Generations of Mobile Standards

3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 34.121

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - D R99 3.0.1 3.1.0 Editorial corrections to clauses 2, 3, 4 and 5.1 TP-08 TP-000090 approved T1 - T1‑000059 agreed 2000‑05‑21 - -
0002 - C R99 3.0.1 3.1.0 Modifications to clause 5.4 Output Power Dynamics in the Uplink TP-08 TP-000090 approved T1 - T1‑000060 agreed 2000‑06‑14 - -
0003 - B R99 3.0.1 3.1.0 Out-of-synchronisation handling of the UE TP-08 TP-000090 approved T1 - T1‑000061 agreed 2000‑06‑14 - -
0004 - D R99 3.0.1 3.1.0 Modifications to clauses 5.8, 5.9, 5.10 and 5.11 TP-08 TP-000090 approved T1 - T1‑000062 agreed 2000‑06‑14 - -
0005 - F R99 3.0.1 3.1.0 Modifications to Chapter 6 Receiver Characteristics TP-08 TP-000090 approved T1 - T1‑000063 agreed 2000‑06‑14 - -
0006 - F R99 3.0.1 3.1.0 Modifications to Annex D, Annex E, Annex G and Annex H TP-08 TP-000090 approved T1 - T1‑000067 agreed 2000‑06‑14 - -
0007 - B R99 3.0.1 - Interpretation of measurement results TP-08 TP-000090 rejected T1 - T1‑000068 agreed 2000‑06‑14 - -
0008 - F R99 3.0.1 3.1.0 Modifications to clauses 5.5, 5.6 and 5.7 TP-08 TP-000090 approved T1 - T1‑000069 agreed 2000‑06‑14 - -
0009 - F R99 3.0.1 3.1.0 Modifications to Chapter 7 Performance requirements TP-08 TP-000090 approved T1 - T1‑000070 agreed 2000‑06‑14 - -
0010 - F R99 3.0.1 3.1.0 Modifications to test power control in downlink TP-08 TP-000090 approved T1 - T1‑000071 agreed 2000‑06‑14 - -
0011 - F R99 3.0.1 3.1.0 Modifications to clause 5.13 Transmit Modulation TP-08 TP-000090 approved T1 - T1‑000072 agreed 2000‑06‑14 - -
0012 - F R99 3.0.1 3.1.0 Modifications to test for inner loop power control in the uplink TP-08 TP-000090 approved T1 - T1‑000073 agreed 2000‑06‑14 - -
0013 - F R99 3.0.1 3.1.0 Revision of Annex B: Global in-channel Tx test TP-08 TP-000090 approved T1 - T1‑000074 agreed 2000‑06‑14 - -
0014 - B R99 3.0.1 3.1.0 Blind transport format detection TP-08 TP-000090 approved T1 - T1‑000075 agreed 2000‑06‑14 - -
0015 - D R99 3.0.1 3.1.0 Removal of Annex I Open Items TP-08 TP-000090 approved T1 - T1‑000077 agreed 2000‑06‑14 - -
0016 - C R99 3.0.1 3.1.0 Modifications to Chapter 8 Requirements for support of RRM TP-08 TP-000090 approved T1 - T1‑000117 agreed 2000‑06‑14 - -
0017 - F R99 3.0.1 3.1.0 Modifications to Annex C Measurement channels TP-08 TP-000090 approved T1 - T1‑000118 agreed 2000‑06‑14 - -
0018 - F R99 3.0.1 3.1.0 Idle mode test cases (test of performance requirements) TP-08 TP-000090 approved T1 - T1‑000119 agreed 2000‑06‑14 - -
0019 - F R99 3.1.0 3.2.0 Editorial corrections for References and Frequency Stability (2, 5.2, 5.3) TP-09 TP-000163 approved T1 T1-08 T1‑000131 agreed 2000‑09‑04 - -
0020 - F R99 3.1.0 3.2.0 Corrections for Output Power Dynamics in the Uplink (5.4) TP-09 TP-000163 approved T1 T1-08 T1‑000132 agreed 2000‑09‑04 - -
0021 - F R99 3.1.0 3.2.0 Transients for uplink inner loop power control (5.4.2.4.2) TP-09 TP-000163 approved T1 T1-08 T1‑000133 agreed 2000‑09‑04 - -
0022 - F R99 3.1.0 3.2.0 Transmit On/Off power (5.5.2.4.2) TP-09 TP-000163 approved T1 T1-08 T1‑000134 agreed 2000‑09‑04 - -
0023 - F R99 3.1.0 3.2.0 Change of TFC (5.6.4.2) TP-09 TP-000163 approved T1 T1-08 T1‑000135 agreed 2000‑09‑04 - -
0024 - F R99 3.1.0 3.2.0 Clarification of the definition on Peak Code Domain Error (5.13.2.1) TP-09 TP-000163 approved T1 T1-08 T1‑000139 agreed 2000‑09‑04 - -
0025 - F R99 3.1.0 3.2.0 UE interfering signal definition (6.3, 6.4, 6.5, 6.7) TP-09 TP-000163 approved T1 T1-08 T1‑000140 agreed 2000‑09‑04 - -
0026 - F R99 3.1.0 3.2.0 Performance requirements (7.1, 7.2, 7.3, 7.4, 7.5) TP-09 TP-000163 approved T1 T1-08 T1‑000143 agreed 2000‑09‑04 - -
0027 - F R99 3.1.0 3.2.0 on clause 7.6 and 7.7 in TS34.121 (7.6, 7.7) TP-09 TP-000163 approved T1 T1-08 T1‑000144 agreed 2000‑09‑04 - -
0028 - F R99 3.1.0 3.2.0 Performance requirements (7.9, 7.10, 7.11) TP-09 TP-000163 approved T1 T1-08 T1‑000146 agreed 2000‑09‑04 - -
0029 - F R99 3.1.0 3.2.0 Corrections for Annex D (Annex-D) TP-09 TP-000163 approved T1 T1-08 T1‑000147 agreed 2000‑09‑04 - -
0030 - F R99 3.1.0 3.2.0 Corrections for Annex E (Annex-E) TP-09 TP-000163 approved T1 T1-08 T1‑000148 agreed 2000‑09‑04 - -
0031 - F R99 3.1.0 3.2.0 Corrections for Transmit ON/OFF Power, Change of TFC and Power setting in uplink compressed mode (5.5, 5.6, 5.7) TP-09 TP-000163 approved T1 T1-08 T1‑000149 agreed 2000‑09‑04 - -
0032 - F R99 3.1.0 3.2.0 Corrections for power setting in uplink compressed mode (5.7) TP-09 TP-000163 approved T1 T1-08 T1‑000136 agreed 2000‑09‑04 - -
0033 - B R99 3.1.0 3.2.0 for subclause 7.8: Power control in downlink (7.8) TP-09 TP-000163 approved T1 T1-08 T1‑000145 agreed 2000‑09‑04 - -
0034 - F R99 3.1.0 3.2.0 Corrections to clause 5.8, 5.9, 5.10, 5.11 and 5.12 TP-09 TP-000163 approved T1 T1-08 T1‑000137 agreed 2000‑09‑04 - -
0035 - F R99 3.1.0 3.2.0 Corrections to EVM and PCDE formulae (B.2.7.1, B2.7.2) TP-09 TP-000163 approved T1 T1-08 T1‑000138 agreed 2000‑09‑04 - -
0036 - F R99 3.1.0 3.2.0 New initial conditions for Spurious emission test case (6.8.4.1) TP-09 TP-000163 approved T1 T1-08 T1‑000141 agreed 2000‑09‑04 - -
0037 - F R99 3.1.0 3.2.0 C.4.1 UL reference measurement channel for BTFD performance requirement (C.4.1) TP-09 TP-000163 approved T1 T1-08 T1‑000142 agreed 2000‑09‑04 - -
0038 - D R99 3.2.0 3.3.0 Corrections to Chapter 3 Definitions, symbols, abbreviations and equations TP-10 TP‑000216 approved T1 T1-09 T1‑000247 agreed 2000‑11‑20 - -
0039 - D R99 3.2.0 3.3.0 Vocabulary Corrections TP-10 TP‑000216 approved T1 T1-09 T1‑000253 agreed 2000‑11‑20 - -
0040 - F R99 3.2.0 3.3.0 Reference Measurement Channels in Annex C TP-10 TP‑000216 approved T1 T1-09 T1‑000238 agreed 2000‑11‑20 - -
0041 - F R99 3.2.0 3.3.0 Inclusion of OCNS definition for performance tests TP-10 TP‑000216 approved T1 T1-09 T1‑000241 agreed 2000‑11‑20 - -
0042 - F R99 3.2.0 3.3.0 Handling of measurement uncertainties in UE conformance testing (FDD) TP-10 TP‑000216 approved T1 T1-09 T1‑000250 agreed 2000‑11‑20 - -
0043 - F R99 3.2.0 3.3.0 Update of Idle mode test cases TP-10 TP‑000216 approved T1 T1-09 T1‑000252 agreed 2000‑11‑20 - -
0044 - F R99 3.2.0 3.3.0 UE emission mask measurement filter definition correction TP-10 TP‑000216 approved T1 T1-09 T1‑000254 agreed 2000‑11‑20 - -
0045 - F R99 3.2.0 3.3.0 New structure of TS 34.121 TP-10 TP‑000216 approved T1 T1-09 T1‑000255 agreed 2000‑11‑20 - -
0046 - F R99 3.2.0 3.3.0 Test for combining TPC commands in soft handover TP-10 TP‑000216 approved T1 T1-09 T1‑000239 agreed 2000‑11‑20 - -
0047 - F R99 3.2.0 3.3.0 Corrections to power control tests TP-10 TP‑000216 approved T1 T1-09 T1‑000240 agreed 2000‑11‑20 - -
0048 - F R99 3.2.0 3.3.0 Correction to Open Loop Power Control in Uplink TP-10 TP‑000216 approved T1 T1-09 T1‑000242 agreed 2000‑11‑20 - -
0049 - F R99 3.2.0 3.3.0 Correction to Transmit ON/OFF Time mask TP-10 TP‑000216 approved T1 T1-09 T1‑000243r agreed 2000‑11‑20 - -
0050 - F R99 3.2.0 3.3.0 Correction to Spurious Emission test TP-10 TP‑000216 approved T1 T1-09 T1‑000244 agreed 2000‑11‑20 - -
0051 - F R99 3.2.0 3.3.0 Correction of spurious emission measurement procedure TP-10 TP‑000216 approved T1 T1-09 T1‑000245 agreed 2000‑11‑20 - -
0052 - F R99 3.2.0 3.3.0 Out-of-synchronization handling of output power TP-10 TP‑000216 approved T1 T1-09 T1‑000246 agreed 2000‑11‑20 - -
0053 - F R99 3.2.0 3.3.0 Clarification of test procedure and test requirement for receiver blocking and spurious response. TP-10 TP‑000216 approved T1 T1-09 T1‑000248 agreed 2000‑11‑20 - -
0054 - F R99 3.2.0 3.3.0 Subclause 7.8 Power control in downlink TP-10 TP‑000216 approved T1 T1-09 T1‑000249 agreed 2000‑11‑20 - -
0055 - F R99 3.2.0 3.3.0 Downlink compressed mode TP-10 TP‑000216 approved T1 T1-09 T1‑000251 agreed 2000‑11‑20 - -
0056 - F R99 3.3.0 3.4.0 on Test tolerance for 6.5 Blocking Characteristics TP-11 TP‑010019 approved T1 T1-10 T1‑010020 agreed 2001‑03‑17 - -
0057 - F R99 3.3.0 3.4.0 on Test tolerance for 6.7 Intermodulation Characteristics TP-11 TP‑010019 approved T1 T1-10 T1‑010025 agreed 2001‑03‑17 - -
0058 - F R99 3.3.0 3.4.0 on Test tolerance for 5.5.1 Test Tolerance for Transmit OFF power TP-11 TP‑010019 approved T1 T1-10 T1‑010027 agreed 2001‑03‑17 - -
0059 - F R99 3.3.0 3.4.0 on Test tolerance for 6.6 Spurious Response TP-11 TP‑010019 approved T1 T1-10 T1‑010028 agreed 2001‑03‑17 - -
0060 - F R99 3.3.0 3.4.0 on Test tolerance for 5.11 Test Tolerance for Transmit Spurious emissions TP-11 TP‑010019 approved T1 T1-10 T1‑010029 agreed 2001‑03‑17 - -
0061 - F R99 3.3.0 3.4.0 on Test tolerance for Annex.F TS34.121 TP-11 TP‑010019 approved T1 T1-10 T1‑010030 agreed 2001‑03‑17 - -
0062 - F R99 3.3.0 3.4.0 on Test tolerance for 5.2 Maximum output power TP-11 TP‑010019 approved T1 T1-10 T1‑010031 agreed 2001‑03‑17 - -
0063 - F R99 3.3.0 3.4.0 on Test tolerance for 5.4.3 Minimum Output Power TP-11 TP‑010019 approved T1 T1-10 T1‑010032 agreed 2001‑03‑17 - -
0064 - F R99 3.3.0 3.4.0 on Test tolerance for 5.9 Spectrum Emission Mask TP-11 TP‑010019 approved T1 T1-10 T1‑010033 agreed 2001‑03‑17 - -
0065 - F R99 3.3.0 3.4.0 on Test tolerance for 5.10 ACLR TP-11 TP‑010019 approved T1 T1-10 T1‑010034 agreed 2001‑03‑17 - -
0066 - F R99 3.3.0 3.4.0 on Test tolerance for 5.12 Transmit Intermodulation TP-11 TP‑010019 approved T1 T1-10 T1‑010035 agreed 2001‑03‑17 - -
0067 - F R99 3.3.0 3.4.0 on Test tolerance for 6.2 Reference Sensitivity Level TP-11 TP‑010019 approved T1 T1-10 T1‑010036 agreed 2001‑03‑17 - -
0068 - F R99 3.3.0 3.4.0 on Test tolerance for 5.3 Frequency Error TP-11 TP‑010019 approved T1 T1-10 T1‑010037 agreed 2001‑03‑17 - -
0069 - F R99 3.3.0 3.4.0 on Test tolerance for 5.8 Occupied Bandwidth TP-11 TP‑010019 approved T1 T1-10 T1‑010038 agreed 2001‑03‑17 - -
0070 - F R99 3.3.0 3.4.0 on Test tolerance for 5.13.1 EVM TP-11 TP‑010019 approved T1 T1-10 T1‑010039 agreed 2001‑03‑17 - -
0071 - F R99 3.3.0 3.4.0 on Test tolerance for 5.13.2 PCDE TP-11 TP‑010019 approved T1 T1-10 T1‑010040 agreed 2001‑03‑17 - -
0072 - F R99 3.3.0 3.4.0 on Test tolerance for 5.4.4 Out of Synchronisation transmit power TP-11 TP‑010019 approved T1 T1-10 T1‑010041 agreed 2001‑03‑17 - -
0073 - F R99 3.3.0 3.4.0 on Test tolerance for 6.4 ACS TP-11 TP‑010019 approved T1 T1-10 T1‑010042 agreed 2001‑03‑17 - -
0074 - F R99 3.3.0 3.4.0 on Test tolerance for 6.8 RX Spurious Emissions TP-11 TP‑010019 approved T1 T1-10 T1‑010108 agreed 2001‑03‑17 - -
0075 - F R99 3.3.0 3.4.0 on corrections to DL compressed mode TP-11 TP‑010019 approved T1 T1-10 T1‑010021 agreed 2001‑03‑17 - -
0076 - F R99 3.3.0 3.4.0 on Corrections to DL 384kbps and BTFD measurement channels TP-11 TP‑010019 approved T1 T1-10 T1‑010022 agreed 2001‑03‑17 - -
0077 - F R99 3.3.0 3.4.0 on Corrections to Maximum output power TP-11 TP‑010019 approved T1 T1-10 T1‑010023 agreed 2001‑03‑17 - -
0078 - F R99 3.3.0 3.4.0 on RX spurious emissions TP-11 TP‑010019 approved T1 T1-10 T1‑010024 agreed 2001‑03‑17 - -
0079 - D R99 3.3.0 3.4.0 on Editorial correction to channel number TP-11 TP‑010019 approved T1 T1-10 T1‑010026 agreed 2001‑03‑17 - -
0080 - F R99 3.3.0 3.4.0 Correction of Annex-E and reference information to Annex E TP-11 TP‑010019 approved T1 T1-10 T1‑010043 agreed 2001‑03‑17 - -
0081 - D R99 3.3.0 3.4.0 Editorial corrections TP-11 TP‑010019 approved T1 T1-10 T1‑010044 agreed 2001‑03‑17 - -
0082 1 F R99 3.3.0 3.4.0 Regional requirements on Test Tolerance TP-11 TP‑010076 approved T1 - - 2001‑03‑17 - Presented directly to TP-11
0083 - F R99 3.4.0 3.5.0 CR: Addition of Test System uncertainties and Test Tolerances TP-12 TP‑010119 approved T1 T1-11 T1‑010139 agreed 2001‑05‑17 - 0
0084 - F R99 3.4.0 3.5.0 CR: Measurement accuracy of CPICH RSCP TP-12 TP‑010119 approved T1 T1-11 T1‑010140 agreed 2001‑05‑17 - 0
0085 - F R99 3.4.0 3.5.0 CR: Measurement accuracy of CPICH Ec/Io TP-12 TP‑010119 approved T1 T1-11 T1‑010141 agreed 2001‑05‑17 - 0
0086 - F R99 3.4.0 3.5.0 CR: Modifications to the structure of RRM test cases (FDD) TP-12 TP‑010119 approved T1 T1-11 T1‑010142 agreed 2001‑05‑17 - 0
0087 - F R99 3.4.0 3.5.0 Maintenance CR: Propagation condition 250 km/h TP-12 TP‑010119 approved T1 T1-11 T1‑010143 agreed 2001‑05‑17 - 0
0088 - F R99 3.4.0 3.5.0 Maintenance CR: Removal of square brackets TP-12 TP‑010119 approved T1 T1-11 T1‑010144 agreed 2001‑05‑17 - 0
0089 - F R99 3.4.0 3.5.0 Maintenance CR: Tx power for Rx characteristics measurement TP-12 TP‑010119 approved T1 T1-11 T1‑010145 agreed 2001‑05‑17 - 0
0090 - F R99 3.4.0 3.5.0 Maintenance CR: Correction of Definition of multi-code OCNS signal TP-12 TP‑010119 approved T1 T1-11 T1‑010146 agreed 2001‑05‑17 - 0
0091 - D R99 3.4.0 3.5.0 Maintenance CR: Conformance requirement to Minimum requirement TP-12 TP‑010119 approved T1 T1-11 T1‑010147 agreed 2001‑05‑17 - 0
0092 - F R99 3.4.0 3.5.0 Maintenance CR: Test conditions for TS 34.121 TP-12 TP‑010119 approved T1 T1-11 T1‑010148 agreed 2001‑05‑17 - 0
0093 - D R99 3.4.0 3.5.0 Maintenance CR: Editorial correction 34.121 TP-12 TP‑010119 approved T1 T1-11 T1‑010149 agreed 2001‑05‑17 - 0
0094 - C R99 3.4.0 3.5.0 Maintenance CR: closed loop power control close to the limits TP-12 TP‑010119 approved T1 T1-11 T1‑010150 agreed 2001‑05‑17 - 0
0095 - D R99 3.4.0 3.5.0 Maintenance CR: romoval of annex.I TP-12 TP‑010119 approved T1 T1-11 T1‑010151 agreed 2001‑05‑17 - 0
0096 - F R99 3.4.0 3.5.0 Maintenance CR: correction to annex.E TP-12 TP‑010119 approved T1 T1-11 T1‑010152 agreed 2001‑05‑17 - 0
0097 - F R99 3.4.0 3.5.0 Maintenance CR: corrections to TS34.121 TP-12 TP‑010119 approved T1 T1-11 T1‑010153 agreed 2001‑05‑17 - 0
0098 - F R99 3.5.0 3.6.0 Annex F Measurement uncertainty TP-13 TP‑010184 approved T1 T1-12 T1‑010342 agreed 2001‑09‑12 - -
0099 - F R99 3.5.0 3.6.0 RX Spurious emissions TP-13 TP‑010184 approved T1 T1-12 T1‑010364 agreed 2001‑09‑12 - -
0100 - F R99 3.5.0 3.6.0 Structure of RRM test cases TP-13 TP‑010184 approved T1 T1-12 T1‑010356 agreed 2001‑09‑12 - -
0101 - F R99 3.5.0 3.6.0 Clause 8.2, Idle mode cell reselection delay tests TP-13 TP‑010184 approved T1 T1-12 T1‑010361 agreed 2001‑09‑12 - -
0102 - F R99 3.5.0 3.6.0 Proposal for measuring method of Random Access TP-13 TP‑010184 approved T1 T1-12 T1‑010362 agreed 2001‑09‑12 - -
0103 - F R99 3.5.0 3.6.0 Modification to OCNS code channels to allow for 384 kbps allocation TP-13 TP‑010184 approved T1 T1-12 T1‑010339 agreed 2001‑09‑12 - -
0104 - F R99 3.5.0 3.6.0 Clarification of AWGN definition TP-13 TP‑010184 approved T1 T1-12 T1‑010340 agreed 2001‑09‑12 - -
0105 - F R99 3.5.0 3.6.0 Correction to test for inner loop power control in the uplink (FDD) TP-13 TP‑010184 approved T1 T1-12 T1‑010341 agreed 2001‑09‑12 - -
0106 - F R99 3.5.0 3.6.0 Core specification change for uplink inner loop power control TP-13 TP‑010184 approved T1 T1-12 T1‑010355 agreed 2001‑09‑12 - -
0107 - F R99 3.5.0 3.6.0 Power Control mode in downlink TP-13 TP‑010184 approved T1 T1-12 T1‑010357 agreed 2001‑09‑12 - -
0108 - F R99 3.5.0 3.6.0 Correction of frequency range for receiver spurious emission requirements TP-13 TP‑010184 approved T1 T1-12 T1‑010360 agreed 2001‑09‑12 - -
0109 - F R99 3.5.0 3.6.0 Test numbering of multi-path fading propagation tests TP-13 TP‑010184 approved T1 T1-12 T1‑010363 agreed 2001‑09‑12 - -
0110 - F R99 3.5.0 3.6.0 Measurement of the ON/OFF power during the PRACH preamble TP-13 TP‑010184 approved T1 T1-12 T1‑010370 agreed 2001‑09‑12 - -
0111 - F R99 3.6.0 3.7.0 Improvement of test description: CPICH RSCP test case TP-14 TP‑010259 approved - - T1‑010489 agreed 2001‑12‑04 - -
0112 - F R99 3.6.0 3.7.0 Improvement of test description: CPICH Ec/Io test case TP-14 TP‑010259 approved - - T1‑010490 agreed 2001‑12‑04 - -
0113 - F R99 3.6.0 3.7.0 UTRA Carrier RSSI test case TP-14 TP‑010259 approved - - T1‑010491 agreed 2001‑12‑04 - -
0114 - F R99 3.6.0 3.7.0 Corrections and improvements for TS 34.121 subclauses 5, 6 and Annex E TP-14 TP‑010259 approved - - T1‑010492 agreed 2001‑12‑04 - -
0115 - F R99 3.6.0 3.7.0 Clarification of test requirements for Transmit ON/OFF time mask TP-14 TP‑010259 approved - - T1‑010493 agreed 2001‑12‑04 - -
0116 - F R99 3.6.0 3.7.0 Clarification of procedure for Out-of-synchronisation handling of output power TP-14 TP‑010259 approved - - T1‑010494 agreed 2001‑12‑04 - -
0117 - F R99 3.6.0 3.7.0 UE Rx-Tx time difference type 1 TP-14 TP‑010259 approved - - T1‑010495 agreed 2001‑12‑04 - -
0118 - F R99 3.6.0 3.7.0 UE Transmit Timing TP-14 TP‑010259 approved - - T1‑010496 agreed 2001‑12‑04 - -
0119 - F R99 3.6.0 3.7.0 Changes to blocking characteristics and spurious response test cases TP-14 TP‑010259 approved - - T1‑010497 agreed 2001‑12‑04 - -
0120 - F R99 3.6.0 3.7.0 Clarification in Spectrum emission mask section TP-14 TP‑010259 approved - - T1‑010498 agreed 2001‑12‑04 - -
0121 - F R99 3.6.0 3.7.0 DL Power Control Step Size in performance requirements TP-14 TP‑010259 approved - - T1‑010499 agreed 2001‑12‑04 - -
0122 - F R99 3.6.0 3.7.0 DL Compressed mode, correction of pattern TP-14 TP‑010259 approved - - T1‑010500 agreed 2001‑12‑04 - -
0123 - F R99 3.6.0 3.7.0 BER/BLER testing based on statistical approach TP-14 TP‑010259 approved - - T1‑010517 agreed 2001‑12‑04 - -
0124 - F R99 3.6.0 3.7.0 Deletion of OFF power measurement on Power setting in uplink compressed mode Test TP-14 TP‑010259 approved - - T1‑010520 agreed 2001‑12‑04 - -
0125 - F R99 3.6.0 3.7.0 Cell reselection delay tests in idle mode TP-14 TP‑010259 approved - - T1‑010521 agreed 2001‑12‑04 - -
0126 - F R99 3.6.0 3.7.0 for Transmit OFF power measurement TP-14 TP‑010259 approved - - T1‑010522 agreed 2001‑12‑04 - -
0127 - F R99 3.7.0 3.8.0 Correction of power terms and definitions TP-15 TP‑020039 approved T1 T1-14 T1‑020133 agreed 2002‑02‑26 - -
0128 - F R99 3.7.0 3.8.0 Creation of common default messages for RRM test cases in Annex I TP-15 TP‑020039 approved T1 T1-14 T1‑020134 agreed 2002‑02‑26 - -
0129 - F R99 3.7.0 3.8.0 Transmit ON/OFF time mask, Change of TFC and Power setting in uplink compressed mode TP-15 TP‑020039 approved T1 T1-14 T1‑020135 agreed 2002‑02‑26 - -
0130 - F R99 3.7.0 3.8.0 Maintenance of Annex B TP-15 TP‑020039 approved T1 T1-14 T1‑020136 agreed 2002‑02‑26 - -
0131 - F R99 3.7.0 3.8.0 Correction of minimum test times under fading TP-15 TP‑020039 approved T1 T1-14 T1‑020137 agreed 2002‑02‑26 - -
0132 - F R99 3.7.0 3.8.0 Addition of test case description for SFN-CFN observed time difference TP-15 TP‑020039 approved T1 T1-14 T1‑020138 agreed 2002‑02‑26 - -
0133 - F R99 3.7.0 3.8.0 Addition of test case description for SFN-SFN observed time difference type 1 TP-15 TP‑020039 approved T1 T1-14 T1‑020139 agreed 2002‑02‑26 - -
0134 - F R99 3.7.0 3.8.0 Corrections for TS 34.121 subclause 8.7.6 TP-15 TP‑020039 approved T1 T1-14 T1‑020140 agreed 2002‑02‑26 - -
0135 - F R99 3.7.0 3.8.0 Correction changes in clause 8.7 TP-15 TP‑020039 approved T1 T1-14 T1‑020141 agreed 2002‑02‑26 - -
0136 - F R99 3.7.0 3.8.0 Update of RRM Cell reselection delay tests in idle mode TP-15 TP‑020039 approved T1 T1-14 T1‑020142 agreed 2002‑02‑26 - -
0137 - F R99 3.7.0 3.8.0 Implementation of test tolerances to test cases in subclause 7 TP-15 TP‑020039 approved T1 T1-14 T1‑020143 agreed 2002‑02‑26 - -
0138 - F R99 3.7.0 3.8.0 RRM AnnexF TP-15 TP‑020039 approved T1 T1-14 T1‑020144 agreed 2002‑02‑26 - -
0139 - F R99 3.7.0 3.8.0 Connection Diagrams for RRM tests cell re-selection in idle mode TP-15 TP‑020039 approved T1 T1-14 T1‑020145 agreed 2002‑02‑26 - -
0140 - F R99 3.7.0 3.8.0 Statistical testing of RRM delay performance TP-15 TP‑020039 approved T1 T1-14 T1‑020146 agreed 2002‑02‑26 - -
0141 - F R99 3.7.0 3.8.0 RRM Hard handover test cases TP-15 TP‑020039 approved T1 T1-14 T1‑020147 agreed 2002‑02‑26 - -
0142 - F R99 3.7.0 3.8.0 System Simulator and Test System definition TP-15 TP‑020039 approved T1 T1-14 T1‑020148 agreed 2002‑02‑26 - -
0143 - F R99 3.7.0 3.8.0 WCDMA 1800 and 1900 additions TP-15 TP‑020039 approved T1 T1-14 T1‑020170 agreed 2002‑02‑26 - -
0144 - F R99 3.7.0 3.8.0 Correction of power spectral density TP-15 TP‑020039 approved T1 T1-14 T1‑020171 agreed 2002‑02‑26 - -
0145 - F R99 3.8.0 3.9.0 Spectrum emission mask test case: Change to frequencies to be tested TP-16 TP‑020139 approved T1 T1-15 T1‑020220 agreed 2002‑05‑27 - -
0146 - F R99 3.8.0 3.9.0 Power control in downlink, initial convergence TP-16 TP‑020139 approved T1 T1-15 T1‑020221 agreed 2002‑05‑27 - -
0147 - F R99 3.8.0 3.9.0 Event triggered reporting in AWGN propagation conditions TP-16 TP‑020139 approved T1 T1-15 T1‑020222 agreed 2002‑05‑27 - -
0148 - F R99 3.8.0 3.9.0 Event triggered reporting of multiple neighbours in AWGN propagation conditions TP-16 TP‑020139 approved T1 T1-15 T1‑020223 agreed 2002‑05‑27 - -
0149 - F R99 3.8.0 3.9.0 Event triggered reporting of two detectable neighbours in AWGN propagation conditions TP-16 TP‑020139 approved T1 T1-15 T1‑020224 agreed 2002‑05‑27 - -
0150 - F R99 3.8.0 3.9.0 Correct reporting of neighbours in fading propagation conditions TP-16 TP‑020139 approved T1 T1-15 T1‑020226 agreed 2002‑05‑27 - -
0151 - F R99 3.8.0 3.9.0 Removal of “AFC On” reference from clause 5.3 Frequency Error test TP-16 TP‑020139 approved T1 T1-15 T1‑020227 agreed 2002‑05‑27 - -
0152 - F R99 3.8.0 3.9.0 Correct reporting of neighbours in AWGN propagation conditions - inter frequency case TP-16 TP‑020139 approved T1 T1-15 T1‑020235 agreed 2002‑05‑27 - -
0153 - F R99 3.8.0 3.9.0 Deletion of test case description 'Correct reporting of neighbours in Fading propagation conditions - Inter frequency case TP-16 TP‑020139 approved T1 T1-15 T1‑020236 agreed 2002‑05‑27 - -
0154 - F R99 3.8.0 3.9.0 Correction of UE Tx Timing adjustment rate TP-16 TP‑020139 approved T1 T1-15 T1‑020237 agreed 2002‑05‑27 - -
0155 - F R99 3.8.0 3.9.0 Correction of Units of side conditions and test parameters TP-16 TP‑020139 approved T1 T1-15 T1‑020238 agreed 2002‑05‑27 - -
0156 - F R99 3.8.0 3.9.0 Structure of subclause 8 TP-16 TP‑020139 approved T1 T1-15 T1‑020239 agreed 2002‑05‑27 - -
0157 - F R99 3.8.0 3.9.0 Inter-system Handover from UTRAN FDD to GSM TP-16 TP‑020139 approved T1 T1-15 T1‑020240 agreed 2002‑05‑27 - -
0158 - F R99 3.8.0 3.9.0 UTRAN to GSM Cell Re-Selection: Change of minimum requirements TP-16 TP‑020139 approved T1 T1-15 T1‑020241 agreed 2002‑05‑27 - -
0159 - F R99 3.8.0 3.9.0 Cell reselection in idle mode: for testcase TP-16 TP‑020139 approved T1 T1-15 T1‑020242 agreed 2002‑05‑27 - -
0160 - F R99 3.8.0 3.9.0 Cell reselection in idle mode: for annex F.4 TP-16 TP‑020139 approved T1 T1-15 T1‑020243 agreed 2002‑05‑27 - -
0161 - F R99 3.8.0 3.9.0 UTRAN to GSM cell reselection: for testcase TP-16 TP‑020139 approved T1 T1-15 T1‑020244 agreed 2002‑05‑27 - -
0162 - F R99 3.8.0 3.9.0 UTRAN to GSM cell reselection: for annex F.4 TP-16 TP‑020139 approved T1 T1-15 T1‑020245 agreed 2002‑05‑27 - -
0163 - F R99 3.8.0 3.9.0 Test parameters of FDD/FDD Hard Handover test case TP-16 TP‑020139 approved T1 T1-15 T1‑020246 agreed 2002‑05‑27 - -
0164 - F R99 3.8.0 3.9.0 Addition of details for RRM test cases in 8.3.7.1 and 8.3.7.2 (Cell Re-selection in URA_PCH) TP-16 TP‑020139 approved T1 T1-15 T1‑020247 agreed 2002‑05‑27 - -
0165 - F R99 3.8.0 3.9.0 Addition of details for RRM test cases in 8.4.1 (RRC Re-establishment delay) TP-16 TP‑020139 approved T1 T1-15 T1‑020248 agreed 2002‑05‑27 - -
0166 - F R99 3.8.0 3.9.0 Addition of details for RRM test case 8.3.1 TP-16 TP‑020139 approved T1 T1-15 T1‑020249 agreed 2002‑05‑27 - -
0167 - F R99 3.8.0 3.9.0 Addition of details for RRM test case 8.3.5.1 TP-16 TP‑020139 approved T1 T1-15 T1‑020250 agreed 2002‑05‑27 - -
0168 - F R99 3.8.0 3.9.0 Addition of details for RRM test case 8.3.5.2 TP-16 TP‑020139 approved T1 T1-15 T1‑020251 agreed 2002‑05‑27 - -
0169 - F R99 3.8.0 3.9.0 UE RX TX time difference: for testcase TP-16 TP‑020139 approved T1 T1-15 T1‑020252 agreed 2002‑05‑27 - -
0170 - F R99 3.8.0 3.9.0 UE RX TX time difference: for annex TP-16 TP‑020139 approved T1 T1-15 T1‑020253 agreed 2002‑05‑27 - -
0171 - F R99 3.8.0 3.9.0 Correction for SSDT test parameters and UL DPCCH slot format for performance TP-16 TP‑020139 approved T1 T1-15 T1‑020265 agreed 2002‑05‑27 - -
0172 - F R99 3.8.0 3.9.0 Correction of UE FDD EVM definition TP-16 TP‑020139 approved T1 T1-15 T1‑020266 agreed 2002‑05‑27 - -
0173 - F R99 3.8.0 3.9.0 Clarification of Meaning of FDR TP-16 TP‑020139 approved T1 T1-15 T1‑020267 agreed 2002‑05‑27 - -
0174 - F R99 3.8.0 3.9.0 Modification to the test case for RX spurious emissions in TS34.121 TP-16 TP‑020139 approved T1 T1-15 T1‑020268 agreed 2002‑05‑27 - -
0175 - F R99 3.8.0 3.9.0 Editorial correction to Open Loop Power Control and Transmit ON/OFF Time mask in TS34.121 TP-16 TP‑020139 approved T1 T1-15 T1‑020422 agreed 2002‑05‑27 - -
0176 - F R99 3.8.0 3.9.0 Corrections to ACLR in TS34.121 TP-16 TP‑020139 approved T1 T1-15 T1‑020423 agreed 2002‑05‑27 - -
0177 - F R99 3.9.0 3.10.0 Addition of sub clause 8.7.6.2 – UE Rx-Tx time difference type 2 TP-17 TP‑020185 approved T1-RF T1-16 T1‑020453 agreed 2002‑07‑22 - -
0178 - F R99 3.9.0 3.10.0 Addition of test case Cell reselection in CELL_PCH TP-17 TP‑020185 approved T1-RF T1-16 T1‑020454 agreed 2002‑07‑22 - -
0179 - F R99 3.9.0 3.10.0 Addition of test case Transport format combination selection in UE TP-17 TP‑020185 approved T1-RF T1-16 T1‑020455 agreed 2002‑07‑22 - -
0180 - F R99 3.9.0 3.10.0 Maintenance of Re-selection and handover test cases TP-17 TP‑020185 approved T1/RF T1-16 T1‑020456 agreed 2002‑07‑30 - -
0181 - F R99 3.9.0 3.10.0 Correction of test parameters of Handover to inter-frequency cell test case TP-17 TP‑020185 approved T1/RF T1-16 T1‑020457 agreed 2002‑07‑30 - -
0182 - F R99 3.9.0 3.10.0 Addition of details for RRM test case 8.7.3C (UE transmitted power) TP-17 TP‑020185 approved T1/RF T1-16 T1‑020458 agreed 2002‑07‑31 - -
0183 - F R99 3.9.0 3.10.0 Corrections to clause 6 and 7 for editorial errors TP-17 TP‑020185 approved T1/RF T1-16 T1‑020459 agreed 2002‑07‑17 - -
0184 - F R99 3.9.0 3.10.0 Correction to clause 8.2.2 Cell Re-Selection TP-17 TP‑020185 approved T1/RF T1-16 T1‑020460 agreed 2002‑07‑17 - -
0185 - F R99 3.9.0 3.10.0 Correction to clause 8.3.1 FDD/FDD Soft Handover TP-17 TP‑020185 approved T1/RF T1-16 T1‑020461 agreed 2002‑07‑17 - -
0186 - F R99 3.9.0 - Correction to clause 8.3.2 FDD/FDD Hard Handover - - - T1/RF T1-16 T1‑020462 withdrawn 2002‑07‑17 - -
0187 - F R99 3.9.0 3.10.0 Correction to clause 8.6.1.1 Event triggered reporting in AWGN propagation conditions TP-17 TP‑020185 approved T1/RF T1-16 T1‑020463 agreed 2002‑07‑17 - -
0188 - F R99 3.9.0 3.10.0 Correction to clause 8.6.1.2 Event triggered reporting of multiple neighbours in AWGN propagation condition TP-17 TP‑020185 approved T1/RF T1-16 T1‑020464 agreed 2002‑07‑17 - -
0189 - F R99 3.9.0 3.10.0 Correction to clause 8.6.1.3 Event triggered reporting of two detectable neighbours in AWGN propagation TP-17 TP‑020185 approved T1/RF T1-16 T1‑020465 agreed 2002‑07‑17 - -
0190 - F R99 3.9.0 3.10.0 Correction to clause 8.6.1.4 Correct reporting of neighbours in fading propagation condition TP-17 TP‑020185 approved T1/RF T1-16 T1‑020466 agreed 2002‑07‑17 - -
0191 - F R99 3.9.0 3.10.0 Correction to clause 8.6.2.1 Correct reporting of neighbours in AWGN propagation condition TP-17 TP‑020185 approved T1/RF T1-16 T1‑020467 agreed 2002‑07‑17 - -
0192 - F R99 3.9.0 3.10.0 Correction to clause 8.7.1 CPICH RSCP TP-17 TP‑020185 approved T1/RF T1-16 T1‑020468 agreed 2002‑07‑17 - -
0193 - F R99 3.9.0 3.10.0 Correction to clause 8.7.2 CPICH Ec/Io TP-17 TP‑020185 approved T1/RF T1-16 T1‑020469 agreed 2002‑07‑17 - -
0194 - F R99 3.9.0 3.10.0 Correction of test case ‘Rx-Tx time difference type 1’. TP-17 TP‑020185 approved T1-RF T1-16 T1‑020470 agreed 2002‑07‑22 - -
0195 - F R99 3.9.0 3.10.0 FDD/TDD Handover Test Case TP-17 TP‑020185 approved T1-RF T1-16 T1‑020471 agreed 2002‑07‑29 - -
0196 - F R99 3.9.0 3.10.0 Test Requirements for Cell Re-Selection in URA_PCH TP-17 TP‑020185 approved T1RF T1-16 T1‑020474 agreed 2002‑07‑01 - -
0197 - F R99 3.9.0 3.10.0 Correction to clause 8.3.7 Cell Re-selection in URA_PCH and Improvements to the test procedure to cope with error recovery TP-17 TP‑020185 approved T1/RF T1-16 T1‑020475 agreed 2002‑07‑31 - -
0198 - F R99 3.9.0 3.10.0 Segmented Measurement to be allowed for Inner Loop Power Control test TP-17 TP‑020185 approved T1/RF T1-16 T1‑020476 agreed 2002‑08‑01 - -
0199 - F R99 3.9.0 3.10.0 Correction to clause 8.4.1 RRC Re-establishment delay TP-17 TP‑020185 approved T1/RF T1-16 T1‑020477 agreed 2002‑07‑17 - -
0200 - F R99 3.9.0 3.10.0 Correction to clause 8.7.3 UTRA Carrier RSSI TP-17 TP‑020185 approved T1/RF T1-16 T1‑020478 agreed 2002‑07‑17 - -
0201 - F R99 3.9.0 3.10.0 Correction to clause 8.7.4 and 8.7.5 SFN-CFN/SFN observed time difference TP-17 TP‑020185 approved T1/RF T1-16 T1‑020479 agreed 2002‑07‑17 - -
0202 - F R99 3.9.0 3.10.0 Addition of a set of Compressed mode reference pattern 2 parameters TP-17 TP‑020185 approved T1/RF T1-16 T1‑020480 agreed 2002‑07‑31 - -
0203 - F R99 3.9.0 3.10.0 Correction of Compressed Mode Performance Requirement TP-17 TP‑020185 approved T1/RF T1-16 T1‑020481 agreed 2002‑07‑31 - -
0204 - F R99 3.9.0 3.10.0 Tx Power level control during Rx testing TP-17 TP‑020185 approved T1/RF T1-16 T1‑020482 agreed 2002‑08‑01 - -
0205 - F R99 3.9.0 3.10.0 Deletion of some suclauses from F.6.1 Statistical testing of receiver BER/BLER performance TP-17 TP‑020185 approved T1/RF T1-16 T1‑020483 agreed 2002‑08‑01 - -
0206 - F R99 3.9.0 3.10.0 Correction to clause 8.3.5 Cell Re-selection in CELL_FACH TP-17 TP‑020185 approved T1/RF T1-16 T1‑020484 agreed 2002‑07‑17 - -
0207 - F R99 3.9.0 3.10.0 Test Requirements for Cell Re-Selection in CELL-FACH TP-17 TP‑020185 approved T1/RF T1-16 T1‑020485 agreed 2002‑07‑01 - -
0208 - F R99 3.9.0 3.10.0 Calculation of Test Requirements for Cell Re-Selection in CELL_FACH, CELL_PCH and URA_PCH TP-17 TP‑020185 approved T1/RF T1-16 T1‑020486 agreed 2002‑07‑08 - -
0209 - F R99 3.9.0 3.10.0 Clarification of the definition of 90 % success rate TP-17 TP‑020185 approved T1/RF T1-16 T1‑020491 agreed 2002‑07‑22 - -
0210 - F R99 3.9.0 3.10.0 Update of test requirement derivation of Downlink compressed mode test case TP-17 TP‑020185 approved T1/RF T1-16 T1‑020492 agreed 2002‑07‑31 - -
0211 - F R99 3.9.0 3.10.0 Correction of regional note in Annex J.1 TP-17 TP‑020192 approved ARIB - - 2002‑09‑04 - -

page generated from database: 2024-11-12 10:16:04