3GPP TDocs (written contributions) at meeting
Meeting: C3-49b - 2008-10-06 to 2008-10-10, Phoenix
meeting id: C3-49b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
C3‑081690 | Draft agenda for CT3#49bis meeting | CT3 Chair | Approved |
C3‑081691 | Allocation of documents to agenda items (at deadline) | CT3 Chair | Noted |
C3‑081692 | Allocation of documents to agenda items (start of Day1) | CT3 Chair | Noted |
C3‑081693 | Allocation of documents to agenda items (start of Day2) | CT3 Chair | Noted |
C3‑081694 | Allocation of documents to agenda items (start of Day3) | CT3 Chair | Noted |
C3‑081695 | Allocation of documents to agenda items (start of Day4) | CT3 Chair | Noted |
C3‑081696 | Allocation of documents to agenda items (start of Day5) | CT3 Chair | Noted |
C3‑081697 | Allocation of documents to agenda items (end of Day5) | CT3 Chair | Noted |
C3‑081698 | Draft Report from CT3#49 | MCC | Approved |
C3‑081699 | Latest Version of 3GPP Workplan | MCC | Noted |
C3‑081700 | Status of CT3 specifications following CT#41 meeting | MCC | Noted |
C3‑081701 | Meeting Calendar for 2008 and 2009 | MCC | Noted |
C3‑081702 | LS to 3GPP CT3, CT4, CT1, SA1 and SA2 status on Overlap Work ^^ | ETSI TISPAN WG3 | Noted |
C3‑081703 | LS: ITU-T SG11 work on CRBT^^ | ITU-T Study Group 11 | Noted |
C3‑081704 | LS on the requirement for interworking of IMS CAT and CS CAT | CT1 | Noted |
C3‑081705 | LS on Protocol Decision on GTP User Plane | CT4 | Noted |
C3‑081706 | LS on H.248 packages to support MONA H.324 Procedures for Multimedia | 3GPP TSG CT WG4 | Noted |
C3‑081707 | LS on Definition of Globally Unique Temporary UE Identity | CT4 | Noted |
C3‑081708 | Terminology alignment for Home Node B and Home eNode B | TSG CT | Noted |
C3‑081709 | Response LS on documentation of TISPAN Rel-2 in 3GPP | 3GPP TSG CT | Noted |
C3‑081710 | LS answer on support of GSM codecs on CS over IP | TSG GERAN | Noted |
C3‑081711 | LS on A-interface user plane over IP | TSG GERAN | Noted |
C3‑081712 | Reply LS on Interworking of MSRP sessions with SMS | TSG SA WG2 | Noted |
C3‑081713 | Reply LS on the requirement for interworking of IMS CAT and CS CAT | TSG SA WG2 | Noted |
C3‑081714 | LS on handling of de-registration request with unknown contact address | TSG SA WG2 | Noted |
C3‑081715 | Reply LS on Definition of Globally Unique Temporary UE Identity | TSG SA WG2 | Noted |
C3‑081716 | LS answer to “LS on support of GSM codecs on CS over IP” | TSG SA WG4 | Noted |
C3‑081717 | Reply LS on Mismatched QCI values between Rel-7 and Rel-8 | TSG SA WG2 | Noted |
C3‑081718 | Reply LS on Resource-Identifier for UE initiated resource requests | TSG SA WG2 | Noted |
C3‑081719 | MSCserver MGW interface -Originating call | LM Ericsson | Revisedin1964 |
C3‑081720 | MSCserver MGW interface -Terminating call | LM Ericsson | Revisedin1965 |
C3‑081721 | Addition of overlap text | LM Ericsson | Agreed |
C3‑081722 | Non-trust domain related action | LM Ericsson | mergedintoC3-081955 |
C3‑081723 | Separating the P-CSCF-S-CSF interface from the S-CSCF-S-CSF interface | LM Ericsson | Noted |
C3‑081724 | LS to 3GPP CT WG4 on new H.248 work items^^ | ITU-T Q3/16 | Noted |
C3‑081725 | Interworking between SIP-I based CS and IMS when forking occurs | Ericsson | Revisedin1941 |
C3‑081726 | MGW bypass when interworking with IMS | Ericsson | Noted |
C3‑081727 | Update on MGW bypass | Ericsson | Revisedin2090 |
C3‑081728 | Incorrect rejection of INVITE request when ALLOW header does not contain UPDATE. | Ericsson | Revisedin1942 |
C3‑081729 | Miscellaneous clean-ups | Ericsson | Revisedin1943 |
C3‑081730 | Brief notes from CT#41 relevant to CT3 | CT3 Chairman | Noted |
C3‑081731 | Proposed schedule for CT3#49bis | CT3 Chairman | Revisedin1905 |
C3‑081732 | Updating the AAA server in connection with Direct Tunnel | Ericsson, Nokia Siemens Networks | Revisedin2070 |
C3‑081733 | Updating the AAA server in connection with Direct Tunnel | Ericsson, Nokia Siemens Networks | Revisedin2071 |
C3‑081734 | Transfer of digits | Ericsson, Nokia Siemens Networks | Revisedin2048 |
C3‑081735 | I-MGCF: Overlap signalling procedures | Ericsson, Nokia Siemens Networks | Revisedin2049 |
C3‑081736 | O-MGCF: Overlap signalling additions | Ericsson, Nokia Siemens Networks | Revisedin2050 |
C3‑081737 | Correcting references | Ericsson | Revisedin1961 |
C3‑081738 | Retry in case of error | Ericsson | Revisedin1956 |
C3‑081739 | Editorial corrections | Ericsson | Revisedin1957 |
C3‑081740 | Interworking INVITE to SMS | Ericsson | Revisedin1958 |
C3‑081741 | Error case when interworking Instant Message to Short Message | Ericsson | Revisedin1959 |
C3‑081742 | Partial interworking of SIP MESSAGE to SMS | Ericsson | Revisedin1960 |
C3‑081743 | sendonly in INVITE | Ericsson | Revisedin1962 |
C3‑081744 | Update definitions of IP-CAN Session and Packet Domain Bearer | Ericsson | Revisedin2034 |
C3‑081745 | Revert the description of RADIUS Framed-Protocol=7 to "GPRS PDP Context" | Ericsson | Revisedin2031 |
C3‑081746 | Update of Access Reference Configuration in Clause 6 | Ericsson | Agreed |
C3‑081747 | Update of EPC based IPv4 non-Transparent access | Ericsson | Revisedin2035 |
C3‑081748 | Update of Clause 11.2.1.3.1a (IPv6 EPC based Bearer Activation) | Ericsson | Revisedin2036 |
C3‑081749 | Corrections in Clause 13a (IMS interworking) | Ericsson | Revisedin2037 |
C3‑081750 | Update of RADIUS 'Accounting Update' subclause | Ericsson | Revisedin2038 |
C3‑081751 | Removal of Clause 15 (Interworking between Packet Domains) | Ericsson | Revisedin2040 |
C3‑081752 | Update of the Obsoleted IPv6 RFCs | Ericsson | Agreed |
C3‑081753 | Removal of S6b related Editor's Notes | Ericsson, Nokia Siemens Networks, Orange, Huawei | Agreed |
C3‑081754 | Satellite indicator | Deutsche Telekom, T-Mobile | Revisedin1949 |
C3‑081755 | Overview on Overlap signalling an the resuming changes | Deutsche Telekom, T-Mobile | Noted |
C3‑081756 | CR on 24.229 for In Dialog signalling | Deutsche Telekom, T-Mobile | Noted |
C3‑081757 | CR on 24.229 for In Dialog signalling interworking | Deutsche Telekom, T-Mobile | Postponed |
C3‑081758 | Merging GCS and GC and QoS Rule Request | Ericsson, Nortel, Qualcomm Europe | Revisedin2022 |
C3‑081759 | Provisioning of Event Triggers over S9 | Ericsson | Revisedin2023 |
C3‑081760 | QoS rules provisioning initiated by H-PCRF for HR | Ericsson | Revisedin1897 |
C3‑081761 | S9 Session Termination for HR | Ericsson | Revisedin2025 |
C3‑081762 | S9 Session Termination for VA | Ericsson | Revisedin2026 |
C3‑081763 | Gx and Gxx linking session | Ericsson | Revisedin2012 |
C3‑081764 | Gx and Gxx linking session | Ericsson | Revisedin1999 |
C3‑081765 | IP-CAN session establishment update | Ericsson | Revisedin2000 |
C3‑081766 | APN-AMBR in Gx and Gxx | Ericsson | Revisedin2013 |
C3‑081767 | Default QoS handling | Ericsson | Withdrawn |
C3‑081768 | New IP-CAN Type 3GPP-EPS and new RAT Type for E-UTRAN. | Ericsson | Revisedin2014 |
C3‑081769 | Defining QoS-Rules related AVPs | Ericsson | Revisedin1898 |
C3‑081770 | Including QoS-Rules related AVPs in the procedures | Ericsson | Revisedin2016 |
C3‑081771 | Update of IETF references | Ericsson | Agreed |
C3‑081772 | Update of IETF references | Ericsson | Agreed |
C3‑081773 | Gxx session handling | Ericsson | Postponed |
C3‑081774 | Time of the Day PCC rule enforcement | Starent | Revisedin1918 |
C3‑081775 | Time of the Day PCC rule enforcement | Starent | Revisedin1919 |
C3‑081776 | Multiple gateway control sessions per Diameter Session | Starent | Postponed |
C3‑081777 | Multiple gateway control sessions per Diameter Session | Starent | Postponed |
C3‑081778 | UE/GW initiated Resource request and management | Starent | Revisedin2018 |
C3‑081779 | Revision Annex F3 | Deutsche Telekom | Revisedin1951 |
C3‑081780 | Clean up of TR 29.909 | Huawei | Agreed |
C3‑081781 | PCRF selection in different scenarios | Huawei | Revisedin2004 |
C3‑081782 | PCRF reselection for the redirect DRA | Huawei | Withdrawn |
C3‑081783 | IP-CAN session termination initiated by PCRF | Huawei | Revisedin1831 |
C3‑081784 | IP-CAN session termination initiated by PCRF | Huawei | Revisedin1832 |
C3‑081785 | IP-CAN session termination initiated by PCRF | Huawei | Revisedin1833 |
C3‑081786 | IP-CAN session termination initiated by PCRF | Huawei | Revisedin1834 |
C3‑081787 | IP Multicast access for SGi | Huawei, Orange | Revisedin2041 |
C3‑081788 | Usage of Diameter on SGi interface | Huawei, Orange | Revisedin2042 |
C3‑081789 | Diameter Accounting Update for SGi | Huawei, Orange | Revisedin2039 |
C3‑081790 | Diameter Server-Initiated Bearer termination for SGi | Huawei, Orange | Revised in 2043 |
C3‑081791 | Complete procedures for receiving of SMS-DELIVER-REPORT over CS/PS | Huwei | Revised in 1963 |
C3‑081792 | Editors cleanup | Huwei | Revised in 1972 |
C3‑081793 | Complete procedures for sending of IMDN | Huwei | Revised in 1973 |
C3‑081794 | UE capability for determination of delivery method | Huwei | Revised in 1974 |
C3‑081795 | Example signalling flow for CAT provided by the terminating CS domain using early session model | Huwei | Noted |
C3‑081796 | Example signalling flow for CAT provided to the originating CS domain with the CAT early-session model | Huwei | Noted |
C3‑081797 | Discussion on FlowControl->TMMBR interworking | Huawei | Noted |
C3‑081798 | Clarification of RTCP messages usage in the inter-working gateways | Huawei | merged into C3-082053 |
C3‑081799 | Interworking for encoding the Req-URI | NSN | Revised in 1966 |
C3‑081800 | Conference termination | NSN | Revised in 1967 |
C3‑081801 | Processing an invitation to a conference | NSN | merged into C3-081909 |
C3‑081802 | IMS session setup with UE initiated resource reservation | Nokia Siemens Networks | Noted |
C3‑081803 | LS on IMS session setup with UE initiated resource reservation | Nokia Siemens Networks | Revised in 2033 |
C3‑081804 | Out-of-credit indication to AF | Nokia Siemens Networks | Noted |
C3‑081805 | Out of credit indication | Nokia Siemens Networks | Withdrawn |
C3‑081806 | Out of credit indication | Nokia Siemens Networks | Withdrawn |
C3‑081807 | Out of credit indication, OFFonly | Nokia Siemens Networks | Withdrawn |
C3‑081808 | Out of credit indication, OFF only | Nokia Siemens Networks | Revised in 2067 |
C3‑081809 | Use 3GPP-SGSN-MCC-MNC AVP for all accesses | Nokia Siemens Networks | Revised in 1896 |
C3‑081810 | Various corrections | Nokia Siemens Networks | Withdrawn |
C3‑081811 | Various corrections | Nokia Siemens Networks | Revised in 2027 |
C3‑081812 | Rel-8 Gx Application ID | Nokia Siemens Networks | Postponed |
C3‑081813 | RAT Type | Nokia Siemens Networks | Postponed |
C3‑081814 | Application ID for Rel-8 Gx | Nokia Siemens Networks | Postponed |
C3‑081815 | Editorial corrections | Nokia Siemens Networks | Revised in 1975 |
C3‑081816 | Update of definitions and abbreviations | Nokia Siemens Networks | Agreed |
C3‑081817 | IMDN creation correction | Nokia Siemens Networks | Revised in 1976 |
C3‑081818 | Creation of an IM based on received SM | Nokia Siemens Networks | Agreed |
C3‑081819 | SRI-FOR-SM correction | Nokia Siemens Networks | Agreed |
C3‑081820 | Improved documentation for service level interworking scenarios | Nokia Siemens Networks | Revised in 1977 |
C3‑081821 | Clarification of NAT/NAPT in 29.162 | Orange, Telecom Italia | Revised in 1952 |
C3‑081822 | Clarification of NAT/NAPT in 29.162 | Orange, Telecom Italia | Revised in 1953 |
C3‑081823 | CS-IBCF procedures as an exit and entry point | Telecom Italia | Revised in 1945 |
C3‑081824 | CS-IBCF CS-TrGW Interaction | Telecom Italia | Revised in 1946 |
C3‑081825 | PCR on II-NNI - SIP profile | Telecom Italia | Revised in 1955 |
C3‑081826 | Tunnel information Handling over Gxx | Qualcomm Europe | Revised in 2019 |
C3‑081827 | RAA command over Gxx | Qualcomm Europe | Agreed |
C3‑081828 | PCRF-initiated gateway control session termination | Qualcomm Europe | Revised in 2003 |
C3‑081829 | S9 subsession handling | Qualcomm Europe | Noted |
C3‑081830 | QoS rule handling over S9 | Qualcomm Europe | Revised in 2028 |
C3‑081831 | IP-CAN session termination initiated by PCRF | Nortel, Huawei | Revised in 2001 |
C3‑081832 | IP-CAN session termination initiated by PCRF | Nortel, Huawei | Revised in 1920 |
C3‑081833 | IP-CAN session termination initiated by PCRF | Nortel, Huawei | Revised in 2017 |
C3‑081834 | IP-CAN session termination initiated by PCRF | Nortel, Huawei | Revised in 2002 |
C3‑081835 | General TS clean up | Mavenir | Agreed |
C3‑081836 | Registration clause clean up | Mavenir | Agreed |
C3‑081837 | Supplementary Services clause clean up | Mavenir | Agreed |
C3‑081838 | Cause code mapping for MSC-initiated release | Mavenir | Revised in 1968 |
C3‑081839 | Need for SDP attribute specification | Mavenir | Agreed |
C3‑081840 | MSC applying announcements prior to answer | Mavenir | Revised in 1969 |
C3‑081841 | CDIV notification to terminator | Mavenir | Revised in 1970 |
C3‑081842 | MSC receiving invitation to a conference | Mavenir | Revised in 1909 |
C3‑081843 | AoIP user plane interworking details | Mavenir | Revised in 1971 |
C3‑081844 | New AVP to convey SGW/AGW IP addresses over Gx/Gxx protocols | Nortel, Camiant | Revised in 2065 |
C3‑081845 | Diameter session establishment/modification flows through redirect DRA via S9 reference point | Nortel | merged into C3-082005 |
C3‑081846 | Diameter session termination flows through redirect DRA via S9 reference point | Nortel | Revised in 2006 |
C3‑081847 | Diameter session establishment flows through proxy DRA via S9 reference point | Nortel | Revised in 2008 |
C3‑081848 | Diameter session modification flows through proxy DRA via S9 reference point | Nortel | Revised in 2007 |
C3‑081849 | Diameter session termination flows through proxy DRA via S9 reference point | Nortel | Revised in 2009 |
C3‑081850 | Sub-session management over S9 for Visited accesses | Nortel, Ericsson, Qualcomm | Revised in 2029 |
C3‑081851 | Correction to Table 10b | Nortel | Noted |
C3‑081852 | Update reference for DAI Parameter for the "tel" URI | Nortel | Revised in 1948 |
C3‑081853 | Multiple BBERF support | Nortel, Verizon | Postponed |
C3‑081854 | BBERF relocation call flow | Nortel | Withdrawn |
C3‑081855 | S9 Procedures and subsession handling | Ericsson | Noted |
C3‑081856 | Interworking towards networks not supporting overlap signalling | Nokia Siemens Networks | Noted |
C3‑081857 | Routeing Considerations | Nokia Siemens Networks | Noted |
C3‑081858 | Mechanisms for the Reduction of Signalling Load | Nokia Siemens Networks | Noted |
C3‑081859 | Editorial Corrections | Nokia Siemens Networks | Revised in 1954 |
C3‑081860 | AoIP impacts to Mc parameters | Nokia Siemens Networks | Revised in 1947 |
C3‑081861 | Data call transport at network side of IWF for SIP-I based CS CN | Nokia Siemens Networks | Revised in 1944 |
C3‑081862 | Considerations regarding MONA comments by ITU-T SG16 | Nokia Siemens Networks | Postponed |
C3‑081863 | MONA corrections | Nokia Siemens Networks | Postponed |
C3‑081864 | Generic MN RTCP procedures | Nokia Siemens Networks | Revised in 1895 |
C3‑081865 | User Location Information over Gx and Gxx | Camiant, Verizon, Nokia Siemens Networks | Noted |
C3‑081866 | Support for 3GPP2 BSID in Gx and Gxx | Camiant, Verizon, Nokia Siemens Networks, Starent | Revised in 2020 |
C3‑081867 | Update to TFT-Filter AVP for multiple IP-CAN types | Camiant | Withdrawn |
C3‑081868 | Network-Initiated IP-CAN Session Modification Roaming Flow (Interactions between GW and PCRF) | Camiant | Revised in 1916 |
C3‑081869 | AF session modification call flow (AF in HPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 1910 |
C3‑081870 | AF session modification call flow (AF in VPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 1911 |
C3‑081871 | AF session termination call flow (AF in HPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 1912 |
C3‑081872 | AF session termination call flow (AF in VPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 1913 |
C3‑081873 | Update to Roaming call flows: AF in the Visited Network | Camiant, Qualcomm Europe | Revised in 1914 |
C3‑081874 | Update to Roaming call flows: AF in the Home Network | Camiant | Revised in 1915 |
C3‑081875 | Fix errors in Gateway control and QoS rules request flow | Camiant, Qualcomm Europe | Revised in 1917 |
C3‑081876 | S9 sub-session management | Camiant | Noted |
C3‑081877 | Sub-Session related AVPs and commands | Camiant, Huawei, ZTE | Revised in 2030 |
C3‑081878 | Event triggers handling in Gxx | ZTE, Ericsson | Revised in 2021 |
C3‑081879 | Discussion on the Redirect DRA flow during IP-CAN session modification | ZTE | Noted |
C3‑081880 | The Redirect DRA flow during IP-CAN session modification | ZTE | Revised in 2005 |
C3‑081881 | Clarification of proxy DRA flows during dimeter session termination | ZTE | Revised in 2010 |
C3‑081882 | Clarification of redirect DRA flow during dimeter session termination | ZTE | Revised in 2011 |
C3‑081883 | Update of the IP-CAN session establishment | ZTE | merged into C3-082000 |
C3‑081884 | BBERF-initiated IP-CAN Session Modification flow | ZTE | Postponed |
C3‑081885 | PCEF-initiated IP-CAN Bearer Termination flow | ZTE | Withdrawn |
C3‑081886 | PCEF-initiated IP-CAN Bearer Establishment or IP-CAN Bearer Modification flow | ZTE | Withdrawn |
C3‑081887 | UE Initiated IP CAN Bearer Establishment or Modification | Alcatel-Lucent | Withdrawn |
C3‑081888 | Re-Used Gxx AVPs | Alcatel-Lucent | Postponed |
C3‑081889 | Gxx Experimental Results Code AVP Values | Alcatel-Lucent | Postponed |
C3‑081890 | Rx Over S9 | Alcatel-Lucent | Revised in 1904 |
C3‑081891 | New Gxx AVPs | Alcatel-Lucent | merged with C3-081769 |
C3‑081892 | V-AF Session Establishment | Alcatel-Lucent | merged with C3-081914 |
C3‑081893 | Multiple BBERF Support | Alcatel-Lucent | Postponed |
C3‑081894 | Event Triggers per PCC Reference Point (Gx, Gxx, S9) | Alcatel-Lucent | Revised in 1921 |
C3‑081895 | Generic MN RTCP procedures | Nokia Siemens Networks | merged into C3-082053 |
C3‑081896 | Use 3GPP-SGSN-MCC-MNC AVP for all accesses | Nokia Siemens Networks,Nortel | Agreed |
C3‑081897 | QoS rules provisioning initiated by H-PCRF for HR | Ericsson | Revised in 2024 |
C3‑081898 | Defining QoS-Rules related AVPs | Ericsson, ALU | Revised in 2015 |
C3‑081899 | Additional CCR “ACK” is not needed upon PCC Rule Provisioning (PULL) | Camiant | Noted |
C3‑081900 | Decision on service level interworking based on TP-PID | Acision | merged into C3-081977 |
C3‑081901 | Procedure when delivery of a short message as instant message is not allowed | Acision | Revised in 1978 |
C3‑081902 | LS to SA and CT3 on Current GSMA IREG Packet work on IP Interconnect | GSMA | Noted |
C3‑081903 | LS on aligning work on Advice of Charge (AOC) | TSG SA WG5 | Noted |
C3‑081904 | Rx Over S9 | Alcatel-Lucent | Withdrawn |
C3‑081905 | Proposed schedule for CT3#49bis | CT3 Chairman | Revised in 2032 |
C3‑081906 | LS Answer status on the overlap work | Ericsson | Revised in 2052 |
C3‑081907 | Draft LS on ITU-T SG16 MONA related questions to be answered by CT3 | TSG CT WG4 | Postponed |
C3‑081908 | Reply LS on new H.248 Work Items | Nokia Siemens Networks | Postponed |
C3‑081909 | MSC receiving invitation to a conference | Mavenir | Agreed |
C3‑081910 | AF session modification call flow (AF in HPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 2044 |
C3‑081911 | AF session modification call flow (AF in VPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 2045 |
C3‑081912 | AF session termination call flow (AF in HPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 2046 |
C3‑081913 | AF session termination call flow (AF in VPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 1922 |
C3‑081914 | Update to Roaming call flows: AF in the Visited Network | Camiant, Qualcomm Europe | Revised in 1923 |
C3‑081915 | Update to Roaming call flows: AF in the Home Network | Camiant | Revised in 2047 |
C3‑081916 | Network-Initiated IP-CAN Session Modification Roaming Flow (Interactions between GW and PCRF) | Camiant | Postponed |
C3‑081917 | Fix errors in Gateway control and QoS rules request flow | Camiant, Qualcomm Europe | Agreed |
C3‑081918 | Time of the Day PCC rule enforcement | Starent Networks Corporation, Ericsson , Camiant | Revised in 2058 |
C3‑081919 | Time of the Day PCC rule enforcement | Starent | Revised in 2059 |
C3‑081920 | IP-CAN session termination initiated by PCRF | Nortel, Huawei | Agreed |
C3‑081921 | Event Triggers per PCC Reference Point (Gx, Gxx, S9) | Alcatel-Lucent | Postponed |
C3‑081922 | AF session termination call flow (AF in VPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 2063 |
C3‑081923 | Update to Roaming call flows: AF in the Visited Network | Camiant, Qualcomm Europe | Revised in 2099 |
C3‑081924 | Gx and Gxx linking session | Ericsson | Agreed |
C3‑081925 | IP-CAN session establishment update | Ericsson, ZTE | Agreed |
C3‑081926 | Gx and Gxx linking session | Ericsson | Agreed |
C3‑081927 | Reply LS on Current GSMA IREG Packet work on IP Interconnect | Telecom Italia | Approved |
C3‑081928 | APN-AMBR in Gx and Gxx | Ericsson | Agreed |
C3‑081929 | Rx Over S9 | Alcatel-Lucent | Revised in 1982 |
C3‑081930 | TS 29.165 v1.1.0 | Telecom Italia | Agreed |
C3‑081931 | AoIP impacts to Mc parameters | Nokia Siemens Networks | Agreed |
C3‑081932 | Status of CT3 work item at CT3#49bis | CT3 Chair | Revised in 1934 |
C3‑081933 | CT SAE Specfication Tracking | CT3 Chair | Revised in 1935 |
C3‑081934 | Status of CT3 work item at CT3#49bis | CT3 Chair | Agreed |
C3‑081935 | CT SAE Specfication Tracking | CT3 Chair | Agreed |
C3‑081936 | inofficial TS 29.212 | Nokia Siemens Networks | Agreed |
C3‑081937 | inofficial TS 29.213 | Ericsson | Agreed |
C3‑081938 | inofficial TS 29.214 | Ericsson | Agreed |
C3‑081939 | TS 29.215 v1.1.0 | Ericsson | Agreed |
C3‑081940 | inofficial TS 29.061 | Orange | Agreed |
C3‑081941 | Interworking between SIP-I based CS and IMS when forking occurs | Ericsson | Agreed |
C3‑081942 | Incorrect rejection of INVITE request when ALLOW header does not contain UPDATE. | LM Ericsson, Alcatel-Lucent | Agreed |
C3‑081943 | Miscellaneous clean-ups | Ericsson | Revised in 2091 |
C3‑081944 | Data call transport at network side of IWF for SIP-I based CS CN | Nokia Siemens Networks | Revised in 2092 |
C3‑081945 | CS-IBCF procedures as an exit and entry point | Telecom Italia | Revised in 2093 |
C3‑081946 | CS-IBCF CS-TrGW Interaction | Telecom Italia | Postponed |
C3‑081947 | AoIP impacts to Mc parameters | Nokia Siemens Networks | Revised in 2095 |
C3‑081948 | Update reference for DAI Parameter for the "tel" URI | Nortel | Agreed |
C3‑081949 | Satellite indicator | Deutsche Telekom, T-Mobile | Agreed |
C3‑081950 | Satellite indicator | Deutsche Telekom, T-Mobile | Revised in 2103 |
C3‑081951 | Revision Annex F3 | Deutsche Telekom | Agreed |
C3‑081952 | Clarification of NAT/NAPT in 29.162 | Orange, Telecom Italia | Agreed |
C3‑081953 | Clarification of NAT/NAPT in 29.162 | Orange, Telecom Italia | Revised in 2104 |
C3‑081954 | Editorial Corrections | Nokia Siemens Networks | Agreed |
C3‑081955 | PCR on II-NNI - SIP profile | Telecom Italia | Revised in 2105 |
C3‑081956 | Retry in case of error | Ericsson | Agreed |
C3‑081957 | Editorial corrections | Ericsson | Agreed |
C3‑081958 | Interworking INVITE to SMS | Ericsson | Revised in 2108 |
C3‑081959 | Error case when interworking Instant Message to Short Message | Ericsson | Agreed |
C3‑081960 | Partial interworking of SIP MESSAGE to SMS | Ericsson | Agreed |
C3‑081961 | Correcting references | Ericsson | Agreed |
C3‑081962 | sendonly in INVITE | Ericsson | Revised in 2109 |
C3‑081963 | Complete procedures for receiving of SMS-DELIVER-REPORT over CS/PS | Huwei | Agreed |
C3‑081964 | MSCserver MGW interface -Originating call | LM Ericsson | Agreed |
C3‑081965 | MSCserver MGW interface -Terminating call | LM Ericsson | Agreed |
C3‑081966 | Interworking for encoding the Req-URI | NSN | Agreed |
C3‑081967 | Conference termination | NSN | Agreed |
C3‑081968 | Cause code mapping for MSC-initiated release | Mavenir | Agreed |
C3‑081969 | MSC applying announcements prior to answer | Mavenir | Agreed |
C3‑081970 | CDIV notification to terminator | Mavenir | Agreed |
C3‑081971 | AoIP user plane interworking details | Mavenir | Agreed |
C3‑081972 | Editors cleanup | Huwei | Agreed |
C3‑081973 | Complete procedures for sending of IMDN | Huwei | Agreed |
C3‑081974 | UE capability for determination of delivery method | Huwei | Agreed |
C3‑081975 | Editorial corrections | Nokia Siemens Networks | Agreed |
C3‑081976 | IMDN creation correction | Nokia Siemens Networks | Agreed |
C3‑081977 | Improved documentation for service level interworking scenarios | Nokia Siemens Networks | Agreed |
C3‑081978 | Procedure when delivery of a short message as instant message is not allowed | Acision | Agreed |
C3‑081979 | inofficial TS 29.235 | Nokia Siemens Networks | Agreed |
C3‑081980 | TS 29.311 v1.1.0 | Huawei | Agreed |
C3‑081981 | TS 29.292 v1.1.0 | Mavenir | Agreed |
C3‑081982 | Rx Over S9 | Alcatel-Lucent | Revised in 1983 |
C3‑081983 | Rx Over S9 | Alcatel-Lucent | Agreed |
C3‑081999 | Gx and Gxx linking session | Ericsson | Revised in 1924 |
C3‑082000 | IP-CAN session establishment update | Ericsson, ZTE | Revised in 1925 |
C3‑082001 | IP-CAN session termination initiated by PCRF | Nortel, Huawei | Revised in 2084 |
C3‑082002 | IP-CAN session termination initiated by PCRF | Nortel, Huawei | Agreed |
C3‑082003 | PCRF-initiated gateway control session termination | Qualcomm Europe | Agreed |
C3‑082004 | PCRF selection in different scenarios | Huawei | Revised in 2069 |
C3‑082005 | The Redirect DRA flow during IP-CAN session modification | ZTE, Nortel | Revised in 2077 |
C3‑082006 | Diameter session termination flows through redirect DRA via S9 reference point | Nortel | Revised in 2078 |
C3‑082007 | Diameter session modification flows through proxy DRA via S9 reference point | Nortel | Revised in 2080 |
C3‑082008 | Diameter session establishment flows through proxy DRA via S9 reference point | Nortel | Revised in 2079 |
C3‑082009 | Diameter session termination flows through proxy DRA via S9 reference point | Nortel | Revised in 2081 |
C3‑082010 | Clarification of proxy DRA flows during dimeter session termination | ZTE | Agreed |
C3‑082011 | Clarification of redirect DRA flow during dimeter session termination | ZTE | Agreed |
C3‑082012 | Gx and Gxx linking session | Ericsson | Revised in 1926 |
C3‑082013 | APN-AMBR in Gx and Gxx | Ericsson | Revised in 1928 |
C3‑082014 | New IP-CAN Type 3GPP-EPS and new RAT Type for E-UTRAN. | Ericsson | Agreed |
C3‑082015 | Defining QoS-Rules related AVPs | Ericsson, ALU | Agreed |
C3‑082016 | Including QoS-Rules related AVPs in the procedures | Ericsson | Revised in 2064 |
C3‑082017 | IP-CAN session termination initiated by PCRF | Nortel, Huawei | Revised in 2085 |
C3‑082018 | UE/GW initiated Resource request and management | Starent | Postponed |
C3‑082019 | Tunnel information Handling over Gxx | Qualcomm Europe | Agreed |
C3‑082020 | Support for 3GPP2 BSID in Gx and Gxx | Camiant, Verizon, Nokia Siemens Networks, Starent Networks Corporation, Ericsson | Agreed |
C3‑082021 | Event triggers handling in Gxx | ZTE, Ericsson | Revised in 2066 |
C3‑082022 | Merging GCS and GC and QoS Rule Request | Ericsson, Nortel, Qualcomm Europe | Revised in 2100 |
C3‑082023 | Provisioning of Event Triggers over S9 | Ericsson | Revised in 2082 |
C3‑082024 | QoS rules provisioning initiated by H-PCRF for HR | Ericsson, Nortel, Qualcomm Europe | Revised in 2068 |
C3‑082025 | S9 Session Termination for HR | Ericsson | Agreed |
C3‑082026 | S9 Session Termination for VA | Ericsson | Revised in 2101 |
C3‑082027 | Various corrections | Nokia Siemens Networks | Agreed |
C3‑082028 | QoS rule handling over S9 | Qualcomm Europe | Revised in 2083 |
C3‑082029 | Sub-session management over S9 for Visited accesses | Nortel, Ericsson, Qualcomm | Revised in 2102 |
C3‑082030 | Sub-Session related AVPs and commands | Camiant, Huawei, ZTE | Agreed |
C3‑082031 | Revert the description of RADIUS Framed-Protocol=7 to "GPRS PDP Context" | Ericsson | Agreed |
C3‑082032 | Proposed schedule for CT3#49bis | CT3 Chairman | Revised in 2057 |
C3‑082033 | LS on IMS session setup with UE initiated resource reservation | Nokia Siemens Networks | Withdrawn |
C3‑082034 | Update definitions of IP-CAN Session and Packet Domain Bearer | Ericsson | Agreed |
C3‑082035 | Update of EPC based IPv4 non-Transparent access | Ericsson | Agreed |
C3‑082036 | Update of Clause 11.2.1.3.1a (IPv6 EPC based Bearer Activation) | Ericsson | Agreed |
C3‑082037 | Corrections in Clause 13a (IMS interworking) | Ericsson | Agreed |
C3‑082038 | Update of RADIUS 'Accounting Update' subclause | Ericsson | Agreed |
C3‑082039 | Diameter Accounting Update for SGi | Huawei, Orange | Agreed |
C3‑082040 | Removal of Clause 15 (Interworking between Packet Domains) | Ericsson | Withdrawn |
C3‑082041 | IP Multicast access for SGi | Huawei, Orange | Agreed |
C3‑082042 | Usage of Diameter on SGi interface | Huawei, Orange | Agreed |
C3‑082043 | Diameter Server-Initiated Bearer termination for SGi | Huawei, Orange | Revised in 2072 |
C3‑082044 | AF session modification call flow (AF in HPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 2060 |
C3‑082045 | AF session modification call flow (AF in VPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 2061 |
C3‑082046 | AF session termination call flow (AF in HPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 2062 |
C3‑082047 | Update to Roaming call flows: AF in the Home Network | Camiant | Agreed |
C3‑082048 | Transfer of digits | Ericsson, Nokia Siemens Networks | Revised in 2054 |
C3‑082049 | I-MGCF: Overlap signalling procedures | Ericsson, Nokia Siemens Networks | Revised in 2055 |
C3‑082050 | O-MGCF: Overlap signalling additions | Ericsson, Nokia Siemens Networks | Revised in 2056 |
C3‑082051 | Revised WID on Overlap Signaling in IMS | Deutshe Telekom, T-Mobile | Postponed |
C3‑082052 | LS Answer status on the overlap work | Ericsson | Revised in 2107 |
C3‑082053 | RTCP messages usage in the inter-working gateways | Huawei, Nokia Siemens Networks | Postponed |
C3‑082054 | Transfer of digits | Ericsson, Nokia Siemens Networks | Agreed |
C3‑082055 | I-MGCF: Overlap signalling procedures | Ericsson, Nokia Siemens Networks | Agreed |
C3‑082056 | O-MGCF: Overlap signalling additions | Ericsson, Nokia Siemens Networks | Revised in 2106 |
C3‑082057 | Proposed schedule for CT3#49bis | CT3 Chairman | Noted |
C3‑082058 | Time of the Day PCC rule enforcement | Starent Networks Corporation,Ericsson, Camiant | Revised in 2086 |
C3‑082059 | Time of the Day PCC rule enforcement | Starent | Revised in 2087 |
C3‑082060 | AF session modification call flow (AF in HPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 2073 |
C3‑082061 | AF session modification call flow (AF in VPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 2074 |
C3‑082062 | AF session termination call flow (AF in HPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 2075 |
C3‑082063 | AF session termination call flow (AF in VPLMN) | Camiant, ZTE, Alcatel-Lucent | Revised in 2076 |
C3‑082064 | Including QoS-Rules related AVPs in the procedures | Ericsson | Agreed |
C3‑082065 | New AVP to convey SGW/AGW IP addresses over Gx/Gxx protocols | Nortel, Camiant | Postponed |
C3‑082066 | Event triggers handling in Gxx | ZTE, Ericsson | Agreed |
C3‑082067 | Out of credit indication, OFF only | Nokia Siemens Networks | Agreed |
C3‑082068 | QoS rules provisioning initiated by H-PCRF for HR | Ericsson, Nortel, Qualcomm Europe | Agreed |
C3‑082069 | PCRF selection in different scenarios | Huawei | Agreed |
C3‑082070 | Updating the AAA server in connection with Direct Tunnel | Ericsson, Nokia Siemens Networks | Agreed |
C3‑082071 | Updating the AAA server in connection with Direct Tunnel | Ericsson, Nokia Siemens Networks | Agreed |
C3‑082072 | Diameter Server-Initiated Bearer termination for SGi | Huawei, Orange | Agreed |
C3‑082073 | AF session modification call flow (AF in HPLMN) | Camiant, ZTE, Alcatel-Lucent | Agreed |
C3‑082074 | AF session modification call flow (AF in VPLMN) | Camiant, ZTE, Alcatel-Lucent | Agreed |
C3‑082075 | AF session termination call flow (AF in HPLMN) | Camiant, ZTE, Alcatel-Lucent | Agreed |
C3‑082076 | AF session termination call flow (AF in VPLMN) | Camiant, ZTE, Alcatel-Lucent | Agreed |
C3‑082077 | The Redirect DRA flow during IP-CAN session modification | ZTE, Nortel | Agreed |
C3‑082078 | Diameter session termination flows through redirect DRA via S9 reference point | Nortel | Agreed |
C3‑082079 | Diameter session establishment flows through proxy DRA via S9 reference point | Nortel | Agreed |
C3‑082080 | Diameter session modification flows through proxy DRA via S9 reference point | Nortel | Agreed |
C3‑082081 | Diameter session termination flows through proxy DRA via S9 reference point | Nortel | Agreed |
C3‑082082 | Provisioning of Event Triggers over S9 | Ericsson | Agreed |
C3‑082083 | QoS rule handling over S9 | Qualcomm Europe | Agreed |
C3‑082084 | IP-CAN session termination initiated by PCRF | Nortel, Huawei | Agreed |
C3‑082085 | IP-CAN session termination initiated by PCRF | Nortel, Huawei | Agreed |
C3‑082086 | Time of the Day PCC rule enforcement | Starent Networks Corporation,Ericsson, Camiant | Revised in 2097 |
C3‑082087 | Time of the Day PCC rule enforcement | Starent | Revised in 2098 |
C3‑082088 | QoS rules provisioning initiated by H-PCRF for HR | Ericsson, Nortel, Qualcomm Europe | Withdrawn |
C3‑082089 | Updated WID on Interconnection Border Control Function (IBCF) – Transition Gateway (TrGW); Ix Interface; Stage 3 | Alcatel Lucent | Revised in 2110 |
C3‑082090 | Update on MGW bypass | Ericsson | Agreed |
C3‑082091 | Miscellaneous clean-ups | Ericsson | Revised in 2096 |
C3‑082092 | Data call transport at network side of IWF for SIP-I based CS CN | Nokia Siemens Networks | Agreed |
C3‑082093 | CS-IBCF procedures as an exit and entry point | Telecom Italia | Agreed |
C3‑082094 | Rx Over S9 | Alcatel-Lucent | Revised in 1929 |
C3‑082095 | AoIP impacts to Mc parameters | Nokia Siemens Networks | Revised in 1931 |
C3‑082096 | Miscellaneous clean-ups | Ericsson | Agreed |
C3‑082097 | Time of the Day PCC rule enforcement | Starent Networks Corporation,Ericsson, Camiant | Agreed |
C3‑082098 | Time of the Day PCC rule enforcement | Starent | Agreed |
C3‑082099 | Update to Roaming call flows: AF in the Visited Network | Camiant, Qualcomm Europe | Agreed |
C3‑082100 | Merging GCS and GC and QoS Rule Request | Ericsson, Nortel, Qualcomm Europe | Agreed |
C3‑082101 | S9 Session Termination for VA | Ericsson | Agreed |
C3‑082102 | Sub-session management over S9 for Visited accesses | Nortel, Ericsson, Qualcomm | Revised in 2114 |
C3‑082103 | Satellite indicator | Deutsche Telekom, T-Mobile | Agreed |
C3‑082104 | Clarification of NAT/NAPT in 29.162 | Orange, Telecom Italia | Agreed |
C3‑082105 | PCR on II-NNI - SIP profile | Telecom Italia | Agreed |
C3‑082106 | O-MGCF: Overlap signalling additions | Ericsson, Nokia Siemens Networks | Revised in 2111 |
C3‑082107 | LS Answer status on the overlap work | Ericsson | Approved |
C3‑082108 | Interworking INVITE to SMS | Ericsson | Agreed |
C3‑082109 | sendonly in INVITE | Ericsson | Agreed |
C3‑082110 | Updated WID on Interconnection Border Control Function (IBCF) – Transition Gateway (TrGW); Ix Interface; Stage 3 | Alcatel Lucent | Endorsed |
C3‑082111 | O-MGCF: Overlap signalling additions | Ericsson, Nokia Siemens Networks | Agreed |
C3‑082112 | Reply LS on LS: ITU-T SG11 work on CRBT | Ericsson | Postponed |
C3‑082113 | Reply LS on Current GSMA IREG Packet work on IP Interconnect | Telecom Italia | Revised in 1927 |
C3‑082114 | Sub-session management over S9 for Visited accesses | Nortel, Ericsson, Qualcomm | Agreed |
page generated from database: 2024-09-26 11:02:35