3GPP TDocs (written contributions) at meeting
Meeting: C6-84 - 2017-05-16 to 2017-05-19, Zhangjiajie
meeting id: C6-84 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
C6‑170201 | CT WG6 #84 agenda with document allocation | Chairman | imported from 3GU |
C6‑170202 | Call for IPRs and Statement of anti-trust compliance | Chairman | imported from 3GU |
C6‑170203 | Draft Report of CT6 meeting #83 | Secretary | imported from 3GU |
C6‑170204 | Approved Report of CT6 meeting #83 | Secretary | imported from 3GU |
C6‑170205 | Action list before CT6 #84 | Secretary | imported from 3GU |
C6‑170206 | Action list after CT6 #84 | Secretary | imported from 3GU |
C6‑170207 | Status of CT6 work items, specifications and rapporteurs before CT6 #84 | Secretary | imported from 3GU |
C6‑170208 | Status of CT6 work items, specifications and rapporteurs after CT6 #84 | Secretary | imported from 3GU |
C6‑170209 | Meetings schedule | Chairman | imported from 3GU |
C6‑170210 | Updated meetings schedule | Chairman | imported from 3GU |
C6‑170211 | CT WG6 #84 agenda (checked opening of the meeting) | Chairman | imported from 3GU |
C6‑170212 | Status report of SCP activities after SCP #77 | ETSI TC SCP Liaison Officer | imported from 3GU |
C6‑170213 | Report from CT plenary #75 (status presented to Plenary) | Chairman | imported from 3GU |
C6‑170214 | Removal of Editor’s Note on DCN-ID length for eDecor | Ericsson, Qualcomm Incorporated | imported from 3GU |
C6‑170215 | TS 31.121, Rel-13 content replacement by reference to TS 31.121, Rel-14 | Qualcomm Incorporated | imported from 3GU |
C6‑170216 | Added applicability for Rel.14 terminals | Qualcomm Incorporated | imported from 3GU |
C6‑170217 | Missing reference to TS 31.124 Rel.13 | Qualcomm Incorporated | imported from 3GU |
C6‑170218 | TS 31.124, Rel-13 content replacement by reference to TS 31.124, Rel-14 | Qualcomm Incorporated | imported from 3GU |
C6‑170219 | Added applicability for Rel.14 terminals | Qualcomm Incorporated | imported from 3GU |
C6‑170220 | Correction of DF-V2X | Qualcomm Incorporated | imported from 3GU |
C6‑170221 | Alignment of TV configuration in the USIM with TS 24.117 | Qualcomm Incorporated | imported from 3GU |
C6‑170222 | Various corrections for the PS Data Off configuration | Qualcomm Incorporated | imported from 3GU |
C6‑170223 | Essential correction to table A.1 | Qualcomm Incorporated | imported from 3GU |
C6‑170224 | Correction to EF-IMSConfigData | Qualcomm Incorporated | imported from 3GU |
C6‑170225 | Fixed implementation issue in EF-MST | Qualcomm Incorporated | imported from 3GU |
C6‑170226 | Essential correction for the Timing Advance for E-UTRAN | Qualcomm Incorporated | imported from 3GU |
C6‑170227 | Essential correction for the Timing Advance for E-UTRAN | Qualcomm Incorporated | imported from 3GU |
C6‑170228 | Introduction of E-UTRAN in NB-S1 mode in EFs encoded as EF-PLMNwAct | Qualcomm Incorporated | imported from 3GU |
C6‑170229 | Removal of test case for Attach with IMSI | Qualcomm Incorporated | imported from 3GU |
C6‑170230 | Removal of test case for EFNASCONFIG - Minimum Periodic Search Timer | Qualcomm Incorporated | imported from 3GU |
C6‑170231 | Removal of test case for EFNASCONFIG - NAS Signalling Priority | Qualcomm Incorporated | imported from 3GU |
C6‑170232 | Removal of test case for EFNASCONFIG - SM_RetryAtRATChange | Qualcomm Incorporated | imported from 3GU |
C6‑170233 | Estimated P-CSCF recover time node | China Mobile Com. Corporation | imported from 3GU |
C6‑170234 | Registration handling when VoPS not supported node | China Mobile Com. Corporation | imported from 3GU |
C6‑170235 | Correction of EF-HPLMNwAct | Qualcomm Incorporated | imported from 3GU |
C6‑170236 | Revised WID on CT aspects on 5G System - Phase 1 | Huawei, HiSilicon, China Mobile | imported from 3GU |
C6‑170237 | USAT support of new IoT Radio Interface Technologies | Gemalto N.V. | imported from 3GU |
C6‑170238 | Radio Interface Technology support by ISIM | Gemalto N.V. | imported from 3GU |
C6‑170239 | XCAP configuration parameters | BlackBerry UK Ltd | imported from 3GU |
C6‑170240 | Radio Interface Technology support by USIM | Gemalto N.V. | imported from 3GU |
C6‑170241 | Non-IP data transfer PDP Type | Gemalto N.V. | imported from 3GU |
C6‑170242 | XCAP configuration parameters | BlackBerry UK Ltd | imported from 3GU |
C6‑170243 | “Data Sent” event definition | Gemalto N.V. | imported from 3GU |
C6‑170244 | Modification of E-UTRAN test sequences under cl. 27.22.7.4 and 27.22.7.17 to test NB-IoT | Comprion GmbH | imported from 3GU |
C6‑170245 | “Drastic Change in Data Throughput” event definition | Gemalto N.V. | imported from 3GU |
C6‑170246 | Modification of E-UTRAN BIP test sequences to verify NB-IoT | Comprion GmbH | imported from 3GU |
C6‑170247 | Addition of new test case 5.2.X | Comprion GmbH | imported from 3GU |
C6‑170248 | Correction to test case 11.4 for EPS NAS security context Storage | Comprion GmbH | imported from 3GU |
C6‑170249 | Introduction of new test case for Call Control on EPS PDN connection | Comprion GmbH | imported from 3GU |
C6‑170250 | LS on network slicing and 5GS network selection | CT1 | imported from 3GU |
C6‑170251 | LS on secure storage and processing of subscription credentials within the NG UE | 3GGP SA3 | imported from 3GU |
C6‑170252 | Reply LS on optimisation of network selection | CT1 | imported from 3GU |
C6‑170253 | Reply LS on secure storage and processing of subscription credentials within the NG UE | ETSI SCP | imported from 3GU |
C6‑170254 | Pseudo-CR on new feature support derived from TS 22.261 | Gemalto N.V. | imported from 3GU |
C6‑170255 | Introduction of new test sequences for MO SHORT MESSAGE CONTROL BY USIM in E-UTRAN | Comprion GmbH | imported from 3GU |
C6‑170256 | Update EF-ICCID reading | Intel | imported from 3GU |
C6‑170257 | Discussion paper on status of UICC for 5G system | Qualcomm Incorporated | imported from 3GU |
C6‑170258 | Reply to LS on network slicing and 5GS network selection | SA1 | imported from 3GU |
C6‑170259 | New WID on CT aspects of support of voice services over WLAN Access | CT1 | imported from 3GU |
C6‑170260 | Correction of EF-HPLMNwAct | Qualcomm Incorporated | imported from 3GU |
C6‑170261 | Introduction of E-UTRAN in NB-S1 mode in EFs encoded as EF-PLMNwAct | Qualcomm Incorporated | imported from 3GU |
C6‑170262 | Reply LS on optimisation of network selection | Morpho | imported from 3GU |
C6‑170263 | XCAP configuration parameters | BlackBerry UK Ltd | imported from 3GU |
C6‑170264 | XCAP configuration parameters | BlackBerry UK Ltd | imported from 3GU |
C6‑170265 | Missing reference to TS 31.124 Rel.13 | Qualcomm Incorporated | imported from 3GU |
C6‑170266 | Introduction of new test case for Call Control on EPS PDN connection | Comprion GmbH | imported from 3GU |
C6‑170267 | Introduction of new test sequences for MO SHORT MESSAGE CONTROL BY USIM in E-UTRAN | Comprion GmbH | imported from 3GU |
C6‑170268 | Estimated P-CSCF recover time node | China Mobile Com. Corporation | imported from 3GU |
C6‑170269 | Registration handling when VoPS not supported node | China Mobile Com. Corporation | imported from 3GU |
C6‑170270 | Modification of E-UTRAN test sequences under cl. 27.22.7.4 and 27.22.7.17 to test NB-IoT | Comprion GmbH | imported from 3GU |
C6‑170271 | Essential correction to table A.1 | Qualcomm Incorporated | imported from 3GU |
C6‑170272 | “Drastic Change in Data Throughput” event definition | Gemalto N.V. | imported from 3GU |
C6‑170273 | Corrections for the Event Download for Data Connection Status | Qualcomm Incorporated | imported from 3GU |
C6‑170274 | Removal of Editor’s Note on DCN-ID length for eDecor | Ericsson, Qualcomm Incorporated | imported from 3GU |
C6‑170275 | New Emerg-request timer defined with configurable values | Deutsche Telekom AG | imported from 3GU |
C6‑170276 | New Emerg-request timer defined with configurable values | Deutsche Telekom AG | imported from 3GU |
C6‑170277 | Alignment of TV configuration in the USIM with TS 24.117 | Qualcomm Incorporated | imported from 3GU |
C6‑170278 | Support for multiple authentication algorithms | Gemalto N.V. | imported from 3GU |
C6‑170279 | Optimize network selection for operator supporting only specific access technologies | Qualcomm Incorporated | imported from 3GU |
C6‑170280 | Draft of TR for technical requirements for the platform for 3GPP applications | Morpho Cards GmbH | imported from 3GU |
C6‑170281 | Removal of test case for Attach with IMSI | Qualcomm Incorporated | imported from 3GU |
C6‑170282 | Removal of test case for EFNASCONFIG - Minimum Periodic Search Timer | Qualcomm Incorporated | imported from 3GU |
C6‑170283 | Removal of test case for EFNASCONFIG - NAS Signalling Priority | Qualcomm Incorporated | imported from 3GU |
C6‑170284 | Removal of test case for EFNASCONFIG - SM_RetryAtRATChange | Qualcomm Incorporated | imported from 3GU |
C6‑170285 | CT WG6 #84 agenda (checked opening of the meeting) | Chairman | imported from 3GU |
C6‑170286 | Editorial corrections to clause 12.5 | Qualcomm Incorporated | imported from 3GU |
C6‑170287 | XCAP configuration parameters | BlackBerry UK Ltd | imported from 3GU |
C6‑170288 | XCAP configuration parameters | BlackBerry UK Ltd | imported from 3GU |
C6‑170289 | Introduction of new test sequences for MO SHORT MESSAGE CONTROL BY USIM in E-UTRAN | Comprion GmbH | imported from 3GU |
C6‑170290 | Introduction of new test case for Call Control on EPS PDN connection | Comprion GmbH | imported from 3GU |
C6‑170291 | LS: Need for a non blocking mecanisms for USAT send data command | Gemalto N.V. | imported from 3GU |
C6‑170292 | “Drastic Change in Data Throughput” event definition | Gemalto N.V. | imported from 3GU |
C6‑170293 | New WID on CT aspects of 3GPP PS data off function – Phase 2 | Huawei, HiSilicon | imported from 3GU |
C6‑170294 | Draft of TR for technical requirements for the platform for 3GPP applications | Morpho Cards GmbH | imported from 3GU |
C6‑170295 | XCAP configuration parameters | BlackBerry UK Ltd | imported from 3GU |
C6‑170296 | XCAP configuration parameters | BlackBerry UK Ltd | imported from 3GU |
C6‑170297 | Pseudo-CR on Concurrent and Multiple Applications | Gemalto N.V | imported from 3GU |
C6‑170298 | Technical Specification Group CT; Study on technical requirements for the secure platform for 3GPP applications | ETSI | imported from 3GU |
C6‑170299 | Pseudo-CR on Concurrent and Multiple Applications | Gemalto N.V | imported from 3GU |
C6‑170300 | Draft of TR for technical requirements for the platform for 3GPP applications | Morpho Cards GmbH | imported from 3GU |
C6‑170301 | Pseudo-CR on 31.801 | Oberthur Technologies | imported from 3GU |
C6‑170302 | Pseudo-CR on 31.801 | Qualcomm Incorporated | imported from 3GU |
C6‑170303 | Need for a non blocking mecanisms for USAT send data command | CT6 | imported from 3GU |
C6‑170304 | “Drastic Change in Data Throughput” event definition | Gemalto N.V. | imported from 3GU |
C6‑170305 | Pseudo-CR on 31.801 | Qualcomm Incorporated | imported from 3GU |
C6‑170306 | Technical Specification Group CT; Study on technical requirements for the secure platform for 3GPP applications | ETSI | imported from 3GU |
C6‑170307 | Action list before CT6 #85 | Secretary | imported from 3GU |
page generated from database: 2024-09-26 11:02:35