3GPP Work Item mapping to Change Requests
3GPP Work Item = 1994 (RInImp-DSCHsho)
This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.
Spec | CR number and Revision | CR Title |
---|---|---|
25.214 | 0149 rev 1 | DSCH Power Control Improvement in soft handover |
25.214 | 0195 rev 1 | Enhanced PDSCH power control clarification |
25.214 | 0217 rev 2 | DSCH power control clarification |
25.214 | 0281 rev 1 | Enhanced DSCH power control parameter name change |
25.214 | 0282 rev 1 | Enhanced DSCH power control parameter name change |
25.214 | 0352 | Clarification of SSDT uplink only signalling |
25.214 | 0353 | Clarification of SSDT uplink only signalling |
25.331 | 0683 rev 1 | Modification of SSDT Information IE parameters to indicate if SSDT is used in the UL only |
25.423 | 0310 rev 2 | SCH Power Control Improvement |
25.423 | 0376 | DSCH Power Control Improvement |
25.433 | 0362 rev 2 | DSCH Power Control Improvement |
25.433 | 0419 | DSCH Power Control Improvement |
25.841 | 0001 rev 1 | TFCI power control for DSCH in split mode |
page generated from database: 2024-11-12 10:16:04