Agenda with allocated Tdocs

Created: 2014-01-27 14:55     Last document: C1-140785

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
1
opening
2
Agenda and reports
C1-140001 agenda CT1 Chairman agenda agreement Yes Yes noted No
    C1-140121 draft C1-85 report MCC meeting report / action list approval Yes Yes approved No
3
Input liaison statements
C1-140060 Reply LS on support for user location age or timestamp (C3-131852) CT3 i/c LS information Yes Yes noted No
    C1-140061 LS on Restoration of warning message delivery upon eNB failure/restart (C4-132265) CT4 i/c LS action Yes Yes noted No
    C1-140062 LS on SMSC Usage Restriction (C4-132279) CT4 i/c LS information Yes Yes noted No
    C1-140063 Reply LS on Roaming Forwarding of signalling for CS fall back (C4-132287) CT4 i/c LS information Yes Yes noted No
    C1-140064 Reply LS on interaction between MTC or IMS emergency call and 'Call control by USIM' (C6-130581) CT6 i/c LS action Yes Yes replied to No
    C1-140065 LS on additional cause causes triggering redirection (GP-131062) GERAN2 i/c LS information Yes Yes noted No
    C1-140066 Reply LS on provisioning of E-UTRA capabilities in GERAN (GP-131119) GERAN2 i/c LS action Yes Yes noted No
    C1-140067 New version of ES 283 035 ETSI NTECH i/c LS action Yes Yes replied to No
    C1-140068 Reply LS on security aspects of protocol architectures for small cell enhancements (R2-134586) RAN2 i/c LS information Yes Yes noted No
    C1-140069 Reply LS on UE considering all TAs of a PLMN as forbidden tracking areas for roaming (R2-134598) RAN2 i/c LS information Yes Yes noted No
    C1-140070 Follow up LS on Provisioning of E-UTRA Radio Capabilities in GERAN (R2-134614) RAN2 i/c LS information Yes Yes noted No
    C1-140071 LS on new WLAN/3GPP interworking work item (RP-132114) TSG RAN i/c LS information Yes Yes noted No
    C1-140072 Reply LS on security aspects of protocol architectures for small cell enhancements (S3-131117) SA3 i/c LS information Yes Yes noted No
    C1-140073 Reply LS on SMS Barring (S1-135341) SA1 i/c LS information Yes Yes noted No
    C1-140074 Reply LS on CN impacts in RAN2 solutions for WLAN/3GPP radio interworking (S2-134303) SA2 i/c LS information Yes Yes noted No
    C1-140075 Reply LS on uplink packet filters (S2-134445) SA2 i/c LS information Yes Yes noted No
    C1-140076 LS response on interaction between SIPTO at the local network and the CS fallback service in connected mode (S2-134546) SA2 i/c LS action Yes Yes noted No
    C1-140077 LS on Extending IEEE 802.11u Generic Container (S2-134581) SA2 i/c LS action Yes Yes forwarded to C1-86bis No
    C1-140078 LS on the handling of QoS parameters between IPv4 and IPv6 systems (S4-131315) SA4 i/c LS action Yes Yes forwarded to C1-86bis No
    C1-140079 LS on Charging Information Delivery to IMS CTF (S5-131750) SA5 i/c LS action Yes Yes forwarded to C1-86bis No
    C1-140080 Reply LS on Population of destination address in VoLTE related charging information (S5-132187) SA5 i/c LS information Yes Yes noted No
    C1-140081 Reply LS to CT on Removal of OAM8-Trace from Rel-11 (S5-132224) SA5 i/c LS information Yes Yes noted No
    C1-140355 Response to: LS on new WLAN/3GPP interworking work item (SP-130719) TSG SA i/c LS information Yes Yes noted No
    C1-140370 Reply LS on Transfer of ETSI TS 182 025 ETSI E2NA i/c LS information Yes Yes replied to No
4
Work organisation
4.1
Meeting schedule
4.2
Work plan and other administrative issues
C1-140122 work plan MCC work plan information Yes Yes revised No C1-140739
    C1-140739 work plan MCC work plan information Yes Yes noted No C1-140122
4.3
Joint session with SA5 on Instance ID in Charging Records
5
Corrections to old releases
5.1
IMS issues
C1-140252 Support of Priority header field in SUBSCRIBE requests Ericsson CR agreement Yes Yes rejected No
    C1-140253 Support of Priority header field in SUBSCRIBE requests Ericsson CR agreement Yes Yes postponed No
    C1-140254 Support of Priority header field in SUBSCRIBE requests Ericsson CR agreement Yes Yes postponed No
    C1-140255 Support of Priority header field in SUBSCRIBE requests Ericsson CR agreement Yes Yes postponed No
    C1-140256 Support of Priority header field in SUBSCRIBE requests Ericsson CR agreement Yes Yes postponed No
    C1-140257 Support of Priority header field in SUBSCRIBE requests Ericsson CR agreement Yes Yes postponed No
    C1-140258 Support of Priority header field in SUBSCRIBE requests Ericsson CR agreement Yes Yes postponed No
5.2
Non-IMS issues
6
Rel-6
6.1
IMS issues
6.2
Non-IMS issues
7
Rel-7
7.1
Rel-7 IMS Work Items and issues
C1-140215 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140490
    C1-140490 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes revised No C1-140688 C1-140215
    C1-140688 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes agreed No C1-140490
    C1-140216 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140491
    C1-140491 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes revised No C1-140689 C1-140216
    C1-140689 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes agreed No C1-140491
    C1-140217 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140492
    C1-140492 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes revised No C1-140690 C1-140217
    C1-140690 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes agreed No C1-140492
    C1-140218 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140493
    C1-140493 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes revised No C1-140691 C1-140218
    C1-140691 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes agreed No C1-140493
    C1-140219 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140494
    C1-140494 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes revised No C1-140692 C1-140219
    C1-140692 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes agreed No C1-140494
    C1-140220 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140495
    C1-140495 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes revised No C1-140693 C1-140220
    C1-140693 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement Yes Yes agreed No C1-140495
    C1-140601 Generation of Public GRUU NSN CR agreement Yes Yes revised No C1-140694
    C1-140694 Generation of Public GRUU NSN CR agreement Yes Yes agreed No C1-140601
    C1-140602 Generation of Public GRUU NSN CR agreement Yes Yes revised No C1-140695
    C1-140695 Generation of Public GRUU NSN CR agreement Yes Yes agreed No C1-140602
    C1-140603 Generation of Public GRUU NSN CR agreement Yes Yes revised No C1-140696
    C1-140696 Generation of Public GRUU NSN CR agreement Yes Yes agreed No C1-140603
    C1-140604 Generation of Public GRUU NSN CR agreement Yes Yes revised No C1-140697
    C1-140697 Generation of Public GRUU NSN CR agreement Yes Yes agreed No C1-140604
    C1-140605 Generation of Public GRUU NSN CR agreement Yes Yes revised No C1-140698
    C1-140698 Generation of Public GRUU NSN CR agreement Yes Yes agreed No C1-140605
    C1-140606 Generation of Public GRUU NSN CR agreement Yes Yes revised No C1-140699 C1-140322
    C1-140699 Generation of Public GRUU NSN CR agreement Yes Yes agreed No C1-140606
7.2
Rel-7 non-IMS Work Items and issues
8
Rel-8
8.1
Rel-8 IMS Work Items and issues
C1-140048 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No
    C1-140049 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No
    C1-140050 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No
    C1-140051 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No
    C1-140052 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No
    C1-140054 Correcting P-Private-Network-Indication descriptions in response NEC,NTT CR agreement Yes Yes revised No C1-140467
    C1-140467 Correcting P-Private-Network-Indication descriptions in response NEC,NTT CR agreement Yes Yes agreed No C1-140054
    C1-140055 Correcting P-Private-Network-Indication descriptions in response NEC,NTT CR agreement Yes Yes revised No C1-140468
    C1-140468 Correcting P-Private-Network-Indication descriptions in response NEC,NTT CR agreement Yes Yes agreed No C1-140055
    C1-140056 Correcting P-Private-Network-Indication descriptions in response NEC,NTT CR agreement Yes Yes revised No C1-140469
    C1-140469 Correcting P-Private-Network-Indication descriptions in response NEC,NTT CR agreement Yes Yes agreed No C1-140056
    C1-140057 Correcting P-Private-Network-Indication descriptions in response NEC,NTT CR agreement Yes Yes revised No C1-140470
    C1-140470 Correcting P-Private-Network-Indication descriptions in response NEC,NTT CR agreement Yes Yes agreed No C1-140057
    C1-140058 Correcting P-Private-Network-Indication descriptions in response NEC,NTT CR agreement Yes Yes revised No C1-140471
    C1-140471 Correcting P-Private-Network-Indication descriptions in response NEC,NTT CR agreement Yes Yes agreed No C1-140058
    C1-140143 Removing of the left IMS debug feature parts Ericsson / Nevenka CR agreement Yes Yes agreed No
    C1-140144 Updating of UUS reference Ericsson / Nevenka CR agreement Yes Yes agreed No
    C1-140145 Updating of UUS references Ericsson / Nevenka CR agreement Yes Yes agreed No
    C1-140146 Updating of UUS references Ericsson / Nevenka CR agreement Yes Yes agreed No
    C1-140147 Updating of UUS references Ericsson / Nevenka CR agreement Yes Yes agreed No
    C1-140205 Diffs between IMEI URN internet draft versions BlackBerry/Andrew information information Yes Yes noted No
    C1-140206 Updating IMEI URN draft reference BlackBerry/Andrew CR agreement Yes Yes revised No C1-140496
    C1-140496 Updating IMEI URN draft reference BlackBerry/Andrew CR agreement Yes Yes agreed No C1-140206
    C1-140207 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140497
    C1-140497 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes agreed No C1-140207
    C1-140208 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140498
    C1-140498 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes agreed No C1-140208
    C1-140209 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140499
    C1-140499 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes agreed No C1-140209
    C1-140210 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140500
    C1-140500 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes agreed No C1-140210
    C1-140222 Outstanding CDIVN IETF dependency BlackBerry/ Andrew discussion discussion Yes Yes noted No
    C1-140607 Generation of Public GRUU NSN CR agreement Yes Yes revised No C1-140700
    C1-140700 Generation of Public GRUU NSN CR agreement Yes Yes agreed No C1-140607
    C1-140608 Allocating a GRUU when the explictly registered IMPU is barred BlackBerry CR agreement No Yes postponed No
    C1-140712 Correction of Notes regarding P-Asserted-Identity header removal for OIP / OIR Deutsche Telekom / Michael CR agreement Yes Yes revised No C1-140730
    C1-140730 Inclusion of definition for private information Deutsche Telekom / Michael CR agreement Yes Yes agreed No C1-140712
    C1-140713 Correction of Notes regarding P-Asserted-Identity header removal for OIP / OIR Deutsche Telekom / Michael CR agreement Yes Yes revised No C1-140731
    C1-140731 Inclusion of definition for private information Deutsche Telekom / Michael CR agreement Yes Yes agreed No C1-140713
    C1-140714 Correction of Notes regarding P-Asserted-Identity header removal for OIP / OIR Deutsche Telekom / Michael CR agreement Yes Yes revised No C1-140732
    C1-140732 Inclusion of definition for private information Deutsche Telekom / Michael CR agreement Yes Yes agreed No C1-140714
    C1-140715 Correction of Notes regarding P-Asserted-Identity header removal for OIP / OIR Deutsche Telekom / Michael CR agreement Yes Yes revised No C1-140733
    C1-140733 Inclusion of definition for private information Deutsche Telekom / Michael CR agreement Yes Yes agreed No C1-140715
    C1-140716 Correction of Notes regarding P-Asserted-Identity header removal for OIP / OIR Deutsche Telekom / Michael CR agreement Yes Yes revised No C1-140734 C1-140487
    C1-140734 Inclusion of definition for private information Deutsche Telekom / Michael CR agreement Yes Yes agreed No C1-140716
8.2
Rel-8 non-IMS Work Items and issues
C1-140108 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes revised No C1-140510
    C1-140510 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes postponed No C1-140108
    C1-140109 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes revised No C1-140511
    C1-140511 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes postponed No C1-140109
    C1-140110 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes revised No C1-140512
    C1-140512 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes postponed No C1-140110
    C1-140111 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes revised No C1-140513
    C1-140513 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes revised No C1-140779 C1-140111
    C1-140112 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes revised No C1-140514
    C1-140514 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes revised No C1-140780 C1-140112
9
Rel-9
9.1
Rel-9 IMS Work Items and issues
C1-140139 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom CR agreement Yes Yes revised No C1-140458
    C1-140458 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes revised No C1-140744 C1-140139
    C1-140744 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes revised No C1-140775 C1-140458
    C1-140775 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes agreed No C1-140744
    C1-140140 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom CR agreement Yes Yes revised No C1-140459
    C1-140459 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes revised No C1-140745 C1-140140
    C1-140745 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes revised No C1-140776 C1-140459
    C1-140776 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes agreed No C1-140745
    C1-140141 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom CR agreement Yes Yes revised No C1-140460
    C1-140460 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes revised No C1-140746 C1-140141
    C1-140746 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes revised No C1-140777 C1-140460
    C1-140777 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes agreed No C1-140746
    C1-140142 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom CR agreement Yes Yes revised No C1-140461
    C1-140461 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes revised No C1-140747 C1-140142
    C1-140747 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes revised No C1-140778 C1-140461
    C1-140778 Non UE detected emergency call correction for retry in CS domain Deutsche Telekom, Telecom Italia, Vodafone, Orange, Telefonica CR agreement Yes Yes agreed No C1-140747
    C1-140148 Reference update: draft-ietf-salud-alert-info-urns Ericsson / Nevenka CR agreement Yes Yes revised No C1-140472
    C1-140472 Reference update: draft-ietf-salud-alert-info-urns Ericsson / Nevenka CR agreement Yes Yes agreed No C1-140148
    C1-140149 Reference update: draft-ietf-salud-alert-info-urns Ericsson / Nevenka CR agreement Yes Yes revised No C1-140473
    C1-140473 Reference update: draft-ietf-salud-alert-info-urns Ericsson / Nevenka CR agreement Yes Yes agreed No C1-140149
    C1-140150 Reference update: draft-ietf-salud-alert-info-urns Ericsson / Nevenka CR agreement Yes Yes revised No C1-140474
    C1-140474 Reference update: draft-ietf-salud-alert-info-urns Ericsson / Nevenka CR agreement Yes Yes agreed No C1-140150
    C1-140174 Lost procedures for handling Retry-After in failure response to REGISTER request Ericsson / Ivo CR agreement Yes Yes revised No C1-140475
    C1-140475 Lost procedures for handling Retry-After in failure response to REGISTER request Ericsson / Ivo CR agreement Yes Yes agreed No C1-140174
    C1-140175 Lost procedures for handling Retry-After in failure response to REGISTER request Ericsson / Ivo CR agreement Yes Yes revised No C1-140476
    C1-140476 Lost procedures for handling Retry-After in failure response to REGISTER request Ericsson / Ivo CR agreement Yes Yes agreed No C1-140175
    C1-140176 Lost procedures for handling Retry-After in failure response to REGISTER request Ericsson / Ivo CR agreement Yes Yes revised No C1-140477
    C1-140477 Lost procedures for handling Retry-After in failure response to REGISTER request Ericsson / Ivo CR agreement Yes Yes agreed No C1-140176
    C1-140177 Lost procedures for handling Retry-After in failure response to REGISTER request Ericsson / Ivo CR agreement Yes Yes revised No C1-140478
    C1-140478 Lost procedures for handling Retry-After in failure response to REGISTER request Ericsson / Ivo CR agreement Yes Yes agreed No C1-140177
    C1-140211 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140501
    C1-140501 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes agreed No C1-140211
    C1-140212 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140502
    C1-140502 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes agreed No C1-140212
    C1-140213 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140503
    C1-140503 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes agreed No C1-140213
9.2
Rel-9 non-IMS Work Items and issues
10
Rel-10
10.1
Rel-10 IMS Work items and issues
C1-140006 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140356
    C1-140356 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140396 C1-140006
    C1-140396 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140654 C1-140356
    C1-140654 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140721 C1-140396
    C1-140721 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140654
    C1-140007 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140357
    C1-140357 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140397 C1-140007
    C1-140397 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140655 C1-140357
    C1-140655 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140722 C1-140397
    C1-140722 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140655
    C1-140008 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140358
    C1-140358 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140398 C1-140008
    C1-140398 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140656 C1-140358
    C1-140656 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140723 C1-140398
    C1-140723 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140656
    C1-140009 Clarify that SDP for sessions with voice media can be updated in a TA indicating voice over PS is not supported BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140359
    C1-140359 Clarify that SDP for sessions with voice media can be updated in a TA indicating voice over PS is not supported BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140399 C1-140009
    C1-140399 Clarify that SDP for sessions with voice media can be updated in a TA indicating voice over PS is not supported BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140359
    C1-140010 Clarify that SDP for sessions with voice media can be updated in a TA indicating voice over PS is not supported BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140360
    C1-140360 Clarify that SDP for sessions with voice media can be updated in a TA indicating voice over PS is not supported BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140400 C1-140010
    C1-140400 Clarify that SDP for sessions with voice media can be updated in a TA indicating voice over PS is not supported BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140360
    C1-140011 Clarify that SDP for sessions with voice media can be updated in a TA indicating voice over PS is not supported BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140361
    C1-140361 Clarify that SDP for sessions with voice media can be updated in a TA indicating voice over PS is not supported BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140401 C1-140011
    C1-140401 Clarify that SDP for sessions with voice media can be updated in a TA indicating voice over PS is not supported BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140361
    C1-140028 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140362
    C1-140362 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140402 C1-140028
    C1-140402 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140362
    C1-140029 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140363
    C1-140363 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140403 C1-140029
    C1-140403 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140363
    C1-140030 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140364
    C1-140364 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140404 C1-140030
    C1-140404 Allow terminating sessions with voice media in a TA indicating voice over PS is not supported, when there is a session with voice media. BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140364
    C1-140184 IOI in MESSAGE with SRVCC information Ericsson / Janne CR agreement Yes Yes revised No C1-140479
    C1-140479 IOI in MESSAGE with SRVCC information Ericsson / Janne CR agreement No Yes postponed No C1-140184
    C1-140185 IOI in MESSAGE with SRVCC information Ericsson / Janne CR agreement Yes Yes revised No C1-140480
    C1-140480 IOI in MESSAGE with SRVCC information Ericsson / Janne CR agreement No Yes postponed No C1-140185
    C1-140186 IOI in MESSAGE with SRVCC information Ericsson / Janne CR agreement Yes Yes revised No C1-140481
    C1-140481 IOI in MESSAGE with SRVCC information Ericsson / Janne CR agreement No Yes postponed No C1-140186
    C1-140259 EN removal: Media feature tag IANA registration status Ericsson CR agreement Yes Yes postponed No
    C1-140260 EN removal: Media feature tag IANA registration status Ericsson CR agreement Yes Yes postponed No
    C1-140261 EN removal: Feature-capability indicator specification status Ericsson CR agreement Yes Yes postponed No
    C1-140262 EN removal: Feature-capability indicator specification status Ericsson CR agreement Yes Yes postponed No
    C1-140263 EN removal: Feature-capability indicator specification status Ericsson CR agreement Yes Yes postponed No
    C1-140264 EN removal: Feature-capability indicator specification status Ericsson CR agreement Yes Yes postponed No
    C1-140316 Correct request for PS to CS cancelled handling NSN, Samsung CR agreement Yes Yes agreed No
    C1-140317 Correct request for PS to CS cancelled handling NSN, Samsung CR agreement Yes Yes agreed No
    C1-140318 Correct request for PS to CS cancelled handling NSN, Samsung CR agreement Yes Yes agreed No
10.2
Rel-10 non-IMS Work items and issues
C1-140003 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140367
    C1-140367 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140392 C1-140003
    C1-140392 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140642 C1-140367
    C1-140642 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140657 C1-140392
    C1-140657 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140642
    C1-140004 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140368
    C1-140368 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140393 C1-140004
    C1-140393 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140643 C1-140368
    C1-140643 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140658 C1-140393
    C1-140658 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140643
    C1-140005 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140369
    C1-140369 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140394 C1-140005
    C1-140394 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140644 C1-140369
    C1-140644 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140659 C1-140394
    C1-140659 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140644
    C1-140083 Cause Code #17 as triggers for redirection for MOCN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-140516 134258
    C1-140516 Cause Code #17 as triggers for redirection for MOCN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NSN CR agreement Yes Yes agreed No C1-140083
    C1-140129 RRC Establishment Cause for TAU procedure ZTE CR agreement Yes Yes rejected No
    C1-140130 RRC Establishment Cause for TAU procedure ZTE CR agreement Yes Yes rejected No
    C1-140131 RRC Establishment Cause for TAU procedure ZTE CR agreement Yes Yes revised No C1-140517
    C1-140132 RRC Establishment Cause for RAU procedure ZTE CR agreement Yes No withdrawn Yes
    C1-140133 RRC Establishment Cause for RAU procedure ZTE CR agreement Yes No withdrawn Yes
    C1-140134 RRC Establishment Cause for RAU procedure ZTE CR agreement Yes Yes revised No C1-140518
    C1-140152 Selective RAU when ISR is activated Intel, NSN, Interdigital, Cisco, NEC CR agreement Yes Yes revised No C1-140519 C1-135014
    C1-140519 Selective RAU when ISR is activated Intel Corporation, NSN, InterDigital, Cisco, NEC CR agreement Yes Yes revised No C1-140751 C1-140152
    C1-140751 Selective RAU when ISR is activated Selective RAU when ISR is activated CR agreement Yes Yes revised No C1-140782 C1-140519
    C1-140782 Selective RAU when ISR is activated Intel Corporation, NSN, InterDigital, Cisco, NEC CR agreement Yes Yes agreed No C1-140751
    C1-140153 Selective RAU when ISR is activated Intel, NSN, Interdigital, Cisco, NEC CR agreement Yes Yes revised No C1-140520 C1-135015
    C1-140520 Selective RAU when ISR is activated Intel Corporation, NSN, InterDigital, Cisco, NEC CR agreement Yes Yes revised No C1-140752 C1-140153
    C1-140752 Selective RAU when ISR is activated Selective RAU when ISR is activated CR agreement Yes Yes revised No C1-140783 C1-140520
    C1-140783 Selective RAU when ISR is activated Intel Corporation, NSN, InterDigital, Cisco, NEC CR agreement Yes Yes agreed No C1-140752
    C1-140154 Selective RAU when ISR is activated Intel, NSN, Interdigital, Cisco, NEC CR agreement Yes Yes revised No C1-140521 C1-135016
    C1-140521 Selective RAU when ISR is activated Intel Corporation, NSN, InterDigital, Cisco, NEC CR agreement Yes Yes revised No C1-140753 C1-140154
    C1-140753 Selective RAU when ISR is activated Selective RAU when ISR is activated CR agreement Yes Yes revised No C1-140784 C1-140521
    C1-140784 Selective RAU when ISR is activated Intel Corporation, NSN, InterDigital, Cisco, NEC CR agreement Yes Yes agreed No C1-140753
    C1-140275 Delay tolerant setting for RRC establishment cause in Service Request Huawei, HiSilicon /Lin CR agreement Yes Yes revised No C1-140522
    C1-140522 Delay tolerant setting and back-off timer start for Service Request with low priority Huawei, HiSilicon CR agreement Yes Yes agreed No C1-140275
    C1-140276 Delay tolerant setting for RRC establishment cause in Service Request Huawei, HiSilicon /Lin CR agreement Yes Yes revised No C1-140523
    C1-140523 Delay tolerant setting and back-off timer start for Service Request with low priority Huawei, HiSilicon CR agreement Yes Yes agreed No C1-140276
    C1-140277 Delay tolerant setting for RRC establishment cause in Service Request Huawei, HiSilicon /Lin CR agreement Yes Yes revised No C1-140524
    C1-140524 Delay tolerant setting and back-off timer start for Service Request with low priority Huawei, HiSilicon CR agreement Yes Yes agreed No C1-140277
11
Rel-11
11.1
Rel-11 IMS Work Items and issues
C1-140031 Re-adding 3gpp body xml schema to archive BlackBerry UK Ltd. CR agreement Yes Yes agreed No
    C1-140032 Re-adding 3gpp body xml schema to archive BlackBerry UK Ltd. CR agreement Yes Yes agreed No
    C1-140046 Correction on syntax of values of feature capability indicators OKI, NTT CR agreement Yes Yes revised No C1-140482
    C1-140482 Correction on syntax of values of feature capability indicators OKI, NTT CR agreement Yes Yes revised No C1-140660 C1-140046
    C1-140660 Correction on syntax of values of feature capability indicators OKI, NTT CR agreement Yes Yes agreed No C1-140482
    C1-140047 Correction on syntax of values of feature capability indicators OKI, NTT CR agreement Yes Yes revised No C1-140483
    C1-140483 Correction on syntax of values of feature capability indicators OKI, NTT CR agreement Yes Yes revised No C1-140661 C1-140047
    C1-140661 Correction on syntax of values of feature capability indicators OKI, NTT CR agreement Yes Yes agreed No C1-140483
    C1-140094 Base64 encoding of NAF specific key material Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-140484
    C1-140484 Base64 encoding of NAF specific key material Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No C1-140094
    C1-140095 Base64 encoding of NAF specific key material Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-140485
    C1-140485 Base64 encoding of NAF specific key material Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No C1-140095
    C1-140151 Removing of the left IMS debug feature parts Ericsson / Nevenka CR agreement Yes Yes revised No C1-140486
    C1-140486 Removing of the left IMS debug feature parts Ericsson / Nevenka CR agreement Yes Yes agreed No C1-140151
    C1-140189 Correcting g.3gpp.home visited feature-capability indicator name Ericsson / Janne CR agreement Yes Yes agreed No
    C1-140190 Correcting g.3gpp.home visited feature-capability indicator name Ericsson / Janne CR agreement Yes Yes agreed No
    C1-140307 Correction of Notes regarding P-Asserted-Identity header removal for OIP / OIR Deutsche Telekom / Michael CR agreement Yes Yes revised No C1-140487
    C1-140487 Correction of Notes regarding P-Asserted-Identity header removal for OIP / OIR Deutsche Telekom / Michael CR agreement No Yes revised No C1-140716 C1-140307
    C1-140319 Deletion of feature tag g.3gpp.mgmt-uri NSN CR agreement Yes Yes revised No C1-140488
    C1-140488 Deletion of feature tag g.3gpp.mgmt-uri NSN CR agreement Yes Yes agreed No C1-140319
    C1-140320 Deletion of feature tag g.3gpp.mgmt-uri NSN CR agreement Yes Yes revised No C1-140489
    C1-140489 Deletion of feature tag g.3gpp.mgmt-uri NSN CR agreement Yes Yes agreed No C1-140320
11.2
Rel-11 non-IMS Work Items and issues
C1-140035 TFT filter settings Ericsson / Mikael CR agreement Yes Yes revised No C1-140525
    C1-140525 TFT filter settings Ericsson CR agreement Yes Yes revised No C1-140754 C1-140035
    C1-140754 TFT filter settings Ericsson CR agreement Yes Yes revised No C1-140770 C1-140525
    C1-140770 TFT filter settings Ericsson CR agreement Yes Yes agreed No C1-140754
    C1-140036 TFT filter settings Ericsson / Mikael CR agreement Yes Yes revised No C1-140526
    C1-140526 TFT filter settings Ericsson CR agreement Yes Yes revised No C1-140755 C1-140036
    C1-140755 TFT filter settings Ericsson CR agreement Yes Yes revised No C1-140771 C1-140526
    C1-140771 TFT filter settings Ericsson CR agreement Yes Yes agreed No C1-140755
    C1-140037 TFT filter settings Ericsson / Mikael CR agreement Yes Yes revised No C1-140527
    C1-140527 TFT filter settings Ericsson CR agreement Yes Yes revised No C1-140756 C1-140037
    C1-140756 TFT filter settings Ericsson CR agreement Yes Yes revised No C1-140772 C1-140527
    C1-140772 TFT filter settings Ericsson CR agreement Yes Yes agreed No C1-140756
    C1-140038 TFT filter settings Ericsson / Mikael CR agreement Yes Yes revised No C1-140528
    C1-140528 TFT filter settings Ericsson / Mikael CR agreement Yes Yes revised No C1-140757 C1-140038
    C1-140757 TFT filter settings Ericsson / Mikael CR agreement Yes Yes revised No C1-140773 C1-140528
    C1-140773 TFT filter settings Ericsson / Mikael CR agreement Yes Yes agreed No C1-140757
    C1-140044 Cases of #17 to trigger redirection Ericsson / Mikael CR agreement Yes Yes revised No C1-140529
    C1-140529 Cases of #17 to trigger redirection Ericsson CR agreement Yes Yes agreed No C1-140044
    C1-140045 Cases of #17 to trigger redirection Ericsson / Mikael CR agreement Yes Yes revised No C1-140530
    C1-140530 Cases of #17 to trigger redirection Ericsson CR agreement Yes Yes agreed No C1-140045
    C1-140084 Collision of tracking area update and the MME initiated IMSI detach procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes revised No C1-140463 C1-134590
    C1-140085 Collision of routing area update and the SGSN initiated IMSI detach procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes revised No C1-140464 C1-134591
    C1-140086 TMSI handling during tracking area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes revised No C1-140465 CP-130781
    C1-140465 TMSI handling during tracking area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T CR agreement Yes Yes revised No C1-140662 C1-140086
    C1-140662 TMSI handling during tracking area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Ericsson, Huawei, HiSilicon CR agreement Yes Yes agreed No C1-140465
    C1-140087 TMSI handling during tracking area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes revised No C1-140466 CP-130782
    C1-140466 TMSI handling during tracking area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T CR agreement Yes Yes revised No C1-140663 C1-140087
    C1-140663 TMSI handling during tracking area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Ericsson, Huawei, HiSilicon CR agreement Yes Yes agreed No C1-140466
    C1-140088 TMSI handling during routing area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes revised No C1-140504 CP-130779
    C1-140504 TMSI handling during routing area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes revised No C1-140664 C1-140088
    C1-140664 TMSI handling during routing area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Ericsson, Huawei, HiSilicon CR agreement Yes Yes agreed No C1-140504
    C1-140089 TMSI handling during routing area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes revised No C1-140505 CP-130780
    C1-140505 TMSI handling during routing area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes revised No C1-140665 C1-140089
    C1-140665 TMSI handling during routing area update procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Ericsson, Huawei, HiSilicon CR agreement Yes Yes agreed No C1-140505
    C1-140779 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes agreed No C1-140513
    C1-140780 Disabling the request for E-UTRAN inter RAT handover information Ericsson / Mikael CR agreement Yes Yes agreed No C1-140514
    C1-140113 Minimum UE capability requirements for an MS to support CS to PS SRVCC from GERAN to E-UTRAN Ericsson CR agreement Yes Yes agreed No
    C1-140114 Minimum UE capability requirements for an MS to support CS to PS SRVCC from GERAN to E-UTRAN Ericsson CR agreement Yes Yes agreed No
    C1-140155 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement Yes Yes postponed No C1-135021
    C1-140156 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement Yes Yes postponed No C1-135022
    C1-140157 Continuation of EAB override for requests on a PDN connection established with EAB override. Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement Yes Yes postponed No C-135023
    C1-140158 Continuation of EAB override for requests on a PDN connection established with EAB override. Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement Yes Yes postponed No C1-135024
    C1-140159 +CGDCONT - missing parameters for NAS signalling low priority indications and EAB Intel Corporation / Chen CR agreement Yes Yes rejected No
    C1-140160 +CGDCONT - missing parameters for NAS signalling low priority indications and EAB Intel Corporation / Chen CR agreement Yes Yes revised No C1-140532
    C1-140164 Removal of non-backward compatible requirements on periodic TAU Intel Corporation, TeliaSonera / Chen CR agreement Yes Yes rejected No
    C1-140165 Removal of non-backward compatible requirements on periodic RAU Intel Corporation, TeliaSonera / Chen CR agreement Yes Yes rejected No
    C1-140226 Collision of tracking area update and the MME initiated IMSI detach procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes rejected No
    C1-140227 Collision of routing area update and the SGSN initiated IMSI detach procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes rejected No
    C1-140228 Enable operator control in case of Non-EPS services recovery Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes rejected No
    C1-140229 Enable operator control in case of Non-EPS services recovery Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes No withdrawn Yes
    C1-140230 Enable operator control in case of Non-GPRS services recovery Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes Yes rejected No
    C1-140231 Enable operator control in case of Non-GPRS services recovery Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T /Jennifer CR agreement Yes No withdrawn Yes
    C1-140240 Response to SGs paging NSN, Ericsson, NEC CR agreement Yes Yes revised No C1-140533
    C1-140533 Response to SGs paging NSN, Ericsson, NEC CR agreement Yes Yes agreed No C1-140240
    C1-140241 Response to SGs paging NSN, Ericsson, NEC CR agreement Yes Yes revised No C1-140534
    C1-140534 Response to SGs paging NSN, Ericsson, NEC CR agreement Yes Yes agreed No C1-140241
    C1-140278 RRC establishment cause setting for dual priority UEs Huawei, HiSilicon CR agreement Yes Yes revised No C1-140677
    C1-140677 RRC establishment cause setting for dual priority UEs Huawei, HiSilicon CR agreement Yes Yes agreed No C1-140278
    C1-140279 RRC establishment cause setting for dual priority UEs Huawei, HiSilicon CR agreement Yes Yes revised No C1-140678
    C1-140678 RRC establishment cause setting for dual priority UEs Huawei, HiSilicon CR agreement Yes Yes agreed No C1-140279
    C1-140303 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement Yes Yes revised No C1-140365
    C1-140365 Handling of ESM cause# 50, 51 and 66 HTC CR agreement Yes Yes revised No C1-140701 C1-140303
    C1-140701 Handling of ESM cause# 50, 51 and 66 HTC CR agreement No Yes postponed No C1-140365
    C1-140456 Handling of ESM cause# 50, 51 and 66 HTC CR agreement Yes Yes revised No C1-140702 C1-140366
    C1-140702 Handling of ESM cause# 50, 51 and 66 HTC CR agreement No Yes postponed No C1-140456
    C1-140305 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement Yes Yes revised No C1-140462
    C1-140462 Handling of ESM cause# 50, 51 and 66 HTC CR agreement Yes Yes revised No C1-140703 C1-140305
    C1-140703 Handling of ESM cause# 50, 51 and 66 HTC CR agreement No Yes postponed No C1-140462
    C1-140457 Handling of ESM cause# 50, 51 and 66 HTC CR agreement Yes Yes revised No C1-140704 C1-140306
    C1-140704 Handling of ESM cause# 50, 51 and 66 HTC CR agreement No Yes postponed No C1-140457
12
Rel-12
12.1
Release 12 documents for information
C1-140223 Current status of IETF drafts which are dependencies for CT1 specifications BlackBerry/ Andrew information information Yes Yes noted No
12.2
LIMONET-LIPA
12.3
REP-WMD
C1-140012 Restart Indication one2many, T-Mobile, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes revised No C1-140422 C1-134927
    C1-140422 Restart Indication one2many, T-Mobile, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes revised No C1-140609 C1-140012
    C1-140609 Restart Indication one2many, T-Mobile, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei CR agreement Yes Yes agreed No C1-140422
    C1-140013 WID discussion update one2many discussion discussion Yes Yes noted No
12.4
OPIIS-CT
C1-140342 Correcting subclause numbering of IARP Ericsson CR agreement Yes Yes revised No C1-140381
    C1-140381 Correcting placement of IARP Ericsson CR agreement Yes Yes revised No C1-140758 C1-140342
    C1-140758 Correcting placement of IARP Ericsson CR agreement Yes Yes agreed No C1-140381
12.5
eSaMOG_St3
C1-140021 Editor's note on UE support of SCM and MCM Ericsson / Ivo CR agreement Yes Yes revised No C1-140380
    C1-140380 Editor's note on UE support of SCM and MCM Ericsson, LG Electronics CR agreement Yes Yes revised No C1-140629 C1-140021
    C1-140629 Editor's note on UE support of SCM and MCM Ericsson, LG Electronics CR agreement Yes Yes revised No C1-140666 C1-140380
    C1-140666 Editor's note on UE support of SCM and MCM Ericsson, LG Electronics CR agreement Yes Yes revised No C1-140724 C1-140629
    C1-140724 Editor's note on UE support of SCM and MCM Ericsson, LG Electronics CR agreement Yes Yes revised No C1-140761 C1-140666
    C1-140761 Editor's note on UE support of SCM and MCM Ericsson, LG Electronics CR agreement Yes Yes agreed No C1-140724
    C1-140022 Editor's note on cause for 'None of the requested connectivity type(s) is authorized' Ericsson CR agreement Yes Yes agreed No
    C1-140023 Editor's note on usage of SCM and MCM being subject to UE subscription Ericsson CR agreement Yes Yes agreed No
    C1-140024 Providing IPv4 address and IPv6 interface identifier Ericsson CR agreement Yes Yes revised No C1-140382
    C1-140382 Providing IPv4 address and IPv6 interface identifier Ericsson CR agreement Yes Yes revised No C1-140628 C1-140024
    C1-140628 Providing IPv4 address and IPv6 interface identifier Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes agreed No C1-140382
    C1-140025 Network capability not supporting UE request for MCM/SCM Ericsson CR agreement Yes Yes revised No C1-140383
    C1-140383 Network capability not supporting UE request for MCM/SCM Ericsson CR agreement Yes Yes revised No C1-140631 C1-140025
    C1-140631 Network capability not supporting UE request for MCM/SCM Ericsson CR agreement Yes Yes revised No C1-140759 C1-140383
    C1-140759 Network capability not supporting UE request for MCM/SCM Ericsson CR agreement Yes Yes agreed No C1-140631
    C1-140026 Causes defined for WLCM which are also applicable to SCM Ericsson CR agreement Yes Yes revised No C1-140384
    C1-140384 Causes defined for WLCM which are also applicable to SCM Ericsson CR agreement Yes Yes revised No C1-140676 C1-140026
    C1-140676 Causes defined for WLCM which are also applicable to SCM Ericsson CR agreement Yes Yes agreed No C1-140384
    C1-140123 IP address allocation via WLCP Qualcomm Incorporated/ Amer pseudo CR agreement Yes Yes revised No C1-140385
    C1-140385 IP address allocation via WLCP Qualcomm Incorporated/ Amer pseudo CR agreement Yes Yes agreed No C1-140123
    C1-140124 Timer definitions for WLCP Qualcomm Incorporated/ Amer pseudo CR agreement Yes Yes revised No C1-140386
    C1-140386 Timer definitions for WLCP Qualcomm Incorporated/ Amer pseudo CR agreement Yes Yes agreed No C1-140124
    C1-140171 Providing TWAG control plane address Ericsson CR agreement Yes Yes revised No C1-140387
    C1-140387 Providing TWAG control plane address Ericsson CR agreement Yes Yes agreed No C1-140171
    C1-140249 Removing Editor's notes on TWAN connection modes LG Electronics / Jae CR agreement Yes No withdrawn Yes
    C1-140250 Backoff timer, message definitions and contents for PDN disconnection procedure LG Electronics / Jae pseudo CR agreement Yes Yes revised No C1-140388
    C1-140388 Backoff timer, message definitions and contents for PDN disconnection procedure LG Electronics / Jae pseudo CR agreement Yes Yes agreed No C1-140250
    C1-140299 The definition of information element Huawei, HiSilicon/Youyang pseudo CR agreement Yes Yes revised No C1-140389
    C1-140389 The definition of information element Huawei, HiSilicon, ZTE pseudo CR agreement Yes Yes revised No C1-140705 C1-140299
    C1-140705 The definition of information element Huawei, HiSilicon, ZTE pseudo CR agreement Yes Yes agreed No C1-140389
    C1-140347 Clarify establishment of UE-initiated additional PDN connectivity ZTE/Joy CR agreement Yes Yes rejected No
    C1-140348 Clarify handling of Protocol Configuration Options ZTE/Joy CR agreement Yes Yes revised No C1-140390
    C1-140390 Clarify handling of Protocol Configuration Options ZTE/Joy CR agreement Yes Yes revised No C1-140706 C1-140348
    C1-140706 Clarify handling of Protocol Configuration Options ZTE/Joy CR agreement Yes Yes agreed No C1-140390
    C1-140349 Definition of WLCP General message format ZTE/Joy pseudo CR agreement Yes No withdrawn Yes
    C1-140350 IE Definition of Message type and Procedure transaction identity ZTE/Joy pseudo CR agreement Yes No withdrawn Yes
    C1-140351 The definition of PDN disconnect message ZTE/Joy pseudo CR agreement Yes No withdrawn Yes
12.6
MTCe-UEPCOP-CT
C1-140041 Enhancements to support UE power saving mode Ericsson / Mikael CR agreement Yes No withdrawn Yes
    C1-140042 Enhancements to support UE power saving mode Ericsson / Mikael CR agreement Yes No withdrawn Yes
    C1-140201 PSM Active Time negotiation NSN/Gabor CR agreement Yes No withdrawn Yes
    C1-140202 PSM Active Time negotiation NSN/Gabor CR agreement Yes No withdrawn Yes
    C1-140285 Introduction of UE power saving mode Huawei, HiSilicon /Christian CR agreement Yes Yes revised No C1-140423
    C1-140423 Introduction of UE power saving mode Huawei, HiSilicon, Ericsson, NSN CR agreement Yes Yes revised No C1-140725 C1-140285
    C1-140725 Introduction of UE power saving mode Huawei, HiSilicon, Ericsson, NSN CR agreement Yes Yes revised No C1-140762 C1-140423
    C1-140762 Introduction of UE power saving mode Huawei, HiSilicon, Ericsson, NSN CR agreement Yes Yes agreed No C1-140725
    C1-140286 Introduction of UE power saving mode Huawei, HiSilicon /Christian CR agreement Yes Yes revised No C1-140424
    C1-140424 Introduction of UE power saving mode Huawei, HiSilicon, Ericsson, NSN CR agreement Yes Yes revised No C1-140726 C1-140286
    C1-140726 Introduction of UE power saving mode Huawei, HiSilicon, Ericsson, NSN CR agreement Yes Yes revised No C1-140763 C1-140424
    C1-140763 Introduction of UE power saving mode Huawei, HiSilicon, Ericsson, NSN CR agreement Yes Yes agreed No C1-140726
12.7
WORM-CT
C1-140125 Stage 3 solutions for WORM Qualcomm Incorporated/ Amer discussion discussion Yes Yes noted No
    C1-140126 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated/ Amer CR agreement Yes Yes revised No C1-140391 C1-135142
    C1-140391 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated/ Amer CR agreement No Yes postponed No C1-140126
    C1-140137 Differentiating 3GPP radio access technologies in routing rules of ISRP Broadcom Corporation, Huawei, HiSilicon CR agreement Yes Yes revised No C1-140405 C1-134922
    C1-140405 Differentiating 3GPP radio access technologies in routing rules of ISRP Broadcom Corporation, Huawei, HiSilicon CR agreement No Yes postponed No C1-140137
    C1-140248 Clarification on UE procedures according to 3GPP RAT differentiation in ISRP LG Electronics / Jae CR agreement Yes Yes revised No C1-140406
    C1-140406 Clarification on UE procedures according to 3GPP RAT differentiation in ISRP LG Electronics / Jae CR agreement No Yes postponed No C1-140248
12.8
WLAN_NS-CT
C1-140283 Access Network reselection procedures Huawei, HiSilicon /Youyang CR agreement Yes Yes revised No C1-140407
    C1-140407 Access Network reselection procedures Huawei, HiSilicon CR agreement Yes Yes agreed No C1-140283
    C1-140284 Remove 24.234 from WLAN selection procedures Huawei, HiSilicon /Youyang CR agreement Yes Yes revised No C1-140408
    C1-140408 Remove 24.234 from WLAN selection procedures Huawei, HiSilicon CR agreement Yes Yes revised No C1-140707 C1-140284
    C1-140707 Remove 24.234 from WLAN selection procedures Huawei, HiSilicon CR agreement Yes Yes revised No C1-140760 C1-140408
    C1-140760 Remove 24.234 from WLAN selection procedures Huawei, HiSilicon CR agreement Yes Yes revised No C1-140785 C1-140707
    C1-140785 Remove 24.234 from WLAN selection procedures Huawei, HiSilicon CR agreement Yes Yes agreed No C1-140760
    C1-140309 definition of List of VPLMNs with preferred WLAN Selection Rules to ANDSF MO CATT CR agreement Yes Yes revised No C1-140410
    C1-140410 definition of List of VPLMNs with preferred WLAN Selection Rules to ANDSF MO CATT CR agreement Yes Yes revised No C1-140630 C1-140309
    C1-140630 Definition of List of VPLMNs with preferred WLAN Selection Rules to ANDSF MO CATT CR agreement Yes Yes revised No C1-140708 C1-140410
    C1-140708 Definition of List of VPLMNs with preferred WLAN Selection Rules to ANDSF MO CATT CR agreement Yes Yes agreed No C1-140630
    C1-140310 Definition of S2a connectivity preference in ANDSF MO CATT CR agreement Yes Yes revised No C1-140411
    C1-140411 Definition of S2a connectivity preference in ANDSF MO CATT CR agreement Yes Yes revised No C1-140669 C1-140310
    C1-140669 Definition of S2a connectivity preference in ANDSF MO CATT CR agreement Yes Yes agreed No C1-140411
    C1-140311 Introduction of enhanced WLAN selection CATT CR agreement Yes Yes revised No C1-140409
    C1-140409 Introduction of enhanced WLAN selection CATT CR agreement Yes Yes revised No C1-140668 C1-140311
    C1-140668 Introduction of enhanced WLAN selection CATT CR agreement Yes Yes postponed No C1-140409
    C1-140313 SPExclusionList node in the WLANSP rule CATT CR agreement Yes Yes revised No C1-140412
    C1-140412 SPExclusionList node in the WLANSP rule CATT CR agreement Yes Yes revised No C1-140632 C1-140313
    C1-140632 SPExclusionList node in the WLANSP rule CATT CR agreement Yes Yes revised No C1-140764 C1-140412
    C1-140764 Modify evaluation of WLANSP node defined in Hotspot 2.0 (Release 2) Technical Specification CATT CR agreement Yes Yes agreed No C1-140632
    C1-140314 DDF in support of WLANSP for ANDSF MO CATT CR agreement Yes Yes revised No C1-140413
    C1-140413 DDF in support of WLANSP for ANDSF MO CATT CR agreement Yes Yes revised No C1-140670 C1-140314
    C1-140670 DDF in support of WLANSP for ANDSF MO CATT CR agreement Yes Yes revised No C1-140727 C1-140413
    C1-140727 DDF in support of WLANSP for ANDSF MO CATT CR agreement Yes Yes agreed No C1-140670
    C1-140315 The relationship between the priority of the SelectionCriteria and the priority of PreferredRoamingPartnerList CATT CR agreement Yes Yes revised No C1-140414
    C1-140414 The relationship between the priority of the SelectionCriteria and the priority of PreferredRoamingPartnerList CATT CR agreement Yes Yes revised No C1-140667 C1-140315
    C1-140667 The relationship between the priority of the SelectionCriteria and the priority of PreferredRoamingPartnerList CATT CR agreement Yes Yes agreed No C1-140414
12.9
SINE
C1-140039 Retry handling during UE initiated ESM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, Orange CR agreement Yes Yes revised No C1-140425 C1-135143
    C1-140425 Retry handling during UE initiated ESM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, Orange, Nokia CR agreement Yes Yes postponed No C1-140039
    C1-140040 Retry handling during UE initiated ESM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, Orange CR agreement Yes Yes revised No C1-140426 C1-135144
    C1-140426 Retry handling during UE initiated ESM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, Orange CR agreement Yes Yes postponed No C1-140040
    C1-140232 Further discussion on UE retry handling for ESM and SM cause #32 and #33 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer discussion discussion Yes Yes revised No C1-140353
    C1-140353 Further discussion on UE retry handling for ESM and SM cause #32 and #33 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer discussion discussion Yes Yes noted No C1-140232
    C1-140233 UE retry handling for ESM cause #32 and #33 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon, Qualcomm Incorporated, CATT, AT&T /Jennifer CR agreement Yes Yes revised No C1-140427 C1-134770
    C1-140427 UE retry handling for ESM cause #32 and #33 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon, Qualcomm Incorporated, CATT, AT&T /Jennifer CR agreement No Yes postponed No C1-140233
    C1-140234 UE retry handling for SM cause #32 and #33 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon, Qualcomm Incorporated, CATT, AT&T /Jennifer CR agreement Yes Yes revised No C1-140428 C1-134771
    C1-140428 UE retry handling for SM cause #32 and #33 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon, Qualcomm Incorporated, CATT, AT&T /Jennifer CR agreement No Yes postponed No C1-140234
    C1-140235 UE retry handling for ESM cause #32 and #33 with optional network signalled timer Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Bell Canada, AT&T, Verizon CR agreement Yes Yes revised No C1-140429
    C1-140429 UE retry handling for ESM cause #32 and #33 with optional network signalled timer Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Bell Canada, AT&T, Verizon CR agreement Yes Yes postponed No C1-140235
    C1-140236 UE retry handling for SM cause #32 and #33 with optional network signalled timer Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Bell Canada, AT&T, Verizon CR agreement Yes Yes revised No C1-140430
    C1-140430 UE retry handling for SM cause #32 and #33 with optional network signalled timer Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Bell Canada, AT&T, Verizon CR agreement Yes Yes postponed No C1-140236
    C1-140238 Handling Service Request failure due to timeout NSN, Verizon Wireless, LG Electronics, Cisco, Qualcomm Incorporated, Ericsson, Intel Corporation, Bell Canada, Vodafone, BlackBerry UK Ltd CR agreement Yes Yes revised No C1-140431 C1-134928
    C1-140431 Handling Service Request failure due to timeout NSN, Verizon Wireless, LG Electronics, Cisco, Qualcomm Incorporated, Ericsson, Intel Corporation, Bell Canada, Vodafone, BlackBerry UK Ltd, Nokia CR agreement Yes Yes agreed No C1-140238
    C1-140239 Handling Service Request failure due to timeout NSN, Verizon Wireless, LG Electronics, Cisco, Qualcomm Incorporated, Ericsson, Intel Corporation, Bell Canada, Vodafone, BlackBerry UK Ltd CR agreement Yes Yes revised No C1-140432 C1-134929
    C1-140432 Handling Service Request failure due to timeout NSN, Verizon Wireless, LG Electronics, Cisco, Qualcomm Incorporated, Ericsson, Intel Corporation, Bell Canada, Vodafone, BlackBerry UK Ltd, Nokia CR agreement Yes Yes agreed No C1-140239
    C1-140280 UE behavior for ESM #54 "PDN connection does not exist" Huawei, HiSilicon, Verizon/Lin CR agreement Yes Yes revised No C1-140433
    C1-140433 UE behavior for ESM #54 "PDN connection does not exist" Huawei, HiSilicon, Verizon CR agreement Yes Yes revised No C1-140645 C1-140280
    C1-140645 UE behavior for ESM #54 “PDN connection does not exist” Huawei, HiSilicon, Verizon CR agreement Yes Yes agreed No C1-140433
    C1-140281 UE behavior for ESM #29 "User authentication failed" Huawei, HiSilicon, NTT DOCOMO /Lin CR agreement Yes Yes revised No C1-140434
    C1-140434 UE behavior for ESM #29 "User authentication failed" Huawei, HiSilicon, NTT DOCOMO CR agreement Yes Yes revised No C1-140646 C1-140281
    C1-140646 UE behavior for ESM #29 "User authentication failed" Huawei, HiSilicon, NTT DOCOMO CR agreement No Yes postponed No C1-140434
    C1-140282 MS behavior for SM #29 "User authentication failed" Huawei, HiSilicon, NTT DOCOMO /Lin CR agreement Yes Yes revised No C1-140435
    C1-140435 MS behavior for SM #29 "User authentication failed" Huawei, HiSilicon, NTT DOCOMO /Lin CR agreement Yes Yes revised No C1-140647 C1-140282
    C1-140647 MS behavior for SM #29 "User authentication failed" Huawei, HiSilicon, NTT DOCOMO /Lin CR agreement No Yes postponed No C1-140435
    C1-140324 Retry handling with ESM reject cause #8 Vodafone CR agreement Yes Yes postponed No
12.10
LIMONET-SIPTO (CT4)
C1-140244 Removing redundant SIPTO@LN procedures BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140436
    C1-140436 Removing redundant SIPTO@LN procedures BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-140244
    C1-140245 Aligning SIPTO@LN IE name with IE name used in TS 25.413 BlackBerry UK Ltd., NSN CR agreement Yes Yes revised No C1-140437
    C1-140437 Aligning SIPTO@LN IE name with IE name used in TS 25.413 BlackBerry UK Ltd., NSN CR agreement Yes Yes agreed No C1-140245
12.11
Dia_SGSN_SMS (CT4)
12.12
MSRD_VAMOS (GERAN)
12.13
SAES3 Wis
C1-140287 ISR deactivation for an MS which supports EMM combined procedures Huawei, NTT DoCoMo, HiSilicon, NEC /Christian CR agreement Yes Yes rejected No
    C1-140290 Restoration of the Gs association when receiving RAU request Huawei, NTT DoCoMo, HiSilicon, NEC /Christian CR agreement Yes Yes rejected No
12.13.1
SAES3
C1-140033 Discussion on way forward for reject cause #15 BlackBerry UK Ltd. discussion discussion Yes Yes noted No
    C1-140034 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd., Telecom Italia, Teliasonera CR agreement Yes Yes revised No C1-140671 C1-135203
    C1-140671 Detecting that all TAIs of a PLMN are forbidden when EMM#15 is received BlackBerry UK Ltd., Telecom Italia, Teliasonera, Nokia, NSN CR agreement Yes Yes revised No C1-140743 C1-140034
    C1-140743 Detecting that all TAIs of a PLMN are forbidden when EMM#15 is received BlackBerry UK Ltd., Telecom Italia, Nokia, NSN CR agreement Yes Yes postponed No C1-140671
    C1-140090 Enhancement of EMM cause #15 Qualcomm Incorporated, Huawei, HiSilicon, ZTE, Samsung, NSN / Lena CR agreement Yes Yes revised No C1-140672 C1-134913
    C1-140672 Enhancement of EMM cause #15 Qualcomm Incorporated, Huawei, HiSilicon, ZTE, Samsung, NSN / Lena CR agreement Yes Yes postponed No C1-140090
    C1-140091 PLMN selection timer for enhanced EMM cause #15 Qualcomm Incorporated, Huawei, HiSilicon, ZTE, Samsung, NSN / Lena CR agreement Yes Yes postponed No C1-135134
    C1-140135 Implicitly detached cause ZTE CR agreement Yes Yes revised No C1-140438
    C1-140438 Implicitly detached cause ZTE CR agreement Yes Yes revised No C1-140709 C1-140135
    C1-140709 Implicitly detached cause ZTE CR agreement Yes Yes revised No C1-140766 C1-140438
    C1-140766 Implicitly detached cause ZTE CR agreement Yes Yes agreed No C1-140709
    C1-140161 Further analysis on disabling E-UTRA capabilities for reject cause #15 Intel, TeliaSonera, Deutsche Telekom, Telecom Italia / Chen discussion discussion Yes Yes noted No
    C1-140243 Align procedures related to usage of "forbidden TAs for roaming" list BlackBerry UK Ltd. CR agreement Yes Yes postponed No C1-134379
    C1-140301 Clarification for T3423 stop condition LG Electronics / Taehun CR agreement Yes Yes rejected No
    C1-140302 Clarification for T3323 stop condition LG Electronics / Taehun CR agreement Yes Yes revised No C1-140634
    C1-140634 Correction of term ‘GMM-CONNECTED mode’ to ‘PMM-CONNECTED’ mode’ LG Electronics CR agreement Yes Yes agreed No C1-140302
12.13.2
SAES3-CSFB
C1-140043 Clarification on Ts14 minimum value Ericsson / Mikael CR agreement Yes Yes agreed No
    C1-140162 Combined TAU trigger for U2 NOT UPDATED Intel Corporation CR agreement Yes Yes revised No C1-140673
    C1-140673 Combined TAU trigger for U2 NOT UPDATED Intel Corporation CR agreement Yes Yes agreed No C1-140162
    C1-140242 RRC establishment cause used for extended service request NSN CR agreement Yes Yes revised No C1-140439
    C1-140439 RRC establishment cause used for extended service request NSN CR agreement Yes Yes agreed No C1-140242
12.13.3
SAES3-non3GPP
C1-140127 On the UE-triggered policy updates Qualcomm Incorporated/ Amer discussion discussion Yes Yes noted No
    C1-140128 Modification of the trigger for ISRP policy update in the UE Qualcomm Incorporated/ Amer CR agreement Yes Yes postponed No
    C1-140163 Correction to misleading requirement on provision of ISMP Intel Corporation, Qualcomm Incorporated CR agreement Yes Yes agreed No
    C1-140251 Correction of Application-ID nodes LG Electronics CR agreement Yes Yes revised No C1-140415
    C1-140415 Correction of Application-ID nodes LG Electronics CR agreement Yes Yes agreed No C1-140251
    C1-140312 Deleting the repeated description about UE capability CATT CR agreement Yes Yes revised No C1-140416
    C1-140416 Deleting the repeated description about UE capability CATT CR agreement Yes Yes agreed No C1-140312
    C1-140325 ANDSF root node NSN/Gabor discussion discussion Yes Yes noted No
    C1-140326 Removing Source IP address/port from ISRP ForFlowBased container NSN CR agreement Yes Yes revised No C1-140417
    C1-140417 Removing Source IP address/port from ISRP ForFlowBased container NSN CR agreement No Yes postponed No C1-140326
    C1-140327 ANDSF rule re-evaluation trigger clarification NSN/Gabor CR agreement Yes Yes revised No C1-140352
    C1-140352 ANDSF rule re-evaluation trigger clarification NSN CR agreement Yes Yes revised No C1-140418 C1-140327
    C1-140418 ANDSF rule re-evaluation trigger clarification NSN CR agreement Yes Yes agreed No C1-140352
    C1-140595 Clarification for UE requirements about ANDSF rule evaluation NSN CR agreement Yes Yes revised No C1-140635
    C1-140635 Clarification for UE requirements about ANDSF rule evaluation NSN CR agreement Yes Yes revised No C1-140765 C1-140595
    C1-140765 Clarification for UE requirements about ANDSF rule evaluation NSN CR agreement Yes Yes agreed No C1-140635
12.14
bSRVCC
C1-140178 Clarification of conditions for transfer of calls in an early phase Ericsson / Janne CR agreement Yes Yes revised No C1-140419
    C1-140419 Clarification of conditions for transfer of calls in an early phase Ericsson / Janne CR agreement Yes Yes agreed No C1-140178
    C1-140188 Conditions for applying PS to CS SRVCC access transfer for calls in originating pre-alerting phase added Ericsson / Janne CR agreement Yes Yes revised No C1-140420
    C1-140420 Conditions for applying PS to CS SRVCC access transfer for calls in originating pre-alerting phase added Ericsson / Janne CR agreement Yes Yes agreed No C1-140188
    C1-140191 Annex F and multiple early sessions Ericsson / Janne CR agreement Yes Yes agreed No
12.15
SMSMI-CT
12.16
TURAN-CT
C1-140018 Solution for tunnelling of IMS services over restrictive non-3GPP access networks - keep-alive using RFC 6223 in Annex D Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-140019 Minor corrections Ericsson / Ivo pseudo CR agreement Yes Yes agreed No
    C1-140328 Firewall traversal for IMS services based on ICE Huawei/Bill CR agreement Yes Yes revised No C1-140421 C1-134897
    C1-140421 Firewall traversal for IMS services based on ICE Huawei/Bill CR agreement No Yes postponed No C1-140328
12.17
IMS_TELEP
C1-140333 Confenrence focus procedures during session establishment Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140579
    C1-140579 Confenrence focus procedures during session establishment Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140684 C1-140333
    C1-140684 Confenrence focus procedures during session establishment Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-140579
    C1-140334 BFCP usage in point to point session Huawei/Tommy pseudo CR agreement Yes Yes agreed No
    C1-140335 Negotiation of media composition Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140580
    C1-140580 Negotiation of media composition Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-140335
    C1-140336 Multiple exchanges of CLUE message Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140581
    C1-140581 Multiple exchanges of CLUE message Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-140336
    C1-140337 Interoperability in conference case with TP UE and non-TP UE Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140582
    C1-140582 Interoperability in conference case with TP UE and non-TP UE Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-140337
    C1-140338 Identification of session fallback Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140583
    C1-140583 Identification of session fallback Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140685 C1-140338
    C1-140685 Identification of session fallback Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-140583
    C1-140339 Choosing on sequence of SDP and CLUE during session update Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140584
    C1-140584 Choosing on sequence of SDP and CLUE during session update Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-140339
    C1-140340 Example signalling flows for session update Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140585
    C1-140585 Example signalling flows for session update Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140686 C1-140340
    C1-140686 Example signalling flows for session update Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-140585
    C1-140341 Update of signalling flows for session establishment Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140586
    C1-140586 Update of signalling flows for session establishment Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-140687 C1-140341
    C1-140687 Update of signalling flows for session establishment Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-140586
12.18
eDRVCC
12.19
EMC_PC
12.20
IMS_RegCon-CT
12.21
BusTI-CT
C1-140138 Correction of P-CSCF procedures for Business Trunking Deutsche Telekom, Ericsson / Michael CR agreement Yes Yes agreed No
    C1-140187 Business trunking in IBCF Ericsson, Deutsche Telekom / Janne CR agreement Yes Yes revised No C1-140587
    C1-140587 Business trunking in IBCF Ericsson, Deutsche Telekom / Janne CR agreement Yes Yes agreed No C1-140187
12.22
UP6665
C1-140214 Notifier including a GRUU as the contact address BlackBerry/ Andrew CR agreement No No withdrawn Yes
    C1-140225 Notifier including a GRUU as the contact address BlackBerry/ Andrew CR agreement Yes Yes revised No C1-140588 C1-134979
    C1-140588 Notifier including a GRUU as the contact address BlackBerry/ Andrew CR agreement No Yes postponed No C1-140225
    C1-140268 Update of 3GPP TS 24.629 Ericsson /Jörgen CR agreement Yes Yes revised No C1-140589 C1-134982
    C1-140589 Update of 3GPP TS 24.629 Ericsson /Jörgen CR agreement Yes Yes revised No C1-140674 C1-140268
    C1-140674 Update of 3GPP TS 24.629 Ericsson /Jörgen CR agreement Yes Yes agreed No C1-140589
    C1-140329 updating TS 24.337 Huawei/Georg CR agreement Yes Yes revised No C1-140590
    C1-140590 Updating TS 24.337 to RFC 6665 Huawei CR agreement Yes Yes revised No C1-140735 C1-140329
    C1-140735 Updating TS 24.337 to RFC 6665 Huawei CR agreement Yes Yes agreed No C1-140590
12.23
IODB
C1-140343 TRF procedure to block local premium rate communications Ericsson /Jörgen CR agreement Yes Yes revised No C1-140591 C1-135104
    C1-140591 TRF procedure to block local premium rate communications Ericsson CR agreement Yes Yes revised No C1-140710 C1-140343
    C1-140710 TRF procedure to block local premium rate communications Ericsson CR agreement Yes Yes postponed No C1-140591
    C1-140344 Alt 2: ODB procedure to indicate premium rate barring Ericsson /Jörgen CR agreement Yes Yes revised No C1-140592 C1-135105
    C1-140592 Alt 2: ODB procedure to indicate premium rate barring Ericsson /Jörgen CR agreement Yes Yes revised No C1-140711 C1-140344
    C1-140711 Alt 2: ODB procedure to indicate premium rate barring Ericsson /Jörgen CR agreement Yes Yes postponed No C1-140592
12.24
FS_NNI_RS (CT3)
12.25
eMEDIASEC_CT (CT4)
C1-140017 Reference update of draft-ietf-mmusic-udptl-dtls Ericsson CR agreement Yes Yes revised No C1-140593
    C1-140593 Reference update of draft-ietf-mmusic-udptl-dtls Ericsson CR agreement Yes Yes agreed No C1-140017
    C1-140321 SDP renegotiation not impacting TLS for BFCP NSN CR agreement Yes Yes postponed No
12.26
IMS_SSFDD (CT4)
12.27
CVO-CT (CT4)
12.28
SIS_CT (CT4)
12.29
E2EMTSI-CT (CT3)
12.30
REVOLTE_IMS
12.31
rtcp-mux
12.32
NETLOC_TWAN_CT (CT3)
12.33
IMSProtoc6
C1-140611 Collection of transit-ioi example NTT / Shunsuke CR agreement Yes Yes agreed No C1-140053
    C1-140096 Value of P-Preferred-Identity when originating an emergency call without IMS registration Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-140597
    C1-140597 Value of P-Preferred-Identity when originating an emergency call without IMS registration Qualcomm Incorporated/Subra CR agreement No Yes postponed No C1-140096
    C1-140097 HOLD and RESUME and one-way media Qualcomm Incorporated/Subra discussion discussion Yes Yes noted No
    C1-140098 Media directionality when resuming a session established with one-way media Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-140596
    C1-140102 Media direction in generated SDP offer when receiving a re INVITE without SDP Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-140598
    C1-140103 Usage of b=AS Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-140599 C1-135213
    C1-140599 Usage of b=AS Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-140636 C1-140103
    C1-140636 Usage of b=AS Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No C1-140599
    C1-140115 Transport of IMEI in SIP signalling Orange/Youssef discussion discussion Yes Yes noted No
    C1-140116 New WID for Support of ALT-C attribute Orange/Youssef new WID agreement Yes Yes revised No C1-140376
    C1-140376 New WID for Support of ALT-C attribute Orange/Youssef new WID endorsement Yes Yes revised No C1-140717 C1-140116
    C1-140717 New WID for Support of ALT-C attribute Orange/Youssef new WID endorsement Yes Yes endorsed No C1-140376
    C1-140117 P-CSCF Discovery Orange/Youssef CR agreement Yes No withdrawn Yes C1-135108
    C1-140614 Alignment between Annex I and the core specification Orange CR agreement Yes Yes agreed No C1-140118
    C1-140172 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-A Ericsson / Ivo CR agreement Yes Yes postponed No C1-134843
    C1-140173 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-B Ericsson / Ivo CR agreement Yes Yes postponed No C1-134872
    C1-140221 Indication of services supported by the visited network BlackBerry/ Andrew discussion discussion Yes Yes noted No
    C1-140620 Completing description of emergency service procedure in the event privacy can apply BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140728 C1-140246
    C1-140728 Completing description of emergency service procedure in the event privacy can apply BlackBerry UK Ltd. CR agreement No Yes postponed No C1-140620
    C1-140247 Release of held sessions after conference establishment using URI list Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-140600
    C1-140322 Generation of Public GRUU NSN CR agreement Yes Yes revised No C1-140606
    C1-140323 P-CSCF and GRUU NSN CR agreement Yes Yes revised No C1-140610
    C1-140610 P-CSCF and GRUU NSN CR agreement Yes Yes agreed No C1-140323
    C1-140623 daylight-saving-time definition clarifications Ericsson CR agreement Yes Yes revised No C1-140675 C1-140271
    C1-140675 daylight-saving-time definition clarifications Ericsson CR agreement Yes Yes agreed No C1-140623
    C1-140624 Use of "daylight-saving-time" parameter Ericsson CR agreement Yes Yes agreed No C1-140272
12.34
TEI12 and other R12 Wis
C1-140304 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement Yes Yes revised No C1-140366
    C1-140366 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement No Yes revised No C1-140456 C1-140304
    C1-140306 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement Yes Yes revised No C1-140457
12.34.1
IMS TEI12
C1-140053 Collection of transit-ioi example NTT / Shunsuke CR agreement Yes Yes revised No C1-140611
    C1-140596 Media directionality when resuming a session established with one-way media Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No C1-140098
    C1-140099 Correction of history related header field name Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-140612
    C1-140612 Correction of history related header field name Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No C1-140099
    C1-140100 Minor editorial corrections Qualcomm Incorporated/Subra CR agreement Yes No withdrawn Yes
    C1-140101 Correct nomenclature for several SIP header fields Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No
    C1-140118 Alignment between Annex I and the core specification Orange CR agreement Yes Yes revised No C1-140614
    C1-140119 Using Regular Expressions for communication barring rules Orange CR agreement Yes Yes revised No C1-140615
    C1-140615 Using Regular Expressions for communication barring rules Orange CR agreement No Yes postponed No C1-140119
    C1-140120 ECT clarification - Transfer attempt signification Orange CR agreement Yes Yes agreed No
    C1-140179 ICS feature-capability indicator when breaking out to CS Ericsson CR agreement Yes Yes agreed No C1-135125
    C1-140180 Removing overlapping procedures in SCC AS when MSC server cancels the PS to CS SRVCC procedure Ericsson CR agreement Yes Yes revised No C1-140616
    C1-140616 Removing overlapping procedures in SCC AS when MSC server cancels the PS to CS SRVCC procedure Ericsson CR agreement Yes Yes agreed No C1-140180
    C1-140181 P-Visited-Network-ID clarifications Ericsson / Janne CR agreement Yes Yes revised No C1-140617
    C1-140617 P-Visited-Network-ID clarifications Ericsson CR agreement Yes Yes agreed No C1-140181
    C1-140182 Explaining 1xx, 18x and 2xx status codes Ericsson CR agreement Yes Yes agreed No
    C1-140183 Reference to subclause 6A.4.3A Ericsson CR agreement Yes Yes agreed No
    C1-140192 Discussion: Support of IPv4/IPv6 interworking Ericsson /Jörgen discussion discussion Yes Yes noted No
    C1-140197 Improving the quality of TS 24.237 Samsung (rapporteur) CR agreement Yes Yes agreed No
    C1-140198 Setting the "MPTY auxiliary state" after access transfer of a conference call Samsung CR agreement Yes Yes revised No C1-140618
    C1-140618 Setting the "MPTY auxiliary state" after access transfer of a conference call Samsung CR agreement No Yes postponed No C1-140198
    C1-140199 Supported capabilities for transfer scenarios with conference control Samsung CR agreement Yes Yes revised No C1-140619
    C1-140619 Supported capabilities for transfer scenarios with conference control Samsung CR agreement Yes Yes agreed No C1-140199
    C1-140200 SRVCC Transfer scenarios with conference control Samsung, Ericsson CR agreement Yes Yes revised No C1-140621
    C1-140621 SRVCC Transfer scenarios with conference control Samsung, Ericsson CR agreement Yes Yes agreed No C1-140200
    C1-140246 Completing description of emergency service procedure in the event privacy can apply BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-140620 C1-134569
    C1-140600 Release of held sessions after conference establishment using URI list Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No C1-140247
    C1-140266 Furnish Charging Information to IMS CTF Ericsson /Jörgen discussion discussion Yes Yes noted No
    C1-140267 Furnished charging data definition Ericsson CR agreement Yes Yes postponed No
    C1-140269 Clarification of network based and terminal based CW Ericsson, Samsung CR agreement Yes Yes revised No C1-140622
    C1-140622 Clarification of network based and terminal based CW Ericsson, Samsung CR agreement Yes Yes agreed No C1-140269
    C1-140270 Correction of CW AS procedure Ericsson, Samsung /Jörgen CR agreement Yes Yes revised No C1-140613
    C1-140613 Correction of CW AS procedure Ericsson, Samsung, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-140270
    C1-140271 daylight-saving-time definition clarifications Ericsson CR agreement Yes Yes revised No C1-140623
    C1-140272 Use of "daylight-saving-time" parameter Ericsson CR agreement Yes Yes revised No C1-140624
    C1-140273 MSC server enhanced for ICS to insert daylight-saving-time Ericsson CR agreement Yes Yes agreed No
    C1-140330 Correction the direction attribute of media stream(s) in the Communication Hold supplementary service Huawei CR agreement Yes Yes agreed No
    C1-140598 Media direction in generated SDP offer when receiving a re INVITE without SDP Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No C1-140102
    C1-140750 Correction of Notes regarding P-Asserted-Identity header removal for OIP / OIR Deutsche Telekom CR agreement Yes Yes revised No C1-140774
    C1-140774 Correction of Notes regarding P-Asserted-Identity header removal for OIP / OIR Deutsche Telekom CR agreement Yes Yes agreed No C1-140750
12.34.2
non IMS TEI12
C1-140014 Capacity Indication Request not implemented one2many CR agreement Yes Yes revised No C1-140440
    C1-140440 Capacity Indication Request not implemented one2many CR agreement Yes Yes agreed No C1-140014
    C1-140059 +CCFCU time conditions Intel Corporation, Samsung, Qualcomm CR agreement Yes Yes agreed No
    C1-140463 Collision of tracking area update and the MME initiated IMSI detach procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T CR agreement Yes Yes revised No C1-140640 C1-140084
    C1-140640 Collision of tracking area update and the MME initiated IMSI detach procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T CR agreement Yes Yes agreed No C1-140463
    C1-140464 Collision of routing area update and the SGSN initiated IMSI detach procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T CR agreement Yes Yes revised No C1-140641 C1-140085
    C1-140641 Collision of routing area update and the SGSN initiated IMSI detach procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T CR agreement Yes Yes agreed No C1-140464
    C1-140104 Emergency PDN Connectivity Request in the network not supporting emergency bearer services NTT DOCOMO CR agreement Yes Yes revised No C1-140441
    C1-140441 Emergency PDN Connectivity Request in the network not supporting emergency bearer services NTT DOCOMO CR agreement No No withdrawn Yes C1-140104
    C1-140105 Emergency Activate PDP Context Request in the network not supporting emergency bearer services NTT DOCOMO CR agreement Yes Yes revised No C1-140442
    C1-140442 Emergency Activate PDP Context Request in the network not supporting emergency bearer services NTT DOCOMO CR agreement No No withdrawn Yes C1-140105
    C1-140106 Emergency Attach in the network not supporting IMS emergency call for limited service state NTT DOCOMO CR agreement Yes Yes revised No C1-140443
    C1-140443 Emergency Attach in the network not supporting IMS emergency call for limited service state NTT DOCOMO CR agreement Yes Yes revised No C1-140736 C1-140106
    C1-140736 Emergency Attach in the network not supporting IMS emergency call for limited service state NTT DOCOMO CR agreement Yes Yes revised No C1-140768 C1-140443
    C1-140768 Emergency Attach in the network not supporting IMS emergency call for limited service state NTT DOCOMO CR agreement Yes Yes agreed No C1-140736
    C1-140107 Emergency Attach in the network not supporting IMS emergency call for limited service state NTT DOCOMO CR agreement Yes Yes revised No C1-140444
    C1-140444 Emergency Attach in the network not supporting IMS emergency call for limited service state NTT DOCOMO CR agreement Yes Yes revised No C1-140737 C1-140107
    C1-140737 Emergency Attach in the network not supporting IMS emergency call for limited service state NTT DOCOMO CR agreement Yes Yes revised No C1-140769 C1-140444
    C1-140769 Emergency Attach in the network not supporting IMS emergency call for limited service state NTT DOCOMO CR agreement Yes Yes agreed No C1-140737
    C1-140517 RRC Establishment Cause for TAU procedure ZTE CR agreement Yes Yes agreed No C1-140131
    C1-140518 RRC Establishment Cause for RAU procedure ZTE CR agreement Yes Yes agreed No C1-140134
    C1-140532 +CGDCONT - missing parameters for NAS signalling low priority indications and EAB Intel Corporation CR agreement Yes Yes revised No C1-140767 C1-140160
    C1-140767 +CGDCONT - missing parameters for NAS signalling low priority indications and EAB Intel Corporation CR agreement Yes Yes agreed No C1-140532
    C1-140166 Enhanced procedure for non-EPS services recovery during periodic TAU Intel Corporation, TeliaSonera / Chen CR agreement Yes Yes rejected No
    C1-140167 Enhanced procedure for non-GPRS services recovery during periodic RAU Intel Corporation, TeliaSonera / Chen CR agreement Yes Yes rejected No
    C1-140168 Enhanced procedure for non-EPS services recovery and VLR redistribution Intel Corporation, TeliaSonera / Chen CR agreement Yes Yes rejected No
    C1-140169 Enhanced procedure for non-GPRS services recovery and VLR redistribution Intel Corporation, TeliaSonera / Chen CR agreement Yes Yes rejected No
    C1-140170 Conversion from periodic to combined RAU/TAU - concept for a more fault tolerant implementation of the feature Intel Corporation / Chen discussion discussion Yes Yes noted No
    C1-140193 Incorrect combination of stored duplicate of RPLMN and current PLMN selection mode due to multiple CSG selections Samsung, Broadcom Corporation CR agreement Yes Yes revised No C1-140445
    C1-140445 Incorrect combination of stored duplicate of RPLMN and current PLMN selection mode due to multiple CSG selections Samsung, Broadcom Corporation, NEC CR agreement Yes Yes revised No C1-140637 C1-140193
    C1-140637 Incorrect combination of stored duplicate of RPLMN and current PLMN selection mode due to multiple CSG selections Samsung, Broadcom Corporation, NEC CR agreement Yes Yes agreed No C1-140445
    C1-140194 No CSG cell and re-enable E-UTRA Samsung CR agreement Yes Yes revised No C1-140446
    C1-140446 No CSG cell and re-enable E-UTRA Samsung, NEC CR agreement Yes Yes agreed No C1-140194
    C1-140195 Missing condition for cause of start of T3402 Samsung CR agreement Yes Yes revised No C1-140447
    C1-140447 Missing condition for cause of start of T3402 Samsung CR agreement Yes Yes revised No C1-140638 C1-140195
    C1-140638 Missing condition for cause of start of T3402 Samsung CR agreement Yes Yes agreed No C1-140447
    C1-140196 Missing condition for cause of start of T3302 Samsung CR agreement Yes Yes revised No C1-140448
    C1-140448 Missing condition for cause of start of T3302 Samsung CR agreement Yes Yes revised No C1-140639 C1-140196
    C1-140639 Missing condition for cause of start of T3302 Samsung CR agreement Yes Yes agreed No C1-140448
    C1-140224 Update of AT commands accepted when MT is pending SIM PIN, SIM PUK, or PH-SIM Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-140449
    C1-140449 Update of AT commands accepted when MT is pending SIM PIN, SIM PUK, or PH-SIM Qualcomm Incorporated, ZTE, Huawei CR agreement Yes Yes agreed No C1-140224
    C1-140237 Clarification on T3396 stopping conditions Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-140450
    C1-140450 Clarification on T3396 stopping conditions Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes agreed No C1-140237
    C1-140288 RAU complete and abnormal case handling on the MME Huawei, NTT DoCoMo, HiSilicon, NEC /Christian CR agreement Yes Yes rejected No
    C1-140289 TAU complete and abnormal case handling on the MME Huawei, NTT DoCoMo, HiSilicon, NEC /Christian CR agreement Yes Yes rejected No
    C1-140291 Handling Session Management Requests without APN for Dual Priority UE Intel CR agreement Yes Yes revised No C1-140451
    C1-140451 Handling Session Management Requests without APN for Dual Priority UE Intel CR agreement No No withdrawn Yes C1-140291
    C1-140292 Handling Session Management Requests without APN for Dual Priority MS Intel CR agreement Yes Yes revised No C1-140452
    C1-140452 Handling Session Management Requests without APN for Dual Priority MS Intel Corporation CR agreement Yes Yes revised No C1-140729 C1-140292
    C1-140729 Handling Session Management Requests without APN for Dual Priority MS Intel Corporation CR agreement No Yes postponed No C1-140452
    C1-140293 Conditions to ignore paging for non-GPRS services Intel CR agreement Yes Yes revised No C1-140453 C1-135043
    C1-140453 Conditions to ignore paging for non-GPRS services Intel CR agreement Yes Yes agreed No C1-140293
    C1-140294 Conditionsfor performing RAU and TAU for UE configured with Dual Priority Intel CR agreement Yes Yes revised No C1-140454 C1-134823
    C1-140454 Conditionsfor performing RAU and TAU for UE configured with Dual Priority Intel CR agreement No Yes postponed No C1-140294
    C1-140295 Conditions for performing RAU and TAU for MS configured with Dual Priority Intel CR agreement Yes Yes revised No C1-140455 C1-134822
    C1-140455 Conditions for performing RAU and TAU for MS configured with Dual Priority Intel CR agreement No Yes postponed No C1-140295
    C1-140298 Discussion on service unavailable in a specific PLMN due to access control Huawei, HiSilicon/Lin discussion discussion Yes Yes noted No
    C1-140308 +CCFCU clarification Intel Corporation, Samsung CR agreement Yes Yes agreed No
    C1-140331 Clarification to the forbidden PLMN list handling HTC CR agreement No No withdrawn Yes
    C1-140332 Clarification to the forbidden PLMN list handling HTC CR agreement No No withdrawn Yes
    C1-140346 Handling of T3246 and T3346 when the MS is switched off Huawei, HiSilicon /Christian CR agreement Yes Yes agreed No
12.35
new / updated Rel-12 WIDs
12.35.1
WIDs
C1-140002 USSD domain selection - stage-3 Ericsson / Ivo new WID agreement Yes Yes revised No C1-140374
    C1-140374 USSD domain selection - stage-3 Ericsson / Ivo new WID agreement No Yes postponed No C1-140002
    C1-140082 WID on " CT aspects of WLAN/3GPP Radio Interworking” Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer new WID agreement Yes Yes revised No C1-140354
    C1-140354 WID on " CT aspects of WLAN/3GPP Radio Interworking” Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer new WID agreement Yes Yes revised No C1-140378 C1-140082
    C1-140378 WID on " CT aspects of WLAN/3GPP Radio Interworking” Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer new WID agreement Yes Yes postponed No C1-140354
    C1-140092 New WID on CT aspects of Proximity-based Services (ProSe) Qualcomm Incorporated / Lena new WID agreement Yes Yes revised No C1-140379
    C1-140379 New WID on CT aspects of Proximity-based Services (ProSe) Qualcomm Incorporated / Lena new WID agreement Yes Yes revised No C1-140748 C1-140092
    C1-140748 New WID on CT aspects of Proximity-based Services (ProSe) Qualcomm Incorporated / Lena new WID agreement Yes Yes agreed No C1-140379
    C1-140204 IMS Signalling Activated Trace Vodafone new WID agreement Yes Yes revised No C1-140375
    C1-140375 IMS Signalling Activated Trace Vodafone new WID agreement Yes Yes revised No C1-140749 C1-140204
    C1-140749 IMS Signalling Activated Trace Vodafone new WID agreement Yes Yes agreed No C1-140375
    C1-140297 Updated WID: Optimized Offloading to WLAN in 3GPP RAT mobility Intel revised WID agreement Yes Yes agreed No
    C1-140345 Web Real Time Communication (WebRTC) Access to IMS China Mobile new WID agreement Yes Yes revised No C1-140377
    C1-140377 Web Real Time Communication (WebRTC) Access to IMS China Mobile new WID agreement Yes Yes revised No C1-140626 C1-140345
    C1-140626 Web Real Time Communication (WebRTC) Access to IMS China Mobile new WID agreement Yes Yes agreed No C1-140377
    C1-140508 New WID of Transfer if ETSI business trunking specifications Alcatel-Lucent new WID agreement Yes Yes revised No C1-140648
    C1-140648 New WID of Transfer of ETSI business trunking specifications Alcatel-Lucent new WID agreement Yes Yes revised No C1-140680 C1-140508
    C1-140680 New WID of Transfer of ETSI business trunking specifications Alcatel-Lucent new WID agreement Yes Yes agreed No C1-140648
    C1-140594 Revised Work Item Description on CT Aspects of IMS Business Trunking for IP-PBX in Static Mode of Operation Deutsche Telekom revised WID agreement Yes Yes agreed No
    C1-140653 Revised WID on IMS-based Telepresence (Stage 3) Huawei revised WID agreement Yes Yes revised No C1-140681
    C1-140681 Revised WID on IMS-based Telepresence (Stage 3) Huawei revised WID agreement Yes Yes agreed No C1-140653
12.35.2
CRs and discussion papers related to new WIDs
C1-140015 CT1 impacts of RAN2 study item FS_SCM_LTE Ericsson / Ivo discussion discussion Yes Yes noted No
    C1-140016 CT1 impacts of RAN2 work item UTRA_LTE_WLAN_interw Ericsson / Ivo discussion discussion Yes Yes noted No
    C1-140020 UE unaware whether the network uses the fixed access broadband access interworking or the fixed broadband access convergence Ericsson / Ivo CR agreement Yes Yes revised No C1-140506
    C1-140506 UE unaware whether the network uses the fixed access broadband access interworking or the fixed broadband access convergence Ericsson CR agreement Yes Yes revised No C1-140649 C1-140020
    C1-140649 UE unaware whether the network uses the fixed access broadband access interworking or the fixed broadband access convergence Ericsson CR agreement Yes Yes agreed No C1-140506
    C1-140093 Proximity-based Services (ProSe) stage 2 status Qualcomm Incorporated / Lena discussion discussion Yes Yes noted No
    C1-140203 Status of IMS Signalling Activated Trace Vodafone discussion discussion Yes Yes noted No
    C1-140274 MTCe Small Data and Device Triggering Enhancements (MTCe-SDDTE) Huawei, HiSilicon /Christian discussion discussion Yes Yes noted No
12.35.3
Status of future work items
13
Output Liaison Statements
C1-140371 Reply LS on interaction between MTC or IMS emergency call and 'Call control by USIM' current meeting o/g LS approval Yes Yes revised No C1-140650
    C1-140650 Reply LS on interaction between MTC or IMS emergency call and 'Call control by USIM' current meeting o/g LS approval Yes Yes approved No C1-140371
    C1-140296 Call control by USIM : Implications of modifications of IEs by UICC Intel discussion discussion Yes Yes noted No
    C1-140507 LS on Reply LS on Transfer of ETSI TS 182 025 current meeting o/g LS approval Yes Yes revised No C1-140651
    C1-140651 LS on Reply LS on Transfer of ETSI TS 182 025 current meeting o/g LS approval Yes Yes approved No C1-140507
    C1-140372 Response LS on New version of ES 283 035 current meeting o/g LS approval Yes Yes approved No
    C1-140373 Reply to: LS on Charging Information Delivery to IMS CTF (S5-131750) current meeting o/g LS approval No Yes postponed No
    C1-140395 LS on keeping ongoing IMS voice calls when IMSvoPS indication changes current meeting o/g LS approval Yes Yes revised No C1-140627
    C1-140627 LS on keeping ongoing IMS voice calls when IMSvoPS indication changes current meeting o/g LS approval Yes Yes revised No C1-140652 C1-140395
    C1-140652 LS on keeping ongoing IMS voice calls when IMSvoPS indication changes current meeting o/g LS approval Yes Yes revised No C1-140718 C1-140627
    C1-140718 LS on keeping ongoing IMS voice calls when IMSvoPS indication changes current meeting o/g LS approval Yes Yes approved No C1-140652
    C1-140515 Reply LS on provisioning of E-UTRA capabilities in GERAN current meeting o/g LS approval Yes Yes revised No C1-140781
    C1-140781 Reply LS on provisioning of E-UTRA capabilities in GERAN current meeting o/g LS approval Yes Yes approved No C1-140515
    C1-140535 Applying EAB override for requests made for a PDN connection established with EAB override current meeting o/g LS approval Yes Yes revised No C1-140683
    C1-140683 Applying EAB override for requests made for a PDN connection established with EAB override current meeting o/g LS approval Yes Yes revised No C1-140741 C1-140535
    C1-140741 Applying EAB override for requests made for a PDN connection established with EAB override current meeting o/g LS approval Yes Yes approved No C1-140683
    C1-140625 LS on “Removal of CDIVN functionality” current meeting o/g LS approval Yes Yes revised No C1-140682
    C1-140682 LS on “Removal of option to subscribe for a notification of diversion” current meeting o/g LS approval Yes Yes revised No C1-140719 C1-140625
    C1-140719 LS on “Removal of option to subscribe for a notification of diversion” current meeting o/g LS approval Yes Yes revised No C1-140738 C1-140682
    C1-140738 LS on “Removal of option to subscribe for a notification of diversion” current meeting o/g LS approval Yes Yes revised No C1-140742 C1-140719
    C1-140742 LS on “Removal of option to subscribe for a notification of diversion” current meeting o/g LS approval Yes Yes approved No C1-140738
    C1-140633 LS current meeting o/g LS approval No Yes postponed No
    C1-140679 LS on selection of transport for USSD signalling current meeting o/g LS approval Yes Yes revised No C1-140740
    C1-140740 LS on selection of transport for USSD signalling current meeting o/g LS approval Yes Yes approved No C1-140679
    C1-140720 LS on "IOI in MESSAGE with SRVCC information" current meeting o/g LS approval Yes Yes approved No
14
Late and misplaced documents
C1-140027 APN based congestion control Ericsson / Ivo CR agreement No No withdrawn Yes
    C1-140136 Discussion on ISRP extensions for WORM Broadcom discussion discussion No No withdrawn Yes
    C1-140265 TCP connection establishment by passive UE Ericsson CR agreement No No withdrawn Yes
    C1-140300 Defintion of ANID Huawei, HiSilicon/Youyang CR agreement No No withdrawn Yes
15
A.O.B.
16
Closing

Created: 2014-01-27 14:55     Last document: C1-140785