S5‑174000 | Agenda | WG Chairman | agenda |
2Approval of the agenda
| Yes |
Yes
| approved | No | |||
S5‑174001 | Report from last SA5 meeting | MCC | report |
4.1Last SA5 meeting report
| Yes |
Yes
| approved | No | |||
S5‑174002 | SA5 status report at last SA meeting | WG Chairman | report |
4.2Last SA meeting report
| Yes |
Yes
| noted | No | |||
S5‑174003 | SA5 results at last SA meeting | WG Chairman | report |
4.2Last SA meeting report
| Yes |
Yes
| noted | No | |||
S5‑174004 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑174328 | ||
S5‑174005 | OAM Executive Report from THIS Meeting | WG Vice Chair (Huawei) | report |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑174488 | ||
S5‑174006 | Leaders meeting agenda | WG Chairman | agenda |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑174007 | Leaders meeting minutes | WG Chairman | report |
5.1Administrative issues at SA5 level
| Yes |
YesMCC clarified the upload of skeletons in 3GU so delegates can create their pCRs.
The Chair will talk with the Work Plan Manager to deal with the WID name changes in the work plan.
The Chair commented on the meeting calendar for 2019:
- Charging would like to co-locate with SA2 as much as possible.
- Colocation with SA2 in December 2018 would be a very late date, currently in the "red zone" which would complicate SA preparation.
- Overlaps with SA3 will be minimised. Thomas will talk with the SA3 Chair (Anand Prasad) about this.
- An Asian host is needed for 2018. IF3 will be contacted.
| noted | No | |||
S5‑174008 | CH Agenda and Time Plan | CH SWG Chair | agenda |
7.1Charging Plenary
| Yes |
Yes
| approved | No | |||
S5‑174009 | CH Executive Report from THIS Meeting | CH SWG Chair | report | Presentation |
7.1Charging Plenary
| Yes |
Yes
| noted | No | ||
S5‑174010 | SA5 Meeting Calendar | Ericsson LM | other |
5.4SA5 meeting calendar
| Yes |
YesSome companies (Vodafone, Huawei, China Mobile) expressed their concern about having a meeting in India in October 2018. This meeting was still currently discussed with the TSDSI.
Adhoc meetings in 2018:
Huawei was in favour of adding more meetings, adhcos with decision power, given the current high workload.
They also suggested having parallel tracks and one-and-a-half-week meetings.
The Chair commented that extending the meeting time would be more complex for the host.
Huawei commented that other groups are having already 10 meetings per year.
Vodafone pointed out cost restrictions of some companies.
| noted | No | |||
S5‑174011 | SA5 Working Procedures | WG Vice Chair (Huawei) | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| approved | No | |||
S5‑174012 | SA5 Meeting Facility Requirements | WG Vice Chair (Orange) | other |
5.1Administrative issues at SA5 level
| Yes |
YesIt was commented that the start time is not usually correct in the invitation sent by the host.
Ericsson commented that this was important for transport to the meeting location; it should be clarified well in advance.
| approved | No | |||
S5‑174013 | Process for management of draft TSs/TRs | WG Chairman | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| revised | No | S5‑174348 | ||
S5‑174014 | CR Quality Check | MCC | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑174015 | Deliverables due for the NEXT SA Plenary | MCC | other |
5.5Review of the Work Plan
| Yes |
Yes
| noted | No | |||
S5‑174016 | Ongoing SA5 WIDs and SIDs | WG Vice Chair (Huawei) | other |
5.5Review of the Work Plan
| Yes |
Yes
| noted | No | |||
S5‑174017 | SA5 3GPP Work Plan | MCC | other |
5.5Review of the Work Plan
| Yes |
Yes
| noted | No | |||
S5‑174018 | Minutes of New Work Item proposals - OAM&P | WG Vice Chair (Orange) | report |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | |||
S5‑174019 | Minutes of OAM&P Maintenance and Rel-15 small Enhancements | MCC | report |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| noted | No | |||
S5‑174020 | Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service | Rapporteur (Huawei) | report |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | |||
S5‑174021 | Minutes for Study on Implementation for the Partitioning of Itf-N | Rapporteur(China Mobile) | report |
6.6.1Study on Implementation for the Partitioning of Itf-N
| Yes |
Yes
| noted | No | |||
S5‑174022 | Minutes for Performance management for mobile networks that include virtualized network functions | Rapporteur(Intel) | report |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | |||
S5‑174023 | Minutes for Study on Management and Orchestration of Network Slicing | Rapporteur (Ericsson) | report |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | |||
S5‑174024 | Minutes for Study on management aspects of next generation network architecture and features | Rapporteur(Nokia) | report |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | |||
S5‑174025 | IPR and legal declaration | WG Chairman | other |
3IPR declaration
| Yes |
Yes
| noted | No | |||
S5‑174026 | Status of email approvals | WG Vice Chair (Orange) | other |
5.1Administrative issues at SA5 level
| No |
No
| reserved | No | |||
S5‑174027 | OAM&P SWG action list | WG Vice Chair (Huawei) | other |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑174398 | ||
S5‑174028 | Work Plan status | WG Chair | other |
5.5Review of the Work Plan
| No |
No
| reserved | No | |||
S5‑174029 | Minutes of OAM&P SWG opening session | WG Vice Chair (Huawei) | report |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑174030 | Minutes of Study on Management aspects of selected IoT-related features | Rapporteur (Cisco) | report |
6.6.5Study on Management aspects of selected IoT-related features
| Yes |
Yes
| noted | No | |||
S5‑174031 | Minutes of Study on a RESTful HTTP-based Solution Set | Rapporteur (Nokia) | report |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| noted | No | |||
S5‑174032 | Minutes of Study on management aspects of virtualized network functions that are part of the NR | Rapporteur (Intel) | report |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | |||
S5‑174033 | Minutes of Study on Management Enhancement of CUPS of EPC Nodes | Rapporteur (Huawei) | report |
6.6.8Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| noted | No | |||
S5‑174034 | Minutes of Study on OAM aspects of LTE and WLAN integration | Rapporteur (Intel) | report |
6.6.9Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| revised | No | S5‑174383 | ||
S5‑174035 | Minutes of Study on network policy management for mobile networks based on NFV scenarios | Rapporteur ( China Mobile) | report |
6.6.10Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| noted | No | |||
S5‑174036 | Minutes of Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) | Rapporteur (ORANGE) | report |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| noted | No | |||
S5‑174037 | Minutes of Management of QoE measurement collection | Rapporteur (Ericsson) | report |
6.5.2Management of QoE measurement collection
| Yes |
Yes
| noted | No | |||
S5‑174038 | Minutes of Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements | Rapporteur (Ericsson) | report |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | |||
S5‑174039 | Minutes of Provisioning of network slicing for 5G networks and services | Rapporteur (Huawei) | report |
6.5.4Provisioning of network slicing for 5G networks and services
| No |
No
| withdrawn | Yes | |||
S5‑174040 | Minutes of Study on system and functional aspects of Energy Efficiency in 5G networks | Rapporteur (ORANGE) | report |
6.6.11Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| noted | No | |||
S5‑174041 | Skeleton TS 28.530 | Ericsson LM | draft TS | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | ||
S5‑174042 | pCR TS 28.530 Introduction and scope for network slicing in mobile networks | Ericsson LM | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑174359 | |
S5‑174043 | pCR 28.304 Update with correct TS numbers and titles | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑174343 | |
S5‑174044 | pCR 28.305 Update with correct TS numbers and titles | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | ||
S5‑174045 | LS from ETSI TC CYBER ccSA5 on Middlebox security | ETSI TC CYBER | LS in |
5.3Liaison statements at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑174046 | LS from GSMA cc SA5 on Network Slicing initiative | GSMA | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesNokia: no word on management here, no impact on our work here.
Huawei: does this mean that GSMA will not work on the management of slices?
Nokia: they will not work on that, this will impact SA1 and SA2 work.
Huawei: the management interface will be provided by SA5. Nokia replied that this wasn't mentioned.
Ericsson: we are copied, no need to reply.
Verizon commented that Charging could also work on the billing of the slices.
Deutsche Telekom commented that there will be impact on several groups, as GSMA will come up with their own network slice definition and the requirements.
Nokia: we cannot stop the study until they bring us that definition. In any case I don’t see big impacts whenever they bring the definition.
Huawei: time plan for their work is not mentioned here.
Postponed for the next meeting.
| postponed | No | |||
S5‑174047 | LS from RAN2 to SA5 on supported features by 5GC for E-UTRA connected to 5G CN | R2-1706153 | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesEricsson: we'll try to do the management once it is clarified what features are supported.
Maryse (Nokia) commented that this is impacting the management aspect, not the Charging aspects.
Nokia: trace MDT and SON; these are features that we are being asked.
Ericsson: we could reply on the QoE as well.
The discussions was postponed for the next meeting.
| postponed | No | |||
S5‑174048 | LS from SA2 to SA5 on standardization of Northbound SCEF API Charging | S2-173674 | LS in |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| replied to | No | |||
S5‑174049 | LS from SA2 to SA5 on Request to update maximum data rate values in EPS | S2-173685 | LS in |
7.1Charging Plenary
| Yes |
Yes
| replied to | No | |||
S5‑174050 | LS from SA2 to SA5 on EUTRAN sharing enhancement | S2-173701 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| postponed | No | |||
S5‑174051 | LS from SA2 to SA5 on Support of NR using Dual Connectivity using EPC | S2-174068 | LS in |
7.4.2Charging aspects of EDCE5
| Yes |
Yes
| replied to | No | |||
S5‑174052 | LS from TSG SA cc SA5 on Energy Efficiency | SP-170597 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑174053 | Discussion Paper on the need for two options regarding PEECMON IRP | ORANGE | discussion | Endorsement |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| noted | No | ||
S5‑174054 | pCR TS 28.304 Add justification for the two options | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑174346 | |
S5‑174055 | pCR TS 28.304 High-level use case and business level reqs for supervising PEE related alarms | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑174347 | |
S5‑174056 | pCR TS 28.304 High-level use case and business level reqs for monitoring PEE configuration changes | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑174351 | |
S5‑174057 | pCR TS 28.304 Specification-level requirements for Option No. 1 | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑174352 | |
S5‑174058 | pCR TS 28.304 Specification-level requirements for Option No. 2 | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑174353 | |
S5‑174059 | pCR TS 28.305 Structuring clauses 5 and 6 for introducing the two options | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑174354 | |
S5‑174060 | pCR TS 28.305 Input to information model for Option 2 | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑174355 | |
S5‑174061 | TS 28.306 Skeleton | ORANGE | draft TS | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑174356 | |
S5‑174062 | LS from RAN2 to SA5 on changing the Neighbour cell Relation acronym to “NCR” | R2-1707464 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑174063 | Resubmitted LS from SA2 to SA5 on Stage 2 completion on introduction of WLAN as alternative technology for ProSe Direct Discovery | S2-172506 | LS in |
7.1Charging Plenary
| Yes |
Yes
| postponed | No | |||
S5‑174064 | Resubmitted LS on Collection Period correction for MDT M3 measurement in eUTRAN | R3-171382 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| postponed | No | |||
S5‑174065 | Resubmitted LS reply to ATIS NRSC on “Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” | ATIS | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| replied to | No | |||
S5‑174066 | TR 32.972 skeleton | ORANGE | draft TR | Agreement |
6.6.11Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| revised | No | S5‑174456 | |
S5‑174067 | LS from ETSI NFV to SA5 on Progress on ETSI NFV APIs specifications for Management and Orchestration interfaces | ETSI ISG NFV | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑174068 | Time management in OAM&P SWG | WG Vice Chair (Huawei) | discussion | Discussion |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | ||
S5‑174069 | Report from 3GPP SA5-on charging work for CUPS ad hoc | CH SWG Chair | report | Approval |
7.1Charging Plenary
| Yes |
Yes
| approved | No | ||
S5‑174070 | Report 5G management architecture WID planning conference call | OAM&P SWG chairman | report | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑174330 | |
S5‑174071 | LS from SA2 cc SA5 on Supported features by 5GC for E-UTRA connected to 5G CN | S2-175192 | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesEricsson: no traffic support is needed yet for the features that SA2 is not covering in Rel-15.
Nokia: in the table; MTC, to enable M2M services is partially covered by SA5.
| noted | No | |||
S5‑174072 | Response LS from SA2 to SA5 on progress of Network Slicing related work | S2-175300 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| replied to | No | |||
S5‑174073 | LS from ETSI TC LI on Request of updated information on SA5 standards or reports related to billing systems and parameters for 5G access and services | ETSI TC LI | LS in |
7.1Charging Plenary
| Yes |
Yes
| replied to | No | |||
S5‑174074 | Rel-14 CR 32.298 Correction on handling of Private and Public user ID for IMS charging | ORANGE,Nokia | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑173359 | |
S5‑174075 | Rel-13 CR 32.298 Correction on handling of Private and Public user ID for IMS charging | ORANGE,Nokia | CR | Approval |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑173357 | |
S5‑174076 | Rel-12 CR 32.298 Correction on handling of Private and Public user ID for IMS charging | ORANGE,Nokia | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑173355 | |
S5‑174077 | Rel-11 CR 32.298 Correction on handling of Private and Public user ID for IMS charging | ORANGE,Nokia | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑173353 | |
S5‑174078 | Rel-12 CR 32.260 Correction in the Trigger for Charging from I-CSCF | Nokia | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑174079 | Rel-13 CR 32.260 Correction in the Trigger for Charging from I-CSCF | Nokia | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑174080 | Rel-14 CR 32.260 Correction in the Trigger for Charging from I-CSCF | Nokia | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑174081 | Rel-14 CR 32.298 Addition of the fields ProSe Direct Discovery for Public Safety | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑173343 | |
S5‑174082 | pCR TS 32.972 - Introduction | ORANGE | pCR | Agreement |
6.6.11Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| noted | No | ||
S5‑174083 | pCR TS 32.972 – About EE KPIs and metrics | ORANGE | pCR | Agreement |
6.6.11Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| revised | No | S5‑174457 | |
S5‑174084 | Response LS from SA6 to SA5 on standardization of Northbound SCEF API Charging | S6-171107 | LS in |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| replied to | No | |||
S5‑174085 | LS from BBF to SA5 on Cooperation on Network Slicing | Broadband Forum (BBF) | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| replied to | No | |||
S5‑174086 | Northbound Application Program Interfaces (APIs) for exposure function interworking charging | HUAWEI TECHNOLOGIES Co. Ltd. | draft TS | Approval |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| approved | No | ||
S5‑174087 | Rel-14 CR 32.298 Addition of FE Identifier List to IMS Charging | Deutsche Telekom AG | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑174310 | S5‑173345 |
S5‑174088 | Overview of SDOs’ work on network slicing | ORANGE | discussion | Presentation |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | ||
S5‑174089 | LS from BBF to SA5 on User Services Platform specification available for review | BBF | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑174090 | LS on Evolution of IMSI format and E.212 Recommendation | ITU-T Study Group 2 | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesMaryse (Charging) commented that there will be an impact on the billing system. This should be addressed first in SA1 before we can work on this.
MCC clarified that this LS wasn’t sent to any group in particular but hand-picked since it may impact SA5's work.
Ericsson: a reply should be coordinated by 3GPP, maybe at SA level. The Chair took note of this and will comment it with the SA Chair.
It was decided to note it and let it to SA to handle it.
| noted | No | |||
S5‑174091 | TR 32.848 Skeleton | China Mobile Com. Corporation | draft TR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| approved | No | ||
S5‑174092 | Discussion on the organization of 5G related WIDs | ORANGE, NEC | discussion | Discussion |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174093 | TR 32.848 Skeleton | China Mobile Com. Corporation | draft TR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| No |
Yes
| withdrawn | Yes | ||
S5‑174094 | pCR to 28.801 NSSI role | Cisco Systems Inc. | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174361 | |
S5‑174095 | pCR to 28.801 Definitions | Cisco Systems Inc. | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174362 | |
S5‑174096 | pCR to 28.801 SON Clarification | Cisco Systems Inc. | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174363 | |
S5‑174097 | pCR to 28.801 Automated NSI optimization.doc | Cisco Systems Inc. | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | ||
S5‑174098 | SID revision Study on IoT Management | Cisco Systems Inc. | SID revised | Agreement |
6.6.5Study on Management aspects of selected IoT-related features
| Yes |
Yes
| revised | No | S5‑174426 | |
S5‑174099 | pCR to 32.875 Handover related measurements | Cisco Systems Inc. | pCR | Approval |
6.6.5Study on Management aspects of selected IoT-related features
| No |
No
| withdrawn | Yes | ||
S5‑174100 | pCR to 32.875 Cell level radio bearer QoS related measurements | Cisco Systems Inc. | pCR | Approval |
6.6.5Study on Management aspects of selected IoT-related features
| No |
No
| withdrawn | Yes | ||
S5‑174101 | pCR to 32.875 Radio resource utilization related measurements | Cisco Systems Inc. | pCR | Approval |
6.6.5Study on Management aspects of selected IoT-related features
| No |
No
| withdrawn | Yes | ||
S5‑174102 | pCR to 32.875 Paging related measurements | Cisco Systems Inc. | pCR | Approval |
6.6.5Study on Management aspects of selected IoT-related features
| No |
No
| withdrawn | Yes | ||
S5‑174103 | proposal on 5G network and service management WI structure | Intel Finland Oy, ZTE | discussion | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174104 | New WID on Management of NG-RAN that includes virtualized network | Intel Finland Oy | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174105 | New WID on Automation of network slicing | Intel Finland Oy | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174106 | New WID on performance measurements for NG-RAN | Intel Finland Oy | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174107 | pCR TR 32.864 Add potential solutions to support partially virtualized NF under NFV concept | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174442 | |
S5‑174108 | pCR TR 32.864 Corrections regarding transport network requirements | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| No |
No
| withdrawn | Yes | ||
S5‑174109 | pCR TR 32.864 Add gap analysis on adding, deleting and replacing the non-virtualized part of gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174439 | |
S5‑174110 | pCR TR 32.864 Add the CU and DU modelling option | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | ||
S5‑174111 | pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174440 | |
S5‑174112 | pCR TR 32.864 Add potential solution for establishing relation between the CN NF and the gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174441 | |
S5‑174113 | pCR TR 32.864 Add potential solution for instantiating NS containing CN VNF and gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174443 | |
S5‑174114 | pCR TR 32.864 Add potential solution for updating transport network requirements | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174444 | |
S5‑174115 | pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174445 | |
S5‑174116 | pCR TR 32.864 Add potential solution for adding VNFFGD and VNFFGs for the gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | ||
S5‑174117 | pCR TR 32.864 add UC for collecting performance measurements | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | ||
S5‑174118 | pCR TR 32.864 add UC for fault detection | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | ||
S5‑174119 | pCR TR 32 864 Add UC on validation of NsDf for a NSD | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174435 | |
S5‑174120 | pCR TR 32.864 Add conclusions | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174446 | |
S5‑174121 | pCR TR 32.864 Add Recommendations | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174447 | |
S5‑174122 | pCR TR 32.868 Add LWA overview and concept | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.9Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| revised | No | S5‑174449 | |
S5‑174123 | pCR TR 32.868 Add UC on provisioning WLAN informaton to WT for non-collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.9Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| revised | No | S5‑174380 | |
S5‑174124 | pCR TR 32.868 Add UC on management of relation between eNB and WT for non-collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.9Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| revised | No | S5‑174381 | |
S5‑174125 | pCR TR 32.868 Add UC on provisioning WLAN informaton to eNB for collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.9Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| revised | No | S5‑174450 | |
S5‑174126 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Approval |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑174340 | |
S5‑174127 | CR TS 32.404 Add new collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Agreement |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑174459 | |
S5‑174128 | CR TS 32.409 Add VR related measurements for IMS NFs | Intel Corporation (UK) Ltd | CR | Agreement |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑174341 | |
S5‑174129 | CR TS 32.426 Add VR related measurements for EPC NFs | Intel Corporation (UK) Ltd | CR | Agreement |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑174342 | |
S5‑174130 | pCR TR 28.801 Changes on CSMF | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| No |
No
| withdrawn | Yes | ||
S5‑174131 | Rel-14 CR 32.298 Introduce T4 Device Trigger charging | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑173399 | |
S5‑174132 | pCR TR 32.899 Roaming | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174316 | |
S5‑174133 | pCR TR 32.899 Online and Offline Charging evaluation | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174317 | |
S5‑174134 | pCR 32.869 Update of Problems and Goals | Ericsson | pCR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑174311 | |
S5‑174135 | pCR 32.869 Update of Introduction | Ericsson | pCR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑174312 | |
S5‑174136 | pCR 32.869 Update of Offline Part | Ericsson | pCR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑174313 | |
S5‑174137 | Discussion on introducing Intelligence in 3GPP network management | Huawei | discussion | Endorsement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174138 | New SID Study on introducing intelligence in management of 3GPP network | Huawei | SID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑174349 | |
S5‑174139 | Discussion on the potential Rel-15 5G management WIDs | Huawei | discussion | Endorsement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174140 | New WID on multi-operator management of services and slices | Huawei | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174141 | Discussion on modifications of Area Scope parameters for MDT | Huawei | discussion | Endorsement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| noted | No | ||
S5‑174142 | Rel-15 CR 32.422 Modification of parameters of Area Scope for MDT | Huawei | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑174143 | pCR 32.867 Add potential solution for PGW and SGW related measurements in CUPS | Huawei | pCR | Approval |
6.6.8Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| revised | No | S5‑174448 | |
S5‑174144 | pCR 32.867 Editor's notes resolution | Huawei | pCR | Approval |
6.6.8Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| noted | No | ||
S5‑174145 | pCR 32.867 Add conclusions | Huawei | pCR | Approval |
6.6.8Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| noted | No | ||
S5‑174146 | pCR 32.867 Add recommendations | Huawei | pCR | Approval |
6.6.8Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| noted | No | ||
S5‑174147 | pCR 32.866 Discussion of REST implementation levels | Huawei | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑174429 | |
S5‑174148 | pCR 32.866 Discussion of options for resource identification | Huawei | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑174430 | |
S5‑174149 | pCR 32.866 Discussion of options for asynchronous operations | Huawei | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑174432 | |
S5‑174150 | pCR 32.866 Subscribe/notify operations | Huawei | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| merged | No | S5‑174433 | |
S5‑174151 | pCR 28.530 Add concept and use case of V2X services using network slicing | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174152 | pCR 28.530 Add concept and use case of network slicing with fixed mobile convergence | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174153 | pCR 28.530 Add business level use cases of providing communication services with massive IoT connections using network slice | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174154 | pCR 28.530 Add concept of services using network slicing | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174155 | pCR 28.530 Add network slice definitions | Huawei, Ericsson | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | ||
S5‑174156 | pCR 28.530 Add network slice subnet definitions | Huawei, Ericsson | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174157 | pCR 28.530 Add potential network slice deployment scenarios | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174158 | pCR 28.530 Add definition for network slice template | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174159 | pCR 28.530 Add network slice management related roles description | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174160 | pCR 28.530 Add network slice lifecycle management description | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174161 | pCR 28.530 Add high level service requirements | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174162 | pCR 28.530 Use of the non-3GPP parts of a slice by the 3GPP management system | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174163 | pCR 28.530 Clarify communication service instance lifecycle | Huawei, CATR, China Telecom | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174164 | pCR 28.530 Exposure of management functions to 3rd party | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174165 | pCR 28.530 Exposure of the management data to 3rd party | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174166 | pCR 28.530 Definition of service instance | Huawei | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174167 | pCR 28.530 Add business level general requirements | Huawei, China Unicom, CATR | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174168 | pCR 32.866 Add REST design principles | Nokia Germany | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑174427 | |
S5‑174169 | pCR 32.866 Add Richardson Maturity Model | Nokia Germany | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| merged | No | S5‑174429 | |
S5‑174170 | pCR 32.866 Add HTTP method descriptions | Nokia Germany | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑174428 | |
S5‑174171 | pCR 32.866 Clarify resource identification mechanism | Nokia Germany | pCR |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | |||
S5‑174172 | pCR 32.866 Add design patterns | Nokia Germany | pCR |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑174433 | ||
S5‑174173 | pCR 32.866 Clarify mapping of the Alarm IRP | Nokia Germany | pCR |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑174434 | ||
S5‑174174 | pCR 28.800 Key issues to be considered for 5G management architecture options | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174396 | |
S5‑174175 | pCR 28.800 Considerations on the 5G NF management standard interfaces | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174397 | |
S5‑174176 | pCR 28.800 Add use case of management and orchestration architecture for management of communication service | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174399 | |
S5‑174177 | pCR 28.800 Add requirement for management and orchestration of networks containing non-5G NE and 5G NE | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174400 | |
S5‑174178 | pCR 28.800 Define key management functionality | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
No
| withdrawn | Yes | ||
S5‑174179 | pCR 28.800 Mapping requirements between 5G management architecture and NFV-MANO architecture | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174401 | |
S5‑174180 | pCR 28.800 Use case of multi-operator service support with management data | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174402 | |
S5‑174181 | pCR 28.800 Interface for service management | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174403 | |
S5‑174182 | pCR 28.800 Concept of infrastructure management function | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174404 | |
S5‑174183 | Draft LS reply from SA5 to SA2 on progress of Network Slicing related work | Huawei | LS out | Approval |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑174350 | |
S5‑174184 | pCR 28.801 Clarifications on the Editor's Notes related to management architecture | Huawei, China Unicom | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑174366 | |
S5‑174185 | pCR 28.801 Clarification on Use case and Requirements for Slice Specific information configuration for CN | Huawei | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑174186 | pCR 28.801 Clarifications on the Editor's Notes related to SON | Huawei, China Unicom | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑174365 | |
S5‑174187 | pCR 28.801 Clarifications on the Editor's Notes related to the relation between two use cases | Huawei | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑174188 | pCR 28.801 Update solution for Management support to facilitate UE roaming between Network Slice Instances in different administrative domains | Huawei, China Unicom, CATR | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑174189 | pCR 28.801 Clean-up the use case for management data isolation when multiple customers share the same Network Slice Instance | Huawei, China Unicom | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | ||
S5‑174190 | pCR 28.801 Clean-up requirements for Network slice lifecycle management and Network slice configuration management | Huawei, China Unicom | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑174390 | |
S5‑174191 | pCR 28.801 Update solution for modifying a network slice instance | Huawei, China Unicom, CATR | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑174192 | pCR 28.801 Clean-up of Editor's notes on RAN part of network slice instance | Huawei, China Unicom | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑174390 | |
S5‑174193 | pCR 28.801 Management function involvement for providing different types of services | Huawei | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑174194 | pCR 28.801 Update potential solution for the priority of the NSI | Huawei | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑174195 | pCR 28.801 Add potential solution for managing the shared NSSI constituent managed by the other NSSMF(s) | Huawei, China Unicom | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑174368 | |
S5‑174196 | pCR 28.801 Resolving the editor’s notes of management exposure solution | Huawei | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑174197 | pCR 28.801 Management function involvement for providing different types of services | Huawei | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| No |
Yes
| withdrawn | Yes | ||
S5‑174198 | Discussion on edge computing management way forward | Huawei | discussion | Endorsement |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | ||
S5‑174199 | pCR 28.802 Introduction of edge computing management | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174411 | |
S5‑174200 | pCR 28.802 Management of 5GC NFs supporting edge computing | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174414 | |
S5‑174201 | pCR 28.802 Management of edge computing AFs | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174415 | |
S5‑174202 | pCR 28.802 Management of edge computing services | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174417 | |
S5‑174203 | pCR 28.802 Update usecase and requirements for Management support for NRF | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | ||
S5‑174204 | pCR 28.802 Update solution of configuration management of 5GC | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | ||
S5‑174205 | Slice management modelling | Ericsson Inc. | discussion | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174206 | add UC and Req re service hosting for network slice management | Ericsson Inc. | discussion | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174207 | Support EUTRAN sharing enhancement | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| No |
Yes
| revised | No | S5‑174269 | |
S5‑174208 | Support EUTRAN new sharing arrangement | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| No |
Yes
| revised | No | S5‑174268 | |
S5‑174209 | New WID on Fault supervision of network slicing for 5G networks and services | ZTE Corporation | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑174413 | |
S5‑174210 | R14 CR TS 28.510 Remove the duplicated use cases and requirements | ZTE Corporation | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑174211 | pCR 32.848 Skeleton update | China Mobile Com. Corporation | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| revised | No | S5‑174323 | |
S5‑174212 | pCR 32.848 Refrence | China Mobile Com. Corporation | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| revised | No | S5‑174324 | |
S5‑174213 | pCR 32.848 Scope | China Mobile Com. Corporation | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| approved | No | ||
S5‑174214 | Provisioning of network slicing for 5G networks and services | Huawei Telecommunication India | draft TS | Agreement |
6.5.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| not treated | No | ||
S5‑174215 | pCR 28.531 Adding new skeleton clauses | Huawei, Nokia | pCR | Approval |
6.5.4Provisioning of network slicing for 5G networks and services
| No |
No
| withdrawn | Yes | ||
S5‑174216 | pCR 28.531 Adding content of scope | Huawei | pCR | Approval |
6.5.4Provisioning of network slicing for 5G networks and services
| No |
No
| withdrawn | Yes | ||
S5‑174217 | pCR to 32.857 Handover related measurements | Cisco Systems Inc. | pCR | Approval |
6.6.5Study on Management aspects of selected IoT-related features
| Yes |
Yes
| revised | No | S5‑174424 | |
S5‑174218 | pCR to 32.857 Cell level radio bearer QoS related measurements | Cisco Systems Inc. | pCR | Approval |
6.6.5Study on Management aspects of selected IoT-related features
| Yes |
Yes
| approved | No | ||
S5‑174219 | pCR to 32.857 Radio resource utilization related measurements | Cisco Systems Inc. | pCR | Approval |
6.6.5Study on Management aspects of selected IoT-related features
| Yes |
Yes
| approved | No | ||
S5‑174220 | pCR to 32.857 Paging related measurements | Cisco Systems Inc. | pCR | Approval |
6.6.5Study on Management aspects of selected IoT-related features
| Yes |
Yes
| revised | No | S5‑174437 | |
S5‑174221 | Updated Work Plan for Study TR 32.899 | HUAWEI TECHNOLOGIES Co. Ltd. | discussion | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174375 | |
S5‑174222 | Rel-15 pCR 32.899 Introduce Service Based architecture topic | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174318 | |
S5‑174223 | Rel-15 pCR 32.899 Network Slicing for Tenant Based Charging | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174319 | |
S5‑174224 | Rel-15 pCR 32.899 Network Capability Exposure of Charging System | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174320 | |
S5‑174225 | Rel-15 pCR 32.899 Charging for Interworking between 5G System and Existing Systems | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174321 | |
S5‑174226 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Quota Management | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174370 | |
S5‑174227 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Parallel Traffic | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174371 | |
S5‑174228 | Rel-15 pCR 32.254 Update of the skeleton | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| revised | No | S5‑174306 | |
S5‑174229 | Rel-15 pCR 32.254 Scope and Reference | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| revised | No | S5‑174307 | |
S5‑174230 | Rel-15 pCR 32.254 Definitions, Symbols and Abbreviations | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Approval |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| revised | No | S5‑174308 | |
S5‑174231 | Rel-15 pCR 32.254 Architecture considerations | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| revised | No | S5‑174309 | |
S5‑174232 | LSOut to Reply on SA2 for LS on standardization of Northbound SCEF API Charging | HUAWEI TECHNOLOGIES Co. Ltd. | LS out | Approval |
7.1Charging Plenary
| Yes |
Yes
| revised | No | S5‑174301 | |
S5‑174233 | pCR TR 32.870 Refinement on existing Application and Diameter description | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.2Study on forward compatibility for 3GPP Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑174314 | |
S5‑174234 | Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval |
7.4.1Charging Enhancement for eFMSS
| Yes |
Yes
| revised | No | S5‑174303 | |
S5‑174235 | pCR TR 32.870 Introduction of key issues | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.2Study on forward compatibility for 3GPP Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑174315 | |
S5‑174236 | Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval |
7.4.1Charging Enhancement for eFMSS
| Yes |
Yes
| revised | No | S5‑174304 | |
S5‑174237 | Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval |
7.4.1Charging Enhancement for eFMSS
| Yes |
Yes
| revised | No | S5‑174305 | |
S5‑174238 | pCR 28.530 text proposal for background and concepts | Ericsson Limited | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑174239 | CR 32.865 clarify management and control functionalities | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑174336 | |
S5‑174240 | new WID on SON for AAS deployment management | Nokia, Alcatel-Lucent Shanghai Bell | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑174335 | |
S5‑174241 | New WID on NR NRM IRP | Nokia, Alcatel-Lucent Shanghai Bell | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174242 | New WID on Performance Measurement for NR | Nokia, Alcatel-Lucent Shanghai Bell | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174243 | New WID on 5GC NRM IRP | Nokia, Alcatel-Lucent Shanghai Bell | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174244 | Proposed way forward of 5G NFs management normative works | Nokia, Alcatel-Lucent Shanghai Bell | discussion | Endorsement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174245 | discussion paper on NR management WID planning | Nokia, Alcatel-Lucent Shanghai Bell | discussion | Endorsement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174246 | discussion papar for 28.800 on 5G service management information framework | Nokia, Alcatel-Lucent Shanghai Bell | discussion | Endorsement |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | ||
S5‑174247 | PCR 28.800 Add service management model definition | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | ||
S5‑174248 | pCR 28.531 Adding new skeleton clauses | Huawei, Nokia | pCR | Approval |
6.5.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| not treated | No | ||
S5‑174249 | pCR 28.531 Adding content of scope | Huawei | pCR | Approval |
6.5.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| not treated | No | ||
S5‑174250 | pCR 28.802 Add use cases to support management for gNB with functional split | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174408 | |
S5‑174251 | pCR 28.802 Add potential solution for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174409 | |
S5‑174252 | pCR 28.802 Add conclusion and recommendation for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174410 | |
S5‑174253 | pCR 28.802 Add use cases to support management for AMF Set | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174419 | |
S5‑174254 | pCR 28.802 Add potential solution for AMF Set management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174420 | |
S5‑174255 | pCR 28.802 add potential solution of SON for New RAN | Nokia, Cisco Systems, Inc., Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174422 | |
S5‑174256 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N | China Mobile Com. Corporation | pCR |
6.6.1Study on Implementation for the Partitioning of Itf-N
| Yes |
Yes
| revised | No | S5‑174416 | ||
S5‑174257 | pCR TR 32.871 adding the deployment use case | China Mobile | pCR | Approval |
6.6.10Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| revised | No | S5‑174451 | |
S5‑174258 | pCR TR 32.871 adding the deployment requirements | China Mobile M2M Company Ltd. | pCR | Approval |
6.6.10Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| revised | No | S5‑174452 | |
S5‑174259 | pCR TR 32.871 adding the policy operation requirements | China Mobile M2M Company Ltd. | pCR | Approval |
6.6.10Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| revised | No | S5‑174453 | |
S5‑174260 | pCR TR 32.871 adding the general process | China Mobile M2M Company Ltd. | pCR | Approval |
6.6.10Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| revised | No | S5‑174454 | |
S5‑174261 | pCR TR 32.871 modification on the concept | China Mobile M2M Company Ltd. | pCR | Approval |
6.6.10Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| approved | No | ||
S5‑174262 | pCR TR 32.864 Add UC on depoyment of non-virtualized part of gNB based on the available non-virualized resource | China Mobile M2M Company Ltd. | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174436 | |
S5‑174263 | pCR 32.864 Add UC on instantiation of virtualized part of a gNB with the concrete NFVI-POP information | China Mobile M2M Company Ltd. | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174438 | |
S5‑174264 | CR 32.101 Addition of management functions and entities | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑174265 | WI Summary the management of mobile network which inlcudes virtualzied network functions | China Mobile M2M Company Ltd. | WI status report | Endorsement |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | ||
S5‑174266 | R15 pCR 28404-000 Introduction and scope for QoE collection | Ericsson | pCR | Approval |
6.5.2Management of QoE measurement collection
| Yes |
Yes
| revised | No | S5‑174357 | |
S5‑174267 | R15 pCR 28404-000 Use cases and requirement for QoE collection | Ericsson | pCR | Approval |
6.5.2Management of QoE measurement collection
| Yes |
Yes
| revised | No | S5‑174358 | |
S5‑174268 | Support EUTRAN new sharing arrangement | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑174337 | S5‑174208 |
S5‑174269 | Support EUTRAN sharing enhancement | Ericsson Inc. | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑174338 | S5‑174207 |
S5‑174270 | pCR 28.801 proposal for handling editor’s notes in clause 4 | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174365 | |
S5‑174271 | pCR 28.801 clarification on use case management data isolation in 5.1.7 | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑174272 | pCR 28.801 proposal for handling editor’s notes in clause 5.1 | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174366 | |
S5‑174273 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174368 | |
S5‑174274 | pCR 28.801 proposal for handling editor’s notes in clause 6.2 | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174390 | |
S5‑174275 | pCR 28.801 proposal for handling editor’s notes in clause 7.1, 7.2 and 7.3 | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174391 | |
S5‑174276 | pCR 28.801 proposal for handling editor’s notes in 7.4 7.9 7.13 and 7.14 | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174392 | |
S5‑174277 | pCR 28.801 Clarify terminology customer service in relation to network slice | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174393 | |
S5‑174278 | pCR 28.801 add conclusions and recommendations | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174395 | |
S5‑174279 | Presentation of 28.801 to SA for approval | Ericsson Limited | TS or TR cover | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | ||
S5‑174280 | Sequence proposal for network slicing agenda point 6.6.3 | Ericsson Limited | discussion | Discussion |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑174281 | S5-174xxx Sequence proposal for network slicing agenda point 6.5.3 | Ericsson Limited | discussion | Discussion |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| No |
Yes
| withdrawn | Yes | ||
S5‑174282 | Sequence proposal for network slicing agenda point 6.5.3 | Ericsson Limited | discussion | Discussion |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | ||
S5‑174283 | pCR 32.899 Key Issue Triggers and reporting in the separate SMF and UPF - Registration procedure | Ericsson | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174372 | |
S5‑174284 | pCR 28.802 Update the usage of terminology of “NF” and “NF instance” | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174407 | |
S5‑174285 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - UPF usage monitoring | Ericsson | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174373 | |
S5‑174286 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - Continuous time | Ericsson | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174374 | |
S5‑174287 | Presentation of 28.802 to SA for information | Nokia, Alcatel-Lucent Shanghai Bell | TS or TR cover | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | ||
S5‑174288 | pCR 28.802 Update 5GC NRM solution | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174421 | |
S5‑174289 | Reply to LS from SA2 to SA5 on Support of NR using Dual Connectivity using EPC | Nokia | LS out | Approval |
7.4.2Charging aspects of EDCE5
| Yes |
Yes
| revised | No | S5‑174300 | |
S5‑174290 | pCR TR 32.870 key issues set 2 | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.2Study on forward compatibility for 3GPP Diameter Charging Applications
| Yes |
Yes
| approved | No | ||
S5‑174291 | pCR TR 32.870 solutions introduction | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.2Study on forward compatibility for 3GPP Diameter Charging Applications
| Yes |
Yes
| approved | No | ||
S5‑174292 | TDocs sequence proposal for 6.2 | ORANGE, Huawei | discussion | Discussion |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174293 | LS from SA3 cc SA5 Reply LS on Security for T8 interface | S3-172076 | LS in |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| postponed | No | |||
S5‑174294 | Preparation of SA2-SA5 discussion on slicing | Huawei | discussion | Information |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | ||
S5‑174295 | LS from MEF Forum to SA5 on MEF Forum Work on 5G | MEF Forum | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesThe Chair commented that SA5 could respond with their 5G WIDs once they were defined, but it was better to postpone it for the next meeting.
| postponed | No | |||
S5‑174296 | Rel-15 CR 32.101 Replacement of 3G term | Huawei | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑174339 | |
S5‑174297 | LS reply to ATIS NRSC on ”Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” | ORANGE | LS out | Approval |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑174331 | |
S5‑174298 | Reply to: Resubmitted LS from SA2 to SA5 on Stage 2 completion on introduction of WLAN as alternative technology for ProSe Direct Discovery | Ericsson | LS out | approval |
7.1Charging Plenary
| Yes |
Yes
| noted | No | ||
S5‑174299 | Reply to: LS from SA2 to SA5 on Request to update maximum data rate values in EPS | Ericsson | LS out | approval |
7.1Charging Plenary
| Yes |
Yes
| approved | No | ||
S5‑174300 | Reply to LS from SA2 to SA5 on Support of NR using Dual Connectivity using EPC | Nokia | LS out | Approval |
7.4.2Charging aspects of EDCE5
| Yes |
Yes
| approved | No | S5‑174289 | |
S5‑174301 | Reply to: LS from SA2 to SA5 on standardization of Northbound SCEF API Charging | Huawei | LS out | approval |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| approved | No | S5‑174232 | |
S5‑174302 | Reply to: Response LS from SA6 to SA5 on standardization of Northbound SCEF API Charging | Huawei | LS out | approval |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| approved | No | ||
S5‑174303 | Rel-15 CR 32.251 Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval |
7.4.1Charging Enhancement for eFMSS
| Yes |
Yes
| agreed | No | S5‑174234 | |
S5‑174304 | Rel-15 CR 32.298 Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval |
7.4.1Charging Enhancement for eFMSS
| Yes |
Yes
| agreed | No | S5‑174236 | |
S5‑174305 | Rel-15 CR 32.299 Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval |
7.4.1Charging Enhancement for eFMSS
| Yes |
Yes
| agreed | No | S5‑174237 | |
S5‑174306 | Rel-15 pCR 32.254 Update of the skeleton | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| approved | No | S5‑174228 | |
S5‑174307 | Rel-15 pCR 32.254 Scope and Reference | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| approved | No | S5‑174229 | |
S5‑174308 | Rel-15 pCR 32.254 Definitions, Symbols and Abbreviations | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Approval |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| approved | No | S5‑174230 | |
S5‑174309 | Rel-15 pCR 32.254 Architecture considerations | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging aspects of NAPS
| Yes |
Yes
| approved | No | S5‑174231 | |
S5‑174310 | Rel-14 CR 32.298 Addition of FE Identifier List to IMS Charging | Deutsche Telekom AG | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑174087 | |
S5‑174311 | pCR 32.869 Update of Problems and Goals | Ericsson | pCR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑174134 | |
S5‑174312 | pCR 32.869 Update of Introduction | Ericsson | pCR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑174135 | |
S5‑174313 | pCR 32.869 Update of Offline Part | Ericsson | pCR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑174136 | |
S5‑174314 | pCR TR 32.870 Refinement on existing Application and Diameter description | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.2Study on forward compatibility for 3GPP Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑174233 | |
S5‑174315 | pCR TR 32.870 Introduction of key issues | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.2Study on forward compatibility for 3GPP Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑174235 | |
S5‑174316 | pCR TR 32.899 Roaming | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑174132 | |
S5‑174317 | pCR TR 32.899 Online and Offline Charging evaluation | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑174133 | |
S5‑174318 | Rel-15 pCR 32.899 Introduce Service Based architecture topic | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑174222 | |
S5‑174319 | Rel-15 pCR 32.899 Network Slicing for Tenant Based Charging | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑174223 | |
S5‑174320 | Rel-15 pCR 32.899 Network Capability Exposure of Charging System | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑174224 | |
S5‑174321 | Rel-15 pCR 32.899 Charging for Interworking between 5G System and Existing Systems | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑174225 | |
S5‑174322 | Reply to: LS from ETSI TC LI on Request of updated information on SA5 standards or reports related to billing systems and parameters for 5G access and services | Nokia | LS out | approval |
7.1Charging Plenary
| Yes |
Yes
| approved | No | ||
S5‑174323 | pCR 32.848 Skeleton update | China Mobile Com. Corporation | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| approved | No | S5‑174211 | |
S5‑174324 | pCR 32.848 Refrence | China Mobile Com. Corporation | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| approved | No | S5‑174212 | |
S5‑174325 | draft TR 32.848 | China Mobile Com. Corporation | draft TR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| No |
Yes
| left for email approval | No | ||
S5‑174326 | draft TR 32.870 | Nokia, Alcatel-Lucent Shanghai Bell | draft TR | Approval |
7.5.2Study on forward compatibility for 3GPP Diameter Charging Applications
| No |
Yes
| left for email approval | No | ||
S5‑174327 | draft TR 32.869 | Ericsson | draft TR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| No |
Yes
| left for email approval | No | ||
S5‑174328 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other | - |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | S5‑174004 | |
S5‑174329 | Reply to: LS from BBF to SA5 on Cooperation on Network Slicing | Huawei | LS out | approval |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑174382 | |
S5‑174330 | Report 5G management architecture WID planning conference call | OAM&P SWG chairman | report | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| approved | No | S5‑174070 | |
S5‑174331 | LS reply to ATIS NRSC on ”Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” | ORANGE | LS out | Approval |
6.1OAM&P Plenary
| Yes |
Yes
| approved | No | S5‑174297 | |
S5‑174332 | LSOut reply to 3GPP SA5 on progress of measurement definitions | ESI NFV | LS in | discussion |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑174333 | LSOut reply to 3GPP SA5 on Managing EM IP address provided to VNF | ETSI NFV | LS in | discussion |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| noted | No | ||
S5‑174334 | Organization of future 5G WIDs | Huawei | discussion | Endorsement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑174335 | new WID on SON for AAS deployment management | Nokia, Alcatel-Lucent Shanghai Bell | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑174240 | |
S5‑174336 | CR 32.865 clarify management and control functionalities | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | S5‑174239 | |
S5‑174337 | Support EUTRAN new sharing arrangement | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑174268 | |
S5‑174338 | Support EUTRAN sharing enhancement | Ericsson Inc. | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑174269 | |
S5‑174339 | Rel-15 CR 32.101 Replacement of 3G term | Huawei | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑174296 | |
S5‑174340 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Approval |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑174412 | S5‑174126 |
S5‑174341 | CR TS 32.409 Add VR related measurements for IMS NFs | Intel Corporation (UK) Ltd | CR | Agreement |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑174460 | S5‑174128 |
S5‑174342 | CR TS 32.426 Add VR related measurements for EPC NFs | Intel Corporation (UK) Ltd | CR | Agreement |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑174461 | S5‑174129 |
S5‑174343 | pCR 28.304 Update with correct TS numbers and titles | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑174043 | |
S5‑174344 | Draft TS 28.305 | ORANGE | draft TS | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| No |
Yes
| left for email approval | No | ||
S5‑174345 | Draft TS 28.304 | ORANGE | draft TS | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| No |
Yes
| left for email approval | No | ||
S5‑174346 | pCR TS 28.304 Add justification for the two options | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑174054 | |
S5‑174347 | pCR TS 28.304 High-level use case and business level reqs for supervising PEE related alarms | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑174055 | |
S5‑174348 | Process for management of draft TSs/TRs | WG Chairman | other | - |
5.1Administrative issues at SA5 level
| Yes |
Yes
| approved | No | S5‑174013 | |
S5‑174349 | New SID Study on introducing intelligence in management of 3GPP network | Huawei | SID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | S5‑174138 | |
S5‑174350 | Reply to: Response LS from SA2 to SA5 on progress of Network Slicing related work | Huawei | LS out | approval |
6.1OAM&P Plenary
| Yes |
Yes
| approved | No | S5‑174183 | |
S5‑174351 | pCR TS 28.304 High-level use case and business level reqs for monitoring PEE configuration changes | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑174056 | |
S5‑174352 | pCR TS 28.304 Specification-level requirements for Option No. 1 | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑174057 | |
S5‑174353 | pCR TS 28.304 Specification-level requirements for Option No. 2 | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑174058 | |
S5‑174354 | pCR TS 28.305 Structuring clauses 5 and 6 for introducing the two options | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑174059 | |
S5‑174355 | pCR TS 28.305 Input to information model for Option 2 | ORANGE | pCR | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑174060 | |
S5‑174356 | TS 28.306 Skeleton | ORANGE | draft TS | Approval |
6.5.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑174061 | |
S5‑174357 | R15 pCR 28404-000 Introduction and scope for QoE collection | Ericsson | pCR | Approval |
6.5.2Management of QoE measurement collection
| Yes |
Yes
| approved | No | S5‑174266 | |
S5‑174358 | R15 pCR 28404-000 Use cases and requirement for QoE collection | Ericsson | pCR | Approval |
6.5.2Management of QoE measurement collection
| Yes |
Yes
| approved | No | S5‑174267 | |
S5‑174359 | pCR TS 28.530 Introduction and scope for network slicing in mobile networks | Ericsson LM | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑174042 | |
S5‑174360 | pCR 28.530 Add network slice definitions | Huawei, Ericsson | pCR | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| No |
No
| withdrawn | Yes | ||
S5‑174361 | pCR to 28.801 NSSI role | Cisco Systems Inc. | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑174094 | |
S5‑174362 | pCR to 28.801 Definitions | Cisco Systems Inc. | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174467 | S5‑174095 |
S5‑174363 | pCR to 28.801 SON Clarification | Cisco Systems Inc. | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑174096 | |
S5‑174364 | Draft TR 28.801 | Ericsson | draft TR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| No |
Yes
| left for email approval | No | ||
S5‑174365 | pCR 28.801 proposal for handling editor’s notes in clause 4 | Ericsson Limited,Huawei, China Unicom | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174468 | S5‑174270 |
S5‑174366 | pCR 28.801 proposal for handling editor’s notes in clause 5.1 | Ericsson Limited, Huawei | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑174272 | |
S5‑174367 | breakout session conclusion for managed slice definition | Huawei | discussion | discussion |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | ||
S5‑174368 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 | Huawei, China Unicom, Ericsson, SK Telecom | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174369 | S5‑174273 |
S5‑174369 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 | Huawei, China Unicom, Ericsson | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174469 | S5‑174368 |
S5‑174370 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Quota Management | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑174226 | |
S5‑174371 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Parallel Traffic | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑174227 | |
S5‑174372 | pCR 32.899 Key Issue Triggers and reporting in the separate SMF and UPF - Registration procedure | Ericsson | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑174283 | |
S5‑174373 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - UPF usage monitoring | Ericsson | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑174285 | |
S5‑174374 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - Continuous time | Ericsson | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑174286 | |
S5‑174375 | Updated Work Plan for Study TR 32.899 | HUAWEI TECHNOLOGIES Co. Ltd. | discussion | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| noted | No | S5‑174221 | |
S5‑174376 | draft TR 32.899 | HUAWEI TECHNOLOGIES Co. Ltd. | draft TR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| No |
Yes
| left for email approval | No | ||
S5‑174377 | Presentation of draft TR 32.899 to SA#77 for information | HUAWEI TECHNOLOGIES Co. Ltd. | TS or TR cover | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | ||
S5‑174378 | LS to SA2 and CT4 on 5G Charging Study Phase 1 on N4 | Ericsson | LS out | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | ||
S5‑174379 | Update "Study on Charging Aspects of 5G System Architecture Phase 1" | HUAWEI TECHNOLOGIES Co. Ltd. | SID revised | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑174389 | |
S5‑174380 | pCR TR 32.868 Add UC on provisioning WLAN informaton to WT for non-collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.9Study on OAM aspects of LTE and WLAN integration
| No |
Yes
| left for email approval | No | S5‑174123 | |
S5‑174381 | pCR TR 32.868 Add UC on management of relation between eNB and WT for non-collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.9Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| noted | No | S5‑174124 | |
S5‑174382 | Reply to: LS from BBF to SA5 on Cooperation on Network Slicing | Huawei | LS out | approval |
6.1OAM&P Plenary
| Yes |
Yes
| approved | No | S5‑174329 | |
S5‑174383 | Minutes of Study on OAM aspects of LTE and WLAN integration | Rapporteur (Intel) | report | - |
6.6.9Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| noted | No | S5‑174034 | |
S5‑174384 | Exception sheet Performance management for mobile networks that include virtualized network functions | Intel | WI exception request | Agreement |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| No |
Yes
| left for email approval | No | ||
S5‑174385 | Draft TS 28.404 | Ericsson | draft TS | Approval |
6.5.2Management of QoE measurement collection
| No |
Yes
| left for email approval | No | ||
S5‑174386 | Draft TS 28.530 | Ericsson | draft TS | Approval |
6.5.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| No |
Yes
| left for email approval | No | ||
S5‑174387 | Draft TR 28.800 | Huawei | draft TR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| left for email approval | No | ||
S5‑174388 | Draft TR 28.802 | Nokia | draft TR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| No |
Yes
| left for email approval | No | ||
S5‑174389 | Update "Study on Charging Aspects of 5G System Architecture Phase 1" | HUAWEI TECHNOLOGIES Co. Ltd. | SID revised | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| agreed | No | S5‑174379 | |
S5‑174390 | pCR 28.801 proposal for handling editor’s notes in clause 6.2 | Ericsson Limited,Huawei,China Unicom | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑174274 | |
S5‑174391 | pCR 28.801 proposal for handling editor’s notes in clause 7.1, 7.2 and 7.3 | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑174275 | |
S5‑174392 | pCR 28.801 proposal for handling editor’s notes in 7.4 7.9 7.13 and 7.14 | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑174276 | |
S5‑174393 | pCR 28.801 Clarify terminology customer service in relation to network slice | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑174277 | |
S5‑174394 | Document sequence | Nokia | other | Information |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | ||
S5‑174395 | pCR 28.801 add conclusions and recommendations | Ericsson Limited | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑174470 | S5‑174278 |
S5‑174396 | pCR 28.800 Key issues to be considered for 5G management architecture options | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174463 | S5‑174174 |
S5‑174397 | pCR 28.800 Considerations on the 5G NF management standard interfaces | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | S5‑174175 | |
S5‑174398 | OAM&P SWG action list | WG Vice Chair (Huawei) | other | - |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | S5‑174027 | |
S5‑174399 | pCR 28.800 Add use case of management and orchestration architecture for management of communication service | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174464 | S5‑174176 |
S5‑174400 | pCR 28.800 Add requirement for management and orchestration of networks containing non-5G NE and 5G NE | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | S5‑174177 | |
S5‑174401 | pCR 28.800 Mapping requirements between 5G management architecture and NFV-MANO architecture | Huawei,SK Telekom | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174466 | S5‑174179 |
S5‑174402 | pCR 28.800 Use case of multi-operator service support with management data | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | S5‑174180 | |
S5‑174403 | pCR 28.800 Interface for service management | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑174465 | S5‑174181 |
S5‑174404 | pCR 28.800 Concept of infrastructure management function | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | S5‑174182 | |
S5‑174405 | Sequence proposal | Intel | other | Information |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | ||
S5‑174406 | PCR 28.800 Add service management model definition | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
No
| withdrawn | Yes | ||
S5‑174407 | pCR 28.802 Update the usage of terminology of “NF” and “NF instance” | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174476 | S5‑174284 |
S5‑174408 | pCR 28.802 Add use cases to support management for gNB with functional split | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑174250 | |
S5‑174409 | pCR 28.802 Add potential solution for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174472 | S5‑174251 |
S5‑174410 | pCR 28.802 Add conclusion and recommendation for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174473 | S5‑174252 |
S5‑174411 | pCR 28.802 Introduction of edge computing management | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174471 | S5‑174199 |
S5‑174412 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Approval |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑174458 | S5‑174340 |
S5‑174413 | New WID on Fault supervision of network slicing for 5G networks and services | ZTE Corporation | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | S5‑174209 | |
S5‑174414 | pCR 28.802 Management of 5GC NFs supporting edge computing | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑174200 | |
S5‑174415 | pCR 28.802 Management of edge computing AFs | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | S5‑174201 | |
S5‑174416 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N | China Mobile Com. Corporation | pCR | - |
6.6.1Study on Implementation for the Partitioning of Itf-N
| Yes |
Yes
| revised | No | S5‑174462 | S5‑174256 |
S5‑174417 | pCR 28.802 Management of edge computing services | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | S5‑174202 | |
S5‑174418 | pCR 28.802 Update solution of configuration management of 5GC | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| No |
No
| withdrawn | Yes | ||
S5‑174419 | pCR 28.802 Add use cases to support management for AMF Set | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174474 | S5‑174253 |
S5‑174420 | pCR 28.802 Add potential solution for AMF Set management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑174475 | S5‑174254 |
S5‑174421 | pCR 28.802 Update 5GC NRM solution | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑174288 | |
S5‑174422 | pCR 28.802 add potential solution of SON for New RAN | Nokia, Cisco Systems, Inc., Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | S5‑174255 | |
S5‑174423 | Draft TR 32.857 | Cisco | draft TR | Approval |
6.6.5Study on Management aspects of selected IoT-related features
| No |
Yes
| left for email approval | No | ||
S5‑174424 | pCR to 32.857 Handover related measurements | Cisco Systems Inc. | pCR | Approval |
6.6.5Study on Management aspects of selected IoT-related features
| Yes |
Yes
| approved | No | S5‑174217 | |
S5‑174425 | Cover sheet TR 32.866 | Nokia | TS or TR cover | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | ||
S5‑174426 | SID revision Study on IoT Management | Cisco Systems Inc. | SID revised | Agreement |
6.6.5Study on Management aspects of selected IoT-related features
| Yes |
Yes
| agreed | No | S5‑174098 | |
S5‑174427 | pCR 32.866 Add REST design principles | Nokia Germany | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | S5‑174168 | |
S5‑174428 | pCR 32.866 Add HTTP method descriptions | Nokia Germany | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | S5‑174170 | |
S5‑174429 | pCR 32.866 Discussion of REST implementation levels | Huawei | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | S5‑174147 | |
S5‑174430 | pCR 32.866 Discussion of options for resource identification | Huawei | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | S5‑174148 | |
S5‑174431 | Draft TR 32.866 | Nokia | draft TR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| No |
Yes
| left for email approval | No | ||
S5‑174432 | pCR 32.866 Discussion of options for asynchronous operations | Huawei | pCR | Approval |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | S5‑174149 | |
S5‑174433 | pCR 32.866 Add design patterns | Nokia Germany | pCR | - |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | S5‑174172 | |
S5‑174434 | pCR 32.866 Clarify mapping of the Alarm IRP | Nokia Germany | pCR | - |
6.6.6Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | S5‑174173 | |
S5‑174435 | pCR TR 32 864 Add UC on validation of NsDf for a NSD | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑174119 | |
S5‑174436 | pCR TR 32.864 Add UC on depoyment of non-virtualized part of gNB based on the available non-virualized resource | China Mobile M2M Company Ltd. | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑174262 | |
S5‑174437 | pCR to 32.857 Paging related measurements | Cisco Systems Inc. | pCR | Approval |
6.6.5Study on Management aspects of selected IoT-related features
| Yes |
Yes
| approved | No | S5‑174220 | |
S5‑174438 | pCR 32.864 Add UC on instantiation of virtualized part of a gNB with the concrete NFVI-POP information | China Mobile M2M Company Ltd. | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑174263 | |
S5‑174439 | pCR TR 32.864 Add gap analysis on adding, deleting and replacing the non-virtualized part of gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑174109 | |
S5‑174440 | pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174478 | S5‑174111 |
S5‑174441 | pCR TR 32.864 Add potential solution for establishing relation between the CN NF and the gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | S5‑174112 | |
S5‑174442 | pCR TR 32.864 Add potential solutions to support partially virtualized NF under NFV concept | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | S5‑174107 | |
S5‑174443 | pCR TR 32.864 Add potential solution for instantiating NS containing CN VNF and gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑174113 | |
S5‑174444 | pCR TR 32.864 Add potential solution for updating transport network requirements | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174479 | S5‑174114 |
S5‑174445 | pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174480 | S5‑174115 |
S5‑174446 | pCR TR 32.864 Add conclusions | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑174481 | S5‑174120 |
S5‑174447 | pCR TR 32.864 Add Recommendations | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑174121 | |
S5‑174448 | pCR 32.867 Add potential solution for PGW and SGW related measurements in CUPS | Huawei | pCR | Approval |
6.6.8Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| approved | No | S5‑174143 | |
S5‑174449 | pCR TR 32.868 Add LWA overview and concept | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.9Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| revised | No | S5‑174484 | S5‑174122 |
S5‑174450 | pCR TR 32.868 Add UC on provisioning WLAN informaton to eNB for collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.9Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| approved | No | S5‑174125 | |
S5‑174451 | pCR TR 32.871 adding the deployment use case | China Mobile | pCR | Approval |
6.6.10Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| approved | No | S5‑174257 | |
S5‑174452 | pCR TR 32.871 adding the deployment requirements | China Mobile M2M Company Ltd. | pCR | Approval |
6.6.10Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| approved | No | S5‑174258 | |
S5‑174453 | pCR TR 32.871 adding the policy operation requirements | China Mobile M2M Company Ltd. | pCR | Approval |
6.6.10Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| approved | No | S5‑174259 | |
S5‑174454 | pCR TR 32.871 adding the general process | China Mobile M2M Company Ltd. | pCR | Approval |
6.6.10Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| approved | No | S5‑174260 | |
S5‑174455 | Draft TR 32.871 | China Mobile | draft TR | Approval |
6.6.10Study on network policy management for mobile networks based on NFV scenarios
| No |
Yes
| left for email approval | No | ||
S5‑174456 | TR 32.972 skeleton | ORANGE | draft TR | Agreement |
6.6.11Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| approved | No | S5‑174066 | |
S5‑174457 | pCR TS 32.972 – About EE KPIs and metrics | ORANGE | pCR | Agreement |
6.6.11Study on system and functional aspects of Energy Efficiency in 5G networks
| No |
Yes
| left for email approval | No | S5‑174083 | |
S5‑174458 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Approval |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| No |
Yes
| left for email approval | No | S5‑174412 | |
S5‑174459 | CR TS 32.404 Add new collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Agreement |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| No |
Yes
| left for email approval | No | S5‑174127 | |
S5‑174460 | CR TS 32.409 Add VR related measurements for IMS NFs | Intel Corporation (UK) Ltd | CR | Agreement |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| No |
Yes
| left for email approval | No | S5‑174341 | |
S5‑174461 | CR TS 32.426 Add VR related measurements for EPC NFs | Intel Corporation (UK) Ltd | CR | Agreement |
6.4.1.1Performance management for mobile networks that include virtualized network functions
| No |
Yes
| left for email approval | No | S5‑174342 | |
S5‑174462 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N | China Mobile Com. Corporation | pCR | - |
6.6.1Study on Implementation for the Partitioning of Itf-N
| Yes |
Yes
| revised | No | S5‑174487 | S5‑174416 |
S5‑174463 | pCR 28.800 Key issues to be considered for 5G management architecture options | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | S5‑174396 | |
S5‑174464 | pCR 28.800 Add use case of management and orchestration architecture for management of communication service | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | S5‑174399 | |
S5‑174465 | pCR 28.800 Interface for service management | Huawei | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | S5‑174403 | |
S5‑174466 | pCR 28.800 Mapping requirements between 5G management architecture and NFV-MANO architecture | Huawei,SK Telekom | pCR | Approval |
6.6.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | S5‑174401 | |
S5‑174467 | pCR to 28.801 Definitions | Cisco Systems Inc. | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑174362 | |
S5‑174468 | pCR 28.801 proposal for handling editor’s notes in clause 4 | Ericsson Limited,Huawei, China Unicom | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑174365 | |
S5‑174469 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 | Huawei, China Unicom, Ericsson | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑174369 | |
S5‑174470 | pCR 28.801 add conclusions and recommendations | Ericsson Limited,Huawei | pCR | Approval |
6.6.3Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑174395 | |
S5‑174471 | pCR 28.802 Introduction of edge computing management | Huawei | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| No |
Yes
| left for email approval | No | S5‑174411 | |
S5‑174472 | pCR 28.802 Add potential solution for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| No |
Yes
| left for email approval | No | S5‑174409 | |
S5‑174473 | pCR 28.802 Add conclusion and recommendation for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| No |
Yes
| left for email approval | No | S5‑174410 | |
S5‑174474 | pCR 28.802 Add use cases to support management for AMF Set | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| No |
Yes
| left for email approval | No | S5‑174419 | |
S5‑174475 | pCR 28.802 Add potential solution for AMF Set management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| No |
Yes
| left for email approval | No | S5‑174420 | |
S5‑174476 | pCR 28.802 Update the usage of terminology of “NF” and “NF instance” | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
6.6.4Study on management aspects of next generation network architecture and features
| No |
Yes
| left for email approval | No | S5‑174407 | |
S5‑174477 | Draft TR 32.864 | Intel | draft TR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| No |
Yes
| left for email approval | No | ||
S5‑174478 | pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| No |
Yes
| left for email approval | No | S5‑174440 | |
S5‑174479 | pCR TR 32.864 Add potential solution for updating transport network requirements | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| No |
Yes
| left for email approval | No | S5‑174444 | |
S5‑174480 | pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| No |
Yes
| left for email approval | No | S5‑174445 | |
S5‑174481 | pCR TR 32.864 Add conclusions | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| No |
Yes
| left for email approval | No | S5‑174446 | |
S5‑174482 | Presentation sheet TR 32.864 for information | Intel | TS or TR cover | Approval |
6.6.7Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | ||
S5‑174483 | Draft TR 32.867 | Huawei | draft TR | Approval |
6.6.8Study on Management Enhancement of CUPS of EPC Nodes
| No |
Yes
| left for email approval | No | ||
S5‑174484 | pCR TR 32.868 Add LWA overview and concept | Intel Corporation (UK) Ltd | pCR | Approval |
6.6.9Study on OAM aspects of LTE and WLAN integration
| No |
Yes
| left for email approval | No | S5‑174449 | |
S5‑174485 | Draft TR 32.868 | Intel | draft TR | Approval |
6.6.9Study on OAM aspects of LTE and WLAN integration
| No |
Yes
| left for email approval | No | ||
S5‑174486 | Draft TR 32.972 | ORANGE | draft TR | Approval |
6.6.11Study on system and functional aspects of Energy Efficiency in 5G networks
| No |
Yes
| left for email approval | No | ||
S5‑174487 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N | China Mobile Com. Corporation | pCR | - |
6.6.1Study on Implementation for the Partitioning of Itf-N
| No |
Yes
| left for email approval | No | S5‑174462 | |
S5‑174488 | OAM Executive Report from THIS Meeting | WG Vice Chair (Huawei) | report | - |
6.1OAM&P Plenary
| No |