3GPP Specifications associated with Work Item
3GPP Work Item = 570029 (UPCON) "User Plane Congestion management" [Rel-13]
This page lists the 3GPP Technical Specifications and Reports which are or might in future be associated with or affected by the above work item. Click on the spec to open its web page.
Spec | Title | WG |
---|---|---|
22.101 | Service aspects; Service principles | S1 |
23.003 | Numbering, addressing and identification | C4 |
23.705 | Study on system enhancements for user plane congestion management | S2 |
23.060 | General Packet Radio Service (GPRS); Service description; Stage 2 | S2 |
22.805 | Feasibility study on user plane congestion management | S1 |
29.303 | Domain Name System Procedures; Stage 3 | C4 |
29.201 | Representational State Transfer (REST) reference point between Application Function (AF) and Protocol Converter (PC) | C3 |
29.215 | Policy and Charging Control (PCC) over S9 reference point; Stage 3 | C3 |
29.405 | Nq and Nq' Application Protocol (Nq-AP); Stage 3 | C4 |
29.230 | Diameter applications; 3GPP specific codes and identifiers | C4 |
29.217 | Policy and Charging Control (PCC); Congestion reporting over Np reference point | C3 |
29.219 | Policy and charging control: Spending limit reporting over Sy reference point | C3 |
29.212 | Policy and Charging Control (PCC); Reference points | C3 |
23.203 | Policy and charging control architecture | S2 |
29.213 | Policy and charging control signalling flows and Quality of Service (QoS) parameter mapping | C3 |
23.002 | Network architecture | S2 |
23.401 | General Packet Radio Service (GPRS) enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) access | S2 |
29.214 | Policy and charging control over Rx reference point | C3 |
page generated from database: 2024-11-12 10:16:04