3GPP TDocs (written contributions) at meeting
Meeting: R1-52 - 2008-02-11 to 2008-02-15, Sorrento
meeting id: R1-52 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑080630 | Draft Agenda for RAN1#52 meeting | RAN1 Chairman | Approved |
R1‑080631 | Draft report of RAN1#51 bis meeting | MCC Support | Approved |
R1‑080632 | Response LS on BCCH transmission | RAN2, Ericsson | Noted |
R1‑080633 | On the Gap of Distributed Allocation | Mitsubishi Electric | Not treated |
R1‑080634 | Evaluation of Metrics for Control of Intercell Interference for Enhanced Uplink in cell-FACH^^ | InterDigital Communications LLC | Revised |
R1‑080635 | Reply LS on various aspects related to GERAN to E-UTRAN interworking | RAN2, Qualcomm | Noted |
R1‑080636 | LS on LS on enhancing radio bearer parameters in 34.108 for 64QAM, MIMO and Enhanced Layer 2 | RAN2, Nokia | Noted |
R1‑080637 | LS on RACH retransmission delay | RAN2, Panasonic | Noted |
R1‑080638 | Further details on dedicated RS structure for DL beamforming | Qualcomm Europe | Not treated |
R1‑080639 | RS power balancing in the spatial domain and interference estimation issues | Qualcomm Europe | Not treated |
R1‑080640 | Specification details for PRS sequences | Qualcomm Europe | Noted |
R1‑080641 | PDCCH formats and contents | Qualcomm Europe | Not treated |
R1‑080642 | PDCCH format for Paging | Qualcomm Europe | Not treated |
R1‑080643 | Resource allocation header for DL assignments | Qualcomm Europe | Not treated |
R1‑080644 | PHICH resource allocation | Qualcomm Europe | Not treated |
R1‑080645 | On the size of the CCE | Qualcomm Europe | Not treated |
R1‑080646 | Limiting the number of PDCCH blind decodes | Qualcomm Europe | Not treated |
R1‑080647 | UL ACK/NAK resource allocation | Qualcomm Europe | Revised |
R1‑080648 | Support of ACK repetition in the UL of E-UTRA | Qualcomm Europe | Not treated |
R1‑080649 | UL control details for TDD | Qualcomm Europe | Not treated |
R1‑080650 | Details of control and data multiplexing in PUSCH | Qualcomm Europe | Not treated |
R1‑080651 | More results on the value of the Nd=3 option for DL distributed transmissions | Qualcomm Europe | Not treated |
R1‑080652 | Completing the scrambling details in the specifications | Qualcomm Europe | Not treated |
R1‑080653 | Draft CR for 36.212 | Qualcomm Europe | Endorsed - Revised |
R1‑080654 | On the signalling of Data/RS power ratio for PDSCH with 16QAM | Qualcomm Europe | Not treated |
R1‑080655 | Link analysis of PUCCH vs. CQI payload size | Qualcomm Europe | Not treated |
R1‑080656 | Bitwidths for CQI reporting on PUCCH for MIMO support | Qualcomm Europe | Missing |
R1‑080657 | System analysis comparing best-M and cycling CQI report mechanisms | Qualcomm Europe | Missing |
R1‑080658 | Feedback needed in support of TDD precoding | Qualcomm Europe | Not treated |
R1‑080659 | Calibration procedures for TDD beamforming | Qualcomm Europe | Not treated |
R1‑080660 | Introduction of optimized FS2 for TDD | RITT | Noted |
R1‑080661 | Summary of Reflector Discussions on EUTRA DL RS | Samsung | Noted |
R1‑080662 | Summary of Reflector Discussions on EUTRA UL RS | Samsung | Noted |
R1‑080663 | DCI Payload Formats and Contents | Samsung | Not treated |
R1‑080664 | Compact UL-SCH Assignment in E-UTRA | Samsung | Not treated |
R1‑080665 | PCFICH Mapping for One Transmitter Antenna | Samsung | Not treated |
R1‑080666 | Subset selection for precoding | Samsung | Not treated |
R1‑080667 | Way forward on downlink PMI indication | Samsung, ZTE, Huawei, LGE | Not treated |
R1‑080668 | PHICH linking to downlink CCE | Samsung, Panasonic | Not treated |
R1‑080669 | HARQ process indication for DL-SCH | Samsung | Not treated |
R1‑080670 | PDCCH CRC length | Samsung | Not treated |
R1‑080671 | RV and NDI indication in downlink assignment | Samsung | Not treated |
R1‑080672 | MCS/TBS indication for DL-SCH and UL-SCH | Samsung | Not treated |
R1‑080673 | TBS table design for DL-SCH and UL-SCH | Samsung | Not treated |
R1‑080674 | Details of PHICH allocation | Samsung | Not treated |
R1‑080675 | Configuration of PDCCH candidate sets for the control of blind decoding attempts | Samsung | Not treated |
R1‑080676 | ACK/NAK DTX Detection in the PUSCH | Samsung | Not treated |
R1‑080677 | ACK/NAK Repetitions in E-UTRA UL | Samsung | Not treated |
R1‑080678 | Multiplexing ACK/NAK in the PUSCH | Samsung | Not treated |
R1‑080679 | Multiplexing Control and Data in the PUSCH | Samsung | Not treated |
R1‑080680 | Slot-level UL ACK/NACK Cyclic Shift/Orthogonal Cover Remapping | Samsung | Not treated |
R1‑080681 | UL ACK/NACK resource indication for DL persistent scheduling | Samsung, NTT DoCoMo, Panasonic, Qualcomm | Noted |
R1‑080682 | Robust RE mapping of control and data on PUSCH | Samsung | Not treated |
R1‑080683 | Frequency Hopping Pattern for PUSCH | Samsung, LGE, NEC, Qualcomm, ZTE | Revised |
R1‑080684 | PDSCH-to-RE mapping robust against CCFI reception errors | Samsung | Not treated |
R1‑080685 | RV definition for UL-SCH | Samsung | Noted |
R1‑080686 | Adjustment to starting positions of redundancy versions for turbo code rate matching | Samsung | Not treated |
R1‑080687 | CRC generator polynomial for PDCCH | Samsung | Noted |
R1‑080688 | Transmission Power Control Using DM RS for UL VoIP | Samsung | Not treated |
R1‑080689 | Further discussion on data power setting for PDSCH | Samsung | Not treated |
R1‑080690 | Power Scaling and DL RS boosting | Samsung | Not treated |
R1‑080691 | Summary of email discussion on CQI reporting | Samsung | Noted |
R1‑080692 | Further considerations on MIMO CQI | Samsung | Not treated |
R1‑080693 | SU-MIMO PMI feedback and Compression | Samsung | Not treated |
R1‑080694 | CQI Reporting for MU-MIMO | Samsung | Not treated |
R1‑080695 | CQI report format | Samsung | Not treated |
R1‑080696 | E-DCH transmission timing for Enhanced Uplink in Cell_FACH | Samsung | Noted |
R1‑080697 | On the interference prior to the completion of contention resolution | Samsung | Noted |
R1‑080698 | Edge treatment for MIMO CQI compression | Marvell | Not treated |
R1‑080699 | Bit permutation for CQI coding | Marvell | Not treated |
R1‑080700 | Sounding Reference Signal In Support of Scheduling Request in E-UTRA | Texas Instruments | Not treated |
R1‑080701 | Some Options for Cyclic Shift Hopping | Texas Instruments | Not treated |
R1‑080702 | CRC Length for PDCCH | Texas Instruments | Not treated |
R1‑080703 | PDCCH Content and Formats | Texas Instruments | Not treated |
R1‑080704 | Consideration of Supportable MCS for E-UTRA DL | Texas Instruments | Revised |
R1‑080705 | Channelization for Scheduling Request Indicator on PUCCH | Texas Instruments | Revised |
R1‑080706 | Resource allocation for Scheduling Request Indicator on PUCCH | Texas Instruments | Not treated |
R1‑080707 | Cell Specific CS Hopping and Slot Based CS/OC Remapping on PUCCH | Texas Instruments | Noted |
R1‑080708 | Separate Rank and CQI Feedback in PUCCH | Texas Instruments | Not treated |
R1‑080709 | Simultaneous ACK/NAK and SR Transmission in Uplink | Texas Instruments | Not treated |
R1‑080710 | Considerations on Data and Control Multiplexing on PUSCH | Texas Instruments | Not treated |
R1‑080711 | CQI Reporting Procedure for E-UTRA | Texas Instruments | Revised |
R1‑080712 | CQI, PMI, and Rank Reports for E-UTRA | Texas Instruments | Not treated |
R1‑080713 | CQI and PMI Report Combinations on PUSCH | Texas Instruments | Revised - Noted |
R1‑080714 | Rank and PMI Feedback Rate – Analysis | Texas Instruments | Not treated |
R1‑080715 | Rank Feedback Rate – System Simulation | Texas Instruments | Not treated |
R1‑080716 | CQI/PMI Feedback Rate – System Simulation | Texas Instruments | Not treated |
R1‑080717 | TS 36.213 v8.1.0 CR | Motorola | Revised |
R1‑080718 | Short CP Dedicated Reference Symbol Pattern Simulation Results | Motorola | Revised |
R1‑080719 | Hopping Patterns for UL RS | Motorola | Noted |
R1‑080720 | Cyclic Shift values for UL RS | Motorola | Not treated |
R1‑080721 | Indication of UE Antenna Selection for PUSCH | Motorola | Not treated |
R1‑080722 | Open Issues on UL Sounding RS | Motorola | Not treated |
R1‑080723 | Multiplexing of SRS and PUSCH | Motorola | Not treated |
R1‑080724 | PHICH Transmission for 1 Tx Antenna | Motorola | Not treated |
R1‑080725 | PCFICH Transmission for 1 Tx Antenna | Motorola | Not treated |
R1‑080726 | Downlink Control Signalling for TDD | Motorola | Not treated |
R1‑080727 | TBS and MCS Signaling and Tables | Motorola | Not treated |
R1‑080728 | On NDI and RV in LTE downlink | Motorola | Not treated |
R1‑080729 | PHICH resource signaling for TDD and FDD | Motorola | Revised |
R1‑080730 | PDCCH Formats and Contents | Motorola | Not treated |
R1‑080731 | PDCCH Search Space Assignment & Signaling | Motorola | Not treated |
R1‑080732 | PDCCH Coverage 1248 vs 124 vs 12348 with limited PC dynamic range | Motorola | Withdrawn |
R1‑080733 | DRX and Change Update Rate for Broadcast LTE L1 Parameters | Motorola | Withdrawn |
R1‑080734 | PHICH Assignment for TDD and FDD | Motorola | Not treated |
R1‑080735 | PDCCH Performance vs WB CQI update rate | Motorola | Not treated |
R1‑080736 | Repetition of UL ACK/NACK on PUCCH | Motorola | Not treated |
R1‑080737 | ACK/NACK and SR Multiplexing | Motorola | Not treated |
R1‑080738 | UL ACK/NACK for TDD | Motorola | Noted |
R1‑080739 | Uplink Control Signaling with Persistent Scheduling | Motorola | Not treated |
R1‑080740 | Details of A/N subcode for extended CP | Motorola | Not treated |
R1‑080741 | Control and Data Multiplexing on PUSCH | Motorola | Not treated |
R1‑080742 | Impact of PUSCH Puncturing to Accommodate ACK/NACK | Motorola | Not treated |
R1‑080743 | System Results for Nd=3 | Motorola | Missing |
R1‑080744 | Downlink DVRB email reflector summary | Motorola | Noted |
R1‑080745 | Uplink SCH Hopping email reflector summary | Motorola | Noted |
R1‑080746 | PDCCH Scrambling and ACK/NAK detection | Motorola | Not treated |
R1‑080747 | RS, Control, and Data in DwPTS | Motorola | Noted |
R1‑080748 | Shortened RB definition for Subframes 0 and 5 (with SCH & BCH) | Motorola | Not treated |
R1‑080749 | Remaining issues on UL/DL PC | Motorola | Not treated |
R1‑080750 | PHICH power borrowing from PDCCH | Motorola | Not treated |
R1‑080751 | Uplink Inter-Cell Power Control: X2 Messages | Motorola | Not treated |
R1‑080752 | Observations on UL ICIC | Motorola | Not treated |
R1‑080753 | Frequency-selective CQI report on PUCCH for Single Tx and TxD | Motorola, Freescale, Samsung, Panasonic, NTT DoCoMo, Texas Instruments | Noted |
R1‑080754 | Frequency-selective CQI report on PUCCH for SU-MIMO | Motorola, Freescale, Samsung, Panasonic, Texas Instruments | Noted |
R1‑080755 | CQI modes for E-UTRA | Motorola | Not treated |
R1‑080756 | Performance of CQI/PMI schemes for PUCCH | Motorola | Noted |
R1‑080757 | 25.212 CR260 (Rel-8, F) Correction of RV mapping in HS-SCCH type 3 for 64-QAM support | QUALCOMM Europe | Noted |
R1‑080758 | PHICH Resource Allocated scheme | ZTE | Not treated |
R1‑080759 | Details for ACK/NACK subcode design | ZTE | Agreed |
R1‑080760 | 1.28Mcps TDD 64-QAM modulation indication and feedback | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications, Potevio | Agreed |
R1‑080761 | Correction on PRACH Sequence Ordering Table | ZTE, RITT | Revised |
R1‑080762 | Performance analysis for LBRM | ZTE | Noted |
R1‑080763 | VoIP capacity Improvement by optimization CQI in PUCCH | SHARP | Revised |
R1‑080764 | CQI, PMI, and rank report feedback interval | SHARP | Revised |
R1‑080765 | Persistent CQI/PMI/rank reporting on PUCCH/PUSCH | SHARP | Revised |
R1‑080766 | UL Sub-frame Bundling and VoIP coverage | Nortel | Noted |
R1‑080767 | Perforamnce evaluation of Dedicated RS Structures for Beam-Forming Transmission | Nortel | Not treated |
R1‑080768 | Channel Estimation Performance Evaluation on PDCCH in BF Zones | Nortel | Not treated |
R1‑080769 | Further discussion on DL/UL signaling channel supporting rank adaptation for high mobility UE | Nortel | Not treated |
R1‑080770 | MCS Table Design for eNB | Nortel | Not treated |
R1‑080771 | Discussion on the PHICH linkage to uplink transmission | Nortel | Not treated |
R1‑080772 | Further discussion on the DVRB mapping scheme | Nortel | Not treated |
R1‑080773 | Power Balancing for 4 Tx Antennas | Nortel | Not treated |
R1‑080774 | UL MU-MIMO scheduling for high mobility | Nortel | Not treated |
R1‑080775 | Need of procedure for supporting MU-MIMO | Nortel | Not treated |
R1‑080776 | PHICH Index Mapping for Uplink Transmission for E-UTRA | InterDigital Communications LLC | Not treated |
R1‑080777 | Downlink Control Signaling for MU-MIMO | InterDigital Communications LLC | Not treated |
R1‑080778 | ZC Sequence Ordering for Short RACH | ZTE | Revised |
R1‑080779 | Remaining Issues on UL DM RS Sequence Hopping | ZTE | Not treated |
R1‑080780 | Simulation on the 64-QAM modulation indication scheme for 1.28Mcps TDD | ZTE | Missing |
R1‑080781 | RS configuration in DwPTS | TD Tech | Noted |
R1‑080782 | 25.224 CR0174 (Rel-7, F) on EUL power control clarification | TD Tech | Not treated |
R1‑080783 | 25.221 CR0152 (Rel7,F) E-AGCH timing for 1.28Mcps TDD EUL | CATT | Agreed |
R1‑080784 | 25.221CR0153 (Rel7,F) Clarification of the description about E-PUCH for 1.28Mcps TDD EUL | CATT | Agreed |
R1‑080785 | 25.222 CR0144 (Rel7,F) Some corrections for 1.28Mcps TDD EUL | CATT | Revised |
R1‑080786 | 25.224 CR0175 (Rel7,F) Clarification of the E-AGCH monitering for 1.28Mcps TDD EUL | CATT | Noted |
R1‑080787 | 25.224 CR0176 (Rel7,F) Improvement of the UL synchronisation of E-PUCH for 1.28Mcps TDD EUL | CATT | Agreed |
R1‑080788 | 25.224 CR0177 (Rel7,F) Clarification and Correction of E-PUCH power control for LCR TDD | CATT | Noted - Revised |
R1‑080789 | 25.224 Cr0178 (Rel7,F) Improvement of the non-scheduled E-DCH transmission procedure for 1.28Mcps TDD EUL | CATT | Noted |
R1‑080790 | 25.222 CR0145 (Rel7,F) Clarification on TFCI mapping for 1.28Mcps TDD MBMS | CATT | Revised |
R1‑080791 | System Simulation Results of 2×2 MIMO for 1.28Mcps TDD | CATT | Noted |
R1‑080792 | Analysis on MIMO schemes for 1.28Mcps TDD | CATT, TD-TECH | Noted |
R1‑080793 | Analysis on CQI and HARQ feedback for Enhanced CELL_FACH state | Huawei | Noted |
R1‑080794 | Discussion on resource allocation scheme for Enhanced CELL-FACH State | Huawei | Noted |
R1‑080795 | UE specific reference pattern | CATT, CMCC, RITT | Not treated |
R1‑080796 | Multiplexing of UE-specific RS and cell-specific RS in DL | CATT | Not treated |
R1‑080797 | Multi-TTI Scheduling for LTE TDD UL | CATT | Not treated |
R1‑080798 | Indication of UL/DL allocation for TDD on PBCH | CATT, Huawei | Not treated |
R1‑080799 | Sounding reference signals in UpPTS for TDD | CATT, CMCC, RITT | Noted |
R1‑080800 | Usage of DwPTS for TDD | CATT | Noted |
R1‑080801 | On UE measurements for TDD asymmetry scenario | CATT, Huawei, RITT | Revised |
R1‑080802 | On antenna calibration of LTE | CATT | Not treated |
R1‑080803 | UL Sounding RS Control Signaling for Closed Loop Antenna Selection | Mitsubishi Electric | Not treated |
R1‑080804 | Parameter in TS36.306 to indicate whether UE supports UL transmit diversity | Mitsubishi Electric | Noted |
R1‑080805 | Potential issues with large DRX cycles | QUALCOMM Europe | Noted |
R1‑080806 | Reducing smallest E-TFCI value | QUALCOMM Europe | Noted |
R1‑080807 | Code Impact of Proposal for Enhancing HS-DSCH Serving Cell Change Based on New Channel Similar to E-RGCH | QUALCOMM Europe | Noted |
R1‑080808 | Link Analysis of AICH/E-AICH E-DCH Resource Allocation scheme | QUALCOMM Europe | Noted |
R1‑080809 | Collision/Blocking Probability Analysis of AICH/E-AICH E-DCH Resource Allocation scheme | QUALCOMM Europe | Noted |
R1‑080810 | Error Performance Analysis of AICH/E-AICH based E-DCH resource allocation scheme | QUALCOMM Europe | Noted |
R1‑080811 | Link Impact due to E-DCH Collisions in CELL_FACH | QUALCOMM Europe | Noted |
R1‑080812 | Impact of Intercell Interference with EUL in CELL_FACH | QUALCOMM Europe | Noted |
R1‑080813 | List of E-DCH resource parameters | QUALCOMM Europe | Noted |
R1‑080814 | System Performance of Uplink Interference Cancellation in Sync E-DCH Simulation Scenarios | QUALCOMM Europe | Revised |
R1‑080815 | Improving reliability of HS-PDSCH Serving Cell Change procedure | QUALCOMM Europe | Noted |
R1‑080816 | Draft TR | QUALCOMM Europe | Noted |
R1‑080817 | Open issues on UE-specific RS | Philips | Not treated |
R1‑080818 | UE-specific RS pattern | Philips | Missing |
R1‑080819 | Configuration of PDCCH blind decoding sets | Philips, NXP | Not treated |
R1‑080820 | PDCCH message information content for persistent scheduling | Philips, NXP | Not treated |
R1‑080821 | Resource allocation signalling on PDCCH | Philips, NXP | Not treated |
R1‑080822 | Distributed Resource Allocation Signalling on PDCCH | Philips, NXP | Not treated |
R1‑080823 | PDCCH message information content for UL resource allocation | Philips, NXP | Not treated |
R1‑080824 | PDSCH timing for power saving for paging in idle mode | Philips, NXP | Not treated |
R1‑080825 | Way forward on Distributed DVRB for EUTRA downlink | Philips | Noted |
R1‑080826 | MBSFN remaining issues | Philips | Not treated |
R1‑080827 | Codebook for MU-MIMO | Philips, NXP | Not treated |
R1‑080828 | CQI definition for MU-MIMO | Philips, NXP | Not treated |
R1‑080829 | UE procedure for ACK/NACK detection | Philips, NXP | Not treated |
R1‑080830 | Remaining issues on E-RACH procedure | Philips | Noted |
R1‑080831 | UL coverage considerations for VoIP transmission | Philips, NXP | Noted |
R1‑080832 | 25212CR0261 (Rel-8, F), Correction to RV-coding in case of simultaneous usage of 64QAM and MIMO | Nokia, Nokia Siemens Networks | Agreed |
R1‑080833 | 25214CR0479 (Rel-7, F), Correction to UE grant monitoring | Nokia, Nokia Siemens Networks | Noted - Revised |
R1‑080834 | 25214CR0480 (Rel-8, A), Correction to UE grant monitoring | Nokia, Nokia Siemens Networks | Noted - Revised |
R1‑080835 | 25211CRdraft (Rel-8, B), Introduction of E-AICH for the purpose of E-DCH Resource Configuration Allocation | Qualcomm Europe, Ericsson, Huawei, Motorola, NEC, Nokia, Nokia Siemens Networks, NXP, Philips | Endorsed |
R1‑080836 | E-AICH resource assignment performance results | Nokia, Nokia Siemens Networks | Noted |
R1‑080837 | 25214CRdraft (Rel-8, B), RACH procedure relation to Enhanced Uplink for CELL_FACH state | Nokia, Nokia Siemens Networks | Noted |
R1‑080838 | 25215CRdraft (Rel-8, B), UPH measurement support for Enhanced Uplink for CELL_FACH state | Nokia, Nokia Siemens Networks | Endorsed |
R1‑080839 | Text proposal on S-EDCH CM & PAPR effects | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑080840 | Text proposal - system simulation results | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑080841 | Text proposal on DL channel structure impact | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑080842 | Text proposal on impact to L1 procedures | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑080843 | Text proposal on impact to L2/3 procedures | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑080844 | Text proposal on impacts to the specifications | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑080845 | Text proposal on synchronisation | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑080846 | Text proposal on backward compatibility | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑080847 | Text proposal on complexity analysis | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑080848 | Text proposal on conclusion | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑080849 | Simulation results of HS-PDSCH serving cell change in Manhattan environment | Nokia, Nokia Siemens Networks | Noted |
R1‑080850 | UE specific PDCCH scrambling for blind detection complexity reduction | Mitsubishi Electric | Not treated |
R1‑080851 | Initialisation of shift registers for PDCCH scrambling | Mitsubishi Electric | Not treated |
R1‑080852 | Length of the reserved period in half-duplex FDD | Mitsubishi Electric | Withdrawn |
R1‑080853 | DL:UL Allocation for TDD | Motorola | Not treated |
R1‑080854 | Dynamic DVRB signaling | Motorola | Not treated |
R1‑080855 | Open issues on UL slot hopping | Motorola | Not treated |
R1‑080856 | Distributed Virtual Resource Block Mapping for Persistent Resource Allocation as VoIP | Alcatel-Lucent | Not treated |
R1‑080857 | Signaling of non-compact Resource Allocation in DL Control Channel | Alcatel-Lucent | Noted |
R1‑080858 | Semi-Static Interference Coordination Method | Alcatel-Lucent | Not treated |
R1‑080859 | Support for Semi-Static Inter cell Interference Coordination | Alcatel-Lucent, Nortel Networks | Not treated |
R1‑080860 | Signaling of Slot Based Frequency Hopping with grant based frequency^^shift information for UL Transmission | Alcatel-Lucent | Noted |
R1‑080861 | Clarification on Uplink Power Control to support UL ICIC | Alcatel-Lucent | Noted |
R1‑080862 | eNodeB Indicator definition for ^^ “Maximum Tx Power per PRB normalized” | Alcatel-Lucent | Not treated |
R1‑080863 | X2-signalling of eNodeB Max Tx Power per PRB report | Alcatel-Lucent | Not treated |
R1‑080864 | Performance of PMI Compression Schemes for E-UTRA | Icera Semiconductor | Not treated |
R1‑080865 | On Uplink coverage for LTE | Ericsson | Noted |
R1‑080866 | Uplink DM RS, discussion/proposals on remaining issues | Ericsson | Noted |
R1‑080867 | Uplink SRS, discussion/proposals on remaining issues | Ericsson | Missing |
R1‑080868 | On TBS sizes for LTE | Ericsson | Withdrawn |
R1‑080869 | Summary of e-mail discussion on downlink control signaling | Ericsson | Noted |
R1‑080870 | Combination of ACK/NACKs for TDD | Ericsson | Noted |
R1‑080871 | Summary of e-mail discussion on uplink control signaling | Ericsson | Noted |
R1‑080872 | Initialization of the 31-Gold sequence generator | Ericsson | Noted |
R1‑080873 | On the design of DwPTS | Ericsson | Noted |
R1‑080874 | On the remaining DL-UL allocation | Ericsson | Withdrawn |
R1‑080875 | On Antenna Configuration Detection and Transmission of Synchronization Signal | Ericsson | Not treated |
R1‑080876 | On HARQ operation for MIMO | Ericsson | Not treated |
R1‑080877 | Extending Codeword to Layer Mapping for Efficient Support of Retransmissions | Ericsson | Noted |
R1‑080878 | On Radio Problem Detection | Ericsson | Withdrawn |
R1‑080879 | Power Control for PRACH | Ericsson | Not treated |
R1‑080880 | Power Control for Retransmissions | Ericsson | Not treated |
R1‑080881 | Range and representation of delta_MCS | Ericsson | Not treated |
R1‑080882 | Completion of Open Issues on Power Control Command | Ericsson | Not treated |
R1‑080883 | Uplink power control, removal of unnecessary options | Ericsson | Not treated |
R1‑080884 | Additional RSRP reporting trigger for ICIC | Ericsson | Not treated |
R1‑080885 | System Level Evaluation of Closed-Loop Large Delay CDD | Ericsson | Not treated |
R1‑080886 | Signaling Requirements for 2 Tx Precoding | Ericsson | Not treated |
R1‑080887 | CQI Measurement Methodology | Ericsson | Noted |
R1‑080888 | Detection of Duplex | Ericsson | Not treated |
R1‑080889 | Maximum Timing Advance for TDD | Ericsson | Not treated |
R1‑080890 | Uplink ACK/NACK timing for TDD | Ericsson | Not treated |
R1‑080891 | Number of DL HARQ processes for TDD | Ericsson | Not treated |
R1‑080892 | Number of UL HARQ processes and HARQ timing for TDD | Ericsson | Not treated |
R1‑080893 | On MBSFN neighbour cell indicators for UE measurements for TDD | Ericsson | Not treated |
R1‑080894 | Draft LS on MBSFN neighbour cell indicators for UE measurements for TDD | Ericsson | Not treated |
R1‑080895 | Sorting of PRACH root sequences for preamble format 4 | Ericsson | Noted |
R1‑080896 | On remaining PRACH issues for TDD | Ericsson | Not treated |
R1‑080897 | Draft reply LS on RACH retransmission delay | Ericsson | Noted |
R1‑080898 | Draft CR to 36.211 v8.1.0 including decisions from RAN1#51bis | Ericsson | Endorsed - Revised |
R1‑080899 | On the location of ACK/NACK bits on UL PUSCH | Fujitsu | Not treated |
R1‑080900 | Physical-layer parameters to be configured by RRC | Ericsson | Noted |
R1‑080901 | Holes in the L1 specification | Ericsson | Missing |
R1‑080902 | Initial Multi-Carrier HSPA performance evaluation | Ericsson | Noted |
R1‑080903 | On the introduction of a second UE DRX cycle in CELL_DCH | Ericsson | Noted |
R1‑080904 | HS-SCCH orders for HS-SCCH-less operation | Ericsson | Noted |
R1‑080905 | Further simulation results for AICH-based resource allocation signaling in Enhanced CELL_FACH | Ericsson | Noted |
R1‑080906 | Timing and acknowledgement signaling for EUL in CELL_FACH | Ericsson | Noted |
R1‑080907 | Inter-cell interference issues for EUL in CELL_FACH | Ericsson | Noted |
R1‑080908 | System performance of Synchronized E-DCH | Ericsson | Revised |
R1‑080909 | Requirements for E-DCH TDM support | Ericsson | Noted |
R1‑080910 | PAPR for Synchronized E-DCH | Ericsson | Noted |
R1‑080911 | HS Serving Cell Change Enhancements | Ericsson | Noted |
R1‑080912 | Power Offsets to Support Data and Control Multiplexing for Persistent PUSCH | Alcatel-Lucent | Not treated |
R1‑080913 | Performance Comparison of Solutions for Subframe Bundling | Alcatel-Lucent | Noted |
R1‑080914 | Implications of Solutions for Subframe Bundling | Alcatel-Lucent | Noted |
R1‑080915 | RACH Frequency position | LG Electronics | Not treated |
R1‑080916 | On the need of ramping step size zero for FDD PRACH | LG Electronics | Not treated |
R1‑080917 | Way Forward on Orthogonal Sequences for DL Reference signals | Nokia, Nokia Siemens Networks | Revised |
R1‑080918 | SRS Position for EUTRA FDD/TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑080919 | Slot-based CS/OC re-mapping for PUCCH | Nokia Siemens Networks, Nokia | Revised |
R1‑080920 | CS hopping for DM RS | Nokia Siemens Networks, Nokia | Not treated |
R1‑080921 | SRS Bandwidth Selection | Nokia Siemens Networks, Nokia | Not treated |
R1‑080922 | A proposal for LTE TDD Uplink Multi-TTI Scheduling | Nokia, Nokia Siemens Networks | Not treated |
R1‑080923 | PHICH resource mapping/dimensioning for TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑080924 | DCI and CCE size | Nokia, Nokia Siemens Networks | Not treated |
R1‑080925 | Associated PDCCH signaling for PCH, RACH response and BCCH transmission on PDSCH | Nokia, Nokia Siemens Networks | Revised |
R1‑080926 | Downlink resource assignment structure for LTE | Nokia, Nokia Siemens Networks | Revised |
R1‑080927 | PHICH and mapping to PHICH groups | Nokia, Nokia Siemens Networks | Not treated |
R1‑080928 | Reducing the decoding complexity of the PDCCH | Nokia, Nokia Siemens Networks | Revised |
R1‑080929 | MBMS single-cell p-t-m related control signaling | Nokia, Nokia Siemens Networks | Revised |
R1‑080930 | On the need for memoryless DL control information | Nokia, Nokia Siemens Networks | Not treated |
R1‑080931 | ACK/NACK channelization for PRBs containing both ACK/NACK and CQI | Nokia Siemens Networks, Nokia, Texas Instruments | Agreed |
R1‑080932 | Simultaneous transmission of ACK/NACK and SR | Nokia Siemens Networks, Nokia | Noted |
R1‑080933 | DTX detection in case of simultaneous transmission of SR and ACK/NACK | Nokia Siemens Networks, Nokia | Not treated |
R1‑080934 | Capacity and coverage analysis for the number of CQI bits carried on PUCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑080935 | Avoiding PUSCH error situations caused by DL allocation grant signalling failure (FDD/TDD) | Nokia Siemens Networks, Nokia | Not treated |
R1‑080936 | Open items of control signaling on PUSCH | Nokia Siemens Networks, Nokia | Revised |
R1‑080937 | Orthogonal Cover Design for Scheduling Request | Nokia Siemens Networks, Nokia | Revised |
R1‑080938 | Comparison of single-sequence and multi sequence modulation with existing DM RS sequence set | Nokia Siemens Networks, Nokia | Revised |
R1‑080939 | Implicit Mapping of ACK/NACK resources | Nokia Siemens Networks, Nokia | Revised |
R1‑080940 | Scrambling Sequence Initialization | Nokia Siemens Networks, Nokia | Noted |
R1‑080941 | Physical Channel/signals arrangement in DwPTS | Nokia, Nokia Siemens Networks | Noted |
R1‑080942 | L1 Support of Dedicated MBSFN Carriers | Nokia Siemens Networks, Nokia, Huawei, Ericsson, LGE | Revised |
R1‑080943 | Multi-cell PBCH Coverage and Capacity | Nokia Siemens Networks, Nokia | Revised |
R1‑080944 | CRC Mask Selection for PBCH | Nokia Siemens Networks, Nokia | Revised |
R1‑080945 | Simulation results on RV usage for uplink HARQ | Nokia Siemens Networks, Nokia | Noted |
R1‑080946 | Way forward on RV usage for uplink HARQ | Nokia Siemens Networks, Nokia, Motorola, Ericsson, LGE, ZTE | Noted |
R1‑080947 | Triggers for Power Headroom Reports in EUTRAN Uplink | Nokia Siemens Networks, Nokia | Not treated |
R1‑080948 | Summary of power control email discussion | Nokia Siemens Networks | Noted |
R1‑080949 | On Definition and Usage of the Uplink Overload Indicator | Nokia Siemens Networks, Nokia | Not treated |
R1‑080950 | Performance of Proactive Uplink ICIC under Fractional Load | Nokia Siemens Networks, Nokia | Not treated |
R1‑080951 | Frequency selective CQI reporting on PUCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑080952 | Rank reporting on PUCCH | Nokia Siemens Networks, Nokia | Revised |
R1‑080953 | Number of spatially multiplexed users for LTE DL MU-MIMO | Nokia, Nokia Siemens Networks | Revised |
R1‑080954 | Channel Quality Indicator for LTE MU-MIMO | Nokia, Nokia Siemens Networks | Revised |
R1‑080955 | Effect of Precoding Granularity on LTE Multiuser MIMO | Nokia, Nokia Siemens Networks | Revised |
R1‑080956 | DL signaling for closed loop antenna selection in LTE UL | Nokia Siemens Networks, Nokia, Ericsson | Revised |
R1‑080957 | UL HARQ Timing of TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑080958 | HARQ Numbers of LTE TDD considering the proposal of special subframe | Nokia, Nokia Siemens Networks | Not treated |
R1‑080959 | Definition of Antenna Connector for eNB Measurements | Nokia Siemens Networks, Nokia | Agreed |
R1‑080960 | Update to 36.214 | Nokia | Endorsed - Revised |
R1‑080961 | TDD RACH Configurations | Nokia, Nokia Siemens Networks | Withdrawn |
R1‑080962 | Limitations of CQI Compression for Dual Codeword MIMO | Alcatel-Lucent | Not treated |
R1‑080963 | Hopping of UL DM-RS | Qualcomm Europe | Noted |
R1‑080964 | Multiplexing of SR and ACK/NAK transmission on PUCCH | Qualcomm Europe | Not treated |
R1‑080965 | Support of DTX signalling for CQI transmission with normal CP | Qualcomm Europe | Not treated |
R1‑080966 | Interference between Sounding Reference Signal and PRACH | Texas Instruments | Not treated |
R1‑080967 | Comparison of Different ACK/NAK in CQI RS Transmission Schemes | Texas Instruments | Not treated |
R1‑080968 | CQI and PMI feedback on PUSCH for rank-1 precoding | Huawei | Not treated |
R1‑080969 | Signaling of MU-MIMO precoding vector | Huawei | Not treated |
R1‑080970 | Performance Evaluation of the Rotational CDM for L1/L2 Control Channel | KDDI | Not treated |
R1‑080971 | Gain of CAZAC sequence hopping for ACK/NACK and CQI Signals in PUCCH | KDDI | Not treated |
R1‑080972 | Multiplexing of Scheduling Request and ACK/NACK Signals in E-UTRA Uplink | KDDI | Not treated |
R1‑080973 | Joint Transport Format and Redundancy Version signaling with explicit NDI | Panasonic | Noted |
R1‑080974 | MCS table definition and analysis of related MAC padding overhead | Panasonic | Not treated |
R1‑080975 | PDCCH payload formats, sizes and CCE aggregation | Panasonic | Revised |
R1‑080976 | Implicit assignment of PHICH | Panasonic | Resubmission of R1-080135 - Not treated |
R1‑080977 | DL D-VRB to PRB mapping | Panasonic | Revised |
R1‑080978 | Necessity of the scrambling for ACK/NACK on PUCCH | Panasonic | Revised |
R1‑080979 | Necessity of the scrambling for the reference signal of CQI in PUCCH | Panasonic | Resubmission of R1-080143 - Not treated |
R1‑080980 | Mapping position of control channel for Uplink Shared Channel | Panasonic | Resubmission of R1-080141 - Not treated |
R1‑080981 | ACK/NACK repetition and Implicit Resource Allocation for PUCCH | Panasonic | Resubmission of R1-080142 - Not treated |
R1‑080982 | Proposal for the implicit resource mapping for UL ACK/NACK channels | Panasonic | Revised |
R1‑080983 | Wayforward on Cyclic Shift Hopping Pattern for PUCCH | Panasonic, Samsung, ETRI | Agreed |
R1‑080984 | Sounding RS parameters | Panasonic | Not treated |
R1‑080985 | CQI coding over PUCCH | Panasonic | Agreed |
R1‑080986 | Effect of set S on CQI reports | Panasonic | Not treated |
R1‑080987 | Draft answer to RACH retransmission delay | Panasonic, Fujitsu | Noted |
R1‑080988 | Configuration of CQI reports | Panasonic | Withdrawn |
R1‑080989 | Rank feedback in downlink MIMO | Panasonic | Revised |
R1‑080990 | Control signalling for downlink MU-MIMO | Panasonic | Resubmission of R1-080153 - Not treated |
R1‑080991 | Analysis of required CCE aggregation sizes | Panasonic | Not treated |
R1‑080992 | CCE aggregation dependent Transport Format signaling | Panasonic | Revised |
R1‑080993 | Draft LS response on RACH transmission delay | Panasonic | Withdrawn |
R1‑080994 | Consideration on UL sounding operation | LG Electronics | Not treated |
R1‑080995 | Signalling of aperiodic CQI reporting in case of no data in uplink | LG Electronics | Withdrawn |
R1‑080996 | Proposal on repetition factor for DL PHICH in 1 Tx case | LG Electronics | Not treated |
R1‑080997 | Remaining issues on PHICH indexing and PHICH to RE mapping | LG Electronics | Noted |
R1‑080998 | Considerations on TB size selection | LG Electronics | Not treated |
R1‑080999 | PHICH linkage to uplink transmissions | LG Electronics | Not treated |
R1‑081000 | Downlink Control Signaling for SU-MIMO | LG Electronics | Not treated |
R1‑081001 | ACK/NACK resource management in Persistent Scheduling | LG Electronics | Not treated |
R1‑081002 | PUCCH channelization index management | LG Electronics | Not treated |
R1‑081003 | PUCCH ACK/NACK configuration and CCE index mapping | LG Electronics | Not treated |
R1‑081004 | Multiplexing of ACK/NACK in PUSCH | LG Electronics | Noted |
R1‑081005 | Multiplexing of Control and Data in PUSCH | LG Electronics | Noted |
R1‑081006 | CQI format design on PUCCH for normal and extended CP | LG Electronics | Withdrawn |
R1‑081007 | DL control signaling for DVRB allocation using compact assignment | LG Electronics | Not treated |
R1‑081008 | SCH structure for dedicated MBMS | LG Electronics | Not treated |
R1‑081009 | RV selection for uplink HARQ | LG Electronics | Noted |
R1‑081010 | Consideration on Per-antenna Power Scaling for Full Power Transmission in 4Tx | LG Electronics | Not treated |
R1‑081011 | On the reliable RI transmission on PUCCH | LG Electronics | Withdrawn |
R1‑081012 | Performance comparison between UE-selected CQI/PMI reporting schemes on PUSCH | LG Electronics | Noted |
R1‑081013 | Clarifications in cell specific RS power boosting | NEC Group | Not treated |
R1‑081014 | Problems with unequal RS power scaling per antenna for control and broadcast channels | NEC Group | Not treated |
R1‑081015 | Low overhead PDCCH format for BCCH, PCH, RACH response transmission on DL-SCH | NEC Group | Not treated |
R1‑081016 | Downlink Control Channels: Formats and Contents | NEC Group | Not treated |
R1‑081017 | Downlink CCE Aggregation and Blind detections | NEC Group | Not treated |
R1‑081018 | Downlink ACK/NACK Signalling for E-UTRA | NEC Group | Not treated |
R1‑081019 | Downlink Multiplexing for Persistent and Dynamic scheduling | NEC Group | Not treated |
R1‑081020 | Detail on mapping between ACK/NACK index and CCE index | NEC Group | Not treated |
R1‑081021 | Remaining issues for DVRB to PRB mapping | NEC Group | Not treated |
R1‑081022 | Frequency Hopping Pattern for EUTRA Uplink | NEC Group | Not treated |
R1‑081023 | Set S - Rank Estimation Perspective | NEC Group | Not treated |
R1‑081024 | Discussions on sequence grouping | Huawei | Resubmission of R1-074059 - Missing |
R1‑081025 | Proposal of CG sequence hopping in group planning | Huawei | Not treated |
R1‑081026 | Control Signaling of MBMS Single-Cell Transmission | Huawei | Resubmission of R1-074063 - Not treated |
R1‑081027 | Slot based Cyclic Shift and Orthogonal Cover Re-mapping for PUCCH | Huawei | Not treated |
R1‑081028 | Mapping Relation between UL ACK/NACK and DL CCE | Huawei | Not treated |
R1‑081029 | Root Zadoff-Chu sequence order for PRACH format 4 in FS2 TDD | Huawei | Noted |
R1‑081030 | Way forward on TDD HARQ RTT and process number | Huawei | Revised |
R1‑081031 | Summary of the e-mail discussion on channel coding | NTT DoCoMo | Noted |
R1‑081032 | Summary of the e-mail discussion on UE category | NTT DoCoMo | Noted |
R1‑081033 | Views on Dedicated RS Structure in E-UTRA Downlink | NTT DoCoMo | Not treated |
R1‑081034 | Sounding RS Parameters in E-UTRA Uplink | NTT DoCoMo | Not treated |
R1‑081035 | Investigation on Control Information Bits in PDCCH | NTT DoCoMo | Not treated |
R1‑081036 | Investigation on Radio Resource Allocation for PHICH in E-UTRA Downlink | NTT DoCoMo | Not treated |
R1‑081037 | Investigation on PMI Indication Schemes for Single-User MIMO Precoding in E-UTRA Downlink | NTT DoCoMo | Not treated |
R1‑081038 | Investigation on Performance of PUCCH in Coverage-limited Conditions | NTT DoCoMo | Withdrawn |
R1‑081039 | Investigation on TPC for PUSCH in E-UTRA Uplink | NTT DoCoMo | Not treated |
R1‑081040 | Investigation on MU-MIMO in E-UTRA Downlink | NTT DoCoMo | Not treated |
R1‑081041 | Response LS to RAN1 and RAN2 on HSPA RB and SRB configurations in 34.108 | RAN5, Ericsson | Noted |
R1‑081042 | LS to RAN1 and RAN2 on new MCCH radio bearer configuration in 34.108 | RAN5, Ericsson | Noted |
R1‑081043 | LBRM procedure with a simplified RV definition on exact soft buffer | Broadcom | Not treated |
R1‑081044 | Correction on PRACH Sequence Ordering Table | ZTE, RITT | Not treated |
R1‑081045 | Interference Cancellation in relation to S-EDCH | Nokia Siemens Networks | Noted |
R1‑081046 | System-level performances of distributed type DL transmission with Nd-order diversity | Huawei | Not treated |
R1‑081047 | Way Forward on Orthogonal Sequences for DL Reference signals | Nokia, Nokia Siemens Networks, Broadcom, Freescale, Huawei, LG Electronics, NXP Semiconductors, Samsung, Texas Intruments, ZTE | Revised |
R1‑081048 | ICIC email discussion summary | Telecom Italia | Noted |
R1‑081049 | On UE measurements for TDD asymmetry scenario | CATT, Huawei, RITT, Ericsson | Agreed |
R1‑081050 | Further Results on Dedicated Reference Signal Design | Motorola | Not treated |
R1‑081051 | Draft Reply LS on HSPA RB and SRB configurations in 34.108 | Ericsson | Revised |
R1‑081052 | Draft Reply LS on new MCCH radio bearer configuration in 34.108 | Ericsson | Revised |
R1‑081053 | DRAFT Reply LS on Uplink Coverage for LTE | Ericsson | Revised |
R1‑081054 | Draft reply LS on RACH retransmission delay requirements | Ericsson, Panasonic, LG, Fujitsu | Revised |
R1‑081055 | Rank reporting on PUCCH | Nokia Siemens Networks, Nokia, Sharp | Not treated |
R1‑081056 | TS 36.213 v8.1.0 CR | Motorola | Endorsed - Revised |
R1‑081057 | PHICH resource signaling for TDD and FDD | Motorola | Not treated |
R1‑081058 | Evaluation of Metrics for Control of Intercell Interference for Enhanced Uplink in cell-FACH^^ | InterDigital Communications LLC | Noted |
R1‑081059 | Consideration of Supportable MCS for E-UTRA DL | Texas Instruments | Missing |
R1‑081060 | CQI Reporting Procedure for E-UTRA | Texas Instruments | Missing |
R1‑081061 | CQI and PMI Report Combinations on PUSCH | Texas Instruments | Missing |
R1‑081062 | Slot-based CS/OC re-mapping for PUCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑081063 | Text proposal for PHICH to RE mapping with cell ID | LGE, Samsung, Nortel, Panasonic, Motorola, Ericsson, Nokia, NSN, Qualcomm | Agreed |
R1‑081064 | 25.222 CR0144r1 (Rel7,F) Some corrections for 1.28Mcps TDD EUL | CATT | Agreed |
R1‑081065 | 25.222 CR0145r1 (Rel7,F) Clarification on TFCI mapping for 1.28Mcps TDD MBMS | CATT | Agreed |
R1‑081066 | 25.224 CR0177r1 (Rel-7, F) Clarification and Correction of E-PUCH power control for LCR TDD | CATT | Agreed |
R1‑081067 | System Performance of Uplink Interference Cancellation in Sync E-DCH Simulation Scenarios | QUALCOMM Europe | Noted |
R1‑081068 | System performance of Synchronized E-DCH | Ericsson | Noted |
R1‑081069 | ZC Sequence Ordering for Short RACH | ZTE, Qualcomm Europe, Texas Instruments | Noted |
R1‑081070 | Way forward on modifying LBRM procedure to avoid inconsistency | Broadcom | Missing |
R1‑081071 | Way forward on PHICH allocation | Nokia, NSN, Samsung, LGE, NTT DoCoMo, Nortel, NEC, Motorola, Panasonic, Ericsson, Qualcomm | Agreed |
R1‑081072 | Rank adaptation in open loop MIMO | Infineon Technologies | Not treated |
R1‑081073 | CRC Mask Selection for PBCH | Nokia Siemens Networks, Nokia | Agreed |
R1‑081074 | Text proposal on S-EDCH CM & PAPR effects | Nokia Siemens Networks, Nokia | Agreed |
R1‑081075 | Text proposal - system simulation results | Nokia Siemens Networks, Nokia | Agreed |
R1‑081076 | TP on system performance of TDM based Synchronized E-DCH | Ericsson | Agreed |
R1‑081077 | void | - | - |
R1‑081078 | Text proposal on IC Simulation results | Nokia Siemens Networks, Ericsson, Qualcomm | Agreed |
R1‑081079 | TR25.823 v0.1.2 | Nokia Siemens Networks | Revised |
R1‑081080 | Text proposal on DL channel structure impact | Nokia Siemens Networks, Nokia | Agreed |
R1‑081081 | Text proposal on impact to L1 procedures | Nokia Siemens Networks, Nokia | Agreed |
R1‑081082 | Text proposal on impact to L2/3 procedures | Nokia Siemens Networks, Nokia | Agreed |
R1‑081083 | Text proposal on impacts to the specifications | Nokia Siemens Networks, Nokia | Agreed |
R1‑081084 | TP on impacts to the specifications for TDM based Synchronized E-DCH | Ericsson | Agreed |
R1‑081085 | TP on the impact of Uplink Interference Cancellation on the specifications | Qualcomm Europe | Revised |
R1‑081086 | Text proposal on synchronisation | Nokia Siemens Networks, Nokia | Agreed |
R1‑081087 | TP on synchronization for TDM based Synchronized E-DCH | Ericsson | Agreed |
R1‑081088 | TP on backwards compatibility for TDM based Synchronized E-DCH | Ericsson | Agreed |
R1‑081089 | Text proposal on backward compatibility | Nokia Siemens Networks, Nokia | Agreed |
R1‑081090 | Text proposal on complexity analysis | Nokia Siemens Networks, Nokia | Agreed |
R1‑081091 | TP on complexity analysis for TDM based Synchronized E-DCH | Ericsson | Agreed |
R1‑081092 | Text proposal on conclusion | Nokia Siemens Networks, Nokia | Agreed |
R1‑081093 | Further Considerations on the Use of Inter-Cell Interference Indication | Ericsson | Not treated |
R1‑081094 | Draft LS on status of study item “HS-PDSCH serving cell change enhancements” | QUALCOMM Europe | Revised |
R1‑081095 | Wrap-around address for LBRM | Nokia Siemens Networks, Nokia | Not treated |
R1‑081096 | Way Forward on Orthogonal Sequences for DL Reference signals | Nokia, Nokia Siemens Networks, Broadcom, Freescale, Huawei, LG Electronics, NXP Semiconductors, Samsung, Texas Intruments, ZTE, NextWave Wireless | Agreed |
R1‑081097 | LBRM and soft buffer size | Motorola, Broadcom | Noted |
R1‑081098 | Coding for CQI moved from PUCCH to PUSCH | LG Electronics | Not treated |
R1‑081099 | [Draft] LS on High Interference Indicator | Ericsson | Revised |
R1‑081100 | DL Control signaling topics | Ad Hoc moderator | Noted |
R1‑081101 | PDCCH blind decoding | Ad Hoc moderator | Noted |
R1‑081102 | PDCCH contents | Ad Hoc moderator | Revised |
R1‑081103 | Reply LS on Uplink Coverage for LTE | RAN1, Ericsson | Agreed |
R1‑081104 | Channelization for Scheduling Request Indicator on PUCCH | Texas Instruments, Nokia Siemens Networks, Nokia, Panasonic, Samsung | Noted |
R1‑081105 | [Draft] LS on CR to TS36.306 | NTT DoCoMo | Revised |
R1‑081106 | Way Forward on Scrambling Sequence Initialisation | Nokia Siemens Networks, Nokia, Ericsson, Qualcomm, Samsung, Panasonic, Motorola | Agreed |
R1‑081107 | UL ACK/NAK resource allocation | Qualcomm Europe | Agreed |
R1‑081108 | Way Forward on Dedicated Reference Signal Design for LTE downlink with Normal CP | Motorola, Nortel, Broadcomm, Nokia, NSN, NTT DoCoMo, NEC, Mitsubishi, Alcatel-Lucent, CATT, Huawei, Sharp, Texas Instrument, ZTE, Panasonic, Philips, Toshiba | Agreed |
R1‑081109 | Proposal for the implicit resource mapping for UL ACK/NACK channels | Panasonic | Not treated |
R1‑081110 | Multiple ACK/NAK for TDD | Ericsson, Motorola, Nokia, Nokia Siemens Networks, Qualcomm | Agreed |
R1‑081111 | Further Refinements on CQI Reporting on PUSCH | Texas Instruments | Noted |
R1‑081112 | LS on Change Request for LTE TDD Frame Structure to TS.36.300 V8.3.0 | RAN1, RITT | Agreed |
R1‑081113 | Way forward on DVRB to PRB index mapping | Nortel, Panasonic, LGE | Revised |
R1‑081114 | Further Refinements on CQI Reporting on PUSCH – Sample Text | Texas Instruments, Ericsson, Nortel, Philips | Not treated |
R1‑081115 | Frequency Hopping Pattern for PUSCH | Samsung, LGE, NEC, Qualcomm, ZTE, Ericsson | Noted |
R1‑081116 | Further refinements on Rank Reporting | Samsung, TI, Ericsson, Nortel, Motorola, Panasonic, Philips, NTT DoCoMo | Noted |
R1‑081117 | Way forward on sequence hopping within group | CMCC, Huawei | Noted |
R1‑081118 | Way forward on DL VRB to PRB mapping | Nokia, Nokia Siemens Networks, Ericsson, Qualcomm, Vodafone, LGE | Noted |
R1‑081119 | Way Forward DVRB to PRB mapping | Nortel, NEC, Panasonic, LGE, Motorola, Mitsubishi Electric, Alcatel-Lucent, Ericsson | Agreed |
R1‑081120 | Discussion on sequence hopping within group | Huawei | Not treated |
R1‑081121 | Way forward on Indication of UE antenna selection for PUSCH | Motorola, Mitsubishi, Nortel | Noted |
R1‑081122 | Draft LS on UE measurements for a symmetrical TDD scenario | CATT | Noted |
R1‑081123 | Summary of Channel Coding session | Ad Hoc moderator | Not treated |
R1‑081124 | Way forward for TDD HARQ processes | Huawei, CMCC, Nokia, Nokia Siemens Networks, Ericsson, CATT, RITT | Agreed |
R1‑081125 | LS on CR to TS36.306 | RAN1, NTT DoCoMo | Agreed |
R1‑081126 | Way forward on RV and NDI signalling | Panasonic, Motorola, Ericsson, Fujitsu, Huawei, Mitsubishi Electric, Nokia, Nokia Siemens Networks, Nortel, NTT DoCoMo, Qualcomm Europe, Samsung, Texas Instruments | Agreed |
R1‑081127 | Draft LS reply on NDI vs RV | Panasonic | Revised |
R1‑081128 | Way forward on Scambling Sequence Initialization | Nokia Siemens Networks, Nokia, Ericsson, Qualcomm, Samsung, Panasonic | Noted |
R1‑081129 | Draft LS on RV Sequences for HARQ | Nokia Siemens Networks, Nokia | Revised |
R1‑081130 | Draft LS on Synchronized E-DCH impacts to specifications | Nokia Siemens Networks, Nokia | Revised |
R1‑081131 | On the need of code rate>1 for UL transmission | QUALCOMM Europe | Not treated |
R1‑081132 | Orthogonal sequence definition for PHICH | QUALCOMM Europe | Noted |
R1‑081133 | Way forward on UL DM-RS hopping pattern generation | Qualcomm Europe, Ericsson, Motorola | Agreed |
R1‑081134 | Downlink power setting | Ericsson, LGE, Motorola, NEC, Nokia, Nortel, NSN, NTT DoCoMo, Qualcomm, Samsung | Noted |
R1‑081135 | Way forward on DwPTS design for LTE TDD | Alcatel-Lucent, CATT, CMCC, Ericsson, Huawei, LGE, Motorola, Philips, Qualcomm Europe, Panasonic, Samsung, TD-Tech, T-mobile, Vodafone Group, Nortel, Nokia, Nokia Siemens Networks, ZTE | Agreed |
R1‑081136 | TP on the impact of Uplink Interference Cancellation on the specifications | Qualcomm Europe | Agreed |
R1‑081137 | Summary of AH on AI 6.3.4 “UE Procedures for downlink shared channel” | Ad Hoc chairman | Endorsed |
R1‑081138 | LS reply on NDI vs RV | RAN1, Panasonic | Agreed |
R1‑081139 | PDCCH contents | Ad Hoc moderator | Noted |
R1‑081140 | Resource Allocation type 1 definition details | Alcatel-Lucent, Motorola, Ericsson, LGE | Agreed |
R1‑081141 | LS on RV Sequences for HARQ | RAN1, Nokia Siemens Networks | Agreed |
R1‑081142 | Solutions to PSS resource overlap for TDD LTE | NextWave Wireless, IPWireless | Withdrawn |
R1‑081143 | Way forward on Uplink SCH Hopping via Grant | Motorola, Ericsson, Alcatel-Lucent | Agreed |
R1‑081144 | Reply LS on HSPA RB and SRB configurations in 34.108 | RAN1, Ericsson | Agreed |
R1‑081145 | Reply LS on new MCCH radio bearer configuration in 34.108 | RAN1, Ericsson | Agreed |
R1‑081146 | 25214CR0479r1 (Rel-7, F), Correction to UE grant monitoring | Nokia, Nokia Siemens Networks | Agreed |
R1‑081147 | 25214CR0480r1 (Rel-8, A), Correction to UE grant monitoring | Nokia, Nokia Siemens Networks | Agreed |
R1‑081148 | LS on High Interference Indicator | RAN1, Ericsson | Agreed |
R1‑081149 | LS on status of study item “HS-PDSCH serving cell change enhancements” | RAN1, QUALCOMM Europe | Agreed |
R1‑081150 | LS on Synchronized E-DCH impacts to specifications | RAN1, Nokia Siemens Networks | Agreed |
R1‑081151 | TR25.823 v0.1.3 | Nokia Siemens Networks | Revised |
R1‑081152 | TR25.823 v0.2.0 | Nokia Siemens Networks | Agreed |
R1‑081153 | 36.214 CR0003 (Rel-8, F) Update to 36.214 | Nokia | Revised |
R1‑081154 | TR25.823 v0.1.4 | Nokia Siemens Networks | Missing |
R1‑081155 | 36.211 CR0003 (Rel-8, F) Update of uplink reference-signal hopping, downlink reference signals, scrambling sequences, DwPTS/UpPTS lengths for TDD and control channel processing | Ericsson | Agreed - Revised |
R1‑081156 | LS on L1-related parameters to be configured by RRC | RAN1, Ericsson | Agreed |
R1‑081157 | 36.212 CR0002 (Rel-8, F) Update to 36.212 incorporating decisions from RAN1#51bis and RAN1#52 | Qualcomm Europe | Agreed |
R1‑081158 | 36.213 CR0002 (Rel-8, F) Update of TS36.213 according to changes listed in cover sheet | Motorola | Agreed |
R1‑081159 | 36.214 CR0003r1 (Rel-8, F) Inclusion of agreements from RAN1#51bis and RAN1#52 | Nokia | Agreed |
R1‑081160 | Reply LS on RACH retransmission delay requirements | RAN1, Panasonic | Agreed |
R1‑081161 | 36.211 CR0003r1 (Rel-8, F) Update of uplink reference-signal hopping, downlink reference signals, scrambling sequences, DwPTS/UpPTS lengths for TDD and control channel processing | Ericsson | Agreed |
page generated from database: 2024-12-12 15:02:31