Generations of Mobile Standards

3GPP Work Item mapping to Change Requests


3GPP Work Item = 470207 (eICIC_LTE-Perf)

This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.

Spec CR number and Revision CR Title
36.101 0962 Pcmax,c Computation Assumptions
36.101 0971 CR on Colliding CRS for non-MBSFN ABS
36.101 0971 rev 1 CR on Colliding CRS for non-MBSFN ABS
36.101 0972 Introduction of eICIC demodulation performance requirements for FDD and TDD
36.101 0972 rev 1 Introduction of eICIC demodulation performance requirements for FDD and TDD
36.101 1002 Test Cases for Rel-10 eICIC demodulation
36.101 1015 On eICIC ABS pattern
36.101 1015 rev 1 On eICIC ABS pattern
36.101 1016 On eICIC interference models
36.101 1016 rev 1 On eICIC interference models
36.101 1033 Introduction of reference channel for eICIC demodulation
36.101 1033 rev 1 Introduction of reference channel for eICIC demodulation
36.101 1046 Additions and Corrections of eICIC demod tests
36.101 1082 TM3 tests for eICIC
36.101 1083 Introduction of requirements of CQI reporting definition for ecICIC
36.101 1083 rev 1 Introduction of requirements of CQI reporting definition for ecICIC
36.101 1101 Corrections for eICIC demod test case with MBSN ABS
36.101 1102 Parameters and terminology Clarification for eICIC demodulation reference channel
36.101 1103 Target SNR setting for eICIC demodulation requirement
36.101 1110 Corrections and clarifications on eICIC demodulation tests
36.101 1110 rev 1 Corrections and clarifications on eICIC demodulation tests
36.101 1114 Corrections and clarifications on eICIC demodulation tests
36.101 1114 rev 1 Corrections and clarifications on eICIC demodulation test
36.101 1116 Corrections and clarifications on eICIC CSI tests
36.101 1116 rev 1 Corrections and clarifications on eICIC CSI tes
36.101 1117 Corrections and clarifications on eICIC CSI tests
36.101 1117 rev 1 Corrections and clarifications on eICIC CSI tests
36.101 1139 CR on typo of PDCCH test case of eICIC in FDD
36.101 1142 Corrections for eICIC demod test case with MBSN ABS
36.101 1145 Introduction of RI test for eICIC for non-MBSFN configuration
36.101 1146 Extension of static eICIC CQI test
36.101 1146 rev 1 Extension of static eICIC CQI test
36.101 1147 Introduction of eICIC demodulation requirements for non-MBSFN configuration
36.101 1148 Introduction of PDCCH test with colliding RS on MBSFN-ABS
36.101 1148 rev 1 Introduction of PDCCH test with colliding RS on MBSFN-ABS
36.101 1148 rev 2 Introduction of PDCCH test with colliding RS on MBSFN-ABS
36.101 1149 Introduction of PDCCH test with colliding RS on MBSFN-ABS
36.101 1149 rev 1 Introduction of PDCCH test with colliding RS on MBSFN-ABS
36.101 1150 CR on CQI definition test
36.101 1151 CR on CQI definition test
36.101 1152 Some clarifications and OCNG pattern for eICIC demodulation requirements
36.101 1152 rev 1 Some clarifications and OCNG pattern for eICIC demodulation requirements
36.101 1152 rev 2 Some clarifications and OCNG pattern for eICIC demodulation requirements
36.101 1153 Some clarifications and OCNG pattern for eICIC demodulation requirements
36.101 1153 rev 1 Some clarifications and OCNG pattern for eICIC demodulation requirements
36.101 1190 CQI test setup for non-MBSFN ABS configuration
36.101 1191 CQI test setup for non-MBSFN ABS configuration
36.101 1192 Target SNR setting for eICIC demodulation requirement
36.101 1192 rev 1 Target SNR setting for eICIC demodulation requirement
36.101 1193 Target SNR setting for eICIC demodulation requirement
36.101 1193 rev 1 Target SNR setting for eICIC demodulation requirement
36.101 1194 Clarification on the signals/Channels transmitted in ABS/Non-ABS subframe
36.101 1195 Clarification on the signals/Channels transmitted in ABS/Non-ABS subframe
36.101 1226 Extension of static eICIC CQI test
36.101 1240 ABS pattern setup for MBSFN ABS test (resubmission of R4-63AH-0204 for Rel-10)
36.101 1241 ABS pattern setup for MBSFN ABS test (resubmission of R4-63AH-0204 for Rel-11)
36.101 1242 CR on eICIC CQI definition test (resubmission of R4-63AH-0205 for Rel-10)
36.101 1243 CR on eICIC CQI definition test (resubmission of R4-63AH-0205 for Rel-11)
36.101 1244 Transmission of CQI feedback and other corrections (Rel-10)
36.101 1244 rev 1 Transmission of CQI feedback and other corrections (Rel-10)
36.101 1245 Transmission of CQI feedback and other corrections (Rel-11)
36.101 1246 Target SNR setting for eICIC MBSFN-ABS demodulation requirements (Rel-10)
36.101 1246 rev 1 Target SNR setting for eICIC MBSFN-ABS demodulation requirements (Rel-10)
36.101 1247 Target SNR setting for eICIC MBSFN-ABS demodulation requirements (Rel-11)
36.101 1256 Clarification on PDSCH test setup under MBSFN ABS
36.101 1256 rev 1 Clarification on PDSCH test setup under MBSFN ABS
36.101 1257 Clarification on PDSCH test setup under MBSFN ABS
36.101 1357 Introduction of RI test for eICIC
36.101 1358 Introduction of RI test for eICIC
36.101 1367 Correction of eICIC CQI tests
36.101 1368 Correction of eICIC CQI tests
36.101 1369 Correction of eICIC demodulation tests
36.101 1370 Correction of eICIC demodulation tests
36.101 1403 CR on eICIC RI test
36.101 1407 CR on eICIC RI test
36.101 1417 Brackets clean up for eICIC CSI/demodulation
36.101 1417 rev 1 Brackets clean up for eICIC CSI/demodulation
36.101 1450 Brackets clean up for eICIC CSI/demodulation
36.101 1454 CR on eICIC RI testing (Rel-10)
36.101 1454 rev 1 CR on eICIC RI testing (Rel-10)
36.101 1455 CR on eICIC RI testing (Rel-11)
36.101 1456 Correction of power allocation for eICIC performance requirements (Rel-10)
36.101 1457 Correction of power allocation for eICIC performance requirements (Rel-11)
36.101 1512 Applicable OFDM symbols of Noc_2 for PDCCH/PCFICH ABS-MBSFN test cases
36.101 1518 Applicable OFDM symbols of Noc_2 for PDCCH/PCFICH ABS-MBSFN test cases
36.101 1535 Corrections for eICIC performance requirements (rel-10)
36.101 1536 Corrections for eICIC performance requirements (rel-11)
36.101 1622 Correction of test parameters for eICIC performance requirements
36.101 1622 rev 1 Correction of test parameters for eICIC performance requirements
36.101 1623 Correction of test parameters for eICIC performance requirements
36.101 1624 Correction of test parameters for eICIC CSI requirements
36.101 1625 Correction of test parameters for eICIC CSI requirements
36.101 1750 Correction on the UE category for eICIC CQI test
36.101 1751 Correction on the UE category for eICIC CQI test
36.101 1752 Correction on the UE category for eICIC CQI test
36.101 1902
36.101 1903
36.101 1904
36.101 2246
36.101 2246 rev 1
36.101 2247
36.101 2331
36.101 2331 rev 1
36.101 2332
36.101 2333
36.101 2336
36.101 2337
36.101 2386
36.101 2386 rev 1
36.101 2388
36.101 2389
36.101 2795
36.101 2796
36.101 2797
36.101 2798
36.101 2799
36.101 2800
36.101 3073
36.101 3074
36.101 3075
36.101 3076
36.133 0836 CR on RLM test cases for eICIC
36.133 0865 Correction for RSRP and RSRQ accuracy requirements in eICIC
36.133 0865 rev 1 Correction for RSRP and RSRQ accuracy requirements in eICIC
36.133 0865 rev 2 Correction for RSRP and RSRQ accuracy requirements in eICIC
36.133 0868 Test cases for E-UTRAN FDD cell identification in eICIC
36.133 0869 Test case for RSRP/RSRQ measurement accuracy in eICIC
36.133 0870 Test case for RLM in eICIC
36.133 0910 Cell identification test cases for eICIC
36.133 0911 Relative RSRP accuracy requirements for eICIC
36.133 0912 RSRP test cases for eICIC
36.133 0913 CR on RLM test cases for eICIC
36.133 0923 CR to TS36.133: Cell identification requirement for eICIC
36.133 0936 CR on RLM test cases for eICIC with short DRX
36.133 0937 CR on cell identification delay for eICIC
36.133 0938 CR on cell identification test cases for eICIC
36.133 0939 CR on test cases for RSRP RSRQ measurement accuracy
36.133 0963 RSRP accuracy test case in eICIC
36.133 0985 Reference channel for RLM testing with eICIC
36.133 0990 PDCCH/PCFICH transmission parameters for RLM
36.133 0997 Test case for cell identification with eICIC in E-UTRAN FDD
36.133 0997 rev 1 Test case for cell identification with eICIC in E-UTRAN FDD
36.133 0998 Test case for cell identification with eICIC in E-UTRAN TDD
36.133 0998 rev 1 Test case for cell identification with eICIC in E-UTRAN TDD
36.133 1013 E-UTRAN FDD Radio Link Monitoring Test for In-sync under time domain measurement resource restriction
36.133 1014 E-UTRAN TDD Radio Link Monitoring Test for Out-of-sync under time domain measurement resource restriction
36.133 1014 rev 1 E-UTRAN TDD Radio Link Monitoring Test for Out-of-sync under time domain measurement resource restriction
36.133 1047 RLM Out of Sync Detection Test for eICIC
36.133 1047 rev 1 RLM Out of Sync Detection Test for eICIC
36.133 1047 rev 2 RLM Out of Sync Detection Test for eICIC
36.133 1051 Colliding CRS in non-MBSFN ABS
36.133 1053 RLM In Sync Detection Test for FDD eICIC
36.133 1053 rev 1 RLM In Sync Detection Test for FDD eICIC
36.133 1054 RLM In Sync Detection Test for TDD eICIC
36.133 1054 rev 1 RLM In Sync Detection Test for FDD eICIC
36.133 1110 FDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS
36.133 1111 TDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS
36.133 1112 RLM test cases with SNRs for OOS and INS for E-UTRAN TDD in eICIC
36.133 1112 rev 1 RLM test cases with SNRs for OOS and INS for E-UTRAN TDD in eICIC
36.133 1134 rev 1 Clarification of colliding CRS in MBSFN ABS
36.133 1145 Side condition clarification for eICIC with MBSFN
36.133 1145 rev 1 Side condition clarification for eICIC with MBSFN
36.133 1146 Clarification on reported cells with eICIC
36.133 1151 RLM requirements with autonomous gaps
36.133 1151 rev 1 RLM requirements with autonomous gaps
36.133 1151 rev 2 RLM requirements with autonomous gaps
36.133 1152 SNR levels in out-of-sync RLM test cases for eICIC
36.133 1152 rev 1 SNR levels in out-of-sync RLM test cases for eICIC
36.133 1153 SNR levels in in-sync RLM test cases for eICIC
36.133 1157 eICIC measurement accuracy
36.133 1175 OCNG Patterns for MBSFN ABS
36.133 1176 OCNG Patterns for MBSFN ABS
36.133 1204 FDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R10
36.133 1204 rev 1 FDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R10
36.133 1205 FDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R11
36.133 1205 rev 1 FDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R11
36.133 1206 TDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R10
36.133 1206 rev 1 TDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R10
36.133 1207 TDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R11
36.133 1207 rev 1 TDD RSRQ under Time Domain Measurement Resource Restriction with Non-MBSFN ABS R11
36.133 1238 Cell identification requirements with DRX
36.133 1239 Cell identification requirements with DRX
36.133 1240 Phase II eICIC FDD: absolute and relative RSRP accuracies in non-MBSFN ABS
36.133 1240 rev 1 Phase II eICIC FDD: absolute and relative RSRP accuracies in non-MBSFN ABS
36.133 1241 Phase II eICIC FDD: absolute and relative RSRP accuracies in non-MBSFN ABS
36.133 1241 rev 1 Phase II eICIC FDD: absolute and relative RSRP accuracies in non-MBSFN ABS
36.133 1242 Phase II eICIC TDD: absolute and relative RSRP accuracies in non-MBSFN ABS
36.133 1242 rev 1 Phase II eICIC TDD: absolute and relative RSRP accuracies in non-MBSFN ABS
36.133 1243 Phase II eICIC TDD: absolute and relative RSRP accuracies in non-MBSFN ABS
36.133 1243 rev 1 Phase II eICIC TDD: absolute and relative RSRP accuracies in non-MBSFN ABS
36.133 1244 Phase IIbis eICIC FDD: out-of-sync detection in MBSFN ABS
36.133 1245 Phase IIbis eICIC FDD: RSRP in MBSFN ABS
36.133 1246 Phase IIbis eICIC TDD: out-of-sync detection in MBSFN ABS
36.133 1247 Phase IIbis eICIC TDD: out-of-sync detection in MBSFN ABS
36.133 1248 RLM requirements with autonomous gaps for DRX
36.133 1249 RLM requirements with autonomous gaps for DRX
36.133 1258 CR on typo of PDCCH test case of eICIC in FDD
36.133 1278 Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS
36.133 1278 rev 1 Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS
36.133 1278 rev 2 Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS
36.133 1279 Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS
36.133 1279 rev 1 Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS
36.133 1279 rev 2 Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS
36.133 1280 Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS
36.133 1280 rev 1 Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS
36.133 1281 Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS
36.133 1281 rev 1 Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS
36.133 1285 eICIC FDD out-of-sync RLM test case in MBSFN ABS
36.133 1285 rev 1 eICIC FDD out-of-sync RLM test case in MBSFN ABS
36.133 1286 eICIC FDD out-of-sync RLM test case in MBSFN ABS
36.133 1286 rev 1 eICIC FDD out-of-sync RLM test case in MBSFN ABS
36.133 1287 eICIC TDD out-of-sync RLM test case in MBSFN ABS
36.133 1287 rev 1 eICIC TDD out-of-sync RLM test case in MBSFN ABS
36.133 1288 eICIC TDD out-of-sync RLM test case in MBSFN ABS
36.133 1288 rev 1 eICIC TDD out-of-sync RLM test case in MBSFN ABS
36.133 1295 CR on FDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10
36.133 1296 CR on FDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11
36.133 1297 A General Definition of ABS
36.133 1298 CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10
36.133 1298 rev 1 CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10
36.133 1298 rev 2 CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10
36.133 1299 CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11
36.133 1299 rev 1 CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11
36.133 1299 rev 2 CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11
36.133 1300 In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R10
36.133 1300 rev 1 In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R10
36.133 1301 A General Definition of ABS
36.133 1302 CR on RLM test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10
36.133 1303 In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R11
36.133 1303 rev 1 In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R11
36.133 1304 CR on RLM test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11
36.133 1305 In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R10
36.133 1305 rev 1 In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R10
36.133 1306 In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R11
36.133 1306 rev 1 In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R11
36.133 1362 Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1362 rev 1 Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1362 rev 2 Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1364 Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1364 rev 1 Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1364 rev 2 Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1365 Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1365 rev 1 Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1365 rev 2 Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1366 Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1366 rev 1 Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1366 rev 2 Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS
36.133 1367 OCNG correction in Phase I eICIC test cases
36.133 1368 OCNG correction in Phase I eICIC test cases
36.133 1369 Alignment of Notes in Phase I eICIC tests
36.133 1370 Alignment of Notes in Phase I eICIC tests
36.133 1372 ABS definition used in test cases in 36.133
36.133 1373 ABS definition used in test cases in 36.133
36.133 1399 Correction to RSRP/RSRQ measurement accuracy tests in MBSFN R10
36.133 1400 Correction to RSRP/RSRQ measurement accuracy tests in MBSFN R11
36.133 1431 Alignment for ABS configurations in RRM Tests R10
36.133 1431 rev 1 Alignment for ABS configurations in RRM Tests R10
36.133 1432 Alignment for ABS configurations in RRM Tests R11
36.133 1448 ABS signal transmission configuration for RRM tests
36.133 1448 rev 1 ABS signal transmission configuration for RRM tests
36.133 1449 ABS signal transmission configuration for RRM tests
36.133 1617 Editorial corrections for eICIC
36.133 1617 rev 1 Editorial corrections for eICIC
36.133 1618 Editorial corrections for eICIC
36.133 1678 RSRP, RSRQ RRM eICIC Test case cleanup
36.133 1678 rev 1 RSRP, RSRQ RRM eICIC Test case cleanup
36.133 1679 RSRP, RSRQ RRM eICIC Test case cleanup
36.133 1679 rev 1 RSRP, RSRQ RRM eICIC Test case cleanup
36.133 1793 E-UTRAN TDD UE Rx-Tx time difference test case in eICIC
36.133 1793 rev 1 E-UTRAN TDD UE Rx-Tx time difference test case in eICIC
36.133 1805 rev 1 Clarification for UE Rx-Tx with eICIC
36.133 1806 rev 1 Clarification for UE Rx-Tx with eICIC
36.133 1808 rev 1 Test case for UE Rx-Tx accuracy with eICIC in FDD
36.133 1847 CRS Es/Iot for eICIC with MBSFN ABS
36.133 1847 rev 1 CRS Es/Iot for eICIC with MBSFN ABS
36.133 1848 CRS Es/Iot for eICIC with MBSFN ABS
36.133 1849 CRS Es/Iot for eICIC with MBSFN ABS
36.133 2007
36.133 2008
36.133 2009
36.133 2102
36.133 2103
36.133 2104
36.133 2377
36.133 2378
36.133 2379
36.133 2380
36.133 2381
36.133 2382
36.141 0298 Home BS Output Power for co-channel E-UTRA protection for 36.141
36.141 0300 Update on Home BS Output Power for co-channel E-UTRA protection for 36.141
36.141 0312 Finalizing Home BS Output Power parameters for co-channel E-UTRA protection in 36.141

page generated from database: 2024-11-12 10:16:04

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links