Generations of Mobile Standards

3GPP Work Item mapping to Change Requests


3GPP Work Item = 550001 (eICIC_LTE-UEConTest)

This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.

Spec CR number and Revision CR Title
36.508 0402 eICIC: Connection diagram for 2x2 antenna configuration scenarios
36.508 0446 Default Message Contents for eICIC PCell Pattern
36.508 0454 Update of Measurement information element
36.508 0465
36.521-1 0835 New RF TC for 36.521-1_8.2.1.2.3_Enhanced ICIC for LTE
36.521-1 0836 New RF TC for 36.521-1_8.4.1.2.3_Enhanced ICIC for LTE
36.521-1 0837 TDD CQI Reporting under AWGN conditions-PUCCH 1-0-Demod subframe overlaps with aggressor cell ABS (eICIC)
36.521-1 0838 TDD PHICH Transmit Diversity 2x2-Demod subframe overlaps with aggressor cell ABS (eICIC)
36.521-1 0839 TDD PDSCH Open Loop Spatial Multiplexing 2x2 Demod subframe overlaps with aggressor cell ABS (eICIC)
36.521-1 0872 eICIC RF: Correction to Annex I
36.521-1 0934 Update RF TC for 36.521-1_8.2.1.2.3_C FDD PDSCH Transmit div 2x2 Enhanced ICIC for LTE
36.521-1 0935 Update RF TC for 36.521-1_8.4.1.2.3_C FDD PCFICH PDCCH Transmit div 2x2 Enhanced ICIC for LTE
36.521-1 0967 Correction of RF conformanceTest case: 8.2.1.3.3
36.521-1 0968 Addition new TC 8.2.2.3.3 TDD PDSCH Open Loop Spatial Multiplexing 2x2-Demod subframe overlaps with aggressor cell ABS (eICIC)
36.521-1 0975 New chap8 TDD TC 8.2.2.2.3_C for eICIC
36.521-1 0976 New chap 8 TDD TC 8.4.2.2.3_C for eICIC
36.521-1 1035 New RF TC for 36.521-1_8.5.1.2.3_C.1_Enhanced ICIC for LTE
36.521-1 1049 New RF TC for 36.521-1_9.2.1.3_C.1_Enhanced ICIC for LTE
36.521-1 1101 Correction to eICIC Performance test cases
36.521-1 1152 eICIC RF: Addition of new RI tests and OCNG patterns for eICIC
36.521-1 1162
36.521-1 1196
36.521-1 1222
36.521-1 1244
36.521-1 1246
36.521-1 1253
36.521-1 1264
36.521-1 1271
36.521-1 1271 rev 1
36.521-1 1276
36.521-1 1327
36.521-1 1328
36.521-1 1375
36.521-1 1383
36.521-1 1385
36.521-1 1393
36.521-1 1394
36.521-1 1421
36.521-1 1422
36.521-1 1424
36.521-1 1454
36.521-1 1462
36.521-1 1485
36.521-1 1503
36.521-1 1515
36.521-2 0087 Updates to applicability for newly introduced eICIC feature chapter9 RRM test cases
36.521-2 0098 Addition of applicability statement for 6 new eICIC test cases
36.521-2 0108 Updates to applicability for newly introduced eICIC feature chapter9 RRM test cases in 36.521-2
36.521-2 0113 Addition of applicability for test cases 7.3.13 and 7.3.15
36.521-2 0116 eICIC RRM: Applicability for some new added eICIC test cases
36.521-2 0120 eICIC RF: Applicability for some new added eICIC test cases
36.521-2 0130 Addition of the applicability of TC7.3.14 & TC7.3.16
36.521-2 0167
36.521-2 0168
36.521-3 0629 RRM Annex C: Addition of physical channel settings for eICIC tests
36.521-3 0630 RRM Annex A: Addition of measurement channels for eICIC tests
36.521-3 0631 RRM New TC 7.3.9: Test skeleton for E-UTRAN FDD Radio Link Monitoring Out-of-sync with non-MBSFN ABS
36.521-3 0632 RRM New TC 7.3.10: Test skeleton for E-UTRAN TDD Radio Link Monitoring Out-of-sync with non-MBSFN ABS
36.521-3 0633 RRM New TC 7.3.11: Test skeleton for E-UTRAN FDD Radio Link Monitoring In-sync with non-MBSFN ABS
36.521-3 0634 RRM New TC 7.3.12: Test skeleton for E-UTRAN TDD Radio Link Monitoring In-sync with non-MBSFN ABS
36.521-3 0635 RRM New TC 8.1.7: Test skeleton for E-UTRAN FDD-FDD Intra-Frequency Event-Triggered Reporting with non-MBSFN ABS
36.521-3 0636 RRM New TC 8.2.5: Test skeleton for E-UTRAN TDD-TDD Intra-Frequency Event-Triggered Reporting with non-MBSFN ABS
36.521-3 0689 Add structure for new eICIC test cases 9.2.7.1 and 9.2.8.1, FDD and TDD RSRQ
36.521-3 0690 Introduction of Chapter 9 RRM test cases for RSRP accuracy for FDD EUTRA -eICIC
36.521-3 0691 Introduction of Chapter 9 RRM test cases for RSRP accuracy for TDD EUTRA -eICIC
36.521-3 0708 eICIC RRM: Addition of MBSFN ABS configuration in annex
36.521-3 0709 eICIC RRM: Further specification of TC 7.3.9
36.521-3 0710 eICIC RRM: Further specification of TC 7.3.10
36.521-3 0711 eICIC RRM: Further specification of TC 7.3.11
36.521-3 0712 eICIC RRM: Further specification of TC 7.3.12
36.521-3 0722 Uncertainties and Test Tols for eICIC RRM test cases 9.2.7.1, 9.2.8.1
36.521-3 0742 eICIC RRM: Further specification of TC 8.1.7
36.521-3 0743 eICIC RRM: Further specification of TC 8.2.5
36.521-3 0744 Structure for new TCs 9.1.8.1, 9.1.8.2, FDD Absolute and Relative eICIC RSRP, Non-MBSFN
36.521-3 0745 Structure for new TCs 9.1.9.1, 9.1.9.2, TDD Absolute and Relative eICIC RSRP, Non-MBSFN
36.521-3 0746 Procedure and messages for eICIC RRM test cases 9.2.7.1, 9.2.8.1
36.521-3 0753 Addition of Chapter 9 RRM test cases for absolute RSRQ accuracy under Time-Domain Measurement Resource Restriction with MBSFN ABS
36.521-3 0758 Uncertainties and Test Tolerances for eICIC Absolute RSRP test cases 9.1.8.1+9.1.9.1
36.521-3 0759 Uncertainties and Test Tolerances for eICIC Relative RSRP test cases 9.1.8.2+9.1.9.2
36.521-3 0761 Addition of test cases 7.3.13 and 7.3.15
36.521-3 0763 eICIC RRM: Message contents for TC-s 7.3.9-12, 8.1.7 and 8.2.5
36.521-3 0771 Addition of TC 7.3.14 E-UTRAN TDD Radio Link Monitoring Test for Out-of-sync under Time Domain Measurement Resource Restriction with MBSFN ABS (eICIC)
36.521-3 0772 Addition of TC 7.3.16 E-UTRAN TDD Radio Link Monitoring Test for In-sync under Time Domain Measurement Resource Restriction with MBSFN ABS (eICIC)
36.521-3 0809
36.521-3 0813
36.521-3 0820
36.521-3 0821
36.521-3 0822
36.521-3 0875
36.521-3 0876
36.521-3 0909
36.521-3 0913
36.521-3 0914
36.521-3 0915
36.521-3 0916
36.521-3 0920
36.521-3 0921
36.521-3 0922
36.521-3 0923
36.521-3 0924
36.521-3 0925
36.521-3 0930
36.521-3 0947
36.523-1 1951 GCF Priority X - Addition of New Rel-10 eICIC test case
36.523-1 1952 Addition of new Rel-10 eICIC test case 8.3.1.19
36.523-1 2009 GCF Priority X - Correction to Rel-10 eICIC test case 8.3.1.20
36.523-1 2186 Update of eICIC test case 8.3.1.20
36.523-1 2335 Update of eICIC test case 8.3.1.20
36.523-1 2348 Correction to eICIC test case 8.3.1.19
36.523-1 2420 Update of Test Case 8.3.1.20
36.523-1 2421 Addition of new eICIC Test Case 8.3.1.27
36.523-1 2422 Correction of eICIC TC 8.3.1.19 & 8.3.1.20
36.523-1 2447 Addition of new Rel-10 eICIC test case 8.3.1.21
36.523-1 2524
36.523-1 2606
36.523-1 2607
36.523-1 2608
36.523-1 3381
36.523-1 3434
36.523-2 0363 Addition of applicability statement for new eICIC test cases
36.523-2 0444 Applicability of new eICIC test case 8.3.1.27
36.523-2 0448 Addition of applicability for new eICIC test case 8.3.1.21
36.523-2 0458 Update of title of test case 8.3.1.20
36.523-3 2191
36.903 0066 Add Test Tolerance analyses for TS 36.521-3 Test cases 9.2.7.1, 9.2.8.1
36.903 0078 Add Test Tolerance analyses for TS 36.521-3 Test cases 9.1.8.1+9.1.9.1
36.903 0079 Add Test Tolerance analyses for TS 36.521-3 Test cases 9.1.8.2+9.1.9.2
36.903 0081 Test Tolerances update for eICIC absolute RSRQ Test cases 9.2.7.1+9.2.8.1
36.903 0092
36.903 0123
36.903 0124
36.903 0125
36.903 0126
36.903 0127
36.903 0128
36.903 0129
36.903 0130
36.903 0131

page generated from database: 2024-11-12 10:16:04

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links