3GPP Specification Change Requests
Go to spec numbering scheme page
3GPP Specification Change Request records for: 03.60
CR no. | rev | cat | Release | CR written to vers | new vers | CR title | TSG meeting | TSG doc | TSG status | source | WG meeting | WG doc | WG status | cover date | work item | remarks | database record created |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
0215 | - | F | R97 | 6.10.1 | 6.11.0 | No MT calls after resumption of GPRS when using NMO=1 | SP-17 | SP‑020604 | approved | S2 | S2-26 | S2‑022332 | agreed | 2002‑09‑08 | TEI | replaces SP-020528 | ‑ |
0216 | - | A | R98 | 7.8.1 | 7.9.0 | No MT calls after resumption of GPRS when using NMO=1 | SP-17 | SP‑020604 | approved | S2 | S2-26 | S2‑022419 | agreed | 2002‑09‑08 | TEI | replaces SP-020528 | ‑ |
A001 | - | C | R97 | 5.0.0 | 5.1.0 | Clarifications to 03.60 | smg-23 | 97‑643 | approved | SMG3 | SMG3-23 | 97P332 | agreed | 1997‑10‑12 | GPRS | - | ‑ |
A003 | - | C | R97 | 5.0.0 | 5.1.0 | Reliable MM signalling over the radio interface | smg-23 | 97‑643 | approved | SMG3 | SMG3-23 | 97P336 | agreed | 1997‑10‑12 | GPRS | - | ‑ |
A004 | 1 | C | R97 | 5.0.0 | 5.1.0 | Selection of the external network reference point by the user | smg-23 | 97‑643 | approved | SMG3 | SMG3-23 | 97P330 | agreed | 1997‑10‑12 | GPRS | - | ‑ |
A005 | 1 | C | R97 | 5.0.0 | 5.1.0 | Allocation of NSAPI in the PDP Context Activation procedure | smg-23 | 97‑643 | approved | SMG3 | SMG3-23 | 97P331 | agreed | 1997‑10‑12 | GPRS | - | ‑ |
A010 | - | D | R97 | 5.0.0 | 5.1.0 | Clarification on the update of the SGSN-VLR association | smg-23 | 97‑643 | approved | SMG3 | SMG3-23 | 97P392 | agreed | 1997‑10‑12 | GPRS | - | ‑ |
A012 | 1 | C | R97 | 5.1.0 | 5.2.0 | SMS delivery path | smg-24 | 97‑937 | approved | SMG3 SA | 24 | 97P462 | agreed | 1997‑12‑12 | GPRS | - | ‑ |
A014 | 5 | C | R97 | 5.1.0 | 5.2.0 | Editorial changes and clarifications on GSM 03.60 | smg-24 | 97‑937 | approved | SMG3 SA | 24 | 97P462 | agreed | 1997‑12‑12 | GPRS | - | ‑ |
A023 | 3 | F | R97 | 5.1.0 | 5.2.0 | GSN number and address | smg-24 | 97‑937 | approved | SMG3 SA | 24 | 97P462 | agreed | 1997‑12‑12 | GPRS | - | ‑ |
A025 | 2 | C | R97 | 5.1.0 | 5.2.0 | More robust network-requested PDP context activation procedure | smg-24 | 97‑937 | approved | SMG3 SA | 24 | 97P501 | agreed | 1997‑12‑12 | GPRS | - | ‑ |
A028 | 5 | C | R97 | 5.1.0 | 5.2.0 | Handling of CS paging requests by the SGSN after a failure | smg-24 | 97‑937 | approved | SMG3 SA | 24 | 97P462 | agreed | 1997‑12‑12 | GPRS | - | ‑ |
A030 | 5 | C | R97 | 5.1.0 | 5.2.0 | QoS definitions | smg-24 | 97‑937 | approved | SMG3 SA | 24 | 97P477 | agreed | 1997‑12‑12 | GPRS | - | ‑ |
A042 | 2 | C | R97 | 5.2.0 | 6.0.0 | Applicability of DRX during MM signalling procedures | smg-25 | 98-0124 | approved | SMG3 SA | 25 | 98P010 | agreed | 1998‑03‑03 | GPRS | - | ‑ |
A046 | 6 | F | R97 | 6.0.0 | 6.1.0 | Subscription withdrawn | smg-26 | 98‑0339 | approved | SMG12 | - | 98S287 | agreed | 1998‑06‑16 | GPRS | - | ‑ |
A047 | 4 | F | R97 | 6.0.0 | 6.1.0 | Triggering of the location updating | smg-26 | 98‑0339 | approved | SMG12 | - | 98S258 | agreed | 1998‑06‑16 | GPRS | - | ‑ |
A048 | 4 | F | R97 | 6.0.0 | 6.1.0 | Usage of the reliability class | smg-26 | 98‑0339 | approved | SMG12 | - | 98S299 | agreed | 1998‑06‑16 | GPRS | - | ‑ |
A051 | 4 | F | R97 | 6.0.0 | 6.1.0 | Suspend and Resume | smg-26 | 98‑0339 | approved | SMG12 | - | 98S231 | agreed | 1998‑06‑16 | GPRS | - | ‑ |
A053 | 1 | F | R97 | 6.0.0 | 6.1.0 | Attach and RA update alignment | smg-26 | 98‑0339 | approved | SMG12 | - | 98S163 | agreed | 1998‑06‑16 | GPRS | - | ‑ |
A054 | 3 | F | R97 | 6.0.0 | 6.1.0 | Align 03.60 and 09.60 with regard to QoS negotiation on the backbone | smg-26 | 98‑0339 | approved | SMG12 | - | 98S246 | agreed | 1998‑06‑16 | GPRS | - | ‑ |
A055 | 2 | F | R97 | 6.0.0 | 6.1.0 | Data forwarding in inter-SGSN | smg-26 | 98‑0339 | approved | SMG12 | - | 98S161 | agreed | 1998‑06‑16 | GPRS | - | ‑ |
A065 | 1 | F | R97 | 6.1.0 | 6.2.0 | Deletion of the Standby timer function | smg-27 | 98-0753 | approved | SMG12 | - | 98S618 | - | 1998‑07‑31 | GPRS | - | ‑ |
A073 | - | F | R97 | 6.1.0 | 6.2.0 | PDP Context Modification for one NSAPI only | smg-27 | 98-0753 | approved | SMG12 | - | 98S446 | - | 1998‑07‑16 | GPRS | - | ‑ |
A074 | - | F | R97 | 6.1.0 | 6.2.0 | PDP context deactivation after GGSN failure | smg-27 | 98-0753 | approved | SMG12 | - | 98S447 | - | 1998‑07‑16 | GPRS | - | ‑ |
A075 | - | F | R97 | 6.1.0 | 6.2.0 | Generation and distribution of Charging Id | smg-27 | 98-0752 | approved | SMG12 | - | 98S448 | - | 1998‑07‑16 | GPRS | - | ‑ |
A077 | 1 | F | R97 | 6.1.0 | 6.2.0 | Handling of GPRS Classmark | smg-27 | 98-0753 | approved | SMG12 | - | 98S548 | - | 1998‑07‑29 | GPRS | - | ‑ |
A082 | 1 | F | R97 | 6.1.0 | 6.2.0 | Various improvements | smg-27 | 98-0753 | approved | SMG12 | - | 98SXXX | - | 1998‑08‑16 | GPRS | - | ‑ |
A087 | 2 | B | R98 | 6.2.0 | 7.0.0 | Introduction of the PDP-type PPP | smg-28 | P‑99‑152 | approved | SMG3 | - | ‑ | agreed | 1999‑02‑08 | GPRS | - | ‑ |
A090 | - | F | R97 | 6.1.0 | 6.2.0 | A interface suspend and resume | smg-27 | 98-0753 | approved | SMG12 | - | 98S821 | - | 1998‑10‑07 | GPRS | - | ‑ |
A091 | 1 | B | R98 | 6.2.0 | 7.0.0 | ANSI references | smg-28 | P‑99‑154 | approved | SMG3 | - | 3A99‑149 | agreed | 1999‑01‑28 | Harm | - | ‑ |
A096 | 2 | F | R97 | 6.2.0 | 6.3.0 | Correction to APN selection tree | smg-28 | P‑99‑153 | approved | SMG3 | - | 3A99‑204 | agreed | 1999‑01‑28 | GPRS | - | ‑ |
A097 | - | F | R97 | 6.2.0 | 6.3.0 | Force to Standby procedure | smg-28 | P‑99‑153 | approved | SMG3 | - | 98ag547 | agreed | 1999‑01‑25 | GPRS | - | ‑ |
A100 | - | F | R97 | 6.2.0 | 6.3.0 | Roaming restriction corrections and alignments with 03.15 and 09.02 | smg-28 | P‑99‑153 | approved | SMG3 | - | 3A99‑097 | agreed | 1999‑01‑25 | GPRS | - | ‑ |
A112 | 2 | F | R97 | 6.3.1 | 6.4.0 | correction of the handling of cksn in the attach procedure | smg-29 | P‑99‑456 | approved | SMG3 | - | N1‑99268 | - | 1999‑06‑24 | GPRS | - | ‑ |
A114 | - | F | R97 | 6.3.1 | 6.4.0 | Selection Mode consistency between 09.60 and 03.60 | smg-29 | P‑99‑456 | approved | SMG3 | - | N1‑99181 | - | 1999‑06‑24 | GPRS | - | ‑ |
A116 | 2 | B | R99 | 6.3.1 | - | Tunnelling of Non-GSM Messages | smg-29 | P‑99‑510 | withdrawn | SMG3 | - | N1‑99592 | - | 1999‑06‑24 | EDGE | - | ‑ |
A117 | - | F | R97 | 6.3.1 | 6.4.0 | SGSN Failure | smg-29 | P‑99‑456 | approved | SMG3 | - | N1‑99466 | - | 1999‑06‑24 | GPRS | - | ‑ |
A118 | 1 | F | R97 | 6.3.1 | 6.4.0 | Information storage | smg-29 | P‑99‑456 | approved | SMG3 | - | N1‑99442 | - | 1999‑06‑24 | GPRS | - | ‑ |
A120 | 2 | F | R97 | 6.3.1 | 6.4.0 | Circuit Switched and Packet Switched priority handling | smg-29 | P‑99‑456 | approved | SMG3 | - | N1‑99572 | - | 1999‑06‑24 | GPRS | - | ‑ |
A130 | - | F | R97 | 6.3.1 | 6.4.0 | MSISDN in GGSN | smg-29 | P‑99‑456 | approved | SMG3 | - | N1‑99596 | - | 1999‑06‑24 | GPRS | - | ‑ |
A132 | - | F | R97 | 6.3.1 | 6.4.0 | Mean throughput classes | smg-29 | P‑99‑456 | approved | SMG3 | - | N1‑99598 | - | 1999‑06‑24 | GPRS | - | ‑ |
A152 | - | F | R98 | 7.0.0 | 7.1.0 | Selection Mode consistency between 09.60 and 03.60 | smg-29 | P‑99‑553 | approved | SMG3 | - | N1‑99181 | - | 1999‑08‑19 | GPRS | Virtual CR: R98 CR is same as R97 CR in A114 | ‑ |
A155 | 1 | F | R98 | 7.0.0 | 7.1.0 | Clarification of the null routeing area | smg-29 | P‑99‑553 | approved | SMG3 | - | N1‑99443 | - | 1999‑08‑19 | GPRS | Virtual CR: R98 CR is same as R97 CR in A119 | ‑ |
A156 | 2 | F | R98 | 7.0.0 | 7.1.0 | Circuit Switched and Packet Switched priority handling | smg-29 | P‑99‑553 | approved | SMG3 | - | N1‑99572 | - | 1999‑08‑19 | GPRS | Virtual CR: R98 CR is same as R97 CR in A120 | ‑ |
A157 | - | F | R98 | 7.0.0 | 7.1.0 | MSISDN in GGSN | smg-29 | P‑99‑553 | approved | SMG3 | - | N1‑99596 | - | 1999‑08‑19 | GPRS | Virtual CR: R98 CR is same as R97 CR in A130 | ‑ |
A161 | 1 | B | R97 | 6.4.0 | 6.5.0 | PDP Context Deactivation during activation | NP-05 | NP-99268 | approved | SA2 | - | C‑99‑545 | agreed | 1999‑08‑05 | GPRS | - | ‑ |
A163 | 1 | B | R98 | 7.1.0 | 7.2.0 | PDP Context deactivation during an activation | NP-05 | NP-99268 | approved | SA2 | - | C‑99‑546 | agreed | 1999‑08‑05 | GPRS | - | ‑ |
A165 | - | F | R97 | 6.4.0 | 6.5.0 | Modification info is not piggybacked | NP-05 | NP-99268 | approved | N1 | - | N1‑99784 | agreed | 1999‑08‑13 | GPRS | - | ‑ |
A166 | 1 | F | R97 | 6.4.0 | 6.5.0 | APN and GGSN selection SDL diagrams (modified from N1-99785) | NP-05 | NP-99268 | approved | N1 | - | N1‑99806 | agreed | 1999‑08‑13 | GPRS | - | ‑ |
A167 | - | F | R98 | 7.1.0 | 7.2.0 | APN and GGSN selection SDL diagrams | NP-05 | NP-99268 | approved | N1 | - | N1‑99847 | agreed | 1999‑09‑22 | GPRS | - | ‑ |
A168 | 2 | F | R98 | 7.1.0 | 7.2.0 | Ga interface to the GPRS Logical Architecture diagram etc | NP-05 | NP-99268 | approved | N1 | - | N1‑99869 | agreed | 1999‑09‑22 | GPRS | - | ‑ |
A169 | - | F | R98 | 7.1.0 | 7.2.0 | Modif information is not piggybacked | NP-05 | NP-99268 | approved | N1 | - | N1‑99856 | agreed | 1999‑08‑19 | GPRS | - | ‑ |
A170 | 2 | F | R97 | 6.4.0 | 6.5.0 | Clarification on multiplexing of several NSAPIS onto one LLC SAP | NP-05 | NP-99268 | approved | N1 | - | N1‑99A99 | agreed | 1999‑09‑21 | GPRS | - | ‑ |
A171 | 2 | F | R98 | 7.1.0 | 7.2.0 | Clarification on multiplexing of several NSAPIS onto one LLC SAPI | NP-05 | NP-99268 | approved | N1 | - | N1‑99B00 | agreed | 1999‑09‑21 | GPRS | - | ‑ |
A172 | 1 | F | R97 | 6.5.0 | 6.6.0 | Removal of BB Protocol | SP-06 | SP-99547 | approved | S2 | S2-09 | S2‑99B91 | agreed | 1999‑12‑16 | - | - | ‑ |
A173 | - | F | R98 | 7.2.0 | 7.3.0 | Removal of BB Protocol | SP-06 | SP-99547 | approved | S2 | S2-09 | S2‑99B92 | agreed | 1999‑12‑16 | - | - | ‑ |
A174 | - | F | R97 | 6.5.0 | 6.6.0 | PTM, PDP, and SS cleanup | SP-06 | SP-99547 | approved | S2 | S2-09 | S2‑99B86 | agreed | 1999‑12‑16 | - | - | ‑ |
A175 | - | F | R98 | 7.2.0 | 7.3.0 | PTM, PDP, and SS cleanup | SP-06 | SP-99547 | approved | S2 | S2-09 | S2‑99B87 | agreed | 1999‑12‑16 | - | - | ‑ |
A176 | - | F | R97 | 6.5.0 | 6.6.0 | No (P-)TMSI in Complete messages | SP-06 | SP-99547 | approved | S2 | S2-09 | S2‑99B93 | agreed | 1999‑12‑16 | - | - | ‑ |
A177 | - | F | R98 | 7.2.0 | 7.3.0 | No (P-)TMSI in Complete messages | SP-06 | SP-99547 | approved | S2 | S2-09 | S2‑99B94 | agreed | 1999‑12‑16 | - | - | ‑ |
A178 | - | F | R97 | 6.5.0 | 6.6.0 | GPRS Mobile Stations classes | SP-06 | SP-99547 | approved | S2 | S2-10 | S2‑99D73 | agreed | 1999‑12‑16 | - | - | ‑ |
A179 | - | F | R98 | 7.2.0 | 7.3.0 | GPRS Mobile Stations classes | SP-06 | SP-99547 | approved | S2 | S2-10 | S2‑99D74 | agreed | 1999‑12‑16 | - | - | ‑ |
A180 | - | F | R97 | 6.5.0 | 6.6.0 | CS paging response | SP-06 | SP-99547 | approved | S2 | S2-10 | S2‑99E52 | agreed | 1999‑12‑16 | - | - | ‑ |
A181 | - | F | R98 | 7.2.0 | 7.3.0 | Cs paging response | SP-06 | SP-99547 | approved | S2 | S2-10 | S2‑99E53 | agreed | 1999‑12‑16 | - | - | ‑ |
A182 | - | F | R98 | 7.2.0 | 7.3.0 | Compatible between R97 and 98 | SP-06 | SP-99547 | approved | S2 | S2-10 | S2‑99E57 | agreed | 1999‑12‑16 | - | - | ‑ |
A183 | - | F | R98 | 7.3.0 | 7.4.0 | Removal of the description of the cell reselection algorithm | SP-07 | SP-000086 | approved | S2 | S2_11/12 | S2‑000046 | agreed | 2000‑03‑17 | - | - | ‑ |
A184 | - | F | R97 | 6.6.0 | 6.7.0 | Removal of the description of the cell reselection algorithm | SP-07 | SP-000086 | approved | S2 | S2_11/12 | S2‑000045 | agreed | 2000‑03‑17 | - | - | ‑ |
A185 | - | F | R98 | 7.3.0 | 7.4.0 | Extension of Maximum N-PDU size in case of PDP type = PPP | SP-07 | SP-000086 | approved | S2 | S2_11/12 | S2‑000280 | agreed | 2000‑03‑17 | - | - | ‑ |
A199 | - | F | R97 | 6.7.1 | 6.8.0 | Failure of Update GPRS Location when HLR is not reachable | SP-11 | SP‑010116 | approved | S2 | S2-17 | S2‑010706 | agreed | 2001‑03‑19 | - | - | ‑ |
A200 | - | A | R98 | 7.5.0 | 7.6.0 | Failure of Update GPRS Location when HLR is not reachable | SP-11 | SP‑010116 | approved | S2 | S2-17 | S2‑010707 | agreed | 2001‑03‑19 | - | - | ‑ |
A205 | 1 | F | R97 | 6.8.0 | 6.9.0 | Using RAU procedure for MS RAC IE update | SP-12 | SP‑010330 | approved | S2 | S2-18 | S2‑011471 | agreed | 2001‑06‑19 | GPRS | - | ‑ |
A206 | 1 | A | R98 | 7.6.0 | 7.7.0 | Using RAU procedure for MS RAC IE update | SP-12 | SP‑010330 | approved | S2 | S2-18 | S2‑011472 | agreed | 2001‑06‑19 | GPRS | - | ‑ |
A207 | 1 | F | R97 | - | - | Losing PDP context during inter RA update procedure | - | - | - | S2 | S2-20 | S2‑012799 | withdrawn | 2001‑12‑16 | - | - | ‑ |
A208 | 1 | A | R98 | - | - | Losing PDP context during inter RA update procedure | - | - | - | S2 | S2-20 | S2‑012800 | withdrawn | 2001‑12‑16 | - | - | ‑ |
A211 | - | F | R97 | - | - | Losing PDP context during Inter SGSN RA Update | - | - | - | S2 | S2-20 | S2‑012876 | revised | 2001‑12‑16 | GPRS | - | ‑ |
A211 | 1 | F | R97 | 6.9.0 | 6.10.0 | Losing PDP context during Inter SGSN RA Update | SP-14 | SP‑010706 | approved | S2 | S2-20 | S2‑012941 | agreed | 2001‑12‑16 | GPRS | - | ‑ |
A212 | - | A | R98 | - | - | Losing PDP context during Inter SGSN RA Update | - | - | - | S2 | S2-20 | S2‑012877 | revised | 2001‑12‑16 | GPRS | - | ‑ |
A212 | 1 | A | R98 | 7.7.0 | 7.8.0 | Losing PDP context during Inter SGSN RA Update | SP-14 | SP‑010706 | approved | S2 | S2-20 | S2‑012942 | agreed | 2001‑12‑16 | GPRS | - | ‑ |
A213 | - | D | R97 | - | - | Editorial Changes | - | - | - | S2 | S2-21 | S2‑013386 | postponed | 2001‑12‑16 | TEI | - | ‑ |
A214 | - | A | R98 | - | - | Editorial Changes | - | - | - | S2 | S2-21 | S2‑013387 | postponed | 2001‑12‑16 | TEI | - | ‑ |
page generated from database: 2024-11-12 10:16:04