3GPP Work Item mapping to Change Requests
3GPP Work Item = 1509 (RInImp-REP)
This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.
Spec | CR number and Revision | CR Title |
---|---|---|
25.106 | 0003 | Correction to units in Spectrum emission mask |
25.106 | 0003 rev 1 | Correction to units in Spectrum emission mask |
25.106 | 0004 | Correction to units in Spectrum emission mask |
25.106 | 0005 | Introduction of output intermodulation requirement |
25.106 | 0006 | Introduction of output intermodulation requirement |
25.106 | 0008 | Out of band gain |
25.106 | 0008 rev 1 | Out of band gain |
25.106 | 0009 | Out of band gain |
25.106 | 0009 rev 1 | Out of band gain |
25.106 | 0010 | EVM Test: Change requirement for the use of HSDPA. |
25.106 | 0011 | Input intermodulation: Correction of co-location and addition of co-existence |
25.106 | 0011 rev 1 | Input intermodulation: Correction of co-location and addition of co-existence |
25.106 | 0012 | Input intermodulation: Correction of co-location and addition of co-existence |
25.106 | 0012 rev 1 | Input intermodulation: Correction of co-location and addition of co-existence |
25.106 | 0013 | Spurious emission: correction of the procedure |
25.106 | 0014 | Spurious emission: correction of the procedure |
25.106 | 0015 | Aligning of the requirement for Output power in extreme conditions with TS25.143 |
25.106 | 0016 | Aligning of the requirement for Output power in extreme conditions with TS25.143 |
25.106 | 0017 | Out of band gain |
25.106 | 0018 | Out of band gain |
25.106 | 0019 | EVM Test: Change requirement for the use of HSDPA. |
25.106 | 0020 | FDD GSM co-existence in the Same Geographic Area |
25.106 | 0021 | FDD GSM co-existence in the Same Geographic Area |
25.106 | 0022 | Spurious emissions: Co-existence with UTRA-FDD BS, Operation in the same geographic area |
25.106 | 0022 rev 1 | Spurious emissions: Co-existence with UTRA-FDD BS, Operation in the same geographic area |
25.106 | 0023 | Spurious emissions: Co-existence with UTRA-FDD BS, Operation in the same geographic area |
25.106 | 0023 rev 1 | Spurious emissions: Co-existence with UTRA-FDD BS, Operation in the same geographic area |
25.106 | 0024 | Correction of naming of frequency bands and operating band. Introduction of pass band |
25.106 | 0025 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.106 | 0026 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.106 | 0028 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.106 | 0028 rev 1 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.106 | 0029 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.106 | 0029 rev 1 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.106 | 0036 | Spurious emissions: Redrafting of tables for co-existence |
25.113 | 0011 | Text proposal for EMC for Repeater |
25.113 | 0013 | Add Arrangements for testing Repeater |
25.143 | 0001 | Measurement uncertainty corrections |
25.143 | 0002 | Correct Uncertainties, Precise wording, Editorial changes |
25.143 | 0005 | Correction to units in Spectrum emission mask |
25.143 | 0005 rev 1 | Correction to units in Spectrum emission mask |
25.143 | 0006 | Correction of initial conditions in Spectrum emission mask and System set-up drawing of input intermodulation. |
25.143 | 0007 | Correction to units in Spectrum emission mask |
25.143 | 0008 | Introduction of output intermodulation requirement |
25.143 | 0009 | Introduction of output intermodulation requirement |
25.143 | 0011 | Out of band gain |
25.143 | 0011 rev 1 | Out of band gain |
25.143 | 0012 | Out of band gain |
25.143 | 0012 rev 1 | Out of band gain |
25.143 | 0013 | New test environment: Extreme power supply for output power test |
25.143 | 0013 rev 1 | New test environment: Extreme power supply for output power test |
25.143 | 0014 | New test environment: Extreme power supply for output power test |
25.143 | 0014 rev 1 | New test environment: Extreme power supply for output power test |
25.143 | 0015 | Addition of Repeater configuration |
25.143 | 0015 rev 1 | Addition of Repeater configuration |
25.143 | 0016 | Addition of Repeater configuration |
25.143 | 0016 rev 1 | Addition of Repeater configuration |
25.143 | 0017 | Definition of the power to select the right table for the spectrum emission mask requirement. |
25.143 | 0018 | Definition of the power to select the right table for the spectrum emission mask requirement. |
25.143 | 0019 | EVM Test: Change of the requirement for the use of HSDPA |
25.143 | 0020 | EVM Test: Change from Test Model 4 to Test Model 1 |
25.143 | 0021 | Input intermodulation: Correction of co-location and addition of co-existence |
25.143 | 0021 rev 1 | Input intermodulation: Correction of co-location and addition of co-existence |
25.143 | 0022 | Input intermodulation: Correction of co-location and addition of co-existence |
25.143 | 0022 rev 1 | Input intermodulation: Correction of co-location and addition of co-existence |
25.143 | 0023 | Spurious emission: correction of the procedure |
25.143 | 0024 | Spurious emission: correction of the procedure |
25.143 | 0025 | Out of band gain |
25.143 | 0026 | Out of band gain |
25.143 | 0027 | EVM Test: Change requirement for the use of HSDPA. |
25.143 | 0028 | EVM Test: Change from Test Model 4 to Test Model 1 |
25.143 | 0029 | FDD GSM co-existence in the Same Geographic Area |
25.143 | 0030 | FDD GSM co-existence in the Same Geographic Area |
25.143 | 0031 | Spurious emissions: Co-existence with UTRA-FDD BS, Operation in the same geographic area |
25.143 | 0031 rev 1 | Spurious emissions: Co-existence with UTRA-FDD BS, Operation in the same geographic area |
25.143 | 0032 | Spurious emissions: Co-existence with UTRA-FDD BS, Operation in the same geographic area |
25.143 | 0032 rev 1 | Spurious emissions: Co-existence with UTRA-FDD BS, Operation in the same geographic area |
25.143 | 0033 | Removal of square brackets in the test uncertainty section regarding output intermodulation |
25.143 | 0034 | Removal of square brackets in the test uncertainty section regarding output intermodulation |
25.143 | 0035 | Correction of naming of frequency bands and operating band. Introduction of pass band |
25.143 | 0036 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.143 | 0037 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.143 | 0039 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.143 | 0039 rev 1 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.143 | 0040 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.143 | 0040 rev 1 | Spurious emissions: Co-existence with UTRA-FDD BS new UL requirement |
25.143 | 0047 | Spurious emissions: Redrafting of tables for co-existence |
page generated from database: 2024-11-12 10:16:04