The 5G Standard

3GPP Work Item mapping to Change Requests


3GPP Work Item = 470107 (eICIC_LTE-Core)

This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.

Spec CR number and Revision CR Title
36.104 0223 Requirements for HeNB Autonomous Power Setting for Macro-eNB Scenario
36.104 0223 rev 1 Requirements for HeNB Autonomous Power Setting for Macro-eNB Scenario
36.104 0223 rev 2 Requirements for HeNB Autonomous Power Setting for Macro-eNB Scenario
36.104 0256 Requirements for HeNB Power Setting for HeNB-eNB Scenario
36.104 0257 Finalizing Home BS Output Power parameters for co-channel E-UTRA protection for 36.104
36.104 0257 rev 1 Finalizing Home BS Output Power parameters for co-channel E-UTRA protection for 36.104
36.104 0268 Finalizing Home BS Output Power parameter for co-channel E-UTRA protection in 36.104
36.104 0268 rev 1 Finalizing Home BS Output Power parameter for co-channel E-UTRA protection in 36.104
36.133 0762 rev 1 CR on RLM requirements for eICIC
36.133 0788 RSRP and RSRQ measurement requirements for eICIC
36.133 0788 rev 1 RSRP and RSRQ measurement requirements for eICIC
36.133 0788 rev 2 RSRP and RSRQ measurement requirements for eICIC
36.133 0789 RLM requirements with DRX
36.133 0789 rev 1 RLM requirements with DRX
36.133 0790 UE Rx-TX requirements with eICIC
36.133 0837 CR on cell identification delay for eICIC
36.133 0838 CR on Relative RSRP accuracy requirements for eICIC
36.133 0851 CR on RSRP and RSRQ measurement accuracy requirements for eICIC
36.133 0851 rev 1 CR on RSRP and RSRQ measurement accuracy requirements for eICIC
36.133 0860 Introduction of RLM requirement for eICIC
36.133 0890 Cell identification requirements
36.133 0890 rev 1 Cell identification requirements
36.133 0891 RSRP and RSRQ measurement requirements for eICIC
36.133 0891 rev 1 RSRP and RSRQ measurement requirements for eICIC
36.133 0892 RLM measurement requirements for eICIC
36.133 0897 Correction to RSRP and RSRQ Accuracy Requirements
36.133 0909 Cell identification delay for eICIC
36.133 0934 Test cases of cell identification for eICIC
36.133 0935 RSRQ test cases for eICIC
36.133 0954 Cell identification requirements
36.133 0955 RLM L1 measurement period requirements
36.133 0956 Measurement requirements for UE Rx-Tx time difference measurement
36.133 0957 Accuracy requirements for UE Rx-Tx time difference measurement
36.133 0989 RLM measurement requirements for eICIC
36.133 0995 Cell identification requirements without DRX
36.133 0996 Cell identification requirements with DRX
36.133 1006 CR to TS36.133: cell identification requirements for eICIC
36.133 1019 E-UTRAN FDD intra frequency measurements with autonomous gaps in eICIC
36.133 1020 E-UTRAN TDD intra frequency measurements with autonomous gaps in eICIC
36.133 1044 CR for eICIC core requirement for cell identification in DRX
36.133 1059 CR on Enhanced ICIC cell identification requirements with DRX
36.133 1075 RLM requirements with autonomous gaps
36.133 1113 Core requirement for cell identification in DRX for eICIC
36.133 1133 Enhanced ICIC cell identification requirements with DRX
36.133 1134 Clarification of colliding CRS in MBSFN ABS
36.133 1137 Clarification of eICIC RRM requirements
36.133 1260 Bands 22, 23, 42 and 43 side conditions for inter-frequency measurements with autonomous gaps
36.133 1261 Clarification on UE Rx-Tx with eICIC
36.133 1560 Clarification of the TDM pattern conditions
36.133 1560 rev 1 Clarification of the TDM pattern conditions
36.133 1560 rev 2 Clarification of the TDM pattern conditions
36.133 1560 rev 3 Clarification of the TDM pattern conditions
36.133 1560 rev 4 Clarification of the TDM pattern conditions
36.133 1560 rev 5 Clarification of the TDM pattern conditions
36.133 1561 Clarification of the TDM pattern conditions
36.133 1561 rev 1 Clarification of the TDM pattern conditions
36.133 2138
36.133 2139
36.133 2140
36.133 2246
36.133 2247
36.133 2248
36.133 2358
36.133 2359
36.133 2360
36.133 2360 rev 1
36.141 0294 CR on 36.141 for Home BS Output Power for co-channel E-UTRA protection
36.141 0294 rev 1 CR on 36.141 for Home BS Output Power for co-channel E-UTRA protection
36.141 0294 rev 2 CR on 36.141 for Home BS Output Power for co-channel E-UTRA protection
36.141 0312 rev 1 Finalizing Home BS Output Power parameters for co-channel E-UTRA protection in 36.141
36.213 0272 RLM Procedure with restricted measurements
36.214 0016 RSRQ Measurement with ABS
36.300 000- Correction of Reset
36.300 0000
36.300 0278 rev 1 Introduction of enhanced ICIC
36.300 0306 rev 1 X2 procedure and OAM requirements to support eICIC
36.300 0311 Introduction of 2 subsets for pattern 3
36.300 0328 rev 1 Update of Inter-cell Interference Coordination Feature Description
36.300 0330 rev 1 CR on ABS definition
36.300 0339 OAM requirement for time domain eICIC for macro-pico scenario
36.300 0360 CR to 36.300 for eICIC updates
36.300 0363 rev 1 Correction on eICIC description
36.300 0443 Correction to Measurement Restriction Description of eICIC in 36.300
36.300 0444 Correction to Measurement Restriction Description of eICIC in 36.300
36.314 0022 rev 1 L2 measurements in an eNB with MBSFN and ABS subframes
36.331 0070
36.331 0590 Update of R2-110807 on CSI measurement resource restriction for time domain ICIC
36.331 0591 Update of R2-110821 on RRM/RLM resource restriction for time domain ICIC
36.331 0662 rev 3 Clarification regarding eICIC measurements
36.331 0694 Restructuring of CQI-ReportConfig-r10
36.331 0700 Reference SFN for MeasSubframePattern
36.331 0840 rev 1 Clarification on MBSFN and measurement resource restrictions
36.331 0862 rev 1 Clarification on MBSFN and measurement resource restrictions
36.331 1609
36.331 1609 rev 1
36.331 1610
36.331 1611
36.331 1748
36.331 1749
36.331 1751
36.401 0047 Introduction of new synchronisation use case for TD ICIC
36.401 0047 rev 1 Introduction of new synchronisation use case for TD ICIC
36.401 0047 rev 2 Introduction of new synchronisation use case for TD ICIC
36.401 0047 rev 3 Introduction of new synchronisation use case for TD ICIC
36.401 0051 Definition of Time Domain Inter-cell Interference Coordination Synchronisation Area
36.420 0008 Updated description of inter-cell interference coordination
36.423 0404 rev 2 Introduction of X2 signalling support for eICIC
36.423 0406 rev 3 Enabling reporting of ABS usage for eICIC purposes
36.423 0409 Introduction of X2 signalling support for eICIC
36.423 0412 Enabling reporting of ABS resource status for eICIC purposes
36.423 0418 Enabling ABS pattern reporting from pico to macro
36.423 0427 Enabling reporting of ABS resource status for eICIC purposes
36.423 0427 rev 1 Enabling reporting of ABS resource status for eICIC purposes
36.423 0432 Exchange of Synchronisation Configuration by means of X2 Setup and eNB Configuration Update
36.423 0433 Exchange of Synchronisation Configuration by means of Synchronisation Configuration Exchange
36.423 0476 Updates of reported quantities for eICIC
36.423 0476 rev 1 Updates of reported quantities for eICIC
36.423 0476 rev 2 Updates of reported quantities for eICIC
36.423 0480 Correction on ABS Information
36.423 0480 rev 1 Correction on ABS Information
36.423 0480 rev 2 Correction on ABS Information
36.423 0596 Correction on ABS Information
36.423 0596 rev 1 Correction on ABS Information
36.423 0597 Correction on ABS Information
36.423 0597 rev 1 Correction on ABS Information
36.423 0601 Correction on ABS Information
36.423 0601 rev 1 Correction on ABS Information
36.423 0602 Correction on ABS Information
36.423 0602 rev 1 Correction on ABS Information
36.423 0602 rev 2 Correction on ABS Information
36.423 0604 Correction on ABS Information
36.423 0605 Correction on ABS Information

page generated from database: 2024-07-12 23:13:41

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links