3GPP Work Item mapping to Change Requests
3GPP Work Item = 50590 (MUROS)
This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.
Spec | CR number and Revision | CR Title |
---|---|---|
45.914 | 0001 | System performance updates for adaptive symbol constellation |
45.914 | 0002 rev 1 | SAM - Single Antenna MIMO – for MUROS |
45.914 | 0003 rev 1 | L2S mapping verifications for MUROS |
45.914 | 0004 | Update of Network Performance Evaluation Results for OSC |
45.914 | 0005 rev 1 | Clarification on the System Performance Evaluation Method |
45.914 | 0006 rev 1 | Inclusion of Text Proposals agreed at GERAN#41 |
45.914 | 0007 | Verification of Link to System Mapping for OSC |
45.914 | 0008 | VAMOS adaptive pulse shaping |
45.914 | 0009 | Updates for Shifted SACCH |
45.914 | 0010 | System performance resuilts for adaptive symbol constellation |
45.914 | 0012 | MAIO Hopping Methodology |
45.914 | 0015 rev 1 | Verifications of L2S mapping for MUROS |
45.914 | 0016 rev 2 | Introduction of DTX-based repeated SACCH for MUROS |
45.914 | 0017 | Link to System Mapping Scheme and Verification for MUROS |
45.914 | 0018 rev 3 | System Performance Evaluation with MAIO Hopping Scheme for MUROS |
45.914 | 0019 rev 2 | Optimised Tx pulse investigation: updated modelling description and system performance results |
45.914 | 0020 | System level evaluation and modelling methodology of wide pulse shape for VAMOS |
45.914 | 0021 rev 2 | Correction of verification figures in Tx pulse shape investigation |
45.914 | 0022 rev 3 | Update of section 13 (Conclusions) |
45.914 | 0024 rev 2 | System performance comparison of the OPT2 Tx pulse shape |
45.914 | 0025 rev 1 | Clarification on Interferer Model Definitions |
45.914 | 0026 rev 1 | Clarification on Interferer Model Definitions |
page generated from database: 2024-11-12 10:16:04