Tdoc List
2021-12-03 11:38
Agenda | Topic | TDoc | Title | Source | Type | For | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Opening of the emeeting |   | ||||||||||
2 | Approval of the agenda | S5‑216000 | Agenda | WG Chair | agenda | Yes |
Yes
| approved | No | |||
3 | IPR and legal declaration |   | ||||||||||
4.1 | Last SA5 meeting report | S5‑216001 | Report from last SA5 meeting | MCC | report | Yes |
Yes
| revised | No | S5‑216336 | ||
S5‑216336 | Report from last SA5 meeting | MCC | report | Yes |
Yes
| approved | No | S5‑216001 | ||||
4.2 | Last SA meeting report |   | ||||||||||
4.3 | Inter-organizational reports | S5‑216277 | SA5 presentation for Linux Networking Foundation 9 June 2021 | 3GPP SA5 Chair, 3GPP SA5 Vice-Chair(Huawei) | other | Information | Yes |
Yes
| noted | No | ||
S5‑216278 | Presentation slides for 3GPP_SA5_Webinar_Part1_SA5_OAM (ETSI3GPP Webinar 28 October 2021) | 3GPP SA5 Chair, 3GPP SA5 Vice-Chair(Huawei) | other | Yes |
Yes
| noted | No | |||||
S5‑216279 | SA5 presentation for GSMA Mobile World Congress Barcelona 29 June 2021 | 3GPP SA5 Chair, 3GPP SA5 Vice-Chair(Huawei) | other | Information | Yes |
Yes
| noted | No | ||||
S5‑216280 | SA5 presentation for the TMF Autonomous Networks Industry Summit China 23 Sept. 2021 | 3GPP SA5 Chair, 3GPP SA5 Vice-Chair(Huawei) | other | Information | Yes |
Yes
| noted | No | ||||
5.1 | Administrative issues at SA5 level | S5‑216002 | e-meeting process | WG Chair | discussion | Yes |
Yes
| noted | No | |||
S5‑216003 | Post e-meeting email approval status | WG Chair | other | No |
No
| reserved | No | |||||
S5‑216010 | SA5 working procedures | WG Chair | other | Yes |
Yes
| noted | No | |||||
S5‑216011 | Process for management of draft TS-TRs | WG Chair | other | Yes |
Yes
| noted | No | |||||
S5‑216250 | Forge working procedure change in SA5 Working Procedures | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| approved | No | ||||
5.2 | Technical issues at SA5 level |   | ||||||||||
5.3 | Liaison statements at SA5 level | S5‑216013 | Resubmitted LS cc SA5 on Prioritized Vehicle to Cloud Technical Solutions | Automotive Edge Computing Consortium (AECC) | LS in | Yes |
Yes
| replied to | No | |||
S5‑216412 | Reply to: LS cc SA5 on Prioritized Vehicle to Cloud Technical Solutions | Huawei | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑216014 | Resubmitted LS on Guidelines on Port Allocation for New 3GPP Interfaces | C4-214848 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑216015 | Resubmitted LS on slicing management aspects in relation to SEAL | S6-210709 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑216017 | Resubmitted Reply LS on Inclusive language for ANR | R2-2108869 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑216197 | Reply to: Reply LS on Inclusive language for ANR | Huawei | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑216018 | Resubmitted Reply LS on Inclusive Language for ANR | R3-214289 | LS in | Yes |
Yes
| noted | No | |||||
S5‑216025 | Resubmitted Reply LS on Inclusive language review | SP-211140 | LS in | Yes |
Yes
| noted | No | |||||
S5‑216026 | LS ccSA5 on updating the readme.md file in 3GPP Forge | C4-215475 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑216413 | Reply to: LS ccSA5 on updating the readme.md file in 3GPP Forge | Huawei | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑216027 | LSccSA5 on updating the readme.md file in 3GPP Forge | C3-215408 | LS in | Yes |
Yes
| noted | No | |||||
S5‑216031 | LIAISON STATEMENT TO 3GPP TSG SA AND SA6 (forwarded to SA5) - APT REPORT ON EMERGING CRITICAL APPLICATIONS & USE CASES OF IMT FOR INDUSTRIAL, SOCIETAL AND ENTERPRISE USERS | APT Wireless Group | LS in | Yes |
Yes
| postponed | No | |||||
S5‑216033 | LS on introducing NR RedCap Indication | S2-2107853 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑216035 | LS on MINT functionality for Disaster Roaming | S2-2108172 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑216267 | Reply LS on network slice management service consumption | China Mobile | LS out | Yes |
Yes
| noted | No | |||||
S5‑216418 | Liaison Multi-SDO Autonomous Networks (AN) Formal Liaison: 22nd November 2021 Meeting Invitation, Agenda, Bridge, and Meeting Schedule Ref AN-SDO2021-13 | TMF | LS in | discussion | Yes |
Yes
| postponed | No | ||||
5.4 | SA5 meeting calendar | S5‑216012 | SA5 meeting calendar | WG CHair | other | Yes |
Yes
| noted | No | |||
6.1 | OAM&P Plenary | S5‑216004 | OAM&P action list | WG Vice Chair (Huawei) | other | Yes |
Yes
| noted | No | |||
S5‑216005 | agenda_with_Tdocs_sequence_proposal_OAM | WG Vice Chair (Huawei) | agenda | Yes |
Yes
| noted | No | |||||
S5‑216006 | OAM Exec Report | WG Vice Chair (Huawei) | report | Yes |
Yes
| noted | No | |||||
S5‑216007 | OAM Chair notes and conclusions | WG Chair | report | Yes |
Yes
| noted | No | |||||
S5‑216016 | Resubmitted LS on the mapping between service types and slice at application | R3-212904 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑216414 | Reply to: LS on the mapping between service types and slice at application | Ericsson | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑216019 | Resubmitted Reply LS on QoE configuration and reporting related issues | R3-214471 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑216415 | Reply to: Reply LS on QoE configuration and reporting related issues | Ericsson | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑216020 | Resubmitted LS on RAN3 agreements for NR QoE | R3-214477 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑216021 | Resubmitted LS on the Beam measurement reports for the MDT measurements | R3-214519 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑216137 | Reply to: LS on the Beam measurement reports for the MDT measurements | Ericsson | LS out | approval | Yes |
Yes
| revised | No | S5‑216628 | |||
S5‑216628 | Reply to: LS on the Beam measurement reports for the MDT measurements | Ericsson | LS out | approval | Yes |
Yes
| approved | No | S5‑216137 | |||
S5‑216022 | Resubmitted LS on Network slice information from OAM | S2-2106634 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑216416 | Reply to: LS on Network slice information from OAM | Ericsson | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑216023 | Resubmitted LS on TS 28.404/TS 28.405 Clarification | S4-211234 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑216024 | Resubmitted LS Reply on QoE report handling at QoE pause | S4-211290 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑216417 | Reply to: LS Reply on QoE report handling at QoE pause | Ericsson | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑216032 | LSout to 3GPP SA5 about MANO performance measurements accuracy to estimate VNF energy consumption | ETSI ISG NFV | LS in | Yes |
Yes
| replied to | No | |||||
S5‑216419 | Reply to: LSout to 3GPP SA5 about MANO performance measurements accuracy to estimate VNF energy consumption | ORANGE | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑216036 | LS on network slice management service consumption | S6-212460 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑216232 | Collection of useful endorsed document and external communication documents | SA5 Vice chair (Huawei) | other | Yes |
Yes
| noted | No | S5‑215154 | ||||
S5‑216240 | Rel-17 CR TS 32.103 Update 5G specifications information | Huawei Technologies (Korea) | CR | Yes |
Yes
| noted | No | |||||
S5‑216357 | LS reply to RAN3 on model deployment and update from OAM to NG-RAN | Intel | LS out | Approval | Yes |
Yes
| revised | No | S5‑216423 | |||
S5‑216423 | LS to RAN3 on model deployment and update from OAM to NG-RAN | Intel | LS out | Approval | Yes |
Yes
| approved | No | S5‑216357 | |||
S5‑216374 | Discussion on structuring Rel-18 work in SA5 | Orange, Deutsche Telekom | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑216551 | |||
S5‑216551 | Discussion on structuring Rel-18 work in SA5 | Orange, Deutsche Telekom | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑216374 | |||
6.2 | New OAM&P Work Item proposals | S5‑216048 | New SID on new aspects of EE for 5G networks Phase 2 | Orange | SID new | Agreement | Yes |
Yes
| revised | No | S5‑216424 | |
S5‑216424 | New SID on new aspects of EE for 5G networks Phase 2 | Orange | SID new | Agreement | Yes |
Yes
| agreed | No | S5‑216048 | |||
S5‑216049 | New WID on enhancements of EE for 5G phase 2 | Orange | WID new | Agreement | Yes |
Yes
| revised | No | S5‑216425 | |||
S5‑216425 | New WID on enhancements of EE for 5G phase 2 | Orange | WID new | Agreement | Yes |
Yes
| agreed | No | S5‑216049 | |||
S5‑216091 | New Rel-18 WID on Enhanced intent driven management services for mobile network | Huawei, China Telecom, CATT, AsiaInfo, China Unicom, China Mobile | SID new | Agreement | Yes |
Yes
| revised | No | S5‑216577 | S5‑215086 | ||
S5‑216577 | New Rel-18 WID on Enhanced intent driven management services for mobile network | Huawei, China Telecom, CATT, AsiaInfo, China Unicom, China Mobile | SID new | Agreement | Yes |
Yes
| agreed | No | S5‑216091 | |||
S5‑216132 | New SID Study on Computing Power Management and Orchestration | China Telecommunications | SID new | Approval | Yes |
Yes
| noted | No | ||||
S5‑216167 | New SID Intent driven management for 5GC | Huawei | SID new | Agreement | Yes |
Yes
| merged | No | S5‑216577 | |||
S5‑216182 | New SID on alignment with GSMA OPG and ETSI MEC for Edge computing management | Huawei, Samsung | SID new | Agreement | Yes |
Yes
| noted | No | ||||
S5‑216229 | New SID on deterministic communication service assurance | Huawei, China Mobile, CATT, China Unicom | SID new | Agreement | Yes |
Yes
| revised | No | S5‑216426 | |||
S5‑216426 | New SID on deterministic communication service assurance | Huawei, China Mobile, CATT, China Unicom | SID new | Agreement | Yes |
Yes
| agreed | No | S5‑216229 | |||
S5‑216243 | New SID on PaaS for Virtualized Network Functions | China Mobile Com. Corporation | SID new | Approval | Yes |
Yes
| revised | No | S5‑216579 | |||
S5‑216579 | New SID on PaaS for Virtualized Network Functions | China Mobile Com. Corporation | SID new | Approval | Yes |
Yes
| noted | No | S5‑216243 | |||
S5‑216262 | Discussion on digital twin for network management | China Mobile | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑216263 | New SID on Digital twin for network management | China Mobile | SID new | Yes |
Yes
| noted | No | |||||
S5‑216264 | New SID on Federated machine learning for mobile network management | China Mobile | SID new | Yes |
Yes
| noted | No | |||||
S5‑216306 | New R18 SID on Conflict management and coordination | Lenovo, Motorola Mobility | SID new | Approval | Yes |
Yes
| noted | No | ||||
S5‑216309 | Discussion Paper on new R18 study for conflict management | Lenovo, Motorola Mobility | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑216313 | New Rel-18 SID AI/ML management | Intel, NEC, Orange, Verizon, China Telecom, China Unicom, Samsung, CATT, ZTE, AT&T, Deutsche Telekom, Telefónica S.A., Lenovo, Motorola Mobility, China Mobile, US Cellular, AsiaInfo | SID new | Agreement | Yes |
Yes
| revised | No | S5‑216427 | |||
S5‑216427 | New Rel-18 SID AI/ML management | Intel, NEC, Orange, Verizon, China Telecom, China Unicom, Samsung, CATT, ZTE, AT&T, Deutsche Telekom, Telefónica S.A., Lenovo, Motorola Mobility, China Mobile, US Cellular, AsiaInfo | SID new | Agreement | Yes |
Yes
| agreed | No | S5‑216313 | |||
S5‑216349 | New WID on network slicing provisioning rules | Ericsson Inc. | WID new | Yes |
Yes
| revised | No | S5‑216549 | ||||
S5‑216549 | New WID on network slicing provisioning rules | Ericsson Inc. | WID new | - | Yes |
Yes
| agreed | No | S5‑216349 | |||
S5‑216351 | New SID on intent-driven network slicing management | Ericsson Inc. | SID new | Yes |
Yes
| revised | No | S5‑216578 | ||||
S5‑216578 | New SID on intent-driven network slicing management | Ericsson Inc. | SID new | - | Yes |
Yes
| noted | No | S5‑216351 | |||
S5‑216356 | Motivation for a Feasibility Study on Network and Service Operations for Energy Verticals | Samsung, EUTC | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑216359 | New SID on Network and Service Operations for Energy Verticals | EUTC, Samsung, BMWi, Vodafone, Orange, Novamint | SID new | Agreement | Yes |
Yes
| revised | No | S5‑216428 | |||
S5‑216428 | New SID on Network and Service Operations for Energy Verticals | EUTC, Samsung, BMWi, Vodafone, Orange, Novamint | SID new | Agreement | Yes |
Yes
| agreed | No | S5‑216359 | |||
S5‑216371 | New SID Study on measurement data collection to support RAN intelligence | Intel Corporation (UK) Ltd, Verizon, AT&T, CMCC | SID new | Approval | Yes |
Yes
| noted | No | ||||
S5‑216375 | New SID on evaluation of autonomous network levels | China Mobile, Huawei, AsiaInfo, China Unicom, China Telecom, ZTE, CATT, Lenovo, Motorola Mobility, Intel | SID new | Approval | Yes |
Yes
| revised | No | S5‑216429 | |||
S5‑216429 | New SID on evaluation of autonomous network levels | China Mobile, Huawei, AsiaInfo, China Unicom, China Telecom, ZTE, CATT, Lenovo, Motorola Mobility, Intel | SID new | Approval | Yes |
Yes
| agreed | No | S5‑216375 | |||
S5‑216376 | New SID on enhancement of autonomous network levels | China Mobile, Huawei, AsiaInfo, China Unicom, China Telecom, ZTE, CATT, Lenovo, Motorola Mobility, Intel | SID new | Approval | Yes |
Yes
| revised | No | S5‑216430 | S5‑215165 | ||
S5‑216430 | New SID on enhancement of autonomous network levels | China Mobile, Huawei, AsiaInfo, China Unicom, China Telecom, ZTE, CATT, Lenovo, Motorola Mobility, Intel | SID new | Approval | Yes |
Yes
| agreed | No | S5‑216376 | |||
6.3 | OAM&P Maintenance and Rel-17 small Enhancements | S5‑216037 | Add new common types for YANG | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| agreed | No | ||
S5‑216039 | Correction of YANG Solution set | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216054 | Rel-16 CR 28.310 Update energy saving solutions | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑216431 | |||
S5‑216431 | Rel-16 CR 28.310 Update energy saving solutions | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑216054 | |||
S5‑216055 | Rel-17 CR 28.310 Update energy saving solutions | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑216432 | |||
S5‑216432 | Rel-17 CR 28.310 Update energy saving solutions | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑216055 | |||
S5‑216066 | Update 5GC NRM for 5G_DDNMF reference point | CATT | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216100 | Rel-17 CR 32.421 Introduce missing interfaces of HSS | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216101 | Rel-17 CR 32.422 Introduce missing interfaces of HSS | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216102 | Rel-16 CR 32.421 Introduce missing interfaces of HSS | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216103 | Rel-16 CR 32.422 Introduce missing interfaces of HSS | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216104 | Rel-16 CR 32.423 Introduce missing IEs for HSS and UDM Trace Record | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑216443 | |||
S5‑216443 | Rel-16 CR 32.423 Introduce missing IEs for HSS and UDM Trace Record | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑216104 | |||
S5‑216105 | Rel-17 CR 32.423 Introduce missing IEs for HSS and UDM Trace Record | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑216444 | |||
S5‑216444 | Rel-17 CR 32.423 Introduce missing IEs for HSS and UDM Trace Record | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑216105 | |||
S5‑216106 | Rel-16 CR 28.623 Introduce missing IEs for HSS and UDM Trace Record | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216122 | Rel-16 CR TS 28.405 Correct the description of QoE reference and PLMN target | ZTE Corporation | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216198 | Rel-17 CR TS 28.541 Update inclusive language modification for TS 28.541 | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑216437 | |||
S5‑216437 | Rel-17 CR TS 28.541 Update inclusive language modification for TS 28.541 | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑216198 | |||
S5‑216207 | Rel-16 CR TS 28.541 Correct the wrong reference for TS 32.160 | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216208 | Rel-17 CR TS 28.541 Correct the wrong reference for TS 32.160 | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216209 | Rel-15 CR TS 28.622 Update the scope to be applicable for SBMA | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216210 | Rel-16 CR TS 28.622 Update the scope to be applicable for SBMA | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216211 | Rel-15 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216580 | |||
S5‑216580 | Rel-15 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑216211 | |||
S5‑216212 | Rel-16 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216581 | |||
S5‑216581 | Rel-16 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑216212 | |||
S5‑216213 | Rel-15 CR TS 28.658 Update Generic RAN NRM to be applicable for SBMA | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216618 | |||
S5‑216618 | Rel-15 CR TS 28.658 Update Generic RAN NRM to be applicable for SBMA | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑216213 | |||
S5‑216214 | Rel-16 CR TS 28.658 Update Generic RAN NRM to be applicable for SBMA | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216619 | |||
S5‑216619 | Rel-16 CR TS 28.658 Update Generic RAN NRM to be applicable for SBMA | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑216214 | |||
S5‑216215 | Rel-16 CR TS 28.533 Fix editorial issues | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216216 | Rel-17 CR TS 28.533 Fix editorial issue | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216244 | Rel-16 Fix stage3 definition for plmnId | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216245 | Fix stage3 definition for plmnId | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216287 | Rel-16 CR 28.622 Add missing definitions of common data types | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| not pursued | No | S5‑215351 | |||
S5‑216288 | Rel-17 CR 28.160 Amend stage 2 NRM specification template | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| not pursued | No | S5‑215356 | |||
S5‑216307 | Rel-16 CR 28.552 Correct definition of Distribution of UL UE throughput in gNB | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216310 | Rel-17 CR 28.552 Correct definition of Distribution of UL UE throughput in gNB | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216323 | Correct handover trigger | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216324 | Correct handover trigger | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| revised | No | S5‑216433 | |||
S5‑216433 | Correct handover trigger | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| agreed | No | S5‑216324 | |||
S5‑216325 | Correct maximumDeviationHoTrigger | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216326 | Correct maximumDeviationHoTrigger | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216327 | Correct wording and header | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| endorsed | No | ||||
S5‑216331 | Rel-16 CR 32.422 Update to include Trace Failure admin messages | Ericsson LM | CR | Approval | Yes |
Yes
| revised | No | S5‑216441 | |||
S5‑216441 | Rel-16 CR 32.422 Update to include Trace Failure admin messages | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | S5‑216331 | |||
S5‑216333 | Rel-17 CR 32.422 Update to include trace failure admin messages | Ericsson LM | CR | Approval | Yes |
Yes
| revised | No | S5‑216442 | |||
S5‑216442 | Rel-17 CR 32.422 Update to include trace failure admin messages | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | S5‑216333 | |||
S5‑216337 | Rel-16 CR 32.422 Correction of IP Address of Trace Collection Entity | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216339 | Rel-17 CR 32.422 Correction of IP Address of Trace Collection Entity | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216347 | Rel-16 CR 28.622 Clarify behavior of NtfSubscriptionControl | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑216440 | |||
S5‑216440 | Rel-16 CR 28.622 Clarify behavior of NtfSubscriptionControl | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑216347 | |||
S5‑216352 | Rel-16 CR 28.532 Correct spelling of notifyAlarmListRebuilt | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑216434 | |||
S5‑216434 | Rel-16 CR 28.532 Correct spelling of notifyAlarmListRebuilt | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑216352 | |||
S5‑216389 | Correct spelling of Attribute properties | Ericsson India Private Limited | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216393 | Clarify business requirement and correct punctuation | Ericsson LM, Deutsche Telekom | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216394 | Clarify communication service in requirement CSA-CON-06 | Ericsson LM, Deutsche Telekom | CR | Approval | Yes |
Yes
| revised | No | S5‑216435 | |||
S5‑216435 | Clarify communication service in requirement CSA-CON-06 | Ericsson LM, Deutsche Telekom | CR | Approval | Yes |
Yes
| agreed | No | S5‑216394 | |||
S5‑216395 | Clarify business requirement and correct punctuation | Ericsson LM, Deutsche Telekom | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216396 | Clarify communication service in requirement CSA-CON-06 | Ericsson LM, Deutsche Telekom | CR | Approval | Yes |
Yes
| revised | No | S5‑216436 | |||
S5‑216436 | Clarify communication service in requirement CSA-CON-06 | Ericsson LM, Deutsche Telekom | CR | Approval | Yes |
Yes
| agreed | No | S5‑216396 | |||
S5‑216402 | Correct spelling of Attribute properties | Ericsson India Private Limited | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216420 | Latest draft TR 28.817 | Nokia | draft TR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216421 | Presentation sheet for SA approval of TR 28.817 | Nokia | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
6.4.1 | Management of non-public networks | S5‑216056 | pCR 28.557 Update names for management modes of NPN | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216445 | |
S5‑216445 | pCR 28.557 Update names for management modes of NPN | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216056 | |||
S5‑216057 | pCR 28.557 Solution for management of SNPN | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216058 | pCR 28.557 Solution for exposure of management capability of PNI-NPN | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216059 | pCR 28.557 Solution for collecting UE related data | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216060 | pCR 28.557 Update NPN management aspects | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216550 | |||
S5‑216550 | pCR 28.557 Update NPN management aspects | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216060 | |||
S5‑216061 | pCR 28.557 Remove editor notes | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216062 | pCR 28.557 Rapporteur proposal | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216598 | Latest draft TS 28.557 | Huawei | draft TS | Approval | Yes |
Yes
| approved | No | ||||
6.4.2 | Enhancement on Management Aspects of 5G Service-Level Agreement | S5‑216063 | Rel-17 CR 28.541 Remove editor notes | Huawei | CR | Approval | Yes |
Yes
| agreed | No | ||
S5‑216246 | Rel-17 network slice isolation | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216247 | network slice protection on N6 interface | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑216438 | |||
S5‑216438 | network slice protection on N6 interface | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑216247 | |||
S5‑216248 | network slice specific authentication | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑216439 | |||
S5‑216439 | network slice specific authentication | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑216248 | |||
S5‑216269 | Modification of network slice related requirements | China Mobile | CR | Yes |
Yes
| revised | No | S5‑216446 | ||||
S5‑216446 | Modification of network slice related requirements | China Mobile | CR | - | Yes |
Yes
| agreed | No | S5‑216269 | |||
S5‑216270 | Rel-17 Correction of attribute in ServiceProfile and CNSliceSubnetProfile | China Mobile | CR | Yes |
Yes
| not pursued | No | |||||
6.4.3 | Management of MDT enhancement in 5G | S5‑216135 | Add new requirements for configuration of beam level measurement | Ericsson Japan K-K | CR | Yes |
Yes
| agreed | No | |||
S5‑216136 | Add beam level configuration parameter in NR | Ericsson Japan K-K | CR | Yes |
Yes
| revised | No | S5‑216537 | ||||
S5‑216537 | Add beam level configuration parameter in NR | Ericsson Japan K-K | CR | - | Yes |
Yes
| agreed | No | S5‑216136 | |||
6.4.4 | Additional NRM features | S5‑216093 | Rel-17 CR 28.541 Stage 3 YANG updates for stage 2 CRs 214164, 585-8 | Cisco Systems Belgium | CR | Approval | Yes |
Yes
| revised | No | S5‑216620 | |
S5‑216620 | Rel-17 CR 28.541 Stage 3 YANG updates for stage 2 CRs 214164, 585-8 | Cisco Systems Belgium | CR | Approval | Yes |
Yes
| not pursued | No | S5‑216093 | |||
S5‑216168 | Rel-17 CR 28.541 Add N70 N71 stage 3 | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑216271 | Rel-17 Enhance NRM of UDM function | China Mobile | CR | Yes |
Yes
| revised | No | S5‑216538 | ||||
S5‑216538 | Rel-17 Enhance NRM of UDM function | China Mobile | CR | - | Yes |
Yes
| agreed | No | S5‑216271 | |||
S5‑216272 | TS28.541 CR Rel-17 Stage3 Update for UPF and PCF | China Mobile | CR | Yes |
Yes
| revised | No | S5‑216539 | ||||
S5‑216539 | TS28.541 CR Rel-17 Stage3 Update for UPF and PCF | China Mobile | CR | - | Yes |
Yes
| agreed | No | S5‑216272 | |||
S5‑216314 | Rel-17 CR 28.541 Introduce missing attribute nrFreqRelationRef in table of attribute properties (stage2) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑216540 | |||
S5‑216540 | Rel-17 CR 28.541 Introduce missing attribute nrFreqRelationRef in table of attribute properties (stage2) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑216314 | |||
S5‑216332 | Rel-17 CR 28.541 Correct attribute in IOC NRCellRelation (stage 3) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑216541 | |||
S5‑216541 | Rel-17 CR 28.541 Correct attribute in IOC NRCellRelation (stage 3) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑216332 | |||
S5‑216343 | Rel-17 CR TS 28.622 Add condition information for threshold monitoring | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑215122 | |||
S5‑216361 | Rel-17 CR 28.541 Introduce bidirectional association between NRCellDU and Beam | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216364 | Enhance 5G Core managed NF Profile NRM fragment (Stage 2) | Nokia Germany, Orange, DT, Telefonica | CR | Approval | Yes |
Yes
| revised | No | S5‑216542 | |||
S5‑216542 | Enhance 5G Core managed NF Profile NRM fragment (Stage 2) | Nokia Germany, Orange, DT, Telefonica | CR | Approval | Yes |
Yes
| agreed | No | S5‑216364 | |||
S5‑216365 | 5GC NRM enhancements for ManagedNFProfile (Stage 3) | Nokia Germany | CR | Approval | Yes |
Yes
| revised | No | S5‑216543 | |||
S5‑216543 | 5GC NRM enhancements for ManagedNFProfile (Stage 3) | Nokia Germany | CR | Approval | Yes |
Yes
| agreed | No | S5‑216365 | |||
S5‑216381 | Rel-17 CR 28.623 Stage 3 YANG correction of _3gpp-common-trace | Cisco Systems Belgium | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216407 | IMS parts in 28.705 to YANG-YAML | Ericsson Hungary Ltd | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
6.4.5 | Enhancement of QoE Measurement Collection | S5‑216089 | Adding Signalling Based Activation for UTRAN and LTE | Ericsson LM | CR | Approval | Yes |
Yes
| revised | No | S5‑216544 | |
S5‑216544 | Adding Signalling Based Activation for UTRAN and LTE | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | S5‑216089 | |||
S5‑216094 | Adding Management Based Activation and Temporary stop and restart during RAN overload in NR | Ericsson LM | draftCR | Approval | Yes |
Yes
| revised | No | S5‑216545 | |||
S5‑216545 | Adding Management Based Activation and Temporary stop and restart during RAN overload in NR | Ericsson LM | draftCR | Approval | Yes |
Yes
| approved | No | S5‑216094 | |||
6.4.6 | Enhancements of 5G performance measurements and KPIs | S5‑216133 | Rel-17 CR 28.552 Add enhanced MIMO PRB Usage for cell | China Unicom | CR | Approval | Yes |
Yes
| revised | No | S5‑216546 | |
S5‑216546 | Rel-17 CR 28.552 Add enhanced MIMO PRB Usage for cell | China Unicom | CR | Approval | Yes |
Yes
| agreed | No | S5‑216133 | |||
S5‑216134 | Discussion on enhanced MIMO PRB Usage for cell | China Unicom | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑216547 | |||
S5‑216547 | Discussion on enhanced MIMO PRB Usage for cell | China Unicom | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑216134 | |||
S5‑216354 | CR Rel-17 28.552 Add measurements related to subscriber data management for UDM | Intel | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216355 | CR Rel-17 28.552 Add measurements related to parameter provision for UDM | Intel | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216362 | Add PM on Handover failures per beam related to MRO for intra-system mobility | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑216548 | |||
S5‑216548 | Add PM on Handover failures per beam related to MRO for intra-system mobility | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑216362 | |||
6.4.7 | Management of the enhanced tenant concept | S5‑216166 | Rel-17 CR TS 28.541 Add tenant IOC to support multiple tenant environment | Huawei | CR | Agreement | No |
Yes
| withdrawn | Yes | ||
S5‑216169 | Rel-17 CR 28.531 Update NSI and NSSI allocation precedures | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑216170 | Rel-17 CR 28.541 Update ServiceProfile and SliceProfile | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑216228 | Rel-17 CR TS 28.541 Add tenant IOC to support multiple tenant environment | Huawei | CR | Approval | Yes |
Yes
| not pursued | No | S5‑215089 | |||
S5‑216391 | DP tenant representation in 3GPP management system | Ericsson, Deutsche Telekom | discussion | Endorsement | Yes |
Yes
| noted | No | S5‑213134 | |||
6.4.8 | Management data collection control and discovery | S5‑216098 | Rel-17 draftCR 28.537 Add requirements for data management | Nokia, Nokia Shanghai Bell | draftCR | Approval | Yes |
Yes
| noted | No | S5‑215273 | |
S5‑216099 | Rel-17 Input to DraftCR 28.622 Add data collection job to allow consumers without detailed knowledge of the network to request for data | Nokia, Nokia Shanghai Bell | draftCR | Approval | Yes |
Yes
| noted | No | S5‑215251 | |||
S5‑216115 | Rel-17 InputToDraftCR 28.537 Targeted management data collection | Samsung Electronics France SA | other | Agreement | Yes |
Yes
| noted | No | ||||
S5‑216117 | Rel-17 InputToDraftCR 28.622 ManagementDataSubscription | Samsung, Ericsson | other | Agreement | Yes |
Yes
| noted | No | ||||
S5‑216292 | Rel-17 Input to DraftCR 28.537 Add requirements for managing external management data | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| noted | No | S5‑215362 | |||
S5‑216293 | Rel-17 Input to DraftCR 28.537 Add requirements for context data | Nokia, Nokia Shanghai ell | other | Approval | Yes |
Yes
| noted | No | S5‑215363 | |||
S5‑216294 | Rel-17 Input to DraftCR 28.622 Add solution for reporting and storing data | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| noted | No | S5‑215365 | |||
S5‑216369 | Discussion on Requesting Management Data for a Geographical Area | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑216370 | Management Data Collection Job in NRM | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑216399 | Input to Draft CR 28.622 Define solution for data discovery | Ericsson Telecomunicazioni SpA | draftCR | Approval | Yes |
Yes
| noted | No | ||||
6.4.9 | Autonomous network levels | S5‑216217 | pCR TS 28.100 update Annex A to align with clause 7.1 | Huawei,China Mobile | pCR | Approval | Yes |
Yes
| approved | No | ||
S5‑216256 | pCR TS 28.100 Update scope | China Mobile, Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216257 | pCR TS 28.100 Update workflow, tasks and generic autonomous network level description | China Mobile, Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216258 | pCR TS 28.100 Clean up | China Mobile, Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216259 | Presentation of Spec to TSG TS 28.100 Version 2.0.0 | China Mobile | other | Approval | Yes |
Yes
| approved | No | ||||
S5‑216599 | Latest draft TS 28.100 | China Mobile | draft TS | Approval | Yes |
Yes
| approved | No | ||||
6.4.10 | Intent driven management service for mobile networks | S5‑216042 | Description of Information Elements of an Intent | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑216447 | S5‑215285 |
S5‑216447 | Description of Information Elements of an Intent | Nokia Germany, Nokia Shanghai Bell, Huawei Asiainfo | pCR | Approval | No |
Yes
| approved | No | S5‑216042 | |||
S5‑216043 | Extend Attributes of the Intent IOC | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑216448 | S5‑215286 | ||
S5‑216448 | Extend Attributes of the Intent IOC | Nokia Germany | pCR | Approval | No |
Yes
| approved | No | S5‑216043 | |||
S5‑216126 | pCR 28.312 ServiceDeploymentExpectation Datatype definition | Samsung Electronics France SA | pCR | Agreement | Yes |
Yes
| noted | No | ||||
S5‑216218 | pCR TS 28.312 Update the concept of intent in clause 4.1.3 | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216449 | |||
S5‑216449 | pCR TS 28.312 Update the concept of intent in clause 4.1.3 | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216218 | |||
S5‑216219 | pCR TS 28.312 Update the use case description to align with intent definition | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216450 | |||
S5‑216450 | pCR TS 28.312 Update the use case description to align with intent definition | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216219 | |||
S5‑216220 | pCR TS 28.312 Add concept of intent translation | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216451 | |||
S5‑216451 | pCR TS 28.312 Add concept of intent translation | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216220 | |||
S5‑216221 | pCR TS 28.312 Update intent life cycle management in Annex B.1 | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216452 | |||
S5‑216452 | pCR TS 28.312 Update intent life cycle management in Annex B.1 | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216221 | |||
S5‑216222 | pCR TS 28.312 pCR TS 28.312 Add generic Intent management requirements | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216453 | |||
S5‑216453 | pCR TS 28.312 pCR TS 28.312 Add generic Intent management requirements | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216222 | |||
S5‑216223 | pCR TS 28.312 Update intent information model | Huawei | pCR | Approval | Yes |
Yes
| merged | No | S5‑216448 | |||
S5‑216224 | pCR TS 28.312 Update RadioNetworkExpectation | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216454 | |||
S5‑216454 | pCR TS 28.312 Update RadioNetworkExpectation | Huawei | pCR | Approval | Yes |
Yes
| noted | No | S5‑216224 | |||
S5‑216261 | pCR 28.312 update the intent definition | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216266 | pCR 28.312 update the terms and introduction of use cases | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216273 | Add judge requirements and intent database query requirements for intent driven management | China Mobile | pCR | Yes |
Yes
| noted | No | |||||
S5‑216301 | Discussion on Intent Model | AsiaInfo Technologies Inc | discussion | Discussion | Yes |
Yes
| merged | No | S5‑216447 | |||
S5‑216360 | pCR TS 28.312 Add attributes of the IntentReport | AsiaInfo Technologies Inc | pCR | Yes |
Yes
| merged | No | S5‑216448 | ||||
S5‑216400 | Update intent information model | Ericsson Telecomunicazioni SpA | pCR | Agreement | Yes |
Yes
| noted | No | ||||
S5‑216591 | Latest draft TS 28.312 | Huawei | draft TS | Approval | Yes |
Yes
| withdrawn | Yes | ||||
S5‑216629 | Latest draft TS 28.312 | Huawei | draft TS | Approval | No |
Yes
| approved | No | ||||
6.4.11 | Network policy management for 5G mobile networks based on NFV scenarios | S5‑216119 | pCR 28.556 Add notificaition definition | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑216455 | |
S5‑216455 | pCR 28.556 Add notificaition definition | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑216119 | |||
S5‑216120 | pCR 28.556 Change stage 2 information attribute definition | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑216456 | |||
S5‑216456 | pCR 28.556 Change stage 2 information attribute definition | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑216120 | |||
S5‑216121 | pCR 28.556 Add stage 3 definition | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑216458 | |||
S5‑216458 | pCR 28.556 Add stage 3 definition | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑216121 | |||
S5‑216124 | Presentation of Spec 28.556 to SA for Approval | China Mobile Com. Corporation | TS or TR cover | Yes |
Yes
| approved | No | |||||
S5‑216173 | pCR 28.556 update Policy activation and deactivation procedure | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216457 | |||
S5‑216457 | pCR 28.556 update Policy activation and deactivation procedure | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216173 | |||
S5‑216174 | pCR 28.556 update PolicyContent definition | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216459 | |||
S5‑216459 | pCR 28.556 update PolicyContent definition | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216174 | |||
S5‑216600 | Latest draft TS 28.556 | China Mobile | draft TS | Approval | Yes |
Yes
| approved | No | ||||
6.4.12 | Enhanced Closed loop SLS Assurance | S5‑216230 | Rel-17 Input to draftCR S5-215550 TS 28.536 Updates to assurance report for eCOSLA | Huawei Technologies Japan K.K. | draftCR | Agreement | Yes |
Yes
| revised | No | S5‑216460 | |
S5‑216460 | Rel-17 Input to draftCR S5-215550 TS 28.536 Updates to assurance report for eCOSLA | Huawei Technologies Japan K.K. | draftCR | Agreement | Yes |
Yes
| approved | No | S5‑216230 | |||
S5‑216231 | Rel-17 Input to draftCR S5-215550 TS 28.536 Add stage 3 SS definitions to assurance report for eCOSLA | Huawei Technologies Japan K.K. | draftCR | Agreement | Yes |
Yes
| revised | No | S5‑216461 | |||
S5‑216461 | Rel-17 Input to draftCR S5-215550 TS 28.536 Add stage 3 SS definitions to assurance report for eCOSLA | Huawei Technologies Japan K.K. | draftCR | Agreement | Yes |
Yes
| approved | No | S5‑216231 | |||
S5‑216397 | Discussion paper on composite management service for Cosla | Ericsson LM | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑216406 | Draft CR Rel 17 Add support for pause point | Lenovo, Motorola Mobility | draftCR | Agreement | Yes |
Yes
| noted | No | ||||
S5‑216596 | DraftCR for eCOSLA - TS 28.536 | Ericsson | draftCR | Approval | Yes |
Yes
| approved | No | ||||
6.4.13 | Self-Organizing Networks (SON) for 5G networks | S5‑216040 | Rel-17 CR 28.313 Add LBO use cases, requirements, and procedure | Intel Corporation (UK) Ltd | CR | Approval | Yes |
Yes
| revised | No | S5‑216462 | |
S5‑216462 | Rel-17 CR 28.313 Add LBO use cases, requirements, and procedure | Intel Corporation (UK) Ltd | CR | Approval | Yes |
Yes
| agreed | No | S5‑216040 | |||
S5‑216095 | Rel-17 CR 28.532 Add definition of additionalText in notifyMOIAttributeValueChanges | Intel Corporation (UK) Ltd | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216107 | Rel-17 CR 28.313 Add information in the PCI configuration notification | Intel Corporation (UK) Ltd | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216108 | Rel-17 CR 28.313 Add information in the C-SON notification | Intel Corporation (UK) Ltd | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216195 | Rel-17 CR 28.313 Add C-SON CCO control information | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑216463 | |||
S5‑216463 | Rel-17 CR 28.313 Add C-SON CCO control information | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑216195 | |||
S5‑216196 | Rel-17 CR 28.541 Add C-SON CCO NRM model | Huawei | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216322 | Clause number correction | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| revised | No | S5‑216464 | |||
S5‑216464 | Clause number correction | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| agreed | No | S5‑216322 | |||
S5‑216363 | Add beam specific handover counters to MRO | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
6.4.14 | Enhancement of Handover Optimization | S5‑216050 | Rel-17 CR NRM for CHO | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| revised | No | S5‑216465 | |
S5‑216465 | Rel-17 CR NRM for CHO | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| agreed | No | S5‑216050 | |||
S5‑216051 | Rel-17 CR NRM for CHO Stage 3 | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| revised | No | S5‑216466 | |||
S5‑216466 | Rel-17 CR NRM for CHO Stage 3 | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| agreed | No | S5‑216051 | |||
S5‑216052 | Rel-17 CR NRM for DAPS handover | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| revised | No | S5‑216467 | |||
S5‑216467 | Rel-17 CR NRM for DAPS handover | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| agreed | No | S5‑216052 | |||
S5‑216053 | Rel-17 CR NRM for DAPS handover Stage 3 | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| revised | No | S5‑216468 | |||
S5‑216468 | Rel-17 CR NRM for DAPS handover Stage 3 | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| agreed | No | S5‑216053 | |||
S5‑216319 | Conditional Handover services and procedures | Ericsson France S.A.S | other | Approval | Yes |
Yes
| revised | No | S5‑216613 | |||
S5‑216613 | Conditional Handover services and procedures | Ericsson France S.A.S | other | Approval | Yes |
Yes
| approved | No | S5‑216319 | |||
S5‑216320 | DAPS handover services and procedures | Ericsson France S.A.S | other | Approval | Yes |
Yes
| revised | No | S5‑216614 | |||
S5‑216614 | DAPS handover services and procedures | Ericsson France S.A.S | other | Approval | Yes |
Yes
| approved | No | S5‑216320 | |||
S5‑216321 | DAPS handover Performance Measurements | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216621 | DraftCR for E-HOO - TS 28.313 | Huawei | draftCR | Approval | Yes |
Yes
| approved | No | ||||
6.4.15 | Enhancements on EE for 5G networks | S5‑216068 | Revised WID Enhancements on EE for 5G networks | Orange | WID revised | Agreement | Yes |
Yes
| agreed | No | ||
S5‑216341 | Rel-17 CR TS 28.554 Add definition of 5GC energy efficiency (EE) KPI | China Telecom | CR | Agreement | Yes |
Yes
| revised | No | S5‑216469 | |||
S5‑216469 | Rel-17 CR TS 28.554 Add definition of 5GC energy efficiency (EE) KPI | China Telecom | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216341 | |||
6.4.16 | Discovery of management services in 5G | S5‑216090 | Rel-17 Input to Draft CR 28.623 Update YANG for MNS Registry | Ericsson LM,Huawei | other | Approval | Yes |
Yes
| approved | No | S5‑215263 | |
S5‑216183 | Rel-17 CR 28.622 Add support for MnS Discovery | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑215532 | |||
S5‑216184 | Rel-17 CR 28.623 Add support for MnS Discovery | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑215533 | |||
S5‑216289 | Rel-17 DP Solutions for REQ-DMS-3 and REQ-DMS-4 of MnS discovery | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑216299 | Clarifications into existing requirements | NEC Europe Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.17 | Management Aspects of 5G Network Sharing | S5‑216225 | Rel-17 CR TS 32.130 Update RAN sharing scenarios to cover 5G RAN sharing | Huawei,China Unicom | CR | Agreement | Yes |
Yes
| agreed | No | ||
S5‑216226 | Rel-17 CR TS 32.130 Update requirments for NG-RAN MOCN network sharing scenarios | Huawei,China Unicom | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216227 | Rel-17 CR TS 28.541 Add YAML solution set for NG-RAN MOCN network sharing scenarios(S5-215534) | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.18 | Enhancements of Management Data Analytics Service | S5‑216125 | pCR 28.104 Replace alarm incident with alarm information | ZTE Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑216471 | |
S5‑216471 | pCR 28.104 Replace alarm incident with alarm information | ZTE Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑216125 | |||
S5‑216127 | pCR 28.104 Software Management usecase and requirements | Samsung Electronics France SA | pCR | Agreement | Yes |
Yes
| revised | No | S5‑216472 | |||
S5‑216472 | pCR 28.104 Software Management usecase and requirements | Samsung Electronics France SA | pCR | Agreement | Yes |
Yes
| approved | No | S5‑216127 | |||
S5‑216128 | pCR 28.104 Paging Optimization usecase and requirements | Samsung Electronics France SA | pCR | Agreement | Yes |
Yes
| revised | No | S5‑216473 | |||
S5‑216473 | pCR 28.104 Paging Optimization usecase and requirements | Samsung Electronics France SA | pCR | Agreement | Yes |
Yes
| approved | No | S5‑216128 | |||
S5‑216129 | pCR 28.104 HO Optimization usecase and requirements | Samsung Electronics France SA | pCR | Agreement | Yes |
Yes
| revised | No | S5‑216474 | |||
S5‑216474 | pCR 28.104 HO Optimization usecase and requirements | Samsung Electronics France SA | pCR | Agreement | Yes |
Yes
| approved | No | S5‑216129 | |||
S5‑216175 | pCR 28.104 Alignment of terminology | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216475 | |||
S5‑216475 | pCR 28.104 Alignment of terminology | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216175 | |||
S5‑216185 | Rel-17 PCR TS 28.104 add coverage analysis requirement | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216476 | |||
S5‑216476 | Rel-17 PCR TS 28.104 add coverage analysis requirement | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216185 | |||
S5‑216186 | Rel-17 PCR TS 28.104 Add alarm incident analysis use case and requirement | Huawei | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑216187 | Rel-17 PCR TS 28.104 Add alarm incident analysis solution | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216188 | Rel-17 pCR 28.104 Add KPI anomaly analysis use case and requirement | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216189 | Rel-17 pCR 28.104 Add KPI anomaly analysis solution | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216190 | Rel-17 PCR TS 28.104 add MDA assisted Energy Saving use case and requirement | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216477 | |||
S5‑216477 | Rel-17 PCR TS 28.104 add MDA assisted Energy Saving use case and requirement | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216190 | |||
S5‑216191 | Rel-17 PCR TS 28.104 add MDA assisted Energy Saving solution | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216192 | Rel-17 PCR TS 28.104 add mobility management solution | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216193 | Rel-17 PCR TS 28.104 add MDA analysis request and report Workflow | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216194 | Rel-17 pCR TS 28.104 Add MDA analysis report reporting related service component | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216622 | |||
S5‑216622 | Rel-17 pCR TS 28.104 Add MDA analysis report reporting related service component | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216194 | |||
S5‑216236 | pCR 28.104 Add E2E latency analysis use case and requirements | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216480 | |||
S5‑216480 | pCR 28.104 Add E2E latency analysis use case and requirements | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216236 | |||
S5‑216237 | pCR 28.104 Add E2E latency analysis solution | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216238 | pCR 28.104 Add service experience analysis solution | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216239 | pCR 28.104 Add network slice throughput analysis solution | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216241 | pCR 28.104 Add network slice instance load analysis use case and requirements | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216552 | |||
S5‑216552 | pCR 28.104 Add network slice instance load analysis use case and requirements | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216241 | |||
S5‑216242 | pCR 28.104 Add network slice instance load analysis solution | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216260 | pCR 28.104 add alarm related Incident analysis | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216265 | pCR 28.104 Add MDA assisted energy saving | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| merged | No | S5‑216477 | |||
S5‑216268 | pCR 28.104 add inter-gNB beam selection optimization | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑216470 | |||
S5‑216470 | pCR 28.104 add inter-gNB beam selection optimization | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑216268 | |||
S5‑216274 | pCR TS28.104 add MDA related data and usecase requirements | China Mobile | pCR | Yes |
Yes
| revised | No | S5‑216481 | ||||
S5‑216481 | pCR TS28.104 add MDA related data and usecase requirements | China Mobile | pCR | - | Yes |
Yes
| approved | No | S5‑216274 | |||
S5‑216275 | pCR draft TS28.104 add slice coverage analysis | China Mobile | pCR | Yes |
Yes
| revised | No | S5‑216553 | ||||
S5‑216553 | pCR draft TS28.104 add slice coverage analysis | China Mobile | pCR | - | Yes |
Yes
| approved | No | S5‑216275 | |||
S5‑216300 | pCR draft TS28.104, add use case and requirements for MDA historical data | NEC Europe Ltd | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216335 | pCR 28.104 Add use case and requirement for MDA assisted energy saving analysis | China Telecom, AsiaInfo | pCR | Yes |
Yes
| merged | No | S5‑216477 | ||||
S5‑216338 | pCR 28.104 Add MDA capability for MDA assisted energy saving analysis | China Telecom, AsiaInfo | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216342 | pCR 28.104 Add requirements for ML model training | Intel | pCR | Approval | Yes |
Yes
| revised | No | S5‑216554 | |||
S5‑216554 | pCR 28.104 Add requirements for ML model training | Intel | pCR | Approval | Yes |
Yes
| approved | No | S5‑216342 | |||
S5‑216344 | pCR 28.104 Add MnS producer initiated ML model training | Intel | pCR | Approval | Yes |
Yes
| revised | No | S5‑216555 | |||
S5‑216555 | pCR 28.104 Add MnS producer initiated ML model training | Intel | pCR | Approval | Yes |
Yes
| approved | No | S5‑216344 | |||
S5‑216345 | pCR Add stage 2 structure for TS 28.104 | Intel, NEC, China Telecom, China Mobile, HUAWEI, CATT, AsiaInfo | pCR | Approval | Yes |
Yes
| revised | No | S5‑216556 | |||
S5‑216556 | pCR Add stage 2 structure for TS 28.104 | Intel, NEC, China Telecom, China Mobile, HUAWEI, CATT, AsiaInfo | pCR | Approval | Yes |
Yes
| approved | No | S5‑216345 | |||
S5‑216346 | DP on requesting a new TS number for AI&ML management | Intel, NEC | discussion | Approval | Yes |
Yes
| revised | No | S5‑216557 | |||
S5‑216557 | DP on requesting a new TS number for AI&ML management | Intel, NEC | discussion | Approval | Yes |
Yes
| approved | No | S5‑216346 | |||
S5‑216348 | Revised WID Enhancements of Management Data Analytics Service | Intel, NEC | WID revised | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216350 | pCR 28.104 Add MDA capability for coverage problem analysis | Intel, NEC, HUAWEI | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216353 | pCR 28.104 Add common information elements of analytics outputs | Intel, NEC, China Telecom, HUAWEI | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216368 | Add obtaining MDA output | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑216478 | |||
S5‑216478 | Add obtaining MDA output | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑216368 | |||
S5‑216373 | Add MDA Request and Control | Nokia Germany | pCR | Approval | Yes |
Yes
| withdrawn | Yes | ||||
S5‑216377 | Add MDA Request and Control | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑216479 | |||
S5‑216479 | Add MDA Request and Control | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑216377 | |||
S5‑216601 | Latest draft TS 28.104 | Intel | draft TS | Approval | Yes |
Yes
| approved | No | ||||
6.4.19 | Plug and connect support for management of Network Functions | S5‑216096 | pCR 28.314 PnC Concepts and Requirements - minor updates | Oy LM Ericsson AB | pCR | Approval | Yes |
Yes
| approved | No | ||
S5‑216097 | pCR 28.315 PnC Procedure flows - minor updates | Oy LM Ericsson AB | pCR | Approval | Yes |
Yes
| revised | No | S5‑216558 | |||
S5‑216558 | pCR 28.315 PnC Procedure flows - minor updates | Oy LM Ericsson AB | pCR | Approval | Yes |
Yes
| approved | No | S5‑216097 | |||
S5‑216358 | pCR 28.316 PnC Data formats - DHCP Request | Oy LM Ericsson AB | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216602 | Latest draft TS 28.314 | Ericsson | draft TS | Approval | Yes |
Yes
| approved | No | ||||
S5‑216603 | Latest draft TS 28.315 | Ericsson | draft TS | Approval | Yes |
Yes
| approved | No | ||||
S5‑216604 | Latest draft TS 28.316 | Ericsson | draft TS | Approval | Yes |
Yes
| approved | No | ||||
6.4.20 | File Management | S5‑216290 | Rel-17 Input to DraftCR 28.622 Amend file retrieval NRM fragment | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| revised | No | S5‑216559 | S5‑215360 |
S5‑216559 | Rel-17 Input to DraftCR 28.622 Amend file retrieval NRM fragment | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| approved | No | S5‑216290 | |||
S5‑216291 | Rel-17 Input to DraftCR 28.622 Add file download control NRM fragment | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| noted | No | S5‑215361 | |||
S5‑216422 | Rel-17 Input to DraftCR 28.623 file retrieval and download control NRM fragment, stage3 | Ericsson | other | Approval | Yes |
Yes
| noted | No | ||||
S5‑216597 | DraftCR for FIMA TS 28.622 | Nokia | draftCR | Approval | Yes |
Yes
| approved | No | ||||
6.4.21 | Edge Computing Management | S5‑216038 | pCR 28.538 Import attribute tAI to for Edge NRM | Nanjing Ericsson Panda Com Ltd, Samsung | pCR | Approval | Yes |
Yes
| approved | No | ||
S5‑216041 | Discussion paper for async solutions to support lifecycle management | Intel Corporation (UK) Ltd | discussion | Endorsement | Yes |
Yes
| withdrawn | Yes | ||||
S5‑216109 | Rel-17 CR 28.552 Add EAS data volume measurements | Intel Corporation (UK) Ltd | CR | Approval | Yes |
Yes
| revised | No | S5‑216560 | |||
S5‑216560 | Rel-17 CR 28.552 Add EAS data volume measurements | Intel Corporation (UK) Ltd | CR | Approval | Yes |
Yes
| agreed | No | S5‑216109 | |||
S5‑216110 | pCR 28.538 add MnS information for EAS performance assurance | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑216561 | |||
S5‑216561 | pCR 28.538 add MnS information for EAS performance assurance | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑216110 | |||
S5‑216123 | pCR 28.538 EESFunction definition and procedure | Samsung Electronics France SA | pCR | Agreement | Yes |
Yes
| noted | No | ||||
S5‑216176 | pCR 28.538 add ECS termination procedure | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216177 | pCR 28.538 add Provisioning MnS for Edge Computing | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216562 | |||
S5‑216562 | pCR 28.538 add Provisioning MnS for Edge Computing | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216177 | |||
S5‑216178 | pCR 28.538 add transport view for EAS | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216563 | |||
S5‑216563 | pCR 28.538 add transport view for EAS | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216178 | |||
S5‑216179 | pCR 28.538 updating EAS termination procedure | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216372 | Discussion paper for asynchronous solutions to support LCM | Intel Corporation (UK) Ltd | other | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑216605 | Latest draft TS 28.538 | Samsung | draft TS | Approval | Yes |
Yes
| approved | No | ||||
6.4.22 | Improved support for NSA in the service-based management architecture | S5‑216092 | Update Inventory stage2 to support SBMA | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| not pursued | No | ||
S5‑216164 | Rel-17 CR TS 28.659 Provide YAML solution set for EUTRAN NRM | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑215132 | |||
S5‑216165 | Rel-17 CR TS 28.663 Provide YAML solution set for RAN NRM | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑215133 | |||
S5‑216276 | CR Rel-17 TS 28.530 Add description for SBMA supporting manangement of 5G SA and NSA scenarios | Huawei Technologies (Korea) | CR | Yes |
Yes
| revised | No | S5‑216564 | ||||
S5‑216564 | CR Rel-17 TS 28.530 Add description for SBMA supporting manangement of 5G SA and NSA scenarios | Huawei Technologies (Korea) | CR | - | Yes |
Yes
| agreed | No | S5‑216276 | |||
S5‑216392 | YANG Solution Set for Generic Radio Access Network NRM | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| not pursued | No | S5‑215194 | |||
S5‑216398 | YANG Solution Set for Inventory Management | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| not pursued | No | S5‑215110 | |||
S5‑216401 | DP on YANG solution set for Inventory | Ericsson Hungary Ltd | discussion | Endorsement | Yes |
Yes
| endorsed | No | ||||
6.4.23 | Access control for management service | S5‑216111 | enhance SBMA to support access control | Nokia, Nokia Shanghai Bell, Ericsson | CR | No |
Yes
| withdrawn | Yes | |||
S5‑216112 | enhance SBMA to support access control | Nokia, Nokia Shanghai Bell, Ericsson | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216113 | enhance request-response communication paradigm to support access control | Nokia, Nokia Shanghai Bell, Ericsson | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑216311 | Enhance Management Service to Support Access Control Procedures | Ericsson LM | discussion | Endorsement | Yes |
Yes
| endorsed | No | ||||
S5‑216312 | Rel-17 CR 28.540 Add requirements for NRM access control | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | ||||
6.4.24 | Network slice provisioning enhancement (preliminary work before SA approval) | S5‑216114 | CR 28.531 Fixing NetworkSlice and NetworkSliceSubnet Allocation and Deallocation Stage 3 | Samsung Electronics France SA | CR | Agreement | Yes |
Yes
| not pursued | No | ||
S5‑216205 | Rel-17 CR TS 28.541 Add feasibility check NRM fragment | Huawei,China Unicom, Deutsche Telekom,China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑215087 | |||
S5‑216206 | Rel-17 CR TS 28.531 Update procedure of reservation and checking feasibility of network slice subnet | Huawei,China Unicom,Deutsche Telekom,China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑215088 | |||
S5‑216252 | Discussion Paper on Asynchronous design | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑216387 | CR Rel-17 28.531 Fixing NetworkSlice and NetworkSliceSubnet Allocation and Deallocation Stage 2 | Ericsson LM, Deutsche Telekom | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑215498 | |||
S5‑216388 | Discussion paper on on generalized approach to asynchronous network slicing procedures | Ericsson LM | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑216390 | Add network slice job class to NRM | Ericsson LM | CR | Approval | Yes |
Yes
| not pursued | No | ||||
6.5.1 | Study on new aspects of EE for 5G networks | S5‑216044 | Presentation of TR 28.813 for approval | Orange | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||
S5‑216045 | pCR TR 28.813 Align conclusion titles | Orange | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216046 | pCR TR 28.813 Change editor’s note to note in KI#3 | Orange | pCR | Approval | Yes |
Yes
| revised | No | S5‑216565 | |||
S5‑216565 | pCR TR 28.813 Change editor’s note to note in KI#3 | Orange | pCR | Approval | Yes |
Yes
| approved | No | S5‑216046 | |||
S5‑216047 | pCR TR 28.813 Add conclusion to Key Issue #3 | Orange, China Telecom | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216064 | pCR 28.813 Update solution of Key Issue 6 | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216566 | |||
S5‑216566 | pCR 28.813 Update solution of Key Issue 6 | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216064 | |||
S5‑216065 | pCR 28.813 Update impact on normative work of Key Issue 4 | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216612 | |||
S5‑216612 | pCR 28.813 Update impact on normative work of Key Issue 4 | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216065 | |||
S5‑216067 | Revised SID New aspects of EE for 5G networks | Orange | SID revised | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216130 | Rel-17 pCR 28.813 EE of URLLC slice based on reliability | Samsung Electronics France SA | pCR | Agreement | Yes |
Yes
| noted | No | ||||
S5‑216606 | Latest draft TR 28.813 | ORANGE | draft TR | Approval | Yes |
Yes
| approved | No | ||||
6.5.2 | Study on network slice management enhancement (revised to include security aspects) | S5‑216171 | pCR 28.811 Editorial cleanup | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||
S5‑216172 | Presentation sheet for approval of TR 28.811 | Huawei | other | Approval | Yes |
Yes
| revised | No | S5‑216615 | |||
S5‑216615 | Presentation sheet for approval of TR 28.811 | Huawei | TS or TR cover | Approval | Yes |
Yes
| approved | No | S5‑216172 | |||
S5‑216404 | Solution for National Roaming Scenario | Ericsson India Private Limited | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216405 | Update WI for isolation use cases | Ericsson India Private Limited | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216607 | Latest draft TR 28.811 | Huawei | draft TR | Approval | Yes |
Yes
| approved | No | ||||
6.5.3 | Study on YANG PUSH |   | ||||||||||
6.5.4 | Study on network slice management capability exposure | S5‑216181 | pCR 28.824 Concept definition for Exposed Management Service | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216582 | |
S5‑216582 | pCR 28.824 Concept definition for Exposed Management Service | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216181 | |||
S5‑216282 | Discussion Paper on exposure scenario | Alibaba Group, AsiaInfo | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑216584 | |||
S5‑216584 | Discussion Paper on exposure scenario | Alibaba Group, AsiaInfo | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑216282 | |||
S5‑216283 | Add Use Case for the exposure without going through BSS | Alibaba Group, AsiaInfo | pCR | Approval | Yes |
Yes
| revised | No | S5‑216616 | |||
S5‑216616 | Add Use Case for the exposure without going through BSS | Alibaba Group, AsiaInfo | pCR | Approval | Yes |
Yes
| approved | No | S5‑216283 | |||
S5‑216284 | Exposure of network slice as a service | Alibaba Group, AsiaInfo | pCR | Approval | Yes |
Yes
| revised | No | S5‑216617 | |||
S5‑216617 | Exposure of network slice as a service | Alibaba Group, AsiaInfo | pCR | Approval | Yes |
Yes
| approved | No | S5‑216284 | |||
S5‑216285 | Consolidate potential requirements of use cases for eMnS discovery service | Alibaba Group | pCR | Approval | Yes |
Yes
| revised | No | S5‑216624 | |||
S5‑216624 | Consolidate potential requirements of use cases for eMnS discovery service | Alibaba Group | pCR | Approval | Yes |
Yes
| approved | No | S5‑216285 | |||
S5‑216308 | pCR TR 28.824 add procedures related to product onboarding | AsiaInfo Technologies Inc | pCR | Approval | Yes |
Yes
| revised | No | S5‑216585 | |||
S5‑216585 | pCR TR 28.824 add procedures related to product onboarding | AsiaInfo Technologies Inc | pCR | Approval | Yes |
Yes
| approved | No | S5‑216308 | |||
S5‑216382 | Add text to procedures related to management capability exposure | Ericsson LM, Deutsche Telekom | pCR | Approval | Yes |
Yes
| revised | No | S5‑216625 | |||
S5‑216625 | Add text to procedures related to management capability exposure | Ericsson LM, Deutsche Telekom | pCR | Approval | Yes |
Yes
| approved | No | S5‑216382 | |||
S5‑216383 | Clarifications on clause 4 overview | Ericsson LM, Deutsche Telekom | pCR | Approval | Yes |
Yes
| revised | No | S5‑216583 | |||
S5‑216583 | Clarifications on clause 4 overview | Ericsson LM, Deutsche Telekom | pCR | Approval | Yes |
Yes
| approved | No | S5‑216383 | |||
S5‑216384 | Clarifications on clause 5 use cases | Ericsson LM, Deutsche Telekom | pCR | Approval | Yes |
Yes
| revised | No | S5‑216586 | |||
S5‑216586 | Clarifications on clause 5 use cases | Ericsson LM, Deutsche Telekom | pCR | Approval | Yes |
Yes
| approved | No | S5‑216384 | |||
S5‑216385 | Clarifications on clause 7 solutions | Ericsson LM, Deutsche Telekom | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216403 | pCR 28.824 Exposure to SA6 applications or mddleware | Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| revised | No | S5‑216623 | |||
S5‑216623 | pCR 28.824 Exposure to SA6 applications or mddleware | Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| approved | No | S5‑216403 | |||
S5‑216608 | Latest draft TR 28.824 | Alibaba | draft TR | Approval | No |
Yes
| approved | No | ||||
6.5.5 | Study on continuous integration continuous delivery support for 3GPP NFs | S5‑216180 | pCR 28.819 Describe ETSI NFV testing framework | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑216626 | |
S5‑216626 | pCR 28.819 Describe ETSI NFV testing framework | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑216180 | |||
S5‑216249 | pCR 28.819 Supplement for notification data | China Mobile Com. Corporation, Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216251 | pCR 28.819 Solution of providing vendor feedback | China Mobile Com. Corporation, Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| revised | No | S5‑216589 | |||
S5‑216589 | pCR 28.819 Solution of providing vendor feedback | China Mobile Com. Corporation, Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| approved | No | S5‑216251 | |||
S5‑216253 | pCR 28.819 Solution of environment data collection | China Mobile Com. Corporation, Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| revised | No | S5‑216590 | |||
S5‑216590 | pCR 28.819 Solution of environment data collection | China Mobile Com. Corporation, Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| approved | No | S5‑216253 | |||
S5‑216254 | pCR 28.819 Solution of test orchestration | China Mobile Com. Corporation, Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216255 | pCR 28.819 Use case of test data analysis | China Mobile Com. Corporation, Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| revised | No | S5‑216592 | |||
S5‑216592 | pCR 28.819 Use case of test data analysis | China Mobile Com. Corporation, Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| approved | No | S5‑216255 | |||
S5‑216366 | pCR 28.819 Rapp Cleanup | Lenovo, Motorola Mobility, CMCC | pCR | Yes |
Yes
| approved | No | |||||
S5‑216367 | pCR - 28.819 Add Proposed overall process | Lenovo, Motorola Mobility, CMCC | pCR | Yes |
Yes
| noted | No | |||||
S5‑216378 | pCR 28.819 Add initial recomendations | Lenovo, Motorola Mobilty, CMCC | pCR | Yes |
Yes
| revised | No | S5‑216593 | ||||
S5‑216593 | pCR 28.819 Add initial recomendations | Lenovo, Motorola Mobilty, CMCC | pCR | - | Yes |
Yes
| approved | No | S5‑216378 | |||
S5‑216379 | pCR 28.819 Add release model details | Lenovo, Motorola Mobility, CMCC | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216380 | pCR 28.819 Automated operational testing | Lenovo, Motorola Mobility, CMCC | pCR | Approval | Yes |
Yes
| revised | No | S5‑216588 | |||
S5‑216588 | pCR 28.819 Automated operational testing | Lenovo, Motorola Mobility, CMCC | pCR | Approval | Yes |
Yes
| approved | No | S5‑216380 | |||
S5‑216386 | pCR 28.819 Providing detailed information for testing an NF | Lenovo, Motorola Mobility, CMCC | pCR | Yes |
Yes
| revised | No | S5‑216587 | ||||
S5‑216587 | pCR 28.819 Providing detailed information for testing an NF | Lenovo, Motorola Mobility, CMCC | pCR | - | Yes |
Yes
| approved | No | S5‑216386 | |||
S5‑216609 | Latest draft TR 28.819 | Lenovo | draft TR | Approval | Yes |
Yes
| approved | No | ||||
6.5.6 | Study on enhancement of service based management architecture | S5‑216233 | TR 28.925 Add key issue on modelling of MnF | Huawei Technologies (Korea) | pCR | Approval | Yes |
Yes
| revised | No | S5‑216594 | S5‑215104 |
S5‑216594 | TR 28.925 Add key issue on modelling of MnF | Huawei Technologies (Korea) | pCR | Approval | Yes |
Yes
| approved | No | S5‑216233 | |||
S5‑216234 | pCR TR 28.925 Add conclusion and recommendation for Issue#6 | Huawei Technologies (Korea) | pCR | Yes |
Yes
| noted | No | |||||
S5‑216235 | pCR TR 28.925 Add potential solution and conclusion for Issue#5 | Huawei Technologies (Korea) | pCR | Yes |
Yes
| approved | No | |||||
S5‑216281 | SID revised was SP-210136 SID on enhancement of service based management architecture | Huawei Technologies (Korea) | SID revised | Yes |
Yes
| revised | No | S5‑216595 | ||||
S5‑216595 | SID revised was SP-210136 SID on enhancement of service based management architecture | Huawei Technologies (Korea) | SID revised | - | Yes |
Yes
| agreed | No | S5‑216281 | |||
S5‑216610 | Latest draft TR 28.925 | Huawei, Ericsson | draft TR | Approval | Yes |
Yes
| approved | No | ||||
6.5.7 | Study on Management Aspects of 5G Network Sharing | S5‑216116 | pCR 28.825 Add analysis and comparison of potential solutions | ZTE, China Unicom | pCR | Approval | Yes |
Yes
| revised | No | S5‑216627 | |
S5‑216627 | pCR 28.825 Add analysis and comparison of potential solutions | ZTE, China Unicom | pCR | Approval | Yes |
Yes
| approved | No | S5‑216116 | |||
S5‑216118 | pCR 28.825 Add recommendation and conclusion | ZTE, China Unicom | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216199 | pCR 28.825 add reference and abbrevation | China Unicom | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216200 | pCR 28.825 add concepts and overview | China Unicom | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216201 | pCR 28.825 rapporteur's proposal | China Unicom | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216202 | pCR 28.825 add conclusions and recommendations | China Unicom | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216203 | pCR 28.825 cleanup | China Unicom | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216204 | Presentation sheet for approval of TR 28.825 | China Unicom | other | Approval | Yes |
Yes
| approved | No | ||||
S5‑216611 | Latest draft TR 28.825 | China Unicom | draft TR | Approval | Yes |
Yes
| approved | No | ||||
7.1 | Charging Plenary | S5‑216008 | CH agenda and time plan | WG vice Chair (Matrixx) | agenda | Yes |
Yes
| revised | No | S5‑216483 | ||
S5‑216483 | CH agenda and time plan | WG vice Chair (Matrixx) | agenda | - | Yes |
Yes
| noted | No | S5‑216008 | |||
S5‑216009 | Charging exec report | WG vice Chair (Matrixx) | report | Yes |
Yes
| noted | No | |||||
S5‑216028 | LS reply on UPF reporting for redundant transmission on transport layer | S2-2107862 | LS in | Yes |
Yes
| noted | No | |||||
S5‑216029 | Reply LS on UPF reporting for redundant transmission on transport layer | C4-215505 | LS in | Yes |
Yes
| noted | No | |||||
S5‑216030 | Reply LS on PSCELL ID availability in SGW CDR | ETSI TC LI | LS in | Yes |
Yes
| noted | No | |||||
S5‑216034 | LS Reply ccSA5 on the offline charging only indication | S2-2107863 | LS in | Yes |
Yes
| noted | No | |||||
S5‑216286 | Presentation slides for 3GPP_SA5_Webinar_Part2_SA5_CH (ETSI3GPP Webinar 2 November 2021) | 3GPP SA5 Vice Chair/CH Chair (MATRIXX Software), 3GPP SA5 CH Vice Chair(Huawei) | other | Yes |
Yes
| noted | No | |||||
S5‑216482 | Collection of useful charging endorsed and external communication documents | Huawei | discussion | Information | Yes |
Yes
| revised | No | S5‑216506 | |||
S5‑216506 | Collection of useful charging endorsed and external communication documents | Huawei | discussion | Information | Yes |
Yes
| noted | No | S5‑216482 | |||
S5‑216511 | LS on Enhancement on Charging Identifier Uniqueness Mechanism | Huawei | LS out | Approval | Yes |
Yes
| noted | No | ||||
7.2 | New Charging Work Item proposals | S5‑216131 | New SID on Charging Aspects for Non-Public Networks | China Mobile Com. Corporation | SID new | Approval | Yes |
Yes
| revised | No | S5‑216503 | |
S5‑216503 | New SID on Charging Aspects for Non-Public Networks | China Mobile Com. Corporation | SID new | Approval | Yes |
Yes
| agreed | No | S5‑216131 | |||
S5‑216138 | New SID on new network resource usage type for charging in the 5G System (5GS) | Huawei | SID new | Agreement | Yes |
Yes
| revised | No | S5‑216533 | |||
S5‑216533 | New SID on new network resource usage type for charging in the 5G System (5GS) | Huawei | SID new | Agreement | Yes |
Yes
| noted | No | S5‑216138 | |||
S5‑216139 | New Work Item on charging enhancement for 5GS CIoT | Huawei | WID new | Yes |
Yes
| revised | No | S5‑216518 | ||||
S5‑216518 | New Work Item on charging enhancement for 5GS CIoT | Huawei | WID new | - | Yes |
Yes
| agreed | No | S5‑216139 | |||
7.3 | Charging Maintenance and Rel-17 small Enhancements | S5‑216069 | Rel-17 CR 32.291 Correcting response code references | Ericsson LM | CR | Agreement | Yes |
Yes
| not pursued | No | ||
S5‑216070 | Rel-17 CR 32.255 Correcting unit count inactivity timer trigger | Ericsson LM | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑216071 | Rel-17 CR 32.255 Correcting SSC mode and triggers | Ericsson LM | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216072 | Rel-17 CR 32.255 Correcting home provided charging id at inter-PLMN V-SMF change | Ericsson LM | CR | Agreement | Yes |
Yes
| revised | No | S5‑216534 | |||
S5‑216534 | Rel-17 CR 32.255 Correcting home provided charging id and trigger at inter-PLMN V-SMF change | Ericsson LM | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216072 | |||
S5‑216148 | Discussion paper on Charging Identifier Uniqueness Mechanism | Huawei | discussion | Agreement | Yes |
Yes
| noted | No | ||||
S5‑216149 | Rel-16 CR 32.290 Addition of the Threshold based re-authorization triggers | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216571 | |||
S5‑216571 | Rel-16 CR 32.290 Addition of the Threshold based re-authorization triggers | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216149 | |||
S5‑216150 | Rel-17 CR 32.290 Addition of the Threshold based re-authorization triggers | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216572 | |||
S5‑216572 | Rel-17 CR 32.290 Addition of the Threshold based re-authorization triggers | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216150 | |||
S5‑216151 | Rel-16 CR 32.290 Clarification on the immediate Report | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑216152 | Rel-17 CR 32.290 Clarification on the immediate Report | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216573 | |||
S5‑216573 | Rel-17 CR 32.290 Clarification on the immediate Report | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216152 | |||
S5‑216153 | Rel-16 CR 32.290 Clarify the NF consumers | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216154 | Rel-17 CR 32.290 Clarify the NF consumers | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216155 | Rel-16 CR 32.255 Correction on the User Location Time Description | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216567 | |||
S5‑216567 | Rel-16 CR 32.255 Correction on the User Location Time Description | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216155 | |||
S5‑216156 | Rel-17 CR 32.255 Correction on the User Location Time Description | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216568 | |||
S5‑216568 | Rel-17 CR 32.255 Correction on the User Location Time Description | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216156 | |||
S5‑216158 | Rel-16 CR 32.291 Alignment of the charging data request and response | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216569 | S5‑215582 | ||
S5‑216569 | Rel-16 CR 32.291 Alignment of the charging data request and response | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216158 | |||
S5‑216159 | Rel-17 CR 32.291 Alignment of the charging data request and response | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216570 | S5‑215583 | ||
S5‑216570 | Rel-17 CR 32.291 Alignment of the charging data request and response | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216159 | |||
S5‑216160 | Rel-17 CR 32.291 Addition of QoS Monitoring to Assist URLLC Service | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216574 | S5‑215467 | ||
S5‑216574 | Rel-17 CR 32.291 Addition of QoS Monitoring to Assist URLLC Service | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216160 | |||
S5‑216161 | Rel-17 CR 32.298 Addition of QoS Monitoring to Assist URLLC Service | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216575 | S5‑215468 | ||
S5‑216575 | Rel-17 CR 32.298 Addition of QoS Monitoring to Assist URLLC Service | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216161 | |||
S5‑216408 | Rel-16 CR 32.240 Correction on converged charging architecture | MATRIXX Software | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216409 | Rel-17 CR 32.240 Correction on converged charging architecture | MATRIXX Software | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216410 | Rel-16 CR 32.240 Correction on charging architecture for management domain | MATRIXX Software, Nokia | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216411 | Rel-17 CR 32.240 Correction on charging architecture for management domain | MATRIXX Software, Nokia | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑216515 | Rel-17 CR 32.255 Addition of QoS Monitoring to Assist URLLC Service | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑215465 | |||
S5‑216524 | Rel-16 CR 32.291 Update OpenAPI version | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑216535 | Rel-17 CR 32.291 Update OpenAPI version | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
7.4.1 | IMS Charging in 5G System Architecture | S5‑216073 | Rel-17 CR 32.281 Addition of IMS converged charging announcement | Ericsson LM | CR | Agreement | Yes |
Yes
| revised | No | S5‑216499 | |
S5‑216499 | Rel-17 CR 32.281 Addition of IMS converged charging announcement | Ericsson LM | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216073 | |||
S5‑216074 | Rel-17 CR 32.291 Addition of IMS converged charging announcement | Ericsson LM | CR | Agreement | Yes |
Yes
| revised | No | S5‑216502 | |||
S5‑216502 | Rel-17 CR 32.291 Addition of IMS converged charging announcement | Ericsson LM | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216074 | |||
S5‑216075 | Rel-17 CR 32.275 Correction of references for converged charging | Ericsson LM | CR | Agreement | Yes |
Yes
| revised | No | S5‑216500 | |||
S5‑216500 | Rel-17 CR 32.275 Correction of references for converged charging | Ericsson LM | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216075 | |||
S5‑216076 | Rel-17 CR 32.291 Addition of MMTel converged charging information | Ericsson LM | CR | Agreement | Yes |
Yes
| revised | No | S5‑216501 | |||
S5‑216501 | Rel-17 CR 32.291 Addition of MMTel converged charging information | Ericsson LM | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216076 | |||
7.4.2 | Charging aspects of Edge Computing | S5‑216315 | pCR 32.257 Add High-level 5G System architecture | Intel Sweden AB | pCR | Approval | Yes |
Yes
| revised | No | S5‑216507 | |
S5‑216507 | pCR 32.257 Add High-level 5G System architecture | Intel Sweden AB | pCR | Approval | Yes |
Yes
| approved | No | S5‑216315 | |||
S5‑216316 | pCR 32.257 Add architecture for enabling edge applications | Intel Sweden AB | pCR | Approval | Yes |
Yes
| revised | No | S5‑216494 | |||
S5‑216494 | pCR 32.257 Add architecture for enabling edge applications | Intel Sweden AB | pCR | Approval | Yes |
Yes
| approved | No | S5‑216316 | |||
S5‑216317 | pCR 32.257 Add Edge Computing domain converged charging architecture | Intel Sweden AB | pCR | Approval | Yes |
Yes
| revised | No | S5‑216495 | |||
S5‑216495 | pCR 32.257 Add Edge Computing domain converged charging architecture | Intel Sweden AB | pCR | Approval | Yes |
Yes
| approved | No | S5‑216317 | |||
S5‑216318 | pCR 32.257 Add charging principles for 5GS usage charging for Edge Computing | Intel Sweden AB | pCR | Approval | Yes |
Yes
| revised | No | S5‑216496 | |||
S5‑216496 | pCR 32.257 Add charging principles for 5GS usage charging for Edge Computing | Intel Sweden AB | pCR | Approval | Yes |
Yes
| approved | No | S5‑216318 | |||
S5‑216328 | pCR 32.257 Add charging scenarios for 5GS usage charging for Edge Computing | Intel Sweden AB | pCR | Approval | Yes |
Yes
| revised | No | S5‑216510 | |||
S5‑216510 | pCR 32.257 Add charging scenarios for 5GS usage charging for Edge Computing | Intel Sweden AB | pCR | Approval | Yes |
Yes
| approved | No | S5‑216328 | |||
S5‑216484 | Draft TS 32.257 | Intel | draft TS | Approval | Yes |
Yes
| approved | No | ||||
7.4.3 | Charging aspects of Architecture Enhancement for NR Reduced Capability Devices (preliminary work before SA approval) |   | ||||||||||
7.4.4 | Charging aspects of Proximity-based Services in 5GS (preliminary work before SA approval) | S5‑216295 | Introduction of 5G DDNMF in charging architecture for 5GS | CATT | other | Approval | No |
Yes
| withdrawn | Yes | ||
S5‑216296 | Introduction of 5G ProSe charging and high-level architecture | CATT | other | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑216297 | Add converged charging architecture for ProSe | CATT | other | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑216302 | Introduction of 5G DDNMF in charging architecture for 5GS | CATT | CR | Approval | Yes |
Yes
| revised | No | S5‑216492 | |||
S5‑216492 | Introduction of 5G DDNMF in charging architecture for 5GS | CATT | CR | Approval | Yes |
Yes
| agreed | No | S5‑216302 | |||
S5‑216303 | Introduction of 5G ProSe charging and high-level architecture | CATT | CR | Approval | Yes |
Yes
| revised | No | S5‑216505 | |||
S5‑216505 | Introduction of 5G ProSe charging and high-level architecture | CATT | CR | Approval | Yes |
Yes
| agreed | No | S5‑216303 | |||
S5‑216304 | Add converged charging architecture for ProSe | CATT | CR | Approval | Yes |
Yes
| revised | No | S5‑216536 | |||
S5‑216536 | Add converged charging architecture for ProSe | CATT | CR | Approval | Yes |
Yes
| agreed | No | S5‑216304 | |||
7.4.5 | Charging Aspects of 5G LAN VN Group (preliminary work before SA approval) | S5‑216145 | Rel-17 CR 32.255 Addition of the 5G LAN service charging in Annex | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||
S5‑216146 | Rel-17 CR 32.255 Addition of the 5G LAN service charging in charging principle | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216497 | |||
S5‑216497 | Rel-17 CR 32.255 Addition of the 5G LAN service charging in charging principle | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216146 | |||
S5‑216147 | Rel-17 CR 32.255 Addition of the 5G LAN service charging requirements | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑216493 | |||
S5‑216493 | Rel-17 CR 32.255 Addition of the 5G LAN service charging requirements | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑216147 | |||
S5‑216498 | Rel-17 CR 32.240 Addition of the 5G LAN service charging | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
7.5.1 | Study on charging aspects of Edge Computing | S5‑216162 | Rel-17 pCR 28.815 Correction on CEF based architecuture in solution 7.4.4.9 | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑216512 | |
S5‑216512 | Rel-17 pCR 28.815 Correction on CEF based architecuture in solution 7.4.4.9 | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑216162 | |||
S5‑216163 | Rel-17 pCR 28.815 Evaluation and Conclusion for Solution 7.1.4.3 | Huawei | pCR | Agreement | Yes |
Yes
| merged | No | S5‑216514 | |||
S5‑216329 | pCR 28.815 Update High-level 5G System architecture | Intel Sweden AB | pCR | Approval | Yes |
Yes
| revised | No | S5‑216509 | |||
S5‑216509 | pCR 28.815 Update High-level 5G System architecture | Intel Sweden AB | pCR | Approval | Yes |
Yes
| approved | No | S5‑216329 | |||
S5‑216330 | pCR 28.815 Update the possible solutions for aggregated charging | Intel Sweden AB | pCR | Approval | Yes |
Yes
| revised | No | S5‑216513 | |||
S5‑216513 | pCR 28.815 Update the possible solutions for aggregated charging | Intel Sweden AB | pCR | Approval | Yes |
Yes
| approved | No | S5‑216330 | |||
S5‑216334 | pCR 28.815 Add evaluation of edge application access charging via EAS | Intel Sweden AB | pCR | Approval | Yes |
Yes
| revised | No | S5‑216514 | |||
S5‑216514 | pCR 28.815 Add evaluation of edge application access charging via EAS | Intel Sweden AB | pCR | Approval | Yes |
Yes
| approved | No | S5‑216334 | |||
S5‑216340 | Presentation of TR 28.815 for approval | Intel Sweden AB | pCR | Approval | Yes |
Yes
| revised | No | S5‑216516 | |||
S5‑216516 | Presentation of TR 28.815 for approval | Intel Sweden AB | pCR | Approval | Yes |
Yes
| approved | No | S5‑216340 | |||
S5‑216485 | Draft TR 28.815 | Intel | draft TR | Approval | Yes |
Yes
| approved | No | ||||
7.5.2 | Study on charging aspects of 5GS CIoT | S5‑216140 | Rel-17 pCR 28.816 Clean up | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑216504 | |
S5‑216504 | Rel-17 pCR 28.816 Clean up | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑216140 | |||
S5‑216486 | Draft TR 28.816 | Huawei | draft TR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216519 | Presentation of TR 28.816 for approval | Huawei | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
7.5.3 | Study on charging aspects of Proximity-based Services in 5GC | S5‑216298 | Presentation of TR 32.846 for information | CATT | TS or TR cover | Approval | No |
Yes
| withdrawn | Yes | ||
S5‑216305 | Presentation of TR 32.846 for approval | CATT | TS or TR cover | Approval | Yes |
Yes
| revised | No | S5‑216576 | |||
S5‑216576 | Presentation of TR 32.846 for approval | CATT | TS or TR cover | Approval | Yes |
Yes
| approved | No | S5‑216305 | |||
S5‑216487 | Draft TR 32.846 | CATT | draft TR | Approval | Yes |
Yes
| approved | No | ||||
7.5.4 | Study on Charging Aspect of 5G LAN-type Services | S5‑216141 | Rel-17 pCR 28.822 Correction on CEF based architecuture in solution 1.2 | Huawei | pCR | Agreement | Yes |
Yes
| noted | No | ||
S5‑216142 | Rel-17 pCR 28.822 Correction on the editorial issues | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | ||||
S5‑216143 | Rel-17 pCR 28.822 Correction on the Reference | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑216517 | |||
S5‑216517 | Rel-17 pCR 28.822 Correction on the Reference | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑216143 | |||
S5‑216144 | Rel-17 pCR 28.822 Remove the editor‘s note for topic 4 | Huawei | pCR | Agreement | Yes |
Yes
| noted | No | ||||
S5‑216488 | Draft TR 28.822 | Huawei | draft TR | discussion | Yes |
Yes
| approved | No | ||||
S5‑216520 | Presentation of TR 28.822 for information | Huawei | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
7.5.5 | Study on charging aspects for enhancements of Network Slicing Phase 2 | S5‑216077 | Rel-17 pCR 32.847 New key issue on types of maximum | Ericsson LM | pCR | Approval | Yes |
Yes
| revised | No | S5‑216522 | |
S5‑216522 | Rel-17 pCR 32.847 New key issue on types of maximum | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | S5‑216077 | |||
S5‑216489 | Draft TR 32.847 | Matrixx | draft TR | Approval | Yes |
Yes
| approved | No | ||||
S5‑216508 | Presentation of TR 32.847 for information | Matrixx | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
7.5.6 | Study on Nchf charging services phase 2 | S5‑216078 | Rel-17 pCR 28.826 Use case trigger without usage | Ericsson LM | pCR | Approval | Yes |
Yes
| revised | No | S5‑216523 | |
S5‑216523 | Rel-17 pCR 28.826 Use case trigger without usage | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | S5‑216078 | |||
S5‑216079 | Rel-17 pCR 28.826 Solution for 3a based on service identifier | Ericsson LM | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216080 | Rel-17 pCR 28.826 Solution for 3a based on rating group map | Ericsson LM | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑216081 | Rel-17 pCR 28.826 Use case size of charging information | Ericsson LM | pCR | Approval | Yes |
Yes
| revised | No | S5‑216525 | |||
S5‑216525 | Rel-17 pCR 28.826 Use case size of charging information | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | S5‑216081 | |||
S5‑216490 | Draft TR 28.826 | Ericsson | draft TR | Approval | Yes |
Yes
| approved | No | ||||
7.5.7 | Study on 5G roaming charging architecture for wholesale and retail scenarios | S5‑216082 | Rel-17 pCR 28.827 Adding reference point architecture to clause 7.1.4 | Ericsson LM | pCR | Approval | Yes |
Yes
| revised | No | S5‑216526 | |
S5‑216526 | Rel-17 pCR 28.827 Adding reference point architecture to clause 7.1.4 | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | S5‑216082 | |||
S5‑216083 | Rel-17 pCR 28.827 Adding SBI architecture to clause 7.2.4 | Ericsson LM | pCR | Approval | Yes |
Yes
| revised | No | S5‑216527 | |||
S5‑216527 | Rel-17 pCR 28.827 Adding SBI architecture to clause 7.2.4 | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | S5‑216083 | |||
S5‑216084 | Rel-17 pCR 28.827 Adding reference point architecture to clause 7.3.4 | Ericsson LM | pCR | Approval | Yes |
Yes
| revised | No | S5‑216528 | |||
S5‑216528 | Rel-17 pCR 28.827 Adding reference point architecture to clause 7.3.4 | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | S5‑216084 | |||
S5‑216085 | Rel-17 pCR 28.827 Adding reference point architecture to clause 7.4.4 | Ericsson LM | pCR | Approval | Yes |
Yes
| revised | No | S5‑216529 | |||
S5‑216529 | Rel-17 pCR 28.827 Adding reference point architecture to clause 7.4.4 | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | S5‑216085 | |||
S5‑216086 | Rel-17 pCR 28.827 New use case MVNO without CHF | Ericsson LM | pCR | Approval | Yes |
Yes
| revised | No | S5‑216530 | |||
S5‑216530 | Rel-17 pCR 28.827 New use case MVNO without CHF | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | S5‑216086 | |||
S5‑216087 | Rel-17 pCR 28.827 New potential solution MVNO without CHF | Ericsson LM | pCR | Approval | Yes |
Yes
| revised | No | S5‑216531 | |||
S5‑216531 | Rel-17 pCR 28.827 New potential solution MVNO without CHF | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | S5‑216087 | |||
S5‑216088 | Rel-17 pCR 28.827 Adding reference point architecture to clause 7.5.4 | Ericsson LM | pCR | Approval | Yes |
Yes
| revised | No | S5‑216532 | |||
S5‑216532 | Rel-17 pCR 28.827 Adding reference point architecture to clause 7.5.4 | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | S5‑216088 | |||
S5‑216157 | Rel-17 pCR 28.827 Correction on the potential charging architectures | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑216521 | |||
S5‑216521 | Rel-17 pCR 28.827 Correction on the potential charging architectures | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑216157 | |||
S5‑216491 | Draft TR 28.827 | Ericsson | draft TR | Approval | Yes |
Yes
| approved | No | ||||
8 | Any Other Business |   |