3GPP Work Item mapping to Change Requests
3GPP Work Item = 2469 (RInImp-DSCHhsp)
This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.
Spec | CR number and Revision | CR Title |
---|---|---|
25.212 | 0123 rev 4 | Inclusion of flexible hard split mode TFCI operation |
25.212 | 0173 rev 2 | Correction on the flexible TFCI coding in the DSCH hard split mode for Rel5 |
25.214 | 0250 rev 1 | Description of SSDT operation for TFCI power control in hard split mode |
25.306 | 0024 | UE capability for flexible hard split mode |
25.306 | 0024 rev 1 | UE capability for flexible hard split mode |
25.331 | 1129 | Support of flexible hard split mode |
25.331 | 1129 rev 1 | Support of flexible hard split mode |
25.331 | 1129 rev 2 | Support of flexible hard split mode |
25.423 | 0543 rev 3 | RNSAP Signalling support for flexible hard split |
25.423 | 0582 rev 3 | RNSAP changes for TFCI power control in DSCH hard split mode |
25.423 | 0623 | RNSAP changes for TFCI power control in DSCH hard split mode |
25.423 | 0689 rev 1 | Correction for inconsistency in length of TFCI field 2 |
25.427 | 0082 rev 1 | DCH FP changes for TFCI power control in DSCH hard split mode |
25.433 | 0583 | NBAP Signalling support for flexible hard split |
25.433 | 0626 | NBAP changes for TFCI power control in DSCH hard split mode |
25.433 | 0703 | Correction for inconsistency in length of TFCI field 2 |
25.433 | 0717 rev 1 | Correction for inconsistency in length of TFCI field 2 |
page generated from database: 2024-11-12 10:16:04