The 5G Standard

3GPP Work Item mapping to Change Requests


3GPP Work Item = 1602 (LCS1-UEpos-enh)

This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.

Spec CR number and Revision CR Title
25.215 0085 RTD measurement in UTRAN for FDD
25.215 0106 rev 1 UTRAN SFN-SFN observed time difference measurement
25.221 0044 Correction of beacon characteristics due to IPDLs
25.224 0048 rev 1 Idle periods for IPDL location method
25.225 0025 RTD measurement in UTRAN for UP-TDD
25.302 0119 UE GPS Code Phase Measurement
25.302 0119 rev 1 UE GPS Code Phase Measurement
25.305 0048 rev 1 Introduction of IPDLs for TDD
25.305 0061 Correction of RTD usage in TDD
25.305 0062 Correction of RTD usage in TDD
25.331 0722 rev 1 Introduction of IPDLs for TDD
25.331 0773 Corrections to IPDLs for TDD
25.331 0970 Correction of IPDL parameters for TDD enhancements in ASN.1 description
25.331 1106 OTDOA assistance data
25.331 1107 Round Trip Time in point-to-point assistance data to assist GPS time recovery

page generated from database: 2024-06-24 21:26:04

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links