3GPP Work Item mapping to Change Requests
3GPP Work Item = 25034 (RANimp-UEConTest_CPC)
This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.
Spec | CR number and Revision | CR Title |
---|---|---|
34.108 | 0659 | Addition of RB setup message contents for CPC |
34.108 | 0678 | Addition of new Test Bearer for MAC CPC testing |
34.108 | 0679 | CPC: Corrections to Radio Bearer Setup message contents for conditions A20 A21 |
34.121-1 | 0903 | Introduction of continuous packet connectivity (CPC) to ôOut-of-syncronization handling of output powerö |
34.121-1 | 0922 | Introduction of continuous packet connectivity (CPC) to E-TFC restriction |
34.121-1 | 1005 | Introduction of HS-SCCH-less demodulation requirements for CPC |
34.121-1 | 1047 | Introduction of continuous packet connectivity (CPC) to intrafrequency CPICH measurement requirements |
34.121-1 | 1059 | to 34.121-1: Correction to Transmit ON/OFF Power test cases for CPC requirements |
34.121-2 | 0036 | Addition of HS-SCCH-less demodulation of HS-DSCH test case |
34.123-1 | 2087 | New CPC test case for physical channel reconfiguration with DTX_DRX_STATUS variable and corresponding actions |
34.123-1 | 2088 | New CPC test case for physical channel reconfiguration with HS_SCCH_LESS_STATUS variable and corresponding actions. |
34.123-1 | 2089 | New MAC test case for grant monitoring in discontinuous downlink reception operation |
34.123-1 | 2090 | New CPC test case for RB establishment with start of DTX |
34.123-1 | 2091 | New CPC test case for RB establishment with start of HS-SCCH less operation |
34.123-1 | 2092 | MAC E-TFCI Selection for CPC |
34.123-1 | 2093 | MAC HS-SCCH Less Operation for CPC |
34.123-1 | 2158 | Addition of a new test case for CPC: CQI reporting in UL. |
34.123-1 | 2159 | Addition of a new test case for CPC: UL DPCCH slot format #4 |
34.123-1 | 2160 | New CPC test case for Radio Bearer Release for transition from CELL_DCH to CELL_DCH: Success (frequency modification, stop of discontinuous uplink transmission) |
34.123-1 | 2161 | New CPC test case for Physical Channel Reconfiguration for transition from CELL_DCH to URA_PCH: Success (frequency modification, stop of discontinuous uplink transmission) |
34.123-1 | 2162 | New CPC test case for Physical Channel Reconfiguration for transition from CELL_DCH to CELL_DCH: Success (serving E-DCH cell change with discontinuous uplink transmission) |
34.123-1 | 2163 | New CPC test case for Physical channel reconfiguration for transition from CELL_DCH to CELL_DCH … |
34.123-1 | 2164 | New CPC test case for Physical Channel Reconfiguration for transition from CELL_DCH to CELL_DCH: Failure (Timing … |
34.123-1 | 2165 | New CPC test case for Cell Update: Transition from URA_PCH to CELL_DCH: Success (start of discontinuous uplink transmission) |
34.123-1 | 2166 | New CPC test case for Cell Update: Transition from CELL_PCH to CELL_DCH: Success (frequency modification, start of discontinuous uplink transmission) |
34.123-1 | 2167 | New CPC test case for Cell Update: Radio Link Failure, with active discontinuous uplink transmission |
34.123-1 | 2168 | New CPC test case for Inter-RAT Cell Change Order from UTRAN to GPRS/CELL_DCH/Success (stop of discontinuous uplink transmission) |
34.123-1 | 2169 | Corrections to CPC RRC test cases |
34.123-1 | 2170 | New CPC test case: RRC Connection Establishment for transition from Idle Mode to CELL_DCH: Success (start of discontinuous uplink transmission) |
34.123-1 | 2171 | New CPC test case: Radio Bearer Reconfiguration from CELL_DCH to CELL_DCH: Success (With active discontinuous uplink transmission) |
34.123-1 | 2172 | New CPC test case: Radio Bearer Reconfiguration for transition from CELL_FACH to CELL_DCH and CELL_DCH to CELL_FACH: Success (start and stop of discontinuous uplink transmission) |
34.123-1 | 2173 | New CPC test case: Radio Bearer Reconfiguration for transition from CELL_DCH to CELL_DCH: Success (hard handover to another frequency, start and stop of discontinuous uplink transmission) |
34.123-1 | 2174 | New CPC test case: Radio Bearer Reconfiguration for transition from CELL_FACH to CELL_DCH and CELL_DCH to CELL_FACH: Success … |
34.123-1 | 2175 | New CPC test case: Radio Bearer Reconfiguration for transition from CELL_DCH to CELL_DCH: Success (Start and stop of discontinuous uplink transmission) |
34.123-1 | 2176 | New CPC test case: Radio Bearer Reconfiguration for transition from CELL_DCH to CELL_PCH: Success (stop of discontinuous uplink transmission) |
34.123-1 | 2253 | Correction to Rel-7 MAC test case 7.1.5b.1 |
34.123-1 | 2254 | Correction to Rel-7 MAC test case 7.1.6.2.11 |
34.123-1 | 2255 | Correction to Rel-7 MAC test case 7.1.6.3.3 |
34.123-1 | 2256 | Correction to Rel-7 MAC test case 7.1.6.4.3 |
34.123-1 | 2257 | CPC: Corrections to RRC Connection Establishment test case 8.1.2.19 |
34.123-1 | 2177 | New CPC test case: Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (hard handover to another frequency, start of discontinuous uplink transmission) |
34.123-1 | 2178 | New CPC test case: Active set update in soft handover: Radio Link addition and serving HS-DSCH / E-DCH cell change, with discontinuous uplink transmission. |
34.123-1 | 2258 | CPC: Corrections to Radio Bearer Establishment and Reconfiguration test cases in section 8.2.1.x – 8.2.3.x |
34.123-1 | 2259 | CPC: Corrections to Physical Channel Reconfiguration test cases in section 8.2.6.x |
34.123-1 | 2260 | CPC: Correction to Cell Update and Active Set Update test cases in sections 8.3.1.x and 8.3.4.11 |
34.123-2 | 0337 | Applicability for new CPC test cases |
34.123-2 | 0358 | Applicability for new CPC test cases |
34.123-2 | 0359 | Applicability change for corrected CPC test case 8.2.6.55 |
page generated from database: 2024-11-12 10:16:04