ETSI logo

www.3gpp.org / ftp / Meetings_3gpp_SYNC / RAN1 / Inbox / drafts / 7(NR_uptoR17_Maint)

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon UL Tx spatial filter for PUSCH transmission in Rel-17 UTCI 2024/11/19 8:58
icon UE capability of SRS antenna switching 2024/11/19 19:02
icon Spatial filter provided by UL TCI state 2024/11/19 13:10
icon SCell dormancy case 2 2024/11/18 19:54
icon R17 UE power saving SSSG timer BWP 2024/11/20 16:32
icon R17 NR-NTN preamble 2024/11/18 21:24
icon PDSCH scheduled by CORESET not following UTCI 2024/11/18 17:26
icon PDCCH with larger AL 2024/11/19 23:30
icon Parameters for maximum number of layers 2024/11/18 17:56
icon On determination of mDCI mTRP operation 2024/11/19 14:54
icon Discussion on skipping uplink transmission in case of BWP switching 2024/11/20 14:54
icon 2-step RACH and UL power control 2024/11/20 13:58
icon 2 TB SPS 2024/11/19 16:44

13 items.