Tdoc List

2023-01-25 16:43

Agenda Topic TDoc Title Source Type For Avail Treated Decision Wdrn Replaced-by Replaces
1 Opening of the meeting                      
2 Approval of the agenda S5‑231000 Agenda WG Chair agenda   Yes
Yes
approved No    
3 IPR and legal declaration S5‑231001 IPR and legal declaration WG Chair other   No
Yes
withdrawn Yes    
4 Meetings and activities reports                      
4.1 Last SA5 meeting report S5‑231002 Report from last SA5 meeting MCC report   Yes
Yes
approved No    
4.2 Inter-organizational reports                      
5 Cross-SWG issues                      
5.1 Administrative issues at SA5 level                      
5.2 Technical issues at SA5 level                      
5.3 Liaison statements at SA5 level                      
5.4 SA5 meeting calendar                      
6 OAM&P                      
6.1 OAM&P Plenary                      
6.1.1 DPs on cross-WI/SI topics S5‑231012 3GPP Rel-18 work on EE Huawei Technologies France discussion Endorsement Yes
Yes
revised No S5‑231149  
    S5‑231149 3GPP Rel-18 work on EE Huawei Technologies France discussion Endorsement Yes
Yes
endorsed No   S5‑231012
    S5‑231013 DP on using intent driven approach to support async network slice provisioning Huawei discussion Endorsement Yes
Yes
noted No    
    S5‑231014 DP on solution for expressing service and slice profile requirements as intent expectations Huawei,Deutsche Telekom discussion Endorsement Yes
Yes
noted No    
    S5‑231015 DP on TS structure proposal for generic NRM Fragment Huawei discussion Endorsement Yes
Yes
noted No   S5‑226381
    S5‑231019 DP Service Management Ericsson discussion   Yes
Yes
noted No    
    S5‑231025 DP on Consolidation of alarm related definitions Nokia, Nokia Shanghai Bell discussion Endorsement Yes
Yes
noted No    
    S5‑231030 Discussion paper on predicted alarms Nokia, Nokia Shanghai Bell discussion Endorsement Yes
Yes
noted No    
    S5‑231031 Discussion paper on reference architecture vs clarification of NetworkSlice Nokia, Nokia Shanghai Bell discussion Approval Yes
Yes
noted No    
    S5‑231039 DP on naming convention of MnS using CRUD operation with certain NRM Huawei discussion Endorsement Yes
Yes
noted No    
    S5‑231040 DP on way forward for mulitple data collection mechanisms Huawei discussion Endorsement Yes
Yes
noted No    
    S5‑231042 Discussion paper on KPI, KQI, QoE Nokia discussion Discussion No
Yes
withdrawn Yes    
    S5‑231043 Discussion paper on KPI, KQI, QoE Nokia discussion Agreement Yes
Yes
revised No S5‑231148  
    S5‑231148 Discussion paper on KPI, KQI, QoE Nokia discussion Agreement Yes
Yes
endorsed No   S5‑231043
    S5‑231044 DP on interoperability support using SBMA HuaWei Technologies Co., Ltd discussion Approval Yes
Yes
noted No   S5‑226509
    S5‑231046 Rel-18 WISI analysis proposal HuaWei Technologies Co., Ltd other Presentation Yes
Yes
noted No    
    S5‑231048 Discussion paper on mechanism to support asynchronous LCM operations Nokia, Nokia Shanghai Bell, Ericsson discussion Endorsement Yes
Yes
noted No    
    S5‑231053 Discussion paper on relation between FS_NSCE, MSAC, NPN and NSOEU Huawei discussion   Yes
Yes
noted No    
    S5‑231080 Discussion paper on Management Aspects of NTN Enhancement China Unicom, China Academy of Telecommunication Technology discussion Endorsement Yes
Yes
noted No    
    S5‑231081 DP on way forward of 5G KQI SI Huawei discussion Endorsement Yes
Yes
noted No    
    S5‑231085 DP on way forward of FS_FSEV Huawei Technologies Japan K.K. discussion Approval Yes
Yes
noted No    
    S5‑231086 DP on way forward of FS_DCSA Huawei Technologies Japan K.K. discussion Approval Yes
Yes
noted No    
    S5‑231087 DP on wayforward of autononous network levels China Mobile, Huawei, AsiaInfo, CATT, ZTE, China Unicom discussion Endorsement Yes
Yes
noted No    
    S5‑231088 DP on ANL relation with other autonomy features China Mobile, Huawei, AsiaInfo, CATT, ZTE, China Unicom discussion Endorsement Yes
Yes
noted No    
    S5‑231102 Discussion paper on intent driven management for network slicing L.M. Ericsson Limited,Deutsche Telekom discussion Endorsement Yes
YesCo-signed by Deutsche Telekom and Telefonica.
noted No    
    S5‑231103 Discussion paper on comparison of ordering a service or ordering intent L.M. Ericsson Limited,Deutsche Telekom discussion Endorsement Yes
YesCo-signed by Deutsche Telekom and Telefonica.
noted No    
    S5‑231104 Discussion paper on potential solution for network slice intent L.M. Ericsson Limited,Deutsche Telekom discussion Endorsement Yes
YesCo-signed by Deutsche Telekom and Telefonica.
noted No    
    S5‑231105 Clarifying multilevel attribute properties Ericsson Hungary Ltd discussion Endorsement Yes
Yes
revised No S5‑231150  
    S5‑231150 Clarifying multilevel attribute properties Ericsson Hungary Ltd discussion Endorsement Yes
Yes
endorsed No   S5‑231105
    S5‑231106 Stateless Alert in Fault Supervision Ericsson Hungary Ltd discussion Endorsement Yes
Yes
noted No    
    S5‑231141 DP on Enhancement of Subscriber and Equipment Trace Ericsson Inc. discussion Endorsement Yes
Yes
noted No    
6.1.2 Adm. documents S5‑231003 Post e-meeting email approval status WG Chair other   Yes
No
available No    
    S5‑231004 OAM&P action list WG Vice Chair (Huawei) other   Yes
Yes
noted No    
    S5‑231005 agenda_with_Tdocs_sequence_proposal_OAM WG Vice Chair (Huawei) agenda   Yes
Yes
noted No    
    S5‑231006 OAM Exec Report WG Vice Chair (Huawei) report   No
No
reserved No    
    S5‑231007 OAM Chair notes and conclusions WG Chair report   Yes
No
available No    
    S5‑231017 Using Forge for SA5 Nokia, Nokia Shanghai Bell other Information Yes
Yes
revised No S5‑231146  
    S5‑231146 Using Forge for SA5 Nokia, Nokia Shanghai Bell other Information Yes
Yes
noted No   S5‑231017
    S5‑231018 SA5 Working Procedures Nokia, Nokia Shanghai Bell,Ericsson Hungary Ltd other Approval Yes
Yes
revised No S5‑231145  
    S5‑231145 SA5 Working Procedures Nokia, Nokia Shanghai Bell,Ericsson Hungary Ltd other Approval Yes
Yes
approved No   S5‑231018
    S5‑231020 DP Workload in SA5 OAM Ericsson discussion   Yes
Yes
noted No    
    S5‑231032 Rel-18&Rel-19 time plan proposal for OAM SA5 Vice chair (Huawei),SA5 Chair discussion Endorsement Yes
Yes
endorsed No   S5‑226377
    S5‑231082 Discussion paper on Using Forge-Git as the primary storage for Code Ericsson Hungary Ltd discussion Endorsement Yes
Yes
endorsed No    
    S5‑231084 Collection of useful endorsed document and external communication documents WG Vice Chair (Huawei) discussion   Yes
Yes
noted No   S5‑226010
    S5‑231143 E-meeting process WG chair other Information Yes
Yes
revised No S5‑231144  
    S5‑231144 E-meeting process WG chair other Information Yes
Yes
revised No S5‑231147 S5‑231143
    S5‑231147 E-meeting process WG chair other Information Yes
Yes
noted No   S5‑231144
6.2 New OAM&P Work Item proposals                      
6.2.1 Intelligence and Automation S5‑231016 New Rel-18 WID on Intent driven Management Service for mobile network phase 2 Huawei,Ericsson WID new Approval Yes
Yes
revised No S5‑231200  
    S5‑231200 New Rel-18 WID on Intent driven Management Service for mobile network phase 2 Huawei,Ericsson WID new Agreement Yes
Yes
agreed No   S5‑231016
    S5‑231022 New WID on intent-driven management for network slicing Ericsson WID new   Yes
Yes
noted No    
    S5‑231023 New Rel-18 WID AI/ML management Intel, NEC WID new Agreement Yes
Yes
revised No S5‑231199  
    S5‑231199 New Rel-18 WID AI/ML management Intel, NEC WID new Agreement Yes
Yes
agreed No   S5‑231023
    S5‑231029 New WID on measurement data collection to support RAN intelligence Intel Korea, Ltd. WID new Approval Yes
Yes
noted No    
    S5‑231089 New WID on autonomous network levels phase 2 China Mobile, Huawei, AsiaInfo, CATT, ZTE, China Unicom WID new Approval Yes
Yes
noted No    
    S5‑231090 New Rel-18 WID on Enhancement of the Management Aspects related to NWDAF Chinatelecom Cloud WID new Approval Yes
Yes
noted No    
    S5‑231140 DP WF for normative specifications development of AI/ML management NEC, Intel discussion Endorsement Yes
Yes
revised No S5‑231195  
    S5‑231195 DP WF for normative specifications development of AI/ML management NEC, Intel discussion Endorsement Yes
Yes
endorsed No   S5‑231140
    S5‑231142 DP AIML collaboration with other 3GPP groups Huawei discussion Endorsement Yes
Yes
revised No S5‑231196  
    S5‑231196 DP AIML collaboration with other 3GPP groups Huawei discussion Endorsement Yes
Yes
endorsed No   S5‑231142
6.2.2 Management Architecture and Mechanisms S5‑231021 New WID on enhance SBMA specifications Ericsson WID new   Yes
Yes
noted No    
    S5‑231024 New WID on SBMA enabler enhancements Nokia, Nokia Shanghai Bell WID new Approval Yes
Yes
noted No    
    S5‑231026 DP on TS structure for data management / performance management Nokia, Nokia Shanghai Bell discussion Endorsement Yes
Yes
noted No    
    S5‑231027 DP on Restructuring of TS 28.622 Nokia, Nokia Shanghai Bell discussion Approval Yes
Yes
noted No    
    S5‑231028 DP on TS for common data types Nokia, Nokia Shanghai Bell discussion Approval Yes
Yes
noted No    
    S5‑231037 New WID on Management Aspect of 5GLAN China Mobile Com. Corporation WID new Approval Yes
Yes
withdrawn Yes    
    S5‑231038 New WID on Management Aspect of 5GLAN China Mobile Com. Corporation WID new Approval No
Yes
withdrawn Yes    
    S5‑231047 new WID on Enhancement of service based management architecture HuaWei Technologies Co., Ltd WID new   Yes
Yes
noted No    
    S5‑231049 Discussion Paper on including EW bound interface into eECM Samsung R&D Institute UK discussion Endorsement Yes
Yes
noted No    
    S5‑231050 Updated WID on enhanced edge computing management Samsung R&D Institute UK WID revised Agreement Yes
Yes
noted No    
    S5‑231198 Updated Study on enhanced edge computing management Samsung R&D Institute UK SID revised Agreement Yes
Yes
agreed No    
    S5‑231079 New WID on Management Aspects of NTN Enhancement China Unicom, China Academy of Telecommunication Technology WID new Approval Yes
Yes
noted No    
    S5‑231083 New WID on Management Aspect of 5GLAN China Mobile Com. Corporation WID new Approval Yes
Yes
noted No    
    S5‑231107 New Rel-18 WID on Management Aspects of URLLC China Unicom, Huawei, CATT, China Telecom WID new Approval Yes
Yes
noted No    
    S5‑231108 New Rel-18 WID on Management Aspects of 5G Network Sharing Phase2 China Unicom, Huawei, CATT, China Telecom WID new Approval Yes
Yes
noted No    
    S5‑231109 New WID on Management of cloud-native Virtualized Network Functions China Mobile E-Commerce Co. WID new   Yes
Yes
withdrawn Yes    
    S5‑231110 New WID on Management of cloud-native Virtualized Network Functions China Mobile E-Commerce Co. WID new Approval Yes
Yes
noted No    
    S5‑231137 Updated Rel-18 WID Enhancement of Management of Trace/MDT phase 2 Ericsson Inc. WID revised Approval Yes
Yes
noted No   S5‑227041
6.2.3 Support of New Services S5‑231010 Proposed way forward for the Rel-18 work on EE Huawei Technologies France discussion Endorsement Yes
Yes
endorsed No    
    S5‑231011 Revised WID Rel-18 Work Item on 5G energy efficiency phase 2 Huawei Technologies France WID revised Approval Yes
Yes
endorsed No    
    S5‑231041 New SID on management aspects of Digital Twin Network China Mobile Com. Corporation SID new Approval Yes
Yes
noted No    
    S5‑231045 New WID on network slice management capability exposure Alibaba Group WID new Approval Yes
Yes
noted No    
    S5‑231051 Proposed way forward for Rel-18 work on NPN Huawei discussion Endorsement Yes
Yes
noted No    
    S5‑231052 New WID on enhanced management of non-public networks Huawei WID new Approval Yes
Yes
noted No    
    S5‑231091 New Work Item on Network and Service Operations for Energy Utilities Samsung, EUTC, EDF, BMWK, Anterix WID new Approval Yes
Yes
noted No    
7 Charging                      
7.1 Charging Plenary S5‑231008 CH agenda and time plan WG vice Chair (Matrixx Software) agenda   Yes
Yes
revised No S5‑231138  
    S5‑231138 CH agenda and time plan WG vice Chair (Matrixx Software) agenda - Yes
Yes
approved No   S5‑231008
    S5‑231009 Charging exec report WG vice Chair (Matrixx Software) report   Yes
Yes
noted No    
    S5‑231036 LS on controlling number of UEs or PDU sessions for NPN China Mobile LS out Approval Yes
Yes
revised No S5‑231253  
    S5‑231253 LS on controlling number of UEs or PDU sessions for NPN China Mobile LS out Approval Yes
Yes
approved No   S5‑231036
7.2 New Charging Work Item proposals                      
7.3 Charging Maintenance and Rel-18 small Enhancements                      
7.4 Rel-18 Charging                      
7.4.1 Charging Aspects of Network Slicing Phase 2                      
7.5 Charging studies                      
7.5.1 Study on charging aspects for enhancements of Network Slicing Phase 2 S5‑231054 Rel-18 pCR 32.847 Correction on the key issue 7 Huawei pCR Agreement Yes
Yes
noted No    
    S5‑231092 Rel-18 pCR 32.847 Update solution#6.3 MATRIXX Software pCR Approval Yes
Yes
revised No S5‑231262  
    S5‑231262 Rel-18 pCR 32.847 Update solution#6.3 MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑231092
    S5‑231093 Rel-18 pCR 32.847 Solve Editor's Note in solution#7.2 MATRIXX Software pCR Approval Yes
Yes
revised No S5‑231256  
    S5‑231256 Rel-18 pCR 32.847 Solve Editor's Note in solution#7.2 MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑231093
    S5‑231094 Rel-18 pCR 32.847 Final conclusion for Key issue#3 MATRIXX Software pCR Approval Yes
Yes
revised No S5‑231252  
    S5‑231252 Rel-18 pCR 32.847 Final conclusion for Key issue#3 MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑231094
    S5‑231095 Rel-18 pCR 32.847 Add evaluation and conclusion for Key issue#6 MATRIXX Software pCR Approval Yes
Yes
revised No S5‑231264  
    S5‑231264 Rel-18 pCR 32.847 Add evaluation and conclusion for Key issue#6 MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑231095
    S5‑231096 Rel-18 pCR 32.847 Refinement on evaluation and conclusion for Key issue#7 MATRIXX Software pCR Approval Yes
Yes
revised No S5‑231257  
    S5‑231257 Rel-18 pCR 32.847 Refinement on evaluation and conclusion for Key issue#7 MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑231096
    S5‑231097 Rel-18 pCR 32.847 Add new Key issue on SBI between UE CHF and Tenant CHF MATRIXX Software pCR Approval Yes
Yes
revised No S5‑231261  
    S5‑231261 Rel-18 pCR 32.847 Add new Key issue on SBI between UE CHF and Tenant CHF MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑231097
    S5‑231098 Rel-18 pCR 32.847 Add a solution for Key issue#x - reuse Nchf_convergedcharging MATRIXX Software pCR Approval Yes
Yes
revised No S5‑231258  
    S5‑231258 Rel-18 pCR 32.847 Add a solution for Key issue#x - reuse Nchf_convergedcharging MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑231098
    S5‑231099 Rel-18 pCR 32.847 Add a solution for Key issue#x - new service API MATRIXX Software pCR Approval Yes
Yes
revised No S5‑231259  
    S5‑231259 Rel-18 pCR 32.847 Add a solution for Key issue#x - new service API MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑231099
    S5‑231100 Rel-18 pCR 32.847 Add evaluation and conclusion for Key issue#x MATRIXX Software pCR Approval Yes
Yes
revised No S5‑231267  
    S5‑231267 Rel-18 pCR 32.847 Add evaluation and conclusion for Key issue#x MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑231100
    S5‑231101 Rel-18 pCR 32.847 Add conclusions and recommendations MATRIXX Software pCR Approval Yes
Yes
revised No S5‑231265  
    S5‑231265 Rel-18 pCR 32.847 Add conclusions and recommendations MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑231101
    S5‑231139 Presentation of TR 32.847 for approval MATRIXX Software TS or TR cover Approval Yes
Yes
noted No    
    S5‑231245 TR 32.847 MATRIXX Software draft TR Approval Yes
Yes
approved No    
7.5.2 Study on Nchf charging services phase 2 S5‑231055 Rel-18 pCR 28.826 Correction on the Topic 5.1 Huawei pCR Agreement Yes
Yes
merged No S5‑231251  
    S5‑231056 Rel-18 pCR 28.826 Clarify the solution 1.1 Huawei pCR Agreement Yes
Yes
noted No    
    S5‑231057 Rel-18 pCR 28.826 Add the max size solution Huawei pCR Agreement Yes
Yes
approved No    
    S5‑231058 Rel-18 pCR 28.826 Common IEs applied in the service charging specifications Huawei pCR Agreement Yes
Yes
revised No S5‑231254  
    S5‑231254 Rel-18 pCR 28.826 Common IEs applied in the service charging specifications Huawei pCR Agreement Yes
Yes
approved No   S5‑231058
    S5‑231059 Rel-18 pCR 28.826 Correction on the key issues in the topic 5.5 Huawei pCR Agreement Yes
Yes
revised No S5‑231286  
    S5‑231286 Rel-18 pCR 28.826 Correction on the key issues in the topic 5.5 Huawei pCR Agreement Yes
Yes
approved No   S5‑231059
    S5‑231060 Rel-18 pCR 28.826 Add the solution for keeping reporting based on the triggers Huawei pCR Agreement Yes
Yes
revised No S5‑231292  
    S5‑231292 Rel-18 pCR 28.826 Add the solution for keeping reporting based on the triggers Huawei pCR Agreement Yes
Yes
approved No   S5‑231060
    S5‑231061 Rel-18 pCR 28.826 Add the solution for Bitrate charging Huawei pCR Agreement Yes
Yes
noted No    
    S5‑231062 Rel-18 pCR 28.826 Evaluation and Conclusion for solution 1.3 Huawei pCR Agreement Yes
Yes
noted No    
    S5‑231063 Rel-18 pCR 28.826 Evaluation and Conclusion for threshold Huawei pCR Agreement Yes
Yes
revised No S5‑231291  
    S5‑231291 Rel-18 pCR 28.826 Evaluation and Conclusion for threshold Huawei pCR Agreement Yes
Yes
approved No   S5‑231063
    S5‑231064 Rel-18 pCR 28.826 Evaluation and Conclusion for Topic 5.3 Huawei pCR Agreement Yes
Yes
revised No S5‑231290  
    S5‑231290 Rel-18 pCR 28.826 Evaluation and Conclusion for Topic 5.3 Huawei pCR Agreement Yes
Yes
approved No   S5‑231064
    S5‑231065 Rel-18 pCR 28.826 Evaluation and Conclusion for Topic 5.4 Huawei pCR Agreement Yes
Yes
revised No S5‑231289  
    S5‑231289 Rel-18 pCR 28.826 Evaluation and Conclusion for Topic 5.4 Huawei pCR Agreement Yes
Yes
approved No   S5‑231065
    S5‑231066 Rel-18 pCR 28.826 Evaluation and Conclusion for Topic 5.5 Huawei pCR Agreement Yes
Yes
revised No S5‑231288  
    S5‑231288 Rel-18 pCR 28.826 Evaluation and Conclusion for Topic 5.5 Huawei pCR Agreement Yes
Yes
approved No   S5‑231066
    S5‑231111 Rel-18 pCR 28.826 Correcting use cases and key issues in clause 5.1 Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231112 Rel-18 pCR 28.826 Correcting solutions in clause 5.1 Ericsson LM pCR Approval Yes
Yes
revised No S5‑231251  
    S5‑231251 Rel-18 pCR 28.826 Correcting solutions in clause 5.1 Ericsson LM pCR Approval Yes
Yes
approved No   S5‑231112
    S5‑231113 Rel-18 pCR 28.826 Adding solution for key issue #1l in clause 5.1 Ericsson LM pCR Approval Yes
Yes
revised No S5‑231276  
    S5‑231276 Rel-18 pCR 28.826 Adding solution for key issue #1l in clause 5.1 Ericsson LM pCR Approval Yes
Yes
approved No   S5‑231113
    S5‑231114 Rel-18 pCR 28.826 Adding solutions to undefined attribute handling in CDR Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231115 Rel-18 pCR 28.826 Adding solution for size of charging information Ericsson LM pCR Approval Yes
Yes
revised No S5‑231250  
    S5‑231250 Rel-18 pCR 28.826 Adding solution for size of charging information Ericsson LM pCR Approval Yes
Yes
approved No   S5‑231115
    S5‑231116 Rel-18 pCR 28.826 Adding use case requested units and quota management indication Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231246 TR 28.826 Ericsson draft TR Approval Yes
Yes
approved No    
7.5.3 Study on 5G roaming charging architecture for wholesale and retail scenarios S5‑231067 Rel-18 pCR 28.827 Add new solution on using RCG in LBO charging Huawei pCR Agreement Yes
Yes
noted No    
    S5‑231068 Rel-18 pCR 28.827 Corrections Huawei pCR Agreement Yes
Yes
revised No S5‑231260  
    S5‑231260 Rel-18 pCR 28.827 Corrections Huawei pCR Agreement Yes
Yes
approved No   S5‑231068
    S5‑231069 Rel-18 pCR 28.827 Evaluation and conclusion of clause 7.1 Huawei pCR Agreement Yes
Yes
noted No    
    S5‑231070 Rel-18 pCR 28.827 Evaluation and conclusion of clause 7.2 Huawei pCR Agreement Yes
Yes
noted No    
    S5‑231117 Rel-18 pCR 28.827 Correcting requirements and key issues in clause 7.1 Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231118 Rel-18 pCR 28.827 Adding solution in clause 7.1 for QBC triggers configured in the V-CHF Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231119 Rel-18 pCR 28.827 Correcting covered requirements for solution #1.9 Ericsson LM pCR Approval Yes
Yes
approved No    
    S5‑231120 Rel-18 pCR 28.827 Correcting solution #1.10 in clause 7.1 Ericsson LM pCR Approval Yes
Yes
revised No S5‑231271  
    S5‑231271 Rel-18 pCR 28.827 Correcting solution #1.10 in clause 7.1 Ericsson LM pCR Approval Yes
Yes
approved No   S5‑231120
    S5‑231121 Rel-18 pCR 28.827 Correcting solution #1.11 in clause 7.1 Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231122 Rel-18 pCR 28.827 Adding solution in clause 7.1 for PDU session triggers Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231123 Rel-18 pCR 28.827 Adding solution in clause 7.1 for QoS flow session triggers Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231124 Rel-18 pCR 28.827 Adding solution in clause 7.1 for QoS flow triggers Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231125 Rel-18 pCR 28.827 Adding evaluation of solutions for clause 7.1 Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231126 Rel-18 pCR 28.827 Correcting solution #2.1 in clause 7.2 Ericsson LM pCR Approval Yes
Yes
revised No S5‑231279  
    S5‑231279 Rel-18 pCR 28.827 Correcting solution #2.1 in clause 7.2 Ericsson LM pCR Approval Yes
Yes
approved No   S5‑231126
    S5‑231127 Rel-18 pCR 28.827 Adding solution in clause 7.2 dual CHF interaction Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231128 Rel-18 pCR 28.827 Correcting solutions in clause 7.2 dual CHF information Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231129 Rel-18 pCR 28.827 Additional evaluation of solutions for clause 7.2 Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231130 Rel-18 pCR 28.827 Additional solution key issue #4e in clause 7.4 Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231131 Rel-18 pCR 28.827 Additional evaluation of solutions for clause 7.4 Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231132 Rel-18 pCR 28.827 Additional solutions for key issue #5d in clause 7.5 Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231133 Rel-18 pCR 28.827 Additional solution for key issue #5f in clause 7.5 Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231134 Rel-18 pCR 28.827 Adding solution in clause 7.6 for UE usage information reporting Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231135 Rel-18 pCR 28.827 Additional solutions for key issue #5e in clause 7.5 Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231136 Rel-18 pCR 28.827 Adding comparison between double or single CHF Ericsson LM pCR Approval Yes
Yes
noted No    
    S5‑231247 TR 28.827 Ericsson draft TR Approval Yes
Yes
approved No    
7.5.4 Study on Charging Aspects for Enhanced support of Non-Public Networks S5‑231033 Rel-18 pCR 28.828 Add evaluation and conclusion for SNPN topic 2 China Mobile pCR Approval Yes
Yes
approved No    
    S5‑231034 Rel-18 pCR 28.828 Update PNI-NPN topic 1 for consistency China Mobile pCR Approval Yes
Yes
approved No    
    S5‑231035 Rel-18 pCR 28.828 Add Conclusions and recommendations China Mobile pCR Approval Yes
Yes
approved No    
    S5‑231071 Rel-18 pCR 28.828 Correction on the Topic 1 and Topic 3 Huawei pCR Agreement Yes
Yes
revised No S5‑231255  
    S5‑231255 Rel-18 pCR 28.828 Correction on the Topic 1 and Topic 3 Huawei pCR Agreement Yes
Yes
approved No   S5‑231071
    S5‑231072 Rel-18 pCR 28.828 Remove the editor's note for Topic 3 Huawei pCR Agreement Yes
Yes
merged No S5‑231255  
    S5‑231073 Rel-18 pCR 28.828 Evaluation and Conclusion for Topic 1 Huawei pCR Agreement Yes
Yes
revised No S5‑231268  
    S5‑231268 Rel-18 pCR 28.828 Evaluation and Conclusion for Topic 1 Huawei pCR Agreement Yes
Yes
approved No   S5‑231073
    S5‑231074 Rel-18 pCR 28.828 Evaluation and Conclusion for Topic 3 Huawei pCR Agreement Yes
Yes
revised No S5‑231269  
    S5‑231269 Rel-18 pCR 28.828 Evaluation and Conclusion for Topic 3 Huawei pCR Agreement Yes
Yes
approved No   S5‑231074
    S5‑231248 TR 28.828 China Mobile draft TR Approval Yes
Yes
email approval No    
7.5.5 Study on Time Sensitive Networking charging S5‑231075 Rel-18 pCR 28.839 Add Use Case for Enablers for Time Sensitive Communications Huawei pCR Agreement Yes
Yes
noted No    
    S5‑231076 Rel-18 pCR 28.839 Add Use Case for Exposure of Time Synchronization Huawei pCR Agreement Yes
Yes
approved No    
    S5‑231077 Rel-18 pCR 28.839 Add Use Case for Time Sensitive Communication Huawei pCR Agreement Yes
Yes
noted No    
    S5‑231078 Rel-18 pCR 28.839 Add Use Case for TSN 5GS bridge Charging Huawei pCR Agreement Yes
Yes
noted No    
    S5‑231249 TR 28.839 Huawei draft TR Approval Yes
Yes
email approval No    
7.5.6 Study on CHF Segmentation                      
7.5.7 Study on Structure of Charging for Verticals                      
7.5.8 Study on charging aspects of Satellite in 5GS                      
8 Any Other Business                      
9 Closing of the meeting