Generations of Mobile Standards

3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 05.05

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
A016 - B R96 - 5.0.0 The Antenna Feeder Loss Compansator smg-17 115/96 approved SMG2 12/96 agreed - -
A018 2 F R96 5.0.0 5.1.0 Spectrum due to modulation and wide band noise smg-18 200/96 approved SMG2 - 80/96 agreed 1996‑03‑08 - -
A020 1 F Ph2 4.15.0 4.16.0 Small MS smg-19 427/96 approved SMG2 18 155 agreed 1996‑05‑30 - -
A025 - A R96 5.2.0 5.3.0 TCH/F2.4 reference interference performance smg-20 604/96 approved SMG2 -19 214 agreed 1996‑09‑01 - -
A026 - B R96 5.2.0 5.3.0 EFR performance smg-20 604/96 approved SMG2 -19 219 agreed 1996‑09‑06 - -
A027 1 F Ph2 4.16.0 4.17.0 Clarification of wording smg-20 604/96 approved SMG2 -19 223 agreed 1996‑09‑06 - -
A029 - B R96 5.3.0 5.4.0 Definition of R-GSM band and associated RF parameters smg-21 157/97 approved SMG2 - - 1997‑02‑06 - -
A036 - D R96 5.3.0 5.4.0 Clarification of definition of monotonicity for power control levels smg-21 159/97 approved SMG2 - - 1997‑02‑06 - -
A038 - F Ph2 4.18.0 4.19.0 MS residual output power between active bursts smg-22 435/97 approved SMG2 - - 1997‑06‑05 - -
A039 - A R96 5.4.0 5.5.0 MS residual output power between active bursts smg-22 435/97 approved SMG2 - - 1997‑06‑05 - -
A040 - F R96 5.4.0 5.5.0 Clarification of the frequency definition text in section 2 smg-22 435/97 approved SMG2 - - 1997‑06‑05 - -
A041 1 F R96 5.4.0 5.5.0 Relaxation for GSM-R smg-22 435/97 approved SMG2 - - 1997‑06‑05 - -
A044 - B R96 5.4.0 5.5.0 MS receiver performance with frequency hopping and downlink power control smg-22 435/97 approved SMG2 - - 1997‑06‑05 - -
A056 - B R96 5.5.0 5.6.0 Call Setup Success Performance at High Received Input Levels smg-23 97‑769 approved SMG2 SMG2-23 290/97 agreed 1997‑10‑06 TEI -
A073 - C R97 6.1.0 6.2.0 Frequency hopping performance under interference conditions smg-26 98‑0386 approved SMG2 SMG2-26 125/98 agreed 1998‑06‑23 TEI -
A078 - F R97 6.2.0 6.3.0 DCS1800 MS sensitivity for GPRS smg-27 98-0710 approved SMG2 SMG2-27 287/98 agreed 1998‑10‑12 GPRS -
A089 - A R97 6.5.0 6.6.0 Allowed power level between two consecutive active time slots smg-30 P‑99‑571 approved SMG2 - 2‑99‑075 agreed GPRS, HSCSD also affected: MS and BSS test specifications
A090 - F R96 5.11.0 5.12.0 Allowed power level between two consecutive active time slots smg-30 P‑99‑571 approved SMG2 - 2‑99‑075 agreed GPRS, HSCSD also affected: MS and BSS test specifications
A091 - B R98 6.3.0 7.0.0 Transmitter / receiver performance in CTS smg-28 P‑99‑167 approved SMG2 - 2P99‑164 agreed 1999‑02‑08 CTS -
A096 - A R96 5.10.1 5.11.0 Micro BTS: Deletion of Max output power per carrier values expressed in Watts smg-29 P‑99‑487 approved SMG2 - 2‑99‑451 agreed TEI -
A098 - A R98 7.0.0 7.1.0 Micro BTS: Deletion of Max output power per carrier values expressed in Watts smg-29 P‑99‑487 approved SMG2 - 2‑99‑451 agreed TEI -
A099 1 F R98 7.0.0 7.1.0 Correction to pico-BTS interference performance smg-29 P‑99‑488 approved SMG2 - 2‑99‑499 agreed PicoBTS -
A101 5 B R99 8.2.0 8.3.0 Transmitter/receiver performance for EDGE smg-31 P‑00‑089 approved SMG2 01/00 2‑00‑503 agreed 2000‑02‑13 EDGE-Layer1 -
A102 1 B R99 7.0.0 8.0.0 Blocking requirements for EDGE MS and BTS receivers smg-29 P‑99‑495 approved SMG2 - 2‑99‑805 agreed EDGE -
A103 1 B R99 7.0.0 8.0.0 Power classes for EDGE mobile stations smg-29 P‑99‑495 approved SMG2 - 2‑99‑827 agreed EDGE -
A104 1 B R99 7.0.0 8.0.0 Modulation Accuracy for EDGE MS and BTS smg-29 P‑99‑495 approved SMG2 - 2‑99‑829 agreed EDGE -
A113 1 F R98 7.1.0 7.2.0 AMR reference sensitivity and interference smg-30 P‑99‑577 approved SMG2 - 2‑99‑D36 agreed AMR see also: CR 05.05-A120 r1 (version 8.0.0)
A114 1 F R99 8.0.0 8.1.0 Output level Dynamic operation in EDGE smg-30 P‑99‑588 approved SMG2 - 2‑99‑D87 agreed EDGE -
A115 - C R99 8.0.0 8.1.0 EDGE blocking requirement for micro and pico-BTS smg-30 P‑99‑588 approved SMG2 - 2‑99‑987 agreed EDGE -
A116 1 F R99 8.0.0 8.1.0 850 MHz frequency band and channel arrangement smg-30 P‑99‑588 approved SMG2 - 2‑99‑D92 agreed EDGE-Compact -
A117 1 B R99 8.0.0 8.1.0 EDGE 850 MHz and 1900 MHz mixed mode smg-30 P‑99‑588 approved SMG2 - 2‑99‑D83 agreed EDGE see also: 05.50, 11.20, 11.21
A118 1 B R99 8.0.0 8.1.0 Frequency compensation requirements for EDGE receivers smg-30 P‑99‑588 approved SMG2 - 2‑99‑D85 agreed EDGE -
A119 2 F R99 8.0.0 8.1.0 Modulation accuracy for EDGE MS and BTS smg-30 P‑99‑588 approved SMG2 - 2‑99‑D86 agreed EDGE -
A120 1 A R99 8.0.0 8.1.0 AMR reference sensitivity and interference smg-30 P‑99‑577 approved SMG2 - 2‑99‑D37 agreed AMR see also: CR 05.05-A113 r1 (version 7.1.0)
A123 - B R98 7.1.0 7.2.0 Introduction of RATSCCH for AMR smg-30 P‑99‑577 approved SMG2 - 2‑99‑C94 agreed AMR -
A124 - A R99 8.0.0 8.1.0 Introduction of RATSCCH for AMR smg-30 P‑99‑577 approved SMG2 - 2‑99‑C95 agreed AMR -
A126 - B R99 8.0.0 8.1.0 8-PSK requirements for GSM 400 smg-30 P‑99‑588 approved SMG2 - 2‑99‑D34 agreed EDGE -
A127 - C R99 8.0.0 8.1.0 PCS 1900 MHz intermodulation requirements smg-30 P‑99‑588 approved SMG2 - 2‑99‑E26 agreed EDGE -
A128 - A R98 7.1.0 7.2.0 Allowed power level between two consecutive active time slots smg-30 P‑99‑571 approved SMG2 - P‑99‑571 - GPRS, HSCSD also affected: MS and BSS test specifications
A129 - A R99 8.0.0 8.1.0 Allowed power level between two consecutive active time slots smg-30 P‑99‑571 approved SMG2 - P‑99‑571 - GPRS, HSCSD also affected: MS and BSS test specifications
A132 - F R99 8.1.0 8.2.0 EDGE blocking requirement for micro and pico-BTS smg-30b P-99-797 approved SMG2 - 2‑99‑G68 agreed 1999‑12‑07 EDGE -
A133 1 B R99 8.1.0 8.2.0 Spurious emission in RX- and TX-band in other frequency bands smg-30b P-99-797 approved SMG2 - 2‑99‑J42 agreed 1999‑12‑07 EDGE -
A134 1 C R99 8.2.0 8.3.0 Measurement Filter for EDGE EVM smg-31 P‑00‑089 approved SMG2 01/00 2‑00‑460 agreed 2000‑02‑13 EDGE-Layer1 -
A135 2 F R99 8.2.0 8.3.0 Alignment of measurement filter reference in Annex G smg-31 P‑00‑089 approved SMG2 01/00 2‑00‑505 agreed 2000‑02‑13 EDGE-Layer1 -
A136 - F R99 8.2.0 8.3.0 Clarification of Intra BTS Intermodulation Attenuation requirments for MXM 850 and MXM 1900 BTS smg-31 P‑00‑089 approved SMG2 01/00 2‑00‑056 agreed 2000‑02‑13 EDGE-Layer1 -
A137 - F R99 8.2.0 8.3.0 Clarification of Intra BTS Intermodulation Attenuation requirments for PCS 1900 BTS smg-31 P‑00‑089 approved SMG2 01/00 2‑00‑057 agreed 2000‑02‑13 EDGE-Layer1 -
A138 - F R99 8.2.0 8.3.0 Definition of MS for Mixed-mode network smg-31 P‑00‑089 approved SMG2 01/00 2‑00‑058 agreed 2000‑02‑13 EDGE-Layer1 -
A139 - F R99 8.2.0 8.3.0 Correction to Output level dynamic operation smg-31 P‑00‑089 approved SMG2 01/00 2‑00‑059 agreed 2000‑02‑13 EDGE-Layer1 -
A141 1 B R99 8.2.0 8.3.0 Nominal Error Rate performance for EDGE smg-31 P‑00‑086 approved SMG2 01/00 2‑00‑504 agreed 2000‑02‑13 EDGE-EGPRS -
A142 - F R99 8.2.0 8.3.0 Corrections to receiver Characteristics for EDGE smg-31 P‑00‑089 approved SMG2 01/00 2‑00‑063 agreed 2000‑02‑13 EDGE-Layer1 -
A143 1 B R99 8.2.0 8.3.0 Spurious emission measurement bandwidths updated to include GSM 400 systems smg-31 P‑00‑076 approved SMG2 01/00 2‑00‑348 agreed 2000‑02‑13 GSM_400 -
A143 1 B R98 7.0.0 7.1.0 AMR reference sensitivity and interference smg-29 P‑99‑486 approved SMG2 - 2‑99‑794 agreed AMR -
A144 - B R99 8.2.0 8.3.0 Harmonisation of Transmitter/receiver performance requirements for PCS 1900 smg-31 P‑00‑075 approved SMG2 01/00 2‑00‑088 agreed 2000‑02‑13 Harmonisation_PCS1900 -
A145 - C R97 6.6.0 6.7.0 Relaxation of C/I performance requirement for CS4 smg-31 P‑00‑079 approved SMG2 01/00 2‑00‑091 agreed 2000‑02‑13 GPRS -
A146 - A R98 7.2.0 7.3.0 Relaxation of C/I performance requirement for CS4 smg-31 P‑00‑079 approved SMG2 01/00 2‑00‑092 agreed 2000‑02‑13 GPRS -
A147 - A R99 8.2.0 8.3.0 Relaxation of C/I performance requirement for CS4 smg-31 P‑00‑079 approved SMG2 01/00 2‑00‑093 agreed 2000‑02‑13 GPRS -
A149 - B R99 8.2.0 8.3.0 EVM requirements for EDGE BTS transmitter with combining equipment smg-31 P‑00‑089 approved SMG2 01/00 2‑00‑384 agreed 2000‑02‑13 EDGE-Layer1 -
A150 - B R99 8.2.0 8.3.0 Introduction of Incremental Redundancy Receiver Performance for MS smg-31 P‑00‑086 approved SMG2 01/00 2‑00‑451 agreed 2000‑02‑13 EDGE-EGPRS -
A151 - F R99 8.2.0 8.3.0 Switching Transients for 8-PSK Modulation smg-31 P‑00‑089 approved SMG2 01/00 2‑00‑482 agreed 2000‑02‑13 EDGE-Layer1 -
A152 - F R98 7.2.0 - Conforming requirements for LMUs containing a control mobile station smg-31 P‑00‑059 postponed T1P1 - - 2000‑02‑16 LCS -
A153 - F R99 8.1.0 - Conforming requirements for LMUs containing a control mobile station smg-31 P‑00‑060 postponed T1P1 - - 2000‑02‑16 LCS -
A154 2 B R99 8.3.0 8.4.0 Completion of GSM 05.05 for EDGE and clean-up smg-31b P-00-214 approved SMG2 S2-35 916/00 agreed 2000‑04‑13 EDGE -
A157 - D R99 8.4.0 8.5.0 Removal of duplicated figures smg-32 P‑00‑287 approved SMG2 05/00 2‑001043 agreed 2000‑06‑28 TEI -
A159 - D R99 8.0.0 8.1.0 GSM in the 400 MHz bands: editorial modification smg-30 P‑99‑583 approved SMG2 - 2‑99‑A69 agreed GSM_400 -
A160 - B R99 8.4.0 8.5.0 Alignment of spurious emissions GSM-3G (UTRA): BTS smg-32 P‑00‑287 approved SMG2 05/00 2‑001047 agreed 2000‑06‑28 TEI -
A161 1 B R99 8.4.0 8.5.0 Alignment of spurious emissions GSM-3G (UTRA): MS smg-32 P‑00‑287 approved SMG2 05/00 2‑001178 agreed 2000‑06‑28 TEI -
A162 - F R99 8.5.0 8.6.0 05.05-A162 Pico BTS Reference interference level clarification (R99) GP-01 GP-000013 approved G1 G1-01 GP‑000013 agreed 2000‑09‑18 PicoBTS -
A163 - F R99 8.5.0 8.6.0 05.05-A163 Alignment of spurious emissions GSM-3G(UTRA): BTS GP-01 GP-000030 approved G1 G1-01 GP‑000030 agreed 2000‑09‑18 TEI -
A164 - F R99 8.5.0 8.6.0 05.05-A164 Alignment of spurious emissions GSM-3G(UTRA): MS GP-01 GP-000031 approved G1 G1-01 GP‑000031 agreed 2000‑09‑18 TEI -
A165 - B R99 8.6.0 - 05.05-A165 Introduction of GSM 700 in 05.05 GSM on 700 MHz Frequency Band (R00) GP-01 GP-000087 revised Ericsson G1-01 GP‑000087 revised 2000‑09‑18 GSM_700 -
A165 1 B R99 8.6.0 4.0.0 05.05-A165 rev 1 Introduction of GSM 700 in 05.05 GSM on 700 MHz Frequency Band (R00) GP-01 GP-000370 approved G1 G1-01 GP‑000370 agreed 2000‑09‑18 GSM_700 -
A166 - C R97 6.7.0 - 05.05-A166 Definition of small MS (R97) GP-01 GP-000098 revised Ericsson G1-01 GP‑000098 revised 2000‑09‑18 TEI -
A166 1 F R97 6.7.0 6.8.0 05.05-A166 rev 1 Definition of small MS (R97) GP-01 GP-000371 approved G1 G1-01 GP‑000371 agreed 2000‑09‑18 TEI -
A167 - C R98 7.4.0 - 05.05-A167 Definition of small MS (R98) GP-01 GP-000099 revised Ericcson G1-01 GP‑000099 revised 2000‑09‑18 TEI -
A167 1 A R98 7.4.0 7.5.0 05.05-A167 rev 1 Definition of small MS (R98) GP-01 GP-000372 approved G1 G1-01 GP‑000372 agreed 2000‑09‑18 TEI -
A168 - C R99 8.5.0 - 05.05-A168 Definition of small MS (R99) GP-01 GP-000100 revised Ericsson G1-01 GP‑000100 revised 2000‑09‑18 TEI -
A168 1 A R99 8.5.0 8.6.0 05.05-A168 rev 1 Definition of small MS (R99) GP-01 GP-000373 approved G1 G1-01 GP‑000373 agreed 2000‑09‑18 TEI -
A169 - F R96 5.12.0 5.d.0 05.05-A169 Removal of GPRS related text (R96) GP-01 GP-000109 approved G1 G1-01 GP‑000109 agreed 2000‑09‑18 TEI -
A170 - F R97 6.7.0 6.8.0 05.05-A170 Correction on CS-4 performance requirements (R97) GP-01 GP-000321 approved G1 G1-01 GP‑000321 agreed 2000‑09‑18 GPRS -
A171 - A R98 7.4.0 7.5.0 05.05-A171 Correction on CS-4 performance requirements (R98) GP-01 GP-000322 approved G1 G1-01 GP‑000322 agreed 2000‑09‑18 GPRS -
A172 - A R99 8.5.0 8.6.0 05.05-A172 Correction on CS-4 performance requirements (R99) GP-01 GP-000323 approved G1 G1-01 GP‑000323 agreed 2000‑09‑18 GPRS -
A173 - F R99 8.5.0 - 05.05-A173 Clarification of BTS output power capability with 8PSK (R99) GP-01 GP-000088 revised Ericsson Nokia G1-01 GP‑000088 revised 2000‑09‑18 EDGE -
A173 1 F R99 8.5.0 8.6.0 05.05-A173 rev 1 Clarification of BTS output power capability with 8PSK (R99) GP-01 GP-000363 approved G1 G1-01 GP‑000363 agreed 2000‑09‑18 EDGE -
A174 - F R99 8.6.0 - NER requirements for EGPRS GP-02 GP-000541 - G1 G1-02 GP‑000541 revised 2000‑11‑14 EGPRS -
A174 1 F R99 8.6.0 - NER requirements for EGPRS GP-02 GP-000845 - G1 G1-02 GP‑000845 revised 2000‑11‑14 EGPRS -
A174 2 F R99 8.6.0 8.7.0 NER requirements for EGPRS GP-02 GP-000906 approved G1 G1-02 GP‑000906 agreed 2000‑11‑14 EGPRS -
A175 - F R99 8.6.0 - Tolerance of BTS output power levels GP-02 GP-000543 - G1 G1-02 GP‑000543 revised 2000‑11‑14 EDGE -
A175 1 F R99 8.6.0 8.7.0 Tolerance of BTS output power levels GP-02 GP-000853 approved G1 G1-02 GP‑000853 agreed 2000‑11‑14 EDGE -
A177 - F R99 8.6.0 8.7.0 Alignment of AM suppression requirements for PCS 1900 MS GP-02 GP-000671 approved G1 G1-02 GP‑000671 agreed 2000‑11‑14 EDGE -
A178 - F R99 8.6.0 - Testing of Blocking requirements for MXM 1900 BSS GP-02 GP-000672 - G1 G1-02 GP‑000672 revised 2000‑11‑14 EDGE -
A178 1 F R99 8.6.0 - Testing of Blocking requirements for MXM 1900 BSS GP-02 GP-000855 - G1 G1-02 GP‑000855 revised 2000‑11‑14 EDGE -
A178 2 F R99 8.6.0 8.7.0 Testing of Blocking requirements for MXM 1900 BSS GP-02 GP-000908 approved G1 G1-02 GP‑000908 agreed 2000‑11‑14 EDGE -
A179 - F R99 8.6.0 8.7.0 Testing of Intra BSS intermodulation attenation requirements for MXM 1900 BSS GP-02 GP-000673 approved G1 G1-02 GP‑000673 agreed 2000‑11‑14 EDGE -
A180 - F R99 8.6.0 - Alignment of AM suppression requirement for PCS 1900, MXM 1900, and PCS 1800 BTS GP-02 GP-000808 - G1 G1-02 GP‑000808 rejected 2000‑11‑14 EDGE -
A181 - - R99 - - Interpretation of common DCS 1800 / PCS 1900 ARFCN numbers when transmitted on other bands GP-03 GP-010198 revised Nokia - - 2001‑01‑31 - -
A181 1 - R99 - - Interpretation of common DCS 1800 / PCS 1900 ARFCN numbers when transmitted on other bands GP-03 GP-010300 revised Nokia - - 2001‑01‑31 - -
A181 2 - R99 - - Interpretation of common DCS 1800 / PCS 1900 ARFCN numbers when transmitted on other bands GP-03 GP-010378 withdrawn Nokia - - 2001‑01‑31 - -
A182 - - R99 - - Further alignment of PCS 1900 RF requirements with DCS 1800 GP-03 GP-010200 revised Nokia - - 2001‑01‑31 - -
A182 1 - R99 - - Further alignment of PCS 1900 RF requirements with DCS 1800 GP-03 GP-010334 rejected Nokia - - 2001‑01‑31 - -
A183 - F R99 8.7.1 8.8.0 Correction of Power vs Time mask for 8-PSK GP-03 GP-010222 approved Ericsson - - 2001‑01‑31 EDGE -
A184 - - R99 - - Definition of MXM systems missing GP-03 GP-010224 revised Ericsson - - 2001‑01‑31 - -
A184 1 F R99 8.7.1 8.8.0 Definition of MXM systems missing GP-03 GP-010298 approved Ericsson - - 2001‑01‑31 EDGE -
A185 - F R99 8.7.1 8.8.0 Testing of Intra BSS intermodulation attenuation requirements for MXM 850 BSS GP-03 GP-010226 approved Ericsson - - 2001‑01‑31 EDGE -
A186 - - R99 - - Mixed Mode Systems Intermodulation Attenuation GP-03 GP-010264 revised Lucent Technologies - - 2001‑01‑31 - -
A186 1 F R99 8.7.1 8.8.0 Mixed Mode Systems Intermodulation Attenuation GP-03 GP-010335 approved Lucent Technologies - - 2001‑01‑31 EDGE -
A187 - F R99 8.7.1 8.8.0 Alignment of AM-suppression requirements for MXM 1900 BTS with PCS 1900 BTS and MXM 850 BTS with GSM 850 BTS GP-03 GP-010285 approved Ericsson - - 2001‑01‑31 EDGE -
A188 - - R99 - - Interpretation of common DCS 1800 / PCS 1900 ARFCN numbers when transmitted on other bands GP-03 GP-010394 revised Ericsson - - 2001‑01‑31 - -
A188 1 F R99 8.7.1 8.8.0 Interpretation of common DCS 1800 / PCS 1900 ARFCN numbers when transmitted on other bands GP-03 GP-010441 approved Ericsson - - 2001‑01‑31 TEI -
A189 - - R99 8.8.0 - Clarification of Origin Offset Suppression GP-04 GP-010498 revised Alcatel G1-4 GP‑010498 - 2001‑04‑06 - -
A189 1 F R99 8.8.0 8.9.0 Clarification of Origin Offset Suppression GP-04 GP-010865 approved Alcatel G1-4 GP‑010865 agreed 2001‑04‑06 EDGE -
A190 - - R99 8.8.0 - Corrections to facilitate the interpretation GP-04 GP-010710 revised Ericsson G1-4 GP‑010710 - 2001‑04‑06 - -
A190 1 F R99 8.8.0 8.9.0 Corrections to facilitate the interpretation GP-04 GP-010863 approved Ericsson G1-4 GP‑010863 agreed 2001‑04‑06 EDGE -
A191 - F R99 8.8.0 8.9.0 Removal of MS intermodulation requirement GP-04 GP-010861 approved Ericsson G1-4 GP‑010861 agreed 2001‑04‑06 TEI -
A192 - F R99 8.9.0 8.10.0 05.05-A192 Corrections for clarification regarding output power and blocking requirements (R99) GP-05 GP-011070 approved Ericsson G1-5 GP‑011070 agreed 2001‑06‑01 TEI -
A193 - F R98 - - Correction to 05.05 – Incorrect references in section H.2.2.2 GP-06 GP-011479 revised Nokia - - 2001‑08‑31 - -
A193 1 F R98 7.5.0 7.6.0 Correction to 05.05 – Incorrect references in section H.2.2.2 GP-06 GP-011907 approved Nokia - - 2001‑08‑31 LCS -
A194 - A R99 - - Correction to 05.05 – Incorrect references in section H.2.2.2 GP-06 GP-011480 revised Nokia - - 2001‑08‑31 - -
A194 1 A R99 8.10.0 8.11.0 Correction to 05.05 – Incorrect references in section H.2.2.2 GP-06 GP-011908 approved Nokia - - 2001‑08‑31 LCS -
A197 - F R98 - - Corrections for clarification regarding PCS 1900 MS requirements on spurious emissions GP-06 GP-011534 revised Ericsson - - 2001‑08‑31 - -
A197 1 F R98 7.5.0 7.6.0 Corrections for clarification regarding PCS 1900 MS requirements on spurious emissions GP-06 GP-011906 approved Ericsson - - 2001‑08‑31 PCS1900 -
A198 - A R99 8.10.0 8.11.0 Corrections for clarification regarding GSM 850 MS and PCS 1900 MS requirements on spurious emissions GP-06 GP-011535 approved Ericsson - - 2001‑08‑31 PCS1900 -
A199 - F R97 - - Transmitted power vs. time - mask alignment for PCS 1900 MS GP-06 GP-011559 withdrawn Siemens - - 2001‑08‑31 - -
A200 - A R98 - - Transmitted power vs. time - mask alignment for PCS 1900 MS GP-06 GP-011560 withdrawn Siemens - - 2001‑08‑31 - -
A201 - A R99 - - Transmitted power vs. time - mask alignment for PCS 1900 MS GP-06 GP-011561 withdrawn Siemens - - 2001‑08‑31 - -
A202 - F R99 - - Transmitted power level versus time GP-06 GP-011623 rejected Motorola - - 2001‑08‑31 - -
A203 - F R99 8.10.0 8.11.0 Alignment to 04.18 for the definition of the BAND_INDICATOR field GP-06 GP-011942 approved Alcatel - - 2001‑08‑31 GPRS -
A205 - - R98 - - Correction of AMR FR inband performance requirement GP-09 - - - G1-09 GP‑020812 revised 2002‑04‑19 - -
A205 1 F R98 7.6.0 7.7.0 Correction of AMR FR inband performance requirement GP-09 GP-021157 approved Ericsson G1-09 GP‑021157 postponed 2002‑04‑19 AMR -
A206 - - R99 - - Correction of AMR FR inband performance requirement GP-09 - - - G1-09 GP‑020811 revised 2002‑04‑19 - -
A206 1 A R99 8.11.0 8.12.0 Correction of AMR FR inband performance requirement GP-09 GP-021156 approved Ericsson G1-09 GP‑021156 postponed 2002‑04‑19 AMR -
A207 - - R98 - - Relaxation of AMR performance GP-09 - - - G1-09 GP‑021030 rejected 2002‑04‑19 - -
A208 - - R98 7.6.0 - Reference sensitivity and interference performance requirements for TCH/AFS and TCH/AHS GP-09 GP-021259 postponed Ericsson et al - - 2002‑04‑19 - -
A209 - F R98 7.7.0 7.8.0 Reference sensitivity and interference performance requirements for TCH/AFS and TCH/AHS GP-10 GP‑021543 approved G1 G1-10 GP‑021543 agreed 2002‑06‑28 AMR -
A210 - A R99 8.12.0 8.13.0 Reference sensitivity and interference performance requirements for TCH/AFS and TCH/AHS GP-10 GP‑021544 approved G1 G1-10 GP‑021544 agreed 2002‑06‑28 AMR -
A212 - F R98 7.7.0 7.8.0 AMR AHS7.4 static channel performance correction GP-10 GP‑022028 approved G1 G1-10 GP‑022028 agreed 2002‑06‑28 AMR -
A213 - A R99 8.12.0 8.13.0 AMR AHS7.4 static channel performance correction GP-10 GP‑022029 approved G1 G1-10 GP‑022029 agreed 2002‑06‑28 AMR -
A214 - - R98 - - Relaxation of AMR-Inband, RATSCCH and SID_UPDATE - - - - G1-11 GP‑022539 revised 2002‑08‑30 - -
A214 1 - R98 - - Relaxation of AMR-Inband, RATSCCH and SID_UPDATE - - - - G1-11 GP‑022642 revised 2002‑08‑30 - -
A214 2 - R98 - - Relaxation of AMR-Inband, RATSCCH and SID_UPDATE - - - - G1-11 GP‑022704 revised 2002‑08‑30 - -
A214 3 F R98 7.8.0 7.9.0 Relaxation of AMR-Inband, RATSCCH and SID_UPDATE GP-11 GP‑022817 approved G1 G1-11 GP‑022817 agreed 2002‑08‑30 AMR -
A215 - - R99 - - Relaxation of AMR-Inband, RATSCCH and SID_UPDATE - - - - G1-11 GP‑022540 revised 2002‑08‑30 - -
A215 1 - R99 - - Relaxation of AMR-Inband, RATSCCH and SID_UPDATE - - - - G1-11 GP‑022643 revised 2002‑08‑30 - -
A215 2 - R99 - - Relaxation of AMR-Inband, RATSCCH and SID_UPDATE - - - - G1-11 GP‑022705 revised 2002‑08‑30 - -
A215 3 A R99 8.13.0 8.14.0 Relaxation of AMR-Inband, RATSCCH and SID_UPDATE GP-11 GP‑022818 approved G1 G1-11 GP‑022818 agreed 2002‑08‑30 AMR -
A236 - C R98 7.2.0 7.3.0 RF Requirements for TOA LMU smg-31 P‑00‑083 approved SMG2 01/00 2‑00‑114 agreed 2000‑02‑13 LCS originated in T1P1.5
A237 - A R99 8.2.0 8.3.0 RF Requirements for TOA LMU smg-31 P‑00‑083 approved SMG2 01/00 2‑00‑115 agreed 2000‑02‑13 LCS originated in T1P1.5
A238 - C R98 7.2.0 7.3.0 Requirements on E-OTD LMU and E-OTD MS smg-31 P‑00‑083 approved SMG2 01/00 2‑00‑116 agreed 2000‑02‑13 LCS originated in T1P1.5
A239 - A R99 8.2.0 8.3.0 Requirements on E-OTD LMU and E-OTD MS smg-31 P‑00‑083 approved SMG2 01/00 2‑00‑117 agreed 2000‑02‑13 LCS originated in T1P1.5
A246 - F R98 7.3.0 7.4.0 Conforming requirements for LMUs containing a control mobile station smg-31b P-00-217 approved SMG2 S2-35 556/00 agreed 2000‑04‑13 LCS -
A247 - A R99 8.3.0 8.4.0 Conforming requirements for LMUs containing a control mobile station smg-31b P-00-217 approved SMG2 S2-35 557/00 agreed 2000‑04‑13 LCS -

page generated from database: 2024-11-12 10:16:04