Agenda with allocated Tdocs
Created: 2011-02-07 16:13     Last document: S5-110001
Agenda |
Topic |
Tdoc |
Title |
Source |
Doc-type |
Doc-for |
Avail |
Treated |
Decision |
Wdrn |
Replaced-by |
Replaces |
1 Opening of the meeting
|
|
|
|
|
|
|
|
|
|
| 2 Approval of the agenda and registration of new documents S5-110001 |
Agenda |
WG Chairman |
agenda |
approval |
Yes |
Yes |
approved as Rev.1 |
No |
|
| 3 IPR declaration S5-110081 |
IPR declaration |
WG Chairman |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| 4 Meetings and activities reports
|
|
|
|
|
|
|
|
|
|
| 4.1 Last SA5 meeting report S5-110002 |
Report from last SA5 meeting |
MCC |
meeting report |
agreement |
Yes |
Yes |
approved |
No |
|
| 4.2 Last SA meeting report S5-110003 |
Report from last SA meeting |
WG Chairman |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 4.3 LS status
|
|
|
|
|
|
|
|
|
|
| 4.4 Inter-organizational communication reports S5-110384 |
Report of methodology coordination with ITU-T |
Ericsson (Thomas) |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| 4.5 Other reports
|
|
|
|
|
|
|
|
|
|
| 5 Cross-SWG issues at SA5 level
|
|
|
|
|
|
|
|
|
|
| 5.1 Administrative issues at SA5 level S5-110014 |
SA5 Working Procedures - Update for thread number |
WG Chairman |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110015 |
SA5 Meeting Facility Requirements |
WG Chairman |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110016 |
Draft TS/TR Management Process |
WG Vice Chair (Thomas) |
other |
discussion |
Yes |
Yes |
revised to S5-110387 |
No |
S5-110387 |
| |
|
S5-110387 |
Draft TS/TR Management Process |
WG Vice Chair (Thomas) |
other |
discussion |
Yes |
Yes |
approved |
No |
| S5-110016 |
|
|
S5-110017 |
CR Quality Check |
MCC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110063 |
Agenda Leaders Meeting |
WG Chairman |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110064 |
Minutes Leaders Meeting |
WG Chairman |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110080 |
SA5 specifications (NOT) to be automatically lifted to Rel-10 |
MCC |
other |
discussion |
Yes |
Yes |
noted (SWG Chairs should report at SA5#76) |
No |
|
| |
|
S5-110307 |
Guidance for CR creation and allocation of CR numbers |
MCC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110388 |
Updated template of the Rapporteur Report |
WG Chair |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| 5.2 Meeting calendar S5-110013 |
SA5 Meeting Calendar |
WG Chairman |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| 5.3 Technical issues at SA5 level
|
|
|
|
|
|
|
|
|
|
| 5.4 Review of the 3GPP Work Plan S5-110018 |
TR 30.820 Project scheduling for SA5 Release 10 |
MCC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110019 |
TR 30.821 Project scheduling for SA5 Release 11 |
MCC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110020 |
SA5 3GPP Work Plan |
MCC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110021 |
Deliverables due for the NEXT SA Plenary |
MCC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| 6 OAM&P (Operations, Administration, Maintenance & Provisioning
|
|
|
|
|
|
|
|
|
|
| 6.1 OAM&P Plenary S5-110004 |
OAM Time Plan |
WG Chairman |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110083 |
Ongoing action items from 3GPPSA5#74_Jacksonville |
MCC |
meeting report |
approval |
Yes |
Yes |
noted (all action were DISCHARGED) |
No |
|
| |
|
S5-110005 |
OAM Detailed Report from LAST Meeting |
OAM SWG Chair |
meeting report |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110006 |
OAM Executive Report from THIS Meeting |
OAM SWG Chair |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110007 |
OAM Detailed Report from THIS Meeting |
OAM SWG Chair |
meeting report |
approval |
No |
No |
to be provided after the meeting |
No |
|
| |
|
S5-110067 |
RESUBMITTED S5-103077 LS_in on OAM architecture aspects for RNs |
R3-102541 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-110369 (Robert) |
No |
|
| |
|
S5-110369 |
LS_out Reply to RAN3 on OAM architecture aspects for RNs (S5-110067 / R3-102541 / RESUBMITTED S5-103077) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-110536 |
No |
S5-110536 |
| |
|
S5-110536 |
LS_out Reply to RAN3 on OAM architecture aspects for RNs (S5-110067 / R3-102541 / RESUBMITTED S5-103077) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-110546 |
No |
S5-110546 |
S5-110369 |
|
|
S5-110546 |
LS_out Reply to RAN3 on OAM architecture aspects for RNs (S5-110067 / R3-102541 / RESUBMITTED S5-103077) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
| S5-110536 |
|
|
S5-110068 |
RESUBMITTED S5-103082 LS_in on H(e)NB related LI requirement |
SA3LI10_056r2 |
i/c LS |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#76 San Diego |
No |
|
| |
|
S5-110069 |
RESUBMITTED S5-103085 LS_in Reply on updated BBF documents and follow up to S5-102574 |
BBF liaison bbf2010_1095_02 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-110370 (Padma) |
No |
|
| |
|
S5-110370 |
LS_out Reply to BBF (S5-110072 and S5-110069 / RESUBMITTED S5-103085) on updated BBF documents and follow up to S5-102574 |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-110498 |
No |
S5-110498 |
| |
|
S5-110498 |
LS_out Reply to BBF (S5-110072 and S5-110069 / RESUBMITTED S5-103085) on updated BBF documents and follow up to S5-102574 |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
| S5-110370 |
|
|
S5-110070 |
RESUBMITTED S5-103087 LS_in on RN E-CGI configuration by O&M |
R3-103091 |
i/c LS |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#76 San Diego |
No |
|
| |
|
S5-110072 |
LS_in from BBF on Received 3GPP Liaison S5-103276 and additional data modelling questions |
BBF liaison bbf2010.1419.01 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-110370 (Padma) |
No |
|
| |
|
S5-110075 |
LS_in from ITU-T SG2 (Geneva, 9-18 Nov 2010) on Updates on the status of Web-Service/XML based design and harmonization |
COM2-LS 85-E |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110363 |
RESUBMITTED S5-103088 LS_in from RAN2 on mapping Uu bearers to Un bearers for relays |
R2-105996 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-110464 |
No |
|
| |
|
S5-110464 |
LS_out Reply to S5-110363 / RESUBMITTED S5-103088 LS_in from RAN2 on mapping Uu bearers to Un bearers for relays |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-110515 |
No |
S5-110515 |
| |
|
S5-110515 |
LS_out Reply to RAN2 on mapping Uu bearers to Un bearers for relays (S5-110363 / RESUBMITTED S5-103088) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
revised in S5-110549 |
No |
S5-110549 |
S5-110464 |
|
|
S5-110549 |
LS_out Reply to RAN2 on mapping Uu bearers to Un bearers for relays (S5-110363 / RESUBMITTED S5-103088) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
| S5-110515 |
|
|
S5-110386 |
LS_out more comprehensive Reply to SA5#74 Jacksonville S5-103072 / R3-101768 (RESUBMITTED LS_in on Multiple trace session) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-110442 |
No |
S5-110442 |
| |
|
S5-110442 |
LS_out Reply to RAN3 on Multiple trace session S5-103072 / R3-101768 (contact Huawei: Zou Lan) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
No |
withdrawn |
Yes |
| S5-110386 |
|
|
S5-110492 |
LS_in Reply from SA3 to CT6 (cc: SA1, SA5) on Hosting Party Module for H(e)NB (S3-110157 / C6-100634) |
S3-110184 |
i/c LS |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#76 San Diego |
No |
|
| |
|
S5-110510 |
Minutes of breakout session on Relay mgmt model |
Ericsson (Thomas) |
meeting report |
discussion |
Yes |
Yes |
noted |
No |
|
| 6.2 New OAM&P Work Item proposals S5-110358 |
New WID on UTRAN Self-Organizing Networks (SON) management |
Huawei, Orange |
New WID |
agreement |
Yes |
Yes |
revised to S5-110371 |
No |
S5-110371 |
| |
|
S5-110371 |
New WID on UTRAN Self-Organizing Networks (SON) management |
Huawei, Orange |
New WID |
agreement |
Yes |
Yes |
revised to S5-110516 |
No |
S5-110516 |
S5-110358 |
|
|
S5-110516 |
New WID on UTRAN Self-Organizing Networks (SON) management |
Huawei, Orange |
New WID |
agreement |
Yes |
Yes |
approved |
No |
| S5-110371 |
|
|
S5-110359 |
New WID on Enhanced Management of UE based network performance measurements |
Huawei |
New WID |
agreement |
Yes |
Yes |
revised to S5-110372 |
No |
S5-110372 |
| |
|
S5-110372 |
New WID on Enhanced Management of UE based network performance measurements |
Huawei |
New WID |
agreement |
Yes |
Yes |
revised to S5-110517 |
No |
S5-110517 |
S5-110359 |
|
|
S5-110517 |
New WID on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) |
Huawei |
New WID |
agreement |
Yes |
Yes |
revised to S5-110537 |
No |
S5-110537 |
S5-110372 |
|
|
S5-110537 |
New WID on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) |
Huawei |
New WID |
agreement |
Yes |
Yes |
approved |
No |
| S5-110517 |
|
|
S5-110362 |
New WID IMS performance management enhancement |
ZTE |
New WID |
agreement |
Yes |
Yes |
revised to S5-110494 |
No |
S5-110494 |
| |
|
S5-110494 |
New WID IMS performance management enhancement |
ZTE |
New WID |
agreement |
Yes |
Yes |
revised to S5-110518 |
No |
S5-110518 |
S5-110362 |
|
|
S5-110518 |
New WID on IMS Performance Management enhancements (OAM-ePM-IMS) |
ZTE |
New WID |
agreement |
Yes |
Yes |
approved |
No |
| S5-110494 |
6.3 OAM&P Maintenance and Rel-10 small Enhancements S5-110022 |
Agenda OAM&P Maintenance and Rel-10 small Enhancements |
OAM SWG Chair |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-110084 |
CR R10 32.300-920 name convention |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110389 |
No |
S5-110389 |
| |
|
S5-110389 |
CR R10 32.300-920 name convention |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110514 |
No |
S5-110514 |
S5-110084 |
|
|
S5-110514 |
CR R10 32.300-920 name convention |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110389 |
|
|
S5-110102 |
CR R10 32.762 Add attributes to RNFunction |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110390 |
No |
S5-110390 |
| |
|
S5-110390 |
CR R10 32.762 Add attributes to RNFunction |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110511 |
No |
S5-110511 |
S5-110102 |
|
|
S5-110511 |
CR R10 32.762 Add attributes to RNFunction |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110390 |
|
|
S5-110103 |
CR R10 32.766 Add attributes to RNFunction |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110391 |
No |
S5-110391 |
| |
|
S5-110391 |
CR R10 32.766 Add attributes to RNFunction |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110520 |
No |
S5-110520 |
S5-110103 |
|
|
S5-110520 |
CR R10 32.766 Add attributes to RNFunction |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110391 |
|
|
S5-110104 |
CR R10 32.762 Add QciDscpMapping IOC |
Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone |
CR |
agreement |
Yes |
Yes |
revised to S5-110392 |
No |
S5-110392 |
| |
|
S5-110392 |
CR R10 32.762 Add QciDscpMapping IOC |
Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110104 |
|
|
S5-110105 |
CR R10 32.766 Add QciDscpMapping IOC |
Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone |
CR |
agreement |
Yes |
Yes |
revised to S5-110393 |
No |
S5-110393 |
| |
|
S5-110393 |
CR R10 32.766 Add QciDscpMapping IOC |
Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110105 |
|
|
S5-110106 |
CR R10 32.762 Add relay IOCs to be connected by the EP_RP_EPS |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110394 |
No |
S5-110394 |
| |
|
S5-110394 |
CR R10 32.762 Add relay IOCs to be connected by the EP_RP_EPS |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110106 |
|
|
S5-110107 |
CR R10 32.766 Add relay IOCs to be connected by the EP_RP_EPS |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-110108 |
CR R10 32.762 Add containment relations for relay |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110109 |
CR R10 32.766 Add containment relations for relay |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110110 |
CR R10 32.425 Add RRC connection setup related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone |
CR |
agreement |
Yes |
Yes |
revised to S5-110397 |
No |
S5-110397 |
| |
|
S5-110397 |
CR R10 32.425 Add RRC connection setup related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110110 |
|
|
S5-110111 |
CR R10 32.425 Add RRC connection reestablishment related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone |
CR |
agreement |
Yes |
Yes |
revised to S5-110398 |
No |
S5-110398 |
| |
|
S5-110398 |
CR R10 32.425 Add RRC connection reestablishment related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone |
CR |
agreement |
Yes |
Yes |
revised to S5-110512 |
No |
S5-110512 |
S5-110111 |
|
|
S5-110512 |
CR R10 32.425 Add RRC connection reestablishment related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110398 |
|
|
S5-110112 |
CR R10 32.425 Add E-RAB setup related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110399 |
No |
S5-110399 |
| |
|
S5-110399 |
CR R10 32.425 Add E-RAB setup related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110112 |
|
|
S5-110113 |
CR R10 32.425 Add E-RAB release related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110400 |
No |
S5-110400 |
| |
|
S5-110400 |
CR R10 32.425 Add E-RAB release related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110519 |
No |
S5-110519 |
S5-110113 |
|
|
S5-110519 |
CR R10 32.425 Add E-RAB release related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110400 |
|
|
S5-110114 |
CR R10 32.425 Add HO related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone |
CR |
agreement |
Yes |
Yes |
revised to S5-110401 |
No |
S5-110401 |
| |
|
S5-110401 |
CR R10 32.425 Add HO related measurements to RN |
Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110114 |
|
|
S5-110115 |
CR R10 32.425 Apply the eNodeB measurements to DeNB |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110402 |
No |
S5-110402 |
| |
|
S5-110402 |
CR R10 32.425 Apply the eNodeB measurements to DeNB |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110115 |
|
|
S5-110116 |
CR R10 32.425 Add Un user plane data bytes measurements for DeNB |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110403 |
No |
S5-110403 |
| |
|
S5-110403 |
CR R10 32.425 Add Un user plane data bytes measurements for DeNB |
Motorola Solutions, Nokia Siemens Networks, China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110116 |
|
|
S5-110117 |
Discussion paper on CS fallback related measurement |
Ericsson |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110305 |
Discussion paper on CS fallback related measurement |
Vodafone |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110118 |
CR R8 32.450 Correct Accessibility formula |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110404 |
No |
S5-110404 |
| |
|
S5-110404 |
CR R8 32.450 Correct Accessibility formula |
Ericsson |
CR |
agreement |
No |
No |
withdrawn |
Yes |
| S5-110118 |
|
|
S5-110119 |
CR R9 32.450 Correcting Accessibility formula |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110405 |
No |
S5-110405 |
| |
|
S5-110405 |
CR R9 32.450 Correcting Accessibility formula |
Ericsson |
CR |
agreement |
No |
No |
withdrawn |
Yes |
| S5-110119 |
|
|
S5-110120 |
CR R8 32.425 Add missing rrc connection reattempts |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110406 |
No |
S5-110406 |
| |
|
S5-110406 |
CR R8 32.425 Add missing rrc connection reattempts |
Ericsson |
CR |
agreement |
No |
No |
withdrawn |
Yes |
| S5-110120 |
|
|
S5-110121 |
CR R9 32.425 Add missing rrc connection reattempts |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110407 |
No |
S5-110407 |
| |
|
S5-110407 |
CR R9 32.425 Add missing rrc connection reattempts |
Ericsson |
CR |
agreement |
No |
No |
withdrawn |
Yes |
| S5-110121 |
|
|
S5-110122 |
CR R10 32.425 Add missing rrc connection reattempts |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110408 |
No |
S5-110408 |
| |
|
S5-110408 |
CR R10 32.425 Add missing rrc connection reattempts |
Ericsson |
CR |
agreement |
No |
No |
withdrawn |
Yes |
| S5-110122 |
|
|
S5-110123 |
CR R8 32.425 Add missing S1 reset to E-RAB release |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110124 |
CR R9 32.425 Add missing S1 reset to E-RAB release |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110139 |
CR R10 32.642 Methodology Cleanup |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved (parked waiting for SS CR) |
No |
|
| |
|
S5-110140 |
CR R10 32.652 Methodology Cleanup |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved (parked waiting for SS CR) |
No |
|
| |
|
S5-110160 |
CR R10 32.412 Add the missing exceptions in create measurement operation |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110409 |
No |
S5-110409 |
| |
|
S5-110409 |
CR R10 32.412 Add the missing exceptions in create measurement operation |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110160 |
|
|
S5-110162 |
CR R10 32.416 Add missing exceptions in create measurement operation - Align with 32.412 IS |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110410 |
No |
S5-110410 |
| |
|
S5-110410 |
CR R10 32.416 Add missing exceptions in create measurement operation - Align with 32.412 IS |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110162 |
|
|
S5-110163 |
CR R9 32.409 Correcting the measurements object classes - Align with 32.732 IS |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110164 |
CR R10 32.409 Correcting the measurements object classes - Align with 32.732 IS |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110165 |
CR R10 32.426 Add combined TA&LA update procedure related measurements |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110411 |
No |
| S5-110411 |
|
|
S5-110411 |
CR R10 32.426 Add combined TA&LA update procedure related measurements |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110165 |
|
|
S5-110167 |
CR R10 32.426 Correct Service Request related measurements |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110412 |
No |
S5-110412 |
| |
|
S5-110412 |
CR R10 32.426 Correct Service Request related measurements |
ZTE |
CR |
agreement |
No |
No |
withdrawn |
Yes |
| S5-110167 |
|
|
S5-110177 |
CR R10 32.446 Add missing input parameter of activateTraceJob |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110413 |
No |
S5-110413 |
| |
|
S5-110413 |
CR R10 32.446 Add missing input parameter of activateTraceJob |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110513 |
No |
S5-110513 |
S5-110177 |
|
|
S5-110513 |
CR R10 32.446 Add missing input parameter of activateTraceJob |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110413 |
|
|
S5-110180 |
CR R8 32.425 Correcting collection method for RACH usage counter |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110185 |
CR R9 32.425 Correcting collection method for RACH usage counter |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110186 |
CR R10 32.425 Correcting collection method for RACH usage counter |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110181 |
CR R10 32.526 Correcting support qualifiers of SONControl attributes |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110183 |
CR R10 32.425 Add measurements on power utilization |
Huawei |
CR |
agreement |
Yes |
Yes |
revised to S5-110416 |
No |
S5-110416 |
| |
|
S5-110416 |
CR R10 32.425 Add measurements on power utilization |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110183 |
|
|
S5-110200 |
CR R10 32.446 add a notification parameter mapping |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110417 |
No |
S5-110417 |
| |
|
S5-110417 |
CR R10 32.446 add a notification parameter mapping |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110200 |
|
|
S5-110216 |
CR R10 32.111-6 Correcting qualifier of clearUserId in XML schema - Align with 32.111-2 IS |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110437 |
No |
S5-110437 |
| |
|
S5-110436 |
CR R10 32.111-2 CR#0064 Correcting qualifier of clearUserId |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110437 |
CR R10 32.111-6 Correcting qualifier of clearUserId in XML schema - Align with 32.111-2 IS |
ZTE |
CR |
agreement |
No |
No |
withdrawn |
Yes |
| S5-110216 |
|
|
S5-110223 |
CR R10 32.762 Add attributes to EUtranGenericCell and EUtranRelation IOC |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
Yes |
Yes |
revised to S5-110418 |
No |
S5-110418 |
| |
|
S5-110418 |
CR R10 32.762 Add attributes to EUtranGenericCell and EUtranRelation IOC |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110223 |
|
|
S5-110242 |
CR R10 32.762 Correcting Relay and Donor eNodeB NRM |
China Mobile, Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110509 |
No |
S5-110509 |
| |
|
S5-110509 |
CR R10 32.762 Correcting Relay and Donor eNodeB NRM |
China Mobile, Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110242 |
|
|
S5-110256 |
CR R10 32.692 Addition of capacity attribute |
China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110257 |
CR R10 32.696 Addition of capacity attribute |
China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110258 |
CR R10 32.756 Correct MMEFunction attributes to align with 32.752 |
China Mobile |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110268 |
CR R8 32.607 Correcting basic CM definition |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110476 |
No |
S5-110476 |
| |
|
S5-110476 |
CR R8 32.607 Correcting basic CM definition |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110268 |
|
|
S5-110269 |
CR R9 32.607 Correcting basic CM definition |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110477 |
No |
S5-110477 |
| |
|
S5-110477 |
CR R9 32.607 Correcting basic CM definition |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110269 |
|
|
S5-110271 |
CR R8 32.665 Correcting KernelCMNotif |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110478 |
No |
S5-110478 |
| |
|
S5-110478 |
CR R8 32.665 Correcting KernelCMNotif |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110271 |
|
|
S5-110272 |
CR R9 32.665 Correcting KernelCMNotif |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110479 |
No |
S5-110479 |
| |
|
S5-110479 |
CR R9 32.665 Correcting KernelCMNotif |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110272 |
|
|
S5-110273 |
CR R10 32.666 Correcting KernelCMNotif |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110480 |
No |
S5-110480 |
| |
|
S5-110480 |
CR R10 32.666 Correcting KernelCMNotif |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110273 |
|
|
S5-110274 |
CR R8 32.667 Correcting import statement |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110473 |
No |
S5-110473 |
| |
|
S5-110473 |
CR R8 32.667 Correcting import statement |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110274 |
|
|
S5-110275 |
CR R9 32.667 Correcting import statement |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110474 |
No |
S5-110474 |
| |
|
S5-110474 |
CR R9 32.667 Correcting import statement |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110275 |
|
|
S5-110276 |
CR R8 32.367 Correcting Entry Point IRP |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110470 |
No |
S5-110470 |
| |
|
S5-110470 |
CR R8 32.367 Correcting Entry Point IRP |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110276 |
|
|
S5-110277 |
CR R9 32.367 Correcting Entry Point IRP |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110471 |
No |
S5-110471 |
| |
|
S5-110471 |
CR R9 32.367 Correcting Entry Point IRP |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110277 |
|
|
S5-110293 |
CR R10 32.425 Add RNReconfiguration related measurements to RN |
China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110430 |
No |
S5-110430 |
| |
|
S5-110430 |
CR R10 32.425 Add RNReconfiguration related measurements to RN |
China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110293 |
|
|
S5-110294 |
CR R10 32.752 Add relayFlag attribute to MMEFunction |
China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110431 |
No |
S5-110431 |
| |
|
S5-110431 |
CR R10 32.752 Add relayFlag attribute to MMEFunction |
China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110294 |
|
|
S5-110491 |
CR R10 32.756 CR#0005 Add relayFlay attribute to MMEFunction and externalMMEFunction - Align with 32.752 IS |
China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110310 |
CR R9 32.422 Change the support qualifier of 'List of NE types to trace parameter' to conditional mandatory |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110311 |
CR R10 32.422 Change the support qualifier of 'List of NE types to trace parameter' to conditional mandatory |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110312 |
CR R9 32.422 Correcting start triggering event in MME in case of HSS Initiated Trace Session Activation for the attach procedure |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110313 |
CR R10 32.422 Correcting start triggering event in MME in case of HSS Initiated Trace Session Activation for the attach procedure |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110314 |
CR R9 32.422 Correcting start and stop triggering events in Mobility Management Entity (MME) |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110315 |
CR R10 32.422 Correcting start and stop triggering events in Mobility Management Entity (MME) |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110316 |
CR R10 32.421 Add missing interfaces S13,S13' for Equipment Information Register (EIR) |
ZTE |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110317 |
CR R10 32.422 Add missing interfaces S13,S13' for Equipment Information Register (EIR) |
ZTE |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110318 |
CR R10 32.423 Add missing S13,S13' interface trace Record Content for Equipment Information Register (EIR) NE |
ZTE |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110320 |
CR R10 32.422 Add missing interface table and Sh interface for Home Subscriber Server (HSS) |
ZTE |
CR |
agreement |
Yes |
Yes |
revised in S5-110432 |
No |
S5-110432 |
| |
|
S5-110432 |
CR R10 32.422 Add missing interface table and Sh interface for Home Subscriber Server (HSS) |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110320 |
|
|
S5-110322 |
CR R10 32.422 Clarify trace parameters for E-UTRAN activation mechanism and update EPC starting mechanism - Align with 32.441 |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110433 |
No |
S5-110433 |
| |
|
S5-110433 |
CR R10 32.422 Clarify trace parameters for E-UTRAN activation mechanism and update EPC starting mechanism - Align with 32.441 |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110322 |
|
|
S5-110324 |
CR R10 32.422 Add support for subscriber trace on PDN-GW for GTP based S2b - Align with SA2 TS 23.402 |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110329 |
CR R10 32.425 Add measurements for radio coverage, radio/transport/hardware resource utilization, handover triggering, RACH performance (technically identical to S5-110222/S5-110303 using latest CR template) |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
Yes |
Yes |
revised to S5-110435 |
No |
S5-110435 |
| |
|
S5-110435 |
CR R10 32.425 Add measurements for radio coverage, radio/transport/hardware resource utilization, handover triggering, RACH performance (technically identical to S5-110222/S5-110303 using latest CR template) |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
No |
Yes |
split into 3 CRs in S5-110522 |
No |
S5-110522 |
S5-110329 |
|
|
S5-110522 |
CR R10 32.425 CR#0053 |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
Yes |
Yes |
revised to S5-110550 |
No |
S5-110550 |
S5-110435 |
|
|
S5-110550 |
CR R10 32.425 CR#0053 |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
Yes |
Yes |
revised to S5-110551 |
No |
S5-110551 |
S5-110522 |
|
|
S5-110551 |
CR R10 32.425 CR#0053 |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110550 |
|
|
S5-110524 |
CR R10 32.425 CR#0055 |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
Yes |
Yes |
revised to S5-110539 |
No |
S5-110539 |
S5-110435 |
|
|
S5-110548 |
CR R10 32.425 CR#0054 |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110538 |
|
|
S5-110539 |
CR R10 32.425 CR#0055 |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
Yes |
No |
for email discussion |
No |
| S5-110524 |
|
|
S5-110523 |
CR R10 32.425 CR#0054 |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
Yes |
Yes |
revised in S5-110538 |
No |
S5-110538 |
S5-110435 |
|
|
S5-110538 |
CR R10 32.425 CR#0054 |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
agreement |
Yes |
Yes |
revised to S5-110548 |
No |
S5-110548 |
S5-110523 |
|
|
S5-110330 |
CR R10 32.606 Correcting basic CM definition |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110475 |
No |
S5-110475 |
| |
|
S5-110475 |
CR R10 32.606 Correcting basic CM definition |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110330 |
|
|
S5-110331 |
CR R10 32.366 Correcting Entry Point IRP |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110472 |
No |
S5-110472 |
| |
|
S5-110472 |
CR R10 32.366 Correcting Entry Point IRP |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110331 |
|
|
S5-110368 |
LS_in from RAN2 on L2 measurements in DeNB having Relay Node (to: SA5; cc: RAN3; contact: NSN) |
R2-110700 |
i/c LS |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#76 San Diego |
No |
|
| |
|
S5-110414 |
CR R8 32.443 CR#0003 Add missing input parameter of activateTraceJob |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110415 |
CR R9 32.443 CR#0004 Add missing input parameter of activateTraceJob |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110434 |
CR R10 32.425 CR#0052 Add measurements to RN |
Ericsson (Yunxi) |
CR |
approval |
Yes |
No |
withdrawn |
Yes |
|
| 6.4 OAM&P 10 Network Infrastructure Management (460032)
|
|
|
|
|
|
|
|
|
|
| 6.4.1 OAM&P for LIPA_SIPTO (450040) S5-110023 |
Agenda OAM&P for LIPA_SIPTO (450040) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-110042 |
Minutes OAM&P for LIPA_SIPTO (450040) |
Rapporteur |
meeting report |
approval |
No |
No |
withdrawn |
Yes |
|
| 6.4.2 Common RAT Network Resource Model (460033) S5-110024 |
Agenda Common RAT Network Resource Model (460033) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110085 |
pCR on Generic RAN NRM IRP d32792-020 |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
merged S5-110085, S5-110170, S5-110171 revised to S5-110457 |
No |
S5-110457 |
| |
|
S5-110170 |
pCR R10 32.792 Add association for UTRAN and EUTRAN sharing |
ZTE |
pseudo CR |
approval |
Yes |
Yes |
merged S5-110085, S5-110170, S5-110171 revised to S5-110457 |
No |
S5-110457 |
| |
|
S5-110171 |
pCR R10 32.792 Add inheritance relationship of Common RAT NRM |
ZTE |
pseudo CR |
approval |
Yes |
Yes |
merged S5-110085, S5-110170, S5-110171 revised to S5-110457 |
No |
S5-110457 |
| |
|
S5-110457 |
pCR on Generic RAN NRM IRP d32792-020 |
Ericsson, ZTE |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-110085 |
|
|
S5-110093 |
pCR TS 32.792 Addition of common BTS function |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-110458 |
No |
S5-110458 |
| |
|
S5-110458 |
pCR TS 32.792 Addition of common BTS function |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-110093 |
|
|
S5-110249 |
pCR 32.792-021 Editor's proposal |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110250 |
First draft TS 32.796 Telecommunication management: Generic Radio Access Network (RAN) Network Resource Model (NRM) Integration Reference Point (IRP): Solution Set (SS) |
Ericsson |
draft TS/TR |
discussion |
Yes |
Yes |
for email approval |
No |
|
| |
|
S5-110043 |
Minutes Common RAT Network Resource Model (460033) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.4.3 IRP Solution Set Specification Organization Improvements (470035) S5-110025 |
Agenda IRP Solution Set Specification Organization Improvements (470035) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-110044 |
Minutes IRP Solution Set Specification Organization Improvements (470035) |
Rapporteur |
meeting report |
approval |
No |
No |
withdrawn |
Yes |
|
| 6.4.4 Service Oriented Architecture (SOA) for IRP continuation (470036) S5-110026 |
Agenda Service Oriented Architecture (SOA) for IRP continuation (470036) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-110045 |
Minutes Service Oriented Architecture (SOA) for IRP continuation (470036) |
Rapporteur |
meeting report |
approval |
No |
No |
withdrawn |
Yes |
|
| 6.4.5 IRP Overview, Profiles, Usage Guide (480042) S5-110027 |
Agenda IRP Overview, Profiles, Usage Guide (480042) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-110096 |
pCR 32.103 Additional IRP Overview Input |
Nokia Siemens Networks |
pseudo CR |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-110101 |
pcR 32.103 Input for IRP Packaging Suggestions |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110046 |
Minutes IRP Overview, Profiles, Usage Guide (480042) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.5 OAM&P 10 Performance Management (470039)
|
|
|
|
|
|
|
|
|
|
| 6.5.1 Key Performance Indicators (KPIs) for IMS (470040) S5-110028 |
Agenda Key Performance Indicators (KPIs) for IMS (470040) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110125 |
pCR R10 32.454 Correct Call Drop Rate |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110126 |
CR R10 32.409 Add dropped session measurements |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110127 |
CR R10 32.409 Enhance session establishment measurements |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110459 |
No |
S5-110459 |
| |
|
S5-110459 |
CR R10 32.409 Enhance session establishment measurements |
Ericsson |
CR |
agreement |
No |
No |
withdrawn |
Yes |
| S5-110127 |
|
|
S5-110259 |
pCR 32.454 update system capacity information |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-110454 |
No |
S5-110454 |
| |
|
S5-110454 |
pCR 32.454 update system capacity information |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-110259 |
|
|
S5-110260 |
Presentation of TS32.454 to SA#51 for approval |
China Mobile |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110460 |
pCR R10 32.454 clarification on Session Establishment Success Rate |
Ericsson |
pseudo CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110047 |
Minutes Key Performance Indicators (KPIs) for IMS (470040) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.5.2 Key Performance Indicators (KPIs) for EPC (470041) S5-110029 |
Agenda Key Performance Indicators (KPIs) for EPC (470041) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110261 |
pCR 32.455 update system capacity information |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-110455 |
No |
S5-110455 |
| |
|
S5-110455 |
pCR 32.455 update system capacity information |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-110261 |
|
|
S5-110262 |
Presentation of TS32.455 to SA#51 for approval |
China Mobile |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110048 |
Minutes Key Performance Indicators (KPIs) for EPC (470041) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.5.3 Management of UE based network performance measurements (470042) S5-110030 |
Agenda Management of UE based network performance measurements (470042) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved as R1 |
No |
|
| |
|
S5-110065 |
CR R10 32.442 Adding MDT to Trace IRP |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
merged S5-110065 with S5-110187 and revised to S5-110385 |
No |
S5-110385 |
| |
|
S5-110187 |
CR R10 32.442 extend activeTraceJob to support MDT configuration |
Huawei |
CR |
agreement |
Yes |
Yes |
merged S5-110065 with S5-110187 and revised to S5-110385 |
No |
| S5-110385 |
|
|
S5-110385 |
CR R10 32.442 Adding MDT to Trace IRP |
Nokia Siemens Networks, Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110065 |
|
|
S5-110076 |
LS_in from SA2 on Second LS reply to S2-105021/S5-102526 on Location Information for MDT from SA5 |
S2-105960 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110157 |
CR R10 32.422 Rapporteur cleanup on MDT |
Nokia Siemens Networks |
CR |
agreement |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-110188 |
CR R10 32.446 extend activeTraceJob to support MDT configuration |
Huawei |
CR |
agreement |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-110192 |
CR R10 32.441 Rapporteur Cleanup Proposal on replacement of 'UE based Performance Measurements' to 'MDT' |
Huawei |
CR |
agreement |
Yes |
Yes |
revised to S5-110377 |
No |
S5-110377 |
| |
|
S5-110377 |
CR R10 32.441 Rapporteur Cleanup Proposal on replacement of 'UE based Performance Measurements' to 'MDT' |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110192 |
|
|
S5-110193 |
pCR Discussion Paper for MDT data sharing |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110245 |
Discussion paper on user consent in MDT activation mechanism |
NEC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110308 |
CR R10 32.422 Correcting the handling of MDT trace at handovers |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110380 |
No |
S5-110380 |
| |
|
S5-110380 |
CR R10 32.422 Correcting the handling of MDT trace at handovers |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110521 |
No |
S5-110521 |
S5-110308 |
|
|
S5-110521 |
CR R10 32.422 Correcting the handling of MDT trace at handovers |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110380 |
|
|
S5-110309 |
CR R10 32.422 defining exact coding of MDT parameters |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
merged S5-110309 with S5-110321 and revised to S5-110381 |
No |
S5-110381 |
| |
|
S5-110321 |
CR R10 32.422 Add Bit information to Minimization of Drive Tests (MDT) measurements configuration |
Huawei |
CR |
agreement |
Yes |
Yes |
merged S5-110309 with S5-110321 and revised to S5-110381 |
No |
| S5-110381 |
|
|
S5-110381 |
CR R10 32.422 defining exact coding of Minimization of Drive Tests (MDT) parameters |
Nokia Siemens Networks, Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110309 |
|
|
S5-110323 |
CR R10 32.422 Add the usage of UE capability in Trace Session Activation |
ZTE |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110325 |
CR R10 32.422 Clarify that there can be only one TRSR per TR at a given time per UE trace session for signalling based trace |
Alcatel-Lucent, Nokia Siemens Networks, Ericsson, Huawei |
CR |
agreement |
Yes |
Yes |
revised to S5-110525 |
No |
S5-110525 |
| |
|
S5-110525 |
CR R10 32.422 Clarify that there can be only one TRSR per TR at a given time per UE trace session for signalling based trace |
Alcatel-Lucent, Nokia Siemens Networks, Ericsson, Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110325 |
|
|
S5-110326 |
CR R10 32.422 Include the user consent in MDT procedures as required by SA3 (Security) |
NEC |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110327 |
CR R10 32.421 Add requirements for security and privacy of UE-based Network Performance Measurements / MDT as required by SA3 (Security) |
Telecom Italia, China Unicom |
CR |
agreement |
Yes |
Yes |
revised to S5-110379 (Simone) |
No |
| S5-110379 |
|
|
S5-110379 |
CR R10 32.421 Add requirements for security and privacy of UE-based Network Performance Measurements / MDT as required by SA3 (Security) |
Telecom Italia, China Unicom |
CR |
agreement |
Yes |
Yes |
revised to S5-110465 |
No |
S5-110465 |
S5-110327 |
|
|
S5-110465 |
CR R10 32.421 Add requirements for security and privacy of UE-based Network Performance Measurements / MDT as required by SA3 (Security) |
Telecom Italia, China Unicom |
CR |
agreement |
Yes |
Yes |
revised to S5-110526 |
No |
| S5-110379 |
|
|
S5-110526 |
CR R10 32.421 Add requirements for security and privacy of UE-based Network Performance Measurements / MDT as required by SA3 (Security) |
Telecom Italia, China Unicom |
CR |
agreement |
Yes |
Yes |
revised to S5-110540 |
No |
S5-110540 |
S5-110465 |
|
|
S5-110540 |
CR R10 32.421 Add requirements for security and privacy of UE-based Network Performance Measurements / MDT as required by SA3 (Security) |
Telecom Italia, China Unicom |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110526 |
|
|
S5-110328 |
CR R10 32.441 Include the user consent in MDT procedures as required by SA3 (Security) |
Telecom Italia |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110335 |
Alternative way for getting the IP address of TCE Resubmission of S5-103123 |
Nokia Siemens Networks |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110366 |
LS_in from RAN2 on Reply LS to S5-103373 = R2-110029 on MDT related UE capabilities (to: SA5; contact: Qualcomm) |
R2-110697 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-110374 (Gyula) |
No |
|
| |
|
S5-110374 |
LS_out Reply to RAN2 on MDT related UE capabilities (S5-110366 / R2-110697) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-110528 |
No |
S5-110528 |
| |
|
S5-110528 |
LS_out Reply to RAN2 on MDT related UE capabilities (S5-110366 / R2-110697) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
| S5-110374 |
|
|
S5-110367 |
LS_in from RAN2 on Reply LS to S3-101422 = R2-106876 on MDT user involvement (to: SA3, SA5; cc: SA1, RAN3; contact: Mediatek) |
R2-110699 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-110376 (Zou Lan) |
No |
|
| |
|
S5-110376 |
LS_out Reply to S5-110367 LS_in from RAN2 on Reply LS to S3-101422 = R2-106876 on MDT user involvement (to: SA3, SA5; cc: SA1, RAN3; contact: Mediatek) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-110482 |
No |
S5-110482 |
| |
|
S5-110482 |
LS_out Reply to S5-110367 LS_in from RAN2 on Reply LS to S3-101422 = R2-106876 on MDT user involvement |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
| S5-110376 |
|
|
S5-110373 |
LS_in from RAN2 on Reply to S5-103274 = R2-106870 on inclusion of RF measurements into MDT report (to: SA5; cc: RAN1; contact: NSN) |
R2-110682 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110375 |
CR R10 32.422 Remove…. |
NSN (Gyula) |
CR |
discussion |
Yes |
Yes |
revised to S5-110527 |
No |
S5-110527 |
| |
|
S5-110527 |
CR R10 32.422 Removing UE capability from MDT parameters |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-110375 |
|
|
S5-110382 |
LS_in from SA3 (to: TSG RAN2, SA1; cc: SA5) on review of MDT design and reply LS on Security Issues with Logged MDT (Nov 2010) |
S3-101422 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-110383 (Giorgio) |
No |
|
| |
|
S5-110383 |
LS_out Reply to S5-110382 LS_in from SA3 (to: TSG RAN2, SA1; cc: SA5) on review of MDT design and reply LS on Security Issues with Logged MDT (Nov 2010) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-110529 |
No |
S5-110529 |
| |
|
S5-110529 |
LS_out Reply to SA3 (cc: RAN2, SA1) on review of MDT design and reply LS on Security Issues with Logged MDT (S5-110382 / S3-101422) |
SA5 (OAM) |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
| S5-110383 |
|
|
S5-110049 |
Minutes Management of UE based network performance measurements (470042) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.5.4 3G HNB and LTE HeNB Subsystem performance measurements (470043) S5-110031 |
Agenda 3G HNB and LTE HeNB Subsystem performance measurements (470043) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved as R1 |
No |
|
| |
|
S5-110292 |
Discussion paper on how to support PM through support IOC |
China Mobile |
other |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-110297 |
pCR 32.453 Add Radio Bearer QoS related performance measurements |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-110456 |
No |
S5-110456 |
| |
|
S5-110456 |
pCR 32.453 Add Radio Bearer QoS related performance measurements |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-110297 |
|
|
S5-110050 |
Minutes 3G HNB and LTE HeNB Subsystem performance measurements (470043) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.6 OAM&P 10 Self-Organizing Networks (SON) - OAM aspects (460034)
|
|
|
|
|
|
|
|
|
|
| 6.6.1 SON Self-optimization management continuation (460035) S5-110032 |
Agenda SON Self-optimization management continuation (460035) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110191 |
CR R10 32.425 Add measurements for RACH optimization targets |
Ericsson |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110199 |
CR R10 32.425 Introduction of distribution of RACH preambles sent PM counters for RACH optimisation |
Huawei |
CR |
agreement |
Yes |
Yes |
revised to S5-110452 |
No |
S5-110452 |
| |
|
S5-110452 |
CR R10 32.425 Introduction of distribution of RACH preambles sent PM counters for RACH optimisation |
Huawei |
CR |
agreement |
Yes |
Yes |
noted |
No |
| S5-110199 |
|
|
S5-110530 |
LS_out to RAN2 on RACH measurement |
SA5 (OAM) |
o/g LS |
agreement |
Yes |
Yes |
revised to S5-110547 |
No |
S5-110547 |
| |
|
S5-110547 |
LS_out to RAN2 on RACH measurement |
SA5 (OAM) |
o/g LS |
agreement |
Yes |
Yes |
approved |
No |
| S5-110530 |
|
|
S5-110197 |
pCR RACH optimization PM |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
merged S5-110197 with S5-110225 in S5-110451 |
No |
S5-110451 |
| |
|
S5-110225 |
pCR 32.522-V30 Add RACH Optimization measurements |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
merged S5-110197 with S5-110225 in S5-110451 |
No |
S5-110451 |
| |
|
S5-110451 |
pCR 32.522-V30 RACH optimization PM |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-110197 |
|
|
S5-110203 |
pCR Architecture for capacity and coverage optimization |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110204 |
pCR Stage 2 solution for NM centralized CCO |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-110462 |
No |
S5-110462 |
| |
|
S5-110462 |
pCR Stage 2 solution for NM centralized CCO |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-110204 |
|
|
S5-110224 |
Discussion paper on Measurement for number of RACH preambles sent |
Ericsson |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110229 |
pCR Managing SON Targets |
Nokia Siemens Networks, Vodafone |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110306 |
Discussion paper on Optimization of HO via SGW Relocation Avoidance |
NEC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110051 |
Minutes SON Self-optimization management continuation (460035) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.6.2 SON Self-healing management (460036) S5-110033 |
Agenda SON Self-healing management (460036) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110132 |
CR R10 32.522 NRM for Cell Outage Compensation |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110134 |
CR R10 32.762 NRM for Cell Outage Compensation |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110211 |
Discussion paper on the handling of draft 32.542 |
Huawei |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110226 |
Discussion paper on Introduction to NRM for Cell Outage Compensation |
Nokia Siemens Networks |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110227 |
pCR to 32.541 |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-110481 |
No |
S5-110481 |
| |
|
S5-110481 |
pCR to 32.541 |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-110227 |
|
|
S5-110052 |
Minutes SON Self-healing management (460036) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.6.3 OAM aspects of Energy Saving in Radio Networks (470037) S5-110034 |
Agenda OAM aspects of Energy Saving in Radio Networks (470037) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110201 |
CR R10 32.762 Add one attribute reconfigureEnabled to IOC EnergySavingProperties |
ZTE |
CR |
agreement |
Yes |
No |
merged S5-110201 with S5-110283 and revised to S5-110447 |
No |
S5-110447 |
| |
|
S5-110283 |
CR R10 32.762 Add a new attribute into EUtranGenericCell object class to define a cell as not changeable by Energy Saving Management - Align with 32.551 |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
merged S5-110201 with S5-110283 and revised to S5-110447 |
No |
S5-110447 |
| |
|
S5-110447 |
CR R10 32.762 Add a new attribute into EUtranGenericCell object class to define a cell as not changeable by Energy Saving Management - Align with 32.551 / Add one attribute reconfigureEnabled to IOC EnergySavingProperties |
Nokia Siemens Networks, ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110531 |
No |
S5-110531 |
S5-110283 |
|
|
S5-110531 |
CR R10 32.762 Add a new attribute into EUtranGenericCell object class to define a cell as not changeable by Energy Saving Management - Align with 32.551 |
Nokia Siemens Networks, ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110447 |
|
|
S5-110202 |
CR R10 32.551 Modify the ES compensation related use cases |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110439 |
No |
S5-110439 |
| |
|
S5-110439 |
CR R10 32.551 Modify the ES compensation related use cases |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110202 |
|
|
S5-110205 |
CR R10 32.551 Add ES compensation deactivation requirement |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110440 |
No |
S5-110440 |
| |
|
S5-110440 |
CR R10 32.551 Add ES compensation deactivation requirement |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110205 |
|
|
S5-110206 |
CR R10 32.551 modify the requirements about traffic threshold and time duration |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110441 |
No |
S5-110441 |
| |
|
S5-110441 |
CR R10 32.551 modify the requirements about traffic threshold and time duration |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110206 |
|
|
S5-110213 |
CR R10 32.526 NRM for Energy Saving Management Policies and ESM switch - Align with 32.522 |
Huawei |
CR |
agreement |
Yes |
Yes |
revised to S5-110450 |
No |
S5-110450 |
| |
|
S5-110450 |
CR R10 32.526 NRM for Energy Saving Management Policies and ESM switch - Align with 32.522 |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110213 |
|
|
S5-110217 |
pCR 32.551 Add time periods related ES policy management requirement |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110219 |
CR R10 32.522 NRM proposal for time periods to allow a cell enter energySaving state |
Huawei |
CR |
agreement |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-110220 |
Discussion paper on Implementation on energy saving compensation over Itf-N |
Huawei |
other |
discussion |
Yes |
Yes |
revised to S5-110443 |
No |
S5-110443 |
| |
|
S5-110443 |
Discussion paper on Implementation on energy saving compensation over Itf-N |
Huawei |
other |
discussion |
Yes |
Yes |
approved |
No |
| S5-110220 |
|
|
S5-110263 |
CR R10 32.425 Addition of duration of the state transition for energy saving management |
China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110284 |
CR R10 32.766 Add Energy Saving Management (ESM) items for Itf-N - Align with 32.762, 32.551 |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
revised to S5-110448 |
No |
S5-110448 |
| |
|
S5-110448 |
CR R10 32.766 Add Energy Saving Management (ESM) items for Itf-N - Align with 32.762, 32.551 |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
revised to S5-110532 |
No |
S5-110532 |
S5-110284 |
|
|
S5-110532 |
CR R10 32.766 Add Energy Saving Management (ESM) items for Itf-N - Align with 32.762, 32.551 |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110448 |
|
|
S5-110461 |
CR R10 32.626 CR#0002 Add containment for object class ESPolicies - Align with 32.522 |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110357 |
Revised WID on OAM aspects of Energy Saving in Radio Networks (OAM-ES) - Revision of SP-100226 |
Nokia Siemens Networks |
Revised WID |
agreement |
Yes |
Yes |
revised to S5-110438 |
No |
S5-110438 |
| |
|
S5-110438 |
Revised WID on OAM aspects of Energy Saving in Radio Networks (OAM-ES) - Revision of SP-100226 |
Nokia Siemens Networks |
Revised WID |
agreement |
Yes |
Yes |
revised to S5-110463 |
No |
S5-110463 |
S5-110357 |
|
|
S5-110463 |
Revised WID on OAM aspects of Energy Saving in Radio Networks (OAM-ES) - Revision of SP-100226 |
Nokia Siemens Networks |
Revised WID |
agreement |
Yes |
Yes |
revised to S5-110533 |
No |
S5-110533 |
S5-110438 |
|
|
S5-110533 |
Revised WID on OAM aspects of Energy Saving in Radio Networks (OAM-ES) - Revision of SP-100226 |
Nokia Siemens Networks |
Revised WID |
agreement |
Yes |
Yes |
approved |
No |
| S5-110463 |
|
|
S5-110053 |
Minutes OAM aspects of Energy Saving in Radio Networks (470037) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.7 OAM&P 10 Subscription Management (SuM) evolution (470038) S5-110035 |
Agenda OAM&P 10 Subscription Management (SuM) evolution (470038) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110280 |
CR R10 32.172 Improve Subscription Management (SuM) Network Resource Model (NRM) Integration Reference Point (IRP) access service modelling |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110281 |
CR R10 32.176 Improve Subscription Management (SuM) Network Resource Model (NRM) Integration Reference Point (IRP) access service modelling - Align with 32.172 IS |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110054 |
Minutes OAM&P 10 Subscription Management (SuM) evolution (470038) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8 OAM&P Studies
|
|
|
|
|
|
|
|
|
|
| 6.8.1 Study on Alignment of 3GPP Generic NRM IRP and TMF Shared Information Data (SID) model (460037) S5-110036 |
Agenda Study on Alignment of 3GPP Generic NRM IRP and TMF Shared Information Data (SID) model (460037) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-110079 |
LS_in from SA#50 to SA5, Joint WG SA5-TMF, TM Forum on Cooperation of TMF and 3GPP |
SP-100873 |
i/c LS |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#76 San Diego |
No |
|
| |
|
S5-110086 |
Discussion paper on FMC federated network model (FNM) |
Ericsson |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110088 |
Discussion paper on Proposed Umbrella classes |
Ericsson, Nokia Siemens Network |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110094 |
pCR 32.828 Inventory object model enhancements |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110097 |
Discussion paper on 3GPP-TMF Model Alignment - Considerations for Working Procedure and Governance |
Nokia Siemens Networks |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110221 |
pCR Discussion Paper for Model Alignment Overview |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-110493 |
No |
S5-110493 |
| |
|
S5-110493 |
pCR Discussion Paper for Model Alignment Overview |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-110221 |
|
|
S5-110055 |
Minutes Study on Alignment of 3GPP Generic NRM IRP and TMF Shared Information Data (SID) model (460037) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8.2 Study on Harmonization of 3GPP Alarm IRP and TMF Interface Program (TIP) Fault Management (460038) S5-110037 |
Agenda Study on Harmonization of 3GPP Alarm IRP and TMF Interface Program (TIP) Fault Management (460038) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110100 |
Discussion paper on 3GPP-TMF - Considerations for Continued IF Harmonization Discussion |
Nokia Siemens Networks, Ericsson, Huawei |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110056 |
Minutes Study on Harmonization of 3GPP Alarm IRP and TMF Interface Program (TIP) Fault Management (460038) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8.3 Study on version handling (470050) S5-110038 |
Agenda Study on version handling (470050) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110169 |
pCR R10 32.832 Add compatibility requirement of version handling |
ZTE |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110319 |
pCR on Version Handling |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110057 |
Minutes Study on version handling (470050) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8.4 Study on Alarm correlation and alarm root cause analysis (480045) S5-110039 |
Agenda Study of Alarm correlation and alarm root cause analysis (480045) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110264 |
pCR 32.832 addition of alarm correlation application |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110287 |
pCR on AC_RCA d32832-030 |
Ericsson |
pseudo CR |
approval |
Yes |
No |
for email approval |
No |
|
| |
|
S5-110058 |
Minutes Study of Alarm correlation and alarm root cause analysis (480045) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8.5 Study on Alignment of 3GPP PM IRP and TMF Interface Program (TIP) PM (480046) S5-110040 |
Agenda Study on Alignment of 3GPP PM IRP and TMF Interface Program (TIP) PM (480046) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110279 |
Discussion paper on PM harmonization |
Alcatel-Lucent |
other |
discussion |
Yes |
Yes |
revised to S5-110500 |
No |
S5-110500 |
| |
|
S5-110500 |
Discussion paper on PM harmonization |
Alcatel-Lucent |
other |
discussion |
Yes |
Yes |
approved |
No |
| S5-110279 |
|
|
S5-110059 |
Minutes Study on Alignment of 3GPP PM IRP and TMF Interface Program (TIP) PM (480046) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8.6 Study on Management of Converged Networks (480047) S5-110041 |
Agenda Study on Management of Converged Networks (480047) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-110087 |
Discussion paper on Interface in FMC NM environment |
Ericsson, Huawei |
other |
discussion |
Yes |
Yes |
approved in principle |
No |
|
| |
|
S5-110267 |
pCR Definition of FMC |
Alcatel-Lucent |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-110505 |
No |
S5-110505 |
| |
|
S5-110505 |
pCR Definition of FMC |
Alcatel-Lucent |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-110267 |
|
|
S5-110060 |
Minutes Study on Management of Converged Networks (480047) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8.7 Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) S5-110061 |
Agenda Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110135 |
Skeleton of TR 32.9yz UDC Information Model Handling and Provisioning: Example Use Cases |
Alcatel-Lucent |
draft TS/TR |
discussion |
Yes |
Yes |
revised to S5-110490 |
No |
S5-110490 |
| |
|
S5-110490 |
Skeleton of TR 32.9yz UDC Information Model Handling and Provisioning: Example Use Cases |
Alcatel-Lucent |
draft TS/TR |
discussion |
Yes |
Yes |
revised to S5-110534 |
No |
S5-110534 |
S5-110135 |
|
|
S5-110534 |
TR 32.901 V0.1.1 (2011-01) Telecommunication management; Study on User Data Convergence (UDC) information model handling and provisioning: Example Use Cases |
Alcatel-Lucent |
draft TS/TR |
discussion |
Yes |
No |
for email approval |
No |
| S5-110490 |
|
|
S5-110360 |
Revised WID on Study on UDC information model handling and provisioning: Example Use Cases (FS_UDC_AppUseCase) - Revision of SP-100502 |
Alcatel-Lucent |
Revised WID |
agreement |
Yes |
Yes |
revised to S5-110535 |
No |
S5-110535 |
| |
|
S5-110535 |
Revised WID on Study on UDC information model handling and provisioning: Example Use Cases (FS_UDC_AppUseCase) - Revision of SP-100502 |
Alcatel-Lucent |
Revised WID |
agreement |
Yes |
Yes |
approved |
No |
| S5-110360 |
|
|
S5-110489 |
RESUBMITTED S5-102161 Minutes on Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) from SA5#73 Aug 2010, New Delhi, INDIA |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110062r1 |
Minutes Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) |
Rapporteur |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| 7 Charging Management
|
|
|
|
|
|
|
|
|
|
| 7.1 Charging Plenary S5-110008 |
CH Agenda and Time Plan |
CH SWG Chair |
agenda |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110009 |
CH List of Documents |
CH SWG Chair |
other |
discussion |
No |
No |
[not addressed] |
No |
|
| |
|
S5-110010 |
CH Detailed Report from LAST Meeting |
CH SWG Chair |
meeting report |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110011 |
CH Executive Report from THIS Meeting |
CH SWG Chair |
meeting report |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110012 |
CH Detailed Report from THIS Meeting |
CH SWG Chair |
meeting report |
approval |
No |
No |
to be provided after the meeting |
No |
|
| |
|
S5-110066 |
RESUBMITTED S5-102892 LS_in on User CSG Information reporting |
C3-100982 |
i/c LS |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#76 San Diego |
No |
|
| |
|
S5-110073 |
LS_in from CT3 (cc: SA5) on direct stage 3 work for NIMTC functionality (S1-102292) |
C3-101490 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110074 |
LS_in from CT4 (cc: SA5) on direct stage 3 work for NIMTC functionality (S1-102292) |
C4-103168 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110077 |
LS_in from SA2 on S2-105772 / S5-102938 Reply LS on clarification on GGSN charging functions |
S2-105969 |
i/c LS |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#76 San Diego |
No |
|
| |
|
S5-110078 |
LS_in from SA2 on Reply LS on User CSG Information reporting from CT3 (C3-100982) |
S2-105991 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110364 |
LS_in from SA1 to SA5 on MTC charging requirements for Rel-10 |
S1-103313 |
i/c LS |
action |
Yes |
Yes |
replied in S5-110396 (Gerald) |
No |
|
| |
|
S5-110396 |
LS_out Reply to S5-110364 LS_in from SA1 to SA5 on MTC charging requirements for Rel-10 |
SA5 (CH) |
o/g LS |
approval |
Yes |
Yes |
revised to S5-110495 |
No |
S5-110495 |
| |
|
S5-110495 |
LS_out Reply to S5-110364 LS_in from SA1 to SA5 on MTC charging requirements for Rel-10 |
SA5 (CH) |
o/g LS |
approval |
Yes |
Yes |
revised to S5-110553 |
No |
S5-110553 |
S5-110396 |
|
|
S5-110553 |
LS_out Reply to S5-110364 LS_in from SA1 to SA5 on MTC charging requirements for Rel-10 |
SA5 (CH) |
o/g LS |
approval |
Yes |
Yes |
approved |
No |
| S5-110495 |
|
|
S5-110365 |
LS_in from SA1 Reply to SA2 (cc: SA5) on location information for IMS charging |
S1-103340 |
i/c LS |
information |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110378 |
LS_in from GSMA CPWP to SA5 on IMS service identification for charging purposes in case of Roaming [amendment to previous CPWP LS on charging for VoLTE Roaming (S5-102806 / CPWP 81_008rev1)] |
GSMA CPWP 86_004 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-110395 |
No |
|
| |
|
S5-110395 |
LS_out Reply to S5-110378 LS_in from GSMA CPWP to SA5 on IMS service identification for charging purposes in case of Roaming [amendment to previous CPWP LS on charging for VoLTE Roaming (S5-102806 / CPWP 81_008rev1)] |
SA5 (CH) |
o/g LS |
approval |
Yes |
Yes |
revised to S5-110496 |
No |
S5-110496 |
| |
|
S5-110496 |
LS_out Reply to S5-110378 LS_in from GSMA CPWP to SA5 on IMS service identification for charging purposes in case of Roaming [amendment to previous CPWP LS on charging for VoLTE Roaming (S5-102806 / CPWP 81_008rev1)] |
SA5 (CH) |
o/g LS |
approval |
Yes |
Yes |
revised to S5-110552 |
No |
S5-110552 |
S5-110395 |
|
|
S5-110552 |
LS_out Reply to S5-110378 LS_in from GSMA CPWP to SA5 on IMS service identification for charging purposes in case of Roaming [amendment to previous CPWP LS on charging for VoLTE Roaming (S5-102806 / CPWP 81_008rev1)] |
SA5 (CH) |
o/g LS |
approval |
Yes |
Yes |
approved |
No |
| S5-110496 |
|
|
S5-110446 |
LS_out to SA1, CT3 on Identification for Charging in EPC Current status |
SA5 (CH) |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110453 |
LS_in from CT4 to SA5 (cc: SA2) on Passing Charging characteristics for Inter-RAT Handover |
C4-110347 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-110508 |
No |
|
| |
|
S5-110508 |
LS_out Reply to CT4 (cc: SA2) on Passing Charging characteristics for Inter-RAT Handover (S5-110453 / C4-110347) |
SA5 (CH) |
o/g LS |
approval |
Yes |
Yes |
approved |
No |
|
| 7.2 New Charging Work Item proposals S5-110090 |
CT#50 approved WID PEST-CT3 on CT3 aspects of Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases |
CP-100663 |
New WID |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110091 |
SA#50 approved SA2 WID PEST on Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases |
SP-100702 |
New WID |
agreement |
Yes |
Yes |
revised to S5-110419 |
No |
S5-110419 |
| |
|
S5-110419 |
Revised SA#50 approved SA2 WID on Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases (PEST) - Revision of SP-100702 |
SA5 (CH) |
New WID |
agreement |
Yes |
Yes |
revised to S5-110554 |
No |
S5-110554 |
S5-110091 |
|
|
S5-110554 |
Revised SA#50 approved SA2 Feature-level WID on Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases (PEST) - Revision of SP-100702 |
SA5 (CH) |
revised WID |
agreement |
Yes |
Yes |
approved |
No |
| S5-110419 |
|
|
S5-110092 |
PEST Work Plan |
MCC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110248 |
New WID on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (IOI_IMS_CH) |
Deutsche Telekom |
New WID |
agreement |
Yes |
Yes |
revised to S5-110422 |
No |
S5-110422 |
| |
|
S5-110422 |
New WID on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (IOI_IMS_CH) |
Deutsche Telekom |
New WID |
agreement |
Yes |
Yes |
approved |
No |
| S5-110248 |
|
|
S5-110254 |
New WID on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) |
Ericsson |
New WID |
agreement |
Yes |
Yes |
revised to S5-110421 |
No |
S5-110421 |
| |
|
S5-110421 |
New WID on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) |
Ericsson |
New WID |
agreement |
Yes |
Yes |
revised to S5-110499 |
No |
S5-110499 |
S5-110254 |
|
|
S5-110499 |
New WID on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) |
Ericsson |
New WID |
agreement |
Yes |
Yes |
revised to S5-110541 |
No |
S5-110541 |
S5-110421 |
|
|
S5-110541 |
New WID on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) |
Ericsson |
New WID |
agreement |
Yes |
Yes |
approved |
No |
| S5-110499 |
|
|
S5-110255 |
New WID on Charging for Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Data Bases (PEST-CH) |
Ericsson |
New WID |
agreement |
Yes |
Yes |
revised to S5-110420 |
No |
S5-110420 |
| |
|
S5-110420 |
New BB-level WID on Charging for Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Data Bases (PEST-CH) |
Ericsson |
New WID |
agreement |
Yes |
Yes |
approved |
No |
| S5-110255 |
|
|
S5-110423 |
LS_out from SA5 to CT1,CT3 on New WID on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (IOI_IMS_CH) |
SA5 (CH) |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-110497 |
No |
S5-110497 |
| |
|
S5-110497 |
LS_out from SA5 to CT1,CT3 on New WID on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (IOI_IMS_CH) |
SA5 (CH) |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
| S5-110423 |
7.3 Charging Maintenance and Rel-10 small Enhancements S5-110233 |
Discussion paper on enhanced credit control failure handling |
Orange |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110247 |
CR R9 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning |
Deutsche Telekom |
CR |
agreement |
Yes |
Yes |
revised to S5-110466 |
No |
S5-110466 |
| |
|
S5-110466 |
CR R9 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning |
Deutsche Telekom |
CR |
agreement |
Yes |
Yes |
revised to S5-110506 |
No |
S5-110506 |
S5-110247 |
|
|
S5-110506 |
CR R9 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning |
Deutsche Telekom |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110466 |
|
|
S5-110285 |
CR R10 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning |
Deutsche Telekom |
CR |
agreement |
Yes |
Yes |
revised to S5-110467 |
No |
S5-110467 |
| |
|
S5-110467 |
CR R10 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning |
Deutsche Telekom |
CR |
agreement |
Yes |
Yes |
revised to S5-110507 |
No |
S5-110507 |
S5-110285 |
|
|
S5-110507 |
CR R10 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning |
Deutsche Telekom |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110467 |
|
|
S5-110300 |
Discussion paper on Identification for Charging in EPC Current status |
Alcatel-Lucent |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110301 |
CR R10 32.270 Add E.164 harmonized address format to the current E.212 in MMS Charging |
Nokia Siemens Networks, Deutsche Telekom |
CR |
agreement |
Yes |
Yes |
revised to S5-110544 |
No |
S5-110544 |
| |
|
S5-110544 |
CR R10 32.270 Add E.164 harmonized address format to the current E.212 in MMS Charging |
Nokia Siemens Networks, Deutsche Telekom |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110301 |
|
|
S5-110302 |
CR R10 32.299 Add E.164 harmonized address format to the current E.212 in MMS Charging |
Nokia Siemens Networks, Deutsche Telekom |
CR |
agreement |
Yes |
Yes |
revised to S5-110545 |
No |
S5-110545 |
| |
|
S5-110545 |
CR R10 32.299 Add E.164 harmonized address format to the current E.212 in MMS Charging |
Nokia Siemens Networks, Deutsche Telekom |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110302 |
|
|
S5-110332 |
CR R10 32.251 Adding CDR fields needed for Machine Type Communication (NIMTC-CH) |
Ericsson |
CR |
agreement |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-110333 |
CR R10 32.251 Adding CDR fields needed for Machine Type Communication (NIMTC-CH) |
Ericsson |
CR |
agreement |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-110334 |
CR R10 32.299 Adding CDR fields needed for Machine Type Communication (NIMTC-CH) |
Ericsson |
CR |
agreement |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-110336 |
CR R8 32.299 Correction to charging scenarios |
Huawei |
CR |
agreement |
Yes |
Yes |
rejected |
No |
|
| |
|
S5-110337 |
CR R9 32.299 Correction to charging scenarios |
Huawei |
CR |
agreement |
Yes |
Yes |
rejected |
No |
|
| |
|
S5-110338 |
CR R10 32.299 Correction to charging scenarios |
Huawei |
CR |
agreement |
Yes |
Yes |
revised to S5-110424 |
No |
S5-110424 |
| |
|
S5-110424 |
CR R10 32.299 Correction to charging scenarios |
Huawei |
CR |
agreement |
Yes |
Yes |
revised to S5-110501 |
No |
S5-110501 |
S5-110338 |
|
|
S5-110501 |
CR R10 32.299 Correction to charging scenarios |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110424 |
|
|
S5-110339 |
CR R10 32.240 Correction on usage of Inter Operator Identifier (IOI) type 2 |
Orange, Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110340 |
CR R9 32.240 Removing inconsistency among abbreviations |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110341 |
CR R10 32.240 Removing inconsistency among abbreviations |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110342 |
CR R10 32.260 Correction on ICSI availability - Align with SA2 TS 23.228 |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110444 |
No |
S5-110444 |
| |
|
S5-110444 |
CR R10 32.260 Correction on ICSI availability - Align with SA2 TS 23.228 |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110342 |
|
|
S5-110343 |
CR R10 32.299 Correction on ICSI availability - Align with SA2 TS 23.228 |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-110445 |
No |
S5-110445 |
| |
|
S5-110445 |
CR R10 32.299 Correction on ICSI availability - Align with SA2 TS 23.228 |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110343 |
|
|
S5-110344 |
CR R9 32.298 Add missing ASN.1 definition for WLAN in PS domain CDRs |
ZTE |
CR |
agreement |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-110345 |
CR R10 32.298 Add missing ASN.1 definition for WLAN in PS domain CDRs |
ZTE |
CR |
agreement |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-110346 |
CR R9 32.299 Add missing enumeration value for E-CSCF network element in Node-Functionality AVP |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110425 |
No |
S5-110425 |
| |
|
S5-110425 |
CR R9 32.299 Add missing enumeration value for E-CSCF network element in Node-Functionality AVP |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110346 |
|
|
S5-110347 |
CR R10 32.299 Add missing enumeration value for E-CSCF network element in Node-Functionality AVP |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-110426 |
No |
S5-110426 |
| |
|
S5-110426 |
CR R10 32.299 Add missing enumeration value for E-CSCF network element in Node-Functionality AVP |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110347 |
|
|
S5-110427 |
CR R8 32.251 CR#0162 Correcting the condition to deliver SGW-CDR |
Orange |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-110348 |
CR R9 32.251 Correcting the condition to deliver SGW-CDR |
Orange |
CR |
agreement |
Yes |
Yes |
revised to S5-110428 |
No |
S5-110428 |
| |
|
S5-110428 |
CR R9 32.251 Correcting the condition to deliver SGW-CDR |
Orange |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110348 |
|
|
S5-110349 |
CR R10 32.251 Correcting the condition to deliver SGW-CDR |
Orange |
CR |
agreement |
Yes |
Yes |
revised to S5-110429 |
No |
S5-110429 |
| |
|
S5-110429 |
CR R10 32.251 Correcting the condition to deliver SGW-CDR |
Orange |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110349 |
|
|
S5-110350 |
CR R9 32.299 Add internal structure and encoding for the Location-Estimate AVP - Align with SA2 23.032 |
NEC |
CR |
agreement |
Yes |
Yes |
revised to S5-110542 |
No |
S5-110542 |
| |
|
S5-110542 |
CR R9 32.299 Add internal structure and encoding for the Location-Estimate AVP - Align with SA2 23.032 |
NEC |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110350 |
|
|
S5-110351 |
CR R10 32.299 Add internal structure and encoding for the Location-Estimate AVP - Align with SA2 23.032 |
NEC |
CR |
agreement |
Yes |
Yes |
revised to S5-110543 |
No |
S5-110543 |
| |
|
S5-110543 |
CR R10 32.299 Add internal structure and encoding for the Location-Estimate AVP - Align with SA2 23.032 |
NEC |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110351 |
7.3.1 CH Release 8
|
|
|
|
|
|
|
|
|
|
| 7.3.2 CH Release 9
|
|
|
|
|
|
|
|
|
|
| 7.3.3 CH Release 10
|
|
|
|
|
|
|
|
|
|
| 7.4 Rel-10 Charging
|
|
|
|
|
|
|
|
|
|
| 7.4.1 IWLAN mobility charging (440063) S5-110288 |
CR R10 32.252 Add Packet Data Gateway (PDG) online charging when re-using GGSN functionality |
Orange |
CR |
agreement |
Yes |
Yes |
revised to S5-110483 |
No |
S5-110483 |
| |
|
S5-110483 |
CR R10 32.252 Add Packet Data Gateway (PDG) online charging when re-using GGSN functionality |
Orange |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110288 |
7.4.2 Charging for LIPA_SIPTO (460039) S5-110289 |
CR R10 32.251 Adding LIPA SIPTO charging description |
Huawei, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110449 |
No |
S5-110449 |
| |
|
S5-110449 |
CR R10 32.251 Adding LIPA SIPTO charging description |
Huawei, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-110469 |
No |
S5-110469 |
S5-110289 |
|
|
S5-110469 |
CR R10 32.251 Adding LIPA SIPTO charging description |
Huawei, China Mobile |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110449 |
|
|
S5-110361 |
Revised WID on Local IP Access and Selected Internet IP Traffic Offload (LIPA_SIPTO) |
MCC |
Revised WID |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#76 San Diego |
No |
|
| |
|
S5-110468 |
LS_out to SA1 on requirements for LIPA SIPTO charging solution |
SA5 (CH) |
o/g LS |
approval |
No |
No |
withdrawn |
Yes |
|
| 7.4.3 Charging for IP Flow Mobility and seamless WLAN offload (470021)
|
|
|
|
|
|
|
|
|
|
| 7.4.4 Add solutions for Rc reference point within the Online Charging System (OCS) (470045) S5-110290 |
CR R10 32.296 Add Guidance of credit control format for Rc reference point implementation in the Online Charging System (OCS) |
Huawei, China Mobile, AT&T, Opennet |
CR |
agreement |
Yes |
Yes |
revised to S5-110484 |
No |
S5-110484 |
| |
|
S5-110484 |
CR R10 32.296 Add Guidance of credit control format for Rc reference point implementation in the Online Charging System (OCS) |
Huawei, China Mobile, AT&T, Opennet |
CR |
agreement |
Yes |
Yes |
revised to S5-110502 |
No |
S5-110502 |
S5-110290 |
|
|
S5-110502 |
CR R10 32.296 Add Guidance of credit control format for Rc reference point implementation in the Online Charging System (OCS) |
Huawei, China Mobile, AT&T, Opennet |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110484 |
|
|
S5-110291 |
CR R10 32.299 Rc Context Definition for Diameter Usage |
AT&T, Huawei, Opennet, China Mobile |
CR |
agreement |
Yes |
No |
withdrawn |
Yes |
|
| 7.4.5 Advice of Charge (AoC) service support enhancements (470047) S5-110352 |
CR R10 32.280 Clarify how 'Advice of Charge (AoC)' is presented to the UE |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110485 |
No |
S5-110485 |
| |
|
S5-110485 |
CR R10 32.280 Clarify how 'Advice of Charge (AoC)' is presented to the UE |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110352 |
|
|
S5-110353 |
CR R10 32.280 Introduce AoC and offline charging Rf description to allow AoC offline charging |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110486 |
No |
S5-110486 |
| |
|
S5-110486 |
CR R10 32.280 Introduce AoC and offline charging Rf description to allow AoC offline charging |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110353 |
|
|
S5-110354 |
CR R10 32.275 Add 'Advice Of Charge (AoC)' MMTel supplementary service Charging description - Align with 22.173 |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110487 |
No |
S5-110487 |
| |
|
S5-110487 |
CR R10 32.275 Add 'Advice Of Charge (AoC)' MMTel supplementary service Charging description - Align with 22.173 |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110504 |
No |
S5-110504 |
S5-110354 |
|
|
S5-110504 |
CR R10 32.275 Add 'Advice Of Charge (AoC)' MMTel supplementary service Charging description - Align with 22.173 |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110487 |
|
|
S5-110355 |
CR R10 32.280 Provide offline AoC charging when the AoC Function is provided by MMTel AS - Align with 22.173 |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110488 |
No |
S5-110488 |
| |
|
S5-110488 |
CR R10 32.280 Provide offline AoC charging when the AoC Function is provided by MMTel AS - Align with 22.173 |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-110503 |
No |
S5-110503 |
S5-110355 |
|
|
S5-110503 |
CR R10 32.280 Provide offline AoC charging when the AoC Function is provided by MMTel AS - Align with 22.173 |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-110488 |
7.4.6 Charging for Optimal Media Routeing (500013)
|
|
|
|
|
|
|
|
|
|
| 7.5 Rel-11 Charging
|
|
|
|
|
|
|
|
|
|
| 7.5.1 Network Provided Location Information for IMS Charging (490029) S5-110071 |
RESUBMITTED S5-103275 LS_in Reply from SA3-LI to SA2 (cc: SA5, SA3) on Network Provided Cell-ID |
SA3LI10_166r1 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-110356 |
Revised WID on Network Provided Location Information for IMS Charging (NWK-PL2IMS_CH) - Revision of SP-100638 |
Nokia Siemens Networks |
Revised WID |
agreement |
Yes |
Yes |
approved |
No |
|
| 7.5.2 Charging for QoS Control Based on Subscriber Spending Limits (500029) S5-110286 |
Discussion paper on Common Principles for QoS and Gating Control Based on Spending Limits [identical with S5-110228 but in Word 2003 version (*.doc) instead of Word 2007 (*.docx)] |
Openet |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| 7.6 Charging Studies
|
|
|
|
|
|
|
|
|
|
| 8 Any Other Business
|
|
|
|
|
|
|
|
|
|
| 9 Closing
|
|
|
|
|
|
|
|
|
|
| |
Created: 2011-02-07 16:13     Last document: S5-110001