group | - |
GP‑023348 | Handover to UTRAN while in DTM | - | - |
GP‑023349 | 51.010-1 Section 40.5 Test PDP contexts | - | - |
GP‑023350 | GPRS attach / rejected / GPRS services not allowed in this PLMN | Motorola | - |
GP‑023351 | GPRS detach / rejected / GPRS services not allowed in this PLMN | Motorola | - |
GP‑023352 | 46.1.2.2.1.4 New test step 5: Reception of an UI frame | Anite Telecoms | - |
GP‑023353 | 46.1.2.2.2.3 Correction of N(R) and N(S) values and removal of steps 12 and 13 | Anite Telecoms | - |
GP‑023354 | 46.1.2.2.2.4 Removal of step 5 and correction of test procedure. | Anite Telecoms | - |
GP‑023355 | 46.1.2.2.3.2 Correction of test procedure and clarify ambiguity of sending RR in step 6 | Anite Telecoms | - |
GP‑023356 | Principles of Iu mode establishment causes | Siemens | - |
GP‑023357 | - | TSG GERAN WG2 | - |
GP‑023358 | Liaison Statement on the addition of frequency ranges | TSG GERAN | - |
GP‑023359 | - | Siemens | - |
GP‑023360 | - | - | - |
GP‑023361 | - | TSG GERAN WG2 | - |
GP‑023362 | [DRAFT][D1] LS on MBMS requirements | TSG GERAN WG2 | - |
GP‑023363 | Coding of Maximum Offset and Included Angle | 3GPP TSG GERAN | - |
GP‑023364 | Two-message packet downlink assignment on CCCH | - | - |
GP‑023365 | Multiple TBF and Iu support in section 9. | - | - |
GP‑023366 | Definition of RLC Buffer | Nokia | - |
GP‑023367 | Clarification to the handling of T3192 value set to 0 | ALCATEL | - |
GP‑023368 | LS on MBMS requirements | TSG GERAN WG2 | - |
GP‑023369 | Reply LS on Architectural Impacts of Early UE Handling | Gp | - |
GP‑023370 | Response LS on “Proposal for the evolution of the GCF GPRS Recommended Set” | TSG GERAN | - |
GP‑023371 | REPLY:LS on Draft TR 26.937 "RTP Usage Model" for PSS | GERAN | - |
GP‑023372 | Liaison Statement on the addition of frequency ranges | GERAN2 | - |
GP‑023373 | - | Siemens | - |
GP‑023374 | - | - | - |
GP‑023375 | - | - | - |
GP‑023376 | - | - | - |
GP‑023381 | 46.1.2.7.6 – Correction of testing time and macro direction in step 14) | Anite Telecoms | - |
GP‑023382 | 51.010-1 Test cases 46.2.2.1.4 – Modification of the size of uplink data to transfer | Setcom | - |
GP‑023383 | 44.2.3.2.5 Combined routing area updating/rejected/roaming not allowed in this location area | Ericsson | - |
GP‑023384 | 51.010-1 Section 40: Wrong HCS PRIORITY CLASS value for the near cell in PSI 3 and 3bis messages. | - | - |
GP‑023385 | Introduction of UTRAN Classmark Change test cases in section 26.6.11 | - | - |
GP‑023386 | Basic Self Location in Dedicated Mode Test Case for Assisted GPS | Qualcomm, Inc. | - |
GP‑023387 | Transfer to 3rd Party Test Case for Assisted GPS | Qualcomm, Inc. | - |
GP‑023388 | Applicability Table Update | Qualcomm, Inc. | - |
GP‑023389 | EOTD MOLR Positioning Measurement | - | - |
GP‑023390 | Applicability Table for E-OTD MOLR test cases | Motorola | - |
GP‑023391 | Introduction of UTRAN Classmark Change test cases in section 26.6.11 | Ericsson | - |
GP‑023392 | Modifications to allow introduction of the 11.10-4 R99 Test Spec | - | - |
GP‑023393 | Applicability Table for E-OTD MOLR test cases | Motorola | - |
GP‑023394 | 26.16.4 and 26.16.4a To correct the specification of speech versions supported by MS. | Anite Telecom Ltd. | - |
GP‑023395 | - | - | - |
GP‑023396 | - | - | - |
GP‑023400 | Single Antenna Receiver Interference Cancellation (SAIC) | - | WID |
GP‑023401 | - | Rapporteur | - |
GP‑023402 | LS on ECSD and Ciphering | TSG GERAN | - |
GP‑023403 | Clarification to cell selection parameter acquisition from neighbour cells while in packet idle mode in a cell witout PCCCH | ALCATEL | - |
GP‑023404 | Single Antenna Receiver Interference Cancellation (SAIC) | - | - |
GP‑023405 | Correction for SBPSCH in Iu Mode DTM | Nokia | - |
GP‑023406 | RX_QUAL value clarification | ALCATEL | - |
GP‑023407 | NOTE:The higher levels of vibration may induce undue physical stress in to equipment after a prolonged series of tests. The testing body should only vibrate the equipment during the RF measurement process. | Ericsson | - |
GP‑023408 | NOTE:The higher levels of vibration may induce undue physical stress in to equipment after a prolonged series of tests. The testing body should only vibrate the equipment during the RF measurement process. | Ericsson | - |
GP‑023409 | 3)To verify that the frequency error during the active part of the time slot does not exceed the specified limits under normal and extreme test conditions and when subjected to vibration. | Ericsson | - |
GP‑023410 | 3)To verify that the frequency error during the active part of the time slot does not exceed the specified limits under normal and extreme test conditions and when subjected to vibration. | Ericsson | - |
GP‑023411 | Introduction of tests and requirements for WB-AMR on GMSK modulated channels | - | - |
GP‑023412 | Introduction of tests and requirements for AMR and WB-AMR on 8-PSK modulated channels | - | - |
GP‑023413 | Correction of requirements for PDTCH/CS-4 C/Ic | Ericsson | - |
GP‑023414 | Correction of requirements for PDTCH/CS-4 C/Ic | Ericsson | - |
GP‑023415 | Correction of requirements for PDTCH/CS-4 C/Ic | - | - |
GP‑023416 | 51.010-1-1211 r2 Extended Uplink TBF Mode (New Test Cases) | Ericsson | - |
GP‑023417 | Work Plan for DTM Test Cases | Vodafone Group | - |
GP‑023418 | 51.010-1-1135 S50 EGPRS Default Conditions, Message Contents and Macros for the Higher Layer Testcases | - | - |
GP‑023419 | 51.010-1-1133 TC 14.18.7 Incremental Redundancy Performance | Siemens AG | - |
GP‑023420 | CR.51.010-1-1105 TC 53.1.2.13 Acknowledged Mode/ Downlink TBF/ IR Operation | Siemens AG | - |
GP‑023421 | Rice Doppler Spectrum definition | - | - |
GP‑023422 | Correction of antenna Feeder loss compensator requirements | Nokia | - |
GP‑023423 | Applicability of broadcast parameters versus default point-to-point messages | - | - |
GP‑023424 | Seamless support of streaming services in A/Gb mode / MS Conformance testing | - | WID |
GP‑023425 | How to create CRs using this form: | Nokia, Motorola | - |
GP‑023426 | LS on " High multislot classes for type 1 mobiles " | TSG GERAN | - |
GP‑023427 | - | Ericsson, Nokia & Siemens | - |
GP‑023428 | Draft Report of TSG GERAN WG1 meeting #12, version 0.0.1 | Secretary TSG GERAN WG1, Paolo Usai | - |
GP‑023429 | - | - | - |
GP‑023430 | - | - | - |
GP‑023431 | Proposed way forward on the Conversational QoS over GERAN A/Gb | Nokia, Orange, AWS, Sonera | - |
GP‑023432 | How to create CRs using this form: | Nokia, Motorola | - |
GP‑023433 | LS on " High multislot classes for type 1 mobiles " | TSG GERAN | - |
GP‑023434 | - | - | - |
GP‑023435 | Coding of Maximum Offset and Included Angle | 3GPP TSG GERAN | - |
GP‑023436 | - | Rapporteur | - |
GP‑023437 | REPLY:LS on Draft TR 26.937 "RTP Usage Model" for PSS | GERAN | - |
GP‑023438 | Update of CT1 Terms of Reference (ToR) | CT1 Convenor | - |
GP‑030001 | - | - | - |
GP‑030002 | - | - | - |
GP‑030003 | - | - | - |
GP‑030004 | - | - | - |
GP‑030005 | - | - | - |
GP‑030006 | SAIC System Aspects | Motorola | - |
GP‑030008 | Correction in EOTD Test Case 70.2.1 | Racal Instruments Ltd | - |
GP‑030009 | Correction in EOTD Test Case 70.2.3 | Racal Instruments Ltd | - |
GP‑030010 | Correction in EOTD Test Case 70.2.4 | Racal Instruments Ltd | - |
GP‑030011 | - | - | - |
GP‑030012 | - | - | - |
GP‑030013 | BS_CV_MAX value, as specified in section 50, are used instead for the EGPRS RLC tests in clause 53.x - Test of EGPRS Radio Link Control (RLC) Protocol. | Nokia & Setcom | - |
GP‑030014 | Applicability change of clause “30 Speech teleservices” test cases. | Nokia | - |
GP‑030015 | Applicability of “Speech teleservices” test cases in Annex B. | Nokia | - |
GP‑030016 | CR 44.2.3.2.5 Combined routing area updating / rejected / roaming not allowed in this location area | Siemens AG | - |
GP‑030017 | 41.2.2.4 Initiation of the packet access procedure / timer T3146 | Anite Telecoms | - |
GP‑030018 | 42.1.2.1.10.1 - Clarification of conformance requirements, and consequent alterations to test procedure. | Anite Telecoms | - |
GP‑030019 | 42.1.2.2.3 - Conflict between Specific Message Contents in Test Case and section 40 defaults | Anite Telecoms | - |
GP‑030021 | 51.2.2.4 Initiation of the packet access procedure / timer T3146 | Anite Telecoms | - |
GP‑030022 | 14.7 - Relaxation of requirements for blocking signal for GSM 850 in range > 914 MHz to 12,75 GHz | Anite | - |
GP‑030023 | 53.1.1.16 - Deletion of redundant steps and correction of step references | Anite Telecoms | - |
GP‑030024 | 42.3.3.1.1 – Test Step added, BS_CV_MAX set to 1 | Anite Telecoms | - |
GP‑030025 | 53.1.1.20 - Core spec references corrected | Anite Telecoms | - |
GP‑030027 | 53.1.1.21 - Sequence corrected to allow for all types of MCS switching, core spec references corrected | Anite Telecoms | - |
GP‑030028 | 42.3.1.1.9 - Multiple corrections to initial conditions, expected sequence and specific message contents | Anite Telecoms | - |
GP‑030029 | 46.1.2.5.2 - Correction of test procedure | Anite Telecoms | - |
GP‑030030 | 46.1.2.6.1 – Correction of PDP Context activation in step 5 | Anite Telecoms | - |
GP‑030031 | 52.3.3.1.1 – Test Step added, BS_CV_MAX set to 1 | Anite Telecoms | - |
GP‑030032 | CR 51.010-1-1259 detach type should be specified and release of RR connection added in TC 44.2.2.2.6; | setcom | - |
GP‑030033 | CR 51.010-1-1260 Release of RR connection is needed in TC 44.2.1.1.10; | setcom | - |
GP‑030034 | CR 51.010-1 testcase 52.1.1.1 needs to be done in transfer mode | Setcom | - |
GP‑030035 | CR 51.010-1 Testcase 52.1.2.1.6 needs to be done in transfer mode | Setcom | - |
GP‑030036 | CR 51.010-1 Testcase 52.1.2.1.7 needs to be done in transfer mode | Setcom | - |
GP‑030037 | CR 51.010-1 Addition of new testcases section 42.7 | Setcom | - |
GP‑030038 | CR 51.010-1 Addition of new testcases section 52.7 | Setcom | - |
GP‑030039 | CR 51.010-1 Addition of new testcases section 52.8 | Setcom | - |
GP‑030040 | Inclusion of U-TDOA location method | TruePosition | - |
GP‑030041 | Proposed modification of SMLC-BSS signalling for U-TDOA | TruePosition | - |
GP‑030042 | Proposed modification of BSSAP-LE signalling | TruePosition | - |
GP‑030043 | Enhanced Measurement Report, (400MHz, 700MHz and 850MHz) All neighbors present | Motorola | - |
GP‑030044 | Addition of an Optional and a Conditional step in the Expected Sequence in clause 41.3.1.1 - TBF Release / Uplink / Normal / MS initiated / Acknowledged mode | Anite & Nokia | - |
GP‑030045 | Change of BSN in optional step A16 of the Expected Sequence in clause 43.1.1.6 - Acknowledged mode / Uplink TBF / Decoding of Received Block Bitmap | Nokia | - |
GP‑030047 | Introduction of a AMR-NB Layer 1 In Band Signaling Tests | Cingular Wireless | - |
GP‑030048 | Introduction of a AMR-NB Layer 1 Senstivity Tests with Link Adaptation turned on | Cingular Wireless | - |
GP‑030049 | Introduction of an AMR-NB Layer 1 Test to verify the CMR Generation performances | Cingular Wireless | - |
GP‑030051 | 52.1.2.1.10.1 - Clarification of conformance requirements, and consequent alterations to test procedure. | Anite Telecoms | - |
GP‑030052 | 42.1.3.1.2 - Macro definition fails to allow for PACKET UPLINK DUMMY CONTROL BLOCK | Anite Telecoms | - |
GP‑030053 | 52.1.3.1.2 - Macro definition fails to allow for PACKET UPLINK DUMMY CONTROL BLOCK | Anite Telecoms | - |
GP‑030054 | 42.3.1.2.3 – Mandatory use of two-phase packet access in RLC unacknowledged mode. | Anite | - |
GP‑030055 | 52.3.1.2.3 – Mandatory use of two-phase packet access in RLC unacknowledged mode. | Anite | - |
GP‑030056 | Wrong CR incorporation "Removal of CBQ2" in SI19 rest octets | Siemens AG | - |
GP‑030057 | Correction of CCN support description | Nokia | - |
GP‑030058 | Correction of CCN support description | Nokia | - |
GP‑030059 | Requested access technology types for GSM900 in IA rest octets | Siemens AG | - |
GP‑030060 | Fixed allocation removal correction | Nokia | - |
GP‑030061 | Removal of TBF establishment via dedicated mode, unused IE's | Siemens AG | - |
GP‑030062 | Correction of CCN support description | Nokia | - |
GP‑030063 | Fixed allocation removal correction | Nokia | - |
GP‑030064 | Requested access technology types for GSM900 in IA rest octets | Siemens AG | - |
GP‑030065 | Clarification on deriving the GSM Neighbour Cell list | Siemens AG | - |
GP‑030066 | Removal of TBF establishment via dedicated mode, unused IE's | Siemens AG | - |
GP‑030067 | Omitted bits in Bitmap type reporting structure | Siemens AG | - |
GP‑030068 | Inconsistency between CSN.1 and details of PACKET SI STATUS | Ericsson | - |
GP‑030069 | CSN.1 coding of PSI3-bis | Ericsson | - |
GP‑030070 | Removal of CCN description from PSI3quater | Nokia | - |
GP‑030071 | Wrong Implementation CR 44.060 278r2 (GP-022931) | Nokia | - |
GP‑030072 | Fixed allocation removal correction | Nokia | - |
GP‑030073 | CSN.1 coding of PSI3-bis | Ericsson | - |
GP‑030074 | Inconsistency between CSN.1 and details of PACKET SI STATUS | Ericsson | - |
GP‑030075 | Removal of Iu mode text from §9.1.12b RLC/MAC Control Message reassembly | Nokia | - |
GP‑030076 | Removal of CCN description from PSI3quater | Nokia | - |
GP‑030077 | Requested access technology types for GSM900 in Multiple TBF Uplink Assignment message | Siemens AG | - |
GP‑030078 | Requested access technology types for GSM900 in Multiple TBF Uplink Assignment message | Siemens AG | - |
GP‑030079 | Fixed allocation removal correction | Nokia | - |
GP‑030080 | Undefined MS behaviour in case of undefined EGPRS MCS values | Siemens AG | - |
GP‑030081 | Wrong Implementation CR 44.060 278r2 (GP-022931) | Nokia | - |
GP‑030082 | CSN.1 coding of PSI3-bis | Ericsson | - |
GP‑030083 | Inconsistency between CSN.1 and details of PACKET SI STATUS | Ericsson | - |
GP‑030084 | Removal of Iu mode text from §9.1.12b RLC/MAC Control Message reassembly | Nokia | - |
GP‑030085 | Removal of CCN description from PSI3quater | Nokia | - |
GP‑030086 | Inconsistent definition of Cell_Index_Start_RTD in PSI3ter message | Siemens AG | - |
GP‑030087 | GPRS Mobile Allocation, wrong character in "NF-1" | Siemens AG | - |
GP‑030088 | CR 44.18- Correction CR to 44118vs5.2.0 | Nokia | - |
GP‑030089 | HFN handling in case of Handover and Cell Reselection between UTRAN and GERAN | Nokia | - |
GP‑030090 | CR 44.118- Alignment UTRAN/GERAN on Iu mode procedures | Nokia | - |
GP‑030091 | Correction to RLC/MAC procedures during contention resolution on SBPSCH | Nokia | - |
GP‑030092 | Wrong implementation of CR 44.160 030r1 (GP-022918) | Nokia | - |
GP‑030093 | Removal of the Final Segment bit on DBPSCH (for FACCH, SACCH and SDCCH) | Nokia | - |
GP‑030094 | Correction to abnormal cases for multiple TBF | Siemens | - |
GP‑030095 | MS requirements on simultaneous RLC/MAC transactions and MTBF | Nokia | - |
GP‑030096 | Use and interpretation of RTI | Nokia | - |
GP‑030097 | Correction to PDU Type IE (Rel-5) | Siemens | - |
GP‑030098 | - | Source | - |
GP‑030099 | - | Source | - |
GP‑030100 | - | - | - |
GP‑030101 | CR 51.010-1-1279 Clause 13.16.3, correction of spurious emissions requirements for GPRS MS with allocated channel when transmitting | TTPCom Ltd | - |
GP‑030102 | CR 51.010-1-1280 Clause 13.17.4, correction of spurious emissions requirements for EGPRS MS with allocated channel when transmitting | TTPCom Ltd | - |
GP‑030103 | 51.010-1 Section 34 - Corrections to SMS test case 34.2.9 Multiple SMS mobile originated | Ericsson | - |
GP‑030104 | 51.010-1 Section 44 - Corrections to GMM test case 44.2.3.2.5 Combined routing area updating/rejected/roaming not allowed in this location area | Ericsson | - |
GP‑030105 | Correction in EOTD Test Case 70.2.2 | Racal Instruments Ltd | - |
GP‑030106 | Correction in EOTD Test Case 70.3.1.2 | Racal Instruments Ltd | - |
GP‑030107 | Correction of step 16 of Expected Sequence for clause 51.1.1.4 - RR / Paging / on PCCCH for EGPRS service / paging reorganisation successful. | Nokia | - |
GP‑030108 | Correction on reaction times for RLC Data Blocks for clauses 53.1.1.14 and 53.1.1.17 - Acknowledged Mode / Uplink TBF. | Nokia | - |
GP‑030109 | Correction of step 16 of Expected Sequence for clause 41.1.1.4 - RR / Paging / on PCCCH for GPRS service / paging reorganisation successful. | Nokia | - |
GP‑030110 | Versio-Current | ETSI MCC | - |
GP‑030111 | Inconsistent specification of Iu-mode multislot configurations | AT&T Wireless Services | - |
GP‑030112 | LS on requirement to test non transmission of newly defined IEs in RRC protocol for Early UE handling | TSG RAN | - |
GP‑030113 | Liaison Statement: LCS architecture descriptions for TS23.002 update | SA2 | - |
GP‑030114 | Response to LS on MBMS requirements | RAN WG2-RAN WG3 MBMS ad-hoc. | - |
GP‑030115 | LS on Transmission Aspects for Speech Enabled Services (SES) | 3GPP TSG SA WG4 | - |
GP‑030116 | Reply to LS on | TSG SA WG4 | - |
GP‑030117 | Reply LS on Subscriber and Equipment Trace Impacts | SA5 SWGD | - |
GP‑030118 | Subscriber and Equipment Trace concepts and requirements | SA5 SWGD | - |
GP‑030119 | - | - | - |
GP‑030120 | - | - | - |
GP‑030121 | Correction of test case 12.1.2 in TS 51.010-1 | CETECOM GmbH | - |
GP‑030122 | EGPRS specific additions to Sec 50 | Setcom | - |
GP‑030123 | - | - | - |
GP‑030124 | - | Source:?[H10] | - |
GP‑030125 | Sec 53.1.1.3 - Modification to the usage of Packet Timeslot Reconfigure and window size | Setcom | - |
GP‑030126 | Sec 51.3.1.2 - MS will not re-initiate Packet Access in Step 20 | Setcom | - |
GP‑030127 | Sec 52.5.5.2 - Testcase requires only One Cell | Setcom | - |
GP‑030128 | TC 51.2.3.10-PTCCH Access Bursts content should be 11-bit | Setcom | - |
GP‑030129 | Sec 53.1.1.5 - Addition of optional steps to cater to MS reaction time and correction of BSN expected | Setcom | - |
GP‑030130 | Sec 52.3.1.1.4 - Packet Uplink Ack/Nack shall not be sent on the activated PDCH in Step 30 | Setcom | - |
GP‑030131 | Sec 51.2.2.1 - The Activation of PDP Context need to be done only once. | Setcom | - |
GP‑030132 | Sec 53.1.2.18 - New testcase - Acknowledged Mode/ Downlink TBF/ Retransmission/Padding | Setcom | - |
GP‑030133 | Sec 52.3.3.1.2 - Correction to the PDP contexts activated in expected sequence. | Setcom | - |
GP‑030134 | Sec 51.2.2.3 - Request reference value check should cater for Egprs Packet Channel Request also. | Setcom | - |
GP‑030135 | Sec 53.1.2.3 and 53.1.2.4 - Polling for Egprs Downlink Ack/Nack shall be done before step 5 | Setcom | - |
GP‑030136 | Sec 53.1.1.11 - SS shall acknowledge all data blocks before Step 11 | Setcom | - |
GP‑030137 | CR 51.010-1 Section 20.22.* Clarification of the tables for GPRS cell selection | Rohde & Schwarz | - |
GP‑030138 | CR 51.010-1 Section 20.22.1 GPRS Cell selection and reselection – default paging on PCH | Rohde & Schwarz | - |
GP‑030139 | CR 51.010-1 Section 40 Introduction of R99 to GPRS default conditions | Rohde & Schwarz | - |
GP‑030140 | CR 51.010-1 Annex A7 New annex General rules for statistical testing | Rohde & Schwarz | - |
GP‑030141 | CR 51.010-1 Section 14.1.5 Bad frame indication - TCH/AFS (Speech frame) – Introduction of statistical testing | Rohde & Schwarz | - |
GP‑030142 | CR 51.010-1 Section 14.1.6 Bad frame indication - TCH/AHS – Introduction of statistical testing | Rohde & Schwarz | - |
GP‑030143 | CR 51.010-1 Section 14.2.10 Reference sensitivity - TCH/AFS – Introduction of statistical testing | Rohde & Schwarz | - |
GP‑030144 | CR 51.010-1 Section 14.2.18 Reference sensitivity - TCH/AHS – Introduction of statistical testing | Rohde & Schwarz | - |
GP‑030145 | CR 51.010-1 Section 14.4.8 Co-channel rejection - TCH/AFS – Introduction of statistical testing | Rohde & Schwarz | - |
GP‑030146 | CR 51.010-1 Section 14.4.16 Co-channel rejection - TCH/AHS – Introduction of statistical testing | Rohde & Schwarz | - |
GP‑030147 | CR 51.010-1 Section 14.5.1.2 Adjacent channel rejection – TCH/AFS – Introduction of statistical testing | Rohde & Schwarz | - |
GP‑030148 | CR 51.010-1 Section 14.5.1.3 Adjacent channel rejection – TCH/AHS – Introduction of statistical testing | Rohde & Schwarz | - |
GP‑030149 | Clarification for EGPRS reporting | Nokia | - |
GP‑030150 | Rice doppler spectrum definition | TTPCom, Nokia | - |
GP‑030151 | Continued discussion on output power requirements for multislot uplink allocations | Nokia | - |
GP‑030152 | New test loops for AMR-NB | Motorola, Cingular Wireless, Philips Semiconductors | - |
GP‑030153 | Correction to test cases 52.3.1.2.2 and 52.3.1.2.3 | Anite | - |
GP‑030154 | - | - | - |
GP‑030155 | - | Source:?[H10] | - |
GP‑030156 | Sec 41.3.1.2 - MS will not re-initiate Packet Access in Step 20 | Setcom | - |
GP‑030159 | - | Cingular | - |
GP‑030160 | - | Rapporteur | - |
GP‑030161 | [ | In GERAN A/Gb mode the concept of a dedicated packet channel (i.e. radio res dedicated to one given packet flow only) does not exist. The GPRS capacity (i.e. number of timeslots allocated to packet based services) available is to be shared between al | - |
GP‑030162 | Sec 42.3.1.1.4 - Packet Uplink Ack Nack shall not be sent on the activated PDCH in Step 30 | Setcom | - |
GP‑030163 | Sec 42.3.3.1.2 - Correction to the PDP contexts activated in expected sequence | Setcom | - |
GP‑030164 | Removal of Authentication and Ciphering from LCS Emergency Call Tests | Qualcomm, Inc. | - |
GP‑030165 | Alignment of Test References to Conformance Requirements for LCS MO-LR Tests | Qualcomm, Inc. | - |
GP‑030166 | MO-LR Positioning Measurement for Assisted GPS | Qualcomm, Inc. | - |
GP‑030167 | Update to Applicability Table Indicating Tests for MS-Assisted E-OTD | Qualcomm, Inc. | - |
GP‑030168 | Update to Applicability Table for Assisted GPS MO-LR Tests | Qualcomm, Inc. | - |
GP‑030169 | - | - | - |
GP‑030171 | - | - | - |
GP‑030172 | - | - | - |
GP‑030173 | CR 51.010-1 Section 15.6 GPRS Timing advance and absolute delay | Rohde & Schwarz | - |
GP‑030174 | CR 51.010-1 Section 20.22.2 – Clarification of Test Procedure and Paging Requirements | Rohde & Schwarz | - |
GP‑030175 | CR 51.010-1 Section 20.22.3 – Clarification of Test Procedure and Paging Requirements | Rohde & Schwarz | - |
GP‑030176 | CR 51.010-1 Section 20.22.4 – Clarification of Test Procedure and Paging Requirements | Rohde & Schwarz | - |
GP‑030178 | CR 51.010-1 Section 20.22.9 Clarification of Test Procedure and Paging Requirements | Rohde & Schwarz | - |
GP‑030179 | CR 51.010-1 Section 50 Adaptions due to introduction of R99 to section 40 | Rohde & Schwarz | - |
GP‑030180 | - | - | - |
GP‑030181 | [ | 9.Re Management for MBMS9 | - |
GP‑030182 | - | - | - |
GP‑030183 | - | - | - |
GP‑030184 | - | - | - |
GP‑030185 | - | - | - |
GP‑030186 | - | - | - |
GP‑030187 | - | - | - |
GP‑030188 | Correction of static AMR sensitivity requirements for TCH/AHS | Ericsson | - |
GP‑030189 | Correction of static AMR sensitivity requirements for TCH/AHS | Ericsson | - |
GP‑030190 | Enhanced Power Control (EPC) information in classmark 3 | Ericsson | - |
GP‑030191 | Early Classmark Sending for Enhanced Power Control (EPC) | Ericsson | - |
GP‑030192 | Early Classmark Sending for Enhanced Power Control (EPC) | Ericsson | - |
GP‑030193 | - | Nokia | - |
GP‑030194 | - | Nokia | - |
GP‑030195 | - | Nokia | - |
GP‑030196 | - | Nokia | - |
GP‑030197 | - | Nokia | - |
GP‑030198 | - | Nokia | - |
GP‑030199 | - | - | - |
GP‑030200 | - | Siemens | - |
GP‑030201 | - | Siemens | - |
GP‑030202 | Handling of R99 GPRS Conformance testing | GCF AG | - |
GP‑030203 | Handling of the UTRAN predefined configurations and NAS messages at inter-rat and Inter-mode hanodver in GERAN Iu mode | Nokia | - |
GP‑030204 | Correction CR to 44118vs5.2.0 | Nokia | - |
GP‑030205 | - | - | - |
GP‑030206 | - | - | - |
GP‑030207 | - | - | - |
GP‑030208 | - | - | - |
GP‑030209 | - | - | - |
GP‑030210 | - | - | - |
GP‑030211 | - | - | - |
GP‑030212 | - | - | - |
GP‑030213 | Timing of DTM assignment | Ericsson | - |
GP‑030214 | Timing of DTM assignment | Ericsson | - |
GP‑030215 | Timing of DTM assignment | Ericsson | - |
GP‑030216 | Modification of the abnormal cases in the packet cell change order procedure | certain interval might be required. This could cause unnecessary delay and also a waste of radio res. | - |
GP‑030217 | Packet Cell Change Failure Replacement | Ericsson | - |
GP‑030218 | Packet Cell Change Failure Replacement | Ericsson | - |
GP‑030219 | Coarse Location Positioning Technique | SiRF Technology | - |
GP‑030220 | Multislot configurations for dual transfer mode. | Nokia | - |
GP‑030221 | Multislot configurations for dual transfer mode. | Nokia | - |
GP‑030222 | Multislot configurations for DBPSCH in Iu mode. | Nokia | - |
GP‑030223 | USF Handling on DBPSCH | Nokia | - |
GP‑030224 | Correction to two-phase access with MTBF in Iu mode | Nokia | - |
GP‑030225 | Correction to RLC/MAC procedures during contention resolution on SBSPCH | Nokia | - |
GP‑030226 | Correction to contention resolution at one-phase access on DBPSCH | Nokia | - |
GP‑030227 | Correction to the description of the cause and message to be used upon uplink access in Iu mode | Nokia | - |
GP‑030228 | Wrong Length Indicator in TCH TBF mode | Nokia | - |
GP‑030229 | Wrong Length Indicator in TCH TBF mode | Nokia | - |
GP‑030230 | Wrong Length Indicator in TCH TBF mode | Nokia | - |
GP‑030231 | Correction to Packet Ack/Nack messages | Nokia | - |
GP‑030232 | Correction to Packet Ack/Nack messages | Nokia | - |
GP‑030233 | Correction to MTBF Uplink Assignment message | Nokia | - |
GP‑030234 | Correction to MTBF Uplink Assignment message | Nokia | - |
GP‑030235 | Correction to Mapping of SRBs onto logical channels | Nokia | - |
GP‑030236 | Wrong implementation CR 44.060 263r2 (GP-022924) | Nokia | - |
GP‑030237 | Wrong implementation CR 44.060 263r2 (GP-022924) | Nokia | - |
GP‑030238 | - | - | - |
GP‑030239 | - | - | - |
GP‑030240 | Analysis of multislot class 12 and extended dynamic allocation | On a block-by-block basis, i.e. the network is allowed to switch radio res between downlink and uplink dynamically, as described in GP-022528 §2.2. | - |
GP‑030241 | - | - | - |
GP‑030242 | - | - | - |
GP‑030243 | Enhancement to PFC creation procedure | Alcatel | - |
GP‑030244 | MS behaviour in case of un-successful cell re-selection | Alcatel | - |
GP‑030245 | MS behaviour in case of un-successful cell re-selection | Alcatel | - |
GP‑030246 | MS behaviour in case of un-successful cell re-selection | Alcatel | - |
GP‑030247 | - | - | - |
GP‑030248 | Usage of Allocation and Retention Priority in the BSS | Alcatel | - |
GP‑030249 | Validity of the RBB in EGPRS RLC unacknowledged mode | Alcatel | - |
GP‑030250 | Validity of the RBB in EGPRS RLC unacknowledged mode | Alcatel | - |
GP‑030251 | Validity of the RBB in EGPRS RLC unacknowledged mode | Alcatel | - |
GP‑030252 | Validity of the RBB in EGPRS RLC unacknowledged mode | Alcatel | - |
GP‑030253 | - | - | - |
GP‑030254 | Correction of interruption times for GSM to UTRAN FDD handover | Siemens | - |
GP‑030255 | Correction of interruption times for GSM to UTRAN FDD handover | Siemens | - |
GP‑030256 | Correction of interruption times for GSM to UTRAN FDD handover | Siemens | - |
GP‑030257 | Correction of interruption times for GSM to UTRAN TDD handover | Siemens | - |
GP‑030258 | Correction of interruption times for GSM to UTRAN TDD handover | Siemens | - |
GP‑030259 | Correction of interruption times for GSM to UTRAN TDD handover | Siemens | - |
GP‑030260 | - | - | - |
GP‑030261 | Fixed allocation removal correction | Siemens | - |
GP‑030262 | Handling of FACCH and RATSCCH during AMR DTX (for information only) | Nokia | - |
GP‑030263 | Packet Cell Change Failure Replacement | Ericsson | - |
GP‑030264 | Packet Cell Change Failure Replacement | Ericsson | - |
GP‑030265 | - | - | - |
GP‑030266 | Correction of maximum number of basic physical channels in DTM configuration | Vodafone | - |
GP‑030267 | Correction of maximum number of basic physical channels in DTM configuration | Vodafone | - |
GP‑030268 | Clarification of the inclusion of DTM information in handover from 3G to 2G | Vodafone | - |
GP‑030269 | Clarification of the inclusion of DTM information in handover from 3G to 2G | Vodafone | - |
GP‑030270 | Clarification on the use of basic HR in DTM single slot configuration | Vodafone | - |
GP‑030271 | Clarification on the default value of MAX_LAPDm parameter | Vodafone | - |
GP‑030272 | Clarification on the default value of MAX_LAPDm parameter | Vodafone | - |
GP‑030273 | Support of Multimedia Broadcast Multicast Service (MBMS) in GERAN | Vodafone | - |
GP‑030274 | MS RAC for UMTS only terminal | Nokia | - |
GP‑030275 | Corrections to Fixed Allocation Test Cases | Motorola | - |
GP‑030276 | - | Nokia | - |
GP‑030277 | BEP estimation accuracy for EMR. | Nokia | - |
GP‑030278 | - | - | - |
GP‑030279 | Following abbreviations are used in figure s T_crs = Cell reselection outage time, T_ra = RAU outage time, v = MS speed. | bitrate | - |
GP‑030280 | - | - | - |
GP‑030281 | Proposed extension of the scope of 29.994 | Nokia | - |
GP‑030282 | Handling of the UTRAN predefined configurations and NAS messages at inter-rat and Inter-mode hanodver in GERAN Iu mode | Nokia | - |
GP‑030283 | Correction to abbr. in reference interference performance requirements | Nokia | - |
GP‑030284 | Correction to reference interference performance requirements | Nokia | - |
GP‑030285 | Correction to reference interference performance requirements | Nokia | - |
GP‑030286 | Correction to reference interference performance requirements | Nokia | - |
GP‑030287 | Correction to reference interference performance requirements | Nokia | - |
GP‑030288 | - | - | - |
GP‑030289 | LS on “A5/3 ciphering modes for ECSD” | SA3 | - |
GP‑030290 | LS on Rel 99 and later Emergency calls in case on UE attached to data only network | SA1 | - |
GP‑030291 | LS on QoS for Signalling PDP Context | SA 2 | - |
GP‑030292 | - | - | - |
GP‑030293 | LS on early UE handling | - | - |
GP‑030296 | Response on LS from GERAN on ”Proposal for the evolution of the GCF GPRS Recommended Set” | GCF Steering Group | - |
GP‑030297 | [DRAFT] LCS architecture descriptions for TS23.002 update | TSG GERAN | - |
GP‑030298 | - | - | - |
GP‑030299 | Correction of Specific message content for RELEASE COMPLETE in step 6 of Expected Sequence for clause 31.8.7 - Call restriction supplementary services / Normal operation. | Nokia | - |
GP‑030300 | Correction of step 5 of Expected Sequence for clause 44.2.3.1.7 - Routing area updating / abnormal cases / change of cell during routing area updating procedure. | Nokia | - |
GP‑030301 | CR 51.010-1 Section 20.22.1 GPRS Cell selection and reselection – default paging on PCH | Rohde & Schwarz | - |
GP‑030302 | Validity of the RBB in EGPRS RLC unacknowledged mode | Alcatel | - |
GP‑030303 | Early Classmark Sending for Enhanced Power Control (EPC) | Ericsson | - |
GP‑030304 | Early Classmark Sending for Enhanced Power Control (EPC) | Ericsson | - |
GP‑030305 | Handling of the UTRAN predefined configurations and NAS messages at inter-rat and Inter-mode hanodver in GERAN Iu mode | Nokia | - |
GP‑030306 | Correction CR to 44118vs5.2.0 | Nokia | - |
GP‑030307 | Correction to the description of the cause and message to be used upon uplink access in Iu mode | Nokia | - |
GP‑030308 | Correction to contention resolution at one-phase access on DBPSCH | Nokia | - |
GP‑030309 | Wrong Length Indicator in TCH TBF mode | Nokia | - |
GP‑030310 | Wrong Length Indicator in TCH TBF mode | Nokia | - |
GP‑030311 | Correction to two-phase access with MTBF in Iu mode | Nokia | - |
GP‑030312 | Correction to MTBF Uplink Assignment message | Nokia | - |
GP‑030313 | Correction to MTBF Uplink Assignment message | Nokia | - |
GP‑030314 | Wrong implementation CR 44.060 263r2 (GP-022924) | Nokia | - |
GP‑030315 | Clarification on the default value of MAX_LAPDm parameter | Vodafone | - |
GP‑030316 | Clarification on the default value of MAX_LAPDm parameter | Vodafone | - |
GP‑030317 | Barred cell due to network authentication failure | Vodafone | - |
GP‑030318 | Barred cell due to network authentication failure | Vodafone | - |
GP‑030319 | Barred cell due to network authentication failure | Vodafone | - |
GP‑030320 | - | - | - |
GP‑030321 | - | - | - |
GP‑030322 | [DRAFT] LS on terminal and network revision interoperability problems | 3GPP TSG GERAN | - |
GP‑030323 | - | - | - |
GP‑030324 | MS RAC in PACKET RESOURCE REQUEST during one phase access for MS RAC acquisition within an EGPRS TBF. | - | - |
GP‑030325 | MS behaviour in case of un-successful cell re-selection | Alcatel | - |
GP‑030326 | MS behaviour in case of un-successful cell re-selection | Alcatel | - |
GP‑030327 | MS behaviour in case of un-successful cell re-selection | Alcatel | - |
GP‑030328 | Usage of Allocation and Retention Priority in the BSS | Alcatel | - |
GP‑030329 | Correction to Mapping of SRBs onto logical channels | Nokia | - |
GP‑030330 | Draft Reply to LS on | TSG GERAN WG2 | - |
GP‑030331 | Enhanced Measurement Report, All neighbors present | Motorola | - |
GP‑030332 | CR 51.010-1 Section 20.22.* Clarification of the tables for GPRS cell selection | Rohde & Schwarz | - |
GP‑030333 | Introduction of a AMR-NB Layer 1 In Band Signaling Tests | Cingular Wireless | - |
GP‑030335 | Addition of test case 42.4.2.3.3 in TS 51.010-1: Packet Measurement Order Reset | Alcatel | - |
GP‑030336 | Addition of test case in TS 51.010 S42: Packet Timeslot Reconfigure containing a new Coding Scheme command | Alcatel | - |
GP‑030340 | CR 51.010-1 testcase 42.5.5.3, change in timing | Setcom | - |
GP‑030341 | CR 51.010-1 testcase 52.5.5.3 change in timing | Setcom | - |
GP‑030342 | 42.1.2.2.3 - Conflict between Specific Message Contents in Test Case and section 40 defaults | Anite Telecoms | - |
GP‑030343 | 42.3.1.1.9 - Multiple corrections to initial conditions, expected sequence and specific message contents | Anite Telecoms | - |
GP‑030344 | CR 51.010-2 Update of the applicability table | Setcom | - |
GP‑030345 | Addition of test case 42.4.2.3.3 in TS 51.010-1: Packet Measurement Order Reset | Alcatel | - |
GP‑030346 | Addition of test case in TS 51.010 S42: Packet Timeslot Reconfigure containing a new Coding Scheme command | Alcatel | - |
GP‑030347 | - | - | - |
GP‑030348 | Updating PICS for AMR Test cases | Cingular Wireless | - |
GP‑030349 | Addition of test case 42.4.2.3.3 in TS 51.010-1: Packet Measurement Order Reset | Alcatel | - |
GP‑030350 | Addition of test case in TS 51.010 S42: Packet Timeslot Reconfigure containing a new Coding Scheme command | Alcatel | - |
GP‑030351 | CR to 11.10-4 R96: Inclusion of pointer to maintained specification | Gemplus | - |
GP‑030352 | CR to 51.010-2 : suppression of table A.26.2 Terminal Profile | Gemplus | - |
GP‑030353 | CR to 11.10-4 : Addition of Terminal Profile information, suppression of PLAY TONE Test sequence 1.2 | Gemplus | - |
GP‑030354 | 46.1.2.5.2 - Correction of test procedure | Anite Telecoms | - |
GP‑030355 | Applicability of “Speech teleservices” test cases in Annex B. | Nokia | - |
GP‑030356 | Correction of step 5 of Expected Sequence for clause 44.2.3.1.7 - Routing area updating / abnormal cases / change of cell during routing area updating procedure. | Nokia | - |
GP‑030357 | CR 51.010-1-1259 release of RR connection added in TC 44.2.2.2.6; | Setcom | - |
GP‑030358 | CR to 11.10-4 R96: Inclusion of pointer to maintained specification | Gemplus | - |
GP‑030359 | CR to 51.010-2 : suppression of table A.26.2 Terminal Profile | Gemplus | - |
GP‑030360 | CR to 11.10-4 : Addition of Terminal Profile information, suppression of PLAY TONE Test sequence 1.2, and few minor editorial corrections | Gemplus | - |
GP‑030362 | CR 51.010-1 Section 40 Introduction of R99 to GPRS default conditions | Rohde & Schwarz | - |
GP‑030363 | Update to Applicability Table for Assisted GPS MO-LR Tests | Qualcomm, Inc. | - |
GP‑030364 | Correction in EOTD Test Case 70.2.1 | Racal Instruments Ltd | - |
GP‑030365 | Correction in EOTD Test Case 70.2.3 | Racal Instruments Ltd | - |
GP‑030366 | Correction in EOTD Test Case 70.2.4 | Racal Instruments Ltd | - |
GP‑030367 | Correction in EOTD Test Case 70.3.1.2 | Racal Instruments Ltd | - |
GP‑030368 | Applicability of “Speech teleservices” test cases in Annex B. | Nokia | - |
GP‑030369 | - | - | - |
GP‑030370 | - | - | - |
GP‑030371 | CR 45.005-060 (Rel-6) Clause 4.3.3 Clarification of spurious emissions requirements for multislot transmit MS’s. | TTPCom Ltd | - |
GP‑030372 | Reply to LS on Rel 99 and later Emergency calls in case on UE attached to data only network | GERAN1 | - |
GP‑030374 | Correction of interruption times for GSM to UTRAN handover | Siemens | - |
GP‑030375 | Correction of interruption times for GSM to UTRAN handover | Siemens | - |
GP‑030376 | Correction of interruption times for GSM to UTRAN handover | Siemens | - |
GP‑030377 | Clarification of interference performance test conditions for AMR | Ericsson | - |
GP‑030378 | Clarification on the use of basic HR in DTM single slot configuration | Vodafone | - |
GP‑030379 | Inconsistent specification of Iu-mode multislot configurations | AT&T Wireless Services | - |
GP‑030380 | Inclusion of U-TDOA location method | TruePosition | - |
GP‑030381 | Correction of static AMR sensitivity requirements for TCH/AHS | Ericsson | - |
GP‑030382 | Correction of static AMR sensitivity requirements for TCH/AHS | Ericsson | - |
GP‑030383 | Correction to abbr. in reference interference performance requirements | Nokia | - |
GP‑030384 | Relaxation of requirements for blocking signal for GSM 850 in range > 914 MHz to 12,75 GHz | Anite | - |
GP‑030385 | CR 51.010-1 Testcase 52.1.2.1.6 needs to be done in transfer mode | Setcom | - |
GP‑030386 | CR 51.010-1 Section 20.22.3 – Clarification of Test Procedure and Paging Requirements | Rohde & Schwarz | - |
GP‑030387 | CR 51.010-1 Section 20.22.9 Clarification of Test Procedure and Paging Requirements | Rohde & Schwarz | - |
GP‑030389 | Update PICS for EMR Test case | Motorola | - |
GP‑030390 | Updating PICS for AMR Test cases | Cingular Wireless | - |
GP‑030391 | CR 51.010-1 Section 20.22.4 – Clarification of Test Procedure and Paging Requirements | Rohde & Schwarz | - |
GP‑030392 | Addition of test case 52.4.4.3 in TS 51.010-1: Packet Measurement Order Reset | Alcatel | - |
GP‑030393 | LS on R99 GPRS Conformance testing within TS51.010. | TSG GERAN | - |
GP‑030394 | CR 51.010-2 Update of the applicability table | Setcom | - |
GP‑030395 | - | - | - |
GP‑030396 | Enhanced Power Control (EPC) information in classmark 3 | Ericsson | - |
GP‑030397 | Early Classmark Sending for Enhanced Power Control (EPC) | Ericsson | - |
GP‑030398 | Early Classmark Sending for Enhanced Power Control (EPC) | Ericsson | - |
GP‑030399 | [DRAFT] LS on “MS capability indication of Enhanced Power Control” | TSG GERAN | - |
GP‑030403 | Enhancement to PFC creation procedure | Alcatel | - |
GP‑030404 | Clarification of the inclusion of DTM information in handover from 3G to 2G | Vodafone | - |
GP‑030405 | Clarification on the use of basic HR in DTM single slot configuration | Vodafone | - |
GP‑030406 | Clarification on the default value of MAX_LAPDm parameter | Vodafone | - |
GP‑030407 | Enhancement of network controlled cell reselection procedure | Ericsson | - |
GP‑030408 | - | - | - |
GP‑030409 | [DRAFT] LS on “MS capability indication of Enhanced Power Control” | TSG GERAN | - |
GP‑030410 | Handling of the UTRAN predefined configurations and NAS messages at inter-rat and Inter-mode hanodver in GERAN Iu mode | Nokia | - |
GP‑030411 | - | - | - |
GP‑030412 | - | Nokia | - |
GP‑030413 | Correction to reference interference performance requirements | Nokia | - |
GP‑030414 | Correction to reference interference performance requirements | Nokia | - |
GP‑030415 | Correction to reference interference performance requirements | Nokia | - |
GP‑030416 | Correction to reference interference performance requirements | Nokia | - |
GP‑030417 | Indication of EPC capability | Ericsson | - |
GP‑030418 | Indication of EPC capability | Ericsson | - |
GP‑030419 | Correction CR to 44118vs5.2.0 | Nokia | - |
GP‑030420 | Enhancement to PFC creation procedure | Alcatel | - |
GP‑030421 | Inclusion of U-TDOA location method | TruePosition | - |
GP‑030422 | Enhancement to PFC creation procedure | Alcatel | - |
GP‑030423 | Reply to LS on | TSG GERAN WG2 | - |
GP‑030424 | - | - | - |
GP‑030425 | - | - | - |
GP‑030426 | - | - | - |
GP‑030431 | Addition of test case 42.4.2.3.3 in TS 51.010-1: Packet Measurement Order Reset | Alcatel | - |
GP‑030432 | - | - | - |
GP‑030433 | - | - | - |
GP‑030434 | - | - | - |
GP‑030436 | [DRAFT] Reply LS on Transmission Aspects for Speech Enabled Services (SES) | TSG GERAN | - |
GP‑030437 | Correction of interruption times for GSM to UTRAN handover | Siemens | - |
GP‑030438 | Correction of interruption times for GSM to UTRAN handover | Siemens | - |
GP‑030439 | Correction of interruption times for GSM to UTRAN handover | Siemens | - |
GP‑030440 | - | Rapporteur | - |
GP‑030441 | Correction to reference interference performance requirements | Nokia | - |
GP‑030442 | Draft Report of TSG GERAN WG1 meeting #13, version 0.0.1 | Secretary TSG GERAN WG1, Paolo Usai | - |
GP‑030450 | Use of Kc in the Uplink TDOA location method | GERAN | - |
GP‑030451 | Use of Kc in the Uplink TDOA location method | GERAN | - |
GP‑030452 | Introduction of an AMR-NB Layer 1 Test to verify the CMR Generation performances | Cingular Wireless, Nokia | - |
GP‑030453 | Reply LS on Transmission Aspects for Speech Enabled Services (SES) | TSG GERAN | - |
GP‑030454 | - | Rapporteur | - |
page generated from database: 2024-09-26 11:02:35