3GPP Specification Change Requests
Go to spec numbering scheme page
3GPP Specification Change Request records for: 03.78
CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A005 | 1 | D | R96 | 5.0.0 | 5.1.0 | Setting of Location Number | smg-22 | 377/97 | approved | SMG3 WPC | 9704p4 | 97C274 | agreed | 1997‑06‑02 | CAMEL_R96 | - | ‑ |
A006 | 1 | D | R96 | 5.0.0 | 5.1.0 | Clarification on handling of Connect and Continue operations | smg-22 | 377/97 | approved | SMG3 WPC | 9704p4 | 97C238 | agreed | 1997‑06‑02 | CAMEL_R96 | - | ‑ |
A007 | - | C | R96 | 5.0.0 | 5.1.0 | Change to CAMEL phase 1 regarding * and # in Called Party Number | smg-22 | 303/97 | approved | SMG3 WPC | 9704p4 | 97C271 | agreed | 1997‑06‑02 | CAMEL_R96 | - | ‑ |
A011 | - | F | R96 | 5.2.0 | 5.3.0 | Removal of CallingPartyNumber from Connect | smg-24 | 97‑915 | approved | SMG3 WPC | 9711p7 | 97C637 | agreed | 1997‑12‑06 | CAMEL_R96 | - | ‑ |
A014 | 1 | F | R96 | 5.2.0 | 5.3.0 | Use of the CallReference Number & GMSC address in SRI | smg-24 | 97‑915 | approved | SMG3 WPC | 9712p8 | 97C735 | agreed | 1997‑12‑06 | CAMEL_R96 | - | ‑ |
A019 | 2 | F | R97 | 6.0.0 | 6.1.0 | Combination clean up on CAMEL Phase 2 | smg-26 | 98‑0410 | approved | SMG3 | -2/98 | 98P126 | agreed | 1998‑05‑28 | - | - | ‑ |
A022 | - | F | R96 | 5.4.0 | 5.5.0 | Release by A party for forwarded calls and CAMEL | smg-26 | 98‑0404 | approved | SMG3 | -2/98 | 98P125 | agreed | 1998‑03‑30 | - | - | ‑ |
A025 | 2 | F | R97 | 6.1.1 | 6.2.0 | CAMEL Phase 2 stage 2 | smg-27 | 98-0724 | approved | SMG3 | - | 98p186 | - | ‑ | CAMEL2 | - | ‑ |
A027 | - | A | R97 | 6.0.0 | 6.1.0 | Release by A party for forwarded calls and CAMEL | smg-26 | 98‑0404 | approved | SMG3 | -2/98 | 98P125 | agreed | 1998‑05‑21 | - | - | ‑ |
A028 | - | C | R97 | 6.0.0 | 6.1.0 | GSM Forwarding Pending Indication in IDP Operation | smg-26 | 98‑0411 | approved | SMG3 | -2/98 | 98P126 | agreed | 1998‑05‑28 | - | - | ‑ |
A029 | 1 | F | R97 | 6.1.1 | 6.2.0 | Corrections | smg-27 | 98-0724 | approved | SMG3 | - | 98p206 | - | ‑ | CAMEL2 | - | ‑ |
A034 | 2 | F | R97 | 6.1.1 | 6.2.0 | Interworking CAMEL with general Bearer Service | smg-27 | 98-0724 | approved | SMG3 | - | 98p206 | - | ‑ | CAMEL2 | - | ‑ |
A037 | 1 | C | R97 | 6.1.1 | - | Removal of O_Not_Reachable and T_Not_Reachable detection points | smg-27 | 98-0724 | postponed | SMG3 | - | 98p186 | - | ‑ | CAMEL2 | - | ‑ |
A042 | - | F | R97 | 6.2.0 | 6.3.0 | Tariff Switch Handling Correction | smg-28 | P‑99‑192 | approved | SMG3 | - | 3P99‑023 | - | 1999‑02‑04 | CAMEL | - | ‑ |
A048 | 2 | F | R97 | 6.2.0 | 6.3.0 | Clarification of handling of call forwarding | smg-28 | P‑99‑192 | approved | SMG3 | - | 3P99‑023 | - | 1999‑02‑04 | CAMEL | - | ‑ |
A050 | 2 | F | R97 | 6.2.0 | 6.3.0 | Corrections on CAMEL phase 2 stage 2 | smg-28 | P‑99‑192 | approved | SMG3 | - | 3P99‑023 | - | 1999‑02‑04 | CAMEL | - | ‑ |
A052 | - | F | R97 | 6.2.0 | 6.3.0 | USSD | smg-28 | P‑99‑192 | approved | SMG3 | - | 3P99‑023 | - | 1999‑02‑04 | CAMEL | - | ‑ |
A059 | - | F | R97 | 6.2.0 | 6.3.0 | Removal of ‘Send Calculation To SCP Indication’ | smg-28 | P‑99‑192 | approved | SMG3 | - | 3P99‑023 | - | 1999‑02‑04 | CAMEL | - | ‑ |
A061 | 3 | F | R97 | 6.2.0 | 6.3.0 | Timer TNRy | smg-28 | P‑99‑192 | approved | SMG3 | - | 3P99‑023 | - | 1999‑02‑04 | CAMEL | - | ‑ |
A067 | 1 | D | R97 | 6.2.0 | 6.3.0 | CAMEL 2 clarifications to charging issues | smg-28 | P‑99‑192 | approved | SMG3 | - | 3P99‑023 | - | 1999‑02‑04 | CAMEL | - | ‑ |
A072 | - | B | R98 | 6.2.0 | 7.0.0 | Introduction of WI CLI Enhancement | smg-28 | P‑99‑196 | approved | SMG3 | - | 3P99‑049 | - | 1999‑02‑04 | CLI_enhancements | - | ‑ |
A075 | 1 | F | R97 | 6.3.0 | 6.4.0 | Dialled Number String Format | smg-29 | P‑99‑454 | approved | SMG3 | - | N2‑99225 | - | 1999‑06‑24 | CAMEL2 | - | ‑ |
A084 | 1 | F | R97 | 6.3.0 | 6.4.0 | Correction of USSD Information flows | smg-29 | P‑99‑454 | approved | SMG3 | - | N2‑99238 | - | 1999‑06‑24 | CAMEL2 | - | ‑ |
A092 | - | F | R97 | 6.3.0 | 6.4.0 | Correction of CAMEL Phase interworking with Call Forwarding | smg-29 | P‑99‑454 | approved | SMG3 | - | N2‑99223 | - | 1999‑06‑24 | CAMEL2 | - | ‑ |
A100 | 1 | F | R97 | 6.3.0 | 6.4.0 | Clarification on the scope of CAMEL Capability Handling parameter | smg-29 | P‑99‑454 | approved | SMG3 | - | N2‑99338 | - | 1999‑06‑24 | CAMEL2 | - | ‑ |
A102 | - | F | R97 | 6.3.0 | 6.4.0 | Refining trigger criteria at DP2, due to the introduction of North American Equal Access | smg-29 | P‑99‑454 | approved | SMG3 | - | N2‑99458 | - | 1999‑06‑24 | CAMEL2 | - | ‑ |
A103 | - | F | R97 | 6.3.0 | 6.4.0 | Introduction of MSISDN Parameters in Process Unstructured | smg-29 | P‑99‑454 | approved | SMG3 | - | N2‑99576 | - | 1999‑06‑24 | CAMEL2 | - | ‑ |
A105 | - | F | R97 | 6.3.0 | 6.4.0 | Correction of gsmSDL; return to idle after ACR | smg-29 | P‑99‑454 | approved | SMG3 | - | N2‑99630 | - | 1999‑06‑24 | CAMEL2 | - | ‑ |
A108 | 2 | F | R97 | 6.4.0 | 6.5.0 | Inclusion of the SS Invocation Notification Procedure | NP-05 | NP-99298 | approved | N2 | - | N2‑99939 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A109 | 2 | A | R98 | 7.1.0 | 7.2.0 | Inclusion of the SS Invocation Notification Procedure | NP-05 | NP-99298 | approved | N2 | - | N2‑99937 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A110 | 1 | A | R98 | 7.0.0 | 7.1.0 | Inclusion of Subscriber Activity Information Flow | smg-29 | P‑99‑551 | approved | SMG3 | - | N2‑99217 | - | 1999‑06‑24 | CAMEL2 | Virtual CR: R97 CR is same as R96 CR in A070 | ‑ |
A111 | - | F | R98 | 7.0.0 | 7.1.0 | Inclusion of Alerting Pattern in Provide Roaming Number (PRN) Information Flow.. | smg-29 | P‑99‑551 | approved | SMG3 | - | 3C99‑275 | - | 1999‑06‑24 | CAMEL2 | Virtual CR: R98 CR is same as R97 CR in A074 | ‑ |
A114 | - | F | R98 | 7.0.0 | 7.1.0 | Inclusion of Activity Test IF between gsmSCF & gsmSRF and gsmSCF and assistSSF | smg-29 | P‑99‑551 | approved | SMG3 | - | 3C99‑480 | - | 1999‑06‑24 | CAMEL2 | Virtual CR: R98 CR is same as R97 CR in A083 | ‑ |
A115 | 1 | F | R98 | 7.0.0 | 7.1.0 | Correction of USSD Information flows | smg-29 | P‑99‑551 | approved | SMG3 | - | N2‑99238 | - | 1999‑06‑24 | CAMEL2 | Virtual CR: R98 CR is same as R97 CR in A084 | ‑ |
A116 | 2 | F | R98 | 7.0.0 | 7.1.0 | Various corrections | smg-29 | P‑99‑551 | approved | SMG3 | - | N2‑99343 | - | 1999‑06‑24 | CAMEL2 | Virtual CR: R98 CR is same as R97 CR in A085 | ‑ |
A117 | - | F | R98 | 7.0.0 | 7.1.0 | Correction of CAMEL Phase interworking with Call Forwarding | smg-29 | P‑99‑551 | approved | SMG3 | - | N2‑99223 | - | 1999‑06‑24 | CAMEL2 | Virtual CR: R98 CR is same as R97 CR in A092 | ‑ |
A118 | - | F | R98 | 7.0.0 | 7.1.0 | Renaming of Call Active Variable | smg-29 | P‑99‑551 | approved | SMG3 | - | N2‑99255 | - | 1999‑06‑24 | CAMEL2 | Virtual CR: R98 CR is same as R97 CR in A093 | ‑ |
A121 | - | F | R98 | 7.0.0 | 7.1.0 | Refining trigger criteria at DP2, due to the introduction of North American Equal Access | smg-29 | P‑99‑551 | approved | SMG3 | - | N2‑99458 | - | 1999‑06‑24 | CAMEL2 | Virtual CR: R98 CR is same as R97 CR in A102 | ‑ |
A125 | 2 | F | R98 | 7.0.0 | 7.1.0 | Notification of call forwarding to the gsmSCF | smg-29 | P‑99‑551 | approved | SMG3 | - | N2‑99638 | - | 1999‑06‑24 | CAMEL2 | Virtual CR: R98 CR is same as R97 CR in A106 | ‑ |
A127 | 1 | F | R97 | 6.4.0 | 6.5.0 | Clarification on handling of Call Reference Number and GMSC address | NP-05 | NP-99298 | approved | N2 | - | N2‑99925 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A130 | 2 | F | R97 | 6.4.0 | 6.5.0 | Alignment of CAMEL2 FCI & Handling of CIR | NP-05 | NP-99298 | approved | N2 | - | N2‑99C85 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A132 | 1 | F | R97 | 6.4.0 | 6.5.0 | Call Reference Number | NP-05 | NP-99298 | approved | N2 | - | N2‑99C45 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A133 | 1 | A | R98 | 7.1.0 | 7.2.0 | Call Reference Number | NP-05 | NP-99298 | approved | N2 | - | N2‑99C47 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A134 | - | F | R97 | 6.4.0 | 6.5.0 | Removal of TDP-Criteria from RCH | NP-05 | NP-99298 | approved | N2 | - | N2‑99B25 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A135 | - | A | R98 | 7.1.0 | 7.2.0 | Removal of TDP-Criteria from RCH | NP-05 | NP-99298 | approved | N2 | - | N2‑99B26 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A136 | 1 | F | R97 | 6.4.0 | 6.5.0 | GMSC CAMEL Phases in PRN | NP-05 | NP-99298 | approved | N2 | - | N2‑99C53 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A137 | 1 | A | R98 | 7.1.0 | 7.2.0 | GMSC CAMEL Phases in PRN | NP-05 | NP-99298 | approved | N2 | - | N2‑99D11 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A138 | 1 | D | R97 | 6.4.0 | 6.5.0 | Value of Call Active parameter in Aoperation - clarifications in the SDL | NP-05 | NP-99298 | approved | N2 | - | N2‑99C55 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A141 | 1 | F | R97 | 6.4.0 | 6.5.0 | Corrections of process gsmSSF SDL | NP-05 | NP-99298 | approved | N2 | - | N2‑99C59 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A142 | - | A | R98 | 7.1.0 | 7.2.0 | Clarification on handling of Call Reference Number and GMSC address | NP-05 | NP-99298 | approved | N2 | - | N2‑99986 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A143 | - | A | R98 | 7.1.0 | 7.2.0 | Value of Call Active parameter in Aoperation - clarifications in the SDL | NP-05 | NP-99298 | approved | N2 | - | N2‑99D15 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A144 | - | A | R98 | 7.1.0 | 7.2.0 | Corrections of process gsmSSF SDL | NP-05 | NP-99298 | approved | N2 | - | N2‑99C61 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A145 | - | A | R98 | 7.1.0 | 7.2.0 | Alignment of CAMEL2 FCI & Handling of CIR | NP-05 | NP-99298 | approved | N2 | - | N2‑99C99 | agreed | 1999‑09‑30 | CAMEL2 | - | ‑ |
A151 | 1 | F | R97 | 6.5.0 | 6.6.0 | Correction of CF notification | NP-07 | NP-000033 | approved | N2 | goodName | N2B000283 | agreed | 2000‑05‑18 | CAMEL2 | - | ‑ |
A152 | 1 | A | R98 | 7.2.0 | 7.3.0 | Correction of CF notification | NP-07 | NP-000033 | approved | N2 | goodName | N2B000284 | agreed | 2000‑05‑18 | CAMEL2 | - | ‑ |
A153 | 1 | F | R97 | 6.5.0 | 6.6.0 | Correction on gsmSSF SDL; return to idle after ACR | NP-07 | NP-000033 | approved | N2 | goodName | N2A000229 | agreed | 2000‑05‑18 | CAMEL2 | - | ‑ |
A154 | 1 | A | R98 | 7.2.0 | 7.3.0 | Correction on gsmSSF SDL; return to idle after ACR | NP-07 | NP-000033 | approved | N2 | goodName | N2A000230 | agreed | 2000‑05‑18 | CAMEL2 | - | ‑ |
A155 | 2 | F | R97 | 6.6.0 | 6.7.0 | gsmSSF DP handling in CF | NP-08 | NP-000241 | approved | N2 | N2-11 | N2‑000195 | agreed | 2000‑06‑27 | CAMEL2 | - | ‑ |
A156 | 2 | A | R98 | 7.3.0 | 7.4.0 | gsmSSF DP handling in CF | NP-08 | NP-000241 | approved | N2 | N2-11 | N2‑000196 | agreed | 2000‑06‑27 | CAMEL2 | - | ‑ |
A157 | 2 | F | R97 | 6.6.0 | 6.7.0 | Usage of Announcement Suppression Indicator | NP-08 | NP-000240 | approved | N2 | N2-11 | N2‑000247 | agreed | 2000‑06‑27 | CAMEL2 | - | ‑ |
A158 | 2 | A | R98 | 7.3.0 | 7.4.0 | Usage of Announcement Suppression Indicator | NP-08 | NP-000240 | approved | N2 | N2-11 | N2‑000248 | agreed | 2000‑06‑27 | CAMEL2 | - | ‑ |
A159 | 5 | F | R97 | 6.7.0 | 6.8.0 | Correction on CF notification | NP-10 | NP‑000614 | approved | N2 | N2-15 | N2‑000683 | agreed | 2000‑11‑29 | CAMEL2 | - | ‑ |
A160 | 5 | A | R98 | 7.4.0 | 7.5.0 | Correction on CF notification | NP-10 | NP‑000614 | approved | N2 | N2-15 | N2‑000684 | agreed | 2000‑11‑29 | CAMEL2 | - | ‑ |
A161 | 1 | F | R97 | 6.8.0 | 6.9.0 | Mapping of Call Forwarding parameters from CAP-Connect to ISUP-IAM and CAP-InitialDP | NP-12 | NP‑010309 | approved | N2 | N2-18 | N2‑010379 | agreed | 2001‑05‑28 | CAMEL2 | 0 | ‑ |
A162 | 1 | A | R98 | 7.5.0 | 7.6.0 | Mapping of Call Forwarding parameters from CAP-Connect to ISUP-IAM and CAP-InitialDP | NP-12 | NP‑010309 | approved | N2 | N2-18 | N2‑010380 | agreed | 2001‑05‑28 | CAMEL2 | 0 | ‑ |
A165 | - | F | R98 | 7.6.1 | 7.7.0 | Re-insertion of missing CLI box into CAMEL Release 1998 | NP-14 | NP‑010580 | approved | N2 | N2-20 | N2‑010726 | agreed | ‑ | CAMEL2 | - | ‑ |
A166 | - | F | R97 | 6.9.1 | 6.10.0 | Correction to implementation of 03.78-A141r1 | NP-14 | NP‑010581 | approved | N2 | N2-20 | N2‑010748 | agreed | ‑ | CAMEL2 | - | ‑ |
A167 | 1 | F | R97 | 6.9.1 | 6.10.0 | Guidance to the SCI operation if the subscriber or the VPLMN do not support AoC service | NP-14 | NP‑010581 | approved | N2 | N2-20 | N2‑010799 | agreed | ‑ | CAMEL2 | - | ‑ |
A168 | - | A | R98 | 7.6.1 | 7.7.0 | Correction to implementation of 03.78-A141r1 | NP-14 | NP‑010581 | approved | N2 | N2-20 | N2‑010797 | agreed | ‑ | CAMEL2 | - | ‑ |
A169 | - | A | R98 | 7.6.1 | 7.7.0 | Guidance to the SCI operation if the subscriber or the VPLMN do not support AoC service | NP-14 | NP‑010581 | approved | N2 | N2-20 | N2‑010800 | agreed | ‑ | CAMEL2 | - | ‑ |
A170 | - | F | R97 | 6.10.0 | - | Clarification in the case multiple RRBs are sent for a DP | - | - | - | N2 | N2-23 | N2‑020377 | revised | 2002‑04‑03 | CAMEL2 | - | ‑ |
A170 | 1 | F | R97 | 6.10.0 | - | Clarification in the case multiple RRBs are sent for a DP | - | - | - | N2 | N2-23 | N2‑020431 | revised | 2002‑04‑03 | CAMEL2 | - | ‑ |
A170 | 2 | F | R97 | 6.10.0 | 6.11.0 | Clarification in the case multiple RRBs are sent for a DP | NP-16 | NP‑020202 | approved | N2 | N2-23 | N2‑020441 | agreed | 2002‑04‑03 | CAMEL2 | - | ‑ |
A171 | - | A | R98 | 7.7.0 | - | Clarification in the case multiple RRBs are sent for a DP | - | - | - | N2 | N2-23 | N2‑020378 | revised | 2002‑04‑03 | CAMEL2 | - | ‑ |
A171 | 1 | A | R98 | 7.7.0 | 7.8.0 | Clarification in the case multiple RRBs are sent for a DP | NP-16 | NP‑020202 | approved | N2 | N2-23 | N2‑020451 | agreed | 2002‑04‑03 | CAMEL2 | - | ‑ |
A172 | - | F | R97 | 6.10.0 | - | Corrections to Connect To Resource Procedures | - | - | - | N2 | N2-24 | N2‑020555 | rejected | 2002‑05‑08 | CAMEL2 | - | ‑ |
A173 | - | A | R98 | 7.7.0 | - | Corrections to Connect To Resource Procedures | - | - | - | N2 | N2-24 | N2‑020556 | rejected | 2002‑05‑08 | CAMEL2 | - | ‑ |
page generated from database: 2024-09-26 11:02:35