Generations of Mobile Standards



3GPP active work programme


Click on UID to show list of all TSs and TRs associated with this work item.

Click on WI code to see a list of TSs and TRs specifically resulting from this work item.

Click on the percentage completion to see a list of approved Change Requests associated with this work item.

The "impact" shows an empirical best-guess of which TSs and TRs are likely to be modified as a result of the WI.

Work Items which have been abandoned are greyed out, and the TSG meeting at which they were abandoned is shown in the final column.

UID code title release lead body completion %
done
WID TDoc WID history created date last updated remarks abandoned
560024 P4C Policy and Charging Control for supporting fixed broadband access networks Rel-12 C4, C1, C3, S5, S1, S2 12/12/2014

100

SP-120443 history 2012/04/13 08/01/2013 Linked to BBF, IETF work. SP#58 stopped BB3 to BB6. Split BB1 and BB2 into TR and Stage 2 work
570031 P4C-FMC ... Stage 1 for Policy and Charging Support for Fixed Mobile Convergence Rel-12 S1 12/09/2012

100

SP-120542 history 2012/08/06 08/01/2013 SP#57 completed
560124 P4C-F ... BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO (Non Seamless WLAN Offload) traffic from 3GPP UEs in fixed broadband access networks (P4C-F) Rel-12 C4, C1, C3, S5, S2 12/12/2014

100

SP-120275 history 2012/06/04 08/01/2013
560724 P4C-F-SA2TR ...... TR on Stage 2 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F) Rel-12 S2 12/12/2014

100

SP-120275 history 2012/06/04 13/03/2015 Mar15: 23.896 for approval.
562124 P4C-F-SA2 ...... Stage 2 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F) Rel-12 S2 11/12/2013

100

SP-120275 history 2012/06/04 28/11/2013 SP#62 completed
610012 P4C-F-CT3 ...... Stage 3 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks Rel-12 C4, C1, C3 13/06/2014

100

CP-130776 history 2013/08/12 16/04/2014
610112 - ......... CT3 part of Stage 3 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks Rel-12 C3 13/06/2014

100

CP-130776 history 2013/08/12 16/04/2014 CP#64 completed
620009 - ......... CT1 part of Stage 3 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks Rel-12 C1 05/03/2014

100

CP-130776 history 2013/11/19 29/01/2014 CP#63 completed
620010 - ......... CT4 part of Stage 3 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks Rel-12 C4 13/06/2014

100

CP-130776 history 2013/11/19 16/04/2014 CP#64 completed
600042 P4C-F-CH_P ...... Policy and Charging Enforcement Function (PCEF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (Stage 2/3) Rel-12 S5 17/09/2014

100

SP-130261 history 2013/06/02 26/08/2014 SP#65 completed. Introduce Charging Characteristics in Convergent scenario, Include missing fixed user location information for NSWO
600043 P4C-F-CH_T ...... Traffic Detection Function (TDF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (Stage 2/3) Rel-12 S5 18/06/2014

100

SP-130262 history 2013/06/02 10/06/2014 SP#64 completed
560224 P4C-TI ... BB2: Policy and Charging Control for 3GPP UEs connected to BroadBand Forum access network as Trusted network in Interworking scenario (P4C-TI) Rel-12 S2 19/06/2013

100

SP-120444 history 2012/06/04 08/01/2013
560824 P4C-TI-SA2TR ...... TR on Stage 2 for BB2: Policy and Charging Control for 3GPP UEs connected to BroadBand Forum access network as Trusted network in Interworking scenario (P4C-TI) Rel-12 S2 19/06/2013

100

SP-120444 history 2012/06/04 17/06/2013 SP#60 completed
562224 P4C-TI-SA2 ...... Stage 2 for BB2: Policy and Charging Control for 3GPP UEs connected to BroadBand Forum access network as Trusted network in Interworking scenario (P4C-TI) Rel-12 S2 19/06/2013

100

SP-120444 history 2012/06/04 06/06/2013 SP#60 completed
560324 P4C-S2bc ... Deleted - BB3: Policy and Charging Control for 3GPP UEs connected to fixed broadband access network via S2b and S2c reference points for EPC routed traffic (P4C-S2bc) Rel-12 S2 12/12/2012

100

SP-120445 history 2012/06/04 08/01/2013 SP#58 stopped (at 0% completion) SP-58
560424 P4C-HeNB ... Deleted - BB4: Policy and Charging Control for EPC routed traffic over fixed broadband access networks of 3GPP UEs connected via H(e)NB in convergent scenarios (P4C-HeNB) Rel-12 S2 12/12/2012

100

SP-120278 history 2012/06/04 08/01/2013 SP#58 stopped (at 0% completion) SP-58
560524 P4C-FL2 ... Deleted - BB5: Policy and Charging Control for supporting Layer 2 traffic in fixed broadband access network (P4C-FL2) Rel-12 S2 12/12/2012

100

SP-120279 history 2012/06/04 08/01/2013 SP#58 stopped (at 0% completion) SP-58
560624 P4C-TC ... Deleted - BB6: Policy and Charging Control for 3GPP UEs connected to fixed broadband access networks via S2a reference point for EPC routed traffic in convergence (P4C-TC) Rel-12 S2 12/12/2012

100

SP-120280 history 2012/06/04 08/01/2013 SP#58 stopped (at 30% completion) SP-58