Agenda with allocated Tdocs
Created: 2011-02-07 16:13 Last document: S5-110001
Agenda | Topic | Tdoc | Title | Source | Doc-type | Doc-for | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
Opening of the meeting |
|||||||||||
2 |
Approval of the agenda and registration of new documents |
S5-110001 | Agenda | WG Chairman | agenda | approval | Yes | Yes | approved as Rev.1 | No | ||
3 |
IPR declaration |
S5-110081 | IPR declaration | WG Chairman | other | discussion | Yes | Yes | noted | No | ||
4 |
Meetings and activities reports |
|||||||||||
4.1 |
Last SA5 meeting report |
S5-110002 | Report from last SA5 meeting | MCC | meeting report | agreement | Yes | Yes | approved | No | ||
4.2 |
Last SA meeting report |
S5-110003 | Report from last SA meeting | WG Chairman | meeting report | approval | Yes | Yes | noted | No | ||
4.3 |
LS status |
|||||||||||
4.4 |
Inter-organizational communication reports |
S5-110384 | Report of methodology coordination with ITU-T | Ericsson (Thomas) | other | discussion | Yes | Yes | noted | No | ||
4.5 |
Other reports |
|||||||||||
5 |
Cross-SWG issues at SA5 level |
|||||||||||
5.1 |
Administrative issues at SA5 level |
S5-110014 | SA5 Working Procedures - Update for thread number | WG Chairman | other | discussion | Yes | Yes | approved | No | ||
S5-110015 | SA5 Meeting Facility Requirements | WG Chairman | other | discussion | Yes | Yes | approved | No | ||||
S5-110016 | Draft TS/TR Management Process | WG Vice Chair (Thomas) | other | discussion | Yes | Yes | revised to S5-110387 | No | S5-110387 | |||
S5-110387 | Draft TS/TR Management Process | WG Vice Chair (Thomas) | other | discussion | Yes | Yes | approved | No | S5-110016 | |||
S5-110017 | CR Quality Check | MCC | other | discussion | Yes | Yes | noted | No | ||||
S5-110063 | Agenda Leaders Meeting | WG Chairman | agenda | approval | Yes | Yes | approved | No | ||||
S5-110064 | Minutes Leaders Meeting | WG Chairman | meeting report | approval | Yes | Yes | noted | No | ||||
S5-110080 | SA5 specifications (NOT) to be automatically lifted to Rel-10 | MCC | other | discussion | Yes | Yes | noted (SWG Chairs should report at SA5#76) | No | ||||
S5-110307 | Guidance for CR creation and allocation of CR numbers | MCC | other | discussion | Yes | Yes | noted | No | ||||
S5-110388 | Updated template of the Rapporteur Report | WG Chair | other | discussion | Yes | Yes | approved | No | ||||
5.2 |
Meeting calendar |
S5-110013 | SA5 Meeting Calendar | WG Chairman | other | discussion | Yes | Yes | noted | No | ||
5.3 |
Technical issues at SA5 level |
|||||||||||
5.4 |
Review of the 3GPP Work Plan |
S5-110018 | TR 30.820 Project scheduling for SA5 Release 10 | MCC | other | discussion | Yes | Yes | noted | No | ||
S5-110019 | TR 30.821 Project scheduling for SA5 Release 11 | MCC | other | discussion | Yes | Yes | noted | No | ||||
S5-110020 | SA5 3GPP Work Plan | MCC | other | discussion | Yes | Yes | noted | No | ||||
S5-110021 | Deliverables due for the NEXT SA Plenary | MCC | other | discussion | Yes | Yes | noted | No | ||||
6 |
OAM&P (Operations, Administration, Maintenance & Provisioning |
|||||||||||
6.1 |
OAM&P Plenary |
S5-110004 | OAM Time Plan | WG Chairman | other | discussion | Yes | Yes | approved | No | ||
S5-110083 | Ongoing action items from 3GPPSA5#74_Jacksonville | MCC | meeting report | approval | Yes | Yes | noted (all action were DISCHARGED) | No | ||||
S5-110005 | OAM Detailed Report from LAST Meeting | OAM SWG Chair | meeting report | approval | Yes | Yes | approved | No | ||||
S5-110006 | OAM Executive Report from THIS Meeting | OAM SWG Chair | meeting report | approval | Yes | Yes | noted | No | ||||
S5-110007 | OAM Detailed Report from THIS Meeting | OAM SWG Chair | meeting report | approval | No | No | to be provided after the meeting | No | ||||
S5-110067 | RESUBMITTED S5-103077 LS_in on OAM architecture aspects for RNs | R3-102541 | i/c LS | discussion | Yes | Yes | replied in S5-110369 (Robert) | No | ||||
S5-110369 | LS_out Reply to RAN3 on OAM architecture aspects for RNs (S5-110067 / R3-102541 / RESUBMITTED S5-103077) | SA5 (OAM) | o/g LS | discussion | Yes | Yes | revised to S5-110536 | No | S5-110536 | |||
S5-110536 | LS_out Reply to RAN3 on OAM architecture aspects for RNs (S5-110067 / R3-102541 / RESUBMITTED S5-103077) | SA5 (OAM) | o/g LS | discussion | Yes | Yes | revised to S5-110546 | No | S5-110546 | S5-110369 | ||
S5-110546 | LS_out Reply to RAN3 on OAM architecture aspects for RNs (S5-110067 / R3-102541 / RESUBMITTED S5-103077) | SA5 (OAM) | o/g LS | discussion | Yes | Yes | approved | No | S5-110536 | |||
S5-110068 | RESUBMITTED S5-103082 LS_in on H(e)NB related LI requirement | SA3LI10_056r2 | i/c LS | discussion | Yes | Yes | RESUBMITTED to SA5#76 San Diego | No | ||||
S5-110069 | RESUBMITTED S5-103085 LS_in Reply on updated BBF documents and follow up to S5-102574 | BBF liaison bbf2010_1095_02 | i/c LS | discussion | Yes | Yes | replied in S5-110370 (Padma) | No | ||||
S5-110370 | LS_out Reply to BBF (S5-110072 and S5-110069 / RESUBMITTED S5-103085) on updated BBF documents and follow up to S5-102574 | SA5 (OAM) | o/g LS | discussion | Yes | Yes | revised to S5-110498 | No | S5-110498 | |||
S5-110498 | LS_out Reply to BBF (S5-110072 and S5-110069 / RESUBMITTED S5-103085) on updated BBF documents and follow up to S5-102574 | SA5 (OAM) | o/g LS | discussion | Yes | Yes | approved | No | S5-110370 | |||
S5-110070 | RESUBMITTED S5-103087 LS_in on RN E-CGI configuration by O&M | R3-103091 | i/c LS | discussion | Yes | Yes | RESUBMITTED to SA5#76 San Diego | No | ||||
S5-110072 | LS_in from BBF on Received 3GPP Liaison S5-103276 and additional data modelling questions | BBF liaison bbf2010.1419.01 | i/c LS | discussion | Yes | Yes | replied in S5-110370 (Padma) | No | ||||
S5-110075 | LS_in from ITU-T SG2 (Geneva, 9-18 Nov 2010) on Updates on the status of Web-Service/XML based design and harmonization | COM2-LS 85-E | i/c LS | discussion | Yes | Yes | noted | No | ||||
S5-110363 | RESUBMITTED S5-103088 LS_in from RAN2 on mapping Uu bearers to Un bearers for relays | R2-105996 | i/c LS | discussion | Yes | Yes | replied in S5-110464 | No | ||||
S5-110464 | LS_out Reply to S5-110363 / RESUBMITTED S5-103088 LS_in from RAN2 on mapping Uu bearers to Un bearers for relays | SA5 (OAM) | o/g LS | discussion | Yes | Yes | revised to S5-110515 | No | S5-110515 | |||
S5-110515 | LS_out Reply to RAN2 on mapping Uu bearers to Un bearers for relays (S5-110363 / RESUBMITTED S5-103088) | SA5 (OAM) | o/g LS | discussion | Yes | Yes | revised in S5-110549 | No | S5-110549 | S5-110464 | ||
S5-110549 | LS_out Reply to RAN2 on mapping Uu bearers to Un bearers for relays (S5-110363 / RESUBMITTED S5-103088) | SA5 (OAM) | o/g LS | discussion | Yes | Yes | approved | No | S5-110515 | |||
S5-110386 | LS_out more comprehensive Reply to SA5#74 Jacksonville S5-103072 / R3-101768 (RESUBMITTED LS_in on Multiple trace session) | SA5 (OAM) | o/g LS | discussion | Yes | Yes | revised to S5-110442 | No | S5-110442 | |||
S5-110442 | LS_out Reply to RAN3 on Multiple trace session S5-103072 / R3-101768 (contact Huawei: Zou Lan) | SA5 (OAM) | o/g LS | discussion | Yes | No | withdrawn | Yes | S5-110386 | |||
S5-110492 | LS_in Reply from SA3 to CT6 (cc: SA1, SA5) on Hosting Party Module for H(e)NB (S3-110157 / C6-100634) | S3-110184 | i/c LS | discussion | Yes | Yes | RESUBMITTED to SA5#76 San Diego | No | ||||
S5-110510 | Minutes of breakout session on Relay mgmt model | Ericsson (Thomas) | meeting report | discussion | Yes | Yes | noted | No | ||||
6.2 |
New OAM&P Work Item proposals |
S5-110358 | New WID on UTRAN Self-Organizing Networks (SON) management | Huawei, Orange | New WID | agreement | Yes | Yes | revised to S5-110371 | No | S5-110371 | |
S5-110371 | New WID on UTRAN Self-Organizing Networks (SON) management | Huawei, Orange | New WID | agreement | Yes | Yes | revised to S5-110516 | No | S5-110516 | S5-110358 | ||
S5-110516 | New WID on UTRAN Self-Organizing Networks (SON) management | Huawei, Orange | New WID | agreement | Yes | Yes | approved | No | S5-110371 | |||
S5-110359 | New WID on Enhanced Management of UE based network performance measurements | Huawei | New WID | agreement | Yes | Yes | revised to S5-110372 | No | S5-110372 | |||
S5-110372 | New WID on Enhanced Management of UE based network performance measurements | Huawei | New WID | agreement | Yes | Yes | revised to S5-110517 | No | S5-110517 | S5-110359 | ||
S5-110517 | New WID on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) | Huawei | New WID | agreement | Yes | Yes | revised to S5-110537 | No | S5-110537 | S5-110372 | ||
S5-110537 | New WID on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) | Huawei | New WID | agreement | Yes | Yes | approved | No | S5-110517 | |||
S5-110362 | New WID IMS performance management enhancement | ZTE | New WID | agreement | Yes | Yes | revised to S5-110494 | No | S5-110494 | |||
S5-110494 | New WID IMS performance management enhancement | ZTE | New WID | agreement | Yes | Yes | revised to S5-110518 | No | S5-110518 | S5-110362 | ||
S5-110518 | New WID on IMS Performance Management enhancements (OAM-ePM-IMS) | ZTE | New WID | agreement | Yes | Yes | approved | No | S5-110494 | |||
6.3 |
OAM&P Maintenance and Rel-10 small Enhancements |
S5-110022 | Agenda OAM&P Maintenance and Rel-10 small Enhancements | OAM SWG Chair | agenda | approval | No | No | withdrawn | Yes | ||
S5-110084 | CR R10 32.300-920 name convention | Ericsson | CR | agreement | Yes | Yes | revised to S5-110389 | No | S5-110389 | |||
S5-110389 | CR R10 32.300-920 name convention | Ericsson | CR | agreement | Yes | Yes | revised to S5-110514 | No | S5-110514 | S5-110084 | ||
S5-110514 | CR R10 32.300-920 name convention | Ericsson | CR | agreement | Yes | Yes | approved | No | S5-110389 | |||
S5-110102 | CR R10 32.762 Add attributes to RNFunction | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | revised to S5-110390 | No | S5-110390 | |||
S5-110390 | CR R10 32.762 Add attributes to RNFunction | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | revised to S5-110511 | No | S5-110511 | S5-110102 | ||
S5-110511 | CR R10 32.762 Add attributes to RNFunction | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | approved | No | S5-110390 | |||
S5-110103 | CR R10 32.766 Add attributes to RNFunction | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | revised to S5-110391 | No | S5-110391 | |||
S5-110391 | CR R10 32.766 Add attributes to RNFunction | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | revised to S5-110520 | No | S5-110520 | S5-110103 | ||
S5-110520 | CR R10 32.766 Add attributes to RNFunction | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | approved | No | S5-110391 | |||
S5-110104 | CR R10 32.762 Add QciDscpMapping IOC | Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone | CR | agreement | Yes | Yes | revised to S5-110392 | No | S5-110392 | |||
S5-110392 | CR R10 32.762 Add QciDscpMapping IOC | Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone | CR | agreement | Yes | Yes | noted | No | S5-110104 | |||
S5-110105 | CR R10 32.766 Add QciDscpMapping IOC | Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone | CR | agreement | Yes | Yes | revised to S5-110393 | No | S5-110393 | |||
S5-110393 | CR R10 32.766 Add QciDscpMapping IOC | Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone | CR | agreement | Yes | Yes | noted | No | S5-110105 | |||
S5-110106 | CR R10 32.762 Add relay IOCs to be connected by the EP_RP_EPS | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | revised to S5-110394 | No | S5-110394 | |||
S5-110394 | CR R10 32.762 Add relay IOCs to be connected by the EP_RP_EPS | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | approved | No | S5-110106 | |||
S5-110107 | CR R10 32.766 Add relay IOCs to be connected by the EP_RP_EPS | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | No | withdrawn | Yes | ||||
S5-110108 | CR R10 32.762 Add containment relations for relay | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | noted | No | ||||
S5-110109 | CR R10 32.766 Add containment relations for relay | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | noted | No | ||||
S5-110110 | CR R10 32.425 Add RRC connection setup related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone | CR | agreement | Yes | Yes | revised to S5-110397 | No | S5-110397 | |||
S5-110397 | CR R10 32.425 Add RRC connection setup related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone | CR | agreement | Yes | Yes | approved | No | S5-110110 | |||
S5-110111 | CR R10 32.425 Add RRC connection reestablishment related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone | CR | agreement | Yes | Yes | revised to S5-110398 | No | S5-110398 | |||
S5-110398 | CR R10 32.425 Add RRC connection reestablishment related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone | CR | agreement | Yes | Yes | revised to S5-110512 | No | S5-110512 | S5-110111 | ||
S5-110512 | CR R10 32.425 Add RRC connection reestablishment related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone | CR | agreement | Yes | Yes | approved | No | S5-110398 | |||
S5-110112 | CR R10 32.425 Add E-RAB setup related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | revised to S5-110399 | No | S5-110399 | |||
S5-110399 | CR R10 32.425 Add E-RAB setup related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | approved | No | S5-110112 | |||
S5-110113 | CR R10 32.425 Add E-RAB release related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | revised to S5-110400 | No | S5-110400 | |||
S5-110400 | CR R10 32.425 Add E-RAB release related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | revised to S5-110519 | No | S5-110519 | S5-110113 | ||
S5-110519 | CR R10 32.425 Add E-RAB release related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | approved | No | S5-110400 | |||
S5-110114 | CR R10 32.425 Add HO related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone | CR | agreement | Yes | Yes | revised to S5-110401 | No | S5-110401 | |||
S5-110401 | CR R10 32.425 Add HO related measurements to RN | Motorola Solutions, Nokia Siemens Networks, China Mobile, Vodafone | CR | agreement | Yes | Yes | approved | No | S5-110114 | |||
S5-110115 | CR R10 32.425 Apply the eNodeB measurements to DeNB | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | revised to S5-110402 | No | S5-110402 | |||
S5-110402 | CR R10 32.425 Apply the eNodeB measurements to DeNB | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | approved | No | S5-110115 | |||
S5-110116 | CR R10 32.425 Add Un user plane data bytes measurements for DeNB | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | revised to S5-110403 | No | S5-110403 | |||
S5-110403 | CR R10 32.425 Add Un user plane data bytes measurements for DeNB | Motorola Solutions, Nokia Siemens Networks, China Mobile | CR | agreement | Yes | Yes | noted | No | S5-110116 | |||
S5-110117 | Discussion paper on CS fallback related measurement | Ericsson | other | discussion | Yes | Yes | noted | No | ||||
S5-110305 | Discussion paper on CS fallback related measurement | Vodafone | other | discussion | Yes | Yes | noted | No | ||||
S5-110118 | CR R8 32.450 Correct Accessibility formula | Ericsson | CR | agreement | Yes | Yes | revised to S5-110404 | No | S5-110404 | |||
S5-110404 | CR R8 32.450 Correct Accessibility formula | Ericsson | CR | agreement | No | No | withdrawn | Yes | S5-110118 | |||
S5-110119 | CR R9 32.450 Correcting Accessibility formula | Ericsson | CR | agreement | Yes | Yes | revised to S5-110405 | No | S5-110405 | |||
S5-110405 | CR R9 32.450 Correcting Accessibility formula | Ericsson | CR | agreement | No | No | withdrawn | Yes | S5-110119 | |||
S5-110120 | CR R8 32.425 Add missing rrc connection reattempts | Ericsson | CR | agreement | Yes | Yes | revised to S5-110406 | No | S5-110406 | |||
S5-110406 | CR R8 32.425 Add missing rrc connection reattempts | Ericsson | CR | agreement | No | No | withdrawn | Yes | S5-110120 | |||
S5-110121 | CR R9 32.425 Add missing rrc connection reattempts | Ericsson | CR | agreement | Yes | Yes | revised to S5-110407 | No | S5-110407 | |||
S5-110407 | CR R9 32.425 Add missing rrc connection reattempts | Ericsson | CR | agreement | No | No | withdrawn | Yes | S5-110121 | |||
S5-110122 | CR R10 32.425 Add missing rrc connection reattempts | Ericsson | CR | agreement | Yes | Yes | revised to S5-110408 | No | S5-110408 | |||
S5-110408 | CR R10 32.425 Add missing rrc connection reattempts | Ericsson | CR | agreement | No | No | withdrawn | Yes | S5-110122 | |||
S5-110123 | CR R8 32.425 Add missing S1 reset to E-RAB release | Ericsson | CR | agreement | Yes | Yes | approved | No | ||||
S5-110124 | CR R9 32.425 Add missing S1 reset to E-RAB release | Ericsson | CR | agreement | Yes | Yes | approved | No | ||||
S5-110139 | CR R10 32.642 Methodology Cleanup | Ericsson | CR | agreement | Yes | Yes | approved (parked waiting for SS CR) | No | ||||
S5-110140 | CR R10 32.652 Methodology Cleanup | Ericsson | CR | agreement | Yes | Yes | approved (parked waiting for SS CR) | No | ||||
S5-110160 | CR R10 32.412 Add the missing exceptions in create measurement operation | ZTE | CR | agreement | Yes | Yes | revised to S5-110409 | No | S5-110409 | |||
S5-110409 | CR R10 32.412 Add the missing exceptions in create measurement operation | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110160 | |||
S5-110162 | CR R10 32.416 Add missing exceptions in create measurement operation - Align with 32.412 IS | ZTE | CR | agreement | Yes | Yes | revised to S5-110410 | No | S5-110410 | |||
S5-110410 | CR R10 32.416 Add missing exceptions in create measurement operation - Align with 32.412 IS | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110162 | |||
S5-110163 | CR R9 32.409 Correcting the measurements object classes - Align with 32.732 IS | ZTE | CR | agreement | Yes | Yes | approved | No | ||||
S5-110164 | CR R10 32.409 Correcting the measurements object classes - Align with 32.732 IS | ZTE | CR | agreement | Yes | Yes | approved | No | ||||
S5-110165 | CR R10 32.426 Add combined TA&LA update procedure related measurements | ZTE | CR | agreement | Yes | Yes | revised to S5-110411 | No | S5-110411 | |||
S5-110411 | CR R10 32.426 Add combined TA&LA update procedure related measurements | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110165 | |||
S5-110167 | CR R10 32.426 Correct Service Request related measurements | ZTE | CR | agreement | Yes | Yes | revised to S5-110412 | No | S5-110412 | |||
S5-110412 | CR R10 32.426 Correct Service Request related measurements | ZTE | CR | agreement | No | No | withdrawn | Yes | S5-110167 | |||
S5-110177 | CR R10 32.446 Add missing input parameter of activateTraceJob | ZTE | CR | agreement | Yes | Yes | revised to S5-110413 | No | S5-110413 | |||
S5-110413 | CR R10 32.446 Add missing input parameter of activateTraceJob | ZTE | CR | agreement | Yes | Yes | revised to S5-110513 | No | S5-110513 | S5-110177 | ||
S5-110513 | CR R10 32.446 Add missing input parameter of activateTraceJob | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110413 | |||
S5-110180 | CR R8 32.425 Correcting collection method for RACH usage counter | Ericsson | CR | agreement | Yes | Yes | approved | No | ||||
S5-110185 | CR R9 32.425 Correcting collection method for RACH usage counter | Ericsson | CR | agreement | Yes | Yes | approved | No | ||||
S5-110186 | CR R10 32.425 Correcting collection method for RACH usage counter | Ericsson | CR | agreement | Yes | Yes | approved | No | ||||
S5-110181 | CR R10 32.526 Correcting support qualifiers of SONControl attributes | Huawei | CR | agreement | Yes | Yes | approved | No | ||||
S5-110183 | CR R10 32.425 Add measurements on power utilization | Huawei | CR | agreement | Yes | Yes | revised to S5-110416 | No | S5-110416 | |||
S5-110416 | CR R10 32.425 Add measurements on power utilization | Huawei | CR | agreement | Yes | Yes | approved | No | S5-110183 | |||
S5-110200 | CR R10 32.446 add a notification parameter mapping | ZTE | CR | agreement | Yes | Yes | revised to S5-110417 | No | S5-110417 | |||
S5-110417 | CR R10 32.446 add a notification parameter mapping | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110200 | |||
S5-110216 | CR R10 32.111-6 Correcting qualifier of clearUserId in XML schema - Align with 32.111-2 IS | ZTE | CR | agreement | Yes | Yes | revised to S5-110437 | No | S5-110437 | |||
S5-110436 | CR R10 32.111-2 CR#0064 Correcting qualifier of clearUserId | ZTE | CR | agreement | Yes | Yes | approved | No | ||||
S5-110437 | CR R10 32.111-6 Correcting qualifier of clearUserId in XML schema - Align with 32.111-2 IS | ZTE | CR | agreement | No | No | withdrawn | Yes | S5-110216 | |||
S5-110223 | CR R10 32.762 Add attributes to EUtranGenericCell and EUtranRelation IOC | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | Yes | Yes | revised to S5-110418 | No | S5-110418 | |||
S5-110418 | CR R10 32.762 Add attributes to EUtranGenericCell and EUtranRelation IOC | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | Yes | Yes | noted | No | S5-110223 | |||
S5-110242 | CR R10 32.762 Correcting Relay and Donor eNodeB NRM | China Mobile, Ericsson | CR | agreement | Yes | Yes | revised to S5-110509 | No | S5-110509 | |||
S5-110509 | CR R10 32.762 Correcting Relay and Donor eNodeB NRM | China Mobile, Ericsson | CR | agreement | Yes | Yes | approved | No | S5-110242 | |||
S5-110256 | CR R10 32.692 Addition of capacity attribute | China Mobile | CR | agreement | Yes | Yes | noted | No | ||||
S5-110257 | CR R10 32.696 Addition of capacity attribute | China Mobile | CR | agreement | Yes | Yes | noted | No | ||||
S5-110258 | CR R10 32.756 Correct MMEFunction attributes to align with 32.752 | China Mobile | CR | agreement | Yes | Yes | approved | No | ||||
S5-110268 | CR R8 32.607 Correcting basic CM definition | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110476 | No | S5-110476 | |||
S5-110476 | CR R8 32.607 Correcting basic CM definition | Alcatel-Lucent | CR | agreement | Yes | Yes | noted | No | S5-110268 | |||
S5-110269 | CR R9 32.607 Correcting basic CM definition | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110477 | No | S5-110477 | |||
S5-110477 | CR R9 32.607 Correcting basic CM definition | Alcatel-Lucent | CR | agreement | Yes | Yes | noted | No | S5-110269 | |||
S5-110271 | CR R8 32.665 Correcting KernelCMNotif | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110478 | No | S5-110478 | |||
S5-110478 | CR R8 32.665 Correcting KernelCMNotif | Alcatel-Lucent | CR | agreement | Yes | Yes | noted | No | S5-110271 | |||
S5-110272 | CR R9 32.665 Correcting KernelCMNotif | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110479 | No | S5-110479 | |||
S5-110479 | CR R9 32.665 Correcting KernelCMNotif | Alcatel-Lucent | CR | agreement | Yes | Yes | noted | No | S5-110272 | |||
S5-110273 | CR R10 32.666 Correcting KernelCMNotif | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110480 | No | S5-110480 | |||
S5-110480 | CR R10 32.666 Correcting KernelCMNotif | Alcatel-Lucent | CR | agreement | Yes | Yes | noted | No | S5-110273 | |||
S5-110274 | CR R8 32.667 Correcting import statement | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110473 | No | S5-110473 | |||
S5-110473 | CR R8 32.667 Correcting import statement | Alcatel-Lucent | CR | agreement | Yes | Yes | noted | No | S5-110274 | |||
S5-110275 | CR R9 32.667 Correcting import statement | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110474 | No | S5-110474 | |||
S5-110474 | CR R9 32.667 Correcting import statement | Alcatel-Lucent | CR | agreement | Yes | Yes | noted | No | S5-110275 | |||
S5-110276 | CR R8 32.367 Correcting Entry Point IRP | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110470 | No | S5-110470 | |||
S5-110470 | CR R8 32.367 Correcting Entry Point IRP | Alcatel-Lucent | CR | agreement | Yes | Yes | noted | No | S5-110276 | |||
S5-110277 | CR R9 32.367 Correcting Entry Point IRP | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110471 | No | S5-110471 | |||
S5-110471 | CR R9 32.367 Correcting Entry Point IRP | Alcatel-Lucent | CR | agreement | Yes | Yes | noted | No | S5-110277 | |||
S5-110293 | CR R10 32.425 Add RNReconfiguration related measurements to RN | China Mobile | CR | agreement | Yes | Yes | revised to S5-110430 | No | S5-110430 | |||
S5-110430 | CR R10 32.425 Add RNReconfiguration related measurements to RN | China Mobile | CR | agreement | Yes | Yes | noted | No | S5-110293 | |||
S5-110294 | CR R10 32.752 Add relayFlag attribute to MMEFunction | China Mobile | CR | agreement | Yes | Yes | revised to S5-110431 | No | S5-110431 | |||
S5-110431 | CR R10 32.752 Add relayFlag attribute to MMEFunction | China Mobile | CR | agreement | Yes | Yes | noted | No | S5-110294 | |||
S5-110491 | CR R10 32.756 CR#0005 Add relayFlay attribute to MMEFunction and externalMMEFunction - Align with 32.752 IS | China Mobile | CR | agreement | Yes | Yes | noted | No | ||||
S5-110310 | CR R9 32.422 Change the support qualifier of 'List of NE types to trace parameter' to conditional mandatory | Nokia Siemens Networks | CR | agreement | Yes | Yes | approved | No | ||||
S5-110311 | CR R10 32.422 Change the support qualifier of 'List of NE types to trace parameter' to conditional mandatory | Nokia Siemens Networks | CR | agreement | Yes | Yes | approved | No | ||||
S5-110312 | CR R9 32.422 Correcting start triggering event in MME in case of HSS Initiated Trace Session Activation for the attach procedure | Nokia Siemens Networks | CR | agreement | Yes | Yes | approved | No | ||||
S5-110313 | CR R10 32.422 Correcting start triggering event in MME in case of HSS Initiated Trace Session Activation for the attach procedure | Nokia Siemens Networks | CR | agreement | Yes | Yes | approved | No | ||||
S5-110314 | CR R9 32.422 Correcting start and stop triggering events in Mobility Management Entity (MME) | Nokia Siemens Networks | CR | agreement | Yes | Yes | approved | No | ||||
S5-110315 | CR R10 32.422 Correcting start and stop triggering events in Mobility Management Entity (MME) | Nokia Siemens Networks | CR | agreement | Yes | Yes | approved | No | ||||
S5-110316 | CR R10 32.421 Add missing interfaces S13,S13' for Equipment Information Register (EIR) | ZTE | CR | agreement | Yes | Yes | noted | No | ||||
S5-110317 | CR R10 32.422 Add missing interfaces S13,S13' for Equipment Information Register (EIR) | ZTE | CR | agreement | Yes | Yes | noted | No | ||||
S5-110318 | CR R10 32.423 Add missing S13,S13' interface trace Record Content for Equipment Information Register (EIR) NE | ZTE | CR | agreement | Yes | Yes | noted | No | ||||
S5-110320 | CR R10 32.422 Add missing interface table and Sh interface for Home Subscriber Server (HSS) | ZTE | CR | agreement | Yes | Yes | revised in S5-110432 | No | S5-110432 | |||
S5-110432 | CR R10 32.422 Add missing interface table and Sh interface for Home Subscriber Server (HSS) | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110320 | |||
S5-110322 | CR R10 32.422 Clarify trace parameters for E-UTRAN activation mechanism and update EPC starting mechanism - Align with 32.441 | ZTE | CR | agreement | Yes | Yes | revised to S5-110433 | No | S5-110433 | |||
S5-110433 | CR R10 32.422 Clarify trace parameters for E-UTRAN activation mechanism and update EPC starting mechanism - Align with 32.441 | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110322 | |||
S5-110324 | CR R10 32.422 Add support for subscriber trace on PDN-GW for GTP based S2b - Align with SA2 TS 23.402 | Alcatel-Lucent | CR | agreement | Yes | Yes | approved | No | ||||
S5-110329 | CR R10 32.425 Add measurements for radio coverage, radio/transport/hardware resource utilization, handover triggering, RACH performance (technically identical to S5-110222/S5-110303 using latest CR template) | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | Yes | Yes | revised to S5-110435 | No | S5-110435 | |||
S5-110435 | CR R10 32.425 Add measurements for radio coverage, radio/transport/hardware resource utilization, handover triggering, RACH performance (technically identical to S5-110222/S5-110303 using latest CR template) | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | No | Yes | split into 3 CRs in S5-110522 | No | S5-110522 | S5-110329 | ||
S5-110522 | CR R10 32.425 CR#0053 | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | Yes | Yes | revised to S5-110550 | No | S5-110550 | S5-110435 | ||
S5-110550 | CR R10 32.425 CR#0053 | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | Yes | Yes | revised to S5-110551 | No | S5-110551 | S5-110522 | ||
S5-110551 | CR R10 32.425 CR#0053 | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | Yes | Yes | approved | No | S5-110550 | |||
S5-110524 | CR R10 32.425 CR#0055 | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | Yes | Yes | revised to S5-110539 | No | S5-110539 | S5-110435 | ||
S5-110548 | CR R10 32.425 CR#0054 | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | Yes | Yes | approved | No | S5-110538 | |||
S5-110539 | CR R10 32.425 CR#0055 | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | Yes | No | for email discussion | No | S5-110524 | |||
S5-110523 | CR R10 32.425 CR#0054 | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | Yes | Yes | revised in S5-110538 | No | S5-110538 | S5-110435 | ||
S5-110538 | CR R10 32.425 CR#0054 | Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless | CR | agreement | Yes | Yes | revised to S5-110548 | No | S5-110548 | S5-110523 | ||
S5-110330 | CR R10 32.606 Correcting basic CM definition | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110475 | No | S5-110475 | |||
S5-110475 | CR R10 32.606 Correcting basic CM definition | Alcatel-Lucent | CR | agreement | Yes | Yes | noted | No | S5-110330 | |||
S5-110331 | CR R10 32.366 Correcting Entry Point IRP | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110472 | No | S5-110472 | |||
S5-110472 | CR R10 32.366 Correcting Entry Point IRP | Alcatel-Lucent | CR | agreement | Yes | Yes | noted | No | S5-110331 | |||
S5-110368 | LS_in from RAN2 on L2 measurements in DeNB having Relay Node (to: SA5; cc: RAN3; contact: NSN) | R2-110700 | i/c LS | discussion | Yes | Yes | RESUBMITTED to SA5#76 San Diego | No | ||||
S5-110414 | CR R8 32.443 CR#0003 Add missing input parameter of activateTraceJob | ZTE | CR | agreement | Yes | Yes | approved | No | ||||
S5-110415 | CR R9 32.443 CR#0004 Add missing input parameter of activateTraceJob | ZTE | CR | agreement | Yes | Yes | approved | No | ||||
S5-110434 | CR R10 32.425 CR#0052 Add measurements to RN | Ericsson (Yunxi) | CR | approval | Yes | No | withdrawn | Yes | ||||
6.4 |
OAM&P 10 Network Infrastructure Management (460032) |
|||||||||||
6.4.1 |
OAM&P for LIPA_SIPTO (450040) |
S5-110023 | Agenda OAM&P for LIPA_SIPTO (450040) | Rapporteur | agenda | approval | No | No | withdrawn | Yes | ||
S5-110042 | Minutes OAM&P for LIPA_SIPTO (450040) | Rapporteur | meeting report | approval | No | No | withdrawn | Yes | ||||
6.4.2 |
Common RAT Network Resource Model (460033) |
S5-110024 | Agenda Common RAT Network Resource Model (460033) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110085 | pCR on Generic RAN NRM IRP d32792-020 | Ericsson | pseudo CR | approval | Yes | Yes | merged S5-110085, S5-110170, S5-110171 revised to S5-110457 | No | S5-110457 | |||
S5-110170 | pCR R10 32.792 Add association for UTRAN and EUTRAN sharing | ZTE | pseudo CR | approval | Yes | Yes | merged S5-110085, S5-110170, S5-110171 revised to S5-110457 | No | S5-110457 | |||
S5-110171 | pCR R10 32.792 Add inheritance relationship of Common RAT NRM | ZTE | pseudo CR | approval | Yes | Yes | merged S5-110085, S5-110170, S5-110171 revised to S5-110457 | No | S5-110457 | |||
S5-110457 | pCR on Generic RAN NRM IRP d32792-020 | Ericsson, ZTE | pseudo CR | approval | Yes | Yes | approved | No | S5-110085 | |||
S5-110093 | pCR TS 32.792 Addition of common BTS function | Nokia Siemens Networks | pseudo CR | approval | Yes | Yes | revised to S5-110458 | No | S5-110458 | |||
S5-110458 | pCR TS 32.792 Addition of common BTS function | Nokia Siemens Networks | pseudo CR | approval | Yes | Yes | approved | No | S5-110093 | |||
S5-110249 | pCR 32.792-021 Editor's proposal | Ericsson | pseudo CR | approval | Yes | Yes | approved | No | ||||
S5-110250 | First draft TS 32.796 Telecommunication management: Generic Radio Access Network (RAN) Network Resource Model (NRM) Integration Reference Point (IRP): Solution Set (SS) | Ericsson | draft TS/TR | discussion | Yes | Yes | for email approval | No | ||||
S5-110043 | Minutes Common RAT Network Resource Model (460033) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.4.3 |
IRP Solution Set Specification Organization Improvements (470035) |
S5-110025 | Agenda IRP Solution Set Specification Organization Improvements (470035) | Rapporteur | agenda | approval | No | No | withdrawn | Yes | ||
S5-110044 | Minutes IRP Solution Set Specification Organization Improvements (470035) | Rapporteur | meeting report | approval | No | No | withdrawn | Yes | ||||
6.4.4 |
Service Oriented Architecture (SOA) for IRP continuation (470036) |
S5-110026 | Agenda Service Oriented Architecture (SOA) for IRP continuation (470036) | Rapporteur | agenda | approval | No | No | withdrawn | Yes | ||
S5-110045 | Minutes Service Oriented Architecture (SOA) for IRP continuation (470036) | Rapporteur | meeting report | approval | No | No | withdrawn | Yes | ||||
6.4.5 |
IRP Overview, Profiles, Usage Guide (480042) |
S5-110027 | Agenda IRP Overview, Profiles, Usage Guide (480042) | Rapporteur | agenda | approval | No | No | withdrawn | Yes | ||
S5-110096 | pCR 32.103 Additional IRP Overview Input | Nokia Siemens Networks | pseudo CR | approval | No | No | withdrawn | Yes | ||||
S5-110101 | pcR 32.103 Input for IRP Packaging Suggestions | Nokia Siemens Networks | pseudo CR | approval | Yes | Yes | noted | No | ||||
S5-110046 | Minutes IRP Overview, Profiles, Usage Guide (480042) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.5 |
OAM&P 10 Performance Management (470039) |
|||||||||||
6.5.1 |
Key Performance Indicators (KPIs) for IMS (470040) |
S5-110028 | Agenda Key Performance Indicators (KPIs) for IMS (470040) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110125 | pCR R10 32.454 Correct Call Drop Rate | Ericsson | pseudo CR | approval | Yes | Yes | approved | No | ||||
S5-110126 | CR R10 32.409 Add dropped session measurements | Ericsson | CR | agreement | Yes | Yes | approved | No | ||||
S5-110127 | CR R10 32.409 Enhance session establishment measurements | Ericsson | CR | agreement | Yes | Yes | revised to S5-110459 | No | S5-110459 | |||
S5-110459 | CR R10 32.409 Enhance session establishment measurements | Ericsson | CR | agreement | No | No | withdrawn | Yes | S5-110127 | |||
S5-110259 | pCR 32.454 update system capacity information | China Mobile | pseudo CR | approval | Yes | Yes | revised to S5-110454 | No | S5-110454 | |||
S5-110454 | pCR 32.454 update system capacity information | China Mobile | pseudo CR | approval | Yes | Yes | approved | No | S5-110259 | |||
S5-110260 | Presentation of TS32.454 to SA#51 for approval | China Mobile | other | discussion | Yes | Yes | noted | No | ||||
S5-110460 | pCR R10 32.454 clarification on Session Establishment Success Rate | Ericsson | pseudo CR | agreement | Yes | Yes | approved | No | ||||
S5-110047 | Minutes Key Performance Indicators (KPIs) for IMS (470040) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.5.2 |
Key Performance Indicators (KPIs) for EPC (470041) |
S5-110029 | Agenda Key Performance Indicators (KPIs) for EPC (470041) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110261 | pCR 32.455 update system capacity information | China Mobile | pseudo CR | approval | Yes | Yes | revised to S5-110455 | No | S5-110455 | |||
S5-110455 | pCR 32.455 update system capacity information | China Mobile | pseudo CR | approval | Yes | Yes | approved | No | S5-110261 | |||
S5-110262 | Presentation of TS32.455 to SA#51 for approval | China Mobile | other | discussion | Yes | Yes | noted | No | ||||
S5-110048 | Minutes Key Performance Indicators (KPIs) for EPC (470041) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.5.3 |
Management of UE based network performance measurements (470042) |
S5-110030 | Agenda Management of UE based network performance measurements (470042) | Rapporteur | agenda | approval | Yes | Yes | approved as R1 | No | ||
S5-110065 | CR R10 32.442 Adding MDT to Trace IRP | Nokia Siemens Networks | CR | agreement | Yes | Yes | merged S5-110065 with S5-110187 and revised to S5-110385 | No | S5-110385 | |||
S5-110187 | CR R10 32.442 extend activeTraceJob to support MDT configuration | Huawei | CR | agreement | Yes | Yes | merged S5-110065 with S5-110187 and revised to S5-110385 | No | S5-110385 | |||
S5-110385 | CR R10 32.442 Adding MDT to Trace IRP | Nokia Siemens Networks, Huawei | CR | agreement | Yes | Yes | approved | No | S5-110065 | |||
S5-110076 | LS_in from SA2 on Second LS reply to S2-105021/S5-102526 on Location Information for MDT from SA5 | S2-105960 | i/c LS | discussion | Yes | Yes | noted | No | ||||
S5-110157 | CR R10 32.422 Rapporteur cleanup on MDT | Nokia Siemens Networks | CR | agreement | No | No | withdrawn | Yes | ||||
S5-110188 | CR R10 32.446 extend activeTraceJob to support MDT configuration | Huawei | CR | agreement | Yes | No | withdrawn | Yes | ||||
S5-110192 | CR R10 32.441 Rapporteur Cleanup Proposal on replacement of 'UE based Performance Measurements' to 'MDT' | Huawei | CR | agreement | Yes | Yes | revised to S5-110377 | No | S5-110377 | |||
S5-110377 | CR R10 32.441 Rapporteur Cleanup Proposal on replacement of 'UE based Performance Measurements' to 'MDT' | Huawei | CR | agreement | Yes | Yes | approved | No | S5-110192 | |||
S5-110193 | pCR Discussion Paper for MDT data sharing | Huawei | pseudo CR | approval | Yes | Yes | noted | No | ||||
S5-110245 | Discussion paper on user consent in MDT activation mechanism | NEC | other | discussion | Yes | Yes | noted | No | ||||
S5-110308 | CR R10 32.422 Correcting the handling of MDT trace at handovers | Ericsson | CR | agreement | Yes | Yes | revised to S5-110380 | No | S5-110380 | |||
S5-110380 | CR R10 32.422 Correcting the handling of MDT trace at handovers | Ericsson | CR | agreement | Yes | Yes | revised to S5-110521 | No | S5-110521 | S5-110308 | ||
S5-110521 | CR R10 32.422 Correcting the handling of MDT trace at handovers | Ericsson | CR | agreement | Yes | Yes | approved | No | S5-110380 | |||
S5-110309 | CR R10 32.422 defining exact coding of MDT parameters | Nokia Siemens Networks | CR | agreement | Yes | Yes | merged S5-110309 with S5-110321 and revised to S5-110381 | No | S5-110381 | |||
S5-110321 | CR R10 32.422 Add Bit information to Minimization of Drive Tests (MDT) measurements configuration | Huawei | CR | agreement | Yes | Yes | merged S5-110309 with S5-110321 and revised to S5-110381 | No | S5-110381 | |||
S5-110381 | CR R10 32.422 defining exact coding of Minimization of Drive Tests (MDT) parameters | Nokia Siemens Networks, Huawei | CR | agreement | Yes | Yes | approved | No | S5-110309 | |||
S5-110323 | CR R10 32.422 Add the usage of UE capability in Trace Session Activation | ZTE | CR | agreement | Yes | Yes | noted | No | ||||
S5-110325 | CR R10 32.422 Clarify that there can be only one TRSR per TR at a given time per UE trace session for signalling based trace | Alcatel-Lucent, Nokia Siemens Networks, Ericsson, Huawei | CR | agreement | Yes | Yes | revised to S5-110525 | No | S5-110525 | |||
S5-110525 | CR R10 32.422 Clarify that there can be only one TRSR per TR at a given time per UE trace session for signalling based trace | Alcatel-Lucent, Nokia Siemens Networks, Ericsson, Huawei | CR | agreement | Yes | Yes | approved | No | S5-110325 | |||
S5-110326 | CR R10 32.422 Include the user consent in MDT procedures as required by SA3 (Security) | NEC | CR | agreement | Yes | Yes | noted | No | ||||
S5-110327 | CR R10 32.421 Add requirements for security and privacy of UE-based Network Performance Measurements / MDT as required by SA3 (Security) | Telecom Italia, China Unicom | CR | agreement | Yes | Yes | revised to S5-110379 (Simone) | No | S5-110379 | |||
S5-110379 | CR R10 32.421 Add requirements for security and privacy of UE-based Network Performance Measurements / MDT as required by SA3 (Security) | Telecom Italia, China Unicom | CR | agreement | Yes | Yes | revised to S5-110465 | No | S5-110465 | S5-110327 | ||
S5-110465 | CR R10 32.421 Add requirements for security and privacy of UE-based Network Performance Measurements / MDT as required by SA3 (Security) | Telecom Italia, China Unicom | CR | agreement | Yes | Yes | revised to S5-110526 | No | S5-110379 | |||
S5-110526 | CR R10 32.421 Add requirements for security and privacy of UE-based Network Performance Measurements / MDT as required by SA3 (Security) | Telecom Italia, China Unicom | CR | agreement | Yes | Yes | revised to S5-110540 | No | S5-110540 | S5-110465 | ||
S5-110540 | CR R10 32.421 Add requirements for security and privacy of UE-based Network Performance Measurements / MDT as required by SA3 (Security) | Telecom Italia, China Unicom | CR | agreement | Yes | Yes | approved | No | S5-110526 | |||
S5-110328 | CR R10 32.441 Include the user consent in MDT procedures as required by SA3 (Security) | Telecom Italia | CR | agreement | Yes | Yes | noted | No | ||||
S5-110335 | Alternative way for getting the IP address of TCE Resubmission of S5-103123 | Nokia Siemens Networks | other | discussion | Yes | Yes | noted | No | ||||
S5-110366 | LS_in from RAN2 on Reply LS to S5-103373 = R2-110029 on MDT related UE capabilities (to: SA5; contact: Qualcomm) | R2-110697 | i/c LS | discussion | Yes | Yes | replied in S5-110374 (Gyula) | No | ||||
S5-110374 | LS_out Reply to RAN2 on MDT related UE capabilities (S5-110366 / R2-110697) | SA5 (OAM) | o/g LS | discussion | Yes | Yes | revised to S5-110528 | No | S5-110528 | |||
S5-110528 | LS_out Reply to RAN2 on MDT related UE capabilities (S5-110366 / R2-110697) | SA5 (OAM) | o/g LS | discussion | Yes | Yes | approved | No | S5-110374 | |||
S5-110367 | LS_in from RAN2 on Reply LS to S3-101422 = R2-106876 on MDT user involvement (to: SA3, SA5; cc: SA1, RAN3; contact: Mediatek) | R2-110699 | i/c LS | discussion | Yes | Yes | replied in S5-110376 (Zou Lan) | No | ||||
S5-110376 | LS_out Reply to S5-110367 LS_in from RAN2 on Reply LS to S3-101422 = R2-106876 on MDT user involvement (to: SA3, SA5; cc: SA1, RAN3; contact: Mediatek) | SA5 (OAM) | o/g LS | discussion | Yes | Yes | revised to S5-110482 | No | S5-110482 | |||
S5-110482 | LS_out Reply to S5-110367 LS_in from RAN2 on Reply LS to S3-101422 = R2-106876 on MDT user involvement | SA5 (OAM) | o/g LS | discussion | Yes | Yes | approved | No | S5-110376 | |||
S5-110373 | LS_in from RAN2 on Reply to S5-103274 = R2-106870 on inclusion of RF measurements into MDT report (to: SA5; cc: RAN1; contact: NSN) | R2-110682 | i/c LS | discussion | Yes | Yes | noted | No | ||||
S5-110375 | CR R10 32.422 Remove…. | NSN (Gyula) | CR | discussion | Yes | Yes | revised to S5-110527 | No | S5-110527 | |||
S5-110527 | CR R10 32.422 Removing UE capability from MDT parameters | Nokia Siemens Networks | CR | discussion | Yes | Yes | approved | No | S5-110375 | |||
S5-110382 | LS_in from SA3 (to: TSG RAN2, SA1; cc: SA5) on review of MDT design and reply LS on Security Issues with Logged MDT (Nov 2010) | S3-101422 | i/c LS | discussion | Yes | Yes | replied in S5-110383 (Giorgio) | No | ||||
S5-110383 | LS_out Reply to S5-110382 LS_in from SA3 (to: TSG RAN2, SA1; cc: SA5) on review of MDT design and reply LS on Security Issues with Logged MDT (Nov 2010) | SA5 (OAM) | o/g LS | discussion | Yes | Yes | revised to S5-110529 | No | S5-110529 | |||
S5-110529 | LS_out Reply to SA3 (cc: RAN2, SA1) on review of MDT design and reply LS on Security Issues with Logged MDT (S5-110382 / S3-101422) | SA5 (OAM) | o/g LS | discussion | Yes | Yes | approved | No | S5-110383 | |||
S5-110049 | Minutes Management of UE based network performance measurements (470042) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.5.4 |
3G HNB and LTE HeNB Subsystem performance measurements (470043) |
S5-110031 | Agenda 3G HNB and LTE HeNB Subsystem performance measurements (470043) | Rapporteur | agenda | approval | Yes | Yes | approved as R1 | No | ||
S5-110292 | Discussion paper on how to support PM through support IOC | China Mobile | other | discussion | Yes | No | withdrawn | Yes | ||||
S5-110297 | pCR 32.453 Add Radio Bearer QoS related performance measurements | China Mobile | pseudo CR | approval | Yes | Yes | revised to S5-110456 | No | S5-110456 | |||
S5-110456 | pCR 32.453 Add Radio Bearer QoS related performance measurements | China Mobile | pseudo CR | approval | Yes | Yes | approved | No | S5-110297 | |||
S5-110050 | Minutes 3G HNB and LTE HeNB Subsystem performance measurements (470043) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.6 |
OAM&P 10 Self-Organizing Networks (SON) - OAM aspects (460034) |
|||||||||||
6.6.1 |
SON Self-optimization management continuation (460035) |
S5-110032 | Agenda SON Self-optimization management continuation (460035) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110191 | CR R10 32.425 Add measurements for RACH optimization targets | Ericsson | CR | agreement | Yes | Yes | noted | No | ||||
S5-110199 | CR R10 32.425 Introduction of distribution of RACH preambles sent PM counters for RACH optimisation | Huawei | CR | agreement | Yes | Yes | revised to S5-110452 | No | S5-110452 | |||
S5-110452 | CR R10 32.425 Introduction of distribution of RACH preambles sent PM counters for RACH optimisation | Huawei | CR | agreement | Yes | Yes | noted | No | S5-110199 | |||
S5-110530 | LS_out to RAN2 on RACH measurement | SA5 (OAM) | o/g LS | agreement | Yes | Yes | revised to S5-110547 | No | S5-110547 | |||
S5-110547 | LS_out to RAN2 on RACH measurement | SA5 (OAM) | o/g LS | agreement | Yes | Yes | approved | No | S5-110530 | |||
S5-110197 | pCR RACH optimization PM | Huawei | pseudo CR | approval | Yes | Yes | merged S5-110197 with S5-110225 in S5-110451 | No | S5-110451 | |||
S5-110225 | pCR 32.522-V30 Add RACH Optimization measurements | Ericsson | pseudo CR | approval | Yes | Yes | merged S5-110197 with S5-110225 in S5-110451 | No | S5-110451 | |||
S5-110451 | pCR 32.522-V30 RACH optimization PM | Huawei | pseudo CR | approval | Yes | Yes | approved | No | S5-110197 | |||
S5-110203 | pCR Architecture for capacity and coverage optimization | Huawei | pseudo CR | approval | Yes | Yes | approved | No | ||||
S5-110204 | pCR Stage 2 solution for NM centralized CCO | Huawei | pseudo CR | approval | Yes | Yes | revised to S5-110462 | No | S5-110462 | |||
S5-110462 | pCR Stage 2 solution for NM centralized CCO | Huawei | pseudo CR | approval | Yes | Yes | approved | No | S5-110204 | |||
S5-110224 | Discussion paper on Measurement for number of RACH preambles sent | Ericsson | other | discussion | Yes | Yes | noted | No | ||||
S5-110229 | pCR Managing SON Targets | Nokia Siemens Networks, Vodafone | pseudo CR | approval | Yes | Yes | noted | No | ||||
S5-110306 | Discussion paper on Optimization of HO via SGW Relocation Avoidance | NEC | other | discussion | Yes | Yes | noted | No | ||||
S5-110051 | Minutes SON Self-optimization management continuation (460035) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.6.2 |
SON Self-healing management (460036) |
S5-110033 | Agenda SON Self-healing management (460036) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110132 | CR R10 32.522 NRM for Cell Outage Compensation | Nokia Siemens Networks | CR | agreement | Yes | Yes | noted | No | ||||
S5-110134 | CR R10 32.762 NRM for Cell Outage Compensation | Nokia Siemens Networks | CR | agreement | Yes | Yes | noted | No | ||||
S5-110211 | Discussion paper on the handling of draft 32.542 | Huawei | other | discussion | Yes | Yes | noted | No | ||||
S5-110226 | Discussion paper on Introduction to NRM for Cell Outage Compensation | Nokia Siemens Networks | other | discussion | Yes | Yes | noted | No | ||||
S5-110227 | pCR to 32.541 | Nokia Siemens Networks | pseudo CR | approval | Yes | Yes | revised to S5-110481 | No | S5-110481 | |||
S5-110481 | pCR to 32.541 | Nokia Siemens Networks | pseudo CR | approval | Yes | Yes | approved | No | S5-110227 | |||
S5-110052 | Minutes SON Self-healing management (460036) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.6.3 |
OAM aspects of Energy Saving in Radio Networks (470037) |
S5-110034 | Agenda OAM aspects of Energy Saving in Radio Networks (470037) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110201 | CR R10 32.762 Add one attribute reconfigureEnabled to IOC EnergySavingProperties | ZTE | CR | agreement | Yes | No | merged S5-110201 with S5-110283 and revised to S5-110447 | No | S5-110447 | |||
S5-110283 | CR R10 32.762 Add a new attribute into EUtranGenericCell object class to define a cell as not changeable by Energy Saving Management - Align with 32.551 | Nokia Siemens Networks | CR | agreement | Yes | Yes | merged S5-110201 with S5-110283 and revised to S5-110447 | No | S5-110447 | |||
S5-110447 | CR R10 32.762 Add a new attribute into EUtranGenericCell object class to define a cell as not changeable by Energy Saving Management - Align with 32.551 / Add one attribute reconfigureEnabled to IOC EnergySavingProperties | Nokia Siemens Networks, ZTE | CR | agreement | Yes | Yes | revised to S5-110531 | No | S5-110531 | S5-110283 | ||
S5-110531 | CR R10 32.762 Add a new attribute into EUtranGenericCell object class to define a cell as not changeable by Energy Saving Management - Align with 32.551 | Nokia Siemens Networks, ZTE | CR | agreement | Yes | Yes | approved | No | S5-110447 | |||
S5-110202 | CR R10 32.551 Modify the ES compensation related use cases | ZTE | CR | agreement | Yes | Yes | revised to S5-110439 | No | S5-110439 | |||
S5-110439 | CR R10 32.551 Modify the ES compensation related use cases | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110202 | |||
S5-110205 | CR R10 32.551 Add ES compensation deactivation requirement | ZTE | CR | agreement | Yes | Yes | revised to S5-110440 | No | S5-110440 | |||
S5-110440 | CR R10 32.551 Add ES compensation deactivation requirement | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110205 | |||
S5-110206 | CR R10 32.551 modify the requirements about traffic threshold and time duration | ZTE | CR | agreement | Yes | Yes | revised to S5-110441 | No | S5-110441 | |||
S5-110441 | CR R10 32.551 modify the requirements about traffic threshold and time duration | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110206 | |||
S5-110213 | CR R10 32.526 NRM for Energy Saving Management Policies and ESM switch - Align with 32.522 | Huawei | CR | agreement | Yes | Yes | revised to S5-110450 | No | S5-110450 | |||
S5-110450 | CR R10 32.526 NRM for Energy Saving Management Policies and ESM switch - Align with 32.522 | Huawei | CR | agreement | Yes | Yes | approved | No | S5-110213 | |||
S5-110217 | pCR 32.551 Add time periods related ES policy management requirement | Huawei | pseudo CR | approval | Yes | Yes | noted | No | ||||
S5-110219 | CR R10 32.522 NRM proposal for time periods to allow a cell enter energySaving state | Huawei | CR | agreement | Yes | No | withdrawn | Yes | ||||
S5-110220 | Discussion paper on Implementation on energy saving compensation over Itf-N | Huawei | other | discussion | Yes | Yes | revised to S5-110443 | No | S5-110443 | |||
S5-110443 | Discussion paper on Implementation on energy saving compensation over Itf-N | Huawei | other | discussion | Yes | Yes | approved | No | S5-110220 | |||
S5-110263 | CR R10 32.425 Addition of duration of the state transition for energy saving management | China Mobile | CR | agreement | Yes | Yes | noted | No | ||||
S5-110284 | CR R10 32.766 Add Energy Saving Management (ESM) items for Itf-N - Align with 32.762, 32.551 | Nokia Siemens Networks | CR | agreement | Yes | Yes | revised to S5-110448 | No | S5-110448 | |||
S5-110448 | CR R10 32.766 Add Energy Saving Management (ESM) items for Itf-N - Align with 32.762, 32.551 | Nokia Siemens Networks | CR | agreement | Yes | Yes | revised to S5-110532 | No | S5-110532 | S5-110284 | ||
S5-110532 | CR R10 32.766 Add Energy Saving Management (ESM) items for Itf-N - Align with 32.762, 32.551 | Nokia Siemens Networks | CR | agreement | Yes | Yes | approved | No | S5-110448 | |||
S5-110461 | CR R10 32.626 CR#0002 Add containment for object class ESPolicies - Align with 32.522 | Nokia Siemens Networks | CR | agreement | Yes | Yes | approved | No | ||||
S5-110357 | Revised WID on OAM aspects of Energy Saving in Radio Networks (OAM-ES) - Revision of SP-100226 | Nokia Siemens Networks | Revised WID | agreement | Yes | Yes | revised to S5-110438 | No | S5-110438 | |||
S5-110438 | Revised WID on OAM aspects of Energy Saving in Radio Networks (OAM-ES) - Revision of SP-100226 | Nokia Siemens Networks | Revised WID | agreement | Yes | Yes | revised to S5-110463 | No | S5-110463 | S5-110357 | ||
S5-110463 | Revised WID on OAM aspects of Energy Saving in Radio Networks (OAM-ES) - Revision of SP-100226 | Nokia Siemens Networks | Revised WID | agreement | Yes | Yes | revised to S5-110533 | No | S5-110533 | S5-110438 | ||
S5-110533 | Revised WID on OAM aspects of Energy Saving in Radio Networks (OAM-ES) - Revision of SP-100226 | Nokia Siemens Networks | Revised WID | agreement | Yes | Yes | approved | No | S5-110463 | |||
S5-110053 | Minutes OAM aspects of Energy Saving in Radio Networks (470037) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.7 |
OAM&P 10 Subscription Management (SuM) evolution (470038) |
S5-110035 | Agenda OAM&P 10 Subscription Management (SuM) evolution (470038) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110280 | CR R10 32.172 Improve Subscription Management (SuM) Network Resource Model (NRM) Integration Reference Point (IRP) access service modelling | Ericsson | CR | agreement | Yes | Yes | approved | No | ||||
S5-110281 | CR R10 32.176 Improve Subscription Management (SuM) Network Resource Model (NRM) Integration Reference Point (IRP) access service modelling - Align with 32.172 IS | Ericsson | CR | agreement | Yes | Yes | approved | No | ||||
S5-110054 | Minutes OAM&P 10 Subscription Management (SuM) evolution (470038) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.8 |
OAM&P Studies |
|||||||||||
6.8.1 |
Study on Alignment of 3GPP Generic NRM IRP and TMF Shared Information Data (SID) model (460037) |
S5-110036 | Agenda Study on Alignment of 3GPP Generic NRM IRP and TMF Shared Information Data (SID) model (460037) | Rapporteur | agenda | approval | No | No | withdrawn | Yes | ||
S5-110079 | LS_in from SA#50 to SA5, Joint WG SA5-TMF, TM Forum on Cooperation of TMF and 3GPP | SP-100873 | i/c LS | discussion | Yes | Yes | RESUBMITTED to SA5#76 San Diego | No | ||||
S5-110086 | Discussion paper on FMC federated network model (FNM) | Ericsson | other | discussion | Yes | Yes | approved | No | ||||
S5-110088 | Discussion paper on Proposed Umbrella classes | Ericsson, Nokia Siemens Network | other | discussion | Yes | Yes | noted | No | ||||
S5-110094 | pCR 32.828 Inventory object model enhancements | Nokia Siemens Networks | pseudo CR | approval | Yes | Yes | approved | No | ||||
S5-110097 | Discussion paper on 3GPP-TMF Model Alignment - Considerations for Working Procedure and Governance | Nokia Siemens Networks | other | discussion | Yes | Yes | noted | No | ||||
S5-110221 | pCR Discussion Paper for Model Alignment Overview | Huawei | pseudo CR | approval | Yes | Yes | revised to S5-110493 | No | S5-110493 | |||
S5-110493 | pCR Discussion Paper for Model Alignment Overview | Huawei | pseudo CR | approval | Yes | Yes | approved | No | S5-110221 | |||
S5-110055 | Minutes Study on Alignment of 3GPP Generic NRM IRP and TMF Shared Information Data (SID) model (460037) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.8.2 |
Study on Harmonization of 3GPP Alarm IRP and TMF Interface Program (TIP) Fault Management (460038) |
S5-110037 | Agenda Study on Harmonization of 3GPP Alarm IRP and TMF Interface Program (TIP) Fault Management (460038) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110100 | Discussion paper on 3GPP-TMF - Considerations for Continued IF Harmonization Discussion | Nokia Siemens Networks, Ericsson, Huawei | other | discussion | Yes | Yes | noted | No | ||||
S5-110056 | Minutes Study on Harmonization of 3GPP Alarm IRP and TMF Interface Program (TIP) Fault Management (460038) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.8.3 |
Study on version handling (470050) |
S5-110038 | Agenda Study on version handling (470050) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110169 | pCR R10 32.832 Add compatibility requirement of version handling | ZTE | pseudo CR | approval | Yes | Yes | noted | No | ||||
S5-110319 | pCR on Version Handling | Ericsson | pseudo CR | approval | Yes | Yes | noted | No | ||||
S5-110057 | Minutes Study on version handling (470050) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.8.4 |
Study on Alarm correlation and alarm root cause analysis (480045) |
S5-110039 | Agenda Study of Alarm correlation and alarm root cause analysis (480045) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110264 | pCR 32.832 addition of alarm correlation application | China Mobile | pseudo CR | approval | Yes | Yes | noted | No | ||||
S5-110287 | pCR on AC_RCA d32832-030 | Ericsson | pseudo CR | approval | Yes | No | for email approval | No | ||||
S5-110058 | Minutes Study of Alarm correlation and alarm root cause analysis (480045) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.8.5 |
Study on Alignment of 3GPP PM IRP and TMF Interface Program (TIP) PM (480046) |
S5-110040 | Agenda Study on Alignment of 3GPP PM IRP and TMF Interface Program (TIP) PM (480046) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110279 | Discussion paper on PM harmonization | Alcatel-Lucent | other | discussion | Yes | Yes | revised to S5-110500 | No | S5-110500 | |||
S5-110500 | Discussion paper on PM harmonization | Alcatel-Lucent | other | discussion | Yes | Yes | approved | No | S5-110279 | |||
S5-110059 | Minutes Study on Alignment of 3GPP PM IRP and TMF Interface Program (TIP) PM (480046) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.8.6 |
Study on Management of Converged Networks (480047) |
S5-110041 | Agenda Study on Management of Converged Networks (480047) | Rapporteur | agenda | approval | No | No | withdrawn | Yes | ||
S5-110087 | Discussion paper on Interface in FMC NM environment | Ericsson, Huawei | other | discussion | Yes | Yes | approved in principle | No | ||||
S5-110267 | pCR Definition of FMC | Alcatel-Lucent | pseudo CR | approval | Yes | Yes | revised to S5-110505 | No | S5-110505 | |||
S5-110505 | pCR Definition of FMC | Alcatel-Lucent | pseudo CR | approval | Yes | Yes | approved | No | S5-110267 | |||
S5-110060 | Minutes Study on Management of Converged Networks (480047) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
6.8.7 |
Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) |
S5-110061 | Agenda Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) | Rapporteur | agenda | approval | Yes | Yes | approved | No | ||
S5-110135 | Skeleton of TR 32.9yz UDC Information Model Handling and Provisioning: Example Use Cases | Alcatel-Lucent | draft TS/TR | discussion | Yes | Yes | revised to S5-110490 | No | S5-110490 | |||
S5-110490 | Skeleton of TR 32.9yz UDC Information Model Handling and Provisioning: Example Use Cases | Alcatel-Lucent | draft TS/TR | discussion | Yes | Yes | revised to S5-110534 | No | S5-110534 | S5-110135 | ||
S5-110534 | TR 32.901 V0.1.1 (2011-01) Telecommunication management; Study on User Data Convergence (UDC) information model handling and provisioning: Example Use Cases | Alcatel-Lucent | draft TS/TR | discussion | Yes | No | for email approval | No | S5-110490 | |||
S5-110360 | Revised WID on Study on UDC information model handling and provisioning: Example Use Cases (FS_UDC_AppUseCase) - Revision of SP-100502 | Alcatel-Lucent | Revised WID | agreement | Yes | Yes | revised to S5-110535 | No | S5-110535 | |||
S5-110535 | Revised WID on Study on UDC information model handling and provisioning: Example Use Cases (FS_UDC_AppUseCase) - Revision of SP-100502 | Alcatel-Lucent | Revised WID | agreement | Yes | Yes | approved | No | S5-110360 | |||
S5-110489 | RESUBMITTED S5-102161 Minutes on Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) from SA5#73 Aug 2010, New Delhi, INDIA | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
S5-110062r1 | Minutes Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) | Rapporteur | meeting report | approval | Yes | Yes | noted | No | ||||
7 |
Charging Management |
|||||||||||
7.1 |
Charging Plenary |
S5-110008 | CH Agenda and Time Plan | CH SWG Chair | agenda | approval | Yes | Yes | noted | No | ||
S5-110009 | CH List of Documents | CH SWG Chair | other | discussion | No | No | [not addressed] | No | ||||
S5-110010 | CH Detailed Report from LAST Meeting | CH SWG Chair | meeting report | approval | Yes | Yes | approved | No | ||||
S5-110011 | CH Executive Report from THIS Meeting | CH SWG Chair | meeting report | approval | Yes | Yes | noted | No | ||||
S5-110012 | CH Detailed Report from THIS Meeting | CH SWG Chair | meeting report | approval | No | No | to be provided after the meeting | No | ||||
S5-110066 | RESUBMITTED S5-102892 LS_in on User CSG Information reporting | C3-100982 | i/c LS | discussion | Yes | Yes | RESUBMITTED to SA5#76 San Diego | No | ||||
S5-110073 | LS_in from CT3 (cc: SA5) on direct stage 3 work for NIMTC functionality (S1-102292) | C3-101490 | i/c LS | discussion | Yes | Yes | noted | No | ||||
S5-110074 | LS_in from CT4 (cc: SA5) on direct stage 3 work for NIMTC functionality (S1-102292) | C4-103168 | i/c LS | discussion | Yes | Yes | noted | No | ||||
S5-110077 | LS_in from SA2 on S2-105772 / S5-102938 Reply LS on clarification on GGSN charging functions | S2-105969 | i/c LS | discussion | Yes | Yes | RESUBMITTED to SA5#76 San Diego | No | ||||
S5-110078 | LS_in from SA2 on Reply LS on User CSG Information reporting from CT3 (C3-100982) | S2-105991 | i/c LS | discussion | Yes | Yes | noted | No | ||||
S5-110364 | LS_in from SA1 to SA5 on MTC charging requirements for Rel-10 | S1-103313 | i/c LS | action | Yes | Yes | replied in S5-110396 (Gerald) | No | ||||
S5-110396 | LS_out Reply to S5-110364 LS_in from SA1 to SA5 on MTC charging requirements for Rel-10 | SA5 (CH) | o/g LS | approval | Yes | Yes | revised to S5-110495 | No | S5-110495 | |||
S5-110495 | LS_out Reply to S5-110364 LS_in from SA1 to SA5 on MTC charging requirements for Rel-10 | SA5 (CH) | o/g LS | approval | Yes | Yes | revised to S5-110553 | No | S5-110553 | S5-110396 | ||
S5-110553 | LS_out Reply to S5-110364 LS_in from SA1 to SA5 on MTC charging requirements for Rel-10 | SA5 (CH) | o/g LS | approval | Yes | Yes | approved | No | S5-110495 | |||
S5-110365 | LS_in from SA1 Reply to SA2 (cc: SA5) on location information for IMS charging | S1-103340 | i/c LS | information | Yes | Yes | noted | No | ||||
S5-110378 | LS_in from GSMA CPWP to SA5 on IMS service identification for charging purposes in case of Roaming [amendment to previous CPWP LS on charging for VoLTE Roaming (S5-102806 / CPWP 81_008rev1)] | GSMA CPWP 86_004 | i/c LS | discussion | Yes | Yes | replied in S5-110395 | No | ||||
S5-110395 | LS_out Reply to S5-110378 LS_in from GSMA CPWP to SA5 on IMS service identification for charging purposes in case of Roaming [amendment to previous CPWP LS on charging for VoLTE Roaming (S5-102806 / CPWP 81_008rev1)] | SA5 (CH) | o/g LS | approval | Yes | Yes | revised to S5-110496 | No | S5-110496 | |||
S5-110496 | LS_out Reply to S5-110378 LS_in from GSMA CPWP to SA5 on IMS service identification for charging purposes in case of Roaming [amendment to previous CPWP LS on charging for VoLTE Roaming (S5-102806 / CPWP 81_008rev1)] | SA5 (CH) | o/g LS | approval | Yes | Yes | revised to S5-110552 | No | S5-110552 | S5-110395 | ||
S5-110552 | LS_out Reply to S5-110378 LS_in from GSMA CPWP to SA5 on IMS service identification for charging purposes in case of Roaming [amendment to previous CPWP LS on charging for VoLTE Roaming (S5-102806 / CPWP 81_008rev1)] | SA5 (CH) | o/g LS | approval | Yes | Yes | approved | No | S5-110496 | |||
S5-110446 | LS_out to SA1, CT3 on Identification for Charging in EPC Current status | SA5 (CH) | o/g LS | discussion | Yes | Yes | approved | No | ||||
S5-110453 | LS_in from CT4 to SA5 (cc: SA2) on Passing Charging characteristics for Inter-RAT Handover | C4-110347 | i/c LS | discussion | Yes | Yes | replied in S5-110508 | No | ||||
S5-110508 | LS_out Reply to CT4 (cc: SA2) on Passing Charging characteristics for Inter-RAT Handover (S5-110453 / C4-110347) | SA5 (CH) | o/g LS | approval | Yes | Yes | approved | No | ||||
7.2 |
New Charging Work Item proposals |
S5-110090 | CT#50 approved WID PEST-CT3 on CT3 aspects of Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases | CP-100663 | New WID | agreement | Yes | Yes | noted | No | ||
S5-110091 | SA#50 approved SA2 WID PEST on Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases | SP-100702 | New WID | agreement | Yes | Yes | revised to S5-110419 | No | S5-110419 | |||
S5-110419 | Revised SA#50 approved SA2 WID on Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases (PEST) - Revision of SP-100702 | SA5 (CH) | New WID | agreement | Yes | Yes | revised to S5-110554 | No | S5-110554 | S5-110091 | ||
S5-110554 | Revised SA#50 approved SA2 Feature-level WID on Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases (PEST) - Revision of SP-100702 | SA5 (CH) | revised WID | agreement | Yes | Yes | approved | No | S5-110419 | |||
S5-110092 | PEST Work Plan | MCC | other | discussion | Yes | Yes | noted | No | ||||
S5-110248 | New WID on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (IOI_IMS_CH) | Deutsche Telekom | New WID | agreement | Yes | Yes | revised to S5-110422 | No | S5-110422 | |||
S5-110422 | New WID on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (IOI_IMS_CH) | Deutsche Telekom | New WID | agreement | Yes | Yes | approved | No | S5-110248 | |||
S5-110254 | New WID on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) | Ericsson | New WID | agreement | Yes | Yes | revised to S5-110421 | No | S5-110421 | |||
S5-110421 | New WID on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) | Ericsson | New WID | agreement | Yes | Yes | revised to S5-110499 | No | S5-110499 | S5-110254 | ||
S5-110499 | New WID on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) | Ericsson | New WID | agreement | Yes | Yes | revised to S5-110541 | No | S5-110541 | S5-110421 | ||
S5-110541 | New WID on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) | Ericsson | New WID | agreement | Yes | Yes | approved | No | S5-110499 | |||
S5-110255 | New WID on Charging for Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Data Bases (PEST-CH) | Ericsson | New WID | agreement | Yes | Yes | revised to S5-110420 | No | S5-110420 | |||
S5-110420 | New BB-level WID on Charging for Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Data Bases (PEST-CH) | Ericsson | New WID | agreement | Yes | Yes | approved | No | S5-110255 | |||
S5-110423 | LS_out from SA5 to CT1,CT3 on New WID on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (IOI_IMS_CH) | SA5 (CH) | o/g LS | discussion | Yes | Yes | revised to S5-110497 | No | S5-110497 | |||
S5-110497 | LS_out from SA5 to CT1,CT3 on New WID on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (IOI_IMS_CH) | SA5 (CH) | o/g LS | discussion | Yes | Yes | approved | No | S5-110423 | |||
7.3 |
Charging Maintenance and Rel-10 small Enhancements |
S5-110233 | Discussion paper on enhanced credit control failure handling | Orange | other | discussion | Yes | Yes | noted | No | ||
S5-110247 | CR R9 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning | Deutsche Telekom | CR | agreement | Yes | Yes | revised to S5-110466 | No | S5-110466 | |||
S5-110466 | CR R9 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning | Deutsche Telekom | CR | agreement | Yes | Yes | revised to S5-110506 | No | S5-110506 | S5-110247 | ||
S5-110506 | CR R9 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning | Deutsche Telekom | CR | agreement | Yes | Yes | approved | No | S5-110466 | |||
S5-110285 | CR R10 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning | Deutsche Telekom | CR | agreement | Yes | Yes | revised to S5-110467 | No | S5-110467 | |||
S5-110467 | CR R10 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning | Deutsche Telekom | CR | agreement | Yes | Yes | revised to S5-110507 | No | S5-110507 | S5-110285 | ||
S5-110507 | CR R10 32.280 Add missing AoC User to Network Interface (UNI) parameters: Type of Charging, Granularity and Pes-transitioning | Deutsche Telekom | CR | agreement | Yes | Yes | approved | No | S5-110467 | |||
S5-110300 | Discussion paper on Identification for Charging in EPC Current status | Alcatel-Lucent | other | discussion | Yes | Yes | noted | No | ||||
S5-110301 | CR R10 32.270 Add E.164 harmonized address format to the current E.212 in MMS Charging | Nokia Siemens Networks, Deutsche Telekom | CR | agreement | Yes | Yes | revised to S5-110544 | No | S5-110544 | |||
S5-110544 | CR R10 32.270 Add E.164 harmonized address format to the current E.212 in MMS Charging | Nokia Siemens Networks, Deutsche Telekom | CR | agreement | Yes | Yes | approved | No | S5-110301 | |||
S5-110302 | CR R10 32.299 Add E.164 harmonized address format to the current E.212 in MMS Charging | Nokia Siemens Networks, Deutsche Telekom | CR | agreement | Yes | Yes | revised to S5-110545 | No | S5-110545 | |||
S5-110545 | CR R10 32.299 Add E.164 harmonized address format to the current E.212 in MMS Charging | Nokia Siemens Networks, Deutsche Telekom | CR | agreement | Yes | Yes | approved | No | S5-110302 | |||
S5-110332 | CR R10 32.251 Adding CDR fields needed for Machine Type Communication (NIMTC-CH) | Ericsson | CR | agreement | Yes | No | withdrawn | Yes | ||||
S5-110333 | CR R10 32.251 Adding CDR fields needed for Machine Type Communication (NIMTC-CH) | Ericsson | CR | agreement | Yes | No | withdrawn | Yes | ||||
S5-110334 | CR R10 32.299 Adding CDR fields needed for Machine Type Communication (NIMTC-CH) | Ericsson | CR | agreement | Yes | No | withdrawn | Yes | ||||
S5-110336 | CR R8 32.299 Correction to charging scenarios | Huawei | CR | agreement | Yes | Yes | rejected | No | ||||
S5-110337 | CR R9 32.299 Correction to charging scenarios | Huawei | CR | agreement | Yes | Yes | rejected | No | ||||
S5-110338 | CR R10 32.299 Correction to charging scenarios | Huawei | CR | agreement | Yes | Yes | revised to S5-110424 | No | S5-110424 | |||
S5-110424 | CR R10 32.299 Correction to charging scenarios | Huawei | CR | agreement | Yes | Yes | revised to S5-110501 | No | S5-110501 | S5-110338 | ||
S5-110501 | CR R10 32.299 Correction to charging scenarios | Huawei | CR | agreement | Yes | Yes | approved | No | S5-110424 | |||
S5-110339 | CR R10 32.240 Correction on usage of Inter Operator Identifier (IOI) type 2 | Orange, Ericsson | CR | agreement | Yes | Yes | approved | No | ||||
S5-110340 | CR R9 32.240 Removing inconsistency among abbreviations | Huawei | CR | agreement | Yes | Yes | approved | No | ||||
S5-110341 | CR R10 32.240 Removing inconsistency among abbreviations | Huawei | CR | agreement | Yes | Yes | approved | No | ||||
S5-110342 | CR R10 32.260 Correction on ICSI availability - Align with SA2 TS 23.228 | Ericsson | CR | agreement | Yes | Yes | revised to S5-110444 | No | S5-110444 | |||
S5-110444 | CR R10 32.260 Correction on ICSI availability - Align with SA2 TS 23.228 | Ericsson | CR | agreement | Yes | Yes | approved | No | S5-110342 | |||
S5-110343 | CR R10 32.299 Correction on ICSI availability - Align with SA2 TS 23.228 | Ericsson | CR | agreement | Yes | Yes | revised to S5-110445 | No | S5-110445 | |||
S5-110445 | CR R10 32.299 Correction on ICSI availability - Align with SA2 TS 23.228 | Ericsson | CR | agreement | Yes | Yes | approved | No | S5-110343 | |||
S5-110344 | CR R9 32.298 Add missing ASN.1 definition for WLAN in PS domain CDRs | ZTE | CR | agreement | Yes | No | withdrawn | Yes | ||||
S5-110345 | CR R10 32.298 Add missing ASN.1 definition for WLAN in PS domain CDRs | ZTE | CR | agreement | Yes | No | withdrawn | Yes | ||||
S5-110346 | CR R9 32.299 Add missing enumeration value for E-CSCF network element in Node-Functionality AVP | ZTE | CR | agreement | Yes | Yes | revised to S5-110425 | No | S5-110425 | |||
S5-110425 | CR R9 32.299 Add missing enumeration value for E-CSCF network element in Node-Functionality AVP | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110346 | |||
S5-110347 | CR R10 32.299 Add missing enumeration value for E-CSCF network element in Node-Functionality AVP | ZTE | CR | agreement | Yes | Yes | revised to S5-110426 | No | S5-110426 | |||
S5-110426 | CR R10 32.299 Add missing enumeration value for E-CSCF network element in Node-Functionality AVP | ZTE | CR | agreement | Yes | Yes | approved | No | S5-110347 | |||
S5-110427 | CR R8 32.251 CR#0162 Correcting the condition to deliver SGW-CDR | Orange | CR | agreement | Yes | Yes | approved | No | ||||
S5-110348 | CR R9 32.251 Correcting the condition to deliver SGW-CDR | Orange | CR | agreement | Yes | Yes | revised to S5-110428 | No | S5-110428 | |||
S5-110428 | CR R9 32.251 Correcting the condition to deliver SGW-CDR | Orange | CR | agreement | Yes | Yes | approved | No | S5-110348 | |||
S5-110349 | CR R10 32.251 Correcting the condition to deliver SGW-CDR | Orange | CR | agreement | Yes | Yes | revised to S5-110429 | No | S5-110429 | |||
S5-110429 | CR R10 32.251 Correcting the condition to deliver SGW-CDR | Orange | CR | agreement | Yes | Yes | approved | No | S5-110349 | |||
S5-110350 | CR R9 32.299 Add internal structure and encoding for the Location-Estimate AVP - Align with SA2 23.032 | NEC | CR | agreement | Yes | Yes | revised to S5-110542 | No | S5-110542 | |||
S5-110542 | CR R9 32.299 Add internal structure and encoding for the Location-Estimate AVP - Align with SA2 23.032 | NEC | CR | agreement | Yes | Yes | approved | No | S5-110350 | |||
S5-110351 | CR R10 32.299 Add internal structure and encoding for the Location-Estimate AVP - Align with SA2 23.032 | NEC | CR | agreement | Yes | Yes | revised to S5-110543 | No | S5-110543 | |||
S5-110543 | CR R10 32.299 Add internal structure and encoding for the Location-Estimate AVP - Align with SA2 23.032 | NEC | CR | agreement | Yes | Yes | approved | No | S5-110351 | |||
7.3.1 |
CH Release 8 |
|||||||||||
7.3.2 |
CH Release 9 |
|||||||||||
7.3.3 |
CH Release 10 |
|||||||||||
7.4 |
Rel-10 Charging |
|||||||||||
7.4.1 |
IWLAN mobility charging (440063) |
S5-110288 | CR R10 32.252 Add Packet Data Gateway (PDG) online charging when re-using GGSN functionality | Orange | CR | agreement | Yes | Yes | revised to S5-110483 | No | S5-110483 | |
S5-110483 | CR R10 32.252 Add Packet Data Gateway (PDG) online charging when re-using GGSN functionality | Orange | CR | agreement | Yes | Yes | approved | No | S5-110288 | |||
7.4.2 |
Charging for LIPA_SIPTO (460039) |
S5-110289 | CR R10 32.251 Adding LIPA SIPTO charging description | Huawei, China Mobile | CR | agreement | Yes | Yes | revised to S5-110449 | No | S5-110449 | |
S5-110449 | CR R10 32.251 Adding LIPA SIPTO charging description | Huawei, China Mobile | CR | agreement | Yes | Yes | revised to S5-110469 | No | S5-110469 | S5-110289 | ||
S5-110469 | CR R10 32.251 Adding LIPA SIPTO charging description | Huawei, China Mobile | CR | agreement | Yes | Yes | approved | No | S5-110449 | |||
S5-110361 | Revised WID on Local IP Access and Selected Internet IP Traffic Offload (LIPA_SIPTO) | MCC | Revised WID | discussion | Yes | Yes | RESUBMITTED to SA5#76 San Diego | No | ||||
S5-110468 | LS_out to SA1 on requirements for LIPA SIPTO charging solution | SA5 (CH) | o/g LS | approval | No | No | withdrawn | Yes | ||||
7.4.3 |
Charging for IP Flow Mobility and seamless WLAN offload (470021) |
|||||||||||
7.4.4 |
Add solutions for Rc reference point within the Online Charging System (OCS) (470045) |
S5-110290 | CR R10 32.296 Add Guidance of credit control format for Rc reference point implementation in the Online Charging System (OCS) | Huawei, China Mobile, AT&T, Opennet | CR | agreement | Yes | Yes | revised to S5-110484 | No | S5-110484 | |
S5-110484 | CR R10 32.296 Add Guidance of credit control format for Rc reference point implementation in the Online Charging System (OCS) | Huawei, China Mobile, AT&T, Opennet | CR | agreement | Yes | Yes | revised to S5-110502 | No | S5-110502 | S5-110290 | ||
S5-110502 | CR R10 32.296 Add Guidance of credit control format for Rc reference point implementation in the Online Charging System (OCS) | Huawei, China Mobile, AT&T, Opennet | CR | agreement | Yes | Yes | approved | No | S5-110484 | |||
S5-110291 | CR R10 32.299 Rc Context Definition for Diameter Usage | AT&T, Huawei, Opennet, China Mobile | CR | agreement | Yes | No | withdrawn | Yes | ||||
7.4.5 |
Advice of Charge (AoC) service support enhancements (470047) |
S5-110352 | CR R10 32.280 Clarify how 'Advice of Charge (AoC)' is presented to the UE | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110485 | No | S5-110485 | |
S5-110485 | CR R10 32.280 Clarify how 'Advice of Charge (AoC)' is presented to the UE | Alcatel-Lucent | CR | agreement | Yes | Yes | approved | No | S5-110352 | |||
S5-110353 | CR R10 32.280 Introduce AoC and offline charging Rf description to allow AoC offline charging | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110486 | No | S5-110486 | |||
S5-110486 | CR R10 32.280 Introduce AoC and offline charging Rf description to allow AoC offline charging | Alcatel-Lucent | CR | agreement | Yes | Yes | approved | No | S5-110353 | |||
S5-110354 | CR R10 32.275 Add 'Advice Of Charge (AoC)' MMTel supplementary service Charging description - Align with 22.173 | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110487 | No | S5-110487 | |||
S5-110487 | CR R10 32.275 Add 'Advice Of Charge (AoC)' MMTel supplementary service Charging description - Align with 22.173 | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110504 | No | S5-110504 | S5-110354 | ||
S5-110504 | CR R10 32.275 Add 'Advice Of Charge (AoC)' MMTel supplementary service Charging description - Align with 22.173 | Alcatel-Lucent | CR | agreement | Yes | Yes | approved | No | S5-110487 | |||
S5-110355 | CR R10 32.280 Provide offline AoC charging when the AoC Function is provided by MMTel AS - Align with 22.173 | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110488 | No | S5-110488 | |||
S5-110488 | CR R10 32.280 Provide offline AoC charging when the AoC Function is provided by MMTel AS - Align with 22.173 | Alcatel-Lucent | CR | agreement | Yes | Yes | revised to S5-110503 | No | S5-110503 | S5-110355 | ||
S5-110503 | CR R10 32.280 Provide offline AoC charging when the AoC Function is provided by MMTel AS - Align with 22.173 | Alcatel-Lucent | CR | agreement | Yes | Yes | approved | No | S5-110488 | |||
7.4.6 |
Charging for Optimal Media Routeing (500013) |
|||||||||||
7.5 |
Rel-11 Charging |
|||||||||||
7.5.1 |
Network Provided Location Information for IMS Charging (490029) |
S5-110071 | RESUBMITTED S5-103275 LS_in Reply from SA3-LI to SA2 (cc: SA5, SA3) on Network Provided Cell-ID | SA3LI10_166r1 | i/c LS | discussion | Yes | Yes | noted | No | ||
S5-110356 | Revised WID on Network Provided Location Information for IMS Charging (NWK-PL2IMS_CH) - Revision of SP-100638 | Nokia Siemens Networks | Revised WID | agreement | Yes | Yes | approved | No | ||||
7.5.2 |
Charging for QoS Control Based on Subscriber Spending Limits (500029) |
S5-110286 | Discussion paper on Common Principles for QoS and Gating Control Based on Spending Limits [identical with S5-110228 but in Word 2003 version (*.doc) instead of Word 2007 (*.docx)] | Openet | other | discussion | Yes | Yes | noted | No | ||
7.6 |
Charging Studies |
|||||||||||
8 |
Any Other Business |
|||||||||||
9 |
Closing |
Created: 2011-02-07 16:13 Last document: S5-110001