3GPP Specification Change Requests
Go to spec numbering scheme page
3GPP Specification Change Request records for: 25.433
CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
0002 | - | D | R99 | 3.0.0 | 3.1.0 | Editorial Improvements of NBAP version 3.0.0 | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000225 | - | 2000‑03‑16 | - | - | ‑ |
0003 | - | F | R99 | 3.0.0 | 3.1.0 | Insertion of missing mapping table; Functions to Elementary Procedures | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000024 | - | 2000‑03‑16 | - | - | ‑ |
0004 | - | F | R99 | 3.0.0 | 3.1.0 | Replacement of the Error Indication procedure with the procedure text agreed at RAN WG3 #9 | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000025 | - | 2000‑03‑16 | - | - | ‑ |
0005 | - | F | R99 | 3.0.0 | 3.1.0 | Missing Cause Values in the RL Failure procedure | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000081 | - | 2000‑03‑16 | - | - | ‑ |
0007 | - | F | R99 | 3.0.0 | 3.1.0 | Scope of Transaction id | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000226 | - | 2000‑03‑16 | - | - | ‑ |
0008 | 3 | F | R99 | 3.0.0 | 3.1.0 | Addition of measurement threshold information elements. | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000728 | - | 2000‑03‑16 | - | - | ‑ |
0009 | - | C | R99 | 3.0.0 | 3.1.0 | NBAP Extendibility | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000118 | - | 2000‑03‑16 | - | - | ‑ |
0010 | - | F | R99 | 3.0.0 | 3.1.0 | Correction of Antenna Diversity parameters for TDD | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000229 | - | 2000‑03‑16 | - | - | ‑ |
0011 | 2 | C | R99 | 3.0.0 | 3.1.0 | Update to R3-000441. | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000760 | - | 2000‑03‑16 | - | - | ‑ |
0012 | 4 | C | R99 | 3.0.0 | 3.1.0 | Physical shared channel reconfiguration | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000966 | - | 2000‑03‑16 | - | - | ‑ |
0013 | - | F | R99 | 3.0.0 | 3.1.0 | Repetition of compressed mode information elements. | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000015 | - | 2000‑03‑16 | - | - | ‑ |
0014 | - | B | R99 | 3.0.0 | 3.1.0 | Changing Eb/N0 to SIR. | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000012 | - | 2000‑03‑16 | - | - | ‑ |
0015 | - | F | R99 | 3.0.0 | 3.1.0 | TPC Step Size defined for TDD | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000138 | - | 2000‑03‑16 | - | - | ‑ |
0017 | - | C | R99 | 3.0.0 | 3.1.0 | Simplified Audit procedure | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000259 | - | 2000‑03‑16 | - | - | ‑ |
0018 | - | D | R99 | 3.0.0 | 3.1.0 | Use of Error Indication procedure on signalling bearers corresponding to the Node B control port | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000080 | - | 2000‑03‑16 | - | - | ‑ |
0019 | 1 | F | R99 | 3.0.0 | 3.1.0 | Update of system information procedure | RP-07 | RP-000128 | approved | R3 | R3-11 | R3‑000494 | - | 2000‑03‑16 | - | - | ‑ |
0020 | - | F | R99 | 3.0.0 | 3.1.0 | Correction of number of possible CPICHs in a cell | RP-07 | RP-000128 | approved | R3 | R3-11 | R3‑000088 | - | 2000‑03‑16 | - | - | ‑ |
0022 | - | C | R99 | 3.0.0 | 3.1.0 | to 25.433: Editorial Correction of the ASN.1 with the Syntax Checking of the NBAP : Common Module | RP-07 | RP-000128 | approved | R3 | R3-11 | R3‑000046 | - | 2000‑03‑16 | - | - | ‑ |
0023 | - | C | R99 | 3.0.0 | 3.1.0 | to 25.433: Editorial Correction of the ASN.1 with the Syntax Checking of the NBAP : Elementary Procedure Module | RP-07 | RP-000128 | approved | R3 | R3-11 | R3‑000219 | - | 2000‑03‑16 | - | - | ‑ |
0024 | 1 | F | R99 | 3.0.0 | 3.1.0 | to 25.433: Editorial Correction of the ASN.1 with the Syntax Checking of the NBAP : PDU Module and correction of the tarbular format. (CR24r1) | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000655 | - | 2000‑03‑16 | - | - | ‑ |
0025 | - | C | R99 | 3.0.0 | 3.1.0 | to 25.433: Editorial Correction of the ASN.1 with the Syntax Checking of the NBAP : Information Element Module | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000284 | - | 2000‑03‑16 | - | - | ‑ |
0026 | - | C | R99 | 3.0.0 | 3.1.0 | to 25.433: Editorial Correction of the ASN.1 with the Syntax Checking of the NBAP : Constant Module | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000222 | - | 2000‑03‑16 | - | - | ‑ |
0027 | 1 | F | R99 | 3.0.0 | 3.1.0 | Modification for number of PCH channels for TDD | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000554 | - | 2000‑03‑16 | - | - | ‑ |
0028 | - | F | R99 | 3.0.0 | 3.1.0 | Modifications to RADIO LINK ADDITION procedure and related parameters | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000298 | - | 2000‑03‑16 | - | - | ‑ |
0029 | - | F | R99 | 3.0.0 | 3.1.0 | Frame Offset Correction | RP-07 | RP-000128 | approved | R3 | R3-10 | R3‑000294 | - | 2000‑03‑16 | - | - | ‑ |
0030 | - | B | R99 | 3.0.0 | 3.1.0 | Primary CPICH Power | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000471 | - | 2000‑03‑16 | - | - | ‑ |
0031 | 1 | F | R99 | 3.0.0 | 3.1.0 | Change of definition of QE | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000939 | - | 2000‑03‑16 | - | - | ‑ |
0032 | 1 | F | R99 | 3.0.0 | 3.1.0 | Update to R3-000478: CR32r1 | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000944 | - | 2000‑03‑16 | - | - | ‑ |
0033 | 1 | C | R99 | 3.0.0 | 3.1.0 | Introduction of RLS in NBAP | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000750 | - | 2000‑03‑16 | - | - | ‑ |
0034 | 1 | C | R99 | 3.0.0 | 3.1.0 | Restriction to allowed procedure parallelism | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000753 | - | 2000‑03‑16 | - | - | ‑ |
0035 | - | F | R99 | 3.0.0 | 3.1.0 | Clarification on measurement characteristics | RP-07 | RP-000128 | approved | R3 | R3-11 | R3‑000487 | - | 2000‑03‑16 | - | - | ‑ |
0036 | - | F | R99 | 3.0.0 | 3.1.0 | Alignment to R3 definition of puncturing limit range and step size | RP-07 | RP-000128 | approved | R3 | R3-11 | R3‑000492 | - | 2000‑03‑16 | - | - | ‑ |
0037 | - | B | R99 | 3.0.0 | 3.1.0 | Pre-amble threshold for PRACH | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000495 | - | 2000‑03‑16 | - | - | ‑ |
0038 | 1 | F | R99 | 3.0.0 | 3.1.0 | Inclusion of Beta C/D TFCS | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000755 | - | 2000‑03‑16 | - | - | ‑ |
0039 | - | F | R99 | 3.0.0 | 3.1.0 | Clarification of the Blocking and Unblocking procedures | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000502 | - | 2000‑03‑16 | - | - | ‑ |
0040 | 1 | D | R99 | 3.0.0 | 3.1.0 | Editorial fault in tabular format | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000814 | - | 2000‑03‑16 | - | - | ‑ |
0041 | 1 | F | R99 | 3.0.0 | 3.1.0 | Clarification on criticality modelling | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000730 | - | 2000‑03‑16 | - | - | ‑ |
0042 | - | F | R99 | 3.0.0 | 3.1.0 | Enhancement of the description of the message type IE | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000510 | - | 2000‑03‑16 | - | - | ‑ |
0043 | 3 | B | R99 | 3.0.0 | 3.1.0 | Capacity Modeling of Node B | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000976 | - | 2000‑03‑16 | - | - | ‑ |
0045 | 1 | F | R99 | 3.0.0 | 3.1.0 | Addition of exception to Error Indication | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000790 | - | 2000‑03‑16 | - | - | ‑ |
0046 | 1 | C | R99 | 3.0.0 | 3.1.0 | Introduction of ‘Repetition Number’ into ‘Criticality Diagnostics’ | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000735 | - | 2000‑03‑16 | - | - | ‑ |
0047 | 2 | C | R99 | 3.0.0 | 3.1.0 | Criticality assignment for NBAP | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000866 | - | 2000‑03‑16 | - | - | ‑ |
0048 | 2 | F | R99 | 3.0.0 | 3.1.0 | Removal of Sync Case 3 | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000970 | - | 2000‑03‑16 | - | - | ‑ |
0050 | - | F | R99 | 3.0.0 | 3.1.0 | Introduction of ‘Presence’ information element for Extension | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000539 | - | 2000‑03‑16 | - | - | ‑ |
0051 | 1 | F | R99 | 3.0.0 | 3.1.0 | UL Interference for TDD | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000758 | - | 2000‑03‑16 | - | - | ‑ |
0052 | 2 | F | R99 | 3.0.0 | 3.1.0 | Clarification on the ''RLC Mode'' parameter | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000902 | - | 2000‑03‑16 | - | - | ‑ |
0053 | 1 | F | R99 | 3.0.0 | 3.1.0 | Clarification on the definition of the DL Power IE | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000775 | - | 2000‑03‑16 | - | - | ‑ |
0054 | 1 | F | R99 | 3.0.0 | 3.1.0 | Clarification on the DL power control procedure and message | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000816 | - | 2000‑03‑16 | - | - | ‑ |
0055 | 2 | C | R99 | 3.0.0 | 3.1.0 | Introduction of “TFCI | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000854 | - | 2000‑03‑16 | - | - | ‑ |
0057 | 1 | B | R99 | 3.0.0 | 3.1.0 | A new IE for “RL information” regarding Transmit Diversity (NBAP) | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000951 | - | 2000‑03‑16 | - | - | ‑ |
0058 | 2 | B | R99 | 3.0.0 | 3.1.0 | Support of infinite PD in compressed mode (RNSAP) | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000858 | - | 2000‑03‑16 | - | - | ‑ |
0061 | 1 | D | R99 | 3.0.0 | 3.1.0 | Some Editorial modifications to NBAP | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000823 | - | 2000‑03‑16 | - | - | ‑ |
0062 | 1 | F | R99 | 3.0.0 | 3.1.0 | UL and DL UARFCN (NBAP) | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000864 | - | 2000‑03‑16 | - | - | ‑ |
0064 | 1 | F | R99 | 3.0.0 | 3.1.0 | Modification to “TGD” unit and range (NBAP) | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000771 | - | 2000‑03‑16 | - | - | ‑ |
0065 | 1 | D | R99 | 3.0.0 | 3.1.0 | Modification of System Information related IEs | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000796 | - | 2000‑03‑16 | - | - | ‑ |
0067 | 1 | D | R99 | 3.0.0 | 3.1.0 | estructuring of System Information Update Request | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000797 | - | 2000‑03‑16 | - | - | ‑ |
0068 | 10 | B | R99 | 3.1.0 | 3.2.0 | NBAP Signalling support for CPCH | RP-08 | RP-000253 | approved | R3 | R3-13 | R3‑001652 | agreed | 2000‑06‑27 | - | - | ‑ |
0071 | 1 | C | R99 | 3.0.0 | 3.1.0 | Addition of cause values for NBAP block resource procedure | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000803 | - | 2000‑03‑16 | - | - | ‑ |
0072 | 1 | C | R99 | 3.0.0 | 3.1.0 | Addition of new indication type category in Resource Status Indication message | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000804 | - | 2000‑03‑16 | - | - | ‑ |
0073 | 1 | C | R99 | 3.0.0 | 3.1.0 | Proposed changes to NBAP to incorporate Node B capacity modelling | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000737 | - | 2000‑03‑16 | - | - | ‑ |
0074 | 1 | D | R99 | 3.0.0 | 3.1.0 | to 25.433: Editorial changes to NBAP for better readability the level of indentation has been indicated by arrows. | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000745 | - | 2000‑03‑16 | - | - | ‑ |
0076 | 1 | F | R99 | 3.0.0 | 3.1.0 | Beginning of DL transmission in one RL | RP-07 | RP-000107 | approved | R3 | R3-11 | R3‑000904 | - | 2000‑03‑16 | - | - | ‑ |
0077 | 1 | F | R99 | 3.0.0 | 3.1.0 | Correction for RACH | RP-07 | RP-000108 | approved | R3 | R3-11 | R3‑000901 | - | 2000‑03‑16 | - | - | ‑ |
0082 | 1 | F | R99 | 3.1.0 | 3.2.0 | Introduction of state information in procedure description | RP-08 | RP-000250 | approved | R3 | R3-12 | R3‑001186 | agreed | 2000‑06‑27 | - | - | ‑ |
0083 | 1 | F | R99 | 3.1.0 | 3.2.0 | Measurement filtering parameters | RP-08 | RP-000250 | approved | R3 | R3-12 | R3‑001132 | agreed | 2000‑06‑27 | - | - | ‑ |
0084 | 1 | B | R99 | 3.1.0 | 3.2.0 | Introduction of RTT measurement | RP-08 | RP-000250 | approved | R3 | R3-12 | R3‑001130 | agreed | 2000‑06‑27 | - | - | ‑ |
0087 | 2 | F | R99 | 3.1.0 | 3.2.0 | Clarification of system info broadcast procedure | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001230 | agreed | 2000‑06‑27 | - | - | ‑ |
0088 | 2 | F | R99 | 3.1.0 | 3.2.0 | Addition of FP PC transmission timing IE in Cell Setup | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001231 | agreed | 2000‑06‑27 | - | - | ‑ |
0089 | 3 | B | R99 | 3.1.0 | 3.2.0 | Sync Parameter configuration via NBAP | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001255 | agreed | 2000‑06‑27 | - | - | ‑ |
0090 | 1 | F | R99 | 3.1.0 | 3.2.0 | Add NULL for only one component to choose in ASN.1 CHOICE type-25.433. | RP-08 | RP-000250 | approved | R3 | R3-12 | R3‑001136 | agreed | 2000‑06‑27 | - | - | ‑ |
0091 | 1 | F | R99 | 3.1.0 | 3.2.0 | Change INTEGER to ENUMERATED for Paging Indicator Length, IB SG REP IE and TGL IE-25.433 | RP-08 | RP-000250 | approved | R3 | R3-12 | R3‑001138 | agreed | 2000‑06‑27 | - | - | ‑ |
0092 | 2 | F | R99 | 3.1.0 | 3.2.0 | Correction on the definition of RSSI parameter | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001233 | agreed | 2000‑06‑27 | - | - | ‑ |
0093 | 3 | F | R99 | 3.1.0 | 3.2.0 | Clarification on the Combining Control field: Update to R3-001209 | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001262 | agreed | 2000‑06‑27 | - | - | ‑ |
0094 | 2 | F | R99 | 3.1.0 | 3.2.0 | Correction to the limited power increase parameter | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001258 | agreed | 2000‑06‑27 | - | - | ‑ |
0096 | 5 | C | R99 | 3.1.0 | 3.2.0 | Addition of limited power increase parameters in Cell Setup and Reconfiguration | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001590 | agreed | 2000‑06‑27 | - | - | ‑ |
0097 | 1 | F | R99 | 3.1.0 | 3.2.0 | DCH and DSCH information response in RL Reconfiguration Ready message | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001204 | agreed | 2000‑06‑27 | - | - | ‑ |
0100 | 1 | F | R99 | 3.1.0 | 3.2.0 | Modification to TFS definition [NBAP] | RP-08 | RP-000250 | approved | R3 | R3-12 | R3‑001197 | agreed | 2000‑06‑27 | - | - | ‑ |
0102 | 1 | C | R99 | 3.1.0 | 3.2.0 | Introduction of RLS in 25.433 | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001236 | agreed | 2000‑06‑27 | - | - | ‑ |
0103 | 1 | F | R99 | 3.1.0 | 3.2.0 | Clarification of Radio Link Reconfiguration with CCTrCH and DPCH deletion in TDD | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001350 | agreed | 2000‑06‑27 | - | - | ‑ |
0104 | - | F | R99 | 3.1.0 | 3.2.0 | NBAP range bounds in ASN.1 description: FDD parts | RP-08 | RP-000250 | approved | R3 | R3-12 | R3‑001127 | agreed | 2000‑06‑27 | - | - | ‑ |
0107 | 3 | F | R99 | 3.1.0 | 3.2.0 | UL Power Clarification for Node B generated SIB in TDD | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001575 | agreed | 2000‑06‑27 | - | - | ‑ |
0109 | - | B | R99 | 3.1.0 | 3.2.0 | NBAP range bounds, TDD parts | RP-08 | RP-000250 | approved | R3 | R3-12 | R3‑001192 | agreed | 2000‑06‑27 | - | - | ‑ |
0110 | 2 | F | R99 | 3.1.0 | 3.2.0 | More stringent power control behaviour specification in NBAP | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001520 | agreed | 2000‑06‑27 | - | - | ‑ |
0112 | 1 | D | R99 | 3.1.0 | 3.2.0 | Editorial correction for NBAP ASN.1 | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001469 | agreed | 2000‑06‑27 | - | - | ‑ |
0113 | - | F | R99 | 3.1.0 | 3.2.0 | (ASN.1) Error Indication and Private message for common procedure | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001320 | agreed | 2000‑06‑27 | - | - | ‑ |
0118 | 1 | B | R99 | 3.1.0 | 3.2.0 | Introduction of Rx Timing Deviation measurement for TDD for locations services | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001484 | agreed | 2000‑06‑27 | - | - | ‑ |
0119 | 2 | F | R99 | 3.1.0 | 3.2.0 | Change of definition of the Quality Estimation (QE) for TDD | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001565 | agreed | 2000‑06‑27 | - | - | ‑ |
0120 | - | F | R99 | 3.1.0 | 3.2.0 | Measurement periods and accuracy for TDD | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001360 | agreed | 2000‑06‑27 | - | - | ‑ |
0121 | 1 | F | R99 | 3.1.0 | 3.2.0 | Range bounds related to TFCS, TFS and PDSCH code mapping | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001528 | agreed | 2000‑06‑27 | - | - | ‑ |
0122 | - | F | R99 | 3.1.0 | 3.2.0 | Clarification that basid Per is used | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001268 | agreed | 2000‑06‑27 | - | - | ‑ |
0123 | 3 | F | R99 | 3.1.0 | 3.2.0 | Downlink power balancing | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001611 | agreed | 2000‑06‑27 | - | - | ‑ |
0124 | 1 | F | R99 | 3.1.0 | 3.2.0 | Alignment of Diversity Indication IE between tabular format and ASN.1 | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001497 | agreed | 2000‑06‑27 | - | - | ‑ |
0125 | - | F | R99 | 3.1.0 | 3.2.0 | AICH Transmissing Timing IE corrections | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001309 | agreed | 2000‑06‑27 | - | - | ‑ |
0126 | - | F | R99 | 3.1.0 | 3.2.0 | Message type IE corrections | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001310 | agreed | 2000‑06‑27 | - | - | ‑ |
0127 | - | F | R99 | 3.1.0 | 3.2.0 | RACH Slot format IE mismatch | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001311 | agreed | 2000‑06‑27 | - | - | ‑ |
0128 | 1 | B | R99 | 3.1.0 | 3.2.0 | Introduction of first RLS indicator | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001489 | agreed | 2000‑06‑27 | - | - | ‑ |
0130 | - | F | R99 | 3.1.0 | 3.2.0 | Handling of presence field | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001274 | agreed | 2000‑06‑27 | - | - | ‑ |
0131 | - | C | R99 | 3.1.0 | 3.2.0 | Basic protocol robustness | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001277 | agreed | 2000‑06‑27 | - | - | ‑ |
0132 | - | F | R99 | 3.1.0 | 3.2.0 | Granularity of Max DL power capability/transmission power | RP-08 | RP-000250 | approved | R3 | R3-13 | R3‑001278 | agreed | 2000‑06‑27 | - | - | ‑ |
0133 | 2 | F | R99 | 3.1.0 | 3.2.0 | Transport bearer related parameters | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001614 | agreed | 2000‑06‑27 | - | - | ‑ |
0134 | 1 | F | R99 | 3.1.0 | 3.2.0 | Clarification on ALLNBCC | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001562 | agreed | 2000‑06‑27 | - | - | ‑ |
0135 | - | F | R99 | 3.1.0 | 3.2.0 | Addition of DL TPC step sizes | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001283 | agreed | 2000‑06‑27 | - | - | ‑ |
0136 | 1 | F | R99 | 3.1.0 | 3.2.0 | PRACH scambling code word | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001532 | agreed | 2000‑06‑27 | - | - | ‑ |
0137 | 1 | F | R99 | 3.1.0 | 3.2.0 | Ambiguous CTrCh Setup Resp | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001527 | agreed | 2000‑06‑27 | - | - | ‑ |
0138 | 1 | F | R99 | 3.1.0 | 3.2.0 | Simplified fault handling for CTrCh Reconfiguration | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001529 | agreed | 2000‑06‑27 | - | - | ‑ |
0139 | - | D | R99 | 3.1.0 | 3.2.0 | Clarification of notations used in NBAP | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001297 | agreed | 2000‑06‑27 | - | - | ‑ |
0140 | - | F | R99 | 3.1.0 | 3.2.0 | Definition Node B and CRNC communication contexts | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001300 | agreed | 2000‑06‑27 | - | - | ‑ |
0141 | 1 | F | R99 | 3.1.0 | 3.2.0 | Mismatch between measurement type and object | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001488 | agreed | 2000‑06‑27 | - | - | ‑ |
0142 | - | D | R99 | 3.1.0 | 3.2.0 | Clarification of Common measurement object IE | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001305 | agreed | 2000‑06‑27 | - | - | ‑ |
0145 | 2 | F | R99 | 3.1.0 | 3.2.0 | Introduction of SFN IE | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001568 | agreed | 2000‑06‑27 | - | - | ‑ |
0146 | 1 | C | R99 | 3.1.0 | 3.2.0 | Update on compressed mode handling | RP-08 | RP-000253 | approved | R3 | R3-13 | R3‑001609 | agreed | 2000‑06‑27 | - | - | ‑ |
0147 | 2 | F | R99 | 3.1.0 | 3.2.0 | Alignment of System Information | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001591 | agreed | 2000‑06‑27 | - | - | ‑ |
0148 | 2 | F | R99 | 3.1.0 | 3.2.0 | Reference for the limited power increase algorithm | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001584 | agreed | 2000‑06‑27 | - | - | ‑ |
0149 | 2 | F | R99 | 3.1.0 | 3.2.0 | Handling of measurements non available | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001640 | agreed | 2000‑06‑27 | - | - | ‑ |
0150 | 1 | F | R99 | 3.1.0 | 3.2.0 | Correction of implementation on version | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001476 | agreed | 2000‑06‑27 | - | - | ‑ |
0151 | - | D | R99 | 3.1.0 | 3.2.0 | Editorial corrections for NBAP (IEs) | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001420 | agreed | 2000‑06‑27 | - | - | ‑ |
0152 | - | F | R99 | 3.1.0 | 3.2.0 | Definition of the Relation between the Tabular Format and ASN.1 in NBAP | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001432 | agreed | 2000‑06‑27 | - | - | ‑ |
0153 | 2 | F | R99 | 3.1.0 | 3.2.0 | Clarification to NBAP Message Syntax | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001630 | agreed | 2000‑06‑27 | - | - | ‑ |
0154 | - | D | R99 | 3.1.0 | 3.2.0 | Correction of reference handling and some other editorial issues | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001445 | agreed | 2000‑06‑27 | - | - | ‑ |
0156 | 2 | B | R99 | 3.1.0 | 3.2.0 | Power Offset for S-CCPCH | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001585 | agreed | 2000‑06‑27 | - | - | ‑ |
0158 | - | F | R99 | 3.1.0 | 3.2.0 | Updated on cause values on msg and RL level in NBAP (update TDOC R3-001120/CR086r1) | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001450 | agreed | 2000‑06‑27 | - | - | ‑ |
0159 | - | B | R99 | 3.1.0 | 3.2.0 | DL ISCP values for Node B | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001453 | agreed | 2000‑06‑27 | - | - | ‑ |
0160 | - | D | R99 | 3.1.0 | 3.2.0 | Section 9.1 alignment | RP-08 | RP-000251 | approved | R3 | R3-13 | R3‑001480 | agreed | 2000‑06‑27 | - | - | ‑ |
0162 | - | F | R99 | 3.1.0 | 3.2.0 | Corrections on inconsistency sync channel definition for TDDs | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001498 | agreed | 2000‑06‑27 | - | - | ‑ |
0163 | 1 | D | R99 | 3.1.0 | 3.2.0 | Transforming tabular format Choices to ASN.1 for RNSAP | RP-08 | RP-000252 | approved | R3 | R3-13 | R3‑001637 | agreed | 2000‑06‑27 | - | - | ‑ |
0164 | - | F | R99 | 3.1.0 | 3.2.0 | NBAP ASN.1 merge file | RP-08 | RP-000253 | approved | R3 | R3-13 | R3‑001657 | agreed | 2000‑06‑27 | - | - | ‑ |
0165 | 4 | F | R99 | 3.2.0 | 3.3.0 | Changes to NBAP to support the signaling of the ‘DSCH DL signaling frame’ from the CRNC to the Node B | RP-09 | RP-000386 | approved | R3 | R3-15 | R3‑002272 | agreed | 2000‑08‑28 | - | - | ‑ |
0168 | 2 | F | R99 | 3.2.0 | 3.3.0 | Clarification for Multi-DPCH cases | RP-09 | RP-000386 | approved | R3 | R3-15 | R3‑002031 | agreed | 2000‑08‑28 | - | - | ‑ |
0169 | 3 | F | R99 | 3.2.0 | 3.3.0 | Alignment of DPCH parameters with WG1/WG2 in TDD | RP-09 | RP-000386 | approved | R3 | R3-15 | R3‑002211 | agreed | 2000‑08‑28 | - | - | ‑ |
0170 | 1 | F | R99 | 3.2.0 | 3.3.0 | Node B communication context ID IE in Radio Link Setup Failure message | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001913 | agreed | 2000‑07‑11 | - | - | ‑ |
0173 | 1 | F | R99 | 3.2.0 | 3.3.0 | Correction of Tabular Formats and Information Element definitions | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001921 | agreed | 2000‑07‑11 | - | - | ‑ |
0174 | 1 | F | R99 | 3.2.0 | 3.3.0 | Corrections to RL Setup Failure description | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001912 | agreed | 2000‑07‑11 | - | - | ‑ |
0175 | 3 | F | R99 | 3.2.0 | 3.3.0 | Rules for NBAP on how IEs become known and clarification on EP knowledge | RP-09 | RP-000386 | approved | R3 | R3-15 | R3‑002313 | agreed | 2000‑08‑28 | - | - | ‑ |
0176 | 1 | F | R99 | 3.2.0 | 3.3.0 | Maximum/minimum DL power settings | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001905 | agreed | 2000‑07‑11 | - | - | ‑ |
0177 | 3 | F | R99 | 3.2.0 | 3.3.0 | Minimum power level | RP-09 | RP-000386 | approved | R3 | R3-15 | R3‑002289 | agreed | 2000‑08‑28 | - | - | ‑ |
0178 | 1 | F | R99 | 3.2.0 | 3.3.0 | Power reference point | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001890 | agreed | 2000‑07‑11 | - | - | ‑ |
0180 | 2 | F | R99 | 3.2.0 | 3.3.0 | Introduction of DL Codes Not Supported cause value | RP-09 | RP-000386 | approved | R3 | R3-15 | R3‑002125 | agreed | 2000‑08‑28 | - | - | ‑ |
0181 | 1 | F | R99 | 3.2.0 | 3.3.0 | Power offset for PICH and AICH in Common Transport Channel Setup | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001914 | agreed | 2000‑07‑11 | - | - | ‑ |
0182 | 1 | F | R99 | 3.2.0 | 3.3.0 | Ambiguous Resource Status Indication and consequences for Audit response | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001911 | agreed | 2000‑07‑11 | - | - | ‑ |
0183 | 1 | F | R99 | 3.2.0 | 3.3.0 | Handling of two non supported non core functionalities | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001934 | agreed | 2000‑07‑11 | - | - | ‑ |
0184 | 1 | F | R99 | 3.2.0 | 3.3.0 | Removal of paging procedure from NBAP | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001882 | agreed | 2000‑07‑11 | - | - | ‑ |
0185 | 2 | F | R99 | 3.2.0 | 3.3.0 | Alignment to RRC CRs 363 and 362 | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001978 | agreed | 2000‑07‑11 | - | - | ‑ |
0186 | 1 | F | R99 | 3.2.0 | 3.3.0 | Introduction of a temporary failure: not expired CFN | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001923 | agreed | 2000‑07‑11 | - | - | ‑ |
0187 | 3 | F | R99 | 3.2.0 | 3.3.0 | NBAP Reset procedure | RP-09 | RP-000386 | approved | R3 | R3-15 | R3‑002305 | agreed | 2000‑08‑28 | - | - | ‑ |
0188 | 1 | F | R99 | 3.2.0 | 3.3.0 | Maximum number of TBs in a TTI | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001894 | agreed | 2000‑07‑11 | - | - | ‑ |
0189 | 1 | F | R99 | 3.2.0 | 3.3.0 | Handling of IEs marked with “Ignore and Notify” in class 2 procs | RP-09 | RP-000386 | approved | R3 | R3-14 | R3‑001874 | agreed | 2000‑07‑11 | - | - | ‑ |
0190 | 3 | F | R99 | 3.2.0 | 3.3.0 | Iub Admission Control | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002218 | agreed | 2000‑08‑28 | - | - | ‑ |
0191 | 1 | F | R99 | 3.2.0 | 3.3.0 | Corrections of diversity information | RP-09 | RP-000387 | approved | R3 | R3-14 | R3‑001900 | agreed | 2000‑07‑11 | - | - | ‑ |
0192 | 1 | F | R99 | 3.2.0 | 3.3.0 | Editorial Correction NBAP | RP-09 | RP-000387 | approved | R3 | R3-14 | R3‑001883 | agreed | 2000‑07‑11 | - | - | ‑ |
0193 | - | F | R99 | 3.2.0 | 3.3.0 | Minor CPCH correction | RP-09 | RP-000387 | approved | R3 | R3-14 | R3‑001847 | agreed | 2000‑06‑29 | - | - | ‑ |
0194 | 2 | F | R99 | 3.2.0 | 3.3.0 | Renaming UL interference | RP-09 | RP-000387 | approved | R3 | R3-14 | R3‑001977 | agreed | 2000‑07‑11 | - | - | ‑ |
0195 | 1 | F | R99 | 3.2.0 | 3.3.0 | compress mode | RP-09 | RP-000387 | approved | R3 | R3-14 | R3‑001975 | agreed | 2000‑07‑11 | - | - | ‑ |
0196 | 1 | F | R99 | 3.2.0 | 3.3.0 | Clarification to the RL Failure procedure | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002088 | agreed | 2000‑08‑28 | - | - | ‑ |
0197 | - | F | R99 | 3.2.0 | 3.3.0 | object identifier value for NBAP | RP-09 | RP-000387 | approved | R3 | R3-14 | R3‑001917 | agreed | 2000‑07‑04 | - | - | ‑ |
0198 | - | F | R99 | 3.2.0 | 3.3.0 | correction of errors and misalignments in the ASN.1 part of NBAP | RP-09 | RP-000387 | approved | R3 | R3-14 | R3‑001945 | agreed | 2000‑07‑05 | - | - | ‑ |
0199 | 2 | F | R99 | 3.2.0 | 3.3.0 | Correction of Burst Type IE and Midamble Shift IE in TDD messages | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002230 | agreed | 2000‑08‑28 | - | - | ‑ |
0200 | 1 | F | R99 | 3.2.0 | 3.3.0 | DSCH Corrections | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002206 | agreed | 2000‑08‑28 | - | - | ‑ |
0203 | 1 | F | R99 | 3.2.0 | 3.3.0 | BER at Uplink DTX for TDD | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002185 | agreed | 2000‑08‑28 | - | - | ‑ |
0205 | 2 | F | R99 | 3.2.0 | 3.3.0 | Correction to RL Addition, RL Reconfiguration Prepare, and RL Configuration Request Transmit Diversity parameters | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002258 | agreed | 2000‑08‑28 | - | - | ‑ |
0207 | 1 | F | R99 | 3.2.0 | 3.3.0 | TDD CCTrCH power control ambiguity | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002255 | agreed | 2000‑08‑28 | - | - | ‑ |
0208 | - | F | R99 | 3.2.0 | 3.3.0 | Renaming of Timeslot ISCP | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002085 | agreed | 2000‑08‑28 | - | - | ‑ |
0211 | 1 | F | R99 | 3.2.0 | 3.3.0 | Correction to FDD DL Channelisation Code Number IE definition | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002231 | agreed | 2000‑08‑28 | - | - | ‑ |
0214 | 1 | F | R99 | 3.2.0 | 3.3.0 | Resource status indication clarification | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002215 | agreed | 2000‑08‑28 | - | - | ‑ |
0218 | 1 | D | R99 | 3.2.0 | 3.3.0 | Edditorial Correction in Tabular format for CPCH | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002256 | agreed | 2000‑08‑28 | - | - | ‑ |
0219 | - | F | R99 | 3.2.0 | 3.3.0 | Correction in Common measurement report message for CPCH | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002156 | agreed | 2000‑08‑28 | - | - | ‑ |
0220 | 1 | F | R99 | 3.2.0 | 3.3.0 | Power Offset for AP-AICH, CD/CA-ICH and CSICH | RP-09 | RP-000387 | approved | R3 | R3-15 | R3‑002260 | agreed | 2000‑08‑28 | - | - | ‑ |
0221 | - | F | R99 | 3.2.0 | 3.3.0 | RACH Transport format Correction in TDD | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002184 | agreed | 2000‑08‑28 | - | - | ‑ |
0222 | 1 | F | R99 | 3.2.0 | 3.3.0 | Measurement alignment | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002209 | agreed | 2000‑08‑28 | - | - | ‑ |
0224 | 2 | F | R99 | 3.2.0 | 3.3.0 | Non-core Features in NBAP | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002320 | agreed | 2000‑08‑28 | - | - | ‑ |
0225 | - | F | R99 | 3.2.0 | 3.3.0 | Limited power increase chapter | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002205 | agreed | 2000‑08‑28 | - | - | ‑ |
0226 | 1 | F | R99 | 3.2.0 | 3.3.0 | Correction of UL-FP mode and Measurement filter coefficient ranges in tabular format | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002207 | agreed | 2000‑08‑28 | - | - | ‑ |
0227 | - | F | R99 | 3.2.0 | 3.3.0 | Remove Unnecessary use of the ProtocolIE-Container | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002227 | agreed | 2000‑08‑28 | - | - | ‑ |
0228 | - | F | R99 | 3.2.0 | 3.3.0 | Correction to Compressed Mode | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002234 | agreed | 2000‑08‑28 | - | - | ‑ |
0233 | - | F | R99 | 3.2.0 | 3.3.0 | Editorial Correction - Min SF | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002261 | agreed | 2000‑08‑28 | - | - | ‑ |
0234 | 3 | F | R99 | 3.2.0 | 3.3.0 | Update of RL-SETUP procedure text, addressing optional IE’s. | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002362 | agreed | 2000‑08‑28 | - | - | ‑ |
0235 | 1 | F | R99 | 3.2.0 | 3.3.0 | Physical Shared Channel procedure clarifications | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002334 | agreed | 2000‑08‑28 | - | - | ‑ |
0236 | - | F | R99 | 3.2.0 | 3.3.0 | Clarification of the Resource Status Indication procedure text | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002294 | agreed | 2000‑08‑28 | - | - | ‑ |
0237 | 1 | F | R99 | 3.2.0 | 3.3.0 | RL addition procedure text update. | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002363 | agreed | 2000‑08‑28 | - | - | ‑ |
0238 | - | F | R99 | 3.2.0 | 3.3.0 | Procedure text proposal for optional IE in common transport channels | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002319 | agreed | 2000‑08‑28 | - | - | ‑ |
0239 | - | F | R99 | 3.2.0 | 3.3.0 | New Abstract syntax error for wrong order or number or IEs | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002325 | agreed | 2000‑08‑28 | - | - | ‑ |
0240 | 4 | F | R99 | 3.2.0 | 3.3.0 | NBAP Common IEs extensibility corrections | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002383 | agreed | 2000‑09‑12 | - | - | ‑ |
0241 | 1 | F | R99 | 3.2.0 | 3.3.0 | NBAP FDD IE's extension capability | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002374 | agreed | 2000‑09‑07 | - | - | ‑ |
0242 | 2 | F | R99 | 3.2.0 | 3.3.0 | Extensibility for NBAP-TDD-Ies | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002380 | agreed | 2000‑09‑12 | - | - | ‑ |
0243 | 3 | F | R99 | 3.2.0 | 3.3.0 | Updated NBAP Sync RL Reconfiguration Procedure (Optional IEs | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002381 | agreed | 2000‑09‑12 | - | - | ‑ |
0244 | - | F | R99 | 3.2.0 | 3.3.0 | procedure rejection in NBAP due to unknown procedure ID | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002366 | agreed | 2000‑08‑28 | - | - | ‑ |
0246 | - | F | R99 | 3.2.0 | 3.3.0 | Correction to range of repetition indicator | RP-09 | RP-000388 | approved | R3 | R3-15 | R3‑002370 | agreed | 2000‑08‑28 | - | - | ‑ |
0247 | 3 | F | R99 | 3.2.0 | 3.3.0 | Updated NBAP UnSync RL Reconfiguration Procedure (Optional IEs) | RP-09 | RP-000389 | approved | R3 | R3-15 | R3‑002382 | agreed | 2000‑09‑12 | - | - | ‑ |
0248 | 1 | F | R99 | 3.2.0 | 3.3.0 | Combined ASN.1 definition based on agreed CRs | RP-09 | RP-000389 | approved | R3 | R3-15 | R3‑002385 | agreed | 2000‑09‑13 | - | - | ‑ |
0250 | 1 | F | R99 | 3.3.0 | 3.4.0 | Measurement report grouping in Node B | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002780 | agreed | 2000‑12‑05 | - | - | ‑ |
0251 | 1 | F | R99 | 3.3.0 | 3.4.0 | Clarification of the handling of UL UU In-and Out-of-sync detection in NBAP | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002746 | agreed | 2000‑12‑05 | - | - | ‑ |
0252 | 2 | F | R99 | 3.3.0 | 3.4.0 | Clarification of Measurement Termination at Measurement Object Deletion | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002818 | agreed | 2000‑12‑05 | - | - | ‑ |
0253 | 1 | F | R99 | 3.3.0 | 3.4.0 | Handling of the optional IEs inside the Criticality Diagnostics IE | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002719 | agreed | 2000‑12‑05 | - | - | ‑ |
0254 | 2 | F | R99 | 3.3.0 | 3.4.0 | Downlink Power control correction | RP-10 | RP‑000627 | approved | R3 | R3-17 | R3‑003012 | agreed | 2000‑12‑05 | - | - | ‑ |
0255 | - | F | R99 | 3.3.0 | 3.4.0 | PRACH related corrections | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002516 | agreed | 2000‑12‑05 | - | - | ‑ |
0256 | 2 | F | R99 | 3.3.0 | 3.4.0 | Common channel power clarification. | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002851 | agreed | 2000‑12‑05 | - | - | ‑ |
0258 | - | F | R99 | 3.3.0 | 3.4.0 | Clarification of Measurement termination | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002520 | agreed | 2000‑12‑05 | - | - | ‑ |
0260 | - | F | R99 | 3.3.0 | 3.4.0 | Protocol specification principles | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002528 | agreed | 2000‑12‑05 | - | - | ‑ |
0261 | 2 | F | R99 | 3.3.0 | 3.4.0 | Transport channel modification | RP-10 | RP‑000627 | approved | R3 | R3-17 | R3‑002988 | agreed | 2000‑12‑05 | - | - | ‑ |
0262 | 5 | F | R99 | 3.3.0 | 3.4.0 | Admission control of internal Node B resources. | RP-10 | RP‑000630 | approved | R3 | R3-17 | R3‑003321 | agreed | 2000‑12‑05 | - | - | ‑ |
0263 | 4 | F | R99 | 3.3.0 | 3.4.0 | Explanation of cause values | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002853 | agreed | 2000‑12‑05 | - | - | ‑ |
0264 | 2 | F | R99 | 3.3.0 | 3.4.0 | CFN/SFN in measurement reporting | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002817 | agreed | 2000‑12‑05 | - | - | ‑ |
0265 | - | F | R99 | 3.3.0 | 3.4.0 | PRACH pre-amble threshold definition | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002540 | agreed | 2000‑12‑05 | - | - | ‑ |
0267 | 1 | F | R99 | 3.3.0 | 3.4.0 | Correction to the Dedicated Measurement Initiation Response and Failure messages | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002770 | agreed | 2000‑12‑05 | - | - | ‑ |
0268 | 2 | F | R99 | 3.3.0 | 3.4.0 | Clarifications to Compressed Mode signalling | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002841 | agreed | 2000‑12‑05 | - | - | ‑ |
0269 | 2 | F | R99 | 3.3.0 | 3.4.0 | Handling of invalid patterns in Compressed Mode | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002840 | agreed | 2000‑12‑05 | - | - | ‑ |
0270 | 1 | F | R99 | 3.3.0 | 3.4.0 | AICH power offset value range | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002778 | agreed | 2000‑12‑05 | - | - | ‑ |
0271 | 3 | F | R99 | 3.3.0 | 3.4.0 | Corrections to System Information Update procedure | RP-10 | RP‑000627 | approved | R3 | R3-17 | R3‑002981 | agreed | 2000‑12‑05 | - | - | ‑ |
0273 | - | F | R99 | 3.3.0 | 3.4.0 | Inconsistency between Tabular and ASN.1 for TDD messages | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002582 | agreed | 2000‑12‑05 | - | - | ‑ |
0274 | 2 | F | R99 | 3.3.0 | 3.4.0 | Clarification on rules for using the tabular format | RP-10 | RP‑000627 | approved | R3 | R3-16 | R3‑002871 | agreed | 2000‑12‑05 | - | - | ‑ |
0275 | 4 | F | R99 | 3.3.0 | 3.4.0 | Corrections to Transport Format Se | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑003203 | agreed | 2000‑12‑05 | - | - | ‑ |
0276 | 4 | F | R99 | 3.3.0 | 3.4.0 | TDD DL Power control on timeslot basis | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑003199 | agreed | 2000‑12‑05 | - | - | ‑ |
0277 | - | F | R99 | 3.3.0 | 3.4.0 | Max PRACH Midamble Shift” presence | RP-10 | RP‑000628 | approved | R3 | R3-16 | R3‑002623 | agreed | 2000‑12‑05 | - | - | ‑ |
0278 | 1 | F | R99 | 3.3.0 | 3.4.0 | Timing Advance adjustment in TDD mode | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑003062 | agreed | 2000‑12‑05 | - | - | ‑ |
0279 | 2 | F | R99 | 3.3.0 | 3.4.0 | Gain Factor in TDD Mode. | RP-10 | RP‑000630 | approved | R3 | R3-17 | R3‑003320 | agreed | 2000‑12‑05 | - | - | ‑ |
0281 | 2 | F | R99 | 3.3.0 | 3.4.0 | Correction for tabular format | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑002969 | agreed | 2000‑12‑05 | - | - | ‑ |
0282 | 1 | F | R99 | 3.3.0 | 3.4.0 | Correction for range of time related to Report Characteristics IE | RP-10 | RP‑000628 | approved | R3 | R3-16 | R3‑002776 | agreed | 2000‑12‑05 | - | - | ‑ |
0283 | 1 | F | R99 | 3.3.0 | 3.4.0 | Uplink outer-loop power control in compressed mode | RP-10 | RP‑000628 | approved | R3 | R3-16 | R3‑002752 | agreed | 2000‑12‑05 | - | - | ‑ |
0285 | - | D | R99 | 3.3.0 | 3.4.0 | Editorial corrections for TS25.433 | RP-10 | RP‑000628 | approved | R3 | R3-16 | R3‑002672 | agreed | 2000‑12‑05 | - | - | ‑ |
0286 | 1 | F | R99 | 3.3.0 | 3.4.0 | Correction to ASN.1 codes in section 9.3.6 | RP-10 | RP‑000628 | approved | R3 | R3-16 | R3‑002801 | agreed | 2000‑12‑05 | - | - | ‑ |
0287 | 1 | F | R99 | 3.3.0 | 3.4.0 | Secondary scrambing code used in DL | RP-10 | RP‑000628 | approved | R3 | R3-16 | R3‑002807 | agreed | 2000‑12‑05 | - | - | ‑ |
0288 | 1 | F | R99 | 3.3.0 | 3.4.0 | Correction of Criticality Information for ASN.1 IEs representing both an IE and a Choice in the Tabular Format | RP-10 | RP‑000628 | approved | R3 | R3-16 | R3‑002820 | agreed | 2000‑12‑05 | - | - | ‑ |
0289 | 2 | F | R99 | 3.3.0 | 3.4.0 | Corrections to Error Indication/RL Deletion related to unknown UE Context Id | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑003025 | agreed | 2000‑12‑05 | - | - | ‑ |
0290 | 2 | F | R99 | 3.3.0 | 3.4.0 | Correction of the DL power balancing | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑002846 | agreed | 2000‑12‑05 | - | - | ‑ |
0291 | - | F | R99 | 3.3.0 | 3.4.0 | RSSI renaming and reference correction | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑002786 | agreed | 2000‑12‑05 | - | - | ‑ |
0292 | 2 | F | R99 | 3.3.0 | 3.4.0 | Synchronisation downlink power balancing | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑002967 | agreed | 2000‑12‑05 | - | - | ‑ |
0294 | - | F | R99 | 3.3.0 | 3.4.0 | Removal of Criticality Assignment on Choice Tags | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑002972 | agreed | 2000‑12‑05 | - | - | ‑ |
0295 | 1 | F | R99 | 3.3.0 | 3.4.0 | Correction of RL Reconfiguration procedure text | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑003249 | agreed | 2000‑12‑05 | - | - | ‑ |
0296 | - | F | R99 | 3.3.0 | 3.4.0 | NBAP Extensibility aspects | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑002979 | agreed | 2000‑12‑05 | - | - | ‑ |
0297 | 1 | F | R99 | 3.3.0 | 3.4.0 | Improved Coding of CTFC | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑003239 | agreed | 2000‑12‑05 | - | - | ‑ |
0298 | 2 | F | R99 | 3.3.0 | 3.4.0 | Improvements of the capacity model for admission control of Node B internal resources.: | RP-10 | RP‑000628 | approved | R3 | R3-17 | R3‑003280 | agreed | 2000‑12‑05 | - | - | ‑ |
0299 | 3 | F | R99 | 3.3.0 | 3.4.0 | Changed conditions in NBAP RESET REQUEST message. | RP-10 | RP‑000630 | approved | R3 | R3-17 | R3‑003323 | agreed | 2000‑12‑05 | - | - | ‑ |
0300 | 1 | F | R99 | 3.3.0 | 3.4.0 | Transport bearer establishment | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003204 | agreed | 2000‑12‑05 | - | - | ‑ |
0301 | 1 | F | R99 | 3.3.0 | 3.4.0 | Clarification of the Handling of Common and Dedicated Resources in the cases Cell Deletion and Cell Disable | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003247 | agreed | 2000‑12‑05 | - | - | ‑ |
0302 | 1 | F | R99 | 3.3.0 | 3.4.0 | Segmentation of AUDIT RESPONSE | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003238 | agreed | 2000‑12‑05 | - | - | ‑ |
0303 | 1 | F | R99 | 3.3.0 | 3.4.0 | Modification of System Information Update procedure | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003248 | agreed | 2000‑12‑05 | - | - | ‑ |
0304 | - | F | R99 | 3.3.0 | 3.4.0 | TFCI2 transmit power | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003015 | agreed | 2000‑12‑05 | - | - | ‑ |
0305 | 2 | F | R99 | 3.3.0 | 3.4.0 | DCH information in TDD messages | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003269 | agreed | 2000‑12‑05 | - | - | ‑ |
0307 | 1 | F | R99 | 3.3.0 | 3.4.0 | Relation between UL and DL CCTrCH for TPC | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003173 | agreed | 2000‑12‑05 | - | - | ‑ |
0308 | 2 | F | R99 | 3.3.0 | 3.4.0 | Variability of SF in UL Physical Channel for TDD mode | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003275 | agreed | 2000‑12‑05 | - | - | ‑ |
0309 | - | F | R99 | 3.3.0 | 3.4.0 | Resource Status Indication corrections for TDD | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003064 | agreed | 2000‑12‑05 | - | - | ‑ |
0310 | 3 | F | R99 | 3.3.0 | 3.4.0 | Extensibility correction for DCH Information Response | RP-10 | RP‑000630 | approved | R3 | R3-17 | R3‑003322 | agreed | 2000‑12‑05 | - | - | ‑ |
0311 | 3 | F | R99 | 3.3.0 | 3.4.0 | Extensibility correction for DSCH and USCH Information Response | RP-10 | RP‑000630 | approved | R3 | R3-17 | R3‑003329 | agreed | 2000‑12‑05 | - | - | ‑ |
0312 | 2 | F | R99 | 3.3.0 | 3.4.0 | Extensibility correction for FACH Information Response | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003271 | agreed | 2000‑12‑05 | - | - | ‑ |
0313 | - | F | R99 | 3.3.0 | 3.4.0 | Refinement for extension tools in ASN.1 | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003095 | agreed | 2000‑12‑05 | - | - | ‑ |
0314 | 1 | F | R99 | 3.3.0 | 3.4.0 | Correction on CPCH | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003254 | agreed | 2000‑12‑05 | - | - | ‑ |
0315 | 5 | F | R99 | 3.3.0 | 3.4.0 | Consistency of the NBAP Specification. | RP-10 | RP‑000630 | approved | R3 | R3-17 | R3‑003333 | agreed | 2000‑12‑05 | - | - | ‑ |
0316 | 1 | F | R99 | 3.3.0 | 3.4.0 | Minor changes to NBAP | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003177 | agreed | 2000‑12‑05 | - | - | ‑ |
0318 | 2 | F | R99 | 3.3.0 | 3.4.0 | Clarification of Assignments of ASN.1 Constants. | RP-10 | RP‑000630 | approved | R3 | R3-17 | R3‑003326 | agreed | 2000‑12‑05 | - | - | ‑ |
0320 | 1 | F | R99 | 3.3.0 | 3.4.0 | Round trip time (UTRAN) for NBAP | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003227 | agreed | 2000‑12‑05 | - | - | ‑ |
0321 | - | F | R99 | 3.3.0 | 3.4.0 | Dated References to RAN WG4 specs | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003182 | agreed | 2000‑12‑05 | - | - | ‑ |
0322 | - | F | R99 | 3.3.0 | 3.4.0 | Introduction of extension of ddMode | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003184 | agreed | 2000‑12‑05 | - | - | ‑ |
0323 | 1 | F | R99 | 3.3.0 | 3.4.0 | Extensibility Correction for DCH Information Response Group IE | RP-10 | RP‑000697 | approved | R3 | R3-17 | R3‑003220 | agreed | 2000‑12‑05 | - | - | ‑ |
0324 | 4 | F | R99 | 3.3.0 | 3.4.0 | Physical channel IE extensibility. | RP-10 | RP‑000630 | approved | R3 | R3-17 | R3‑003325 | agreed | 2000‑12‑05 | - | - | ‑ |
0325 | 2 | F | R99 | 3.4.1 | 3.5.0 | In/out of sync alignment with WG1 for TDD | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010289 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0326 | - | F | R99 | 3.4.1 | 3.5.0 | Removal of Rate Matching Parameter Ambiguity | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010024 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0327 | 1 | F | R99 | 3.4.1 | 3.5.0 | Activation CFN Alignment with R2 | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010206 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0328 | 1 | F | R99 | 3.4.1 | 3.5.0 | AUDIT RESPONSE tabular format modification | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010207 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0329 | 3 | F | R99 | 3.4.1 | 3.5.0 | Improved Compressed Mode Handling Specification Text | RP-11 | RP‑010125 | approved | R3 | R3-19 | R3‑010789 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0330 | - | F | R99 | 3.4.1 | 3.5.0 | Correction to ASN.1 | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010066 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0333 | 1 | F | R99 | 3.4.1 | 3.5.0 | Correction to the maximum number of RLs in the RL Addition procedure | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010237 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0334 | 1 | F | R99 | 3.4.1 | 3.5.0 | Editorial Correction in TS 25.433 | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010238 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0335 | 1 | F | R99 | 3.4.1 | 3.5.0 | Editorial Correction to Unsynchronised Radio Link Reconfiguration Procedure Text | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010208 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0336 | - | F | R99 | 3.4.1 | 3.5.0 | Radio Link Initialisation procedure text | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010103 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0339 | - | F | R99 | 3.4.1 | 3.5.0 | Handling of Response messages with IEs with criticality = Ignore IE | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010128 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0340 | 2 | F | R99 | 3.4.1 | 3.5.0 | Midamble - Channelisation code association for TDD | RP-11 | RP‑010125 | approved | R3 | R3-19 | R3‑010849 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0341 | 1 | F | R99 | 3.4.1 | 3.5.0 | Correction of error procedure text of Common Transport Channel Deletion | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010209 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0342 | 2 | F | R99 | 3.4.1 | 3.5.0 | Clarification of operation of Common & Dedicated Measurement Initiation | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010284 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0344 | 2 | F | R99 | 3.4.1 | 3.5.0 | Inclusion of Services expected from NBAP signalling bearer | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010321 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0346 | - | F | R99 | 3.4.1 | 3.5.0 | Intuitive Value Names for the Compressed Mode Deactivation Flag IE | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010220 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0347 | - | F | R99 | 3.4.1 | 3.5.0 | Removal of Ambiguity in Radio Link Failure Procedure | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010221 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0348 | - | F | R99 | 3.4.1 | 3.5.0 | Removal of inter-mixing of FDD with TDD for DCHs to Modify | RP-11 | RP‑010125 | approved | R3 | R3-18 | R3‑010050 | agreed | 2001‑01‑23 | - | 0 | ‑ |
0350 | 1 | F | R99 | 3.4.1 | 3.5.0 | Correction of Capacity model for TDD | RP-11 | RP‑010125 | approved | R3 | R3-19 | R3‑010922 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0351 | - | F | R99 | 3.4.1 | 3.5.0 | Time measurement granularity | RP-11 | RP‑010125 | approved | R3 | R3-19 | R3‑010675 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0352 | 2 | F | R99 | 3.4.1 | 3.5.0 | Measurement range modification | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑011020 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0353 | - | F | R99 | 3.4.1 | 3.5.0 | Addition of SIB17 | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010679 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0354 | - | F | R99 | 3.4.1 | 3.5.0 | Correction of Frame Handling Priority Presence | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010680 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0355 | - | F | R99 | 3.4.1 | 3.5.0 | SCH Timeslot IE definition | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010681 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0356 | 1 | F | R99 | 3.4.1 | 3.5.0 | DL Timeslot ISCP report correction | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010918 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0358 | 2 | B | Rel-4 | 3.4.1 | 4.0.0 | The impacts on TS 25.433 for supporting low chip rate TDD in the NBAP Common Procedures | RP-11 | RP‑010164 | approved | R3 | R3-19 | R3‑011005 | agreed | 2001‑03‑06 | LCRTDD-IubIur | 0 | ‑ |
0359 | 3 | B | Rel-4 | 3.4.1 | 4.0.0 | The impacts on TS 25.433 for supporting low chip rate TDD in the NBAP Dedicated Procedures | RP-11 | RP‑010164 | approved | R3 | R3-19 | R3‑011006 | agreed | 2001‑03‑06 | LCRTDD-IubIur | 0 | ‑ |
0360 | 3 | B | Rel-4 | 3.4.1 | 4.0.0 | Introduction of NBAP Cell Synchronisation function for TDD | RP-11 | RP‑010166 | approved | R3 | R3-19 | R3‑011073 | agreed | 2001‑03‑06 | RANimp-NBsync | 0 | ‑ |
0361 | 1 | B | Rel-4 | 3.4.1 | 4.0.0 | NBAP Procedure modifications due to cell synchronisation | RP-11 | RP‑010166 | approved | R3 | R3-19 | R3‑010934 | agreed | 2001‑03‑06 | RANimp-NBsync | 0 | ‑ |
0362 | 2 | B | Rel-4 | 3.4.1 | 4.0.0 | DSCH Power Control Improvement | RP-11 | RP‑010167 | approved | R3 | R3-19 | R3‑011037 | agreed | 2001‑03‑06 | RInImp-DSCHsho | 0 | ‑ |
0365 | - | F | R99 | 3.4.1 | 3.5.0 | DL power clarification | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010752 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0367 | - | F | R99 | 3.4.1 | 3.5.0 | Modification of Context ID Presence in RESET REQUEST | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010756 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0368 | - | F | R99 | 3.4.1 | 3.5.0 | Handling of the Procedures Triggering an Error Indication Procedure | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010762 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0369 | - | F | R99 | 3.4.1 | 3.5.0 | Removal/Modification of notes related to UARFCN | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010763 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0370 | - | F | R99 | 3.4.1 | 3.5.0 | Mapping of TFS and TFI | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010765 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0371 | - | F | R99 | 3.4.1 | 3.5.0 | General clarifications ad corrections | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010766 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0372 | 2 | B | Rel-4 | 3.4.1 | 4.0.0 | Introduction of the UTRAN-GPS and SFN-SFN timing measurement in NBAP | RP-11 | RP‑010159 | approved | R3 | R3-19 | R3‑010994 | agreed | 2001‑03‑06 | LCS1-UEPos-IubIur | 0 | ‑ |
0373 | 2 | B | Rel-4 | 3.4.1 | 4.0.0 | DPC Rate Reduction in Soft Handover | RP-11 | RP‑010160 | approved | R3 | R3-19 | R3‑011014 | agreed | 2001‑03‑06 | RANimp-RRMopt | 0 | ‑ |
0374 | 2 | B | Rel-4 | 3.4.1 | 4.0.0 | Introduction of the Information Exchange Procedures in RNSAP | RP-11 | RP‑010159 | approved | R3 | R3-19 | R3‑010990 | agreed | 2001‑03‑06 | LCS1-UEPos-IubIur | 0 | ‑ |
0375 | 1 | B | Rel-4 | 3.4.1 | - | The impacts on TS25.433 for supporting gating operation | RP-11 | RP‑010165 | postponed | R3 | R3-19 | R3‑010943 | agreed | 2001‑03‑06 | RInImp-TPS | 0 | ‑ |
0377 | 1 | F | R99 | 3.4.1 | 3.5.0 | NBAP correction in tabular format | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010907 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0378 | 1 | F | R99 | 3.4.1 | 3.5.0 | Correction based on NBAP detailed review | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010916 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0379 | 2 | F | R99 | 3.4.1 | 3.5.0 | Erroneous Criticality Diagnostics IE | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑011086 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0381 | 1 | B | Rel-4 | 3.4.1 | 4.0.0 | Introduction of the network configurable idle periods for OTDOA UE Positioning function | RP-11 | RP‑010159 | approved | R3 | R3-19 | R3‑010989 | agreed | 2001‑03‑06 | LCS1-UEPos-IubIur | 0 | ‑ |
0383 | - | F | R99 | 3.4.1 | 3.5.0 | Handling of Not Comprehended and Missing IEs Leading to Incapability to Compile a Response Message | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010786 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0385 | 2 | F | R99 | 3.4.1 | 3.5.0 | Node B resource model | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑011088 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0386 | - | F | R99 | 3.4.1 | 3.5.0 | Correction of Physical Shared Channel Reconfiguration | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑010937 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0387 | 1 | B | Rel-4 | 3.4.1 | 4.0.0 | Limited Power Increase Range | RP-11 | RP‑010160 | approved | R3 | R3-19 | R3‑011015 | agreed | 2001‑03‑06 | RANimp-RRMopt | 0 | ‑ |
0388 | - | F | R99 | 3.4.1 | 3.5.0 | Interaction between measurements and reset on Iub | RP-11 | RP‑010126 | approved | R3 | R3-19 | R3‑011035 | agreed | 2001‑03‑06 | - | 0 | ‑ |
0389 | 2 | F | R99 | 3.5.0 | 3.6.0 | Corrections and introduction of an appendix for usage of Criticality Diagnostics IE | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011864 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0390 | 2 | A | Rel-4 | 4.0.0 | 4.1.0 | Corrections and introduction of an appendix for usage of Criticality Diagnostics IE | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011865 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0391 | - | F | R99 | 3.5.0 | 3.6.0 | Reporting of Logical Error with Error Indication Procedure | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011329 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0392 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Reporting of Logical Error with Error Indication Procedure | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011330 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0393 | - | F | R99 | 3.5.0 | 3.6.0 | Clarification of IEs order rule | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011337 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0394 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Clarification of IEs order rule | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011338 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0395 | - | F | R99 | 3.5.0 | 3.6.0 | Modification of RL-Setup and RL-Addition procedure text | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011368 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0396 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Modification of RL-Setup and RL-Addition procedure text | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011369 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0397 | - | F | R99 | 3.5.0 | 3.6.0 | Clarification on Procedure Parallelism for RL Restoration | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011372 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0398 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Clarification on Procedure Parallelism for RL Restoration | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011373 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0399 | 2 | F | R99 | 3.5.0 | 3.6.0 | Measurement reporting clarification | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011767 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0400 | 2 | A | Rel-4 | 4.0.0 | 4.1.0 | Measurement reporting clarification | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011768 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0401 | - | F | R99 | 3.5.0 | 3.6.0 | Clarification of the CM Configuration Change CFN IE | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011380 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0402 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Clarification of the CM Configuration Change CFN IE | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011381 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0403 | 1 | F | R99 | 3.5.0 | 3.6.0 | Clarification of DL Power Applicability | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011704 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0404 | 1 | A | Rel-4 | 4.0.0 | 4.1.0 | Clarification of DL Power Applicability | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011705 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0405 | - | F | R99 | 3.5.0 | 3.6.0 | Ambiguity in meaning of DL power IE | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011400 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0406 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Ambiguity in meaning of DL power IE | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011401 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0407 | - | F | R99 | 3.5.0 | 3.6.0 | Clarification between ddMode and ALLNBCC measurements | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011402 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0408 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Clarification between ddMode and ALLNBCC measurements | RP-12 | RP‑010383 | approved | R3 | R3-21 | R3‑011403 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0409 | 3 | F | R99 | 3.6.0 | 3.7.0 | Ambiguity in CM handling | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012208 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0410 | 2 | A | Rel-4 | 4.1.0 | 4.2.0 | Ambiguity in CM handling | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012209 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0411 | - | F | R99 | 3.5.0 | 3.6.0 | Correction to the range of Successful RL Information in the RADIO LINK ADDITION FAILURE | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011408 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0412 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Correction to the range of Successful RL Information in the RADIO LINK ADDITION FAILURE | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011409 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0413 | - | F | Rel-4 | 4.0.0 | 4.1.0 | Correction of Neighbouring TDD Cell Measurement Info | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011414 | agreed | 2001‑05‑29 | LCS1-UEPos-IubIur | - | ‑ |
0414 | - | F | Rel-4 | 4.0.0 | 4.1.0 | Removal syntax errors from Rel.4 NBAP ASN.1 | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011417 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0415 | - | F | Rel-4 | 4.0.0 | 4.1.0 | Correction of NBAP Cell Sync function for TDD | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011419 | agreed | 2001‑05‑29 | RANimp-NBsync | - | ‑ |
0416 | - | F | Rel-4 | 4.0.0 | 4.1.0 | Frequency Acquisition for Cell Synchronisation for TDD | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011420 | agreed | 2001‑05‑29 | RANimp-NBsync | - | ‑ |
0417 | - | F | Rel-4 | 4.0.0 | 4.1.0 | Modification of the abbreviation list | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011421 | agreed | 2001‑05‑29 | LCS1-UEPos-IubIur | - | ‑ |
0418 | 1 | F | Rel-4 | 4.0.0 | 4.1.0 | Allowed combination of the measurement and event types | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011725 | agreed | 2001‑05‑29 | LCS1-UEPos-IubIur | - | ‑ |
0419 | - | F | Rel-4 | 4.0.0 | 4.1.0 | DSCH Power Control Improvement | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011424 | agreed | 2001‑05‑29 | RInImp-DSCHsho | - | ‑ |
0420 | 1 | F | R99 | 3.5.0 | 3.6.0 | Clarification on the System Information Update procedure (Information Element Functional Definition) | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011664 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0421 | 1 | A | Rel-4 | 4.0.0 | 4.1.0 | Clarification on the System Information Update procedure (Information Element Functional Definition) | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011665 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0422 | 1 | F | R99 | 3.5.0 | 3.6.0 | Node B resources model at common transport channel reconfiguration | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011806 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0423 | 1 | A | Rel-4 | 4.0.0 | 4.1.0 | Node B resources model at common transport channel reconfiguration | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011807 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0425 | 4 | B | Rel-5 | 4.3.0 | 5.0.0 | DL Power Capability as a shared resource between Cells | RP-15 | RP‑020188 | approved | R3 | R3-27 | R3‑020521 | agreed | 2002‑03‑01 | TEI5 | - | ‑ |
0426 | 1 | F | R99 | 3.5.0 | 3.6.0 | Correction of the text for ToAWE IE | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011659 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0427 | 1 | A | Rel-4 | 4.0.0 | 4.1.0 | Correction of the text for ToAWE IE | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011660 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0430 | - | F | R99 | 3.5.0 | 3.6.0 | Corrections on Dedicated Measurement Initiation Request message | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011459 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0431 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Corrections on Dedicated Measurement Initiation Request message | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011460 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0432 | - | F | R99 | 3.5.0 | 3.6.0 | Clarification to the Common Transport Channel Setup procedure | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011461 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0433 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Clarification to the Common Transport Channel Setup procedure | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011462 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0436 | - | F | R99 | 3.5.0 | 3.6.0 | Misalignment between tabular Format and ASN.1 in NBAP | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011487 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0437 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Misalignment between tabular Format and ASN.1 in NBAP | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011488 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0438 | 1 | F | R99 | 3.5.0 | 3.6.0 | Initial DL Power After addition of CCTrCH in Synchronised Reconfiguration | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011710 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0439 | 1 | A | Rel-4 | 4.0.0 | 4.1.0 | Initial DL Power After addition of CCTrCH in Synchronised Reconfiguration | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011711 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0440 | 1 | F | R99 | 3.5.0 | 3.6.0 | Correction of TDD DL TPC Step Size After addition of CCTrCH in Synchronised Reconfiguration | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011681 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0441 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Correction of TDD DL TPC Step Size After addition of CCTrCH in Synchronised Reconfiguration | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011498 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0442 | - | F | R99 | 3.5.0 | 3.6.0 | Order of elements in Bitstrings | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011503 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0443 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Order of elements in Bitstrings | RP-12 | RP‑010384 | approved | R3 | R3-21 | R3‑011504 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0445 | - | F | R99 | 3.5.0 | 3.6.0 | Alignmrnt to the WG1 definmition of DL power averaging window size. | RP-12 | RP‑010385 | approved | R3 | R3-21 | R3‑011514 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0448 | 1 | F | R99 | 3.5.0 | 3.6.0 | Measurement clarifications | RP-12 | RP‑010385 | approved | R3 | R3-21 | R3‑011685 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0449 | 1 | A | Rel-4 | 4.0.0 | 4.1.0 | Measurement clarifications | RP-12 | RP‑010385 | approved | R3 | R3-21 | R3‑011686 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0450 | 2 | F | Rel-4 | 4.0.0 | 4.1.0 | Alignment of LTDD to the latest R99 modifications | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011778 | agreed | 2001‑05‑29 | LCRTDD-IubIur | - | ‑ |
0451 | 1 | F | Rel-4 | 4.0.0 | 4.1.0 | Corrections to TDD 1.28 Mcps RACH parameters | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011726 | agreed | 2001‑05‑29 | LCRTDD-IubIur | - | ‑ |
0452 | 2 | F | Rel-4 | 4.0.0 | 4.1.0 | Uplink power control for 1.28 Mcps TDD | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011782 | agreed | 2001‑05‑29 | LCRTDD-IubIur | - | ‑ |
0453 | 2 | F | Rel-4 | 4.0.0 | 4.1.0 | Introduction of Dedicated Measurements on PUSCH | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011810 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0454 | 1 | F | Rel-4 | 4.0.0 | 4.1.0 | Removal of the timeslot in the Cell Setup Request TDD message for LTDD | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011760 | agreed | 2001‑05‑29 | LCRTDD-IubIur | - | ‑ |
0455 | 1 | F | R99 | 3.5.0 | 3.6.0 | IB Type correction | RP-12 | RP‑010396 | approved | R3 | R3-21 | R3‑011712 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0456 | 1 | A | Rel-4 | 4.0.0 | 4.1.0 | IB Type correction | RP-12 | RP‑010385 | approved | R3 | R3-21 | R3‑011713 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0461 | - | F | R99 | 3.5.0 | 3.6.0 | Alignment the range of TGPRC with RRC | RP-12 | RP‑010385 | approved | R3 | R3-21 | R3‑011708 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0462 | - | A | Rel-4 | 4.0.0 | 4.1.0 | Alignment the range of TGPRC with RRC | RP-12 | RP‑010385 | approved | R3 | R3-21 | R3‑011709 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0463 | 1 | F | R99 | 3.5.0 | 3.6.0 | Correction to the Error Indication Procedure | RP-12 | RP‑010385 | approved | R3 | R3-21 | R3‑011776 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0464 | 1 | A | Rel-4 | 4.0.0 | 4.1.0 | Correction to the Error Indication Procedure | RP-12 | RP‑010385 | approved | R3 | R3-21 | R3‑011777 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0465 | 1 | F | Rel-4 | 4.0.0 | 4.1.0 | Addition of “ReportCharacteristicsType-OnModification” to 9.3.4 | RP-12 | RP‑010385 | approved | R3 | R3-21 | R3‑011808 | agreed | 2001‑05‑29 | TEI | - | ‑ |
0466 | 2 | F | R99 | 3.5.0 | 3.6.0 | Alignment of Conditional Presence with RAN3 Specification Principles | RP-12 | RP‑010385 | approved | R3 | R3-21 | R3‑011882 | agreed | 2001‑06‑05 | TEI | - | ‑ |
0467 | 3 | A | Rel-4 | 4.0.0 | 4.1.0 | Alignment of Conditional Presence with RAN3 Specification Principles | RP-12 | RP‑010385 | approved | R3 | R3-21 | R3‑011883 | agreed | 2001‑06‑05 | TEI | - | ‑ |
0468 | 2 | F | Rel-4 | 4.1.0 | 4.2.0 | Allowed Combinations of Dedicated Measurement Type and the Reporting Characteristics Type | RP-13 | RP‑010599 | approved | R3 | R3-23 | R3‑012657 | agreed | 2001‑09‑10 | RANimp-RRMopt | - | ‑ |
0470 | - | F | Rel-4 | 4.1.0 | 4.2.0 | Support of 8PSK modulation for LTDD | RP-13 | RP‑010599 | approved | R3 | R3-23 | R3‑012252 | agreed | 2001‑09‑10 | LCRTDD-IubIur | - | ‑ |
0472 | - | A | Rel-4 | 4.1.0 | 4.2.0 | Correction to Information Block Deletion | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012235 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0473 | - | F | Rel-4 | 4.1.0 | 4.2.0 | DPC Mode in Radio Link Addition procedure | RP-13 | RP‑010599 | approved | R3 | R3-23 | R3‑012257 | agreed | 2001‑09‑10 | RANimp-RRMopt | - | ‑ |
0474 | - | F | R99 | 3.6.0 | 3.7.0 | Correction to Information Block Deletion | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012234 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0475 | - | F | Rel-4 | 4.1.0 | 4.2.0 | Correction on NBAP function | RP-13 | RP‑010599 | approved | R3 | R3-23 | R3‑012256 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0476 | - | A | Rel-4 | 4.1.0 | 4.2.0 | Clarification of the AICH power | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012233 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0477 | - | F | R99 | 3.6.0 | 3.7.0 | Clarification of the AICH power | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012232 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0479 | 1 | A | Rel-4 | 4.1.0 | 4.2.0 | Transport bearer replacement clarification | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012590 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0480 | 1 | F | R99 | 3.6.0 | 3.7.0 | Nbap criticality | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012509 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0481 | 1 | A | Rel-4 | 4.1.0 | 4.2.0 | Corrections to the PDSCH Code Mapping IE | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012555 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0482 | 1 | F | R99 | 3.6.0 | 3.7.0 | Corrections to the PDSCH Code Mapping IE | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012554 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0483 | 1 | F | R99 | 3.6.0 | 3.7.0 | Correction to the handling of DL Code Information in RL Reconfiguration procedures | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012587 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0484 | 1 | A | Rel-4 | 4.1.0 | 4.2.0 | Correction to the handling of DL Code Information in RL Reconfiguration procedures | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012588 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0485 | 1 | A | Rel-4 | 4.1.0 | 4.2.0 | Correction to the Error handling of the ERROR INDICATION message | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012499 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0486 | - | A | Rel-4 | 4.1.0 | 4.2.0 | Correct max Codes discrepancy between tabular and ASN.1 | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012227 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0487 | 1 | F | R99 | 3.6.0 | 3.7.0 | Transport bearer replacement clarification | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012589 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0488 | - | A | Rel-4 | 4.1.0 | 4.2.0 | S-CCPCH Corrections for TDD | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012229 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0489 | - | F | R99 | 3.6.0 | 3.7.0 | Correct max Codes discrepancy between tabular and ASN.1 | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012226 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0490 | - | F | R99 | 3.6.0 | 3.7.0 | S-CCPCH Corrections for TDD | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012228 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0491 | 1 | A | Rel-4 | 4.1.0 | 4.2.0 | Nbap criticality | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012510 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0495 | 1 | F | R99 | 3.6.0 | 3.7.0 | Correction to the Error handling of the ERROR INDICATION message | RP-13 | RP‑010587 | approved | R3 | R3-23 | R3‑012498 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0496 | 4 | C | Rel-5 | 4.3.0 | 5.0.0 | Power Balancing Activation with Radio Link Setup and Radio Link Addition procedures in NBAP | RP-15 | RP‑020188 | approved | R3 | R3-27 | R3‑020750 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0497 | 3 | C | Rel-5 | 4.3.0 | 5.0.0 | Power Balancing Restart with Radio Link Reconfiguration procedure in NBAP | RP-15 | RP‑020188 | approved | R3 | R3-27 | R3‑020752 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0498 | 1 | F | Rel-4 | 4.1.0 | 4.2.0 | Adding protocol container in CHOICE type IE | RP-13 | RP‑010599 | approved | R3 | R3-23 | R3‑012608 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0499 | 1 | F | R99 | 3.6.0 | 3.7.0 | Clarification of Abnormal Conditions/Unsuccessful Operation | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012558 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0500 | 1 | A | Rel-4 | 4.1.0 | 4.2.0 | Clarification of Abnormal Conditions/Unsuccessful Operation | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012559 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0501 | 1 | F | Rel-4 | 4.1.0 | 4.2.0 | Clarification of Abnormal Conditions/Unsuccessful Operation | RP-13 | RP‑010599 | approved | R3 | R3-23 | R3‑012564 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0502 | 2 | B | Rel-5 | 4.3.0 | 5.0.0 | Initial DL Power Per CCTrCH | RP-15 | RP‑020188 | approved | R3 | R3-27 | R3‑020353 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0503 | - | F | R99 | 3.6.0 | 3.7.0 | Error handling of erroneously present conditional IEs | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012336 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0504 | - | A | Rel-4 | 4.1.0 | 4.2.0 | Error handling of erroneously present conditional IEs | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012337 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0506 | 1 | F | R99 | 3.6.0 | 3.7.0 | Correction for maxNrOfCPCHs | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012581 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0507 | 1 | A | Rel-4 | 4.1.0 | 4.2.0 | Correction for maxNrOfCPCHs | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012582 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0508 | 1 | F | R99 | 3.6.0 | 3.7.0 | Correction for N_EOT | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012583 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0509 | 1 | A | Rel-4 | 4.1.0 | 4.2.0 | Correction for N_EOT | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012584 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0512 | - | F | R99 | 3.6.0 | 3.7.0 | Bitstrings ordering | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012373 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0513 | - | A | Rel-4 | 4.1.0 | 4.2.0 | Bitstrings ordering | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012374 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0515 | 1 | F | Rel-4 | 4.1.0 | 4.2.0 | Corrections to position reporting | RP-13 | RP‑010599 | approved | R3 | R3-23 | R3‑012611 | agreed | 2001‑09‑10 | LCS1-UEPos-IubIur | - | ‑ |
0516 | - | F | R99 | 3.6.0 | 3.7.0 | Mapping of TFCS to TFCI | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012396 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0517 | - | A | Rel-4 | 4.1.0 | 4.2.0 | Mapping of TFCS to TFCI | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012397 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0518 | 2 | F | Rel-4 | 4.1.0 | 4.2.0 | to 25.433 v4.1.0: RX timing deviation as dedicated measurement for 1.28Mcps TDD | RP-13 | RP‑010599 | approved | R3 | R3-23 | R3‑012722 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0519 | - | A | Rel-4 | 4.1.0 | 4.2.0 | Correction of implementation of RAN#12 CRs | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012404 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0520 | - | F | R99 | 3.6.0 | 3.7.0 | TDD Channelisation code range definition | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012407 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0521 | - | A | Rel-4 | 4.1.0 | 4.2.0 | TDD Channelisation code range definition | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012408 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0522 | 1 | F | Rel-4 | 4.1.0 | 4.2.0 | Clarification on the Time Slot LCR | RP-13 | RP‑010599 | approved | R3 | R3-23 | R3‑012614 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0523 | 1 | F | R99 | 3.6.0 | 3.7.0 | Clarification of chapter 10 | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012653 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0524 | 1 | A | Rel-4 | 4.1.0 | 4.2.0 | Clarification of chapter 10 | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012654 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0525 | - | F | R99 | 3.6.0 | 3.7.0 | Clarification of use of Diversity Control Indicator | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012460 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0526 | - | A | Rel-4 | 4.1.0 | 4.2.0 | Clarification of use of Diversity Control Indicator | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012461 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0527 | 3 | F | R99 | 3.6.0 | 3.7.0 | Clarification of coordinated DCHs | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012703 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0528 | 3 | A | Rel-4 | 4.1.0 | 4.2.0 | Clarification of coordinated DCHs | RP-13 | RP‑010588 | approved | R3 | R3-23 | R3‑012704 | agreed | 2001‑09‑10 | TEI | - | ‑ |
0529 | 2 | F | R99 | 3.7.0 | 3.8.0 | on Priority range | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013486 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0530 | 1 | A | Rel-4 | 4.2.1 | - | on Priority range | RP-14 | RP‑010862 | revised | R3 | R3-25 | R3‑013090 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0530 | 2 | A | Rel-4 | 4.2.1 | 4.3.0 | on Priority range | RP-14 | RP‑010897 | approved | R3 | R3-25 | R3‑013723 | agreed | 2001‑12‑11 | TEI | - | ‑ |
0533 | - | F | R99 | 3.7.0 | 3.8.0 | Bitstrings ordering | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013128 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0534 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Bitstrings ordering | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013129 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0535 | - | F | R99 | 3.7.0 | 3.8.0 | Added UTRAN modes in the IE Type and Reference and Semantics Description in IEs in NBAP messages | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013134 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0536 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Added UTRAN modes in the IE Type and Reference and Semantics Description in IEs in NBAP messages | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013135 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0537 | - | F | R99 | 3.7.0 | 3.8.0 | Alignment to RAN4 spec for Transmitted Code Power Measurement | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013140 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0538 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Alignment to RAN4 spec for Transmitted Code Power Measurement | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013141 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0539 | - | F | R99 | 3.7.0 | 3.8.0 | Correction the Clause 10 Error Handling | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013640 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0540 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Correction the Clause 10 Error Handling | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013641 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0541 | - | F | R99 | 3.7.0 | 3.8.0 | Clarification of TrCh Ordering in TFCS | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013144 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0542 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Clarification of TrCh Ordering in TFCS | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013145 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0543 | - | F | R99 | 3.7.0 | 3.8.0 | Reconstruction of the procedure text for Radio Link Setup in case of TDD | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013146 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0544 | - | F | Rel-4 | 4.2.1 | 4.3.0 | Addition of SIB15.4 and SIB18 to tabular | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013147 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0545 | 1 | F | Rel-4 | 4.2.1 | 4.3.0 | Correction to SFN-SFN Observed Time Difference Measurement report mapping | RP-14 | RP‑010912 | approved | Nokia | - | ‑ | - | 2001‑12‑11 | LCS1-UEPos-IubIur | - | ‑ |
0546 | 1 | F | Rel-4 | 4.2.1 | 4.3.0 | Correction of drift rate resolution | RP-14 | RP‑010874 | approved | R3 | R3-25 | R3‑013677 | agreed | 2001‑12‑03 | LCS1-UEPos-IubIur | - | ‑ |
0547 | - | F | Rel-4 | 4.2.1 | 4.3.0 | Cell Parameter ID IE definition for 1.28Mcps TDD | RP-14 | RP‑010874 | approved | R3 | R3-25 | R3‑013170 | agreed | 2001‑12‑03 | LCRTDD-IubIur | - | ‑ |
0548 | - | F | Rel-4 | 4.2.1 | 4.3.0 | Amendment of the RADIO LINK ADDITION RESPONSE TDD message for LTDD | RP-14 | RP‑010874 | approved | R3 | R3-25 | R3‑013173 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0549 | - | F | R99 | 3.7.0 | 3.8.0 | Transmit Diversity for TDD | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013179 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0550 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Transmit Diversity for TDD | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013180 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0551 | - | F | R99 | 3.7.0 | 3.8.0 | Clarification for the definition of the ASN.1 constants | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013236 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0552 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Clarification for the definition of the ASN.1 constants | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013237 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0558 | 1 | F | R99 | 3.7.0 | 3.8.0 | Terminology Corrections | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013542 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0559 | 1 | A | Rel-4 | 4.2.1 | 4.3.0 | Terminology Corrections | RP-14 | RP‑010862 | approved | R3 | R3-25 | R3‑013543 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0560 | 1 | F | Rel-4 | 4.2.1 | 4.3.0 | Rel-4 specific terminology corrections | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013604 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0561 | - | F | R99 | 3.7.0 | 3.8.0 | Procedure Code Criticality in Error Indication | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013298 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0562 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Procedure Code Criticality in Error Indication | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013299 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0564 | - | F | R99 | 3.7.0 | 3.8.0 | Clarification for the Power Adjustment Type IE in the DL POWER CONTROL REQUEST message | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013340 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0565 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Clarification for the Power Adjustment Type IE in the DL POWER CONTROL REQUEST message | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013341 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0566 | 1 | F | R99 | 3.7.0 | 3.8.0 | Forward Compatibility for DL Power Balancing | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013537 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0567 | 1 | A | Rel-4 | 4.2.1 | 4.3.0 | Forward Compatibility for DL Power Balancing | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013539 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0568 | - | F | R99 | 3.7.0 | 3.8.0 | Reconfiguration clarification | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013356 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0569 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Reconfiguration clarification | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013357 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0570 | 2 | F | R99 | 3.7.0 | 3.8.0 | Addition of amendment to clarify the PER encoding of bitstrings | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013650 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0571 | 2 | A | Rel-4 | 4.2.1 | 4.3.0 | Addition of amendment to clarify the PER encoding of bitstrings | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013652 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0574 | 2 | F | R99 | 3.7.0 | 3.8.0 | Transport Bearer replacement clarification for the DSCH case | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013662 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0575 | 2 | A | Rel-4 | 4.2.1 | 4.3.0 | Transport Bearer replacement clarification for the DSCH case | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013663 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0576 | - | F | R99 | 3.7.0 | 3.8.0 | Clarification of the Transaction ID | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013449 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0577 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Clarification of the Transaction ID | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013451 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0578 | 1 | F | R99 | 3.7.0 | 3.8.0 | CPCH-related corrections | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013584 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0579 | 1 | A | Rel-4 | 4.2.1 | 4.3.0 | CPCH-related corrections | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013585 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0580 | 2 | F | Rel-4 | 4.2.1 | 4.3.0 | SFN-SFN quality indication | RP-14 | RP‑010874 | approved | R3 | R3-25 | R3‑013696 | agreed | 2001‑12‑03 | LCS1-UEPos-IubIur | - | ‑ |
0581 | - | F | R99 | 3.7.0 | 3.8.0 | Correction of S field length | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013590 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0582 | - | A | Rel-4 | 4.2.1 | 4.3.0 | Correction of S field length | RP-14 | RP‑010863 | approved | R3 | R3-25 | R3‑013591 | agreed | 2001‑12‑03 | TEI | - | ‑ |
0583 | - | B | Rel-5 | 4.3.0 | 5.0.0 | NBAP Signalling support for flexible hard split | RP-15 | RP‑020194 | approved | R3 | R3-27 | R3‑020778 | agreed | 2002‑03‑01 | RInImp-DSCHhsp | - | ‑ |
0584 | 3 | B | Rel-5 | 4.3.0 | 5.0.0 | Add IPDL parameters for LTDD in CELL SETUP REQUEST and CELL RECONFIGURATION REQUEST in NBAP message. | RP-15 | RP‑020193 | approved | R3 | R3-27 | R3‑020857 | agreed | 2002‑03‑01 | LCS-128Pos | - | ‑ |
0585 | 1 | F | Rel-4 | 4.3.0 | 4.4.0 | Corrections to the Information Exchange Initiation procedure | RP-15 | RP‑020182 | approved | R3 | R3-27 | R3‑020657 | agreed | 2002‑03‑01 | LCS1-UEPos-IubIur | - | ‑ |
0586 | 1 | F | Rel-4 | 4.3.0 | 4.4.0 | Correction to UE position measurements quality and threshold information | RP-15 | RP‑020182 | approved | R3 | R3-27 | R3‑020670 | agreed | 2002‑03‑01 | LCS1-UEPos-IubIur | - | ‑ |
0587 | 1 | F | Rel-4 | 4.3.0 | 4.4.0 | Correction to UE position measurements change and deviation limit formulas | RP-15 | RP‑020182 | approved | R3 | R3-27 | R3‑020660 | agreed | 2002‑03‑01 | LCS1-UEPos-IubIur | - | ‑ |
0588 | 1 | B | Rel-5 | 4.3.0 | 5.0.0 | Re-arrangement of Iub Transport Bearers | RP-15 | RP‑020198 | approved | R3 | R3-27 | R3‑020739 | agreed | 2002‑03‑01 | RANimp-TTPS | - | ‑ |
0589 | 2 | B | Rel-5 | 4.3.0 | 5.0.0 | HSDPA NBAP Common Procedure Modifications | RP-15 | RP‑020190 | approved | R3 | R3-27 | R3‑020792 | agreed | 2002‑03‑01 | HSDPA-IubIur | - | ‑ |
0590 | 1 | F | R99 | 3.8.0 | 3.9.0 | Incorrect Physical Shared Channel TDD Procedure definition | RP-15 | RP‑020174 | approved | R3 | R3-27 | R3‑020896 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0591 | - | A | Rel-4 | 4.3.0 | 4.4.0 | Incorrect Physical Shared Channel TDD Procedure definition in ASN.1 | RP-15 | RP‑020174 | approved | R3 | R3-27 | R3‑020358 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0592 | 1 | F | R99 | 3.8.0 | 3.9.0 | Removal of criticality information for Transaction ID in the ERROR INDICATION message | RP-15 | RP‑020174 | approved | R3 | R3-27 | R3‑020654 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0593 | - | A | Rel-4 | 4.3.0 | 4.4.0 | Removal of criticality information for Transaction ID in the ERROR INDICATION message | RP-15 | RP‑020174 | approved | R3 | R3-27 | R3‑020384 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0595 | 2 | C | Rel-5 | 4.3.0 | - | Introduction of Qth signalling in UTRAN | RP-15 | RP‑020213 | postponed | R3 | R3-27 | R3‑020786 | agreed | 2002‑03‑01 | RANimp-SSDT | - | ‑ |
0595 | 3 | C | Rel-5 | 5.0.0 | 5.1.0 | Introduction of Qth signalling in UTRAN | RP-16 | RP‑020426 | approved | R3 | R3-29 | R3‑021388 | agreed | 2002‑06‑01 | RANimp-SSDT | - | ‑ |
0597 | 2 | B | Rel-5 | 4.3.0 | 5.0.0 | Introduction of the IP Transport option into NBAP | RP-15 | RP‑020189 | approved | R3 | R3-27 | R3‑020873 | agreed | 2002‑03‑01 | ETRAN-Iptrans | - | ‑ |
0598 | - | B | Rel-5 | 4.3.0 | 5.0.0 | Introduction separate max PDSCH power limitation | RP-15 | RP‑020188 | approved | R3 | R3-27 | R3‑020409 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0599 | - | F | R99 | 3.8.0 | 3.9.0 | Clarification to measurement unit at Higher Layer Filtering. | RP-15 | RP‑020174 | approved | R3 | R3-27 | R3‑020410 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0600 | - | A | Rel-4 | 4.3.0 | 4.4.0 | Clarification to measurement unit at Higher Layer Filtering. | RP-15 | RP‑020174 | approved | R3 | R3-27 | R3‑020412 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0601 | 1 | F | Rel-4 | 4.3.0 | 4.4.0 | Modification of the T_utran-gps length | RP-15 | RP‑020182 | approved | R3 | R3-27 | R3‑020777 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0602 | 2 | B | Rel-5 | 4.3.0 | 5.0.0 | Separation of Resource Reservation and Radio Link Activation | RP-15 | RP‑020199 | approved | R3 | R3-27 | R3‑020811 | agreed | 2002‑03‑01 | RANimp-SepRR | - | ‑ |
0603 | - | B | Rel-5 | 4.3.0 | 5.0.0 | Introduction of RL Timing Adjustment support | RP-15 | RP‑020196 | approved | R3 | R3-27 | R3‑020436 | agreed | 2002‑03‑01 | RANimp-RLTA | - | ‑ |
0604 | - | F | R99 | 3.8.0 | 3.9.0 | Correction of the Limited Power Increase in Synchronised Radio Link Reconfiguration Preparation | RP-15 | RP‑020174 | approved | R3 | R3-27 | R3‑020443 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0605 | - | A | Rel-4 | 4.3.0 | 4.4.0 | Correction of the Limited Power Increase in Synchronised Radio Link Reconfiguration Preparation | RP-15 | RP‑020174 | approved | R3 | R3-27 | R3‑020444 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0606 | - | F | Rel-4 | 4.3.0 | 4.4.0 | Amendment of the COMMON MEASUREMENT INITIATION REQUEST message | RP-15 | RP‑020182 | approved | R3 | R3-27 | R3‑020446 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0607 | 1 | B | Rel-5 | 4.3.0 | 5.0.0 | Introduction of the Neighbouring TDD Cell Measurement Information LCR | RP-15 | RP‑020193 | approved | R3 | R3-27 | R3‑020765 | agreed | 2002‑03‑01 | LCS-128Pos | - | ‑ |
0608 | 2 | B | Rel-5 | 4.3.0 | 5.0.0 | Node B synchronisation for 1.28Mcps TDD | RP-15 | RP‑020191 | approved | R3 | R3-27 | R3‑020888 | agreed | 2002‑03‑01 | RANimp-NBSLCR | - | ‑ |
0609 | 1 | F | Rel-4 | 4.3.0 | 4.4.0 | ASN.1 and tabular amendments for LTDD | RP-15 | RP‑020182 | approved | R3 | R3-27 | R3‑020681 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0610 | - | F | Rel-4 | 4.3.0 | 4.4.0 | Midamble shift Lin the PHYSICAL SAHRED SCHANNEL RECONFIGURATION REQUEST [TDD] message | RP-15 | RP‑020182 | approved | R3 | R3-27 | R3‑020455 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0612 | 3 | B | Rel-5 | 4.3.0 | 5.0.0 | HSDPA RL-Level Signalling for TDD & FDD | RP-15 | RP‑020190 | approved | R3 | R3-27 | R3‑020885 | agreed | 2002‑03‑01 | HSDPA-IubIur | - | ‑ |
0613 | 1 | B | Rel-5 | 4.3.0 | 5.0.0 | Introduction of Angle of Arrival enhanced positioning for 1.28Mcps TDD in NBAP | RP-15 | RP‑020193 | approved | R3 | R3-27 | R3‑020767 | agreed | 2002‑03‑01 | LCS-128Pos | - | ‑ |
0617 | - | F | Rel-4 | 4.3.0 | 4.4.0 | NBAP Rapporteur corrections | RP-15 | RP‑020182 | approved | R3 | R3-27 | R3‑020520 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0622 | 1 | F | R99 | 3.8.0 | 3.9.0 | Correction to physical channels which SCTD can be applied (Iub) | RP-15 | RP‑020174 | approved | R3 | R3-27 | R3‑020643 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0623 | 1 | A | Rel-4 | 4.3.0 | 4.4.0 | Correction to physical channels which SCTD can be applied (Iub) | RP-15 | RP‑020174 | approved | R3 | R3-27 | R3‑020644 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0626 | - | B | Rel-5 | 4.3.0 | 5.0.0 | NBAP changes for TFCI power control in DSCH hard split mode | RP-15 | RP‑020194 | approved | R3 | R3-27 | R3‑020542 | agreed | 2002‑03‑01 | RInImp-DSCHhsp | - | ‑ |
0627 | 1 | F | R99 | 3.8.0 | - | Removing of channel coding option no coding for FDD & 3.84Mcps TDD NBAP R99 | RP-15 | RP‑020187 | withdrawn | R3 | R3-27 | R3‑020649 | - | 2002‑03‑01 | TEI | Tech correct but no consensus at R3 | ‑ |
0627 | 2 | F | R99 | 3.8.0 | 3.9.0 | Removing of channel coding option no coding for FDD & 3.84Mcps TDD NBAP R99 | RP-15 | RP‑020231 | approved | R3 | - | ‑ | - | 2002‑03‑01 | TEI | Tech correct but no consensus at R3 | ‑ |
0628 | 1 | A | Rel-4 | 4.3.0 | - | Removing of channel coding option no coding for FDD & 3.84Mcps TDD NBAP R4 | RP-15 | RP‑020187 | withdrawn | R3 | R3-27 | R3‑020650 | agreed | 2002‑03‑01 | TEI | - | ‑ |
0628 | 2 | A | Rel-4 | 4.3.0 | 4.4.0 | Removing of channel coding option no coding for FDD & 3.84Mcps TDD NBAP R4 | RP-15 | RP‑020231 | approved | R3 | - | ‑ | - | 2002‑03‑01 | TEI | - | ‑ |
0630 | 2 | F | R99 | 3.9.0 | 3.10.0 | Criticality Information Decoding Failure Handling | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021175 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0631 | 2 | A | Rel-4 | 4.4.0 | 4.5.0 | Criticality Information Decoding Failure Handling | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021174 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0633 | - | A | Rel-5 | 5.0.0 | 5.1.0 | Criticality Information Decoding Failure Handling | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021173 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0634 | 1 | F | R99 | 3.9.0 | 3.10.0 | Alignment of tabular and ASN.1 coding for DL power | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021558 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0635 | 1 | A | Rel-4 | 4.4.0 | 4.5.0 | Alignment of tabular and ASN.1 coding for DL power | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021559 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0636 | 1 | A | Rel-5 | 5.0.0 | 5.1.0 | Alignment of tabular and ASN.1 coding for DL power | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021560 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0637 | 1 | F | R99 | 3.9.0 | 3.10.0 | Correction to RL Restore Indication | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021564 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0638 | 1 | A | Rel-4 | 4.4.0 | 4.5.0 | Correction to RL Restore Indication | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021565 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0639 | 1 | A | Rel-5 | 5.0.0 | 5.1.0 | Correction to RL Restore Indication | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021566 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0646 | - | F | R99 | 3.9.0 | 3.10.0 | Use of PDSCH RL ID for TDD DSCH/USCH | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021236 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0647 | - | A | Rel-4 | 4.4.0 | 4.5.0 | Use of PDSCH RL ID for TDD DSCH/USCH | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021237 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0648 | - | A | Rel-5 | 5.0.0 | 5.1.0 | Use of PDSCH RL ID for TDD DSCH/USCH | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021238 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0651 | - | F | Rel-4 | 4.4.0 | 4.5.0 | Clarification on the Neighboring TDD Cell Measurement information | RP-16 | RP‑020420 | approved | R3 | R3-29 | R3‑021245 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0652 | - | A | Rel-5 | 5.0.0 | 5.1.0 | Clarification on the Neighboring TDD Cell Measurement information | RP-16 | RP‑020420 | approved | R3 | R3-29 | R3‑021246 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0653 | - | F | Rel-4 | 4.4.0 | 4.5.0 | Introduction of SIB | RP-16 | RP‑020420 | approved | R3 | R3-29 | R3‑021247 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0654 | - | A | Rel-5 | 5.0.0 | 5.1.0 | Introduction of SIB | RP-16 | RP‑020420 | approved | R3 | R3-29 | R3‑021248 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0655 | - | F | Rel-5 | 5.0.0 | - | Removal of syntax errors from ASN.1 | RP-16 | RP‑020424 | revised | R3 | R3-29 | R3‑021255 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0655 | - | F | Rel-5 | 5.0.0 | 5.1.0 | Removal of syntax errors from ASN.1 | RP-16 | RP‑020432 | approved | R3 | - | ‑ | - | 2002‑06‑01 | TEI | - | ‑ |
0656 | - | F | Rel-5 | 5.0.0 | - | Interaction between HSDPA and IP transport in UTRAN | RP-16 | RP‑020424 | withdrawn | R3 | R3-29 | R3‑021258 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0658 | 1 | F | Rel-5 | 5.0.0 | 5.1.0 | Interaction between HSDPA and Bearer Re-arrangement | RP-16 | RP‑020422 | approved | R3 | R3-29 | R3‑021609 | agreed | 2002‑06‑01 | HSDPA-IubIur | - | ‑ |
0659 | - | F | Rel-5 | 5.0.0 | - | Correction to Implementation of Rel-5 | RP-16 | RP‑020424 | revised | R3 | R3-29 | R3‑021263 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0659 | - | F | Rel-5 | 5.0.0 | 5.1.0 | Correction to Implementation of Rel-5 | RP-16 | RP‑020432 | approved | R3 | - | ‑ | - | 2002‑06‑01 | TEI | - | ‑ |
0660 | - | F | R99 | 3.9.0 | 3.10.0 | Correction to the use of the CFN IE / SFN IE in the Measurement Initiation procedures | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021267 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0661 | - | A | Rel-4 | 4.4.0 | 4.5.0 | Correction to the use of the CFN IE / SFN IE in the Measurement Initiation procedures | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021268 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0662 | - | A | Rel-5 | 5.0.0 | 5.1.0 | Correction to the use of the CFN IE / SFN IE in the Measurement Initiation procedures | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021269 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0663 | - | F | R99 | 3.9.0 | 3.10.0 | TFCI 0 definition for TDD | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021284 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0664 | - | A | Rel-4 | 4.4.0 | 4.5.0 | TFCI 0 definition for TDD | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021285 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0665 | - | A | Rel-5 | 5.0.0 | 5.1.0 | TFCI 0 definition for TDD | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021286 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0668 | 2 | F | R99 | 3.9.0 | 3.10.0 | NBAP Review – Alignment on the ASN.1 | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021643 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0669 | 2 | A | Rel-4 | 4.4.0 | 4.5.0 | NBAP Review Alignment on the ASN.1 | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021644 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0670 | 2 | A | Rel-5 | 5.0.0 | 5.1.0 | NBAP Review – Alignment on the ASN.1 | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021645 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0671 | 1 | A | Rel-4 | 4.4.0 | 4.5.0 | NBAP Review Alignment of the ASN.1 | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021604 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0672 | 1 | A | Rel-5 | 5.0.0 | 5.1.0 | NBAP Review Alignment of the ASN.1 | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021605 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0674 | 1 | F | Rel-4 | 4.4.0 | 4.5.0 | Definition of quality figures for SFN-SFN and Tutran-gps measurement value information | RP-16 | RP‑020420 | approved | R3 | R3-29 | R3‑021590 | agreed | 2002‑06‑01 | LCS1-UEPos-IubIur | - | ‑ |
0675 | - | A | Rel-5 | 5.0.0 | 5.1.0 | Definition of quality figures for SFN-SFN and Tutran-gps measurement value information | RP-16 | RP‑020420 | approved | R3 | R3-29 | R3‑021350 | agreed | 2002‑06‑01 | LCS1-UEPos-IubIur | - | ‑ |
0684 | 1 | F | R99 | 3.9.0 | 3.10.0 | Clarification for the usage of the cause value | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021505 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0685 | 1 | A | Rel-4 | 4.4.0 | 4.5.0 | Clarification for the usage of the cause value | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021506 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0686 | 1 | A | Rel-5 | 5.0.0 | 5.1.0 | Clarification for the usage of the cause value | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021507 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0693 | 2 | F | Rel-5 | 5.0.0 | 5.1.0 | HS-DSCH Initial credits | RP-16 | RP‑020422 | approved | R3 | R3-29 | R3‑021664 | agreed | 2002‑06‑01 | HSDPA-IubIur | - | ‑ |
0696 | 1 | F | R99 | 3.9.0 | 3.10.0 | TFCI2 bearer clarification | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021587 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0697 | 1 | A | Rel-4 | 4.4.0 | 4.5.0 | TFCI2 bearer clarification | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021588 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0698 | 1 | A | Rel-5 | 5.0.0 | 5.1.0 | TFCI2 bearer clarification | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021589 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0702 | - | F | R99 | 3.9.0 | 3.10.0 | NBAP Review – Alignment of the ASN.1 | RP-16 | RP‑020412 | approved | R3 | R3-29 | R3‑021490 | agreed | 2002‑06‑01 | TEI | - | ‑ |
0703 | - | C | Rel-5 | 5.0.0 | - | Correction for inconsistency in length of TFCI field 2 | - | - | - | Samsung | 29 | R3‑021594 | withdrawn | 2002‑07‑19 | RInImp-DSCHhsp | - | ‑ |
0704 | - | F | Rel-5 | 5.0.0 | - | Change of Maximum Number of HS-SCCH Codes | - | - | - | Siemens | 29 | R3‑021601 | withdrawn | 2002‑07‑19 | HSDPA-IubIur | - | ‑ |
0705 | - | F | Rel-4 | 4.5.0 | 4.6.0 | WG4 Reference Corrections | RP-17 | RP‑020612 | approved | R3 | R3-31 | R3‑021864 | agreed | 2002‑08‑19 | TEI4 | - | ‑ |
0706 | - | A | Rel-5 | 5.1.0 | 5.2.0 | WG4 Reference Corrections | RP-17 | RP‑020612 | approved | R3 | R3-31 | R3‑021865 | agreed | 2002‑08‑19 | TEI4 | - | ‑ |
0707 | - | F | Rel-4 | 4.5.0 | 4.6.0 | Rx Timing Deviation (TDD) corrections | RP-17 | RP‑020614 | approved | R3 | R3-31 | R3‑021866 | agreed | 2002‑08‑23 | TEI4 | - | ‑ |
0708 | - | A | Rel-5 | 5.1.0 | 5.2.0 | Rx Timing Deviation (TDD) corrections | RP-17 | RP‑020614 | approved | R3 | R3-31 | R3‑021867 | agreed | 2002‑08‑23 | TEI4 | - | ‑ |
0709 | - | F | Rel-4 | 4.5.0 | 4.6.0 | Clarification of the Common Measurement Reporting procedure | RP-17 | RP‑020616 | approved | R3 | R3-31 | R3‑021868 | agreed | 2002‑08‑23 | TEI4 | - | ‑ |
0710 | - | A | Rel-5 | 5.1.0 | 5.2.0 | Clarification of the Common Measurement Reporting procedure | RP-17 | RP‑020616 | approved | R3 | R3-31 | R3‑021869 | agreed | 2002‑08‑23 | TEI4 | - | ‑ |
0711 | 1 | F | Rel-5 | 5.1.0 | 5.2.0 | Correction of HSDPA Common Configuration | RP-17 | RP‑020628 | approved | R3 | R3-31 | R3‑022120 | agreed | 2002‑08‑19 | HSDPA-IubIur | - | ‑ |
0712 | - | F | Rel-5 | 5.1.0 | 5.2.0 | TFCI2 Bearer Correction for IP Transport | RP-17 | RP‑020628 | approved | R3 | R3-31 | R3‑021871 | agreed | 2002‑08‑19 | ETRAN-Iptrans | - | ‑ |
0713 | 2 | F | Rel-5 | 5.1.0 | - | CQI and ACK/NACK Repetition factor and Power Offset and k-value | RP-17 | RP‑020623 | revised | R3 | R3-31 | R3‑022111 | agreed | 2002‑08‑23 | HSDPA-IubIur | - | ‑ |
0713 | 3 | F | Rel-5 | 5.1.0 | 5.2.0 | CQI and ACK/NACK Repetition factor and Power Offset and k-value | RP-17 | RP‑020647 | approved | R3 | - | ‑ | - | 2002‑08‑23 | HSDPA-IubIur | - | ‑ |
0714 | - | F | Rel-5 | 5.1.0 | 5.2.0 | Change of Maximum Number of HS-SCCH Codes | RP-17 | RP‑020622 | approved | R3 | R3-31 | R3‑021873 | agreed | 2002‑08‑23 | HSDPA-IubIur | - | ‑ |
0715 | 1 | F | Rel-5 | 5.1.0 | 5.2.0 | Clarification for the initial power of the power balancing (Pinit) | RP-17 | RP‑020618 | approved | R3 | R3-31 | R3‑022122 | agreed | 2002‑08‑19 | TEI5 | - | ‑ |
0716 | - | F | Rel-5 | 5.1.0 | 5.2.0 | Removal of BLER for HS-DSCH | RP-17 | RP‑020619 | approved | R3 | R3-31 | R2‑021875 | agreed | 2002‑08‑13 | HSDPA-IubIur | - | ‑ |
0717 | 1 | F | Rel-5 | 5.1.0 | 5.2.0 | Correction for inconsistency in length of TFCI field 2 | RP-17 | RP‑020617 | approved | R3 | R3-31 | R3‑022125 | agreed | 2002‑08‑16 | RInImp-DSCHhsp | - | ‑ |
0719 | 1 | F | R99 | 3.10.0 | 3.11.0 | Replacing all occurences of PSIR(k) by dPcurr in 25.433 | RP-17 | RP‑020589 | approved | R3 | R3-31 | R3‑022047 | agreed | 2002‑08‑20 | TEI | - | ‑ |
0720 | 1 | A | Rel-4 | 4.5.0 | 4.6.0 | Replacing all occurences of PSIR(k) by dPcurr in 25.433 | RP-17 | RP‑020589 | approved | R3 | R3-31 | R3‑022048 | agreed | 2002‑08‑20 | TEI | - | ‑ |
0721 | 1 | A | Rel-5 | 5.1.0 | 5.2.0 | Replacing all occurences of PSIR(k) by dPcurr in 25.433 | RP-17 | RP‑020589 | approved | R3 | R3-31 | R3‑022049 | agreed | 2002‑08‑20 | TEI | - | ‑ |
0725 | 1 | F | Rel-5 | 5.1.0 | 5.2.0 | RL Parameter Update Procedure | RP-17 | RP‑020623 | approved | R3 | R3-31 | R3‑022106 | agreed | 2002‑08‑15 | HSDPA-IubIur | - | ‑ |
0726 | 2 | F | Rel-4 | 4.5.0 | 4.6.0 | IP_offset correction | RP-17 | RP‑020630 | approved | R3 | R3-31 | R3‑022164 | agreed | 2002‑07‑15 | TEI4 | - | ‑ |
0727 | 2 | A | Rel-5 | 5.1.0 | 5.2.0 | IP_offset correction | RP-17 | RP‑020630 | approved | R3 | R3-31 | R3‑022165 | agreed | 2002‑07‑15 | TEI4 | - | ‑ |
0728 | 2 | F | Rel-4 | 4.5.0 | 4.6.0 | Uplink Synchronisation in 1.28Mcps TDD | RP-17 | RP‑020613 | approved | R3 | R3-31 | R3‑022159 | agreed | 2002‑08‑23 | LCRTDD-IubIur | - | ‑ |
0729 | 2 | A | Rel-5 | 5.1.0 | 5.2.0 | Uplink Synchronisation in 1.28Mcps TDD | RP-17 | RP‑020613 | approved | R3 | R3-31 | R3‑022160 | agreed | 2002‑08‑23 | LCRTDD-IubIur | - | ‑ |
0732 | 2 | F | Rel-4 | 4.5.0 | 4.6.0 | Modification of PICH Parameters LTDD | RP-17 | RP‑020609 | approved | R3 | R3-31 | R3‑022143 | agreed | 2002‑08‑23 | LCRTDD-IubIur | - | ‑ |
0733 | 2 | A | Rel-5 | 5.1.0 | 5.2.0 | Modification of PICH Parameters LTDD | RP-17 | RP‑020609 | approved | R3 | R3-31 | R3‑022144 | agreed | 2002‑08‑23 | LCRTDD-IubIur | - | ‑ |
0737 | 1 | F | R99 | 3.10.0 | 3.11.0 | Handling of conflicting specification text | RP-17 | RP‑020604 | approved | R3 | R3-31 | R3‑022161 | agreed | 2002‑08‑21 | TEI | - | ‑ |
0738 | 1 | A | Rel-4 | 4.5.0 | 4.6.0 | Handling of conflicting specification text | RP-17 | RP‑020604 | approved | R3 | R3-31 | R3‑022162 | agreed | 2002‑08‑21 | TEI | - | ‑ |
0739 | 1 | A | Rel-5 | 5.1.0 | 5.2.0 | Handling of conflicting specification text | RP-17 | RP‑020604 | approved | R3 | R3-31 | R3‑022163 | agreed | 2002‑08‑21 | TEI | - | ‑ |
0740 | 1 | F | Rel-4 | 4.5.0 | 4.6.0 | Correction to the specification of Optional IEs | RP-17 | RP‑020609 | approved | R3 | R3-31 | R3‑022175 | agreed | 2002‑08‑22 | TEI4 | - | ‑ |
0741 | 1 | A | Rel-5 | 5.1.0 | 5.2.0 | Correction to the specification of Optional IEs | RP-17 | RP‑020609 | approved | R3 | R3-31 | R3‑022176 | agreed | 2002‑08‑22 | TEI4 | - | ‑ |
0742 | - | F | Rel-5 | 5.1.0 | - | HS-SCCH power offset | RP-17 | RP‑020621 | revised | R3 | R3-31 | R3‑022118 | agreed | 2002‑08‑15 | HSDPA-IubIur | - | ‑ |
0742 | 1 | F | Rel-5 | 5.1.0 | 5.2.0 | HS-SCCH power offset | RP-17 | RP‑020650 | approved | NEC | - | ‑ | - | 2002‑09‑04 | HSDPA-IubIur | - | ‑ |
0743 | - | F | Rel-4 | 4.5.0 | 4.6.0 | Quality IEs for the UE Positioning measurements | RP-17 | RP‑020615 | approved | R3 | R3-31 | R3‑022137 | agreed | 2002‑08‑19 | TEI4 | - | ‑ |
0744 | - | A | Rel-5 | 5.1.0 | 5.2.0 | Quality IEs for the UE Positioning measurements | RP-17 | RP‑020615 | approved | R3 | R3-31 | R3‑022138 | agreed | 2002‑08‑22 | TEI4 | - | ‑ |
page generated from database: 2024-11-12 10:16:04