Page 7 - Highlight_Issue_3_final_web
P. 7

Project Co-ordination Group (PCG)
                                                                       TM
                                                      TSG RAN          TSG CT             TSG SA
                                                    Radio Access Network   Core Network & Terminals  Service & System Aspects
                                                       RAN WG1           CT WG1            SA WG1
                                                      Radio Layer 1   User Equipment -     Services
                                                      (Physical layer)  Core Network
                                                                        protocols          SA WG2
                                                       RAN WG2                          System Architecture
                                                     Radio Layer 2 &                      & Services
                                                      Radio Layer 3
                                                   Radio Resource Control  CT WG3          SA WG3
                                                                    Interworking with External   Security and Privacy
                                                                      Networks & Policy
                                                       RAN WG3        & Charging Control   SA WG4
                                                   UTRAN/E-UTRAN/NG-RAN                 Multimedia Codecs,
                                                    architecture and related            Systems and Services
                                                     network interfaces
                                                                         CT WG4            SA WG5
                                                       RAN WG4       Core Network protocols  Management,
                                                     Radio Performance                Orchestration and Charging
                                                     Protocol aspects
                                                                                           SA WG6
                                                      RAN WG5            CT WG6       Application Enablement &
                                                     Mobile Terminal    Smart Card     Critical Communication
                                                    Conformance Testing  Application Aspects  Applications
                                                                                                  © 3GPP
                                     Release 18 timeline decided             Not all of the currently available items will
                                                                             become part of Rel-18, but everything that gets
                                     During the September meetings, all three 3GPP   into the first 5G Advanced release will need the
                                     Technical Specification Groups have approved   approval of all companies in 3 GPP SA, as 3GPP
                                     the Rel-18 timeline, which sets the date for   is based on consensus led decisions.
                                     completion of all protocol related work
                                     (so-called “stage 3 freeze”) to December 2023.   The principle of consensus is key in this
                                                                             discussion. Some jokingly say that it guarantees
                                        “Over 40 proposals for               that everybody is equally unhappy with the
                                                                             outcome, but there is a more important
                                        Rel-18 items are currently           role to it. Consensus means that the Rel-18
                                                                             3GPP specifications will have the support of
                                        under discussion.”                   all companies represented in 3GPP – be it
                                                                             terrestrial or satellite operators, UE, chipset
                                                                             or network vendors or companies from the
                                     This decision was taken although the ongoing   diverse vertical industrial sectors. This broad
                                     Covid-19 pandemic situation still forces 3GPP   agreement shows that companies are willing
                                     to operate in a setting where only electronic   to support the related features and gives a
                                     meetings are possible. With the timeline being   guarantee for the upcoming years, so that
                                     fixed it is now possible to plan the amount   companies can plan their products and services
                                     of technical work which can be done by the   based on 3GPP specifications.
                                     individual 3GPP Working Groups. Nevertheless,   Most of the other 3GPP SA Working Groups
                                     as said above, the content of Rel-18 is still   are currently also starting their discussions and
                                     under discussion.                       work on Rel-18 items. Currently it seems that in
                                     Release 18 content – decision in December  WGs SA3, SA4, SA5 and SA6 no prioritization
                                                                             of items will be needed, as the proposed new
                                     3GPP WG SA1 started to work on Rel-18   items will fit into the available time.
                                     requirements more than a year ago and will
                                     finish the related work by December 2021.   For all the items which will be part of the
                                                                             approved Rel-18 content, 3GPP will look into
                                     In WG SA2, the Architecture Working Group   security (WG SA3), charging, operation and
                                     of TSG SA, over 40 proposals for Rel-18 items   maintenance (WG SA5) issues. As the work
                                     are currently under discussion. An initial rough   on these areas is dependent on the outcome
                                     estimation of the required time for those items   of TSG RAN, WG SA2 and SA6, the related
                                     would require more than twice the amount of   activities will as usual start later during the
                                     time available based on the agreed timeline.   Rel-18 timeline.
                                     As the architectural decisions strongly influence   3GPP TSG SA has some busy discussions ahead
                                     the Rel-18 work in other 3GPP WGs, it was   to determine which of the candidate features
                                     decided to go through a prioritization process   will make it into Rel-18. Once the content
                                     of the WG SA2 items. For that purpose TSG SA   of the new release is approved, in December
                                     will hold another 2 day workshop in December   2021, 3GPP will work on the technical
                                     2021 during which the proposed items will be   specifications to provide a major update to the
                                     further modified and streamlined.
                                                                             5G eco-system within two years.


                                        More about TSG SA here: www.3gpp.org/specifications-group
                                                                                                           |
                                                                                I ssue 03 - O ct ober  2021     07
   2   3   4   5   6   7   8   9   10   11   12