Generations of Mobile Standards

3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 03.60

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0215 - F R97 6.10.1 6.11.0 No MT calls after resumption of GPRS when using NMO=1 SP-17 SP‑020604 approved S2 S2-26 S2‑022332 agreed 2002‑09‑08 TEI replaces SP-020528
0216 - A R98 7.8.1 7.9.0 No MT calls after resumption of GPRS when using NMO=1 SP-17 SP‑020604 approved S2 S2-26 S2‑022419 agreed 2002‑09‑08 TEI replaces SP-020528
A001 - C R97 5.0.0 5.1.0 Clarifications to 03.60 smg-23 97‑643 approved SMG3 SMG3-23 97P332 agreed 1997‑10‑12 GPRS -
A003 - C R97 5.0.0 5.1.0 Reliable MM signalling over the radio interface smg-23 97‑643 approved SMG3 SMG3-23 97P336 agreed 1997‑10‑12 GPRS -
A004 1 C R97 5.0.0 5.1.0 Selection of the external network reference point by the user smg-23 97‑643 approved SMG3 SMG3-23 97P330 agreed 1997‑10‑12 GPRS -
A005 1 C R97 5.0.0 5.1.0 Allocation of NSAPI in the PDP Context Activation procedure smg-23 97‑643 approved SMG3 SMG3-23 97P331 agreed 1997‑10‑12 GPRS -
A010 - D R97 5.0.0 5.1.0 Clarification on the update of the SGSN-VLR association smg-23 97‑643 approved SMG3 SMG3-23 97P392 agreed 1997‑10‑12 GPRS -
A012 1 C R97 5.1.0 5.2.0 SMS delivery path smg-24 97‑937 approved SMG3 SA 24 97P462 agreed 1997‑12‑12 GPRS -
A014 5 C R97 5.1.0 5.2.0 Editorial changes and clarifications on GSM 03.60 smg-24 97‑937 approved SMG3 SA 24 97P462 agreed 1997‑12‑12 GPRS -
A023 3 F R97 5.1.0 5.2.0 GSN number and address smg-24 97‑937 approved SMG3 SA 24 97P462 agreed 1997‑12‑12 GPRS -
A025 2 C R97 5.1.0 5.2.0 More robust network-requested PDP context activation procedure smg-24 97‑937 approved SMG3 SA 24 97P501 agreed 1997‑12‑12 GPRS -
A028 5 C R97 5.1.0 5.2.0 Handling of CS paging requests by the SGSN after a failure smg-24 97‑937 approved SMG3 SA 24 97P462 agreed 1997‑12‑12 GPRS -
A030 5 C R97 5.1.0 5.2.0 QoS definitions smg-24 97‑937 approved SMG3 SA 24 97P477 agreed 1997‑12‑12 GPRS -
A042 2 C R97 5.2.0 6.0.0 Applicability of DRX during MM signalling procedures smg-25 98-0124 approved SMG3 SA 25 98P010 agreed 1998‑03‑03 GPRS -
A046 6 F R97 6.0.0 6.1.0 Subscription withdrawn smg-26 98‑0339 approved SMG12 - 98S287 agreed 1998‑06‑16 GPRS -
A047 4 F R97 6.0.0 6.1.0 Triggering of the location updating smg-26 98‑0339 approved SMG12 - 98S258 agreed 1998‑06‑16 GPRS -
A048 4 F R97 6.0.0 6.1.0 Usage of the reliability class smg-26 98‑0339 approved SMG12 - 98S299 agreed 1998‑06‑16 GPRS -
A051 4 F R97 6.0.0 6.1.0 Suspend and Resume smg-26 98‑0339 approved SMG12 - 98S231 agreed 1998‑06‑16 GPRS -
A053 1 F R97 6.0.0 6.1.0 Attach and RA update alignment smg-26 98‑0339 approved SMG12 - 98S163 agreed 1998‑06‑16 GPRS -
A054 3 F R97 6.0.0 6.1.0 Align 03.60 and 09.60 with regard to QoS negotiation on the backbone smg-26 98‑0339 approved SMG12 - 98S246 agreed 1998‑06‑16 GPRS -
A055 2 F R97 6.0.0 6.1.0 Data forwarding in inter-SGSN smg-26 98‑0339 approved SMG12 - 98S161 agreed 1998‑06‑16 GPRS -
A065 1 F R97 6.1.0 6.2.0 Deletion of the Standby timer function smg-27 98-0753 approved SMG12 - 98S618 - 1998‑07‑31 GPRS -
A073 - F R97 6.1.0 6.2.0 PDP Context Modification for one NSAPI only smg-27 98-0753 approved SMG12 - 98S446 - 1998‑07‑16 GPRS -
A074 - F R97 6.1.0 6.2.0 PDP context deactivation after GGSN failure smg-27 98-0753 approved SMG12 - 98S447 - 1998‑07‑16 GPRS -
A075 - F R97 6.1.0 6.2.0 Generation and distribution of Charging Id smg-27 98-0752 approved SMG12 - 98S448 - 1998‑07‑16 GPRS -
A077 1 F R97 6.1.0 6.2.0 Handling of GPRS Classmark smg-27 98-0753 approved SMG12 - 98S548 - 1998‑07‑29 GPRS -
A082 1 F R97 6.1.0 6.2.0 Various improvements smg-27 98-0753 approved SMG12 - 98SXXX - 1998‑08‑16 GPRS -
A087 2 B R98 6.2.0 7.0.0 Introduction of the PDP-type PPP smg-28 P‑99‑152 approved SMG3 - agreed 1999‑02‑08 GPRS -
A090 - F R97 6.1.0 6.2.0 A interface suspend and resume smg-27 98-0753 approved SMG12 - 98S821 - 1998‑10‑07 GPRS -
A091 1 B R98 6.2.0 7.0.0 ANSI references smg-28 P‑99‑154 approved SMG3 - 3A99‑149 agreed 1999‑01‑28 Harm -
A096 2 F R97 6.2.0 6.3.0 Correction to APN selection tree smg-28 P‑99‑153 approved SMG3 - 3A99‑204 agreed 1999‑01‑28 GPRS -
A097 - F R97 6.2.0 6.3.0 Force to Standby procedure smg-28 P‑99‑153 approved SMG3 - 98ag547 agreed 1999‑01‑25 GPRS -
A100 - F R97 6.2.0 6.3.0 Roaming restriction corrections and alignments with 03.15 and 09.02 smg-28 P‑99‑153 approved SMG3 - 3A99‑097 agreed 1999‑01‑25 GPRS -
A112 2 F R97 6.3.1 6.4.0 correction of the handling of cksn in the attach procedure smg-29 P‑99‑456 approved SMG3 - N1‑99268 - 1999‑06‑24 GPRS -
A114 - F R97 6.3.1 6.4.0 Selection Mode consistency between 09.60 and 03.60 smg-29 P‑99‑456 approved SMG3 - N1‑99181 - 1999‑06‑24 GPRS -
A116 2 B R99 6.3.1 - Tunnelling of Non-GSM Messages smg-29 P‑99‑510 withdrawn SMG3 - N1‑99592 - 1999‑06‑24 EDGE -
A117 - F R97 6.3.1 6.4.0 SGSN Failure smg-29 P‑99‑456 approved SMG3 - N1‑99466 - 1999‑06‑24 GPRS -
A118 1 F R97 6.3.1 6.4.0 Information storage smg-29 P‑99‑456 approved SMG3 - N1‑99442 - 1999‑06‑24 GPRS -
A120 2 F R97 6.3.1 6.4.0 Circuit Switched and Packet Switched priority handling smg-29 P‑99‑456 approved SMG3 - N1‑99572 - 1999‑06‑24 GPRS -
A130 - F R97 6.3.1 6.4.0 MSISDN in GGSN smg-29 P‑99‑456 approved SMG3 - N1‑99596 - 1999‑06‑24 GPRS -
A132 - F R97 6.3.1 6.4.0 Mean throughput classes smg-29 P‑99‑456 approved SMG3 - N1‑99598 - 1999‑06‑24 GPRS -
A152 - F R98 7.0.0 7.1.0 Selection Mode consistency between 09.60 and 03.60 smg-29 P‑99‑553 approved SMG3 - N1‑99181 - 1999‑08‑19 GPRS Virtual CR: R98 CR is same as R97 CR in A114
A155 1 F R98 7.0.0 7.1.0 Clarification of the null routeing area smg-29 P‑99‑553 approved SMG3 - N1‑99443 - 1999‑08‑19 GPRS Virtual CR: R98 CR is same as R97 CR in A119
A156 2 F R98 7.0.0 7.1.0 Circuit Switched and Packet Switched priority handling smg-29 P‑99‑553 approved SMG3 - N1‑99572 - 1999‑08‑19 GPRS Virtual CR: R98 CR is same as R97 CR in A120
A157 - F R98 7.0.0 7.1.0 MSISDN in GGSN smg-29 P‑99‑553 approved SMG3 - N1‑99596 - 1999‑08‑19 GPRS Virtual CR: R98 CR is same as R97 CR in A130
A161 1 B R97 6.4.0 6.5.0 PDP Context Deactivation during activation NP-05 NP-99268 approved SA2 - C‑99‑545 agreed 1999‑08‑05 GPRS -
A163 1 B R98 7.1.0 7.2.0 PDP Context deactivation during an activation NP-05 NP-99268 approved SA2 - C‑99‑546 agreed 1999‑08‑05 GPRS -
A165 - F R97 6.4.0 6.5.0 Modification info is not piggybacked NP-05 NP-99268 approved N1 - N1‑99784 agreed 1999‑08‑13 GPRS -
A166 1 F R97 6.4.0 6.5.0 APN and GGSN selection SDL diagrams (modified from N1-99785) NP-05 NP-99268 approved N1 - N1‑99806 agreed 1999‑08‑13 GPRS -
A167 - F R98 7.1.0 7.2.0 APN and GGSN selection SDL diagrams NP-05 NP-99268 approved N1 - N1‑99847 agreed 1999‑09‑22 GPRS -
A168 2 F R98 7.1.0 7.2.0 Ga interface to the GPRS Logical Architecture diagram etc NP-05 NP-99268 approved N1 - N1‑99869 agreed 1999‑09‑22 GPRS -
A169 - F R98 7.1.0 7.2.0 Modif information is not piggybacked NP-05 NP-99268 approved N1 - N1‑99856 agreed 1999‑08‑19 GPRS -
A170 2 F R97 6.4.0 6.5.0 Clarification on multiplexing of several NSAPIS onto one LLC SAP NP-05 NP-99268 approved N1 - N1‑99A99 agreed 1999‑09‑21 GPRS -
A171 2 F R98 7.1.0 7.2.0 Clarification on multiplexing of several NSAPIS onto one LLC SAPI NP-05 NP-99268 approved N1 - N1‑99B00 agreed 1999‑09‑21 GPRS -
A172 1 F R97 6.5.0 6.6.0 Removal of BB Protocol SP-06 SP-99547 approved S2 S2-09 S2‑99B91 agreed 1999‑12‑16 - -
A173 - F R98 7.2.0 7.3.0 Removal of BB Protocol SP-06 SP-99547 approved S2 S2-09 S2‑99B92 agreed 1999‑12‑16 - -
A174 - F R97 6.5.0 6.6.0 PTM, PDP, and SS cleanup SP-06 SP-99547 approved S2 S2-09 S2‑99B86 agreed 1999‑12‑16 - -
A175 - F R98 7.2.0 7.3.0 PTM, PDP, and SS cleanup SP-06 SP-99547 approved S2 S2-09 S2‑99B87 agreed 1999‑12‑16 - -
A176 - F R97 6.5.0 6.6.0 No (P-)TMSI in Complete messages SP-06 SP-99547 approved S2 S2-09 S2‑99B93 agreed 1999‑12‑16 - -
A177 - F R98 7.2.0 7.3.0 No (P-)TMSI in Complete messages SP-06 SP-99547 approved S2 S2-09 S2‑99B94 agreed 1999‑12‑16 - -
A178 - F R97 6.5.0 6.6.0 GPRS Mobile Stations classes SP-06 SP-99547 approved S2 S2-10 S2‑99D73 agreed 1999‑12‑16 - -
A179 - F R98 7.2.0 7.3.0 GPRS Mobile Stations classes SP-06 SP-99547 approved S2 S2-10 S2‑99D74 agreed 1999‑12‑16 - -
A180 - F R97 6.5.0 6.6.0 CS paging response SP-06 SP-99547 approved S2 S2-10 S2‑99E52 agreed 1999‑12‑16 - -
A181 - F R98 7.2.0 7.3.0 Cs paging response SP-06 SP-99547 approved S2 S2-10 S2‑99E53 agreed 1999‑12‑16 - -
A182 - F R98 7.2.0 7.3.0 Compatible between R97 and 98 SP-06 SP-99547 approved S2 S2-10 S2‑99E57 agreed 1999‑12‑16 - -
A183 - F R98 7.3.0 7.4.0 Removal of the description of the cell reselection algorithm SP-07 SP-000086 approved S2 S2_11/12 S2‑000046 agreed 2000‑03‑17 - -
A184 - F R97 6.6.0 6.7.0 Removal of the description of the cell reselection algorithm SP-07 SP-000086 approved S2 S2_11/12 S2‑000045 agreed 2000‑03‑17 - -
A185 - F R98 7.3.0 7.4.0 Extension of Maximum N-PDU size in case of PDP type = PPP SP-07 SP-000086 approved S2 S2_11/12 S2‑000280 agreed 2000‑03‑17 - -
A199 - F R97 6.7.1 6.8.0 Failure of Update GPRS Location when HLR is not reachable SP-11 SP‑010116 approved S2 S2-17 S2‑010706 agreed 2001‑03‑19 - -
A200 - A R98 7.5.0 7.6.0 Failure of Update GPRS Location when HLR is not reachable SP-11 SP‑010116 approved S2 S2-17 S2‑010707 agreed 2001‑03‑19 - -
A205 1 F R97 6.8.0 6.9.0 Using RAU procedure for MS RAC IE update SP-12 SP‑010330 approved S2 S2-18 S2‑011471 agreed 2001‑06‑19 GPRS -
A206 1 A R98 7.6.0 7.7.0 Using RAU procedure for MS RAC IE update SP-12 SP‑010330 approved S2 S2-18 S2‑011472 agreed 2001‑06‑19 GPRS -
A207 1 F R97 - - Losing PDP context during inter RA update procedure - - - S2 S2-20 S2‑012799 withdrawn 2001‑12‑16 - -
A208 1 A R98 - - Losing PDP context during inter RA update procedure - - - S2 S2-20 S2‑012800 withdrawn 2001‑12‑16 - -
A211 - F R97 - - Losing PDP context during Inter SGSN RA Update - - - S2 S2-20 S2‑012876 revised 2001‑12‑16 GPRS -
A211 1 F R97 6.9.0 6.10.0 Losing PDP context during Inter SGSN RA Update SP-14 SP‑010706 approved S2 S2-20 S2‑012941 agreed 2001‑12‑16 GPRS -
A212 - A R98 - - Losing PDP context during Inter SGSN RA Update - - - S2 S2-20 S2‑012877 revised 2001‑12‑16 GPRS -
A212 1 A R98 7.7.0 7.8.0 Losing PDP context during Inter SGSN RA Update SP-14 SP‑010706 approved S2 S2-20 S2‑012942 agreed 2001‑12‑16 GPRS -
A213 - D R97 - - Editorial Changes - - - S2 S2-21 S2‑013386 postponed 2001‑12‑16 TEI -
A214 - A R98 - - Editorial Changes - - - S2 S2-21 S2‑013387 postponed 2001‑12‑16 TEI -

page generated from database: 2024-11-12 10:16:04