Generations of Mobile Standards

3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 23.078

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0002 - D R99 3.0.0 3.1.0 Health warning on MSC address in Initial DP NP-04 NP-99244 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0003 - A R99 3.0.0 3.1.0 Inclusion of Subscriber Activity Information Flow NP-04 N2-99217 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0004 - F R99 3.0.0 3.1.0 Inclusion of Alerting Pattern in Provide Roaming Number (PRN) Information Flow.. NP-04 3C99-275 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0005 - F R99 3.0.0 3.1.0 Dialled Number String Format NP-04 N2-99225 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0006 - F R99 3.0.0 3.1.0 Handling of AC/Ain DP Busy, DP No Answer and DP Route Select NP-04 N2-99244 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0007 - F R99 3.0.0 3.1.0 Inclusion of Activity Test IF between gsmSCF & gsmSRF and gsmSCF and assistSSF NP-04 3C99-480 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0008 - F R99 3.0.0 3.1.0 Correction of USSD Information flows NP-04 N2-99238 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0009 - F R99 3.0.0 3.1.0 Various corrections NP-04 N2-99343 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0010 - F R99 3.0.0 3.1.0 Correction of CAMEL Phase interworking with Call Forwarding NP-04 N2-99223 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0011 - F R99 3.0.0 3.1.0 Renaming of Call Active Variable NP-04 N2-99255 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0012 - F R99 3.0.0 3.1.0 Reporting of O/T_Abandon DP when caller clears during O/T_Busy, O/T_No_Answer or Route_Select_Failure EDP-R. NP-04 N2-99310 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0013 - F R99 3.0.0 3.1.0 Clarification on the scope of CAMEL Capability Handling parameter NP-04 N2-99338 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0014 - F R99 3.0.0 3.1.0 Refining trigger criteria at DP2, due to the introduction of North American Equal Access NP-04 N2-99458 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0015 - F R99 3.0.0 3.1.0 Introduction of MSISDN Parameters in Process Unstructured NP-04 N2-99576 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0016 - F R99 3.0.0 3.1.0 MSC address in Initial DP NP-04 N2-99646 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0017 - F R99 3.0.0 3.1.0 Correction of gsmSDL; return to idle after ACR NP-04 N2-99630 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0018 - F R99 3.0.0 3.1.0 Notification of call forwarding to the gsmSCF NP-04 N2-99638 approved N2A - agreed 1999‑06‑28 - approved via corresp (28/6/99)
0019 - A R99 3.1.0 3.2.0 Inclusion of the SS Invocation Notification Procedure NP-05 NP-99298 approved N2 - N2‑99A71 agreed 1999‑10‑05 CAMEL2 -
0021 - A R99 3.1.0 3.2.0 Removal of TDP-Criteria from RCH NP-05 NP-99298 approved N2 - N2‑99B27 agreed 1999‑10‑05 CAMEL2 -
0022 1 A R99 3.1.0 3.2.0 GMSC CAMEL Phases in PRN NP-05 NP-99298 approved N2 - N2‑99D13 agreed 1999‑10‑05 CAMEL2 -
0023 1 A R99 3.1.0 3.2.0 Cal Reference Number NP-05 NP-99298 approved N2 - N2‑99C49 agreed 1999‑10‑05 CAMEL2 -
0025 - A R99 3.1.0 3.2.0 Clarification on handling of Call Reference Number and GMSC address NP-05 NP-99298 approved N2 - N2‑99985 agreed 1999‑10‑05 CAMEL2 -
0027 - A R99 3.1.0 3.2.0 Value of Call Active parameter in Aoperation - clarifications in the SDL NP-05 NP-99298 approved N2 - N2‑99D17 agreed 1999‑10‑05 CAMEL2 -
0028 - A R99 3.1.0 3.2.0 Corrections of process gsmSSF SDL NP-05 NP-99298 approved N2 - N2‑99C63 agreed 1999‑10‑05 CAMEL2 -
0029 - A R99 3.1.0 3.2.0 Alignment of CAMEL2 FCI & Handling of CIR NP-05 NP-99298 approved N2 - N2‑99D01 agreed 1999‑10‑05 CAMEL2 -
0032 2 B R99 3.2.0 3.3.0 23.078 revised for CAMEL Phase 3 Relase 1999 NP-06 NP-99471 approved N2 N2-12 N2‑99L23 agreed 1999‑12‑15 CAMEL3 -
0033 - F R99 3.2.0 3.3.0 Correction of the direction of Int_Continue after sending Int_O/T-Abandon NP-06 NP-99507 approved Siemens - agreed 1999‑12‑15 CAMEL3 Siemens
0034 1 D R99 3.3.0 3.4.0 Correction to some SDLs in chapter 4 NP-07 NP-000160 approved N2 goodName N2A000114 agreed 2000‑05‑18 CAMEL3 -
0035 3 F R99 3.3.0 3.4.0 Correction of Translation Information Flag in the VLR for DTN NP-07 NP-000160 approved N2 goodName N2A000306 agreed 2000‑05‑18 CAMEL3 Agreed via E-mail
0037 3 C R99 3.3.0 3.4.0 Clarification on CUG handling NP-07 NP-000160 approved N2 goodName N2A000255 agreed 2000‑05‑18 CAMEL3 Agreed via E-mail
0038 1 F R99 3.3.0 3.4.0 Clarification of SS Invocation Notification NP-07 NP-000160 approved N2 goodName N2A000117 agreed 2000‑05‑18 CAMEL3 -
0040 5 C R99 3.3.0 3.4.0 Correction of SS Invocation Notification for CCBS NP-07 NP-000160 approved N2 goodName N2A000300 agreed 2000‑05‑18 CAMEL3 -
0041 5 C R99 3.3.0 3.4.0 Introduction of call gapping NP-07 NP-000160 approved N2 goodName N2A000296 agreed 2000‑05‑18 CAMEL3 Agreed via E-mail
0042 2 F R99 3.3.0 3.4.0 Technical and editorial corrections to ATSI, ATM, NCSD (rev of both 008 &014) NP-07 NP-000160 approved N2 goodName N2A000264 agreed 2000‑05‑18 CAMEL3 -
0043 2 F R99 3.3.0 3.4.0 Technical and editorial corrections to Location Services and Any Time Interrogation NP-07 NP-000160 approved N2 goodName N2A000265 agreed 2000‑05‑18 CAMEL3 -
0044 1 F R99 3.3.0 3.4.0 Technical and editorial corrections to circuit cwithed call handling NP-07 NP-000034 approved N2 goodName N2A000118 agreed 2000‑05‑18 CAMEL3 -
0045 - F R99 3.3.0 3.4.0 Technical and editorial corrections to USSD NP-07 NP-000160 approved N2 N2-09 N2A000017 agreed 2000‑05‑18 CAMEL3 -
0046 1 F R99 3.3.0 3.4.0 Technical and editorial corrections to GPRS NP-07 NP-000160 approved N2 goodName N2A000119 agreed 2000‑05‑18 CAMEL3 -
0047 - F R99 3.3.0 3.4.0 Technical and editorial corrections to SMS NP-07 NP-000160 approved N2 N2-09 N2A000019 agreed 2000‑05‑18 CAMEL3 -
0048 1 F R99 3.3.0 3.4.0 Inclusion of O-CSI trigger criteria in Resume Call Handling NP-07 NP-000160 approved N2 goodName N2A000122 agreed 2000‑05‑18 CAMEL3 -
0051 4 F R99 3.3.0 3.4.0 Correction of SDL related to CAMEL Phase3 for D-CSI NP-07 NP-000160 approved N2 goodName N2A000268 agreed 2000‑05‑18 CAMEL3 -
0052 4 F R99 3.3.0 3.4.0 Addition of description of D-CSI in MO Calls NP-07 NP-000160 approved N2 goodName N2A000269 agreed 2000‑05‑18 CAMEL3 -
0055 - F R99 3.3.0 3.4.0 Reporting of T_Busy when absent subscriber NP-07 NP-000160 approved N2 N2-09 N2A000033 agreed 2000‑05‑18 CAMEL3 -
0056 3 F R99 3.3.0 3.4.0 GPRS TCAP dialogues NP-07 NP-000160 approved N2 goodName N2A000277 agreed 2000‑05‑18 CAMEL3 -
0059 - F R99 3.3.0 3.4.0 Addition of gsmSRF disconnect handling in CCF SDL NP-07 NP-000160 approved N2 goodName N2A000059 agreed 2000‑05‑18 CAMEL3 -
0061 3 B R99 3.3.0 3.4.0 Addition of SCI handling in Waiting for Instructions For DS state NP-07 NP-000160 approved N2 goodName N2A000282 agreed 2000‑05‑18 CAMEL3 -
0062 5 F R99 3.4.0 3.5.0 Correction of SDL and IF for Dialled Services in Call Forwarding case NP-08 NP-000245 approved N2 N2-10 N2A000390 agreed 2000‑06‑27 CAMEL3 -
0063 2 F R99 3.3.0 3.4.0 Clarification of N-CSI in Core NW NP-07 NP-000160 approved N2 goodName N2A000151 agreed 2000‑05‑18 CAMEL3 -
0066 - F R99 3.3.0 3.4.0 Addition of Int_Error in DP_O/T_Answer states NP-07 NP-000035 approved N2 goodName N2A000075 agreed 2000‑05‑18 CAMEL3 -
0068 - F R99 3.3.0 3.4.0 Correction of the decision box after receiving Int_DP_O_Answer and Int_DP_T_Answer in the procedure gsmSSF NP-07 NP-000035 approved N2 goodName N2A000077 agreed 2000‑05‑18 CAMEL3 -
0069 1 F R99 3.3.0 3.4.0 Correction of the description in the creation of a new leg in CF NP-07 NP-000035 approved N2 goodName N2A000288 agreed 2000‑05‑18 CAMEL3 -
0070 1 F R99 3.3.0 3.4.0 Correction of the description of BCSM relationships NP-07 NP-000035 approved N2 goodName N2A000289 agreed 2000‑05‑18 CAMEL3 -
0071 - F R99 3.3.0 3.4.0 Correction of the direction of Int_Continue after sending Int_T-Abandon (additional to 23.078-033) NP-07 NP-000035 approved N2 goodName N2A000080 agreed 2000‑05‑18 CAMEL3 -
0073 - D R99 3.3.0 3.4.0 Editorial changes for legs NP-07 NP-000035 approved N2 goodName N2A000082 agreed 2000‑05‑18 CAMEL3 -
0076 2 F R99 3.3.0 3.4.0 Extension of the description of the O_No_Answer NP-07 NP-000035 approved N2 goodName N2A000292 agreed 2000‑05‑18 CAMEL3 -
0077 2 A R99 3.4.0 3.5.0 gsmSSF DP handling in CF NP-08 NP-000241 approved N2 N2-11 N2‑000131 agreed 2000‑06‑27 CAMEL2 -
0079 1 F R99 3.3.0 3.4.0 Inclusion of Release transaction in CAMEL_OCH_MSC_INIT NP-07 NP-000035 approved N2 goodName N2A000291 agreed 2000‑05‑18 CAMEL3 -
0081 1 D R99 3.3.0 3.4.0 Improved SDLs in GPRS interworking NP-07 NP-000035 approved N2 goodName N2A000208 agreed 2000‑05‑18 CAMEL3 -
0082 - F R99 3.3.0 3.4.0 Correction of the description of the SGSN NP-07 NP-000035 approved N2 goodName N2A000097 agreed 2000‑05‑18 CAMEL3 -
0084 1 F R99 3.3.0 3.4.0 Correction of references occurring in the SDL figures NP-07 NP-000035 approved N2 goodName N2A000195 agreed 2000‑05‑18 CAMEL3 -
0085 - D R99 3.3.0 3.4.0 Inclusion of CAMEL Phase 1 procedures as targets for references in 3G TS 23.018 NP-07 NP-000035 approved N2 goodName N2A000100 agreed 2000‑05‑18 CAMEL3 -
0086 - F R99 3.3.0 3.4.0 modelling of unsuccessful DPs NP-07 NP-000035 approved N2 goodName N2A000101 agreed 2000‑05‑18 CAMEL3 -
0090 - D R99 3.3.0 3.4.0 Definitions of service key NP-07 NP-000035 approved N2 goodName N2A000144 agreed 2000‑05‑18 CAMEL3 -
0091 1 A R99 3.3.0 3.4.0 Correction of CF notification NP-07 NP-000033 approved N2 goodName N2B000285 agreed 2000‑05‑18 CAMEL2 -
0093 2 B R99 3.3.0 3.4.0 Addition of Long Forwarded-to Numbers NP-07 NP-000055 approved N2 goodName N2A000275 agreed 2000‑05‑18 CF_enhancements -
0094 - F R99 3.3.0 3.4.0 Removal of Redirection Information from the ContinueWithArgument operation NP-07 NP-000035 approved N2 goodName N2A000167 agreed 2000‑05‑18 CAMEL3 -
0096 2 B R99 3.3.0 3.4.0 Addition to SDL of user interaction in Waiting_for_Instructions_for_DS NP-07 NP-000035 approved N2 goodName N2A000251 agreed 2000‑05‑18 CAMEL3 -
0098 1 C R99 3.3.0 3.4.0 addition of gsmSCF address list to CSI NP-07 NP-000035 approved N2 goodName N2A000259 agreed 2000‑05‑18 CAMEL3 -
0100 1 C R99 3.3.0 3.4.0 Introduction of 'Service Area Identity (SAI)' NP-07 NP-000113 approved N2 goodName N2A000200 agreed 2000‑05‑18 TEI -
0101 1 F R99 3.3.0 3.4.0 Correction of SII2 description NP-07 NP-000035 approved N2 goodName N2A000262 agreed 2000‑05‑18 CAMEL3 -
0102 1 F R99 3.3.0 3.4.0 Clarification on CUG handling NP-07 NP-000035 approved N2 goodName N2A000257 agreed 2000‑05‑18 CAMEL3 -
0103 - F R99 3.3.0 3.4.0 Replacement of Figure 4.57g: Process gsmSSF (sheet 7) by correct SDL figure. NP-07 NP-000036 approved N2 goodName N2A000188 agreed 2000‑05‑18 CAMEL3 -
0104 - F R99 3.3.0 3.4.0 Correction of Figure 6.2: GPRS Attach/Detach FSM NP-07 NP-000036 approved N2 goodName N2A000189 agreed 2000‑05‑18 CAMEL3 -
0105 - F R99 3.3.0 3.4.0 Correction of first state in Figure 6.14 l: Process GPRS_SSF NP-07 NP-000036 approved N2 goodName N2A000190 agreed 2000‑05‑18 CAMEL3 -
0106 1 F R99 3.3.0 3.4.0 Correction of GPRS session description NP-07 NP-000036 approved N2 goodName N2A000272 agreed 2000‑05‑18 CAMEL3 -
0108 2 F R99 3.3.0 3.4.0 Correction of GPRS PDP context FSM NP-07 NP-000036 approved N2 goodName N2A000298 agreed 2000‑05‑18 CAMEL3 Agreed via E-mail
0109 2 F R99 3.3.0 3.4.0 Enhancement of the SDL for ATM NP-07 NP-000036 approved N2 goodName N2A000297 agreed 2000‑05‑18 CAMEL3 -
0110 1 F R99 3.3.0 3.4.0 Enhancement of the SDL for NCSD NP-07 NP-000036 approved N2 goodName N2A000284 agreed 2000‑05‑18 CAMEL3 -
0111 - D R99 3.3.0 3.4.0 Removal of PSI description NP-07 NP-000036 approved N2 goodName N2A000204 agreed 2000‑05‑18 CAMEL3 -
0112 1 D R99 3.3.0 3.4.0 Procedure Handle_SCI_GPRS and Complete_FCI_Record_GPRS NP-07 NP-000036 approved N2 goodName N2A000286 agreed 2000‑05‑18 CAMEL3 -
0114 1 A R99 3.3.0 3.4.0 Correction on gsmSSF SDL; return to idle after ACR NP-07 NP-000033 approved N2 goodName N2A000231 agreed 2000‑05‑18 CAMEL2 -
0116 - F R99 3.3.0 3.4.0 O-CSI and D-CSI checks for ORLCF NP-07 NP-000036 approved N2 goodName N2A000218 agreed 2000‑05‑18 CAMEL3 -
0117 - F R99 3.3.0 3.4.0 Removal of user interaction in the monitoring state NP-07 NP-000144 approved Siemens goodName N2A000221 rejected 2000‑05‑18 CAMEL3 -
0119 1 C R99 3.3.0 3.4.0 Enhancement of the ATSI SDL NP-07 NP-000036 approved N2 goodName N2A000285 agreed 2000‑05‑18 CAMEL3 -
0120 - D R99 3.3.0 3.4.0 Transfer of destination address to gsmSCF NP-07 NP-000036 approved N2 goodName N2A000248 agreed 2000‑05‑18 CAMEL3 Agreed via E-mail
0121 1 F R99 3.3.0 3.4.0 Implementation of retriggering in gsmSSF SDL NP-07 NP-000036 approved N2 goodName N2A000266 agreed 2000‑05‑18 CAMEL3 Agreed via E-mail
0123 1 F R99 3.4.0 3.5.0 Correction of incoming call handling NP-08 NP-000245 approved N2 N2-10 N2A000363 agreed 2000‑06‑27 CAMEL3 -
0125 2 F R99 3.4.0 3.5.0 Correction of Call Gapping NP-08 NP-000245 approved N2 N2-10 N2A000400 agreed 2000‑06‑27 CAMEL3 -
0130 1 F R99 3.4.0 3.5.0 Remove of SII2 frw CCBS treatment ind NP-08 NP-000245 approved N2 N2-10 N2A000399 agreed 2000‑06‑27 CAMEL3 -
0132 - F R99 3.4.0 3.5.0 Correction of the CWA SII2 description NP-08 NP-000245 approved N2 N2-10 N2A000329 agreed 2000‑06‑27 CAMEL3 -
0133 2 F R99 3.4.0 3.5.0 Improvements on ATM/ATSI/NSDC NP-08 NP-000245 approved N2 N2-11 N2‑000230 agreed 2000‑06‑27 CAMEL3 -
0134 4 F R99 3.5.0 3.6.0 Interworking of Call Forwardings and new CAMEL3 trigger detection points NP-09 NP-000456 approved N2 N2-12 N2‑000327 agreed 2000‑09‑01 CAMEL3 -
0137 4 F R99 3.5.0 3.6.0 E-parameter handling of distinct CAP dialogues/TDPs NP-09 NP-000456 approved N2 N2-13 N2‑000418 agreed 2000‑09‑01 CAMEL3 -
0138 1 F R99 3.4.0 3.5.0 Reception of Int_QoS_Change in the gprsSSF in gsmSSF SDL NP-08 NP-000245 approved N2 N2-10 N2A000397 agreed 2000‑06‑27 CAMEL3 -
0140 - C R99 3.4.0 3.5.0 Disallowing Compound Basic Service group codes for conditional triggering NP-08 NP-000243 approved N2 N2-10 N2A000348 agreed 2000‑06‑27 CAMEL3 -
0141 - F R99 3.4.0 3.5.0 Correction on chapter 10. NP-08 NP-000245 approved N2 N2-10 N2A000350 agreed 2000‑06‑27 CAMEL3 -
0142 1 C R99 3.4.0 3.5.0 Proposed information flow on Notify subscriber Data Change NP-08 NP-000243 approved N2 N2-10 N2A000385 agreed 2000‑06‑27 CAMEL3 -
0145 1 F R99 3.4.0 3.5.0 Invocation of O-BCSM in case of GSM call forwarding NP-08 NP-000246 approved N2 N2-10 N2A000404 agreed 2000‑06‑27 CAMEL3 -
0146 2 F R99 3.4.0 3.5.0 Clarification on TDP Analyzedinfoo Criteria checks NP-08 NP-000244 approved N2 N2-10 N2A000409 agreed 2000‑06‑27 CAMEL3 -
0147 2 F R99 3.4.0 3.5.0 CAMEL Subscription Info NP-08 NP-000246 approved N2 N2-11 N2‑000236 agreed 2000‑06‑27 CAMEL3 -
0148 1 C R99 3.4.0 3.5.0 Usage of GPRS Reference Number NP-08 NP-000243 approved N2 N2-11 N2‑000201 agreed 2000‑06‑27 CAMEL3 -
0150 2 F R99 3.4.0 3.5.0 Correction on Quality of Service (GPRS) NP-08 NP-000246 approved N2 N2-11 N2‑000252 agreed 2000‑06‑27 CAMEL3 -
0153 - F R99 3.4.0 3.5.0 Alignment of the EventSpecificInformationBCSM Stage 2&3 definitions NP-08 NP-000246 approved N2 N2-11 N2‑000121 agreed 2000‑06‑27 CAMEL3 -
0154 - F R99 3.4.0 3.5.0 Clean-up the Monitoring state User Interaction NP-08 NP-000246 approved N2 N2-11 N2‑000122 agreed 2000‑06‑27 CAMEL3 -
0156 1 F R99 3.4.0 3.5.0 Correction of MM paragraph NP-08 NP-000246 approved N2 N2-11 N2‑000237 agreed 2000‑06‑27 CAMEL3 -
0157 - F R99 3.4.0 3.5.0 Editorial correction of the GPRS_activate_PDP_context SDL NP-08 NP-000246 approved N2 N2-11 N2‑000141 agreed 2000‑06‑27 CAMEL3 -
0158 1 F R99 3.4.0 3.5.0 Removal of ActivityTestSMS operation NP-08 NP-000246 approved N2 N2-11 N2‑000238 agreed 2000‑06‑27 CAMEL3 -
0159 1 F R99 3.4.0 3.5.0 PDPid in the EntityReleasedGPRS operation NP-08 NP-000246 approved N2 N2-11 N2‑000205 agreed 2000‑06‑27 CAMEL3 -
0161 1 D R99 3.4.0 3.5.0 Renaming FSM to State Model in GPRS NP-08 NP-000248 approved N2 N2-11 N2‑000197 agreed 2000‑06‑27 CAMEL3 -
0162 2 F R99 3.4.0 3.5.0 Various corrections and updates for 23.078 NP-08 NP-000247 approved N2 N2-11 N2‑000234 agreed 2000‑06‑27 CAMEL3 -
0163 1 F R99 3.4.0 3.5.0 Specification of segmented GPRS Dialogues NP-08 NP-000247 approved N2 N2-11 N2‑000207 agreed 2000‑06‑27 CAMEL3 -
0164 - F R99 3.4.0 3.5.0 Release of PDP context during Waiting for Instructions NP-08 NP-000247 approved N2 N2-11 N2‑000153 agreed 2000‑06‑27 CAMEL3 -
0165 1 F R99 3.4.0 3.5.0 Reset Timer GPRS NP-08 NP-000247 approved N2 N2-11 N2‑000209 agreed 2000‑06‑27 CAMEL3 -
0166 - F R99 3.4.0 3.5.0 Correction: Enhancement of the SDL for ATM NP-08 NP-000247 approved N2 N2-11 N2‑000158 agreed 2000‑06‑27 CAMEL3 -
0167 - F R99 3.4.0 3.5.0 gprsSSF definition NP-08 NP-000247 approved N2 N2-11 N2‑000159 agreed 2000‑06‑27 CAMEL3 -
0168 - F R99 3.4.0 3.5.0 Reference to 3G TS 23.088 NP-08 NP-000247 approved N2 N2-11 N2‑000160 agreed 2000‑06‑27 CAMEL3 -
0169 - D R99 3.4.0 3.5.0 Editorial corrections in the clause 5 NP-08 NP-000248 approved N2 N2-11 N2‑000161 agreed 2000‑06‑27 CAMEL3 -
0170 1 D R99 3.4.0 3.5.0 Editorial corrections in the clause 6 NP-08 NP-000248 approved N2 N2-11 N2‑000239 agreed 2000‑06‑27 CAMEL3 -
0171 1 D R99 3.4.0 3.5.0 Editorial corrections in the clause 7 NP-08 NP-000248 approved N2 N2-11 N2‑000240 agreed 2000‑06‑27 CAMEL3 -
0172 - D R99 3.4.0 3.5.0 Editorial corrections in the clause 8 NP-08 NP-000248 approved N2 N2-11 N2‑000164 agreed 2000‑06‑27 CAMEL3 -
0173 1 D R99 3.4.0 3.5.0 Editorial corrections in the clause 9 NP-08 NP-000248 approved N2 N2-11 N2‑000241 agreed 2000‑06‑27 CAMEL3 -
0174 1 D R99 3.4.0 3.5.0 Editorial corrections in the clause 10 NP-08 NP-000248 approved N2 N2-11 N2‑000242 agreed 2000‑06‑27 CAMEL3 -
0175 1 D R99 3.4.0 3.5.0 Editorial corrections in the clause 11 NP-08 NP-000248 approved N2 N2-11 N2‑000243 agreed 2000‑06‑27 CAMEL3 -
0176 2 F R99 3.4.0 3.5.0 Clarifications on GPRS Concepts NP-08 NP-000247 approved N2 N2-11 N2‑000254 agreed 2000‑06‑27 CAMEL3 -
0177 2 A R99 3.4.0 3.5.0 Usage of Announcement Suppression Indicator NP-08 NP-000240 approved N2 N2-11 N2‑000249 agreed 2000‑06‑27 CAMEL2 -
0180 1 F R99 3.4.0 3.5.0 Addition of Location Information to Initial DP GPRS NP-08 NP-000247 approved N2 N2-11 N2‑000257 agreed 2000‑06‑27 CAMEL3 -
0181 2 F R99 3.5.0 3.6.0 Indication of Network requested PDP Context in Initial DPGPRS message NP-09 NP-000459 approved N2 N2-12 N2‑000280 agreed 2000‑09‑01 CAMEL3 -
0182 - D R99 3.4.0 - Improved SDLs in clauses 6-11 NP-08 NP-000319 withdrawn Siemens - - 2000‑06‑27 CAMEL3 -
0183 - D R99 3.4.0 - Editorial modifications NP-08 NP-000320 withdrawn Siemens - - 2000‑06‑27 CAMEL3 -
0185 1 F R99 3.5.0 3.6.0 Addition of the Handle_FCI_GPRS procedure NP-09 NP-000456 approved N2 N2-12 N2‑000336 agreed 2000‑09‑01 CAMEL3 -
0186 - F R99 3.5.0 3.6.0 Correction to Procedure CAMEL_ICH_MSC_INIT NP-09 NP-000456 approved N2 N2-12 N2‑000275 agreed 2000‑09‑01 CAMEL3 -
0187 1 F R99 3.5.0 3.6.0 Transfer of Procedure Check_CD_SII2 from TS 23.072 NP-09 NP-000456 approved N2 N2-13 N2‑000358 agreed 2000‑09‑01 CAMEL3 -
0188 2 F R99 3.5.0 3.6.0 Update of References for the Location Information IE NP-09 NP-000456 approved N2 N2-13 N2‑000411 agreed 2000‑09‑01 CAMEL3 -
0190 - F R99 3.5.0 3.6.0 Removal of duplicate SGSN address/number from IDP-GPRS NP-09 NP-000456 approved N2 N2-12 N2‑000283 agreed 2000‑09‑01 CAMEL3 -
0191 - F R99 3.5.0 3.6.0 Clean-up the Monitoring state User Interaction NP-09 NP-000456 approved N2 N2-12 N2‑000286 agreed 2000‑09‑01 CAMEL3 -
0192 - D R99 3.5.0 3.6.0 Editorial corrections and enhancements NP-09 NP-000456 approved N2 N2-12 N2‑000287 agreed 2000‑09‑01 CAMEL3 -
0193 1 F R99 3.5.0 3.6.0 GPRS Change of Position Procedure for Session and Context NP-09 NP-000456 approved N2 N2-12 N2‑000335 agreed 2000‑09‑01 CAMEL3 -
0194 3 F R99 3.5.0 3.6.0 Corrections on GPRS NP-09 NP-000456 approved N2 N2-13 N2‑000438 agreed 2000‑09‑01 CAMEL3 -
0198 3 F R99 3.5.0 3.6.0 Location Number GPRS NP-09 NP-000456 approved N2 N2-13 N2‑000378 agreed 2000‑09‑01 CAMEL3 -
0200 7 F R99 3.5.0 3.6.0 ACR/AC supervision for GPRS NP-09 NP-000456 approved N2 N2-13 N2‑000439 agreed 2000‑09‑01 CAMEL3 -
0201 1 F R99 3.5.0 3.6.0 Correction to Proceure CAMEL_Modify_CUG_Info NP-09 NP-000456 approved N2 N2-12 N2‑000326 agreed 2000‑09‑01 CAMEL3 -
0203 1 D R99 3.5.0 3.6.0 Move of processing rules for GPRS context. NP-09 NP-000456 approved N2 N2-12 N2‑000342 agreed 2000‑09‑01 CAMEL3 -
0204 - F R99 3.5.0 3.6.0 Interaction with CUG NP-09 NP-000457 approved N2 N2-12 N2‑000331 agreed 2000‑09‑01 CAMEL3 -
0205 1 F R99 3.5.0 3.6.0 Handling of the Call Diversion Treatment Indicator NP-09 NP-000457 approved N2 N2-13 N2‑000419 agreed 2000‑09‑01 CAMEL3 -
0206 1 F R99 3.5.0 3.6.0 GPRS location information in GPRSEventSpecificInformation NP-09 NP-000457 approved N2 N2-13 N2‑000408 agreed 2000‑09‑01 CAMEL3 -
0207 1 F R99 3.5.0 3.6.0 Removal of NPI check in DP Analyzed_Information NP-09 NP-000457 approved N2 N2-13 N2‑000420 agreed 2000‑09‑01 CAMEL3 -
0208 2 F R99 3.5.0 3.6.0 SDL modelling and overlapping dialogue case NP-09 NP-000457 approved N2 N2-13 N2‑000436 agreed 2000‑09‑01 CAMEL3 -
0209 - F R99 3.5.0 3.6.0 Correction CAMEL_MT_GMSC_INIT NP-09 NP-000457 approved N2 N2-13 N2‑000380 agreed 2000‑09‑01 CAMEL3 -
0213 1 F R99 3.5.0 3.6.0 Correction of MO-SMS SDL's NP-09 NP-000457 approved N2 N2-13 N2‑000416 agreed 2000‑09‑01 CAMEL3 -
0215 - F R99 3.5.0 3.6.0 Correction to description of DP Collected_Info NP-09 NP-000457 approved N2 N2-13 N2‑000367 agreed 2000‑09‑01 CAMEL3 -
0216 1 F R99 3.5.0 3.6.0 Introduction of Guard Timer for GPRS TCAP dialogue handling NP-09 NP-000457 approved N2 N2-13 N2‑000440 agreed 2000‑09‑01 CAMEL3 -
0217 - F R99 3.5.0 3.6.0 PDP establishment NP-09 NP-000459 approved N2 N2-13 N2‑000409 agreed 2000‑09‑01 CAMEL3 -
0218 1 D R99 3.5.0 3.6.0 Clarification of description of number comparison for dialled services NP-09 NP-000457 approved N2 N2-13 N2‑000434 agreed 2000‑09‑01 CAMEL3 -
0219 - F R99 3.5.0 3.6.0 Correction to Initial DP SMS Information Flow NP-09 NP-000457 approved N2 N2-13 N2‑000427 agreed 2000‑09‑01 CAMEL3 -
0220 - F R99 3.5.0 3.6.0 Correction to the missing connection in SDL gsmSSF NP-09 NP-000581 approved Rapporteur - - 2000‑09‑21 CAMEL3 -
0221 3 F R99 3.6.0 3.7.0 Correction on CAMEL CF and OR NP-10 NP‑000615 approved N2 N2-14 N2‑000558 agreed 2000‑11‑29 CAMEL3 -
0222 1 F R99 3.6.0 3.7.0 Corrections in clauses 3 and 4 NP-10 NP‑000615 approved N2 N2-14 N2‑000527 agreed 2000‑11‑29 CAMEL3 -
0223 1 F R99 3.6.0 3.7.0 Clarification for the relationship for DPs NP-10 NP‑000615 approved N2 N2-14 N2‑000528 agreed 2000‑11‑29 CAMEL3 -
0224 2 F R99 3.6.0 3.7.0 Clarification for the CUG data in Initial DP NP-10 NP‑000615 approved N2 N2-14 N2‑000556 agreed 2000‑11‑29 CAMEL3 -
0225 1 F R99 3.6.0 3.7.0 Correction on the SDL CAMEL_Store_Destination_Address NP-10 NP‑000615 approved N2 N2-14 N2‑000530 agreed 2000‑11‑29 CAMEL3 -
0226 - F R99 3.6.0 3.7.0 Correction on the SDL gsmSSF NP-10 NP‑000615 approved N2 N2-14 N2‑000455 agreed 2000‑11‑29 CAMEL3 -
0228 3 F R99 3.6.0 3.7.0 Correction for ambiguous description in clause 10 and 11 NP-10 NP‑000615 approved N2 N2-14 N2‑000550 agreed 2000‑11‑29 CAMEL3 -
0229 1 F R99 3.6.0 3.7.0 Clarification on GPRS 'guard timer' NP-10 NP‑000615 approved N2 N2-14 N2‑000520 agreed 2000‑11‑29 CAMEL3 -
0230 1 F R99 3.6.0 3.7.0 Specifying timer range values NP-10 NP‑000615 approved N2 N2-14 N2‑000523 agreed 2000‑11‑29 CAMEL3 -
0231 - F R99 3.6.0 3.7.0 Correction to ‘Initial DP SMS’ Information Flow NP-10 NP‑000615 approved N2 N2-14 N2‑000467 agreed 2000‑11‑29 CAMEL3 -
0232 4 F R99 3.6.0 - First set of corrections of paragraph 6 GPRS NP-10 NP‑000616 revised N2 N2-15 N2‑000642 agreed 2000‑11‑29 CAMEL3 NP-000616 revised to NP-000714
0232 4 F R99 3.6.0 3.7.0 First set of corrections of paragraph 6 GPRS NP-10 NP‑000714 approved N2 - N2‑000642 agreed 2000‑11‑29 CAMEL3 NP-000714 revised from NP-000616
0233 3 F R99 3.6.0 3.7.0 Second set of corrections of paragraph 6 GPRS NP-10 NP‑000615 approved N2 N2-14 N2‑000553 agreed 2000‑11‑29 CAMEL3 -
0235 - F R99 3.6.0 3.7.0 Correction on error implementing a 23.078-159r1 NP-10 NP‑000615 approved N2 N2-14 N2‑000501 agreed 2000‑11‑29 CAMEL3 -
0236 - F R99 3.6.0 3.7.0 Correction on error implementing a 23.078-194r3 NP-10 NP‑000615 approved N2 N2-14 N2‑000509 agreed 2000‑11‑29 CAMEL3 -
0237 - F R99 3.6.0 3.7.0 CallGap IF correction NP-10 NP‑000615 approved N2 N2-14 N2‑000517 agreed 2000‑11‑29 CAMEL3 -
0238 - F R99 3.6.0 3.7.0 CAMEL3 removal of duplicate RAI NP-10 NP‑000615 approved N2 N2-14 N2‑000525 agreed 2000‑11‑29 CAMEL3 -
0239 - F R99 3.6.0 3.7.0 Check_Gap_Criteria correction NP-10 NP‑000618 approved N2 N2-15 N2‑000566 agreed 2000‑11‑29 CAMEL3 -
0244 - F R99 3.6.0 3.7.0 GsmSSF state transition in the case of Abandon/Disconnect is armed as an EDP-N, or when they are not armed NP-10 NP‑000615 approved N2 N2-14 N2‑000482 agreed 2000‑11‑29 CAMEL3 -
0247 - F R99 3.6.0 - Request more than one SS data and/or CSI in one ATSI request NP-10 NP‑000616 rejected N2 N2-15 N2‑000597 agreed 2000‑11‑29 CAMEL3 -
0248 2 F R99 3.6.0 - Improved description of the location information in SGSN NP-10 NP‑000616 revised N2 N2-15 N2‑000673 agreed 2000‑11‑29 CAMEL3 NP-000616 revised to NP-000714
0248 2 F R99 3.6.0 3.7.0 Improved description of the location information in SGSN NP-10 NP‑000714 approved N2 - N2‑000673 agreed 2000‑11‑29 CAMEL3 NP-000714 revised from NP-000616
0249 2 F R99 3.6.0 - Error handling in ATSI NP-10 NP‑000616 revised N2 N2-15 N2‑000672 agreed 2000‑11‑29 CAMEL3 NP-000616 revised to NP-000714
0249 2 F R99 3.6.0 3.7.0 Error handling in ATSI NP-10 NP‑000714 approved N2 - N2‑000672 agreed 2000‑11‑29 CAMEL3 NP-000714 revised from NP-000616
0250 2 F R99 3.6.0 - Additional clarification for ATM NP-10 NP‑000616 revised N2 N2-15 N2‑000685 agreed 2000‑11‑29 CAMEL3 E-mail appr 27/11.NP-000616 revised to NP-000714
0250 2 F R99 3.6.0 3.7.0 Additional clarification for ATM NP-10 NP‑000714 approved N2 - N2‑000685 agreed 2000‑11‑29 CAMEL3 e-mail agreedNP-000714 revised from NP-000616
0255 - F R99 3.6.0 - Introduction of GGSN Address NP-10 NP‑000616 revised N2 N2-15 N2‑000645 agreed 2000‑11‑29 CAMEL3 NP-000616 revised to NP-000714
0255 - F R99 3.6.0 3.7.0 Introduction of GGSN Address NP-10 NP‑000714 approved N2 - N2‑000645 agreed 2000‑11‑29 CAMEL3 NP-000714 revised from NP-000616
0256 2 F R99 3.7.0 3.8.0 Clarification on APN usage in the ConnectGPRS operation NP-11 NP‑010055 approved N2 N2-17 N2‑010209 agreed 2001‑03‑02 CAMEL3 0
0257 - F R99 3.7.0 3.8.0 Update of References NP-11 NP‑010055 approved N2 N2-16 N2‑010009 agreed 2001‑01‑19 CAMEL3 0
0258 1 F R99 3.7.0 3.8.0 Hand-over indication for GPRS NP-11 NP‑010055 approved N2 N2-16 N2‑010084 agreed 2001‑01‑19 CAMEL3 0
0259 1 F R99 3.7.0 3.8.0 Description of Entity Released GPRS NP-11 NP‑010055 approved N2 N2-16 N2‑010086 agreed 2001‑01‑19 CAMEL3 0
0260 1 F R99 3.7.0 3.8.0 Correction to description of 'O-CSI Applicable' parameter NP-11 NP‑010055 approved N2 N2-16 N2‑010095 agreed 2001‑01‑19 CAMEL3 0
0261 1 F R99 3.7.0 3.8.0 Restriction on SS-CSI to VLR - no marking for CCBS NP-11 NP‑010055 approved N2 N2-16 N2‑010079 agreed 2001‑01‑19 CAMEL3 0
0263 1 F R99 3.7.0 3.8.0 No Volume charging on GPRS Session (clarifying text) NP-11 NP‑010055 approved N2 N2-16 N2‑010089 agreed 2001‑01‑19 CAMEL3 0
0264 2 F R99 3.7.0 3.8.0 Correction of Call Forwarding Notification feature in CAMEL Phase 3. NP-11 NP‑010055 approved N2 N2-16 N2‑010114 agreed 2001‑01‑19 CAMEL3 0
0267 1 F R99 3.7.0 3.8.0 Usage of MSISDN for CAMEL - USSD Information Flows NP-11 NP‑010055 approved N2 N2-16 N2‑010081 agreed 2001‑01‑19 CAMEL3 0
0268 1 F R99 3.7.0 3.8.0 Correction of error implementing 23.078-118r2 NP-11 NP‑010055 approved N2 N2-16 N2‑010082 agreed 2001‑01‑19 CAMEL3 0
0269 4 F R99 3.7.0 3.8.0 Correction of reference NP-11 NP‑010056 approved N2 N2-17 N2‑010205 agreed 2001‑03‑02 CAMEL3 0
0270 1 F R99 3.7.0 - Clarification of APN change in PDP Context Established NP-11 - - N2 N2-16 N2‑010092 rejected 2001‑01‑19 CAMEL3 Rejected in CN2#17, replaced by N2-010209
0271 1 F R99 3.7.0 3.8.0 Correction on GPRS related information flows NP-11 NP‑010055 approved N2 N2-16 N2‑010093 agreed 2001‑01‑19 CAMEL3 0
0272 - F R99 3.7.0 3.8.0 Corrections to Information Flow Definitions NP-11 NP‑010056 approved N2 N2-17 N2‑010125 agreed 2001‑03‑02 CAMEL3 0
0273 1 F R99 3.7.0 3.8.0 Correction of the Location Information IE NP-11 NP‑010056 approved N2 N2-17 N2‑010207 agreed 2001‑03‑02 CAMEL3 0
0274 - F R99 3.7.0 3.8.0 Correction of Interactions with Call Barring in CAMEL Phase 3. NP-11 NP‑010056 approved N2 N2-17 N2‑010158 agreed 2001‑03‑02 CAMEL3 0
0279 - F R99 3.7.0 3.8.0 Correction of Triggering after Call Gapping in CAMEL Phase 3. NP-11 NP‑010056 approved N2 N2-17 N2‑010163 agreed 2001‑03‑02 CAMEL3 0
0280 1 F R99 3.7.0 3.8.0 Correction of SDL Set_Notification_Type NP-11 NP‑010056 approved N2 N2-17 N2‑010208 agreed 2001‑03‑02 CAMEL3 0
0282 1 F R99 3.7.0 3.8.0 Correction to vendor/operator specific GPRS charging response timer handling NP-11 NP‑010056 approved N2 N2-17 N2‑010220 agreed 2001‑03‑02 CAMEL3 0
0283 - F R99 3.7.0 3.8.0 Marking of Location Number in InitialDP SMS as 'Conditional' NP-11 NP‑010056 approved N2 N2-17 N2‑010215 agreed 2001‑03‑02 CAMEL3 0
0284 1 F R99 3.7.0 3.8.0 Correction on checking DP criteria and sending VT/T-CSI NP-11 NP‑010056 approved N2 N2-17 N2‑010221 agreed 2001‑03‑02 CAMEL3 0
0285 - F R99 3.7.0 3.8.0 Correction of Output Signals in Process Reconnected_MT_Call_VLR NP-11 NP‑010056 approved N2 N2-17 N2‑010219 agreed 2001‑03‑02 CAMEL3 0
0286 - F R99 3.8.0 3.9.0 GGSN address in SGSN to SCP interface NP-12 NP‑010310 approved N2 N2-18 N2‑010282 agreed 2001‑05‑28 CAMEL3 0
0287 - A Rel-4 4.0.0 4.1.0 GGSN address in SGSN to SCP interface NP-12 NP‑010310 approved N2 N2-18 N2‑010283 agreed 2001‑05‑28 CAMEL3 0
0288 1 F R99 3.8.0 3.9.0 Mapping of Call Forwarding parameters from CAP-Connect to ISUP-IAM and CAP-InitialDP NP-12 NP‑010309 approved N2 N2-18 N2‑010381 agreed 2001‑05‑28 CAMEL3 0
0289 1 A Rel-4 4.0.0 4.1.0 Mapping of Call Forwarding parameters from CAP-Connect to ISUP-IAM and CAP-InitialDP NP-12 NP‑010309 approved N2 N2-18 N2‑010382 agreed 2001‑05‑28 CAMEL3 0
0290 - F R99 3.8.0 3.9.0 Correction of error implementing 23.078-181r2 NP-12 NP‑010310 approved N2 N2-18 N2‑010290 agreed 2001‑05‑28 CAMEL3 0
0291 - A Rel-4 4.0.0 4.1.0 Correction of error implementing 23.078-181r2 NP-12 NP‑010310 approved N2 N2-18 N2‑010291 agreed 2001‑05‑28 CAMEL3 0
0292 1 F R99 3.8.0 3.9.0 Handling of second SIFOC NP-12 NP‑010310 approved N2 N2-18 N2‑010404 agreed 2001‑05‑28 CAMEL3 0
0293 1 A Rel-4 4.0.0 4.1.0 Handling of second SIFOC NP-12 NP‑010310 approved N2 N2-18 N2‑010406 agreed 2001‑05‑28 CAMEL3 0
0294 1 F R99 3.8.0 3.9.0 Correction to GPRS SDL: no state transition for QoS-induced ACR-GPRS NP-12 NP‑010310 approved N2 N2-18 N2‑010389 agreed 2001‑05‑28 CAMEL3 0
0295 1 F R99 3.8.0 3.9.0 Correction on the call-Diversion-Treatment-Indicator at the GMSC NP-12 NP‑010310 approved N2 N2-18 N2‑010412 agreed 2001‑05‑28 CAMEL3 0
0296 3 F R99 3.8.0 - Introduction of Reference Number for MO-SMS NP-12 NP‑010315 rejected N2 N2-18 N2‑010444 agreed 2001‑05‑28 CAMEL3 0
0297 - A Rel-4 4.0.0 4.1.0 Correction to GPRS SDL: no state transition for QoS-induced ACR-GPRS NP-12 NP‑010310 approved N2 N2-18 N2‑010390 agreed 2001‑05‑28 CAMEL3 0
0298 1 F R99 3.8.0 - Inclusion of warning note for the reporting of total duration or volume for GPRS NP-12 NP‑010316 rejected N2 N2-18 N2‑010459 agreed 2001‑05‑28 CAMEL3 0
0299 - A Rel-4 4.0.0 4.1.0 Correction on the call-Diversion-Treatment-Indicator at the GMSC NP-12 NP‑010310 approved N2 N2-18 N2‑010413 agreed 2001‑05‑28 CAMEL3 0
0300 - A Rel-4 4.0.0 - Introduction of Reference Number for MO-SMS NP-12 NP‑010315 rejected N2 N2-18 N2‑010445 agreed 2001‑05‑28 CAMEL3 0
0301 - F R99 3.8.0 3.9.0 CAMEL Capability Handling in GPRS-CSI NP-12 NP‑010310 approved N2 N2-18 N2‑010449 agreed 2001‑05‑28 CAMEL3 0
0302 - A Rel-4 4.0.0 4.1.0 CAMEL Capability Handling in GPRS-CSI NP-12 NP‑010310 approved N2 N2-18 N2‑010450 agreed 2001‑05‑28 CAMEL3 0
0303 - A Rel-4 4.0.0 - Inclusion of warning note for the reporting of total duration or volume for GPRS NP-12 NP‑010316 rejected N2 N2-18 N2‑010460 agreed 2001‑05‑28 CAMEL3 0
0304 1 F R99 3.8.0 - Indication of gsmSCF Address in Continue GPRS and Connect GPRS IFs NP-12 NP‑010314 rejected N2 N2-18 N2‑010472 agreed 2001‑05‑28 CAMEL3 0
0305 - A Rel-4 4.0.0 - Indication of gsmSCF Address in Continue GPRS and Connect GPRS Ifs NP-12 NP‑010314 rejected N2 N2-18 N2‑010473 agreed 2001‑05‑28 CAMEL3 0
0306 - F R99 3.8.0 - Correction for the CAMEL3 ACR-GPRS parameter range problem (roll-over) NP-12 NP‑010320 revised Nokia - - 2001‑06‑05 CAMEL3 replaced by NP-010354
0306 1 F R99 3.8.0 3.9.0 Correction for the CAMEL3 ACR-GPRS parameter range problem (roll-over) NP-12 NP‑010354 approved Nokia - - 2001‑06‑14 CAMEL3 0
0307 - A Rel-4 4.0.0 - Correction for the CAMEL3 ACR-GPRS parameter range problem (roll-over) NP-12 NP‑010320 revised Nokia - - 2001‑06‑05 CAMEL3 replaced by NP-010354
0307 1 A Rel-4 4.0.0 4.1.0 Correction for the CAMEL3 ACR-GPRS parameter range problem (roll-over) NP-12 NP‑010354 approved Nokia - - 2001‑06‑14 CAMEL3 0
0308 - F R99 3.8.0 3.9.0 Correction to PDP Context DP description table (table 6.2) NP-12 NP‑010246 approved Ericsson - - 2001‑06‑07 CAMEL3 0
0309 - A Rel-4 4.0.0 4.1.0 Correction to PDP Context DP description table (table 6.2) NP-12 NP‑010246 approved Ericsson - - 2001‑06‑07 CAMEL3 0
0310 1 F R99 3.9.0 3.10.0 Correction of error implementing 23.078-194r3 NP-13 NP‑010447 approved N2 N2-19 agreed 2001‑09‑13 CAMEL3 -
0311 - A Rel-4 4.1.0 4.2.0 Correction of error implementing 23.078-194r3 NP-13 NP‑010447 approved N2 N2-19 agreed 2001‑09‑13 CAMEL3 -
0312 2 F R99 3.9.0 3.10.0 Possible information in Initial DP NP-13 NP‑010447 approved N2 N2-19 agreed 2001‑09‑13 CAMEL3 -
0313 1 A Rel-4 4.1.0 4.2.0 Possible information in Initial DP NP-13 NP‑010447 approved N2 N2-19 agreed 2001‑09‑13 CAMEL3 -
0317 1 F R99 3.9.0 3.10.0 Correction of CUG information handling NP-13 NP‑010447 approved N2 N2-19 agreed 2001‑09‑13 CAMEL3 -
0318 1 A Rel-4 4.1.0 4.2.0 Correction of CUG information handling NP-13 NP‑010447 approved N2 N2-19 agreed 2001‑09‑13 CAMEL3 -
0322 1 F R99 3.10.0 3.11.0 Handling of Reconnect on the MSC-VLR Interface NP-14 NP‑010583 approved N2 N2-20 N2‑010810 agreed CAMEL3 -
0323 1 A Rel-4 4.2.0 4.3.0 Handling of Reconnect on the MSC-VLR Interface NP-14 NP‑010583 approved N2 N2-20 N2‑010843 agreed CAMEL3 -
0324 1 F R99 3.10.0 3.11.0 Indication of deletion of CSI in Notify Subscriber Data Change NP-14 NP‑010583 approved N2 N2-20 N2‑010804 agreed CAMEL3 -
0325 1 A Rel-4 4.2.0 4.3.0 Indication of deletion of CSI in Notify Subscriber Data Change NP-14 NP‑010583 approved N2 N2-20 N2‑010815 agreed CAMEL3 -
0328 1 F R99 3.10.0 3.11.0 Clarification of the CUG data used in IDP NP-14 NP‑010583 approved N2 N2-20 N2‑010824 agreed CAMEL3 -
0329 1 A Rel-4 4.2.0 4.3.0 Clarification of the CUG data used in IDP NP-14 NP‑010583 approved N2 N2-20 N2‑010853 agreed CAMEL3 -
0331 1 F R99 3.10.0 3.11.0 TDP3 triggering criterion in MO case NP-14 NP‑010583 approved N2 N2-20 N2‑010827 agreed CAMEL3 -
0332 1 A Rel-4 4.2.0 4.3.0 TDP3 triggering criterion in MO case NP-14 NP‑010583 approved N2 N2-20 N2‑010828 agreed CAMEL3 -
0333 2 F R99 3.10.0 3.11.0 Guidance to the SCI operation if the subscriber or the VPLMN do not support AoC service NP-14 NP‑010583 approved N2 N2-20 N2‑010811 agreed CAMEL3 -
0334 - F R99 3.10.0 3.11.0 Inclusion of D-CSI in arming/disarming mechanism NP-14 NP‑010582 approved N2 N2-20 N2‑010773 agreed CAMEL3 -
0335 2 F R99 3.10.0 3.11.0 Clarification on ATM NP-14 NP‑010582 approved N2 N2-20 N2‑010808 agreed CAMEL3 -
0336 1 F R99 3.10.0 3.11.0 Clarification on NSCD when data is withdrawn NP-14 NP‑010582 approved N2 N2-20 N2‑010805 agreed CAMEL3 -
0337 - A Rel-4 4.2.0 4.3.0 Inclusion of D-CSI in arming/disarming mechanism NP-14 NP‑010582 approved N2 N2-20 N2‑010774 agreed CAMEL3 -
0338 - F R99 3.10.0 3.11.0 Correction of SDL to text extention NP-14 NP‑010582 approved N2 N2-20 N2‑010775 agreed CAMEL3 -
0339 - A Rel-4 4.2.0 4.3.0 Correction of SDL to text extention NP-14 NP‑010582 approved N2 N2-20 N2‑010776 agreed CAMEL3 -
0340 2 F R99 3.10.0 3.11.0 Introduction of SMS Reference Number NP-14 NP‑010582 approved N2 N2-20 N2‑010845 agreed CAMEL3 -
0341 - A Rel-4 4.2.0 4.3.0 Guidance to the SCI operation if the subscriber or the VPLMN do not support AoC service NP-14 NP‑010583 approved N2 N2-20 N2‑010812 agreed CAMEL3 -
0342 - A Rel-4 4.2.0 4.3.0 Clarification on NSCD when data is withdrawn NP-14 NP‑010582 approved N2 N2-20 N2‑010820 agreed CAMEL3 -
0343 - A Rel-4 4.2.0 4.3.0 Clarification on ATM NP-14 NP‑010582 approved N2 N2-20 N2‑010842 agreed CAMEL3 -
0344 - A Rel-4 4.2.0 4.3.0 Introduction of SMS Reference Number NP-14 NP‑010582 approved N2 N2-20 N2‑010846 agreed CAMEL3 -
0345 - F R99 3.10.0 3.11.0 Correction to Procedure Handle_AC (missing check box exit) NP-14 NP‑010587 approved N2 N2-21 N2‑010871 agreed 2001‑12‑05 CAMEL3 -
0346 1 F R99 3.10.0 3.11.0 Corrections in the Call Information Report/Request operation NP-14 NP‑010587 approved N2 N2-21 N2‑010999 agreed 2001‑12‑05 CAMEL3 -
0347 - F R99 3.10.0 3.11.0 Tccd shall be stopped in procedure Handle_ACR NP-14 NP‑010587 approved N2 N2-21 N2‑010895 agreed 2001‑12‑05 CAMEL3 -
0348 - F R99 3.10.0 3.11.0 Correction to ECT Treatment Indicator description NP-14 NP‑010587 approved N2 N2-21 N2‑010896 agreed 2001‑12‑05 CAMEL3 -
0351 - F R99 3.10.0 3.11.0 Reporting QoS changes shall not be restricted to User initiated QoS changes NP-14 NP‑010587 approved N2 N2-21 N2‑010899 agreed 2001‑12‑05 CAMEL3 -
0352 1 F R99 3.10.0 3.11.0 Guidance to the usage of SCI-GPRS in the case of no support of AoC NP-14 NP‑010588 approved N2 N2-21 N2‑010997 agreed 2001‑12‑06 CAMEL3 -
0355 1 F R99 3.10.0 3.11.0 Clarification on Connect and ContinueWithArgument about the SII2 NP-14 NP‑010588 approved N2 N2-21 N2‑011012 agreed 2001‑12‑06 CAMEL3 -
0359 1 F R99 3.10.0 3.11.0 Clarification on ATM about simultaneous SS modifications NP-14 NP‑010588 approved N2 N2-21 N2‑010976 agreed 2001‑12‑06 CAMEL3 -
0362 - A Rel-4 4.2.0 4.3.0 Clarification on ATM about simultaneous SS modifications NP-14 NP‑010588 approved N2 N2-21 N2‑010977 agreed 2001‑12‑06 CAMEL3 -
0363 4 F R99 3.10.0 3.11.0 Clarification: use of SS-Code in ATM, ATSI and NSDC NP-14 NP‑010588 approved N2 N2-21 N2‑011040 agreed 2001‑12‑06 CAMEL3 -
0364 - A Rel-4 4.2.0 4.3.0 Reporting QoS changes shall not be restricted to User initiated QoS changes NP-14 NP‑010587 approved N2 N2-21 N2‑010990 agreed 2001‑12‑05 CAMEL3 -
0365 - A Rel-4 4.2.0 4.3.0 Correction to Procedure Handle_AC (missing check box exit) NP-14 NP‑010587 approved N2 N2-21 N2‑010998 agreed 2001‑12‑05 CAMEL3 -
0366 - A Rel-4 4.2.0 4.3.0 Corrections in the Call Information Report/Request operation NP-14 NP‑010587 approved N2 N2-21 N2‑011000 agreed 2001‑12‑05 CAMEL3 -
0367 - A Rel-4 4.2.0 4.3.0 Tccd shall be stopped in procedure Handle_ACR NP-14 NP‑010587 approved N2 N2-21 N2‑011009 agreed 2001‑12‑05 CAMEL3 -
0368 - A Rel-4 4.2.0 4.3.0 Correction to ECT Treatment Indicator description NP-14 NP‑010587 approved N2 N2-21 N2‑011010 agreed 2001‑12‑05 CAMEL3 -
0369 - A Rel-4 4.2.0 4.3.0 Guidance to the usage of SCI-GPRS in the case of no support of AoC NP-14 NP‑010588 approved N2 N2-21 N2‑011026 agreed 2001‑12‑06 CAMEL3 -
0370 - A Rel-4 4.2.0 4.3.0 Clarification on Connect and ContinueWithArgument about the SII2 NP-14 NP‑010588 approved N2 N2-21 N2‑011027 agreed 2001‑12‑06 CAMEL3 -
0371 - A Rel-4 4.2.0 4.3.0 Clarification: use of SS-Code in ATM, ATSI and NSDC NP-14 NP‑010588 approved N2 N2-21 N2‑011041 agreed 2001‑12‑06 CAMEL3 -
0372 1 F R99 3.11.0 3.12.0 Clarification on NP check at DP2 NP-15 NP‑020055 approved N2 N2-22 N2‑020178 agreed 2002‑02‑06 CAMEL3 -
0373 2 F R99 3.11.0 3.12.0 Clarification on national values of the Called Party Number’s Nature of Address field NP-15 NP‑020056 approved N2 N2-22 N2‑020216 agreed 2002‑02‑06 CAMEL3 -
0374 - F R99 3.11.0 3.12.0 Correction to GPRS Dialogue Handler NP-15 NP‑020054 approved N2 N2-22 N2‑020031 agreed 2002‑02‑06 CAMEL3 -
0376 1 F R99 3.11.0 3.12.0 Correction to Advice of Charge for MT calls NP-15 NP‑020054 approved N2 N2-22 N2‑020182 agreed 2002‑02‑06 CAMEL3 -
0378 - F R99 3.11.0 3.12.0 Exact wordings for Apply Charging and Apply Charging Report in GPRS NP-15 NP‑020054 approved N2 N2-22 N2‑020077 agreed 2002‑02‑06 CAMEL3 -
0379 - A Rel-4 4.3.0 4.4.0 Exact wordings for Apply Charging and Apply Charging Report in GPRS NP-15 NP‑020054 approved N2 N2-22 N2‑020078 agreed 2002‑02‑06 CAMEL3 -
0380 - F R99 3.11.0 3.12.0 FCI handling harmonisation NP-15 NP‑020054 approved N2 N2-22 N2‑020107 agreed 2002‑02‑06 CAMEL3 -
0381 - A Rel-4 4.3.0 4.4.0 FCI handling harmonisation NP-15 NP‑020054 approved N2 N2-22 N2‑020108 agreed 2002‑02‑06 CAMEL3 -
0382 1 F R99 3.11.0 3.12.0 The waiting for new AC timers NP-15 NP‑020055 approved N2 N2-22 N2‑020194 agreed 2002‑02‑06 CAMEL3 -
0383 1 A Rel-4 4.3.0 4.4.0 The waiting for new AC timers NP-15 NP‑020055 approved N2 N2-22 N2‑020195 agreed 2002‑02‑06 CAMEL3 -
0384 1 F R99 3.11.0 3.12.0 Handling Disconnect From IP Forbidden IE in Play Announcement and Prompt And Collect User Information IFs NP-15 NP‑020055 approved N2 N2-22 N2‑020192 agreed 2002‑02‑06 CAMEL3 -
0385 1 A Rel-4 4.3.0 4.4.0 Handling Disconnect From IP Forbidden IE in Play Announcement and Prompt And Collect User Information IFs NP-15 NP‑020055 approved N2 N2-22 N2‑020193 agreed 2002‑02‑06 CAMEL3 -
0386 - F R99 3.11.0 3.12.0 Correction: CSI handling at several FEs NP-15 NP‑020054 approved N2 N2-22 N2‑020131 agreed 2002‑02‑06 CAMEL3 -
0387 - A Rel-4 4.3.0 4.4.0 Correction: CSI handling at several FEs NP-15 NP‑020054 approved N2 N2-22 N2‑020132 agreed 2002‑02‑06 CAMEL3 -
0388 - A Rel-4 4.3.0 4.4.0 Correction to GPRS Dialogue Handler NP-15 NP‑020054 approved N2 N2-22 N2‑020169 agreed 2002‑02‑06 CAMEL3 -
0389 - A Rel-4 4.3.0 4.4.0 Correction to Advice of Charge for MT calls NP-15 NP‑020054 approved N2 N2-22 N2‑020183 agreed 2002‑02‑06 CAMEL3 -
0390 1 F R99 3.11.0 3.12.0 MSISDN to be made available to MSC NP-15 NP‑020055 approved N2 N2-22 N2‑020206 agreed 2002‑02‑06 CAMEL3 -
0391 1 A Rel-4 4.3.0 4.4.0 MSISDN to be made available to MSC NP-15 NP‑020055 approved N2 N2-22 N2‑020207 agreed 2002‑02‑06 CAMEL3 -
0392 - A Rel-4 4.3.0 4.4.0 Clarification on NP check at DP2 NP-15 NP‑020055 approved N2 N2-22 N2‑020213 agreed 2002‑02‑06 CAMEL3 -
0393 - A Rel-4 4.3.0 4.4.0 Clarification on national values of the Called Party Number’s Nature of Address field NP-15 NP‑020056 approved N2 N2-22 N2‑020217 agreed 2002‑02‑06 CAMEL3 -
0394 - B Rel-5 4.3.0 - Composite changes for CAMEL phase 4 NP-15 NP‑020057 noted N2 N2-22 agreed 2002‑03‑01 CAMEL3 Intention is to approve huge CR at NP-16.
0394 1 B Rel-5 4.4.0 5.0.0 Composite changes for CAMEL phase 4 NP-16 NP‑020205 approved N2 N2-24 N2‑020626 agreed 2002‑03‑01 CAMEL4 CR 394 provided for CN#15 for information
0395 - F R99 3.12.0 - Correction of EventReportGPRS parameter QOS - - - N2 N2-23 N2‑020355 revised 2002‑03‑28 CAMEL3 -
0395 1 F R99 3.12.0 3.13.0 Correction of EventReportGPRS parameter QOS NP-16 NP‑020203 approved N2 N2-23 N2‑020434 agreed 2002‑03‑28 CAMEL3 -
0396 - A Rel-4 4.4.0 - Correction of EventReportGPRS parameter QOS - - - N2 N2-23 N2‑020356 revised 2002‑03‑28 CAMEL3 -
0396 1 A Rel-4 4.4.0 4.5.0 Correction of EventReportGPRS parameter QOS NP-16 NP‑020203 approved N2 N2-23 N2‑020435 agreed 2002‑03‑28 CAMEL3 -
0397 - F R99 3.12.0 - Clarifications on ATM/ATM-ack - - - N2 N2-23 N2‑020375 revised 2002‑04‑03 CAMEL3 -
0397 1 F R99 3.12.0 - Clarifications on ATM/ATM-ack - - - N2 N2-23 N2‑020442 postponed 2002‑04‑03 CAMEL3 -
0397 2 F R99 3.12.0 3.13.0 Clarifications on ATM/ATM-ack NP-16 NP‑020204 approved N2 N2-24 N2‑020564 agreed 2002‑04‑03 CAMEL3 -
0398 - A R99 3.12.0 - Clarification in the case multiple RRBs are sent for a DP - - - N2 N2-23 N2‑020379 revised 2002‑04‑03 CAMEL2 -
0398 1 A R99 3.12.0 3.13.0 Clarification in the case multiple RRBs are sent for a DP NP-16 NP‑020202 approved N2 N2-23 N2‑020452 agreed 2002‑04‑03 CAMEL2 -
0399 - A Rel-4 4.4.0 - Clarification in the case multiple RRBs are sent for a DP - - - N2 N2-23 N2‑020380 revised 2002‑04‑03 CAMEL2 -
0399 1 A Rel-4 4.4.0 4.5.0 Clarification in the case multiple RRBs are sent for a DP NP-16 NP‑020202 approved N2 N2-23 N2‑020453 agreed 2002‑04‑03 CAMEL2 -
0400 - F R99 3.12.0 - Correction to handling when Delta is greater than received maximum threshold in an AC?GPRS - - - N2 N2-23 N2‑020394 revised 2002‑04‑03 CAMEL3 -
0400 1 F R99 3.12.0 - Correction to handling when Delta is greater than received maximum threshold in an AC?GPRS - - - N2 N2-23 N2‑020436 postponed 2002‑04‑03 CAMEL3 -
0401 - A Rel-4 4.4.0 - Correction to handling when Delta is greater than received maximum threshold in an AC?GPRS - - - N2 N2-23 N2‑020395 postponed 2002‑04‑03 CAMEL3 -
0402 - A R99 3.12.0 - 23.078 SDL correction of CancelGPRS - - - N2 N2-24 N2‑020522 noted 2002‑05‑03 CAMEL3 merged with CR 408
0403 - F R99 3.12.0 - Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-24 N2‑020533 revised 2002‑05‑07 CAMEL3 -
0403 1 F R99 3.12.0 - Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-24 N2‑020582 revised 2002‑05‑07 CAMEL3 -
0403 2 F R99 3.12.0 - Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-24 N2‑020603 postponed 2002‑05‑07 CAMEL3 -
0404 - A Rel-4 4.4.0 - Correction to handling when Delta is greater than received maximum threshold - - - N2 N2-24 N2‑020534 postponed 2002‑05‑07 CAMEL3 -
0405 - F R99 3.12.0 - Corrections to CTR and ETC Procedures - - - N2 N2-24 N2‑020557 revised 2002‑05‑08 CAMEL3 -
0405 1 F R99 3.12.0 3.13.0 Corrections to CTR and ETC Procedures NP-16 NP‑020204 approved N2 N2-24 N2‑020567 agreed 2002‑05‑08 CAMEL3 -
0406 - A Rel-4 4.4.0 - Corrections to CTR and ETC Procedures - - - N2 N2-24 N2‑020558 revised 2002‑05‑08 CAMEL3 -
0406 1 A Rel-4 4.4.0 4.5.0 Corrections to CTR and ETC Procedures NP-16 NP‑020204 approved N2 N2-24 N2‑020568 agreed 2002‑05‑08 CAMEL3 -
0407 - A Rel-4 4.4.0 4.5.0 Clarifications on ATM-req/ATM-ack NP-16 NP‑020204 approved N2 N2-24 N2‑020565 agreed 2002‑05‑15 CAMEL3 -
0408 - F R99 3.12.0 - Clarification of PDP id for GPRS control - - - N2 N2-24 N2‑020569 revised 2002‑05‑15 CAMEL3 -
0408 1 F R99 3.12.0 - Clarification of PDP id for GPRS control - - - N2 N2-24 N2‑020604 revised 2002‑05‑15 CAMEL3 -
0408 2 F R99 3.12.0 3.13.0 Clarification of PDP id for GPRS control NP-16 NP‑020204 approved N2 N2-24 N2‑020619 agreed 2002‑05‑15 CAMEL3 -
0409 - A R99 3.12.0 - Corrections to GPRS DP arming rules for scenario #1 - - - N2 N2-24 N2‑020570 postponed 2002‑05‑15 CAMEL3 -
0410 - A Rel-4 4.4.0 4.5.0 Clarification of PDP id for GPRS control NP-16 NP‑020204 approved N2 N2-24 N2‑020620 agreed 2002‑05‑17 CAMEL3 -
0411 - F Rel-4 4.5.1 - CAMEL3 inter-working with Rel-4 GPRS barring - - - N2 N2-25 N2‑020631 revised 2002‑06‑26 CAMEL3 -
0411 1 F Rel-4 4.5.1 4.6.0 CAMEL3 inter-working with Rel-4 GPRS barring NP-17 NP‑020341 approved N2 N2-25 N2‑020754 agreed 2002‑06‑26 CAMEL3 -
0412 - B Rel-5 5.0.0 - CPH clarification on overall SDL architecture - - - N2 N2-25 N2‑020633 revised 2002‑06‑26 CAMEL4 -
0412 1 B Rel-5 5.0.0 5.1.0 CPH clarification on overall SDL architecture NP-17 NP‑020343 approved N2 N2-25 N2‑020768 agreed 2002‑06‑26 CAMEL4 -
0413 - F Rel-5 5.0.0 - Only one AC/Aper BCSM - - - N2 N2-25 N2‑020634 rejected 2002‑06‑26 CAMEL4 -
0414 - F Rel-5 5.0.0 5.1.0 Move Leg not allowed before Active phase of normal A-B call NP-17 NP‑020343 approved N2 N2-25 N2‑020655 agreed 2002‑07‑15 CAMEL4 -
0415 - F Rel-5 5.0.0 - Disconnect of penultimate leg in CSID1 - - - N2 N2-25 N2‑020657 revised 2002‑07‑15 CAMEL4 -
0415 1 F Rel-5 5.0.0 5.1.0 Disconnect of penultimate leg in CSID1 NP-17 NP‑020343 approved N2 N2-25 N2‑020770 agreed 2002‑07‑15 CAMEL4 -
0416 - C Rel-5 5.0.0 - Handling of partial implementations of CAMEL phase 4 - - - N2 N2-25 N2‑020659 revised 2002‑07‑15 CAMEL4 -
0416 1 C Rel-5 5.0.0 - Handling of partial implementations of CAMEL phase 4 - - - N2 N2-25 N2‑020734 revised 2002‑07‑15 CAMEL4 -
0416 2 C Rel-5 5.0.0 - Handling of partial implementations of CAMEL phase 4 - - - N2 N2-25 N2‑020775 revised 2002‑07‑15 CAMEL4 -
0416 3 C Rel-5 5.0.0 5.1.0 Handling of partial implementations of CAMEL phase 4 NP-17 NP‑020347 approved N2 N2-25 N2‑020659 revised 2002‑07‑15 CAMEL4 See linked CRs to 22.078 in SP-17.
0417 - C Rel-5 5.0.0 5.1.0 Removal of ChargingNotification feature NP-17 NP‑020345 approved N2 N2-25 N2‑020663 agreed 2002‑07‑15 CAMEL4 -
0418 - B Rel-5 5.0.0 - Playing of Warning Tones - - - N2 N2-25 N2‑020666 revised 2002‑07‑15 CAMEL4 -
0418 1 B Rel-5 5.0.0 - Playing of Warning Tones - - - N2 N2-25 N2‑020783 revised 2002‑07‑15 CAMEL4 -
0418 2 B Rel-5 5.0.0 - Playing of Warning Tones NP-17 NP‑020346 rejected N2 N2-25 N2‑020794 agreed 2002‑07‑15 CAMEL4 -
0419 - F Rel-5 5.0.0 - No use of Call Segment ID for the direct gsmSCF - gsmSRF case - - - N2 N2-25 N2‑020669 revised 2002‑07‑15 CAMEL4 -
0419 1 F Rel-5 5.0.0 5.1.0 No use of Call Segment ID for the direct gsmSCF - gsmSRF case NP-17 NP‑020343 approved N2 N2-25 N2‑020771 agreed 2002‑07‑15 CAMEL4 -
0420 - F Rel-5 5.0.0 - T_Change_Of_Position is not applicable for an MO call. - - - N2 N2-25 N2‑020670 revised 2002‑07‑15 CAMEL4 -
0420 1 D Rel-5 5.0.0 5.1.0 Clean-up of LocationInformation table for Call_Accepted DP NP-17 NP‑020345 approved N2 N2-25 N2‑020785 agreed 2002‑07‑15 CAMEL4 -
0421 - F Rel-5 5.0.0 5.1.0 Correction of clause 4.3.3 N-CSI NP-17 NP‑020342 approved N2 N2-25 N2‑020671 agreed 2002‑07‑15 CAMEL4 -
0422 - F Rel-5 5.0.0 5.1.0 Inconsistency for the negotiated Camel Capability handling of the D-CSI NP-17 NP‑020342 approved N2 N2-25 N2‑020675 agreed 2002‑07‑15 CAMEL4 -
0423 - F Rel-5 5.0.0 5.1.0 Change Initial Call Segment to CSID1 NP-17 NP‑020343 approved N2 N2-25 N2‑020681 agreed 2002‑07‑17 CAMEL4 -
0424 - F Rel-5 5.0.0 5.1.0 Removal of DP_MidCall state from CAMEL_EXPORT_LEG_MSC NP-17 NP‑020343 approved N2 N2-25 N2‑020683 agreed 2002‑07‑17 CAMEL4 -
0425 - F Rel-5 5.0.0 5.1.0 FtN in Perform Call Handling ack NP-17 NP‑020343 approved N2 N2-25 N2‑020684 agreed 2002‑07‑17 CAMEL4 -
0426 - F Rel-5 5.0.0 - CSA_gsmSSF: Handling signals in states such as DL_ack - - - N2 N2-25 N2‑020685 revised 2002‑07‑17 CAMEL4 -
0426 1 F Rel-5 5.0.0 - CSA_gsmSSF: Handling signals in states such as DL_ack NP-17 NP‑020344 revised N2 N2-25 N2‑020792 agreed 2002‑07‑17 CAMEL4 -
0426 1 F Rel-5 5.0.0 5.1.0 CSA_gsmSSF: Handling signals in states such as DL_ack NP-17 NP‑020476 approved N2 N2-25 N2‑020792 agreed 2002‑07‑17 CAMEL4 NP-020476 replaces NP-020344
0427 - C Rel-5 5.0.0 - Use of Release Call and Release Call Segment in gsmSSF processes - - - N2 N2-25 N2‑020686 postponed 2002‑07‑17 CAMEL4 -
0428 - F Rel-5 5.0.0 - Removal of Note that in descriptions of CPH operations NP-17 NP‑020344 revised N2 N2-25 N2‑020687 agreed 2002‑07‑17 CAMEL4 CR incorrectly allocated (wrong spec!)
0429 - F Rel-5 5.0.0 - Wrong State Name in CSA_gsmSSF NP-17 NP‑020344 revised N2 N2-25 N2‑020688 agreed 2002‑07‑17 CAMEL4 -
0429 - F Rel-5 5.0.0 5.1.0 Wrong State Name in CSA_gsmSSF NP-17 NP‑020476 approved N2 N2-25 N2‑020688 agreed 2002‑07‑17 CAMEL4 NP-020476 replaces NP-020344
0430 - F Rel-5 5.0.0 - Change Int_Continue_Without_Leg2 to Int_Disconnect_Leg (Leg2) NP-17 NP‑020344 revised N2 N2-25 N2‑020689 agreed 2002‑07‑17 CAMEL3 -
0430 - F Rel-5 5.0.0 5.1.0 Change Int_Continue_Without_Leg2 to Int_Disconnect_Leg (Leg2) NP-17 NP‑020476 approved N2 N2-25 N2‑020689 agreed 2002‑07‑17 CAMEL3 NP-020476 replaces NP-020344
0431 - C Rel-5 5.0.0 - Contents of CWA at MidCall DP NP-17 NP‑020344 revised N2 N2-25 N2‑020690 agreed 2002‑07‑17 CAMEL4 -
0431 - C Rel-5 5.0.0 5.1.0 Contents of CWA at MidCall DP NP-17 NP‑020476 approved N2 N2-25 N2‑020690 agreed 2002‑07‑17 CAMEL4 NP-020476 replaces NP-020344
0432 - D Rel-5 5.0.0 - Introduction of CPH Definitions - - - N2 N2-25 N2‑020691 revised 2002‑07‑17 CAMEL4 -
0432 1 D Rel-5 5.0.0 5.1.0 Introduction of CPH Definitions NP-17 NP‑020343 approved N2 N2-25 N2‑020779 agreed 2002‑07‑17 CAMEL4 -
0433 - F R99 3.13.0 - Correction in CAMEL_MO_Dialled_Services procedure - - - N2 N2-25 N2‑020697 revised 2002‑07‑18 CAMEL4 -
0433 1 F R99 3.13.0 3.14.0 Correction in CAMEL_MO_Dialled_Services procedure NP-17 NP‑020340 approved N2 N2-25 N2‑020751 agreed 2002‑07‑18 CAMEL3 -
0434 - A Rel-4 4.5.1 - Correction in CAMEL_MO_Dialled_Services procedure - - - N2 N2-25 N2‑020698 revised 2002‑07‑18 CAMEL3 -
0434 1 A Rel-4 4.5.1 4.6.0 Correction in CAMEL_MO_Dialled_Services procedure NP-17 NP‑020340 approved N2 N2-25 N2‑020752 agreed 2002‑07‑18 CAMEL3 -
0435 - A Rel-5 5.0.0 - Correction in CAMEL_MO_Dialled_Services procedure - - - N2 N2-25 N2‑020699 revised 2002‑07‑18 CAMEL3 -
0435 1 A Rel-5 5.0.0 5.1.0 Correction in CAMEL_MO_Dialled_Services procedure NP-17 NP‑020340 approved N2 N2-25 N2‑020753 agreed 2002‑07‑18 CAMEL3 -
0436 - F Rel-5 5.0.0 - Handling Password and WrongPasswordAttemptsCounter in ATSI result and ATMod - - - N2 N2-25 N2‑020700 withdrawn 2002‑07‑18 CAMEL4 -
0437 - C Rel-5 5.0.0 - Ordering D-CSI destination number triggering criterion - - - N2 N2-25 N2‑020701 revised 2002‑07‑18 CAMEL4 -
0437 1 C Rel-5 5.0.0 - Ordering D-CSI destination number triggering criterion - - - N2 N2-25 N2‑020761 postponed 2002‑07‑18 CAMEL4 -
0438 - F R99 3.13.0 - ERB when VT call is reported in DP T_Busy due to Call Deflection - - - N2 N2-25 N2‑020710 rejected 2002‑07‑23 CAMEL3 -
0439 - A Rel-4 4.5.0 - ERB when VT call is reported in DP T_Busy due to Call Deflection - - - N2 N2-25 N2‑020711 rejected 2002‑07‑23 CAMEL3 -
0440 - A Rel-5 5.0.0 - ERB when VT call is reported in DP T_Busy due to Call Deflection - - - N2 N2-25 N2‑020712 rejected 2002‑07‑23 CAMEL3 -
0441 - F R99 3.13.0 - Inconsistent description on ACR: time information - - - N2 N2-25 N2‑020716 revised 2002‑07‑23 CAMEL3 -
0441 1 F R99 3.13.0 3.14.0 Inconsistent description on ACR: time information NP-17 NP‑020340 approved N2 N2-25 N2‑020742 agreed 2002‑07‑23 CAMEL3 -
0442 - A Rel-4 4.5.0 - Inconsistent description on ACR: time information - - - N2 N2-25 N2‑020717 revised 2002‑07‑23 CAMEL3 -
0442 1 A Rel-4 4.5.1 4.6.0 Inconsistent description on ACR: time information NP-17 NP‑020340 approved N2 N2-25 N2‑020743 agreed 2002‑07‑23 CAMEL3 -
0443 - A Rel-5 5.0.0 - Inconsistent description on ACR: time information - - - N2 N2-25 N2‑020718 revised 2002‑07‑23 CAMEL3 -
0443 1 A Rel-5 5.0.0 5.1.0 Inconsistent description on ACR: time information NP-17 NP‑020340 approved N2 N2-25 N2‑020744 agreed 2002‑07‑23 CAMEL3 -
0444 - F R99 3.13.0 - Secondary PDP context for DP change of position context - - - N2 N2-25 N2‑020719 rejected 2002‑07‑23 CAMEL3 -
0445 - A Rel-4 4.5.1 - Secondary PDP context for DP change of position context - - - N2 N2-25 N2‑020720 rejected 2002‑07‑23 CAMEL3 -
0446 - A Rel-5 5.0.0 - Secondary PDP context for DP change of position context - - - N2 N2-25 N2‑020721 revised 2002‑07‑23 CAMEL3 -
0446 1 F Rel-5 5.0.0 5.1.0 Secondary PDP context for DP change of position context NP-17 NP‑020342 approved N2 N2-25 N2‑020747 agreed 2002‑07‑23 CAMEL3 -
0447 - F Rel-5 5.0.0 - Detail description for applicability of call cases - - - N2 N2-25 N2‑020757 revised 2002‑07‑23 CAMEL4 -
0447 1 F Rel-5 5.0.0 - Detail description for applicability of call cases - - - N2 N2-25 N2‑020722 revised 2002‑07‑23 CAMEL4 -
0447 2 F Rel-5 5.0.0 5.1.0 Detail description for applicability of call cases NP-17 NP‑020342 approved N2 N2-25 N2‑020793 agreed 2002‑07‑23 CAMEL4 -
0448 - F Rel-5 5.0.0 - Location information for VT-call - - - N2 N2-25 N2‑020723 postponed 2002‑07‑23 CAMEL4 -
0449 - F Rel-5 5.0.0 - Correction of handling of MT-SMS in the SGSN - - - N2 N2-25 N2‑020724 revised 2002‑07‑23 CAMEL4 -
0449 1 F Rel-5 5.0.0 - Correction of handling of MT-SMS in the SGSN - - - N2 N2-25 N2‑020795 postponed 2002‑07‑23 CAMEL4 -
0450 - A Rel-5 5.0.0 5.1.0 CAMEL3 inter-working with Rel-4 GPRS barring NP-17 NP‑020341 approved N2 N2-25 N2‑020755 agreed 2002‑07‑30 CAMEL3 -
0451 - C Rel-5 5.0.0 - Handling of partial implementations of CAMEL phase 4 - - - N2 N2-25 N2‑020763 withdrawn 2002‑07‑31 CAMEL4 -

page generated from database: 2024-11-12 10:16:04