3GPP TDocs (written contributions) at meeting
Meeting: C3-48b - 2008-06-23 to 2008-06-27, Zagreb
meeting id: C3-48b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
C3‑080856 | Allocation of documents to agenda items (at deadline) | CT3 Chair | - |
C3‑080857 | Allocation of documents to agenda items (start of Day1) | CT3 Chair | - |
C3‑080858 | Allocation of documents to agenda items (start of Day2) | CT3 Chair | - |
C3‑080859 | Allocation of documents to agenda items (start of Day3) | CT3 Chair | - |
C3‑080860 | Draft agenda for CT3#48bis meeting | CT3 Chair | - |
C3‑080861 | Allocation of documents to agenda items (start of Day4) | CT3 Chair | - |
C3‑080862 | Allocation of documents to agenda items (start of Day5) | CT3 Chair | - |
C3‑080863 | Allocation of documents to agenda items (end of Day5) | CT3 Chair | - |
C3‑080864 | Draft Report from CT3#48 | MCC | - |
C3‑080865 | Latest Version of 3GPP Workplan | MCC | - |
C3‑080866 | Status of CT3 specifications following CT#40 meeting | MCC | - |
C3‑080867 | Meeting Calendar for 2008 | MCC | - |
C3‑080868 | Add TS number 29.292 to the TS cover page | Mavenir | - |
C3‑080869 | Ambiguity in the specification of bandwidth in Rx (TS 29.214-730) | ETSI TISPAN WG3 | - |
C3‑080870 | LS to 3GPP CT3, CT4, CT1, SA1 and SA2 status on Overlap Work^^ | ETSI TISPAN WG3 | - |
C3‑080871 | LS on “Changes to the format of TMGI” | CT4 | - |
C3‑080872 | LS on documentation of TISPAN Rel-2 in 3GPP | 3GPP TSG CT | - |
C3‑080873 | LS on NGCN issues and proposed workshop | 3GPP CT1 | - |
C3‑080874 | LS on H.248 Profile on I3 Interface for IMS Centralised Service Control | TSG CT WG4 | - |
C3‑080875 | LS on A-Interface User Plane over IP | TSG GERAN | - |
C3‑080876 | Reply LS on improved IMS-CS Video Interworking with MONA | ITU-T SG 16 | - |
C3‑080877 | Reply LS on Applicability of Multimedia Priority Service | TSG SA WG1 | - |
C3‑080878 | Reply LS on NGCN issues and proposed workshop | TSG SA WG2 | - |
C3‑080879 | LS on documentation of TISPAN Rel-2 in 3GPP | TSG SA | - |
C3‑080880 | Sending of instant message in a SIP MESSAGE request | LM Ericsson | - |
C3‑080881 | Pseudo-CR on use of registration event package | LM Ericsson | - |
C3‑080882 | Concatenated ConConcatenated Short messages delivered as IM Large Message | LM Ericsson | - |
C3‑080883 | Example signalling flow for CS UE origination via an MSC enhanced ICS where the origination MSC server enhanced for ICS does not supports codec negotiation | LM Ericsson | - |
C3‑080884 | Example signalling flow for CS UE origination via an MSC enhanced ICS where the origination MSC server enhanced for ICS supports codec negotiation. | LM Ericsson | - |
C3‑080885 | Correction to the communication diversion service | LM Ericsson | - |
C3‑080886 | Correction to the communication diversion service | LM Ericsson | - |
C3‑080887 | Correction to supplementary service sections in TS 29.163 | LM Ericsson | - |
C3‑080888 | Correction to supplementary service sections in TS 29.163 | LM Ericsson | - |
C3‑080889 | Pseudo-CR on IP-SM-GW functionality in the terminating network | LM Ericsson | - |
C3‑080890 | Signalling mode at NNI | LM Ericsson | - |
C3‑080891 | Removing erroneous sections | LM Ericsson | - |
C3‑080892 | SMS-Deliver-Report and IMDN | LM Ericsson | - |
C3‑080893 | Discussion on Overlap in IMS | LM ericsson | - |
C3‑080894 | O-MGCF : Overlap signalling additions | LM Ericsson, Deutsche Telekom | - |
C3‑080895 | I-MGCF: Overlap signalling procedures | LM Ericsson, Deutsche Telekom | - |
C3‑080896 | Addition of support of the SDP Capability Negotiation and AVPF | LM Ericsson | - |
C3‑080897 | Conflicting stage 2 requirements for DRA | Bridgewater Systems | - |
C3‑080898 | Roaming Scenarios on S9 for LBO case (HPLMN) | Alcatel-Lucent | - |
C3‑080899 | Roaming Scenarios on S9 for LBO case (VPLMN) | Alcatel-Lucent | - |
C3‑080900 | Roaming Scenarios on S9 for LBO case | Alcatel-Lucent | - |
C3‑080901 | Trusted Non-3GPP Access Speciific AVPs over the Gxa Interface | Alcatel-Lucent, Huawei, Samsung | - |
C3‑080902 | GW (BBERF) Relocation | Alcatel-Lucent | - |
C3‑080903 | Update Gxx interface for Gateway relocation scenarios | Alcatel-Lucent | - |
C3‑080904 | PCRF Initiated GW Control Session Termination | Alcatel-Lucent | - |
C3‑080905 | Pseudo-CR on 3GPP SIP-I and ISUP Interworking | Alcatel-Lucent | - |
C3‑080906 | Pseudo-CR on Handling of unrecognized preconditions by external SIP-I networks | Alcatel-Lucent | - |
C3‑080907 | Pseudo-CR on Required preconditions | ALU | - |
C3‑080908 | Support for SCTP Associations | Alcatel-Lucent | - |
C3‑080909 | Discussion on the Operators’ Recommendation for DRA Approaches | Sprint, Orange,Telecom Italia, Vodafone | - |
C3‑080910 | Pseudo-CR on Interworking of Incoming Calls from IMS | Ericsson | - |
C3‑080911 | Pseudo-CR on Interworking of Outgoing Calls towards IMS | Ericsson | - |
C3‑080912 | Pseudo-CR on Incoming Call Flows from IMS | Ericsson | - |
C3‑080913 | Pseudo-CR on Outgoing Call Flows towards IMS | Ericsson | - |
C3‑080914 | Pseudo-CR on DTMF interworking procedures in SIP-I based Nc | Ericsson | - |
C3‑080915 | Brief notes from CT#40 relevant for CT3 | CT3 Chairman | - |
C3‑080916 | Proposed schedule for CT3#48bis | CT3 Chairman | - |
C3‑080917 | Location Dependent Content Transfer for MBMS Broadcast | Ericsson | - |
C3‑080918 | SGi: DHCP interworking on SGi interface | Ericsson | - |
C3‑080919 | Gi: Removal of IPv6 Stateful Address Autoconfiguration | Ericsson | - |
C3‑080920 | SGi: Clarification on logical reference configurations in Clause 6 | Ericsson | - |
C3‑080921 | SGi: IPv6 parameter configuration via stateless DHCPv6 | Ericsson | - |
C3‑080922 | RADIUS 3GPP Vendor-Specific sub-attributes for SGi | Ericsson | - |
C3‑080923 | AF-Application-Identifier AVP | Ericsson | - |
C3‑080924 | AF-Application-Identifier AVP | Ericsson | - |
C3‑080925 | Removal of BCM=Nw-Only | Ericsson | - |
C3‑080926 | Removal of BCM=Nw-Only | Ericsson | - |
C3‑080927 | Removal of BCM=Nw-Init | Ericsson | - |
C3‑080928 | Removal of BCM=Nw-Only | Ericsson | - |
C3‑080929 | ARP Handling in Gx | Ericsson | - |
C3‑080930 | ARP Handling | Ericsson | - |
C3‑080931 | Event Triggers handling in Gxx | Ericsson | - |
C3‑080932 | Alignment of RAT-type values with GTPv2 | Ericsson | - |
C3‑080933 | Completion of QoS rules request procedure in Gxx | Ericsson | - |
C3‑080934 | PCC Rule Error Handling | Ericsson, Qualcomm, Camiant | - |
C3‑080935 | PCC Rule Error Handling | Ericsson, Qualcomm, Camiant | - |
C3‑080936 | Gateway Control session Establishment Procedure | Ericsson | - |
C3‑080937 | IP-CAN Session Establishment flow description | Ericsson | - |
C3‑080938 | Bearer Binding update | Ericsson, Qualcomm | - |
C3‑080939 | Pseudo-CR on Operations on PCC Rules | Ericsson | - |
C3‑080940 | Pseudo-CR on Operations on Procedures over S9 Reference Point | Ericsson | - |
C3‑080941 | Request for PCC Rules over S9 | Ericsson | - |
C3‑080942 | Request for QoS Rules over S9 | Ericsson | - |
C3‑080943 | Provisioning of PCC Rules over S9 | Ericsson | - |
C3‑080944 | Provisioning of QoS Rules over S9 | Ericsson | - |
C3‑080945 | Pseudo-CR on Gxx messages over S9 for visited access | Ericsson | - |
C3‑080946 | Overview on Overlap signalling an the resuming changes | Deutsche Telekom, T-Mobile | - |
C3‑080947 | Mapping of TMU | Deutsche Telekom, T-Mobile | - |
C3‑080948 | Mapping of TMU | Deutsche Telekom | - |
C3‑080949 | Progress Indicator mapping | Deutsche Telekom, T-Mobile | - |
C3‑080950 | Progress Indicator mapping | Deutsche Telekom, T-Mobile | - |
C3‑080951 | Mapping of Progress Indicator | Deutsche Telekom | - |
C3‑080952 | Editorial changes | Deutsche Telekom, T-Mobile | - |
C3‑080953 | CR on 24.229 for In Dialog signalling | Deutsche Telekom, T-Mobile | - |
C3‑080954 | Pseudo-CR on Provisioning of event triggers over S9 | Ericsson | - |
C3‑080955 | Reply LS on Ambiguity in the specification of bandwidth in Rx (TS 29.214-730) | Nokia Siemens Networks | - |
C3‑080956 | Error code misalignments | Nokia Siemens Networks | - |
C3‑080957 | Error code misalignments | Nokia Siemens Networks | - |
C3‑080958 | Out of credit indication | Nokia Siemens Networks | - |
C3‑080959 | Out of credit indication | Nokia Siemens Networks | - |
C3‑080960 | Out of credit indication | Nokia Siemens Networks | - |
C3‑080961 | Out of credit indication | Nokia Siemens Networks | - |
C3‑080962 | Mapping of Call Rejected | Nokia Siemens Networks | - |
C3‑080963 | GGSN-initiated broadcast session termination | Ericsson | - |
C3‑080964 | Pseudo-CR to update references to 3GPP TS 24.292 | Mavenir | - |
C3‑080965 | Pseudo-CR on clarification that the CS-MGW is used for ICS | Mavenir | - |
C3‑080966 | Pseudo-CR on adding new subclauses for call clearing | Mavenir | - |
C3‑080967 | Discussion paper showing example signalling flow for CS UE termination with codec negotiation via enhanced MSC Server | Mavenir | - |
C3‑080968 | Discussion paper showing example signalling flow for CS UE termination without codec negotiation via enhanced MSC Server | Mavenir | - |
C3‑080969 | Pseudo-CR on the interworking of mobile originating call from NAS signalling to SIP – Success scenario and OIR | Mavenir | - |
C3‑080970 | Pseudo-CR on the interworking of mobile originating call from NAS signalling to SIP – Failure scenarios | Mavenir | - |
C3‑080971 | Pseudo-CR on the interworking of the TIP service during a mobile originated cal | Mavenir | - |
C3‑080972 | Pseudo-CR on the interworking of mobile initiated call clearing | Mavenir | - |
C3‑080973 | Pseudo-CR on the interworking of IMS initiated call clearing | Mavenir | - |
C3‑080974 | Pseudo-CR on the interworking of MSC Server initiated call clearing | Mavenir | - |
C3‑080975 | Pseudo-CR on the interworking of mobile terminating call from SIP to NAS signalling – Normal (success) scenarios and OIP | Mavenir | - |
C3‑080976 | Pseudo-CR on the interworking of mobile terminating call from SIP to NAS signalling – Failure scenarios | Mavenir | - |
C3‑080977 | Pseudo-CR on the interworking of the TIR service during a mobile terminated call | Mavenir | - |
C3‑080978 | Pseudo-CR on the User Plane Interworking subclause for IuCS to Mb interworking | Mavenir | - |
C3‑080979 | Pseudo-CR on the User Plane Interworking subclause for A to Mb interworking | Mavenir | - |
C3‑080980 | Remove unused reference | Qualcomm Europe | - |
C3‑080981 | Disc on Signaling for improved MTSI and 3G 324M inter-working | Qualcomm Europe | - |
C3‑080982 | Improvements for MTSI and 3G 324M interworking | Qualcomm Europe | - |
C3‑080983 | Update to binding mechanisms | Qualcomm Europe | - |
C3‑080984 | Gateway control and QoS rules request flow | Qualcomm Europe | - |
C3‑080985 | Gateway control and QoS rules provision flow | Qualcomm Europe | - |
C3‑080986 | Gateway control session termination flow | Qualcomm Europe | - |
C3‑080987 | Add CoA and tunnel related AVPs | Qualcomm Europe | - |
C3‑080988 | Separation of GPRS specific procedures | Qualcomm Europe | - |
C3‑080989 | QoS mapping in PCC | Qualcomm Europe | - |
C3‑080990 | Pseudo-CR on QoS mapping procedures | Qualcomm Europe | - |
C3‑080991 | Pseudo-CR on II-NNI: Overview | Telecom Italia, Ericsson, Orange, Huawei | - |
C3‑080992 | Pseudo-CR on II-NNI: Reference Model | Telecom Italia, Ericsson, Orange, Huawei | - |
C3‑080993 | Pseudo-CR on II-NNI: User plane Interconnection | Telecom Italia, Ericsson, Orange, Huawei | - |
C3‑080994 | Pseudo-CR on II-NNI: cleaning TR version for CT approval | Telecom Italia | - |
C3‑080995 | Pseudo-CR on Stage 2 aspects for CS-IBCF and CS-TrGW | Telecom Italia, Huawei | - |
C3‑080996 | Pseudo-CR on Home-routed access procedures over S9 | Nortel, Ericsson | - |
C3‑080997 | Pseudo-CR on Visited access procedures over S9 | Nortel, Ericsson | - |
C3‑080998 | All access PLMN identifier AN-MCC-MNC AVP | Nortel | - |
C3‑080999 | Gxx - Initialisation, maintainance and termination of Diameter sessions | Nortel | - |
C3‑081000 | Pseudo-CR on Initialisation, maintainance and termination of Diameter sessions over S9 | Nortel | - |
C3‑081001 | Transit of ISUP through IMS using IMS SIP-I in support of public PSTN/ISDN networks | Nortel | - |
C3‑081002 | Optional support of binary ISUP encapsulation (IMS SIP-I) within IMS | Nortel | - |
C3‑081003 | WID for Support of Service-Level Interworking for Messaging Services Stage 3 | Huawei | - |
C3‑081004 | Pseudo-CR on Handling of routing information | Huawei | - |
C3‑081005 | Pseudo-CR on IM to SM deliver: Receiving of MESSAGE | Huawei | - |
C3‑081006 | IM to SM deliver: Sending of SMS-DELIVER | Huawei | - |
C3‑081007 | Pseudo-CR on IM to SM deliver: Receiving of SMS-DELIVER-REPORT | Huawei | - |
C3‑081008 | Pseudo-CR on IM to SM deliver: Sending of IMDN | Huawei | - |
C3‑081009 | Pseudo-CR on IM to SM submission: Receiving of SMS-STATUS-REPORT | Huawei | - |
C3‑081010 | Skeleton for the shadow TS 29.061 | Huawei | - |
C3‑081011 | Service interworking for EPS | Huawei, Orange, Telecom Italia | - |
C3‑081012 | Interworking with PDN (DHCP) for EPS | Huawei, Orange | - |
C3‑081013 | IPv4 address allocation via default bearer activation by DHCP | Huawei, Orange | - |
C3‑081014 | Usage of RADIUS on SGi interface | Huawei, Orange, Telecom Italia | - |
C3‑081015 | IP-CAN session termination initiated by PCRF | Huawei | - |
C3‑081016 | IP-CAN session termination initiated by PCRF | Huawei | - |
C3‑081017 | PCC rule status consistency | Huawei | - |
C3‑081018 | PCC rule status consistency | Huawei | - |
C3‑081019 | Information for Session binding | Huawei | - |
C3‑081020 | Information for Session binding | Huawei | - |
C3‑081021 | The APN of AF session provided to the H-PCRF | Huawei | - |
C3‑081022 | Change on the formate of TMGI over Gmb | Huawei | - |
C3‑081023 | Change on the formate of TMGI over Gmb | Huawei | - |
C3‑081024 | Reply LS on "Changes to the format of TMGI" | Huawei | - |
C3‑081025 | 3GPP Evaluation for Re-use of AVPs | Huawei | - |
C3‑081026 | 3GPP Evaluation for Version Handling | Huawei | - |
C3‑081027 | 3GPP Evaluation for Setting of a new Application-Id | Huawei | - |
C3‑081028 | 3GPP Evaluation for Adding new values to an existing enumerated AVP | Huawei | - |
C3‑081029 | Use-cases and Requirements for Enhancement of Interworking between MTSI and Circuit Switched networks | Huawei | - |
C3‑081030 | Work plan for WID "Enhancement of interworking between MTSI and Circuit Switched networks" | Huawei | - |
C3‑081031 | PCC Rule Error Handling | Camiant, Qualcomm, Ericsson | - |
C3‑081032 | PCC Error Handling Procedures | Camiant, Qualcomm, Ericsson | - |
C3‑081033 | Update of the vPCRF and hPCRF functional description | ZTE | - |
C3‑081034 | Update of UE-Initiated IP-CAN Session termination folw | ZTE | - |
C3‑081035 | Update of GW-Initiated IP-CAN Session termination folw | ZTE | - |
C3‑081036 | Update of PCRF-Initiated IP-CAN Session termination folw | ZTE | - |
C3‑081037 | Update of the scope and references of 29.213 | ZTE | - |
C3‑081038 | Removing the unnecessary subclause | ZTE | - |
C3‑081039 | PCRF initiated gateway control session termination | ZTE | - |
C3‑081040 | Update of the Gateway control and QoS rules request/reply procedure | ZTE | - |
C3‑081041 | P-CR Parameters Interworking decision OMA-SIMPLE-IM | Acision | - |
C3‑081042 | P-CR Selecting the Delivery method | Acision | - |
C3‑081043 | QCI values | Ericsson | - |
C3‑081044 | ISUP Interworking Procedures | Nokia Siemens Networks | - |
C3‑081045 | ISUP Interworking Example Callflows | Nokia Siemens Networks | - |
C3‑081046 | User Plane Interworking | Nokia Siemens Networks | - |
C3‑081047 | DTMF Interworking towards SIP-I | Nokia Siemens Networks | - |
C3‑081048 | DTMF interworking procedures between SIP-I based Nc and IMS | Nokia Siemens Networks | - |
C3‑081049 | DTMF interworking procedures between SIP-I based Nc and BICC based network | Nokia Siemens Networks | - |
C3‑081050 | DTMF interworking procedures between SIP-I based Nc and ISUP based network | Nokia Siemens Networks | - |
C3‑081051 | Evaluation: Multiple-INVITEs versus In-Dialog | Alcatel-Lucent, Nokia Siemens Networks | - |
C3‑081052 | Non-encoding related possible impacts of overlap signalling | Nokia Siemens Networks | - |
C3‑081053 | Reply LS on "New WID on "Encoding formats, transport formats and media description signalling for interworking, QoE, and other enhancements to MTSI-MHI" | Nokia Siemens Networks | - |
C3‑081054 | TCP session termination and reuse | Nokia Siemens Networks | - |
C3‑081055 | TCP session termination and reuse | Nokia Siemens Networks | - |
C3‑081056 | SIP Haeder Handling | Nokia Siemens Networks | - |
C3‑081057 | Proposed revised WID on CS-IBCF and CS-TrGW definition in 3GPP specifications | LM Ericsson, Vodafone, Alcatel-Lucent, Telecom Italia | - |
C3‑081058 | GGSN-initiated broadcast session termination | Ericsson | - |
C3‑081059 | WMIAX AVPs on Gxa interface | Alcatel-Lucent,Sprint | - |
C3‑081060 | Change on the formate of TMGI over Gmb | Huawei,Ericsson | - |
C3‑081061 | Change on the formate of TMGI over Gmb | Huawei,Ericsson | - |
C3‑081062 | Reply LS on "Changes to the format of TMGI" | Huawei,Ericsson | - |
C3‑081063 | Reply LS on Ambiguity in the specification of bandwidth in Rx (TS 29.214-730) | Nokia Siemens Networks | - |
C3‑081064 | LS on Clarification of stage 2 requirements for DRA | CT3 | - |
C3‑081065 | Removal of BCM=Nw-Only | Ericsson | - |
C3‑081066 | Removal of BCM=Nw-Init | Ericsson | - |
C3‑081067 | Removal of BCM=Nw-Only | Ericsson | - |
C3‑081068 | Removal of BCM=Nw-Only | Ericsson | - |
C3‑081069 | Out of credit indication | Nokia Siemens Networks, Starent | - |
C3‑081070 | Out of credit indication | Nokia Siemens Networks, Starent | - |
C3‑081071 | Pseudo-CR on Stage 2 aspects for CS-IBCF and CS-TrGW | Telecom Italia, Huawei | - |
C3‑081072 | Transit of ISUP through IMS using IMS SIP-I in support of public PSTN/ISDN networks | Nortel, BT | - |
C3‑081073 | Optional support of binary ISUP encapsulation (IMS SIP-I) within IMS | Nortel, BT | - |
C3‑081074 | ISUP Interworking Procedures | Nokia Siemens Networks | - |
C3‑081075 | Pseudo-CR on Interworking of Incoming Calls from IMS | Ericsson | - |
C3‑081076 | Pseudo-CR on Interworking of Outgoing Calls towards IMS | Ericsson | - |
C3‑081077 | Pseudo-CR on Incoming Call Flows from IMS | Ericsson | - |
C3‑081078 | LS on Current Status of Interworking Specifications within 3GPP | CT3 | - |
C3‑081079 | Pseudo-CR on DTMF interworking procedures in SIP-I based Nc | Ericsson,Vodafone | - |
C3‑081080 | Pseudo-CR on Stage 2 aspects for CS-IBCF and CS-TrGW | Telecom Italia, Huawei | - |
C3‑081081 | TCP session termination and reuse | Nokia Siemens Networks | - |
C3‑081082 | TCP session termination and reuse | Nokia Siemens Networks | - |
C3‑081083 | IP-CAN session termination initiated by PCRF | Huawei | - |
C3‑081084 | IP-CAN session termination initiated by PCRF | Huawei | - |
C3‑081085 | Skeleton for the shadow TS 29.061 | Huawei | - |
C3‑081086 | SGi: DHCP interworking on SGi interface | Ericsson | - |
C3‑081087 | Usage of RADIUS on SGi interface | Huawei, Orange, Telecom Italia | - |
C3‑081088 | Sending of instant message in a SIP MESSAGE request | LM Ericsson | - |
C3‑081089 | Pseudo-CR on use of registration event package | LM Ericsson | - |
C3‑081090 | Concatenated ConConcatenated Short messages delivered as IM Large Message | LM Ericsson | - |
C3‑081091 | Pseudo-CR on IP-SM-GW functionality in the terminating network | Huawei, Ericsson, Acision | - |
C3‑081092 | Pseudo-CR on IM to SM deliver: Receiving of SMS-DELIVER-REPORT | Huawei, Comverse, Acision | - |
C3‑081093 | Pseudo-CR on IM to SM deliver: Sending of IMDN | Huawei, Comverse, Acision | - |
C3‑081094 | Pseudo-CR on Handling of routing information | Huawei, Comverse | - |
C3‑081095 | Pseudo-CR on IM to SM submission: Receiving of SMS-STATUS-REPORT | Huawei, Comverse | - |
C3‑081096 | Example signalling flow for CS UE origination via an MSC enhanced ICS where the origination MSC server enhanced for ICS does not supports codec negotiation | LM Ericsson | - |
C3‑081097 | Example signalling flow for CS UE origination via an MSC enhanced ICS where the origination MSC server enhanced for ICS supports codec negotiation. | LM Ericsson | - |
C3‑081098 | Clarification that the CS-MGW is used for ICS | Mavenir | - |
C3‑081099 | Information flow for terminating call interworking (IMS to CS) with codec negotiation | Mavenir | - |
C3‑081100 | Pseudo-CR on the interworking of mobile originating call from NAS signalling to SIP – Success scenario and OIR | Mavenir | - |
C3‑081101 | Pseudo-CR on the interworking of mobile originating call from NAS signalling to SIP – Failure scenarios | Mavenir | - |
C3‑081102 | Pseudo-CR on the interworking of the TIP service during a mobile originated cal | Mavenir | - |
C3‑081103 | Pseudo-CR on the interworking of mobile initiated call clearing | Mavenir | - |
C3‑081104 | Pseudo-CR on the interworking of MSC Server initiated call clearing | Mavenir | - |
C3‑081105 | Pseudo-CR on the interworking of mobile terminating call from SIP to NAS signalling – Normal (success) scenarios and OIP | Mavenir | - |
C3‑081106 | Pseudo-CR on the interworking of mobile terminating call from SIP to NAS signalling – Failure scenarios | Mavenir | - |
C3‑081107 | Pseudo-CR on the interworking of the TIR service during a mobile terminated call | Mavenir | - |
C3‑081108 | Pseudo-CR on the User Plane Interworking subclause for IuCS to Mb interworking | Mavenir | - |
C3‑081109 | Pseudo-CR on the User Plane Interworking subclause for A to Mb interworking | Mavenir | - |
C3‑081110 | Potential topics for the SAE/PCC breakout session Wednesday, June 25 | CT3 Chairman | - |
C3‑081111 | Proposed schedule for CT3#48bis | CT3 Chairman | - |
C3‑081112 | Status of CT3 Work items at CT3#48bis | CT3 Chairman | - |
C3‑081113 | Pseudo-CR on Operations on PCC Rules | Ericsson | - |
C3‑081114 | Pseudo-CR on Provisioning of event triggers over S9 | Ericsson | - |
C3‑081115 | Gateway control and QoS rules request flow | Qualcomm Europe | - |
C3‑081116 | Gateway control and QoS rules provision flow | Qualcomm Europe | - |
C3‑081117 | Gateway control session termination flow | Qualcomm Europe | - |
C3‑081118 | Add CoA and tunnel related AVPs | Qualcomm Europe | - |
C3‑081119 | Editorial changes | Deutsche Telekom, T-Mobile | - |
C3‑081120 | LS on Clarification of stage 2 requirements for DRA | CT3 | - |
C3‑081121 | Proposed schedule for CT3#48bis | CT3 Chairman | - |
C3‑081122 | PCC Error Handling Procedures | Camiant, Qualcomm, Ericsson | - |
C3‑081123 | PCC Rule Error Handling | Camiant, Qualcomm, Ericsson | - |
C3‑081124 | Out of credit indication | Nokia Siemens Networks | - |
C3‑081125 | Out of credit indication | Nokia Siemens Networks | - |
C3‑081126 | Information for Session binding | Huawei | - |
C3‑081127 | Information for Session binding | Huawei | - |
C3‑081128 | Roaming Scenarios on S9 for LBO case (HPLMN) | Alcatel-Lucent | - |
C3‑081129 | Roaming Scenarios on S9 for LBO case (VPLMN) | Alcatel-Lucent | - |
C3‑081130 | Roaming Scenarios on S9 for LBO case | Alcatel-Lucent | - |
C3‑081131 | GW (BBERF) Relocation | Alcatel-Lucent | - |
C3‑081132 | Update Gxx interface for Gateway relocation scenarios | Alcatel-Lucent | - |
C3‑081133 | PCRF Initiated GW Control Session Termination | Alcatel-Lucent | - |
C3‑081134 | ARP Handling in Gx | Ericsson | - |
C3‑081135 | ARP Handling | Ericsson | - |
C3‑081136 | Event Triggers handling in Gxx | Ericsson | - |
C3‑081137 | Alignment of RAT-type values with GTPv2 | Ericsson | - |
C3‑081138 | GGSN-initiated broadcast session termination | Ericsson | - |
C3‑081139 | GGSN-initiated broadcast session termination | Ericsson | - |
C3‑081140 | Completion of QoS rules request procedure in Gxx | Ericsson | - |
C3‑081141 | Gateway Control session Establishment Procedure | Ericsson | - |
C3‑081142 | IP-CAN Session Establishment flow description | Ericsson | - |
C3‑081143 | Pseudo-CR on Operations on PCC Rules | Ericsson | - |
C3‑081144 | Pseudo-CR on Gxx messages over S9 for visited access | Ericsson | - |
C3‑081145 | Pseudo-CR on Provisioning of event triggers over S9 | Ericsson | - |
C3‑081146 | Update to binding mechanisms | Qualcomm Europe | - |
C3‑081147 | Gateway control and QoS rules request flow | Qualcomm Europe | - |
C3‑081148 | Gateway control and QoS rules provision flow | Qualcomm Europe | - |
C3‑081149 | Gateway control session termination flow | Qualcomm Europe | - |
C3‑081150 | Add CoA and tunnel related AVPs | Qualcomm Europe | - |
C3‑081151 | Separation of GPRS specific procedures | Qualcomm Europe | - |
C3‑081152 | Pseudo-CR on Home-routed access procedures over S9 | Nortel, Ericsson | - |
C3‑081153 | Pseudo-CR on Visited access procedures over S9 | Nortel, Ericsson | - |
C3‑081154 | SGi: Clarification on logical reference configurations in Clause 6 | Ericsson | - |
C3‑081155 | SGi: IPv6 parameter configuration via stateless DHCPv6 | Ericsson | - |
C3‑081156 | RADIUS 3GPP Vendor-Specific sub-attributes for SGi | Ericsson | - |
C3‑081157 | Signalling mode at NNI | LM Ericsson | - |
C3‑081158 | Pseudo-CR on II-NNI: Reference Model | Telecom Italia, Ericsson, Orange, Huawei | - |
C3‑081159 | Pseudo-CR on II-NNI: User plane Interconnection | Telecom Italia, Ericsson, Orange, Huawei | - |
C3‑081160 | Signaling for improved MTSI and 3G 324M inter-working | CT3 | - |
C3‑081161 | LS on Possbile interworking of MTSI parameters | CT3 | - |
C3‑081162 | Addition of support of the SDP Capability Negotiation and AVPF | LM Ericsson | - |
C3‑081163 | Mapping of TMU | Deutsche Telekom, T-Mobile | - |
C3‑081164 | Mapping of TMU | Deutsche Telekom | - |
C3‑081165 | Progress Indicator mapping | Deutsche Telekom, T-Mobile | - |
C3‑081166 | Progress Indicator mapping | Deutsche Telekom, T-Mobile | - |
C3‑081167 | Editorial changes | Deutsche Telekom, T-Mobile | - |
C3‑081168 | TR 29.165 v1.2.0 | Telecom Italia | - |
C3‑081169 | LS on Actions upon out of credit condition | CT3 | - |
C3‑081170 | All access PLMN identifier AN-MCC-MNC AVP | Nortel | - |
C3‑081171 | Gxx - Initialisation, maintainance and termination of Diameter sessions | Nortel | - |
C3‑081172 | Pseudo-CR on Initialisation, maintainance and termination of Diameter sessions over S9 | Nortel | - |
C3‑081173 | Update of UE-Initiated IP-CAN Session termination folw | ZTE | - |
C3‑081174 | Update of GW-Initiated IP-CAN Session termination flow | ZTE | - |
C3‑081175 | Update of PCRF-Initiated IP-CAN Session termination folw | ZTE | - |
C3‑081176 | Update of the scope and references of 29.213 | ZTE | - |
C3‑081177 | Removing the unnecessary subclause | ZTE | - |
C3‑081178 | Update of the Gateway control and QoS rules request/reply procedure | ZTE | - |
C3‑081179 | LS on Mismatched QCI values between Rel-7 and Rel-8 | CT3 | - |
C3‑081180 | LS on Actions upon out of credit condition | CT3 | - |
C3‑081181 | Information for Session binding | Huawei | - |
C3‑081182 | Information for Session binding | Huawei | - |
C3‑081183 | Pseudo-CR on Operations on Procedures over S9 Reference Point | Ericsson | - |
C3‑081184 | Pseudo-CR on Home-routed access procedures over S9 | Nortel, Ericsson | - |
C3‑081185 | GGSN-initiated broadcast session termination | Ericsson | - |
C3‑081186 | Gateway Control session Establishment Procedure | Ericsson | - |
C3‑081187 | LS on Clarification of stage 2 requirements for DRA | CT3 | - |
C3‑081188 | 3GPP Evaluation for Re-use of AVPs | Huawei, Alcatel-Lucent, Bridgewater Systerms | - |
C3‑081189 | 3GPP Evaluation for Version Handling | Huawei, Alcatel-Lucent, Bridgewater Systems | - |
C3‑081190 | 3GPP Evaluation for Setting of a new Application-Id | Huawei, Alcatel-Lucent, Bridgewater Systems | - |
C3‑081191 | 3GPP Evaluation for Adding new values to an existing enumerated AVP | Huawei, Alcatel-Lucent, Bridgewater Systems, TeliaSonera | - |
C3‑081192 | Pseudo-CR on Handling of unrecognized preconditions by external SIP-I networks | Alcatel-Lucent | - |
C3‑081193 | Concatenated ConConcatenated Short messages delivered as IM Large Message | Ericsson | - |
C3‑081194 | Pseudo-CR on IM to SM deliver: Sending of IMDN | Huawei, Comverse, Acision | - |
C3‑081195 | Pseudo-CR on IM to SM submission: Receiving of SMS-STATUS-REPORT | Huawei, Comverse | - |
C3‑081196 | 29.311 v0.2.0 | Huawei | - |
C3‑081197 | PCC Error Handling Procedures | Camiant, Qualcomm, Ericsson, Huawei | - |
C3‑081198 | PCC Rule Error Handling | Camiant, Qualcomm, Ericsson, Huawei | - |
C3‑081199 | Information for Session binding | Huawei | - |
C3‑081200 | Event Triggers handling in Gxx | Ericsson | - |
C3‑081201 | Completion of QoS rules request procedure in Gxx | Ericsson | - |
C3‑081202 | Gateway Control session Establishment Procedure | Ericsson | - |
C3‑081203 | Gateway control and QoS rules request flow | Qualcomm Europe | - |
C3‑081204 | Gateway control and QoS rules provision flow | Qualcomm Europe | - |
C3‑081205 | Add CoA and tunnel related AVPs | Qualcomm Europe | - |
C3‑081206 | RADIUS 3GPP Vendor-Specific sub-attributes for SGi | Ericsson | - |
C3‑081207 | ISUP Interworking Procedures | Nokia Siemens Networks | - |
C3‑081208 | Pseudo-CR on II-NNI: User plane Interconnection | Telecom Italia, Ericsson, Orange, Huawei | - |
C3‑081209 | Mapping of TMU | Deutsche Telekom, T-Mobile, Telekom Austria | - |
C3‑081210 | Progress Indicator mapping | Deutsche Telekom, T-Mobile, Telekom Austria | - |
C3‑081211 | LS on Possbile interworking of MTSI parameters | CT3 | - |
C3‑081212 | 29.292 v0.2.0 | Mavenir | - |
C3‑081213 | Disc on Signaling for improved MTSI and 3G 324M inter-working | CT3 | - |
C3‑081214 | LS on Current Status of Interworking Specifications within 3GPP | CT3 | - |
C3‑081215 | IP-CAN session termination initiated by PCRF | Huawei | - |
C3‑081216 | IP-CAN session termination initiated by PCRF | Huawei | - |
C3‑081217 | Roaming Scenarios on S9 for LBO case | Alcatel-Lucent | - |
C3‑081218 | Roaming Scenarios on S9 for LBO case (HPLMN) | Alcatel-Lucent | - |
C3‑081219 | Roaming Scenarios on S9 for LBO case (VPLMN) | Alcatel-Lucent | - |
C3‑081220 | Update Gxx interface for Gateway relocation scenarios | Alcatel-Lucent | - |
C3‑081221 | PCRF Initiated GW Control Session Termination | Alcatel-Lucent | - |
C3‑081222 | Completion of QoS rules request procedure in Gxx | Ericsson | - |
C3‑081223 | Update of UE-Initiated IP-CAN Session termination flow | ZTE | - |
C3‑081224 | PCRF initiated gateway control session termination | ZTE | - |
C3‑081225 | Potential topics for the SAE/PCC breakout session Wednesday, June 25 | CT3 Chairman | - |
C3‑081226 | The APN of AF session provided to the H-PCRF | Huawei | - |
C3‑081227 | Decision on Session Termination | CT3 Chairman | - |
C3‑081228 | TS 29.165 v0.1.0 | Telecom Italia | - |
C3‑081229 | Update of UE-Initiated IP-CAN Session termination flow | ZTE | - |
C3‑081230 | Update of GW-Initiated IP-CAN Session termination folw | ZTE | - |
C3‑081231 | Update of PCRF-Initiated IP-CAN Session termination folw | ZTE | - |
C3‑081232 | Usage of RADIUS on SGi interface | Huawei, Orange, Telecom Italia | - |
C3‑081233 | LS on Current Status of Interworking Specifications within 3GPP | CT3 | - |
C3‑081234 | Roaming Scenarios on S9 for LBO case | Alcatel-Lucent | - |
C3‑081235 | Roaming Scenarios on S9 for LBO case (HPLMN) | Alcatel-Lucent | - |
C3‑081236 | Roaming Scenarios on S9 for LBO case (VPLMN) | Alcatel-Lucent | - |
C3‑081237 | The PDN information provided to the H-PCRF(29.804) | Huawei | - |
C3‑081238 | IP-CAN Session Establishment flow description | Ericsson | - |
C3‑081239 | LS on Current Status of Interworking Specifications within 3GPP | CT3 | - |
C3‑081240 | Roaming Scenarios on S9 for LBO case | Alcatel-Lucent | - |
C3‑081241 | Roaming Scenarios on S9 for LBO case (VPLMN) | Alcatel-Lucent | - |
C3‑081242 | User Plane Interworking | Nokia Siemens Networks | - |
C3‑081243 | 3GPP Evaluation for Re-use of AVPs | Huawei, Alcatel-Lucent, Bridgewater Systerms | - |
C3‑081244 | The PDN information provided to the H-PCRF(29.804) | Huawei | - |
C3‑081245 | Update of UE-Initiated IP-CAN Session termination flow | ZTE | - |
C3‑081246 | Update of GW-Initiated IP-CAN Session termination flow | ZTE | - |
C3‑081247 | Update of PCRF-Initiated IP-CAN Session termination folw | ZTE | - |
C3‑081248 | 29.804 v1.1.0 | Ericsson | - |
C3‑081249 | 29.213 v0.2.0 | Ericsson | - |
C3‑081250 | Shadow TS 29.061 v0.2.0 | Orange | - |
C3‑081251 | 29.238 v0.3.0 | Nokia Siemens Networks | - |
C3‑081252 | 29.909 v1.3.0 | Huawei | - |
C3‑081253 | Status of CT3 Work items at CT3#48bis | CT3 Chairman | - |
C3‑081254 | LS on Possbile interworking of MTSI parameters | CT3 | - |
page generated from database: 2024-10-07 07:52:06