Tdoc List

2021-12-01 12:16

TDoc Title Source Type For Agenda Avail Treated Decision Wdrn Replaced-by Replaces
S3‑213800 Agenda SA WG3 Chair agenda  
1Agenda and Meeting Objectives
Yes
Yes
approved No    
S3‑213801 Report from SA3#104e MCC report  
2Meeting Reports
Yes
Yes
approved No    
S3‑213802 Report from SA3#104e-Adhoc MCC report  
2Meeting Reports
Yes
Yes
approved No    
S3‑213803 Process for SA3#105e meeting SA WG3 Chair other  
1Agenda and Meeting Objectives
Yes
Yes
noted No    
S3‑213804 Report from last SA SA WG3 Chair report  
2Meeting Reports
Yes
Yes
noted No    
S3‑213805 Meeting notes from SA3 leadership SA WG3 Chair report  
2Meeting Reports
Yes
Yes
noted No    
S3‑213806 LS to 3GPP SA3 working group on 5GS Roaming Hubbing 5GJA LS in  
3Reports and Liaisons from other Groups
Yes
Yes
replied to No    
S3‑213807 Reply LS on UE capabilities indication in UPU C1-212599 LS in  
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
noted No    
S3‑213808 Reply LS on UE capabilities indication in UPU S2-2106703 LS in  
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
postponed No    
S3‑213809 LS on new parameters for SOR C1-214118 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
postponed No    
S3‑213810 Reply LS on NAS-based busy indication C1-214917 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213811 LS on user plane integrity protection for UE not supporting NR as primary RAT and supporting E-UTRA C1-214952 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213812 [FSAG#94 Doc 003] Reply LS on attack preventing NAS procedures to succeed C1-215153 LS in  
6CVD and research
Yes
Yes
noted No    
S3‑213813 Reply LS on Header Enrichment for HTTPS in PFCP C4-214531 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
replied to No    
S3‑213814 LS on Using N32 for interconnect scenarios C4-214533 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
replied to No    
S3‑213815 Stealth Pirating Attack by RACH Rebroadcast Overwriting (SPARROW) GSMA FSAG LS in  
6CVD and research
Yes
Yes
noted No    
S3‑213816 Attack preventing NAS procedures to succeed GSMA FSAG LS in  
6CVD and research
Yes
Yes
withdrawn Yes    
S3‑213817 Support of UAVs authentication/authorization in 3GPP systems and interfacing with USS/UTM GSMA LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213818 LS on broadcast of NTN GW or gNB position R1-2106332 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
replied to No    
S3‑213819 Reply LS on broadcast of NTN GW or gNB position S1-213211 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213820 New LS on UE location aspects in NTN R2-2106543 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
replied to No    
S3‑213821 Reply LS on UE location aspects in NTN R2-2109216 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213822 Reply LS on UE location aspects in NTN R2-2109217 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
replied to No    
S3‑213823 LS on NTN specific user consent R2-2109199 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
replied to No    
S3‑213824 Reply LS on NAS-based busy indication R2-2108855 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213825 LS Reply to SA3 on security protection on RRCResumeRequest message R2-2109121 LS in  
5.1Study on 5G security enhancement against false base stations
Yes
Yes
replied to No    
S3‑213826 LS on UE ID in adaptation layer R2-2109227 LS in  
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑213827 LS on UP security policy updated by intra-cell handover R3-214464 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213828 LS to SA3 on support of Pre-shared key derivation for IAB-donor-CU-UP R3-214465 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
replied to No    
S3‑213829 LS on UE capabilities indication in UPU S2-2101072 LS in  
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
replied to No    
S3‑213830 LS on 5G capabilities exposure for factories of the future S2-2106683 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213831 Reply LS to 5G-ACIA on 5G capabilities exposure for factories of the future SP-211134 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213832 LS Response on Clarifications of Network slice selection during AMF Reallocation S2-2106686 LS in  
5.14Study on the security of AMF re-allocation
Yes
Yes
noted No    
S3‑213833 Reply LS on updating the Credentials Holder controlled lists for SNPN selection S2-2106705 LS in  
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
postponed No    
S3‑213834 Reply to LS on Resynchronisations ETSI SAGE LS in  
5.4Study on authentication enhancements in 5GS
Yes
Yes
postponed No    
S3‑213835 Attack preventing NAS procedures to succeed GSMA LS in  
6CVD and research
No
Yes
withdrawn Yes    
S3‑213836 Reply LS on Security risk evaluation of using long term key for another key derivation than AKA ETSI SAGE LS in  
5.4Study on authentication enhancements in 5GS
Yes
Yes
noted No    
S3‑213837 LS Reply on QoE report handling at QoE pause S4-211290 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213838 LS on progress of study items for security on management aspect S5-214467 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213839 Reply LS on QoE report handling at QoE pause S5-214519 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213840 LS on new SID on Application Enablement for Data Integrity Verification Service in IOT S6-211496 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
replied to No    
S3‑213841 Reply LS on RAT type for network monitoring S6-212146 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213842 LS re Penetration Testing of SCAS GSMA SECAG LS in  
4.3Security Assurance Specification Enhancements for 5G (Rel-17)
Yes
Yes
noted No    
S3‑213843 LS on information about draft Recommendation ITU-T Y.frd: "Framework and Requirements of Network-oriented Data Integrity Verification Service based on Blockchain in Future Network” ITU-T SG13 LS in  
3Reports and Liaisons from other Groups
No
Yes
withdrawn Yes    
S3‑213844 LS on new liaison officer from ITU-T SG17 ITU-T SG17 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213845 Reply LS on Inclusive language review SP-211140 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213846 TCG progress - report from TCG rapporteur InterDigital, Inc. other Information
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213847 Study of privacy of identities over radio access InterDigital, Inc., Apple, AT&T, CableLabs, Convida Wireless, Futurewei, Intel, Motorola Mobility, Nokia, Nokia Shanghai Bell, Telefonica, Verizon Wireless SID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
revised No S3‑214296  
S3‑213848 Reply LS on EAS and ECS identifiers S6-212490 LS in  
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
postponed No    
S3‑213849 Test Test CR Approval
5.11Study on User Consent for 3GPP services
No
Yes
withdrawn Yes    
S3‑213850 LS-Reply on Home Network triggered re-authentication C4-215437 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
postponed No    
S3‑213851 Update to solution #2.1 JSRPC Kryptonite pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No    
S3‑213852 Update to solution #2.2 JSRPC Kryptonite pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No    
S3‑213853 Update to solution #2.3 JSRPC Kryptonite pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
revised No S3‑214358  
S3‑213854 Update to solution #2.4 JSRPC Kryptonite pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
noted No    
S3‑213855 Update to solution #2.5 JSRPC Kryptonite pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No    
S3‑213856 Update to solution #3.1 JSRPC Kryptonite pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No    
S3‑213857 Update to solution #4.3 JSRPC Kryptonite pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No    
S3‑213858 Update to solution #4.7 JSRPC Kryptonite pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No    
S3‑213859 Update to solution #2.12 JSRPC Kryptonite pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No    
S3‑213860 Conclusions on key issues #2.1, #2.2, #3.2 and #4.1 in TR 33.846 JSRPC Kryptonite pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
not treated No    
S3‑213861 Some problems concerning combination of solutions for key issues in TR 33.846 JSRPC Kryptonite discussion Decision
5.4Study on authentication enhancements in 5GS
Yes
Yes
not treated No    
S3‑213862 Baseline of user conent living CR for SA3#105-e Ericsson other Approval
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
approved No    
S3‑213863 AMF - Expected result for test case not defined in the specifications Keysight Technologies UK Ltd CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213864 AMF - Expected result for test case not defined in the specifications Keysight Technologies UK Ltd CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213865 AMF - NAS protection algorithm selection in AMF change Keysight Technologies UK Ltd CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213866 AMF - NAS protection algorithm selection in AMF change Keysight Technologies UK Ltd CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213867 Reply LS to LS on SBA for GBA S2-2107793 LS in  
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
noted No    
S3‑213868 Reply LS on proposed NSWO architecture S2-2107859 LS in  
5.19Study on non-seamless WLAN Offload in 5GS using 3GPP credentials
Yes
Yes
postponed No    
S3‑213869 LS Response on full registration request message to be rerouted via RAN S2-2107860 LS in  
5.14Study on the security of AMF re-allocation
Yes
Yes
noted No    
S3‑213870 Reply LS on NSAC procedure S2-2107942 LS in  
5.18Study on enhanced security for network slicing Phase 2
Yes
Yes
noted No    
S3‑213871 Reply LS on Layer-3 UE-to-Network Relay authentication and authorization S2-2107976 LS in  
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
replied to No    
S3‑213872 LS on Multicast paging with TMGI S2-2107995 LS in  
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
postponed No    
S3‑213873 LS on IMEI for Non-Public Networks/Private Networks without using USIM S2-2108093 LS in  
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
noted No    
S3‑213874 LS on MINT functionality for Disaster Roaming S2-2108172 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
replied to No    
S3‑213875 33.512 – Alignment with TS 33.501 Rel-17 Keysight Technologies UK Ltd CR Approval
4.3Security Assurance Specification Enhancements for 5G (Rel-17)
Yes
Yes
revised No S3‑214417  
S3‑213876 Reply LS on user plane integrity protection for UE not supporting NR as primary RAT and supporting E-UTRA S2-2107794 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213877 LS to 3GPP SA3 working group on NRF mutual authentication in roaming scenario GSMA LS in  
3Reports and Liaisons from other Groups
Yes
Yes
replied to No    
S3‑213878 AMF – NAS NULL integrity protection clarifications Keysight Technologies UK Ltd CR Approval
4.3Security Assurance Specification Enhancements for 5G (Rel-17)
Yes
Yes
agreed No    
S3‑213879 AMF – precondition bidding down prevention in Xn-handover test Keysight Technologies UK Ltd CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213880 AMF – precondition bidding down prevention in Xn-handover test Keysight Technologies UK Ltd CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213881 Living document for BEST_5G: draftCR to TS 33.163 KPN N.V. draftCR Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
Yes
Yes
revised No S3‑214461  
S3‑213882 pCR to Living document for BEST_5G: resolution of Editor’s notes KPN N.V., Vodafone other Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
Yes
Yes
revised No S3‑214419  
S3‑213883 SA3 Procedures and deadlines SA3 Chair agenda Information
1Agenda and Meeting Objectives
Yes
Yes
noted No    
S3‑213884 New solution: Ticket based access control for administrators MITRE Corporation pCR Approval
5.3Study on Security Impacts of Virtualisation
Yes
Yes
revised No S3‑214390  
S3‑213885 LS on question and feedback about the EVEX Work Item C3-215316 LS in  
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213886 CR Updating SIP DIGEST IETF references from RFC 2617 to RFC 7616 T-Mobile USA CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
merged No S3‑214516  
S3‑213887 LS on reply to SA6 about new SID on Application Enablement for Data Integrity Verification Service in IOT Nokia, Nokia Shanghai Bell LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
revised No S3‑214337  
S3‑213888 New WID on Non-Seamless WLAN offload Authentication in 5GS Nokia, Nokia Shanghai Bell WID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
revised No S3‑214433  
S3‑213889 Coversheet for TR 33.881 Nokia, Nokia Shanghai Bell TS or TR cover Approval
5.19Study on non-seamless WLAN Offload in 5GS using 3GPP credentials
Yes
Yes
approved No    
S3‑213890 Support for NSWO in 5GS Nokia, Nokia Shanghai Bell,AT&T,Lenovo,Motorola Mobility,Qualcomm Incorporated CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214432  
S3‑213891 Discussion on SA2 LS reply on proposed NSWO architecture Nokia, Nokia Shanghai Bell discussion Discussion
5.19Study on non-seamless WLAN Offload in 5GS using 3GPP credentials
Yes
Yes
noted No    
S3‑213892 Editor note removal for solution#2.8 Nokia, Nokia Shanghai Bell pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No    
S3‑213893 Editors note removal for solution#4.3 Nokia, Nokia Shanghai Bell pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
noted No    
S3‑213894 Conclusion to Key Issue #4.1 Nokia, Nokia Shanghai Bell pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
noted No    
S3‑213895 Security Protection of SQN during AKA re-synchronisations Nokia, Nokia Shanghai Bell CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑213896 New solution for Ki#13: Remote Attestation on 3GPP level Nokia, Nokia Shanghai Bell pCR Approval
5.3Study on Security Impacts of Virtualisation
Yes
Yes
revised No S3‑214393  
S3‑213897 New Solution Using Boot Time Attestation for NF Registration Johns Hopkins University APL, US National Security Agency, CableLabs, InterDigital, AT&T, CISA ECD pCR Approval
5.3Study on Security Impacts of Virtualisation
Yes
Yes
revised No S3‑214391  
S3‑213898 Clarification on Kaf lifetime in Clause 5.2 Futurewei Technologies CR Agreement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
agreed No    
S3‑213899 Kaf refresh when lifetime expires Futurewei Technologies CR Agreement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
not pursued No    
S3‑213900 AMF skipping UUAA procedure Futurewei Technologies pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
approved No    
S3‑213901 SPARROW Covert Communication Vulnerability in CRI Rebroadcast: Analysis & Remediation Proposal KEYSIGHT TECHNOLOGIES discussion Action
6CVD and research
Yes
Yes
noted No    
S3‑213902 Padding SUPIs in NAI format with Random Length of Characters for non-null schemes InterDigital Communications CR Agreement
6CVD and research
Yes
Yes
not pursued No    
S3‑213903 Mission Critical R18 WID Motorola Solutions Danmark A/S WID new Agreement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
revised No S3‑214485  
S3‑213904 [33.180] R17 Preconfigured group clarification Motorola Solutions Danmark A/S CR Agreement
4.9Mission critical security enhancements phase 2 (Rel-17)
Yes
Yes
agreed No    
S3‑213905 [33.180] R15 KMS message signature clarification Motorola Solutions Danmark A/S CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213906 [33.180] R16 KMS message signature clarification (mirror) Motorola Solutions Danmark A/S CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213907 [33.180] R17 KMS message signature clarification (mirror) Motorola Solutions Danmark A/S CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213908 [33.180] R15 MIKEY signature clarification Motorola Solutions Danmark A/S CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213909 [33.180] R16 MIKEY signature clarification (mirror) Motorola Solutions Danmark A/S CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213910 [33.180] R17 MIKEY signature clarification (mirror) Motorola Solutions Danmark A/S CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213911 TR 33.847 Conclusion for NSSAA support with L3 U2N InterDigital, Europe, Ltd., LG Electronics pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑213912 NSSAA for Remote UE with L3 U2N relay without N3IWF InterDigital, Europe, Ltd., LG Electronics pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
noted No    
S3‑213913 Update to solution #25 Huawei, HiSilicon pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑213914 Evaluation of solution #4 Huawei, HiSilicon pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑213915 Conclusion for KI#3 Huawei, HiSilicon pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑213916 update to KI#1 based on RAN progress Huawei, Hisilicon pCR Approval
5.18Study on enhanced security for network slicing Phase 2
Yes
Yes
approved No    
S3‑213917 update to KI#2 based on SA2 LS Huawei, Hisilicon pCR Approval
5.18Study on enhanced security for network slicing Phase 2
Yes
Yes
noted No    
S3‑213918 update to Sol#1 Huawei, Hisilicon pCR Approval
5.18Study on enhanced security for network slicing Phase 2
Yes
Yes
revised No S3‑214361  
S3‑213919 conclusion to KI# 3 Huawei, Hisilicon pCR Approval
5.18Study on enhanced security for network slicing Phase 2
Yes
Yes
revised No S3‑214371  
S3‑213920 WID on enhanced security for Phase 2 network slicing Huawei, Hisilicon WID new Agreement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
revised No S3‑214460  
S3‑213921 clarification on optional EAP ID Request in NSSAA Procedure Huawei, Hisilicon CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑213922 Serving network ID in NSSAA Huawei, Hisilicon CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑213923 UUAA procedure at registration Huawei, Hisilicon pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
revised No S3‑214463  
S3‑213924 UUAA procedure at PDU session establishment Huawei, Hisilicon pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
revised No S3‑214465  
S3‑213925 Pairing authorizaiton Huawei, Hisilicon, Lenovo, Motorola Mobility pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
revised No S3‑214466  
S3‑213926 UUAA re-authentication identification EN Huawei, Hisilicon pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
approved No    
S3‑213927 addressing EN in revocation procedure Huawei, Hisilicon pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
merged No S3‑214453  
S3‑213928 Update Nnssaaf_AIW interface CableLabs other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
revised No S3‑214484  
S3‑213929 Verification of NSSAIs for preventing slice attack CableLabs CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑213930 Verification of NSSAIs for preventing slice attack CableLabs CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑213931 Reply LS on Header Enrichment for HTTPS in PFCP ZTE Corporation LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
merged No S3‑214505  
S3‑213932 TS 33.220 Resolution of editor's note on 5G GBA roaming ZTE Corporation other Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
noted No    
S3‑213933 TS 33.223 Resolution of editor's note on 5G GBA roaming ZTE Corporation other Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
noted No    
S3‑213934 Authenticaton and authorization for MBS service ZTE Corporation other Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
merged No S3‑214497  
S3‑213935 Security for MBS-eMBMS interworking ZTE Corporation other Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
noted No    
S3‑213936 Clean up for clause 6.6.1 ZTE Corporation CR Agreement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
revised No S3‑214490  
S3‑213937 Discussion on refresh of KAF and no Kakma in AAnF ZTE Corporation discussion Endorsement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
not pursued No    
S3‑213938 Kaf expiration ZTE Corporation CR Agreement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
not pursued No    
S3‑213939 Kaf is invalid in AF ZTE Corporation CR Agreement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
not pursued No    
S3‑213940 No AKMA security context in AAnF ZTE Corporation CR Agreement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
not pursued No    
S3‑213941 Sending UE ID to the AKMA AF ZTE Corporation CR Agreement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
agreed No    
S3‑213942 UE stores AKMA subscription data ZTE Corporation CR Agreement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
not pursued No    
S3‑213943 Authentication based on AKMA between EEC and ECS in clause 6.2 ZTE Corporation pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
noted No    
S3‑213944 Authentication based on AKMA between EEC and EES in clause 6.3 ZTE Corporation pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
noted No    
S3‑213945 Delete the GBA_Digest in annex B.1.2.2 ZTE Corporation CR Agreement
4.19 TLS protocols profiles for AKMA (Rel-17)
Yes
Yes
revised No S3‑214491  
S3‑213946 Network domain security ZTE Corporation pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214472  
S3‑213947 Security of Npc2 interface ZTE Corporation pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214472  
S3‑213948 Security of UE 5G DDNMF interface ZTE Corporation pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214472  
S3‑213949 Security requirements for 5G ProSe Direct Discovery ZTE Corporation pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214444  
S3‑213950 Security procedures for 5G ProSe Direct Discovery ZTE Corporation pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
noted No    
S3‑213951 Conclusion on key issue 4.1 ZTE Corporation pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
noted No    
S3‑213952 Conclusion on key issue 1 ZTE Corporation pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
merged No S3‑214385  
S3‑213953 Conclusion on key issue 2 ZTE Corporation pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
merged No S3‑214386  
S3‑213954 Conclusion for key issue 1 ZTE Corporation pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
merged No S3‑214407  
S3‑213955 Conclusion for key issue 2 ZTE Corporation pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
merged No S3‑214407  
S3‑213956 Update the solution #6 ZTE Corporation pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
approved No    
S3‑213957 Resolving ENs in Key Issue #2 ZTE Corporation pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑213958 Evaluation of Solution #20 ZTE Corporation pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑213959 Evaluation of Solution #21 ZTE Corporation pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑213960 Conclusion on Key Issue #2 ZTE Corporation pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑213961 Update the solution #11 ZTE Corporation pCR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
approved No    
S3‑213962 Conclusion for the key issue 1 ZTE Corporation pCR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
noted No    
S3‑213963 Further conclusion for KI#4 (initial access) CableLabs pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No    
S3‑213964 Update Annex B in TR 33.809 CableLabs pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
revised No S3‑214392  
S3‑213965 Discussion on Data Integrity Service in IoT China Unicom discussion Information
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213966 Reply LS to SA6 on new SID on Application Enablement for Data Integrity Verification Service in IoT China Unicom LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
merged No S3‑214337  
S3‑213967 Authentication and Authorization between EES and ECS Intel Sweden AB pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
revised No S3‑214489  
S3‑213968 [Draft] Reply LS on UE location aspects in NTN Intel Sweden AB LS out  
3Reports and Liaisons from other Groups
Yes
Yes
merged No S3‑214394  
S3‑213969 Conclusions for KI#4 (initial access) Intel Sweden AB,Interdigital, Apple, Philips, Convida, Broadcom, Cablelabs, Lenovo, Motorola Mobility pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
revised No S3‑214335  
S3‑213970 TR 33.847 Conclusion for Secondary Authentication support with L3 U2N LG Electronics, InterDigital pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑213971 Secondary Authentication for Remote UE with L3 U2N relay without N3IWF LG Electronics, InterDigital pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
noted No    
S3‑213972 Reply LS on Layer-3 UE-to-Network Relay authentication and authorization LG Electronics LS out Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑213973 New solution for UE onboarding LG Electronics pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
revised No S3‑214341  
S3‑213974 Further conclusion for KI#4 LG Electronics pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑213975 Reply LS on LS on MINT functionality for Disaster Roaming LG Electronics LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
revised No S3‑214342  
S3‑213976 New WID proposal for MINT LG Electronics, LG Uplus, KT Corp, SK Telecom WID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
noted No    
S3‑213977 TS 33.501 Rel-17 security aspects on MINT feature LG Electronics Inc. CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑213978 5GFBS-Conclusion for solution#17 Apple pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑213979 5GFBS-Reply LS to R2-2109121 on protection of RRCResumerequest message Apple pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑213980 5GFBS- Update solution#27 on UE local security policy Apple LS out Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑213981 WID of 5GFBS Apple WID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
noted No    
S3‑213982 MEC- New solution on EEC authentication based on GBA Apple pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
noted No    
S3‑213983 MEC- Discussion paper on the privacy issue EEC ID Apple pCR  
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
noted No    
S3‑213984 MEC- New solution on EEC ID privacy protection Apple pCR  
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
noted No    
S3‑213985 Reply LS on UE location aspects in NTN (R2-2106543) Apple LS out  
3Reports and Liaisons from other Groups
Yes
Yes
merged No S3‑214394  
S3‑213986 Reply LS on NTN specific user consent (R2-2109199) Apple LS out  
3Reports and Liaisons from other Groups
Yes
Yes
merged No S3‑214349  
S3‑213987 Discussion paper on physical layer security Apple discussion  
4.26Other work areas (no release restrictions)
Yes
Yes
noted No    
S3‑213988 Countermeasures against a threat of a service disruption due to unprotected RRC messages proposed by 5G Security Forum in South Korea SK Telecom discussion  
6CVD and research
Yes
Yes
revised No S3‑214332  
S3‑213989 Discussion on Integrity check during mobility procedure NEC Telecom MODUS Ltd. discussion Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
noted No    
S3‑213990 Integrity check during context transfer scenario 1 NEC Telecom MODUS Ltd. CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑213991 Integrity check during context transfer scenario 2 NEC Telecom MODUS Ltd. CR  
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑213992 Discussion on SA2 LS on MINT LG Electronics Inc. discussion Discussion
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑213993 Conclusion for Key Issue #1 Huawei, HiSilicon pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
revised No S3‑214380  
S3‑213994 MSK derivation in external authentication Huawei, HiSilicon other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
merged No S3‑214515  
S3‑213995 Living CR for UC3S in TS 33.501 Huawei, HiSilicon draftCR Approval
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
noted No    
S3‑213996 User consent check Huawei, HiSilicon other Approval
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
revised No S3‑214478  
S3‑213997 User consent revocation Huawei, HiSilicon other Approval
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
revised No S3‑214479  
S3‑213998 New solution for naming of purposes Huawei, HiSilicon pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
noted No    
S3‑213999 Address EN and add evaluation for solution 3 Huawei, HiSilicon pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
approved No    
S3‑214000 Address EN and add evaluation for solution 4 Huawei, HiSilicon pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
revised No S3‑214381  
S3‑214001 Conclusion on key issue #3 Huawei, HiSilicon pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
revised No S3‑214382  
S3‑214002 Conclusion on UDM Service for User Consent Check Huawei, HiSilicon pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
revised No S3‑214383  
S3‑214003 Conclusion on User Consent Check Huawei, HiSilicon pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
revised No S3‑214384  
S3‑214004 Update the conclusion to KI#12 Huawei,HiSilicon pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
revised No S3‑214374  
S3‑214005 Update to solution #38 Huawei,HiSilicon pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No    
S3‑214006 Propose text to clause 6.3 about PC5 unicast Huawei,HiSilicon, LG Electronics pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
revised No S3‑214470  
S3‑214007 Propose to mitigate bidding-down attack Huawei, HiSilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214008 Reply LS on support of Pre-shared key derivation for IAB-donor-CU-UP Huawei, HiSilicon LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No    
S3‑214009 living doc for 5MBS WID Huawei, HiSilicon draftCR Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
revised No S3‑214422  
S3‑214010 Update the clause of security mechanisms for MBS traffic transmission Huawei, HiSilicon other Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
merged No S3‑214436  
S3‑214011 Discussion paper on key distribution in interworking between LTE and 5G Huawei, HiSilicon discussion Endorsement
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
endorsed No    
S3‑214012 Update to conclusion on key issue#2 Huawei, HiSilicon pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
revised No S3‑214377  
S3‑214013 editorial changes to TR 33.850 Huawei, HiSilicon pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
approved No    
S3‑214014 Rel17 Clarification about multiple horizontal key derivations upon AMF re-allocation via direct NAS reroute Huawei, HiSilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214015 Conclusion on Key Issue #4.1 Huawei, HiSilicon pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
noted No    
S3‑214016 Clarifications on solution 17 Huawei, HiSilicon pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑214017 User Consent Requirement Huawei, HiSilicon other Approval
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
revised No S3‑214480  
S3‑214018 Security protection for interworking between 5MBS and eMBMS Huawei, HiSilicon other Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
approved No    
S3‑214019 addressing the editor's notes in sol#27 Huawei, HiSilicon pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
revised No S3‑214379  
S3‑214020 Update to conclusion on key issue#3 Huawei, HiSilicon pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
revised No S3‑214378  
S3‑214021 SUPI privacy for SNPN Ericsson other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
noted No    
S3‑214022 SUPI handling for EAP Ericsson other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
noted No    
S3‑214023 Exclude EAP-AKA' from AAA Ericsson other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
noted No    
S3‑214024 Initial access using AAA Ericsson other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
merged No S3‑214543  
S3‑214025 Solution KI#2 using AKMA Ericsson pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑214026 Correction of testcases in TS 33.511 Huawei, HiSilicon CR Approval
4.3Security Assurance Specification Enhancements for 5G (Rel-17)
Yes
Yes
revised No S3‑214481  
S3‑214027 Adding security description for L2 solution Huawei, HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
revised No S3‑214471  
S3‑214028 Add content to clause 5 Huawei, HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
revised No S3‑214472  
S3‑214029 A new solution to address KI#17 Huawei, HiSilicon pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
No
Yes
revised No S3‑214278  
S3‑214030 Conclusion to KI#17 Huawei, HiSilicon pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214031 Add a new clause on security policy provisioning Huawei, HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
No
Yes
revised No S3‑214279  
S3‑214032 Discuss on a new study on Home network triggerred authenticaiton Huawei, HiSilicon endorsement Approval Huawei, HiSilicon discussion Endorsement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
noted No    
S3‑214033 New WID on Security Assurance Specification for Management Function Huawei, HiSilicon SID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
revised No S3‑214482  
S3‑214034 New WID for SCAS work to introduce R-17 features on existing functions Huawei, HiSilicon SID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
noted No    
S3‑214035 Add clarification in EN-DC scenario Huawei, HiSilicon other Approval
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
revised No S3‑214476  
S3‑214036 Definition to Anonymous SUPI Huawei, HiSilicon other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
revised No S3‑214483  
S3‑214037 Correction to Authorization for indirect communication with delegated discovery procedure in rel16 Huawei,HiSilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214474  
S3‑214038 Correction to Authorization for indirect communication with delegated discovery procedure in rel17 Huawei,HiSilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214475  
S3‑214039 Correction to Deriving AKMA Application Key for a specific AF Huawei,HiSilicon CR Approval
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
not pursued No    
S3‑214040 P-TID Privacy protection in solution 39 Huawei,HiSilicon pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
revised No S3‑214375  
S3‑214041 resolving the EN on Kausf desych and key lifetime Huawei,HiSilicon pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
revised No S3‑214376  
S3‑214042 Proposal for U2NW relay authentication, authorization and key management Huawei,HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
noted No    
S3‑214043 Update clause 4 Huawei, HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
revised No S3‑214473  
S3‑214044 Add text to clause 6.1 Huawei, HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
noted No    
S3‑214045 Add a new clause on the privacy of DCR Huawei, HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
noted No    
S3‑214046 clarification on handling the security context in MR Huawei, HiSilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214047 clarification on handling the security context in MR Huawei, HiSilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214048 clarification on handling the security context in MR Huawei, HiSilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214049 Resolving EN on the subscribe-notify issue Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, Samsung pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
noted No    
S3‑214050 Adding the evaluation for solution #9 Huawei, HiSilicon pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
revised No S3‑214387  
S3‑214051 Adding the conclusion for key issue #7 Huawei, HiSilicon pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
noted No    
S3‑214052 Adding the conclusion for key issue #5 Huawei, HiSilicon pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
revised No S3‑214388  
S3‑214053 Authorizating the use of GBA service Huawei, HiSilicon other Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
noted No    
S3‑214054 Authentication and authorization for MBS session Huawei, HiSilicon other Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
revised No S3‑214497  
S3‑214055 implementation for living CR for SIP digest changes Huawei, Hisilicon other Approval
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
noted No    
S3‑214056 removal of unspecified validity of AV-R16 Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214498  
S3‑214057 removal of unspecified validity of AV-R17 Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214499  
S3‑214058 clarification on NAS count handling-R16 Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214059 clarification on NAS count handling-R17 Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214060 EN removal about the confidential protection in BEST Huawei, Hisilicon other Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
Yes
Yes
revised No S3‑214512  
S3‑214061 EN removal about the authentication method selection in BEST Huawei, Hisilicon other Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
Yes
Yes
noted No    
S3‑214062 EN removal about the UE identification in BEST Huawei, Hisilicon other Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
Yes
Yes
noted No    
S3‑214063 CR for SIP digest Huawei, Hisilicon CR Approval
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
revised No S3‑214501  
S3‑214064 Conclusion on Key issue #1 Huawei, Hisilicon pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
revised No S3‑214385  
S3‑214065 Conclusion on Key issue #2 Huawei, Hisilicon pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
revised No S3‑214386  
S3‑214066 Clarification on the SA2 and SA6 issues Huawei, Hisilicon pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
approved No    
S3‑214067 Authentication and Authorization between EEC and ECS Huawei, Hisilicon pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
noted No    
S3‑214068 Authentication and Authorization between EEC and EES Huawei, Hisilicon pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
noted No    
S3‑214069 Authentication and Authorization in EES capability exposure for non-CAPIF scenario Huawei, Hisilicon pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
revised No S3‑214502  
S3‑214070 New Annex for Edge computing security Huawei, Hisilicon CR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
revised No S3‑214503  
S3‑214071 Clarification on the emergency test Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214504  
S3‑214072 Add the threat references in the TS 33.226 Huawei, Hisilicon CR Approval
4.2Security Assurance Specification for IMS (Rel-17)
Yes
Yes
agreed No    
S3‑214073 Clarification on the TLS mechanism betwee SEPPs Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214074 Resolving the EN on the authorization between SCPs Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
withdrawn Yes    
S3‑214075 Reply LS on Header Enrichment for HTTPS in PFCP Huawei, Hisilicon LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
revised No S3‑214505  
S3‑214076 open discovery Huawei, HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214441  
S3‑214077 restricted discovery Huawei, HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214441  
S3‑214078 Living CR on SCP to 33.926 Nokia, Nokia Shanghai Bell draftCR  
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
approved No   S3‑212293
S3‑214079 Adding methods for authentication during onboarding Nokia, Nokia Shanghai Bell other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
merged No S3‑214543  
S3‑214080 Resolution to editor’s notes concerning identity sharing Nokia, Nokia Shanghai Bell other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
merged No S3‑214439  
S3‑214081 Resolution of editor note related to selection of root key Nokia, Nokia Shanghai Bell other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
revised No S3‑214515  
S3‑214082 Reply to LS on broadcast of NTN GW or gNB position Nokia, Nokia Shanghai Bell LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
merged No S3‑214336  
S3‑214083 Add details of algorithms to be supported Ericsson other Approval
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
noted No    
S3‑214084 UE Capability to support UP IP with SeNB in DC Ericsson other Approval
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
merged No S3‑214476  
S3‑214085 UE Capability to support UP IP with SgNB in EN-DC Ericsson other Approval
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
merged No S3‑214476  
S3‑214086 Updates to clause 7.3.X on UP integrity protection policy Ericsson other Approval
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
approved No    
S3‑214087 Updates to IW HO from EPS to 5GS in TS 33.501 Ericsson other Approval
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
approved No    
S3‑214088 LS on support of User Plane integrity protection in EPS/LTE Ericsson LS out Approval
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
noted No    
S3‑214089 Clarification on the emergency test - Rel15 Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214506  
S3‑214090 Clarification on the emergency test - Rel16 Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214507  
S3‑214091 AKMA roaming Lenovo, Motorola Mobility CR Approval
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
not pursued No    
S3‑214092 New WID on SECAM and SCAS for 3GPP virtualized network products China Mobile WID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
revised No S3‑214492  
S3‑214093 New SID on interworking between 3GPP NF and security devices China Mobile SID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
noted No    
S3‑214094 living CR for eNA China Mobile draftCR Agreement
4.23Security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) (Rel-17)
Yes
Yes
revised No S3‑214493  
S3‑214095 Add conclusion to KI #2.1 China Mobile pCR Approval
5.13Study on security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) Phase 2
Yes
Yes
approved No    
S3‑214096 LI for AKMA Roaming Lenovo, Motorola Mobility discussion Endorsement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
noted No    
S3‑214097 Discussions on ZUC-256 CATT discussion Endorsement
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑214098 Detection of MitM attacks with secret paging Lenovo, Motorola Mobility pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑214099 Evaluation of the potential security issue in QoE report handling at QoE pause Lenovo, Motorola Mobility discussion Endorsement
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑214100 LS on ZUC-256 CATT LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑214101 [DRAFT] Reply LS on QoE report handling at QoE pause Lenovo, Motorola Mobility LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
revised No S3‑214458  
S3‑214102 Resolving the EN on the authorization between SCPs Huawei, HiSilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214103 Reply LS on UE location aspects in NTN CATT LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
revised No S3‑214360  
S3‑214104 pCR to TR33.847- Update conclusions of KI#13 CATT, Xiaomi, ZTE pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No    
S3‑214105 pCR to TS33.503-Remove groupcast related content CATT pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No    
S3‑214106 Conclusion for key issue #2 on PNI-NPN China Mobile, Ericsson pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑214107 Add evaluation and system impact to solution#17 China Mobile pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑214108 living document of 5GMSG China Mobile draftCR Approval
4.24Security aspects of the 5GMSG Service (Rel-17)
Yes
Yes
revised No S3‑214430  
S3‑214109 Change request to living document-MSGin5G China Mobile other Approval
4.24Security aspects of the 5GMSG Service (Rel-17)
Yes
Yes
revised No S3‑214517  
S3‑214110 pCR to TS33.503 Clause 4.2-Change reference point name CATT pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No    
S3‑214111 Presentation of Specification to TSG: TS 33.520, Version <0.3.0> for approval China Unicom, Huawei, Hisilicon pCR  
4.6Security Assurance Specification for Non-3GPP InterWorking Function (N3IWF) (Rel- 17)
Yes
Yes
approved No    
S3‑214112 pCR to TS33.503 Clause 6.3-Security for Unicast mode 5G ProSe Direct Communication CATT pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214470  
S3‑214113 Editorial and corrections Ericsson CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214420  
S3‑214114 Editorial change on TS 33.520 China Unicom, Huawei, Hisilicon pCR  
4.6Security Assurance Specification for Non-3GPP InterWorking Function (N3IWF) (Rel- 17)
Yes
Yes
approved No    
S3‑214115 Clarification to TEID uniqueness test case Ericsson CR  
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214116 Clarification to TEID uniqueness test case Ericsson CR  
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214117 Conclusion to KI#1 Lenovo, Motorola Mobility, Deutsche Telekom, Interdigital, Broadcom, Intel pCR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
noted No    
S3‑214118 SUPI in Notifications from NSSAAF Ericsson CR  
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214119 Update to Solution #4 Lenovo, Motorola Mobility pCR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
revised No S3‑214339  
S3‑214120 Update to Solution #12 Lenovo, Motorola Mobility pCR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
revised No S3‑214340  
S3‑214121 Clarifications to UUAA Revocation Lenovo, Motorola Mobility pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
revised No S3‑214453  
S3‑214122 SUPI in Notifications from NSSAAF Ericsson CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214123 Adding some abbreviations to TR 33.854 Qualcomm Incorporated CR Agreement
5.5Study on security aspects of Unmanned Aerial Systems
Yes
Yes
revised No S3‑214343  
S3‑214124 Corrections to TS 33.854 Qualcomm Incorporated CR Agreement
5.5Study on security aspects of Unmanned Aerial Systems
Yes
Yes
revised No S3‑214344  
S3‑214125 Proposed text for UUAA-MM Qualcomm Incorporated pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
merged No S3‑214463 S3‑213517
S3‑214126 Proposed text for UUAA-SM Qualcomm Incorporated pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
merged No S3‑214465 S3‑213518
S3‑214127 Proposed text for UUAA in EPS Qualcomm Incorporated pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
noted No    
S3‑214128 Proposed conclusions for key issue #1 and key issue #2 Qualcomm Incorporated pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
noted No   S3‑213522
S3‑214129 Proposed conclusion for key issue #4.1 Qualcomm Incorporated pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
revised No S3‑214355 S3‑212843
S3‑214130 Adding MACS as an input parameter to the calculation of AK* to provide freshness Qualcomm Incorporated, Thales CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No   S3‑212846
S3‑214131 Corrections to the TLS with AKMA specification Qualcomm Incorporated CR Agreement
4.19 TLS protocols profiles for AKMA (Rel-17)
Yes
Yes
agreed No   S3‑212840
S3‑214132 Adding TLS 1.3 with AKMA keys Qualcomm Incorporated CR Agreement
4.19 TLS protocols profiles for AKMA (Rel-17)
Yes
Yes
agreed No   S3‑212841
S3‑214133 Correction to the GBA TLS 1.3 specification Qualcomm Incorporated CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
not pursued No   S3‑212842
S3‑214134 GBA key re-negotiation with TLS 1.3 Qualcomm Incorporated CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
revised No S3‑214451  
S3‑214135 Discussion on adding SCAS for the various split gNB cases Qualcomm Incorporated, Deutsche Telekom AG, AT&T discussion Discussion
4.3Security Assurance Specification Enhancements for 5G (Rel-17)
Yes
Yes
noted No   S3‑212838
S3‑214136 Adding SCAS for the various split gNB cases Qualcomm Incorporated, Deutsche Telekom AG, AT&T CR Agreement
4.3Security Assurance Specification Enhancements for 5G (Rel-17)
Yes
Yes
not pursued No   S3‑212839
S3‑214137 Proposed conclusion for AMF Re-allocation Qualcomm Incorporated pCR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
noted No   S3‑212850
S3‑214138 Confirming UE supported algorithms in Path Switch procedure Qualcomm Incorporated CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214452  
S3‑214139 Security requirements for UPIP over E-UTRA Qualcomm Incorporated other Approval
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
revised No S3‑214435  
S3‑214140 User-plane UE-to-network relay connection procedure Qualcomm Incorporated, Ericsson pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
revised No S3‑214438  
S3‑214141 Additional conclusion of KI #17 – UP security policy Qualcomm Incorporated, CATT pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214142 Discussion on SA2 Reply LS on Layer-3 UE-to-Network Relay authentication and authorization Qualcomm Incorporated other Discussion
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214143 Removing Editor’s Notes in solution #42 Qualcomm Incorporated pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
merged No S3‑214346  
S3‑214144 Update of conclusion for KI#5 Qualcomm Incorporated pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214145 Update of conclusion for Key Issue #13 Qualcomm Incorporated pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No    
S3‑214146 Conclusion of privacy protection of PDU session-related parameters for relaying Qualcomm Incorporated pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214147 CR to ProSe TS – Direct Discovery Qualcomm Incorporated, CATT pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
revised No S3‑214441  
S3‑214148 CR to ProSe TS – Security Requirements in Direct Discovery Qualcomm Incorporated, CATT pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
revised No S3‑214444  
S3‑214149 Conclusion of KI #1 and KI #2 Qualcomm Incorporated pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
revised No S3‑214407  
S3‑214150 5G MBS key management Qualcomm Incorporated other Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
revised No S3‑214436  
S3‑214151 Conclusion for KI #1 Qualcomm Incorporated pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑214152 Conclusion for KI #2 Qualcomm Incorporated pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑214153 Conclusion for KI #3 Qualcomm Incorporated pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑214154 Reply LS on UE location aspects in NTN Qualcomm Incorporated LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
merged No S3‑214394  
S3‑214155 Reply LS on NTN specific User Consent Qualcomm Incorporated LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
revised No S3‑214349  
S3‑214156 Securing initial access for UE onboarding Qualcomm Incorporated other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
revised No S3‑214543  
S3‑214157 Resolution for EN on sending SUPI to SNPN Qualcomm Incorporated other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
revised No S3‑214439  
S3‑214158 Configuration of CH credentials Qualcomm Incorporated other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
merged No S3‑214515  
S3‑214159 eNPN: Evaluation of Solution #5 Qualcomm Incorporated pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑214160 pCR: Additional conclusions for KI #1 Qualcomm Incorporated pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No    
S3‑214161 UUAA during Registration Lenovo, Motorola Mobility pCR  
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
merged No S3‑214463  
S3‑214162 UUAA during PDU Session Establishment Lenovo, Motorola Mobility pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
merged No S3‑214465  
S3‑214163 Update to Solution#23 Lenovo, Motorola Mobility pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
revised No S3‑214338  
S3‑214164 Solution for provisioning PNI-NPN Credential Lenovo, Motorola Mobility pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑214165 Update to Clause 6.15.2.1 Procedure for UE Parameters Update Lenovo, Motorola Mobility CR Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
not pursued No    
S3‑214166 Reply LS (S3-213818) on broadcast of NTN GW or gNB position Xiaomi Technology LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
merged No S3‑214336  
S3‑214167 Reply LS (S3-213820) on UE location aspects in NTN Xiaomi Technology LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
merged No S3‑214394  
S3‑214168 Reply LS (S3-213822) on UE location aspects in NTN Xiaomi Technology LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
revised No S3‑214394  
S3‑214169 Reply LS (S3-213823) on NTN specific user consent Xiaomi Technology LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
merged No S3‑214349  
S3‑214170 ProSe: Update to Solution #40 Xiaomi Technology pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
revised No S3‑214395  
S3‑214171 ProSe: Evaluation Update for Solution #41 Xiaomi Technology pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
revised No S3‑214396  
S3‑214172 ProSe: Conclusion Update for Key Issue #3 Xiaomi Technology pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214173 ProSe: Conclusion for Key Issue #13 Xiaomi Technology pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No    
S3‑214174 ProSe: Conclusion for Key Issue #17 Xiaomi Technology pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214175 eNPN: Conclusion for Key Issue #2 Xiaomi Technology pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑214176 eNS2: Key Issue #2 update Xiaomi Communication pCR Approval
5.18Study on enhanced security for network slicing Phase 2
Yes
Yes
noted No    
S3‑214177 33.503: Common Security Xiaomi Technology pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214472  
S3‑214178 33.503: Security for Unicast Mode Direct Communication Xiaomi Technology pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214470  
S3‑214179 33.503: Security for L3 U2N Relay Communication Xiaomi Technology pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
revised No S3‑214488  
S3‑214180 33.503: Security for L2 U2N Relay Communication Xiaomi Technology pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214471  
S3‑214181 Protection for eNPN credential provisioning Xiaomi Technology draftCR Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
noted No    
S3‑214182 Validity and revocation of consent Ericsson other Approval
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
revised No S3‑214434  
S3‑214183 eSBA Editorial updates to 33875-040 Nokia, Nokia Shanghai Bell pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
approved No    
S3‑214184 eSBA KI#5 EN resolution Nokia, Nokia Shanghai Bell pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
revised No S3‑214365  
S3‑214185 eSBA KI#4 conclusion Nokia, Nokia Shanghai Bell pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
revised No S3‑214366  
S3‑214186 eSBA KI#9 Threats Nokia, Nokia Shanghai Bell pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
merged No S3‑214397  
S3‑214187 SBA CR CCA in roaming R16 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214188 SBA CR CCA in roaming R17 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214189 SBA CR NRF-NRF mutual auth R16 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214530  
S3‑214190 SBA CR NRF-NRF mutual auth R17 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214531  
S3‑214191 SBA CR Alignment for Oauth2.0 validation R15 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214192 SBA CR Alignment for Oauth2.0 validation R16 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214193 SBA CR Alignment for Oauth2.0 validation R17 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214194 SBA CR NRF deployments R17 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214195 SBA CR N32 for interconnect R16 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214532  
S3‑214196 SBA CR N32 for interconnect R17 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214533  
S3‑214197 IPUPS overload control R17 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214198 Cover sheet - FS eSBA - Presentation of Report TR 33.875 Nokia, Nokia Shanghai Bell TS or TR cover Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
revised No S3‑214367  
S3‑214199 Cover sheet - FS IIOT - Presentation and Approval of Report TR 33.851 Nokia, Nokia Shanghai Bell TS or TR cover Approval
5.8Study on security for enhanced support of Industrial IoT
Yes
Yes
approved No    
S3‑214200 Cover sheet - SCAS SECOP - Presentation and Approval of TR 33.522 Nokia, Nokia Shanghai Bell TS or TR cover Approval
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
approved No    
S3‑214201 FS_eSBA_SEC - SID revision Nokia, Nokia Shanghai Bell SID revised Agreement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
revised No S3‑214535  
S3‑214202 WID_eSBA_SEC Nokia, Nokia Shanghai Bell WID new Agreement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
noted No    
S3‑214203 WID_N32_SEC Nokia, Nokia Shanghai Bell WID new Agreement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
noted No    
S3‑214204 01 SCAS SECOP editorials to 33522-030 Nokia, Nokia Shanghai Bell pCR Approval
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
revised No S3‑214526  
S3‑214205 02 SCAS SECOP Technical baseline Nokia, Nokia Shanghai Bell pCR Approval
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
revised No S3‑214527  
S3‑214206 SCAS SECOP Operating Systems Nokia, Nokia Shanghai Bell pCR Approval
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
approved No    
S3‑214207 SCAS SECOP Web Servers Nokia, Nokia Shanghai Bell pCR Approval
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
approved No    
S3‑214208 SCAS SECOP Network Devices Nokia, Nokia Shanghai Bell other Approval
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
approved No    
S3‑214209 SCAS SECOP Vulnerability testing Nokia, Nokia Shanghai Bell other Approval
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
approved No    
S3‑214210 SCAS SECOP update to Annex SCP in 33.926 Nokia, Nokia Shanghai Bell other Approval
4.3Security Assurance Specification Enhancements for 5G (Rel-17)
Yes
Yes
revised No S3‑214486  
S3‑214211 ProSe: New solution PC5 anchor key generation via GBA Push Ericsson pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
revised No S3‑214363  
S3‑214212 Conclusion for user plane solutions for KI#3, KI#4, KI#9 Ericsson pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214213 Conclusion for control plane solutions for KI#3, KI#4, KI#9 Ericsson pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
revised No S3‑214345  
S3‑214214 Security requirements for UE-to-network relay Ericsson pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214488  
S3‑214215 Security for UE to 5G DDNMF communication and for UE to 5G PKMF communication Ericsson pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
merged No S3‑214472  
S3‑214216 Introducing support of TLS v1.3 in ProSe TS 33.303 Ericsson CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
agreed No    
S3‑214217 Update to WID on 3GPP profiles for cryptographic algorithms and security protocols Ericsson WID revised Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
agreed No    
S3‑214218 Proposal for U2NW relay authentication, authorization and key management Samsung, Interdigital, LG Electronics, Nokia, Nokia Shanghai Bell pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
revised No S3‑214495  
S3‑214219 ProSe: Resolve EN in solution#1 Samsung pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214220 [5gMSG] CR to living document: Authorization of MSG Client Samsung other Agreement
4.24Security aspects of the 5GMSG Service (Rel-17)
Yes
Yes
noted No    
S3‑214221 [EDGE] Discussion paper on need for EEC authentication Samsung discussion Endorsement
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
noted No    
S3‑214222 [EDGE] Discussion on EDGE wayforward Samsung discussion Endorsement
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
noted No    
S3‑214223 [eSBA] KI on inter slice access Samsung pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
revised No S3‑214397  
S3‑214224 Solution to KI#9: Authorization for Inter-Slice Access Samsung pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
revised No S3‑214398  
S3‑214225 [UC3S] Adding evaluation of solution #7 Samsung pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
revised No S3‑214400  
S3‑214226 [UC3S] Resolving Editor’s Note of solution #7 Samsung pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
approved No    
S3‑214227 [UC3S] Conclusion for Edge User Consent Samsung pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
revised No S3‑214401  
S3‑214228 [Rel-16]Clarification on KIAB generation for CP-UP separation Samsung, Nokia, Nokia Shanghai Bell, Huawei, Hisilicon, Intel CR Agreement
3Reports and Liaisons from other Groups
Yes
Yes
agreed No    
S3‑214229 [Rel-17]Clarification on KIAB generation for CP-UP separation Samsung, Nokia, Nokia Shanghai Bell, Huawei, Hisilicon, Intel CR Agreement
3Reports and Liaisons from other Groups
Yes
Yes
agreed No    
S3‑214230 KIAB generation for NR-DC scenario Samsung, Nokia, Nokia Shanghai Bell, Huawei, Hisilicon, Intel CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑214231 Discussion paper on need for Re-authentication Samsung, NEC discussion Endorsement
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑214232 CR to 33.501: Network initiated Primary Authentication Samsung, NEC CR Agreement
3Reports and Liaisons from other Groups
Yes
Yes
not pursued No    
S3‑214233 CR to 33.535: Refresh of KAKMA and KAF Samsung, NEC CR Agreement
3Reports and Liaisons from other Groups
Yes
Yes
not pursued No    
S3‑214234 CR to 33.535: Clarification on AKMA Application Key retrieval Samsung CR Agreement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
not pursued No    
S3‑214235 Discussion on AKMA Roaming scenario Samsung discussion Endorsement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
noted No    
S3‑214236 CR to 33.535: AKMA service support for roaming UE Samsung CR Agreement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
not pursued No    
S3‑214237 New WID for SEAL security enhancement Samsung WID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
revised No S3‑214496  
S3‑214238 SID on user plane security enhancement Samsung SID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
noted No    
S3‑214239 [eSBA] New Solution for Key Issue #3: Authorization of notification endpoint Samsung, Huawei, Hisilicon, Nokia, Nokia Shanghai Bell pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
revised No S3‑214399  
S3‑214240 [eSBA] Conclusion for KI#1 Samsung, Huawei, HisiliconNokia, Nokia Shanghai Bell pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
noted No    
S3‑214241 [AMF re-alloc] Conclution to KI #1 Samsung pCR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
noted No    
S3‑214242 Re-route 5G NAS security context via RAN Samsung other Agreement
5.14Study on the security of AMF re-allocation
Yes
Yes
noted No    
S3‑214243 AMF re-allocation: Discussion about the WID Ericsson discussion Information
5.14Study on the security of AMF re-allocation
Yes
Yes
noted No    
S3‑214244 New WID on the security of AMF re-allocation Ericsson WID new Agreement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
noted No    
S3‑214245 Conclusion for the study Ericsson pCR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
revised No S3‑214350  
S3‑214246 Security handing of AMF re-allocation via RAN Ericsson draftCR Discussion
5.14Study on the security of AMF re-allocation
Yes
Yes
noted No    
S3‑214247 Authentication enhancements: Discussion about the WID Ericsson discussion Information
5.4Study on authentication enhancements in 5GS
Yes
Yes
noted No    
S3‑214248 New WID on Authentication enhancements in 5GS Ericsson WID new Agreement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
revised No S3‑214445  
S3‑214249 Remove Editor's Notes in key issue #3.1 Ericsson pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No    
S3‑214250 Living document for GBA_5G: draftCR to TS 33.220: SBA support for Zh and Zn interfaces Ericsson draftCR Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
revised No S3‑214449  
S3‑214251 Living document for GBA_5G: draftCR to TS 33.223: SBA support for Zpn Ericsson draftCR Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
revised No S3‑214450  
S3‑214252 pCR to living document of TS 33.220: Update of the interface names and removal of Editor's Notes Ericsson other Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
approved No    
S3‑214253 pCR to living document of TS 33.223: Update of the interface names and removal of Editor's Notes Ericsson other Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
approved No    
S3‑214254 pCR to living document of TS 33.220: Editorial changes Ericsson other Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
approved No    
S3‑214255 pCR to living document of TS 33.223: Editorial changes Ericsson other Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
approved No    
S3‑214256 pCR to living document of TS 33.220: Update of the new UDM service to a service operation Ericsson other Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
approved No    
S3‑214257 Discussion about GBA roaming in 5G Ericsson discussion Endorsement
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
endorsed No    
S3‑214258 pCR to living document of TS 33.220: Roaming Ericsson other Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
approved No    
S3‑214259 pCR to living document of TS 33.223: Roaming Ericsson other Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
approved No    
S3‑214260 Reply to LS on broadcast of NTN GW or gNB position Ericsson LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
revised No S3‑214336  
S3‑214261 Discussion on the SBA services to support NSWO authentication Ericsson discussion  
4.26Other work areas (no release restrictions)
Yes
Yes
noted No    
S3‑214262 SBA services of AUSF/UDM for NSWO authentication Ericsson CR  
4.26Other work areas (no release restrictions)
Yes
Yes
noted No    
S3‑214263 NSWO Solution 1 evaluation Ericsson pCR  
5.19Study on non-seamless WLAN Offload in 5GS using 3GPP credentials
Yes
Yes
approved No    
S3‑214264 Authorization mechanisms for data consumer to access data from data producer via DCCF Nokia, Nokia Shanghai Bell, Lenovo, Motorola Mobility, Mavenir, Verizon other Approval
4.23Security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) (Rel-17)
Yes
Yes
revised No S3‑214513  
S3‑214265 Authorization mechanisms for data consumer to access data from data producer when notification sent via MFAF Nokia, Nokia Shanghai Bell, Lenovo, Motorola Mobility other Approval
4.23Security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) (Rel-17)
Yes
Yes
revised No S3‑214514  
S3‑214266 Inputs to DDoS analysis framework to detect signalling storm Nokia, Nokia Shanghai Bell pCR Approval
5.13Study on security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) Phase 2
Yes
Yes
approved No    
S3‑214267 Ed Note Removal for KI 1.4 Conclusion Nokia, Nokia Shanghai Bell pCR Approval
5.13Study on security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) Phase 2
Yes
Yes
approved No    
S3‑214268 Ed Note Removal for Solution 11 Nokia, Nokia Shanghai Bell pCR Approval
5.13Study on security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) Phase 2
Yes
Yes
approved No    
S3‑214269 [33.180] MCXSec over 5GS Ericsson, Motorola Solutions CR Agreement
4.9Mission critical security enhancements phase 2 (Rel-17)
Yes
Yes
agreed No    
S3‑214270 Updates to KI#1 and KI#2 Ericsson pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
revised No S3‑214347  
S3‑214271 Solving the EN in the requirements Ericsson pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
approved No    
S3‑214272 Security for CoAP interfaces in SEAL Ericsson CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
revised No S3‑214431  
S3‑214273 Updates to conclusion of KI#1 Ericsson pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
noted No    
S3‑214274 Updates to conclusion of KI#2 Ericsson pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
noted No    
S3‑214275 Authentication and Authorization between EEC and ECS Ericsson pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
noted No    
S3‑214276 Authentication and Authorization between EEC and EES Ericsson pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
noted No    
S3‑214277 OAuth 2.0 profile for EC Ericsson pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
noted No    
S3‑214278 A new solution to address KI#17 Huawei, HiSilicon,Xiaomi pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No   S3‑214029
S3‑214279 Add a new clause on security policy provisioning Huawei, HiSilicon,Xiaomi pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
noted No   S3‑214031
S3‑214280 New Solution: Shared key based MIB/SIBs protection with enhanced protection against replay/MitM attacks Philips International B.V. pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑214281 Conclusions KI#3 Philips International B.V. pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
noted No    
S3‑214282 Scope of TR 33.857 Ericsson pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No    
S3‑214283 Empty conclusion to KI#2 Provisioning of Credentials Ericsson pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
noted No    
S3‑214284 Empty conclusion to KI#3 Security impacts from supporting IMS voice and IMS services in SNPNs Ericsson pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
revised No S3‑214351  
S3‑214285 Presentation of Report to TSG: TR 33.857, Version 0.9.0 Ericsson TS or TR cover Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No    
S3‑214286 Clean-up of TR 33.857 Ericsson pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No    
S3‑214287 Living document for eNPN: draftCR to TS 33.501 capturing Security aspects of eNPN Ericsson, Huawei, HiSilicon, Qualcomm Incorporated, CableLabs, Charter Communications, Intel, Nokia, Nokia Shanghai Bell draftCR Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
revised No S3‑214437  
S3‑214288 Clarification audience of CCA Ericsson CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑214289 Clarification audience of CCA Ericsson CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑214290 Certificate profile for SCP and SEPP Ericsson CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214291 Certificate profile for SCP and SEPP Ericsson CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214292 SEPP include and verify source PLMN-ID Ericsson CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214293 DP of LS from GSMA about roaming hub support Ericsson discussion Discussion
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑214294 Solution for Key issue #7: Authorization mechanism determination Ericsson pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
noted No    
S3‑214295 Key hierarchy, key distribution and key update in 5MBS Philips International B.V. CR Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
not pursued No    
S3‑214296 Study of privacy of identities over radio access InterDigital, Inc., Apple, AT&T, CableLabs, Convida Wireless, Futurewei, Intel, Motorola Mobility, Nokia, Nokia Shanghai Bell, Samsung, Telefonica, Verizon Wireless SID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
revised No S3‑214487 S3‑213847
S3‑214297 Update Solution 37: Modification to ensure source authenticity in restricted discovery for relay and group discovery Philips International B.V. pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
revised No S3‑214348  
S3‑214298 Updates Solution #42 Philips International B.V. pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
revised No S3‑214346  
S3‑214299 Updates Solution #43 Philips International B.V. pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214300 Conclusions KI#1 Philips International B.V. pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214301 pCR to 5G ProSe draft TS clause 6.1-Security for 5G ProSe Discovery Philips International B.V. pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
noted No    
S3‑214302 Concealing the length of NAI format SUPI exposed in SUCI by padding the SUPI before using non-null schemes Ericsson CR Agreement
6CVD and research
Yes
Yes
not pursued No   S3‑213003
S3‑214303 Update on Authorization of NF Service Consumers for data access via DCCF Ericsson other Approval
4.23Security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) (Rel-17)
Yes
Yes
noted No    
S3‑214304 Security protection of data via Messaging Framework Ericsson, Lenovo, Motorola Mobility other Approval
4.23Security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) (Rel-17)
Yes
Yes
approved No    
S3‑214305 Security updates for algorithms and protocols in 33.310 Ericsson CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
not pursued No    
S3‑214306 Security updates for algorithms and protocols in 33.328 Ericsson CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
revised No S3‑214428  
S3‑214307 Security updates for algorithms and protocols in 33.203 Ericsson CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
revised No S3‑214429  
S3‑214308 Living draftCRSecurity updates for algorithms and protocols for 33.310 Ericsson draftCR Approval
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
approved No    
S3‑214309 Living draftCR Security updates for algorithms and protocols for 33.210 Ericsson draftCR Approval
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
approved No    
S3‑214310 Conclusion for KI#2 ORANGE, Deutsche Telekom, Thales, IDEMIA, Giesecke+Devrient pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
revised No S3‑214359  
S3‑214311 New KI for Authentication of PLMNs over Roaming Hub CableLabs pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
noted No    
S3‑214312 Conclusion for KI#4.1 THALES, IDEMIA pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
noted No    
S3‑214313 Add Conclusion to Key Issue #12 about unicast communication and key refresh KPN N.V;.Huawei; HiSilicon pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214314 New KI on Authorization of Roaming Hub by PLMN CableLabs pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
noted No    
S3‑214315 Refresh of security context for PC5 unicast communication KPN N.V. pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
noted No    
S3‑214316 Addition of MAC-S for authentication enhancement THALES, IDEMIA CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214317 Conclusion for KI#1 THALES pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
noted No    
S3‑214318 Conclusion for KI#2 THALES pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
noted No    
S3‑214319 Presentation of Report to TSG: TR 33.846, Version 0.14.0 Ericsson España S.A. TS or TR cover Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
revised No S3‑214352  
S3‑214320 Update Solution#9 Philips International B.V. pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
revised No S3‑214412  
S3‑214321 Update to solution #32 to address privacy issues with User Info ID (KI#5) Philips International B.V. pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
revised No S3‑214354  
S3‑214322 Update to conclusion KI#5 Philips International B.V. pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214323 Conclusion for KI#16 Philips International B.V. pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
noted No    
S3‑214324 Add new clauses on privacy protection for UE-to-NW relays Philips International B.V. pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
noted No    
S3‑214325 LS out on authenticity and replay protection of system information CableLabs LS out Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
noted No    
S3‑214326 CR to 33.501 to protect additional SoR information (CPSOR-CMCI) NTT DOCOMO INC. CR Agreement
3Reports and Liaisons from other Groups
Yes
Yes
not pursued No    
S3‑214327 draft-Reply LS on new parameters for SOR NTT DOCOMO INC. LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑214328 Draft CR to 33.401 - Living document on LTE UPIP VODAFONE Group Plc draftCR Agreement
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
noted No    
S3‑214329 Avoiding unencrypted radio interface data transfer Vodafone CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214330 Draft CR to 33.501 - Living document on LTE UPIP VODAFONE Group Plc draftCR Agreement
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
noted No    
S3‑214331 Avoiding unencrypted radio interface data transfer Vodafone CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
not pursued No    
S3‑214332 Countermeasures against a threat of a service disruption due to unprotected RRC messages proposed by 5G Security Forum in South Korea SK Telecom discussion  
6CVD and research
Yes
Yes
noted No   S3‑213988
S3‑214333 Reply LS from 5GJA to 3GPP CT4, SA2 and SA3 on Using N32 for Interconnect Scenarios GSMA LS in Discussion
3Reports and Liaisons from other Groups
Yes
Yes
noted No    
S3‑214334 LS on conclusions of authentication methods for initial access for onboarding Nokia LS out Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
revised No S3‑214541  
S3‑214335 Conclusions for KI#4 (initial access) Intel Sweden AB,Interdigital, Apple, Philips, Convida, Broadcom, Cablelabs, Lenovo, Motorola Mobility, Qualcomm pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No   S3‑213969
S3‑214336 Reply to LS on broadcast of NTN GW or gNB position Ericsson LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No   S3‑214260
S3‑214337 LS on reply to SA6 about new SID on Application Enablement for Data Integrity Verification Service in IOT Nokia, Nokia Shanghai Bell LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No   S3‑213887
S3‑214338 Update to Solution#23 Lenovo, Motorola Mobility pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No   S3‑214163
S3‑214339 Update to Solution #4 Lenovo, Motorola Mobility pCR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
approved No   S3‑214119
S3‑214340 Update to Solution #12 Lenovo, Motorola Mobility pCR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
approved No   S3‑214120
S3‑214341 New solution for UE onboarding LG Electronics pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No   S3‑213973
S3‑214342 Reply LS on LS on MINT functionality for Disaster Roaming LG Electronics LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No   S3‑213975
S3‑214343 Adding some abbreviations to TR 33.854 Qualcomm Incorporated CR Agreement
5.5Study on security aspects of Unmanned Aerial Systems
Yes
Yes
agreed No   S3‑214123
S3‑214344 Corrections to TS 33.854 Qualcomm Incorporated CR Agreement
5.5Study on security aspects of Unmanned Aerial Systems
Yes
Yes
agreed No   S3‑214124
S3‑214345 Conclusion for control plane solutions for KI#3, KI#4, KI#9 Ericsson pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No   S3‑214213
S3‑214346 Updates Solution #42 Philips International B.V. pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No   S3‑214298
S3‑214347 Updates to KI#1 and KI#2 Ericsson pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
approved No   S3‑214270
S3‑214348 Update Solution 37: Modification to ensure source authenticity in restricted discovery for relay and group discovery Philips International B.V. pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No   S3‑214297
S3‑214349 Reply LS on NTN specific User Consent Qualcomm Incorporated LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No   S3‑214155
S3‑214350 Conclusion for the study Ericsson pCR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
approved No   S3‑214245
S3‑214351 Empty conclusion to KI#3 Security impacts from supporting IMS voice and IMS services in SNPNs Ericsson pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No   S3‑214284
S3‑214352 Presentation of Report to TSG: TR 33.846, Version 0.14.0 Ericsson España S.A. TS or TR cover Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No   S3‑214319
S3‑214353 Presentation of Report to TSG: TR 33.864, Version 0.7.0 Ericsson España S.A. TS or TR cover Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
approved No    
S3‑214354 Update to solution #32 to address privacy issues with User Info ID (KI#5) Philips International B.V. pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No   S3‑214321
S3‑214355 Proposed conclusion for key issue #4.1 Qualcomm Incorporated, Thales pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No   S3‑214129
S3‑214356 Presentation of Report to TSG: TR 33.850, Version 0.9.0 Huawei, HiSilicon TS or TR cover  
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
approved No    
S3‑214357 Presentation of Report to TSG: TR 33.867, Version 0.8.0 Huawei, HiSilicon TS or TR cover  
5.11Study on User Consent for 3GPP services
Yes
Yes
approved No    
S3‑214358 Update to solution #2.3 JSRPC Kryptonite pCR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No   S3‑213853
S3‑214359 Conclusion for KI#2 Thales, ORANGE, Deutsche Telekom, Telecom Italia, IDEMIA, Giesecke+Devrient pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No   S3‑214310
S3‑214360 Reply LS on UE location aspects in NTN CATT LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No   S3‑214103
S3‑214361 update to Sol#1 Huawei, Hisilicon pCR Approval
5.18Study on enhanced security for network slicing Phase 2
Yes
Yes
approved No   S3‑213918
S3‑214362 draft TR 33.857 v0.9.0 Ericsson draft TR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
revised No S3‑214540  
S3‑214363 ProSe: New solution PC5 anchor key generation via GBA Push Ericsson pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No   S3‑214211
S3‑214364 Draft TR33.867 Huawei, HiSilicon draft TR  
5.11Study on User Consent for 3GPP services
Yes
Yes
approved No    
S3‑214365 eSBA KI#5 EN resolution Nokia, Nokia Shanghai Bell pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
approved No   S3‑214184
S3‑214366 eSBA KI#4 conclusion Nokia, Nokia Shanghai Bell pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
approved No   S3‑214185
S3‑214367 Presentation of Report TR 33.875-050 FS eSBA Security Nokia, Nokia Shanghai Bell TS or TR cover Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
approved No   S3‑214198
S3‑214368 TR 33.850 for MBS security Huawei, Hisilicon draft TR  
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
approved No    
S3‑214369 TR 33.875-050 eSBA Security Nokia, Nokia Shanghai Bell draft TR  
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
approved No    
S3‑214370 Presentation of Report to TSG: TR 33.862, Version 0.7.0 China Mobile TS or TR cover Approval
5.12Study on security aspects of the 5GMSG Service
Yes
Yes
approved No    
S3‑214371 conclusion to KI# 3 Huawei, Hisilicon pCR Approval
5.18Study on enhanced security for network slicing Phase 2
Yes
Yes
approved No   S3‑213919
S3‑214372 Presentation of Report to TSG: TR 33.839, Version 0.9.0 (For approval) Huawei, HiSilicon TS or TR cover Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
approved No    
S3‑214373 draft_TR33.874-050 Huawei, HiSilicon draft TR  
5.18Study on enhanced security for network slicing Phase 2
Yes
Yes
approved No    
S3‑214374 Update the conclusion to KI#12 Huawei, HiSilicon pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No   S3‑214004
S3‑214375 P-TID Privacy protection in solution 39 Huawei, HiSilicon pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No   S3‑214040
S3‑214376 resolving the EN on Kausf desych and key lifetime Huawei, HiSilicon pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No   S3‑214041
S3‑214377 Update to conclusion on key issue#2 Huawei, HiSilicon pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
approved No   S3‑214012
S3‑214378 Update to conclusion on key issue#3 Huawei, HiSilicon pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
approved No   S3‑214020
S3‑214379 addressing the editor's notes in sol#27 Huawei, HiSilicon pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
approved No   S3‑214019
S3‑214380 Conclusion on KI#1 for key derivation Huawei, HiSilicon pCR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No   S3‑213993
S3‑214381 Address EN and add evaluation for solution 4 Huawei, HiSilicon pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
approved No   S3‑214000
S3‑214382 Conclusion on key issue #3 Huawei, HiSilicon pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
approved No   S3‑214001
S3‑214383 Conclusion on UDM Service for User Consent Check Huawei, HiSilicon, Nokia, Nokia Shanghai Bell pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
approved No   S3‑214002
S3‑214384 Conclusion on User Consent Check Huawei, HiSilicon pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
approved No   S3‑214003
S3‑214385 Conclusion on Key issue #1 Huawei, Hisilicon, ZTE pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
approved No   S3‑214064
S3‑214386 Conclusion on Key issue #2 Huawei, Hisilicon, ZTE pCR Approval
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
approved No   S3‑214065
S3‑214387 Adding the evaluation for solution #9 Huawei, HiSilicon pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
revised No S3‑214389 S3‑214050
S3‑214388 Adding the conclusion for key issue #5 Huawei, HiSilicon pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
approved No   S3‑214052
S3‑214389 Adding the evaluation for solution #9 Huawei, HiSilicon, China Mobile pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
approved No   S3‑214387
S3‑214390 New solution: Ticket based access control for administrators MITRE Corporation pCR Approval
5.3Study on Security Impacts of Virtualisation
Yes
Yes
approved No   S3‑213884
S3‑214391 New Solution Using Boot Time Attestation for NF Registration Johns Hopkins University APL, US National Security Agency, CableLabs, InterDigital, AT&T, CISA ECD, NIST pCR Approval
5.3Study on Security Impacts of Virtualisation
Yes
Yes
approved No   S3‑213897
S3‑214392 Update Annex B in TR 33.809 CableLabs pCR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
approved No   S3‑213964
S3‑214393 New solution for Ki#13: Remote Attestation on 3GPP level Nokia, Nokia Shanghai Bell pCR Approval
5.3Study on Security Impacts of Virtualisation
Yes
Yes
approved No   S3‑213896
S3‑214394 Reply LS (S3-213822) on UE location aspects in NTN Xiaomi Technology LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No   S3‑214168
S3‑214395 ProSe: Update to Solution #40 Xiaomi Technology pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No   S3‑214170
S3‑214396 ProSe: Evaluation Update for Solution #41 Xiaomi Technology pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No   S3‑214171
S3‑214397 [eSBA] KI on inter slice access Samsung pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
approved No   S3‑214223
S3‑214398 Solution to KI#9: Authorization for Inter-Slice Access Samsung pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
approved No   S3‑214224
S3‑214399 [eSBA] New Solution for Key Issue #3: Authorization of notification endpoint Samsung, Huawei, Hisilicon, Nokia, Nokia Shanghai Bell pCR Approval
5.17Study on enhanced Security Aspects of the 5G Service Based Architecture
Yes
Yes
approved No   S3‑214239
S3‑214400 [UC3S] Adding evaluation of solution #7 Samsung pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
approved No   S3‑214225
S3‑214401 [UC3S] Conclusion for Edge User Consent Samsung pCR Approval
5.11Study on User Consent for 3GPP services
Yes
Yes
approved No   S3‑214227
S3‑214402 Draft TR 33.846 v0.14.0 Study on authentication enhancements in the 5G System (5GS) Ericsson España S.A. draft TR Approval
5.4Study on authentication enhancements in 5GS
Yes
Yes
approved No    
S3‑214403 Draft TR 33.864 v0.7.0 Study on the security of Access and Mobility Management Function (AMF) re-allocation Ericsson España S.A. draft TR Approval
5.14Study on the security of AMF re-allocation
Yes
Yes
approved No    
S3‑214404 TR 33.847 v0.9.0 Study on Security Aspects of Enhancement for Proximity Based Services in 5GS CATT draft TR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No    
S3‑214405 draft TR 33.881 Nokia Hungary draft TR Approval
5.19Study on non-seamless WLAN Offload in 5GS using 3GPP credentials
Yes
Yes
approved No    
S3‑214406 draft TR 33.848 BT plc draft TR Agreement
5.3Study on Security Impacts of Virtualisation
Yes
Yes
approved No    
S3‑214407 Conclusion of KI #1 and KI #2 Qualcomm Incorporated pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
approved No   S3‑214149
S3‑214408 Draft TR 33.809 Apple (UK) Limited draft TR Approval
5.1Study on 5G security enhancement against false base stations
Yes
Yes
approved No    
S3‑214409 Presentation of Report TR 33.847-090 FS 5G ProSe Security CATT TS or TR cover Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
approved No    
S3‑214410 draft TR 33.866 0.8.0 China Mobile E-Commerce Co. draft TR Approval
5.13Study on security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) Phase 2
Yes
Yes
approved No    
S3‑214411 Presentation of Report to TSG: TR 33.866, Version 0.8.0 China Mobile E-Commerce Co. TS or TR cover Approval
5.13Study on security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) Phase 2
Yes
Yes
approved No    
S3‑214412 Update Solution#9 Philips International B.V. pCR Approval
5.9Study on Security Aspects of Enhancements for 5G Multicast-Broadcast Services
Yes
Yes
approved No   S3‑214320
S3‑214413 Draft TR 33.839 HuaWei Technologies Co., Ltd draft TR  
5.6Study on Security Aspects of Enhancement of Support for Edge Computing in 5GC
Yes
Yes
approved No    
S3‑214414 Reply to: Attack preventing NAS procedures to succeed Huawei Technologies Sweden AB LS out  
6CVD and research
Yes
Yes
approved No    
S3‑214415 Attack preventing NAS procedures to succeed GSMA LS in  
6CVD and research
Yes
Yes
replied to No    
S3‑214416 Follow up LS on MINT functionality for Disaster Roaming LG Electronics Inc. LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No    
S3‑214417 33.512 – Alignment with TS 33.501 Rel-17 Keysight Technologies UK Ltd CR Approval
4.3Security Assurance Specification Enhancements for 5G (Rel-17)
Yes
Yes
agreed No   S3‑213875
S3‑214418 LS to SA2 on secondary authentication for multicast PDU session Huawei, Hisilicon LS out  
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
revised No S3‑214538  
S3‑214419 pCR to Living document for BEST_5G: resolution of Editor’s notes KPN N.V., Vodafone other Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
Yes
Yes
approved No   S3‑213882
S3‑214420 Editorial and corrections Ericsson CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214113
S3‑214421 Editorial and corrections Ericsson CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑214422 living doc for 5MBS WID Huawei, HiSilicon draftCR Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
approved No   S3‑214009
S3‑214423 Editorial and corrections Ericsson CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No    
S3‑214424 CR - Security updates for algorithms and protocols for 33.310 Ericsson CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
agreed No    
S3‑214425 Reply LS to GSMA on NRF mutual authentication in roaming scenario Nokia LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No    
S3‑214426 CR - Security updates for algorithms and protocols for 33.210 Ericsson CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
agreed No    
S3‑214427 Reply-LS on Using N32 for interconnect scenarios Nokia LS out  
3Reports and Liaisons from other Groups
Yes
Yes
approved No    
S3‑214428 Security updates for algorithms and protocols in 33.328 Ericsson CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
agreed No   S3‑214306
S3‑214429 Security updates for algorithms and protocols in 33.203 Ericsson CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
agreed No   S3‑214307
S3‑214430 living document of 5GMSG China Mobile draftCR Approval
4.24Security aspects of the 5GMSG Service (Rel-17)
Yes
Yes
approved No   S3‑214108
S3‑214431 Security for CoAP interfaces in SEAL Ericsson, Samsung CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214272
S3‑214432 Support for NSWO in 5GS Nokia, Nokia Shanghai Bell,AT&T,Lenovo,Motorola Mobility,Qualcomm Incorporated, Intel, Samsung CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑213890
S3‑214433 New WID on Non-Seamless WLAN offload Authentication in 5GS Nokia, Nokia Shanghai Bell WID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
agreed No   S3‑213888
S3‑214434 Validity and revocation of consent Ericsson other Approval
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
approved No   S3‑214182
S3‑214435 Security requirements for UPIP over E-UTRA Qualcomm Incorporated other Approval
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
approved No   S3‑214139
S3‑214436 5G MBS key management Qualcomm Incorporated other Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
approved No   S3‑214150
S3‑214437 Living document for eNPN: draftCR to TS 33.501 capturing Security aspects of eNPN Ericsson, Huawei, HiSilicon, Qualcomm Incorporated, CableLabs, Charter Communications, Intel, Nokia, Nokia Shanghai Bell draftCR Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
approved No   S3‑214287
S3‑214438 User-plane UE-to-network relay connection procedure Qualcomm Incorporated, Ericsson pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No   S3‑214140
S3‑214439 Resolution for EN on sending SUPI to SNPN Qualcomm Incorporated other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
approved No   S3‑214157
S3‑214440 Certificate profile for SCP and SEPP Ericsson, Nokia, Nokia Shanghai Bell draftCR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
approved No    
S3‑214441 CR to ProSe TS – Direct Discovery Qualcomm Incorporated, CATT, ZTE, Huawei, HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No   S3‑214147
S3‑214442 SEPP include and verify source PLMN-ID Ericsson draftCR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
approved No    
S3‑214443 Reply LS on Layer-3 UE-to-Network Relay authentication and authorization QUALCOMM JAPAN LLC. LS out  
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No    
S3‑214444 CR to ProSe TS – Security Requirements in Direct Discovery Qualcomm Incorporated, CATT, ZTE pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No   S3‑214148
S3‑214445 New WID on Authentication enhancements in 5GS Ericsson WID new Agreement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
agreed No   S3‑214248
S3‑214446 Security aspects of eNPN Ericsson, Huawei, HiSilicon, Qualcomm Incorporated, CableLabs, Charter Communications, Intel, Nokia, Nokia Shanghai Bell CR Agreement
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
agreed No    
S3‑214447 Reply LS on UE capabilities indication in UPU Qualcomm India Pvt Ltd LS out Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
approved No    
S3‑214448 Update of conclusion for Key Issue #13 Qualcomm Incorporated pCR Approval
5.7Study on Security Aspects of Enhancement for Proximity Based Services in 5GS
Yes
Yes
withdrawn Yes    
S3‑214449 Living document for GBA_5G: draftCR to TS 33.220: SBA support for Zh and Zn interfaces Ericsson draftCR Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
approved No   S3‑214250
S3‑214450 Living document for GBA_5G: draftCR to TS 33.223: SBA support for Zpn Ericsson draftCR Approval
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
approved No   S3‑214251
S3‑214451 GBA key re-negotiation with TLS 1.3 Qualcomm Incorporated CR Agreement
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
agreed No   S3‑214134
S3‑214452 Confirming UE supported algorithms in Path Switch procedure Qualcomm Incorporated CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214138
S3‑214453 Clarifications to UUAA Revocation Lenovo, Motorola Mobility, Huawei, Hisilicon pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
approved No   S3‑214121
S3‑214454 Addition of UPIP for LTE VODAFONE Group Plc CR Agreement
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
agreed No    
S3‑214455 User Plane Integrity Protection Policy Handling in IW handover from EPS to 5GS VODAFONE Group Plc CR Agreement
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
agreed No    
S3‑214456 Reply LS on 5GS roaming hubbing NTT DOCOMO INC. LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No    
S3‑214457 Living document for UC3S: draftCR to TS 33.501 capturing Security aspects of user consent Huawei, HiSilicon draftCR  
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
approved No    
S3‑214458 LS on QoE report handling at QoE pause Lenovo, Motorola Mobility LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No   S3‑214101
S3‑214459 Security aspects of User Consent Huawei, HiSilicon CR  
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
agreed No    
S3‑214460 WID on enhanced security for Phase 2 network slicing Huawei, Hisilicon, Lenovo, Motorola Mobility, China Mobile, China Unicom, CATT, ZTE, CAICT, Xiaomi WID new Agreement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
agreed No   S3‑213920
S3‑214461 Living document for BEST_5G: draftCR to TS 33.163 KPN N.V. draftCR Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
Yes
Yes
approved No   S3‑213881
S3‑214462 LS on LTE User Plane Integrity Protection VODAFONE Group Plc LS out Approval
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
approved No    
S3‑214463 UUAA procedure at registration Huawei, Hisilicon, Lenovo, Motorola Mobility, Qualcomm, Interdigital pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
approved No   S3‑213923
S3‑214464 Security aspects of 5MBS Huawei, Hisilicon CR Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
agreed No    
S3‑214465 UUAA procedure at PDU session establishment Huawei, Hisilicon, Lenovo, Motorola Mobility, Qualcomm, Interdigital pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
approved No   S3‑213924
S3‑214466 Pairing authorization Huawei, Hisilicon, Lenovo, Motorola Mobility, Interdigital pCR Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
approved No   S3‑213925
S3‑214467 New Annex with Assets and Threats specific to SCAS SCP Nokia, Nokia Shanghai Bell CR  
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
agreed No    
S3‑214468 33.522 - 5G Security Assurance Specification (SCAS); Service Communication Proxy (SECOP) Nokia, Nokia Shanghai Bell draft TS  
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
approved No    
S3‑214469 Minimum set of functions for SCP Nokia, Nokia Shanghai Bell CR  
4.3Security Assurance Specification Enhancements for 5G (Rel-17)
Yes
Yes
agreed No    
S3‑214470 Propose text to clause 6.3 about PC5 unicast Huawei; HiSilicon, LG Electronics, CATT, Xiaomi pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No   S3‑214006
S3‑214471 Adding security description for L2 solution Huawei, HiSilicon, Xiaomi pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No   S3‑214027
S3‑214472 Add content to clause 5 Huawei, HiSilicon, ZTE, Xiaomi, Ericsson pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No   S3‑214028
S3‑214473 Update clause 4 Huawei, HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No   S3‑214043
S3‑214474 Correction to Authorization for indirect communication Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, Ericsson CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214037
S3‑214475 Correction to Authorization for indirect communication Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, Ericsson CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214038
S3‑214476 Add clarification in EN-DC scenario Huawei, HiSilicon other Approval
4.13User Plane Integrity Protection for LTE (Rel-17)
Yes
Yes
approved No   S3‑214035
S3‑214477 Living CR for UC3S in TS 33.501 Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, Ericsson draftCR Approval
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
withdrawn Yes    
S3‑214478 User consent check Huawei, HiSilicon, Nokia, Nokia Shanghai Bell other Approval
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
approved No   S3‑213996
S3‑214479 User consent revocation Huawei, HiSilicon, Nokia, Nokia Shanghai Bell other Approval
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
approved No   S3‑213997
S3‑214480 User Consent Requirement Huawei, HiSilicon, Nokia, Nokia Shanghai Bell other Approval
4.22Security Aspects of User Consent for 3GPP services (Rel-17)
Yes
Yes
approved No   S3‑214017
S3‑214481 Update testcases to clause 4.2.2.1.18 and 4.2.2.1.19 Huawei, HiSilicon CR Approval
4.3Security Assurance Specification Enhancements for 5G (Rel-17)
Yes
Yes
agreed No   S3‑214026
S3‑214482 New WID on Security Assurance Specification for Management Function (MnF) Huawei, HiSilicon WID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
agreed No   S3‑214033
S3‑214483 Clarification on anonymous SUCI related Huawei, HiSilicon other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
approved No   S3‑214036
S3‑214484 Update Nnssaaf_AIW interface CableLabs other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
approved No   S3‑213928
S3‑214485 Mission Critical R18 WID Motorola Solutions Danmark A/S WID new Agreement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
agreed No   S3‑213903
S3‑214486 SCAS SECOP update to Annex SCP in 33.926 Nokia, Nokia Shanghai Bell other Approval
4.3Security Assurance Specification Enhancements for 5G (Rel-17)
Yes
Yes
approved No   S3‑214210
S3‑214487 New Study of privacy of identifiers over radio access InterDigital, Inc., Apple, AT&T, CableLabs, CATT, CISA ECD, Convida Wireless, Ericsson, Futurewei, Intel, Johns Hopkins University APL, Mavenir, Motorola Mobility, Nokia, Nokia Shanghai Bell, Peraton Labs, Phillips, Samsung, Telefonica, T-Mobile US, US NI SID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
agreed No   S3‑214296
S3‑214488 33.503: Security for L3 U2N Relay Communication Xiaomi Technology pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No   S3‑214179
S3‑214489 Authentication and Authorization between EES and ECS Intel Sweden AB pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
approved No   S3‑213967
S3‑214490 Clean up for clause 6.6.1 ZTE Corporation CR Agreement
4.12Authentication and key management for applications based on 3GPP credential in 5G (Rel-17)
Yes
Yes
agreed No   S3‑213936
S3‑214491 Delete the GBA_Digest in annex B.1.2.2 ZTE Corporation CR Agreement
4.19 TLS protocols profiles for AKMA (Rel-17)
Yes
Yes
agreed No   S3‑213945
S3‑214492 New WID on SECAM and SCAS for 3GPP virtualized network products China Mobile WID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
agreed No   S3‑214092
S3‑214493 living CR for eNA China Mobile draftCR Agreement
4.23Security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) (Rel-17)
Yes
Yes
approved No   S3‑214094
S3‑214494 CR for eNA China Mobile E-Commerce Co. CR Approval
4.23Security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) (Rel-17)
Yes
Yes
agreed No    
S3‑214495 Proposal for U2NW relay authentication, authorization and key management Samsung, Interdigital, LG Electronics, Nokia, Nokia Shanghai Bell, Huawei, HiSilicon pCR Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No   S3‑214218
S3‑214496 New WID for SEAL security enhancement Samsung WID new Approval
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
agreed No   S3‑214237
S3‑214497 Authentication and authorization for MBS session Huawei, HiSilicon other Approval
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
approved No   S3‑214054
S3‑214498 removal of unspecified validity of AV-R16 Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214056
S3‑214499 removal of unspecified validity of AV-R17 Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214057
S3‑214500 EN removal about the UE identification in BEST Huawei, Hisilicon other Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
No
Yes
withdrawn Yes    
S3‑214501 CR for SIP digest Huawei, Hisilicon CR Approval
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
revised No S3‑214516 S3‑214063
S3‑214502 Authentication and Authorization in EES capability exposure for non-CAPIF scenario Huawei, Hisilicon pCR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
approved No   S3‑214069
S3‑214503 New Annex for Edge computing security Huawei, Hisilicon CR Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
agreed No   S3‑214070
S3‑214504 Clarification on the emergency test Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214071
S3‑214505 Reply LS on Header Enrichment for HTTPS in PFCP Huawei, Hisilicon LS out Approval
3Reports and Liaisons from other Groups
Yes
Yes
approved No   S3‑214075
S3‑214506 Clarification on the emergency test - Rel15 Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214089
S3‑214507 Clarification on the emergency test - Rel16 Huawei, Hisilicon CR Approval
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214090
S3‑214508 Draft TS 33.558 Huawei, Hisilicon draft TS Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
approved No    
S3‑214509 Rel-17 Work Item Exception for EDGE_5GC Huawei, Hisilicon WI exception request Approval
4.18 Security Aspects of Enhancement of Support for Edge Computing in 5GC (Rel-17)
Yes
Yes
agreed No    
S3‑214510 Rel-17 Work Item Exception for 5G_ProSe Security Aspects CATT WI exception request Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
agreed No    
S3‑214511 Draft TS 33.503 v0.2.0 Security Aspects of Proximity based Services (ProSe) in the 5G System (5GS) CATT draft TS Approval
4.21Security Aspects of Proximity based services in 5GS ProSe (Rel-17)
Yes
Yes
approved No    
S3‑214512 EN removal about the confidential protection in BEST Huawei, Hisilicon other Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
Yes
Yes
revised No S3‑214536 S3‑214060
S3‑214513 Authorization mechanisms for data consumer to access data from data producer via DCCF Nokia, Nokia Shanghai Bell, Lenovo, Motorola Mobility, Mavenir, Verizon, Ericsson, Huawei, HiSilicon, China mobile other Approval
4.23Security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) (Rel-17)
Yes
Yes
approved No   S3‑214264
S3‑214514 Authorization mechanisms for data consumer to access data from data producer when notification sent via MFAF Nokia, Nokia Shanghai Bell, Lenovo, Motorola Mobility other Approval
4.23Security aspects of enablers for Network Automation (eNA) for the 5G system (5GS) (Rel-17)
Yes
Yes
approved No   S3‑214265
S3‑214515 Resolution of editor note related to selection of root key Nokia, Nokia Shanghai Bell, Huawei, HiSilicon, Qualcomm Incorporated other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
approved No   S3‑214081
S3‑214516 CR for SIP digest Huawei, Hisilicon, T-Mobile US, Mavenir CR Approval
4.14Enhancements of 3GPP profiles for cryptographic algorithms and security protocols (Rel- 17)
Yes
Yes
agreed No   S3‑214501
S3‑214517 Change request to living document-MSGin5G China Mobile other Approval
4.24Security aspects of the 5GMSG Service (Rel-17)
Yes
Yes
approved No   S3‑214109
S3‑214518 Security aspects of MSGin5G China Mobile CR Approval
4.24Security aspects of the 5GMSG Service (Rel-17)
Yes
Yes
agreed No    
S3‑214519 SBA support for the Zh and Zn interfaces Ericsson, Huawei, HiSilicon, Thales CR Agreement
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
agreed No    
S3‑214520 SBA support for the Zpn interface Ericsson, Huawei, HiSilicon, Thales CR Agreement
4.1Integration of GBA into 5GC (Rel-17)
Yes
Yes
agreed No    
S3‑214521 Draft TS 33.256 Qualcomm CDMA Technologies draft TS Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
approved No   S3‑213710
S3‑214522 Cover sheet for TS 33.256 Qualcomm Incorporated TS or TR cover Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
approved No    
S3‑214523 Exception sheet for UAS Qualcomm Incorporated WI exception request Approval
4.20 Security aspects of Uncrewed Aerial Systems (Rel-17)
Yes
Yes
agreed No    
S3‑214524 Update of BEST for 5G including GBA, 5G GBA, AKMA KPN N.V. CR Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
Yes
Yes
revised No S3‑214542  
S3‑214525 LS Reply on security protection of RRCResumeRequest message NTT DOCOMO INC. LS out  
5.1Study on 5G security enhancement against false base stations
Yes
Yes
revised No S3‑214539  
S3‑214526 SCAS SECOP editorials to 33522-030 Nokia, Nokia Shanghai Bell pCR Approval
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
approved No   S3‑214204
S3‑214527 SCAS SECOP Technical baseline Nokia, Nokia Shanghai Bell pCR Approval
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
Yes
Yes
approved No   S3‑214205
S3‑214528 SCAS SECOP Operating Systems Nokia, Nokia Shanghai Bell other Approval
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
No
Yes
withdrawn Yes    
S3‑214529 SCAS SECOP Web Servers Nokia, Nokia Shanghai Bell pCR Approval
4.4Security Assurance Specification for Service Communication Proxy (SECOP) (Rel-17)
No
Yes
withdrawn Yes    
S3‑214530 SBA CR NRF-NRF mutual auth R16 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214189
S3‑214531 SBA CR NRF-NRF mutual auth R17 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214190
S3‑214532 SBA CR N32 for interconnect R16 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214195
S3‑214533 SBA CR N32 for interconnect R17 Nokia, Nokia Shanghai Bell CR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
agreed No   S3‑214196
S3‑214534 SBA CR NRF deployments R17 Nokia, Nokia Shanghai Bell, Ericsson draftCR Agreement
4.26Other work areas (no release restrictions)
Yes
Yes
approved No    
S3‑214535 FS_eSBA_SEC - SID revision Nokia, Nokia Shanghai Bell SID revised Agreement
4.25New work item proposals for Rel-17/Rel-18
Yes
Yes
agreed No   S3‑214201
S3‑214536 EN removal about the confidential protection in BEST Huawei, Hisilicon other Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
Yes
Yes
approved No   S3‑214512
S3‑214537 Draft TS 33.520 China Unicom draft TS Approval
4.6Security Assurance Specification for Non-3GPP InterWorking Function (N3IWF) (Rel- 17)
Yes
Yes
approved No    
S3‑214538 LS to SA2 on secondary authentication for multicast PDU session Huawei, Hisilicon LS out -
4.15 Security Aspects of Enhancements for 5G Multicast-Broadcast Services (Rel-17)
Yes
Yes
approved No   S3‑214418
S3‑214539 LS Reply on security protection of RRCResumeRequest message NTT DOCOMO INC. LS out -
5.1Study on 5G security enhancement against false base stations
Yes
Yes
approved No   S3‑214525
S3‑214540 draft TR 33.857 v0.9.0 Ericsson draft TR Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No   S3‑214362
S3‑214541 LS on conclusions of authentication methods for initial access for onboarding Nokia LS out Approval
5.10Study on enhanced security support for Non-Public Networks
Yes
Yes
approved No   S3‑214334
S3‑214542 Update of BEST for 5G including GBA, 5G GBA, AKMA KPN N.V. CR Approval
4.11Adapting BEST for use in 5G networks (Rel-17)
Yes
Yes
agreed No   S3‑214524
S3‑214543 Securing initial access for UE onboarding Qualcomm Incorporated other Approval
4.17 Security Aspects of eNPN (Rel-17)
Yes
Yes
approved No   S3‑214156