3GPP Work Item mapping to Change Requests
3GPP Work Item = 340018 (SAES-GPRS_LTE)
This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.
Spec | CR number and Revision | CR Title |
---|---|---|
23.060 | 1333 | The correction for reference of TS 29.274 |
23.401 | 0045 rev 1 | Signalling of MTU from MME to UE |
23.401 | 0047 rev 1 | Network Assisted Cell Change from E-UTRAN to GERAN |
23.401 | 0049 rev 1 | High level description of Tracking and Reachability Management for UE in ECM-IDLE state |
23.401 | 0049 rev 2 | High level description of Tracking and Reachability Management for UE in ECM-IDLE state |
23.401 | 0050 rev 1 | Information Storage |
23.401 | 0052 rev 1 | E-UTRAN Tracking Area Update against GBR PDP context |
23.401 | 0054 rev 1 | PDN GW address in attach procedure |
23.401 | 0055 rev 1 | The editorial modification for attach procedure |
23.401 | 0067 rev 1 | Network Initiated Re-attach |
23.401 | 0083 rev 1 | Add New EnodeB information onto handover related messages |
23.401 | 0083 rev 2 | Add New EnodeB information onto handover related messages |
23.401 | 0122 | Clarification of the Default PDN |
23.401 | 0122 rev 1 | Clarification of the Default PDN |
23.401 | 0122 rev 2 | Clarification of the Default PDN |
23.401 | 0123 | PDN connectivity request without APN |
23.401 | 0123 rev 1 | PDN connectivity request without APN |
23.401 | 0124 | S-TMSI cleanup |
23.401 | 0124 rev 1 | S-TMSI cleanup |
23.401 | 0124 rev 2 | S-TMSI cleanup |
23.401 | 0125 | AMBR modification procedure |
23.401 | 0135 | Corrections to Attach procedure related to the MME routeing information |
23.401 | 0136 | Clarification to Procedure Transaction Id (PTI) use in bearer modification procedures |
23.401 | 0136 rev 1 | Clarification to Procedure Transaction Id (PTI) use in bearer modification procedures |
23.401 | 0136 rev 3 | Clarification to Procedure Transaction Id (PTI) use in bearer modification procedures |
23.401 | 0136 rev 4 | Clarification to Procedure Transaction Id (PTI) use in bearer modification procedures |
23.401 | 0137 | Security consideration in the TAU procedure |
23.401 | 0145 | MME load re-balancing functionality |
23.401 | 0146 | GUTI Reallocation in the handover procedure |
23.401 | 0150 | Excluding a special scenario with Multiple PDN Connectivity |
23.401 | 0157 | Introduction of Rel-8 GGSN and connectivity to SGW |
23.401 | 0157 rev 1 | Introduction of Rel-8 GGSN and connectivity to SGW |
23.401 | 0158 | Support of GPRS bearer model on S4 interface |
23.401 | 0159 | LTE Attach Procedure Enhancement |
23.401 | 0161 | Need Scheduling Starvation Prevention Mechanism |
23.401 | 0163 | URA-PCH handling in ISR |
23.401 | 0164 | Clarification on default bearers |
23.401 | 0174 | Authentication Vector update |
23.401 | 0512 | Packet Routing Function |
23.401 | 0512 rev 1 | Packet Routing Function |
23.401 | 0512 rev 2 | Packet Routing Function |
23.401 | 0512 rev 3 | Packet Routing Function |
23.401 | 0513 | Clarifications to Bearer Control Mode (BCM) use |
23.401 | 0514 | Combined NAS Security Mode Command |
23.401 | 0648 | Updates to information storage tables |
23.401 | 0648 rev 1 | Updates to information storage tables |
23.401 | 0648 rev 2 | Updates to information storage tables |
23.401 | 0690 | IMEISV request in the Security Mode Command |
23.401 | 0691 | P-TMSI Signature in TAU procedure |
23.401 | 0800 | ISR local reactivation when UE handovers back to a previously registered area. |
23.401 | 0801 | EPS security context terminology alignment |
23.401 | 1473 | A Handling of MME Load Rebalancing |
23.401 | 1494 | Removal of indirect uplink data forwarding from Inter RAT handovers |
23.401 | 1494 rev 1 | Removal of indirect uplink data forwarding from Inter RAT handovers |
23.401 | 1495 | Removal of indirect uplink data forwarding from Inter RAT handovers |
23.401 | 1495 rev 1 | Removal of indirect uplink data forwarding from Inter RAT handovers |
23.401 | 1979 | The clarification for UE initiated PDN connectivity procedure |
23.401 | 1980 | The correction for reference of TS 29.274 |
page generated from database: 2024-11-12 10:16:04