Agenda with allocated Tdocs

Created: 2014-01-29 10:14     Last document: S5-140364

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
1
Opening of the meeting
2
Approval of the agenda
S5-140000 Agenda WG Chairman agenda - Yes Yes approved No
3
IPR declaration
S5-140039 IPR declaration WG Chairman other - Yes Yes noted No
4
Meetings and activities reports
4.1
Last SA5 meeting report
S5-140001 Report from last SA5 meeting MCC meeting report - Yes Yes approved No
4.2
Last SA meeting report
S5-140002 SA5 status report at last SA meeting WG Chairman meeting report - Yes Yes noted No
    S5-140003 SA5 results at last SA meeting WG Chairman meeting report - Yes Yes noted No
4.3
Inter-organizational reports
S5-140042 SA5 presentation at M-SDO plenary on Dec 6th 2013 WG Chairman other - Yes Yes noted No
    S5-140043 Minutes M-SDO plenary on Dec 6th 2013 WG Chairman WG Chairman meeting report - Yes Yes noted No
    S5-140216 Other presentations at M-SDO plenary on Dec 6th 2013 WG Chairman meeting report - Yes Yes noted No
5
Cross-SWG issues
5.1
Administrative issues at SA5 level
S5-140007 Leaders meeting agenda WG Chairman agenda - Yes Yes noted No
    S5-140008 Leaders meeting minutes WG Chairman meeting report - Yes Yes noted No
    S5-140014 SA5 Working Procedures WG Chairman other - Yes Yes noted No
    S5-140015 SA5 Meeting Facility Requirements WG Chairman other - Yes Yes noted No
    S5-140016 Process for management of draft TSs/TRs WG ViceChair other - Yes Yes noted No
    S5-140017 CR Quality Check MCC (az) other - Yes Yes noted No
    S5-140028 Reserved MCC other - No No [not addressed] Yes
5.2
Technical issues at SA5 level
5.3
Liaison statements at SA5 level
5.4
SA5 meeting calendar
S5-140013 SA5 Meeting Calendar WG Chairman other - Yes Yes noted No
5.5
Review of the Work Plan
S5-140018 Deliverables due for the NEXT SA Plenary MCC other - Yes Yes revised No S5-140222
    S5-140222 Deliverables due for the NEXT SA Plenary MCC other - Yes Yes noted No S5-140018
    S5-140019 SA5 WIDs WG Chairman other - Yes Yes noted No
    S5-140020 SA5 3GPP Work Plan MCC other - Yes Yes noted No
    S5-140219 SA5 work plan status after SA5#93 WG Chairman other - No No [not addressed] No
5.6
Joint meeting SA1/SA5 on RAN sharing
6
OAM&P
6.1
OAM&P Plenary
S5-140004 Time Plan for OAM&P and Converged Management SWGs WG Chairman other - Yes Yes revised No S5-140225
    S5-140225 Time Plan for OAM&P and Converged Management SWGs WG Chairman other - Yes Yes noted No S5-140004
    S5-140005 OAM Executive Report from THIS Meeting OAM SWG Chair meeting report - Yes Yes revised No S5-140297
    S5-140297 OAM Executive Report from THIS Meeting OAM SWG Chair meeting report - Yes Yes noted No S5-140005
    S5-140021 Minutes of OAM&P Plenary Rapporteur meeting report - No No withdrawn (remove for future meetings from AND) Yes
    S5-140191 Reply LS from GSMA IREG to 3GPP CT4 cc SA5 on FQDNs to support Multi-vendor Plug and Play (MvPnP) feature GSMA IREG i/c LS - Yes Yes noted No
    S5-140241 Report from Breakout session on IS-SS link WG Chairman meeting report Yes Yes noted No
    S5-140242 Reply to 3GPP/SA5 Liaison Questions Regarding Performance Measurements Architecture Broadband Forum i/c LS - Yes Yes noted No
6.2
New Work Item proposals - OAM&P & Converged Management
S5-140022 Minutes of New Work Item proposals - OAM&P & Converged Management Rapporteur action list - Yes Yes noted No
    S5-140136 New WID Radio Planning Tool interface (OAM-RPT) NSN new WID - Yes Yes revised No S5-140259
    S5-140259 New WID Radio Planning Tool interface (OAM-RPT) NSN new WID - Yes Yes revised No S5-140278 S5-140136
    S5-140278 New WID Radio Planning Tool interface (OAM-RPTi) NSN new WID - Yes Yes revised No S5-140363 S5-140259
    S5-140363 New WID Radio Planning Tool interface (OAM-RPT) NSN new WID - Yes Yes agreed No S5-140278
    S5-140138 DP on New proposed WID on Radio Planning Tool interface NSN other - Yes Yes noted No
6.3
Maintenance and Rel-12 small Enhancements - OAM&P & Converged Management
S5-140023 Minutes of Maintenance and Rel-12 small Enhancements - OAM&P & Converged Management MCC meeting report - Yes Yes noted No
    S5-140057 Rel-12 CR 32752 Add mMEForMTC attribute Intel CR - Yes Yes noted No
    S5-140058 Rel-12 CR 32753 Add mMEForMTC attribute Intel CR - Yes Yes noted No
    S5-140059 Rel-12 CR 32755 Add mMEForMTC attribute Intel CR - Yes Yes noted No
    S5-140089 Rel-10 CR 32.766 Add missing XML elements for SONControl and SONTargets Huawei CR - Yes Yes revised No S5-140228
    S5-140228 Rel-10 CR 32.766 Add missing XML elements for SONControl and SONTargets Huawei CR - Yes Yes agreed No S5-140089
    S5-140090 Rel-11 CR 32.422 Add missing figure for RCEF reporting example scenario Huawei CR - Yes Yes revised No S5-140229
    S5-140229 Rel-11 CR 32.422 Add missing figure for RCEF reporting example scenario Huawei CR - Yes Yes agreed No S5-140090
    S5-140091 Rel-12 CR 32.422 Add missing figure for RCEF reporting example scenario Huawei CR - Yes Yes revised No S5-140230
    S5-140230 Rel-12 CR 32.422 Add missing figure for RCEF reporting example scenario Huawei CR - Yes Yes agreed No S5-140091
    S5-140096 Rel-12 CR 32.300 Removal of DN max length for 28 series (Converged Management) Ericsson CR - Yes Yes revised No S5-140231
    S5-140231 Rel-12 CR 32.300 Removal of DN max length for 28 series (Converged Management) Ericsson CR - Yes Yes revised No S5-140279 S5-140096
    S5-140279 Rel-12 CR 32.300 Removal of DN max length for 28 series (Converged Management) Ericsson CR - Yes Yes agreed No S5-140231
    S5-140121 Rel-10 CR 32.762 Add new member in blacklist Ericsson CR - Yes Yes agreed No
    S5-140122 Rel-10 CR 32.766 Add new member in blacklist Ericsson CR - Yes Yes agreed No
    S5-140126 Rel-11 CR 28.702 Correct reference and attribute properties Ericsson CR - Yes Yes revised No S5-140234
    S5-140234 Rel-11 CR 28.702 Correct reference and attribute properties Ericsson CR - Yes Yes agreed No S5-140126
    S5-140127 Rel-11 CR 28.703 Correct proceduralState attribute mapping and datatype Ericsson CR - Yes Yes revised No S5-140235
    S5-140235 Rel-11 CR 28.703 Correct proceduralState attribute mapping and datatype Ericsson CR - Yes Yes agreed No S5-140127
    S5-140156 Rel-12 CR 32.851 Editorial Cleanup Alcatel-Lucent CR - No No withdrawn Yes
    S5-140157 Rel-12 CR 32.851 Remove hanging paragraph Alcatel-Lucent CR - Yes Yes revised No S5-140240
    S5-140240 Rel-12 CR 32.851 Remove hanging paragraph Alcatel-Lucent CR - Yes Yes agreed No S5-140157
    S5-140158 Rel-9 CR 32.423 Trace Session Reference Ericsson CR - Yes Yes revised No S5-140236
    S5-140236 Rel-9 CR 32.423 Trace Session Reference Ericsson CR - Yes Yes agreed No S5-140158
    S5-140159 Rel-10 CR 32.423 Trace Session Reference Ericsson CR - Yes Yes revised No S5-140237
    S5-140237 Rel-10 CR 32.423 Trace Session Reference Ericsson CR - Yes Yes agreed No S5-140159
    S5-140160 Rel-11 CR 32.423 Trace Session Reference Ericsson CR - Yes Yes revised No S5-140238
    S5-140238 Rel-11 CR 32.423 Trace Session Reference Ericsson CR - Yes Yes agreed No S5-140160
    S5-140161 Rel-10 CR 32.423 MNC/MCC Optional Ericsson CR - Yes Yes noted No
    S5-140162 Rel-11 CR 32.423 MNC/MCC Optional Ericsson CR - Yes Yes noted No
    S5-140163 Rel-11 CR 32.423 TRSR Ericsson CR - Yes Yes revised No S5-140239
    S5-140239 Rel-11 CR 32.423 TRSR Ericsson CR - Yes Yes agreed No S5-140163
    S5-140226 Rel-11 CR 32.762 Addition of not implemented parts of S5-131772 Add new member in blacklist Ericsson CR - Yes Yes revised No S5-140232
    S5-140232 Rel-11 CR 32.762 Addition of not implemented parts of S5-131772 Add new member in blacklist Ericsson CR - Yes Yes revised No S5-140280 S5-140226
    S5-140280 Rel-11 CR 32.762 Addition of not implemented parts of S5-131772 Add new member in blacklist Ericsson CR - Yes Yes agreed No S5-140232
    S5-140227 Rel-11 CR 32.766 Addition of not implemented parts of S5-131772 Add new member in blacklist Ericsson CR - Yes Yes revised No S5-140233
    S5-140233 Rel-11 CR 32.766 Addition of not implemented parts of S5-131772 Add new member in blacklist Ericsson CR - Yes Yes agreed No S5-140227
6.4
OAM&P 12 Network Infrastructure Management
6.4.1
Network Management for 3GPP Interworking WLAN - NIM part
S5-140024 Minutes for Network Management for 3GPP Interworking WLAN - NIM part (530050) Rapporteur meeting report - No No withdrawn Yes
6.4.2
Alarm quality improvements
S5-140037 Minutes for Alarm Quality Improvements Rapporteur meeting report - Yes Yes noted No
    S5-140165 pCR for Super CR on 32111-1 Alarm mgmt definitions Ericsson pseudo CR - Yes Yes noted No
6.5
OAM&P 12 Performance Management
6.5.1
Network Management for 3GPP Interworking WLAN - PM part
S5-140025 Minutes for Network Management for 3GPP Interworking WLAN - PM part (530150) Rapporteur meeting report - No No withdrawn Yes
6.5.2
Energy Efficiency related Performance Measurements
S5-140026 Minutes for Energy Efficiency related Performance Measurements (600044) Rapporteur meeting report - Yes Yes noted No
    S5-140187 LS from ETSI EE to SA5 on Cooperation for Energy Efficiency Measurements ETSI EE i/c LS - Yes Yes Resubmit at next meeting No
6.6
OAM&P 12 Self-Organizing Networks (SON) - OAM aspects
6.6.1
TR Study on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization
S5-140056 Rel-12 CR 32425 Add UE distribution measurements Intel CR - Yes Yes revised No S5-140246
    S5-140246 Converted to pCR TR 32.841 (was Rel-12 CR 32.425 Add UE distribution measurements) Intel pseudo CR - Yes Yes approved No S5-140056
    S5-140088 DP of 2D UE distribution Intel other - Yes Yes noted No
    S5-140150 pCR to TR 32.836 Study on NM CCO SON Function: measurements in 2-dim bins Cisco pseudo CR - Yes Yes noted No
    S5-140173 Revised WID Study on Enhanced NM Centralised Coverage and Capacity Optimisation Ericsson revised WID - Yes Yes revised No S5-140275
    S5-140275 Revised WID Study on Enhanced NM Centralised Coverage and Capacity Optimisation Ericsson revised WID - Yes Yes revised No S5-140283 S5-140173
    S5-140283 Revised WID Study on Enhanced NM Centralised Coverage and Capacity Optimisation Ericsson revised WID - No No for Email approval No S5-140275
    S5-140174 pCR on CCO bin evaluation for TR 32.836 Study on NM CCO SON Function Ericsson pseudo CR - Yes Yes revised No S5-140243
    S5-140243 pCR on CCO bin evaluation for TR 32.836 Study on NM CCO SON Function Ericsson pseudo CR - Yes Yes revised No S5-140281 S5-140174
    S5-140281 pCR on CCO bin evaluation for TR 32.836 Study on NM CCO SON Function Ericsson pseudo CR - No No for Email approval No S5-140243
    S5-140175 pCR on Extending CCO actions for TR 32.836 Study on NM CCO SON Function Ericsson pseudo CR - Yes Yes noted No
    S5-140176 pCR to TR 32.836 Add CCO PM triggering action Ericsson pseudo CR - Yes Yes revised No S5-140248
    S5-140248 pCR to TR 32.836 Add CCO PM triggering action Ericsson pseudo CR - Yes Yes approved No S5-140176
    S5-140177 pCR on Privacy clarifications for TR 32.836 Study on NM CCO SON Function Ericsson pseudo CR - Yes Yes revised No S5-140273
    S5-140273 pCR on Privacy clarifications for TR 32.836 Study on NM CCO SON Function Ericsson pseudo CR - Yes Yes approved No S5-140177
    S5-140178 pCR Recommendation for GERAN in TR 32.836 v1.2.1 Study on NM CCO SON Function Ericsson pseudo CR - Yes Yes revised No S5-140247
    S5-140247 pCR Recommendation for GERAN in TR 32.836 v1.2.1 Study on NM CCO SON Function Ericsson pseudo CR - Yes Yes approved No S5-140178
    S5-140180 pCR TR 32.836 Evaluation of correlation methods Ericsson pseudo CR - Yes Yes revised No S5-140282
    S5-140282 pCR TR 32.836 Evaluation of correlation methods Ericsson pseudo CR - No No for Email approval No S5-140180
    S5-140182 pCR TR 32.836 MLB use case recommendation Ericsson pseudo CR - Yes Yes noted No
    S5-140185 pCR on Clarification on impact of user consent on data collection for TR 32.836 Study on NM CCO SON Function Huawei pseudo CR - Yes Yes revised No S5-140274
    S5-140274 pCR on Clarification on impact of user consent on data collection for TR 32.836 Study on NM CCO SON Function Huawei pseudo CR - Yes Yes approved No S5-140185
    S5-140190 Clarification on impact of user consent on data collection Huawei other - Yes Yes noted No
    S5-140287 Draft TR 32.836 Telecommunication management; Study on Network Mangagement (NM) centralized Coverage and Capacity Optimization (CCO) Self-Organizing Networks (SON) function Ericsson draft TS/TR - No No for Email approval No
6.6.2
Enhanced Network Management (NM) centralized Coverage and Capacity Optimization
S5-140027 Minutes for Enhanced NM Centralised Coverage and Capacity Optimisation (560032) Rapporteur meeting report - Yes Yes noted No
6.7
OAM&P 12 WLAN Management
S5-140029 Minutes for OAM&P 12 WLAN Management (560036) Rapporteur agenda - Yes Yes noted No
6.7.1
TR on WLAN impacts to Type-2 management interface to the 3GPP Network Manager
S5-140083 DP on remote monitoring Intel other - No No withdrawn Yes
    S5-140084 pCR TR 32.841 WLAN alarm notification Intel pseudo CR - Yes Yes noted No
    S5-140085 pCR TR 32.841 WLAN use cases Intel pseudo CR - Yes No withdrawn Yes
    S5-140131 pCR TR 32.841 Use Alarm IRP for reporting WLAN AP alarm Ericsson pseudo CR - Yes Yes revised No S5-140276
    S5-140276 pCR TR 32.841 Use Alarm IRP for reporting WLAN AP alarm Ericsson pseudo CR - Yes Yes revised No S5-140284 S5-140131
    S5-140284 pCR TR 32.841 Use Alarm IRP for reporting WLAN AP alarm Ericsson pseudo CR - Yes Yes approved No S5-140276
    S5-140220 pCR TR 32.841 WLAN use cases Intel pseudo CR - Yes Yes noted No
    S5-140285 Draft TR 32.841 WLAN impacts on Type-2 management Intel draft TS/TR - No No for Email approval No
6.7.2
WLAN Network Resource Model for Type-2 interface
S5-140086 pCR on 28680-001 WLAN Requirement Intel pseudo CR - Yes Yes revised No S5-140277
    S5-140277 pCR TS 28.680-001 WLAN Requirement Intel pseudo CR - No No for Email approval No S5-140086
    S5-140286 Draft TS 28.680 WLAN Requirements Intel draft TS/TR - No No for Email approval No
6.7.3
WLAN measurements defined in IEEE and IETF WLAN performance measurements for use on Type-2 interface
S5-140087 pCR on 28403-001 WLAN PM Intel pseudo CR - Yes Yes noted No
6.8
OAM&P 12 Network Sharing
S5-140038 Minutes for Network Sharing Rapporteur meeting report - Yes Yes noted No
6.8.1
OAM aspects of Network Sharing - Concepts and requirements (Stage 1)
S5-140151 pCR 32.130 on definitions Orange pseudo CR - Yes Yes revised No S5-140254
    S5-140254 pCR 32.130 on definitions Orange pseudo CR - Yes Yes approved No S5-140151
    S5-140152 pCR 32.130 on concepts and background Orange pseudo CR - Yes Yes revised No S5-140249
    S5-140249 pCR 32.130 on concepts and background Orange pseudo CR - Yes Yes approved No S5-140152
    S5-140153 pCR 32.130 on requirements Orange pseudo CR - Yes Yes revised No S5-140250
    S5-140250 pCR 32.130 on requirements Orange pseudo CR - Yes Yes approved No S5-140153
    S5-140288 Draft TS 32.130 Network sharing; Concepts and requirements Orange draft TS/TR - No No for Email approval No
6.8.2
OAM aspects of Network Sharing - Stage 2/3
6.9
OAM&P Studies
6.9.1
Study on management of Heterogeneous Networks
S5-140030 Minutes for Study on management of Heterogeneous Networks (510046) Rapporteur meeting report - Yes Yes noted No
    S5-140164 pCR TR 32.835 Reduction of PM data Ericsson pseudo CR - Yes Yes noted No
    S5-140189 pCR on Rapporteur clean up for TR 32.835 Study of Heterogeneous Networks Management Ericsson pseudo CR - Yes Yes revised No S5-140251
    S5-140251 pCR on Rapporteur clean up for TR 32.835 Study of Heterogeneous Networks Management Ericsson pseudo CR - Yes Yes approved No S5-140189
    S5-140192 pCR TR 32.835 Completing the analysis of classification Ericsson pseudo CR - Yes Yes revised No S5-140253
    S5-140253 pCR TR 32.835 Completing the analysis of classification Ericsson pseudo CR - Yes Yes revised No S5-140289 S5-140192
    S5-140289 pCR TR 32.835 Completing the analysis of classification Ericsson pseudo CR - Yes Yes revised No S5-140293 S5-140253
    S5-140293 pCR TR 32.835 Completing the analysis of classification Ericsson pseudo CR - Yes Yes approved No S5-140289
    S5-140195 pCR on Recommendations for TR 32.835 Study of Heterogeneous Networks Management Ericsson pseudo CR - Yes Yes revised No S5-140252
    S5-140252 pCR on Recommendations for TR 32.835 Study of Heterogeneous Networks Management Ericsson pseudo CR - Yes Yes approved No S5-140195
    S5-140256 Revised WID SP-130046 Study on management of Heterogeneous Networks Ericsson revised WID - Yes Yes agreed (not to go to SA) No
    S5-140290 Draft TR 32.835 Study on management of Heterogeneous Networks Ericsson draft TS/TR - No No for Email approval No
6.9.2
Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function
S5-140031 Minutes for Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function Rapporteur meeting report - Yes Yes revised No S5-140291
    S5-140291 Minutes for Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function Rapporteur meeting report - Yes Yes noted No S5-140031
    S5-140062 pCR to TR 32.8xy Study on Enhancements of OAM aspects of distributed Self-Organizing Networks (SON) functions: MLB parameters alignment Cisco pseudo CR - Yes Yes revised No S5-140258
    S5-140258 pCR TR 32.860 MLB Algorithms – Problem Statement (S5-140062 split into 2 pCRs S5-140258/S5-140262) Cisco pseudo CR - Yes Yes approved No S5-140062
    S5-140262 pCR to TR 32.860 FS_D_MLB_SON_OAM (S5-140062 split into 2 pCRs S5-140258/S5-140262): MLB parameters alignment Cisco pseudo CR - No No withdrawn Yes S5-140062
    S5-140065 pCR to TR 32.8xy Study on Enhancements of OAM aspects of distributed Self-Organizing Networks (SON) functions: Additional load information for MLB Cisco pseudo CR - Yes Yes revised No S5-140260
    S5-140260 pCR TR 32.860 Problem statement – information of non-neighbours (S5-140065 split into 2 pCRs S5-140260/S5-140261) Cisco pseudo CR - Yes Yes revised No S5-140292 S5-140065
    S5-140292 pCR TR 32.860 Problem statement – information of non-neighbours (S5-140065 split into 2 pCRs S5-140260/S5-140261) Cisco pseudo CR - No No for Email approval No S5-140260
    S5-140261 pCR to TR 32.860 FS_D_MLB_SON_OAM (S5-140065 split into 2 pCRs S5-140260/S5-140261): Additional load information for MLB Cisco pseudo CR - No No withdrawn Yes S5-140065
    S5-140098 pCR on TR 32.8xy on MLB Ericsson pseudo CR - Yes Yes revised No S5-140223
    S5-140223 pCR to TR 32.860 FS_D_MLB_SON_OAM Ericsson pseudo CR - Yes Yes revised No S5-140263 S5-140098
    S5-140263 pCR to TR 32.860 FS_D_MLB_SON_OAM Ericsson pseudo CR - No No withdrawn Yes S5-140223
    S5-140099 pCR to TR 32.8xy Study on Enhancements of OAM aspects of distributed Self-Organizing Networks (SON) functions: CAC definition Cisco pseudo CR - Yes No withdrawn Yes
    S5-140120 pCR to TR 32.8xy Study on Enhancements of OAM aspects of distributed Self-Organizing Networks (SON) functions: HO Parameters Negotiation issues NEC pseudo CR - Yes Yes noted No
    S5-140124 Revised WID SP-130430 Study on Enhancements of OAM aspects of Distributed MLB SON function Cisco, Rapporteur revised WID - Yes Yes revised No S5-140257
    S5-140257 Revised WID SP-130430 Study on Enhancements of OAM aspects of Distributed MLB SON function Cisco revised WID - Yes Yes agreed (not to go to SA) No S5-140124
    S5-140202 pCR to TR 32.8xy Study on Enhancements of OAM aspects of distributed Self-Organizing Networks (SON) functions: CAC definition Cisco, NEC pseudo CR - Yes Yes noted No
    S5-140296 Draft TR 32.860 Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function Cisco draft TS/TR - No No for Email approval No
6.9.3
Study on Application and Partitioning of Itf-N
S5-140036 Minutes for Study on Application and Partitioning of Itf-N Rapporteur meeting report - Yes Yes noted No
    S5-140154 Draft TR 32.8xy Study on Application and Partitioning of Itf-N China Mobile draft TS/TR - Yes Yes revised No S5-140264
    S5-140264 Draft TR 32.861 Study on Application and Partitioning of Itf-N China Mobile draft TS/TR - No No for Email approval No S5-140154
7
Converged Management
7.1
Converged Management Plenary
S5-140006 Converged Management Executive report from THIS meeting Converged Management SWG Chair meeting report - Yes Yes noted No
    S5-140097 TD Plan CRs upgrade XSD Ericsson, Huawei other - Yes Yes approved No
    S5-140166 Open Action Items for Converged Management SWG CMAN SWG chair action list - Yes No withdrawn Yes
    S5-140172 Open Action Items for Converged Management SWG CMAN SWG chair meeting report - Yes Yes revised No S5-140265
    S5-140265 Open Action Items for Converged Management SWG CMAN SWG chair meeting report - Yes Yes noted No S5-140172
    S5-140179 LS from NGMN Project NGCOR to SA5 on Publication of Deliverables NGMN NGCOR i/c LS - Yes Yes Resubmit at next meeting No
    S5-140224 Multi-SDO meeting calendar WG Chairman other - Yes Yes noted No
7.2
OAM&P 12 Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations
S5-140032 Minutes for Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations (560034) Rapporteur meeting report - Yes Yes noted No
7.2.1
TR on compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations
S5-140112 pCR to TR 32.838 Northbound Interface for SON related parameters Cisco pseudo CR - Yes Yes revised No S5-140266
    S5-140266 pCR to TR 32.838 Northbound Interface for SON related parameters Cisco pseudo CR - Yes Yes revised No S5-140272 S5-140112
    S5-140272 pCR to TR 32.838 Northbound Interface for SON related parameters Cisco pseudo CR - No No withdrawn Yes S5-140266
    S5-140113 pCR to TR 32.838 SON controlled implementation: eICIC patterns Cisco pseudo CR - Yes Yes revised No S5-140267
    S5-140267 pCR to TR 32.838 SON controlled implementation: eICIC patterns Cisco pseudo CR - Yes Yes approved No S5-140113
    S5-140114 pCR to TR 32.838 SON controlled implementation: eNBs association Cisco pseudo CR - Yes Yes revised No S5-140268
    S5-140268 pCR to TR 32.838 SON controlled implementation: eNBs association Cisco pseudo CR - Yes Yes approved No S5-140114
    S5-140115 pCR to TR 32.838 SON controlled implementation, Interference Control Cisco pseudo CR - Yes Yes revised No S5-140269
    S5-140269 pCR to TR 32.838 SON controlled implementation, Interference Control Cisco pseudo CR - No No withdrawn Yes S5-140115
    S5-140116 pCR to TR 32.838 SON controlled implementation eICIC Cisco pseudo CR - Yes Yes revised No S5-140270
    S5-140270 pCR to TR 32.838 SON controlled implementation eICIC Cisco pseudo CR - No No withdrawn Yes S5-140116
    S5-140117 pCR to TR 32.838 SON controlled implementation: ICIC Cisco pseudo CR - Yes Yes revised No S5-140271
    S5-140271 pCR to TR 32.838 SON controlled implementation: ICIC Cisco pseudo CR - Yes Yes revised No S5-140294 S5-140117
    S5-140294 pCR to TR 32.838 SON controlled implementation: ICIC Cisco pseudo CR - No No for Email approval No S5-140271
    S5-140188 Template for Clause 13 Automatic Inventory Huawei other - Yes Yes agreed No
    S5-140295 Draft TR 32.838 Study on Compliance of 3GPP OAM specifications to the NGMN Top OPE Recommendations Ericsson draft TS/TR - No No for Email approval No
7.2.2
TS work on Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations
S5-140092 Rel-9 CR 32.522 Add missing performance measurement support for HO Huawei CR - Yes Yes noted No
    S5-140093 Rel-10 CR 32.522 Add missing performance measurement support for HO Huawei CR - Yes Yes noted No
    S5-140094 Rel-11 CR 32.522 Add missing performance measurement support for HO Huawei CR - Yes Yes noted No
    S5-140095 Rel-11 CR 28.628 Add missing performance measurement support for HO Huawei CR - Yes Yes noted No
    S5-140197 Clarification on the relation between RRC connection re-establishment measurement and HO optimization Huawei other - Yes Yes noted No
    S5-140198 Enhancements for HO optimization performance evaluation Huawei other - Yes Yes noted No
7.3
OAM&P 12 Compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements
7.3.1
TR on compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements
S5-140033 Minutes for TR on compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements (560435) Rapporteur meeting report - Yes Yes noted No
    S5-140199 Discussion paper on Comparison of NGCOR V1.3 and V1.4 and way forward for NGCOR compliance WID Huawei other - Yes Yes noted No
    S5-140200 pCR Add introduction section to TR 32.837 Huawei pseudo CR - Yes Yes noted No
    S5-140201 Revised WID Compliance to NGMN NGCOR Requirements Huawei revised WID - Yes Yes noted No
7.3.2
Converged Management Model alignment Phase 2
S5-140034 Minutes for Converged Management Model alignment Phase 2 (560135) Rapporteur meeting report - Yes Yes noted No
    S5-140215 MultiSDO-JWG-ModelAlignment-Status And Next Steps Rapporteur meeting report - Yes Yes noted No
    S5-140217 Umbrella Operation Model (UOM) Version 5.1 Draft Editor other - Yes Yes noted No
    S5-140244 Minutes 21st meeting Multi-SDO Converged Management Model Alignment JWG SWG Chair meeting report - Yes Yes noted No
    S5-140245 Minutes 22nd meeting Multi-SDO Converged Management Model Alignment JWG SWG Chair meeting report - Yes Yes noted No
7.3.3
Converged Management PM Interface definitions
S5-140035 Minutes for Converged Management PM Interface definitions (560235) Rapporteur meeting report - Yes Yes noted No
    S5-140155 DP on gap analysis of performance requirements China Mobile other - Yes Yes noted No
    S5-140214 Status on Multi-SDO Converged Management PM Interface definitions JWG Rapporteur meeting report - Yes Yes noted No
8
Charging
8.1
Charging Plenary
S5-140009 CH Agenda and Time Plan CH SWG Chair agenda - Yes Yes revised No S5-140301
    S5-140301 CH Agenda and Time Plan CH SWG Chair agenda - Yes Yes approved No S5-140009
    S5-140010 CH Detailed Report from LAST Meeting CH SWG Chair meeting report - Yes No withdrawn Yes S5-140041
    S5-140041 CH Detailed Report from LAST Meeting CH SWG Chair meeting report - Yes Yes approved No
    S5-140011 CH Executive Report from THIS Meeting CH SWG Chair meeting report - Yes Yes revised No S5-140361
    S5-140361 CH Executive Report from THIS Meeting CH SWG Chair meeting report - Yes Yes noted No S5-140011
    S5-140012 CH Detailed Report from THIS Meeting CH SWG Chair meeting report - No No n.a. No
    S5-140181 Reply LS from CT1 to SA5 on Availability of SIP Instance Identifier C1-135196 i/c LS - Yes Yes noted No
    S5-140184 Reply LS from CT3 cc SA5 on support for user location age or timestamp C3-131852 i/c LS - Yes Yes noted No
    S5-140186 LS out to CT1 Reply LS on Availability of SIP Instance Identifier Ericsson o/g LS - Yes Yes noted No
    S5-140193 LS from SA2 to SA5 on the provision of IPv6 prefix length to SGW/SGSN S2-133832 i/c LS - Yes Yes noted No
    S5-140196 LS from SA2 to SA5 on Charging aspects for Network Sharing (MOCN GWCN) S2-134589 i/c LS - Yes Yes noted No
    S5-140203 LS out to SA2, CT3 on credit control failure handling Openet o/g LS - Yes Yes revised No S5-140319
    S5-140319 LS out to SA2, CT3 on credit control failure handling Openet o/g LS - Yes Yes revised No S5-140364 S5-140203
    S5-140364 LS out to SA2, CT3 on credit control failure handling Openet o/g LS - No No [not addressed] No S5-140319
    S5-140218 Resubmitted LS from CT1 to SA5 on transit IOI exchange over ISC interface C1-131748 i/c LS - Yes Yes Resubmit at next meeting No
    S5-140221 Reply LS from GSMA SOLU to SA5 on Transit IOI clarification GSMA SOLU i/c LS - Yes Yes noted No
    S5-140255 Reply LS from SA3 to SA5 (S5-132105) (cc: GSMA IREG) on securing Gy/Gyn interfaces for EPC Roaming LBO scenario S3-140208 i/c LS - Yes Yes noted No
    S5-140336 LS out to BBF SA5 SWG CH o/g LS - Yes Yes revised No S5-140362
    S5-140362 LS out to BBF SA5 SWG CH o/g LS - No No for Email approval No S5-140336
8.2
New Charging Work Item proposals
8.3
Charging Maintenance and Rel-12 small Enhancements
S5-140068 Rel-11 CR 32.260 Correction for SIP Route header transmitted in TF CDR Ericsson CR - Yes Yes agreed No
    S5-140070 Rel-12 CR 32.260 Correction for SIP Route header transmitted in S-CSCF CDR Ericsson CR - Yes Yes revised No S5-140351
    S5-140351 Rel-12 CR 32.260 Correction for SIP Route header transmitted in S-CSCF CDR Ericsson CR - Yes Yes agreed No S5-140070
    S5-140071 Rel-8 CR 32.299 Correction of data type for Time-Usage and applicability of Service-Specific-Info and AF-Charging-Identifier Ericsson CR - Yes Yes revised No S5-140337
    S5-140337 Rel-8 CR 32.299 Correction of data type for Time-Usage and applicability of Service-Specific-Info and AF-Charging-Identifier Ericsson CR - Yes Yes agreed No S5-140071
    S5-140072 Rel-9 CR 32.299 Correction of data type for Time-Usage and applicability of Service-Specific-Info and AF-Charging-Identifier Ericsson CR - Yes Yes revised No S5-140338
    S5-140338 Rel-9 CR 32.299 Correction of data type for Time-Usage and applicability of Service-Specific-Info and AF-Charging-Identifier Ericsson CR - Yes Yes agreed No S5-140072
    S5-140073 Rel-10 CR 32.299 Correction of data type for Time-Usage and applicability of Service-Specific-Info and AF-Charging-Identifier Ericsson CR - Yes Yes revised No S5-140339
    S5-140339 Rel-10 CR 32.299 Correction of data type for Time-Usage and applicability of Service-Specific-Info and AF-Charging-Identifier Ericsson CR - Yes Yes agreed No S5-140073
    S5-140074 Rel-11 CR 32.299 Correction of data type for Time-Usage and applicability of Service-Specific-Info and AF-Charging-Identifier Ericsson CR - Yes Yes revised No S5-140340
    S5-140340 Rel-11 CR 32.299 Correction of data type for Time-Usage and applicability of Service-Specific-Info and AF-Charging-Identifier Ericsson CR - Yes Yes agreed No S5-140074
    S5-140075 Rel-12 CR 32.299 Correction of data type for Time-Usage and applicability of Service-Specific-Info and AF-Charging-Identifier Ericsson CR - Yes Yes revised No S5-140341
    S5-140341 Rel-12 CR 32.299 Correction of data type for Time-Usage and applicability of Service-Specific-Info and AF-Charging-Identifier Ericsson CR - Yes Yes agreed No S5-140075
    S5-140076 Rel-11 CR 32.298 Correction for User Location Information Time Ericsson CR - Yes Yes revised No S5-140352
    S5-140352 Rel-11 CR 32.298 Correction for User Location Information Time Ericsson CR - Yes Yes agreed No S5-140076
    S5-140077 Rel-12 CR 32.298 Correction for User Location Information Time Ericsson CR - Yes Yes revised No S5-140353
    S5-140353 Rel-12 CR 32.298 Correction for User Location Information Time Ericsson CR - Yes Yes agreed No S5-140077
    S5-140078 Rel-11 CR 32.251 Application based charging in case of PCEF enhanced with ADC-alignment with TS 23.203 Alcatel-Lucent CR - Yes Yes revised No S5-140354
    S5-140354 Rel-11 CR 32.251 Application based charging in case of PCEF enhanced with ADC - alignment with TS 23.203 Alcatel-Lucent CR - Yes Yes agreed No S5-140078
    S5-140079 Rel-12 CR 32.251 Application based charging in case of PCEF enhanced with ADC - alignment with TS 23.203 Alcatel-Lucent CR - Yes Yes revised No S5-140355
    S5-140355 Rel-12 CR 32.251 Application based charging in case of PCEF enhanced with ADC - alignment with TS 23.203 Alcatel-Lucent CR - Yes Yes agreed No S5-140079
    S5-140081 Rel-8 CR 32.298 Correction on Serving Node PLMN Identifier ASN.1 value in SGSN record Alcatel-Lucent CR - Yes Yes agreed No
    S5-140100 CR Required MBMS Bearer Capabilities ZTE CR - No No winhdrawn Yes
    S5-140101 Rel-9 CR 32.251 Correction for Partial Record Closure Reason in eMBMS Charging ZTE CR - Yes Yes revised No S5-140347
    S5-140347 Rel-9 CR 32.251 Correction for Partial Record Closure Reason in eMBMS Charging ZTE CR - Yes Yes agreed No S5-140101
    S5-140102 Rel-10 CR 32.251 Correction for Partial Record Closure Reason in eMBMS Charging ZTE CR - Yes Yes revised No S5-140348
    S5-140348 Rel-10 CR 32.251 Correction for Partial Record Closure Reason in eMBMS Charging ZTE CR - Yes Yes agreed No S5-140102
    S5-140103 Rel-11 CR 32.251 Correction for Partial Record Closure Reason in eMBMS Charging ZTE CR - Yes Yes revised No S5-140349
    S5-140349 Rel-11 CR 32.251 Correction for Partial Record Closure Reason in eMBMS Charging ZTE CR - Yes Yes agreed No S5-140103
    S5-140104 Rel-12 CR 32.251 Correction for Partial Record Closure Reason in eMBMS Charging ZTE CR - Yes Yes revised No S5-140350
    S5-140350 Rel-12 CR 32.251 Correction for Partial Record Closure Reason in eMBMS Charging ZTE CR - Yes Yes agreed No S5-140104
    S5-140105 Rel-9 CR 32.298 Correction for Comment line of RequiredMBMSBearerCapabilities in eMBMS Charging ZTE CR - Yes Yes noted No
    S5-140106 Rel-10 CR 32.298 Correction for Comment line of RequiredMBMSBearerCapabilities in eMBMS Charging ZTE CR - Yes Yes noted No
    S5-140107 Rel-11 CR 32.298 Correction for Comment line of RequiredMBMSBearerCapabilities in eMBMS Charging ZTE CR - Yes Yes noted No
    S5-140108 Rel-12 CR 32.298 Correction for Comment line of RequiredMBMSBearerCapabilities in eMBMS Charging ZTE CR - Yes Yes noted No
    S5-140109 Rel-9 CR 32.251 Correction for QoS Negotiation in eMBMS charging ZTE CR - Yes Yes noted No
    S5-140110 Rel-9 CR 32.273 Correction for QoS Negotiation in eMBMS charging ZTE CR - Yes Yes noted No
    S5-140111 Rel-9 CR 32.298 Correction for QoS Negotiation in eMBMS charging ZTE CR - Yes Yes noted No
    S5-140132 Rel-8 CR 32.298 Correction for S-GW change cause for record closing Ericsson, Vodafone CR - Yes Yes revised No S5-140342
    S5-140342 Rel-8 CR 32.298 Correction for S-GW change cause for record closing Ericsson, Vodafone CR - Yes Yes agreed No S5-140132
    S5-140133 Rel-9 CR 32.298 Correction for S-GW change cause for record closing Ericsson, Vodafone CR - Yes Yes revised No S5-140343
    S5-140343 Rel-9 CR 32.298 Correction for S-GW change cause for record closing Ericsson, Vodafone CR - Yes Yes agreed No S5-140133
    S5-140134 Rel-10 CR 32.298 Correction for S-GW change cause for record closing Ericsson, Vodafone CR - Yes Yes revised No S5-140344
    S5-140344 Rel-10 CR 32.298 Correction for S-GW change cause for record closing Ericsson, Vodafone CR - Yes Yes agreed No S5-140134
    S5-140135 Rel-11 CR 32.298 Correction for S-GW change cause for record closing Ericsson, Vodafone CR - Yes Yes revised No S5-140345
    S5-140345 Rel-11 CR 32.298 Correction for S-GW change cause for record closing Ericsson, Vodafone CR - Yes Yes agreed No S5-140135
    S5-140137 Rel-12 CR 32.298 Correction for S-GW change cause for record closing Ericsson, Vodafone CR - Yes Yes revised No S5-140346
    S5-140346 Rel-12 CR 32.298 Correction for S-GW change cause for record closing Ericsson, Vodafone CR - Yes Yes agreed No S5-140137
    S5-140139 Rel-8 CR 32.299 Correction for S-GW change in Change-Condition AVP Ericsson, Vodafone CR - Yes Yes agreed No
    S5-140140 Rel-9 CR 32.299 Correction for S-GW change in Change-Condition AVP Ericsson, Vodafone CR - Yes Yes agreed No
    S5-140141 Rel-10 CR 32.299 Correction for S-GW change in Change-Condition AVP Ericsson, Vodafone CR - Yes Yes agreed No
    S5-140142 Rel-11 CR 32.299 Correction for S-GW change in Change-Condition AVP Ericsson, Vodafone CR - Yes Yes agreed No
    S5-140143 Rel-12 CR 32.299 Correction for S-GW change in Change-Condition AVP Ericsson, Vodafone CR - Yes Yes agreed No
    S5-140146 Rel-12 CR 32.299 Remove clause 6.3 Editor's Notes Ericsson CR - Yes Yes noted No
    S5-140148 Rel-11 CR 32.251 Correction of CDR generated for SMS in the MME Ericsson CR - Yes Yes agreed No
    S5-140149 Rel-12 CR 32.251 Correction of CDR generated for SMS in the MME Ericsson CR - Yes Yes agreed No
    S5-140204 Rel-11 CR 32.260 Correction for SRVCC PS to CS transfer Flows through ATCF China Mobile, Huawei CR - Yes Yes revised No S5-140356
    S5-140356 Rel-11 CR 32.260 Correction for SRVCC PS to CS transfer Flows through ATCF China Mobile, Huawei CR - Yes Yes postponed No S5-140204
    S5-140205 Rel-12 CR 32.260 Correction for SRVCC PS to CS transfer Flows through ATCF China Mobile, Huawei CR - Yes Yes revised No S5-140357
    S5-140357 Rel-12 CR 32.260 Correction for SRVCC PS to CS transfer Flows through ATCF China Mobile, Huawei CR - Yes Yes postponed No S5-140205
    S5-140206 Rel-11 CR 32.260 Correction for SRVCC CS to PS transfer Flows through ATCF China Mobile, Huawei CR - Yes Yes revised No S5-140358
    S5-140358 Rel-11 CR 32.260 Correction for SRVCC CS to PS transfer Flows through ATCF China Mobile, Huawei CR - Yes Yes postponed No S5-140206
    S5-140207 Rel-12 CR 32.260 Correction for SRVCC CS to PS transfer Flows through ATCF China Mobile, Huawei CR - Yes Yes revised No S5-140359
    S5-140359 Rel-12 CR 32.260 Correction for SRVCC CS to PS transfer Flows through ATCF China Mobile, Huawei CR - Yes Yes postponed No S5-140207
    S5-140209 Rel-12 CR 32.260 Correction of Subscriber Equipment Number and Instance Id for privacy concerns Ericsson CR - Yes Yes noted No
    S5-140210 Rel-12 CR 32.298 Correction of Subscriber Equipment Number and Instance Id for privacy concerns Ericsson CR - Yes Yes noted No
    S5-140213 Rel-12 CR 32.251 Functional update NSN CR - Yes Yes revised No S5-140316
    S5-140316 Rel-12 CR 32.251 Functional update NSN CR - Yes Yes noted No S5-140213
    S5-140314 DP on Availability of SIP Instance Identifier SWG CH other - Yes Yes agreed No
8.4
Rel-12 Charging
8.4.1
Short Message Service - Service Centre (SMS-SC) Offline Charging
S5-140060 Rel-12 CR 32274 SCS Identity identified as Originator for Device Triggering Alcatel-Lucent CR - Yes Yes agreed No
    S5-140061 Rel-12 CR 32274 Introduction of new SC-SMO and SC-SMT CDRs description Alcatel-Lucent CR - Yes Yes revised No S5-140302
    S5-140302 Rel-12 CR 32274 Introduction of new SC-SMO and SC-SMT CDRs description Alcatel-Lucent CR - Yes Yes agreed No S5-140061
    S5-140063 Rel-12 CR 32274 Introduction of information for SMS offline Charging Alcatel-Lucent CR - Yes Yes revised No S5-140303
    S5-140064 Rel-12 CR 32274 Introduction of supported fields for SMS online Charging Alcatel-Lucent CR - Yes Yes revised No S5-140303
    S5-140303 Rel-12 CR 32274 Introduction of information for SMS offline Charging Alcatel-Lucent CR - Yes Yes agreed No S5-140063
    S5-140304 Rel-12 CR 32274 Introduction of supported fields for SMS online Charging Alcatel-Lucent CR - No No withdrawn Yes S5-140064
    S5-140066 Rel-10 CR 32298 Introduction of new SC-SMO and SC-SMT CDRs description Alcatel-Lucent CR - Yes Yes agreed No
    S5-140067 Rel-12 CR 32.299 Introduction of information for SMS offline Charging Alcatel-Lucent CR - Yes Yes revised No S5-140305
    S5-140305 Rel-12 CR 32.299 Introduction of information for SMS offline Charging Alcatel-Lucent CR - Yes Yes agreed No S5-140067
    S5-140069 Rel-12 CR 32274 Improve References specifications list Alcatel-Lucent CR - Yes No withdrawn Yes
    S5-140082 Rel-12 CR 32.297 Add File transfer for SMS CDRs from SMS-SC - Bsm Interface Alcatel-Lucent CR - Yes Yes agreed No
    S5-140167 Revised WID Short Message Service - Service Center (SMS-SC) Offline Charging Alcatel-Lucent revised WID - Yes Yes revised No S5-140306
    S5-140306 Revised WID SP-120775 Short Message Service - Service Center (SMS-SC) Offline Charging Alcatel-Lucent revised WID - Yes Yes revised No S5-140360 S5-140167
    S5-140360 Revised WID SP-120775 Short Message Service - Service Center (SMS-SC) Offline Charging Alcatel-Lucent revised WID - Yes Yes agreed No S5-140306
8.4.2
Charging per IP-Connectivity Access Network (IP-CAN) Session
S5-140147 Rel-12 CR 32.251 Corrections for CHIPS Ericsson CR - Yes Yes revised No S5-140307
    S5-140307 Rel-12 CR 32.251 Corrections for CHIPS Ericsson CR - Yes Yes agreed No S5-140147
8.4.3
Charging using an Alternative Roaming Provider
S5-140040 pCR 32.276 Change to functional protocol names Ericsson, Alcatel-Lucent, NSN pseudo CR - Yes Yes agreed No
    S5-140044 pCR 32.276 Correction of offline charging sections Ericsson pseudo CR - Yes Yes agreed No
    S5-140045 pCR 32.276 Additional requirements and limitations for VCS charging Ericsson pseudo CR - Yes Yes revised No S5-140308
    S5-140308 pCR 32.276 Additional requirements and limitations for VCS charging Ericsson pseudo CR - Yes Yes approved No S5-140045
    S5-140046 DP Analysis of charging information for VCS Ericsson other - Yes Yes noted No
    S5-140047 pCR 32.276 Charging information for VCS Ericsson pseudo CR - Yes Yes revised No S5-140300
    S5-140300 pCR 32.276 Charging information for VCS Ericsson pseudo CR - Yes Yes approved No S5-140047
    S5-140168 pCR Definition of Charging Information for Voice Call Service Charging Alcatel-Lucent pseudo CR - Yes No revised No S5-140300
    S5-140048 pCR 32.276 Relationship of VCS chargeable events to CAMEL events Ericsson pseudo CR - Yes Yes revised No S5-140309
    S5-140309 pCR 32.276 Relationship of VCS chargeable events to CAMEL events Ericsson pseudo CR - Yes Yes approved No S5-140048
    S5-140049 TD Presentation of Spec 32.276 to TSG Ericsson Presentation to TSG - Yes Yes noted No
    S5-140050 Rel-12 CR 32.299 Introduction of charging information for VCS Ericsson CR - Yes Yes revised No S5-140313
    S5-140313 Rel-12 CR 32.299 Introduction of charging information for VCS Ericsson CR - Yes Yes noted No S5-140050
    S5-140208 pCR 32.293 The examples of message flow for Proxy Function Huawei pseudo CR - Yes Yes revised No S5-140311
    S5-140311 pCR 32.293 The examples of message flow for Proxy Function Huawei pseudo CR - Yes Yes approved No S5-140208
    S5-140310 Draft TS 32.276 Telecommunication management; Charging management; Voice call service charging Ericsson draft TS/TR - No No for Email approval No
    S5-140312 Draft TS 32.293 Telecommunication management; Charging management; Proxy function Ericsson draft TS/TR - No No for Email approval No
8.4.4
Charging for IMS centralized service (ICS) control (Stage 2/3)
S5-140211 Rel-12 CR 32.250 Charging management for IMS Centralized Services (ICS) NSN CR - Yes Yes revised No S5-140315
    S5-140315 Rel-12 CR 32.250 Charging management for IMS Centralized Services (ICS) NSN CR - Yes Yes revised No S5-140327 S5-140211
    S5-140327 Rel-12 CR 32.250 Charging management for IMS Centralized Services (ICS) NSN CR - Yes Yes agreed No S5-140315
    S5-140212 Rel-12 CR 32.298 Charging management for IMS Centralized Services (ICS) NSN CR - Yes Yes revised No S5-140328
    S5-140328 Rel-12 CR 32.298 Charging management for IMS Centralized Services (ICS) NSN CR - Yes Yes agreed No S5-140212
8.5
Application Based Charging
8.5.1
Charging for Application Based Charging
S5-140053 Rel-12 CR 32.251 Requirements and parameters alignment for application based charging Allot CR - Yes Yes revised No S5-140317
    S5-140145 Rel-12 CR 32.251 Corrections for ABC Ericsson CR - Yes Yes revised No S5-140317
    S5-140317 Rel-12 CR 32.251 Requirements and parameters alignment for application based charging Allot CR - Yes Yes agreed No S5-140053
    S5-140054 Rel-12 CR 32.298 Additional AVPs definitions and clarifications for application based charging Allot CR - Yes Yes noted No
    S5-140055 Rel-12 CR 32.299 Additional AVPs definitions and clarifications for application based charging Allot CR - Yes Yes noted No
    S5-140080 Rel-12 32.251 Clarify Application based charging chapters apply to TDF Alcatel-Lucent CR - No No withdrawn Yes
    S5-140144 DP on Rel-12 issues on ABC in TS 32.251 Ericsson other - Yes Yes noted No
    S5-140194 Reply LS from SA2 to SA5 on providing Charging Characteristics to TDF S2-134575 i/c LS - Yes Yes noted No
    S5-140318 Rel-12 CR 32.251 Add support for TDF into Failure Situations Openet, Allot CR discussion Yes Yes agreed No
8.6
BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO (Non Seamless WLAN Offload) traffic from 3GPP UEs in fixed broadband access networks
8.6.1
Policy and Charging Enforcement Function (PCEF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks
S5-140051 Rel-12 CR 32.299 Addition of Fixed User Subscription Identifier Allot CR - Yes Yes revised No S5-140335
    S5-140335 Rel-12 CR 32.299 Addition of Fixed User Subscription Identifier Allot CR - Yes Yes agreed No S5-140051
    S5-140052 Rel-12 CR 32.251 Resolution for Open Issues, alignments and corrections for Fixed Broadband Access Annex Allot CR - Yes Yes revised No S5-140334
    S5-140334 Rel-12 CR 32.251 Resolution for Open Issues, alignments and corrections for Fixed Broadband Access Annex Allot CR - Yes Yes agreed No S5-140052
    S5-140169 Rel-12 CR 32.251 Use of Bp Reference Point for CDR files transfer Alcatel-Lucent CR - Yes Yes revised No S5-140329
    S5-140329 Rel-12 CR 32.251 Use of Bp Reference Point for CDR files transfer Alcatel-Lucent CR - Yes Yes agreed No S5-140169
    S5-140170 Rel-12 CR 32.251 Add requirements and clarify miscellaneous charging information Alcatel-Lucent CR - Yes Yes revised No S5-140330
    S5-140183 Rel-12 CR 32.251 Corrections for Fixed Broadband Access Ericsson CR - Yes Yes revised No S5-140330
    S5-140330 Rel-12 CR 32.251 Add requirements and clarify miscellaneous charging information Alcatel-Lucent CR - Yes Yes agreed No S5-140170
    S5-140171 Rel-12 CR 32.251 Introduce IPE-CDR description and PS Charging information Alcatel-Lucent CR - Yes Yes revised No S5-140331
    S5-140331 Rel-12 CR 32.251 Introduce IPE-CDR description and PS Charging information Alcatel-Lucent CR - Yes Yes agreed No S5-140171
    S5-140332 Rel-12 CR 32.251 Corrections for Fixed Broadband Access Ericsson CR - No No withdrawn Yes S5-140183
8.6.2
Traffic Detection Function (TDF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks
8.7
Charging Studies
8.7.1
Study on Charging aspects on Roaming End-to-end scenarios with VoLTE IMS and interconnecting networks
S5-140118 Draft TR 32.8xy Study on Charging aspects on Roaming End-to-end scenarios with VoLTE IMS and interconnecting networks (FS_REVOLTE_IMS_CH) Deutsche Telekom draft TS/TR - Yes Yes revised No S5-140321
    S5-140321 Draft TR 32.849 Study on Charging aspects on Roaming End-to-end scenarios with VoLTE IMS and interconnecting networks (FS_REVOLTE_IMS_CH) Deutsche Telekom draft TS/TR - Yes Yes agreed No S5-140118
    S5-140119 pCR Proposed general sections for TR32.8xy FS_REVOLTE_IMS_CH Deutsche Telekom pseudo CR - Yes Yes revised No S5-140322
    S5-140322 pCR Proposed general sections for TR 32.849 FS_REVOLTE_IMS_CH Deutsche Telekom pseudo CR - Yes Yes approved No S5-140119
    S5-140123 pCR Proposed section Overview TR32.8xy FS_REVOLTE_IMS_CH Deutsche Telekom pseudo CR - Yes Yes revised No S5-140323
    S5-140323 pCR Proposed section Overview TR32.849 FS_REVOLTE_IMS_CH Deutsche Telekom pseudo CR - Yes Yes approved No S5-140123
    S5-140125 pCR Proposed Section for CDR Generation TR32.8xy FS_REVOLTE_IMS_CH Deutsche Telekom pseudo CR - Yes Yes revised No S5-140324
    S5-140324 pCR Proposed Section for CDR Generation TR 32.849 FS_REVOLTE_IMS_CH Deutsche Telekom pseudo CR - Yes Yes approved No S5-140125
    S5-140128 pCR Section on Logical LinkID TR 32.8xy FS_REVOLTE_IMS_CH Deutsche Telekom pseudo CR - Yes Yes revised No S5-140325
    S5-140325 pCR Section on Logical LinkID TR 32.849 FS_REVOLTE_IMS_CH Deutsche Telekom pseudo CR - Yes Yes approved No S5-140128
    S5-140129 pCR Proposed Section on Description of Scenarios TR 32.8xy FS_REVOLTE_IMS_CH Deutsche Telekom pseudo CR - Yes Yes noted No
    S5-140130 pCR Proposed Section on ioi TR 32.8xy FS_REVOLTE_IMS_CH Deutsche Telekom pseudo CR - Yes Yes revised No S5-140326
    S5-140326 pCR Proposed Section on ioi TR 32.849 FS_REVOLTE_IMS_CH Deutsche Telekom pseudo CR - Yes Yes approved No S5-140130
    S5-140320 Draft TR 32.849 Study on Charging aspects on Roaming End-to-end scenarios with VoLTE IMS and interconnecting networks (FS_REVOLTE_IMS_CH) Deutsche Telekom draft TS/TR No No for Email approval No
9
Any Other Business
10
Closing of the meeting

Created: 2014-01-29 10:14     Last document: S5-140364