3GPP Work Item mapping to Change Requests
3GPP Work Item = 34042 (eCall_Phase2)
This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.
Spec | CR number and Revision | CR Title |
---|---|---|
26.267 | 0001 rev 1 | Correction of the required number of transmitted ACK messages |
26.267 | 0002 rev 1 | Integration of higher-layer acknowledgement message |
26.267 | 0003 rev 1 | Integration of IVS-initiated signalling option |
26.267 | 0004 rev 3 | IVS transmitter termination correction |
26.267 | 0005 rev 1 | Correction to text in clause 4.3 |
26.267 | 0006 | Detector for handling PCM sample inversion in the network |
26.267 | 0007 | Detector for handling PCM sample inversion in the network |
26.267 | 0008 | Feedback signal modifications to increase robustness in the presence of network echo cancellers |
26.267 | 0009 | Feedback signal modifications to increase robustness in the presence of network echo cancellers |
26.267 | 0010 | Correction of synchronization procedures in the eCall in-band modem |
26.267 | 0011 rev 1 | Correction of synchronization procedures in the eCall in-band modem |
26.267 | 0012 rev 1 | State machine corrections in the eCall in-band modem |
26.267 | 0013 rev 1 | State machine corrections in the eCall in-band modem |
26.267 | 0014 | Correction of downlink message encoding table |
26.267 | 0015 | Correction of downlink message encoding table |
26.267 | 0016 | Clarification of START, LLACKs, and HLACKs messages |
26.268 | 0001 rev 1 | Correction of a mismatch with 3GPP TS 26.267 concerning synchronization |
26.268 | 0002 rev 1 | Correction concerning modulator initialization |
26.268 | 0003 rev 1 | Correction of a mismatch with 3GPP TS 26.267 concerning ACK transmission |
26.268 | 0004 rev 1 | Extension of eCall test setup to allow conformance testing of ACK messages |
26.268 | 0005 rev 2 | Separation of IVS and PSAP transmitter and receiver functions in the C-code |
26.268 | 0006 rev 1 | Integration of higher-layer acknowledgement message |
26.268 | 0007 | Integration of IVS-initiated signalling option |
26.268 | 0008 | Parameter change in eCall test setup |
26.268 | 0009 | Update of receiver-transmitter interfaces for conformance testing |
26.268 | 0010 | Corrections and bugfixes of the eCall source code |
26.268 | 0011 rev 1 | Correction of ACK detection conditions |
26.268 | 0012 rev 1 | Correction of ACK detection conditions |
26.268 | 0013 rev 1 | Detector for handling PCM sample inversion in the network |
26.268 | 0014 rev 1 | Detector for handling PCM sample inversion in the network |
26.268 | 0015 rev 1 | Feedback signal modifications to increase robustness in the presence of network echo cancellers |
26.268 | 0016 rev 1 | Feedback signal modifications to increase robustness in the presence of network echo cancellers |
26.268 | 0017 | Correction of some errors in the eCall reference code |
26.268 | 0018 | Correction of some errors in the eCall reference code |
26.268 | 0019 | Update of eCall test framework software to handle new in-band modem features |
26.268 | 0020 | Update of eCall test framework software to handle new in-band modem features |
26.268 | 0021 | Correction of synchronization procedures in the eCall in-band modem |
26.268 | 0022 rev 1 | Correction of synchronization procedures in the eCall in-band modem |
26.268 | 0023 | State machine corrections in the eCall in-band modem |
26.268 | 0024 rev 1 | State machine corrections in the eCall in-band modem |
26.268 | 0025 | Correction of the inversion detector |
26.268 | 0026 rev 1 | Correction of the inversion detector |
26.268 | 0027 | Correction of synchronization algorithm for the eCall in-band modem |
26.268 | 0028 | Correction of synchronization algorithm for the eCall in-band modem |
26.268 | 0029 | Correction of signal inversion operation and callback message event set |
26.268 | 0030 | Correction of signal inversion operation and callback message event set |
26.269 | 0001 | Introduction of HL-ACK test cases |
26.269 | 0002 rev 3 | Introduction of test cases for IVS-initiated signalling |
26.269 | 0003 rev 1 | Clarification of conformance testing requirements and correction of a figure |
26.269 | 0004 | Update of conformance testing reference sequences |
26.269 | 0005 | Update of conformance testing reference sequences |
26.269 | 0006 | Correction of eCall conformance test sequences |
26.269 | 0006 rev 1 | Correction of eCall conformance test sequences |
26.269 | 0007 rev 1 | Correction of eCall conformance test sequences |
26.269 | 0007 rev 2 | Correction of eCall conformance test sequences |
26.269 | 0008 rev 1 | |
26.969 | 0001 rev 2 | Editorial corrections and clarifications of characterization test results |
26.969 | 0002 rev 2 | Update of characterization test results to latest eCall reference code version |
26.969 | 0003 rev 2 | Update of characterization test results to latest eCall reference code version |
26.969 | 0004 rev 2 |
page generated from database: 2024-11-12 10:16:04